  1. Independent Oversight Review, West Valley Demonstration Project...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Transportation - September 2000 Independent Oversight Review, West Valley Demonstration Project Transportation - September 2000 September 2000 ...

  2. Independent Oversight Special Review, Rocky Flats Closure Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats...

  3. Independent Oversight Review, West Valley Demonstration Project

    Office of Environmental Management (EM)

    Facility - April 2014 | Department of Energy April 2014 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - April 2014 April 2014 Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the construction quality and fire

  4. Independent Oversight Special Review, Rocky Flats Closure Project Site -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 2001 | Department of Energy Rocky Flats Closure Project Site - April 2001 Independent Oversight Special Review, Rocky Flats Closure Project Site - April 2001 April 2001 Special Review of the Rocky Flats Closure Project Site This report provides the results of a Special Review at the Rocky Flats Closure Project that was performed U.S. Department of Energy's (DOE) Office of Independent Environment, Safety, and Health Oversight. The Special Review was conducted in February and March 2001

  5. Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Portsmouth/Paducah Project Office - May 2012 Independent Oversight Review, Portsmouth/Paducah Project Office - May 2012 May 2012 Review of the Department of Energy Office of Environmental Management Assessment of the Portsmouth/Paducah Project Office Oversight of the Portsmouth Gaseous Diffusion Plant Criticality Safety Program This report provides the results of an independent review of the Department of Energy's (DOE) Headquarters Office of Environmental Management

  6. Independent Oversight Review, Advanced Mixed Waste Treatment Project- April 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Radiation Protection Program Implementation at the Advanced Mixed Waste Treatment Project of the Idaho Site

  7. Independent Oversight Review, Idaho Cleanup Project- August 2014

    Energy.gov [DOE]

    Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Contractor Readiness Assessment at the Idaho Site.

  8. Independent Oversight Review, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This report provides the results of an independent review of the Department of Energy's ... The independentreview was performed January 31 - February 2, 2012, by the DOE Office of ...

  9. Independent technical review, handbook

    SciTech Connect

    Not Available

    1994-02-01

    Purpose Provide an independent engineering review of the major projects being funded by the Department of Energy, Office of Environmental Restoration and Waste Management. The independent engineering review will address questions of whether the engineering practice is sufficiently developed to a point where a major project can be executed without significant technical problems. The independent review will focus on questions related to: (1) Adequacy of development of the technical base of understanding; (2) Status of development and availability of technology among the various alternatives; (3) Status and availability of the industrial infrastructure to support project design, equipment fabrication, facility construction, and process and program/project operation; (4) Adequacy of the design effort to provide a sound foundation to support execution of project; (5) Ability of the organization to fully integrate the system, and direct, manage, and control the execution of a complex major project.

  10. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Contractor- June 2012

    Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Contractor Operational Readiness Review

  11. Independent Oversight Review, Sodium Bearing Waste Treatment Project- Federal- June 2012

    Energy.gov [DOE]

    Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Unit Federal Operational Readiness Review

  12. Independent Oversight Review, Waste Treatment and Immobilization Plant Project- October 2010

    Energy.gov [DOE]

    Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and Immobilization Plant Project

  13. Independent Oversight Review, Advanced Mixed Waste Treatment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Advanced Mixed Waste Treatment Project - April 2013 Independent Oversight Review, Advanced Mixed Waste Treatment Project - April 2013 April 2013 Review of Radiation Protection...

  14. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    Independent Oversight Review, Sodium Bearing Waste Treatment Project - Contractor - June 2012 June 2012 Review of the Sodium Bearing Waste Treatment Project - Integrated Waste ...

  15. Independent Peer Reviews

    SciTech Connect

    2012-03-16

    Independent Assessments: DOE's Systems Integrator convenes independent technical reviews to gauge progress toward meeting specific technical targets and to provide technical information necessary for key decisions.

  16. Review of the independent risk assessment of the proposed Cabrillo liquified natural gas deepwater port project.

    SciTech Connect

    Gritzo, Louis Alan; Hightower, Marion Michael; Covan, John Morgan; Luketa-Hanlin, Anay Josephine

    2006-01-01

    In March 2005, the United States Coast Guard requested that Sandia National Laboratories provide a technical review and evaluation of the appropriateness and completeness of models, assumptions, analyses, and risk management options presented in the Cabrillo Port LNG Deepwater Port Independent Risk Assessment-Revision 1 (Cabrillo Port IRA). The goal of Sandia's technical evaluation of the Cabrillo Port IRA was to assist the Coast Guard in ensuring that the hazards to the public and property from a potential LNG spill during transfer, storage, and regasification operations were appropriately evaluated and estimated. Sandia was asked to review and evaluate the Cabrillo Port IRA results relative to the risk and safety analysis framework developed in the recent Sandia report, ''Guidance on Risk Analysis and Safety Implications of a Large Liquefied Natural Gas (LNG) Spill over Water''. That report provides a framework for assessing hazards and identifying approaches to minimize the consequences to people and property from an LNG spill over water. This report summarizes the results of the Sandia review of the Cabrillo Port IRA and supporting analyses. Based on our initial review, additional threat and hazard analyses, consequence modeling, and process safety considerations were suggested. The additional analyses recommended were conducted by the Cabrillo Port IRA authors in cooperation with Sandia and a technical review panel composed of representatives from the Coast Guard and the California State Lands Commission. The results from the additional analyses improved the understanding and confidence in the potential hazards and consequences to people and property from the proposed Cabrillo Port LNG Deepwater Port Project. The results of the Sandia review, the additional analyses and evaluations conducted, and the resolutions of suggested changes for inclusion in a final Cabrillo Port IRA are summarized in this report.

  17. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders ...

  18. Independent Oversight Review, Sodium Bearing Waste Treatment...

    Office of Environmental Management (EM)

    This report documents the results of an independent review of the Sodium Bearing Waste Treatment Project-Integrated Waste Treatment Unit Federal Operational Readiness Review. ...

  19. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project ...

  20. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Treatment and Immobilization Plant Project - October 2010 October 2010 Review of Nuclear Safety Culture at the Hanford Site Waste Treatment and ...

  1. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect

    SCHAUS, P.S.

    2000-03-29

    This report describes the results of an independent review team brought in to assess CH2M Hill Hanford Group's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor

  2. River Protection Project (RPP) Readiness to Proceed 2 Internal Independent Review Team Final Report

    SciTech Connect

    SCHAUS, P.S.

    2000-03-15

    This report describes the results of an independent review team brought in to assess CH2M HILL Hanford's readiness and ability to support the RPP's move into its next major phase - retrieval and delivery of tank waste to the Privatization Contractor.

  3. Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operating Procedures, Revision 2 | Department of Energy Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard Operating Procedures, Revision 2 Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard Operating Procedures, Revision 2 This Standard Operating Procedures (SOP) provides guidance for Department of Energy (DOE) Project Management Oversight and Assessment (PM) staff and contractors performing either an Independent Cost Estimate (ICE) or an

  4. Independent Oversight Review, Waste Treatment and Immobilization...

    Energy.gov [DOE] (indexed site)

    Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of selected aspects of...

  5. INDEPENDENT TECHNICAL REVIEW OF THE C-400 INTERIM REMEDIAL PROJECT PHASE I RESULTS, PADUCAH, KENTUCKY

    SciTech Connect

    Looney, B.; Rossabi, J.; Stewart,L.; Richards, W.

    2010-10-29

    The groundwater and soil in the vicinity of the C-400 Building at the Paducah Gaseous Diffusion Plant (PGDP), is contaminated with substantial quantities of industrial solvents, primarily trichoroethene (TCE). This solvent 'source' is recognized as a significant challenge and an important remediation target in the overall environmental cleanup strategy for PGDP. Thus, the cleanup of the C-400 TCE Source is a principal focus for the Department of Energy (DOE) and its contractors, and for PGDP regulators and stakeholders. Using a formal investigation, feasibility study and decision process, Electrical Resistance Heating (ERH) was selected for the treatment of the soil and groundwater in the vicinity of C-400. ERH was selected as an interim action to remove 'a significant portion of the contaminant mass of TCE at the C-400 Cleaning Building area through treatment' with the longer term goal of reducing 'the period the TCE concentration in groundwater remains above its Maximum Contaminant Level (MCL).' ERH is a thermal treatment that enhances the removal of TCE and related solvents from soil and groundwater. The heterogeneous conditions at PGDP, particularly the high permeability regional gravel aquifer (RGA), are challenging to ERH. Thus, a phased approach is being followed to implement this relatively expensive and complex remediation technology. Conceptually, the phased approach encourages safety and efficiency by providing a 'lessons learned' process and allowing appropriate adjustments to be identified and implemented prior to follow-on phase(s) of treatment. More specifically, early deployment targeted portions of the challenging RGA treatment zone with relatively little contamination reducing the risk of adverse collateral impacts from underperformance in terms of heating and capture. Because of the importance and scope of the C-400 TCE source remediation activities, DOE chartered an Independent Technical Review (ITR) in 2007 to assess the C-400 ERH plans prior

  6. Independent review of estimated load reductions for PJM's small customer load response pilot project

    SciTech Connect

    Heffner, G.; Moezzi, M.; Goldman, C.

    2004-06-01

    This study describes the results of a low-cost approach used to measure reported load reductions from a residential electric water heater (EWH) load control program operated as part of PJM Interconnection's Demand Response small customer pilot program. Lawrence Berkeley National Laboratory (LBNL) conducted this independent review of the engineering estimates for EWH load control reported by a Curtailment Service Provider (CSP) at PJM's request. LBNL employed low-cost measurement and verification (M&V) approaches that utilized existing interval metering equipment to monitor results for a series of load control tests. The CSP collected hourly load data for two substations and several hundred households over a six-week period in October and November 2003. During this time period, the CSP operated its electric water heater load control program during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control program. We found that the observed load reductions for the premise-level data aggregated over all households in the two participating electric cooperatives were, respectively, 40 percent-60 percent less and 3 percent less-10 percent higher than the estimated diversified demand reduction values assumed by the CSP, depending on whether observed or normalized results are considered. We also analyzed sub-station level data and found that the observed load reductions during the test periods were significantly lower than expected, although confounding influences and operational problems signifiogram during pre-specified test periods in the morning, afternoon and early evening. LBNL then analyzed substation and premise-level data from these tests in order to verify the diversified demand reductions claimed by the CSP for customers participating in the EWH load control

  7. Vehicle Technologies Office Merit Review 2014: Central Texas Fuel Independence Project

    Energy.gov [DOE]

    Presentation given by City of Austin at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about Central Texas Fuel...

  8. External Independent Review (EIR) Standard Operating Procedure...

    Energy.gov [DOE] (indexed site)

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  9. CONTAIN independent peer review

    SciTech Connect

    Boyack, B.E. [Los Alamos National Lab., NM (United States); Corradini, M.L. [Univ. of Wisconsin, Madison, WI (United States). Nuclear Engineering Dept.; Denning, R.S. [Battelle Memorial Inst., Columbus, OH (United States); Khatib-Rahbar, M. [Energy Research Inc., Rockville, MD (United States); Loyalka, S.K. [Univ. of Missouri, Columbia, MO (United States); Smith, P.N. [AEA Technology, Dorchester (United Kingdom). Winfrith Technology Center

    1995-01-01

    The CONTAIN code was developed by Sandia National Laboratories under the sponsorship of the US Nuclear Regulatory Commission (NRC) to provide integrated analyses of containment phenomena. It is used to predict nuclear reactor containment loads, radiological source terms, and associated physical phenomena for a range of accident conditions encompassing both design-basis and severe accidents. The code`s targeted applications include support for containment-related experimental programs, light water and advanced light water reactor plant analysis, and analytical support for resolution of specific technical issues such as direct containment heating. The NRC decided that a broad technical review of the code should be performed by technical experts to determine its overall technical adequacy. For this purpose, a six-member CONTAIN Peer Review Committee was organized and a peer review as conducted. While the review was in progress, the NRC issued a draft ``Revised Severe Accident Code Strategy`` that incorporated revised design objectives and targeted applications for the CONTAIN code. The committee continued its effort to develop findings relative to the original NRC statement of design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications. However, the revised CONTAIN design objectives and targeted applications were considered by the Committee in assigning priorities to the Committee`s recommendations. The Committee determined some improvements are warranted and provided recommendations in five code-related areas: (1) documentation, (2) user guidance, (3) modeling capability, (4) code assessment, and (5) technical assessment.

  10. Independent Oversight Activity Report, Hanford Sludge Treatment Project – September 2013

    Energy.gov [DOE]

    Hanford Sludge Treatment Project Engineered Container Retrieval and Transfer System Operational Awareness Review and Sludge Treatment Project Independent Project Review [HIAR-RL-2013-09-18

  11. Independent Activity Report, Hanford Sludge Treatment Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sludge Treatment Project - February 2012 Independent Activity Report, Hanford Sludge Treatment Project - February 2012 February 2012 Hanford Sludge Treatment Project Operational...

  12. External Independent Review (EIR) Report Template

    Office of Energy Efficiency and Renewable Energy (EERE)

    Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. An EIR typically results in both a Draft and Final EIR Report. Where follow-up actions are required, a Corrective Action Plan (CAP) Review Report and Addendum to the Final EIR Report is also generated.

  13. Independent Activity Report, West Valley Demonstration Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    West Valley Demonstration Project - July 2012 Independent Activity Report, West Valley Demonstration Project - July 2012 July 2012 Operational Awareness Oversight of the West...

  14. Independent Oversight Activity Report, Idaho Cleanup Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Idaho Cleanup Project - November 2013 Independent Oversight Activity Report, Idaho Cleanup Project - November 2013 November 2013 Pre-restart Visit to the Integrated Waste Treatment...

  15. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External Independent Review (EIR) Standard Operating Procedure (SOP) October 2008 External ...

  16. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Independent Oversight Review, Los Alamos National Laboratory - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility ...

  17. Independent Oversight Review, Pantex Plant - February 2012 |...

    Office of Environmental Management (EM)

    Plant - February 2012 Independent Oversight Review, Pantex Plant - February 2012 February 2012 Review of the Pantex Plant Implementation Verification Review Processes This report ...

  18. Independent Oversight Review, Bonneville Power Administration...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (Independent Oversight), within the Office of Health, Safety and Security, conduct an independent review of the Bonneville Power Administration (BPA) safety management program. ...

  19. Valuation analysis for independent power project

    SciTech Connect

    Ellsworth, R.K. )

    1994-08-01

    Independent power projects will continue to be developed as a result of the economic stimulus provided by PURPA legislation. Projects are complex; therefore a careful understanding of facility operations is necessary to assess the unique characteristics inherent with each project. Valuation analysis of independent power projects is important in acquisition, divestiture, taxation, litigation, and financing situations to establish an appropriate facility value. The consideration of the cost approach, the market approach and the discounted cash-flow approach provides a framework to estimate the value of an independent power project.

  20. External Independent Review (EIR) Standard Operating Procedure (SOP) May

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2016 | Department of Energy Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard Operating Procedure (SOP) May 2016 The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost

  1. Independent Oversight Special Review, Bechtel Jacobs Company...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bechtel Jacobs Company, LLC - July 2011 Independent Oversight Special Review, Bechtel Jacobs Company, LLC - July 2011 July 2011 Special Review of the SuspectCounterfeit Items ...

  2. Independent Oversight Review of Integrated Safety Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... on LSO's most recent assessment of LLNL's contractor ... and the request for peer reviews and independent HSS reviews, show that LSO is a learning organization and that ...

  3. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance ...

  4. Independent Oversight Review, Nevada National Security - May...

    Office of Environmental Management (EM)

    National Security - May 2013 Independent Oversight Review, Nevada National Security - May 2013 May 2013 Review of the Nevada National Security Site Criticality Safety Program ...

  5. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    Plant - November 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - November 2013 November 5, 2013 Review of Preparedness for Severe Natural Phenomena Events ...

  6. Independent Oversight Review, Livermore Site Office - October...

    Office of Environmental Management (EM)

    Livermore Site Office - October 2011 Independent Oversight Review, Livermore Site Office - October 2011 October 2011 Review of Integrated Safety Management System Effectiveness at ...

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  8. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos ...

  9. Independent Oversight Review, Rocky Flats Environmental Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation ...

  10. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory ...

  11. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  12. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    September 2011 Independent Oversight Review, Los Alamos National Laboratory - September 2011 September 2011 Review of the Facility Centered Assessment of the Los Alamos National ...

  13. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant ...

  14. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  15. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction ...

  16. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Environmental Management (EM)

    August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant ...

  17. Independent Oversight Review, Oak Ridge National Laboratory ...

    Energy Saver

    National Laboratory - January 2013 Independent Oversight Review, Oak Ridge National Laboratory - January 2013 January 2013 Review of the Oak Ridge National Laboratory High Flux...

  18. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    Laboratory Chemistry and Metallurgy Research Facility - January 2012 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - ...

  19. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    March 2012 | Department of Energy March 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - March 2012 March 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Project Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed November 14-17, 2011, by the U.S. Department of Energy's (DOE) Office of

  20. Waste Treatment Plant External Independent Review, Office of...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    March 28, 2016 8:00AM EDT to April 1, 2016 5:00PM EDT External Independent Review (EIR). On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will ...

  1. Independent Oversight Focused Program Review, Argonne National

    Office of Environmental Management (EM)

    Laboratory-West - May 2001 | Department of Energy Focused Program Review, Argonne National Laboratory-West - May 2001 Independent Oversight Focused Program Review, Argonne National Laboratory-West - May 2001 May 2001 Focused Program Review at Argonne National Laboratory-West This report provides the results of an independent focused review of the Emergency Management Program at the Department of Energy's Argonne National Laboratory-West site that was conducted by the Office of Independent

  2. External Independent Review (EIR) Scoping Meeting Agreement Form

    Office of Energy Efficiency and Renewable Energy (EERE)

    Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3.

  3. Independent Oversight Review, Bonneville Power Administration Safety

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Program - March 2014 | Department of Energy Review, Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office

  4. External Independent Review (EIR) Standard Operating Procedure...

    Office of Environmental Management (EM)

    Standard Operating Procedure (SOP) May 2016 External Independent Review (EIR) Standard ... The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ...

  5. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Health, Safety and Security (HSS), conducted an independent review of the Los Alamos National Laboratory (LANL) Weapons Engineering Tritium Facility (WETF) safety significant...

  6. External Independent Review (EIR) Standard Operating Procedure...

    Energy.gov [DOE] (indexed site)

    The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR ... PDF icon External Independent Review (EIR) Standard Operating Procedure (SOP), Revision 3, ...

  7. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    The independent review was one part of a targeted assessment of fire protection at nuclear facilities across the DOE complex, including National Nuclear Security Administration ...

  8. Independent Oversight Review, Waste Treatment and Immobilization...

    Energy.gov [DOE] (indexed site)

    Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant ...

  9. Independent Oversight Review, Savannah River Operations Office...

    Office of Environmental Management (EM)

    - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River ... O 442.1, DEPARTMENT OF ENERGY EMPLOYEE CONCERNS PROGRAM Independent Activity ...

  10. Background Information for Independent Review Team. Lifecycle...

    Office of Scientific and Technical Information (OSTI)

    Background Information for Independent Review Team. Lifecycle Plan and FY14 Quarterly ... Visit OSTI to utilize additional information resources in energy science and technology. A ...

  11. Independent Oversight Special Review, Headquarters - August 2008...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications Independent Oversight Special Review, Department of Energy sites - February 2008 Focus Group Meeting (Topical Meeting) 10 CFR 851 Worker Safety and ...

  12. Independent Oversight Review, Richland Operations Office and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and work management and control processes in the areas of conduct of operations, quality assurance, and integrated safety management. Independent Oversight Review, Richland...

  13. Radiography Facility - Building 239 Independent Validation Review...

    Office of Scientific and Technical Information (OSTI)

    The purpose of this task was to perform an Independent Validation Review to evaluate the ... The review follows the outline developed for Milestone 1 of the PEP, which is based on the ...

  14. Independent Oversight Targeted Review, Sandia National Laboratories -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 2014 | Department of Energy Targeted Review, Sandia National Laboratories - April 2014 Independent Oversight Targeted Review, Sandia National Laboratories - April 2014 April 2014 Targeted Review of the Sandia National Laboratories Federal Assurance Capability The U.S. Department of Energy (DOE) Office of Enforcement and Oversight, within the Office of Health, Safety and Security (HSS), conducted an independent review of the performance of the DOE Sandia Field Office safety oversight of

  15. Independent Peer Review Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Independent Peer Review Program Independent Peer Review Program 2014 PERT Charter.pdf (680.02 KB) More Documents & Publications Procurement Evaluation & Re-Engineering Team (PERT) and Establishment of a 5-year Cycle with Corresponding Schedule Hydropower Vision Task Force Charter NETWG Charter

  16. Joint Integration Office Independent Review Committee annual report, 1985

    SciTech Connect

    Not Available

    1986-08-01

    Comprised of seven persons with extensive experience in the issues of nuclear waste, the Independent Review Committee (IRC) provides independent and objective review of Defense Transuranic Waste Program (DTWP) activities managed by the Joint Integration Office (JIO), formerly the Defense Transuranic Waste Lead Organization (TLO). The Committee is ensured a broad, interdisciplinary perspective since its membership includes representatives from the fields of nuclear engineering, nuclear waste transportation, industrial quality control, systems and environmental engineering and state and local government. The scope of IRC activities includes overall review of specific TLO plans, projects and activities, and technical review of particular research and development projects. The Committee makes specific suggestions and recommendations based upon expertise in the field of TRU Waste Management. The IRC operates as a consulting group, under an independent charter providing objective review of program activities. This report summarizes the 12 major topics reviewed by the committee during 1985.

