National Library of Energy BETA

Sample records for lead time cost

  1. Geothermal Exploration Cost and Time

    DOE Data Explorer

    Jenne, Scott

    2013-02-13

    The Department of Energy’s Geothermal Technology Office (GTO) provides RD&D funding for geothermal exploration technologies with the goal of lowering the risks and costs of geothermal development and exploration. The National Renewable Energy Laboratory (NREL) was tasked with developing a metric in 2012 to measure the impacts of this RD&D funding on the cost and time required for exploration activities. The development of this cost and time metric included collecting cost and time data for exploration techniques, creating a baseline suite of exploration techniques to which future exploration cost and time improvements can be compared, and developing an online tool for graphically showing potential project impacts (all available at http://en.openei.org/wiki/Gateway: Geothermal). This paper describes the methodology used to define the baseline exploration suite of techniques (baseline), as well as the approach that was used to create the cost and time data set that populates the baseline. The resulting product, an online tool for measuring impact, and the aggregated cost and time data are available on the Open Energy Information website (OpenEI, http://en.openei.org) for public access. - Published 01/01/2013 by US National Renewable Energy Laboratory NREL.

  2. Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch The Dow ...

  3. Chicago Solar Express Reduces Costs, Wait Times | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chicago Solar Express Reduces Costs, Wait Times Chicago Solar Express Reduces Costs, Wait Times October 28, 2014 - 10:48am Addthis The Solar Express program in Chicago, ...

  4. Timing discriminator using leading-edge extrapolation

    DOEpatents

    Gottschalk, Bernard

    1983-01-01

    A discriminator circuit to recover timing information from slow-rising pulses by means of an output trailing edge, a fixed time after the starting corner of the input pulse, which is nearly independent of risetime and threshold setting. This apparatus comprises means for comparing pulses with a threshold voltage; a capacitor to be charged at a certain rate when the input signal is one-third threshold voltage, and at a lower rate when the input signal is two-thirds threshold voltage; current-generating means for charging the capacitor; means for comparing voltage capacitor with a bias voltage; a flip-flop to be set when the input pulse reaches threshold voltage and reset when capacitor voltage reaches the bias voltage; and a clamping means for discharging the capacitor when the input signal returns below one-third threshold voltage.

  5. Timing discriminator using leading-edge extrapolation

    DOEpatents

    Gottschalk, B.

    1981-07-30

    A discriminator circuit to recover timing information from slow-rising pulses by means of an output trailing edge, a fixed time after the starting corner of the input pulse, which is nearly independent of risetime and threshold setting is described. This apparatus comprises means for comparing pulses with a threshold voltage; a capacitor to be charged at a certain rate when the input signal is one-third threshold voltage, and at a lower rate when the input signal is two-thirds threshold voltage; current-generating means for charging the capacitor; means for comparing voltage capacitor with a bias voltage; a flip-flop to be set when the input pulse reaches threshold voltage and reset when capacitor voltage reaches the bias voltage; and a clamping means for discharging the capacitor when the input signal returns below one-third threshold voltage.

  6. Unconventional Staging Package Selection Leads to Cost Savings

    SciTech Connect

    ,

    2012-06-07

    In late 2010, U.S. Department of Energy (DOE) Deputy Secretary of Energy, Daniel Poneman, directed that an analysis be conducted on the U-233 steel-clad, Zero Power Reactor (ZPR) fuel plates that were stored at Oak Ridge National Laboratory (ORNL), focusing on cost savings and any potential DOE programmatic needs for the special nuclear material (SNM). The NA-162 Nuclear Criticality Safety Program requested retention of these fuel plates for use in experiments at the Nevada National Security Site (NNSS). A Secretarial Initiative challenged ORNL to make the first shipment to the NNSS by the end of the 2011 calendar year, and this effort became known as the U-233 Project Accelerated Shipping Campaign. To meet the Secretarial Initiative, National Security Technologies, LLC (NSTec), the NNSS Management and Operations contractor, was asked to facilitate the receipt and staging of the U-233 fuel plates in the Device Assembly Facility (DAF). Because there were insufficient staging containers available for the fuel plates, NSTec conducted an analysis of alternatives. The project required a staging method that would reduce the staging footprint while addressing nuclear criticality safety and radiation exposure concerns. To accommodate an intermediate staging method of approximately five years, the NSTec project team determined that a unique and unconventional staging package, the AT-400R, was available to meet the project requirements. By using the AT-400R containers, NSTec was able to realize a cost savings of approximately $10K per container, a total cost savings of nearly $450K.

  7. Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Launch | Department of Energy Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch The Dow Chemical Company - Midland, MI An extrusion process for making carbon fiber uses a novel polyolefin material in place of conventional polyacrylonitrile. Low-cost carbon fiber has widespread application in automobiles, wind turbines, and other industrial applications. This novel process could

  8. Energy Tricks Lead to Cost-Saving Treats | Department of Energy

    Energy Saver

    Energy Tricks Lead to Cost-Saving Treats Energy Tricks Lead to Cost-Saving Treats October 29, 2014 - 1:37pm Addthis Halloween LED lights are a common, energy efficient decoration. | Photo courtesy of Jeremy Roof, Creative Commons. Halloween LED lights are a common, energy efficient decoration. | Photo courtesy of Jeremy Roof, Creative Commons. Michael Hess Michael Hess Former Digital Communications Specialist, Office of Public Affairs What does this mean for me? Compact fluorescent porch lights,

  9. Exploration Cost and Time Metric | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    lt":0,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map Language: English Exploration Cost and Time Metric Screenshot References: Conference Paper1...

  10. Cost of lead-based-paint abatement in public housing. Volume 2. Appendix C-F

    SciTech Connect

    Not Available

    1986-07-01

    This study provides data on lead incidence and the estimated costs of abating lead hazards in public housing at several possible threshold levels of lead concentration in applied paint. The data were collected at a sample of family projects by cooperating Lead Paint Poisoning Prevention Programs using data collection forms designed for the study. National estimates are provided based on the assumption that the construction year of a dwelling or building is the only characteristic related to lead incidence. The estimates are provided for all family dwelling units, defined as those of two-bedrooms or larger; for all buildings in family projects; and for site-wide facilities in family projects.

  11. Cost of lead-based-paint abatement in public housing. Volume 1

    SciTech Connect

    Wallace, J.E.

    1986-07-01

    This study provides data on lead incidence and the estimated costs of abating lead hazards in public housing at several possible threshold levels of lead concentration in applied paint. The data were collected at a sample of family projects by cooperating Lead Paint Poisoning Prevention Programs using data collection forms designed for the study. National estimates are provided based on the assumption that the construction year of a dwelling or building is the only characteristic related to lead incidence. The estimates are provided for all family dwelling units, defined as those of two-bedrooms or larger; for all buildings in family projects; and for site-wide facilities in family projects.

  12. Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Carbon Fibers ADVANCED MANUFACTURING OFFICE Scale Up of Novel, Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch Demonstrating a Revolutionary Process for Manufacturing Carbon Fiber Based on a Novel Polymer Fiber Precursor. In order to advance the clean energy economy, the United States must fnd new ways to conserve energy. One approach is to develop low-cost, alternative composites and structural materials for end-use products that are lightweight yet still provide the required

  13. Time Domain Partitioning of Electricity Production Cost Simulations

    SciTech Connect

    Barrows, C.; Hummon, M.; Jones, W.; Hale, E.

    2014-01-01

    Production cost models are often used for planning by simulating power system operations over long time horizons. The simulation of a day-ahead energy market can take several weeks to compute. Tractability improvements are often made through model simplifications, such as: reductions in transmission modeling detail, relaxation of commitment variable integrality, reductions in cost modeling detail, etc. One common simplification is to partition the simulation horizon so that weekly or monthly horizons can be simulated in parallel. However, horizon partitions are often executed with overlap periods of arbitrary and sometimes zero length. We calculate the time domain persistence of historical unit commitment decisions to inform time domain partitioning of production cost models. The results are implemented using PLEXOS production cost modeling software in an HPC environment to improve the computation time of simulations while maintaining solution integrity.

  14. New design strategy reduces time and cost of material discovery

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    design strategy New design strategy reduces time and cost of material discovery Iteratively guiding experiments toward finding materials with the desired target properties May 17, 2016 Mars Adaptive design framework. New design strategy reduces time and cost of material discovery Researchers from the US and China have recently demonstrated how an informatics-based adaptive design strategy, tightly coupled to experiments, can accelerate the discovery of new materials with targeted properties.

  15. Low-cost household paint abatement to reduce children's blood lead levels

    SciTech Connect

    Taha, T.; Kanarek, M.S.; Schultz, B.D.; Murphy, A.

    1999-11-01

    The purpose was to examine the effectiveness of low-cost abatement on children's blood lead levels. Blood lead was analyzed before and after abatement in 37 homes of children under 7 years old with initial blood lead levels of 25--44 {micro}g/dL. Ninety-five percent of homes were built before 1950. Abatement methods used were wet-scraping and repainting deteriorated surfaces and wrapping window wells with aluminum or vinyl. A control group was retrospectively selected. Control children were under 7 years old, had initial blood lead levels of 25--44 {micro}g/dL and a follow-up level at least 28 days afterward, and did not have abatements performed in their homes between blood lead levels. After abatement, statistically significant declines occurred in the intervention children's blood lead levels. The mean decline was 22%, 1 to 6 months after treatment. After adjustment for seasonality and child's age, the mean decline was 6.0 {micro}g/dL, or 18%. The control children's blood levels did not decline significantly. There was a mean decline of 0.25 {micro}g/dL, or 0.39%. After adjustment for seasonality and age, the mean decline for control children was 1.6 {micro}g/dL, or 1.8%. Low-cost abatement and education are effective short-term interim controls.

  16. Real Time Corrosion Monitoring in Lead and Lead-Bismuth Systems

    SciTech Connect

    James F. Stubbins; Alan Bolind; Ziang Chen

    2010-02-25

    The objective of this research program is to develop a real-time, in situ corrosion monitoring technique for flowing liquid Pb and eutectic PbBi (LBE) systems in a temperature range of 400 to 650 C. These conditions are relevant to future liquid metal cooled fast reactor operating parameters. THis program was aligned with the Gen IV Reactor initiative to develp technologies to support the design and opertion of a Pb or LBE-cooled fast reactor. The ability to monitor corrosion for protection of structural components is a high priority issue for the safe and prolonged operation of advanced liquid metal fast reactor systems. In those systems, protective oxide layers are intentionally formed and maintained to limit corrosion rates during operation. This program developed a real time, in situ corrosion monitoring tecnique using impedance spectroscopy (IS) technology.

  17. DOE-Sponsored IGCC Project Could Lead to Lower-Cost Carbon Capture...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and significant cost savings at Integrated Gasification Combined Cycle (IGCC) power plants, according to new research from a U.S. Department of Energy (DOE)-sponsored project. ...

  18. DOE-Sponsored IGCC Project Could Lead to Lower-Cost Carbon Capture...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    produce both power generation increases and significant cost savings at Integrated Gasification Combined Cycle (IGCC) power plants, according to new research from a U.S....

  19. 1 billion times brighter than the sun: Will Jeff Lab's beam lead...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    billion times brighter than the sun: Will Jeff Lab's beam lead to new discoveries? (Daily Press) External Link: http:articles.dailypress.com2011-01-17news...

  20. Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor That Produces Low Cost Electricty - FY-02 Annual Report

    SciTech Connect

    Mac Donald, Philip Elsworth; Buongiorno, Jacopo

    2002-10-01

    The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A. This is the third in a series of Annual Reports for this project, the others are also listed in Appendix A as FY-00 and FY-01 Annual Reports.

  1. Design of an Actinide Burning, Lead or Lead-Bismuth Cooled Reactor that Produces Low Cost Electricity FY-01 Annual Report, October 2001

    SciTech Connect

    Mac Donald, Philip Elsworth; Buongiorno, Jacopo; Davis, Cliff Bybee; Herring, James Stephen; Loewen, Eric Paul; Smolik, Galen Richard; Weaver, Kevan Dean; Todreas, N.

    2001-10-01

    The purpose of this collaborative Idaho National Engineering and Environmental Laboratory (INEEL) and Massachusetts Institute of Technology (MIT) Laboratory Directed Research and Development (LDRD) project is to investigate the suitability of lead or lead-bismuth cooled fast reactors for producing low-cost electricity as well as for actinide burning. The goal is to identify and analyze the key technical issues in core neutronics, materials, thermal-hydraulics, fuels, and economics associated with the development of this reactor concept. Work has been accomplished in four major areas of research: core neutronic design, plant engineering, material compatibility studies, and coolant activation. The publications derived from work on this project (since project inception) are listed in Appendix A.

  2. DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Scientific Research Projects | Department of Energy 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects DOE Awards 265 Million Hours of Supercomputing Time to Advance Leading Scientific Research Projects January 17, 2008 - 10:38am Addthis WASHINGTON, DC -The U.S. Department of Energy's (DOE) Office of Science today announced that 265 million processor-hours were awarded to 55 scientific projects, the largest amount of supercomputing resource awards

  3. Batch drilling program cuts time, costs for Liuhua development

    SciTech Connect

    Gray, G.E.; Hall, K.H.; Mu, H.C.

    1996-08-12

    The efficiency of batch drilling operations and the appropriate use of technology, teamwork, and thorough planning helped cut several days off the time to drill each of 10 subsea wells for the Liuhua 11-1 development project in the South China Sea. The overall development program calls for drilling and completing 20 subsea horizontal wells. The rig-of-opportunity phase was the initial phase of this development and used a contract rig to establish the subsea wellhead array and initiate drilling of the development wells. The wellhead array was the first critical step. It was the foundation for the building block construction process used to create Liuhua`s subsea production system on the seabed. The paper discusses conductor operations, batch drilling operations, surface hole section, intermediate and production hole sections, the ten wells, application of technology, and overall results.

  4. Analysis of Residential System Strategies Targeting Least-Cost Solutions Leading to Net Zero Energy Homes: Preprint

    SciTech Connect

    Anderson, R.; Christensen, C.; Horowitz, S.

    2006-04-01

    The U. S. Department of Energy's Building America residential systems research project uses an analysis-based system research approach to identify research priorities, identify technology gaps and opportunities, establish a consistent basis to track research progress, and identify system solutions that are most likely to succeed as the initial targets for residential system research projects. This report describes the analysis approach used by the program to determine the most cost-effective pathways to achieve whole-house energy-savings goals. This report also provides an overview of design/technology strategies leading to net zero energy buildings as the basis for analysis of future residential system performance.

  5. 1 billion times brighter than the sun: Will Jeff Lab's beam lead to new

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    discoveries? (Daily Press) | Jefferson Lab billion times brighter than the sun: Will Jeff Lab's beam lead to new discoveries? (Daily Press) External Link: http://articles.dailypress.com/2011-01-17/news/dp-nws-cp-jlab-laser-20110116_1_s... By jlab_admin on Thu, 2011-01-20 00:00

  6. Lead Slowing-Down Spectrometry Time Spectral Analysis for Spent Fuel Assay: FY12 Status Report

    SciTech Connect

    Kulisek, Jonathan A.; Anderson, Kevin K.; Casella, Andrew M.; Siciliano, Edward R.; Warren, Glen A.

    2012-09-28

    Executive Summary Developing a method for the accurate, direct, and independent assay of the fissile isotopes in bulk materials (such as used fuel) from next-generation domestic nuclear fuel cycles is a goal of the Office of Nuclear Energy, Fuel Cycle R&D, Material Protection and Control Technology (MPACT) Campaign. To meet this goal, MPACT supports a multi-institutional collaboration, of which PNNL is a part, to study the feasibility of Lead Slowing Down Spectroscopy (LSDS). This technique is an active nondestructive assay method that has the potential to provide independent, direct measurement of Pu and U isotopic masses in used fuel with an uncertainty considerably lower than the approximately 10% typical of today’s confirmatory methods. This document is a progress report for FY2012 PNNL analysis and algorithm development. Progress made by PNNL in FY2012 continues to indicate the promise of LSDS analysis and algorithms applied to used fuel assemblies. PNNL further refined the semi-empirical model developed in FY2011 based on singular value decomposition (SVD) to numerically account for the effects of self-shielding. The average uncertainty in the Pu mass across the NGSI-64 fuel assemblies was shown to be less than 3% using only six calibration assemblies with a 2% uncertainty in the isotopic masses. When calibrated against the six NGSI-64 fuel assemblies, the algorithm was able to determine the total Pu mass within <2% uncertainty for the 27 diversion cases also developed under NGSI. Two purely empirical algorithms were developed that do not require the use of Pu isotopic fission chambers. The semi-empirical and purely empirical algorithms were successfully tested using MCNPX simulations as well applied to experimental data measured by RPI using their LSDS. The algorithms were able to describe the 235U masses of the RPI measurements with an average uncertainty of 2.3%. Analyses were conducted that provided valuable insight with regard to design requirements (e

  7. Scale-up of Novel Low-Cost Carbon Fibers Leading to High-Volume Commercial Launch

    SciTech Connect

    Spalding, Mark A

    2014-08-27

    The project started in September, 2012 with the goal of scaling up from the existing laboratory scale process for producing carbon fiber (CF) from polyolefin (PO) based precursor fiber using a Dow proprietary sulfonation-desulfonation stabilization process. The award was used to develop a process that was capable of producing market development quantities of CF from PO precursor fiber at a rate of 4 kg/h of CF. The CF would target properties that met or exceeded the Department of Energy (DOE) Vehicles Technology [1] standard; i.e., 172 GPa modulus and 1.72 GPa strength at greater than or equal to 1% strain. The Dow proprietary process was capable of meeting and exceeding these targets properties. Project DE-EE0005760 resulted from a Collaborative Research and Development Agreement (CRADA) between Dow and Oak Ridge National Laboratory (ORNL) with support from the Michigan Economic Development Corporation (MEDC) and DOE. In the first budget period, the main goal was to design a sulfonation-desulfonation market development plant capable of stabilizing PO precursor fiber at a rate of 5 kg/h using a sulfonation solution. The detailed design, location, and cost estimate were determined as scheduled in the Project Management Plan (PMP). In parallel with this DOE award project was a fundamentals and economic evaluation funded by The Dow Chemical Company (Dow). The goal of the Dow sponsored project was to finalize the mass balances, energy balances, and levelized cost to produce CF using the Dow process. A Go-No-Go decision was scheduled in June, 2013 based on the findings of the DOE sponsored scale up project and the Dow sponsored project. In June, 2013, Dow made the No-Go decision to halt and abandon the Dow proprietary sulfonation-desulfonation process for stabilizing PO precursor fibers for the manufacturing of CF. This No-Go decision was identified in the original proposal and at the start of this project, and the decision was made as scheduled. The decision was based

  8. Optimal Materials and Deposition Technique Lead to Cost-Effective Solar Cell with Best-Ever Conversion Efficiency (Fact Sheet)

    SciTech Connect

    Not Available

    2012-07-01

    This fact sheet describes how the SJ3 solar cell was invented, explains how the technology works, and why it won an R&D 100 Award. Based on NREL and Solar Junction technology, the commercial SJ3 concentrator solar cell - with 43.5% conversion efficiency at 418 suns - uses a lattice-matched multijunction architecture that has near-term potential for cells with {approx}50% efficiency. Multijunction solar cells have higher conversion efficiencies than any other type of solar cell. But developers of utility-scale and space applications crave even better efficiencies at lower costs to be both cost-effective and able to meet the demand for power. The SJ3 multijunction cell, developed by Solar Junction with assistance from foundational technological advances by the National Renewable Energy Laboratory, has the highest efficiency to date - almost 2% absolute more than the current industry standard multijunction cell-yet at a comparable cost. So what did it take to create this cell having 43.5% efficiency at 418-sun concentration? A combination of materials with carefully designed properties, a manufacturing technique allowing precise control, and an optimized device design.

  9. A Low-Cost, Real-Time Network for Radiological Monitoring Around Nuclear Facilities

    SciTech Connect

    Bertoldo, N A

    2004-08-13

    A low-cost, real-time radiological sensor network for emergency response has been developed and deployed at the Lawrence Livermore National Laboratory (LLNL). The Real-Time Radiological Area Monitoring (RTRAM) network is comprised of 16 Geiger-Mueller (GM) sensors positioned on the site perimeter to continuously monitor radiological conditions as part of LLNL's comprehensive environment/safety/health protection program. The RTRAM network sensor locations coincide with wind sector directions to provide thorough coverage of the one square mile site. These low-power sensors transmit measurement data back to a central command center (CCC) computer through the LLNL telecommunications infrastructure. Alarm conditions are identified by comparing current data to predetermined threshold parameters and are validated by comparison with plausible dispersion modeling scenarios and prevailing meteorological conditions. Emergency response personnel are notified of alarm conditions by automatic radio- and computer- based notifications. A secure intranet provides emergency response personnel with current condition assessment data that enable them to direct field response efforts remotely. This system provides a low-cost real-time radiation monitoring solution that is easily converted to incorporate both a hard-wired interior perimeter with strategically positioned wireless secondary and tertiary concentric remote locations. These wireless stations would be configured with solar voltaic panels that provide current to recharge batteries and power the sensors and radio transceivers. These platforms would supply data transmission at a range of up to 95 km from a single transceiver location. As necessary, using radio transceivers in repeater mode can extend the transmission range. The RTRAM network as it is presently configured at LLNL has proven to be a reliable system since initial deployment in August 2001 and maintains stability during inclement weather conditions. With the proposed

  10. Revisiting the question: Does high-latitude solar activity lead low-latitude solar activity in time phase?

    SciTech Connect

    Kong, D. F.; Qu, Z. N.; Guo, Q. L.

    2014-05-01

    Cross-correlation analysis and wavelet transform methods are used to investigate whether high-latitude solar activity leads low-latitude solar activity in time phase or not, using the data of the Carte Synoptique solar filaments archive from 1919 March to 1989 December. From the cross-correlation analysis, high-latitude solar filaments have a time lead of 12 Carrington solar rotations with respect to low-latitude ones. Both the cross-wavelet transform and wavelet coherence indicate that high-latitude solar filaments lead low-latitude ones in time phase. Furthermore, low-latitude solar activity is better correlated with high-latitude solar activity of the previous cycle than with that of the following cycle, which is statistically significant. Thus, the present study confirms that high-latitude solar activity in the polar regions is indeed better correlated with the low-latitude solar activity of the following cycle than with that of the previous cycle, namely, leading in time phase.

  11. Lead Slowing-Down Spectrometry Time Spectral Analysis for Spent Fuel Assay: FY11 Status Report

    SciTech Connect

    Kulisek, Jonathan A.; Anderson, Kevin K.; Bowyer, Sonya M.; Casella, Andrew M.; Gesh, Christopher J.; Warren, Glen A.

    2011-09-30

    Developing a method for the accurate, direct, and independent assay of the fissile isotopes in bulk materials (such as used fuel) from next-generation domestic nuclear fuel cycles is a goal of the Office of Nuclear Energy, Fuel Cycle R&D, Material Protection and Control Technology (MPACT) Campaign. To meet this goal, MPACT supports a multi-institutional collaboration, of which PNNL is a part, to study the feasibility of Lead Slowing Down Spectroscopy (LSDS). This technique is an active nondestructive assay method that has the potential to provide independent, direct measurement of Pu and U isotopic masses in used fuel with an uncertainty considerably lower than the approximately 10% typical of today's confirmatory assay methods. This document is a progress report for FY2011 PNNL analysis and algorithm development. Progress made by PNNL in FY2011 continues to indicate the promise of LSDS analysis and algorithms applied to used fuel. PNNL developed an empirical model based on calibration of the LSDS to responses generated from well-characterized used fuel. The empirical model, which accounts for self-shielding effects using empirical basis vectors calculated from the singular value decomposition (SVD) of a matrix containing the true self-shielding functions of the used fuel assembly models. The potential for the direct and independent assay of the sum of the masses of 239Pu and 241Pu to within approximately 3% over a wide used fuel parameter space was demonstrated. Also, in FY2011, PNNL continued to develop an analytical model. Such efforts included the addition of six more non-fissile absorbers in the analytical shielding function and the non-uniformity of the neutron flux across the LSDS assay chamber. A hybrid analytical-empirical approach was developed to determine the mass of total Pu (sum of the masses of 239Pu, 240Pu, and 241Pu), which is an important quantity in safeguards. Results using this hybrid method were of approximately the same accuracy as the pure

  12. An Assessment of Lifecycle Cost in the U.S. over Time

    SciTech Connect

    Previsic, Mirko

    2011-10-06

    Presentation from the 2011 Water Peer Review in which principal investigator discussed project progress to assess Lifecycle cost of Wave, Tidal, River, and Ocean Current Technologies

  13. Levelized Power Generation Cost Codes

    Energy Science and Technology Software Center

    1996-04-30

    LPGC is a set of nine microcomputer programs for estimating power generation costs for large steam-electric power plants. These programs permit rapid evaluation using various sets of economic and technical ground rules. The levelized power generation costs calculated may be used to compare the relative economics of nuclear and coal-fired plants based on life-cycle costs. Cost calculations include capital investment cost, operation and maintenance cost, fuel cycle cost, decommissioning cost, and total levelized power generationmore » cost. These programs can be used for quick analyses of power generation costs using alternative economic parameters, such as interest rate, escalation rate, inflation rate, plant lead times, capacity factor, fuel prices, etc. The two major types of electric generating plants considered are pressurized water reactor (PWR) and pulverized coal-fired plants. Data are also provided for the Large Scale Prototype Breeder (LSPB) type liquid metal reactor.« less

  14. Argonne`s Expedited Site Characterization: An integrated approach to cost- and time-effective remedial investigation

    SciTech Connect

    Burton, J.C.; Walker, J.L.; Aggarwal, P.K.; Meyer, W.T.

    1995-07-01

    Argonne National Laboratory has developed a methodology for remedial site investigation that has proven to be both technically superior to and more cost- and time-effective than traditional methods. This methodology is referred to as the Argonne Expedited Site Characterization (ESC). Quality is the driving force within the process. The Argonne ESC process is abbreviated only in time and cost and never in terms of quality. More usable data are produced with the Argonne ESC process than with traditional site characterization methods that are based on statistical-grid sampling and multiple monitoring wells. This paper given an overview of the Argonne ESC process and compares it with traditional methods for site characterization. Two examples of implementation of the Argonne ESC process are discussed to illustrate the effectiveness of the process in CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act) and RCRA (Resource Conservation and Recovery Act) programs.

  15. EERE Success Story—Chicago Solar Express Reduces Costs, Wait Times

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Solar Express program in Chicago, Illinois—funded through a SunShot Initiative Rooftop Solar Challenge (RSC) I award of $750,000—is making it faster, easier, and cheaper for residents to go solar by cutting long wait times and fees for solar permits.

  16. Challenging the Mean Time to Failure: Measuring Dependability as a Mean Failure Cost

    SciTech Connect

    Sheldon, Frederick T; Mili, Ali

    2009-01-01

    many fronts: it ignores the variance in stakes among stakeholders; it fails to recognize the structure of complex specifications as the aggregate of overlapping requirements; it fails to recognize that different components of the specification carry different stakes, even for the same stakeholder; it fails to recognize that V&V actions have different impacts with respect to the different components of the specification. Similar metrics of security, such as MTTD (Mean Time to Detection) and MTTE (Mean Time to Exploitation) suffer from the same shortcomings. In this paper we advocate a measure of dependability that acknowledges the aggregate structureof complex system specifications, and takes into account variations by stakeholder, by specification components, and by V&V impact.

  17. VOLUMETRIC LEAD ASSAY

    SciTech Connect

    M.A. Ebadian, Ph.D.; S.K. Dua; David Roelant; Sachin Kumar

    2001-01-01

    This report describes a system for handling and radioassay of lead, consisting of a robot, a conveyor, and a gamma spectrometer. The report also presents a cost-benefit analysis of options: radioassay and recycling lead vs. disposal as waste.

  18. Development and Design of Cost-Effective, Real-Time Implementable Sediment and Contaminant Release Controls

    SciTech Connect

    Hampson, Steve

    2007-08-01

    Alternative design options for integrated storm water and sediment control systems were developed and evaluated for Outfalls 008, 011 and 015 of the Paducah Gaseous Diffusion Plant. The remedial options were required to be cost effective and implementable in a relatively short timeframe. Additionally, construction activities were to minimize earth disturbance, especially with respect to excavation. The current database for storm water and effluent sediment oncentration was assessed for the three outfalls. It was concluded that there was a significant lack of data and recommendations for monitoring equipment were provided to initiate a comprehensive surface water and sediment data acquisition system. Modeling was completed for current conditions. Peak flow, runoff volume, peak sediment concentration and storm sediment load were modeled for storm events, ranging from 0.5 inches (12.7mm) to 3.0 inches (6.2mm). Predicted peak flows ranged from 2.5 cfs (0.071 m3/s) for Outfall 011 and a 0.5 inches (12.7mm) storm to 210 cfs (5.95 m3/s) for Outfall 008 and a 3.0 inches (76.2mm) storm. Additionally, the 100-yr 24-hr NRCS Type II storm was modeled. Storm sediment loads, for the corresponding outfalls and storm events, ranged from 0.1 to 9.0 tons (8.18 tonnes). Retention ponds were designed and evaluated for each of the three outfalls. The ponds had a dual function; 1) contain the storm runoff volume for smaller storm events and 2) passively treat and discharge runoff that was in excess of the ponds storage capacity. Stored runoff was transferred to alternative secondary treatment systems. The expected performance of these treatment systems was evaluated. The performance of the outfall ponds was evaluated for storm events ranging from 0.5 inches (12.7mm) to 4.0 inches (101.6mm). Outfall 011 has a watershed of 33.3 acres. Pond 011 (Outfall 011) has the largest storage capacity of the three outfalls, and therefore the highest potential for effective treatment. The predicted

  19. Using architecture information and real-time resource state to reduce power consumption and communication costs in parallel applications.

    SciTech Connect

    Brandt, James M.; Devine, Karen D.; Gentile, Ann C.; Leung, Vitus J.; Olivier, Stephen Lecler; Pedretti, Kevin; Rajamanickam, Sivasankaran; Bunde, David P.; Deveci, Mehmet; Catalyurek, Umit V.

    2014-09-01

    As computer systems grow in both size and complexity, the need for applications and run-time systems to adjust to their dynamic environment also grows. The goal of the RAAMP LDRD was to combine static architecture information and real-time system state with algorithms to conserve power, reduce communication costs, and avoid network contention. We devel- oped new data collection and aggregation tools to extract static hardware information (e.g., node/core hierarchy, network routing) as well as real-time performance data (e.g., CPU uti- lization, power consumption, memory bandwidth saturation, percentage of used bandwidth, number of network stalls). We created application interfaces that allowed this data to be used easily by algorithms. Finally, we demonstrated the benefit of integrating system and application information for two use cases. The first used real-time power consumption and memory bandwidth saturation data to throttle concurrency to save power without increasing application execution time. The second used static or real-time network traffic information to reduce or avoid network congestion by remapping MPI tasks to allocated processors. Results from our work are summarized in this report; more details are available in our publications [2, 6, 14, 16, 22, 29, 38, 44, 51, 54].

  20. LEADING WITH LEADING INDICATORS

    SciTech Connect

    PREVETTE, S.S.

    2005-01-27

    This paper documents Fluor Hanford's use of Leading Indicators, management leadership, and statistical methodology in order to improve safe performance of work. By applying these methods, Fluor Hanford achieved a significant reduction in injury rates in 2003 and 2004, and the improvement continues today. The integration of data, leadership, and teamwork pays off with improved safety performance and credibility with the customer. The use of Statistical Process Control, Pareto Charts, and Systems Thinking and their effect on management decisions and employee involvement are discussed. Included are practical examples of choosing leading indicators. A statistically based color coded dashboard presentation system methodology is provided. These tools, management theories and methods, coupled with involved leadership and employee efforts, directly led to significant improvements in worker safety and health, and environmental protection and restoration at one of the nation's largest nuclear cleanup sites.

  1. A New Thermostat for Real-Time Price Demand Response: Cost, Comfort and Energy Impacts of Discrete-Time Control without Deadband

    SciTech Connect

    Chassin, David P.; Stoustrup, Jakob; Agathoklis, Pan; Djilali, Ned

    2015-10-01

    This paper presents a residential thermostat design that enables accurate aggregate load control systems for electricity demand response. The thermostat features a control strategy that can be modeled as a linear time-invariant system for short- term demand response signals from the utility. This control design maintains the same comfort and demand response characteristics of existing real-time price- responsive thermostats but gives rise to linear time-invariant models of aggregate load control and demand response, which facilitates the design of highly accurate load-based regulation services for electricity interconnections.

  2. Startup Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  3. Time

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 4 5 6 7 8 9 10 Time with respect to the BNB Trigger Time [µs] 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 Fractional Flash Count per 0.15 µs with respect to Cosmic Background Measured Cosmic Rate (Beam-Off) BNB Trigger Data (Beam-On) [4.51E18 POT]

  4. Time

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10 15 20 Time with respect to the NuMI Trigger Time [µs] 0.9 1.0 1.1 1.2 1.3 1.4 1.5 Fractional Flash Count per 0.5 µs with respect to Cosmic Background Measured Cosmic Rate (Beam-Off) NuMI Trigger Data (Beam-On) [4.83E18 POT]

  5. Operating Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  6. BPA's Costs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  7. Deregulation and Nuclear Training: Cost Effective Alternatives

    SciTech Connect

    Richard P. Coe; Patricia A. Lake

    2000-11-12

    Training is crucial to the success of any organization. It is also expensive, with some estimates exceeding $50 billion annually spent on training by U.S. corporations. Nuclear training, like that of many other highly technical organizations, is both crucial and costly. It is unlikely that the amount of training can be significantly reduced. If anything, current trends indicate that training needs will probably increase as the industry and workforce ages and changes. With the advent of energy deregulation in the United States, greater pressures will surface to make the costs of energy more cost-competitive. This in turn will drive businesses to more closely examine existing costs and find ways to do things in a more cost-effective way. The commercial nuclear industry will be no exception, and nuclear training will be equally affected. It is time for nuclear training and indeed the entire nuclear industry to begin using more aggressive techniques to reduce costs. This includes the need for nuclear training to find alternatives to traditional methods for the delivery of cost-effective high-quality training that meets regulatory requirements and produces well-qualified personnel capable of working in an efficient and safe manner. Computer-based and/or Web-based training are leading emerging technologies.

  8. An Insoluble Titanium-Lead Anode for Sulfate Electrolytes

    SciTech Connect

    Ferdman, Alla

    2005-05-11

    measurable anode weight loss during this time period. Quantitative chemical analysis of the anode surface showed that the lead content after testing remained at its initial level. No lead dissolution or transfer from the anode to the product occurred.A key benefit of the titanium-lead anode design is that cobalt additions to copper electrolyte should be eliminated. Cobalt is added to the electrolyte to help stabilize the lead oxide surface of conventional lead anodes. The presence of the titanium intimately mixed with the lead should eliminate the need for cobalt stabilization of the lead surface. The anode should last twice as long as the conventional lead anode. Energy savings should be achieved due to minimizing and stabilizing the anode-cathode distance in the electrowinning cells. The anode is easily substitutable into existing tankhouses without a rectifier change.The copper electrowinning test data indicate that the titanium-lead anode is a good candidate for further testing as a possible replacement for a conventional lead anode. A key consideration is the cost. Titanium costs have increased. One of the ways to get the anode cost down is manufacturing the anodes with fewer cylinders. Additional prototypes having different number of cylinders were constructed for a long-term commercial testing in a circuit without cobalt. The objective of the testing is to evaluate the need for cobalt, investigate the effect of decreasing the number of cylinders on the anode performance, and to optimize further the anode design in order to meet the operating requirements, minimize the voltage, maximize the life of the anode, and to balance this against a reasonable cost for the anode. It is anticipated that after testing of the additional prototypes, a whole cell commercial test will be conducted to complete evaluation of the titanium-lead anode costs/benefits.

  9. Wind energy`s declining costs

    SciTech Connect

    Gipe, P.

    1995-11-01

    Wind energy is competitive with traditional energy sources for the first time since European windmills graced the landscapes of the Old World. This article explores the current economics of wind power. Topics discussed include the following: standardizing cost of energy reporting and the cost of wind energy; wind power plant price; maintenance costs; effect of installed cost on the cost of energy; future costs; decommissioning; modularity; social or environmental costs; cost of capital; bidding and price.

  10. Print-based Manufacturing of Integrated, Low Cost, High Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Print-based Manufacturing of Integrated, Low Cost, High Performance SSL Luminaires Print-based Manufacturing of Integrated, Low Cost, High Performance SSL Luminaires Lead ...

  11. Soluble Lead Flow Battery: Soluble Lead Flow Battery Technology

    SciTech Connect

    2010-09-01

    GRIDS Project: General Atomics is developing a flow battery technology based on chemistry similar to that used in the traditional lead-acid battery found in nearly every car on the road today. Flow batteries store energy in chemicals that are held in tanks outside the battery. When the energy is needed, the chemicals are pumped through the battery. Using the same basic chemistry as a traditional battery but storing its energy outside of the cell allows for the use of very low cost materials. The goal is to develop a system that is far more durable than today’s lead-acid batteries, can be scaled to deliver megawatts of power, and which lowers the cost of energy storage below $100 per kilowatt hour.

  12. Getting the Lead Out

    DOE R&D Accomplishments

    Gibson, Kerry

    2011-04-08

    Discarded electronics no longer pose an environmental hazard from lead solder thanks to a lead-free alternative developed at the Ames Laboratory.

  13. Cutting the Cost for Commercial Gas Purification - Theory Leads...

    Office of Science (SC)

    ... This material may also be capable of purifying natural gas streams containing a number of impurity gases. Contact Jeffrey R. Long University of California, Berkeley ...

  14. Estimating Specialty Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  15. Heliostat cost reduction study.

    SciTech Connect

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David; Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  16. Cost Study Manual

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a

  17. A lower cost development path for heavy ion fusion

    SciTech Connect

    Hogan, W.J.; Meier, W.R.

    1993-05-19

    If two features of the inertial fusion process are exploited successfully, they can lead to significantly lower costs for demonstrating the feasibility of commercial electric power production from this source of energy. First, fusion capsule ignition and burn physics is independent of reaction chamber size and hydrodynamically-equivalent capsules can be designed to perform at small yield, exactly as they do at large yield. This means that an integrated test of all power plant components and feasibility tests of various reaction chamber concepts can be done at much smaller sizes (about 1--2 m first wall radius) and much lower powers (tens of MWs) than magnetic fusion development facilities such as ITER. Second, the driver, which is the most expensive component of currently conceived IFE development facilities, can be used to support more than one experiment target chamber/reactor (simultaneously and/or sequentially). These two factors lead to lower development facility costs, modular facilities, and the planning flexibility to spread costs over time or do several things in parallel and thus shorten the total time needed for development of Inertial Fusion Energy (IFE). In this paper the authors describe the general feature of a heavy ion fusion development plan that takes advantage of upgradable accelerators and the ability to test chambers and reactor systems at small scale in order to reduce development time and costs.

