National Library of Energy BETA

Sample records for line cxs applied

  1. Applying a Modified Triad Approach to Investigate Wastewater lines

    SciTech Connect

    Pawlowicz, R.; Urizar, L.; Blanchard, S.; Jacobsen, K.; Scholfield, J.

    2006-07-01

    Approximately 20 miles of wastewater lines are below grade at an active military Base. This piping network feeds or fed domestic or industrial wastewater treatment plants on the Base. Past wastewater line investigations indicated potential contaminant releases to soil and groundwater. Further environmental assessment was recommended to characterize the lines because of possible releases. A Remedial Investigation (RI) using random sampling or use of sampling points spaced at predetermined distances along the entire length of the wastewater lines, however, would be inefficient and cost prohibitive. To accomplish RI goals efficiently and within budget, a modified Triad approach was used to design a defensible sampling and analysis plan and perform the investigation. The RI task was successfully executed and resulted in a reduced fieldwork schedule, and sampling and analytical costs. Results indicated that no major releases occurred at the biased sampling points. It was reasonably extrapolated that since releases did not occur at the most likely locations, then the entire length of a particular wastewater line segment was unlikely to have contaminated soil or groundwater and was recommended for no further action. A determination of no further action was recommended for the majority of the waste lines after completing the investigation. The modified Triad approach was successful and a similar approach could be applied to investigate wastewater lines on other United States Department of Defense or Department of Energy facilities. (authors)

  2. Apply

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Applied Studies and Technology (AS&T) Applied Studies and Technology (AS&T) Applied Studies and Technology (AS&T) DOE established the Environmental Sciences Laboratory (ESL) in Grand Junction, Colorado, in 1991 to support its programs. ESL scientists perform applied research and laboratory-scale demonstrations of soil and groundwater remediation and treatment technologies. Capabilities Installation, monitoring, and operation of permeable reactive barriers Research of permeable

  3. Apply

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Apply Application Process Bringing together top space science students with internationally recognized researchers at Los Alamos in an educational and collaborative atmosphere. ...

  4. CX-012645: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wenatchee District 2014 Transmission Line Maintenance - Multiple Lines CX(s) Applied: B1.3Date: 41862 Location(s): WashingtonOffices(s): Bonneville Power Administration

  5. CX-012647: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kalispell District 2014 Transmission Line Maintenance - Multiple Lines CX(s) Applied: B1.3Date: 41862 Location(s): MontanaOffices(s): Bonneville Power Administration

  6. CX-012587: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    HB-Line Security Upgrades CX(s) Applied: B1.3Date: 41835 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  7. CX-008144: Categorical Exclusion Determination

    Energy.gov [DOE]

    Planned Repair of Flow Lines CX(s) Applied: B5.4 Date: 08/09/2011 Location(s): Wyoming Offices(s): RMOTC

  8. CX-010091: Categorical Exclusion Determination

    Energy.gov [DOE]

    Power Line Configuration 2013-1 CX(s) Applied: B4.13 Date: 04/15/2012 Location(s): Idaho Offices(s): Nuclear Energy

  9. CX-012637: Categorical Exclusion Determination

    Energy.gov [DOE]

    LURR 20140521 - David King - Sewer Line Installation CX(s) Applied: B4.9Date: 41876 Location(s): OregonOffices(s): Bonneville Power Administration

  10. CX-012791: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Grizzly Captain Jack Transmission Line Access Road Acquisition CX(s) Applied: B1.24Date: 41935 Location(s): OregonOffices(s): Bonneville Power Administration

  11. CX-010341: Categorical Exclusion Determination

    Energy.gov [DOE]

    Chandler Tap Line Reconductoring CX(s) Applied: B4.6 Date: 05/17/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  12. CX-010398: Categorical Exclusion Determination

    Energy.gov [DOE]

    Power Line Configuration CX(s) Applied: B4.13 Date: 04/25/2013 Location(s): Idaho Offices(s): Idaho Operations Office

  13. CX-011626: Categorical Exclusion Determination

    Energy.gov [DOE]

    Line Yard Fence Project CX(s) Applied: B1.11 Date: 06/05/2013 Location(s): Tennessee Offices(s): Y-12 Site Office

  14. CX-012795: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    North Bonneville Substation 23- Kilovolt Line Retermination CX(s) Applied: B4.11Date: 41926 Location(s): WashingtonOffices(s): Bonneville Power Administration

  15. CX-010727: Categorical Exclusion Determination

    Energy.gov [DOE]

    Dayton Tap Line Retirement CX(s) Applied: B4.10 Date: 08/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  16. CX-012371: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hawkins-Alvey Line Impairment CX(s) Applied: B1.3 Date: 05/08/2014 Location(s): Oregon Offices(s): Bonneville Power Administration

  17. Categorical Exclusion Determinations: Southwestern Power Administratio...

    Office of Environmental Management (EM)

    NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6 ... May 5, 2014 CX-012212: Categorical Exclusion Determination Doniphan Substation Backup ...

  18. Applied combustion

    SciTech Connect

    1993-12-31

    From the title, the reader is led to expect a broad practical treatise on combustion and combustion devices. Remarkably, for a book of modest dimension, the author is able to deliver. The text is organized into 12 Chapters, broadly treating three major areas: combustion fundamentals -- introduction (Ch. 1), thermodynamics (Ch. 2), fluid mechanics (Ch. 7), and kinetics (Ch. 8); fuels -- coal, municipal solid waste, and other solid fuels (Ch. 4), liquid (Ch. 5) and gaseous (Ch. 6) fuels; and combustion devices -- fuel cells (Ch. 3), boilers (Ch. 4), Otto (Ch. 10), diesel (Ch. 11), and Wankel (Ch. 10) engines and gas turbines (Ch. 12). Although each topic could warrant a complete text on its own, the author addresses each of these major themes with reasonable thoroughness. Also, the book is well documented with a bibliography, references, a good index, and many helpful tables and appendices. In short, Applied Combustion does admirably fulfill the author`s goal for a wide engineering science introduction to the general subject of combustion.

  19. Coherent soliton communication lines

    SciTech Connect

    Yushko, O. V. Redyuk, A. A.; Fedoruk, M. P.; Turitsyn, S. K.

    2014-11-15

    The data transmission in coherent fiber-optical communication lines using solitons with a variable phase is studied. It is shown that nonlinear coherent structures (solitons) can be applied for effective signal transmission over a long distance using amplitude and optical-phase keying of information. The optimum ratio of the pulse width to the bit slot at which the spectral efficiency (transmitted bits per second and hertz) is maximal is determined. It is shown that soliton fiber-optical communication lines can ensure data transmission at a higher spectral efficiency as compared to traditional communication lines and at a high signal-to-noise ratio.

  20. Line Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  1. Apply to the Cyclotron Institute REU Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    an advanced physicschemistry course. To apply for the REU Program, complete the 3 steps below: Fill out the on-line 2016 Cyclotron Institute REU Application Note: You will be...

  2. How To Apply

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CSCNSI How To Apply How to Apply for Computer System, Cluster, and Networking Summer Institute Emphasizes practical skills development Contact Leader Stephan Eidenbenz (505)...

  3. CX-011183: Categorical Exclusion Determination

    Energy.gov [DOE]

    Line Upgrade on Bonneville Power Administration’s Walla Walla-Pendleton Number 1 Transmission Line CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): Washington, Oregon Offices(s): Bonneville Power Administration

  4. CX-011996: Categorical Exclusion Determination

    Energy.gov [DOE]

    Line Tap Construction on the East Ellensburg Tap to Columbia-Ellensburg Transmission Line CX(s) Applied: B4.6 Date: 04/11/2014 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  5. CX-011717: Categorical Exclusion Determination

    Energy.gov [DOE]

    Line 3002 and 3002A Electrical Transmission Line Reconductoring Project CX(s) Applied: B2.5 Date: 05/22/2013 Location(s): Missouri, Missouri Offices(s): Southwestern Power Administration

  6. CX-014715: Categorical Exclusion Determination

    Energy.gov [DOE]

    Transmission Line Segment Modification, Line 3004, Structures 39, 39A, and 40 CX(s) Applied: B4.6Date: 02/26/2016 Location(s): MissouriOffices(s): Southwestern Power Administration

  7. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Plains and Eastern Clean Line Transmission Line: Comment from Change.org Plains and Eastern Clean Line Transmission Line: Comment from Mr. Leftwich Plains and Eastern Clean Line ...

  8. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Plains and Eastern Clean Line Transmission Line: Comment from Mr. Dyer Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line ...

  9. How to Apply

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Apply » How to Apply How to Apply Information and tips to help you apply for a career at the Laboratory Contact applyhelp@lanl.gov (505) 665-4444, opt. 1 Monday-Friday 8 am-5 pm Join the Lab team Access our application or browse jobs To apply for or browse jobs, go to iRecruitment at jobs.lanl.gov. Search for jobs three ways: Click any of the Quick Links to browse jobs in specific categories. Click a Job Category, then the Search button, for jobs in a single category. Tip: To select more than

  10. Line Equipment Operator

    Energy.gov [DOE]

    There are several Line Equipment Operator positions located in Washington and Oregon. A successful candidate in this position will perform Line Equipment Operator work operating trucks and all...

  11. Anonymous Help Line

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Anonymous Help Line Ombuds Anonymous Help Line Committed to the fair and equitable treatment of all employees, contractors, and persons doing business with the Laboratory. Contact...

  12. How To Apply

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    How To Apply How to Apply to the Computer System, Cluster, and Networking Summer Institute Emphasizes practical skills development. Contacts Program Lead Carolyn Connor (505) 665-9891 Email Professional Staff Assistant Nickole Aguilar Garcia (505) 665-3048 Email Applications are due on or before December 1, 2016. Undergraduate and graduate students in computer science, engineering, and information technology related majors are encouraged to apply. Must be a U.S. Citizen. 2017 Application

  13. Applied Computer Science

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 Applied Computer Science Innovative co-design of applications, algorithms, and architectures in order to enable scientific simulations at extreme scale Leadership Group Leader ...

  14. Applied & Computational Math

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    & Computational Math - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us ... Twitter Google + Vimeo GovDelivery SlideShare Applied & Computational Math HomeEnergy ...

  15. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Plains and Eastern Clean Line Transmission Line: Comment from Fallon Sanford Plains and Eastern Clean Line Transmission Line: Comment from Mr. Leftwich Plains and Eastern Clean ...

  16. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comment from Mr. Garrett Plains and Eastern Clean Line Transmission Line: Comment from Ms. Rutherford Plains and Eastern Clean Line Transmission Line: Comment from Ms. Campbell

  17. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clean Line: Arkansas and Oklahoma Plains and Eastern Clean Line Transmission Line: Comment from Block Plains and Eastern Clean Line: Arkansas and Oklahoma Comment submitted on ...

  18. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comment from Downwind, LLC Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line Transmission Line: Comment from Crystal Yarbrough

  19. Plains and Eastern Clean Line Transmission Line: Federal Register...

    Office of Environmental Management (EM)

    Plains and Eastern Clean Line Transmission Line: Federal Register Notice, Volume 80, No. 81 - April 28, 2015 Plains and Eastern Clean Line Transmission Line: Federal Register ...

  20. Applied Science/Techniques

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Applied ScienceTechniques Print The ALS is an excellent incubator of new scientific techniques and instrumentation. Many of the technical advances that make the ALS a world-class...

  1. X-ray line polarization spectroscopy of Li-like satellite line...

    Office of Scientific and Technical Information (OSTI)

    We apply the magnetic-sublevel atomic kinetics model POLAR to the calculation of polarization properties of satellite lines in Li-like Si driven by subpicosecond-duration laser ...

  2. Nuclear reactor overflow line

    DOEpatents

    Severson, Wayne J.

    1976-01-01

    The overflow line for the reactor vessel of a liquid-metal-cooled nuclear reactor includes means for establishing and maintaining a continuous bleed flow of coolant amounting to 5 to 10% of the total coolant flow through the overflow line to prevent thermal shock to the overflow line when the reactor is restarted following a trip. Preferably a tube is disposed concentrically just inside the overflow line extending from a point just inside the reactor vessel to an overflow tank and a suction line is provided opening into the body of liquid metal in the reactor vessel and into the annulus between the overflow line and the inner tube.

  3. CX-008693: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Wood Pole Structure Replacements on the Chehalis-Centralia No. 2 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 06/20/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-010388: Categorical Exclusion Determination

    Energy.gov [DOE]

    Northern Illinois Center for Accelerator and Detector Development Extrusion Line Facility CX(s) Applied: B1.15 Date: 02/20/2013 Location(s): Illinois Offices(s): Fermi Site Office

  5. CX-013781: Categorical Exclusion Determination

    Energy.gov [DOE]

    Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line CX(s) Applied: B1.42Date: 07/09/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  6. CX-008709: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  7. CX-012182: Categorical Exclusion Determination

    Energy.gov [DOE]

    Saltstone Disposal Units 2, 3, and 5 Grout Line Modification CX(s) Applied: B1.3 Date: 04/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  8. CX-009534: Categorical Exclusion Determination

    Energy.gov [DOE]

    Construct New Transmission Line and Footings, Garrison Switchyard CX(s) Applied: B4.13 Date: 12/03/2012 Location(s): North Dakota Offices(s): Western Area Power Administration-Upper Great Plains Region

  9. CX-010145: Categorical Exclusion Determination

    Energy.gov [DOE]

    City of Sherwood Sewer Line Replacement Land Use Review Request CX(s) Applied: B4.9 Date: 04/25/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  10. CX-008879: Categorical Exclusion Determination

    Energy.gov [DOE]

    Pearl-Marion No.1 Line Tower 21/1 Bank Repair Project CX(s) Applied: B1.3 Date: 08/13/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  11. CX-008382: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bridgeport-Sidney 115 Kilovolt Line Rejected Pole Replacement CX(s) Applied: B1.3 Date: 03/16/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-010887: Categorical Exclusion Determination

    Energy.gov [DOE]

    Archer-Sidney 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 08/08/2013 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-011227: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bi-Annual "Live Line" Maintenance Training CX(s) Applied: B1.2 Date: 10/08/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  14. CX-011614: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Blue Mesa 115-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 12/04/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-014648: Categorical Exclusion Determination

    Energy.gov [DOE]

    Remove/Replace HB-Line Anion Column Colorimeters With Spectrophotometers CX(s) Applied: B2.2Date: 02/22/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  16. CX-013346: Categorical Exclusion Determination

    Energy.gov [DOE]

    Reroute 221-S Gas Chromatograph Common Return Line per J-DCF-S-03003 CX(s) Applied: B1.3Date: 12/04/2014 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  17. CX-013623: Categorical Exclusion Determination

    Energy.gov [DOE]

    Transmission Line Wood Pole Replacements and Access Road Maintenance within Bonneville Power Administration's the Dallas District CX(s) Applied: B1.3Date: 05/04/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  18. CX-013772: Categorical Exclusion Determination

    Energy.gov [DOE]

    Oracle-Saguaro 115 Kilovolt Transmission Line Routine Maintenance Project CX(s) Applied: B1.3Date: 05/04/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  19. CX-011650: Categorical Exclusion Determination

    Energy.gov [DOE]

    Parker-Gila 161 Kilovolt Transmission Line - Structure 109-8 Relocation CX(s) Applied: B1.3 Date: 12/18/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  20. CX-013582: Categorical Exclusion Determination

    Energy.gov [DOE]

    Provide a Rated Wall for HB-Line Stairwell #2, Storage Room and Fire Door CX(s) Applied: B2.5Date: 03/25/2015Location(s): South CarolinaOffices(s): Savannah River Operations Office

  1. CX-008386: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Bridgeport to Sydney 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/11/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-010577: Categorical Exclusion Determination

    Energy.gov [DOE]

    Peninsula Light Company Line and Load Interconnection Request L0308 (Amendment) CX(s) Applied: B4.12 Date: 07/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  3. CX-005844: Categorical Exclusion Determination

    Energy.gov [DOE]

    Peninsula Light Company Line and Load Interconnection Request L0308CX(s) Applied: B4.6Date: 05/05/2011Location(s): Mason County, WashingtonOffice(s): Bonneville Power Administration

  4. CX-011618: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kremmling-Windy Gap 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-011208: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Malta-Mount Elbert 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-011616: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gore Pass-Kremmling 138-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-011619: Categorical Exclusion Determination

    Energy.gov [DOE]

    Muddy Pass-Walden 69-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-011724: Categorical Exclusion Determination

    Energy.gov [DOE]

    Repair Corroded Flow Line Near 33-SX-11 CX(s) Applied: B5.4, B5.6 Date: 12/30/2013 Location(s): Wyoming Offices(s): RMOTC

  9. CX-013927: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Crystal 115 Kilovolt Transmission Line Herbicide Treatment Montrose County, CO CX(s) Applied: B1.3Date: 05/28/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-012084: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Snowy Range-Happy Jack 115-Kilovolt Transmission Line Structure Replacements CX(s) Applied: B1.3 Date: 03/10/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-008752: Categorical Exclusion Determination

    Energy.gov [DOE]

    Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line CX(s) Applied: B3.6 Date: 05/17/2012 Location(s): Idaho Offices(s): Idaho Operations Office

  12. CX-008171: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Install Extension of the Underground Natural Gas Line From Its Current Termination Point CX(s) Applied: B5.5 Date: 03/13/2012 Location(s): New York Offices(s): Brookhaven Site Office

  13. CX-011651: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hazard Tree Removal Along the Prescott Peacock 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 11/22/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  14. CX-012744: Categorical Exclusion Determination

    Energy.gov [DOE]

    Prescott Peacock Transmission Line- Insulator Repair at 3 Structures CX(s) Applied: B1.3Date: 41851 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  15. CX-012108: Categorical Exclusion Determination

    Energy.gov [DOE]

    Telephone Line Removal Along the Access Road into Wautoma Substation CX(s) Applied: B1.3 Date: 03/17/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  16. CX-009862: Categorical Exclusion Determination

    Energy.gov [DOE]

    Building 4 Drain Line Replacement CX(s) Applied: B1.3, B1.15, B1.31 Date: 01/08/2013 Location(s): Oregon Offices(s): National Energy Technology Laboratory

  17. CX-010685: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hayden Substation 230-kilovolt Tie Line CX(s) Applied: B4.6 Date: 07/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-012077: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Craig to Hayden 230-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/21/2014 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-008881: Categorical Exclusion Determination

    Energy.gov [DOE]

    Disposition of Mountain Avenue Tap Line Sectionalizing Switches CX(s) Applied: B1.24 Date: 08/08/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  20. CX-008686: Categorical Exclusion Determination

    Energy.gov [DOE]

    Disposition of Mountain Avenue Substation and Tap Line CX(s) Applied: B1.24 Date: 07/11/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  1. CX-014149: Categorical Exclusion Determination

    Energy.gov [DOE]

    Snohomish-Beverly Park #3 and #4 Line Structure Replacements CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration

  2. CX-013307: Categorical Exclusion Determination

    Energy.gov [DOE]

    Vera Tap to Trentwood-Valley Transmission Line Rebuild CX(s) Applied: B4.13Date: 01/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  3. CX-014325: Categorical Exclusion Determination

    Energy.gov [DOE]

    Dome-Wellton-Mohawk-Ligurta Line Maintenance CX(s) Applied: B1.3Date: 09/14/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  4. CX-012404: Categorical Exclusion Determination

    Energy.gov [DOE]

    Palisades-Swan Valley Transmission Line Rebuild CX(s) Applied: B4.13 Date: 06/30/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  5. CX-008707: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bettas Road-Columbia No. 1 230 Kilovolt Transmission Line Thermal Upgrade CX(s) Applied: B4.13 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  6. CX-007819: Categorical Exclusion Determination

    Energy.gov [DOE]

    Yellowtail Dam Tie Lines CX(s) Applied: B2.5, B4.6 Date: 01/25/2012 Location(s): Montana Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-014371: Categorical Exclusion Determination

    Energy.gov [DOE]

    Ross-Lexington Transmission Line Corridor Lease for Horse Pasture and Garden CX(s) Applied: B4.9Date: 12/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  8. CX-014370: Categorical Exclusion Determination

    Energy.gov [DOE]

    Orchard Tree Planting within North Bonneville-Ross No. 1 Transmission Line corridor - LURR 20150270 CX(s) Applied: B4.9Date: 12/04/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  9. CX-100493 Categorical Exclusion Determination

    Energy.gov [DOE]

    Integrated Glass Coating Manufacturing Line Award Number: DE-EE0006810 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 09/11/2014 Location(s): CA Office(s): Golden Field Office

  10. CX-009801: Categorical Exclusion Determination

    Energy.gov [DOE]

    Copper Mountain to Boysen 34.5 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 01/11/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-012740: Categorical Exclusion Determination

    Energy.gov [DOE]

    Insulator Replacements for the Flagstaff to Pinnacle Peak #1 and #2 345 Kilovolt Transmission Lines CX(s) Applied: B1.3Date: 41821 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  12. CX-010439: Categorical Exclusion Determination

    Energy.gov [DOE]

    Routine Maintenance on the Colville-Republic Number 1 Transmission Line CX(s) Applied: B1.3 Date: 05/30/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  13. CX-008867: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Hill Recycle Line Repair CX(s) Applied: B1.3 Date: 07/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  14. CX-012072: Categorical Exclusion Determination

    Energy.gov [DOE]

    Archer-Cheyenne North/South 115-kilovolt Transmission Line Structure Replacement CX(s) Applied: B4.13 Date: 03/18/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-010146: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bald Mountain, Miller Peak, Lines Creek, and Taft Passive Repeater Communication Upgrades CX(s) Applied: B1.19 Date: 04/24/2013 Location(s): Montana, Montana, Idaho Offices(s): Bonneville Power Administration

  16. CX-011494: Categorical Exclusion Determination

    Energy.gov [DOE]

    Remove Failed Waste Transfer Drain Line 1533 CX(s) Applied: B1.3 Date: 11/05/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  17. CX-007750: Categorical Exclusion Determination

    Energy.gov [DOE]

    Highlands Trail in the Longview-Cowlitz Number 1 Transmission Line Right-of-Way CX(s) Applied: B4.9 Date: 12/21/2011 Location(s): Washington Offices(s): Bonneville Power Administration

  18. CX-012078: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on the Great Cut Tap 115-Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 02/20/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-012086: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wray-Wray Tap 115-Kilovolt Transmission Line Construction CX(s) Applied: B4.12 Date: 02/28/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-009409: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gering-Gering Valley 34.5 Kilovolt Transmission Line Underground Installation CX(s) Applied: B4.13 Date: 10/02/2012 Location(s): Nebraska Offices(s): Western Area Power Administration

  1. CX-011210: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bridgeport-Gering 115-Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-012642: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Snohomish-Beverly Park #3 and #4 Line Structure Replacements CX(s) Applied: B1.3Date: 41865 Location(s): WashingtonOffices(s): Bonneville Power Administration

  3. CX-013638: Categorical Exclusion Determination

    Energy.gov [DOE]

    North Marion-Sullivan No. 1. 57-Kilovolt Line Reinforcement Funding CX(s) Applied: B1.3Date: 04/21/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  4. CX-011689: Categorical Exclusion Determination

    Energy.gov [DOE]

    Fence Replacement on the Latham Tap Transmission Line Corridor CX(s) Applied: B1.3 Date: 11/29/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  5. CX-007791: Categorical Exclusion Determination

    Energy.gov [DOE]

    Idalia to Asherville Transmission Line Reconductoring Project CX(s) Applied: B4.6 Date: 10/13/2011 Location(s): Missouri Offices(s): Southwestern Power Administration

  6. CX-010737: Categorical Exclusion Determination

    Energy.gov [DOE]

    Insulator Replacement on Bonneville Power Administration's (BPA) North Bonneville-Midway No. 1 Transmission Line CX(s) Applied: B4.6 Date: 07/16/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  7. CX-012823: Categorical Exclusion Determination

    Energy.gov [DOE]

    Rocky Reach-Maple Valley #1 Line Bridge Installation CX(s) Applied: B1.3Date: 41873 Location(s): WashingtonOffices(s): Bonneville Power Administration

  8. CX-013634: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Access Road Easement Acquisition for Midway-Moxee and Midway-Grandview Transmission Lines CX(s) Applied: B1.24Date: 04/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  9. CX-013791: Categorical Exclusion Determination

    Energy.gov [DOE]

    St. Johns-St. Helens Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  10. CX-008406: Categorical Exclusion Determination

    Energy.gov [DOE]

    Structure Replacement Flaming Gorge-Vernal No.3 138 Kilovolt Transmission Line CX(s) Applied: B4.6 Date: 03/06/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-008400: Categorical Exclusion Determination

    Energy.gov [DOE]

    Estes Park to Mary's Lake West 115 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-010137: Categorical Exclusion Determination

    Energy.gov [DOE]

    Correct Obstruction in the Sprinkler System on Level 3 of HB-Line CX(s) Applied: B2.5 Date: 03/11/2013 Location(s): South Carolina Offices(s): Savannah River Operations Office

  13. CX-008772: Categorical Exclusion Determination

    Energy.gov [DOE]

    Buried Flow Line from 32-A-34 to 34-AX-34 CX(s) Applied: B2.5, B5.2, B5.4 Date: 07/17/2012 Location(s): Wyoming Offices(s): RMOTC

  14. CX-009072: Categorical Exclusion Determination

    Energy.gov [DOE]

    Modify the HB-Line Can Inerting System CX(s) Applied: B1.31 Date: 07/20/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  15. CX-013941: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kayenta-Navajo 230 Kilovolt Transmission Line Insulator Replacement Navajo County AZ CX(s) Applied: B1.3Date: 02/24/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-009411: Categorical Exclusion Determination

    Energy.gov [DOE]

    Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration

  17. CX-008768: Categorical Exclusion Determination

    Energy.gov [DOE]

    Buried Power Line to 64-SX-3 CX(s) Applied: B1.3, B4.6, B4.12 Date: 05/17/2012 Location(s): Wyoming Offices(s): RMOTC

  18. CX-012112: Categorical Exclusion Determination

    Energy.gov [DOE]

    Chehalis-Mayfield Number 1 Line Impairment Structure Replacements CX(s) Applied: B1.3 Date: 04/03/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  19. CX-011529: Categorical Exclusion Determination

    Energy.gov [DOE]

    Usk-Boundary No. 1 Transmission Line Impairment Remediation CX(s) Applied: B1.3 Date: 10/15/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  20. CX-012605: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Replacement Air Dryer for the HB-Line Breathing Air System CX(s) Applied: B1.3Date: 41810 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  1. CX-013795: Categorical Exclusion Determination

    Energy.gov [DOE]

    Ellensburg-Moxee Line Impairment Correction CX(s) Applied: B4.11Date: 06/17/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  2. CX-011209: Categorical Exclusion Determination

    Energy.gov [DOE]

    Archer-North Park 230-Kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 09/10/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-008163: Categorical Exclusion Determination

    Energy.gov [DOE]

    Portland General Electric 13-Kilovolt Overhead Electrical Line Land Use Review Request CX(s) Applied: B4.9 Date: 03/28/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  4. CX-010098: Categorical Exclusion Determination

    Energy.gov [DOE]

    Phoenix to Lone Butte 230 Kilovolt Transmission Line, Bird Diverter Installation CX(s) Applied: B1.3 Date: 04/08/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Desert Southwest Region

  5. CX-011179: Categorical Exclusion Determination

    Energy.gov [DOE]

    Alvey-Lane #1 Transmission Line Access Road Maintenance CX(s) Applied: B1.3 Date: 09/12/2013 Location(s): Oregon Offices(s): Bonneville Power Administration

  6. CX-013305: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace Buckling Tower 1/9 on the Raymond-Henkle Street Number 1 Line CX(s) Applied: B4.13Date: 01/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  7. CX-012734: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bouse Hills Pumping Plant to Harcuvar 115 Kilovolt Transmission Line, Inset Structure Installation CX(s) Applied: B4.6Date: 41878 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  8. CX-014188: Categorical Exclusion Determination

    Energy.gov [DOE]

    Fiscal year 2015 Wood Pole Replacements along the Libby-Bonners Ferry Transmission Line CX(s) Applied: B1.3Date: 08/10/2015 Location(s): IdahoOffices(s): Bonneville Power Administration

  9. CX-012764: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kayenta-Navajo 230 Kilovolt Transmission Line Access Road Maintenance Coconini and Navajo Counties, Arizona CX(s) Applied: B1.3Date: 41872 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-012762: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gore Pass-Kremmling 138 Kilovolt Transmission Line Maintenance Grand County, Colorado CX(s) Applied: B1.3Date: 41834 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-012750: Categorical Exclusion Determination

    Energy.gov [DOE]

    Canon West-Poncha 230 Kilovolt Transmission Line Road Maintenance Chaffee and Fremont Counties, Colorado CX(s) Applied: B1.3Date: 41878 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-008690: Categorical Exclusion Determination

    Energy.gov [DOE]

    Lancaster Line and Load Project CX(s) Applied: B4.6, B4.7 Date: 06/28/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

  13. CX-011852: Categorical Exclusion Determination

    Energy.gov [DOE]

    Blythe-Knob 161 Kilovolt Transmission Line, Structure Maintenance Project CX(s) Applied: B1.3 Date: 01/21/2014 Location(s): California, California Offices(s): Western Area Power Administration-Desert Southwest Region

  14. CX-012394: Categorical Exclusion Determination

    Energy.gov [DOE]

    Remove HEPA Filters From The Old HB-Line Exhaust System CX(s) Applied: B2.5 Date: 05/08/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  15. CX-007787: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Line Relocation Project for Farrell Cooper Mining Company CX(s) Applied: B4.13 Date: 01/04/2012 Location(s): Oklahoma Offices(s): Southwestern Power Administration

  16. CX-012085: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Urban Transmission Line Hazard Tree Management CX(s) Applied: B1.3 Date: 03/06/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  17. CX-006597: Categorical Exclusion Determination

    Energy.gov [DOE]

    Vermont Biofuels Initiative: State Line Biofuels 09CX(s) Applied: B5.1Date: 08/29/2011Location(s): North Bennington, VermontOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  18. CX-008377: Categorical Exclusion Determination

    Energy.gov [DOE]

    Alcova-Casper North 115 Kilovolt Transmission Line Pole Replacements CX(s) Applied: B1.3 Date: 04/10/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-013615: Categorical Exclusion Determination

    Energy.gov [DOE]

    Keeler-Forest Grove Transmission Line Structure Relocations CX(s) Applied: B4.6Date: 06/03/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  20. CX-008770: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Buried Power Line at Customer Operations Center CX(s) Applied: B1.3, B4.6, B4.12 Date: 06/08/2012 Location(s): Wyoming Offices(s): RMOTC

  1. CX-011211: Categorical Exclusion Determination

    Energy.gov [DOE]

    Box Butte-Chadron 115-Kilovolt Transmission Line Structure Replacements CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Nebraska, Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-013986: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Chehalis-Mayfield No. 1 Line Local Area Protection Scheme Project CX(s) Applied: B1.7, B2.2Date: 07/22/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  3. CX-007985: Categorical Exclusion Determination

    Energy.gov [DOE]

    Acquisition of Cowlitz County Public Utility District's 115-Kilovolt Transmission Line CX(s) Applied: B1.24 Date: 02/24/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-009221: Categorical Exclusion Determination

    Energy.gov [DOE]

    Rerouting of Power Lines at 100-D Reactor in Support of Site Remediation CX(s) Applied: B4.13 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office

  5. CX-010686: Categorical Exclusion Determination

    Energy.gov [DOE]

    Cheyenne Substation KV2A 115-kilovolt Tie Line Installation CX(s) Applied: B4.6 Date: 07/02/2013 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-012815: Categorical Exclusion Determination

    Energy.gov [DOE]

    Sale of Penwalt Tap to PGE Harborton-Station E Line CX(s) Applied: B1.24Date: 41892 Location(s): OregonOffices(s): Bonneville Power Administration

  7. CX-011235: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Inspection and Treatment - Routine Transmission Line Maintenance CX(s) Applied: B1.3 Date: 10/24/2013 Location(s): CX: none Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-010880: Categorical Exclusion Determination

    Energy.gov [DOE]

    Transmission Line 3016, Access Road Acquisition Project CX(s) Applied: B1.24 Date: 07/25/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration

  9. CX-012092: Categorical Exclusion Determination

    Energy.gov [DOE]

    Tucson-Apache 115-Kilovolt Transmission Line Structure Stabilization Project CX(s) Applied: B1.3 Date: 09/06/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  10. CX-007625: Categorical Exclusion Determination

    Energy.gov [DOE]

    Flush Fire Water Distribution Lines to Remove Sediment CX(s) Applied: B1.3 Date: 01/24/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  11. CX-012232: Categorical Exclusion Determination

    Energy.gov [DOE]

    Swan Valley-Teton Overhead Fiber Line Install CX(s) Applied: B4.6 Date: 06/02/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  12. CX-013909: Categorical Exclusion Determination

    Energy.gov [DOE]

    NERC Alert Phase III Transmission Line Structure Replacement Project CX(s) Applied: B4.6Date: 04/16/2015 Location(s): OklahomaOffices(s): Southwestern Power Administration

  13. CX-013991: Categorical Exclusion Determination

    Energy.gov [DOE]

    Correction of Western Oregon Line Impairments CX(s) Applied: B1.3Date: 07/20/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  14. CX-012741: Categorical Exclusion Determination

    Energy.gov [DOE]

    Liberty-Westwing 230 Kilovolt Transmission Line Insulator Replacement CX(s) Applied: B1.3Date: 41795 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  15. CX-012736: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    ED2-ED4 Transmission Line Rebuild Project CX(s) Applied: B1.3Date: 41648 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  16. CX-014167: Categorical Exclusion Determination

    Energy.gov [DOE]

    HB-Line Vessel Vent System (VVS) Valves; V-780 and V-784 CX(s) Applied: B2.5Date: 05/21/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  17. CX-011648: Categorical Exclusion Determination

    Energy.gov [DOE]

    Davis-Parker 230 Kilovolt Transmission Line- Marker Ball(s) Replacement CX(s) Applied: B1.3 Date: 12/17/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  18. CX-013887: Categorical Exclusion Determination

    Energy.gov [DOE]

    HB-Line Vessel Vent System (VVS) Valves; V-780 and V-784 CX(s) Applied: B2.5Date: 05/21/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  19. CX-012509: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Potable Water and Fire Water Supply Line Replacement CX(s) Applied: B1.3, B2.5Date: 41849 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory

  20. CX-008408: Categorical Exclusion Determination

    Energy.gov [DOE]

    Torrington-Wildcat 69 Kilovolt Transmission Line Rebuild Project CX(s) Applied: B4.13 Date: 04/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  1. CX-013914: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Ault Craig 345 Kilovolt Transmission Line Vegetation Management Routt County, CO CX(s) Applied: B1.3Date: 05/28/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-013913: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Ault Craig 345 Kilovolt Transmission Line WCMO Vegetation Management Routt County, CO CX(s) Applied: B1.3Date: 06/01/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-010105: Categorical Exclusion Determination

    Energy.gov [DOE]

    Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 03/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-008381: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Thompson to Flatiron 13.8 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-009800: Categorical Exclusion Determination

    Energy.gov [DOE]

    Urban Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 01/15/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-012748: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Spring-Sydney 115 Kilovolt Transmission Line Pole Replacement Project, Deuel County, Nebraska CX(s) Applied: B1.3Date: 41845 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-009610: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Communication Line Installation Between Manhole F-39 and Building 221-12F CX(s) Applied: B1.7 Date: 11/27/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  8. CX-008687: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bandon-Rogue Transmission Line Rebuild Project - Fiscal Year 2012 Culvert Replacement and Associated Access Road Reconstruction CX(s) Applied: B1.3 Date: 07/06/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  9. CX-013422: Categorical Exclusion Determination

    Energy.gov [DOE]

    Maupin-Tygh Valley Transmission Line Rebuild CX(s) Applied: B4.10Date: 01/28/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  10. CX-008160: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacement on The Dalles-Discovery Number 1 Transmission Line CX(s) Applied: B1.3 Date: 04/23/2012 Location(s): Oregon Offices(s): Bonneville Power Administration

  11. CX-011206: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kayenta-Shiprock 230-Kilovolt Transmission Line Road Maintenance CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): Colorado, Colorado, New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-011205: Categorical Exclusion Determination

    Energy.gov [DOE]

    Lost Canyon-Shiprock 230-Kilovolt Transmission Line Road Maintenance CX(s) Applied: B1.3 Date: 08/30/2013 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-008380: Categorical Exclusion Determination

    Energy.gov [DOE]

    Archer to Ault 230 Kilovolt Transmission Line Structure Replacement, Weld County, Colorado CX(s) Applied: B1.3 Date: 05/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-011653: Categorical Exclusion Determination

    Energy.gov [DOE]

    Saguaro-Tucson 115 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 12/03/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  15. CX-010545: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gila Knob Transmission Line Crossarm Replacement at Structure 18/3 CX(s) Applied: B4.6 Date: 06/03/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region

  16. CX-014142: Categorical Exclusion Determination

    Energy.gov [DOE]

    Install Blank on Line WEE-3222 after 242016F Overheads CX(s) Applied: B1.3Date: 06/30/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  17. Categorical Exclusion Determinations: B1.22 | Department of Energy

    Office of Environmental Management (EM)

    August 14, 2014 CX-012767: Categorical Exclusion Determination Medicine Bow Substation ... Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, ...