  17. Independent Oversight Review, National Nuclear Security Administration

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Production Office - February 2014 | Department of Energy National Nuclear Security Administration Production Office - February 2014 Independent Oversight Review, National Nuclear Security Administration Production Office - February 2014 February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security,

  18. Independent Oversight Review, Babcock & Wilcox Technical Services...

    Energy.gov [DOE] (indexed site)

    July 2012 Review of the Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project This report provides the ...

  19. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Environmental Management (EM)

    in Technical Area-55 that were conducted July 18 through August 19, 2011. The independent review was performed by the U.S. Department of Energy's (DOE) Office of Safety and ...

  20. External Independent Review (EIR) Standard Operating Procedure (SOP) October 2015

    Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PMOA) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress with an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and ultimately fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedures (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PMOA, its support contractors, DOE Program offices and project teams.

  1. External Independent Review (EIR) Standard Operating Procedure (SOP) April 2016

    Energy.gov [DOE]

    The Office of Project Management Oversight and Assessments (PM) performs External Independent Reviews (EIRs) to provide Project Management Executives (PMEs), senior leaders within the Department of Energy (DOE), and Congress an unbiased assessment of whether a capital asset project can be executed within proposed scope, schedule and cost commitments, while also meeting its key performance parameters and fulfilling its associated mission need. The objectives of this EIR Standard Operating Procedure (SOP) document are to clarify EIR expectations and to facilitate EIR planning and execution by PM, its support contractors, DOE Program offices and project teams.

  2. Independent technical review of the Pinellas Plant

    SciTech Connect

    Not Available

    1994-07-01

    This report documents an Independent Technical Review (ITR) of facilities, organizations, plans, activities and various other elements required to successfully transition the Pinellas Plant from Defense Program (DP) funded operation to either community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Department of Energy (DOE) Deputy Assistant Secretary for Facility Transition and Management (EM-60) and is a consensus of the nine member ITR Team.

  3. Independent technical review of the Mound Plant

    SciTech Connect

    Not Available

    1994-06-01

    This report documents an Independent Technical Review (ITR) of the facilities, organizations, plans, and activities required to transition particular elements of the Mound Plant from Defense Program (DP) funded operation as appropriate either to community developed reuse or safe deactivation leading to decontamination and decommissioning (D&D). The review was conducted at the request of the Dr. Willis Bixby, Deputy Assistant Secretary, U.S. Department of Energy EM-60, Office of Facility Transition and Management and is a consensus of the nine member ITR Team. Information for the review was drawn from documents provided to the ITR Team by the Miamisburg Area Office (MB) of the DOE, EG&G, the City of Miamisburg, and others; and from presentations, discussions, interviews, and facility inspections at the Mound Plant during the weeks of March 14 and March 28, 1994. During the week of April 25, 1994, the ITR Team met at Los Alamos, New Mexico to develop consensus recommendations. A presentation of the core recommendations was made at the Mound Plant on May 5, 1994. This is an independent assessment of information available to, and used by, the Mound Plant personnel. Repetition of the information is not meant to imply discovery by the ITR Team. Team members, however, acting as independent reviewers, frequently assess the information from a perspective that differs significantly from that of the Mound Plant personnel. The report is based on information obtained and conditions observed during the March 1994 review interval. The ITR process and normal site work often initiate rapid, beneficial changes in understanding and organization immediately following the review. These changes frequently alter conditions observed during the review, but the report does not address changes subsequent to the review interval.

  4. Independent Activity Report, Portsmouth/Paducah Project Office...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Independent Activity Report, PortsmouthPaducah Project Office - April 2013 April 2003 Operational Awareness Oversight of the PortsmouthPaducah Project Office (PPPO) Performance ...

  5. Pantex Falling Man - Independent Review Panel Report.

    SciTech Connect

    Bertolini, Louis; Brannon, Nathan; Olson, Jared; Price, Bernard; Wardle, Robert; Steinzig, Mike; Winfield, Michael

    2014-11-01

    Consolidated Nuclear Security (CNS) Pantex took the initiative to organize a Review Panel of subject matter experts to independently assess the adequacy of the Pantex Tripping Man Analysis methodology. The purpose of this report is to capture the details of the assessment including the scope, approach, results, and detailed Appendices. Along with the assessment of the analysis methodology, the panel evaluated the adequacy with which the methodology was applied as well as congruence with Department of Energy (DOE) standards 3009 and 3016. The approach included the review of relevant documentation, interactive discussion with Pantex staff, and the iterative process of evaluating critical lines of inquiry.

  6. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    SciTech Connect

    Ruth, M.

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  7. Independent Oversight Assessment, Idaho Cleanup Project Sodium...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Waste Treatment Project - November 2012 November 2012 Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project This report...

  8. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review ...

  9. Independent Oversight Review, Hanford Site K-West Annex Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of ...

  10. BETO Project Management Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Management Review June 25, 2015 Jonathan Male Director, Bioenergy Technologies Office (BETO) 2 | Bioenergy Technologies Office I. BETO Portfolio II. Coordination of Technology Areas III. Synergies IV. Project Impacts V. Technology Pathways VI. Budget Priorities VII. Other Technologies & Market Trends VIII. New Initiatives Outline 3 | Bioenergy Technologies Office BETO Portfolio * Integration of lessons learned for IBRs - BETO's IBR Investment Report has been finalized and will be

  11. Independent Oversight Assessment, Salt Waste Processing Facility Project -

    Office of Environmental Management (EM)

    January 2013 | Department of Energy Salt Waste Processing Facility Project - January 2013 Independent Oversight Assessment, Salt Waste Processing Facility Project - January 2013 January 2013 Assessment of Nuclear Safety Culture at the Salt Waste Processing Facility Project The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent assessment of nuclear safety culture at the

  12. Independent Oversight Review, Idaho Site - November 2012 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    November 2012 Review of Radiation Protection Program Implementation at the Idaho Site This report documents an independent review of radiation protection program implementation at ...

  13. Independent Oversight Follow-up Review, Idaho Site - January...

    Office of Environmental Management (EM)

    Follow-up Review of Activity-Level Implementation of Radiation Controls and Radiological ... This report documents the results of an independent oversight review of radiation ...

  14. Independent Oversight Review, Sandia Site Office - January 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sandia Site Office - January 2013 Independent Oversight Review, Sandia Site Office - January 2013 January 2013 Review of the Sandia Site Office Quality Assurance Assessment of the ...

  15. Independent Oversight Review, Nevada Site Office - October 2011...

    Energy Saver

    Site Office - October 2011 Independent Oversight Review, Nevada Site Office - October 2011 October 2011 Review of Nevada Site Office Criticality Safety Assessments at the ...

  16. Independent Oversight Review, Hanford Site Waste Treatment and...

    Energy Saver

    Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford ...

  17. Independent Oversight Review, Savannah River Site Salt Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    August 2013 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - August 2013 August 2013 Review of the Savannah River Site Salt Waste Processing...

  18. Independent Oversight Review, Waste Isolation Pilot Plant - April...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 2013 Independent Oversight Review, Waste Isolation Pilot Plant - April 2013 April 2013 Review of the Waste Isolation Pilot Plant Work Planning and Control Activities The...

  19. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    March 2014 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - March 2014 March 2014 Review of the Hanford Site Waste Treatment and Immobilization...

  20. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  1. Independent Oversight Review, Hanford Site - July 2012 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    July 2012 Review of the Hanford Site Employee Concerns Programs TThis report provides the results of an independent oversight review of the Hanford Site Employee Concerns Programs. ...

  2. Independent Oversight Review, Hanford Tank Farms - December 2012...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    - December 2012 December 2012 Review of the Hanford Tank Farms Radiological Controls Activity-Level Implementation This report documents an independent review by the Office of...

  3. Independent Oversight Review, Hanford Site Waste Treatment and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Waste Treatment and Immobilization Plant, August 2013 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant, August 2013 August 2013 Review of the ...

  4. Independent Oversight Follow-up Review, Savannah River National...

    Office of Environmental Management (EM)

    Review, Los Alamos National Laboratory - December 2013 Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility - January 2012

  5. Independent Oversight Special Review, Department of Energy sites...

    Office of Environmental Management (EM)

    of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of...

  6. Independent Oversight Review, Waste Isolation Pilot Plant - November...

    Office of Environmental Management (EM)

    Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot ...

  7. Independent Oversight Targeted Review, Y-12 National Security...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Y-12 National Security Complex - February 2012 Independent Oversight Targeted Review, Y-12 National Security Complex - February 2012 February 2012 Targeted Review of Site...

  8. Independent Oversight Review, Los Alamos Site Office - March...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Office - March 2012 Independent Oversight Review, Los Alamos Site Office - March 2012 March 2012 Review of the Los Alamos Site Office Safety System Oversight Program ...

  9. Independent Oversight Review of the Savannah River Field Office...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Independent Oversight Review of the Savannah River Field Office Tritium Facilities ... areas as health physics services (dosimetry, institutional procedures and ...

  10. Independent Oversight Review, DOE Headquarters Facilities - March 2002 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy DOE Headquarters Facilities - March 2002 Independent Oversight Review, DOE Headquarters Facilities - March 2002 March 2002 Review of the Headquarters Facilities Emergency Response Plans This report provides the results of an independent review of the emergency response plans for the Department of Energy's Headquarters facilities. The review was performed in February 2002 by the DOE Office of Independent Oversight and Performance Assurance. The purpose of the review was

  11. PROJECT PROFILE: Council of Independent Colleges in Virginia (Solar Market

    Energy Saver

    Pathways) | Department of Energy Council of Independent Colleges in Virginia (Solar Market Pathways) PROJECT PROFILE: Council of Independent Colleges in Virginia (Solar Market Pathways) Title: A Solar Market Pathway for Independent Colleges in Virginia CICV logo.png Funding Opportunity: Solar Market Pathways SunShot Subprogram: Soft Costs Location: Bedford, VA Amount Awarded: $807,563 Awardee Cost Share: $409,357 The Council of Independent Colleges in Virginia (CICV) is leading a Solar

  12. Waste Treatment Plant External Independent Review, Office of River Protection, Richland

    Energy.gov [DOE]

    External Independent Review (EIR).  On March 28 - April 1, the Office of Project Management Oversight and Assessments (PM) will lead the site visit for the first phase of the WTP Baseline Change...

  13. Independent Oversight Review, Y-12 National Security Complex...

    Office of Environmental Management (EM)

    - March 2014 March 2014 Review of the Uranium Processing Facility Project Design ... and configuration management program at the Uranium Processing Facility (UPF) project. ...

  14. Independent Oversight Review, Y-12 National Security Complex - June 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy June 2012 Independent Oversight Review, Y-12 National Security Complex - June 2012 June 2012 Review of the Y-12 Implementation Verification Review Processes This report documents the results of an independent review of the implementation verification review (IVR) processes at the Department of Energy's (DOE) Y-12 National Security Complex. The review was conducted March 12-30, 2012, by the DOE Office of Safety and Emergency Management Evaluations, which is within the

  15. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 | Department of Energy Portsmouth Gaseous Diffusion Plant - April 2013 Independent Oversight Review, Portsmouth Gaseous Diffusion Plant - April 2013 April 2013 Review of the Integrated Safety Management System Phase I Verification Review at the Portsmouth Gaseous Diffusion Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Portsmouth/Paducah

  16. Independent Oversight Review, National Nuclear Security Administration...

    Office of Environmental Management (EM)

    February 2014 Review of the National Nuclear Security Administration Production Office Readiness Review Program The U.S. Department of Energy (DOE) Office of Enforcement and ...

  17. Independent Oversight Targeted Review, Sandia National Laboratories...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Targeted Review, Sandia National Laboratories - November 2013 December 2013 Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National ...

  18. Independent Oversight Review, Savannah River Site- August 2011

    Energy.gov [DOE]

    Review of Commercial Grade Dedication Plans for the Safety Instrumented System at the Savannah River Site Waste Solidification Building Project

  19. Independent Oversight Review, Savannah River Site- July 2011

    Energy.gov [DOE]

    Review of Electrical System Configuration Management and Design Change Control at the Savannah River Site, Waste Solidification Building Project

  20. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant...

    Office of Environmental Management (EM)

    The contractor at PORTS is Fluor-Babcock & Wilcox Portsmouth (FBP). The HSS Office of Safety and Emergency Management Evaluations performed the onsite portion of the Independent ...

  1. Independent Oversight Review of the Lawrence Livermore National Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  2. Location Independent Professional Project: A Pilot Study

    SciTech Connect

    Hudson, J.A.; Long, J.P.; Miller, M.M.

    1999-02-01

    This pilot study project explored the problem of providing access to the nomadic worker who desires to connect a computer through network access points at a number of different locations within the SNL/NM campus as well as outside the campus. The design and prototype development gathered knowledge that may allow a design to be developed that could be extended to a larger number of SNL/NM network drop boxes. The focus was to provide a capability for a worker to access the SNL IRN from a network drop box (e.g. in a conference room) as easily as when accessing the computer network from the office normally used by the worker. Additional study was done on new methods to authenticate the off campus worker, and protect and control access to data.

  3. Independent Oversight Review, Savannah River Site Salt Waste Processing

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facility - April 2014 | Department of Energy Salt Waste Processing Facility - April 2014 Independent Oversight Review, Savannah River Site Salt Waste Processing Facility - April 2014 April 2014 Review of the Savannah River Site Salt Waste Processing Facility Construction Quality and Fire Protection Systems The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security, conducted an independent review of the

  4. Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Isolation Pilot Plant - November 2012 Independent Oversight Review, Waste Isolation Pilot Plant - November 2012 November 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Waste Isolation Pilot Plant The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the U.S. Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) preparedness for severe

  5. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 2013 | Department of Energy January 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - January 2013 January 2013 Review of the Hanford Waste Treatment and Immobilization Plant Black-Cell and Hard-To-Reach Pipe Spools Procurement Process and the Office of River Protection Audit of That Process The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted a concurrent independent review with

  6. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    May 2013 | Department of Energy May 2013 Independent Oversight Review, Waste Treatment and Immobilization Plant - May 2013 May 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality The U.S. Department of Energy (DOE) Office of Enforcement and Oversight (Independent Oversight) within the Office of Health, Safety and Security (HSS) conducted an independent review of selected aspects of construction quality at the Hanford Site Waste Treatment and

  7. Independent Oversight Review, Hanford K Basin and Cold Vacuum...

    Energy.gov [DOE] (indexed site)

    Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations This report provides the results of an independent oversight review of operations...

  8. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Energy.gov [DOE] (indexed site)

    Facilities - June 2012 More Documents & Publications Technical Qualification Program Self-Assessment Report - Savannah River Site Office - 2011 Independent Oversight Review,...

  9. Independent Oversight Review of DOE Headquarters Emergency Response...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    March 26, 2003 The Secretary of Energy's Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE ...

  10. Independent Oversight Review, Los Alamos National Laboratory- December 2011

    Energy.gov [DOE]

    Review of the Independent Integrated Safety Management/Integrated Work Management Assessment of Research and Development and Programmatic Work at the Los Alamos National Laboratory

  11. Distributed Hydrogen Production from Natural Gas: Independent Review

    SciTech Connect

    Fletcher, J.; Callaghan, V.

    2006-10-01

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  12. Independent Oversight Review, Hanford Tank Farms - April 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the management of safety class or safety significant structures, systems and ...

  13. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oversight), within the Office of Health, Safety and Security (HSS), conducted an independent review of the implementation of the electrical safety management program (SMP) at the ...

  14. Distributed Hydrogen Production from Natural Gas: Independent Review Panel Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    Independent review report on the available information concerning the technologies needed for forecourts producing 150 kg/day of hydrogen from natural gas.

  15. Enterprise Assessments Review, Idaho Cleanup Project - September 2014 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Idaho Cleanup Project - September 2014 Enterprise Assessments Review, Idaho Cleanup Project - September 2014 September 2014 Review of the Idaho Cleanup Project Integrated Waste Treatment Unit Federal Readiness Assessment at the Idaho Site The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) was established in May 2014 and assumed responsibility for managing the Department's Independent Oversight Program for the Department's former Office

  16. Independent Oversight Review, Idaho Site, March 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site, March 2013 Independent Oversight Review, Idaho Site, March 2013 March 2013 Review of the Facility Representative Program at the Idaho Site The U.S. Department of Energy (DOE)...

  17. Independent Oversight Follow-up Review, Hanford Site - June 2011...

    Energy.gov [DOE] (indexed site)

    Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program This report provides the results of a follow-up independent oversight review of the Hanford Site...

  18. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES...

    Office of Environmental Management (EM)

    ... project can be executed within proposed scope, schedule and cost commitments, while also ... Definitive integrated scope, schedule and cost baselines has been developed * CD-3, ...

  19. EXTERNAL INDEPENDENT REVIEW (EIR) STANDARD OPERATING PROCEDURES...

    Energy Saver

    ... quality assurance, sustainability, and environmental, ... with project team success metrics? Are there appropriate ... and well-informed of DOE policy and guidance? Does the ...

  20. External Independent Review (EIR) Standard Operating Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The purpose is to provide the Acquisition Executive and senior leadership within the Department of Energy, as well as Congress confidence, with minimal bias, that the project can ...

  1. Independent Oversight Review, Hanford Waste Treatment and Immobilization

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Plant - December 2013 | Department of Energy Waste Treatment and Immobilization Plant - December 2013 Independent Oversight Review, Hanford Waste Treatment and Immobilization Plant - December 2013 December 2013 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review,

  2. Independent Oversight Review, Savannah River Operations Office - July 2013

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Operations Office - July 2013 Independent Oversight Review, Savannah River Operations Office - July 2013 July 2013 Review of the Employee Concerns Program at the Savannah River Operations Office The purpose of this Independent Oversight targeted review was to evaluate DOE-SR processes and their implementation for addressing safety concerns reported by DOE, contractor, and subcontractor employees at the Savannah River Site (SRS). This targeted review was performed at

  3. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    August 2012 | Department of Energy August 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - August 2012 August 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of Construction Quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). The review was performed February 6-10, 2012, and April 30 - May 4, 2012, by the U.S. Department of

  4. Independent Oversight Review, Waste Treatment and Immobilization Plant -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    October 2012 | Department of Energy October 2012 Independent Oversight Review, Waste Treatment and Immobilization Plant - October 2012 October 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent review of selected aspects of construction quality at the Department of Energy's (DOE) Hanford Site Waste Treatment and Immobilization Plant. The review was conducted August 6-10, 2012, by the DOE Office of

  5. Independent Oversight Special Review, Department of Energy sites - February

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2008 | Department of Energy Department of Energy sites - February 2008 Independent Oversight Special Review, Department of Energy sites - February 2008 February 2008 Independent Oversight Special Review of Workplace Exposure Monitoring This report provides the results of a Special Review of Construction Safety and Health Programs at Department of Energy (DOE) sites. This special review is based on data collected from late 2005 to early 2008 during scheduled inspections performed by the DOE

  6. Independent Oversight Review, National Energy Technology Laboratory...

    Energy Saver

    Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory This report documents the results of an ...

  7. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lawrence Livermore National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Lawrence Livermore National Laboratory This report documents the...

  8. Independent Oversight Review, Pacific Northwest National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pacific Northwest National Laboratory - September 2013 September 2013 Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression...

  9. Independent Oversight Review, Argonne National Laboratory - November...

    Energy.gov [DOE] (indexed site)

    Office of Health, Safety and Security. The review was carried out within the broader context of an ongoing program of assessments of the execution of implementation verification...

  10. Independent Oversight Review, Waste Treatment and Immobilization...

    Energy.gov [DOE] (indexed site)

    Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality ... construction quality at the Hanford Site Waste Treatment and Immobilization Plant (WTP). ...

  11. Independent Oversight Review, Lawrence Livermore National Laboratory...

    Energy.gov [DOE] (indexed site)

    Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore ... Nuclear Security Administration (NNSA) Livermore Field Office (LFO) and Lawrence ...

  12. Independent Oversight Review, Waste Treatment and Immobilization...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 2012 Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity The Office of Enforcement and...

  13. Independent Oversight Review, Los Alamos National Laboratory...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This report discusses the scope, background, methodology, results, and conclusions of the review, as well as opportunities for improvement and items identified for further ...

  14. Independent Oversight Review, Idaho National Laboratory - July...

    Energy Saver

    of Health, Safety and Security. The review evaluated the site's processes for identifying emergency response capabilities and maintaining them in a state of readiness in the event...

  15. Independent Oversight Review, Hanford Site - September 2013 ...

    Energy Saver

    Management Evaluations performed this review to evaluate the processes for identifying emergency response capabilities and maintaining them in a state of readiness in case of a...

  16. Independent Peer Review Program | Department of Energy

    Energy Saver

    Peer Review Program PDF icon 2014 PERT Charter.pdf More Documents & Publications Hydropower Vision Task Force Charter Policy Flash 2013-65 Procurement Evaluation &...