  18. Life-cycle cost comparisons of advanced storage batteries and fuel cells for utility, stand-alone, and electric vehicle applications

    SciTech Connect

    Humphreys, K.K.; Brown, D.R.

    1990-01-01

    This report presents a comparison of battery and fuel cell economics for ten different technologies. To develop an equitable economic comparison, the technologies were evaluated on a life-cycle cost (LCC) basis. The LCC comparison involved normalizing source estimates to a standard set of assumptions and preparing a lifetime cost scenario for each technology, including the initial capital cost, replacement costs, operating and maintenance (O M) costs, auxiliary energy costs, costs due to system inefficiencies, the cost of energy stored, and salvage costs or credits. By considering all the costs associated with each technology over its respective lifetime, the technology that is most economical to operate over any given period of time can be determined. An analysis of this type indicates whether paying a high initial capital cost for a technology with low O M costs is more or less economical on a lifetime basis than purchasing a technology with a low initial capital cost and high O M costs. It is important to realize that while minimizing cost is important, the customer will not always purchase the least expensive technology. The customer may identify benefits associated with a more expensive option that make it the more attractive over all (e.g., reduced construction lead times, modularity, environmental benefits, spinning reserve, etc.). The LCC estimates presented in this report represent three end-use applications: utility load-leveling, stand-alone power systems, and electric vehicles.

  19. Realistic costs of carbon capture

    SciTech Connect

    Al Juaied, Mohammed . Belfer Center for Science and International Affiaris); Whitmore, Adam )

    2009-07-01

    There is a growing interest in carbon capture and storage (CCS) as a means of reducing carbon dioxide (CO2) emissions. However there are substantial uncertainties about the costs of CCS. Costs for pre-combustion capture with compression (i.e. excluding costs of transport and storage and any revenue from EOR associated with storage) are examined in this discussion paper for First-of-a-Kind (FOAK) plant and for more mature technologies, or Nth-of-a-Kind plant (NOAK). For FOAK plant using solid fuels the levelised cost of electricity on a 2008 basis is approximately 10 cents/kWh higher with capture than for conventional plants (with a range of 8-12 cents/kWh). Costs of abatement are found typically to be approximately US$150/tCO2 avoided (with a range of US$120-180/tCO2 avoided). For NOAK plants the additional cost of electricity with capture is approximately 2-5 cents/kWh, with costs of the range of US$35-70/tCO2 avoided. Costs of abatement with carbon capture for other fuels and technologies are also estimated for NOAK plants. The costs of abatement are calculated with reference to conventional SCPC plant for both emissions and costs of electricity. Estimates for both FOAK and NOAK are mainly based on cost data from 2008, which was at the end of a period of sustained escalation in the costs of power generation plant and other large capital projects. There are now indications of costs falling from these levels. This may reduce the costs of abatement and costs presented here may be 'peak of the market' estimates. If general cost levels return, for example, to those prevailing in 2005 to 2006 (by which time significant cost escalation had already occurred from previous levels), then costs of capture and compression for FOAK plants are expected to be US$110/tCO2 avoided (with a range of US$90-135/tCO2 avoided). For NOAK plants costs are expected to be US$25-50/tCO2. Based on these considerations a likely representative range of costs of abatement from CCS excluding

  20. PAFC Cost Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell® 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ® FUEL CELL SYSTEM First cost 2010 cost reduction is being accomplished by incremental changes in technology & low cost sourcing Technology advances are required to reduce further cost and attain UTC Power's commercialization targets 2010 First unit 2010 Last unit Commercialization target Powerplant cost 4

  1. Lead carbonate scintillator materials

    DOEpatents

    Derenzo, Stephen E.; Moses, William W.

    1991-01-01

    Improved radiation detectors containing lead carbonate or basic lead carbonate as the scintillator element are disclosed. Both of these scintillators have been found to provide a balance of good stopping power, high light yield and short decay constant that is superior to other known scintillator materials. The radiation detectors disclosed are favorably suited for use in general purpose detection and in medical uses.

  2. High-temperature superconducting current leads

    SciTech Connect

    Niemann, R.C.

    1995-03-01

    Use of high-temperature superconductors (HTSs) for current leads to deliver power to devices at liquid helium temperature can reduce refrigeration requirements to values significantly below those achievable with conventional leads. HTS leads are now near commercial realization. Argonne National Laboratory (ANL) has developed a sinter-forge process to fabricate current leads from bismuth-based superconductors. The current-carrying capacity of these leads is five times better than that of HTS leads made by a conventional fabrication process. ANL along with Superconductivity, Inc., has developed a 1500 ampere current lead for an existing superconducting magnetic energy storage (SMES) device. With Babcock & Wilcox Company, Argonne is creating 16-kiloampere leads for use in a 0.5 MWh SMES. In a third project Argonne performed characterization testing of a existing, proprietary conduction-cooled lead being developed by Zer Res Corp.

  3. Materials that Improve the Cost-Effectiveness of Air Barrier Systems |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Materials that Improve the Cost-Effectiveness of Air Barrier Systems Materials that Improve the Cost-Effectiveness of Air Barrier Systems 1 of 3 3M has developed a primer-less self-adhered membrane that serves as an air, liquid water, and water vapor barrier. This technology installs in up to half the time of asphalt-based membranes, which will lead to installed costs that are similar or lower than that of asphalt-based membranes. Image: 3M 2 of 3 3M has developed a

  4. lead paint chart

    Office of Environmental Management (EM)

    1930 Assume Lead Will WX Disturb Paint? No Yes Will WX Disturb More than 2 ft 2 . per Room? Yes HUD Housing or Using HUD ? Yes More than 50ugm 3 ? No LSW & HUD Rule 35.900 **...

  5. Lead carbonate scintillator materials

    DOEpatents

    Derenzo, S.E.; Moses, W.W.

    1991-05-14

    Improved radiation detectors containing lead carbonate or basic lead carbonate as the scintillator element are disclosed. Both of these scintillators have been found to provide a balance of good stopping power, high light yield and short decay constant that is superior to other known scintillator materials. The radiation detectors disclosed are favorably suited for use in general purpose detection and in medical uses. 3 figures.

  6. SEE Action Webinar – Energy Efficiency Measure Cost Studies

    Energy.gov [DOE]

    In this webinar, leading experts will explain the importance of measure cost studies, review the current “state of the science” of measure cost development and estimation, and explore opportunities...

  7. Cost Model and Cost Estimating Software

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  8. UPF workers' two cents lead to savings | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    UPF workers' two cents ... UPF workers' two cents lead to savings Posted: May 7, 2014 - 5:34pm | Y-12 Report | Volume 10, Issue 2 | 2014 UPF's process engineers, risk coordinators and everyone in between work together to ferret out inefficiencies and trim costs. When it comes to planning a multibillion-dollar construction project like the Uranium Processing Facility, there can be a tendency to focus only on big-time-savings opportunities. But throughout the multiyear design and construction

  9. Low Cost, High Efficiency Tandem Silicon Solar Cells and LEDs...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Building Energy Efficiency Building Energy ... Return to Search Low Cost, High Efficiency Tandem Silicon Solar Cells and LEDs ... gaps will lead to efficient power conversion. ...

  10. Clean distributed generation performance and cost analysis

    SciTech Connect

    None, None

    2004-04-01

    This assessment examined the performance, cost, and timing of ultra-low emissions CHP technologies driven by certain air quality regions in the U.S.

  11. Activity Based Costing

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  12. 2015 Leading Builder Round Table Report | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Leading Builder Round Table Report 2015 Leading Builder Round Table Report The nation is on the cusp of a dramatic movement to zero energy ready homes. This includes statewide codes, large developments, and a growing amount of commitment to the DOE Zero Energy Ready Home program. Much of this progress can be attributed to a small contingent of our nation's leading builders who are demonstrating the technical, cost, and design feasibility for this level of excellence At the 2015 Leading Builder

  13. Review of storage battery system cost estimates

    SciTech Connect

    Brown, D.R.; Russell, J.A.

    1986-04-01

    Cost analyses for zinc bromine, sodium sulfur, and lead acid batteries were reviewed. Zinc bromine and sodium sulfur batteries were selected because of their advanced design nature and the high level of interest in these two technologies. Lead acid batteries were included to establish a baseline representative of a more mature technology.

  14. INEEL Lead Recycling in a Moratorium Environment

    SciTech Connect

    Kooda, K. E.; Galloway, K.; McCray, C. W.; Aitken, D. W.

    2003-02-26

    Since 1999, the Idaho National Engineering and Environmental Laboratory (INEEL) Lead Project successfully recycled over 700,000 pounds of excess INEEL lead to the private sector. On February 14, 2000, the Secretary of Energy, Bill Richardson, formalized the January 12, 2000, moratorium on recycling radioactive scrap metal that prevented the unrestricted release of recycled scrap metals to the private sector. This moratorium created significant problems for the INEEL lead recycling program and associated plans; however, through the cooperative efforts of the INEEL and Idaho State University as well as innovative planning and creative thinking the recycling issues were resolved. This collaboration has recycled over 160,000 pounds of excess lead to Idaho State University with a cost savings of over $.5M.

  15. INEEL Lead Recycling in a Moratorium Environment

    SciTech Connect

    Kooda, Kevin Evan; Mc Cray, Casey William; Aitken, Darren William; Galloway, Kelly

    2003-02-01

    Since 1999, the Idaho National Engineering and Environmental Laboratory (INEEL) Lead Project successfully recycled over 700,000 pounds of excess INEEL lead to the private sector. On February 14, 2000, the Secretary of Energy, Bill Richardson, formalized the January 12, 2000, moratorium on recycling radioactive scrap metal that prevented the unrestricted release of recycled scrap metals to the private sector. This moratorium created significant problems for the INEEL lead recycling program and associated plans; however, through the cooperative efforts of the INEEL and Idaho State University as well as innovative planning and creative thinking the recycling issues were resolved. This collaboration has recycled over 160,000 pounds of excess lead to Idaho State University with a cost savings of over $.5M.

  16. Electricity Generation Cost Simulation Model

    Energy Science and Technology Software Center

    2003-04-25

    The Electricity Generation Cost Simulation Model (GENSIM) is a user-friendly, high-level dynamic simulation model that calculates electricity production costs for variety of electricity generation technologies, including: pulverized coal, gas combustion turbine, gas combined cycle, nuclear, solar (PV and thermal), and wind. The model allows the user to quickly conduct sensitivity analysis on key variables, including: capital, O&M, and fuel costs; interest rates; construction time; heat rates; and capacity factors. The model also includes consideration ofmore » a wide range of externality costs and pollution control options for carbon dioxide, nitrogen oxides, sulfur dioxide, and mercury. Two different data sets are included in the model; one from the U.S. Department of Energy (DOE) and the other from Platt's Research Group. Likely users of this model include executives and staff in the Congress, the Administration and private industry (power plant builders, industrial electricity users and electric utilities). The model seeks to improve understanding of the economic viability of various generating technologies and their emission trade-offs. The base case results using the DOE data, indicate that in the absence of externality costs, or renewable tax credits, pulverized coal and gas combined cycle plants are the least cost alternatives at 3.7 and 3.5 cents/kwhr, respectively. A complete sensitivity analysis on fuel, capital, and construction time shows that these results coal and gas are much more sensitive to assumption about fuel prices than they are to capital costs or construction times. The results also show that making nuclear competitive with coal or gas requires significant reductions in capital costs, to the $1000/kW level, if no other changes are made. For renewables, the results indicate that wind is now competitive with the nuclear option and is only competitive with coal and gas for grid connected applications if one includes the federal production tax

  17. Aerogel commercialization: Technology, markets and costs

    SciTech Connect

    Carlson, G.; Lewis, D.; McKinley, K.; Richardson, J.; Tillotson, T.

    1994-10-07

    Commercialization of aerogels has been slow due to several factors including cost and manufacturability issues. The technology itself is well enough developed as a result of work over the past decade by an international-community of researchers. Several extensive substantial markets appear to exist for aerogels as thermal and sound insulators, if production costs can keep prices in line with competing established materials. The authors discuss here the elements which they have identified as key cost drivers, and they give a prognosis for the evolution of the technology leading to reduced cost aerogel production.

  18. LEAD SEVERING CONTRIVANCE

    DOEpatents

    Widmaier, W.

    1958-04-01

    A means for breaking an electrical circuit within an electronic tube during the process of manufacture is described. Frequently such circuits must be employed for gettering or vapor coating purposes, however, since an external pair of corector pins having no use after manufacture, is undesirable, this invention permits the use of existing leads to form a temporary circuit during manufacture, and severing it thereafter. One portion of the temporary circuit, made from a springy material such as tungsten, is spot welded to a fusable member. To cut the circuit an external radiant heat source melts the fusable member, allowing the tensed tungsten spring to contract and break the circuit. This inexpensive arrangement is particularly useful when the tube has a great many external leads crowded into the tube base.

  19. Life Cycle Cost Estimate

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  20. Cost Estimation Package

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  1. A chronicle of costs

    SciTech Connect

    Elioff, T.

    1994-04-01

    This report contains the history of all estimated costs associated with the superconducting super collider.

  2. Get the lead out! removing lead-based paint on hydro plant structures

    SciTech Connect

    Johnson, M.L.

    1996-05-01

    This article describes a hydroblasting technology used to remove lead-based surface coatings from the steel associated with the flood gates at the Wirtz Dam. Using this technology and an advanced moisture-cured urethane coating, the Lower Colorado River Authority was able to save more than $250,000 in materials, labor, and waste disposal costs.

  3. Hydrogen Threshold Cost Calculation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing

  4. OOTW COST TOOLS

    SciTech Connect

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  5. Hydrogen Pathway Cost Distributions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric

  6. Hazen Named Storage Systems Group Lead

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hazen Named Storage Systems Group Lead Hazen Named Storage Systems Group Lead May 10, 2016 Damian Hazen Damian Hazen Damian Hazen, who has been with NERSC since 2001, has been named group lead for the Storage Systems Group. Hazen has been acting lead since last October, taking over for Jason Hick, who recently left NERSC to take a position at Los Alamos National Laboratory. During his time at NERSC, Hazen has worked primarily in the Storage Systems Group as an administrator and programmer for

  7. Lead-free solder

    DOEpatents

    Anderson, Iver E.; Terpstra, Robert L.

    2001-05-15

    A Sn--Ag--Cu eutectic alloy is modified with one or more low level and low cost alloy additions to enhance high temperature microstructural stability and thermal-mechanical fatigue strength without decreasing solderability. Purposeful fourth or fifth element additions in the collective amount not exceeding about 1 weight % (wt. %) are added to Sn--Ag--Cu eutectic solder alloy based on the ternary eutectic Sn--4.7%Ag--1.7%Cu (wt. %) and are selected from the group consisting essentially of Ni, Fe, and like-acting elements as modifiers of the intermetallic interface between the solder and substrate to improve high temperature solder joint microstructural stability and solder joint thermal-mechanical fatigue strength.

  8. Generating Energy Efficiency Project Leads and Allocating Leads to Contractors

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Residential Network Peer Exchange Call Series: Generating Energy Efficiency Project Leads and Allocating Leads to Contractors, Call Slides and Discussion Summary February 26, 2015.

  9. Generating Energy Efficiency Project Leads and Allocating Leads...

    Energy Saver

    Generating Energy Efficiency Project Leads and Allocating Leads to Contractors Better Buildings Residential Network Peer Exchange Call Series: Generating Energy Efficiency Project ...

  10. ASPEN costing manual

    SciTech Connect

    Schwint, K.J.

    1986-07-25

    The ASPEN program contains within it a Cost Estimation System (CES) which estimates the purchase cost and utility consumption rates for major pieces of equipment in a process flowsheet as well as installed equipment costs. These estimates are ''preliminary-study grade'' with an accuracy of plus or minus 30%. The ASPEN program also contains within it an Economic Evaluation System (EES) which estimates overall capital investment costs, annual operating expenses and profitability indices for a chemical plant. This ASPEN costing manual has been written as a guide for those inexperienced in the use of ASPEN and unfamiliar with standard cost estimating techniques who want to use the ASPEN CES and EES. The ASPEN Costing Manual is comprised of the following sections: (1) Introduction, (2) ASPEN Input Language, (3) ASPEN Cost Estimation System (CES), (4) ASPEN Cost Blocks; and (5) ASPEN Economic Evaluation System (EES).

  11. Asset Recovery of Hazardous Materials Beneficial Reuse of Radiologically Encumbered Lead Stocks ''Getting the Lead Out''

    SciTech Connect

    LLOYD, E.R.

    2003-01-23

    Underutilized and surplus lead stocks and leaded components are a common legacy environmental problem across much of the Department of Energy (DOE) Complex. While seeking to dispose of these items through its Environmental Management Program, DOE operational programs continue to pursue contemporary mission requirements such as managing and/or storing radioactive isotopes that require lead materials for shielding. This paradox was identified in late 1999 when DOES policies for managing scrap metal were assessed. In January 2000, the Secretary of Energy directed the National Center of Excellence for Materials Recycle (NMR) to develop and implement a comprehensive lead reuse program for all of DOE. Fluor Hanford, contractor for DOE Richland Operations, subsequently contacted NMR to pilot lead reclamation and reuse at the Hanford Site, This relationship resulted in the development of a beneficial reuse pathway for lead reclaimed from spent fuel transport railcars being stored at Hanford. The 1.3 million pounds of lead in the railcars is considered radiologically encumbered due to its prior use. Further, the material was considered a mixed Resource Conservation and Recovery Act (RCRA) low-level radioactive waste that would require expensive storage or macro encapsulation to meet land disposal restrictions prior to burial. Working closely with Flour Hanford and the Office of Air, Water, and Radiation (EH-412), NMR developed a directed reuse pathway for this and other radiologically encumbered lead When derived supplemental release limits were used, the lead recovered from these railcars became eligible for reuse in shielding products to support DOE and commercial nuclear industry operations. Using this disposition pathway has saved Hanford one third of the cost of disposing of the lead and the cost of acquiring additional lead for nuclear shielding applications. Furthermore, the environmental costs associated with mining and producing new lead for shielding products and

  12. Worker lead exposures during renovation of homes with lead-based paint

    SciTech Connect

    Sussell, A.; Gittleman, J.; Singal, M.

    1998-11-01

    The authors evaluated lead exposures among full-time home renovators and part-time volunteers working primarily in pre-1960 homes with lead-based paint. Potentially hazardous lead exposures were measured during two tasks: exterior dry scraping and wet scraping. Maximum exposures were 120 and 63 {micro}g/m{sup 3}, respectively. Exposures during other tasks, including general repair, weatherization, exterior scraping/painting, window replacement, demolition, and plumbing, were low, as were all 13 full-shift personal exposures. Blood lead levels for full-time workers ranged up to 17.5 {micro}g/dl, with a GM of 5.2 {micro}g/dl; the GM for volunteers was 3.2 {micro}g/dl. All of the paint samples collected from work surfaces had detectable amounts of lead, with 65% of the work surfaces tested having an average lead concentration of >0.5%.

  13. 700 bar Type IV H2 Pressure Vessel Cost Projections

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    bar Type IV H2 Pressure Vessel Cost Projections Brian D. James and Cassidy Houchins Department of Energy Physical-Based Hydrogen Storage Workshop: Identifying Potential Pathways for Lower Cost 700 Bar Storage Vessels 24 August 2016 USCAR, Southfield, MI Outline * System design * Cost analysis methodology * Cost projections * Key opportunities for cost reduction * Recent focus areas - Composites - BOP - Winding time 2 * Overview assumptions & results of latest cost analyses * Categorize

  14. Low Cost Titanium Alloy Production

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Titanium Alloy Production Titanium for Energy Efficient Mechanical Systems. Titanium (Ti) is highly valued for its strength-to-weight ratio and corrosion resistance. However, after conventional wrought processing and machining, it is typically in excess of 40 times more expensive than a corresponding steel part and nearly 20 times more expensive than an aluminum part. The high cost of Ti parts is a function of both high materials loss and multiple high temperature forging steps. This, in turn,

  15. Direct/Indirect Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  16. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center

    Annual Fuel Cost gal Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and ...

  17. Low Cost, Durable Seal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability

  18. Home refinishing, lead paint, and infant blood lead levels

    SciTech Connect

    Rabinowitz, M.; Leviton, A.; Bellinger, D.

    1985-04-01

    The blood lead levels of 249 infants were measured semi-annually from birth to two years of age; the home paint was sampled and any recent home refinishing activity recorded. Mean blood lead from birth to age 2 years did not vary systematically with age but did correlate significantly with the amount of lead in the indoor paint. Refinishing activity in homes with high lead paint was associated with elevations of blood lead averaging 69 per cent.

  19. Power Plant Cycling Costs

    SciTech Connect

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  20. Atmospheric lead in downtown Guatemala City

    SciTech Connect

    Durando, M.L.; Aragon, S.R.

    1982-01-01

    Atomic absorption (AA) analysis was employed to determine, for the first time in this country, lead concentrations in aerosols collected in Nuclepore filter media during the months of February and March (1980) in Guatemala City, Guatemala. In particular, the lead in the atmospheric fine particulate was measured in different downtown locations around noontime and in a single location at 1-h intervals throughout the day. The first was used to study short-term variations from one location to the other, and the second one was used to correlate parameters such as traffic density and wind velocity with the levels of airborne lead on the same day. In addition, this paper presents a brief discussion of the lead content in Guatemalan gasoline, the lead levels in street dusts, and the total suspended particulate matter in downtown Guatemala City.

  1. Changing the Climate: Looking Towards a More Cost Effective, Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Efficient Future | Department of Energy Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future July 20, 2011 - 2:04pm Addthis November 18, 2008 Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future WASHINGTON, DC - The U.S. Environmental Protection Agency and U.S. Department of Energy are helping states lead the way in an effort to promote low cost

  2. CBERD: Cost Optimization of Energy Efficiency | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost Optimization of Energy Efficiency CBERD: Cost Optimization of Energy Efficiency Triple bottomline framework being utilized for the CBERD Cost Optimization of Energy Efficiency cross-cutting activity. Triple bottomline framework being utilized for the CBERD Cost Optimization of Energy Efficiency cross-cutting activity. Lead performer: Carnegie Mellon University - Pittsburgh PA Partner: --Centre for Environmental Planning and Technology - Ahmedabad, India FY16 DOE Funding: $50,000 per year

  3. 2006 Update of Business Downtime Costs

    SciTech Connect

    Hinrichs, Mr. Doug; Goggin, Mr. Michael

    2007-01-01

    The objective of this paper is to assess the downtime cost of power outages to businesses in the commercial and industrial sectors, updating and improving upon studies that have already been published on this subject. The goal is to produce a study that, relative to existing studies, (1) applies to a wider set of business types (2) reflects more current downtime costs, (3) accounts for the time duration factor of power outages, and (4) includes data on the costs imposed by real outages in a well-defined market. This study examines power outage costs in 11 commercial subsectors and 5 industrial subsectors, using data on downtime costs that was collected in the 1990's. This study also assesses power outage costs for power outages of 20 minutes, 1 hour, and 4 hours duration. Finally, this study incorporates data on the costs of real power outages for two business subsectors. However, the current limited state of data availability on the topic of downtime costs means there is room to improve upon this study. Useful next steps would be to generate more recent data on downtime costs, data that covers outages shorter than 20 minutes duration and longer than 4 hours duration, and more data that is based on the costs caused by real-world outages. Nevertheless, with the limited data that is currently available, this study is able to generate a clear and detailed picture of the downtime costs that are faced by different types of businesses.

  4. Cost analysis guidelines

    SciTech Connect

    Strait, R.S.

    1996-01-10

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

  5. substantially reduced production costs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    production costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy ...

  6. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  7. Workplace Charging Installation Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  8. MULTI-TUBE POWER LEADS TOWER FOR BEPCII IR MAGNETS.

    SciTech Connect

    JIA,L.X.; ZHANG,X.B.; WANG,L.; WANG,T.H.; YAO,Z.L.

    2004-05-11

    A power lead tower containing the multi-tube power leads is designed and under fabrication for the superconducting IR quadrupole magnets in the Beijing Electron Position Collider Upgrade (BEPCII). The lead tower consists of six pairs of gas-cooled leads for seven superconducting coils at various operating currents. The power lead is designed in a modular fashion, which can be easily applied to suit different operating current. The end copper block of the tube lead has a large cold mass that provide a large time constant in case of cooling flow interruption. A novel cryogenic electrical isolator is used for the leads.

  9. Breakthrough: Lead-free Solder

    ScienceCinema

    Anderson, Iver

    2013-03-01

    Ames Laboratory senior metallurgist Iver Anderson explains the importance of lead-free solder in taking hazardous lead out of the environment by eliminating it from discarded computers and electronics that wind up in landfills. Anderson led a team that developed a tin-silver-copper replacement for traditional lead-tin solder that has been adopted by more than 50 companies worldwide.

  10. Cost Contributors to Geothermal Power Production

    SciTech Connect

    Nathwani, Jay; Mines, Greg

    2011-07-01

    The US Department of Energy Geothermal Technologies Office (DOE-GTO) has developed the tool Geothermal Electricity Technologies Evaluation Model (GETEM) to assess the levelized cost of electricity (LCOE) of power produced from geothermal resources. Recently modifications to GETEM allow the DOE-GTO to better assess how different factors impact the generation costs, including initial project risk, time required to complete a development, and development size. The model characterizes the costs associated with project risk by including the costs to evaluate and drill those sites that are considered but not developed for commercial power generation, as well as to assign higher costs to finance those activities having more risk. This paper discusses how the important parameters impact the magnitude project costs for different project scenarios. The cost distributions presented include capital cost recovery for the exploration, confirmation, well field completion and power plant construction, as well as the operation and maintenance (O&M) costs. The paper will present these cost distributions for both EGS and hydrothermal resources.

  11. H2A Delivery: Miscellaneous Cost and H2 Losses

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Miscellaneous Costs and H2 Losses Hydrogen Delivery Analysis Meeting May 8-9, 2006 Matt Ringer National Renewable Energy Laboratory H2A Delivery Presentation Outline * Direct and Indirect Costs * Operating and Maintenance Costs * Labor Costs and Scaling Factor * Component Hydrogen Losses H2A Delivery Direct and Indirect Costs * Currently posted model includes site preparation, engineering and design, project contingency, one-time licensing fees and permitting - Factor of 1.225 above installed

  12. Lead-based paint assessment

    SciTech Connect

    Lorie, C.; Cowdery, J.W.

    1994-12-31

    In 1977, The US consumer product safety commission banned the use of lead-based paint (LBP) in all industries, except the maritime industry which still has certain privileged uses. Unfortunately for property and building owners, the ban did not come soon enough. In response to this heightened awareness, several environmental market sectors addressing the issues have emerged. These include: residential; soil; commercial; water; and structures. The first and most important step in addressing the concerns posed by the existence of lead based contamination is to quantify the amount of lead-based product, to determine the location of the lead based product and the extent, if any, of lead based contamination, and to make recommendations for the remediation or abatement of the lead product and resultant contamination. In narrowing the focus of these issues, this paper discusses lead-based paint assessment; preparing and organizing the assessment, the regulatory considerations, assessment methodology, and presentation of results.

  13. INFOGRAPHIC: Better Buildings Leading to Big Energy Savings | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Better Buildings Leading to Big Energy Savings INFOGRAPHIC: Better Buildings Leading to Big Energy Savings May 11, 2016 - 12:35pm Addthis Better Buildings partners have saved more than $1.3 billion on energy costs. Our new infographic explains how Better Buildings works and why it’s important. | Graphic by <a href="/node/1332956">Carly Wilkins</a>, Energy Department Better Buildings partners have saved more than $1.3 billion on energy costs. Our new

  14. Transmission line capital costs

    SciTech Connect

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  15. Decommissioning Unit Cost Data

    SciTech Connect

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-02-26

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for

  16. EM Leads Successful Workshop Supporting Fukushima Cleanup | Department...

    Energy.gov [DOE] (indexed site)

    officials leading the cleanup of the Fukushima Daiichi Nuclear Power Plant site and surrounding area, this time addressing priorities identified by Japan's government agencies. ...

  17. New developments in capital cost estimating

    SciTech Connect

    Stutz, R.A.; Zocher, M.A.

    1988-01-01

    The new developments in cost engineering revolve around the ability to capture information that in the past could not be automated. The purpose of automation is not to eliminate the expert cost engineer. The goal is to use available technology to have more information available to the professionals in the cost engineering field. In that sense, the demand for expertise increases in order to produce the highest quality estimate and project possible from all levels of cost engineers. We cannot overemphasize the importance of using a good source of expert information in building these types of programs. ''Garbage in, garbage out'' still applies in this form of programming. Expert systems technology will become commonplace in many vertical markets; it is important to undersand what can and cannot be accomplished in our field, and where this technology will lead us in the future.

  18. Optimization of life cycle management costs

    SciTech Connect

    Banerjee, A.K.

    1994-12-31

    As can be seen from the case studies, a LCM program needs to address and integrate, in the decision process, technical, political, licensing, remaining plant life, component replacement cycles, and financial issues. As part of the LCM evaluations, existing plant programs, ongoing replacement projects, short and long-term operation and maintenance issues, and life extension strategies must be considered. The development of the LCM evaluations and the cost benefit analysis identifies critical technical and life cycle cost parameters. These {open_quotes}discoveries{close_quotes} result from the detailed and effective use of a consistent, quantifiable, and well documented methodology. The systematic development and implementation of a plant-wide LCM program provides for an integrated and structured process that leads to the most practical and effective recommendations. Through the implementation of these recommendations and cost effective decisions, the overall power production costs can be controlled and ultimately lowered.

  19. High temperature superconductor current leads

    DOEpatents

    Hull, John R.; Poeppel, Roger B.

    1995-01-01

    An electrical lead having one end for connection to an apparatus in a cryogenic environment and the other end for connection to an apparatus outside the cryogenic environment. The electrical lead includes a high temperature superconductor wire and an electrically conductive material distributed therein, where the conductive material is present at the one end of the lead at a concentration in the range of from 0 to about 3% by volume, and at the other end of the lead at a concentration of less than about 20% by volume. Various embodiments are shown for groups of high temperature superconductor wires and sheaths.

  20. High temperature superconductor current leads

    DOEpatents

    Hull, J.R.; Poeppel, R.B.

    1995-06-20

    An electrical lead is disclosed having one end for connection to an apparatus in a cryogenic environment and the other end for connection to an apparatus outside the cryogenic environment. The electrical lead includes a high temperature superconductor wire and an electrically conductive material distributed therein, where the conductive material is present at the one end of the lead at a concentration in the range of from 0 to about 3% by volume, and at the other end of the lead at a concentration of less than about 20% by volume. Various embodiments are shown for groups of high temperature superconductor wires and sheaths. 9 figs.

  1. One Vaccine Leads to Another

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    One Vaccine Leads to Another Print Diphtheria is a potentially lethal respiratory disease that is fairly well controlled by vaccines discovered early last century. These vaccines...

  2. Guide for Conducting Benefit-Cost Evaluation of Realized Impacts...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... These are not included in Table II-6 for greater ease in exposition, but they are included ... risk and changes in health incidents that lead to health care costs andor lost workdays. ...

  3. Utilizing Bacteria for Sustainable Manufacturing of Low-Cost...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bacteria for Sustainable Manufacturing of Low-Cost Nanoparticles Chad Duty, Ph.D. Technical Lead Additive Manufacturing Roll-to-Roll Processing June 26, 2012 2 Managed by ...

  4. CBERD Cross-Cutting Task: Cost Optimization of Energy Efficiency

    Energy.gov [DOE]

    Lead performer: Carnegie Mellon University – Pittsburgh PAPartner:--Centre for Environmental Planning and Technology - Ahmedabad, IndiaFY16 DOE Funding: $50,000 per yearCost share: N/AProject Term:...

  5. Special Feature: Reducing Energy Costs with Better Batteries

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... But researchers hope that a new type of battery, called the lithium-air battery, will one day lead to a cost-effective, long-range electric vehicles that could travel 300 miles or ...

  6. Estimating Renewable Energy Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

  7. Vehicle Cost Calculator

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Select FuelTechnology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator Update Your Widget Code This ...

  8. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center

    Select FuelTechnology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Propane (LPG) Next Vehicle Cost Calculator Vehicle 0 City ...

  9. Cost Estimating Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  10. Cost Estimating Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  11. Cost Estimating Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    The objective of this Guide is to improve the quality of cost estimates and further strengthen the DOE program/project management system. The original 25 separate chapters and three appendices have been combined to create a single document.

  12. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  13. System Cost Model

    Energy Science and Technology Software Center

    1996-03-27

    SCM is used for estimation of the life-cycle impacts (costs, health and safety risks) of waste management facilities for mixed low-level, low-level, and transuranic waste. SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at Department of Energy (DOE) installations. SCM also provides transportation costs for intersite transfer of DOE wastes. SCM covers the entire DOE waste management complex tomore » allow system sensitivity analysis including: treatment, storage, and disposal configuration options; treatment technology selection; scheduling options; transportation options; waste stream and volume changes; and site specific conditions.« less

  14. Soft Costs Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy SunShot Initiative is a collaborative national effort to make solar energy technologies cost-competitive with conventional forms of energy by the end of the decade. Reducing the total installed cost for utility-scale solar electricity to roughly 6 cents per kilowatt hour without subsidies will result in rapid, large-scale adoption of solar electricity across the United States. Reaching this goal will re-establish American technological leadership, improve the nation's energy security,

  15. Independent Cost Estimate (ICE)

    Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  16. ''Measuring the Costs of Climate Change Policies''

    SciTech Connect

    Montgomery, W. D.; Smith, A. E.; Biggar, S. L.; Bernstein, P.M.

    2003-05-09

    Studies of the costs of climate change policies have utilized a variety of measures or metrics for summarizing costs. The leading economic models have utilized GNP, GDP, the ''area under a marginal cost curve,'' the discounted present value of consumption, and a welfare measure taken directly from the utility function of the model's representative agent (the ''Equivalent Variation''). Even when calculated using a single model, these metrics do not necessarily give similar magnitudes of costs or even rank policies consistently. This paper discusses in non-technical terms the economic concepts lying behind each concept, the theoretical basis for expecting each measure to provide a consistent ranking of policies, and the reasons why different measures provide different rankings. It identifies a method of calculating the ''Equivalent Variation'' as theoretically superior to the other cost metrics in ranking policies. When regulators put forward new economic or regulatory policies, there is a need to compare the costs and benefits of these new policies to existing policies and other alternatives to determine which policy is most cost-effective. For command and control policies, it is quite difficult to compute costs, but for more market-based policies, economists have had a great deal of success employing general equilibrium models to assess a policy's costs. Not all cost measures, however, arrive at the same ranking. Furthermore, cost measures can produce contradictory results for a specific policy. These problems make it difficult for a policy-maker to determine the best policy. For a cost measures to be of value, one would like to be confident of two things. First one wants to be sure whether the policy is a winner or loser. Second, one wants to be confident that a measure produces the correct policy ranking. That is, one wants to have confidence in a policy measure's ability to correctly rank policies from most beneficial to most harmful. This paper analyzes

  17. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Soft Costs » Soft Costs Soft Costs The U.S. Department of Energy (DOE) SunShot Initiative's soft costs program works to lower the non-hardware costs of solar and accelerate the adoption of solar energy technologies throughout the United States. In support of the SunShot Initiative goals, the soft costs program works in the following strategic areas: networking and technical assistance, data analysis, business innovation, and training. Soft Costs Activity Areas, Business Innovation, Networking

  18. Lead-free primary explosives

    DOEpatents

    Huynh, My Hang V.

    2010-06-22

    Lead-free primary explosives of the formula (cat).sub.Y[M.sup.II(T).sub.X(H.sub.2O).sub.6-X].sub.Z, where T is 5-nitrotetrazolate, and syntheses thereof are described. Substantially stoichiometric equivalents of the reactants lead to high yields of pure compositions thereby avoiding dangerous purification steps.

  19. Innovative High-Performance Deposition Technology for Low-Cost

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Manufacturing of OLED Lighting | Department of Energy High-Performance Deposition Technology for Low-Cost Manufacturing of OLED Lighting Innovative High-Performance Deposition Technology for Low-Cost Manufacturing of OLED Lighting Lead Performer: OLEDWorks, LLC - Rochester, NY DOE Total Funding: $1,046,452 Cost Share: $1,046,452 Project Term: October 1, 2013 - March 31, 2017 Funding Opportunity: SSL Manufacturing R&D Funding Opportunity Announcement (FOA) DE-FOA-000079 Project Objective

  20. Changing the Climate: Looking Towards a More Cost Effective, Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Efficient Future | Department of Energy Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future Changing the Climate: Looking Towards a More Cost Effective, Energy Efficient Future November 18, 2008 - 4:58pm Addthis WASHINGTON, DC - The U.S. Environmental Protection Agency and U.S. Department of Energy are helping states lead the way in an effort to promote low cost energy efficiency. More than 60 energy, environmental and state policy leaders from across the

  1. Factory Cost Model

    Energy Science and Technology Software Center

    1996-12-17

    The Factory Cost Model (FCM) is an economic analysis tool intended to provide flat panel display (FPD) and other similar discrete component manufacturers with the ability to make first-order estimates of the cost of unit production. This software has several intended uses. Primary among these is the ability to provide first-order economic analysis for future factories. Consequently, the model requires a minimal level of input detail, and accomodates situations where actual production data are notmore » available. This software is designed to be activity based such that most of the calculated direct costs are associated with the steps of a manufacturibg process. The FCM architecture has the ability to accomodate the analysis of existing manufacturing facilities. The FCM can provide assistance with strategic economic decisions surrounding production related matters. For instance, the program can project the effect on costs and resources of a new product''s introduction, or it can assess the potential cost reduction produced by step yield improvements in the manufacturing process.« less

  2. DIRECT COSTS OF DISABLING WORKPLACE INJURIES GROW 2.5 PERCENT

    Energy.gov [DOE]

    April 7, 2003 Annual Liberty Mutual Workplace Safety Index Shows Direct Costs of the Three Leading Causes of Workplace Incidents Grew Significantly Faster...

  3. Fuel Consumption and Cost Benefits of DOE Vehicle Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    vehicles decreases with time. * Manufacturing costs associated with batteries and electric machines fall faster than those of conventional technologies (i.e., engine,...

  4. NATIONAL LEAD COMPANY OF OHIO

    Office of Legacy Management (LM)

    8 Radiatlon Dept. 3 Water Treatment Plant (Far W&or Spnphs Only) NILHhS-1?6 (RFV lO... 8 Radiation Dept. 3 Water Treotmnt Plant (Fw Wkr bnplos Only) NATIONAL. LEAD ...

  5. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    costs program works to lower the non-hardware costs of ... data analysis, business innovation, and training. ... for as much as 64% of the total cost of a new solar system. ...