  18. Categorical Exclusion Determinations: B1.33 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Kiowa Creek-Weld 115-Kilovolt Transmission Line Culvert Replacement CX(s) Applied: B1.3, ... May 17, 2013 CX-010416: Categorical Exclusion Determination Substation Maintenance and ...

  19. CX-010879: Categorical Exclusion Determination

    Energy.gov [DOE]

    Transmission Line 3005, Structure 290 Replacement CX(s) Applied: B4.6 Date: 08/06/2013 Location(s): Oklahoma Offices(s): Southwestern Power Administration

  20. CX-007963: Categorical Exclusion Determination

    Energy.gov [DOE]

    Install a New Colorimeter on the NK-1/3 Raffinate Line CX(s) Applied: B2.2 Date: 02/09/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  1. CX-012370: Categorical Exclusion Determination

    Energy.gov [DOE]

    Pasco District Wood Pole Replacements (Multiple Lines) 2014 CX(s) Applied: B1.3 Date: 05/09/2014 Location(s): Washington, Washington, Oregon Offices(s): Bonneville Power Administration

  2. CX-008704: Categorical Exclusion Determination

    Energy.gov [DOE]

    Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

  3. CX-012342: Categorical Exclusion Determination

    Energy.gov [DOE]

    Liberty Parker #2 Transmission Line - Erosion Repair at Structure 53/1 CX(s) Applied: B4.6 Date: 06/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  4. CX-013982: Categorical Exclusion Determination

    Energy.gov [DOE]

    Chenoweth-Harvey Transmission Line Sale CX(s) Applied: B1.24Date: 07/23/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  5. Applied Cathode Enhancement and

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Applied Cathode Enhancement and Robustness Technologies (ACERT) Team Our project team, a part of Los Alamos National Laboratory (LANL) comprised of world leading experts from fields of accelerator design & testing, chemical synthesis of nanomaterials (quantum dots), and shielding application of nanomaterials (graphene and other atomically-thin sheets). Our goal is to develop and demonstrate 'designer' cold cathode electron sources with tunable parameters (bandgap, efficiency, optical

  6. Applied Computer Science

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 Applied Computer Science Innovative co-design of applications, algorithms, and architectures in order to enable scientific simulations at extreme scale Leadership Group Leader Linn Collins Email Deputy Group Leader David Daniel (Acting) Email Professional Assistant Erika Maestas 505-664-0673 Email Climate modeling visualization Results from a climate simulation computed using the Model for Prediction Across Scales (MPAS) code. This visualization shows the temperature of ocean currents using a

  7. Applied Modern Physics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ADEPS » Physics » P-21 Applied Modern Physics From the first bionic eye to airport scanners that detect liquid explosives, our expertise in developing advanced diagnostics results in real-world innovations. Contact Us Group Leader (acting) John George Email Deputy Group Leader Larry Schultz Email Group Office (505) 665-2545 Email QkarD Quantum key distribution technology could ensure truly secure commerce, banking, communications and data transfer. Read more... A history of excellence in the

  8. Applied ALARA techniques

    SciTech Connect

    Waggoner, L.O.

    1998-02-05

    The presentation focuses on some of the time-proven and new technologies being used to accomplish radiological work. These techniques can be applied at nuclear facilities to reduce radiation doses and protect the environment. The last reactor plants and processing facilities were shutdown and Hanford was given a new mission to put the facilities in a safe condition, decontaminate, and prepare them for decommissioning. The skills that were necessary to operate these facilities were different than the skills needed today to clean up Hanford. Workers were not familiar with many of the tools, equipment, and materials needed to accomplish:the new mission, which includes clean up of contaminated areas in and around all the facilities, recovery of reactor fuel from spent fuel pools, and the removal of millions of gallons of highly radioactive waste from 177 underground tanks. In addition, this work has to be done with a reduced number of workers and a smaller budget. At Hanford, facilities contain a myriad of radioactive isotopes that are 2048 located inside plant systems, underground tanks, and the soil. As cleanup work at Hanford began, it became obvious early that in order to get workers to apply ALARA and use hew tools and equipment to accomplish the radiological work it was necessary to plan the work in advance and get radiological control and/or ALARA committee personnel involved early in the planning process. Emphasis was placed on applying,ALARA techniques to reduce dose, limit contamination spread and minimize the amount of radioactive waste generated. Progress on the cleanup has,b6en steady and Hanford workers have learned to use different types of engineered controls and ALARA techniques to perform radiological work. The purpose of this presentation is to share the lessons learned on how Hanford is accomplishing radiological work.

  9. Series Transmission Line Transformer

    DOEpatents

    Buckles, Robert A.; Booth, Rex; Yen, Boris T.

    2004-06-29

    A series transmission line transformer is set forth which includes two or more of impedance matched sets of at least two transmissions lines such as shielded cables, connected in parallel at one end ans series at the other in a cascading fashion. The cables are wound about a magnetic core. The series transmission line transformer (STLT) which can provide for higher impedance ratios and bandwidths, which is scalable, and which is of simpler design and construction.

  10. MMW Drilling & Lining

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MMW Drilling & Lining PI & Presenter: Ken Oglesby Impact Technologies LLC SubRecipient: MIT- Dr.Woskov, Dr.Einstein Research & Development Track Project Officers: Ava Coy & Erik ...

  11. Transmission Business Line

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Transmission Business Line Non-Federal Financing of Transmission Projects - March 2004 Critical paths on the Northwest transmission grid are congested and the system is near or at...

  12. Plains and Eastern Clean Line Transmission Line: Comment from Marshall

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hughes | Department of Energy from Marshall Hughes Plains and Eastern Clean Line Transmission Line: Comment from Marshall Hughes Comment submitted on updated Part 2 application. Comment from Marshall Hughes 07-10-15.pdf (14.91 KB) More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Mr. Dyer Plains and Eastern Clean Line Transmission Line: Comment from Sheila Beck Plains and Eastern Clean Line Transmission Line: Comment from Patti McCutchen

  13. Transmission Line Security Monitor

    ScienceCinema

    None

    2016-07-12

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  14. Transmission Line Security Monitor

    SciTech Connect

    2011-01-01

    The Transmission Line Security Monitor is a multi-sensor monitor that mounts directly on high-voltage transmission lines to detect, characterize and communicate terrorist activity, human tampering and threatening conditions around support towers. For more information about INL's critical infrastructure protection research, visit http://www.facebook.com/idahonationallaboratory.

  15. Information Science, Computing, Applied Math

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Information Science, Computing, Applied Math Information Science, Computing, Applied Math National security depends on science and technology. The United States relies on Los ...

  16. ORISE: Applied health physics projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Applied health physics projects The Oak Ridge Institute for Science and Education (ORISE) provides applied health physics services to government agencies needing technical support ...

  17. Flow line sampler

    DOEpatents

    Nicholls, Colin I.

    1992-07-14

    An on-line product sampling apparatus and method for measuring product samples from a product stream (12) in a flow line (14) having a sampling aperture (11), includes a sampling tube (18) for containing product samples removed from flow line (14). A piston (22) removes product samples from the product stream (12) through the sampling aperture (11) and returns samples to product stream (12). A sensor (20) communicates with sample tube (18), and senses physical properties of samples while the samples are within sample tube (18). In one embodiment, sensor (20) comprises a hydrogen transient nuclear magnetic resonance sensor for measuring physical properties of hydrogen molecules.

  18. Corona losses in HVdc bipolar lines

    SciTech Connect

    Corbellini, U.; Pelacchi, P.

    1996-07-01

    The problem related to the prediction of corona losses in HVdc bipolar lines has been solved, in the past, by means of semi-empirical monomial formulae. However, the proposed formulae that are simpler to use do not always give adequate calculation precision, while the formulae that provide the closest results require implicit functions of different complexity, which are difficult to apply; moreover, it is not possible to understand clearly what influence the variations of the different line parameters have on the losses themselves. The new monomial semi-empirical relationship, proposed to predict the corona losses in HVdc bipolar lines, is very simple to use; it highlights the dependence of power losses due to the corona effect by the different line parameters. The formula has been developed by elaborating a considerable amount of available experimental data.

  19. Temperatures in the blast furnace refractory lining

    SciTech Connect

    Hebel, R.; Streuber, C.; Steiger, R.; Jeschar, R.

    1995-12-01

    The campaign life duration of a blast furnace is mainly determined by the condition of the refractory lining in heavy-duty zones such as the hearth, bosh, belly and lower stack. To achieve a desired lifetime, the temperature of the lining in these areas thereby proved to be the decisive controllable parameter. Low operating temperatures result in prolonged service life and are attained through high cooling efficiency. Besides the refractory grade chosen, the wear profile is mainly determined by the type of cooling system applied and the cooling intensity. Therefore, an appropriate compromise between long service life and energy losses has to be found in each case. In order to predict the service life of a lining it is important to know the wear condition at all times during the campaign. The paper describes the approaches the authors have made so far on European blast furnaces, on a theoretical and practical basis, on how to analyze the lining wear.

  20. Lineman (Live Line)

    Energy.gov [DOE]

    There are several Lineman (Liveline) positions located in Spokane, Washington. A successful candidate in this position will perform construction and maintenance work for live-line on wood and steel...

  1. Line Extension Alternatives

    Energy.gov [DOE]

    The Public Service Board (PSB) of Vermont developed rules regarding utility line extension requests. While the majority of the rules focus on the procedure followed (and associated fees) for the...

  2. Maersk Line Equipment guide

    National Nuclear Security Administration (NNSA)

    Maersk Line containers has an average age of less than six years and a stringent maintenance programme ensures they are always ready for service. Each container in our fleet...

  3. Power line detection system

    DOEpatents

    Latorre, V.R.; Watwood, D.B.

    1994-09-27

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard. 4 figs.

  4. Power line detection system

    DOEpatents

    Latorre, Victor R.; Watwood, Donald B.

    1994-01-01

    A short-range, radio frequency (RF) transmitting-receiving system that provides both visual and audio warnings to the pilot of a helicopter or light aircraft of an up-coming power transmission line complex. Small, milliwatt-level narrowband transmitters, powered by the transmission line itself, are installed on top of selected transmission line support towers or within existing warning balls, and provide a continuous RF signal to approaching aircraft. The on-board receiver can be either a separate unit or a portion of the existing avionics, and can also share an existing antenna with another airborne system. Upon receipt of a warning signal, the receiver will trigger a visual and an audio alarm to alert the pilot to the potential power line hazard.

  5. Transmission line capital costs

    SciTech Connect

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  6. Polymer delineation system. [Patent application: traffic lane lines

    DOEpatents

    Woolman, S.; Steinberg, M.

    1975-06-24

    A delineation system (traffic lane lines) for highways is described in which polymerizable substances are applied to existing or newly prepared highway pavements. The substances would contain a suitable pigment and may incorporate reflective elements.

  7. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2013-04-04

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities.

  8. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Comment submitted on updated Part 2 application. PDF icon Comment from Dr. Contreras ...

  9. Plains and Eastern Clean Line Transmission Line: Comment from...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ms. Callahan Plains and Eastern Clean Line Transmission Line: Comment from Ms. Callahan Comment submitted on updated Part 2 application. PDF icon Comment from Ms. Callahan ...

  10. Magnetically insulated transmission line oscillator

    DOEpatents

    Bacon, Larry D.; Ballard, William P.; Clark, M. Collins; Marder, Barry M.

    1988-01-01

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields arfe produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap.

  11. Magnetically insulated transmission line oscillator

    DOEpatents

    Bacon, L.D.; Ballard, W.P.; Clark, M.C.; Marder, B.M.

    1987-05-19

    A magnetically insulated transmission line oscillator employs self-generated magnetic fields to generate microwave energy. An anode of the oscillator includes slow-wave structures which are formed of a plurality of thin conductive vanes defining cavities therebetween, and a gap is formed between the anode and a cathode of the oscillator. In response to a pulsed voltage applied to the anode and cathode, self-generated magnetic fields are produced in a cross-field orientation with respect to the orientation of the electric field between the anode and the cathode. The cross-field magnetic fields insulate the flow of electrons in the gap and confine the flow of electrons within the gap. 11 figs.

  12. Applied Optoelectronics | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    optical semiconductor devices, packaged optical components, optical subsystems, laser transmitters, and fiber optic transceivers. References: Applied Optoelectronics1...

  13. Bonneville upgrades lines

    SciTech Connect

    Not Available

    1993-08-30

    A stretch of Bonneville Power Administration transmission line between Spokane and the Grand Coulee Dam is an 82-mile bottleneck as it is the last 115-kv section of [open quotes]road[close quotes] along a 500-kv transmission [open quotes]highway[close quotes]. Soon the administration will change all that. A number of independent and utility powerplants have been proposed in Idaho, Montana and the Spokane, Wash., area during the 1990s. As the operators will need to move their power, Bonneville is planning to build a $144-million, 500-kv line to upgrade the 115-kv section. The agency is planning to use its existing right-of-way.

  14. ONE NEVADA LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE ONE NEVADA LINE PROJECT SUMMARY In February 2011, the Department of Energy issued a $343 million loan guarantee to finance the One Nevada Transmission Line (ON Line) project, a 235-mile, 500 kV AC transmission line capable of carrying 600 MW of power to the grid running

  15. Apply

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Unofficial transcripts are acceptable. If transcripts are not in English, provide a translation. If grades are not in the U.S.-traditional lettered (A,B,C), or GPA (out of 4.0)...

  16. PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Section 1222 of the Energy Policy Act 2005 » PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE On March 25, 2016, U.S. Secretary of Energy Dr. Ernest Moniz announced that the Department of Energy (DOE) will participate in the development of the Plains & Eastern Clean Line project (Project), a major clean energy infrastructure project. Through section 1222 of the Energy Policy Act of 2005, Congress authorized DOE to promote electric

  17. Dynamic Line Rating: Research and Policy Evaluation

    SciTech Connect

    Jake P. Gentle; Kurt S. Myers; Michael R. West

    2014-07-01

    Dynamic Line Rating (DLR) is a smart grid technology that allows the rating of electrical conductors to be increased based on local weather conditions. Overhead lines are conventionally given a conservative rating based on worst case scenarios. We demonstrate that observing the conditions in real time leads to additional capacity and safer operation. This paper provides a report of a pioneering scheme in the United States of America in which DLR has been applied. Thereby, we demonstrate that observing the local weather conditions in real time leads to additional capacity and safer operation. Secondly, we discuss limitations involved. In doing so, we arrive at novel insights which will inform and improve future DLR projects. Third, we provide a policy background and discussion to clarify the technology’s potential and identifies barriers to the imminent adoption of dynamic line rating systems. We provide suggestions for regulatory bodies about possible improvements in policy to encourage adoption of this beneficial technology.

  18. Printed circuit dispersive transmission line

    DOEpatents

    Ikezi, H.; Lin-Liu, Y.R.; DeGrassie, J.S.

    1991-08-27

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other. 5 figures.

  19. Printed circuit dispersive transmission line

    DOEpatents

    Ikezi, Hiroyuki; Lin-Liu, Yuh-Ren; DeGrassie, John S.

    1991-01-01

    A printed circuit dispersive transmission line structure is disclosed comprising an insulator, a ground plane formed on one surface of the insulator, a first transmission line formed on a second surface of the insulator, and a second transmission line also formed on the second surface of the insulator and of longer length than the first transmission line and periodically intersecting the first transmission line. In a preferred embodiment, the transmission line structure exhibits highly dispersive characteristics by designing the length of one of the transmission line between two adjacent periodic intersections to be longer than the other.

  20. Applied Materials | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search Name: Applied Materials Address: 3050 Bowers Avenue Place: Santa Clara, California Zip: 95054 Sector: Solar Website: www.appliedmaterials.com...

  1. Drill string transmission line

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David S.; Bradford, Kline; Fox, Joe

    2006-03-28

    A transmission line assembly for transmitting information along a downhole tool comprising a pin end, a box end, and a central bore traveling between the pin end and the box end, is disclosed in one embodiment of the invention as including a protective conduit. A transmission line is routed through the protective conduit. The protective conduit is routed through the central bore and the ends of the protective conduit are routed through channels formed in the pin end and box end of the downhole tool. The protective conduit is elastically forced into a spiral or other non-linear path along the interior surface of the central bore by compressing the protective conduit to a length within the downhole tool shorter than the protective conduit.

  2. CRUCIBLE LINING METHOD

    DOEpatents

    Bone, W.H.; Schmidt, W.W.

    1958-11-01

    A method is presented for forming refractory liners in cylindrical reaction vessels used for the reductlon of uranium tetrafluoride to metallic uranium. A preliminary form, having positioning lugs attached thereto, is inserted into the reaction vessel and the refractory powder, usually CaO, is put in the annular space between the form and the inner wall of the reaction vessel. A jolting table is used to compact this charge of liner material ln place, and after thls has been done, the preliminary form is removed and the flnal form or plug is lnserted without disturbing the partially completed lining. The remainder of the lining charge is then introduced and compacted by jolting, after which the form is removed.

  3. Sensor, method and system of monitoring transmission lines

    DOEpatents

    Syracuse, Steven J.; Clark, Roy; Halverson, Peter G.; Tesche, Frederick M.; Barlow, Charles V.

    2012-10-02

    An apparatus, method, and system for measuring the magnetic field produced by phase conductors in multi-phase power lines. The magnetic field measurements are used to determine the current load on the conductors. The magnetic fields are sensed by coils placed sufficiently proximate the lines to measure the voltage induced in the coils by the field without touching the lines. The x and y components of the magnetic fields are used to calculate the conductor sag, and then the sag data, along with the field strength data, can be used to calculate the current load on the line and the phase of the current. The sag calculations of this invention are independent of line voltage and line current measurements. The system applies a computerized fitter routine to measured and sampled voltages on the coils to accurately determine the values of parameters associated with the overhead phase conductors.

  4. PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE | Department of...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PLAINS & EASTERN CLEAN LINE TRANSMISSION LINE On March 25, 2016, U.S. Secretary of Energy Dr. Ernest Moniz announced that the Department of Energy (DOE) will participate in the ...

  5. Patterns and perspectives in applied fracture mechanics

    SciTech Connect

    Merkle, J.G.

    1994-12-31

    This lecture begins with a overview of applied fracture mechanics pertinent to safety of pressure vessels. It then progresses to a chronological panorama of experimental and analytical results. To be useful and dependable in safety analysis of real structures, new analysis developments must be physically realistic, which means that they must accurately describe physical cause and effect. Consequently, before mathematical modeling can begin, cause and effect must be established from experimental data. This can be difficult and time consuming, but worth the effort. Accordingly, the theme of this paper is that the search for patterns is constant and vital. This theme is illustrated by the development of small, single-specimen, fracture toughness testing techniques. It is also illustrated by the development, based on two different published large-strain, elastic-plastic, three-dimensional finite-element analyses, of a hypothesis concerning three-dimensional loss of constraint. When a generalization of Irwin`s thickness-normalized plastic-zone parameter, reaches a value close to 2{pi}, the through-thickness contraction strain at the apex of the near-tip logarithmic-spiral slip-line region becomes the dominant negative strain accommodating crack opening. Because slip lines passing from the midplane to the stress-free side surfaces do not have to curve, once these slip lines are established, stresses near the crack tip are only elevated by strain hardening and constraint becomes significantly relaxed. This hypothesis, based on published three-dimensional elastic-plastic analyses, provides a potentially valuable means for gaining additional insight into constraint effects on fracture toughness by considering the roles played by the plastic strains as well as the stresses that develop near a crack tip.