  17. Independent engineering review of the Hanford Waste Vitrification System

    SciTech Connect

    Not Available

    1991-10-01

    The Hanford Waste Vitrification Plant (HWVP) was initiated in June 1987. The HWVP is an essential element of the plan to end present interim storage practices for defense wastes and to provide for permanent disposal. The project start was justified, in part, on efficient technology and design information transfer from the prototype Defense Waste Processing Facility (DWPF). Development of other serial Hanford Waste Vitrification System (HWVS) elements, such as the waste retrieval system for the double-shell tanks (DSTs), and the pretreatment system to reduce the waste volume converted into glass, also was required to accomplish permanent waste disposal. In July 1991, at the time of this review, the HWVP was in the Title 2 design phase. The objective of this technical assessment is to determine whether the status of the technology development and engineering practice is sufficient to provide reasonable assurance that the HWVP and the balance of the HWVS system will operate in an efficient and cost-effective manner. The criteria used to facilitate a judgment of potential successful operation are: vitrification of high-level radioactive waste from specified DSTs on a reasonably continuous basis; and glass produced with physical and chemical properties formally acknowledge as being acceptable for disposal in a repository for high-level radioactive waste. The criteria were proposed specifically for the Independent Engineering Review to focus that assessment effort. They are not represented as the criteria by which the Department will judge the prudence of the Project. 78 refs., 10 figs., 12 tabs.

  18. 2015 Project Peer Review

    Energy.gov [DOE]

    The Bioenergy Technologies Office is hosting the 2015 Peer Review on March 23–27, 2015, at the Hilton Mark Center, in Alexandria, Virginia.

  19. SCDAP/RELAP5 independent peer review

    SciTech Connect

    Corradini, M.L. . Dept. of Nuclear Engineering); Dhir, V.K. Santa Monica, CA ); Haste, T.J. ); Heames, T.J. ); Jenks, R.P. ); Kelly, J.E. (Sandia National Labs., Albuquerque, NM

    1993-01-01

    The SCDAP/RELAP5 code has been developed for best-estimate transient simulation of light-water-reactor coolant systems during severe accidents. The newest version of the code is SCDAP/RELAP5/MOD3. The US Nuclear Regulatory Commission (NRC) decided that there was a need for a broad technical review of the code by recognized experts to determine overall technical adequacy, even though the code is still under development. For this purpose, an eight-member SCDAP/RELAP5 Peer Review Committee was organized, and the outcome of the review should help the NRC prioritize future code-development activity. Because the code is designed to be mechanistic, the Committee used a higher standard for technical adequacy than was employed in the peer review of the parametric MELCOR code. The Committee completed its review of the SCDAP/RELAP5 code, and the findings are documented in this report. Based on these findings, recommendations in five areas are provided: (1) phenomenological models, (2) code-design objectives, (3) code-targeted applications, (4) other findings, and (5) additional recommendations.

  20. Independent Oversight Review, Hanford Site Waste Treatment and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Immobilization Plant - June 2014 | Department of Energy Hanford Site Waste Treatment and Immobilization Plant - June 2014 Independent Oversight Review, Hanford Site Waste Treatment and Immobilization Plant - June 2014 June 2014 Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality This report documents the results of an independent oversight review of selected aspects of construction quality at the Hanford Site Waste Treatment and Immobilization Plant. The

  1. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Los Alamos National Laboratory - April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Emergency Response Organization at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency response organization program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of

  2. Independent Oversight Review, Los Alamos National Laboratory - September

    Office of Environmental Management (EM)

    Department of Energy May 2012 Independent Oversight Review, Los Alamos National Laboratory - May 2012 May 2012 Review of Site Preparedness for Severe Natural Phenomena Events at the Los Alamos National Laboratory his report provides the results of an independent review of the Los Alamos National Laboratory's preparedness for severe natural phenomena events that was conducted by the U.S. Department of Energy's Office of Health, Safety and Security (HSS) in March 2012. The HSS Office of Safety

  3. Independent Oversight Review, Los Alamos National Laboratory - April 2012 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy April 2012 Independent Oversight Review, Los Alamos National Laboratory - April 2012 April 2012 Review of the Consequence Assessment Program at the Los Alamos National Laboratory This report provides the results of an independent review of the Los Alamos National Laboratory emergency management consequence assessment program that was conducted February 7-9, 2012, by the Office of Safety and Emergency Management Evaluations within the Department of Energy's (DOE) Office

  4. Independent Oversight Review, Los Alamos National Laboratory - January 2013

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy January 2013 Independent Oversight Review, Los Alamos National Laboratory - January 2013 January 2013 Review of the Los Alamos National Laboratory Corrective Action Effectiveness Review The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), evaluated the Los Alamos Site Office (LASO) safety system oversight (SSO) assessment of Los Alamos National Laboratory's (LANL) corrective actions to address prior

  5. Independent Oversight Review, Los Alamos National Laboratory - November

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 | Department of Energy November 2013 Independent Oversight Review, Los Alamos National Laboratory - November 2013 November 2013 Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation This report documents the results of an independent oversight review of radiological protection program activity-level implementation performed by Los Alamos National Security and its subcontractors at Los Alamos National Laboratory, Los Alamos Neutron Science

  6. Independent Oversight Review, Rocky Flats Environmental Technology Site -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    March 2000 | Department of Energy Rocky Flats Environmental Technology Site - March 2000 Independent Oversight Review, Rocky Flats Environmental Technology Site - March 2000 March 2000 Review of the Rocky Flats Environmental Technology Site Transportation Emergency Management Program This report provides the results of an independent review of the Transportation Emergency Management Program at the Department of Energy's Rocky Flats Environmental Technology Site that was conducted by the

  7. Enterprise Assessments Review of the West Valley Demonstration Project Site

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fire Protection Program - March 2016 | Department of Energy West Valley Demonstration Project Site Fire Protection Program - March 2016 Enterprise Assessments Review of the West Valley Demonstration Project Site Fire Protection Program - March 2016 March 2016 Review of the Fire Protection Program at the West Valley Demonstration Project The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) conducted a review of the fire protection program at the West Valley

  8. Independent Oversight Review, Savannah River Site- June 2012

    Energy.gov [DOE]

    Review of Electrical System Configuration Management, Safety Instrumented System Commercial Grade Dedication, Setpoint Calculations, and Software Testing at the Savannah River Site, Waste Solidification Building Project

  9. Enterprise Assessments Review, West Valley Demonstration Project...

    Energy Saver

    West Valley Demonstration Project. The onsite review was conducted during May 19-22 and June 9-13, 2014. Enterprise Assessments Review, West Valley Demonstration Project - ...

  10. Independent Oversight Review, Department of Energy Contractor - August 2000

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Department of Energy Contractor - August 2000 Independent Oversight Review, Department of Energy Contractor - August 2000 August 2000 Review of Department of Energy Contractor Occupational Medicine Programs from December 1998 to June 1999 This report provides the results of a series of reviews of contractor occupational medicine programs that were conducted at eight Department of Energy (DOE) sites from September 1998 to December 1999. The reviews were conducted by the

  11. The independent review group`s comments on the MPC

    SciTech Connect

    Vincent, J.A.

    1994-10-01

    This article presents comments from the Group (IRG) who independently reviewed the multipurpose canister system (MCS) Conceptual Design Report. The IRG determined that its efforts would be best directed toward providing the DOE with recommendations concerning the MPC system design and development. Comments also focused on applying lessons learned during the CSDP review to the MPC design and procurement. Topics highlighted are the programmatic review and the MPC design review.

  12. 2017 Project Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Events » Meetings & Workshops » 2017 Project Peer Review 2017 Project Peer Review 2017 Project Peer Review The U.S. Department of Energy's Bioenergy Technologies Office (BETO) is hosting the 2017 Project Peer Review on March 5-10, 2017, in Denver, Colorado. Approximately 90% of projects in BETO's research, development, and demonstration portfolio will be presented to the public and systematically reviewed by external subject-matter experts from industry, academia, and federal agencies. The

  13. Project Execution Plan Review Module (RM) | Department of Energy

    Office of Environmental Management (EM)

    Review Module (RM) Project Execution Plan Review Module (RM) The Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project review teams in...

  14. Enterprise Assessments Review, West Valley Demonstration Project...

    Energy.gov [DOE] (indexed site)

    management program at the West Valley Demonstration Project (WVDP) was conducted prior to ... Assessments Review, West Valley Demonstration Project - December 2014 (245.41 KB) ...

  15. California - Establishing Transmission Project Review Streamlining...

    OpenEI (Open Energy Information) [EERE & EIA]

    Regulatory Guidance - Supplemental Material: California - Establishing Transmission Project Review Streamlining DirectivesPermittingRegulatory GuidanceSupplemental Material...

  16. 2015 BALESŽ Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3, 2015 Technology Area Review Kevin Comer, Sr. Project Manager Antares Group, Inc. DOE Bioenergy Technologies Office (BETO) 2015 Project Peer Review 2015 "BALES" Project Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Summary * 3 Year Development and Demonstration Project, Began Sept 2013 * Develop and demonstrate new and improved harvest and processing technologies that will reduce biomass supply chain costs while

  17. Gridley Biofuels Project Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Peer Review 1 Gridley Biofuels Project Technology Area Review: Thermochemical Conversion Dennis Schuetzle, REI International (REII), Sacramento, CA Matt Michaelis, City of Gridley, Gridley CA Alexandria, VA March 26, 2015 A Rice Field near the Sutter Butte Mountains in Northern CA Gridley Biofuels Project Gridley Sacramento Gridley is Centrally Located in the Northern Sacramento Valley 3 Project Goal The primary goal of this final phase (BP2) of the Gridley Biofuels Project during 2015

  18. International project -- RBMK safety review

    SciTech Connect

    Hall, S.F.; Gabaraev, B.A.

    1996-07-01

    A major international RBMK safety review project managed by AEA Technology and funded by the CEC TACIS Programme, and the governments of Canada, Sweden and Finland is assessing the safety of RBMK Reactors as operated in Russia, Lithuania and Ukraine. RBMK reactors have been the subject of numerous safety studies by other Eastern and Western European organizations and Canada. Their objectives were, by necessity, not consistent (for example, identifying the deficiencies, reviewing and assessing the safety, checking the existing safety reports, establishing western style safety justifications). However, they share a common technical content in many areas. As a result a considerable number of Safety Recommendations have already been published. The current problem is to categorize and evaluate these recommendations.

  19. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hydrogen Production Cost Estimate Using Biomass Gasification National Renewable Energy Laboratory 1617 Cole Boulevard * Golden, Colorado 80401-3393 303-275-3000 * www.nrel.gov NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Contract No. DE-AC36-08GO28308 Independent Review Published for the U.S. Department of Energy Hydrogen and Fuel Cells Program NREL/BK-6A10-51726 October

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Biochemical Processing Integration May 20, 2013 Biochemical Conversion Area Daniel Schell NREL This presentation does not contain any proprietary, confidential or otherwise restricted information 2 High-Level Project Goal Supports the mission of BETO and the Biochemical Conversion Technology Area to independently demonstrate integrated process performance and transfer this knowledge to industry, further facilitating BETO's mission

  1. Independent Review of Tank 241-AY-101 Fitness for Service

    SciTech Connect

    Stewart, Charles W.; Bush, Spencer H.; Delegard, Calvin H.; Elmore, Monte R.; Johnson, A. Burton; Pardini, Allan F.; Posakony, Gerald J.; Simonen, Fredric A.; Terry, Michael T.; Zapp, Philip E.

    2003-02-28

    Video inspections in the annulus of Hanford double-shell waste storage tank 241-AY-101 in 2001 and earlier showed rust over large areas of the primary and secondary tank walls. These observations led to extensive on-destructive inspections and analyses to determine the extent and severity of the corrosion and correction of several operational deficiencies that contributed to the problem. PNNL has performed an independent review of the accumulated evidence from these efforts to determine whether unacceptable conditions were corrected and the current condition of the tank meets or exceeds technical and operational requirements. The findings of this review are the subject of this report. The conclusion is that AY-101 is fit for service without restriction subject to several recommendations for further inspections and analyses.

  2. Project Execution and Operational Readiness Reviews

    Energy.gov [DOE]

    PMCDP is offering its annual delivery of the 3-day course, Project Execution and Operational Readiness Reviews, December 15-17, in Washington, D.C.

  3. Independent Oversight Review, Y-12 National Security Complex – March 2014

    Energy.gov [DOE]

    Review of the Uranium Processing Facility Project Design Requirements and Configuration Management Program

  4. ESPC Project Review Comment Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Review Comment Template ESPC Project Review Comment Template Template for project facilitator review of the preliminary assessment, investment-grade audit, commissioning plan, and...

  5. 2008-10 "Independent Review of the MDA G CME Report by DOE Office...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and ...

  6. Enterprise Assessments Review, West Valley Demonstration Project -

    Energy Saver

    Emergency Management Exercise Program - August 2015 | Department of Energy Review of the Y-12 National Security Complex Emergency Management Exercise Program - August 2015 Enterprise Assessments Review of the Y-12 National Security Complex Emergency Management Exercise Program - August 2015 August 2015 Review of Emergency Management Exercise Program The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) conducted a review of National Nuclear Security

  7. Independent Oversight Assessment, Portsmouth/Paducah Project Office- May 2012

    Energy.gov [DOE]

    Assessment of the Portsmouth/Paducah Project Office Conduct of Operations Oversight of the Depleted Uranium Hexafluoride Conversion Plants

  8. Measurement of Hydrogen Production Rate Based on Dew Point Temperatures: Independent Review

    SciTech Connect

    Duffy, M.; Harrison, K.; Sheahen, T.

    2007-11-01

    This independent review verified Idaho National Labotory's approach of measuring the rate of hydrogen production using dew point temperatures.

  9. Current (2009) State-of-the-Art Hydrogen Production Cost Estimate Using Water Electrolysis: Independent Review

    SciTech Connect

    Not Available

    2009-09-01

    This independent review examines DOE cost targets for state-of-the art hydrogen production using water electrolysis.

  10. INDEPENDENT VERIFICATION SURVEY REPORT OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect

    W.C. Adams

    2010-07-21

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-03-0

  11. INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT

    SciTech Connect

    W.C. Adams

    2010-05-24

    INDEPENDENT VERIFICATION SURVEY REPORT FOR THE OPERABLE UNIT-1 LANDFILL TRENCHES, MIAMISBURG CLOSURE PROJECT, MIAMISBURG, OHIO DCN: 0468-SR-02-0

  12. Final Report - Independent Confirmatory Survey Summary and Results for the Hematite Decommissioning Project

    SciTech Connect

    E.N. Bailey

    2009-03-18

    The objectives of the confirmatory surveys were to provide independent contractor field data reviews and to generate independent radiological data for use by the NRC in evaluating the adequacy and accuracy of the licensee’s procedures and survey results.

  13. Independent Oversight Review, DOE Nuclear Facilities- May 2013

    Energy.gov [DOE]

    Lessons Learned from Targeted Reviews of Implementation Verification Review Processes at Department of Energy Nuclear Facilities

  14. Independent Oversight Review, Los Alamos National Laboratory- July 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Los Alamos National Laboratory Implementation Verification Review at Technical Area-55

  15. Independent Oversight Review, Oak Ridge National Laboratory- January 2013

    Energy.gov [DOE]

    Review of the Oak Ridge National Laboratory High Flux Isotope Reactor Implementation Verification Review Processes

  16. PROJECT PROFILE: Council of Independent Colleges in Virginia...

    Energy Saver

    The project team is developing a collaborative and replicable approach that will guide campuses through the process of preparing for and purchasing a solar photovoltaic ...

  17. Midwest Independent Transmission System Operator Smart Grid Project...

    OpenEI (Open Energy Information) [EERE & EIA]

    to optimize the dispatch and operation of power plants while improving the reliability of the bulk transmission system. This project deploys phasor measurement units...

  18. New York Independent System Operator, Inc. Smart Grid Project...

    OpenEI (Open Energy Information) [EERE & EIA]

    capacitors across the New York transmission system. The project aims to improve the reliability of the transmission grid and prevent the spread of local outages to neighboring...

  19. Independent Activity Report, Portsmouth/Paducah Project Office- April 2013

    Energy.gov [DOE]

    Operational Awareness Oversight of the Portsmouth/Paducah Project Office (PPPO) Performance of the Contractor Assurance System Program [HIAR PORTS-2012-09-24

  20. Independent Oversight Review, Plutonium Finishing Plant- July 2014

    Energy.gov [DOE]

    Targeted Review of the Safety Significant Confinement Ventilation System and Review of Federal Assurance Capability at the Plutonium Finishing Plant

  1. Independent Oversight Review, Argonne National Laboratory- November 2011

    Energy.gov [DOE]

    Review of the Argonne National Laboratory Alpha-Gamma Hot Cell Facility Readiness Assessment (Implementation Verification Review Sections)

  2. External Independent Review (EIR) Scoping Meeting Agreement Form...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Acquisition and Project Management (OAPM) must perform a Performance ... expectations for both the CD-2 and CD-3 EIR, and thereby facilitate the project planning process. ...

  3. 2013 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project and Program Statistical Calculations Overview 2013 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle ...

  4. 2011 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project and Program Statistics Calculations Overview 2011 Annual Merit Review Results Report - Project and Program Statistics Calculations Overview Merit review of DOE Vehicle ...

  5. 2014 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project and Program Statistical Calculations Overview 2014 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle ...

  6. 2012 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project and Program Statistical Calculations Overview 2012 Annual Merit Review Results Report - Project and Program Statistical Calculations Overview Merit review of DOE Vehicle ...

  7. Energy Design Assistance Project Tracker - 2014 BTO Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Design Assistance Project Tracker - 2014 BTO Peer Review Energy Design Assistance Project Tracker - 2014 BTO Peer Review Presenter: Larry Brackney, National Renewable Energy ...

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (BETO) Project Peer Review Resource Analysis Project WBS 1.6.1.3 Date: May 20 th , 2013 Technology Area Review: Analysis and Sustainability Principal Investigator: Matt Langholtz ...

  9. Independent Oversight Review, Nevada National Security Site, December 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Targeted Review of the Safety Significant Blast Door and Special Door Interlock Systems and Review of Federal Assurance Capability at the Nevada National Security Site

  10. Independent Oversight Review of Department of Energy Contractor...

    Energy.gov [DOE] (indexed site)

    The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was ...

  11. Independent Oversight Review, Hanford Waste Treatment and Immobilizati...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The scope of this quarterly assessment of construction quality review included observations of ongoing work activities, review of the Bechtel National, Inc. (BNI) corrective action ...

  12. Independent Oversight Assessment, Idaho Cleanup Project Sodium Bearing Waste Treatment Project- November 2012

    Energy.gov [DOE]

    Assessment of Nuclear Safety Culture at the Idaho Cleanup Project Sodium Bearing Waste Treatment Project

  13. Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation

    Office of Environmental Management (EM)

    Management Program - March 2014 | Department of Energy Review, Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office

  14. Independent Oversight Review, Pantex Plant, December 2013 | Department...

    Energy Saver

    The Pantex Plant is operated by Babcock & Wilcox Technical Services Pantex, LLC under contract to the National Nuclear Security Administration Production Office. Independent ...

  15. Independent Oversight Review, Savannah River Site Tritium Facilities...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independentreview of preparedness for severe ...

  16. Independent Oversight Review, Paducah Site - April 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Office of Enforcement and Oversight (Independent Oversight), within the Office of Health, Safety and Security (HSS), conducted an independentreview of the U.S. Department of ...

  17. Independent Oversight Follow-up Review of Activity Level Implementatio...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Although the computer station is located within the posted contamination area, this is a ... were jointly witnessed by Independent Oversight and a DOE-ID MFC Facility Representative. ...

  18. Independent Oversight Activity Report for Review of Corrective...

    Office of Environmental Management (EM)

    of radiological posting and labeling, proper personal protective equipment doffing and contamination control, and response to abnormal operations. Result: Independent Oversight...

  19. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant – November 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Preparedness for Severe Natural Phenomena Events at the Portsmouth Gaseous Diffusion Plant.

  20. Independent Specific Administrative Controls Review, Richland Operations Office- December 2010

    Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at DOE-Richland Operations Office

  1. Independent Oversight Review, Lawrence Livermore National Laboratory- July 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Preparedness for Severe Natural Phenomena Events at the Lawrence Livermore National Laboratory

  2. Independent Oversight Review, Hanford Tank Farms- November 2011

    Energy.gov [DOE]

    Review of Hanford Tank Farms Safety Basis Amendment for Double-Shell Tank Ventilation System Upgrades

  3. Independent Oversight Review, Lawrence Livermore National Laboratory- August 2014

    Energy.gov [DOE]

    Review of the Lawrence Livermore National Laboratory Radiological Controls Activity-Level Implementation.

  4. Independent Oversight Review, Los Alamos National Laboratory- July 2014

    Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Transuranic Waste Facility Safety Basis and Design Development

  5. Independent Oversight Review, Lawrence Livermore National Laboratory- September 2011

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Integrated Safety Management System Effectiveness at Lawrence Livermore National Laboratory

  6. Independent Oversight Review, Los Alamos National Laboratory- January 2012

    Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Waste Characterization, Reduction, and Repackaging Facility Fire Suppression System

  7. Independent Oversight Review, Los Alamos National Laboratory – December 2013

    Energy.gov [DOE]

    Review of the Technical Area 55 Safety Class Fire Suppression System at Los Alamos National Laboratory

  8. Independent Oversight Review, Idaho National Laboratory- September 2011

    Energy.gov [DOE]

    Review of the Occupational Radiation Program as Implemented and Recently Enhanced at the Idaho National Laboratory

  9. Independent Oversight Review, Savannah River Site Tritium Facilities- December 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Site Preparedness for Severe Natural Phenomena Events at the Savannah River Site Tritium Facilities

  10. Independent Oversight Review, Savannah River Site- September 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Savannah River Site, Salt Waste Processing Facility, Construction Quality of Piping & Pipe Supports

  11. Independent Oversight Review, Portsmouth Gaseous Diffusion Plant- January 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Portsmouth Gaseous Diffusion Plant Work Planning and Control Activities Prior to Work Execution

  12. Independent Oversight Targeted Review, Sandia National Laboratories – November 2013

    Energy.gov [DOE]

    Targeted Review of Activity-Level Implementation of Radiological Controls at Sandia National Laboratories

  13. Full Reviews: Low-temperature and Exploration Demonstration Projects...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Low-temperature and Exploration Demonstration Projects Full Reviews: Low-temperature and Exploration Demonstration Projects Below are the project presentations and respective peer ...