  6. QGESS: Capital Cost Scaling Methodology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the tonnes of CO2 utilized. The costs of the process are to include infrastructure, raw materials, processing, byproduct disposal, and utilities costs, as well as any other costs....

  7. Factors Impacting Decommissioning Costs - 13576

    SciTech Connect

    Kim, Karen; McGrath, Richard

    2013-07-01

    The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

  8. Low Cost, Durable Seal

    SciTech Connect

    Roberts, George; Parsons, Jason; Friedman, Jake

    2010-12-17

    Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

  9. Lead paint abatement -- A technological review

    SciTech Connect

    Draper, A.C. III; Kapuscik, D.

    1994-12-31

    Abatement of lead from various surfaces proves to be a rapidly developing industry. Removal techniques and effectiveness varies greatly with varying substrates (wood, concrete, steel, etc.) and surface configurations including interior/exterior considerations, habitability and anticipated retrofit. Numerous technologies advances, and/or adaptations of long accepted removal techniques have recently emerged. Some of the more commonly used removal procedures including vacuum blasting, chemical stripping, scarifiers, grinders, sanders, etc. will be reviewed. Specific emphasis will be placed upon mode of application, positive and negative environmental aspects, and varying emissions generated. Personnel sampling data will be discussed with respect to associated personal protective equipment impact to derive the most cost productive environmentally conscious alternatives.

  10. Lead-free electric matches.

    SciTech Connect

    Son, S. F.; Hiskey, M. A.; Naud, D.; Busse, J. R.; Asay, B. W.

    2002-01-01

    Electric matches are used in pyrotechnics to initiate devices electrically rather than by burning fuses. Fuses have the disadvantage of burning with a long delay before igniting a pyrotechnic device, while electric matches can instantaneously fire a device at a user's command. In addition, electric matches can be fired remotely at a safe distance. Unfortunately, most current commercial electric match compositions contain lead as thiocyanate, nitroresorcinate or tetroxide, which when burned, produces lead-containing smoke. This lead pollutant presents environmental exposure problems to cast, crew, and audience. The reason that these lead containing compounds are used as electric match compositions is that these mixtures have the required thermal stability, yet are simultaneously able to be initiated reliably by a very small thermal stimulus. A possible alternative to lead-containing compounds is nanoscale thermite materials (metastable intermolecular composites or MIC). These superthermite materials can be formulated to be extremely spark sensitive with tunable reaction rate and yield high temperature products. We have formulated and manufactured lead-free electric matches based on nanoscale Al/MoO{sub 3} mixtures. We have determined that these matches fire reliably and to consistently ignite a sample of black powder. Initial safety, ageing and performance results are presented in this paper.

  11. Fermilab | Science | Particle Accelerators | Leading Accelerator Technology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Leading Accelerator Technology photo From blueprint to construction, Fermilab scientists and engineers develop particle accelerators to produce beams to take particle physics to the next level, collaborating with scientists and laboratories around the world to help build these complex machines. Researchers build accelerators to be efficient and robust along every step of the particle beam's path, from the time it's born to its termination on target. The machines themselves must be efficient,

  12. Turbine Cost Systems Engineering Model

    Energy Science and Technology Software Center

    2012-09-30

    turb_costSE is a set of models that link wind turbine component masses (and a few other key variables) to component costs.

  13. Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operating Procedures, Revision 2 | Department of Energy Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard Operating Procedures, Revision 2 Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard Operating Procedures, Revision 2 This Standard Operating Procedures (SOP) provides guidance for Department of Energy (DOE) Project Management Oversight and Assessment (PM) staff and contractors performing either an Independent Cost Estimate (ICE) or an

  14. Industrial lead paint removal specifications

    SciTech Connect

    Stone, R.C.

    1997-06-01

    The purpose of this paper is to inform the reader as to some of the pertinent rules and regulations promulgated by the Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) that may effect an industrial lead paint removal project. The paper discusses a recommended schedule of procedures and preparations to be followed by the lead paint removal specification writer when analyzing the possible impact of the project on the environment, the public and workers. Implications of the Clean Air Act, the Clean Water Act and the Resource Conservation and Recovery Act (RCRA) along with hazardous waste handling, manifesting, transporting and disposal procedures are discussed with special emphasis placed as to their impact on the writer and the facility owner. As the rules and regulations are highly complex, the writer has attempted to explain the methodology currently being used in state-of-the-art industrial lead abatement specifications.

  15. Leading the Charge: Christine Klein

    Office of Energy Efficiency and Renewable Energy (EERE)

    Change doesn’t happen on its own. It’s led by dedicated and passionate people who are committed to empowering Indian Country to energize future generations. Leading the Charge is a regular Office of Indian Energy newsletter feature spotlighting the movers and shakers in energy development on tribal lands. In this issue, we talk to Christine Klein, an adopted Haida who is leading efforts to help Alaska Native villages address their energy challenges in her role as Vice President and Chief Operating Officer of the Calista Corporation.

  16. Towards More Transmission Asset Utilization through Real-time Path Rating

    SciTech Connect

    Diao, Ruisheng; Huang, Zhenyu; Jin, Chunlian; Vyakaranam, Bharat GNVSR; Jin, Shuangshuang; Makarov, Yuri V.

    2013-10-21

    Ratings of transmission paths, typically determined in an offline environment, are static and tend to be conservative, leading to underutilization of transmission assets, higher costs of system operation and renewable energy integration, and lower efficiency and savings. With the ever-increasing transmission congestion costs and new challenges from renewable integration, increasing transfer capacity of existing transmission lines is essential. Real-time path rating provides a promising approach to enabling additional power transfer capability and fully utilizing transfer capability. In this paper, the feasibility of real-time path rating is investigated. Several promising technologies to achieve real-time path rating are discussed. Various benefits that can be expected from real-time path rating, such as increased transfer capability and reduced total generation cost, are demonstrated through simulations conducted on the Western Electricity Coordinating Council system model.

  17. Cost Estimating, Analysis, and Standardization

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1984-11-02

    To establish policy and responsibilities for: (a) developing and reviewing project cost estimates; (b) preparing independent cost estimates and analysis; (c) standardizing cost estimating procedures; and (d) improving overall cost estimating and analytical techniques, cost data bases, cost and economic escalation models, and cost estimating systems. Cancels DOE O 5700.2B, dated 8-5-1983; DOE O 5700.8, dated 5-27-1981; and HQ 1130.1A, dated 12-30-1981. Canceled by DOE O 5700.2D, dated 6-12-1992

  18. Geothermal probabilistic cost study

    SciTech Connect

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  19. Power Plant Cycling Costs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Power Plant Cycling Costs April 2012 N. Kumar, P. Besuner, S. Lefton, D. Agan, and D. Hilleman Intertek APTECH Sunnyvale, California NREL Technical Monitor: Debra Lew Subcontract Report NREL/SR-5500-55433 July 2012 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory 15013 Denver West Parkway Golden, Colorado 80401 303-275-3000 * www.nrel.gov

  20. Reducing Power Factor Cost

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Low power factor is expensive and inefficient. Many utility companies charge you an additional fee if your power factor is less than 0.95. Low power factor also reduces your electrical system's distribu- tion capacity by increasing current flow and causing voltage drops. This fact sheet describes power factor and explains how you can improve your power factor to reduce electric bills and enhance your electrical system's capacity. REDUCING POWER FACTOR COST To understand power factor, visualize a

  1. Hydrogen and Infrastructure Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FUEL CELL TECHNOLOGIES PROGRAM Hydrogen and Infrastructure Costs Hydrogen Infrastructure Market Readiness Workshop Washington D.C. February 17, 2011 Fred Joseck U.S. Department of Energy Fuel Cell Technologies Program Fuel Cells: Diverse Fuels and Applications More than $40 million from the 2009 American Recovery and Reinvestment Act to fund 12 projects to deploy up to 1,000 fuel cells Recovery Act Funding for Fuel Cells COMPANY AWARD APPLICATION Delphi Automotive $2.4 M Auxiliary Power FedEx

  2. Leading the Charge: Jim Manion

    Energy.gov [DOE]

    Change doesn’t happen on its own. It’s led by dedicated and passionate people who are committed to empowering Indian Country to energize future generations. Leading the Charge is a regular Office of Indian Energy newsletter feature spotlighting the movers and shakers in energy development on tribal lands.

  3. NATIONAL LEAD COMPANY OF OHIO

    Office of Legacy Management (LM)

    t-t AL- 1. + T fi r,y* t ,.- . NATIONAL LEAD COMPANY OF OHIO Ofll i iy Ci)wp HEALTH AND SAFETY DIVISION - ANALYTICAL DEPT. ANALYTICAL DATA SHEET U-G b ;33y jl:tL G c-w &3(y I...

  4. Cost estimate of initial SSC experimental equipment

    SciTech Connect

    1986-06-01

    The cost of the initial detector complement at recently constructed colliding beam facilities (or at those under construction) has been a significant fraction of the cost of the accelerator complex. Because of the complexity of large modern-day detectors, the time-scale for their design and construction is comparable to the time-scale needed for accelerator design and construction. For these reasons it is appropriate to estimate the cost of the anticipated detector complement in parallel with the cost estimates of the collider itself. The fundamental difficulty with this procedure is that, whereas a firm conceptual design of the collider does exist, comparable information is unavailable for the detectors. Traditionally, these have been built by the high energy physics user community according to their perception of the key scientific problems that need to be addressed. The role of the accelerator laboratory in that process has involved technical and managerial coordination and the allocation of running time and local facilities among the proposed experiments. It seems proper that the basic spirit of experimentation reflecting the scientific judgment of the community should be preserved at the SSC. Furthermore, the formal process of initiation of detector proposals can only start once the SSC has been approved as a construction project and a formal laboratory administration put in place. Thus an ad hoc mechanism had to be created to estimate the range of potential detector needs, potential detector costs, and associated computing equipment.

  5. SF 6432-TM (xx-xx-xx) Time Material

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    costs are comprised of indirect costs, including Control : SF 6432-TM Title: Standard Terms and Conditions for Time and Materials Labor-Hour Contracts Owner: Procurement Policy...

  6. AN OVERVIEW OF TOOL FOR RESPONSE ACTION COST ESTIMATING (TRACE)

    SciTech Connect

    FERRIES SR; KLINK KL; OSTAPKOWICZ B

    2012-01-30

    Tools and techniques that provide improved performance and reduced costs are important to government programs, particularly in current times. An opportunity for improvement was identified for preparation of cost estimates used to support the evaluation of response action alternatives. As a result, CH2M HILL Plateau Remediation Company has developed Tool for Response Action Cost Estimating (TRACE). TRACE is a multi-page Microsoft Excel{reg_sign} workbook developed to introduce efficiencies into the timely and consistent production of cost estimates for response action alternatives. This tool combines costs derived from extensive site-specific runs of commercially available remediation cost models with site-specific and estimator-researched and derived costs, providing the best estimating sources available. TRACE also provides for common quantity and key parameter links across multiple alternatives, maximizing ease of updating estimates and performing sensitivity analyses, and ensuring consistency.

  7. Fact Sheet: Carbon-Enhanced Lead-Acid Batteries (October 2012)

    Energy.gov [DOE]

    DOE's Energy Storage Program is funding research and testing to improve the performance and reduce the cost of lead-acid batteries. Research to understand and quantify the mechanisms responsible...

  8. Beyond pollution prevention: Managing life-cycle costs

    SciTech Connect

    Cohan, D.; Gess, D. )

    1993-01-01

    Companies that purchases and use chemicals and materials in their everyday operation are finding that disposing of these products is becoming increasingly expensive. These disposal and liability costs have been the motivating factor behind recent efforts at pollution prevention. This paper suggests an alternative approach: considering the full life-cycle costs of chemicals and materials at the time purchase decisions are made. Life-cycle cost is the sum of all the costs that a product is expected to incur from the time of its purchase, during its use, until the disposal of any wastes or by-products and beyond as long as liabilities may remain. It represents the product's real cost to the company, and as such is a better basis for making cost-effective decisions. By using life-cycle costs to make decisions, companies can prevent uneconomical decisions on potentially hazardous materials and more effectively minimize overall costs. Life-cycle cost management can also help in the formulation of pollution prevention plans by identifying cost-effective waste-reduction alternatives. Although the concepts of life-cycle cost management are straightforward and intuitive, applying these concepts to real decisions may be challenging. This paper presents an overview of life-cycle cost management, discusses some of the challenges companies face applying this approach to real decisions, and provides solutions that meet these challenges.

  9. Cost Study Manual | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost Study Manual Cost Study Manual Update 62912. PDF icon Memo regarding Cost Study Manual PDF icon Cost Study Manual More Documents & Publications Contractor Human Resources ...

  10. Comparison of costs for solidification of high-level radioactive waste solutions: glass monoliths vs metal matrices

    SciTech Connect

    Jardine, L.J.; Carlton, R.E.; Steindler, M.J.

    1981-05-01

    A comparative economic analysis was made of four solidification processes for liquid high-level radioactive waste. Two processes produced borosilicate glass monoliths and two others produced metal matrix composites of lead and borosilicate glass beads and lead and supercalcine pellets. Within the uncertainties of the cost (1979 dollars) estimates, the cost of the four processes was about the same, with the major cost component being the cost of the primary building structure. Equipment costs and operating and maintenance costs formed only a small portion of the building structure costs for all processes.

  11. Liquefaction and Pipeline Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Liquefaction and Pipeline Costs Bruce Kelly Nexant, Inc. Hydrogen Delivery Analysis Meeting May 8-9, 2007 Columbia, Maryland 2 Hydrogen Liquefaction Basic process Compress Cool to temperature with positive Joule- Thompson coefficient Throttle to form liquid Water cooling Nitrogen refrigerator precooler Ortho-para conversion reactors J-T valve L H 2 H 2 gas Compressor(s) 3 Hydrogen Liquefaction - Continued Electric energy requirements Isentropic demand is 3.9 kWh/kg y = 17.844x -0.1548 6 8 10 12

  12. Levelized cost and levelized avoided cost of new generation resources...

    Annual Energy Outlook

    3 The importance of the factors varies among the technologies. For technologies such as solar and wind generation that have no fuel costs and relatively small variable O&M costs,...

  13. LIFE Cost of Electricity, Capital and Operating Costs

    SciTech Connect

    Anklam, T

    2011-04-14

    Successful commercialization of fusion energy requires economic viability as well as technical and scientific feasibility. To assess economic viability, we have conducted a pre-conceptual level evaluation of LIFE economics. Unit costs are estimated from a combination of bottom-up costs estimates, working with representative vendors, and scaled results from previous studies of fission and fusion plants. An integrated process model of a LIFE power plant was developed to integrate and optimize unit costs and calculate top level metrics such as cost of electricity and power plant capital cost. The scope of this activity was the entire power plant site. Separately, a development program to deliver the required specialized equipment has been assembled. Results show that LIFE power plant cost of electricity and plant capital cost compare favorably to estimates for new-build LWR's, coal and gas - particularly if indicative costs of carbon capture and sequestration are accounted for.

  14. FY 1995 cost savings report

    SciTech Connect

    Andrews-Smith, K.L., Westinghouse Hanford

    1996-06-21

    Fiscal Year (FY) 1995 challenged us to dramatically reduce costs at Hanford. We began the year with an 8 percent reduction in our Environmental Management budget but at the same time were tasked with accomplishing additional workscope. This resulted in a Productivity Challenge whereby we took on more work at the beginning of the year than we had funding to complete. During the year, the Productivity Challenge actually grew to 23 percent because of recissions, Congressional budget reductions, and DOE Headquarters actions. We successfully met our FY 1995 Productivity Challenge through an aggressive cost reduction program that identified and eliminated unnecessary workscope and found ways to be more efficient. We reduced the size of the workforce, cut overhead expenses, eliminated paperwork, cancelled construction of new facilities, and reengineered our processes. We are proving we can get the job done better and for less money at Hanford. DOE`s drive to do it ``better, faster, cheaper`` has led us to look for more and larger partnerships with the private sector. The biggest will be privatization of Hanford`s Tank Waste Remediation System, which will turn liquid tank waste into glass logs for eventual disposal. We will also save millions of dollars and avoid the cost of replacing aging steam plants by contracting Hanford`s energy needs to a private company. Other privatization successes include the Hanford Mail Service, a spinoff of advanced technical training, low level mixed waste thermal treatment, and transfer of the Hanford Museums of Science and history to a private non-profit organization. Despite the rough roads and uncertainty we faced in FY 1995, less than 3 percent of our work fell behind schedule, while the work that was performed was completed with an 8.6 percent cost under-run. We not only met the FY 1995 productivity challenge, we also met our FY 1995-1998 savings commitments and accelerated some critical cleanup milestones. The challenges continue

  15. Workers' Compensation Costs Rising Across the Nation

    Office of Energy Efficiency and Renewable Energy (EERE)

    For the first time since 1992, benefits paid to workers and employers' costs for workers' compensation rose faster than wages by James L Nash (jnash@penton.com) The National Academy of Social Insurance (NASI) study, which provides the only comprehensive national data on the largely state-run program, states that premiums charged by insurers rose by eight percent in 2001.

  16. The Cost of Transmission for Wind Energy: A Review of Transmission Planning Studies

    SciTech Connect

    Mills, Andrew D.; Wiser, Ryan; Porter, Kevin

    2009-02-02

    The rapid development of wind power that the United States has experienced over the last several years has been coupled with a growing concern that wind development will require substantial additions to the nation's transmission infrastructure. Transmission is particularly important for wind power due to the locational dependence of wind resources, the relatively low capacity factor of wind plants, and the mismatch between the short lead time to build a new wind project and the longer lead time often needed to plan, permit, and construct transmission. It is clear that institutional issues related to transmission planning, siting, and cost allocation will pose major obstacles to accelerated wind power deployment, but also of concern is the potential cost of this infrastructure build out. Simply put, how much extra cost will society bear to deliver wind power to load centers? Without an answer to this question, there can be no consensus on whether or not the cost of developing transmission for wind will be a major barrier to further wind deployment, or whether the institutional barriers to transmission expansion are likely to be of more immediate concern. In this report, we review a sample of 40 detailed transmission studies that have included wind power. These studies cover a broad geographic area, and were completed from 2001-2008. Our primary goal in reviewing these studies is to develop a better understanding of the transmission costs needed to access growing quantities of wind generation. A secondary goal is to gain a better appreciation of the differences in transmission planning approaches in order to identify those methodologies that seem most able to estimate the incremental transmission costs associated with wind development. Finally, we hope that the resulting dataset and discussion might be used to inform the assumptions, methods, and results of higher-level assessment models that are sometimes used to estimate the cost of wind deployment (e.g. NEMS and

  17. Cost | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Cost Home Ocop's picture Submitted by Ocop(5) Member 15 July, 2014 - 07:07 MHK LCOE Reporting Guidance Draft Cost Current DOE LCOE numerical modeling Performance Tidal Wave To...

  18. Impacts of Rising Construction and Equipment Costs on Energy Industries (released in AEO2007)

    Reports and Publications

    2007-01-01

    Costs related to the construction industry have been volatile in recent years. Some of the volatility may be related to higher energy prices. Prices for iron and steel, cement, and concrete -- commodities used heavily in the construction of new energy projects -- rose sharply from 2004 to 2006, and shortages have been reported. How such price fluctuations may affect the cost or pace of new development in the energy industries is not known with any certainty, and short-term changes in commodity prices are not accounted for in the 25-year projections in Annual Energy Outlook 2007. Most projects in the energy industries require long planning and construction lead times, which can lessen the impacts of short-term trends.

  19. Wind Integration Cost and Cost-Causation: Preprint

    SciTech Connect

    Milligan, M.; Kirby, B.; Holttinen, H.; Kiviluoma, J.; Estanqueiro, A.; Martin-Martinez, S.; Gomez-Lazaro, E.; Peneda, I.; Smith, C.

    2013-10-01

    The question of wind integration cost has received much attention in the past several years. The methodological challenges to calculating integration costs are discussed in this paper. There are other sources of integration cost unrelated to wind energy. A performance-based approach would be technology neutral, and would provide price signals for all technology types. However, it is difficult to correctly formulate such an approach. Determining what is and is not an integration cost is challenging. Another problem is the allocation of system costs to one source. Because of significant nonlinearities, this can prove to be impossible to determine in an accurate and objective way.

  20. New Liquid Salt Electrolytes Could Lead to Cost-Effective Flow...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CO2 Geothermal Natural Gas Safety, Security & ... Hydrogen Production Market Transformation Fuel Cells ... HomeEnergy, Energy Storage Systems, Grid Integration, News, ...

  1. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    SciTech Connect

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  2. Check Estimates and Independent Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Check estimates and independent cost estimates (ICEs) are tools that can be used to validate a cost estimate. Estimate validation entails an objective review of the estimate to ensure that estimate criteria and requirements have been met and well documented, defensible estimate has been developed. This chapter describes check estimates and their procedures and various types of independent cost estimates.

  3. Hydropower Baseline Cost Modeling

    SciTech Connect

    O'Connor, Patrick W.; Zhang, Qin Fen; DeNeale, Scott T.; Chalise, Dol Raj; Centurion, Emma E.

    2015-01-01

    Recent resource assessments conducted by the United States Department of Energy have identified significant opportunities for expanding hydropower generation through the addition of power to non-powered dams and on undeveloped stream-reaches. Additional interest exists in the powering of existing water resource infrastructure such as conduits and canals, upgrading and expanding existing hydropower facilities, and the construction new pumped storage hydropower. Understanding the potential future role of these hydropower resources in the nation’s energy system requires an assessment of the environmental and techno-economic issues associated with expanding hydropower generation. To facilitate these assessments, this report seeks to fill the current gaps in publically available hydropower cost-estimating tools that can support the national-scale evaluation of hydropower resources.

  4. What is lead-based paint

    SciTech Connect

    Vernon, L.S.

    1994-03-01

    The number of variety of lead-abatement regulations and requirements make it difficult and confusing to identify and properly respond to dangerous levels of lead in every situation. Definitions of lead-based paint'' and three test methods for lead detection are described to help determine when and how to test for the presence of lead.

  5. Low-Cost Solar Water Heating Research and Development Roadmap

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Gas Heat Pump For Building Space Heating Low-Cost Gas Heat Pump For Building Space Heating Credit: Stone Mountain Technologies Credit: Stone Mountain Technologies Lead Performer: Stone Mountain Technologies - Erwin, TN Partners: -- A.O. Smith - Milwaukee, WI -- Gas Technology Institute - Des Plaines, IL DOE Funding: $903,000 Cost Share: $232,294 Project Term: March 1, 2013 - August 31, 2015 Funding Opportunity: Energy Savings Through Improved Mechanical Systems and Building Envelope Technologies

  6. High-Quality, Low-Cost Bulk Gallium Nitride Substrates

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    High-Quality, Low- Cost Bulk Gallium Nitride Substrates Electrochemical Solution Growth: A Scalable Semiconductor Manufacturing Process The ever-growing demand in the past decade for more energy effcient solid-state lighting and electrical power conversion is leading to a higher demand for wide bandgap semiconductor-based devices, such as gallium nitride (GaN), over traditional silicon (Si)-based devices. High cost and limited availability, how- ever, have hindered the adoption of GaN substrates

  7. Multi-lead heat sink

    DOEpatents

    Roose, L.D.

    1982-08-25

    The disclosure relates to a heat sink used to protect integrated circuits from the heat resulting from soldering them to circuit boards. A tubular housing contains a slidable member which engages somewhat inwardly extending connecting rods, each of which is rotatably attached at one end to the bottom of the housing. The other end of each rod is fastened to an expandable coil spring loop. As the member is pushed downward in the housing, its bottom edge engages and forces outward the connecting rods, thereby expanding the spring so that it will fit over an integrated circuit. After the device is in place, the member is slid upward and the spring contracts about the leads of the integrated circuit. Soldering is now conducted and the spring absorbs excess heat therefrom to protect the integrated circuit. The placement steps are repeated in reverse order to remove the heat sink for use again.

  8. Multi-lead heat sink

    DOEpatents

    Roose, L.D.

    1984-07-03

    The disclosure relates to a heat sink used to protect integrated circuits from the heat resulting from soldering them to circuit boards. A tubular housing contains a slidable member which engages somewhat inwardly extending connecting rods, each of which is rotatably attached at one end to the bottom of the housing. The other end of each rod is fastened to an expandable coil spring loop. As the member is pushed downward in the housing, its bottom edge engages and forces outward the connecting rods, thereby expanding the spring so that it will fit over an integrated circuit. After the device is in place, the member is slid upward and the spring contracts about the leads of the integrated circuit. Soldering is now conducted and the spring absorbs excess heat therefrom to protect the integrated circuit. The placement steps are repeated in reverse order to remove the heat sink for use again. 4 figs.

  9. Multi-lead heat sink

    DOEpatents

    Roose, Lars D.

    1984-01-01

    The disclosure relates to a heat sink used to protect integrated circuits from the heat resulting from soldering them to circuit boards. A tubular housing contains a slidable member which engages somewhat inwardly extending connecting rods, each of which is rotatably attached at one end to the bottom of the housing. The other end of each rod is fastened to an expandable coil spring loop. As the member is pushed downward in the housing, its bottom edge engages and forces outward the connecting rods, thereby expanding the spring so that it will fit over an integrated circuit. After the device is in place, the member is slid upward and the spring contracts about the leads of the integrated circuit. Soldering is now conducted and the spring absorbs excess heat therefrom to protect the integrated circuit. The placement steps are repeated in reverse order to remove the heat sink for use again.

  10. HUD lead-based-paint abatement demonstration (FHA)

    SciTech Connect

    Not Available

    1991-08-01

    The toxic effects of lead on human beings, and particularly on young children, have been known for many years. Amendments to the Lead-Based Paint Poisoning Prevention Act (LPPPA) in 1987 and 1988 required the U.S. Department of Housing and Urban Development (HUD) to undertake a lead-based paint abatement demonstration program. The overall objective of the demonstration was to 'utilize a sufficient number of abatement methods in a sufficient number of areas and circumstances to demonstrate their relative cost-effectiveness...' One component of the demonstration was conducted in HUD-owned, vacant, single-family properties and was completed in the fall of 1990. A public housing component is expected to be completed in 1991. The report describes the objectives, research design, experience and findings of the completed component, which is generally known as the FHA demonstration, named after the Federal Housing Administration, which held title to the houses.

  11. Shifting the cost curve for subsea developments

    SciTech Connect

    Solheim, B.J.; Hestad, E.

    1995-12-31

    A steadily increasing challenge in offshore oil and gas field developments in the Norwegian part of the North Sea is to design, construct, and install offshore installations that give an acceptable return of investment Deeper water, limited reservoirs and a low, fluctuating oil price make the task even more demanding. Saga Petroleum has recently faced this challenge with its last field development project. Attention in this paper is focused on the Vigdis subsea production system. However, the considerations and cost reduction elements are valid for offshore field developments in general. The main cost reductions are obtained by: Maximum use of industry capability; Application of new organization principles; Focus on functional requirements; Shortened project execution time; Technological development. In addition this paper presents thoughts on further cost reduction possibilities for future subsea field developments.

  12. Electric power plant capital costs

    SciTech Connect

    Dodero, G.; Castellie, D.; Coffetti, M.

    1998-07-01

    Due to the increase of technology options, it is becoming day by day more important to have an overview of electric power plants capital costs so to take the right decisions in the preliminary stages of the project choices. From 1970 through the 1980's and 1990's, the capital costs of traditional steam power plants increased steadily, due in part to the addition of more advanced, and more costly, pollution control equipment. On the other hand the availability of ample natural gas, the scaling up of gas turbine machinery and the appearance on the market of new technologies (PFB, IGCC, fuel cells, etc.) are offering new opportunities to the traditional utilities and to the new players including the independent power producers, developers and private operators. The costs indicated will be referred to the two main world markets, that is, the Western countries and Asian area. These costs are obviously for preliminary studies and project assessment. To minimize the cost/benefit ratio, the design activities of the architect-engineer consultant have a very important role. Impact of manufacturing area on main component costs and on erection works: The three main factors, which influence machinery price are: local labor cost, license or research cost and raw material cost. An additional impact on plant cost on local basis are the raw material cost for erection, erection manpower, their skill and components available/manufactured in the erection area. Local taxation and custom duties must also be considered. Labor costs in Eastern Germany are still much lower than in the West Germany, but they are not indicated in the survey. Portuguese and Greek workers have the lowest labor costs.

  13. Special Feature: Reducing Energy Costs with Better Batteries

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reducing Energy Costs with Better Batteries Special Feature: Reducing Energy Costs with Better Batteries September 9, 2013 Contact: Linda Vu, +1 510 495 2402, lvu@lbl.gov Electricvehicles8331019248.jpg Electric vehicles lined up in Cascade Locks. Credit: Oregon Department of Transportation A better battery-one that is cheap and safe, but packs a lot of power-could lead to an electric vehicle that performs better than today's gasoline-powered cars, and costs about the same or less to consumers.

  14. Lead phosphate glass compositions for optical components

    DOEpatents

    Sales, Brian C.; Boatner, Lynn A.

    1987-01-01

    A lead phosphate glass to which has been added indium oxide or scandium oe to improve chemical durability and provide a lead phosphate glass with good optical properties.

  15. David Skinner Named NERSC Strategic Partnerships Lead

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    David Skinner Named NERSC Strategic Partnerships Lead David Skinner Named NERSC Strategic Partnerships Lead January 24, 2014 Contact: Linda Vu, +1 510 495 2402, lvu@lbl.gov...

  16. Heavy Isotopes Lead Materials Management Organization (LMMO)...

    Office of Scientific and Technical Information (OSTI)

    Heavy Isotopes Lead Materials Management Organization (LMMO) Update Citation Details In-Document Search Title: Heavy Isotopes Lead Materials Management Organization (LMMO) Update ...

  17. Low Emissions Asian Development (LEAD) Program - Bangladesh ...

    OpenEI (Open Energy Information) [EERE & EIA]

    Low Emissions Asian Development (LEAD) Program - Bangladesh Redirect page Jump to: navigation, search REDIRECT Low Emissions Asian Development (LEAD) Program Retrieved from...

  18. Downregulation of Cinnamyl Alcohol Dehydrogenase (CAD) Leads...

    Office of Scientific and Technical Information (OSTI)

    (CAD) Leads to Improved Saccharification Efficiency in Switchgrass Citation Details In-Document Search Title: Downregulation of Cinnamyl Alcohol Dehydrogenase (CAD) Leads ...

  19. Distributed Generation Lead-by-Example Resources

    Energy.gov [DOE]

    State governments can lead by example by promoting renewable energy programs and policies. Efforts to lead by example include using renewable energy resources (including alternative fuel for...

  20. Cities Leading through Energy Analysis and Planning

    Energy.gov [DOE]

    The Cities Leading through Energy Analysis and Planning (Cities-LEAP) project delivers standardized, localized energy data and analysis that enables cities to lead clean energy innovation and...

  1. Using life-cycle cost management to cut costs and reduce waste

    SciTech Connect

    Gess, D.; Cohan, D.; McLearn, M.

    1995-12-01

    Increasing competition is forcing electric utility companies to reduce costs and improve efficiency. At the same time, increasing costs for waste disposal and emissions control and growing environmental regulatory pressure are providing powerful incentives for firms in virtually every industry to investigate opportunities to reduce or even eliminate the adverse environmental impacts associated with their operations. companies are also striving toward environmental stewardship to realize the potential benefits to the firms`s public image, employees, an shareholders. Motivated by these cost and environmental concerns, the Electric Power Research Institute (EPRI), Decision Focus Inc. (DFI), and a consortium of electric utility companies have developed techniques and tools to help electric utility companies to make purchase and operating decisions based on their full life-cycle costs, which explicitly include environmental, health, and safety costs. The process, called Life-Cycle Cost Management (LCCM), helps utilities to efficiently assemble the appropriate life-cycle information and bring it to bear on their business decisions. To date, several utilities have used LCCM to evaluate a range of product substitution and process improvement decisions and to implement cost-savings actions. This paper summarizes some of these applications.

  2. NWTC Collaborative Increases Gearbox Reliability and Helps Reduce Cost of Wind Energy; NREL (National Renewable Energy Laboratory)

    SciTech Connect

    2015-07-01

    A collaborative at the National Renewable Energy Laboratory's (NREL's) National Wind Technology Center (NWTC) leads to wind turbine gearbox reliability and lowers the cost of wind energy.

  3. Progress in Recycling Elemental Lead for Reuse of Radiologically-Contaminated within the Nuclear Industry

    SciTech Connect

    Reno, C.

    2003-02-26

    Duratek successfully demonstrated a process for reusing contaminated lead as a shielding material for radioactive waste containers. This process offers the Department of Energy (DOE) and commercial utilities a cost-effective strategy for reusing a material that would otherwise require costly disposal as a mixed waste. During the past year, GTS-Duratek Inc. approximately 500,000 pounds of contaminated and potentially contaminated lead into shielding (bricks) and shielded steel containers. The lead originated from the DOE facilities including INEEL, Hanford, Argonne, Los Alamos, Berkeley and Sandia.

  4. Dissolution of lead paint in aqueous solutions

    SciTech Connect

    Barnes, G.L.; Davis, A.P.

    1996-07-01

    An analysis of the rate and extent of lead leaching from a lead-based paint was completed. At low-solution pH, dissolution was rapid and approached 80% of the total lead. Residual lead can be estimated based on the predicted solubility of lead carbonate and basic lead carbonate. Release of lead from the paint was slower than that from pure basic lead carbonate due to inhibition by the paint matrix. Although the dissolved concentration of lead in solution at neutral/high pH was low, the paint binder was apparently destroyed at these pH values, releasing colloidal lead pigment particles. The presence of ethylenediaminetetraacetic acid (EDTA) and nitrilotriacetic acid (NTA) enhanced both the rate and degree of lead dissolution, while benzoic acid had a minimal effect.

  5. Low Cost Carbon Fibre: Applications, Performance and Cost Models - Chapter 17

    SciTech Connect

    Warren, Charles David; Wheatley, Dr. Alan; Das, Sujit

    2014-01-01

    Weight saving in automotive applications has a major bearing on fuel economy. It is generally accepted that, typically, a 10% weight reduction in an automobile will lead to a 6-8% improvement in fuel economy. In this respect, carbon fibre composites are extremely attractive in their ability to provide superlative mechanical performance per unit weight. That is why they are specified for high-end uses such as Formula 1 racing cars and the latest aircraft (e.g. Boeing 787, Airbus A350 and A380), where they comprise over 50% by weight of the structure However, carbon fibres are expensive and this renders their composites similarly expensive. Research has been carried out at Oak Ridge National Laboratories (ORNL), Tennessee, USA for over a decade with the aim of reducing the cost of carbon fibre such that it becomes a cost-effective option for the automotive industry. Aspects of this research relating to the development of low cost carbon fibre have been reported in Chapter 3 of this publication. In this chapter, the practical industrial applications of low-cost carbon fibre are presented, together with considerations of the performance and cost models which underpin the work.

  6. Advanced Fuel Cycle Cost Basis

    SciTech Connect

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2008-03-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  7. Advanced Fuel Cycle Cost Basis

    SciTech Connect

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert

    2007-04-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 26 cost modules—24 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, and high-level waste.

  8. Advanced Fuel Cycle Cost Basis

    SciTech Connect

    D. E. Shropshire; K. A. Williams; W. B. Boore; J. D. Smith; B. W. Dixon; M. Dunzik-Gougar; R. D. Adams; D. Gombert; E. Schneider

    2009-12-01

    This report, commissioned by the U.S. Department of Energy (DOE), provides a comprehensive set of cost data supporting a cost analysis for the relative economic comparison of options for use in the Advanced Fuel Cycle Initiative (AFCI) Program. The report describes the AFCI cost basis development process, reference information on AFCI cost modules, a procedure for estimating fuel cycle costs, economic evaluation guidelines, and a discussion on the integration of cost data into economic computer models. This report contains reference cost data for 25 cost modules—23 fuel cycle cost modules and 2 reactor modules. The cost modules were developed in the areas of natural uranium mining and milling, conversion, enrichment, depleted uranium disposition, fuel fabrication, interim spent fuel storage, reprocessing, waste conditioning, spent nuclear fuel (SNF) packaging, long-term monitored retrievable storage, near surface disposal of low-level waste (LLW), geologic repository and other disposal concepts, and transportation processes for nuclear fuel, LLW, SNF, transuranic, and high-level waste.

  9. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Model (HDSAM), including costs for retail stations receiving either gaseous or liquid ... Truck delivery systems, with production usually occurring at existing natural gas SMR ...

  10. A simple route for making surfactant free lead sulfide (PbS) quantum dots

    SciTech Connect

    Alam, Firoz; Kumar, Neetesh; Dutta, Viresh

    2015-05-15

    Highlights: • Surfactant free PbS NCs were successfully synthesised using CoSP technique. • The technique eliminates the requirements of washing to remove the ligands. • Grinding using mortar and pestle creates well separated PbS QDs. • Surfactant free PbS NCs are stable and do not show any degradation with time. - Abstract: An efficient, cost effective and less time consuming method suitable for mass production of surfactant free quantum dots (QDs) of lead sulfide (PbS) is reported. PbS nanocrystals (NCs) are first synthesised by continuous spray pyrolysis (CoSP) technique and de-agglomeration into PbS quantum dots (QDs) is achieved by vigorous mechanical grinding using mortar and pestle. Lead acetate and thiourea were used as the precursor materials for preparation of surfactant free PbS NCs. The broadening in XRD peaks of ground NCs as compared to as synthesized PbS NCs clearly indicated the reduction in particle size to be QDs of PbS. The TEM images also showed that ground PbS NCs were nearly spherical in shape having an average diameter in the range of 4–6 nm. The shift in optical gap from 0.41 eV to 1.47 eV supported the QD formation.

  11. Results from the Cooler and Lead Tests

    SciTech Connect

    Green, Michael A

    2010-06-10

    The report presents the results of testing MICE spectrometer magnet current leads on a test apparatus that combines both the copper leads and the high temperature superconducting (HTS) leads with a single Cryomech PT415 cooler and liquid helium tank. The current is carried through the copper leads from 300 K to the top of the HTS leads. The current is then carried through the HTS leads to a feed-through from the vacuum space to the inside of a liquid helium tank. The experiment allows one to measure the performance of both cooler stages along with the performance of the leads. While the leads were powered we measured the voltage drops through the copper leads, through the HTS leads, through spliced to the feed-through, through the feed-through and through the low-temperature superconducting loop that connects one lead to the other. Measurements were made using the leads that were used in spectrometer magnet 1A and spectrometer magnet 2A. These are the same leads that were used for Superbend and Venus magnets at LBNL. The IL/A for these leads was 5.2 x 10{sup 6} m{sup -1}. The leads turned out to be too long. The same measurements were made using the leads that were installed in magnet 2B. The magnet 2B leads had an IL/A of 3.3 x 10{sup 6} A m{sup -1}. This report discusses the cooler performance and the measured electrical performance of the lead circuit that contains the copper leads and the superconducting leads. All of the HTS leads that were installed in magnet 2B were current tested using this apparatus.