  6. Applied Sedimentology | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Sedimentology Jump to: navigation, search OpenEI Reference LibraryAdd to library Book: Applied Sedimentology Author R.C. Salley Published Academic Press, 2000 DOI Not Provided...

  7. Information Science, Computing, Applied Math

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Information Science, Computing, Applied Math Information Science, Computing, Applied Math National security depends on science and technology. The United States relies on Los Alamos National Laboratory for the best of both. No place on Earth pursues a broader array of world-class scientific endeavors. Computer, Computational, and Statistical Sciences (CCS)» High Performance Computing (HPC)» Extreme Scale Computing, Co-design» supercomputing into the future Overview Los Alamos Asteroid Killer

  8. ORISE: Applied health physics projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Applied health physics projects The Oak Ridge Institute for Science and Education (ORISE) provides applied health physics services to government agencies needing technical support for decommissioning projects. Whether the need is assistance with the development of technical basis documents or advice on how to identify, measure and assess the presence of radiological materials, ORISE can help determine the best course for an environmental cleanup project. Our key areas of expertise include fuel

  9. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-04-25

    The purpose of this Guide is to provide U.S. Department of Energy (DOE) line management with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, date April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities.

  10. CRC handbook of applied thermodynamics

    SciTech Connect

    Palmer, D.A. . Research and Development Dept.)

    1987-01-01

    The emphasis of this book is on applied thermodynamics, featuring the stage of development of a process rather than the logical development of thermodynamic principles. It is organized according to the types of problems encountered in industry, such as probing research, process assessment, and process development. The applied principles presented can be used in most areas of industry including oil and gas production and processing, chemical processing, power generation, polymer production, food processing, synthetic fuels production, specialty chemicals and pharmaceuticals production, bioengineered processes, etc.

  11. In-line real time air monitor

    DOEpatents

    Wise, M.B.; Thompson, C.V.

    1998-07-14

    An in-line gas monitor capable of accurate gas composition analysis in a continuous real time manner even under strong applied vacuum conditions operates by mixing an air sample with helium forming a sample gas in two complementary sample loops embedded in a manifold which includes two pairs of 3-way solenoid valves. The sample gas is then analyzed in an ion trap mass spectrometer on a continuous basis. Two valve drivers actuate the two pairs of 3-way valves in a reciprocating fashion, so that there is always flow through the in-line gas monitor via one or the other of the sample loops. The duty cycle for the two pairs of 3-way valves is varied by tuning the two valve drivers to a duty cycle typically between 0.2 to 0.7 seconds. 3 figs.

  12. In-line real time air monitor

    DOEpatents

    Wise, Marcus B.; Thompson, Cyril V.

    1998-01-01

    An in-line gas monitor capable of accurate gas composition analysis in a continuous real time manner even under strong applied vacuum conditions operates by mixing an air sample with helium forming a sample gas in two complementary sample loops embedded in a manifold which includes two pairs of 3-way solenoid valves. The sample gas is then analyzed in an ion trap mass spectrometer on a continuous basis. Two valve drivers actuate the two pairs of 3-way valves in a reciprocating fashion, so that there is always flow through the in-line gas monitor via one or the other of the sample loops. The duty cycle for the two pairs of 3-way valves is varied by tuning the two valve drivers to a duty cycle typically between 0.2 to 0.7 seconds.

  13. Plains and Eastern Clean Line Transmission Line: Federal Register Notice,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Volume 80, No. 81 - April 28, 2015 | Department of Energy Federal Register Notice, Volume 80, No. 81 - April 28, 2015 Plains and Eastern Clean Line Transmission Line: Federal Register Notice, Volume 80, No. 81 - April 28, 2015 The Department of Energy (DOE) requests public comment on the first complete application submitted in response to its June 10, 2010 Request for Proposals for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 in the Federal

  14. Non-coherent continuum scattering as a line polarization mechanism

    SciTech Connect

    Del Pino Alemán, T.; Manso Sainz, R.; Trujillo Bueno, J. E-mail: rsainz@iac.es

    2014-03-20

    Line scattering polarization can be strongly affected by Rayleigh scattering at neutral hydrogen and Thomson scattering at free electrons. Often a depolarization of the continuum results, but the Doppler redistribution produced by the continuum scatterers, which are light (hence, fast), induces more complex interactions between the polarization in spectral lines and in the continuum. Here we formulate and solve the radiative transfer problem of scattering line polarization with non-coherent continuum scattering consistently. The problem is formulated within the spherical tensor representation of atomic and light polarization. The numerical method of solution is a generalization of the Accelerated Lambda Iteration that is applied to both the atomic system and the radiation field. We show that the redistribution of the spectral line radiation due to the non-coherence of the continuum scattering may modify the shape of the emergent fractional linear polarization patterns significantly, even yielding polarization signals above the continuum level in intrinsically unpolarizable lines.

  15. Bipolar pulse forming line

    DOEpatents

    Rhodes, Mark A.

    2008-10-21

    A bipolar pulse forming transmission line module for linear induction accelerators having first, second, third, fourth, and fifth planar conductors which form an interleaved stack with dielectric layers between the conductors. Each conductor has a first end, and a second end adjacent an acceleration axis. The first and second planar conductors are connected to each other at the second ends, the fourth and fifth planar conductors are connected to each other at the second ends, and the first and fifth planar conductors are connected to each other at the first ends via a shorting plate adjacent the first ends. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short a high voltage from the first end of the third planar conductor to the first end of the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

  16. EC Transmission Line Materials

    SciTech Connect

    Bigelow, Tim S

    2012-05-01

    The purpose of this document is to identify materials acceptable for use in the US ITER Project Office (USIPO)-supplied components for the ITER Electron cyclotron Heating and Current Drive (ECH&CD) transmission lines (TL), PBS-52. The source of material property information for design analysis shall be either the applicable structural code or the ITER Material Properties Handbook. In the case of conflict, the ITER Material Properties Handbook shall take precedence. Materials selection, and use, shall follow the guidelines established in the Materials Assessment Report (MAR). Materials exposed to vacuum shall conform to the ITER Vacuum Handbook. [Ref. 2] Commercial materials shall conform to the applicable standard (e.g., ASTM, JIS, DIN) for the definition of their grade, physical, chemical and electrical properties and related testing. All materials for which a suitable certification from the supplier is not available shall be tested to determine the relevant properties, as part of the procurement. A complete traceability of all the materials including welding materials shall be provided. Halogenated materials (example: insulating materials) shall be forbidden in areas served by the detritiation systems. Exceptions must be approved by the Tritium System and Safety Section Responsible Officers.

  17. ONE NEVADA LINE | Department of Energy

    Energy Saver

    ONE NEVADA LINE ONE NEVADA LINE DOE-LPOProject-PostersSTOR-TRSMOne-Nevada-Line.pdf (323.38 KB) More Documents & Publications STEPHENTOWN SPINDLE CX-011989: Categorical Exclusion ...

  18. NETL LINES OF DEMARCATION 09282012

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LINES OF DEMARCATION September 28, 2012 Contact: Site Operations Division or ESS&H Division with Questions The oversight, upkeep, and segregation of NETL infrastructure components, including lines of demarcation between ORD and OIO, will be as follows: 1. Common utility headers including gas compression systems that enter or exit the site will be maintained by the Office of Institutional Operations (OIO). A line of responsibility demarcation between OIO and ORD will be established at the

  19. LINE-ABOVE-GROUND ATTENUATOR

    DOEpatents

    Wilds, R.B.; Ames, J.R.

    1957-09-24

    The line-above-ground attenuator provides a continuously variable microwave attenuator for a coaxial line that is capable of high attenuation and low insertion loss. The device consists of a short section of the line-above- ground plane type transmission lime, a pair of identical rectangular slabs of lossy material like polytron, whose longitudinal axes are parallel to and indentically spaced away from either side of the line, and a geared mechanism to adjust amd maintain this spaced relationship. This device permits optimum fineness and accuracy of attenuator control which heretofore has been difficult to achieve.

  20. Summer of Applied Geophysical Experience

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Summer of Applied Geophysical Experience (SAGE) 2016 - Our 34 rd Year! SAGE is a 3-4 week research and education program in exploration geophysics for graduate, undergraduate students, and working professionals based in Santa Fe, NM, U.S.A. Application deadline March 27, 2016, 5:00pm MDT SAGE students, faculty, teaching assistants, and visiting scientists acquire, process and interpret reflection/refraction seismic, magnetotelluric (MT)/electromagnetic (EM), ground penetrating radar (GPR),

  1. Applied Mathematics and Plasma Physics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ADTSC » T » T-5 Applied Mathematics and Plasma Physics Maintaining mathematic, theory, modeling, and simulation capabilities in a broad set of areas Leadership Group Leader Pieter Swart Email Deputy Group Leader (Acting) Luis Chacon Email Contact Us Administrator Charlotte Lehman Email Electron density simulation Electron density from an orbital-free quantum molecular dynamics simulation for a warm dense plasma of deuterium at density 10 g/cc and temperature 10 eV. Mathematical, theory,

  2. Emergency pipe line repair connects subsea pipe lines

    SciTech Connect

    Lerique, M.P.; Thiberge, P. ); Wright, N. )

    1990-11-01

    Emergency repair of any subsea line pipe must form a high-integrity, metal-to-metal seal. This paper presents a remote, diverless repair system that utilizes master flanges, a connector and a spool piece to repair line pipe in deep offshore waters.

  3. SunLine Transit Agency

    Office of Energy Efficiency and Renewable Energy (EERE)

    SunLine Transit Agency provides public transit and community services to California's Coachella Valley. The service area is more than 1,100 square miles and includes nine member cities, as well as Riverside County. Over the years, SunLine has pursued an aggressive strategy for implementing clean technologies into its fleet.

  4. International combustion engines; Applied thermosciences

    SciTech Connect

    Ferguson, C.R.

    1985-01-01

    Focusing on thermodynamic analysis - from the requisite first law to more sophisticated applications - and engine design, this book is an introduction to internal combustion engines and their mechanics. It covers the many types of internal combustion engines, including spark ignition, compression ignition, and stratified charge engines, and examines processes, keeping equations of state simple by assuming constant specific heats. Equations are limited to heat engines and later applied to combustion engines. Topics include realistic equations of state, stroichiometry, predictions of chemical equilibrium, engine performance criteria, and friction, which is discussed in terms of the hydrodynamic theory of lubrication and experimental methods such as dimensional analysis.

  5. Monolithic high voltage nonlinear transmission line fabrication process

    DOEpatents

    Cooper, Gregory A.

    1994-01-01

    A process for fabricating sequential inductors and varactor diodes of a monolithic, high voltage, nonlinear, transmission line in GaAs is disclosed. An epitaxially grown laminate is produced by applying a low doped active n-type GaAs layer to an n-plus type GaAs substrate. A heavily doped p-type GaAs layer is applied to the active n-type layer and a heavily doped n-type GaAs layer is applied to the p-type layer. Ohmic contacts are applied to the heavily doped n-type layer where diodes are desired. Multiple layers are then either etched away or Oxygen ion implanted to isolate individual varactor diodes. An insulator is applied between the diodes and a conductive/inductive layer is thereafter applied on top of the insulator layer to complete the process.

  6. Monolithic high voltage nonlinear transmission line fabrication process

    DOEpatents

    Cooper, G.A.

    1994-10-04

    A process for fabricating sequential inductors and varistor diodes of a monolithic, high voltage, nonlinear, transmission line in GaAs is disclosed. An epitaxially grown laminate is produced by applying a low doped active n-type GaAs layer to an n-plus type GaAs substrate. A heavily doped p-type GaAs layer is applied to the active n-type layer and a heavily doped n-type GaAs layer is applied to the p-type layer. Ohmic contacts are applied to the heavily doped n-type layer where diodes are desired. Multiple layers are then either etched away or Oxygen ion implanted to isolate individual varistor diodes. An insulator is applied between the diodes and a conductive/inductive layer is thereafter applied on top of the insulator layer to complete the process. 6 figs.

  7. CX-008697: Categorical Exclusion Determination

    Energy.gov [DOE]

    Sale of Line Mile 1 of the 115 Kilovolt (kV) Tanner Tap to Snoqualmie-Lake Tradition #1 Transmission Line CX(s) Applied: B1.24 Date: 06/12/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  8. CX-011228: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Structure 112-4 LIBPAD1 230-kilovolt Transmission Line "Live Line" Maintenance Training CX(s) Applied: B1.2 Date: 10/25/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  9. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2014-04-14

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities. Supersedes DOE G 226.1-2

  10. Plains & Eastern Clean Line Transmission Line - Part 2 Application...

    Energy Saver

    ... KB) Appendix 10-E HVDC Scheme Diagram (33.51 KB) Appendix 10-F Shelby Substation and Optima Substation One-Line Drawings (925.73 KB) Appendix 10-J HVDC Specification ...

  11. SSRL Beam Lines Map | Stanford Synchrotron Radiation Lightsource

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SSRL Beam Lines Map Beam Line by Number | Beam Line by Techniques | Photon Source Parameters

  12. Electrical transmission line diametrical retainer

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2004-12-14

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within down hole components. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to with stand the tension and compression of drill pipe during routine drilling cycles.

  13. Pulse shaping with transmission lines

    DOEpatents

    Wilcox, Russell B.

    1987-01-01

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  14. Pulse shaping with transmission lines

    DOEpatents

    Wilcox, R.B.

    1985-08-15

    A method and apparatus for forming shaped voltage pulses uses passive reflection from a transmission line with nonuniform impedance. The impedance of the reflecting line varies with length in accordance with the desired pulse shape. A high voltage input pulse is transmitted to the reflecting line. A reflected pulse is produced having the desired shape and is transmitted by pulse removal means to a load. Light activated photoconductive switches made of silicon can be utilized. The pulse shaper can be used to drive a Pockels cell to produce shaped optical pulses.

  15. Project Profile: Applied Materials (SunPath 2) | Department of Energy

    Energy Saver

    Project Profile: Applied Materials (SunPath 2) Project Profile: Applied Materials (SunPath 2) Awardee Name: Applied Materials Project Title: Epitaxial-Silicon Wafer Integrated Pilot Production Line Funding Opportunity: SunShot Technology to Market (SunPath 2) SunShot Subprogram: Technology to Market Location: Santa Clara, CA Amount Awarded: $5,067,147 Awardee Cost Share: $4,999,900 Project Investigator: James Gee Producing silicon wafers in bulk can be costly due to the significant waste

  16. NETL LINES OF DEMARCATION 09282012

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A line of responsibility demarcation between OIO and ORD will be established at the shutoff on the branch leading to or from an R&D project or laboratory area. OIO will install a ...

  17. Fin-line horn antenna

    DOEpatents

    Reindel, John

    1990-01-01

    A fin line circuit card containing a fin line slot feeds a dipole antenna ich extends a quarterwave outside the waveguide and provides an energy beam focal point at or near the open end of the waveguide. The dipole antenna thus maintains a wide and nearly constant beamwidth, low VSWR and a circular symmetric radiation pattern for use in electronic warfare direction finding and surveillance applications.

  18. Applied Materials Wind Turbine | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Wind Turbine Jump to: navigation, search Name Applied Materials Wind Turbine Facility Applied Materials Sector Wind energy Facility Type Community Wind Facility Status In Service...

  19. Applied Intellectual Capital AIC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Intellectual Capital AIC Jump to: navigation, search Name: Applied Intellectual Capital (AIC) Place: California Zip: 94501-1010 Product: Applied Intellectual Capital (AIC) was...

  20. Applied Ventures LLC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Applied Ventures LLC Name: Applied Ventures LLC Address: 3050 Bowers Avenue Place: Santa Clara, California Zip: 95054 Region: Southern CA Area Product: Venture capital. Number...

  1. Building America Expert Meeting: Recommendations for Applying...

    Energy Saver

    Recommendations for Applying Water Heaters in Combination Space and Domestic Water Heating Systems Building America Expert Meeting: Recommendations for Applying Water Heaters in ...

  2. Letter from Deputy Secretary Poneman to Clean Line Energy Regarding...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Line: Comment from Ms. Schroeder Plains and Eastern Clean Line Transmission Line: Comment from Mr. Zuniga Plains and Eastern Clean Line Transmission Line: Comment from Mr. Cain...

  3. SPEAR3 Beam Line Availability

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Beam Line Support | Floor Support | Administrative Support SPEAR3 Beam Line Availability Beam Line BL Type Technique(s) Status 1-4 X-ray Small and Wide Angle X-ray Scattering Open 1-5 MC MAD, Monochromatic Open 2-1 X-ray Powder Diffraction Open 2-2 X-ray Michromachining, Topography, White Beam, LIGA Down 2-3 X-ray XAS, Instrumentation development and Calibration Open 4-1 X-ray XAS, XSW Re-opens 2008 4-2 X-ray SMB Small Angle X-ray Scattering/Diffraction Re-opens 2008 4-3 X-ray XAS Re-opens 2008

  4. Statistical line-by-line model for atomic spectra in intermediate...

    Office of Scientific and Technical Information (OSTI)

    Statistical line-by-line model for atomic spectra in intermediate coupling Citation Details In-Document Search Title: Statistical line-by-line model for atomic spectra in ...

  5. X-ray line polarization spectroscopy of Li-like satellite line...

    Office of Scientific and Technical Information (OSTI)

    X-ray line polarization spectroscopy of Li-like satellite line spectra Citation Details In-Document Search Title: X-ray line polarization spectroscopy of Li-like satellite line ...

  6. CX-011989: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: Categorical Exclusion Determination CX-011989: Categorical Exclusion Determination Wind Tests of Transmission Line Towers: One Nevada Transmission Project CX(s) Applied: B4.6 Date: 03/14/2012 Location(s): Nevada, Nevada Offices(s): Loan Guarantee Program Office The Department of Energy proposed action is to support the temporary erection and monitoring of transmission line towers being used for the One Nevada Transmission Line Project (ON Line), formerly known as the Southwest Intertie

  7. Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Comment submitted on updated Part 2 application. Comment from Dr. Contreras 6-10-15.pdf (608.36 KB) More Documents & Publications Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras Plains and Eastern Clean Line Transmission Line: Comment from Dr. Contreras

  8. Chemometrics/on-line measurements

    SciTech Connect

    O'Rourke, P.E. )

    1989-11-01

    The possible future of on-line analytical-quality measurements for improved process control and more timely safeguards measurements is examined in the light of a current project at Savannah River. A measurement system involving a fiber-optic spectrophotometer and the application of mathematical techniques called chemometrics is described.