  14. Voluntary Protection Program Onsite Review, Idaho Cleanup Project...

    Energy Saver

    Idaho Cleanup Project- June 2007 Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007 June 2007 Evaluation to determine whether the Idaho Cleanup Project is...

  15. Multi Canister Overpack (MCO) Handling Machine Independent Review of Seismic Structural Analysis

    SciTech Connect

    SWENSON, C.E.

    2000-09-22

    The following separate reports and correspondence pertains to the independent review of the seismic analysis. The original analysis was performed by GEC-Alsthom Engineering Systems Limited (GEC-ESL) under subcontract to Foster-Wheeler Environmental Corporation (FWEC) who was the prime integration contractor to the Spent Nuclear Fuel Project for the Multi-Canister Overpack (MCO) Handling Machine (MHM). The original analysis was performed to the Design Basis Earthquake (DBE) response spectra using 5% damping as required in specification, HNF-S-0468 for the 90% Design Report in June 1997. The independent review was performed by Fluor-Daniel (Irvine) under a separate task from their scope as Architect-Engineer of the Canister Storage Building (CSB) in 1997. The comments were issued in April 1998. Later in 1997, the response spectra of the Canister Storage Building (CSB) was revised according to a new soil-structure interaction analysis and accordingly revised the response spectra for the MHM and utilized 7% damping in accordance with American Society of Mechanical Engineers (ASME) NOG-1, ''Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder).'' The analysis was re-performed to check critical areas but because manufacturing was underway, designs were not altered unless necessary. FWEC responded to SNF Project correspondence on the review comments in two separate letters enclosed. The dispositions were reviewed and accepted. Attached are supplier source surveillance reports on the procedures and process by the engineering group performing the analysis and structural design. All calculation and analysis results are contained in the MHM Final Design Report which is part of the Vendor Information File 50100. Subsequent to the MHM supplier engineering analysis, there was a separate analyses for nuclear safety accident concerns that used the electronic input data files provided by FWEC/GEC-ESL and are contained in document SNF-6248

  16. A Review of Market Monitoring Activities at U.S. Independent System

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operators | Department of Energy A Review of Market Monitoring Activities at U.S. Independent System Operators A Review of Market Monitoring Activities at U.S. Independent System Operators Evaluate and report on market performance. Propose changes to rules to improve market operation and performance. Monitor compliance with the rules and apply mitigating measures and sanctions when applicable and authorized. A Review of Market Monitoring Activities at U.S. Independent System Operators

  17. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Energy.gov [DOE] (indexed site)

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  18. Independent Oversight Focused Review, Kansas City Plant, Summary...

    Energy.gov [DOE] (indexed site)

    1 Focused Review of Environment, Safety and Health and Emergency Management at the Kansas City Plant This report provides a summary of the results of a focused review of the...

  19. Independent Oversight Review, Oak Ridge Office- August 2011

    Energy.gov [DOE]

    Review of the Oak Ridge Office Oversight of the Fire Protection Program at the Oak Ridge Reservation

  20. Independent Oversight Review, Los Alamos Field Office – March 2014

    Energy.gov [DOE]

    Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation.

  1. Independent Oversight Review, National Energy Technology Laboratory – May 2014

    Energy.gov [DOE]

    Review of the Emergency Management Program Technical Basis and Emergency Preparedness at the National Energy Technology Laboratory

  2. Independent Oversight Special Review, Bechtel Jacobs Company, LLC- July 2011

    Energy.gov [DOE]

    Special Review of the Suspect/Counterfeit Items Program at the Bechtel Jacobs Company, LLC at the Oak Ridge Reservation

  3. Independent Oversight Review, Los Alamos National Laboratory- January 2013

    Energy.gov [DOE]

    Review of the Los Alamos National Laboratory Weapons Engineering Tritium Facility Tritium Gas Containment Vital Safety System

  4. Independent Oversight Review, Waste Treatment and Immobilization Plant- December 2012

    Energy.gov [DOE]

    Review of the Hanford Site Waste Treatment and Immobilization Plant Low Activity Waste Melter Process System Hazards Analysis Activity

  5. Independent Oversight Focused Review, Kansas City Plant, Summary Report -

    Energy Saver

    | Department of Energy Appraisal, Y-12 National Security Complex - May 2013 Independent Oversight Appraisal, Y-12 National Security Complex - May 2013 May 2013 Appraisal of the Uranium Processing Facility Safety Basis Preliminary Safety Design Report Process at the Y-12 National Security Complex The Office of Safety and Emergency Management Evaluations, within the U.S. Department of Energy (DOE) Office of Health, Safety and Security (HSS) Office of Enforcement and Oversight (Independent

  6. Enterprise Assessments Review, West Valley Demonstration Project – December 2014

    Energy.gov [DOE]

    Review of the West Valley Demonstration Project Emergency Management Program Technical Basis and Emergency Preparedness

  7. 2013 DOE BETO Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 DOE BETO Project Peer Review NREL Sustainability Analysis: Life Cycle Inventory of Air Emissions Date: May 22, 2013 Technology Area: Sustainability PIs: Daniel Inman and Garvin Heath Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information. 2 NREL Sustainability Analysis Goals This project provides analysis to assess the sustainability of renewable fuels in terms of greenhouse gas emissions,

  8. 2013 DOE BETO Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 DOE BETO Project Peer Review Biomass Pyrolysis to Hydrocarbon Fuels in the Petroleum Refining Context Brazil Bilateral: Petrobras - NREL RD&D CRADA WBS: 6.5.1.1 May 21, 2013 Bio-Oil Technology Area Review Helena L. Chum National Renewable Energy Laboratory Andrea Pinho, Petrobras/CENPES This presentation does not contain any proprietary, confidential, or otherwise restricted information NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and

  9. Full Reviews: Low-temperature and Exploration Demonstration Projects

    Energy.gov [DOE]

    Below are the project presentations and respective peer review results for Low-temperature and Exploration Demonstration Projects. The peer review results for each project will be available soon.

  10. Independent Oversight Review, Savannah River Site- January 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Savannah River Site, Waste Solidification Building, Construction Quality of Mechanical Systems Installation and Selected Aspects of Fire Protection System Design

  11. Independent Oversight Review, Oak Ridge Transuranic Waste Processing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ridge Transuranic Waste Processing Facility - December 2013 December 2013 Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing...

  12. Independent Oversight Review, DOE/NNSA Nuclear Facilities- April 2013

    Energy.gov [DOE]

    Lessons Learned from the 2012 Targeted Reviews of Emergency Preparedness for Severe Natural Phenomena Events at Select DOE/NNSA Nuclear Facilities

  13. Independent Oversight Review, Pacific Northwest National Laboratory- October 2012

    Energy.gov [DOE]

    Review of the Department of Energy Office of Science Assessment of the Pacific Northwest National Laboratory Radiochemical Processing Laboratory Criticality Alarm System

  14. Independent Oversight Review of the Lawrence Livermore National...

    Energy.gov [DOE] (indexed site)

    March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department ... Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. ...

  15. Independent Oversight Review, Pantex Site Office- June 2012

    Energy.gov [DOE]

    Review of the Pantex Site Office's Compliance with DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities

  16. Independent Oversight Targeted Review, Oak Ridge National Laboratory- April 2014

    Energy.gov [DOE]

    Targeted Review of Radiological Controls Activity-Level Implementation at the Oak Ridge National Laboratory Radiochemical Engineering Development Center and High Flux Isotope Reactor Facilities

  17. Independent Oversight Review of the Uranium Processing Facilkity...

    Energy Saver

    Oversight Review of the Uranium Processing Facility Design Requirements and Configuration Management Program March 2014 Office of Safety and Emergency Management Evaluations Office ...

  18. Independent Oversight Review, Pacific Northwest National Laboratory- September 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Fire Protection Program at Pacific Northwest National Laboratory and the Fire Suppression System at the Radiochemical Processing Laboratory

  19. Independent Oversight Review, Savannah River Field Office Tritium...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    work planning and control across U.S. Department of Energy sites that have hazard category 1, 2, and 3 facilities. The review was performed at the Savannah River Site from June ...

  20. Independent Oversight Follow-up Review, Hanford Site - February...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 February 2013 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  1. Independent Oversight Follow-up Review, Hanford Site - January...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2014 January 2014 Follow-up Review of the Hanford Site Chronic Beryllium Disease Prevention Program The U.S. Department of Energy (DOE) Office of Enforcement and Oversight...

  2. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    SciTech Connect

    Herborn, D.I.

    1991-10-01

    The requirements for Westinghouse Hanford independent review of the Preliminary Safety Analysis Report (PSAR) are contained in Section 1.0, Subsection 4.3 of WCH-CM-4-46. Specifically, this manual requires the following: (1) Formal functional reviews of the HWVP PSAR by the future operating organization (HWVP Operations), and the independent review organizations (HWVP and Environmental Safety Assurance, Environmental Assurance, and Quality Assurance); and (2) Review and approval of the HWVP PSAR by the Tank Waste Disposal (TWD) Subcouncil of the Safety and Environmental Advisory Council (SEAC), which provides independent advice to the Westinghouse Hanford President and executives on matters of safety and environmental protection. 7 refs.

  3. External Independent Review (EIR) Standard Operating Procedure (SOP) September 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EIR Standard Operating Procedure (SOP) includes discussion of the EIR process, scope elements and lines of inquiry (LOI) (tailored based on the project scope, size, complexity, dollar value, and other factors), Corrective Action Plans (CAP), and OECM’s Performance Baseline validation process.

  4. CNS Project Management and Standard Review Plans | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CNS Project Management and Standard Review Plans CNS Project Management and Standard Review Plans CNS Project Management and Standard Review Plans The experience with major nuclear design and construction projects continues to highlight the importance of a focused, technically rigorous, and standardized approach to project reviews performed at Critical Decision (CD) approval points. This approach is fundamental to a positive safety culture and effective nuclear safety management. The CNS led the

  5. Independent Oversight Review, Babcock & Wilcox Technical Services Y-12, LLC- July 2012

    Energy.gov [DOE]

    Review of the Long Lead Procurement Processed Used by Babcock & Wilcox Technical Services Y-12, LLC for the Uranium Processing Facility Project

  6. 2015 Project Peer Review Program Booklet | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Peer Review Program Booklet 2015 Project Peer Review Program Booklet The Bioenergy Technologies Office (BETO) is hosting the 2015 Project Peer Review on March 23-27, 2015, at the Hilton Mark Center, in Alexandria, Virginia. The program booklet can be found below. 2015_peer_review_program_booklet.pdf (1.9 MB) More Documents & Publications 2015 Project Peer Review Agenda At a Glance Bioproducts to Enable Biofuels Workshop Agenda 2013

  7. Reviewing Measurement and Verification Plans for Federal ESPC Projects |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Reviewing Measurement and Verification Plans for Federal ESPC Projects Reviewing Measurement and Verification Plans for Federal ESPC Projects Document provides a framework for implementing uniform and consistent reviews of measurement and verification plans for federal energy savings performance contract (ESPC) projects. Download the review framework. (184.56 KB) More Documents & Publications Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

  8. Voluntary Protection Program Onsite Review, Waste Treatment Project...

    Office of Environmental Management (EM)

    Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste...

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Peer Review Pilot-Scale Demonstration of a Fully Integrated Process for Converting Woody Biomass into Clean Biomass Diesel Fuel May 21, 2013 Gasification Peer Review This ...

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Peer Review BioChemCat Date: April 21, 2013 Technology Area Review: Gasification Principal ... LLC and PNNL Project holder, Delivery of biomass feedstocks, Public Education & Outreach ...

  11. INDEPENDENT REVIEW OF THE X-701B GROUNDWATER REMEDY, PORTSMOUTH, OHIO: TECHNICAL EVALUATION AND RECOMMENDATIONS

    SciTech Connect

    Looney, B.; Eddy-Dilek, C.; Costanza, J.; Rossabi, J.; Early, T.; Skubal, K.; Magnuson, C.

    2008-12-15

    The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of Environmental Management (EM-22) to provide independent technical experts to evaluate past and ongoing remedial activities at the Portsmouth facility that were completed to address TCE contamination associated with the X-701B groundwater plume and to make recommendations for future efforts. The Independent Technical Review team was provided with a detailed and specific charter. The charter requested that the technical team first review the past and current activities completed for the X-701B groundwater remedy for trichloroethene (TCE) in accordance with a Decision Document that was issued by Ohio EPA on December 8, 2003 and a Work Plan that was approved by Ohio EPA on September 22, 2006. The remedy for X-701B divides the activities into four phases: Phase I - Initial Source Area Treatment, Phase II - Expanded Source Area Treatment, Phase III - Evaluation and Reporting, and Phase IV - Downgradient Remediation and Confirmation of Source Area Treatment. Phase I of the remedy was completed during FY2006, and DOE has now completed six oxidant injection events within Phase II. The Independent Technical Review team was asked to evaluate Phase II activities, including soil and groundwater results, and to determine whether or not the criteria that were defined in the Work Plan for the Phase II end point had been met. The following criteria are defined in the Work Plan as an acceptable Phase II end point: (1) Groundwater samples from the identified source area monitoring wells have concentrations below the Preliminary Remediation Goal (PRG) for TCE in groundwater, or (2) The remedy is no longer effective in removing TCE mass from the source area. In addition, the charter specifies that if the Review Team determines that the Phase II endpoint has not been reached, then the team should address the following issues: (1) If additional injection events are

  12. Independent Review of the July 8, 2010 Fatality at the Strategic...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In consultation with the Assistant Secretary for Fossil Energy (FE), the Chief Health, Safety and Security Officer appointed an Independent Review Board (IRE3) on July 20,201 0, ...

  13. Independent Oversight Review of DOE Headquarters Emergency Response Plans and Performance, March 2003

    Energy.gov [DOE]

    The Secretary of Energy’s Office of Independent Oversight and Performance Assurance (OA) conducted a review of emergency response plans and performance at DOE Headquarters (HQ) in February 2003.

  14. Recommendation 179: DOE Quarterly Project Reviews | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: DOE Quarterly Project Reviews Recommendation 179: DOE Quarterly Project Reviews ORSSAB Recommendation to DOE on Providing Information in the DOE Quarterly Project Reviews. Recommendation 179 (107.34 KB) DOE response to recommendation 179 (293.68 KB) More Documents & Publications Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 164: Recommendation on Engineering and Technology Development on the Oak Ridge Reservation Recommendation 163:

  15. Independent Oversight Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality, June 2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Independent Oversight Review of the Hanford Site Waste Treatment and Immobilization Plant Construction Quality June 2014 Office of Environment, Safety and Health Assessments Office of Independent Enterprise Assessments U.S. Department of Energy Table of Contents 1.0 Purpose ................................................................................................................................................. 1 2.0 Background

  16. Project Execution Plan Review Module (RM) | Department of Energy

    Energy.gov [DOE] (indexed site)

    Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project ... any size and complexity. Project Execution Plan RM (2.32 MB) More Documents & Publications ...

  17. Independent review of design and analysis for Holtec spent fuel storage racks of CPP 666 Pool 1

    SciTech Connect

    Miller, G.K.

    1996-03-01

    This document summarizes the analyses and review performed to develop and validate the design of the new fuel storage racks for the Idaho Chemical Processing Plant (ICPP) Fuel Storage Area (FSA). Holtec International is responsible for the design and fabrication of the storage racks. This report describes the issues raised in the review effort and the resolutions to these issues. The conclusion is reached that the review issues for the racks of Pool 1 have been satisfactorily resolved in the final design and analysis for these racks. Section 1 of this report gives a brief description of the project. Section 2 describes the approach that Holtec used in analyzing the racks and results from these analyses. Section 3 describes the independent review process. Section 4 discusses the identification of and resolution to comments on the design analysis. Section 5 describes additional analysis performed to address major concerns with the Holtec design analysis. Section 6 presents a summary of AEC`s independent review, which is based on AEC`s final review report. Finally, Section 7 gives the Lockheed Idaho Technologies Company (LITCO) position on the acceptability of Holtec`s design.

  18. INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS BROOKHAVEN NATIONAL LABORATORY UPTON, NEW YORK

    SciTech Connect

    P.C. Weaver

    2010-12-15

    5098-SR-03-0 FINAL REPORT- INDEPENDENT VERIFICATION SURVEY OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT OUTSIDE AREAS, BROOKHAVEN NATIONAL LABORATORY

  19. LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BNL

    SciTech Connect

    P.C. Weaver

    2010-10-22

    5098-LR-01-0 -LETTER REPORT INDEPENDENT VERIFICATION OF THE HIGH FLUX BEAM REACTOR DECOMMISSIONING PROJECT FAN HOUSE, BUILDING 704 BROOKHAVEN NATIONAL LABORATORY

  20. Voluntary Protection Program Onsite Review, Waste Treatment Project - May

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2006 | Department of Energy Waste Treatment Project - May 2006 Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 May 2006 Evaluation of Intermech, Inc. activities at the Hanford Waste Treatment Project This report summarizes the team's findings from the evaluation of Intermech, Inc. activities at the Hanford Waste Treatment Project during the week of May 1-2, 2006. Voluntary Protection Program Onsite Review, Waste Treatment Project - May 2006 (204.33 KB) More

  1. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-09-23

    This Guide addresses the various project reviews conducted during the life-cycle of a project based on the stage, complexity and duration of a project. This Guide describes typical reviews, the purpose of each, the timing during the project life-cycle, lines of inquiry, and required documentation. No cancellations.

  2. DEVELOPMENT AND IMPLEMENTATION OF THE LOS ALAMOS NATIONAL LABORATORY INDEPENDENT SAR REVIEW PROCESS.

    SciTech Connect

    J. BUECK; T. MARTH

    2001-05-01

    Contractor independent review of contractor prepared safety documents has ceased as a requirement under DOE orders. However, a recent study to determine root causes of the poor quality and extremely long approval times for Los Alamos National Laboratory nuclear safety document has identified such a review as a crucial step in ensuring quality. LANL has teamed with the DOE Field Office to reinstate an independent review process modeled after DOE-STD-1104. A review guide has been prepared predicated on the content of DOE-STD-3009. Discipline has been enforced to ensure that comments reflect important issues and that resolution of the comment is possible. Safety management at both LANL and DOE have embraced this concept. This process has been exercised and has resulted in improvements in safety analysis quality and a degree of uniformity between DOE and LANL reviews.

  3. Advanced Sensors and Instrumentation Annual Project Review 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Advanced Sensors and Instrumentation (ASI) element of the Nuclear Energy Enabling Technologies (NEET) program conducted its first Annual Project Review Meeting on May 21-22, 2013 in Germantown, Maryland. The purpose of this meeting was to review the status of the 10 ASI projects initiated in FY 2012. The meeting summary and project presentations are available here.

  4. Independent design review report for truck {number_sign}1 modifications for flammable gas tanks

    SciTech Connect

    Wilson, G.W.

    1997-05-09

    The East and West Tank Farm Standing Order 97-01 requires that the PMST be modified to include purging of the enclosed space underneath the shielded receiver weather cover per National Fire Protection Association (NFPA) 496, Purged and Pressurized Enclosures for Electrical Equipment. The Standing Order also requires that the PMST be modified by replacing the existing electrical remote latch (RLU) unit with a mechanical remote latch unit. As the mechanical remote latch unit was exactly like the RLU installed on the Rotary Mode Core Sampler Trucks (RMCST) and the design for the RMCST went through formal design review, replacing the RLU was done utilizing informal design verification and was completed per work package ES-97-0028. As the weather cover purge was similar to the design for the RMCSTS, this design was reviewed using the independent review method with multiple independent reviewers. A function design criteria (WHC-SD-WM-FDC-048, Functional Design Criteria for Core Sampling in Flammable Gas Watch List Tanks) provided the criteria for the modifications. The review consisted of distributing the design review package to the reviewers and collecting and dispositioning the RCR comments. The review package included the ECNs for review, the Design Compliance Matrix, copies of all drawings affected, and copies of outstanding ECNs against these drawings. A final meeting was held to ensure that all reviewers were aware of the changes to ECNs from incorporation of RCR comments.

  5. Microsoft Word - HABAdv#228_Independent Review of BerylliumProgram.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    HAB Consensus Advice # 228 Subject: Independent Review of Beryllium Program Adopted: February 5, 2010 Page 1 February 5, 2010 Inés Triay, Assistant Secretary for Environmental Management EM-1/Forestal Building U.S. Department of Energy 1000 Independence Avenue Washington, D.C. 20585 Steven Krahn, Deputy Assistance Secretary U.S. Department of Energy, Office of Health, Safety and Security HS-10 / GTN 1000 Independence Avenue, SW Washington, D.C. 20585 David Brockman, Manager U.S. Department of

  6. Vehicle Technologies Office Merit Review 2014: EV Project: Solar...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells ...

  7. Status Report: EM Acquisition and Project Management Review

    Office of Environmental Management (EM)

    Report: Acquisition and Project Management Review August 15, 2006 Submitted ... Management Advisory Board is in the process of ... Terri Lamb, Executive Director of EMAB, forwarded ...