  12. Forage Harvest and Transport Costs

    SciTech Connect

    Butler, J.; Downing, M.; Turhollow, A.

    1998-12-01

    An engineering-economic approach is used to calculate harvest, in-field transport, and over-the-road transport costs for hay as bales and modules, silage, and crop residues as bales and modules. Costs included are equipment depreciation interest; fuel, lube, and oil; repairs; insurance, housing, and taxes; and labor. Field preparation, pest control, fertilizer, land, and overhead are excluded from the costs calculated Equipment is constrained by power available, throughput or carrying capacity, and field speed.

  13. HTGR Cost Model Users' Manual

    SciTech Connect

    A.M. Gandrik

    2012-01-01

    The High Temperature Gas-Cooler Reactor (HTGR) Cost Model was developed at the Idaho National Laboratory for the Next Generation Nuclear Plant Project. The HTGR Cost Model calculates an estimate of the capital costs, annual operating and maintenance costs, and decommissioning costs for a high-temperature gas-cooled reactor. The user can generate these costs for multiple reactor outlet temperatures; with and without power cycles, including either a Brayton or Rankine cycle; for the demonstration plant, first of a kind, or nth of a kind project phases; for a single or four-pack configuration; and for a reactor size of 350 or 600 MWt. This users manual contains the mathematical models and operating instructions for the HTGR Cost Model. Instructions, screenshots, and examples are provided to guide the user through the HTGR Cost Model. This model was design for users who are familiar with the HTGR design and Excel. Modification of the HTGR Cost Model should only be performed by users familiar with Excel and Visual Basic.

  14. Project Cost Profile Spreadsheet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Cost Profile Spreadsheet Project Cost Profile Spreadsheet File Project Cost Profile Spreadsheet.xlsx More Documents & Publications Statement of Work (SOW) Template ...

  15. PHEV Battery Cost Assessment | Department of Energy

    Energy.gov [DOE] (indexed site)

    es02barnett.pdf (615.99 KB) More Documents & Publications PHEV Battery Cost Assessment PHEV Battery Cost Assessment PHEV and LEESS Battery Cost Assessment

  16. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    SciTech Connect

    Samuel S. Tam

    2002-05-01

    coal plant and 1,260 $/kW for the coke plant). Therefore, in the near term, a coke IGCC power plant could penetrate the market and provide a foundation for future coal-fueled facilities. Subtask 1.6 generated a design, cost estimate and economics for a multiple train coal-fueled IGCC powerplant, also based on the Subtaks 1.3 cases. The Subtask 1.6 four gasification train plant has a thermal efficiency of 40.6% (HHV) and cost 1,066 $/kW. The single-train advanced Subtask 1.4 plant, which uses an advanced ''G/H-class'' combustion turbine, can have a thermal efficiency of 45.4% (HHV) and a plant cost of 1,096 $/kW. Multi-train plants will further reduce the cost. Again, all these plants have superior emissions performance. Subtask 1.7 developed an optimized design for a coal to hydrogen plant. At current natural gas prices, this facility is not competitive with hydrogen produced from natural gas. The preferred scenario is to coproduce hydrogen in a plant similar to Subtask 1.3, as described above. Subtask 1.8 evaluated the potential merits of warm gas cleanup technology. This study showed that selective catalytic oxidation of hydrogen sulfide (SCOHS) is promising. As gasification technology matures, SCOHS and other improvements identified in this study will lead to further cost reductions and efficiency improvements.

  17. An Examination of Avoided Costs in Utah

    SciTech Connect

    Bolinger, Mark; Wiser, Ryan

    2005-01-07

    The Utah Wind Working Group (UWWG) believes there are currently opportunities to encourage wind power development in the state by seeking changes to the avoided cost tariff paid to qualifying facilities (QFs). These opportunities have arisen as a result of a recent renegotiation of Pacificorp's Schedule 37 tariff for wind QFs under 3 MW, as well as an ongoing examination of Pacificorp's Schedule 38 tariff for wind QFs larger than 3 MW. It is expected that decisions made regarding Schedule 38 will also impact Schedule 37. Through the Laboratory Technical Assistance Program (Lab TAP), the UWWG has requested (through the Utah Energy Office) that LBNL provide technical assistance in determining whether an alternative method of calculating avoided costs that has been officially adopted in Idaho would lead to higher QF payments in Utah, and to discuss the pros and cons of this method relative to the methodology recently adopted under Schedule 37 in Utah. To accomplish this scope of work, I begin by summarizing the current method of calculating avoided costs in Utah (per Schedule 37) and Idaho (the ''surrogate avoided resource'' or SAR method). I then compare the two methods both qualitatively and quantitatively. Next I present Pacificorp's four main objections to the use of the SAR method, and discuss the reasonableness of each objection. Finally, I conclude with a few other potential considerations that might add value to wind QFs in Utah.

  18. Activity: How Much Does it Cost to Light Your School?

    Energy.gov [DOE]

    Students compute the cost of electricity used to light their classroom and their school for various lengths of time. They then compute the amount of coal needed to produce the electricity used for...

  19. Satellite Power Systems (SPS) space transportation cost analysis and evaluation

    SciTech Connect

    1980-11-01

    The objective of this study is to provide a clear picture of SPS space transportation costs at the present time with respect to their accuracy as stated, the reasonableness of the methods used, the assumptions made, and the uncertainty associated with the estimates. The approach used consists of examining space transportation costs from several perspectives - to perform a variety of sensitivity analyses or reviews and examine the findings in terms of internal consistency and external comparison with analogous systems. These approaches are summarized as a theoretical and historical review including a review of stated and unstated assumptions used to derive the costs, and a performance or technical review. These reviews cover the overall transportation program as well as the individual vehicles proposed. The review of overall cost assumptions is the principal means used for estimating the cost uncertainty derived. The cost estimates used as the best current estimate are included.

  20. Use of Cost Estimating Relationships

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Cost Estimating Relationships (CERs) are an important tool in an estimator's kit, and in many cases, they are the only tool. Thus, it is important to understand their limitations and characteristics. This chapter discusses considerations of which the estimator must be aware so the Cost Estimating Relationships can be properly used.

  1. Replacement Cost of Domestic Crude

    Energy Science and Technology Software Center

    1994-12-01

    The DEEPWATER model forecasts the replacement cost of domestic crude oil for 13 offshore regions in the lower 48 states. The replacement cost of domestic crude oil is the constant or levelized selling price that will recover the full expense of exploration, development, and productions with a reasonable return on capital.

  2. Renewable Energy Cost Optimization Spreadsheet

    Energy Science and Technology Software Center

    2007-12-31

    The Software allow users to determine the optimum combination of renewable energy technologies to minimize life cycle cost for a facility by employing various algorithms which calculate initial and operating cost, energy delivery, and other attributes associated with each technology as a function of size.

  3. Electric power substation capital costs

    SciTech Connect

    Dagle, J.E.; Brown, D.R.

    1997-12-01

    The displacement or deferral of substation equipment is a key benefit associated with several technologies that are being developed with the support of the US Department of Energy`s Office of Utility Technologies. This could occur, for example, as a result of installing a distributed generating resource within an electricity distribution system. The objective of this study was to develop a model for preparing preliminary estimates of substation capital costs based on rudimentary conceptual design information. The model is intended to be used by energy systems analysts who need ``ballpark`` substation cost estimates to help establish the value of advanced utility technologies that result in the deferral or displacement of substation equipment. This cost-estimating model requires only minimal inputs. More detailed cost-estimating approaches are recommended when more detailed design information is available. The model was developed by collecting and evaluating approximately 20 sets of substation design and cost data from about 10 US sources, including federal power marketing agencies and private and public electric utilities. The model is principally based on data provided by one of these sources. Estimates prepared with the model were compared with estimated and actual costs for the data sets received from the other utilities. In general, good agreement (for conceptual level estimating) was found between estimates prepared with the cost-estimating model and those prepared by the individual utilities. Thus, the model was judged to be adequate for making preliminary estimates of typical substation costs for US utilities.

  4. Computerized management report system for monitoring manpower and cost

    SciTech Connect

    Bullington, V.R.; Stephenson, R.L.; Cardwell, R.G.

    1980-04-01

    Although most cost systems offer complete detail and traceability, not all provide timely detail in a concise form useful to senior management. This system was developed for a multifunction research organization funded from many sources. It extracts cost and manpower data from the general cost systems, summarizes it, compares it by program with previous cost periods, and presents it with minimum detail yet with maximum overview. The system monitors the basic manpower distribution of effort at the source, that is, the division time-card input. Cost data are taken from the central computer ahead of the print-out and report-distribution steps; thus, the summary information is available several days ahead of the detailed reports. This procedure has been regularly used for several months, and has proven to be a valuable tool in management action and planning. 9 figures.

  5. Costs of Storing and Transporting Hydrogen

    Energy.gov [DOE]

    An analysis was performed to estimate the costs associated with storing and transporting hydrogen. These costs can be added to a hydrogen production cost to determine the total delivered cost of hydrogen.

  6. Unreasonable Cost Waivers | Department of Energy

    Office of Environmental Management (EM)

    Unreasonable Cost Waivers Unreasonable Cost Waivers unreasonablecost10-03-2012.pdf cnmidecision.pdf eaglepassdecision.pdf...

  7. Addressing Deferred Maintenance, Infrastructure Costs, and Excess...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities at Portsmouth and Paducah Addressing Deferred Maintenance, Infrastructure Costs, and Excess Facilities ...

  8. Low-Cost Illumination-Grade LEDs

    SciTech Connect

    Epler, John

    2013-08-31

    Solid State Lighting is a cost-effective, energy-conserving technology serving a rapidly expand- ing multi-billion dollar market. This program was designed to accelerate this lighting revolution by reducing the manufacturing cost of Illumination-Grade LEDs. The technical strategy was to investigate growth substrate alternatives to standard planar sapphire, select the most effective and compatible option, and demonstrate a significant increase in Lumen/$ with a marketable LED. The most obvious alternate substrate, silicon, was extensively studied in the first two years of the program. The superior thermal and mechanical properties of Si were expected to improve wavelength uniformity and hence color yield in the manufacture of high-power illumination- grade LEDs. However, improvements in efficiency and epitaxy uniformity on standard c-plane sapphire diminished the advantages of switching to Si. Furthermore, the cost of sapphire decreased significantly and the cost of processing Si devices using our thin film process was higher than expected. We concluded that GaN on Si was a viable technology but not a practical option for Philips Lumileds. Therefore in 2012 and 2013, we sought and received amendments which broadened the scope to include other substrates and extended the time of execution. Proprietary engineered substrates, off-axis (non-c-plane) sapphire, and c-plane patterned sapphire substrates (PSS) were all investigated in the final 18 months of this program. Excellent epitaxy quality was achieved on all three candidates; however we eliminated engineered substrates and non-c-plane sapphire because of their higher combined cost of substrate, device fabrication and packaging. Ultimately, by fabricating a flip-chip (FC) LED based upon c-plane PSS we attained a 42% reduction in LED manufacturing cost relative to our LUXEON Rebel product (Q1-2012). Combined with a flux gain from 85 to 102 Lm, the LUXEON Q delivered a 210% increase in Lm/$ over this time period. The

  9. Deployment Support Leading to Implementation

    SciTech Connect

    E. E. Cook

    1997-10-01

    The following paragraphs summarize the progress of each research project funded under the WVU Cooperative Agreement during the third quarter of 1997 (July - September 1997). The projects are arranged according to their 1997 WVU task number. WVU Focus Area 1.0: Subsurface Contaminants, Containment and Remediation Task No. 1.1: Project discontinued. Task No. 1.2: Development of Standard Test Protocols and Barrier Design Models for Desiccation Barriers (K. Amininan & S. Ameri): A number of experiments were preformed this period to evaluate the ability of the dried sand-packs to act as a barrier to liquids. Water infiltration tests were done with a constant head, dispersing 80 ml of water, and by adding water in small increments. Results indicate that when the water is spilled over the sand-pack, it has the tendency to channel through the sand-pack, significantly reducing the capacity of the dried zone to retain liquid contaminants. This appears to be largely influenced by particle size. As the particle size is reduced, the capillary forces spread the water and prevent/delay channels from forming. The measured permeability values were in agreement with those measured with air. The water retention capacity and capillary rise were largely influenced by time and showed no sensitivity to channeling. The water retention capacity tests suggest the sand-packs can retain more water than the expected. Two sets of water infiltration and drying experiments were designed to evaluate the CAB�s ability to prevent spills from spreading. Ten ml of water was injected every 20 minutes and 80 ml of water was added at one time. When injected slowly, results showed the drying process to be similar to the original drying process. The second set indicted the drying process follows a slowly declining drying with no break through. Results also suggested that air flow through the sand-pack can remove water infiltration. The air flow appeared to prevent any water channeling and thus should

  10. An alternative to removing lead-based paint: Overcoating

    SciTech Connect

    Vernon, L.S.

    1996-02-01

    The case of repairing a municipal water tank coated with lead-based paint (LBP) is used to illustrate some of the benefits of overcoating, a possible alternative to removing failing paint. The paper discusses data regarding performance of the waterborne acrylic used in the case study, briefly reviews revisions to specifications for the coating`s use, and offers some costs by which to compare use of a waterborne encapsulant such as that used in the case study with either removal and recoating or use of a solvent-borne encapsulant. A surface-tolerant, water-based, corrosion-resistant acrylic was selected to overcoat the LBP. By cleaning and overcoating the existing adherent LBP using the acrylic coating, chances of lead exposure to workers and the public were reduced. Eliminating abrasive blasting and the need for full containment saved about $80,000 to $100,000.

  11. University Competition Leads to Geothermal Breakthroughs

    Energy.gov [DOE]

    Learn how students are leading groundbreaking research to help expand the development of America's vast geothermal energy resources.

  12. Prabhat Steps In as DAS Group Lead

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Prabhat Steps In as DAS Group Lead Prabhat Steps In as DAS Group Lead September 1, 2014 prabhat Prabhat has been named Group Lead of the Data and Analytics Services (DAS) Group at the Department of Energy's National Energy Research Scientific Computing Center (NERSC). The DAS group helps NERSC's users address data and analytics challenges arising from the increasing size and complexity of data from simulations and experiments. As the DAS Group Lead, Prabhat will play a key role in developing and

  13. Cost-Causation and Integration Cost Analysis for Variable Generation

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Cost-Causation and Integration Cost Analysis for Variable Generation Michael Milligan, Erik Ela, Bri-Mathias Hodge, Brendan Kirby (Consultant), and Debra Lew National Renewable Energy Laboratory Charlton Clark, Jennifer DeCesaro, and Kevin Lynn U.S. Department of Energy Technical Report NREL/TP-5500-51860 June 2011 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National

  14. Clean Lead Facility (CLF) Inventory System

    Energy Science and Technology Software Center

    1995-07-13

    The CLF Inventory System records shipments of clean or nonradioactive contaminated lead stored at the CLF. The Inventory System provides reports and inventory information to Facility operators. Annual, quarterly, monthly, and current inventory reports may be printed. Profile reports of each shipment of lead may also be printed for verification and documentation of lead transactions.

  15. Low Cost Carbon Fiber Overview

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Low Cost Carbon Fiber Overview 9 May 2011 LM002 This presentation does not contain any proprietary, confidential or otherwise restricted information. 2 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name CARBON FIBER OVERVIEW Materials LM002 Task FY 2010 Budget Industry Cost Share FY 2011 Budget Industry Cost Share Precursors $1,725,000 $688,000 $1,850,000 $1,136,000 Commercialization of Textile Precursors Precursor & Fiber Evaluation Polyolefin Precursors Lignin Based

  16. SU-E-P-09: Radiation Transmission Measurements and Evaluation of Diagnostic Lead-Based and Lead-Free Aprons

    SciTech Connect

    Syh, J

    2014-06-01

    Purpose: This study was conducted to ensure that various lead shield apron manufacturers provided accurate attenuation factors regardless of whether the apron was made of lead-based or lead-free equivalent material. Methods: A calibrated ionization survey meter was placed at chest height and 36 cm horizontally away from a solid water phantom on a simulator couch. Measurements were done with or without apron. Radiation field was set to 24cmx24cm with the phantom at 100cm source-to-surface distance. Irradiation time was set for 1 minute at voltages of 60, 80, 100 and 120 kVp. Current was set at 6mA. Results: Between 60 kVp and 120 kVp, the transmission through 0.50 mm of lead-based apron was between 1.0% and 6.5% with a mean value of 3.2% and a standard deviation (s.d.) of 1.4%. The transmissions through the 0.50 mm lead-free aprons were 1.0 % to 12.0% with a mean value of 6.1% and s.d. of 2.6%. At 120 kVp, the transmission value was 6.5% for 0.50 mm lead-based apron and 11.1% to 12.0% for 0.50 mm lead-free aprons. The radiation transmissions at 80 kVp, measured in two different 0.5 mm lead-free aprons, were 4.3% each. However, only 1.4% transmission was found through the lead-based apron. Overall, the radiation transmitted through the lead-based apron was 1/3 transmission of lead-free at 80kVp, and half value of lead-free aprons at 100 and 120 kVp. Conclusion: Even though lead-based and lead-free aprons all claimed to have the same lead equivalent thickness, the transmission might not be the same. The precaution was needed to exercise diligence in quality assurance program to assure adequate protection to staff who wear it during diagnostic procedures. The requirement for aprons not only should be in certain thickness to meet state regulation but also to keep reasonably achievable low exposure with the accurate labeling from manufacturers.

  17. The cost of wetland creation and restoration. Final report

    SciTech Connect

    King, D.; Bohlen, C.

    1995-08-01

    This report examines the economics of wetland creation, restoration, and enhancement projects, especially as they are used within the context of mitigation for unavoidable wetland losses. Complete engineering-cost-accounting profiles of over 90 wetland projects were developed in collaboration with leading wetland restoration and creation practitioners around the country to develop a primary source database. Data on the costs of over 1,000 wetland projects were gathered from published sources and other available databases to develop a secondary source database. Cases in both databases were carefully analyzed and a set of baseline cost per acre estimates were developed for wetland creation, restoration, and enhancement. Observations of costs varied widely, ranging from $5 per acre to $1.5 million per acre. Differences in cost were related to the target wetland type, and to site-specific and project-specific factors that affected the preconstruction, construction, and post-construction tasks necessary to carry out each particular project. Project-specific and site-specific factors had a much larger effect on project costs than wetland type for non-agricultural projects. Costs of wetland creation and restoration were also shown to differ by region, but not by as much as expected, and in response to the regulatory context. The costs of wetland creation, restoration, and enhancement were also analyzed in a broader economic context through examination of the market for wetland mitigation services, and through the development of a framework for estimating compensation ratios-the number of acres of created, restored, or enhanced wetland required to compensate for an acre of lost natural wetland. The combination of per acre creation, restoration, and enhancement costs and the compensation ratio determine the overall mitigation costs associated with alternative mitigation strategies.

  18. Shifting the Paradigm for Long Term Monitoring at Legacy Sites to Improve Performance while Reducing Cost

    SciTech Connect

    Eddy-Dilek, Carol A.; Looney, Brian B.; Seaman, John; Kmetz, Thomas

    2013-01-10

    groundwater system, and include redox variables (ORP, DO, chemicals), pH, specific conductivity, biological community (breakdown/decay products), and temperature. A robust suite of relatively inexpensive tools is commercially available to measure these variables. Traditional plume/contaminant variables are various measures of contaminant concentration including traditional analysis of chemicals in groundwater samples. An innovative long term monitoring strategy has been developed for acidic or caustic groundwater plumes contaminated with metals and/or radionuclides. Not only should the proposed strategy be more effective at early identification of potential risks, this strategy should be significantly more cost effective because measurement of controlling boundary conditions and master variables is relatively simple. These variables also directly reflect the evolution of the plume through time, so that the monitoring strategy can be modified as the plume 'ages'. This transformational long-term monitoring paradigm will generate significant cost savings to DOE, other federal agencies and industry and will provide improved performance and leading indicators of environmental management performance.

  19. Savannah River Remediation Cost Savings Initiative - 12339

    SciTech Connect

    Davis, Neil R.

    2012-07-01

    Savannah River enjoyed two years of increased funding as a result of the American Reinvestment and Recovery Act and Department of Energy (DOE) directed scope additions. Moving into FY2012, a much lower funding level is anticipated. In the past, the first response to a reduced funding scenario was to defer scope and slow down the program. This time, Savannah River decided that a better process was needed to try to maximize value to the government. This approach was named the Cost Savings Initiative (CSI). The CSI process is similar to a zero-based budget concept. Every element of work scope was screened to eliminate everything that was not directly related to safety and regulatory compliance. Then the schedules for the regulatory-driven scope were deferred such that the regulatory milestones were achieved just in time with no acceleration. This resulted in a strategy that met regulatory requirements in FY2012-13 with some remaining funding but not in FY2014-15. The remaining funding was then invested in cost savings initiatives in FY2012-13 to reduce the future cost of doing business in the FY2014-15 timeframe and beyond. This resulted in a Strategy that: - Meets all regulatory commitments; - Meets some regulatory commitments early; and - Preserves most of the life cycle savings that were built in to the baseline plan The CSI process used at Savannah River may be considered for application elsewhere in the DOE Complex. (authors)

  20. Cost-Effective Cable Insulation: Nanoclay Reinforced Ethylene-Propylene-Rubber for Low-Cost HVDC Cabling

    SciTech Connect

    2012-02-24

    GENI Project: GE is developing new, low-cost insulation for high-voltage direct current (HVDC) electricity transmission cables. The current material used to insulate HVDC transmission cables is very expensive and can account for as much as 1/3 of the total cost of a high-voltage transmission system. GE is embedding nanomaterials into specialty rubber to create its insulation. Not only are these materials less expensive than those used in conventional HVDC insulation, but also they will help suppress excess charge accumulation. The excess charge left behind on a cable poses a major challenge for high-voltage insulation—if it’s not kept to a low level, it could ultimately lead the insulation to fail. GE’s low-cost insulation is compatible with existing U.S. cable manufacturing processes, further enhancing its cost effectiveness.

  1. Prospects for reducing the processing cost of lithium ion batteries

    SciTech Connect

    Wood III, David L.; Li, Jianlin; Daniel, Claus

    2014-11-06

    A detailed processing cost breakdown is given for lithium-ion battery (LIB) electrodes, which focuses on: elimination of toxic, costly N-methylpyrrolidone (NMP) dispersion chemistry; doubling the thicknesses of the anode and cathode to raise energy density; and, reduction of the anode electrolyte wetting and SEI-layer formation time. These processing cost reduction technologies generically adaptable to any anode or cathode cell chemistry and are being implemented at ORNL. This paper shows step by step how these cost savings can be realized in existing or new LIB manufacturing plants using a baseline case of thin (power) electrodes produced with NMP processing and a standard 10-14-day wetting and formation process. In particular, it is shown that aqueous electrode processing can cut the electrode processing cost and energy consumption by an order of magnitude. Doubling the thickness of the electrodes allows for using half of the inactive current collectors and separators, contributing even further to the processing cost savings. Finally wetting and SEI-layer formation cost savings are discussed in the context of a protocol with significantly reduced time. These three benefits collectively offer the possibility of reducing LIB pack cost from $502.8 kWh-1-usable to $370.3 kWh-1-usable, a savings of $132.5/kWh (or 26.4%).

  2. Prospects for reducing the processing cost of lithium ion batteries

    DOE PAGES [OSTI]

    Wood III, David L.; Li, Jianlin; Daniel, Claus

    2014-11-06

    A detailed processing cost breakdown is given for lithium-ion battery (LIB) electrodes, which focuses on: elimination of toxic, costly N-methylpyrrolidone (NMP) dispersion chemistry; doubling the thicknesses of the anode and cathode to raise energy density; and, reduction of the anode electrolyte wetting and SEI-layer formation time. These processing cost reduction technologies generically adaptable to any anode or cathode cell chemistry and are being implemented at ORNL. This paper shows step by step how these cost savings can be realized in existing or new LIB manufacturing plants using a baseline case of thin (power) electrodes produced with NMP processing and amore » standard 10-14-day wetting and formation process. In particular, it is shown that aqueous electrode processing can cut the electrode processing cost and energy consumption by an order of magnitude. Doubling the thickness of the electrodes allows for using half of the inactive current collectors and separators, contributing even further to the processing cost savings. Finally wetting and SEI-layer formation cost savings are discussed in the context of a protocol with significantly reduced time. These three benefits collectively offer the possibility of reducing LIB pack cost from $502.8 kWh-1-usable to $370.3 kWh-1-usable, a savings of $132.5/kWh (or 26.4%).« less

  3. Prospects for Reducing the Processing Cost of Lithium Ion Batteries

    SciTech Connect

    Wood III, David L; Li, Jianlin; Daniel, Claus

    2014-01-01

    A detailed processing cost breakdown is given for lithium-ion battery (LIB) electrodes, which focuses on: 1) elimination of toxic, costly N-methylpyrrolidone (NMP) dispersion chemistry; 2) doubling the thicknesses of the anode and cathode to raise energy density; and 3) reduction of the anode electrolyte wetting and SEI-layer formation time. These processing cost reduction technologies generically adaptable to any anode or cathode cell chemistry and are being implemented at ORNL. This paper shows step by step how these cost savings can be realized in existing or new LIB manufacturing plants using a baseline case of thin (power) electrodes produced with NMP processing and a standard 10-14-day wetting and formation process. In particular, it is shown that aqueous electrode processing can cut the electrode processing cost and energy consumption by an order of magnitude. Doubling the thickness of the electrodes allows for using half of the inactive current collectors and separators, contributing even further to the processing cost savings. Finally wetting and SEI-layer formation cost savings are discussed in the context of a protocol with significantly reduced time. These three benefits collectively offer the possibility of reducing LIB pack cost from $502.8 kWh-1-usable to $370.3 kWh-1-usable, a savings of $132.5/kWh (or 26.4%).

  4. Improved InGaN LED System Efficacy and Cost via Droop Reduction

    Energy.gov [DOE]

    Lead Performer: Lumileds, LLC – San Jose, CAPartners: Sandia National Laboratories – Albuquerque, NMDOE Total Funding: $1,495,990Cost Share: $374,000Project Term: 9/1/2015 - 8/31/2017Funding...

  5. Scalable Light Module for Low-Cost, High Efficiency LED Luminaires...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lead Performer: Cree, Inc. - Durham, NC DOE Total Funding: 2,349,704 Cost Share: 2,349,704 Project Term: 812013 - 7312015 Funding Opportunity: SSL Manufacturing R&D Funding ...

  6. Costs of lithium-ion batteries for vehicles

    SciTech Connect

    Gaines, L.; Cuenca, R.

    2000-08-21

    One of the most promising battery types under development for use in both pure electric and hybrid electric vehicles is the lithium-ion battery. These batteries are well on their way to meeting the challenging technical goals that have been set for vehicle batteries. However, they are still far from achieving the current cost goals. The Center for Transportation Research at Argonne National Laboratory undertook a project for the US Department of Energy to estimate the costs of lithium-ion batteries and to project how these costs might change over time, with the aid of research and development. Cost reductions could be expected as the result of material substitution, economies of scale in production, design improvements, and/or development of new material supplies. The most significant contributions to costs are found to be associated with battery materials. For the pure electric vehicle, the battery cost exceeds the cost goal of the US Advanced Battery Consortium by about $3,500, which is certainly enough to significantly affect the marketability of the vehicle. For the hybrid, however, the total cost of the battery is much smaller, exceeding the cost goal of the Partnership for a New Generation of Vehicles by only about $800, perhaps not enough to deter a potential buyer from purchasing the power-assist hybrid.

  7. Lightweighting Impacts on Fuel Economy, Cost, and Component Losses

    SciTech Connect

    Brooker, A. D.; Ward, J.; Wang, L.

    2013-01-01

    The Future Automotive Systems Technology Simulator (FASTSim) is the U.S. Department of Energy's high-level vehicle powertrain model developed at the National Renewable Energy Laboratory. It uses a time versus speed drive cycle to estimate the powertrain forces required to meet the cycle. It simulates the major vehicle powertrain components and their losses. It includes a cost model based on component sizing and fuel prices. FASTSim simulated different levels of lightweighting for four different powertrains: a conventional gasoline engine vehicle, a hybrid electric vehicle (HEV), a plug-in hybrid electric vehicle (PHEV), and a battery electric vehicle (EV). Weight reductions impacted the conventional vehicle's efficiency more than the HEV, PHEV and EV. Although lightweighting impacted the advanced vehicles' efficiency less, it reduced component cost and overall costs more. The PHEV and EV are less cost effective than the conventional vehicle and HEV using current battery costs. Assuming the DOE's battery cost target of $100/kWh, however, the PHEV attained similar cost and lightweighting benefits. Generally, lightweighting was cost effective when it costs less than $6/kg of mass eliminated.

  8. Yearly Energy Costs for Buildings

    Energy Science and Technology Software Center

    1991-03-20

    COSTSAFR3.0 generates a set of compliance forms which will be attached to housing Requests for Proposals (RFPs) issued by Departments or Agencies of the Federal Government. The compliance forms provide a uniform method for estimating the total yearly energy cost for each proposal. COSTSAFR3.0 analyzes specific housing projects at a given site, using alternative fuel types, and considering alternative housing types. The program is designed around the concept of minimizing overall costs through energy conservationmore » design, including first cost and future utility costs, and estabilishes a standard design to which proposed housing designs are compared. It provides a point table for each housing type that can be used to determine whether a proposed design meets the standard and how a design can be modified to meet the standard.« less

  9. Wind Electrolysis: Hydrogen Cost Optimization

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... 50.1 million a Electrolyzer Efficiency 50 kWhkg Replacement Cost 25% of direct installed ... units were 384kW (800kgday and 50 kWhkg) with an installation factor of 1.05 to ...

  10. Cost Effective Water Heating Solutions

    Energy.gov [DOE]

    This presentation was given at the Summer 2012 DOE Building America meeting on July 25, 2012, and addressed the question"Are high-efficiency hot water heating systems worth the cost?"

  11. Sustainable Alternative Fuels Cost Workshop

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alternative Fuels Cost Workshop Tuesday, November 27, 2012 9:00 a.m. - 4:00 p.m. National Renewable Energy Lab Offices - Suite 930 901 D Street, SW, Washington, DC 20585 AGENDA ...

  12. Load Leveling Battery System Costs

    Energy Science and Technology Software Center

    1994-10-12

    SYSPLAN evaluates capital investment in customer side of the meter load leveling battery systems. Such systems reduce the customer's monthly electrical demand charge by reducing the maximum power load supplied by the utility during the customer's peak demand. System equipment consists of a large array of batteries, a current converter, and balance of plant equipment and facilities required to support the battery and converter system. The system is installed on the customer's side of themore » meter and controlled and operated by the customer. Its economic feasibility depends largely on the customer's load profile. Load shape requirements, utility rate structures, and battery equipment cost and performance data serve as bases for determining whether a load leveling battery system is economically feasible for a particular installation. Life-cycle costs for system hardware include all costs associated with the purchase, installation, and operation of battery, converter, and balance of plant facilities and equipment. The SYSPLAN spreadsheet software is specifically designed to evaluate these costs and the reduced demand charge benefits; it completes a 20 year period life cycle cost analysis based on the battery system description and cost data. A built-in sensitivity analysis routine is also included for key battery cost parameters. The life cycle cost analysis spreadsheet is augmented by a system sizing routine to help users identify load leveling system size requirements for their facilities. The optional XSIZE system sizing spreadsheet which is included can be used to identify a range of battery system sizes that might be economically attractive. XSIZE output consisting of system operating requirements can then be passed by the temporary file SIZE to the main SYSPLAN spreadsheet.« less

  13. Low Cost Non-Reactive

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Prepared: 10/28/09 Low Cost Non-Reactive Coating for Refractory Metals A non-reactive coating for refractory metals has been developed at The Ames Laboratory. Contamination of rare earth and reactive metals and their alloys has been a chronic problem that results from their interaction with the crucibles or other vessels used in high temperature processing or during other applications. As a consequence, processing and other costs are high due to the need to replace equipment or containers, or

  14. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    SciTech Connect

    Glatzmaier, G.

    2011-12-01

    system leads to higher thermal-to-electric conversion efficiency. However, in a CSP system, higher operating temperature also leads to greater thermal losses. These two effects combine to give an optimal system-level operating temperature that may be less than the upper operating temperature limit of system components. The overall efficiency may be improved by developing materials, power cycles, and system-integration strategies that enable operation at elevated temperature while limiting thermal losses. This is particularly true for the TES system and its components. Meeting the SunShot cost target will require cost and performance improvements in all systems and components within a CSP plant. Solar collector field hardware will need to decrease significantly in cost with no loss in performance and possibly with performance improvements. As higher temperatures are considered for the power block, new working fluids, heat-transfer fluids (HTFs), and storage fluids will all need to be identified to meet these new operating conditions. Figure 1 shows thermodynamic conversion efficiency as a function of temperature for the ideal Carnot cycle and 75% Carnot, which is considered to be the practical efficiency attainable by current power cycles. Current conversion efficiencies for the parabolic trough steam cycle, power tower steam cycle, parabolic dish/Stirling, Ericsson, and air-Brayton/steam Rankine combined cycles are shown at their corresponding operating temperatures. Efficiencies for supercritical steam and carbon dioxide (CO{sub 2}) are also shown for their operating temperature ranges.

  15. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  16. Commercialization of laser-induced breakdown spectroscopy for lead-in-paint inspection

    SciTech Connect

    Myers, Richard A.; Kolodziejski, Noah J.; Squillante, Michael R

    2008-11-01

    A study was undertaken to determine if laser-induced breakdown spectroscopy (LIBS) can be a practical and competitive alternative to x-ray fluorescence (XRF) methods for lead-in-paint inspection. Experiments in the laboratory confirmed that LIBS is suitable for detecting lead in paint at the hazard levels defined by federal agencies. Although we compared speed, function, and cost, fundamental differences between the XRF and LIBS measurements limited our ability to make a quantitative performance comparison. While the LIBS method can achieve the required sensitivity and offers a way to obtain unique information during inspection, the current component costs will likely restrict interest in the method to niche applications.

  17. Breaking the Fuel Cell Cost Barrier

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Breaking the Fuel Cell Cost Barrier AMFC Workshop May 8 th , 2011, Arlington, VA Shimshon Gottesfeld, CTO The Fuel Cell Cost Challenge 2 CellEra's goal - achieve price parity with incumbents earlier on in market entry process ! Mainstream Polymer Electrolyte Fuel Cell ( PEM) Cost Barriers 3 Graphite / stainless steel hardware Acidic membrane Platinum based electrodes Cost barriers deeply embedded in core tech materials BOM-based cost barriers - 90% of stack cost Cost volatility - Platinum

  18. Leading the Charge: Harold Frank | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Harold Frank Leading the Charge: Harold Frank June 22, 2012 - 5:11pm Addthis Harold "Gus" Frank, Forest County Potawatomi Community Chairman and 2012 White House "Champion of Change". Photo from Potawatomi Traveling Times Harold "Gus" Frank, Forest County Potawatomi Community Chairman and 2012 White House "Champion of Change". Photo from Potawatomi Traveling Times Solar panels on the rooftop of the Forest County Potawatomi Tribe's administration building

  19. Transport of lead in PWR secondary cycles

    SciTech Connect

    Sawochka, S.G.; Clouse, M.E.; Miller, M.R. )

    1991-04-01

    Since lead can accelerate IGA/IGSCC of Alloy 600 steam generator tubing, lead transport studies were performed at several pressurized water reactors to establish a basis for recommendations regarding transport reduction techniques. Special emphasis was given to sampling and analysis procedures since lead concentrations in the feedwater generally were very low, i.e., 5 to 20 parts per trillion. Lead sources were determined to be highly distributed in the secondary cycle, e.g., turbine and pump bearings and seals and valve packing materials. The major materials of construction (carbon steel, stainless steel, and copper alloy tubing) were not major lead sources in the study plants. Most of the lead that entered the steam generators via the feedwater deposited on the tubes or in the sludge pile leading to concentrations in the range of 1000 ppM. The ubiquitous nature of the lead release phenomenon is expected to lead to significant difficulties in identifying techniques for reducing lead concentrations in the steam generator sludge. 8 refs., 19 figs., 13 tabs.

  20. Development of Production PVD-AIN Buffer Layer System and Processes to Reduce Epitaxy Costs and Increase LED Efficiency

    SciTech Connect

    Cerio, Frank

    2013-09-14

    The DOE has set aggressive goals for solid state lighting (SSL) adoption, which require manufacturing and quality improvements for virtually all process steps leading to an LED luminaire product. The goals pertinent to this proposed project are to reduce the cost and improve the quality of the epitaxial growth processes used to build LED structures. The objectives outlined in this proposal focus on achieving cost reduction and performance improvements over state-of-the-art, using technologies that are low in cost and amenable to high efficiency manufacturing. The objectives of the outlined proposal focus on cost reductions in epitaxial growth by reducing epitaxy layer thickness and hetero-epitaxial strain, and by enabling the use of larger, less expensive silicon substrates and would be accomplished through the introduction of a high productivity reactive sputtering system and an effective sputtered aluminum-nitride (AlN) buffer/nucleation layer process. Success of the proposed project could enable efficient adoption of GaN on-silicon (GaN/Si) epitaxial technology on 150mm silicon substrates. The reduction in epitaxy cost per cm{sup 2} using 150mm GaN-on-Si technology derives from (1) a reduction in cost of ownership and increase in throughput for the buffer deposition process via the elimination of MOCVD buffer layers and other throughput and CoO enhancements, (2) improvement in brightness through reductions in defect density, (3) reduction in substrate cost through the replacement of sapphire with silicon, and (4) reduction in non-ESD yield loss through reductions in wafer bow and temperature variation. The adoption of 150mm GaN/Si processing will also facilitate significant cost reductions in subsequent wafer fabrication manufacturing costs. There were three phases to this project. These three phases overlap in order to aggressively facilitate a commercially available production GaN/Si capability. In Phase I of the project, the repeatability of the performance

  1. Lead and cadmium contamination levels in edible vegetables

    SciTech Connect

    Zurera, G.; Estrada, B.; Rincon, F.; Pozo, R.

    1987-05-01

    The objective of this research is to reveal the level of lead and cadmium pollution in fresh vegetable samples from the Cordovan fertile lowland region of the Guadalquivir River and to establish a base level of contamination to serve as a reference point in further studies. At the same time, the possible health risks for the consumer are discussed.

  2. Reducing Enzyme Costs Increases the Market Potential of Biofuels (Fact Sheet)

    SciTech Connect

    Not Available

    2013-08-01

    Cellulosic ethanol prices depend heavily on the cost of the cellulase enzymes used to break down the biomass into fermentable sugars. To reduce these costs, NREL partnered with two leading enzyme companies, Novozymes and Genencor, to engineer new cellulase enzymes that are exceptionally good at breaking down cellulose. Genencor is now part of DuPont Industrial Biosciences.