  9. Coiled transmission line pulse generators

    DOEpatents

    McDonald, Kenneth Fox

    2010-11-09

    Methods and apparatus are provided for fabricating and constructing solid dielectric "Coiled Transmission Line" pulse generators in radial or axial coiled geometries. The pour and cure fabrication process enables a wide variety of geometries and form factors. The volume between the conductors is filled with liquid blends of monomers, polymers, oligomers, and/or cross-linkers and dielectric powders; and then cured to form high field strength and high dielectric constant solid dielectric transmission lines that intrinsically produce ideal rectangular high voltage pulses when charged and switched into matched impedance loads. Voltage levels may be increased by Marx and/or Blumlein principles incorporating spark gap or, preferentially, solid state switches (such as optically triggered thyristors) which produce reliable, high repetition rate operation. Moreover, these Marxed pulse generators can be DC charged and do not require additional pulse forming circuitry, pulse forming lines, transformers, or an a high voltage spark gap output switch. The apparatus accommodates a wide range of voltages, impedances, pulse durations, pulse repetition rates, and duty cycles. The resulting mobile or flight platform friendly cylindrical geometric configuration is much more compact, light-weight, and robust than conventional linear geometries, or pulse generators constructed from conventional components. Installing additional circuitry may accommodate optional pulse shape improvements. The Coiled Transmission Lines can also be connected in parallel to decrease the impedance, or in series to increase the pulse length.

  10. Applying for PMCDP/FPD Certification (initial)

    Energy.gov [DOE]

    Certification applicants are nominated by their respective Program Secretarial Office (PSO) to apply for FPD certification – candidates may not apply without program sponsorship. Each participating...

  11. Apply for Beam Time | Advanced Photon Source

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    All About Proposals Users Home Apply for Beam Time Deadlines Proposal Types Concepts, Definitions, and Help My APS Portal My APS Portal Apply for Beam Time Next Proposal Deadline...

  12. How to Apply for the ENERGY STAR®

    Energy.gov [DOE]

    Join us to learn about applying for ENERGY STAR Certification in Portfolio Manager. Understand the value of the ENERGY STAR certification, see the step-by-step process of applying, and gain tips to...

  13. getnim - NIM's Command Line Interface

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    getnim command getnim - NIM's Command Line Interface This page describes the inquiry-only command called getnim that users can use interactively and in scripts to get their account balances. GETNIM(l) NERSC GETNIM(l) NAME getnim - query the NERSC banking database for remaining allocation, resources and repository information SYNOPSIS getnim [ options ] -Rrname or getnim [ options ] -Rrname { -uuid | -Uuname } or getnim [ options ][ -D ] { -uuid | -Uuname } or getnim [ options ] -Rrname { -l | -L

  14. In-Line Thermoelectric Module

    SciTech Connect

    Pento, Robert; Marks, James E.; Staffanson, Clifford D.

    1998-07-28

    A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an-in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions maybe perpendicular to the direction-of current flow through the module.

  15. In-line thermoelectric module

    DOEpatents

    Pento, Robert; Marks, James E.; Staffanson, Clifford D.

    2000-01-01

    A thermoelectric module with a plurality of electricity generating units each having a first end and a second end, the units being arranged first end to second end along an in-line axis. Each unit includes first and second elements each made of a thermoelectric material, an electrically conductive hot member arranged to heat one side of the first element, and an electrically conductive cold member arranged to cool another side of the first element and to cool one side of the second element. The hot member, the first element, the cold member and the second element are supported in a fixture, are electrically connected respectively to provide an electricity generating unit, and are arranged respectively in positions along the in-line axis. The individual components of each generating unit and the respective generating units are clamped in their in-line positions by a loading bolt at one end of the fixture and a stop wall at the other end of the fixture. The hot members may have a T-shape and the cold members an hourglass shape to facilitate heat transfer. The direction of heat transfer through the hot members may be perpendicular to the direction of heat transfer through the cold members, and both of these heat transfer directions may be perpendicular to the direction of current flow through the module.

  16. Categorical Exclusion Determinations: RMOTC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RMOTC Categorical Exclusion Determinations: RMOTC Categorical Exclusion Determinations issued by RMOTC. DOCUMENTS AVAILABLE FOR DOWNLOAD December 30, 2013 CX-011724: Categorical Exclusion Determination Repair Corroded Flow Line Near 33-SX-11 CX(s) Applied: B5.4, B5.6 Date: 12/30/2013 Location(s): Wyoming Offices(s): RMOTC July 26, 2013 CX-010688: Categorical Exclusion Determination Optimization Project #3 CX(s) Applied: B2.5, B5.2, B5.4, B5.5 Date: 07/26/2013 Location(s): Wyoming Offices(s):

  17. Apply to the Cyclotron Institute REU Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Apply Now Applying for the 2017 NSF-REU Nuclear Physics and Nuclear Chemistry Program at the Cyclotron Institute Eligibility: Applicants must be US citizens or have permanent resident status. Applicants must have undergraduate status at the time of the program. (Students planning to receive a degree by May 2017 are not eligible). Applicants must have completed an introductory physics/chemistry course and have completed or be enrolled in an advanced physics/chemistry course. To apply for the REU

  18. Applied Field Research Initiative Deep Vadose Zone

    Office of Environmental Management (EM)

    Applied Field Research Initiative Deep Vadose Zone Located on the Hanford Site in Richland, Washington, the Deep Vadose Zone Applied Field Research Initiative (DVZ AFRI) was established to protect water resources by addressing the challenge of preventing contamination in the deep vadose zone from reaching groundwater. Led by the Pacific Northwest National Laboratory, the Initiative is a collaborative effort that leverages Department of Energy (DOE) investments in basic science and applied

  19. CX-008708: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Wood Pole Structure Replacements on the Chehalis-Olympia No. 1 and Chehalis-Mayfield No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration

  20. CX-013950: Categorical Exclusion Determination

    Energy.gov [DOE]

    Poncha-Canon West-Midway 230 Kilovolt Transmission Line Vegetation Management El Paso, Pueblo, Fremont and Chaffee Counties CO CX(s) Applied: B1.3Date: 04/29/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  1. CX-013922: Categorical Exclusion Determination

    Energy.gov [DOE]

    Canon West-Midway 230 Kilovolt Transmission Line Road Maintenance Fremont County, CO CX(s) Applied: B1.3Date: 04/22/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-013932: Categorical Exclusion Determination

    Energy.gov [DOE]

    Flaming Gorge-Vernal #3 138 Kilovolt Transmission Line Vegetation Management and Herbicide Treatments Uintah and Daggett Counties CX(s) Applied: B1.3Date: 04/27/2015 Location(s): UtahOffices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-013931: Categorical Exclusion Determination

    Energy.gov [DOE]

    Flaming Gorge-Vernal #1 138 Kilovolt Transmission Line Vegetation Management and Herbicide Treatments Uintah and Daggett Counties UT CX(s) Applied: B1.3Date: 04/27/2015 Location(s): UtahOffices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-012346: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Blue River-Gore Pass 230-kilovolt Transmission Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-011621: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Windy Gap-Granby Pumping Plant and Granby Pumping Plant-Mary's Lake (West Portal) 69-kilovolt Transmission Line Danger Tree Management CX(s) Applied: B1.3 Date: 11/21/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-009230: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Curecanti-Rifle 230 Kilovolt Transmission Line Sullivan Ranch Irrigation Water Pipeline Project Between Structures 25/5 to 26/1 CX(s) Applied: B4.9 Date: 09/28/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-011858: Categorical Exclusion Determination

    Energy.gov [DOE]

    Beaver Creek-Sterling 115 Kilovolt Transmission Line Structure Relocation, Morgan County, Colorado CX(s) Applied: B4.13 Date: 01/21/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-013486: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace Screen Wash Piping, Discharge Header & Recycle Line at West Hackberry RWIS (WH-MM-1105) CX(s) Applied: B1.3Date: 03/18/2015 Location(s): LouisianaOffices(s): Strategic Petroleum Reserve Field Office

  9. CX-011831: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacements Along the Targhee Tap and Targhee-Drummond 115-kilovolt (kV) Transmission Line Rights-Of-Way CX(s) Applied: B1.3 Date: 01/29/2014 Location(s): Idaho Offices(s): Bonneville Power Administration

  10. CX-012340: Categorical Exclusion Determination

    Energy.gov [DOE]

    Flagstaff Pinnacle Peak #1 & 2 Transmission Lines - Slid Static Damper Repair at Structures 134/3 & 139/2 CX(s) Applied: B1.3 Date: 06/11/2014 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  11. CX-009227: Categorical Exclusion Determination

    Energy.gov [DOE]

    Beaver Creek- Big Sandy 115 Kilovolt Transmission Line Structure Replacements - Last Chance Fire CX(s) Applied: B4.13 Date: 08/31/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-009233: Categorical Exclusion Determination

    Energy.gov [DOE]

    Flaming Gorge - Vernal 138 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/21/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-010551: Categorical Exclusion Determination

    Energy.gov [DOE]

    Alcova-Miracle Mile East 115 Kilovolt Transmission Line Structure Replace and Road Maintenance, Carbon and Natrona Counties, Wyoming CX(s) Applied: B1.3 Date: 06/20/2013 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-008719: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacements As Needed on the Naselle-Tarlett No. 1, Holcomb- Naselle No. 1, and Raymond-Willapa River No. 1, 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 05/16/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  15. CX-014311: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace the Bartex Level Instrumentation for HB-Line Tanks NT-31/32 With Radar Level Instrumentation CX(s) Applied: B2.5Date: 08/20/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  16. CX-013442: Categorical Exclusion Determination

    Energy.gov [DOE]

    Construction of the Rapid City-Dry 115 kilovolt Transmission Line CX(s) Applied: B4.12Date: 02/03/2015 Location(s): South DakotaOffices(s): Western Area Power Administration-Upper Great Plains Region

  17. CX-010882: Categorical Exclusion Determination

    Energy.gov [DOE]

    Liberty-Parker Dam #2 230-Kilovolt Transmission Line, Optical Power Ground Wire Repair CX(s) Applied: B4.7 Date: 08/22/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  18. CX-012090: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Henderson-Mead Number 2 230-Kilovolt Transmission Line, Erosion Repair at Structure 2/4 CX(s) Applied: B1.3 Date: 09/11/2013 Location(s): Nevada, Nevada Offices(s): Western Area Power Administration-Desert Southwest Region

  19. CX-008396: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Shiprock-Four Corners 345 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/13/2012 Location(s): New Mexico Offices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-012384: Categorical Exclusion Determination

    Energy.gov [DOE]

    Eleven Soil Bores Along the M-Area Abandoned Process Sewer Line for Vadose Zone Characterization CX(s) Applied: B3.1 Date: 05/19/2014 Location(s): South Carolina Offices(s): Savannah River Operations Office

  1. CX-012763: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hesperus-Montrose 345 Kilovolt Transmission Line Routine Maintenance of ROW Roads Ouray, Montrose, and San Miguel Counties, Colorado CX(s) Applied: B1.3Date: 41869 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-009088: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Crystal 115 Kilovolt Transmission Line Routine Maintenance of Existing Access Roads and Right-of-Ways CX(s) Applied: B1.3 Date: 08/07/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-011722: Categorical Exclusion Determination

    Energy.gov [DOE]

    Green Mountain-Blue Ridge Repeater 2.4 Kilovolt Distribution Line Danger Tree Management in Grand County, Colorado CX(s) Applied: B1.3 Date: 12/31/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-011721: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gore Pass-Muddy Pass 69 Kilovolt Transmission Line Danger Tree Management in Grand and Jackson Counties, Colorado CX(s) Applied: B1.3 Date: 12/31/2013 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-011720: Categorical Exclusion Determination

    Energy.gov [DOE]

    Blue River-Gore Pass 230 Kilovolt Transmission Line Danger Tree Management in Grand County, Colorado CX(s) Applied: B1.3 Date: 01/06/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-011233: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Morrow Point 230 Kilovolt Transmission Line Danger Tree Management, Montrose County, Colorado CX(s) Applied: B1.3 Date: 10/17/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-007682: Categorical Exclusion Determination

    Energy.gov [DOE]

    Pole Replacement on Big Springs-Sidney 115 Kilovolt Transmission Line, Deuel County, Nebraska CX(s) Applied: B1.3 Date: 01/05/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-013935: Categorical Exclusion Determination

    Energy.gov [DOE]

    Green Mountain-Kremmling 69 Kilovolt Transmission Line Maintenance Grand and Summit Counties CO CX(s) Applied: B1.3Date: 05/26/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-013928: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Lost Canyon-Shiprock 230 Kilovolt Transmission Line Insulator Replacement Montezuma County CO CX(s) Applied: B1.3Date: 03/24/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-013948: Categorical Exclusion Determination

    Energy.gov [DOE]

    North Yuma-Spring Canyon Transmission Line Erosion Control-Structure 313 Logan County, CO CX(s) Applied: B1.3Date: 05/28/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-013946: Categorical Exclusion Determination

    Energy.gov [DOE]

    Midway-Canon West 230 Kilovolt Transmission Line Access Road Maintenance El Paso and Pueblo Counties, CO CX(s) Applied: B1.3Date: 04/21/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-013930: Categorical Exclusion Determination

    Energy.gov [DOE]

    Deering Lake Eckley 115 Kilovolt Transmission Line Structure Replacements Washington and Yuma Counties, CO CX(s) Applied: B1.3Date: 05/01/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-013943: Categorical Exclusion Determination

    Energy.gov [DOE]

    Lost Canyon-Shiprock 230 Kilovolt Transmission Line Vegetation Management and Herbicide Treatments Montezuma County, CO CX(s) Applied: B1.3Date: 05/26/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-013919: Categorical Exclusion Determination

    Energy.gov [DOE]

    Beaver Creek-Big Sandy 115 Kilovolt Transmission Line Structure Replacements, Morgan, Washington, and Lincoln Counties, CO CX(s) Applied: B1.3Date: 05/06/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-013916: Categorical Exclusion Determination

    Energy.gov [DOE]

    Amended Boysen-Thermopolis 115 Kilovolt Transmission Line Structure Replacement Project Hot Springs Fremont Counties WY CX(s) Applied: B1.3Date: 06/12/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-011294: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace Potable Water Supply Line: Phase Two (Project Modification) CX(s) Applied: B1.3, B1.16, B1.32 Date: 10/24/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

  17. CX-100647 Categorical Exclusion Determination

    Energy.gov [DOE]

    Enabling Efficiencies Greater Than 22.5% with Metal Oxide Passivated Contacts Using Low-Cost In-Line Atmospheric Pressure Chemical Vapor Deposition Award Number: DE-EE0007533 CX(s) Applied: A9, B3.6 Solar Energy Technology Office Date: 6/23/2016 Location(s): FL Office(s): Golden Field Office

  18. CX-100600 Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Epitaxial-Silicon Wafer Integrated Process Line Award Number: DE-EE0007203 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 04/29/2016 Location(s): CA Office(s): Golden Field Office

  19. CX-010413: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Curecanti-Morrow Point 230- and 12.47 Kilovolt Transmission Line Structure Replacement CX(s) Applied: B1.3 Date: 05/08/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-012111: Categorical Exclusion Determination

    Energy.gov [DOE]

    B3S4-White Bluffs Number 1 and Benton-B3S4 Number 1 Transmission Line Reroute CX(s) Applied: B4.13 Date: 04/02/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  1. CX-008716: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bonneville Power Administration (BPA) Tacoma Power Chehalis- Covington 230-Kilovolt (kV) Line/Convert Microwave Signals From Analog To Digital CX(s) Applied: B1.7 Date: 05/21/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration

  2. CX-007673: Categorical Exclusion Determination

    Energy.gov [DOE]

    Edible Oil Deployment for Enhanced Chlorinated Volatile Organic Compounds Attenuation at the M Area Abandoned Process Sewer Line CX(s) Applied: B3.1 Date: 10/25/2011 Location(s): South Carolina Offices(s): Savannah River Operations Office

  3. CX-008781: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Curecanti to Blue Mesa 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-012349: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Gore Pass-Hayden 138-kilovolt Transmission Line, Grand and Routt Counties, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-012354: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hayden-Vernal 138-kilovolt Transmission Line Road Maintenance and Structure Replacements, Uintah County, Utah CX(s) Applied: B1.3 Date: 06/17/2014 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-012759: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Hayden-Gore Pass 230 Kilovolt Transmission Line Grand and Routt Counties, Colorado CX(s) Applied: B1.3Date: 41866 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-008714: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacements on the Alvey-Fairview No. 1 230 Kilovolt (kV), Alvey- Martin Creek 115-kV, and Martin Creek-Drain #1 115-kV Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 05/21/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration

  8. CX-013977: Categorical Exclusion Determination

    Energy.gov [DOE]

    North Bonneville-Ross Transmission Line Right-of-way Sale and Temporary Construction Permit - New Four Seasons Lane to 138th Ave. Segment CX(s) Applied: B1.24Date: 07/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration

  9. CX-012214: Categorical Exclusion Determination

    Energy.gov [DOE]

    Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project, Fremont County, Wyoming CX(s) Applied: B1.3 Date: 05/05/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-013926: Categorical Exclusion Determination

    Energy.gov [DOE]

    Copper Mountain-Pilot Butte 34.5 Kilovolt Transmission Line Structure Pole Replacement Project Fremont County WY CX(s) Applied: B1.3Date: 03/19/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-012348: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Curecanti to Poncha 230-kilovolt Transmission Line, Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-009235: Categorical Exclusion Determination

    Energy.gov [DOE]

    Willow Creek - Granby Tap 2.4 Kilovolt Distribution Line Structure 0/3A Pole Replacement Project CX(s) Applied: B4.6 Date: 09/20/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  13. CX-010108: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Curecanti-Crystal, 115 Kilovolt Transmission Line Danger Tree and Vegetation Management CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-008398: Categorical Exclusion Determination

    Energy.gov [DOE]

    Erosion Control Measures Structure No. 20-1 East Morrill Tap to Lyman 34.5 Kilovolt Transmission Line, Scotts Bluff County, Nebraska CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Nebraska Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-012216: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Curecanti-Morrow Point 230 Kilovolt Transmission Line (Amended), Montrose County, Colorado CX(s) Applied: B1.3 Date: 05/16/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-009231: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Danger Tree Management on Curecanti to North Fork 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  17. CX-007999: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacement Along the Minidoka Power House-Unity #1 and Unity-Heyburn #1, 138-Kilovolt Transmission Line Rights-of-way CX(s) Applied: B1.3 Date: 02/02/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

  18. CX-010675: Categorical Exclusion Determination

    Energy.gov [DOE]