  8. A Compilation and Review of Alaska Energy Projects

    SciTech Connect

    Arlon Tussing; Steve Colt

    2008-12-31

    There have been many energy projects proposed in Alaska over the past several decades, from large scale hydro projects that have never been built to small scale village power projects to use local alternative energy sources, many of which have also not been built. This project was initially intended to review these rejected projects to evaluate the economic feasibility of these ideas in the light of current economics. This review included contacting the agencies responsible for reviewing and funding these projects in Alaska, including the Alaska Energy Authority, the Denali Commission, and the Arctic Energy Technology Development Laboratory, obtaining available information about these projects, and analyzing the economic data. Unfortunately, the most apparent result of this effort was that the data associated with these projects was not collected in a systematic way that allowed this information to be analyzed.

  9. Independent Technical Review of the X-740 Groundwater Remedy, Portsmouth, Ohio: Technical Evaluation and Recommendations

    SciTech Connect

    Looney, B.; Rhia, B.; Jackson, D.; Eddy-Dilek, C.

    2010-04-30

    site history and data and organizing the information into a conceptual model and findings to assist in evaluating the potential of alternative remediation technologies. Examples of the key conceptual findings of the EM-32 review team were: (1) The Gallia represents the most practical target for deployment of in situ remediation treatment reagents - injection/extraction focused in this zone would provide maximum lateral impacts with minimal potential risk of failure or adverse collateral impacts. (2) The slow release of TCE from clay and sandstone into the Gallia represent a long term source of TCE that can re-contaminate the Gallia in the future - technologies that effectively treat the permeable portions of the Gallia, but do not leave residual treatment capacity in the system are unlikely to achieve long term remedial action objectives. CDM, the site contractor, provided important and useful information documenting the status and preliminary results of the on-site technology alternative evaluation. In the CDM evaluation, potential technologies were either retained (or screened out) in two preliminary evaluation phases and a detailed evaluation was performed on the five alternatives that were retained into the final 'detailed analysis' phase. The five alternatives that were included in the detailed analysis were: (1) hydraulic fracturing with EHC (a solid bioremediation amendment), (2) enhanced anaerobic bioremediation, (3) in situ chemical oxidation, (4) electrical resistance heating, and (5) reactive barriers. In several cases, two or three variants were separately evaluated. The review team found the CDM effort to be generally credible and reasonable. Thus, the review team focused on providing additional considerations and inputs to Portsmouth and on amending and refining the alternatives in ways that might improve performance and/or reduce costs. The Department of Energy Portsmouth Paducah Project Office requested assistance from Department of Energy Office of

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (BETO) Project Peer Review Collaborative: Algae-based biofuels integrated assessment framework development, evaluation, and demonstration (PNNL) MAY 23, 2013 TECHNOLOGY AREA REVIEW: ALGAE PRINCIPAL INVESTIGATOR: RICHARD SKAGGS PACIFIC NORTHWEST NATIONAL LABORATORY This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Goal: This collaborative project couples PNNL's Biomass Assessment Tool (BAT) with the Algae Logistics Model (ALM)

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Tuesday, May 21 st , 2013 Technology Area Review: Biochemical Conversion Principal Investigator: David K. Johnson Organization: National Renewable Energy Laboratory 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Pretreatment and Enzyme Hydrolysis This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Project Overview *2 Develop and apply fundamental knowledge of pretreatment and enzymatic hydrolysis concepts in process-relevant

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Engineering Zymomonas mobilis for Hydrocarbon Fuels Production Date: May 22, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Min Zhang Organization: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement * Project objectives - Develop biological catalysts for production of fuel molecules and/or

  13. 2008-10 "Independent Review of the MDA G CME Report by DOE Office of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Groundwater and Soil Remediation" | Department of Energy 0 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" 2008-10 "Independent Review of the MDA G CME Report by DOE Office of Groundwater and Soil Remediation" The intent of this recommendation is to perform an independent and informed review of the MDA G CME which can be referenced by LANL in their discussions with NMED during the NMED acceptance review. This independent

  14. U.S. Department of Energy Project Review Guide for Capital Asset Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-09-23

    This guide is a tool for Federal Project Directors (FPD) and Federal Program Managers in planning and preparing for appropriate reviews as an integral part of the project planning and implementation cycle.

  15. 2015 Project Peer Review | Department of Energy

    Office of Environmental Management (EM)

    Approximately 185 projects in BETO's research, development, and demonstration portfolio ... Conversion Thermochemical Conversion Demonstration and Market Transformation ...

  16. Super Truck Program: Engine Project Review

    Energy.gov [DOE]

    2011 DOE Hydrogen and Fuel Cells Program, and Vehicle Technologies Program Annual Merit Review and Peer Evaluation

  17. SuperTruck Program: Engine Project Review

    Office of Energy Efficiency and Renewable Energy (EERE)

    2013 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Program Annual Merit Review and Peer Evaluation Meeting

  18. Objective and independent review system for SRP (Savannah River Plant) nonreactor facilities

    SciTech Connect

    Durant, W.S.

    1986-01-29

    The review system described in DPW-83-112 effectively provides objective and independent review for operation of SRP non-reactor nuclear facilities. Safe operation is ensured by trained personnel; an extensive system of Operational Safety Requirements, Technical Standards, written procedures and safety documents; incident investigation and reporting; and internal auditing. Implementation of DOE Order 5480.1A, Chapter V will be completed with issue of Operational Safety Requirements for all the non-reactor designated facilities in March 1986. 6 refs., 1 fig.

  19. Welding and nondestructive examination issues at Seabrook Nuclear Station: An independent review team report

    SciTech Connect

    Spessard, R.L.; Coley, J.; Crowley, W.; Walton, G.

    1990-07-01

    In response to congressional concerns about the adequacy of the welding and nondestructive examination (NDE) programs at the Seabrook Nuclear Station, NRC senior management established an independent review team (IRT) to conduct an assessment. The IRT focused on the quality of the finished hardware and associated records, as well as on the adequacy of the overall quality assurance program as applied to the fabrication and NDE programs for pipe welds. This report documents the findings of that investigation.

  20. SuperTruck Program: Engine Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Year 4 (PY4) BTE Improvement 2.1% Further increase in compression ratio (CR), piston bowl and matching injector profile optimization. Third iteration of...

  1. DOE CD-4 Review of the MINERvA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE CD-4 Review of the MINERvA Project Main INjector ExpeRiment v-A May 12, 2010 | Overview | CD-4 Documentation| Other Documents| Overview of Charge and Experiment MINERvA Overview (2.2 MB pdf) Review Agenda (all times EDT) (pdf) Review Charge (pdf) Review Presentation by MINERvA Project (DRAFT until the week of May 12) (docdb page) Required CD-4 Documentation CD-4 Document Checklist (pdf) Technical Requirements Completion Document (pdf) Quality Assurance Plan (pdf) Safety Documentation Hazard

  2. DOE Bioenergy Technologies Office: Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PMP in Additional Slides. *MYPP: Multi-Year Program Plan, April 2012 Project Overview * FY04 to FY06: Focus on hydrogen from biomass via gasification * FY07 to FY12: Focus on ...

  3. DOE Hydrogen Pipeline R&D Project Review Meeting

    Energy.gov [DOE]

    On January 5th and 6th, 2005, the FreedomCAR and Fuels Partnership Hydrogen Delivery Tech Team hosted a project review meeting at Oak Ridge National Laboratory in Oak Ridge, Tennessee. The invitees...

  4. 2015 Project Peer Review Agenda At a Glance

    Energy.gov [DOE]

    The Bioenergy Technologies Office (BETO) is hosting the 2015 Project Peer Review on March 23–27, 2015, at the Hilton Mark Center, in Alexandria, Virginia. The overview meeting agenda can be found below.

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 DOE Bioenergy Technologies Office (BETO) Project Peer Review Mild Biomass Liquefaction Process for Economic production of Stabilized Refinery- Ready Bio-Oils May 20-24, 2013 Bio-Oil Technology Area Review Santosh Gangwal, Kevin McCabe, Andrew Campos and Demps Pettway Southern Research Institute This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement Project Goal * Demonstrate a mild thermochemical liquefaction process to

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Optimized Co-processing of Algal Bio-Crude Through a Petroleum Refinery 23 May 2013 Bio-Oil Technology Area Review Benjamin Saydah Sapphire Energy Goal/Objective Statement * Sapphire produces an algae bio-crude that is similar to petroleum crude oil * This project will establish the optimal refinery operating conditions required to upgrade algae bio-crude produced via the Sapphire process * Identifying the operating conditions

  7. 2016 University Turbine Systems Research Project Review Meeting

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Student Employment Brochure 2016 Student Employment Brochure This year's brochure listing the veriest programs with in the Department of Energy for students and recent graduates. Student Employment Brochure_2016_ final.pdf (311.21 KB) More Documents & Publications MICKEY LELAND ENERGY FELLOWSHIP 2017 FLYLER

    Conference Proceedings 2016 UNIVERSITY TURBINE SYSTEMS RESEARCH PROJECT REVIEW MEETING November 1-3, 2016 Blackburg, VA Agenda The 2016 UTSR Project Review Meeting was held on November

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    proprietary, confidential, or otherwise restricted information. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review International Sustainability and Standards (ISO) and Brazil collaborations May 23, 2013 Technology Area: Analysis & Sustainability Principal Investigator: Keith L. Kline Oak Ridge National Laboratory 2 Managed by UT-Battelle for the Department of Energy Project * Build international consensus around criteria, definitions and measurement methods required to assess

  9. Spent Nuclear Fuel (SNF) Project Cask and MCO Helium Purge System Design Review Completion Report Project A.5 and A.6

    SciTech Connect

    ARD, K.E.

    2000-04-19

    This report documents the results of the design verification performed on the Cask and Multiple Canister Over-pack (MCO) Helium Purge System. The helium purge system is part of the Spent Nuclear Fuel (SNF) Project Cask Loadout System (CLS) at 100K area. The design verification employed the ''Independent Review Method'' in accordance with Administrative Procedure (AP) EN-6-027-01.

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technologies Office (BETO) Project Peer Review Defining Sustainability Date: May 22, 2013 Technology Area Review: Analysis and Sustainability Principal Investigator: Virginia Dale Organization: Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information. Goal Statement * Goal: To ensure long term supply of sustainable feedstock and bioenergy by determining - How bioenergy production can affect sustainability - How those

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Genomatica Sustainable Chemicals Genomatica Sustainable Chemicals Development of an Integrated Biofuel and Chemical Refinery John D. Trawick Research Fellow, Genomatica 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Date: 21 May 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Mark Burk Organization: Genomatica This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Demonstrate the

  12. Annual Merit Review Evaluates Impact of Sustainable Transportation Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nearly 400 Energy Department activities and projects will be judged by reviewers from a variety of scientific backgrounds at the Vehicle Technologies Office and Hydrogen and Fuel Cells Program Annual Merit Review and Peer Evaluation Meeting in Washington, D.C., which is free of charge and open to the public.

  13. Independent Oversight Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of Los Alamos National Laboratory Radiological Controls Activity-Level Implementation - February 12, 2014

    Office of Environmental Management (EM)

    HSS Independent Activity Report - Rev. 0 Report Number: HIAR LANL-2014-02-12 Site: Los Alamos National Laboratory (LANL) Subject: Office of Enforcement and Oversight's Office of Safety and Emergency Management Evaluations Activity Report for Review of Corrective Actions for Findings from the Independent Oversight Review of LANL Radiological Controls Activity-Level Implementation (Published November 2013) Dates of Activity : 02/12/2014 Report Preparer: Robert Freeman, Nuclear Engineer Activity

  14. A review of market monitoring activities at U.S. independent system operators

    SciTech Connect

    Lesieutre, Bernard C.; Goldman, Charles; Bartholomew, Emily

    2004-01-01

    Policymakers have increasingly recognized the structural impediments to effective competition in electricity markets, which has resulted in a renewed emphasis on the need for careful market design and market monitoring in wholesale and retail electricity markets. In this study, we review the market monitoring activities of four Independent System Operators in the United States, focusing on such topics as the organization of an independent market monitoring unit (MMU), the role and value of external market monitors, performance metrics and indices to aid in market analysis, issues associated with access to confidential market data, and market mitigation and investigation authority. There is consensus across the four ISOs that market monitoring must be organizationally independent from market participants and that ISOs should have authority to apply some degree of corrective actions on the market, though scope and implementation differ across the ISOs. Likewise, current practices regarding access to confidential market data by state energy regulators varies somewhat by ISO. Drawing on our interviews and research, we present five examples that illustrate the impact and potential contribution of ISO market monitoring activities to enhance functioning of wholesale electricity markets. We also discuss several key policy and implementation issues that Western state policymakers and regulators should consider as market monitoring activities evolve in the West.

  15. Reviews and Validations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital ...

  16. US-VISIT Independent Verification and Validation Project: Test Bed Establishment Report

    SciTech Connect

    Jensen, N W; Gansemer, J D

    2011-01-21

    This document describes the computational and data systems available at the Lawrence Livermore National Laboratory for use on the US-VISIT Independent Verification and Validation (IV&V) project. This system - composed of data, software and hardware - is designed to be as close as a representation of the operational ADIS system as is required to verify and validate US-VISIT methodologies. It is not required to reproduce the computational capabilities of the enterprise-class operational system. During FY10, the test bed was simplified from the FY09 version by reducing the number of database host computers from three to one, significantly reducing the maintenance and overhead while simultaneously increasing system throughput. During the current performance period, a database transfer was performed as a set of Data Pump Export files. The previous RMAN backup from 2007 required the availability of an AIX system which is not required when using data pump. Due to efficiencies in the new system and process, loading of the database refresh was able to be accomplished in a much shorter time frame than was previously required. The FY10 Oracle Test Bed now consists of a single Linux platform hosting two Oracle databases including the 2007 copy as well as the October 2010 refresh.

  17. U.S. Department of Energy Project Review Guide for Capital Asset...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9, U.S. Department of Energy Project Review Guide for Capital Asset Projects by John Makepeace Functional areas: Program Management, Project Management This Guide addresses the...

  18. 2010 Solar Program Peer Review Report: An Independent Evaluation of Program Activities for FY2009 and FY2010

    SciTech Connect

    DOE Solar Energy Technologies Program

    2010-12-01

    This document summarizes the recommendations and evaluations provided by an independent external panel of experts at the DOE Solar Energy Technologies Program's 2010 Program Review meeting, held on May 24?27, 2010, in Washington, D.C.

  19. FINAL REPORT INDEPENDENT VERIFICATION SURVEY SUMMARY AND RESULTS FOR THE ARGONNE NATIONAL LABORATORY BUILDING 330 PROJECT FOOTPRINT, ARGONNE, ILLINOIS

    SciTech Connect

    ERIKA N. BAILEY

    2012-02-29

    ORISE conducted onsite verification activities of the Building 330 project footprint during the period of June 6 through June 7, 2011. The verification activities included technical reviews of project documents, visual inspections, radiation surface scans, and sampling and analysis. The draft verification report was issued in July 2011 with findings and recommendations. The contractor performed additional evaluations and remediation.

  20. Independent Review of AFC 2A, 2B, and 2E ATR Irradiation Tests

    SciTech Connect

    M. Cappiello; R. Hobbins; K. Penny; L. Walters

    2014-01-01

    As part of the Department of Energy Advanced Fuel Cycle program, a series of fuels development irradiation tests have been performed in the Advanced Test Reactor (ATR) at the Idaho National Laboratory. These tests are providing excellent data for advanced fuels development. The program is focused on the transmutation of higher actinides which best can be accomplished in a sodium-cooled fast reactor. Because a fast test reactor is no longer available in the US, a special test vehicle is used to achieve near-prototypic fast reactor conditions (neutron spectra and temperature) for use in ATR (a water-cooled thermal reactor). As part of the testing program, there were many successful tests of advanced fuels including metals and ceramics. Recently however, there have been three experimental campaigns using metal fuels that experienced failure during irradiation. At the request of the program, an independent review committee was convened to review the post-test analyses performed by the fuels development team, to assess the conclusions of the team for the cause of the failures, to assess the adequacy and completeness of the analyses, to identify issues that were missed, and to make recommendations for improvements in the design and operation of future tests. Although there is some difference of opinion, the review committee largely agreed with the conclusions of the fuel development team regarding the cause of the failures. For the most part, the analyses that support the conclusions are sufficient.

  1. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton

    2009-10-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  2. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton; Kent Norris

    2010-03-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  3. Independent Verification and Validation Of SAPHIRE 8 Software Project Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Carl Wharton; Kent Norris

    2009-12-01

    This report provides an evaluation of the Project Plan. The Project Plan is intended to provide the high-level direction that documents the required software activities to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  4. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    SciTech Connect

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  5. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 1

    SciTech Connect

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and U S Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Applied Membrane Technology for Processing of Ethanol from Biomass Date: May 20-23, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Stuart Nemser, PhD Organization: Compact Membrane Systems Goal Statement * Enhance the low-cost production of bioethanol * Develop membrane system * Demonstrate drying ethanol to fuel grade * Demonstrate long term resistance 2 Quad Chart Overview Timeline * Project start date: 6/29/2006 * Project end date: 3/31/2013 * Percent complete:

  7. Targeted Microbial Development Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Targeted Microbial Development Date: March 23-27 Technology Area Review: Biochemical Platform Principal Investigator: Michael E. Himmel Task Leads: Min Zhang & Gregg Beckham Organization: NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Present the goal of this project and describe how the project fits with the goals/objectives of the Technology Area and ultimately the goals/objectives of the DOE Bioenergy

  8. Independent review of Oak Ridge HCTW test program and development of seismic evaluation criteria

    SciTech Connect

    1995-05-01

    Many of the existing buildings at the Oak Ridge Y-12 Plant are steel frame construction with unreinforced hollow clay tile infill walls (HCTW). The HCTW infill provides some lateral seismic resistance to the design/evaluation basis earthquake; however acceptance criteria for this construction must be developed. The basis for the development of seismic criteria is the Oak Ridge HCTW testing and analysis program and the target performance goals of DOE 5480.28 and DOE-STD-1020-94. This report documents and independent review of the testing and analysis program and development of recommended acceptance criteria for Oak Ridge HCTW construction. The HCTW test program included ``macro`` wall in-plane and out-of-plane tests, full-scale wall in-plane and out-of-plane tests, in-situ out-of-plane test, shake table tests, and masonry component tests.

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 Bio-Oil Technology Area Review May 22, 2013 Zia Abdullah Battelle Memorial Institute John Lee Pacific Northwest National Laboratory 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information Upgrading of Biomass Fast Pyrolysis Oil (Bio-oil) * *2 Goal/Objective Statement Develop a hydroprocessing system & catalysts tailored for the Catalytic Bio-Oil produced by Battelle's Ex Situ

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Avello ® and Bioasphalt® are trademarks of Avello Bioenergy, Inc. Copyright © 2013 All rights reserved. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Demonstration of Pyrolysis Biorefinery Concept for Biopower, Biomaterials and Biochar May 20, 2013 Bio-Oil Technology Area Review Dennis S Banasiak, PhD Avello Bioenergy, Inc. This presentation does not contain any proprietary, confidential, or otherwise restricted information TM Avello ® and Bioasphalt® are trademarks of

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bio-Oil Technology Area Review Joseph Libera and Jeffrey Elam 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review 3.3.1.11. Selective Deoxygenation Catalysts This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement 2  Develop and demonstrate catalysts synthesized by Atomic Layer Deposition for long-lived service in deoxygenation of biomass pyrolysis oil.  FOA - none  Effective and long-lived catalysts

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review New Technology for Hydroprocessing Bio-oils to Fuels May 20, 2013 Bio-Oil Technology Area Review Stephen R. Schmidt Grace New Business Development/Catalysts This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement 2 Goal: demonstrate viability of a new reactor technology and improved-stability catalyst(s) for hydrotreating pyrolysis oils to yield transportation

  13. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Peer Review LBNL PDU Support Advanced Biofuels Process Demonstration Unit The First Year Date: May 22, 2013 Technology Area Review: Biochemical Conversion WBS 2.3.1.6 Principal Investigator: Julio Baez Organization: Lawrence Berkeley National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Established that the unit can enable researchers (public & private) to evaluate, adapt, develop, demonstrate, and transfer

  14. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Steven W. Peretti, peretti@ncsu.edu Presenter: Sunkyu Park, sunkyu_park@ncsu.edu Organization: North Carolina State University 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review This presentation does not contain any proprietary, confidential, or otherwise restricted information * Biomass Pretreatment and Reactivity of the Resulting Sugars - How does residual lignin effect enzymatic hydrolysis? - How

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Producing Transportation Fuels via Photosynthetically-derived Ethylene * Date: May 22, 2013 * Technology Area Review: Biochemical Conversion * Principal Investigator: Jianping Yu * Organization: National Renewable Energy Laboratory This presentation does not contain

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This presentation does not contain any proprietary, confidential, or otherwise restricted information 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review Renewable Enhanced Feedstocks for Advanced Biofuels and Bioproducts (REFABB) Date: May 23 rd 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Oliver P. Peoples, PhD Organization: Metabolix © 2013 Metabolix 2 Goal Statement Goals and Technology Fit Technology Area Fit The goal of the REFABB

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (BETO) Project Peer Review 1.3.1.3 Feedstock Logistics Fundamentals Date: May 21, 2013 Technology Area Review: Feedstock Supply & Logistics Presenter: Jaya Shankar Tumuluru Principal Investigators: Jeff Lacey, Jaya Shankar Tumuluru, David Thompson, Vicki Thompson Organization: Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Energy Efficiency & Renewable Energy eere.energy.gov 2 Develop and demonstrate

  18. 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Investigators, Projects, and Organizations | Department of Energy 8 Annual Merit Review Results Summary - 18. Cross-Reference of Project Investigators, Projects, and Organizations 2008 Annual Merit Review Results Summary - 18. Cross-Reference of Project Investigators, Projects, and Organizations DOE Vehicle Technologies Annual Merit Review 2008_merit_review_18.pdf (368.74 KB) More Documents & Publications 2010 Annual Merit Review Results Cross Reference of PIs and Organizations DOE

  19. Independent Review of Simulation of Net Infiltration for Present-Day and Potential Future Climates

    SciTech Connect

    Review Panel: Soroosh Sorooshian, Ph.D., Panel Chairperson, University of California, Irvine; Jan M. H. Hendrickx, Ph.D., New Mexico Institute of Mining and Technology; Binayak P. Mohanty, Ph.D., Texas A&M University; Scott W. Tyler, Ph.D., University of Nevada, Reno; Tian-Chyi Jim Yeh, Ph.D., University of Arizona -- ORISE Review Facilitators: Robert S. Turner, Ph.D., Technical Review Group Manager, Oak Ridge Institute for Science and Education; Brian R. Herndon, Project Manager, Oak Ridge Institute for Science and Education; Russ Manning, Technical Writer /Editor, Haselwood Enterprises, Inc.