  3. DOE to Fund up to $50 Million to Demonstrate Innovative, Cost-Competitive

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solar Energy Technologies | Department of Energy 50 Million to Demonstrate Innovative, Cost-Competitive Solar Energy Technologies DOE to Fund up to $50 Million to Demonstrate Innovative, Cost-Competitive Solar Energy Technologies December 16, 2010 - 12:00am Addthis Washington, DC - Energy Secretary Steven Chu today announced the Department's intent to fund up to $50 million to test and demonstrate innovative technologies that will lead to cost-competitive solar energy technologies. The

  4. NUCLEAR ENERGY SYSTEM COST MODELING

    SciTech Connect

    Francesco Ganda; Brent Dixon

    2012-09-01

    The U.S. Department of Energy’s Fuel Cycle Technologies (FCT) Program is preparing to perform an evaluation of the full range of possible Nuclear Energy Systems (NES) in 2013. These include all practical combinations of fuels and transmuters (reactors and sub-critical systems) in single and multi-tier combinations of burners and breeders with no, partial, and full recycle. As part of this evaluation, Levelized Cost of Electricity at Equilibrium (LCAE) ranges for each representative system will be calculated. To facilitate the cost analyses, the 2009 Advanced Fuel Cycle Cost Basis Report is being amended to provide up-to-date cost data for each step in the fuel cycle, and a new analysis tool, NE-COST, has been developed. This paper explains the innovative “Island” approach used by NE-COST to streamline and simplify the economic analysis effort and provides examples of LCAE costs generated. The Island approach treats each transmuter (or target burner) and the associated fuel cycle facilities as a separate analysis module, allowing reuse of modules that appear frequently in the NES options list. For example, a number of options to be screened will include a once-through uranium oxide (UOX) fueled light water reactor (LWR). The UOX LWR may be standalone, or may be the first stage in a multi-stage system. Using the Island approach, the UOX LWR only needs to be modeled once and the module can then be reused on subsequent fuel cycles. NE-COST models the unit operations and life cycle costs associated with each step of the fuel cycle on each island. This includes three front-end options for supplying feedstock to fuel fabrication (mining/enrichment, reprocessing of used fuel from another island, and/or reprocessing of this island’s used fuel), along with the transmuter and back-end storage/disposal. Results of each island are combined based on the fractional energy generated by each islands in an equilibrium system. The cost analyses use the probability

  5. Integration of Variable Generation and Cost-Causation (Fact Sheet)

    SciTech Connect

    Not Available

    2012-09-01

    Variable renewable energy generation sources, such as wind and solar energy, provide benefits such as reduced environmental impact, zero fuel consumption, and low and stable costs. Advances in both technologies can reduce capital costs and provide significant control capabilities. However, their variability and uncertainty - which change with weather conditions, time of day, and season - can cause an increase in power system operating costs compared to a fully controllable power plant. Although a number of studies have assessed integration costs, calculating them correctly is challenging because it is difficult to accurately develop a baseline scenario without variable generation that properly accounts for the energy value. It is also difficult to appropriately allocate costs given the complex, nonlinear interactions between resources and loads.

  6. Announcing 7 Communities That Will Lead the Climate Fight in Alaska |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Announcing 7 Communities That Will Lead the Climate Fight in Alaska Announcing 7 Communities That Will Lead the Climate Fight in Alaska October 21, 2016 - 4:44pm Addthis Dr. Elizabeth Sherwood-Randall Dr. Elizabeth Sherwood-Randall Deputy Secretary of Energy KEY FACTS Climate change and energy costs have a big impact on Alaskan communities. Remote Alaska Communities Energy Efficiency Competition helping the state tackle energy challenges. Seven communities awarded

  7. Apparatus and methods for purifying lead

    DOEpatents

    Tunison, Harmon M.

    2016-01-12

    Disclosed is an exemplary method of purifying lead which includes the steps of placing lead and a fluoride salt blend in a container; forming a first fluid of molten lead at a first temperature; forming a second fluid of the molten fluoride salt blend at a second temperature higher than the first temperature; mixing the first fluid and the second fluid together; separating the two fluids; solidifying the molten fluoride salt blend at a temperature above a melting point of the lead; and removing the molten lead from the container. In certain exemplary methods the molten lead is removed from the container by decanting. In still other exemplary methods the molten salt blend is a Lewis base fluoride eutectic salt blend, and in yet other exemplary methods the molten salt blend contains sodium fluoride, lithium fluoride, and potassium fluoride.

  8. David Skinner Named NERSC Strategic Partnerships Lead

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    David Skinner Named NERSC Strategic Partnerships Lead David Skinner Named NERSC Strategic Partnerships Lead January 24, 2014 Contact: Linda Vu, +1 510 495 2402, lvu@lbl.gov XBD201102-00089.jpg David Skinner This month, the National Energy Research Scientific Computing Center (NERSC) created a new position-Strategic Partnerships Lead, to identify new science communities that can benefit from NERSC resources. David Skinner, former head of NERSC's Outreach Software and Programming Group (OSP), has

  9. Property:LeadAgency | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Subproperties This property has the following 1 subproperty: R RAPIDRoadmap9-FD-k Pages using the property "LeadAgency" Showing 25 pages using this property. (previous...

  10. Building Standards Lead-by-Example Resources

    Office of Energy Efficiency and Renewable Energy (EERE)

    State and local governments can lead by example by promoting energy efficiency programs and policies for public facilities, equipment, and government operations.

  11. LEAD SUBSTITUTION AND ELIMINATION STUDY, PART II

    SciTech Connect

    T. MARTINEZ; M. COURNOYER

    2001-01-01

    Within the Nuclear Materials Technology Division of Los Alamos National Laboratory, lead is used as shielding for a variety of operations, including actinide chemistry, weapons production, radiochemistry, and analytical chemistry. In this study, waste minimization issues associated with replacing lead shielding with non-hazardous materials are addressed. These include institutional program available to support this effort, the hazards and accompanying controls grouped with lead shielding, operations that use lead bricks and how this effects the selection of the substitute. Life cycle management issues are also examined. As a final step, an approach to get buy-in from both technical and budget minded employees is presented.

  12. Facilities Electrician & Lead Electrician | Princeton Plasma...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    performing electrical work: Electrician10 years; and LEAD Electrician15 years of experience required 2. Thorough understanding of the National Electric Code. 3. Demonstrated ...

  13. Construction Branch Electrician & Lead Electrician | Princeton...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Construction Branch Electrician & Lead Electrician Department: Engineering Supervisor(s): ... devices, and assist with the construction and repair of facilities on the PPPL campus. ...

  14. Procurement Standards Lead-by-Example Resources

    Energy.gov [DOE]

    State and local governments can lead by example by promoting energy efficiency programs and policies for public facilities, equipment, and government operations.

  15. Compatibility of PETN with lead azide

    SciTech Connect

    Hurd, R.; Fronabarger, J.W.; Johnson, R.; Fleming, W.

    1983-01-01

    The compatibility of PETN with lead azide at elevated temperatures has been investigated. Ramped and isothermal DSC methods were used to obtain energies of activation at temperatures above the melting point of PETN. Mixtures were found to show exothermic activity at lower temperatures than pure PETN. High Pressure Liquid Chromatography was used to follow the decomposition of PETN and PETN/lead azide mixtures at temperatures below the melting point. Reaction below 120/sup 0/C appeared minimal, while at higher temperatures, both PETN and PETN/lead azide mixtures showed degradation. A PETN/lead azide sample exploded at or near the melting point of PETN.

  16. Real-time Optical Network for Accelerator Control

    SciTech Connect

    Lee, Keun

    2012-06-27

    The timing requirements of a modern accelerator complex call for several features. The first is a system for high precision relative timing among accelerator components. Stabilized fiber links have already been demonstrated to achieve sub-10 femtoseconds relative timing precision. The second is a system for timing distribution of absolute time with sufficient precision to identify a specific RF bucket. The White Rabbit technology is a promising candidate to deliver the absolute time that is linked to the GPS clock. In this study we demonstrated that these two technologies can be combined in a way that the absolute time information can be delivered to the stabilized fiber link system. This was accomplished by researching the design of the stabilized fiber and White Rabbit systems and devising adaptation modules that facilitate co-existence of both systems in the same FPGA environment. We built a prototype system using off-the-shelf products and implemented a proof-of-concept version of the FPGA firmware. The test verified that the White Rabbit features operate correctly under the stabilized fiber system environment. This work demonstrates that turn-key femtosecond timing systems with absolute time information can be built cost effectively and deployed in various accelerator environments. This will lead to many new applications in chemistry, biology and surface dynamics, to name a few.

  17. Modifications to Replacement Costs System

    SciTech Connect

    Godec, M. [ICF Resources, Inc., Fairfax, VA (United States)

    1989-05-18

    The purpose of this memorandum is to document the improvements and modifications made to the Replacement Costs of Crude Oil (REPCO) Supply Analysis System. While some of this work was performed under our previous support contract to DOE/ASFE, we are presenting all modifications and improvements are presented here for completeness. The memo primarily documents revisions made to the Lower-48 Onshore Model. Revisions and modifications made to other components and models in the REPCO system which are documented elsewhere are only highlighted in this memo. Generally, the modifications made to the Lower-48 Onshore Model reflect changes that have occurred in domestic drilling, oil field costs, and reserves since 1982, the date of the most recent available data used for the original Replacement Costs report, published in 1985.

  18. Cost-Causation and Integration Cost Analysis for Variable Generation

    SciTech Connect

    Milligan, M.; Ela, E.; Hodge, B. M.; Kirby, B.; Lew, D.; Clark, C.; DeCesaro, J.; Lynn, K.

    2011-06-01

    This report examines how wind and solar integration studies have evolved, what analysis techniques work, what common mistakes are still made, what improvements are likely to be made in the near future, and why calculating integration costs is such a difficult problem and should be undertaken carefully, if at all.

  19. Cost and quality of fuels for electric plants 1993

    SciTech Connect

    Not Available

    1994-07-01

    The Cost and Quality of Fuels for Electric Utility Plants (C&Q) presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. The purpose of this publication is to provide energy decision-makers with accurate and timely information that may be used in forming various perspectives on issues regarding electric power.

  20. Backup Power Cost of Ownership Analysis and Incumbent Technology Comparison

    SciTech Connect

    Kurtz, J.; Saur, G.; Sprik, S.; Ainscough, C.

    2014-09-01

    This cost of ownership analysis identifies the factors impacting the value proposition for fuel cell backup power and presents the estimated annualized cost of ownership for fuel cell backup power systems compared with the incumbent technologies of battery and diesel generator systems. The analysis compares three different backup power technologies (diesel, battery, and fuel cell) operating in similar circumstances in four run time scenarios (8, 52, 72, and 176 hours).

  1. GAO Cost Estimating and Assessment Guide

    Energy.gov [DOE]

    GAO Cost Estimating and Assessment Guide: Twelve Steps of a High-Quality Cost Estimating Process, from the first step of defining the estimate's purpose to the last step of updating the estimate to reflect actual costs and changes.

  2. Third-order nonlinear optical properties of methylammonium lead halide

    Office of Scientific and Technical Information (OSTI)

    perovskite films (Journal Article) | SciTech Connect Third-order nonlinear optical properties of methylammonium lead halide perovskite films Citation Details In-Document Search Title: Third-order nonlinear optical properties of methylammonium lead halide perovskite films We report third-order nonlinear coefficient values and decay time kinetics vs. halide composition (CH3NH3PbBr3 and CH3NH3PbBr2I), temperature, and excitation wavelength. The maximum values of the third-order nonlinear

  3. Managing lead-based paint abatement wastes

    SciTech Connect

    Steele, N.L.C.

    1994-12-31

    Renovation, remodeling, demolition, and surface preparation for painting, in addition to specified lead abatement, are all activities that have the potential to produce hazardous wastes if a property was painted with lead-based paint. Lead-based paint was used on residential structures until 1978, when most residential uses were banned by the Consumer Products Safety Council. Prior to the 1950s, paints for residential uses may have contained up to 50% lead by weight. Today, commercial and military paints may still contain lead and can be used on non-residential structures. The lead content of residential paints is limited to 0.06% lead (by weight) in the dried film. This paper provides an overview of some of the information needed to properly manage lead-based paint abatement wastes. The issues covered in this paper include waste classification, generator status, treatment, and land disposal restrictions. The author assumes that the reader is familiar with the provision of the Health and Safety Code and the California Code of Regulations that pertain to generation and management of hazardous wastes. Citations provided herein do not constitute an exhaustive list of all the regulations with which a generator of hazardous waste must comply.

  4. Distributed electrical leads for thermionic converter

    DOEpatents

    Fitzpatrick, Gary O.; Britt, Edward J.

    1979-01-01

    In a thermionic converter, means are provided for coupling an electrical lead to at least one of the electrodes thereof. The means include a bus bar and a plurality of distributed leads coupled to the bus bar each of which penetrates through one electrode and are then coupled to the other electrode of the converter in spaced apart relation.

  5. GASIFICATION PLANT COST AND PERFORMANCE OPTIMIZATION

    SciTech Connect

    Sheldon Kramer

    2003-09-01

    investment of 18%. Subtask 2.3 converted the Subtask 1.6 four-train coal fueled IGCC power plant into one that coproduced 12,377 bpd of liquid fuel precursors in addition to 676 MW of export power. Adding the coproduction of liquid fuel precursors can enhance the profitability of an IGCC power plant when oil prices are high relative to power prices. As gasification technology matures, improvements identified in this study will lead to further cost reductions and efficiency improvements that will make IGCC power plants more competitive in the marketplace.

  6. Alternative Fuels Data Center: Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center

    Tools Printable Version Share this resource Send a link to Alternative Fuels Data Center: Vehicle Cost Calculator to someone by E-mail Share Alternative Fuels Data Center: Vehicle Cost Calculator on Facebook Tweet about Alternative Fuels Data Center: Vehicle Cost Calculator on Twitter Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Google Bookmark Alternative Fuels Data Center: Vehicle Cost Calculator on Delicious Rank Alternative Fuels Data Center: Vehicle Cost Calculator on

  7. Hydrogen Threshold Cost Calculation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Threshold Cost Calculation Hydrogen Threshold Cost Calculation DOE Hydrogen Program Record number11007, Hydrogen Threshold Cost Calculation, documents the methodology and assumptions used to calculate that threshold cost. 11007_h2_threshold_costs.pdf (443.22 KB) More Documents & Publications DOE Hydrogen and Fuel Cells Program Record 11007: Hydrogen Threshold Cost Calculation Fuel Cell Technologies Program Overview: 2010 Annual Merit Review and Peer Evaluation Meeting Fuel Cell Technologies

  8. Near-Net Shape Fabrication Using Low-Cost Titanium Alloy Powders

    SciTech Connect

    Dr. David M. Bowden; Dr. William H. Peter

    2012-03-31

    The use of titanium in commercial aircraft production has risen steadily over the last half century. The aerospace industry currently accounts for 58% of the domestic titanium market. The Kroll process, which has been used for over 50 years to produce titanium metal from its mineral form, consumes large quantities of energy. And, methods used to convert the titanium sponge output of the Kroll process into useful mill products also require significant energy resources. These traditional approaches result in product forms that are very expensive, have long lead times of up to a year or more, and require costly operations to fabricate finished parts. Given the increasing role of titanium in commercial aircraft, new titanium technologies are needed to create a more sustainable manufacturing strategy that consumes less energy, requires less material, and significantly reduces material and fabrication costs. A number of emerging processes are under development which could lead to a breakthrough in extraction technology. Several of these processes produce titanium alloy powder as a product. The availability of low-cost titanium powders may in turn enable a more efficient approach to the manufacture of titanium components using powder metallurgical processing. The objective of this project was to define energy-efficient strategies for manufacturing large-scale titanium structures using these low-cost powders as the starting material. Strategies include approaches to powder consolidation to achieve fully dense mill products, and joining technologies such as friction and laser welding to combine those mill products into near net shape (NNS) preforms for machining. The near net shape approach reduces material and machining requirements providing for improved affordability of titanium structures. Energy and cost modeling was used to define those approaches that offer the largest energy savings together with the economic benefits needed to drive implementation. Technical

  9. Fan-fold shielded electrical leads

    DOEpatents

    Rohatgi, Rajeev R.; Cowan, Thomas E.

    1996-01-01

    Fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate.

  10. Cryogenic Current Lead Analysis Model Program

    Energy Science and Technology Software Center

    1992-01-01

    CCLAMP was developed to provide a tool for tha analysis of superconducting or normal current leads used to supply electricity from a warm interface (usually room temperature) to a device at cryogenic temperatures. It determines the heat leak to the cryogenic connection and the mass flow of the cryogen (typically helium) for the lead and installation modelled. It may be used to thermally optimize a lead design for a particular application. The user provides relevantmore » geometry details to model the electrical (length, diameter, superconducting length) and heat exchanger design of the lead (heat transfer coefficient, heat transfer area). It has a transient analysis capability so that lead transients such as cool down, current ramping, flow disruptions, and control simulations can be performed.« less

  11. Fan-fold shielded electrical leads

    DOEpatents

    Rohatgi, R.R.; Cowan, T.E.

    1996-06-11

    Disclosed are fan-folded electrical leads made from copper cladded Kapton, for example, with the copper cladding on one side serving as a ground plane and the copper cladding on the other side being etched to form the leads. The Kapton is fan folded with the leads located at the bottom of the fan-folds. Electrical connections are made by partially opening the folds of the fan and soldering, for example, the connections directly to the ground plane and/or the lead. The fan folded arrangement produces a number of advantages, such as electrically shielding the leads from the environment, is totally non-magnetic, and has a very low thermal conductivity, while being easy to fabricate. 3 figs.

  12. Lead Coolant Test Facility Development Workshop

    SciTech Connect

    Paul A. Demkowicz

    2005-06-01

    A workshop was held at the Idaho National Laboratory on May 25, 2005, to discuss the development of a next generation lead or lead-alloy coolant test facility. Attendees included representatives from the Generation IV lead-cooled fast reactor (LFR) program, Advanced Fuel Cycle Initiative, and several universities. Several participants gave presentations on coolant technology, existing experimental facilities for lead and lead-alloy research, the current LFR design concept, and a design by Argonne National Laboratory for an integral heavy liquid metal test facility. Discussions were focused on the critical research and development requirements for deployment of an LFR demonstration test reactor, the experimental scope of the proposed coolant test facility, a review of the Argonne National Laboratory test facility design, and a brief assessment of the necessary path forward and schedule for the initial stages of this development project. This report provides a summary of the presentations and roundtable discussions.

  13. Cost estimation for solid waste management in industrialising regions - Precedents, problems and prospects

    SciTech Connect

    Parthan, Shantha R.; Milke, Mark W.; Wilson, David C.; Cocks, John H.

    2012-03-15

    Highlights: Black-Right-Pointing-Pointer We review cost estimation approaches for solid waste management. Black-Right-Pointing-Pointer Unit cost method and benchmarking techniques used in industrialising regions (IR). Black-Right-Pointing-Pointer Variety in scope, quality and stakeholders makes cost estimation challenging in IR. Black-Right-Pointing-Pointer Integrate waste flow and cost models using cost functions to improve cost planning. - Abstract: The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories - the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.

  14. Favorable Supplies, Costs, Environmental Profile for Natural...

    Energy Saver

    Favorable Supplies, Costs, Environmental Profile for Natural Gas Revealed in New Department of Energy Study Favorable Supplies, Costs, Environmental Profile for Natural Gas ...

  15. California Biomass Collaborative Energy Cost Calculators | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Biomass Collaborative Energy Cost Calculators Jump to: navigation, search Tool Summary LAUNCH TOOL Name: California Biomass Collaborative Energy Cost Calculators AgencyCompany...

  16. Property:Cost | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Cost Jump to: navigation, search This is a property of type Number. Retrieved from "http:en.openei.orgwindex.php?titleProperty:Cost&oldid285418...

  17. Electric power substation capital costs (Technical Report) |...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Subject: 24 POWER TRANSMISSION AND DISTRIBUTION; POWER SUBSTATIONS; CAPITALIZED COST; CALCULATION METHODS; PLANNING; COST ESTIMATION; MATHEMATICAL MODELS Word Cloud More Like This ...

  18. Example Cost Codes for Construction Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides an example outline of cost items and their corresponding cost codes that may be used for construction projects.

  19. 2017 Levelized Costs AEO 2012 Early Release

    Energy Information Administration (EIA) (indexed site)

    Report," collects the cost and quality of fossil fuel purchases made by electric ... a reduction of approximately 9 percent of natural gas purchases, cost, and quality data. ...

  20. Benchmark the Fuel Cost of Steam Generation

    Energy.gov [DOE]

    This tip sheet on benchmarking the fuel cost of steam provides how-to advice for improving industrial steam systems using low-cost, proven practices and technologies.

  1. TIMING APPARATUS

    DOEpatents

    Bennett, A.E.; Geisow, J.C.H.

    1956-04-17

    The timing device comprises an escapement wheel and pallet, a spring drive to rotate the escapement wheel to a zero position, means to wind the pretensioned spring proportional to the desired signal time, and a cam mechanism to control an electrical signal switch by energizing the switch when the spring has been wound to the desired position, and deenergizing it when it reaches the zero position. This device produces an accurately timed signal variably witain the control of the operator.

  2. Examples of Cost Estimation Packages

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Estimates can be performed in a variety of ways. Some of these are for projects for an undefined scope, a conventional construction project, or where there is a level of effort required to complete the work. Examples of cost estimation packages for these types of projects are described in this appendix.

  3. Mandatory Photovoltaic System Cost Estimate

    Office of Energy Efficiency and Renewable Energy (EERE)

    If the customer has a ratio of estimated monthly kilowatt-hour (kWh) usage to line extension mileage that is less than or equal to 1,000, the utility must provide the comparison at no cost. If the...

  4. Wind Electrolysis: Hydrogen Cost Optimization

    SciTech Connect

    Saur, G.; Ramsden, T.

    2011-05-01

    This report describes a hydrogen production cost analysis of a collection of optimized central wind based water electrolysis production facilities. The basic modeled wind electrolysis facility includes a number of low temperature electrolyzers and a co-located wind farm encompassing a number of 3MW wind turbines that provide electricity for the electrolyzer units.

  5. Pollution prevention cost savings potential

    SciTech Connect

    Celeste, J.

    1994-12-01

    The waste generated by DOE facilities is a serious problem that significantly impacts current operations, increases future waste management costs, and creates future environmental liabilities. Pollution Prevention (P2) emphasizes source reduction through improved manufacturing and process control technologies. This concept must be incorporated into DOE`s overall operating philosophy and should be an integral part of Total Quality Management (TQM) program. P2 reduces the amount of waste generated, the cost of environmental compliance and future liabilities, waste treatment, and transportation and disposal costs. To be effective, P2 must contribute to the bottom fine in reducing the cost of work performed. P2 activities at LLNL include: researching and developing innovative manufacturing; evaluating new technologies, products, and chemistries; using alternative cleaning and sensor technologies; performing Pollution Prevention Opportunity Assessments (PPOAs); and developing outreach programs with small business. Examples of industrial outreach are: innovative electroplating operations, printed circuit board manufacturing, and painting operations. LLNL can provide the infrastructure and technical expertise to address a wide variety of industrial concerns.

  6. Regulatory cost-risk study

    SciTech Connect

    Not Available

    1983-04-01

    This study is intended to provide some quantitative perspective by selecting certain examples of criteria for which estimates of risks and costs can be obtained, and the balance of the various risks, (i.e., internal versus external risks), can be put into perspective. 35 refs., 39 tabs. (JDB)

  7. Optimal shielding design for minimum materials cost or mass

    DOE PAGES [OSTI]

    Woolley, Robert D.

    2015-12-02

    The mathematical underpinnings of cost optimal radiation shielding designs based on an extension of optimal control theory are presented, a heuristic algorithm to iteratively solve the resulting optimal design equations is suggested, and computational results for a simple test case are discussed. A typical radiation shielding design problem can have infinitely many solutions, all satisfying the problem's specified set of radiation attenuation requirements. Each such design has its own total materials cost. For a design to be optimal, no admissible change in its deployment of shielding materials can result in a lower cost. This applies in particular to very smallmore » changes, which can be restated using the calculus of variations as the Euler-Lagrange equations. Furthermore, the associated Hamiltonian function and application of Pontryagin's theorem lead to conditions for a shield to be optimal.« less

  8. Optimal shielding design for minimum materials cost or mass

    SciTech Connect

    Woolley, Robert D.

    2015-12-02

    The mathematical underpinnings of cost optimal radiation shielding designs based on an extension of optimal control theory are presented, a heuristic algorithm to iteratively solve the resulting optimal design equations is suggested, and computational results for a simple test case are discussed. A typical radiation shielding design problem can have infinitely many solutions, all satisfying the problem's specified set of radiation attenuation requirements. Each such design has its own total materials cost. For a design to be optimal, no admissible change in its deployment of shielding materials can result in a lower cost. This applies in particular to very small changes, which can be restated using the calculus of variations as the Euler-Lagrange equations. Furthermore, the associated Hamiltonian function and application of Pontryagin's theorem lead to conditions for a shield to be optimal.

  9. Light Weight, Low Cost PEM Fuel Cell Stacks

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Light-weight, Low Cost PEM Fuel Cell Stacks Case Western Reserve University Endura Plastics Inc. This presentation does not contain any proprietary or confidential information. Lead Investigators Case Western Reserve University Jesse Wainright, Assoc. Res. Prof., ChemE Gary Wnek, Professor, Macrom. Sci. C. C. Liu, Professor, ChemE Vladimir Gurau, Sr. Research Assoc., ChemE Tom Zawodzinski, Professor, ChemE Endura Plastics Inc. Mark DiLillo, President Martin Klammer, Engineering Manager DOE

  10. Isotopic generator for bismuth-212 and lead-212 from radium

    DOEpatents

    Atcher, Robert W.; Friedman, Arnold M.; Hines, John

    1987-01-01

    A method and apparatus for providing radionuclides of bismuth-212 and lead-212. Thorium-228 and carrier solution starting material is input to a radiologically contained portion of an isotopic generator system, and radium-224 is separated from thorium-228 which is retained by a strongly basic anion exchange column. The separated radium-224 is transferred to an accessible, strongly acidic cationic exchange column. The cationic column retains the radium-224, and natural radioactive decay generates bismuth-212 and lead-212. The cationic exchange column can also be separated from the contained portion of the system and utilized without the extraordinary safety measures necessary in the contained portion. Furthermore, the cationic exchange column provides over a relatively long time period the short lived lead-212 and bismuth-212 radionuclides which are useful for a variety of medical therapies.

  11. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    SciTech Connect

    Melaina, M.; Penev, M.

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  12. Method for measuring lead concentrations in blood

    DOEpatents

    Nogar, Nicholas S.

    2001-01-01

    Method for measuring lead concentrations in blood. The present invention includes the use of resonant laser ablation to analyze .ltoreq.1 .mu.L (or equivalent mass) samples of blood for lead content. A typical finger prick, for example, yields about 10 .mu.L. Solid samples may also readily be analyzed by resonant laser ablation. The sample is placed on a lead-free, electrically conducting substrate and irradiated with a single, focused laser beam which simultaneously vaporizes, atomizes, and resonantly ionizes an analyte of interest in a sample. The ions are then sorted, collected and detected using a mass spectrometer.

  13. Scalable Light Module for Low-Cost, High Efficiency LED Luminaires |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Scalable Light Module for Low-Cost, High Efficiency LED Luminaires Scalable Light Module for Low-Cost, High Efficiency LED Luminaires Lead Performer: Cree, Inc. - Durham, NC DOE Total Funding: $2,349,704 Cost Share: $2,349,704 Project Term: 8/1/2013 - 7/31/2015 Funding Opportunity: SSL Manufacturing R&D Funding Opportunity Announcement (FOA) DE-FOA-000079 Project Objective This project plans to develop a versatile, low-cost, low profile LED light-module architecture

  14. Low Cost Hydrogen Production Platform

    SciTech Connect

    Timothy M. Aaron, Jerome T. Jankowiak

    2009-10-16

    A technology and design evaluation was carried out for the development of a turnkey hydrogen production system in the range of 2.4 - 12 kg/h of hydrogen. The design is based on existing SMR technology and existing chemical processes and technologies to meet the design objectives. Consequently, the system design consists of a steam methane reformer, PSA system for hydrogen purification, natural gas compression, steam generation and all components and heat exchangers required for the production of hydrogen. The focus of the program is on packaging, system integration and an overall step change in the cost of capital required for the production of hydrogen at small scale. To assist in this effort, subcontractors were brought in to evaluate the design concepts and to assist in meeting the overall goals of the program. Praxair supplied the overall system and process design and the subcontractors were used to evaluate the components and system from a manufacturing and overall design optimization viewpoint. Design for manufacturing and assembly (DFMA) techniques, computer models and laboratory/full-scale testing of components were utilized to optimize the design during all phases of the design development. Early in the program evaluation, a review of existing Praxair hydrogen facilities showed that over 50% of the installed cost of a SMR based hydrogen plant is associated with the high temperature components (reformer, shift, steam generation, and various high temperature heat exchange). The main effort of the initial phase of the program was to develop an integrated high temperature component for these related functions. Initially, six independent concepts were developed and the processes were modeled to determine overall feasibility. The six concepts were eventually narrowed down to the highest potential concept. A US patent was awarded in February 2009 for the Praxair integrated high temperature component design. A risk analysis of the high temperature component was

  15. The risk of lead toxicity in homes with lead paint hazard

    SciTech Connect

    Schwartz, J.; Levin, R. )

    1991-02-01

    While lead paint has long been known to be a major source of lead poisoning, only a few small epidemiologic studies have attempted to assess directly the relative risk of lead poisoning due to the presence of lead paint. Using data from over 200,000 screening tests of children in the city of Chicago performed between 1976 and 1980, the relative risks can be quantified for children living in a major urban area. Lead paint was found to be a significant predictor of the probability of a child having lead toxicity. As expected, the reduction in leaded gasoline sales during the period reduced mean blood lead levels and increased the percentage of lead toxic children whose toxicity could be attributed to paint lead. Poisson regression models indicated that with the elimination of leaded gasoline, the relative risk of lead toxicity given lead paint exposure was 5.70 (95% CI, 4.13-7.86) during the winter and fall. The relative risk rose to 12.81 (95% CI, 7.33-22.4) in the spring and 15.8 (95% CI, 8.90-28.1) in the summer, probably due to increased exposure to window wells.

  16. Low-Cost Hydrogen Distributed Production System Development

    SciTech Connect

    C.E. Thomas, Ph.D., President Franklin D. Lomax, Ph.D, CTO & Principal Investigator, and Maxim Lyubovski, Ph.D.

    2011-03-10

    H{sub 2}Gen, with the support of the Department of Energy, successfully designed, built and field-tested two steam methane reformers with 578 kg/day capacity, which has now become a standard commercial product serving customers in the specialty metals and PV manufacturing businesses. We demonstrated that this reformer/PSA system, when combined with compression, storage and dispensing (CSD) equipment could produce hydrogen that is already cost-competitive with gasoline per mile driven in a conventional (non-hybrid) vehicle. We further showed that mass producing this 578 kg/day system in quantities of just 100 units would reduce hydrogen cost per mile approximately 13% below the cost of untaxed gasoline per mile used in a hybrid electric vehicle. If mass produced in quantities of 500 units, hydrogen cost per mile in a FCEV would be 20% below the cost of untaxed gasoline in an HEV in the 2015-2020 time period using EIA fuel cost projections for natural gas and untaxed gasoline, and 45% below the cost of untaxed gasoline in a conventional car. This 20% to 45% reduction in fuel cost per mile would accrue even though hydrogen from this 578 kg/day system would cost approximately $4.14/kg, well above the DOE hydrogen cost targets of $2.50/kg by 2010 and $2.00/kg by 2015. We also estimated the cost of a larger, 1,500 kg/day SMR/PSA fueling system based on engineering cost scaling factors derived from the two H{sub 2}Gen products, a commercial 115 kg/day system and the 578 kg/day system developed under this DOE contract. This proposed system could support 200 to 250 cars per day, similar to a medium gasoline station. We estimate that the cost per mile from this larger 1,500 kg/day hydrogen fueling system would be 26% to 40% below the cost per mile of untaxed gasoline in an HEV and ICV respectively, even without any mass production cost reductions. In quantities of 500 units, we are projecting per mile cost reductions between 45% (vs. HEVs) and 62% (vs ICVs), with hydrogen

  17. Lightweight, durable lead-acid batteries

    SciTech Connect

    Lara-Curzio, Edgar; An, Ke; Kiggans, Jr., James O.; Dudney, Nancy J.; Contescu, Cristian I.; Baker, Frederick S.; Armstrong, Beth L.

    2011-09-13

    A lightweight, durable lead-acid battery is disclosed. Alternative electrode materials and configurations are used to reduce weight, to increase material utilization and to extend service life. The electrode can include a current collector having a buffer layer in contact with the current collector and an electrochemically active material in contact with the buffer layer. In one form, the buffer layer includes a carbide, and the current collector includes carbon fibers having the buffer layer. The buffer layer can include a carbide and/or a noble metal selected from of gold, silver, tantalum, platinum, palladium and rhodium. When the electrode is to be used in a lead-acid battery, the electrochemically active material is selected from metallic lead (for a negative electrode) or lead peroxide (for a positive electrode).

  18. Lightweight, durable lead-acid batteries

    DOEpatents

    Lara-Curzio, Edgar; An, Ke; Kiggans, Jr., James O; Dudney, Nancy J; Contescu, Cristian I; Baker, Frederick S; Armstrong, Beth L

    2013-05-21

    A lightweight, durable lead-acid battery is disclosed. Alternative electrode materials and configurations are used to reduce weight, to increase material utilization and to extend service life. The electrode can include a current collector having a buffer layer in contact with the current collector and an electrochemically active material in contact with the buffer layer. In one form, the buffer layer includes a carbide, and the current collector includes carbon fibers having the buffer layer. The buffer layer can include a carbide and/or a noble metal selected from of gold, silver, tantalum, platinum, palladium and rhodium. When the electrode is to be used in a lead-acid battery, the electrochemically active material is selected from metallic lead (for a negative electrode) or lead peroxide (for a positive electrode).

  19. Lead Hero Limited | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Hero Limited Jump to: navigation, search Name: Lead Hero Limited Place: China Product: China-based company that holds a 100% interest in XiAn Lv Jing and a 15.05% interest in...

  20. Measurement of the production of neighbouring jets in lead-lead...

    Office of Scientific and Technical Information (OSTI)

    Measurement of the production of neighbouring jets in lead-lead collisions at sNN2.76 TeV with the ATLAS detector Citation Details In-Document Search Title: Measurement of the...

  1. Corrosion by liquid lead and lead-bismuth: experimental results review and analysis

    SciTech Connect

    Zhang, Jinsuo

    2008-01-01

    Liquid metal technologies for liquid lead and lead-bismuth alloy are under wide investigation and development for advanced nuclear energy systems and waste transmutation systems. Material corrosion is one of the main issues studied a lot recently in the development of the liquid metal technology. This study reviews corrosion by liquid lead and lead bismuth, including the corrosion mechanisms, corrosion inhibitor and the formation of the protective oxide layer. The available experimental data are analyzed by using a corrosion model in which the oxidation and scale removal are coupled. Based on the model, long-term behaviors of steels in liquid lead and lead-bismuth are predictable. This report provides information for the selection of structural materials for typical nuclear reactor coolant systems when selecting liquid lead or lead bismuth as heat transfer media.

  2. Time Off

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Time Off Time Off A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. thumbnail of Benefits Office CONTACT US Benefits Office (505) 667-1806 Email Create time away from work Work schedules A variety of work schedules are available that allow flexibility for workers and Laboratory programs. The most popular work schedule is the "9/80"-employees work 80 hours over a nine-workday (two-week) period, with a

  3. Novel, Low-Cost Nanoparticle Production

    SciTech Connect

    2011-05-31

    Fact sheet describing a modular hybrid plasma reactor and process to manufacture low-cost nanoparticles

  4. Primer on lead-acid storage batteries

    SciTech Connect

    1995-09-01

    This handbook was developed to help DOE facility contractors prevent accidents caused during operation and maintenance of lead-acid storage batteries. Major types of lead-acid storage batteries are discussed as well as their operation, application, selection, maintenance, and disposal (storage, transportation, as well). Safety hazards and precautions are discussed in the section on battery maintenance. References to industry standards are included for selection, maintenance, and disposal.

  5. Zerkle to lead LANL's Information Technology organization

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Zerkle to lead Information Technology organization Zerkle to lead LANL's Information Technology organization Information Technology is responsible for departmental computing, software and software applications, and computing networks and infrastructure. March 14, 2011 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to

  6. NERSC seeks Computational Systems Group Lead

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    seeks Computational Systems Group Lead NERSC seeks Computational Systems Group Lead January 6, 2011 by Katie Antypas Note: This position is now closed. The Computational Systems Group provides production support and advanced development for the supercomputer systems at NERSC. Manage the Computational Systems Group (CSG) which provides production support and advanced development for the supercomputer systems at NERSC (National Energy Research Scientific Computing Center). These systems, which

  7. Nick Wright Named Advanced Technologies Group Lead

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Nick Wright Named Advanced Technologies Group Lead Nick Wright Named Advanced Technologies Group Lead February 4, 2013 Nick Nick Wright has been named head of the National Energy Research Scientific Computing Center's (NERSC) Advanced Technologies Group (ATG), which focuses on understanding the requirements of current and emerging applications to make choices in hardware design and programming models that best serve the science needs of NERSC users. ATG specializes in benchmarking, system

  8. Supplemental report on cost estimates'

    SciTech Connect

    1992-04-29

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

  9. SLH Timing Belt Powertrain

    SciTech Connect

    Schneider, Abe

    2014-04-09

    The main goal of this proposal was to develop and test a novel powertrain solution for the SLH hydroEngine, a low-cost, efficient low-head hydropower technology. Nearly two-thirds of U.S. renewable electricity is produced by hydropower (EIA 2010). According to the U.S. Department of Energy; this amount could be increased by 50% with small hydropower plants, often using already-existing dams (Hall 2004). There are more than 80,000 existing dams, and of these, less than 4% generate power (Blankinship 2009). In addition, there are over 800 irrigation districts in the U.S., many with multiple, non-power, low-head drops. These existing, non-power dams and irrigation drops could be retrofitted to produce distributed, baseload, renewable energy with appropriate technology. The problem is that most existing dams are low-head, or less than 30 feet in height (Ragon 2009). Only about 2% of the available low-head hydropower resource in the U.S. has been developed, leaving more than 70 GW of annual mean potential low-head capacity untapped (Hall 2004). Natel Energy, Inc. is developing a low-head hydropower turbine that operates efficiently at heads less than 6 meters and is cost-effective for deployment across multiple low-head structures. Because of the unique racetrack-like path taken by the prime-movers in the SLH, a flexible powertrain is required. Historically, the only viable technological solution was roller chain. Despite the having the ability to easily attach blades, roller chain is characterized by significant drawbacks, including high cost, wear, and vibration from chordal action. Advanced carbon- fiber-reinforced timing belts have been recently developed which, coupled with a novel belt attachment system developed by Natel Energy, result in a large reduction in moving parts, reduced mass and cost, and elimination of chordal action for increased fatigue life. The work done in this project affirmatively addressed each of the following 3 major uncertainties concerning

  10. EM Leads with Advanced Simulation Capability Technology

    Energy.gov [DOE]

    WASHINGTON, D.C. – Since 2010, EM’s Office of Soil and Groundwater Remediation has initiated technology development programs such as the Advanced Simulation Capability for Environmental Management (ASCEM) and the Applied Field Research Initiatives to enhance characterization and remediation technologies and create cost savings.