    Parker Dam to Gila 161-kilovolt Transmission Line, Cross Arm Replacement at Structure 0/7 CX(s) Applied: B1.3 Date: 07/22/2013 Location(s): California Offices(s): Western Area Power Administration-Desert Southwest Region

  19. CX-010407: Categorical Exclusion Determination

    Energy.gov [DOE]

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line Access Road Maintenance between Structure 26/8 and 26/9 CX(s) Applied: B1.3 Date: 05/20/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  20. CX-010410: Categorical Exclusion Determination

    Energy.gov [DOE]

    Oracle to Tucson 115 Kilovolt Transmission Line, Cross Arm Replacements at Structure 2/5 and 7/3 CX(s) Applied: B1.3 Date: 05/02/2013 Location(s): Arizona, Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  1. CX-009089: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Green Mountain to Kremmling 69 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 08/15/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-010107: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Curecanti-Morrow Point 230 Kilovolt (kV) and 12.47-kV Transmission Lines Access Road Maintenance CX(s) Applied: B1.3 Date: 04/12/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-012351: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Danger Tree Management on Green Mountain-Blue Ridge Repeater 2.4-kilovolt Distribution Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 06/23/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-012758: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Curecanti to South Canal and South Canal to Montrose 115 Kilovolt Transmission Lines, Gunnison County, Colorado CX(s) Applied: B1.3Date: 41855 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-010544: Categorical Exclusion Determination

    Energy.gov [DOE]

    Glen Canyon Switchyard - 230 Kilovolt Wavetrap Removal - TZ9A2 on the Navajo Line CX(s) Applied: B4.11 Date: 06/21/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  6. CX-008771: Categorical Exclusion Determination

    Energy.gov [DOE]

    Buried Flow Line from T-2-34 to T-1-33 CX(s) Applied: B2.5, B5.2, B5.4 Date: 06/27/2012 Location(s): Wyoming Offices(s): RMOTC

  7. CX-009703: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Improve the Access Road System in Miles 4, 5, 16, 17, 18, and 30 of the Lower Granite-Hatwai Transmission Line CX(s) Applied: B1.3, B1.13 Date: 12/19/2012 Location(s): Washington, Idaho Offices(s): Bonneville Power Administration

  8. CX-013360: Categorical Exclusion Determination

    Energy.gov [DOE]

    Dave Johnston-Stegall 230-kilovolt Transmission Lines Structure Repair and Road Right-of-Way Maintenance Converse County, Wyoming CX(s) Applied: B1.3Date: 01/05/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-009197: Categorical Exclusion Determination

    Energy.gov [DOE]

    2012 Spacer and Insulator Replacement Program; Hatwai-Dworshak No. 1 500-kilovolt (kV) Transmission Line Spacer Replacement Project CX(s) Applied: B1.3 Date: 09/24/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

  10. CX-009232: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on North Fork to Rifle 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-011688: Categorical Exclusion Determination

    Energy.gov [DOE]

    Insulator Replacement on North Bonneville-Midway No. 1 Transmission Line (update to previous CX issued 7/16/13) CX(s) Applied: B4.6 Date: 11/12/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  12. CX-014468: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace West Hackberry Raw Water Injection Pump Discharge Piping and Recycle Line (WH-MM-1106) CX(s) Applied: B1.3Date: 11/04/2015 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office

  13. CX-012522: Categorical Exclusion Determination

    Energy.gov [DOE]

    Building 33 Renovation & Site Fence Line Extension CX(s) Applied: B1.4, B1.16, B1.23, B2.1, B2.2, B2.5Date: 41848 Location(s): OregonOffices(s): National Energy Technology Laboratory

  14. CX-011203: Categorical Exclusion Determination

    Energy.gov [DOE]

    Emergency Storm Damage Repairs to the Gila North Gila, Gila Knob, and Sonora San Luis Transmission Lines, near Yuma, Yuma County, Arizona CX(s) Applied: B4.6 Date: 08/26/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  15. CX-011735: Categorical Exclusion Determination

    Energy.gov [DOE]

    UHV Technologies, Inc. - Low Cost High Throughput In-Line XRF Scrap Metal Sorter CX(s) Applied: B3.6 Date: 12/05/2013 Location(s): Texas, Kentucky Offices(s): Advanced Research Projects Agency-Energy

  16. CX-012113: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    NREL National Wind Technology Center Offsite 115 Kilovolt Tramsmission Line - Planning, Preliminary Design, and Environmental Surveys CX(s) Applied: A9, B3.1 Date: 05/20/2014 Location(s): Colorado Offices(s): Golden Field Office

  17. CX-012760: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Hesperus-Montrose 345 Kilovolt Transmission Line, Phase II Montezuma County, Colorado CX(s) Applied: B1.3Date: 41838 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-009530: Categorical Exclusion Determination

    Energy.gov [DOE]

    Artesia-Rangely Tap of the Hayden-Vernal 138 Kilovolt Transmission Line Bank Stabilization on Structure 20/2 CX(s) Applied: B1.3 Date: 10/29/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-008790: Categorical Exclusion Determination

    Energy.gov [DOE]

    Routine Maintenance of Hesperus-Montrose 345 Kilovolt Transmission Line Access Roads San Miguel, Ouray, Montrose, Montezuma, La Plata, and Dolores Counties, Colorado CX(s) Applied: B1.3 Date: 06/05/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-010888: Categorical Exclusion Determination

    Energy.gov [DOE]

    Great Cut-McPhee 12.5-Kilovolt Fiber Optic Line Replacement CX(s) Applied: B1.3, B4.7 Date: 08/08/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  1. CX-009229: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti- Lost Canyon 230 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-013940: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hesperus-Montrose 345 Kilovolt and Curecanti-Lost Canyon 230 Kilovolt Transmission Lines Vegetation Management San Miguel and Dolores Counties CX(s) Applied: B1.3Date: 09/13/2012 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-009234: Categorical Exclusion Determination

    Energy.gov [DOE]

    Hesperus- Montrose 345 Kilovolt Transmission Line Private Lands Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/13/2012 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-012356: Categorical Exclusion Determination

    Energy.gov [DOE]

    Lovell-Yellowtail No. 1 115-kilovolt Transmission Line Culvert Replacement Project, Big Horn County, Wyoming CX(s) Applied: B1.3 Date: 07/01/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-012742: Categorical Exclusion Determination

    Energy.gov [DOE]

    Mead-Liberty 345 Kilovolt Transmission Line Access Road and Maintenance and Localized Vegetation Management Project CX(s) Applied: B1.3Date: 41878 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region

  6. CX-010181: Categorical Exclusion Determination

    Energy.gov [DOE]

    Building 26 Air Handlers and In-Line Return Fans Replacement CX(s) Applied: B1.3, B1.22, B.1.31 Date: 04/25/2013 Location(s): West Virginia Offices(s): National Energy Technology Laboratory

  7. CX-008667: Categorical Exclusion Determination

    Energy.gov [DOE]

    Eliminate the Capability to Transfer HB-Line Filtrate Solution (Tanks NT-51/52) to H Canyon Tank 8.8 CX(s) Applied: B2.5 Date: 04/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office

  8. CX-012350: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Gore Pass-Kremmling 138-kilovolt Transmission Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 07/01/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-013929: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Upper Molina Lower Molina 115 Kilovolt Transmission Line Structure 34 Mesa County, CO CX(s) Applied: B1.3Date: 02/04/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-012083: Categorical Exclusion Determination

    Energy.gov [DOE]

    Rosedale-Willowby-Kiowa Creek 115-Kilovolt Transmission Line Wood H-Structure Replacement CX(s) Applied: B1.3 Date: 04/10/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-011857: Categorical Exclusion Determination

    Energy.gov [DOE]

    Archer-Cheyenne North/South 115 Kilovolt Transmission Line Structure Replacement, Laramie County, Wyoming CX(s) Applied: B4.13 Date: 01/28/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-007509: Categorical Exclusion Determination

    Energy.gov [DOE]

    Record of Categorical Exclusion for Use of RW Surge Line to Big Hill Anhydrite Pond for Raw Water Intake Structure Recycle CX(s) Applied: B1.3 Date: 11/28/2011 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office

  13. CX-010881: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Glen Canyon to Flagstaff #2 345-Kilovolt Transmission Line, Access Road Maintenance from Structure 45/5 to 46/1 CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  14. CX-008403: Categorical Exclusion Determination

    Energy.gov [DOE]

    Multiple Structure Replacement Flaming Gorge to Vernal No. 1 138 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Utah Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-013507: Categorical Exclusion Determination

    Energy.gov [DOE]

    Modify Jacket Drain Lines LD-1521 and LD-1545 to LD-LDB-1 at Tank 38 CX(s) Applied: B1.3Date: 02/12/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office

  16. CX-011835: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    St. Clair Loop in to Olympia-South Tacoma No.1 230-kilovolt (kV) Transmission Line CX(s) Applied: B4.11 Date: 01/22/2014 Location(s): Washington Offices(s): Bonneville Power Administration

  17. CX-012089: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Testing for 20 Transmission Lines in Southern Arizona and Southern California CX(s) Applied: B3.1 Date: 04/17/2014 Location(s): Arizona, Arizona, Arizona, California, California Offices(s): Western Area Power Administration-Desert Southwest Region

  18. CX-012757: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Curecanti-Lost Canyon 230 Kilovolt Transmission Line Phase II Montezuma County, Colorado CX(s) Applied: B1.3Date: 41838 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-012755: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Morrow Point 230 Kilovolt and 12.47 Kilovolt Transmission Line Access Road Maintenance Montrose County, Colorado CX(s) Applied: B1.3Date: 41848 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-012747: Categorical Exclusion Determination

    Energy.gov [DOE]

    Alcova-Miracle Mile East 115 Kilovolt Transmission Line Fiber Optic Ground Wire and Structure Replacement Project Natrona and Carbon Counties, Wyoming CX(s) Applied: B1.3, B4.7Date: 41855 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  1. CX-012353: Categorical Exclusion Determination

    Energy.gov [DOE]

    Green Mountain-Kremmling 69-kilovolt Transmission Line Maintenance, Grand and Summit Counties, Colorado CX(s) Applied: B1.3 Date: 07/02/2014 Location(s): Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-001369: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Repair Firewater Line in B-Area East Side (Road C-2) near Post Indicator Valve 2118CX(s) Applied: B1.3Date: 03/16/2010Location(s): Aiken, South CarolinaOffice(s): Environmental Management, Savannah River Operations Office

  3. CX-010159: Categorical Exclusion Determination

    Energy.gov [DOE]

    Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration

  4. CX-012215: Categorical Exclusion Determination

    Energy.gov [DOE]

    Curecanti-Poncha 230-Kilovolt Transmission Line Vegetation Management Under the Uncompahgre/Com Task Letter No. 5-No Name Creek Project CX(s) Applied: B1.3 Date: 05/16/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  5. CX-011230: Categorical Exclusion Determination

    Energy.gov [DOE]

    Artesia Tap- Southwest Rangely 138 Kilovolt Transmission Line Danger Tree and Herbicide Treatment for Vegetation Management CX(s) Applied: B1.3 Date: 09/26/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-001652: Categorical Exclusion Determination

    Energy.gov [DOE]

    Structure Replacement Hayden-Gore Pass 138 Kilovolt Transmission Line (Structure 25/5) Spring 2010CX(s) Applied: B4.6Date: 04/15/2010Location(s): ColoradoOffice(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-007991: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Targhee Tap 115-Kilovolt Transmission Line Right-of-ways CX(s) Applied: B1.3 Date: 02/10/2012 Location(s): Idaho Offices(s): Bonneville Power Administration

  8. CX-009709: Categorical Exclusion Determination

    Energy.gov [DOE]

    Wood Pole Replacements Along the Drummond-Macks Inn, Macks Inn-Madison, and Swan Valley-Teton 115-kilovolt Transmission Line Rights-of-Way CX(s) Applied: B1.3 Date: 11/29/2012 Location(s): Idaho, Idaho Offices(s): Bonneville Power Administration

  9. CX-013364: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on North Gunnison to Skito 115-kilovolt and Curecanti to Poncha 230-kilovolt Transmission Line Gunnison and Chaffee Counties, Colorado CX(s) Applied: B1.3Date: 11/14/2014 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-012217: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Deering Lake-Eckley 115 Kilovolt Transmission Line Structure Replacements, Yuma County, Colorado CX(s) Applied: B1.3 Date: 05/19/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-012355: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Kayenta-Navajo 230-kilovolt Transmission Line Landing Construction and Insulator Replacement, Navajo County, Arizona CX(s) Applied: B1.3 Date: 06/05/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-011196: Categorical Exclusion Determination

    Energy.gov [DOE]

    Easement to Tennessee Valley Authority for Bethel Valley Substation and Transmission Line Feeds and Clearing of Trees within the Project Area at the Oak Ridge National Laboratory CX(s) Applied: B1.24, B4.11, B4.12 Date: 09/12/2013 Location(s): Tennessee Offices(s): Oak Ridge Office

  13. CX-012347: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Craig-Rifle 230-kilovolt Transmission Line, Moffat, Rio Blanco, and Garfield Counties, Colorado CX(s) Applied: B1.3 Date: 06/02/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-011207: Categorical Exclusion Determination

    Energy.gov [DOE]

    Ault-Craig 345-Kilovolt Transmission Line Eastern Colorado Maintenance Office Danger Tree Management CX(s) Applied: B1.3 Date: 09/09/2013 Location(s): Colorado, Colorado, Colorado, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-012213: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Boysen-Thermopolis 115 Kilovolt Transmission Line Structure Replacement Project, Hot Springs and Fremont Counties, Wyoming CX(s) Applied: B1.3 Date: 05/16/2014 Location(s): Wyoming, Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  16. CX-009805: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Maintenance and Wood Pole Replacement along the Gila Wellton Mohawk 161 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 01/03/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  17. CX-010547: Categorical Exclusion Determination

    Energy.gov [DOE]

    Parker-Gila 161 Kilovolt Transmission Line Maintenance Project, Structure 92/1 to 94/9 CX(s) Applied: B1.3 Date: 06/05/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  18. CX-010885: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kiowa Creek-Weld 115-Kilovolt Transmission Line Culvert Replacement CX(s) Applied: B1.3, B1.33 Date: 08/06/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  19. CX-005881: Categorical Exclusion Determination

    Energy.gov [DOE]

    Operation of the Chloride Extraction and Acid Recovery Line at TA-55-4CX(s) Applied: B6.8Date: 05/17/2011Location(s): Los Alamos, New MexicoOffice(s): Los Alamos Site Office

  20. CX-008166: Categorical Exclusion Determination

    Energy.gov [DOE]

    Amended: Acquisition of a Portion of Cowlitz County Public Utility Districts 115-Kilovolt Transmission Line Washington Way Substation CX(s) Applied: B1.24 Date: 03/22/2012 Location(s): Washington Offices(s): Bonneville Power Administration

  1. CX-014733: Categorical Exclusion Determination

    Energy.gov [DOE]

    Construction of an Electrical Substation and the Transmission Line Feeds for the Uranium Processing Facility (UPF) at the Y-12 National Security Complex (Y-12) (NEPA #4201.16, rev. 1) CX(s) Applied: B1.24, B4.11, B4.12Date: 04/19/2015 Location(s): TennesseeOffices(s): Y-12 Site Office

  2. CX-013990: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big Eddy-Troutdale No. 1 230 Kilovolt Transmission Line Mile 38 and 39 Priority Conductor Replacement Project CX(s) Applied: B1.3Date: 07/17/2015 Location(s): OregonOffices(s): Bonneville Power Administration

  3. CX-010406: Categorical Exclusion Determination

    Energy.gov [DOE]

    Davis Dam to Kingman Tap 69 Kilovolt Transmission Line, Overhead Optical Power Ground Wire Installation CX(s) Applied: B4.7 Date: 05/16/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  4. CX-010964: Categorical Exclusion Determination

    Energy.gov [DOE]

    Replace Potable Water Supply Lines: Phase Two CX(s) Applied: B1.3, B1.16, B1.32, B2.2 Date: 09/16/2013 Location(s): Pennsylvania Offices(s): National Energy Technology Laboratory

  5. CX-007359: Categorical Exclusion Determination

    Energy.gov [DOE]

    McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration

  6. CX-012074: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Canyon City West-Midway 230-Kilovolt Transmission Line Safety Marker Ball Installation CX(s) Applied: B.13 Date: 04/07/2014 Location(s): Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-011718: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Electrical District 2 to Saguaro #2 115 Kilovolt Transmission Line, Marker Ball Installation at Structure 26-10. CX(s) Applied: B1.3 Date: 01/09/2014 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  8. CX-012201: Categorical Exclusion Determination

    Energy.gov [DOE]

    Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office

  9. CX-008399: Categorical Exclusion Determination

    Energy.gov [DOE]

    Erosion Control Measures Structure No. 110-3 Dave Johnston to Stegall 230 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 03/29/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-013947: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Muddy Pass-Walden 69 Kilovolt Transmission Line Danger Tree Management Jackson County, CO CX(s) Applied: B1.3Date: 05/26/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  11. CX-013915: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Ault Craig 345 Kilovolt Transmission Line ECMO Vegetation Management Weld, Larimer and Jackson Counties, CO CX(s) Applied: B1.3Date: 05/29/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  12. CX-100698 Categorical Exclusion Determination

    Energy.gov [DOE]

    Novel Infiltration Diagnostics based on Laser-line Scanning and Infrared Temperature Field Imaging Award Number: DE-EE0007686 CX(s) Applied: A9, B3.6 Buildings Technology Office Date: 8/15/2016 Location(s): IA Office(s): Golden Field Office

  13. CX-013918: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Archer Terry Ranch and North Park Terry Ranch Road 230 Kilovolt Transmission Line Vegetation Management, Larimer and Jackson Counties, CO and Albany County, WY CX(s) Applied: B1.3Date: 06/10/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  14. CX-013937: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hayden-North Park 230 Kilovolt Transmission Line WCMO Vegetation Management Jackson and Routt Counties, CO CX(s) Applied: B1.3Date: 06/01/2015 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  15. CX-014168: Categorical Exclusion Determination

    Energy.gov [DOE]

    Blythe-Knob 161 Kilovolt Transmission Line, Pole Replacements at Interstate 10 Crossing CX(s) Applied: B1.3Date: 08/07/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Desert Southwest Region

  16. CX-014734: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Line Emission from High Z Multiply Ionized Ions Influenced by Dielectric Recombination and Polarization at the University of Nevada, Reno CX(s) Applied: A1, A9, B3.6Date: 11/05/2015 Location(s): NevadaOffices(s): NNSA-Headquarters

  17. CX-008785: Categorical Exclusion Determination

    Energy.gov [DOE]

    Line Switch Replacements at Chappell and Julesburg Taps in Deuel County, Nebraska and Kersey Tap in Weld, Colorado CX(s) Applied: B4.6, B4.11 Date: 07/25/2012 Location(s): Nebraska, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  18. CX-012784: Categorical Exclusion Determination