    2008-08-30

    The DOE Office of Civilian Radioactive Waste Management (OCRWM) tasked Oak Ridge Institute for Science and Education (ORISE) with providing an independent expert review of the documented model and prediction results for net infiltration of water into the unsaturated zone at Yucca Mountain. The specific purpose of the model, as documented in the report MDL-NBS-HS-000023, Rev. 01, is “to provide a spatial representation, including epistemic and aleatory uncertainty, of the predicted mean annual net infiltration at the Yucca Mountain site ...” (p. 1-1) The expert review panel assembled by ORISE concluded that the model report does not provide a technically credible spatial representation of net infiltration at Yucca Mountain. Specifically, the ORISE Review Panel found that: • A critical lack of site-specific meteorological, surface, and subsurface information prevents verification of (i) the net infiltration estimates, (ii) the uncertainty estimates of parameters caused by their spatial variability, and (iii) the assumptions used by the modelers (ranges and distributions) for the characterization of parameters. The paucity of site-specific data used by the modeling team for model implementation and validation is a major deficiency in this effort. • The model does not incorporate at least one potentially important hydrologic process. Subsurface lateral flow is not accounted for by the model, and the assumption that the effect of subsurface lateral flow is negligible is not adequately justified. This issue is especially critical for the wetter climate periods. This omission may be one reason the model results appear to underestimate net infiltration beneath wash environments and therefore imprecisely represent the spatial variability of net infiltration. • While the model uses assumptions consistently, such as uniform soil depths and a constant vegetation rooting depth, such assumptions may not be appropriate for this net infiltration simulation because they

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    US-India Consortium For Development of Sustainable Advanced Lignocellulosic Biofuels Systems Date: May 22, 2013 Technology Area Review: Biochemical Conversion Dr. Pratap Pullammanappallil, University of Florida Dr. Shibu Jose, University of Missouri Dr. Janaki Alavalapati, Virginia Tech This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement 2 The project goals: * Sustainable switchgrass feedstock development using marginal lands. *

  1. Baseline review of the U.S. LHC Accelerator project

    SciTech Connect

    1998-02-01

    The Department of Energy (DOE) Review of the U.S. Large Hadron Collider (LHC) Accelerator project was conducted February 23--26, 1998, at the request of Dr. John R. O`Fallon, Director, Division of High Energy Physics, Office of Energy Research, U.S. DOE. This is the first review of the U.S. LHC Accelerator project. Overall, the Committee found that the U.S. LHC Accelerator project effort is off to a good start and that the proposed scope is very conservative for the funding available. The Committee recommends that the project be initially baselined at a total cost of $110 million, with a scheduled completion data of 2005. The U.S. LHC Accelerator project will supply high technology superconducting magnets for the interaction regions (IRs) and the radio frequency (rf) straight section of the LHC intersecting storage rings. In addition, the project provides the cryogenic support interface boxes to service the magnets and radiation absorbers to protect the IR dipoles and the inner triplet quadrupoles. US scientists will provide support in analyzing some of the detailed aspects of accelerator physics in the two rings. The three laboratories participating in this project are Brookhaven National Laboratory, Fermi National Accelerator Laboratory (Fermilab), and Lawrence Berkeley National Laboratory. The Committee was very impressed by the technical capabilities of the US LHC Accelerator project team. Cost estimates for each subsystem of the US LHC Accelerator project were presented to the Review Committee, with a total cost including contingency of $110 million (then year dollars). The cost estimates were deemed to be conservative. A re-examination of the funding profile, costs, and schedules on a centralized project basis should lead to an increased list of deliverables. The Committee concluded that the proposed scope of US deliverables to CERN can be readily accomplished with the $110 million total cost baseline for the project. The current deliverables should serve as

  2. Independent Verification Survey Report for the Operable Unit-1 Miamisburg Closure Project, Miamisburg, OH

    SciTech Connect

    Weaver, P.

    2008-03-17

    The objectives of the independent verification survey were to confirm that remedial actions have been effective in meeting established release criteria and that documentation accurately and adequately describes the current radiological and chemical conditions of the MCP site.

  3. Independent Oversight Follow-up Review, Savannah River National Laboratory- January 2012

    Energy.gov [DOE]

    Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site

  4. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  5. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  6. Independent Verification and Validation Of SAPHIRE 8 Software Requirements Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2009-09-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE requirements definition is to assess the activities that results in the specification, documentation, and review of the requirements that the software product must satisfy, including functionality, performance, design constraints, attributes and external interfaces. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP).

  7. Biochemical Feedstock Interface Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Feedstock Interface BETO 2015 Project Peer Review March 23, 2015 Washington D.C. Nick Nagle Allison Ray Garold Gresham National Renewable Energy Laboratory Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information WBS 2.2.1.100, 2.2.1.101, & 2.2.1.102 2 | Bioenergy Technologies Office Goal Statement Goal: * Understand the impact of feedstock logistics & preprocessing on blend conversion performance Relevance to BETO

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office (BETO) Project Peer Review 9.1.3.2 Microalgal Harvesting/ Dewatering and Algae Feedstock Logistics May 20, 2013 Algae Platform Deborah Newby, Ph.D. Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement To advance algal biofuel feasibility through: * Investigation of algal dewatering * Consideration of post harvest stability * Characterization of algae feedstock and its potential use in formulated

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    GCAM Bioenergy and Land Use Modeling May 21, 2013 Technology Area Review: Analysis and Sustainability Principal Investigator: Marshall Wise Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * The main objective is to model and study the long-term global potential and role of bioenergy using the PNNL Global Change Assessment Model (GCAM) - Project supports BETO

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Liquefaction of Forest Biomass to "Drop-in" Hydrocarbon Biofuels May 23, 2013 Bio-Oil Technology Area Review Robert C. Brown Iowa State University This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal/Objective Statement * Project Goal: Demonstrate solvent liquefaction as a viable pathway to stable intermediates that can be upgraded to fuel blendstocks * Funding Opportunity Announcement DE-FOA-00005100 * R&D, demonstration, and

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Integration and Scale Up WBS# 3.3.1.13 May 22, 2013 Technology Area Review: Bio-Oils Mark Davis and Esther Wilcox Organizations: National Renewable Energy Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Project Goal: Demonstrate/validate the individual unit operations along with integrated production of cost competitive hydrocarbons at the pilot scale Objectives - Construct a

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Bioenergy Technologies Office (BETO) Project Peer Review National Advanced Biofuels Consortium May 20, 2013 Thomas D. Foust NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 What is the NABC? * The National Advanced Biofuels Consortium (NABC) is a collaboration among U.S. Department of Energy national laboratories, universities, and private industry that is developing technologies to produce infrastructure- compatible, biomass-based

  13. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Refinery Upgrading of Hydropyrolysis Oil from Biomass May 23, 2012 Bio-Oil Technology Area Review Terry Marker GTI This presentation does not contain any proprietary, confidential, or otherwise restricted information Project Goals and Objectives * Develop a cost effective route for converting biomass to transportation fuels by - Converting biomass to hydropyrolysis oil - Upgrading the hydropyrolysis oil in a petroleum refinery using existing refinery equipment - Working closely with a major

  14. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Engineering yeast consortia for surface-display of complex cellulosome structures: A consolidated bioprocessing approach from cellulosic biomass to ethanol Date: May 21, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Wilfred Chen Organization: University of Delaware This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * The goal of the project is to develop a synthetic yeast consortium for direct

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Deployment of a Short Rotation Woody Crops Harvesting System Based on a Case New Holland Forage Harvester and SRC Woody Crop Header Date: May 22, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Timothy A. Volk Organization: SUNY-ESF Project Partners Goal Statement Develop, test and deploy a single pass cut and chip harvester combined with a handling, transportation and storage system that is effective and efficient in a range of different short rotation

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Genera Energy Inc. ● 167 Tellico Port Road ● Vonore, TN 37885 Development of a Bulk-Format System to Harvest, Handle, Store, and Deliver High-Tonnage Low-Moisture Switchgrass Feedstock 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review May 19-23, 2013 Feedstock Supply & Logistics Al Womac, University of Tennessee Lead Organization: Genera Energy Inc. Goal Statement  Develop and test bulk-format logistics for low-moisture switchgrass incorporating bulk-handled loose,

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review 6.5.2.5 China Task May 20-23, 2013 Feedstock Production and Logistics Platform Christopher T. Wright, PhD Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Biomass Program eere.energy.gov * Establish a U.S. and China international feedstock working group to identify and research barriers in biomass production, logistics, and feedstock quality for

  18. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NC A&T Renewable Energy Center -Production of High-Quality Syngas via Biomass Gasification for Catalytic Synthesis of Liquid Fuels and Combined Heat and Power Generation May 21st 2013 Technology Area Review: Biomass Gasification Ghasem Shahbazi and Lijun Wang Biological Engineering North Carolina Agricultural and Technical State University Goal Statement The major goal of this project is to develop an efficient gasification system in order to convert woody biomass and agricultural residue

  19. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Logistics, Costs, and GHG of Co-firing with 20% Biomass May 23, 2013 Technology Area Review: Heat and Power Principal Investigators: J.L. Male, R.D. Boardman Organization: PNNL, INL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement & Project Overview History: Biopower Technical Strategy Workshop held by the Bioenergy Technologies Office (BETO) on December 2-3, 2009 Priority

  20. 2015 Carbon Storage Project Review Meeting | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Carbon Storage R&D Project Review Meeting Meeting Summary Presentations Tuesday, August 18, 2015 OPENING PLENARY SESSION - KEYNOTE PRESENTATION Transforming Technology Through Integration and Collaboration Grace M. Bochenek, Ph.D., Director, U.S. Department of Energy, National Energy Technology Laboratory DOE's Clean Coal RD&D Program Mark Ackiewicz, Office of Fossil Energy, U.S. Department of Energy Overview of the Norwegian RD&D CCS Program (CLIMIT) Hans Jörg Fell, Gassnova IEAGHG

  1. 1990 DOE/SANDIA crystalline photovoltaic technology project review meeting

    SciTech Connect

    Ruby, D.S.

    1990-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia's Photovoltaic Cell Research Division and Photovoltaic Technology Division. It contains information supplied by each organization making a presentation at the meeting, which was held August 7 through 9, 1990 at the Sheraton Hotel in Albuquerque, New Mexico. Sessions were held to discuss national photovoltaic programs, one-sun crystalline silicon cell research, concentrator silicon cell research, concentrator 3-5 cell research, and concentrating collector development.

  2. 1?10 kW Stationary Combined Heat and Power Systems Status and Technical Potential: Independent Review

    SciTech Connect

    Maru, H. C.; Singhal, S. C.; Stone, C.; Wheeler, D.

    2010-11-01

    This independent review examines the status and technical potential of 1-10 kW stationary combined heat and power fuel cell systems and analyzes the achievability of the DOE cost, efficiency, and durability targets for 2012, 2015, and 2020.

  3. Independent Oversight Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation, November 2013

    Energy Saver

    Independent Oversight Review of the Los Alamos National Laboratory Radiological Controls Activity-Level Implementation May 2011 November 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose................................................................................................................................................ 1 2.0

  4. Independent Specific Administrative Controls Review, Office of River Protection- December 2010

    Energy.gov [DOE]

    Specific Administrative Controls Review with the Office of Environmental Management at the Office of River Protection

  5. Independent Oversight Review, Savannah River Field Office Tritium Facilities – November 2013

    Energy.gov [DOE]

    Review of Savannah River Field Office Tritium Facilities Radiological Controls Activity-Level Implementation

  6. Independent Oversight Review, Savannah River Site Salt Waste Processing Facility- August 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development.

  7. Independent Oversight Review, Oak Ridge Transuranic Waste Processing Facility – December 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Fire Protection Program and Fire Protection Systems at the Transuranic Waste Processing Center

  8. Independent Oversight Review of the Los Alamos Field Office Processes for Laboratory Oversight of Radiological Controls Activity-Level Implementation, March 2014

    Energy Saver

    - March 2001 | Department of Energy Review of the Lawrence Livermore National Laboratory - March 2001 Independent Oversight Review of the Lawrence Livermore National Laboratory - March 2001 March 2001 Review of the Lawrence Livermore National Laboratory Health Services Department This report provides the results of an independent oversight review of the Health Services Division at the Department of Energy's (DOE) Lawrence Livermore National Laboratory. The review was performed March 19-21,

  9. Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 4: Quarterly Project Reviews Be Shared with the EM SSABs Recommendation 174: Quarterly Project Reviews Be Shared with the EM SSABs The ORSSAB recommends DOE Quarterly Project Reviews Be Shared with the EM SSABs. Recommendation 174 (324.16 KB) DOE response to recommendation 174 (122.81 KB) More Documents & Publications Recommendation 179: DOE Quarterly Project Reviews Recommendation 173: Recommendation to Support Establishment and Continuation of the Office of

  10. Energy Storage Systems 2012 Peer Review Presentations- Poster Session 2 (Day 2): ARRA Projects

    Energy.gov [DOE]

    Day 2 poster session presentations (ARRA projects) for OE's Energy Storage Systems Program (ESS) 2012 Peer Review

  11. EM Capital and Major Operating Project Standard Review Plan Edition Two

    Office of Energy Efficiency and Renewable Energy (EERE)

    This memorandum introduces the Second Edition of the Capital and Major Operations Projects Standard Review Plan (SRP).

  12. Energy Storage Systems 2012 Peer Review Presentations- Poster Session 1 (Day 1): National Lab Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Day 1 poster session presentations (national lab projects) for OE's Energy Storage Systems Program (ESS) 2012 Peer Review

  13. Energy Storage Systems 2012 Peer Review Presentations- Poster Session 1 (Day 1): ARPA-E Projects

    Energy.gov [DOE]

    Day 1 poster session presentations (ARPA-E projects) for OE's Energy Storage Systems Program (ESS) 2012 Peer Review

  14. DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meeting | Department of Energy Delivery High-Pressure Tanks and Analysis Project Review Meeting DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting On February 8-9, 2005, the Department of Energy held the DOE Hydrogen Delivery High-Pressure Tanks and Analysis Project Review Meeting at Argonne National Laboratory. The purpose of the meeting was to review the progress and plans of the R&D projects and to facilitate collaboration among researchers. The

  15. Energy Storage Systems 2012 Peer Review Presentations- Poster Session 2 (Day 2): University Projects

    Energy.gov [DOE]

    Day 2 poster session presentations (University projects) for OE's Energy Storage Systems Program (ESS) 2012 Peer Review

  16. Energy Storage Systems 2012 Peer Review Presentations- Poster Session 2 (Day 2): SBIR Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Day 2 poster session presentations (SBIR projects) for OE's Energy Storage Systems Program (ESS) 2012 Peer Review

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review BIOMASS ENERGY GENERATION PROJECT

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Peer Review BIOMASS ENERGY GENERATION PROJECT 5/23/2013 Heat and Power Ed Olthoff Cedar Falls Utilities STREETER STATION Unit #6 - 1963 Stoker 16.5 MW Coal/Natural Gas Unit #7 - 1973 Pulverized 35.0 MW Coal/Natural Gas Goal Statement & Project Overview 3 * Densification process to mimic stoker coal - ¾" to 1 ¼" chunks of coal - Suitable for corn stover and other energy crops - Compatible with the existing fuel handling equipment and boiler - Validity determined by test burns *

  18. Independent Oversight Review, Nevada Site Office and National Security Technologies, LLC- November 2011

    Energy.gov [DOE]

    Review of Nevada Site Office and National Security Technologies, LLC, Line Oversight and Contractor Assurance Systems Self-Assessment

  19. Independent Oversight Review, Oak Ridge Transuranic Waste Processing Center, September 2013

    Energy.gov [DOE]

    Review of Management of Safety Systems at the Oak Ridge Transuranic Waste Processing Center and Associated Feedback and Improvement Processes

  20. Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility- August 2012

    Energy.gov [DOE]

    Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations

  1. Independent Oversight Review, Los Alamos National Laboratory Chemistry and Metallurgy Research Facility- January 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Los Alamos National Laboratory Chemistry and Metallurgy Research Facility Fire Suppression Vital Safety System

  2. Independent Oversight Targeted Review, Y-12 National Security Complex- February 2012

    Energy.gov [DOE]

    Targeted Review of Site Preparedness for Severe Natural Phenomena Events at the Y-12 National Security Complex

  3. Independent Oversight Review, Hanford Site Tank Farms 222-S Laboratory – January 2014

    Energy.gov [DOE]

    Review of the Hanford Tank Farms Safety Management Program Implementation Electrical Safety in the 222-S Laboratory

  4. The Independent Technical Analysis Process

    SciTech Connect

    Duberstein, Corey A.; Ham, Kenneth D.; Dauble, Dennis D.; Johnson, Gary E.

    2007-04-13

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. In the past, regional parties have interacted with a single entity, the Fish Passage Center to access the data, analyses, and coordination related to fish passage. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities.

  5. Energy Independence and Security Act Six-Year Review of Covered Products

    Energy.gov [DOE]

    This memorandum explains that the Energy Independence and Security Act of 2007 (EISA) requires the Department of Energy to re-evaluate efficiency standards for all covered appliances and products...

  6. Independent Review of Pantex Plant Property and Material Clearance Processes September 8-12, 2008

    Office of Environmental Management (EM)

    Department of Energy Special Study, Department of Energy - August 2003 Independent Oversight Special Study, Department of Energy - August 2003 August 2003 Special Study of the Department of Energy's Management of Suspect/Counterfeit Items This report provides the results of a special study of the U.S. Department of Energy's (DOE) management of suspect/counterfeit items. The study was conducted from May through August 2003 by the DOE Office of Independent Oversight and Performance Assurance

  7. Independent Oversight Review of Nevada Site Office Criticality Safety Assessments at the Criticality Experiments Facility and Traininig Assembly of the Criticality Experiments Facility Startup Plan, October 2011

    Energy Saver

    - January 2012 | Department of Energy Savannah River National Laboratory - January 2012 Independent Oversight Follow-up Review, Savannah River National Laboratory - January 2012 January 2012 Follow-up Review of Implementation Verification Reviews at the Savannah River National Laboratory Savannah River Site This report provides the results of an independent review of the identification and implementation of safety basis hazard controls associated with "flashing spray release"

  8. 2017 Project Peer Review Save the Date Flier | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 Project Peer Review Save the Date Flier 2017 Project Peer Review Save the Date Flier Save the Date for the U.S. Department of Energy Bioenergy Technologies Office's 2017project Peer Review on on March 5-10, 2017, in Denver, Colorado. 2017_peer_review_save_the_date.pdf (1.36 MB) More Documents & Publications the Small Business Voucher Program Overview Webinar November 2013 News Blast Bioenergy Technologies Office Fiscal Year 2014 Annual Report

  9. Rooftop Unit Network Project - 2013 BTO Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Network Project - 2013 BTO Peer Review Rooftop Unit Network Project - 2013 BTO Peer Review Emerging Technologies Project for the 2013 Building Technologies Office's Program Peer Review emrgtech23_brambley_040413.pdf (1.57 MB) More Documents & Publications Rooftop Unit Suite: RTU Challenge, RTU Advanced Controls and RTU Smart Monitoring and Diagnostic System - 2013 BTO Peer Review Technical Meeting: Software Framework for Transactive Energy VOLTTRON(tm) 2014 Transactional Network

  10. FINAL REPORT FOR INDEPENDENT CONFIRMATORY SURVEY SUMMARY AND RESULTS FOR THE HEMATITE DECOMMISSIONING PROJECT, FESTUS, MISSOURI

    SciTech Connect

    Bailey, Erika N.; Lee, Jason D.