  11. Flexible low-cost packaging for lithium ion batteries.

    SciTech Connect

    Jansen, A. N.; Amine, K.; Chaiko, D. J.; Henriksen, G. L.; Chemical Engineering

    2004-01-01

    Batteries with various types of chemistries are typically sold in rigid hermetically sealed containers that, at the simplest level, must contain the electrolyte while keeping out the exterior atmosphere. However, such rigid containers can have limitations in packaging situations where the form of the battery is important, such as in hand-held electronics like personal digital assistants (PDAs), laptops, and cell phones. Other limitations exist as well. At least one of the electrode leads must be insulated from the metal can, which necessitates the inclusion of an insulated metal feed-through in the containment hardware. Another limitation may be in hardware and assembly cost, such as exists for the lithium-ion batteries that are being developed for use in electric vehicles (EVs) and hybrid electric vehicles (HEVs). The large size (typically 10-100 Ah) of these batteries usually results in electric beam or laser welding of the metal cap to the metal can. The non-aqueous electrolyte used in these batteries are usually based on flammable solvents and therefore require the incorporation of a safety rupture vent to relieve pressure in the event of overcharging or overheating. Both of these features add cost to the battery. Flexible packaging provides an alternative to the rigid container. A common example of this is the multi-layered laminates used in the food packaging industry, such as for vacuum-sealed coffee bags. However, flexible packaging for batteries does not come without concerns. One of the main concerns is the slow egress of the electrolyte solvent through the face of the inner laminate layer and at the sealant edge. Also, moisture and air could enter from the outside via the same method. These exchanges may be acceptable for brief periods of time, but for the long lifetimes required for batteries in electric/hybrid electric vehicles, batteries in remote locations, and those in satellites, these exchanges are unacceptable. Argonne National Laboratory (ANL

  12. Advanced Biofuels Cost of Production

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OF ENERGY BIOMASS PROGRAM Advanced Biofuels Cost of Production Aviation Biofuels Conference Zia Haq DPA Coordinator October 12, 2012 2 | Office of the Biomass Program eere.energy.gov Introduction * Resource assessment - do we have enough biomass? * Techno-economic analysis - can biofuels be produced at competitive prices? * Sustainability - What are the greenhouse gas emissions? * Integrated biorefineries - what is being funded at DOE and what are future plans? 3 | Office of the Biomass Program

  13. 1998 Cost and Quality Annual

    Gasoline and Diesel Fuel Update

    8) Distribution Category UC-950 Cost and Quality of Fuels for Electric Utility Plants 1998 Tables June 1999 Energy Information Administration Office of Coal, Nuclear, Electric and Alternate Fuels U.S. Department of Energy Washington DC 20585 This report was prepared by the Energy Information Administration, the independent statistical and analytical agency within the Department of Energy. The information contained herein should not be construed as advocating or reflecting any policy position of

  14. Support for Cost Analyses on

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    35 Hartwell Ave Lexington, MA 02421 Support for Cost Analyses on Solar-Driven High Temperature Thermochemical Water-Splitting Cycles Final Report to: Department of Energy Order DE-DT0000951 Report prepared by TIAX LLC Reference D0535 February 22, 2011 Matt Kromer (Principal Investigator) Kurt Roth Rosalind Takata Paul Chin Copyright 2011, TIAX LLC Notice: This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government

  15. Emissions Scenarios, Costs, and Implementation Considerations of REDD Programs

    SciTech Connect

    Sathaye, Jayant; Andrasko, Ken; Chan, Peter

    2011-04-11

    Greenhouse gas emissions from the forestry sector are estimated to be 8.4 GtCO2-eq./year or about 17percent of the global emissions. We estimate that the cost forreducing deforestation is low in Africa and several times higher in Latin America and Southeast Asia. These cost estimates are sensitive to the uncertainties of how muchunsustainable high-revenue logging occurs, little understood transaction and program implementation costs, and barriers to implementation including governance issues. Due to lack of capacity in the affected countries, achieving reduction or avoidance of carbon emissions will require extensive REDD-plus programs. Preliminary REDD-plus Readiness cost estimates and program descriptions for Indonesia, Democratic Republic of the Congo, Ghana, Guyana and Mexico show that roughly one-third of potential REDD-plus mitigation benefits might come from avoided deforestation and the rest from avoided forest degradation and other REDD-plus activities.

  16. Eliminating Stress leads to New Clues about Superconductivity | The Ames

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Laboratory Eliminating Stress leads to New Clues about Superconductivity For the first time, the directionally dependent electrical resistivity in iron-selenium, an iron-based superconductor, could be extrapolated to the zero-stress limit, and studied over a broad range of temperatures without interference from long-range magnetic order. In contrast to other iron-based superconductors, iron-selenium does not develop long-range magnetic order below the structural (nematic) transition at Ts

  17. Validation and Comparison of Carbon Sequestration Project Cost Models with Project Cost Data Obtained from the Southwest Partnership

    SciTech Connect

    Robert Lee; Reid Grigg; Brian McPherson

    2011-04-15

    Obtaining formal quotes and engineering conceptual designs for carbon dioxide (CO{sub 2}) sequestration sites and facilities is costly and time-consuming. Frequently, when looking at potential locations, managers, engineers and scientists are confronted with multiple options, but do not have the expertise or the information required to quickly obtain a general estimate of what the costs will be without employing an engineering firm. Several models for carbon compression, transport and/or injection have been published that are designed to aid in determining the cost of sequestration projects. A number of these models are used in this study, including models by J. Ogden, MIT's Carbon Capture and Sequestration Technologies Program Model, the Environmental Protection Agency and others. This report uses the information and data available from several projects either completed, in progress, or conceptualized by the Southwest Regional Carbon Sequestration Partnership on Carbon Sequestration (SWP) to determine the best approach to estimate a project's cost. The data presented highlights calculated versus actual costs. This data is compared to the results obtained by applying several models for each of the individual projects with actual cost. It also offers methods to systematically apply the models to future projects of a similar scale. Last, the cost risks associated with a project of this scope are discussed, along with ways that have been and could be used to mitigate these risks.

  18. Indonesian fuel consumers shouldering development costs

    SciTech Connect

    Not Available

    1984-08-22

    A graph shows how Indonesia's prices for regular and premium leaded gasolines and diesel fuel compare to the world average price, in US dollars per gallon: USA $0.28 lower for regular leaded gasoline, $0.30 lower for premium leaded, and $0.48 lower for diesel. Such proximity to world averages is of note in the context that Indonesia, a developing country with pressing needs for industrial and social development, does not internally provide the deep consumer subsidies that have long persisted in many such oil-producing countries. Although the other three countries shown on the graph have recently moved to cut internal fuel price subsidies, they still price these three important fuels more deeply below the world average than does Indonesia. A table details Indonesia's internal market price changes over time, by petroleum product. A chart tracks Indonesia's oil exports since 1966. The year of the first world oil price shock, 1973, shows a dramatic increase in exports, but that near-doubling was not repeated during the period of the second price shock, 1978-1979. As of 182, exports (by now including condensates) had fallen to pre-Arab Oil Embargo levels. This issue contains the fuel price/tax series and the principal industrial fuel prices for August 1984 for countries of the Western Hemisphere. Also, beginning with this issue, Energy Detente will appear only in English rather than both English and Spanish, as heretofore.

  19. Methods for measuring lead concentrations in paint films

    SciTech Connect

    McKnight, M.E.; Byrd, W.E.; Roberts, W.E.; Lagergren, E.S.

    1989-12-01

    Recent legislation required the U.S. Department of Housing and Urban Development (HUD) to establish procedures to abate lead-based paint in existing HUD-assisted housing. The legislation also required HUD to assess the accuracy, precision, reliability, and safety of methods for measuring lead content of paint films and to investigate the availability of testers and samplers. The National Institute of Standards and Technology was requested to carry out the assessment. With regard to accuracy and precision of field measurements, it was concluded that: chemical spot tests when carried out by an experienced analytical chemistry technician can detect the presence of lead in paint films having concentrations in excess of 1 mg/sq cm about 90% of the time; the estimate of the precision of a field measurement procedure using lead-specific portable X-ray fluorescence (XRF) analyzers for lead concentrations near 1 mg/sq cm is + or - 0.6 mg/sq cm and the estimate of the bias is 0.2 mg/sq cm; this results in a 95% confidence interval of + or - 1.4 mg/sq cm; and based upon very preliminary measurements using the latest version of the spectrum analyzer portable XRF, the 95% confidence interval for field measurements is estimated to be + or - 0.5 mg/sq cm. In addition to field methods, standard laboratory procedures can be used to measure the lead content of paint samples to within a few percent of the quantity present over a wide range extending from less than 0.1 to over 10 mg/sq cm. Sample collection and sample dissolution procedures were also investigated.

  20. A measurement of E/. pi. for a fast lead liquid argon calorimeter

    SciTech Connect

    Makowiecki, D.; Gordon, H.A.; Ma, H.; Murtagh, M.; Radeka, V.; Rahm, D.; Rescia, S. ); Abrams, G.S.; Groom, D.E.; Kirsten, F.; Levi, M.; Siegrist, J. ); Amako, K.; Inaba, O.; Kondo, T. ); Baden, A.R.; Fong, D.; Hadley, N.; Kunori, S.; Skuja, A. (Maryland U

    1990-01-01

    The NA34 (HELIOS) calorimeter has measured e/{pi} {congruent} 1.1 in a uranium/liquid argon calorimeter with a shaping time of 135 nsec. Lead may be a viable alternative, but e/{pi} must first be measured at fast shaping times in lead. We re preparing to measure e/{pi} at momenta ranging from 0.5 to 20 GeV/c and with shaping times of 50, 100 and 150 nsec.

  1. A measurement of E/{pi} for a fast lead liquid argon calorimeter

    SciTech Connect

    Makowiecki, D.; Gordon, H.A.; Ma, H.; Murtagh, M.; Radeka, V.; Rahm, D.; Rescia, S.; Abrams, G.S.; Groom, D.E.; Kirsten, F.; Levi, M.; Siegrist, J.; Amako, K.; Inaba, O.; Kondo, T.; Baden, A.R.; Fong, D.; Hadley, N.; Kunori, S.; Skuja, A.; Bowen, T.; Forden, G.; Jenkins, E.; Johns, K.; Rutherfoord, J.; Shupe, M.; Burnett, T.; Cook, V.; Davisson, R.; Mockett, P.; Rothberg, J.; Williams, R.W.; Cremaldi, L.; Reidy, J.; Summers, D.; DiGiacomo, N.; Draper, P.; Ferbel, T.; Lobkowicz, F.; Faust, J.; Hauptman, J.; Pang, M.; Gabriel, T.A.; Hagopian, V.; Womersley, J.; Handler, T.; Hitlin, D.; Mulholland, G.T.; Watanabe, Y.; Weerts, H.

    1990-12-31

    The NA34 (HELIOS) calorimeter has measured e/{pi} {congruent} 1.1 in a uranium/liquid argon calorimeter with a shaping time of 135 nsec. Lead may be a viable alternative, but e/{pi} must first be measured at fast shaping times in lead. We re preparing to measure e/{pi} at momenta ranging from 0.5 to 20 GeV/c and with shaping times of 50, 100 and 150 nsec.

  2. Properly engineer lead paint removal projects

    SciTech Connect

    Kaelin, A.B.

    1996-01-01

    Deciding how to mitigate the hazards during lead paint removal is complex and requires consideration of many variables. Assessment of public health risk, environmental impact, and emissions potential of the operations must be considered. Additionally, the removal technique, containment system, and monitoring criteria must be developed. This article presents an integrated approach to identifying lead hazards, assessing risks to workers, the environment, and the public, developing the appropriate maintenance strategy, and selecting paint removal and containment systems. Also considered are guidelines for selecting a third party to design the overall project. This approach is based on a decision path that provides criteria for project assessment in an orderly fashion. The design of lead paint management projects in industrial applications requires consideration of the variables shown in the decision path.

  3. Development of surface mine cost estimating equations

    SciTech Connect

    Not Available

    1980-09-26

    Cost estimating equations were developed to determine capital and operating costs for five surface coal mine models in Central Appalachia, Northern Appalachia, Mid-West, Far-West, and Campbell County, Wyoming. Engineering equations were used to estimate equipment costs for the stripping function and for the coal loading and hauling function for the base case mine and for several mines with different annual production levels and/or different overburden removal requirements. Deferred costs were then determined through application of the base case depreciation schedules, and direct labor costs were easily established once the equipment quantities (and, hence, manpower requirements) were determined. The data points were then fit with appropriate functional forms, and these were then multiplied by appropriate adjustment factors so that the resulting equations yielded the model mine costs for initial and deferred capital and annual operating cost. (The validity of this scaling process is based on the assumption that total initial and deferred capital costs are proportional to the initial and deferred costs for the primary equipment types that were considered and that annual operating cost is proportional to the direct labor costs that were determined based on primary equipment quantities.) Initial capital costs ranged from $3,910,470 in Central Appalachia to $49,296,785; deferred capital costs ranged from $3,220,000 in Central Appalachia to $30,735,000 in Campbell County, Wyoming; and annual operating costs ranged from $2,924,148 in Central Appalachia to $32,708,591 in Campbell County, Wyoming. (DMC)

  4. Data, Feedback, and Awareness Lead to Big Energy Savings | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Data, Feedback, and Awareness Lead to Big Energy Savings Data, Feedback, and Awareness Lead to Big Energy Savings Data, Feedback, and Awareness Lead to Big Energy Savings Fact ...

  5. Protocol, Qualification Standard for the Site Lead Program -...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Qualification Standard for the Site Lead Program - May 2011 Protocol, Qualification Standard for the Site Lead Program - May 2011 May 2011 Qualification Standard for the Site Lead...

  6. Sandia National Laboratories: Due Diligence on Lead Acid Battery...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Due Diligence on Lead Acid Battery Recycling March 23, 2011 Lead Acid Batteries on secondary containment pallet Lead Acid Batteries on secondary containment pallet In 2004, the US...

  7. Incorporating psychological influences in probabilistic cost analysis

    SciTech Connect

    Kujawski, Edouard; Alvaro, Mariana; Edwards, William

    2004-01-08

    Today's typical probabilistic cost analysis assumes an ''ideal'' project that is devoid of the human and organizational considerations that heavily influence the success and cost of real-world projects. In the real world ''Money Allocated Is Money Spent'' (MAIMS principle); cost underruns are rarely available to protect against cost overruns while task overruns are passed on to the total project cost. Realistic cost estimates therefore require a modified probabilistic cost analysis that simultaneously models the cost management strategy including budget allocation. Psychological influences such as overconfidence in assessing uncertainties and dependencies among cost elements and risks are other important considerations that are generally not addressed. It should then be no surprise that actual project costs often exceed the initial estimates and are delivered late and/or with a reduced scope. This paper presents a practical probabilistic cost analysis model that incorporates recent findings in human behavior and judgment under uncertainty, dependencies among cost elements, the MAIMS principle, and project management practices. Uncertain cost elements are elicited from experts using the direct fractile assessment method and fitted with three-parameter Weibull distributions. The full correlation matrix is specified in terms of two parameters that characterize correlations among cost elements in the same and in different subsystems. The analysis is readily implemented using standard Monte Carlo simulation tools such as {at}Risk and Crystal Ball{reg_sign}. The analysis of a representative design and engineering project substantiates that today's typical probabilistic cost analysis is likely to severely underestimate project cost for probability of success values of importance to contractors and procuring activities. The proposed approach provides a framework for developing a viable cost management strategy for allocating baseline budgets and contingencies. Given the

  8. Lower Cost Carbon Fiber Precursors

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost Carbon Fiber Precursors 9 June 2010 C. David (Dave) Warren Field Technical Manager Transportation Materials Research Oak Ridge National Laboratory P.O. Box 2009, M/S 8050 Oak Ridge, Tennessee 37831-8050 Phone: 865-574-9693 Fax: 865-574-0740 Email: WarrenCD@ORNL.GOV LM004 This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name Alternative Precursors and Conventional

  9. Engineering Evaluation/Cost Analysis

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PPPO/03-0145&D2 Engineering Evaluation/Cost Analysis for Group 1 Buildings X-103, X-334, and X-344B at the Portsmouth Gaseous Diffusion Plant, Piketon, Ohio This document has been approved for public release: Henry H. Thomas (signature on file) 10/29/10 Classification & Information Control Officer Date Restoration Services, Inc. (RSI) contributed to the preparation of this document and should not be considered an eligible contractor for its review DOE/PPPO/03-0145&D2 Engineering

  10. Syngas Mixed Alcohol Cost Validation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Techno-economic analysis (TEA) - Feedback to the research efforts Specific objective in 2012: Provide TEA and validate DOE BETO's goal to demonstrate technologies capable of producing cost competitive ethanol from biomass by the year 2012. 2 Quad Chart Overview 3 Start Date Oct 1, 2006 End Date Sept 30, 2012 % Complete 100% Timeline for Mixed Alcohols Year Total [Gasification/Pyrolysis] FY12 $860k [$700k/$160k] FY13 $1,000k [$250k/$750k] FY14 $1,050k [$350k/$700k] projected Years 10 (FY04 to

  11. Evaluation of field-portable X-ray fluorescence spectrometry for the determination of lead contamination on small-arms firing ranges

    SciTech Connect

    Schneider, J.F.; Taylor, J.D.; Bass, D.A.; Zellmer, D.; Rieck, M.

    1995-02-01

    Field analytical methods for the characterization of lead contamination in soil are being developed. In this study, the usefulness of a commercially available, field-portable energy-dispersive X-ray fluorescence spectrometer (XRF) is evaluated for determining the extent of lead contamination in soils on small-arms firing ranges at a military installation. This field screening technique provides significant time and cost savings for the study of sites with lead-contaminated soil. Data obtained with the XRF unit in the field are compared with data obtained from soil samples analyzed in an analytical laboratory by inductively coupled plasma atomic emission spectroscopy. Results indicate that the field-portable XRF unit evaluated in this study provides data that are useful in determining the extent and relative magnitude of lead contamination. For the commercial unit used in this study, improvements in the spectral resolution and in the limit of detection would be required to make the unit more than just a screening tool.

  12. Medium Power Lead Alloy Fast Reactor Balance of Plant Options

    SciTech Connect

    Vaclav Dosta; Pavel Hejzlar; Neil E. Todreas; Jacopo Buongiorno

    2004-09-01

    Proper selection of the power conversion cycle is a very important step in the design of a nuclear reactor. Due to the higher core outlet temperature (~550°C) compared to that of light water reactors (~300°C), a wide portfolio of power cycles is available for the lead alloy fast reactor (LFR). Comparison of the following cycles for the LFR was performed: superheated steam (direct and indirect), supercritical steam, helium Brayton, and supercritical CO2 (S-CO2) recompression. Heat transfer from primary to secondary coolant was first analyzed and then the steam generators or heat exchangers were designed. The direct generation of steam in the lead alloy coolant was also evaluated. The resulting temperatures of the secondary fluids are in the range of 530-545°C, dictated by the fixed space available for the heat exchangers in the reactor vessel. For the direct steam generation situation, the temperature is 312°C. Optimization of each power cycle was carried out, yielding net plant efficiency of around 40% for the superheated steam cycle while the supercritical steam and S-CO2 cycles achieved net plant efficiency of 41%. The cycles were then compared based on their net plant efficiency and potential for low capital cost. The superheated steam cycle is a very good candidate cycle given its reasonably high net plant efficiency and ease of implementation based on the extensive knowledge and operating experience with this cycle. Although the supercritical steam cycle net plant efficiency is slightly better than that of the superheated steam cycle, its high complexity and high pressure result in higher capital cost, negatively affecting plant economics. The helium Brayton cycle achieves low net plant efficiency due to the low lead alloy core outlet temperature, and therefore, even though it is a simpler cycle than the steam cycles, its performance is mediocre in this application. The prime candidate, however, appears to be the S-CO2 recompression cycle, because it

  13. Parallel time integration software

    Energy Science and Technology Software Center

    2014-07-01

    This package implements an optimal-scaling multigrid solver for the (non) linear systems that arise from the discretization of problems with evolutionary behavior. Typically, solution algorithms for evolution equations are based on a time-marching approach, solving sequentially for one time step after the other. Parallelism in these traditional time-integrarion techniques is limited to spatial parallelism. However, current trends in computer architectures are leading twards system with more, but not faster. processors. Therefore, faster compute speeds mustmore » come from greater parallelism. One approach to achieve parallelism in time is with multigrid, but extending classical multigrid methods for elliptic poerators to this setting is a significant achievement. In this software, we implement a non-intrusive, optimal-scaling time-parallel method based on multigrid reduction techniques. The examples in the package demonstrate optimality of our multigrid-reduction-in-time algorithm (MGRIT) for solving a variety of parabolic equations in two and three sparial dimensions. These examples can also be used to show that MGRIT can achieve significant speedup in comparison to sequential time marching on modern architectures.« less

  14. Achieving dust lead clearance standards after lead hazard control projects: An evaluation of the HUD-recommended cleaning procedure and an abbreviated alternative

    SciTech Connect

    Dixon, S. ); Tohn, E. ); Rupp, R. ); Clark, S. . Dept. of Environmental Health)

    1999-05-01

    The US Department of Housing and Urban Development's (HUD's) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing strongly recommend that after lead hazard control interventions all walls, ceiling, floors, and other horizontal surfaces be cleaned using a three-step process to reduce lead-contaminated dust and debris. The three steps are: an initial vacuuming using a machine equipped with a high-efficiency particulate air (HEPA) filter (HEPA vacuum), wet wash with a lead cleaner, and a final HEPA vacuum. This study evaluated the effectiveness of two cleaning protocols: (1) the HUD-recommended three-step procedure, and (2) an abbreviated two-step cleaning procedure that omits the final HEPA vacuum. Cleaning procedures were evaluated in 27 dwelling units that had undergone significant lead hazard control interventions likely to produce lead dust. Dust lead samples were collected on floors and in window sills and troughs prior to the lead control hazard intervention, after the wet wash step of the cleaning procedure, and after completion of the second HEPA vacuuming. The results of the study demonstrate that dust lead surface loading on smooth and cleanable surfaces following the three-step and two-step cleaning procedures can achieve 1995 federal guidance dust clearance levels and levels substantially lower. Although the dust lead clearance rates before and after the second HEPA vacuum were the same, the time saved by omitting the second HEPA is small relative to the other elements of the cleaning process.

  15. After Cajun, what next for stranded costs?

    SciTech Connect

    Pembroke, J.D.

    1994-10-01

    Members of FERC have said that the Cajun decision does not pose a serious problem to its proposed rulemaking on stranded costs. But the D.C. Circuit`s Cajun decision, criticizing the concept of recovery for stranded investment in broad terms, promises to make that task difficult, if not impossible. The United States Court of Appeals for the District of Columbia Circuit, in its July 12, 1994 opinion in Cajun Electric Power Cooperative, Inc. v. Federal Energy Regulatory Commission, subjected the Entergy Corporations`s transmission tariff`s stranded investment provision to broad and, perhaps, fatal criticism. The Cajun opinion, premised on basic concepts of antitrust law, was issued at a time of substantial industry discussion on the concept of stranded investment and should greatly impact the decisions of both federal and state regulators on stranded investment.

  16. Cost and quality of fuels for electric utility plants, 1992

    SciTech Connect

    Not Available

    1993-08-02

    This publication presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. The purpose of this publication is to provide energy decision-makers with accurate and timely information that may be used in forming various perspectives on issues regarding electric power.

  17. Cost and quality of fuels for electric utility plants, 1994

    SciTech Connect

    1995-07-14

    This document presents an annual summary of statistics at the national, Census division, State, electric utility, and plant levels regarding the quantity, quality, and cost of fossil fuels used to produce electricity. Purpose of this publication is to provide energy decision-makers with accurate, timely information that may be used in forming various perspectives on issues regarding electric power.

  18. Development and Industrialization of InGaN/GaN LEDs on Patterned Sapphire Substrates for Low Cost Emitter Architecture

    Energy.gov [DOE]

    Lead Performer: Lumileds, LLC – San Jose, CADOE Total Funding: $1,890,891Cost Share: $1,890,892Project Term: 8/1/2013 – 11/30/2015Funding Opportunity: SSL Manufacturing R&D Funding Opportunity...

  19. Archaeological Lead Findings in the Ukraine

    SciTech Connect

    Danevich, F. A.; Kobychev, V. V.; Kropivyansky, B. N.; Mokina, V. M.; Nagorny, S. S.; Nikolaiko, A. S.; Poda, D. V.; Tretyak, V. I.; Kim, S. K.; Kim, H. J.; Kostezh, A. B.; Laubenstein, M.; Nisi, S.; Voronov, S. A.

    2007-03-28

    In June-August 2006 an expedition with the aim to look for low-radioactive archaeological lead at the bottom of the Black Sea, near the Crimean peninsula (Ukraine) was organised by a Korean-Ukrainian collaboration. The first samples with {approx}0.2 tons of total mass were found at a depth of 28 m among the relics of an ancient Greek ship. Their age has been dated to the first century B.C. This lead was used as ballast in the keel of the ship. The element composition of the samples was measured by means of X-ray fluorescence and ICP-MS analyses. The first preliminary limits on the 210Pb contamination of the samples are less than a few hundreds mBq/kg. The measurements were performed using gamma spectroscopy with HPGe-detectors and alpha spectroscopy with commercial {alpha}-detectors. Measurements of 40K, Th/U in the lead samples were undertaken in Kiev and in the underground laboratories of the Laboratori Nazionali del Gran Sasso (LNGS, Italy). If it was found to be radio-clean this lead could be used as high efficiency shield for ultra low-level detectors, and as raw material for growing radio-pure scintillation crystals such as PbMoO4 or PbWO4 for the search for rare processes.

  20. Lead-203 as a label for radioimaging

    DOEpatents

    Srivastava, Suresh C.; Meinken, George E.

    1990-02-06

    A radiopharmaceutical composition comprising a radioactive isotope of lead (Pb-203) in combination with a pharmaceutical or an antibody or antibody fragment and a bifunctional chelating agent. These compositions are especially useful in the imaging and diagnosis of tumors and tumor metastases.

  1. Hanford Leads the Way for Greener Classrooms

    Energy.gov [DOE]

    EM’s Richland Operations Office and contractor Mission Support Alliance (MSA) are leading the way to greener classrooms by developing a totally paperless class at the HAMMER Federal Training Facility at the Hanford site. MSA manages HAMMER on behalf of EM.

  2. Lead-203 as a label for radioimaging

    DOEpatents

    Srivastava, Suresh C.; Meinken, George E.

    1990-01-01

    A radiopharmaceutical composition comprising a radioactive isotope of lead (Pb-203) in combination with a pharmaceutical or an antibody or antibody fragment and a bifunctional chelating agent. These compositions are especially useful in the imaging and diagnosis of tumors and tumor metastases.

  3. Maxima of two random walks: Universal statistics of lead changes

    DOE PAGES [OSTI]

    Ben-Naim, E.; Krapivsky, P. L.; Randon-Furling, J.

    2016-04-18

    In this study, we investigate statistics of lead changes of the maxima of two discrete-time random walks in one dimension. We show that the average number of lead changes grows asmore » $${\\pi }^{-1}\\mathrm{ln}t$$ in the long-time limit. We present theoretical and numerical evidence that this asymptotic behavior is universal. Specifically, this behavior is independent of the jump distribution: the same asymptotic underlies standard Brownian motion and symmetric Lévy flights. We also show that the probability to have at most n lead changes behaves as $${t}^{-1/4}{(\\mathrm{ln}t)}^{n}$$ for Brownian motion and as $${t}^{-\\beta (\\mu )}{(\\mathrm{ln}t)}^{n}$$ for symmetric Lévy flights with index μ. The decay exponent $$\\beta \\equiv \\beta (\\mu )$$ varies continuously with the Lévy index when $$0\\lt \\mu \\lt 2$$, and remains constant $$\\beta =1/4$$ for $$\\mu \\gt 2$$.« less

  4. SF 6432-TM (xx-xx-xx) Time Material

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    costs are consistent with subparagraph (3) below. Control : SF 6432-TM Title: Standard Terms and Conditions for Time and Materials Labor-Hour Contracts Owner: Procurement Policy &...

  5. Integrated MARKAL-EFOM System (TIMES) | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Program ComplexityEase of Use: Advanced Website: iea-etsap.orgwebTimes.asp Cost: Free Related Tools TEEMP Intertemporal Computable Equilibrium System (ICES) MCA4Climate -...

  6. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect

    Smith, M.; Gonzales, J.

    2014-08-05

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  7. Costs Associated With Propane Vehicle Fueling Infrastructure

    SciTech Connect

    Smith, M.; Gonzales, J.

    2014-08-01

    This document is designed to help fleets understand the cost factors associated with propane vehicle fueling infrastructure. It provides an overview of the equipment and processes necessary to develop a propane fueling station and offers estimated cost ranges.

  8. 2010 Cost of Wind Energy Review

    SciTech Connect

    Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

    2012-04-01

    This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions, and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

  9. Cost Participation in Research and Development Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Section 988 also provides guidance, in addition to the applicable cost principles, for determining allowable costs. 2.1.1 Authority to Exclude Research and Development of a Basic ...

  10. 2010 Cost of Wind Energy Review

    SciTech Connect

    Tegen, S.; Hand, M.; Maples, B.; Lantz, E.; Schwabe, P.; Smith, A.

    2012-04-01

    This document provides a detailed description of NREL's levelized cost of wind energy equation, assumptions and results in 2010, including historical cost trends and future projections for land-based and offshore utility-scale wind.

  11. Low Cost Heliostat Development | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Low Cost Heliostat Development Low Cost Heliostat Development This presentation was delivered at the SunShot Concentrating Solar Power (CSP) Program Review 2013, held April 23-25, ...

  12. Low-cost conformable storage to maximize vehicle range

    SciTech Connect

    Graham, R.P.

    1998-01-01

    Liquefied petroleum gas (LPG) and compressed natural gas (CNG) are currently the leading fuel contenders for converting vehicles from gasoline and diesel to alternative fuels. Two factors that inhibit conversion are additional vehicle costs and reduced range compared to gasoline. In overcoming these barriers, a key element of the alternative fuel system becomes the storage tank for these pressurized fuels. Using cylindrical pressure vessels is the conventional approach, but they do not package well in the available vehicle volume. Thiokol Corporation has developed and is now producing a conformable (non-cylindrical) aluminum storage system for LPG vans. This system increases fuel storage in a given rectangular envelope. The goal of this project was to develop the technology for a lower cost conformable tank made of injection-molded plastic. Much of the cost of the aluminum conformable tank is in the fabrication because several weld seams are required. The injection-molding process has the potential to greatly reduce the fabrication costs. The requirements of a pressurized fuel tank on a vehicle necessitate the proper combination of material properties. Material selection and tank design must be optimized for maximum internal volume and minimum material use to be competitive with other technologies. The material and the design must also facilitate the injection-molding process. Prototype tanks must be fabricated to reveal molding problems, prove solutions, and measure results. In production, efficient fabrication will be key to making these tanks cost competitive. The work accomplished during this project has demonstrated that conformable LPG tanks can be molded with thermoplastics. However, to achieve a competitive tank, improvements are needed in the effective material strength. If these improvements can be made, molded plastics should produce a lower cost tank that can store more LPG on a vehicle than conventional cylinders.

  13. A Second Opinion is Worth the Cost - 12479

    SciTech Connect

    Madsen, Drew

    2012-07-01

    This paper, 'A Second Opinion is Worth the Cost', shows how a second opinion for a Department of Energy (DOE) Project helped prepare and pass a DOE Order 413.3A 'Program and Project Management for the acquisition of Capital Assets' Office of Engineering and Construction Management (OECM) required External Independent Review (EIR) in support of the approved baseline for Critical Decision (CD) 2. The DOE project personnel were informed that the project's Total Project Cost (TPC) was going to increase from $815 million to $1.1 billion due to unforeseen problems and unexplained reasons. The DOE Project Team determined that a second opinion was needed to review and validate the TPC. Project Time and Cost, Inc. (PT and C) was requested to evaluate the cost estimate, schedule, basis of estimate (BOE), and risk management plan of the Project and to give an independent assessment of the TPC that was presented to DOE. This paper will demonstrate how breaking down a project to the work breakdown structure (WBS) level allows a project to be analyzed for potential cost increases and/or decreases, thus providing a more accurate TPC. The review Team's cost analyses of Projects identified eight primary drivers resulting in cost increases. They included: - Overstatement of the effort required to develop drawings and specifications. - Cost allocation to 'Miscellaneous' without sufficient detail or documentation. - Cost for duplicated efforts. - Vendor estimates or quotations without sufficient detail. - The practice of using the highest price quoted then adding an additional 10% mark-up. - Application of Nuclear Quality Assurance (NQA) highest level quality requirements when not required. - Allocation of operational costs to the Project Costs instead of to the Operating Expenses (OPEX). OPEX costs come from a different funding source. - DOE had not approved the activities. By using a Team approach with professionals from cost, civil, mechanical, electrical, structural and nuclear

  14. Break-Even Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities

    SciTech Connect

    Denholm, P.; Margolis, R. M.; Ong, S.; Roberts, B.

    2009-12-01

    Grid parity--or break-even cost--for photovoltaic (PV) technology is defined as the point where the cost of PV-generated electricity equals the cost of electricity purchased from the grid. Break-even cost is expressed in $/W of an installed system. Achieving break-even cost is a function of many variables. Consequently, break-even costs vary by location and time for a country, such as the United States, with a diverse set of resources, electricity prices, and other variables. In this report, we analyze PV break-even costs for U.S. residential customers. We evaluate some key drivers of grid parity both regionally and over time. We also examine the impact of moving from flat to time-of-use (TOU) rates, and we evaluate individual components of the break-even cost, including effect of rate structure and various incentives. Finally, we examine how PV markets might evolve on a regional basis considering the sensitivity of the break-even cost to four major drivers: technical performance, financing parameters, electricity prices and rates, and policies. We find that local incentives rather than ?technical? parameters are in general the key drivers of the break-even cost of PV. Additionally, this analysis provides insight about the potential viability of PV markets.

  15. Grain-Size-Limited Mobility in Methylammonium Lead Iodide Perovskite Thin

    Office of Scientific and Technical Information (OSTI)

    Films (Journal Article) | SciTech Connect Grain-Size-Limited Mobility in Methylammonium Lead Iodide Perovskite Thin Films Citation Details In-Document Search Title: Grain-Size-Limited Mobility in Methylammonium Lead Iodide Perovskite Thin Films We report a systematic study of the gigahertz-frequency charge carrier mobility found in methylammonium lead iodide perovskite films as a function of average grain size using time-resolved microwave conductivity and a single processing chemistry. Our

  16. Biotrans: Cost Optimization Model | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    URI: cleanenergysolutions.orgcontentbiotrans-cost-optimization-model,http Language: English Policies: Deployment Programs DeploymentPrograms: Demonstration &...

  17. Low Cost, Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Low Cost, Durable Seal Low Cost, Durable Seal This presentation, which focuses on low cost, durable seals, was given by George Roberts of UTC Power at a February 2007 meeting on new fuel cell projects. new_fc_roberts_utc.pdf (823.45 KB) More Documents & Publications Improved AST's Based on Real World FCV Data Low Cost Durable Seal Breakout Group 3: Water Management

  18. PHEV Battery Cost Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Battery Cost Assessment PHEV Battery Cost Assessment 2012 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting es111_gallagher_2012_o.pdf (1.1 MB) More Documents & Publications Promises and Challenges of Lithium- and Manganese-Rich Transition-Metal Layered-Oxide Cathodes PHEV Battery Cost Assessment EV Everywhere Grand Challenge - Battery Status and Cost Reduction Prospects

  19. Hydrogen Pathway Cost Distributions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pathway Cost Distributions Hydrogen Pathway Cost Distributions Presentation on hydrogen pathway cost distributions presented January 25, 2006. wkshp_storage_uihlein.pdf (189.04 KB) More Documents & Publications Manufacturing Cost Analysis of 1 kW and 5 kW Solid Oxide Fuel Cell (SOFC) for Auxiliary Power Applications Natural Gas Imports and Exports First Quarter Report 2016 Pathway and Resource Overview

  20. Reduce Pumping Costs through Optimum Pipe Sizing

    SciTech Connect

    Not Available

    2005-10-01

    BestPractices Program tip sheet discussing pumping system efficiency by reducing pumping costs through optimum pipe sizing.

  1. Cost Analysis: Technology, Competitiveness, Market Uncertainty | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Technology to Market » Cost Analysis: Technology, Competitiveness, Market Uncertainty Cost Analysis: Technology, Competitiveness, Market Uncertainty As a basis for strategic planning, competitiveness analysis, funding metrics and targets, SunShot supports analysis teams at national laboratories to assess technology costs, location-specific competitive advantages, policy impacts on system financing, and to perform detailed levelized cost of energy (LCOE) analyses. This shows the

  2. Cost Participation in Research and Development Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5.2 June 2016 ______________________________________________________________________________ 1 Cost Participation in Research and Development Contracting [References: Public Law 109-58, Energy Policy Act of 2005, FAR 35.003(b), DEAR 917.70] 1.0 Summary of Latest Changes This update: (1) combines Acquisition Guide Chapters 17.2, Cost Participation, and 35.2, Cost Sharing in Research and Development Contracting, (2) updates delegations of authority, (3) updates sample cost sharing language for

  3. Evolving Utility Cost-Effectiveness Test Criteria

    Energy.gov [DOE]

    Presents an overview of tests done to evaluate the cost-effectiveness of energy efficiency program benefits.

  4. High Energy Cost Grants | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    High Energy Cost Grants High Energy Cost Grants The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and distribution facilities servicing eligible rural communities with home energy costs that are over 275% of the national average. Grants under this program may be used for the acquisition, construction, installation, repair, replacement, or improvement of energy generation, transmission, or distribution facilities in

  5. Microsoft Word - CR-091 Primary Basis of Cost Savings and Cost...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Cost Savings and Cost Savings Amount. The new configurations will only apply to acquisition document types, specifically: BPA Calls, Contracts, Delivery OrderTask Order,...