    Energy.gov [DOE]

    2014 Access Road Erosion Repair Along the Path 15 500 Kilovolt Transmission Line CX(s) Applied: B1.3, B1.13Date: 41831 Location(s): CaliforniaOffices(s): Western Area Power Administration-Sierra Nevada Region

  19. CX-013942: Categorical Exclusion Determination

    Energy.gov [DOE]

    Kayenta-Navajo 230 Kilovolt Transmission Line Access Road Maintenance Coconino and Navajo Counties AZ CX(s) Applied: B1.3Date: 01/21/2015 Location(s): ArizonaOffices(s): Western Area Power Administration-Rocky Mountain Region

  20. CX-013920: Categorical Exclusion Determination

    Energy.gov [DOE]

    Box Butte-Chadron 115 Kilovolt Transmission Line Structure Replacement Project, Dawes County, CO CX(s) Applied: B1.3Date: 06/02/2015 Location(s): NebraskaOffices(s): Western Area Power Administration-Rocky Mountain Region

  1. CX-008782: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on North Gunnison to Skito 115 Kilovolt Transmission Line Gunnison County, Colorado CX(s) Applied: B1.3 Date: 07/02/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  2. CX-008389: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on Estes-Pole Hill and Pole Hill-Flatiron 115 Kilovolt Transmission Lines CX(s) Applied: B1.3 Date: 03/09/2012 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  3. CX-013363: Categorical Exclusion Determination

    Energy.gov [DOE]

    Danger Tree Management on North Gunnison to Salida 115-kilovolt Transmission Lines and Gunnison and Chaffee Counties, Colorado CX(s) Applied: B1.3Date: 11/14/2014 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region

  4. CX-010412: Categorical Exclusion Determination

    Energy.gov [DOE]

    Road Maintenance and Brushwork along the Saguaro-Tucson 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 04/30/2013 Location(s): Arizona Offices(s): Western Area Power Administration-Desert Southwest Region

  5. CX-012751: Categorical Exclusion Determination

    Energy.gov [DOE]

    Casper-Seminoe (Retired) 69 Kilovolt Transmission Line Emergency Conductor Removal Carbon and Natrona Counties, Wyoming CX(s) Applied: B4.10Date: 41858 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region

  6. CX-011232: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gore Pass-Hayden 138 Kilovolt Transmission Line Emergency Repairs of Downed Conductor Grand County, Colorado CX(s) Applied: B1.3 Date: 10/09/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  7. CX-010549: Categorical Exclusion Determination

    Energy.gov [DOE]

    Chappell, Julesburg, and Kersey Tap Line Switch Replacements in Deuel County, Nebraska and Weld County, Colorado CX(s) Applied: B4.6, B4.11 Date: 06/04/2013 Location(s): Nebraska, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region

  8. CX-012073: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big George-Heart Mountain 69-Kilovolt Transmission Line Glendale Tap Replacement (Amended) CX(s) Applied: B4.13 Date: 05/01/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  9. CX-011859: Categorical Exclusion Determination

    Energy.gov [DOE]

    Big George-Heart Mountain 69 Kilovolt Transmission Line Glendale Tap Replacement, Park County, Wyoming CX(s) Applied: B4.6 Date: 01/21/2014 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  10. CX-008777: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Boysen-Thermopolis 115 Kilowolt Transmission Line Structure 15/6 Pole Replacement Project Fremont County, Wyoming CX(s) Applied: B4.6 Date: 07/02/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region

  11. Applied Energy Management | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Energy Management Jump to: navigation, search Name: Applied Energy Management Place: Huntersville, North Carolina Zip: 28078 Sector: Efficiency, Renewable Energy Product: North...

  12. Applied Quantum Technology AQT | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Quantum Technology AQT Jump to: navigation, search Name: Applied Quantum Technology (AQT) Place: Santa Clara, California Zip: 95054 Product: California-based manufacturer of CIGS...

  13. CRF Summer Undergraduate Internship Opportunities - Apply by...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Apply online and select Sandia as the host laboratory at: Undergraduate: http:science.energy.govwdtssuli Community College: http:science.energy.govwdtscci For further ...

  14. Vehicle Technologies Office: Applied Battery Research | Department...

    Office of Environmental Management (EM)

    Applied battery research addresses the barriers facing the lithium-ion systems that are closest to meeting the technical energy and power requirements for hybrid electric vehicle ...

  15. Applied Materials Inc AMAT | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    manufacturer of equipment used in solar (silicon, thin-film, BIPV), semiconductor, and LCD markets. References: Applied Materials Inc (AMAT)1 This article is a stub. You can...

  16. Nuclear Facilities and Applied Technologies at Sandia

    SciTech Connect

    Wheeler, Dave; Kaiser, Krista; Martin, Lonnie; Hanson, Don; Harms, Gary; Quirk, Tom

    2014-11-28

    The Nuclear Facilities and Applied Technologies organization at Sandia National Laboratories’ Technical Area Five (TA-V) is the leader in advancing nuclear technologies through applied radiation science and unique nuclear environments. This video describes the organization’s capabilities, facilities, and culture.

  17. Plains and Eastern Clean Line Transmission Line: Comment from Save The

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ozarks | Department of Energy from Save The Ozarks Plains and Eastern Clean Line Transmission Line: Comment from Save The Ozarks Comment submitted on updated Part 2 application. Comment by Save the Ozarks 07-13-15.pdf (112.79 KB) More Documents & Publications Plains & Eastern Clean Line Transmission Line - Part 2 Application Plains & Eastern Clean Line Project Proposal for New or Upgraded Transmission Line Projects Under Section 1222 of the Energy Policy Act of 2005 Plains and

  18. CXD 4601, Line Yard Fence Project (4601)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Line Yard Fence Project (4601) Y-12 Site Office Oak Ridge, Anderson County, Tennessee The proposed action is to install fencing around the Old Line Yard to provide protected...

  19. FB Line Basis for Interim Operation

    SciTech Connect

    Shedrow, B.

    1998-10-19

    The safety analysis of the FB-Line Facility indicates that the operation of FB-Line to support the current mission does not present undue risk to the facility and co-located workers, general public, or the environment.

  20. O.A.R. 734-055 - Pole Lines, Buried Cables, Pipe lines, Signs...

    OpenEI (Open Energy Information) [EERE & EIA]

    rules outline the requirements for location, installation, construction, maintenance and use of pole lines, buried cables, pipe lines, signs miscellaneous operations...

  1. Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization

    DOEpatents

    Jankowiak, R.J.; Small, G.J.; Shields, P.A.

    1999-04-27

    Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes. 21 figs.

  2. Capillary electrophoresis-fluorescence line narrowing system (CE-FLNS) for on-line structural characterization

    DOEpatents

    Jankowiak, Ryszard J.; Small, Gerald J.; Shields, Peter A.

    1999-04-27

    Capillary electrophoresis (CE) is interfaced with low temperature fluorescence line-narrowing (FLN) spectroscopy for on-line structural characterization of separated molecular analytes.

  3. Superconducting transmission line particle detector

    DOEpatents

    Gray, K.E.

    1988-07-28

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non- superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propagating in a superconducting transmission line are used to resolve N/sup 2/ ambiguity of charged particle events. 6 figs.

  4. Superconducting transmission line particle detector

    DOEpatents

    Gray, Kenneth E.

    1989-01-01

    A microvertex particle detector for use in a high energy physic collider including a plurality of parallel superconducting thin film strips separated from a superconducting ground plane by an insulating layer to form a plurality of superconducting waveguides. The microvertex particle detector indicates passage of a charged subatomic particle by measuring a voltage pulse measured across a superconducting waveguide caused by the transition of the superconducting thin film strip from a superconducting to a non-superconducting state in response to the passage of a charged particle. A plurality of superconducting thin film strips in two orthogonal planes plus the slow electromagnetic wave propogating in a superconducting transmission line are used to resolve N.sup.2 ambiguity of charged particle events.

  5. Unsplit bipolar pulse forming line

    DOEpatents

    Rhodes, Mark A.

    2011-05-24

    A bipolar pulse forming transmission line module and system for linear induction accelerators having first, second, third, and fourth planar conductors which form a sequentially arranged interleaved stack having opposing first and second ends, with dielectric layers between the conductors. The first and second planar conductors are connected to each other at the first end, and the first and fourth planar conductors are connected to each other at the second end via a shorting plate. The third planar conductor is electrically connectable to a high voltage source, and an internal switch functions to short at the first end a high voltage from the third planar conductor to the fourth planar conductor to produce a bipolar pulse at the acceleration axis with a zero net time integral. Improved access to the switch is enabled by an aperture through the shorting plate and the proximity of the aperture to the switch.

  6. Applied Energy Programs, SPO-AE: LANL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Karl Jonietz 505-663-5539 Program Manager Melissa Fox 505-663-5538 Budget Analyst Fawn Gore 505-665-0224 The Applied Energy Program Office (SPO-AE) manages Los Alamos National...

  7. Overview of the NMSEA applied research program

    SciTech Connect

    Stickney, B.; Wilson, A.

    1980-01-01

    Recently the NMSEA has seen the need to augment its other informational programs with a program of in-house applied research. The reasoning behind this move is presented here along with and accounting of past research activities.

  8. Pi in Applied Optics | GE Global Research

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The sPI Cam visits the Applied Optics Lab to see how Mark Meyers, a physicist and optical engineer at GE Global Research, uses Pi. You Might Also Like lightning bolt We One-Upped ...

  9. SAGE, Summer of Applied Geophysical Experience

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Apply Who Qualifies Special Undergrad Information Contributors Faculty Past Programs Photo Gallery NSEC » CSES » SAGE SAGE, the Summer of Applied Geophysical Experience A National Science Foundation Research Experiences for Undergraduates program Contacts Institute Director Reinhard Friedel-Los Alamos SAGE Co-Director W. Scott Baldridge-Los Alamos SAGE Co-Director Larry Braile-Purdue University Professional Staff Assistant Georgia Sanchez (505) 665-0855 Email SAGE Class of 2016 SAGE 2016

  10. How to Apply | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Postdoctoral Research Awards » How to Apply How to Apply Online Application Available at www.zintellect.com/Posting/Details/1997 Application deadline May 20, 2016. Familiarize yourself with the benefits, obligations, eligibility requirements, and evaluation criteria. Familiarize yourself with the requirements and obligations to determine whether your education and professional goals are well aligned with the EERE Postdoctoral Research Awards. Read the Evaluation Criteria that will be used to

  11. Multiple Lines Of Evidence Supporting Natural Attenuation: Lines Of Inquiry Supporting Monitored Natural Attenuation And Enhanced Attenuatin Of Chlorinated Solvents

    SciTech Connect

    Vangelas, Karen; Widemeirer, T. H.; Barden, M.J.; Dickson, W. Z.; Major, David

    2004-12-31

    The Department of Energy (DOE) is sponsoring an initiative to facilitate efficient, effective and responsible use of Monitored Natural Attenuation (MNA) and Enhanced Attenuation (EA) for chlorinated solvents. This Office of Environmental Management (EM) ''Alternative Project,'' focuses on providing scientific and policy support for MNA/EA. A broadly representative working group of scientists supports the project along with partnerships with regulatory organizations such as the Interstate Technology Regulatory Council (ITRC) and the United States Environmental Protection Agency (USEPA). The initial product of the technical working group was a summary report that articulated the conceptual approach and central scientific tenants of the project, and that identified a prioritized listing of technical targets for field research. This report documented the process in which: (1) scientific ground rules were developed, (2) lines of inquiry were identified and then critically evaluated, (3) promising applied research topics were highlighted in the various lines of inquiry, and (4) these were discussed and prioritized. The summary report will serve as a resource to guide management and decision making throughout the period of the subject MNA/EA Alternative Project. To support and more fully document the information presented in the summary report, the DOE is publishing a series of supplemental documents that present the full texts from the technical analyses within the various lines of inquiry (see listing). The following report--documenting our evaluation of the state of the science for the lines of evidence for supporting decision-making for MNA--is one of those supplemental documents.

  12. Relativistic redshifts in quasar broad lines

    SciTech Connect

    Tremaine, Scott; Shen, Yue; Liu, Xin; Loeb, Abraham E-mail: yshen@obs.carnegiescience.edu E-mail: aloeb@cfa.harvard.edu

    2014-10-10

    The broad emission lines commonly seen in quasar spectra have velocity widths of a few percent of the speed of light, so special- and general-relativistic effects have a significant influence on the line profile. We have determined the redshift of the broad Hβ line in the quasar rest frame (determined from the core component of the [O III] line) for over 20,000 quasars from the Sloan Digital Sky Survey Data Release 7 quasar catalog. The mean redshift as a function of line width is approximately consistent with the relativistic redshift that is expected if the line originates in a randomly oriented Keplerian disk that is obscured when the inclination of the disk to the line of sight exceeds ∼30°-45°, consistent with simple active galactic nucleus unification schemes. This result also implies that the net line-of-sight inflow/outflow velocities in the broad-line region are much less than the Keplerian velocity when averaged over a large sample of quasars with a given line width.

  13. Political efficacy and familiarity as predictors of attitudes towards electric transmission lines in the United States

    DOE PAGES [OSTI]

    Joe, Jeffrey C.; Hendrickson, Kelsie; Wong, Maria; Kane, Stephanie L.; Solan, David; Carlisle, Juliet E.; Koehler, David; Ames, Daniel P.; Beazer, Robert

    2016-05-18

    Public opposition to the construction (i.e., siting) of new high voltage overhead transmission lines is not a new or isolated phenomenon. Past research has posited a variety of reasons, applied general theories, and has provided empirical evidence to explain public opposition. The existing literature, while clarifying many elements of the issue, does not yet fully explain the complexities underlying this public opposition phenomenon. As a result, the current study demonstrated how two overlooked factors, people’s sense of political efficacy and their familiarity (i.e., prior exposure) with transmission lines, explained attitudes of support and opposition to siting new power lines.

  14. Categorical Exclusion Determinations: Advanced Technology Vehicles...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reequipping and Engineering CX(s) Applied: B1.31, B5.1 Date: 09062011 ... Aptera All-Electric and Hybrid Electric Vehicles CX(s) Applied: B1.31, B5.1 Date: 0620...

  15. Categorical Exclusion Determinations: Idaho Operations Office...

    Energy.gov [DOE] (indexed site)

    Stack Modifications for Sample Probe Replacement CX(s) Applied: B2.2 Date: 05112015 ... Determination Test Reactor Area-774 Substation Equipment Upgrades CX(s) Applied: B2.5 ...

  16. THEORETICAL EVOLUTION OF OPTICAL STRONG LINES ACROSS COSMIC TIME

    SciTech Connect

    Kewley, Lisa J.; Dopita, Michael A.; Sutherland, Ralph; Leitherer, Claus; Dave, Romeel; Allen, Mark; Groves, Brent

    2013-09-10

    We use the chemical evolution predictions of cosmological hydrodynamic simulations with our latest theoretical stellar population synthesis, photoionization, and shock models to predict the strong line evolution of ensembles of galaxies from z = 3 to the present day. In this paper, we focus on the brightest optical emission-line ratios, [N II]/H{alpha} and [O III]/H{beta}. We use the optical diagnostic Baldwin-Phillips-Terlevich (BPT) diagram as a tool for investigating the spectral properties of ensembles of active galaxies. We use four redshift windows chosen to exploit new near-infrared multi-object spectrographs. We predict how the BPT diagram will appear in these four redshift windows given different sets of assumptions. We show that the position of star-forming galaxies on the BPT diagram traces the interstellar medium conditions and radiation field in galaxies at a given redshift. Galaxies containing active galactic nucleus (AGN) form a mixing sequence with purely star-forming galaxies. This mixing sequence may change dramatically with cosmic time, due to the metallicity sensitivity of the optical emission-lines. Furthermore, the position of the mixing sequence may probe metallicity gradients in galaxies as a function of redshift, depending on the size of the AGN narrow-line region. We apply our latest slow shock models for gas shocked by galactic-scale winds. We show that at high redshift, galactic wind shocks are clearly separated from AGN in line ratio space. Instead, shocks from galactic winds mimic high metallicity starburst galaxies. We discuss our models in the context of future large near-infrared spectroscopic surveys.

  17. NSLS-II Transport Line Progress

    SciTech Connect

    Fliller R. P.; Wahl, W.; Anderson, A.; Benish, B.; DeBoer, W.; Ganetis, G.; Heese, R.; Hseuh, H.-C.; Hu, J.-P.; Johanson, M.P.; Kosciuk, B.N.; Padrazo, D.; Roy, K.; Shaftan, T.; Singh, O.; Tuozzolo, J.; Wang, G.

    2012-05-20

    The National Synchrotron Light Source II (NSLS-II) is a state-of-the-art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The first part of the Linac to Booster Transport (LBT) line has been installed for linac commissioning. This part includes all components necessary to commission the NSLS-II linac. The second part of this transport line is undergoing installation. Initial results of hardware commissioning will be discussed. The Booster to Storage Ring (BSR) transport line underwent a design review. The first part of the BSR transport line, consisting of all components necessary to commission the booster will be installed in 2012 for booster commissioning. We report on the final design of the BSR line along with the plan to commission the booster.

  18. Single transmission line data acquisition system

    DOEpatents

    Fasching, George E.

    1984-01-01

    A single transmission line interrogated multiple channel data acquisition system is provided in which a plurality of remote station/sensors monitor specific process variables and transmit measurement values over the single transmission line to a master station when addressed by the master station. Power for all remote stations (up to 980) is provided by driving the line with constant voltage supplied from the master station and automatically maintained independent of the number of remote stations directly connected to the line. The transmission line can be an RG-62 coaxial cable with lengths up to about 10,000 feet with branches up to 500 feet. The remote stations can be attached randomly along the line. The remote stations can be scanned at rates up to 980 channels/second.

  19. Microsoft Word - STO Comments on Clean Line Application under...

    Energy.gov [DOE] (indexed site)

    Clean Line Transmission Line Project ("Clean Line Project" or "Project"). ... "objective of integrating more renewable resources onto the grid," 1 However, after reviewing Section ...

  20. Salt Waste Processing Facility, Line Management Review Board...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Line Management Review Board Charter Salt Waste Processing Facility, Line Management Review Board Charter The Line Management Review Board (LMRB) serves an important oversight ...

  1. Method of applying coatings to substrates

    DOEpatents

    Hendricks, Charles D.

    1991-01-01

    A method for applying novel coatings to substrates is provided. The ends of multiplicity of rods of different materials are melted by focused beams of laser light. Individual electric fields are applied to each of the molten rod ends, thereby ejecting charged particles that include droplets, atomic clusters, molecules, and atoms. The charged particles are separately transported, by the accelerations provided by electric potentials produced by an electrode structure, to substrates where they combine and form the coatings. Layered and thickness graded coatings comprised of hithereto unavailable compositions, are provided.