    2012-09-21

    ORAU conducted confirmatory surveys of the Hematite site during the period of June 12 through June 13, 2012. The survey activities included in-process inspections, document review, walkover surveys, sampling activities, and laboratory analysis of split samples. WEC was forthcoming with information relating to practices, procedures, and surface scan results. Scans performed by the WEC technician were extremely thorough and methodical. The WEC and ORAU technicians identified the same areas of elevated activity with comparable detector responses. WEC sampling of re-use soils, waste soils, sediments, and groundwater were conducted under ORAU observation. The sampling efforts observed by ORAU were performed in accordance with site-specific procedures and in a manner sufficient to provide quality supporting data. Three observations were made during groundwater sampling activities. First, the water level indicator was re-used without submitting rinse blank. Second, bubbles created during tubing extraction could indicate the presence of volatilized organic compounds. Third, samplers did not use a photo ionization detector prior to sample collection to indicate the presence of volatile organic vapors. Results of split samples indicated a high level of comparability between the WEC and ORAU/ORISE radiological laboratories. Analytical practices and procedures appear to be sufficient in providing quality radiochemical data. All concentrations from the Soil Re-Use Area and sediment samples are below Uniform radionuclide-specific derived concentration guideline level (DCGL{sub W}) limits; thus, comparisons to the less conservative stratified geometry were not required. Results were compared to individual DCGLs and using the sum of fractions approach. Both composite soil samples collected from the Waste Handling Area (Bins 1 and 4) were well below the prescribed USEI waste acceptance criteria.

  11. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report

    SciTech Connect

    Herborn, D.I.

    1992-10-01

    This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals for the Hanford Waste Vitrification Plant.

  12. 1992 DOE/Sandia crystalline photovoltaic technology project review meeting

    SciTech Connect

    Maish, A.

    1992-07-01

    This document serves as the proceedings for the annual project review meeting held by Sandia National Laboratories` Photovoltaic Technology and Photovoltaic Evaluation Departments. It contains information supplied by organizations making presentations at the meeting, which was held July 14--15, 1992 at the Sheraton Old Town Hotel in Albuquerque, New Mexico. Overview sessions covered the Department of Energy (DOE) program, including those at Sandia and the National Renewable Energy Laboratory (NREL), and non-DOE programs, including the EPRI concentrator collector program, The Japanese crystalline silicon program, and some concentrating photovoltaic activities in Europe. Additional sessions included papers on Sandia`s Photovoltaic Device Fabrication Laboratory`s collaborative research, cell processing research, the activities of the participants in the Concentrator Initiative Program, and photovoltaic technology evaluation at Sandia and NREL.

  13. Appendix J: Peer reviewer project/program evaluation form

    SciTech Connect

    None, None

    2009-01-18

    This is a sample PEER Review Evaluation Form to be completed by reviewers after presentations and before leaving the review site.

  14. Enterprise Assessments Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects- June 2015

    Energy.gov [DOE]

    Targeted Review of Work Planning and Control at the Hanford Central Plateau Environmental Remediation Projects

  15. Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Project Engineering Processes – October 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of Engineering Processes at the Hanford Site Waste Treatment and Immobilization Plant Project

  16. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    SciTech Connect

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  17. Independent Oversight Review of the Uranium Processing Facilkity Design Requirements and Configuration Management Program, March 2014

    Energy Saver

    Oversight Review of the Uranium Processing Facility Design Requirements and Configuration Management Program March 2014 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy i Table of Contents 1.0 Purpose ................................................................................................................................................ 1 2.0 Background ...

  18. Review of the Sodium Bearing Waste Treatment Project - Integrated...

    Office of Environmental Management (EM)

    ... Operational Readiness Review OSO Outside Support ... Control SAR Safety Analysis Report SBWTP Sodium Bearing ... Quality Review Board William Eckroade John ...

  19. DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda

    Energy.gov [DOE]

    DOE Hydrogen Delivery Analysis and High Pressure Tanks R&D Project Review Meeting Agenda, held February 8-9, 2005 by Argonne National Laboratory

  20. FRIB reviewed favorably by DOE Office of Project Assessment (Michigan State

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    University, Facility for Rare Isotope Beams) | Jefferson Lab www.frib.msu.edu/content/frib-reviewed-favorably-doe-office-project-asses...

  1. An independent review of the Multi-Path Redundant Avionics Suite (MPRAS) architecture assessment and characterization report

    SciTech Connect

    Johnson, M.R.

    1991-02-01

    In recent years the NASA Langley Research Center has funded several contractors to conduct conceptual designs defining architectures for fault tolerant computer systems. Such a system is referred to as a Multi-Path Redundant Avionics Suite (MPRAS), and would form the basis for avionics systems that would be used in future families of space vehicles in a variety of missions. The principal contractors were General Dynamics, Boeing, and Draper Laboratories. These contractors participated in a series of review meetings, and submitted final reports defining their candidate architectures. NASA then commissioned the Research Triangle Institute (RTI) to perform an assessment of these architectures to identify strengths and weaknesses of each. This report is a separate, independent review of the RTI assessment, done primarily to assure that the assessment was comprehensive and objective. The report also includes general recommendations relative to further MPRAS development.

  2. 2013 Annual Merit Review Results Report - Project and Program...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    within each subprogram area and a comparison to the other projects within the subprogram area necessitates a statistical comparison of the projects utilizing specific criteria. ...

  3. Director's CD-3b Readiness Review of the MINERvA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3b Readiness Review of the MINERvA Project Main INjector ExpeRiment v-A June 11, 2007 | Overview | CD-3b Documentation| Other Documents| Link to the Directorate Web Page for this Review Overview of Charge and Experiment MINERvA Overview (pdf) Review Agenda (pdf) Review Charge (pdf) DOE CD-3b Scorecard (pdf with links) Review Presentations by MINERvA Project Team Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf) Phototubes (WBS 6.0) PMT

  4. Design review plan for Multi-Function Waste Tank Facility (Project W-236A)

    SciTech Connect

    Renfro, G.G.

    1994-12-20

    This plan describes how the Multi-Function Waste Tank Facility (MWTF) Project conducts reviews of design media; describes actions required by Project participants; and provides the methodology to ensure that the design is complete, meets the technical baseline of the Project, is operable and maintainable, and is constructable. Project W-236A is an integrated project wherein the relationship between the operating contractor and architect-engineer is somewhat different than that of a conventional project. Working together, Westinghouse Hanford Company (WHC) and ICF Karser Hanford (ICF KH) have developed a relationship whereby ICF KH performs extensive design reviews and design verification. WHC actively participates in over-the-shoulder reviews during design development, performs a final review of the completed design, and conducts a formal design review of the Safety Class I, ASME boiler and Pressure Vessel Code items in accordance with WHC-CM-6-1, Standard Engineering Practices.

  5. Review of the Sodium Bearing Waste Treatment Project - Integrated...

    Office of Environmental Management (EM)

    Review OSO Outside Support Operator POA Plan of Action SAC Specific Administrative Control SAR Safety Analysis Report ... Quality Review Board William Eckroade John ...

  6. Independent Review of Mitigating System Performance Indicator Reporting in the EPIX Database

    SciTech Connect

    Wierman, Thomas Edward

    2009-05-01

    This report summarizes work done to verify the component, failure mode, and method of detection information provided in the Equipment Performance Information Exchange (EPIX) to support implementation of Mitigating Systems Performance Indices. This task is to select reports from EPIX and determine if their categorization as MSPI or non-MSPI failures is consistent with the development of unreliability baseline failure rates, and whether this significantly affects estimates of plant risk. This review is of all MSPI devices in EPIX that were reported as failures. The components include emergency generators; motor-driven, turbine-driven, and enginedriven pumps; and air and motor-operated valves. The date range for this report includes all MSPI device reported failures from 2003 to the most current EPIX data at the INL (up to the 3rd quarter 2008).

  7. Independent Verification Survey of the Clean Coral Storage Pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project

    SciTech Connect

    Wilson-Nichols, M.J.; Egidi, P.V.; Roemer, E.K.; Schlosser, R.M.

    2000-09-01

    f I The Oak Ridge National Laboratory (ORNL) Environmental Technology Section conducted an independent verification (IV) survey of the clean storage pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project (JAPCSRP) from January 18-25, 1999. The goal of the JAPCSRP is to restore a 24-acre area that was contaminated with plutonium oxide particles during nuclear testing in the 1960s. The selected remedy was a soil sorting operation that combined radiological measurements and mining processes to identify and sequester plutonium-contaminated soil. The soil sorter operated from about 1990 to 1998. The remaining clean soil is stored on-site for planned beneficial use on Johnston Island. The clean storage pile currently consists of approximately 120,000 m3 of coral. ORNL conducted the survey according to a Sampling and Analysis Plan, which proposed to provide an IV of the clean pile by collecting a minimum number (99) of samples. The goal was to ascertain wi th 95% confidence whether 97% of the processed soil is less than or equal to the accepted guideline (500-Bq/kg or 13.5-pCi/g) total transuranic (TRU) activity.

  8. Reviewing Post-Installation and Annual Reports for Federal ESPC Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this document is to provide a framework for implementing uniform and consistent reviews of post-installation and annual reports for federal ESPC projects. These procedures will allow for consistent evaluations of performance reports, produce standardized reviews, and enable centralized tracking of ongoing project performance.

  9. Reviews and Validations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services » Project Management » Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating

  10. Independent oversight review of the Department of Energy Quality Assurance Program for suspect/counterfeit parts. Revision 1

    SciTech Connect

    1996-05-01

    To address the potential threat that suspect/counterfeit parts could pose to DOE workers and the public, the Office of the Deputy Assistant Secretary for Oversight initiated a number of activities beginning in mid-1995. Oversight placed increased emphasis on the field`s quality assurance-suspect/counterfeit parts programs during safety management evaluations, in keeping with the Office of Environment, Safety and Health (EH) oversight responsibilities, which include oversight of the Department`s quality assurance (QA) programs. In addition, Oversight reviewed relevant policy documents and occurrence reports to determine the nature and magnitude of the problem within the Department. The results of that review, contained in an Office of Oversight report, Independent Oversight Analysis of Suspect/Counterfeit Parts Within the Department of Energy (November 1995), indicate a lack of consistency and comprehensiveness in the Department`s QA-suspect/counterfeit parts program. A detailed analysis of the causes and impacts of the problem was recommended. In response, this review was initiated to determine the effectiveness of the Department`s QA program for suspect/counterfeit parts. This study goes beyond merely assessing and reporting the status of the program, however. It is the authors intention to highlight the complex issues associated with suspect/counterfeit parts in the Department today and to present approaches that DOE managers might consider to address these issues.

  11. DOE CD-3b Review of the MINERvA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3b Review of the MINERvA Project Main INjector ExpeRiment v-A August 21, 2007 | Overview | CD-3b Documentation| Other Documents| Overview of Charge and Experiment MINERvA Overview (pdf) Review Agenda (pdf) Review Charge (pdf) DOE CD-3b Scorecard (pdf with links) Scorecard Addendum describing documents not needed by MINERvA for CD-3b (pdf with links) Review Presentations by MINERvA Project Team (links to appear the week of August 14) Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS

  12. Energy Design Assistance Project Tracker- 2014 BTO Peer Review

    Energy.gov [DOE]

    Presenter: Larry Brackney, National Renewable Energy Laboratory The Energy Design Assistance Program Tracker (EDAPT) tracks and manages projects, performs automated quality checks of energy model designs, and generates project documentation and reports for commercial buildings.

  13. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- October 2010

    Energy.gov [DOE]

    Evaluation to determine whether Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  14. 2013 DOE Bioenergy Technologies Office(BETO) IBR Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office(BETO) IBR Project Peer Review *© 2013 ICM, Inc. All Rights Reserved. *1 Recovery Act: Pilot Integrated Cellulosic Biorefinery Operations to Fuel Ethanol Award Number: DE-EE0002875 May 20, 2013 Integrated Biorefinery Program Review Panel Douglas B. Rivers, Ph.D. ICM, Inc. Project Description > Project Location - ICM, Inc., St. Joseph MO > Company headquarters - ICM, Inc., Colwich, KS > High Level overview of:  Feedstock handling * Dry Frac Corn Fiber, Switchgrass/Energy

  15. Vehicle Technologies Office Merit Review 2014: EV Project Data & Analytic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Results | Department of Energy Project Data & Analytic Results Vehicle Technologies Office Merit Review 2014: EV Project Data & Analytic Results Presentation given by Idaho National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about EV project data & analytic results. vss137_francfort_2014_o.pdf (2.64 MB) More Documents & Publications INL Efficiency and Security Testing of EVSE, DC Fast

  16. Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Charging Demo | Department of Energy Project: Solar-Assisted Charging Demo Vehicle Technologies Office Merit Review 2014: EV Project: Solar-Assisted Charging Demo Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about the EV project: solar-assisted charging demo. vss138_lapsa_2014_o.pdf (3.12 MB) More Documents & Publications CX-002663: Categorical Exclusion

  17. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    SciTech Connect

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  18. Assessment of Financial Savings From Peer Reviews of In-Progress Projects:

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A Case Study from the Department of Energy's Hydrogen Program | Department of Energy Financial Savings From Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Assessment of Financial Savings From Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Results of a study to assess the financial savings to the Department of Energy's (DOE) Hydrogen Program due to decisions made from peer reviews. Case

  19. Documentation of Hanford Site independent review of the Hanford Waste Vitrification Plant Preliminary Safety Analysis Report. Revision 3

    SciTech Connect

    Herborn, D.I.

    1993-11-01

    Westinghouse Hanford Company (WHC) is the Integrating Contractor for the Hanford Waste Vitrification Plant (HWVP) Project, and as such is responsible for preparation of the HWVP Preliminary Safety Analysis Report (PSAR). The HWVP PSAR was prepared pursuant to the requirements for safety analyses contained in US Department of Energy (DOE) Orders 4700.1, Project Management System (DOE 1987); 5480.5, Safety of Nuclear Facilities (DOE 1986a); 5481.lB, Safety Analysis and Review System (DOE 1986b) which was superseded by DOE order 5480-23, Nuclear Safety Analysis Reports, for nuclear facilities effective April 30, 1992 (DOE 1992); and 6430.lA, General Design Criteria (DOE 1989). The WHC procedures that, in large part, implement these DOE requirements are contained in WHC-CM-4-46, Nonreactor Facility Safety Analysis Manual. This manual describes the overall WHC safety analysis process in terms of requirements for safety analyses, responsibilities of the various contributing organizations, and required reviews and approvals.

  20. DOE CD-4 Review of the MINERvA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Assessment Document (with signatures) (pdf) Integrated Safety Management Document (pdf) Burn Test Results (pdf) Project Execution Plan (22207 Version with signatures) (pdf) Other...

  1. Voluntary Protection Program Onsite Review, Idaho Cleanup Project- June 2007

    Energy.gov [DOE]

    Evaluation to determine whether the Idaho Cleanup Project is continuing to perform at a level deserving DOE-VPP Star recognition.

  2. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RTI International Quad Chart Overview Barriers Addressed * Tt-E Liquefaction of Biomass ... * Tt-K Bio-Oil Pathways Process Integration Partners * RTI - project lead, ...

  3. Independent Activity Report, Richland Operations Office - June 2011 |

    Office of Environmental Management (EM)

    Department of Energy June 2011 Independent Activity Report, Richland Operations Office - June 2011 June 2011 Hanford Sludge Treatment Project Review [HIAR-RL-2011-06-17] This Independent Activity Report documents an operational awareness activity conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations June 13-17, 2011, at the Sludge Treatment Project at the Department of Energy's (DOE) Hanford Site. The activity consisted of touring project

  4. A Review of Wind Project Financing Structures in the USA

    SciTech Connect

    Bolinger, Mark A; Harper, John; Karcher, Matthew

    2008-09-24

    The rapid pace of wind power development in the U.S. over the last decade has outstripped the ability of most project developers to provide adequate equity capital and make efficient use of project-related tax benefits. In response, the sector has created novel project financing structures that feature varying combinations of equity capital from project developers and third-party tax-oriented investors, and in some cases commercial debt. While their origins stem from variations in the financial capacity and business objectives of wind project developers, as well as the risk tolerances and objectives of equity and debt providers, each structure is, at its core, designed to manage project risk and allocate federal tax incentives to those entities that can use them most efficiently. This article surveys the six principal financing structures through which most new utility-scale wind projects (excluding utility-owned projects) in the U.S. have been financed from 1999 to the present. These structures include simple balance-sheet finance, several varieties of all-equity special allocation partnership 'flip' structures, and two leveraged structures. In addition to describing each structure's mechanics, the article also discusses its rationale for use, the types of investors that find it appealing and why, and its relative frequency of use in the market. The article concludes with a generalized summary of how a developer might choose one structure over another.

  5. Review of the Regional Biomass Energy Program: Technical projects

    SciTech Connect

    Lusk, P.

    1994-12-31

    This article summarizes technical projects of the regional Biomass Energy Program. Projects included are as follows: economic impact studies for renewable energy resources; alternative liquid fuels; Wood pellets fuels forum; residential fuel wood consumption; waste to energy decision-makers guide; fuel assessment for cogeneration facilities; municipal solid waste combustion characteristics.

  6. Finance and Markets: Public Peer Review of EPSA Projects | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Finance and Markets: Public Peer Review of EPSA Projects Finance and Markets: Public Peer Review of EPSA Projects November 10, 2015 - 12:30pm Addthis Hugh Chen Hugh Chen Deputy Director for Finance, Incentives, and Program Analysis On Wednesday, December 9, 2015, the Office of Energy Policy and Systems Analysis (EPSA) at the U.S. Department of Energy will be conducting an in-progress public peer review for energy-related financial and market analytical projects. All interested

  7. Director's CD-1/Trial CD-2 Review of the MINERvA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1/Trial CD-2 Review of the MINERvA Project Main INjector ExpeRiment v-A December 13-15, 2005 | Overview | General Reference Material | CD-1/CD-2 Documentation| Link to the Directorate Web Page for this review Review Overview Information Charge to the Committee (pdf) Agenda (pdf - linked to talks) List of Prepared Breakout Talks (pdf) Review Committee (pdf) Video and Phone Connection Numbers (doc) Information for Visitors Bringing Laptops to Fermilab (doc) Final Report - Director's Prelimianary

  8. Review of the Sodium Bearing Waste Treatment Project - Integrated Waste Treatment Uinit Contractor Operational Readiness Review, June 2012

    Office of Environmental Management (EM)

    Independent Oversight Review of the Savannah River Site Salt Waste Processing Facility Safety Basis and Design Development May 2011 August 2013 Office of Safety and Emergency Management Evaluations Office of Enforcement and Oversight Office of Health, Safety and Security U.S. Department of Energy Table of Contents 1.0 Purpose.................................................................................................................................................... 1 2.0 Background

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bio-oil Upgrading with Novel Low Cost Catalysts - Catalyst Development with Synergistic ... restricted information May 21, 2013 Bio-Oil Technology Area Review (DOE Manager: ...

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Synthetic Biology and BETO May 20, 2013 Technology Area Review: Biochemical Conversion ... needed to have a definition of Synthetic Biology: "Synthetic biology" was generally ...

  11. INDEPENDENT COST REVIEW (ICR)

    Office of Environmental Management (EM)

    the entire effort, including report preparation and logistics, on comparatively straightforward ICRs for which no contractor support is required. However, for more complex ICRs...

  12. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  13. Independent Verification Survey of the Clean Coral Storage Pile at the Johnston Atoll Plutonium-Contaminated Soil Remediation Project

    SciTech Connect

    Wilson-Nichols, M.J.

    2000-12-07

    The Oak Ridge National Laboratory (ORNL) Environmental Technology Section conducted an independent verification (IV) survey of the clean storage pile at the Johnston Atoll Plutonium Contaminated Soil Remediation Project (JAPCSRP) from January 18-25, 1999. The goal of the JAPCSRP is to restore a 24-acre area that was contaminated with plutonium oxide particles during nuclear testing in the 1960s. The selected remedy was a soil sorting operation that combined radiological measurements and mining processes to identify and sequester plutonium-contaminated soil. The soil sorter operated from about 1990 to 1998. The remaining clean soil is stored on-site for planned beneficial use on Johnston Island. The clean storage pile currently consists of approximately 120,000 m{sup 3} of coral. ORNL conducted the survey according to a Sampling and Analysis Plan, which proposed to provide an IV of the clean pile by collecting a minimum number (99) of samples. The goal was to ascertain with 95% confidence whether 97% of the processed soil is less than or equal to the accepted guideline (500-Bq/kg or 13.5-pCi/g) total transuranic (TRU) activity. In previous IV tasks, ORNL has (1) evaluated and tested the soil sorter system software and hardware and (2) evaluated the quality control (QC) program used at the soil sorter plant. The IV has found that the soil sorter decontamination was effective and significantly reduced plutonium contamination in the soil processed at the JA site. The Field Command Defense Threat Reduction Agency currently plans to re-use soil from the clean pile as a cover to remaining contamination in portions of the radiological control area. Therefore, ORNL was requested to provide an IV. The survey team collected samples from 103 random locations within the top 4 ft of the clean storage pile. The samples were analyzed in the on-site radioanalytical counting laboratory with an American Nuclear Systems (ANS) field instrument used for the detection of low

  14. The Independent Technical Analysis Process Final Report 2006-2007.

    SciTech Connect

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis; Johnson, Gary

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related to juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161

  15. The Hanford Site-Wide Risk Review Project | Department of Energy

    Office of Environmental Management (EM)

    December 11, 2014 To view all the P&RA CoP 2014 Technical Exchange Meeting videos click here. Video Presentation PDF icon The Hanford Site-Wide Risk Review Project More...

  16. Vehicle Technologies Office Merit Review 2015: PEV-EVSE Interoperability Project

    Energy.gov [DOE]

    Presentation given by Intertek at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation meeting about PEV-EVSE interoperability project.