  6. Renewable Portfolio Standards: Costs and Benefits (Poster)

    SciTech Connect

    Bird, L.; Heeter, J.; Barbose, G.; Weaver, S.; Flores, F.; Kuskova-Burns, K.; Wiser, R.

    2014-10-01

    This report summarizes state-level RPS costs to date, and considers how those costs may evolve going forward given scheduled increases in RPS targets and cost containment mechanisms. The report also summarizes RPS benefits estimates, based on published studies for individual states and discusses key methodological considerations.

  7. R2R Production of Low-Cost Integrated OLED Substrate with Improved

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transparent Conductor and Enhanced Light Outcoupling | Department of Energy R2R Production of Low-Cost Integrated OLED Substrate with Improved Transparent Conductor and Enhanced Light Outcoupling R2R Production of Low-Cost Integrated OLED Substrate with Improved Transparent Conductor and Enhanced Light Outcoupling Lead Performer: MicroContinuum, Inc. - Cambridge, MA DOE Total Funding: $1,149,037 Project Term: April 6, 2015 - April 5, 2017 Funding Opportunity: FY2015 Phase II Release 1 SBIR

  8. Lead magnesium niobate actuator for micropositioning

    DOEpatents

    Swift, C.D.; Bergum, J.W.

    1994-10-25

    An improved lead magnesium niobate actuator is disclosed comprising a cylindrical lead magnesium niobate crystal stack mounted in a cylindrical casing wherein a bias means, such as one or more belleville washers, is located between one end of the crystal stack and a partially closed end of the casing; and adjustment means are provided which bear against the opposite end of the crystal stack, whereby an adjustable compressive force is constantly applied against the crystal stack, whether the crystal stack is actuated in an extended position, or is in an unactuated contracted position. In a preferred embodiment, cooling ports are provided for the circulation of coolant in the actuator to cool the crystal stack, and provision is made for removal and replacement of the crystal stack without disconnecting the actuator from the external device being actuated. 3 figs.

  9. Lead magnesium niobate actuator for micropositioning

    SciTech Connect

    Swift, Charles D.; Bergum, John W.

    1994-01-01

    An improved lead magnesium niobate actuator is disclosed comprising a cylindrical lead magnesium niobate crystal stack mounted in a cylindrical casing wherein a bias means, such as one or more belleville washers, is located between one end of the crystal stack and a partially closed end of the casing; and adjustment means are provided which bear against the opposite end of the crystal stack, whereby an adjustable compressive force is constantly applied against the crystal stack, whether the crystal stack is actuated in an extended position, or is in an unactuated contracted position. In a preferred embodiment, cooling ports are provided for the circulation of coolant in the actuator to cool the crystal stack, and provision is made for removal and replacement of the crystal stack without disconnecting the actuator from the external device being actuated.

  10. From Lab to Market: Energy Department Researchers Lead R&D 100 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy From Lab to Market: Energy Department Researchers Lead R&D 100 From Lab to Market: Energy Department Researchers Lead R&D 100 July 18, 2013 - 2:22pm Addthis Argonne National Lab biologists Philip Laible (pictured) and Deborah Hanson, R&D 100 award recipients, developed a system that uses photosynthetic bacteria (Rhodobacter) to create much larger amounts of membrane protein than was ever before available, driving down production costs and making studies of membrane

  11. Kazmerski Leads National Center for Solar Research

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Kazmerski Leads National Center for Solar Research For more information contact: e:mail: Public Affairs Golden, Colo., Dec. 1, 1998 — The future of solar energy got brighter today when Larry Kazmerski started his new position as director of the National Center for Photovoltaics (NCPV). Thanks to his shining 21-year research career at the National Renewable Energy Laboratory (NREL), he was selected after a nationwide search. The U.S. Department of Energy created the NCPV in 1996 to provide a

  12. Methodology for Evaluating Cost-effectiveness of Commercial Energy Code Changes

    SciTech Connect

    Hart, Philip R.; Liu, Bing

    2015-01-31

    This document lays out the U.S. Department of Energy’s (DOE’s) method for evaluating the cost-effectiveness of energy code proposals and editions. The evaluation is applied to provisions or editions of the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE) Standard 90.1 and the International Energy Conservation Code (IECC). The method follows standard life-cycle cost (LCC) economic analysis procedures. Cost-effectiveness evaluation requires three steps: 1) evaluating the energy and energy cost savings of code changes, 2) evaluating the incremental and replacement costs related to the changes, and 3) determining the cost-effectiveness of energy code changes based on those costs and savings over time.

  13. 2013 Cost of Wind Energy Review

    SciTech Connect

    Mone, C.; Smith, A.; Maples, B.; Hand, M.

    2015-02-01

    This report uses representative project types to estimate the levelized cost of wind energy (LCOE) in the United States for 2013. Scheduled to be published on an annual basis, it relies on both market and modeled data to maintain a current understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed from this analysis are used to inform wind technology cost projections, goals, and improvement opportunities.

  14. The experience in handling of lead-bismuth coolant contaminated by Polonium-210

    SciTech Connect

    Pankratov, D.V.; Gromov, B.F.; Solodjankin, M.A.

    1993-12-31

    During exploitation of lead-bismuth cooled reactors a wide experience in handling of radioactive coolant containing polonium has been gained. By 1990 total time of this reactor operation has reached approximately 60 reactor years.

  15. Low-cost inertial measurement unit.

    SciTech Connect

    Deyle, Travis Jay

    2005-03-01

    Sandia National Laboratories performs many expensive tests using inertial measurement units (IMUs)--systems that use accelerometers, gyroscopes, and other sensors to measure flight dynamics in three dimensions. For the purpose of this report, the metrics used to evaluate an IMU are cost, size, performance, resolution, upgradeability and testing. The cost of a precision IMU is very high and can cost hundreds of thousands of dollars. Thus the goals and results of this project are as follows: (1) Examine the data flow in an IMU and determine a generic IMU design. (2) Discuss a high cost IMU implementation and its theoretically achievable results. (3) Discuss design modifications that would save money for suited applications. (4) Design and implement a low cost IMU and discuss its theoretically achievable results. (5) Test the low cost IMU and compare theoretical results with empirical results. (6) Construct a more streamlined printed circuit board design reducing noise, increasing capabilities, and constructing a self-contained unit. Using these results, we can compare a high cost IMU versus a low cost IMU using the metrics from above. Further, we can examine and suggest situations where a low cost IMU could be used instead of a high cost IMU for saving cost, size, or both.

  16. Research and Development of a Low Cost Solar Collector

    SciTech Connect

    Ansari, Asif; Philip, Lee; Thouppuarachchi, Chirath

    2012-08-01

    trough. And the cost reduction obtained by the Optimized Parabolic Trough compared to the industry benchmark reference was approximately 16.5% against the industry benchmark. The new BPFC design showed a weight savings of almost 36% compared to the optimized parabolic trough and a 50% reduction in field assembly labor and a 13% reduction in shipping volume. The BPFC design showed only a marginal improvement of 16% over the fully projected installed cost of the optimized parabolic trough benchmark developed as Concept One. During the course of the investigation numerous sensitivity analyses and other analytical studies were conducted to assess potential improvement opportunities, and further optimizations that could lead to cost reductions and performance improvements. Factors that could have a significant impact on high-volume costs were related to production and further improvements in design for manufacturability, automation, assembly jigs, and fixtures, and robotic welding etc. The wind modeling analysis showed that the Fresnel design concept did not reduce the wind load in a significant manner. The stress analysis showed that the design concept with almost a 36% lower weight than the parabolic trough and it was strong enough to withstand the expected wind loads and maintain targeting accuracy. The Initial on-sun optical testing showed that the Fresnel Trough was capable of concentrating sunlight effectively to the desired target and yielding an optical efficiency slightly lower than a parabolic trough.

  17. SunShot Initiative award funds scaleup of Argonne's leading-edge thermal

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    energy storage system | Argonne National Laboratory SunShot Initiative award funds scaleup of Argonne's leading-edge thermal energy storage system By Vic Comello * September 16, 2015 Tweet EmailPrint On September 16, 2015, the U.S. Department of Energy SunShot Initiative program announced funding awards to several research projects that aim to make concentrating solar power (CSP) plants cost competitive with traditional forms of electricity. Argonne National Laboratory and its industrial

  18. High efficiency, low cost scrubber upgrades

    SciTech Connect

    Klingspor, J.S.; Walters, M.

    1998-07-01

    ABB introduced the LS-2 technology; a limestone based wet FGD system, which is capable of producing high purity gypsum from low grade limestone, in late 1995. Drawing from 30,000 MWe of worldwide wet FGD experience, ABB has incorporated several innovations in the new system designed to reduce the overall cost of SO{sub 2} compliance. Collectively, these improvements are referred to as LS-2. The improvements include a compact high efficiency absorber, a simple dry grinding system, a closed coupled flue gas reheat system, and a tightly integrated dewatering system. The compact absorber includes features such a high velocity spray zone, significantly improved gas-liquid contact system, compact reaction tank, and a high velocity mist eliminator. The LS-2 system is being demonstrated at Ohio Edison's Niles Plant at the 130 MWe level, and this turnkey installation was designed and erected in a 20-month period. At Niles, all of the gypsum is sold to a local wallboard manufacturer. Many of the features included in the LS-2 design and demonstrated at Niles can be used to improve the efficiency and operation of existing systems including open spray towers and tray towers. The SO{sub 2} removal efficiency can be significantly improved by installing the high efficiency LS-2 style spray header design and the unique wall rings. The absorber bypass can be eliminated or reduced by including the LS-2 style high velocity mist eliminator. Also, the LS-2 style spray header design combined with wall rings allow for an increase in absorber gas velocity at a maintained or improved performance without the need for costly upgrades of the absorber recycle pumps. the first upgrade using LS-2 technology was done at CPA's Coal Creek Station (2{times}545 MWe). The experience form the scrubber upgrade at Coal Creek is discussed along with operating results.

  19. Facilitating Sound, Cost-Effective Federal Energy Management (Fact Sheet)

    SciTech Connect

    Not Available

    2012-03-01

    This fact sheet is an overview of the U.S. Department of Energy's Federal Energy Management Program (FEMP). The Federal Government, as the nation's largest energy consumer, has a tremendous opportunity and acknowledged responsibility to lead by example. The U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP) plays a critical role in this effort. FEMP facilitates the Federal Government's implementation of sound, cost-effective energy management and investment practices to enhance the nation's energy security and environmental stewardship. FEMP does this by focusing on the needs of its Federal customers, delivering an array of services across a variety of program areas.

  20. Reduction in Fabrication Costs of Gas Diffusion Layers

    SciTech Connect

    Jason Morgan; Donald Connors; Michael Hickner

    2012-07-10

    Ballard Material Products (BMP) performed a pre-design technical and cost analysis of state of the art production technologies feasible for high volume GDL manufacturing. Based upon criteria that also included environmental health and safety, customer quality requirements, and future needs, BMP selected technologies that can be integrated into its current manufacturing process. These selections included Many-At-A-Time (MAAT) coating and continuous mixing technologies, as well as various on-line process control tools. These processes have allowed BMP to produce high performance GDLs at lower cost for near-term markets, as well as to define the inputs needed to develop a conceptual Greenfield facility to meet the cost targets for automotive volumes of 500,000 vehicles per year.

  1. Residential Gas-fired Cost-effective Triple-state Sorption Heat Pump |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Residential Gas-fired Cost-effective Triple-state Sorption Heat Pump Residential Gas-fired Cost-effective Triple-state Sorption Heat Pump Lead Performer: Oak Ridge National Lab-Oak Ridge, TN Partner(s): ClimateWell-Stockholm, Sweden; Rheem-Atlanta, GA DOE Total Funding: $2,000,000 Cost Share: $230,000 Project Term: 2016-2019 Funding Type: Building Energy Efficiency Frontiers and Innovations Technologies (BENEFIT) - 2016 (DE-FOA-0001383) PROJECT OBJECTIVE Oak Ridge

  2. Review of current research and activities involving characterization, abatement, and disposal of lead-containing paint films

    SciTech Connect

    McKnight, M.E.

    1990-05-01

    In response to a recent regulation for abating lead-based paint in housing and other environmental regulations, research projects and other activities are being conducted to provide information on procedures for carrying out abatement and maintenance of lead-containing paint films in a safe and cost-effective manner. Relevant Federal regulations, and current research projects and other activities addressing the issues are reviewed.

  3. Breakeven Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities (Report Summary) (Presentation)

    SciTech Connect

    Denholm, P.; Margolis, R. M.; Ong, S.; Roberts, B.

    2009-12-01

    "Break-even cost" for photovoltaic (PV) technology is defined as the point where the cost of PV-generated electricity equals the cost of electricity purchased from the grid. Break-even cost is expressed in $/W of an installed system. Achieving break-even cost is a function of many variables. Consequently, break-even costs vary by location and time for a country, such as the United States, with a diverse set of resources, electricity prices, and other variables. In this presentation, we introduce an analysis of PV break-even costs for residential customers in the United States, including an evaluation of some of the key drivers of PV breakeven both regionally and over time. This presentation includes our methodology and presents results for both near-term residential breakeven costs(2009) and future market sensitivities of break-even costs (2015). See also the the report "Break-Even Cost for Residential Photovoltaics in the United States: Key Drivers and Sensitivities". Presentation for NREL/TP-6A2-45991.

  4. Department of Energy Environmental Management cost infrastructure development program: Cost analysis requirements

    SciTech Connect

    Custer, W.R. Jr.; Messick, C.D.

    1996-03-31

    This report was prepared to support development of the Department of Energy Environmental Management cost infrastructure -- a new capability to independently estimate and analyze costs. Currently, the cost data are reported according to a structure that blends level of effort tasks with product and process oriented tasks. Also. the budgetary inputs are developed from prior year funding authorizations and from contractor-developed parametric estimates that have been adjusted to planned funding levels or appropriations. Consequently, it is difficult for headquarters and field-level activities to use actual cost data and technical requirements to independently assess the costs generated and identify trends, potential cost savings from process improvements, and cost reduction strategies.

  5. Novel lead-iron phosphate glass

    DOEpatents

    Boatner, L.A.; Sales, B.C.

    1989-07-11

    The invention described and claimed in the specification relates to the discovery that effective addition of Fe[sub 2]O[sub 3] to a lead phosphate glass results in a glass having enhanced chemical durability and physical stability, and consists essentially of the glass resulting from melting a mixture consisting essentially of, in weight percent, 40--66 percent PbO, 30--55 percent P[sub 2]O[sub 5] and an effective concentration up to 12 percent Fe[sub 2]O[sub 3].

  6. Lead Slowing Down Spectrometer Status Report

    SciTech Connect

    Warren, Glen A.; Anderson, Kevin K.; Bonebrake, Eric; Casella, Andrew M.; Danon, Yaron; Devlin, M.; Gavron, Victor A.; Haight, R. C.; Imel, G. R.; Kulisek, Jonathan A.; O'Donnell, J. M.; Weltz, Adam

    2012-06-07

    This report documents the progress that has been completed in the first half of FY2012 in the MPACT-funded Lead Slowing Down Spectrometer project. Significant progress has been made on the algorithm development. We have an improve understanding of the experimental responses in LSDS for fuel-related material. The calibration of the ultra-depleted uranium foils was completed, but the results are inconsistent from measurement to measurement. Future work includes developing a conceptual model of an LSDS system to assay plutonium in used fuel, improving agreement between simulations and measurement, design of a thorium fission chamber, and evaluation of additional detector techniques.

  7. Non-lead hollow point bullet

    DOEpatents

    Vaughn, Norman L.; Lowden, Richard A.

    2003-04-15

    The non-lead hollow point bullet of the instant invention comprises a mixed construction slug further comprising, a monolithic metal insert having a tapered (preferred conical) hollow point tip and a tapered (preferred conical) tail protrusion, and an unsintered powdered metal composite core in tandem alignment with the insert. The core has a hollow tapered (preferred conical) cavity tip portion coupled with the tapered (preferred conical) tail protrusion on the insert. An open tip jacket envelops at least a portion of the insert and the core. The jacket is swaged at the open tip.

  8. Novel lead-iron phosphate glass

    DOEpatents

    Boatner, Lynn A.; Sales, Brian C.

    1989-01-01

    The invention described and claimed in the specification relates to the discovery that effective addition of Fe.sub.2 O.sub.3 to a lead phosphate glass results in a glass having enhanced chemical durability and physical stability, and consists essentially of the glass resulting from melting a mixture consisting essentially of, in weight percent, 40-66 percent PbO, 30-55 percent P.sub.2 O.sub.5 and an effective concentration up to 12 percent Fe.sub.2 O.sub.3.

  9. (Lead-lithium corrosion and chemistry)

    SciTech Connect

    Tortorelli, P.F.

    1990-09-21

    The traveler participated in the 1990 European Workshop on Lead-Lithium Corrosion and Chemistry. Main areas of emphasis in the European liquid metal (exclusively Pb-17 at. % Li) program are now on deposition effects and corrosion-resistant surface product layers that can also serve as barriers to tritium permeation and insulators. Dr. Tortorelli also visited Harwell Laboratory to discuss innovative methods of corrosion analysis. He attended the 16th Symposium on Fusion Technology in London and the initial meeting of the Program Committee for the Second International Symposium on Fusion Nuclear Technology, which will be held in June 1991. He toured the JET facilities as part of the SOFT program.

  10. Unbundling power products, modifying rate design, and fixed cost coverage

    SciTech Connect

    Procter, R.J.

    1996-03-01

    In this paper, the author provides an overview of efforts currently underway at the Bonneville Power Administration (BPA) to respond to these various challenges to how BPA has traditionally managed the marketing of power at the wholesale level in the Pacific Northwest and to areas outside this region along the West Cast in general. The paper begins with an overview of the role of the BPA in the region, and trends in costs and revenues. The paper provides a general outline of BPA`s efforts to separate its business into three separate product lines (power, energy services, and transmission) as well as providing an overview of how BPA is unbundling power products. In addition, the paper provides an overview of some of the major changes BPA has proposed in its rate design. This is followed by an overview of the approach to the issue of stranded cost. You will see that it is their desire to as much as possible avoid a legislative solution to this issue and rely on marketing and working with customers as a way of dealing with this very contentious issue. The paper wraps up with an assessment of the potential for power product unbundling to significantly reduce potential stranded costs. You will see that at the present time, unbundling power products offers BPA little in the way of substantial reductions in potential stranded costs. Whereas, margins on the delivery of energy and capacity offer the greatest potential for covering fixed costs.

  11. GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    GAO Cost Estimating and Assessment Guide Twelve Steps of a High-Quality Cost Estimating Process Step Description Associated task 1 Define estimate's purpose Determine estimate's purpose, required level of detail, and overall scope; Determine who will receive the estimate 2 Develop estimating plan Determine the cost estimating team and develop its master schedule; Determine who will do the independent cost estimate; Outline the cost estimating approach; Develop the estimate timeline 3 Define

  12. Validation of a 20-year forecast of US childhood lead poisoning: Updated prospects for 2010

    SciTech Connect

    Jacobs, David E. . E-mail: dejacobs@starpower.net; Nevin, Rick

    2006-11-15

    We forecast childhood lead poisoning and residential lead paint hazard prevalence for 1990-2010, based on a previously unvalidated model that combines national blood lead data with three different housing data sets. The housing data sets, which describe trends in housing demolition, rehabilitation, window replacement, and lead paint, are the American Housing Survey, the Residential Energy Consumption Survey, and the National Lead Paint Survey. Blood lead data are principally from the National Health and Nutrition Examination Survey. New data now make it possible to validate the midpoint of the forecast time period. For the year 2000, the model predicted 23.3 million pre-1960 housing units with lead paint hazards, compared to an empirical HUD estimate of 20.6 million units. Further, the model predicted 498,000 children with elevated blood lead levels (EBL) in 2000, compared to a CDC empirical estimate of 434,000. The model predictions were well within 95% confidence intervals of empirical estimates for both residential lead paint hazard and blood lead outcome measures. The model shows that window replacement explains a large part of the dramatic reduction in lead poisoning that occurred from 1990 to 2000. Here, the construction of the model is described and updated through 2010 using new data. Further declines in childhood lead poisoning are achievable, but the goal of eliminating children's blood lead levels {>=}10 {mu}g/dL by 2010 is unlikely to be achieved without additional action. A window replacement policy will yield multiple benefits of lead poisoning prevention, increased home energy efficiency, decreased power plant emissions, improved housing affordability, and other previously unrecognized benefits. Finally, combining housing and health data could be applied to forecasting other housing-related diseases and injuries.

  13. Benefit cost estimation and cooperation in greenhouse gas abatement

    SciTech Connect

    Hamaide, B.

    1997-12-31

    The world is divided in five players: the USA, the other OECD countries, the former Soviet Union, China and the Rest of the World. The damage equation is formulated around the benchmark damage (at twice the CO{sub 2} level) and the change of temperature in time due to past concentration and current emissions. For having damage cost data (or benefit data) with respect to emissions reduction, damages must be computed at each level of restriction, summed from 2000 to 2100 and discounted back at a predetermined two percent rate of time preference. Abatement costs have been estimated by various authors, some of which believe in no-regrets and some of which only believe in low-regrets policy, some of which are aggregate and some of which are disaggregate. Both theories are taken into account to find abatement cost data between the lower bound of some studies and the upper bound of others. Finally, all exercise is undertaken for getting a curve through the disaggregated benefit and cost data and the best regional fit, represented by a mathematical expression is chosen.

  14. Webinar February 25: Update to the 700 bar Compressed Hydrogen Storage System Cost Projection

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department will present a live webinar titled "Update to the 700 bar Compressed Hydrogen Storage System Cost Projection" on Thursday, February 25, from 12 to 1 p.m. Eastern Standard Time (EST). Strategic Analysis will present results of its cost analysis of onboard compressed hydrogen storage systems.

  15. Status of experiments leading to a small recirculator

    SciTech Connect

    Sangster, C.T.; Barnard, J.J.; Cianciolo, T.V.

    1998-01-16

    A heavy ion linear induction accelerator is considered to be the leading driver candidate for an Inertial Fusion Energy reactor. To deliver a space-charge-dominated beam at the appropriate energy (several GeV), such an accelerator would be several kilometers in length. Since total length has a strong influence on accelerator cost, we are considering the potential advantages and practical implementation of a recirculating induction accelerator. To address the critical scientific and technical challenges of a recirculating space-charge-dominated heavy ion beam, we have begun to develop the elements of a scaled ``small recirculator``. An operating recirculator must demonstrate full beam control including multi-lap operation, beam insertion/extraction, acceleration and pulse compression. At present, experiments have been conducted using a 2mA, 80keV K{sup +} beam transported through a 45{degree} bend; experiments on a 90{degree} bend with five induction modulators will begin soon. This paper briefly summarizes the recirculator specifications and operational features and reports the latest experimental data as well as the developmental status of beam diagnostics.

  16. Hydrogen diffusion in Lead Zirconate Titanate and Barium Titanate

    SciTech Connect

    Alvine, Kyle J.; Vijayakumar, M.; Bowden, Mark E.; Schemer-Kohrn, Alan L.; Pitman, Stan G.

    2012-08-28

    Hydrogen is a potential clean-burning, next-generation fuel for vehicle and stationary power. Unfortunately, hydrogen is also well known to have serious materials compatibility issues in metals, polymers, and ceramics. Piezoelectric actuator materials proposed for low-cost, high efficiency high-pressure hydrogen internal combustion engines (HICE) are known to degrade rapidly in hydrogen. This limits their potential use and poses challenges for HICE. Hydrogen-induced degradation of piezoelectrics is also an issue for low-pressure hydrogen passivation in ferroelectric random access memory. Currently, there is a lack of data in the literature on hydrogen species diffusion in piezoelectrics in the temperature range appropriate for the HICE as charged via a gaseous route. We present 1HNMR quantification of the local hydrogen species diffusion within lead zirconate titanate and barium titanate on samples charged by exposure to high-pressure gaseous hydrogen ?32?MPa. Results are discussed in context of theoretically predicted interstitial hydrogen lattice sites and aqueous charging experiments from existing literature.

  17. Real-time POD-CFD Wind-Load Calculator for PV Systems

    SciTech Connect

    Huayamave, Victor; Divo, Eduardo; Ceballos, Andres; Barriento, Carolina; Stephen, Barkaszi; Hubert, Seigneur

    2014-03-21

    The primary objective of this project is to create an accurate web-based real-time wind-load calculator. This is of paramount importance for (1) the rapid and accurate assessments of the uplift and downforce loads on a PV mounting system, (2) identifying viable solutions from available mounting systems, and therefore helping reduce the cost of mounting hardware and installation. Wind loading calculations for structures are currently performed according to the American Society of Civil Engineers/ Structural Engineering Institute Standard ASCE/SEI 7; the values in this standard were calculated from simplified models that do not necessarily take into account relevant characteristics such as those from full 3D effects, end effects, turbulence generation and dissipation, as well as minor effects derived from shear forces on installation brackets and other accessories. This standard does not include provisions that address the special requirements of rooftop PV systems, and attempts to apply this standard may lead to significant design errors as wind loads are incorrectly estimated. Therefore, an accurate calculator would be of paramount importance for the preliminary assessments of the uplift and downforce loads on a PV mounting system, identifying viable solutions from available mounting systems, and therefore helping reduce the cost of the mounting system and installation. The challenge is that although a full-fledged three-dimensional computational fluid dynamics (CFD) analysis would properly and accurately capture the complete physical effects of air flow over PV systems, it would be impractical for this tool, which is intended to be a real-time web-based calculator. CFD routinely requires enormous computation times to arrive at solutions that can be deemed accurate and grid-independent even in powerful and massively parallel computer platforms. This work is expected not only to accelerate solar deployment nationwide, but also help reach the SunShot Initiative goals

  18. Generation cost unbundling: Untangling the gordian knot

    SciTech Connect

    Conkling, R.L.

    1997-03-01

    One useful byproduct of California`s efforts to restructure its electricity industry comes in the form of Southern California Edison`s proposal to facilitate unbundling by adopting a superior cost allocation method. Utilities and regulators elsewhere should take notice. Clearing the deck for generating competition is the urgent order of the day in electric restructuring. The critical question is: What are the generation costs to be unbundled? Schemes for restructuring, both in California and elsewhere, have called for the stranded component of utility generating costs to be recovered through customer payments of a non-bypassable competition transition charge (CTC). The stranded cost component of generation is the difference between total costs and the revenues received from future market-based prices. This makes a total cost determination for the calculation of the CTC essential, not optional.

  19. Artifacts in digital coincidence timing

    DOE PAGES [OSTI]

    Moses, W. W.; Peng, Q.

    2014-10-16

    Digital methods are becoming increasingly popular for measuring time differences, and are the de facto standard in PET cameras. These methods usually include a master system clock and a (digital) arrival time estimate for each detector that is obtained by comparing the detector output signal to some reference portion of this clock (such as the rising edge). Time differences between detector signals are then obtained by subtracting the digitized estimates from a detector pair. A number of different methods can be used to generate the digitized arrival time of the detector output, such as sending a discriminator output into amore » time to digital converter (TDC) or digitizing the waveform and applying a more sophisticated algorithm to extract a timing estimator.All measurement methods are subject to error, and one generally wants to minimize these errors and so optimize the timing resolution. A common method for optimizing timing methods is to measure the coincidence timing resolution between two timing signals whose time difference should be constant (such as detecting gammas from positron annihilation) and selecting the method that minimizes the width of the distribution (i.e. the timing resolution). Unfortunately, a common form of error (a nonlinear transfer function) leads to artifacts that artificially narrow this resolution, which can lead to erroneous selection of the 'optimal' method. In conclusion, the purpose of this note is to demonstrate the origin of this artifact and suggest that caution should be used when optimizing time digitization systems solely on timing resolution minimization.« less

  20. Low Cost Durable Seal | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Low Cost Durable Seal Low Cost Durable Seal Part of a $100 million fuel cell award announced by DOE Secretary Bodman on Oct. 25, 2006. 4_utc.pdf (21.66 KB) More Documents & Publications Low Cost, Durable Seal 2012 Pathways to Commercial Success: Technologies and Products Supported by the Fuel Cell Technologies Program 2011 Pathways to Commercial Success: Technologies and Products Supported by the Fuel Cell Technologies Program

  1. Lower Cost, Higher Performance Carbon Fiber

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lower Cost, Higher Performance Carbon Fiber 14 February 2011 2 Managed by UT-Battelle for the U.S. Department of Energy Presentation_name Questions for Today Materials How can the cost of carbon fiber suitable for higher performance applications (H 2 Storage) be developed? H 2 Storage requirements implies Aerospace grade fibers. Can we build off of work previously done for more modest structural applications? To accurately answer: We need to know the minimum performance and maximum cost

  2. Costing and pricing electricity in developing countries

    SciTech Connect

    Munasinghe, M.; Rungta, S.

    1984-01-01

    This book compiles the papers presented at a conference on costing and pricing electricity in developing countries. The topics discussed include: Power tariffs, an overview; electricity tariff policy; estimating and using marginal cost pricing concepts; power tariff policy of Philippines, India, Papua New Guinea, Burma, Bangladesh, Indonesia, Korea, Pakistan; Inter-American Development Bank-Electricity tariffs, policies and practices; and costs of supplying electricity and tariff policy in some other countries.

  3. WIPP - Cost of a FOIA request

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Cost of a Freedom of Information Act (FOIA) request The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of four fee categories described below: Commercial use requestor: Responsible for all direct costs; i.e. search for responsive documents, review of documents located for responsiveness; 16%

  4. Updated Cost Analysis of Photobiological Hydrogen Production...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Updated Cost Analysis of Photobiological Hydrogen Production from Chlamydomonas reinhardtii Green Algae: Milestone Completion Report This report updates the 1999 economic analysis ...

  5. Modified Accelerated Cost-Recovery System (MACRS)

    Energy.gov [DOE]

    Under the federal Modified Accelerated Cost-Recovery System (MACRS), businesses may recover investments in certain property through depreciation deductions. The MACRS establishes a set of class...

  6. Biomass Derivatives Competitive with Heating Oil Costs.

    Energy Saver

    Biomass Derivatives Competitive with Heating Oil Costs Transportation fuel Heat or electricity * Data are from literature, except heating oil is adjusted from 2011 winter average * ...

  7. Process Equipment Cost Estimation, Final Report

    SciTech Connect

    H.P. Loh; Jennifer Lyons; Charles W. White, III

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  8. 2013 Cost of Wind Energy Review

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... (Tavner 2010) (BVG Associates 2010) Reliability Database (Hill et al. 2009) Cost ... and dynamic cable systems 6 Portable diesel generators Provide power to turbines if the grid ...

  9. Benchmarking for Cost Improvement. Final report

    SciTech Connect

    Not Available

    1993-09-01

    The US Department of Energy`s (DOE) Office of Environmental Restoration and Waste Management (EM) conducted the Benchmarking for Cost Improvement initiative with three objectives: Pilot test benchmarking as an EM cost improvement tool; identify areas for cost improvement and recommend actions to address these areas; provide a framework for future cost improvement. The benchmarking initiative featured the use of four principal methods (program classification, nationwide cost improvement survey, paired cost comparison and component benchmarking). Interested parties contributed during both the design and execution phases. The benchmarking initiative was conducted on an accelerated basis. Of necessity, it considered only a limited set of data that may not be fully representative of the diverse and complex conditions found at the many DOE installations. The initiative generated preliminary data about cost differences and it found a high degree of convergence on several issues. Based on this convergence, the report recommends cost improvement strategies and actions. This report describes the steps taken as part of the benchmarking initiative and discusses the findings and recommended actions for achieving cost improvement. The results and summary recommendations, reported below, are organized by the study objectives.

  10. Cost Contributors to Geothermal Power Production (Conference...

    Office of Scientific and Technical Information (OSTI)

    has developed the tool Geothermal Electricity Technologies Evaluation Model (GETEM) to assess the levelized cost of electricity (LCOE) of power produced from geothermal resources. ...

  11. Cost Recovery | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Cost Recovery Home Kyoung's picture Submitted by Kyoung(150) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations...

  12. Cost Mechanisms | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Cost Mechanisms Home Kyoung's picture Submitted by Kyoung(150) Contributor 9 July, 2013 - 20:57 GRR 3rd Quarter - Stakeholder Update Meeting Alaska analysis appropriations...

  13. Cost Effectiveness of Electricity Energy Efficiency Programs...

    OpenEI (Open Energy Information) [EERE & EIA]

    Effectiveness of Electricity Energy Efficiency Programs Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Cost Effectiveness of Electricity Energy Efficiency Programs...

  14. Interruption Cost Estimate Calculator | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Cost Estimate (ICE) Calculator This calculator is a tool designed for electric reliability planners at utilities, government organizations or other entities that are...

  15. 2014 Cost of Wind Energy Review

    SciTech Connect

    Mone, Christopher; Stehly, Tyler; Maples, Ben; Settle, Edward

    2015-10-01

    This report uses representative commercial projects to estimate the levelized cost of energy (LCOE) for both land-based and offshore wind plants in the United States for 2014. Scheduled to be published on an annual basis, the analysis relies on both market and modeled data to maintain an up-to-date understanding of wind generation cost trends and drivers. It is intended to provide insight into current component-level costs and a basis for understanding variability in the LCOE across the industry. Data and tools developed by the National Renewable Energy Laboratory (NREL) are used in this analysis to inform wind technology cost projections, goals, and improvement opportunities.

  16. Wind Turbine Design Cost and Scaling Model

    SciTech Connect

    Fingersh, L.; Hand, M.; Laxson, A.

    2006-12-01

    This model intends to provide projections of the impact on cost from changes in economic indicators such as the Gross Domestic Product and Producer Price Index.

  17. Hydrogen Compression, Storage, and Dispensing Cost Reduction...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hydrogen Compression, Storage, and Dispensing Cost Reduction Workshop Addendum Document states additional feedback on the worksop received via a request for information issued in ...

  18. Controller (Cost Compliance and Financial Reporting) | Princeton...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    GAAP, Cost Accounting Standards and internal controls required. Excellent analytical and problem solving skills Knowledge of DOE reporting requirements and prior Laboratory or...

  19. Table 1. Real Average Transportation and Delivered Costs of Coal...

    Energy Information Administration (EIA) (indexed site)

    Real Average Transportation and Delivered Costs of Coal, By Year and Primary Transport Mode" "Year","Average Transportation Cost of Coal (Dollars per Ton)","Average Delivered Cost...

  20. Lead Slowing Down Spectrometer Research Plans

    SciTech Connect

    Warren, Glen A.; Kulisek, Jonathan A.; Gavron, Victor; Danon, Yaron; Weltz, Adam; Harris, Jason; Stewart, T.

    2013-03-22

    The MPACT-funded Lead Slowing Down Spectrometry (LSDS) project has been evaluating the feasibility of using LSDS techniques to assay fissile isotopes in used nuclear fuel assemblies. The approach has the potential to provide considerable improvement in the assay of fissile isotopic masses in fuel assemblies compared to other non-destructive techniques in a direct and independent manner. The LSDS collaborations suggests that the next step to in empirically testing the feasibility is to conduct measurements on fresh fuel assemblies to understand investigate self-attenuation and fresh mixed-oxide (MOX) fuel rodlets so we may betterto understand extraction of masses for 235U and 239Pu. While progressing toward these goals, the collaboration also strongly suggests the continued development of enabling technology such as detector development and algorithm development, thatwhich could provide significant performance benefits.

  1. LOFT lead rod test results evaluation. [PWR

    SciTech Connect

    Driskell, W.B.; Tolman, E.L.

    1980-07-30

    The purpose for evaluating the LOFT Lead Rod Test (simulations of large break, loss-of-coolant accidents) data was to determine; (a) if the centerline thermocouple and fuel rod elongation sensor data show indications of the collapsed fuel rod cladding, (b) the capability of the FRAP-T5 computer code to accurately predict cladding collapse, and (c) if cladding surface thermocouples enhance fuel rod cooling. With consideration to unresolved questions on data integrity, it was concluded that: the fuel rod centerline thermocouple and elongation sensor data do show indications of the fuel rod cladding collapse; the FRAP-T5 code conservatively predicts cladding collapse; and there is an indication that cladding surface thermocouples are enhancing fuel rod cooling.

  2. Closure device for lead-acid batteries

    DOEpatents

    Ledjeff, Konstantin

    1983-01-01

    A closure device for lead-acid batteries includes a filter of granulated activated carbon treated to be hydrophobic combined with means for preventing explosion of emitted hydrogen and oxygen gas. The explosion prevention means includes a vertical open-end tube within the closure housing for maintaining a liquid level above side wall openings in an adjacent closed end tube. Gases vent from the battery through a nozzle directed inside the closed end tube against an impingement surface to remove acid droplets. The gases then flow through the side wall openings and the liquid level to quench any possible ignition prior to entering the activated carbon filter. A wick in the activated carbon filter conducts condensed liquid back to the closure housing to replenish the liquid level limited by the open-end tube.

  3. Jay Srinivasan! Group Lead, Computational Systems!

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Group Lead, Computational Systems! NUG - Feb 2015 Computational Systems Update NERSC - 2014 --- 2 --- Sponsored C ompute S ystems Carver, P DSF, J GI, K BASE, H EP 8 x F DR I B /global/ scratch 4 PB /project 5 PB /home 250 TB 45 P B s tored, 2 40 P B capacity, 4 0 y ears o f community d ata HPSS 48 GB/s 2.2 P B L ocal Scratch 70 GB/s 6.4 P B L ocal Scratch 140 GB/s 80 GB/s 2 x 10 Gb 1 x 100 Gb Science D ata N etwork Vis & A naly?cs, D ata T ransfer N odes, Adv. A rch., S cience G ateways 80

  4. Bescorp soil washing system for lead battery site treatment. Applications analysis report. Project report

    SciTech Connect

    Gaire, R.J.

    1995-01-01

    The Brice Environmental Services Corporation (BESCORP) Soil Washing System (BSWS) and its applicability in remediating lead-contaminated soil at lead battery sites was evaluated. The report presents performance and economic data, developed from the U.S. Environmental Protection Agency Superfund Innovative Technology Evaluation (SITE) demonstration (three test runs) and additional data provided by the developer. The demonstration took place at the Alaskan Battery Enterprises (ABE) site in Fairbanks, Alaska. Economic data for a commercial 20-tph unit processing wastes similar to those treated in the SITE Demonstration, including disposal of waste effluents, project operating costs to be about $165/ton of soil (dry basis) containing 6.6 wt percent moisture. This figure does not reflect any revenue from recycling of metallic lead or cashing chips.