  2. Detonator comprising a nonlinear transmission line

    SciTech Connect

    Elizondo-Decanini, Juan M

    2014-12-30

    Detonators are described herein. In a general embodiment, the detonator includes a nonlinear transmission line that has a variable capacitance. Capacitance of the nonlinear transmission line is a function of voltage on the nonlinear transmission line. The nonlinear transmission line receives a voltage pulse from a voltage source and compresses the voltage pulse to generate a trigger signal. Compressing the voltage pulse includes increasing amplitude of the voltage pulse and decreasing length of the voltage pulse in time. An igniter receives the trigger signal and detonates an explosive responsive to receipt of the trigger signal.

  3. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 4 - Nuclear Safety Basis Program Review During Facility ...

  4. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    4 Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Commercial Grade Dedication (CGD) August 2013 2 of 14 OFFICE OF ...

  5. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 2 -- Nuclear Safety Basis Program Review During Design February ...

  6. Transmission Line Security Monitor: Final Report

    SciTech Connect

    John Svoboda

    2011-04-01

    The Electric Power Transmission Line Security Monitor System Operational Test is a project funded by the Technical Support Working Group (TSWG). TSWG operates under the Combating Terrorism Technical Support Office that functions under the Department of Defense. The Transmission Line Security Monitor System is based on technology developed by Idaho National Laboratory. The technology provides a means for real-time monitoring of physical threats and/or damage to electrical transmission line towers and conductors as well as providing operational parameters to transmission line operators to optimize transmission line operation. The end use is for monitoring long stretches of transmission lines that deliver electrical power from remote generating stations to cities and industry. These transmission lines are generally located in remote transmission line corridors where security infrastructure may not exist. Security and operational sensors in the sensor platform on the conductors take power from the transmission line and relay security and operational information to operations personnel hundreds of miles away without relying on existing infrastructure. Initiated on May 25, 2007, this project resulted in pre-production units tested in realistic operational environments during 2010. A technology licensee, Lindsey Manufacturing of Azusa California, is assisting in design, testing, and ultimately production. The platform was originally designed for a security monitoring mission, but it has been enhanced to include important operational features desired by electrical utilities.

  7. DOE Sustainability Reporting Open Line Help Call

    Energy.gov [DOE]

    The Sustainability Performance Office (SPO) sponsors open line help calls to assist DOE sites and national laboratories with the annual sustainability reporting process. Representatives from the...

  8. Supervisory Transmission Lines and Substation Maintenance Manager

    Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Transmission Lines and Substation Maintenance (G5200) 615...

  9. MMW Drilling & Lining | Department of Energy

    Energy.gov [DOE] (indexed site)

    MMW Drilling & Lining presentation at the April 2013 peer review meeting held in Denver, Colorado. mmwdrillingpeer2013.pdf (1 MB) More Documents & Publications Microhole Arrays ...

  10. Applying process-control techniques to a research environment: on-line controls and instrumentation for Doublet III fusion project

    SciTech Connect

    Drobnis, D. D.

    1983-09-01

    The system design is given in terms of the following: (1) conventional aspects, (2) architecture, (3) electronic interfaces, (4) operator interfaces, (5) unconventional aspects, (6) electrical energy, (7) electrical noise, (8) operating flexibility, and (9) command procedure development. (MOW)

  11. Blasting Rocks and Blasting Cars Applied Engineering

    SciTech Connect

    LBNL

    2008-07-02

    June 30, 2004 Berkeley Lab lecture: Deb Hopkins works with industries like automobile, mining and paper to improve their evaluation and measuring techniques. For several years, she has coordinated ... June 30, 2004 Berkeley Lab lecture: Deb Hopkins works with industries like automobile, mining and paper to improve their evaluation and measuring techniques. For several years, she has coordinated a program at Berkeley Lab funded under the Partnership for a New Generation of Vehicles, a collaboration between the federal government and the U.S. Council for Automotive Research. Nondestructive evaluation techniques to test a car's structural integrity are being developed for auto assembly lines.

  12. Blasting Rocks and Blasting Cars Applied Engineering

    ScienceCinema

    LBNL

    2016-07-12

    June 30, 2004 Berkeley Lab lecture: Deb Hopkins works with industries like automobile, mining and paper to improve their evaluation and measuring techniques. For several years, she has coordinated ... June 30, 2004 Berkeley Lab lecture: Deb Hopkins works with industries like automobile, mining and paper to improve their evaluation and measuring techniques. For several years, she has coordinated a program at Berkeley Lab funded under the Partnership for a New Generation of Vehicles, a collaboration between the federal government and the U.S. Council for Automotive Research. Nondestructive evaluation techniques to test a car's structural integrity are being developed for auto assembly lines.

  13. Uniform insulation applied-B ion diode

    DOEpatents

    Seidel, David B.; Slutz, Stephen A.

    1988-01-01

    An applied-B field extraction ion diode has uniform insulation over an anode surface for increased efficiency. When the uniform insulation is accomplished with anode coils, and a charge-exchange foil is properly placed, the ions may be focused at a point on the z axis.

  14. How to Apply for Senior Executive positions

    Energy.gov [DOE]

    To apply vacancies for SENIOR EXECUTIVE SERVICE (SES) , SENIOR LEVEL (SL), SCIENTIFIC AND PROFESSIONAL (ST) positions within the Department of Energy please visit OPM's website: http://www.usajobs.gov. From this site, you may download announcements for vacancies of interest to you.

  15. (Applied mass spectrometry in the health sciences)

    SciTech Connect

    Glish, G.L.

    1990-05-03

    The traveler attended the 2nd International Symposium on Applied Mass Spectrometry in the Health Sciences and presented and invited paper. Papers presented that were of interest to ORNL mass spectrometry programs involved ionization of large molecules by electrospray and laser desorption. Other papers of interest included applications of MS/MS for structural elucidation and new instrumentation.

  16. Soliton production with nonlinear homogeneous lines

    DOE PAGES [OSTI]

    Elizondo-Decanini, Juan M.; Coleman, Phillip D.; Moorman, Matthew W.; Petney, Sharon Joy Victor; Dudley, Evan C.; Youngman, Kevin; Penner, Tim Dwight; Fang, Lu; Myers, Katherine M.

    2015-11-24

    Low- and high-voltage Soliton waves were produced and used to demonstrate collision and compression using diode-based nonlinear transmission lines. Experiments demonstrate soliton addition and compression using homogeneous nonlinear lines. We built the nonlinear lines using commercially available diodes. These diodes are chosen after their capacitance versus voltage dependence is used in a model and the line design characteristics are calculated and simulated. Nonlinear ceramic capacitors are then used to demonstrate high-voltage pulse amplification and compression. The line is designed such that a simple capacitor discharge, input signal, develops soliton trains in as few as 12 stages. We also demonstrated outputmore » voltages in excess of 40 kV using Y5V-based commercial capacitors. The results show some key features that determine efficient production of trains of solitons in the kilovolt range.« less

  17. Soliton production with nonlinear homogeneous lines

    SciTech Connect

    Elizondo-Decanini, Juan M.; Coleman, Phillip D.; Moorman, Matthew W.; Petney, Sharon Joy Victor; Dudley, Evan C.; Youngman, Kevin; Penner, Tim Dwight; Fang, Lu; Myers, Katherine M.

    2015-11-24

    Low- and high-voltage Soliton waves were produced and used to demonstrate collision and compression using diode-based nonlinear transmission lines. Experiments demonstrate soliton addition and compression using homogeneous nonlinear lines. We built the nonlinear lines using commercially available diodes. These diodes are chosen after their capacitance versus voltage dependence is used in a model and the line design characteristics are calculated and simulated. Nonlinear ceramic capacitors are then used to demonstrate high-voltage pulse amplification and compression. The line is designed such that a simple capacitor discharge, input signal, develops soliton trains in as few as 12 stages. We also demonstrated output voltages in excess of 40 kV using Y5V-based commercial capacitors. The results show some key features that determine efficient production of trains of solitons in the kilovolt range.

  18. Applied Mathematics Conferences and Workshops | U.S. DOE Office...

    Office of Science (SC)

    ASCR Home About Research Applied Mathematics Applied Mathematics Conferences And Workshops Computer Science Next Generation Networking Scientific Discovery through Advanced ...

  19. Summer of Applied Geophysical Experience Reading List

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Geophysical Experience Reading List Summer of Applied Geophysical Experience Reading List A National Science Foundation Research Experiences for Undergraduates program Contacts Institute Director Reinhard Friedel-Los Alamos SAGE Co-Director W. Scott Baldridge-Los Alamos SAGE Co-Director Larry Braile-Purdue University Professional Staff Assistant Georgia Sanchez (505) 665-0855 Keller, R., Khan, M. A., Morgan, P., et al., 1991, A Comparative Study of the Rio Grande and Kenya rifts, Tectonophys.,

  20. CX-010718: Categorical Exclusion Determination | Department of Energy

    Energy Saver

    30: Categorical Exclusion Determination CX-010430: Categorical Exclusion Determination Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kilovot transmission line to Cowlitz County Public Utility District Number 1 (Cowlitz PUD) in Cowlitz County,

  1. CX-013993: Categorical Exclusion Determination | Department of Energy

    Energy Saver

    93: Categorical Exclusion Determination CX-013993: Categorical Exclusion Determination Kalispell-Kerr No. 1 Transmission Line Access Road Improvements CX(s) Applied: B1.3 Date: 07/06/2015 Location(s): Montana Offices(s): Bonneville Power Administration Bonneville Power Administration proposes to perform routine road maintenance along BPA's Kalispell-Kerr No. 1 transmission line which involves improving approximately 1,900 feet of mainline access road servicing structures 15/4-15/7. Document(s)

  2. CX-005363: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Categorical Exclusion Determination CX-005363: Categorical Exclusion Determination Solar Junction's 100 Megawatt Manufacturing Line CX(s) Applied: B1.31 Date: 03/04/2011 Location(s): San Jose, California Office(s): Loan Guarantee Program Office The Department of Energy's proposed action is to issue a loan guarantee to Solar Junction to finance a 100 megawatt (MW) solar cell manufacturing line for multifunction photovoltaic solar cells to expand their existing 7 MW Demonstration Facility at

  3. CX-010430: Categorical Exclusion Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0: Categorical Exclusion Determination CX-010430: Categorical Exclusion Determination Lexington-Delameter 115-kilovolt (kV) Transmission Line Sale CX(s) Applied: B1.24 Date: 06/20/2013 Location(s): Washington Offices(s): Bonneville Power Administration Bonneville Power Administration (BPA) is proposing to transfer ownership of a portion of its existing Lexington-Delameter 115-kilovot transmission line to Cowlitz County Public Utility District Number 1 (Cowlitz PUD) in Cowlitz County, Washington.

  4. CX-010109: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    09: Categorical Exclusion Determination CX-010109: Categorical Exclusion Determination Curecanti-Poncha 230 Kilovolt Transmission Line Cross Bar Ranch Project CX(s) Applied: B1.3 Date: 04/25/2013 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to fund off right-of-way (ROW) vegetation restoration treatments immediately adjacent to Western's Curecanti-Poncha 230-kilovolt Transmission Line (CCI-PON) in

  5. CX-010110: Categorical Exclusion Determination | Department of Energy

    Office of Environmental Management (EM)

    10: Categorical Exclusion Determination CX-010110: Categorical Exclusion Determination Hesperus-Montrose (Project No. 3) 345 Kilovolt (kV) Transmission Line and Curecanti-Lost Canyon 230-kilovolt Transmission Line Routine Maintenance of Right-of-Way Roads CX(s) Applied: B1.3 Date: 04/26/2013 Location(s): Colorado, Colorado, Colorado, Colorado, Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region Western Area Power Administration (Western) proposes to perform routine

  6. Cache directory lookup reader set encoding for partial cache line speculation support

    SciTech Connect

    Gara, Alan; Ohmacht, Martin

    2014-10-21

    In a multiprocessor system, with conflict checking implemented in a directory lookup of a shared cache memory, a reader set encoding permits dynamic recordation of read accesses. The reader set encoding includes an indication of a portion of a line read, for instance by indicating boundaries of read accesses. Different encodings may apply to different types of speculative execution.

  7. Analytical SFE applied to polymeric materials

    SciTech Connect

    Taylor, L.T.

    1995-12-31

    Polymeric materials afford unique challenges for analytical supercritical fluid extraction. Oligomeric components, monomers, anti-oxidants, finishes, residual solvents and processing additives are some of the analytes of interest. In addition to their marginal solubility in 100% CO{sub 2}, the extraction analyte is many times diffusion limited rather than enthalpically driven which means that exhaustive extractions from polymer matrices may be slow. The presentation will draw upon our experiences in the (a) fractionation of high density polyethylene with supercritical propane-modified CO{sub 2}, (b) coupling of SFE and Fourier Transform Infrared Spectrometry (FT-IR) for analysis of finishes from polyester, nylon, aramid, and polyurethane, and (c) removal of low molecular weight oligomers and additives from polyamides and polystyrene and their identification by on-line supercritical fluid chromatography/FT-IR.

  8. Computing Criticality of Lines in Power Systems

    SciTech Connect

    Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

    2006-10-13

    We propose a computationally efficient method based onnonlinear optimization to identify critical lines, failure of which cancause severe blackouts. Our method computes criticality measure for alllines at a time, as opposed to detecting a single vulnerability,providing a global view of the system. This information on criticality oflines can be used to identify multiple contingencies by selectivelyexploring multiple combinations of broken lines. The effectiveness of ourmethod is demonstrated on the IEEE 30 and 118 bus systems, where we canvery quickly detect the most critical lines in the system and identifysevere multiple contingencies.

  9. Apply for a Job | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    FAQs Answers to frequently asked questions about applying for a job at Argonne A Note About Privacy We do not ask you for personally identifiable information such as birthdate, social security number, or driver's license number. To ensure your privacy, please do not include such information in the documents that you upload to the system. A Note About File Size Our application system has a file size limit of 820KB. While this is sufficient for the vast majority of documents, we have found that

  10. Expert systems applied to two problems in nuclear power plants

    SciTech Connect

    Kim, K.Y.

    1988-01-01

    This dissertation describes two prototype expert systems applied to two problems in nuclear power plants. One problem is spare parts inventory control, and the other one is radionuclide release from containment during severe accident. The expert system for spare parts inventory control can handle spare parts requirements not only in corrective, preventive, or predictive maintenance, but also when failure rates of components or parts are updated by new data. Costs and benefits of spare parts inventory acquisition are evaluated with qualitative attributes such as spare part availability to provide the inventory manager with an improved basis for decision making. The expert system is implemented with Intelligence/Compiler on an IBM-AT. The other expert system for radionuclide release from containment can estimate magnitude, type, location, and time of release of radioactive materials from containment during a severe accident nearly on line, based on the actual measured physical parameters such as temperature and pressure inside the containment. The expert system has a function to check the validation of sensor data. The expert system is implemented with KEE on a Symbolics LISP machine.

  11. 2009 Applied and Environmental Microbiology GRC

    SciTech Connect

    Nicole Dubilier

    2009-07-12

    The topic of the 2009 Gordon Conference on Applied and Environmental Microbiology is: From Single Cells to the Environment. The Conference will present and discuss cutting-edge research on applied and environmental microbiology with a focus on understanding interactions between microorganisms and the environment at levels ranging from single cells to complex communities. The Conference will feature a wide range of topics such as single cell techniques (including genomics, imaging, and NanoSIMS), microbial diversity at scales ranging from clonal to global, environmental 'meta-omics', biodegradation and bioremediation, metal - microbe interactions, animal microbiomes and symbioses. The Conference will bring together investigators who are at the forefront of their field, and will provide opportunities for junior scientists and graduate students to present their work in poster format and exchange ideas with leaders in the field. Some poster presenters will be selected for short talks. The collegial atmosphere of this Conference, with extensive discussion sessions as well as opportunities for informal gatherings in the afternoons and evenings, provides an ideal setting for scientists from different disciplines to exchange ideas, brainstorm and discuss cross-disciplinary collaborations.

  12. Electrical Transmission Line Diametrical Retention Mechanism

    DOEpatents

    Hall, David R.; Hall, Jr., H. Tracy; Pixton, David; Dahlgren, Scott; Sneddon, Cameron; Briscoe, Michael; Fox, Joe

    2006-01-03

    The invention is a mechanism for retaining an electrical transmission line. In one embodiment of the invention it is a system for retaining an electrical transmission line within downhole components. The invention allows a transmission line to be attached to the internal diameter of drilling components that have a substantially uniform drilling diameter. In accordance with one aspect of the invention, the system includes a plurality of downhole components, such as sections of pipe in a drill string, drill collars, heavy weight drill pipe, and jars. The system also includes a coaxial cable running between the first and second end of a drill pipe, the coaxial cable having a conductive tube and a conductive core within it. The invention allows the electrical transmission line to withstand the tension and compression of drill pipe during routine drilling cycles.

  13. Electrician - Foreman II (Transmission Lines & Substations) ...

    Energy.gov [DOE] (indexed site)

    Region Transmission Lines and Substation Maintenance (G5200) 615 S. 43rd Avenue Phoenix, AZ 85009 Duty Location is Page, AZ Find out more about living conditions at this...

  14. Ames Lab 101: Next Generation Power Lines

    ScienceCinema

    Russell, Alan

    2016-07-12

    Ames Laboratory scientist Alan Russell discusses the need to develop new power lines that are stronger and more conductive as a way to address the problem of the nation's aging and inadequate power grid.

  15. Northern Pass Transmission Line Project Environmental Impact...

    Office of Environmental Management (EM)

    persons who have subscribed to the email list of this change via email on September 10, ... Line Project (174.73 KB) More Documents & Publications EIS-0463: Notice of ...

  16. On-line chemical composition analyzer development

    SciTech Connect

    Garrison, A.A.

    1993-01-01

    This report relates to the development of an on-line Raman analyzer for control of a distillation column. It is divided into: program issues, experimental control system evaluation, energy savings analysis, and reliability analysis. (DLC)

  17. factsheet - trees and power lines - July 2008

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Trees and power lines July 2008 This summer, BPA maintenance crews are inspecting and clearing high-growing vegetation from all 8,500- miles (15,000 circuit miles) of our...

  18. Line Environment, Safety and Health Oversight

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-06-26

    Sets forth the Department's expectations line management environment, safety and health (ES&H) oversight and for the use of contractor self-assessment programs as the cornerstone for this oversight. Canceled by DOE O 226.1.

  19. DNA Assembly Line for Nano-Construction

    ScienceCinema

    Oleg Gang

    2010-01-08

    Building on the idea of using DNA to link up nanoparticles scientists at Brookhaven National Lab have designed a molecular assembly line for high-precision nano-construction. Nanofabrication is essential for exploiting the unique properties of nanoparticl

  20. Insulate Steam Distribution and Condensate Return Lines

    Energy.gov [DOE]

    This tip sheet on insulating steam distribution and condensate return lines provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.