  5. Low-Cost Precursors to Novel Hydrogen Storage Materials

    SciTech Connect

    Suzanne W. Linehan; Arthur A. Chin; Nathan T. Allen; Robert Butterick; Nathan T. Kendall; I. Leo Klawiter; Francis J. Lipiecki; Dean M. Millar; David C. Molzahn; Samuel J. November; Puja Jain; Sara Nadeau; Scott Mancroni

    2010-12-31

    From 2005 to 2010, The Dow Chemical Company (formerly Rohm and Haas Company) was a member of the Department of Energy Center of Excellence on Chemical Hydrogen Storage, which conducted research to identify and develop chemical hydrogen storage materials having the potential to achieve DOE performance targets established for on-board vehicular application. In collaboration with Center co-leads Los Alamos National Laboratory (LANL) and Pacific Northwest National Laboratory (PNNL), and other Center partners, Dow's efforts were directed towards defining and evaluating novel chemistries for producing chemical hydrides and processes for spent fuel regeneration. In Phase 1 of this project, emphasis was placed on sodium borohydride (NaBH{sub 4}), long considered a strong candidate for hydrogen storage because of its high hydrogen storage capacity, well characterized hydrogen release chemistry, safety, and functionality. Various chemical pathways for regenerating NaBH{sub 4} from spent sodium borate solution were investigated, with the objective of meeting the 2010/2015 DOE targets of $2-3/gal gasoline equivalent at the pump ($2-3/kg H{sub 2}) for on-board hydrogen storage systems and an overall 60% energy efficiency. With the September 2007 No-Go decision for NaBH{sub 4} as an on-board hydrogen storage medium, focus was shifted to ammonia borane (AB) for on-board hydrogen storage and delivery. However, NaBH{sub 4} is a key building block to most boron-based fuels, and the ability to produce NaBH{sub 4} in an energy-efficient, cost-effective, and environmentally sound manner is critical to the viability of AB, as well as many leading materials under consideration by the Metal Hydride Center of Excellence. Therefore, in Phase 2, research continued towards identifying and developing a single low-cost NaBH4 synthetic route for cost-efficient AB first fill, and conducting baseline cost estimates for first fill and regenerated AB using a variety of synthetic routes. This project

  6. Sandia National Laboratories: Due Diligence on Lead Acid Battery Recycling

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Due Diligence on Lead Acid Battery Recycling March 23, 2011 Lead Acid Batteries on secondary containment pallet Lead Acid Batteries on secondary containment pallet In 2004, the US Geological Survey estimated that 95% of lead in the United States is recycled, primarily from used lead acid batteries. A broader 2009 European study estimated that globally about 52% of lead is recycled, and a 2008 Asian study estimated a global recycle rate of 68%. Unfortunately, many incidents over the past decade

  7. Energy Efficiency Lead-by-Example Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lead-by-Example Resources Energy Efficiency Lead-by-Example Resources State and local governments can lead by example by promoting energy efficiency programs and policies for public facilities, equipment, and government operations. Find energy efficiency lead-by-example resources below. DOE Resource Federal Energy Management Program Publications. Other Resources Environmental Protection Agency: Lead by Example in Government Operations ACEEE's Lead By Example Initiatives National Governors

  8. Development of a Low-Cost Rotary Steerable Drilling System

    SciTech Connect

    Roney Nazarian

    2012-01-31

    The project had the goal to develop and commercialize a low-cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures to reduce operating costs by a minimum of 50% and lost-in-hole charges by at least 50% over the currently offered systems. The LCRSS system developed under this project does reduce operating costs by 55% and lost-in-hole charges by at least 50%. The developed product is not commercializable in its current form. The overall objective was to develop and commercialize a low cost rotary steerable system (LCRSS) capable of operating downhole at conventional pressures and temperatures (20,000 psi/150 C) while reducing the operating costs by 50% and the lost-in-hole charges by 50% over the currently available systems. The proposed reduction in costs were to be realized through the significant reduction in tool complexity, a corresponding increase in tool reliability as expressed in the mean-time between failure (MTBF), and a reduction in the time and costs required to service tools after each field operation. Ultimately, the LCRSS system was to be capable of drilling 7 7/8 in. to 9 5/8 in. borehole diameters. The project was divided into three Phases, of which Phases I & II were previously completed and reported on, and are part of the case file. Therefore, the previously reported information is not repeated herein. Phase III included the fabrication of two field ready prototypes that were to be subjected to a series of drilling tests at GTI Catoosa, DOE RMOTC, and at customer partnering wells, if possible, as appropriate in the timing of the field test objectives to fully exercise all elements of the LCRSS. These tests were conducted in an iterative process based on a performance/reliability improvement cycle with the goal of demonstrating the system met all aspects required for commercial viability. These tests were conducted to achieve continuous runs of 100+ hours with well trajectories that fully

  9. Fuel Cell Expert Dr. Sanjiv Malhotra to Lead Energy Department...

    Energy Saver

    Expert Dr. Sanjiv Malhotra to Lead Energy Department's Clean Energy Investment Center Fuel Cell Expert Dr. Sanjiv Malhotra to Lead Energy Department's Clean Energy Investment ...

  10. Lab Breakthrough Leads to Petroleum-Free Glycol Production |...

    Office of Environmental Management (EM)

    Lab Breakthrough Leads to Petroleum-Free Glycol Production Lab Breakthrough Leads to Petroleum-Free Glycol Production Addthis Description This video is about scientists at Pacific ...

  11. Questions about how plants die leads to climate change answers

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Questions about how plants die leads to climate change answers Questions about how plants die leads to climate change answers Understanding mechanisms of mortality will provide ...

  12. Algal Biology Toolbox Workshop Brings Lead Experts to Inform...

    Office of Environmental Management (EM)

    Algal Biology Toolbox Workshop Brings Lead Experts to Inform Algae-Based Biofuel Strategy Algal Biology Toolbox Workshop Brings Lead Experts to Inform Algae-Based Biofuel Strategy ...

  13. Bush Administration Plays Leading Role in Studying and Addressing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bush Administration Plays Leading Role in Studying and Addressing Global Climate Change Bush Administration Plays Leading Role in Studying and Addressing Global Climate Change...

  14. SEEWEC Consortium lead partner Ghent University | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    SEEWEC Consortium lead partner Ghent University Jump to: navigation, search Name: SEEWEC Consortium lead partner Ghent University Address: Sint Pietersnieuwstraat 41 Place: Gent...

  15. Low Emission Asian Development (LEAD) Program | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    Low Emission Asian Development (LEAD) Program Redirect page Jump to: navigation, search REDIRECT Low Emissions Asian Development (LEAD) Program Retrieved from "http:...

  16. Volunteers Leading Technology, A Case Study: Chewonki Renewable...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Volunteers Leading Technology, A Case Study: Chewonki Renewable Hydrogen Project Volunteers Leading Technology, A Case Study: Chewonki Renewable Hydrogen Project This presentation ...

  17. Advanced Lead Acid Battery Consortium | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Lead Acid Battery Consortium Jump to: navigation, search Name: Advanced Lead-Acid Battery Consortium Place: Durham, North Carolina Zip: 27713 Sector: Vehicles Product: The ALABC is...

  18. Lead Hexacyanoferrate(II) Tetrahydrate: Crystal Structure, FTIR...

    Office of Scientific and Technical Information (OSTI)

    Lead Hexacyanoferrate(II) Tetrahydrate: Crystal Structure, FTIR Spectroscopy and Thermal Decomposition Studies Citation Details In-Document Search Title: Lead Hexacyanoferrate(II) ...

  19. Fractionated Radiation Exposure of Rat Spinal Cords Leads to...

    Office of Scientific and Technical Information (OSTI)

    Fractionated Radiation Exposure of Rat Spinal Cords Leads to Latent Neuro-Inflammation in ... of Rat Spinal Cords Leads to Latent Neuro-Inflammation in Brain, Cognitive Deficits, ...

  20. Solar Decathlon 2015: Nation's Leading Sustainable Home Design...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solar Decathlon 2015: Nation's Leading Sustainable Home Design Competition on the Horizon Solar Decathlon 2015: Nation's Leading Sustainable Home Design Competition on the Horizon...

  1. Crushing leads to waste disposal savings for FUSRAP

    SciTech Connect

    Darby, J.

    1997-02-01

    In this article the author discusses the application of a rock crusher as a means of implementing cost savings in the remediation of FUSRAP sites. Transportation and offsite disposal costs are at present the biggest cost items in the remediation of FUSRAP sites. If these debris disposal problems can be handled in different manners, then remediation savings are available. Crushing can result in the ability to handle some wastes as soil disposal problems, which have different disposal regulations, thereby permitting cost savings.

  2. Geothermal drilling problems and their impact on cost

    SciTech Connect

    Carson, C.C.

    1982-01-01

    Historical data are presented that demonstrate the significance of unexpected problems. In extreme cases, trouble costs are the largest component of well costs or severe troubles can lead to abandonment of a hole. Drilling experiences from US geothermal areas are used to analyze the frequency and severity of various problems. In addition, average trouble costs are estimated based on this analysis and the relationship between trouble and depth is discussed. The most frequent drilling and completion problem in geothermal wells is lost circulation. This is especially true for resources in underpressured, fractured formations. Serious loss of circulation can occur during drilling - because of this, the producing portions of many wells are drilled with air or aerated drilling fluid and the resulting corrosion/erosion problems are tolerated - but it can also affect the cementing of well casing. Problems in bonding the casing to the formation result from many other causes as well, and are common in geothermal wells. Good bonds are essential because of the possibility of casing collapse due to thermal cycling during the life of the well. Several other problems are identified and their impacts are quantified and discussed.

  3. Systematic Approach to Better Understanding Integration Costs

    SciTech Connect

    Stark, Gregory B.

    2015-09-01

    This research presents a systematic approach to evaluating the costs of integrating new generation and operational procedures into an existing power system, and the methodology is independent of the type of change or nature of the generation. The work was commissioned by the U.S. Department of Energy and performed by the National Renewable Energy Laboratory to investigate three integration cost-related questions: (1) How does the addition of new generation affect a system's operational costs, (2) How do generation mix and operating parameters and procedures affect costs, and (3) How does the amount of variable generation (non-dispatchable wind and solar) impact the accuracy of natural gas orders? A detailed operational analysis was performed for seven sets of experiments: variable generation, large conventional generation, generation mix, gas prices, fast-start generation, self-scheduling, and gas supply constraints. For each experiment, four components of integration costs were examined: cycling costs, non-cycling VO&M costs, fuel costs, and reserves provisioning costs. The investigation was conducted with PLEXOS production cost modeling software utilizing an updated version of the Institute of Electrical and Electronics Engineers 118-bus test system overlaid with projected operating loads from the Western Electricity Coordinating Council for the Sacramento Municipal Utility District, Puget Sound Energy, and Public Service Colorado in the year 2020. The test system was selected in consultation with an industry-based technical review committee to be a reasonable approximation of an interconnection yet small enough to allow the research team to investigate a large number of scenarios and sensitivity combinations. The research should prove useful to market designers, regulators, utilities, and others who want to better understand how system changes can affect production costs.

  4. Cost Estimating Handbook for Environmental Restoration

    SciTech Connect

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  5. Webinar: Update to the 700 bar Compressed Hydrogen Storage System Cost Projection

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department will present a live webinar titled "Update to the 700 bar Compressed Hydrogen Storage System Cost Projection" on Thursday, February 25, from 12 to 1 p.m. Eastern Standard Time.

  6. Fact #791: August 5, 2013 Comparative Costs to Drive an Electric...

    Energy.gov [DOE] (indexed site)

    On average, it costs about three times less to drive an electric vehicle than a conventional gasoline-powered vehicle. The Department of Energy has created a new term, called the ...

  7. Sept 16 (all times EDT

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sept 16 (all times EDT): 10 am: Welcome, Kick off, and overview of NEET: Sue Lesica 10:30 - 1: Select NEET FOA award presentations and discussion (Sue Lesica, Stu Maloy, and Jeremy Busby to lead) - 10:30-11:00: Michael Nastasi - 11:00-11:30: Afsaneh Rabiei - 11:30-12:00: Meimei Li - 12:00-12:30: Lizhen Tan - 12:30-1:00: Kevin Field 1 - 1:30: break 1:30 - 4: LWRS overview and select LWRS highlights (Keith Leonard and Jeremy Busby to lead) - 1:30-2:30: LWRS MAaD Overview, Keith Leonard -

  8. Utilization of UV Curing Technology to Significantly Reduce the Manufacturing Cost of LIB Electrodes

    SciTech Connect

    Voelker, Gary; Arnold, John

    2015-11-30

    Previously identified novel binders and associated UV curing technology have been shown to reduce the time required to apply and finish electrode coatings from tens of minutes to less than one second. This revolutionary approach can result in dramatic increases in process speeds, significantly reduced capital (a factor of 10 to 20) and operating costs, reduced energy requirements, and reduced environmental concerns and costs due to the virtual elimination of harmful volatile organic solvents and associated solvent dryers and recovery systems. The accumulated advantages of higher speed, lower capital and operating costs, reduced footprint, lack of VOC recovery, and reduced energy cost is a reduction of 90% in the manufacturing cost of cathodes. When commercialized, the resulting cost reduction in Lithium batteries will allow storage device manufacturers to expand their sales in the market and thereby accrue the energy savings of broader utilization of HEVs, PHEVs and EVs in the U.S., and a broad technology export market is also envisioned.

  9. Draft Submission; Social Cost of Energy Generation

    SciTech Connect

    1990-01-05

    This report is intended to provide a general understanding of the social costs associated with electric power generation. Based on a thorough review of recent literature on the subject, the report describes how these social costs can be most fully and accurately evaluated, and discusses important considerations in applying this information within the competitive bidding process. [DJE 2005

  10. NPR (New Production Reactor) capacity cost evaluation

    SciTech Connect

    1988-07-01

    The ORNL Cost Evaluation Technical Support Group (CETSG) has been assigned by DOE-HQ Defense Programs (DP) the task defining, obtaining, and evaluating the capital and life-cycle costs for each of the technology/proponent/site/revenue possibilities envisioned for the New Production Reactor (NPR). The first part of this exercise is largely one of accounting, since all NPR proponents use different accounting methodologies in preparing their costs. In order to address this problem of comparing ''apples and oranges,'' the proponent-provided costs must be partitioned into a framework suitable for all proponents and concepts. If this is done, major cost categories can then be compared between concepts and major cost differences identified. Since the technologies proposed for the NPR and its needed fuel and target support facilities vary considerably in level of technical and operational maturity, considerable care must be taken to evaluate the proponent-derived costs in an equitable manner. The use of cost-risk analysis along with derivation of single point or deterministic estimates allows one to take into account these very real differences in technical and operational maturity. Chapter 2 summarizes the results of this study in tabular and bar graph form. The remaining chapters discuss each generic reactor type as follows: Chapter 3, LWR concepts (SWR and WNP-1); Chapter 4, HWR concepts; Chapter 5, HTGR concept; and Chapter 6, LMR concept. Each of these chapters could be a stand-alone report. 39 refs., 36 figs., 115 tabs.

  11. Cost Codes and the Work Breakdown Structure

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    The chapter discusses the purpose of the work breakdown structure (WBS) and code of account (COA) cost code system, shows the purpose and fundamental structure of both the WBS and the cost code system, and explains the interface between the two systems.

  12. PAFC Cost Challenges | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost Challenges PAFC Cost Challenges Presentation at the MCFC and PAFC R&D Workshop held Nov. 16, 2009, in Palm Springs, CA mcfc_pafc_workshop_kanuri.pdf (1.5 MB) More Documents & Publications MCFC and PAFC R&D Workshop Summary Report High Temperature Fuel Cell (Phosphoric Acid) Manufacturing R&D PAFC History and Successes

  13. Standardized Cost Savings Definitions and Reporting Template

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting Fiscal Year (FY) 2012 data.

  14. Cost Analysis of Hydrogen Storage Systems

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Forecast: System Cost (kWH) I L L U S T R A T I V E 12 SLJB012306D0268 ... Fuel Economy (mpgge) H 2 Storage Requirement (kg H 2 ) Fuel Price (eq gal) O&M Cost (mi) ...

  15. Residential retrofit specification/cost data base

    SciTech Connect

    Carlisle, N.; Potter, T.; Bircher, T.

    1982-06-01

    To aid state agencies, utilities, and contractors participating in the Residential Conservation Service (RCS) program in determining contractor-installed and do-it-yourself costs for active, passive, and wind retrofit measures in their locality, the Solar Energy Research Institute (SERI) has developed a residential retrofit specification/cost data base. The document consists of technical specifications for 17 renewable resource systems. The specifications were used as the basis for costing the systems in 56 cities. This paper describes the specifications, highlighting the passive systems, discusses the costs for the system, and describes how the costs were used with performance predictions to develop an applicability matrix that served as the basis for determining eligible passive measures in 146 regions under the RCS rule.

  16. The Laboratory Microfusion Facility standardized costing methodology

    SciTech Connect

    Harris, D.B.; Dudziak, D.J.

    1988-01-01

    The DOE-organized Laboratory Microfusion Facility (LMF) has a goal of generation 1000 MJ of fusion yield in order to perform weapons physics experiments, simulate weapons effects, and develop high-gain inertial confinement fusion (ICF) targets for military and civil applications. There are currently three options seriously being considered for the driver of this facility: KrF lasers, Nd:glass lasers, and light-ion accelerators. In order to provide a basis for comparison of the cost estimated for each of the different driver technologies, a standardized costing methodology has been devised. This methodology defines the driver-independent costs and indirect cost multipliers for the LMF to aid in the comparison of the LMF proposal cost estimates. 10 refs., 4 tabs.

  17. Nuclear plant cancellations: causes, costs, and consequences

    SciTech Connect

    Not Available

    1983-04-01

    This study was commissioned in order to help quantify the effects of nuclear plant cancellations on the Nation's electricity prices. This report presents a historical overview of nuclear plant cancellations through 1982, the costs associated with those cancellations, and the reasons that the projects were terminated. A survey is presented of the precedents for regulatory treatment of the costs, the specific methods of cost recovery that were adopted, and the impacts of these decisions upon ratepayers, utility stockholders, and taxpayers. Finally, the report identifies a series of other nuclear plants that remain at risk of canellation in the future, principally as a result of similar demand, finance, or regulatory problems cited as causes of cancellation in the past. The costs associated with these potential cancellations are estimated, along with their regional distributions, and likely methods of cost recovery are suggested.

  18. Ultrasound in lead-bismuth eutectic

    SciTech Connect

    Dierckx, M.; Van Dyck, D.

    2011-07-01

    The Belgian Nuclear Research Centre (SCK.CEN) is in the process of designing MYRRHA, a new multi-purpose irradiation facility to replace the ageing BR2. MYRRHA is a fast spectrum reactor cooled with lead-bismuth eutectic (LBE). As liquid metal is opaque to visual light, ultrasonic measurement techniques are selected to fulfill essential tasks that, according to our assessment, will be demanded by licensing authorities, in particular: fuel assembly identification and localization of a lost fuel assembly. To that end, a considerable research effort at SCK.CEN is devoted to study ultrasonic propagation in LBE. As ultrasonic experiments in LBE are elaborate and expensive to set up, we are particularly interested in to what extent experiments in water can be extrapolated to LBE - one of the main focuses of this article. We describe and present results of a first experiment with this goal which shows that the signal to noise ratio is better in LBE and that we even see small diffuse reflections up to 40 deg. off normal. On the other hand, we do not see internal reflections in stainless steel objects in LBE which we do in water. Therefore, we conclude that experiments in water can be used to validate algorithms for LBE on the condition that they do not rely on internal reflections. We also present solutions to tackle the essential tasks: fuel assembly identification and lost object localization. The requirements for the ultrasonic equipment implementing these solutions are also discussed. (authors)

  19. DOE Fuel Cell Technologies Office Record 12024: Hydrogen Production Cost Using Low-Cost Natural Gas

    Office of Energy Efficiency and Renewable Energy (EERE)

    This program record from the U.S. Department of Energy's Fuel Cell Technologies Office provides information about the cost of hydrogen production using low-cost natural gas.

  20. Rocky Flats Closure Unit Cost Data

    SciTech Connect

    Sanford, P.C.; Skokan, B.

    2007-07-01

    The Rocky Flats Closure Project has completed the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, remediating environmental media and closing the Rocky Flats Site (Site). The project cost approximately $4.1 B and included the decommissioning of over 700 structures including 5 major plutonium facilities and 5 major uranium facilities, shipping over 14,600 cubic meters of transuranic and 565,000 cubic meters of low level radioactive waste, and remediating a 385-acre industrial area and the surrounding land. Actual costs were collected for a large variety of closure activities. These costs can be correlated with metrics associated with the facilities and environmental media to capture cost factors from the project that could be applicable to a variety of other closure projects both within and outside of the Department of Energy's weapons complex. The paper covers four general topics: the process to correlate the actual costs and metrics, an example of the correlated data for one large sub-project, a discussion of the results, and the additional activities that are planned to correlate and make this data available to the public. The process to collect and arrange the project control data of the Closure Project relied on the actual Closure Project cost information. It was used to correlate these actual costs with the metrics for the physical work, such as building area or waste generated, to support the development of parametric cost factors. The example provides cost factors for the Industrial Sites Project. The discussion addresses the strengths and weaknesses of the data, followed by a section identifying future activities to improve and extend the analyses and integrate it within the Department's Environmental Cost Analysis System. (authors)

  1. Simple cost model for EV traction motors

    SciTech Connect

    Cuenca, R.M.

    1995-02-01

    A simple cost model has been developed that allows the calculation of the OEM cost of electric traction motors of three different types, normalized as a function of power in order to accommodate different power and size. The model includes enough information on the various elements integrated in the motors to allow analysis of individual components and to factor-in the effects of changes in commodities prices. A scalable cost model for each of the main components of an electric vehicle (EV) is a useful tool that can have direct application in computer simulation or in parametric studies. For the cost model to have wide usefulness, it needs to be valid for a range of values of some parameter that determines the magnitude or size of the component. For instance, in the case of batteries, size may be determined by energy capacity, usually expressed in kilowatt-hours (kWh), while in the case of traction motors, size is better determined by rated power, usually expressed in kilowatts (kW). The simplest case is when the cost of the component in question is a direct function of its size; then cost is simply the product of its specific cost ($/unit size) and the number of units (size) in the vehicle in question. Batteries usually fall in this category (cost = energy capacity x $/kWh). But cost is not always linear with size or magnitude; motors (and controllers), for instance, become relatively less expensive as power rating increases. Traction motors, one of the main components for EV powertrains are examined in this paper, and a simplified cost model is developed for the three most popular design variations.

  2. Dissecting the Cost of the Smart Grid | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Equivalent URI: cleanenergysolutions.orgcontentdissecting-cost-smart-grid Language: English Policies: Regulations Regulations: "Resource Integration Planning,Cost...

  3. Microsoft PowerPoint - Cost Escalation.ppt

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hydroelectric Design Center Hydroelectric Design Center " " Cost Trends for Cost Trends for Hydropower Capital Hydropower Capital Replacements" Replacements" Presentation Outline ...

  4. Polonium problem in lead-bismuth flow target

    SciTech Connect

    Pankratov, D.V.; Yefimov, E.I.; Bugreev, M.I.

    1996-06-01

    Alpha-active polonium nuclides Po198 - Po210 are formed in a lead-bismuth target as results of reactions Bi{sup 209}(n,{gamma})Bi{sup 210} {yields} Po{sup 210}, Bi{sup 209}(p,xn)Po{sup 210} {yields} Po{sup 210 {minus} x} (x = 1-12), Pb{sup 208}({alpha},xn) {yields} Po{sup 210 {minus} x + 2} (x = 2-14). The most important nuclides are Po-210 (T{sub {1/2}}=138.4 day), Po-209 (T{sub {1/2}}=102 years) and Po-208 (T{sub {1/2}}=2.9 years). Polonium activity of the circuit for SINQ - conditions is about 15,000 Ci after 1-year operation. Polonium radiation hazard is connected with its output from the coolant and formation of aerosol and surface alpha-activity after the circuit break-down for repair works or in accidents. One of the important issues of polonium removal system creation is containing and storing polonium removed. Its storage in solidified alkaline is not expedient because of secondary neutron formation as a result of ({alpha},n) - reaction on oxygen and sodium nucleus. The estimations carried out demonstrated that by polonium concentration {approx} 100 Ci/l neutron current on the container surface can reach {approx} 10{sup 4}n/(cm{sup 2}s). Concentration and storage of polonium in solidified lead-bisumth seems the most convenient. The calculations demonstrated that in a 100 l container 50,000 Ci of polonium can be stored (as much as 3 times more than 1-year polonium product in SINQ-conditions) under temperature in the container less than melting point of lead bismuth (the wall temperature is about 100{degrees}C).

  5. Microsoft Word - Final Lead Assembly SA.doc

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... of European Fabrication of Lead MOX Assemblies. ...... 20 Table 4. Comparison of Human Health ...

  6. The Year Leading to a Supereruption

    DOE PAGES [OSTI]

    Gualda, Guilherme A. R.; Sutton, Stephen R.

    2016-07-20

    Supereruptions catastrophically eject 100s-1000s of km3 of magma to the surface in a matter of days to a few months. In this study, we use zoning in quartz crystals from the Bishop Tuff (California) to assess the timescales over which a giant magma body transitions from relatively quiescent, pre-eruptive crystallization to rapid decompression and eruption. Quartz crystals in the Bishop Tuff have distinctive rims (<200 μm thick), which are Ti-rich and bright in cathodoluminescence (CL) images, and which can be used to calculate Ti diffusional relaxation times. We use synchrotron-based x-ray microfluorescence to obtain quantitative Ti maps and profiles alongmore » rim-interior contacts in quartz at resolutions of 1–5 μm in each linear dimension. We perform CL imaging on a scanning electron microscope (SEM) using a low-energy (5 kV) incident beam to characterize these contacts in high resolution (<1 μm in linear dimensions). Quartz growth times were determined using a 1D model for Ti diffusion, assuming initial step functions. Minimum quartz growth rates were calculated using these calculated growth times and measured rim thicknesses. Maximum rim growth times span from ~1 min to 35 years, with a median of ~4 days. More than 70% of rim growth times are less than 1 year, showing that quartz rims have mostly grown in the days to months prior to eruption. Minimum growth rates show distinct modes between 10-8 and 10-10 m/s (depending on sample), revealing very fast crystal growth rates (100s of nm to 10s of μm per day). Our data show that quartz rims grew well within a year of eruption, with most of the growth happening in the weeks or days preceding eruption. Growth took place under conditions of high supersaturation, suggesting that rim growth marks the onset of decompression and the transition from pre-eruptive to syn-eruptive conditions.« less

  7. Methodology for Calculating Cost-per-Mile for Current and Future Vehicle Powertrain Technologies, with Projections to 2024: Preprint

    SciTech Connect

    Ruth, M.; Timbario, T. A.; Timbario, T. J.; Laffen, M.

    2011-01-01

    Currently, several cost-per-mile calculators exist that can provide estimates of acquisition and operating costs for consumers and fleets. However, these calculators are limited in their ability to determine the difference in cost per mile for consumer versus fleet ownership, to calculate the costs beyond one ownership period, to show the sensitivity of the cost per mile to the annual vehicle miles traveled (VMT), and to estimate future increases in operating and ownership costs. Oftentimes, these tools apply a constant percentage increase over the time period of vehicle operation, or in some cases, no increase in direct costs at all over time. A more accurate cost-per-mile calculator has been developed that allows the user to analyze these costs for both consumers and fleets. The calculator was developed to allow simultaneous comparisons of conventional light-duty internal combustion engine (ICE) vehicles, mild and full hybrid electric vehicles (HEVs), and fuel cell vehicles (FCVs). This paper is a summary of the development by the authors of a more accurate cost-per-mile calculator that allows the user to analyze vehicle acquisition and operating costs for both consumer and fleets. Cost-per-mile results are reported for consumer-operated vehicles travelling 15,000 miles per year and for fleets travelling 25,000 miles per year.

  8. Maximizing productivity & profitability through best cost shift schedules

    SciTech Connect

    Coleman, R.

    1996-12-31

    If you have the right equipment and employees at the right place, the fight time, and the right cost, you have the perfect business schedule. But, if you`re like most mines, you can probably improve your schedule, improvements that will reach all the way to the bottom line. And unlike adding employees, materials, or capital equipment, better scheduling is a cost-free way improve profitability. A good schedule can save millions. A bad schedule will cost money every year. A shift schedule is not a day off pattern or shift length. A shift schedule is a complete system deploying personnel and capital equipment. Most mining schedules are either copied from another operation, based on tradition or the result of a contract negotiation made far from the mine site. Unfortunately, most mine managers don`t give much thought to schedules until a crisis develops; at which point the tendency is to implement the first solution that comes along as quickly as possible. Costly mistakes are made.

  9. A blasting additive that renders wastes non hazardous in lead paint abatement projects

    SciTech Connect

    Clark, R.; Rapp, D.J.; McGrew, M.

    1994-12-31

    Maintenance of steel structures often produces abrasive wastes that are considered toxic and hazardous due to the lead content of the old paint system present in spent abrasives. Environmental regulations in the US and Canada effectively preclude on-site treatment and disposal of these wastes, thereby forcing them into costly transport and secure disposal options. The authors have developed an abrasive additive that allows dry or wet blasting to remove old paint systems, but the resultant wastes are considered non-hazardous and are eligible for recycling or non-hazardous waste disposal, both at sharply reduced costs. The agent does not ``mask`` environmental test results, but does produce a stable residue suitable for long term disposal or reuse. Surface conditions after application of abrasives appear to be amenable to virtually all paint systems tested. The process is in use on an estimated 10% of all steel based lead paint abatement projects in the US, and is experiencing considerable growth in market acceptance. The technology may allow disposal cost reductions in excess of 50%.

  10. Lead Slowing-Down Spectrometry for Spent Fuel Assay: FY12 Status Report

    SciTech Connect

    Warren, Glen A.; Anderson, Kevin K.; Casella, Andrew M.; Danon, Yaron; Devlin, M.; Gavron, A.; Haight, R. C.; Harris, Jason; Imel, G. R.; Kulisek, Jonathan A.; O'Donnell, J. M.; Stewart, T.; Weltz, Adam

    2012-10-01

    benchmarking measurements, we continue to improve our understanding of the experimental setup by studying issues such as the effect of room return and impurities in the lead. RPI performed a series of experiments with a fresh fuel pin and various 235U and 239Pu sources. A comparison between simulations and measurements shows significant deviations after 200 µs for both 235U and 239Pu samples, as well as significant deviations at earlier times for the 239Pu sample. The FY2013 effort will shift focus to planning for a Technical Readiness Level 5 demonstration. The primary deliverable for the year will be a plan on how to do this demonstration. The plan will include measurement design, sample acquisition, sample handling, cost estimate, schedule and assumptions. Research will continue on the 4He detector, algorithms development, thorium fission chambers and benchmarking measurements involving sub assemblies of fresh fuel.

  11. Renewable Energy Planning: Multiparametric Cost Optimization

    SciTech Connect

    Walker, A.

    2008-01-01

    This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

  12. Renewable Energy Planning: Multiparametric Cost Optimization; Preprint

    SciTech Connect

    Walker, A.

    2008-05-01

    This paper describes a method for determining the combination of renewable energy technologies that minimize life-cycle cost at a facility, often with a specified goal regarding percent of energy use from renewable sources. Technologies include: photovoltaics (PV); wind; solar thermal heat and electric; solar ventilation air preheating; solar water heating; biomass heat and electric (combustion, gasification, pyrolysis, anaerobic digestion); and daylighting. The method rests upon the National Renewable Energy Laboratory's (NREL's) capabilities in characterization of technology cost and performance, geographic information systems (GIS) resource assessment, and life-cycle cost analysis. The paper discusses how to account for the way candidate technologies interact with each other, and the solver routine used to determine the combination that minimizes life-cycle cost. Results include optimal sizes of each technology, initial cost, operating cost, and life-cycle cost, including incentives from utilities or governments. Results inform early planning to identify and prioritize projects at a site for subsequent engineering and economic feasibility study.

  13. Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

    SciTech Connect

    Lacey, Ph.D, P.E., Ronald E.

    2012-07-16

    Discrete Event Modeling of Algae Cultivation and Harvesting at Commercial Scale: Capital Costs, Operating Costs, and System Bottlenecks

  14. Lead Slowing Down Spectrometer FY2013 Annual Report

    SciTech Connect

    Warren, Glen A.; Kulisek, Jonathan A.; Gavron, Victor A.; Danon, Yaron; Weltz, Adam; Harris, Jason; Stewart, T.

    2013-10-29

    Executive Summary The Lead Slowing Down Spectrometry (LSDS) project, funded by the Materials Protection And Control Technology campaign, has been evaluating the feasibility of using LSDS techniques to assay fissile isotopes in used nuclear fuel assemblies. The approach has the potential to provide considerable improvement in the assay of fissile isotopic masses in fuel assemblies compared to other non-destructive techniques in a direct and independent manner. This report is a high level summary of the progress completed in FY2013. This progress included: • Fabrication of a 4He scintillator detector to detect fast neutrons in the LSDS operating environment. Testing of the detector will be conducted in FY2014. • Design of a large area 232Th fission chamber. • Analysis using the Los Alamos National Laboratory perturbation model estimated the required number of neutrons for an LSDS measurement to be 10 to the 16th source neutrons. • Application of the algorithms developed at Pacific Northwest National Laboratory to LSDS measurement data of various fissile samples conducted in 2012. The results concluded that the 235U could be measured to 2.7% and the 239Pu could be measured to 6.3%. Significant effort is yet needed to demonstrate the applicability of these algorithms for used-fuel assemblies, but the results reported here are encouraging in demonstrating that we are making progress toward that goal. • Development and cost-analysis of a research plan for the next critical demonstration measurements. The plan suggests measurements on fresh fuel sub assemblies as a means to experimentally test self-attenuation and the use of fresh mixed-oxide fuel as a means to test simultaneous measurement of 235U and 239Pu.

  15. Cost and code study of underground buildings

    SciTech Connect

    Sterling, R.L.

    1981-01-01

    Various regulatory and financial implications for earth-sheltered houses and buildings are discussed. Earth-sheltered houses are covered in the most detail including discussions of building-code restrictions, HUD Minimum Property Standards, legal aspects, zoning restrictions, taxation, insurance, and home financing. Examples of the initial-cost elements in earth-sheltered houses together with projected life-cycle costs are given and compared to more-conventional energy-conserving houses. For larger-scale underground buildings, further information is given on building code, fire protection, and insurance provisions. Initial-cost information for five large underground buildings is presented together with energy-use information where available.

  16. How three smart managers control steam costs

    SciTech Connect

    Kendall, R.

    1982-11-01

    Three steam-intensive companies report innovative ways to reduce steam-production costs. Goodyear Tire and Rubber Co. concentrated on regular maintenance, process modifications, and heat recovery, but also has an on-going policy of seeking further cost savings. Future efforts will explore computer-based boiler controls. Zenith Radio Corporation's color picture tube-making process uses 12% less steam after 700 mechanical steam traps were replaced with fixed-orifice traps. Petro-Tex Chemical Corp. reduced steam costs by monitoring and optimizing process units and by making capital investments to improve steam management. (DCK)

  17. Fact Sheet: Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Soft Costs Fact Sheet: Soft Costs Soft costs can vary significantly as a result of a fragmented energy marketplace. In the U.S., there are 18,000 jurisdictions and 3,000 utilities with different rules and regulations for how to go solar. The same solar equipment may vary widely in its final installation price due to process and market variations across jurisdictions, creating barriers to rapid industry growth. SunShot supports the development of innovative solutions that enable communities to

  18. Novel Low Cost Organic Vapor Jet Printing of Striped High Efficiency Phosphorescent OLEDs for White Lighting

    SciTech Connect

    Mike Hack

    2008-12-31

    In this program, Universal Display Corporation and University of Michigan proposed to integrate three innovative concepts to meet the DOE's Solid State Lighting (SSL) goals: (1) high-efficiency phosphorescent organic light emitting device (PHOLED{trademark}) technology, (2) a white lighting design that is based on a series of red, green and blue OLED stripes, and (3) the use of a novel cost-effective, high rate, mask-less deposition process called organic vapor jet printing (OVJP). Our PHOLED technology offers up to four-times higher power efficiency than other OLED approaches for general lighting. We believe that one of the most promising approaches to maximizing the efficiency of OLED lighting sources is to produce stripes of the three primary colors at such a pitch (200-500 {mu}m) that they appear as a uniform white light to an observer greater than 1 meter (m) away from the illumination source. Earlier work from a SBIR Phase 1 entitled 'White Illumination Sources Using Striped Phosphorescent OLEDs' suggests that stripe widths of less than 500 {mu}m appear uniform from a distance of 1m without the need for an external diffuser. In this program, we intend to combine continued advances in this PHOLED technology with the striped RGB lighting design to demonstrate a high-efficiency, white lighting source. Using this background technology, the team has focused on developing and demonstrating the novel cost-effective OVJP process to fabricate these high-efficiency white PHOLED light sources. Because this groundbreaking OVJP process is a direct printing approach that enables the OLED stripes to be printed without a shadow mask, OVJP offers very high material utilization and high throughput without the costs and wastage associated with a shadow mask (i.e. the waste of material that deposits on the shadow mask itself). As a direct printing technique, OVJP also has the potential to offer ultra-high deposition rates (> 1,000 Angstroms/second) for any size or shaped

  19. Performance Comparison of Metallic, Actinide Burning Fuel in Lead-Bismuth and Sodium Cooled Fast Reactors

    SciTech Connect

    Weaver, Kevan Dean; Herring, James Stephen; Mac Donald, Philip Elsworth

    2001-04-01

    Various methods have been proposed to incinerate or transmutate the current inventory of trans-uranic waste (TRU) that exits in spent light-water-reactor (LWR) fuel, and weapons plutonium. These methods include both critical (e.g., fast reactors) and non-critical (e.g., accelerator transmutation) systems. The work discussed here is part of a larger effort at the Idaho National Engineering and Environmental Laboratory (INEEL) and at the Massachusetts Institute of Technology (MIT) to investigate the suitability of lead and lead-alloy cooled fast reactors for producing low-cost electricity as well as for actinide burning. The neutronics of non-fertile fuel loaded with 20 or 30-wt% light water reactor (LWR) plutonium plus minor actinides for use in a lead-bismuth cooled fast reactor are discussed in this paper, with an emphasis on the fuel cycle life and isotopic content. Calculations show that the average actinide burn rate is similar for both the sodium and lead-bismuth cooled cases ranging from -1.02 to -1.16 g/MWd, compared to a typical LWR actinide generation rate of 0.303 g/MWd. However, when using the same parameters, the sodium-cooled case went subcritical after 0.2 to 0.8 effective full power years, and the lead-bismuth cooled case ranged from 1.5 to 4.5 effective full power years.

  20. NREL Leads Effort to Get Traffic Moving in Right Direction - News Releases

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    | NREL NREL Leads Effort to Get Traffic Moving in Right Direction Connected Traveler project will guide travelers in energy-efficient manner August 17, 2015 The Energy Department's National Renewable Energy Laboratory (NREL) will serve as the lead organization in developing a tool travelers and transportation officials can use in helping guide people through a city in the most energy-efficient way possible. "Using real-time traffic and GPS data, along with simulations that take into