  17. Completed Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC)

    Completed Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated October 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Completed Projects Print Text

  18. Ongoing Projects | U.S. DOE Office of Science (SC)

    Office of Science (SC)

    Current Projects Project Assessment (OPA) OPA Home About Project Management SC Projects Review Dates (updated October 2016) Project Construction Photos Completed Projects Current Projects Other Links SC Federal Project Directors (FPD) and FPD Resources Contact Information Project Assessment U.S. Department of Energy SC-28/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-4840 F: (301) 903-8520 E: Email Us Project Construction Photos Current Projects Print Text

  19. Kaiser Engineers Hanford internal position paper -- Project W-236A, Multi-function Waste Tank Facility -- Peer reviews of selected activities

    SciTech Connect

    Stine, M.D.

    1995-01-04

    The purpose of this paper is to develop and document a proposed position on the performance of independent peer reviews on selected design and analysis components of the Title 1 [Preliminary] and Title 2 [Final] design phases of the Multi-Function Waste Tank Facility [MWTF] project. An independent, third-party peer review is defined as a documented critical review of documents, data, designs, design inputs, tests, calculations, or related materials. The peer review should be conducted by persons independent of those who performed the work, but who are technically qualified to perform the original work. The peer review is used to assess the validity of assumptions and functional requirements, to assess the appropriateness and logic of selected methodologies and design inputs, and to verify calculations, analyses and computer software. The peer review can be conducted at the end of the design activity, at specific stages of the design process, or continuously and concurrently with the design activity. This latter method is often referred to as ``Continuous Peer Review.``

  20. Assessment of Financial Savings from Peer Reviews of In-Progress Projects:

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A Case Study from the Department of Energy's Hydrogen Program | Department of Energy Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Assessment of Financial Savings from Peer Reviews of In-Progress Projects: A Case Study from the Department of Energy's Hydrogen Program Results of a study to assess the financial savings to the Department of Energy's (DOE) Hydrogen Program due to decisions made from peer

  1. Catalytic Upgrading of Sugars Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4th, 2015 Technology Area Review: Biochemical Conversion Principal Investigator: David K. Johnson Organization: National Renewable Energy Laboratory DOE Bioenergy Technologies Office 2015 Project Peer Review Catalytic Upgrading of Sugars This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goal Statement Direct support for BETO's Multi-Year Program Plan (MYPP) objectives: * This project directly supports BETO's MYPP objectives to demonstrate

  2. 2016 CO2 Capture Technology Project Review Meeting | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 CO2 Capture Technology Project Review Meeting 2016 NETL CO2 CAPTURE TECHNOLOGY PROJECT REVIEW MEETING August 8-12, 2016 Meeting Summary Previous Proceedings 2015: NETL CO2 Capture Technology Meeting 2014: NETL CO2 Capture Technology Meeting 2013: NETL CO2 Capture Technology Meeting 2012: NETL CO2 Capture Technology Meeting Proceedings of the 2016 NETL CO2 Capture Technology Meeting Table of Contents Presentations Monday, August 8, 2016 Opening Session International Perspectives National Carbon

  3. FINAL Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Letter v1, 1/12/15, CRESP Site-Wide Risk Review Project 1 Author: Pam Larsen The Honorable Monica Regalbuto Assistant Secretary for Environmental Management Subject: Discontinue funding for CRESP studies from Hanford cleanup dollars Dear Assistant Secretary Regalbuto: The Hanford Advisory Board (HAB) is writing with respect to the draft Hanford Site-Wide Risk Review Project's Interim Progress Report (August 31, 2015), prepared by the Consortium for Risk Evaluation with Stakeholder Participation

  4. NREL Thermochemical Platform Analysis Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (BETO) 2015 Project Peer Review: NREL Thermochemical Platform Analysis Presenter: Abhijit Dutta on behalf of Mary Biddy, Jack Ferrell and Michael Talmadge (PI) BETO 2015 Project Peer Review Hilton Mark Center, Alexandria, VA March 26, 2015 2 1. Goal and Supporting Objectives Goal Statement: Develop process and techno-economic models for biomass-to-fuels research. * Develop design cases / reports to identify barriers and set technical and cost targets for cost competitiveness by 2022 * Use

  5. Template for Expedited National Environmental Policy Act (NEPA) Review of Certain State Energy Program Projects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Enclosure 2 Template for Expedited NEPA Review of Certain State Energy Program Projects Purpose: This document provides an optional approach/Template that a State may use to help the Department of Energy (DOE) expedite National Environmental Policy Act (NEPA) review of certain activities (Projects) contained in the State's energy and conservation plan for which the State requests State Energy Program (SEP) funding. This optional approach/Template builds on the August 21, 2009, draft guidance

  6. Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects for 1990/1991.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 19--21, 1991, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. This document list the projects by title, the project leaders and BPA's project officers, and an abstract of each leader's presentation.

  7. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Development of Bio-Oil Commodity Fuel as a Refinery Feedstock from High Impact Algae Biomass May 23 rd , 2013 Bio-Oil Technology Area Review James R. Kastner BioChemical ...

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3.2.2.31-Improved Hydrothermal Liquefaction Bio-Oil Production May 23, 2013 Technology Area Review: Bio-Oil Technology Area Principal Investigators: Richard Hallen and Tanner ...

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Southern Pine Based Biorefinery Center May 20 - 23, 2013 Bio-Oil Technology Area Review ... residues and kraft lignin to a pyrolysis oil that could be used as a feedstock for green ...

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Stabilization of Bio-Oil Fractions for Insertion into Petroleum Refineries May 20, 2013 Bio-Oil Technology Area Review Robert C. Brown Iowa State University This presentation does ...

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oils Corrosion Studies May 22, 2013 Bio-Oil Technology Area Review James R Keiser Oak ... techniques to fully characterize bio-oil intermediates and products 2) Assess the ...

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Production and Upgrading of Infrastructure Compatible Bio-Oil 3.2.2.26 May 21, 2013 Technology Area Review: Bio-Oil Principal Investigators: Doug Elliott and Iva Tews Organization: ...

  13. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    WBS 3.2.2.27 TAN Control of Bio-oil May 22, 2013 Bio-Oil Technology Area Review Yupo Lin and Seth Snyder Argonne National Laboratory This presentation does not contain any ...

  14. A Review of the NGNP Project: February 2006 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the NGNP Project: February 2006 A Review of the NGNP Project: February 2006 In 2002, the Department of Energy Office of Nuclear Energy completed a technology roadmap project that provided an overall plan to the broad vision of enhancing the future role of nuclear energy systems in the United States and the world at large. This Technology Roadmap focused on the development of advanced nuclear systems, so-called Generation IV systems, which meet profram foals of improved safety and economics, as

  15. Memo Issuance of EM Capital and Major Operating Project Standard Review Plan Edition Two

    Office of Environmental Management (EM)

    MAR 2 4 201011 MEMORANDUM FOR DISTRIBUTION FROM: DR. STEVEN L. KRAHN DEPUTY ASSISTANT SAFETY AND SECU EIVVIROIVMENTAL MANAGEMENT SUBJECT: Issuance of Environmental Management Capital and Major Operating Project Standard Review Plan Edition Two The Office of Environmental Management (EM) is responsible for managing the design, construction, operation, and eventual disposition of mission critical projects/facilities. Effective management of these projects requires multiple disciplines to be

  16. Reviews | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Services » Project Management » Reviews and Validations Reviews and Validations External Independent Review (EIR) Procedures Under DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, the Office of Acquisition and Project Management (OAPM) must perform a Performance Baseline External Independent Review (EIR) prior to Critical Decision (CD) 2, and a Construction/Execution Readiness EIR for all Major System projects prior to CD-3. The EIR Standard Operating

  17. DOE CD-1/2/3a Review of the MINERvA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1/2/3a Review of the MINERvA Project Main INjector ExpeRiment v-A December 5, 2006 | Overview | CD-2 Documentation| CD-3a Documentation|Other Documents| Overview of Charge and Experiment MINERvA Overview (pdf) DOE CD-2 and CD-3a Scorecard (pdf) Review Presentations by MINERvA Project Team Project Overview (pdf) Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0) (pdf) Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0) (pdf) Scintillator Plane

  18. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-03-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

  19. Independent Verification and Validation Of SAPHIRE 8 Software Design and Interface Design Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2009-10-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE software design and interface design is to assess the activities that results in the development, documentation, and review of a software design that meets the requirements defined in the software requirements documentation. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production. IV&V reviewed the requirements specified in the NRC Form 189s to verify these requirements were included in SAPHIRE’s Software Verification and Validation Plan (SVVP) design specification.

  20. Site fire protection projects review board engineering evaluation

    SciTech Connect

    Fayfich, R.R.

    1992-12-31

    The Savannah River Site (SRS) has been safely operated since its beginning in the early 1950`s with an effective, highly successful program of fire prevention. However, in the mid 1980`s the Department of Energy directed the site to identify and install fire protection measure in addition to the reliance on prevention. To address the site needs, independent fire protection surveys were conducted by Factory Mutual Research Corporation and Professional Loss Control, Inc. in 1986 and 1987. The results of these surveys identified 1400 fire protection improvements needed in existing facilities to comply with DOE Orders and NFPA Codes and Standards.

  1. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1.2.4 - Thermal Conversion Sustainability Interface May 20, 2013 Technology Area Review: Analysis and Sustainability PI: Lesley Snowden-Swan Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statements * Integration of BETO's Thermochemical Conversion and Sustainability Thrusts: - Incorporate sustainability considerations during design and development of emerging pathways

  2. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presentation Template Separations/Separative Bioreactor May 23, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Yupo Lin, Seth Snyder Organization: Argonne National Laboratory Goal Statement * Pretreatment using new separations platform - Technical feasibility and benefit of using integrated separation platform to optimize the hydrolysis pretreatment process - * Low-energy slurry separation * No waste gypsum generation and handling * Reduce process time * Less water

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fungal Genomics aka Fungal Biotechnology May 21, 2013 Technology Area Review: Biochemical Conversion Principal Investigator: Jon Magnuson Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * Our goal is enabling accelerated development of fungal bioprocesses using fungi that are industrially relevant. * Use systems biology, genetic engineering and bioreactors to

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Saint Joseph's University Institute for Environmental Stewardship May 23, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Clint J. Springer* & Michael McCann Organization: Saint Joseph's University This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Establishment of an Institute of Environmental Stewardship at Saint Joseph's University in Philadelphia, PA who's mission will have a

  5. Solar Technology Assessment Project. Volume VII. A review of OTEC

    SciTech Connect

    Yuen, P.C.

    1981-04-01

    The Ocean Thermal Energy Conversion (OTEC) principle is discussed along with general system and cycle types, specific OTEC designs, applications, and the ocean thermal resource. the historic development and present status of OTEC are reviewed. Power system components of the more technically advanced closed-cycle OTEC concept are discussed: heat exchangers, corrosion and biofouling countermeasures, working fluids, ammonia power systems, and on-platform seawater sytems. Several open-cycle features are also discussed. A critical review of the ocean engineering aspects of the OTEC power system is presented. Major subsystems such as platform, cold water pipe, mooring system, dynamic positioning system and power transmission cable system are assessed for their relationships with the ocean environment and with each other. Nine available studies of OTEC costs are reviewed, and tentative comparisons are made between OTEC and traditional fuel costs. OTEC products and markets are considered. Possible environmental and social effects of OTEC development are discussed. International and national laws regulating OTEC plants are reviewed, specifically, the United Nations Third Conference on the Law of the Sea and the Ocean Thermal Energy Conversion Act of 1980. Coast Guard regulations, OSHA laws, and state and local government regulations are also considered as well as attitudes of the utilities. (LEW)

  6. Lessons from Iowa : development of a 270 megawatt compressed air energy storage project in midwest Independent System Operator : a study for the DOE Energy Storage Systems Program.

    SciTech Connect

    Holst, Kent; Huff, Georgianne; Schulte, Robert H.; Critelli, Nicholas

    2012-01-01

    The Iowa Stored Energy Park was an innovative, 270 Megawatt, $400 million compressed air energy storage (CAES) project proposed for in-service near Des Moines, Iowa, in 2015. After eight years in development the project was terminated because of site geological limitations. However, much was learned in the development process regarding what it takes to do a utility-scale, bulk energy storage facility and coordinate it with regional renewable wind energy resources in an Independent System Operator (ISO) marketplace. Lessons include the costs and long-term economics of a CAES facility compared to conventional natural gas-fired generation alternatives; market, legislative, and contract issues related to enabling energy storage in an ISO market; the importance of due diligence in project management; and community relations and marketing for siting of large energy projects. Although many of the lessons relate to CAES applications in particular, most of the lessons learned are independent of site location or geology, or even the particular energy storage technology involved.

  7. Independent Verification and Validation Of SAPHIRE 8 System Test Plan Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2010-02-01

    The purpose of the Independent Verification and Validation (IV&V) role in the evaluation of the SAPHIRE System Test Plan is to assess the approach to be taken for intended testing activities associated with the SAPHIRE software product. The IV&V team began this endeavor after the software engineering and software development of SAPHIRE had already been in production.

  8. Summary for the Next Generation Nuclear Plant Project in Review

    SciTech Connect

    L.E. Demick

    2010-08-01

    This paper reports on the major progress that the NGNP Project has made toward developing and commercializing the HTGR technology. Significant R&D progress has been made in addressing key technical issues for qualification of the HTGR fuel and graphite, codification of high temperature materials and verification and validation of design codes. Work is also progressing in heat transfer/transport design and testing and in development of the high temperature steam electrolysis hydrogen production process. A viable licensing strategy has been formulated in coordination with the NRC and DOE. White papers covering key licensing issues have been and will continue to be submitted and necessary discussions of these key issues have begun with the NRC. Continued government support is needed to complete the Project objectives as established in the 2005 Energy Policy Act.

  9. Summary for the Next Generation Nuclear Plant Project in Review

    SciTech Connect

    L.E. Demick

    2010-09-01

    This paper reports on the major progress that the NGNP Project has made toward developing and commercializing the HTGR technology. Significant R&D progress has been made in addressing key technical issues for qualification of the HTGR fuel and graphite, codification of high temperature materials and verification and validation of design codes. Work is also progressing in heat transfer/transport design and testing and in development of the high temperature steam electrolysis hydrogen production process. A viable licensing strategy has been formulated in coordination with the NRC and DOE. White papers covering key licensing issues have been and will continue to be submitted and necessary discussions of these key issues have begun with the NRC. Continued government support is needed to complete the Project objectives as established in the 2005 Energy Policy Act.

  10. 2013 DOE Bioenergy Technologies Office (BETO) IBR Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Award 2 ARRA Presenters/Principal Investigators: Necy Sumait and John Cuzens BlueFire Renewables, Inc. Project Location Fulton, MS - 5,000 population Itawamba County ~20,000 population Feedstock handling -Truck dumps with in-bed conveyor to 3-day onsite storage pile, processing to remove dirt and process by size (3/4"-+/- ½"), dried using boiler exhaust in rotary drum driers, 3-day dry storage. Conversion technology - Concentrated Acid (~75%) decrystallyzation and chemical hydrolysis

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9.3.2.1 Whole Algae Liquefaction Model Development DATE MAY 22, 2013 TECHNOLOGY AREA REVIEW: ALGAE DAN ANDERSON RICH HALLEN, SUE JONES, DOUG ELLIOTT PACIFIC NORTHWEST NATIONAL LABORATORY This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement Develop sufficient data to formulate a robust and detailed techno- economic model of the whole algae hydrothermal liquefaction (HTL) process In addition to HTL, this process application includes:

  12. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    11.2.2.2 Opportunities for Biomass- Base Fuels and Products to Address the Entire Barrel of Oil in a Refinery May 20, 2013 Technology Area Review: Analysis and Sustainability Principal Investigators: Sue Jones, Charlie Freeman Organization: Pacific Northwest National Laboratory PNNL-SA-95231 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * The goal of the analysis to address

  13. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Date: May 21 st 2013 Technology Area Review: Analysis & Sust. Principal Investigator: Paul N. Leiby Co-Investigators: Rocio Uria-Martinez and Maxwell Brown Organization: Oak Ridge National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Biofuels National Strategic Benefits Analysis *2 Managed by UT-Battelle for the U.S. Department of Energy *Presentation_name Biofuels National Strategic Benefit Analysis: Goals Statement Advance

  14. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Biomass Production and Nitrogen Recovery Date: May 23, 2013 Technology Area Review: Sustainability Principal Investigator: M. Cristina Negri Organization: Argonne National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement To determine the feasibility , productivity and sustainability of a biomass landscape production scenario and BMP that by design introduce positive land use change and water quality benefits at the

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title: Algae Resource Assessment May 20, 2013 Technology Area Review: Analysis & Sustainability Principal Investigator: Mark Wigmosta Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement BETO launched an initiative to obtain consistent quantitative metrics for algal biofuel production in order to establish an "integrated baseline" production scenario

  16. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Long Term Processing using Integrated Hydropyrolysis plus Hydroconversion (IH 2 ) for Production of Gasoline and Diesel from Biomass May 23, 2012 Bio-Oil Technology Area Review Terry Marker GTI This presentation does not contain any proprietary, confidential, or otherwise restricted information Big Picture Goals and Objectives * Demonstrate a new game changing technology, IH 2 , in a continuous pilot plant which - Solves the current technical and economic issues for biomass conversion to

  17. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Direct Liquefaction Aqueous Phase Utilization: Characterization, Upgrading, and Steam Reforming May 21, 2013 Technology Area Review: Bio-Oil Technology Karl Albrecht, Robert Dagle, Daniel Howe, Mark Gerber Organization: PNNL PNNL-SA-95131 This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * GOAL: Increase carbon yield to liquid fuels and diminish hydrogen upgrading requirements by

  18. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    IEA Task 34 Fast Pyrolysis 6.3.2.25 May 21, 2013 Technology Area Review: Bio-oil Principal Investigator: Doug Elliott Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objective Statement * The ultimate objective of IEA Bioenergy Task 34 is to promote commercialization of economical biomass fast pyrolysis for the production of refinery feedstock and fuel oil with

  19. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bio-Oil Separation and Stabilization by SCF Fractionation - 3.3.1.19 May 23, 2013 Bio-Oil Technology Area Review Daniel M. Ginosar, Ph.D, Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Goals and Objectives * Stabilize algae based pyrolysis and hydrothermal liquefaction oils by separating them into similar polarity groups using energy efficient supercritical fluid fractionation * Bio-Oil Stabilization and

  20. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CA-02 Pyrolysis and Upgrading Collaboration with Canada Technology Area Review: Bio-oil Technology Organizations: NREL, PNNL Kristiina Iisa, Alan Zacher May 21, 2013 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objective Statement * Objective: Combine US and Canadian expertise to advance pyrolysis of residue woody feedstocks for biofuels and biopower applications - Production and upgrading of bio-oil to meet requirements for use in transportation and stationary power applications *

  1. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3.6.1.1, 3.6.1.3 Thermochemical Platform Analysis: Ex-Situ and In-Situ TEAs (No Evaluation) May 22, 2013 Technology Area Review: Bio-Oils Abhijit Dutta, Sue Jones Organizations: National Renewable Energy Laboratory, Pacific Northwest National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement  Enable technologies for improvement of the quality of vapors from the fast

  2. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Renewable Home Heating Oil for the Northeast May 21, 2013 Technology Area Review: Bio-oil Principal Investigators: Thomas Butcher, Richard Boardman, Corrie Nichols, James Keiser, Jonathan Male, Corinne Valkenburg, Susanne Jones, Jacob Jacobson Organization: BNL, INL, ORNL, PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objectives Statement The Goal Statement * Evaluate the options

  3. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CATALYTIC DEOXYGENATION OF PYROLYSIS OILS 20 May 2013 Technology Area Review: Bio-Oil and Upgrading Principal Investigator: Corinne Valkenburg Co-PI: Mariefel V. Olarte Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Reduce the costs associated with catalytic upgrading of pyrolysis oil by - Increasing liquid fuel yield by improving carbon utilization - Improving H 2

  4. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6.5.2.2 U.S.-China collaboration- Thermochemical Conversion of Biomass May 21 th , 2013 Technology Area Review: Bio-oil Principal Investigators: Jonathan Male, Huamin Wang Organization: PNNL This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * GOAL: Combine and leverage U.S. and Chinese expertise to evaluate, develop, and enable commercially viable processes in thermochemical

  5. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conversion to Liquid Hydrocarbons from Pyrolysis Oil and Syngas May 20, 2013 Bio-Oil Technology Area Review Fei Yu and Philip H. Steele Sustainable Energy Research Center (SERC) Mississippi State University (MSU) This presentation does not contain any proprietary, confidential, or otherwise restricted information *On many slides, the slide notes section has important additional information* Goal/Objective Statement * MSU pyrolysis/syngas program goals: - Develop hydrocarbon and biodiesel fuels

  6. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pyrolysis Core R&D, Stabilized Oil Upgrading Technology Area Review: Bio-oil Technology Organizations: PNNL, NREL Alan Zacher, Kristiina Iisa May 21, 2013 PNNL-SA-95399 2 | Bioenergy Technologies Office eere.energy.gov Goal Statement * Develop the science and engineering for production of liquid transportation fuels from biomass via pyrolysis (fast pyrolysis and catalytic pyrolysis) and bio-oil upgrading 3 | Bioenergy Technologies Office eere.energy.gov Quad Chart Overview 3.2.2.4

  7. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    BC Process Improvements Validation Task (2.3.1.7) Date: May 21, 2013 Technology Area Review: Biochemical Conversion Principal Investigators: James D. (Jim) McMillan and Nancy Dowe Organization: NREL This presentation does not contain any proprietary, confidential, or otherwise restricted information NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. BC Process Improvements

  8. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Agricultural Residues May 20, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigators: Douglas L. Karlen & David J. Muth Jr. Organization: Sun Grant Regional Partnership/USDA-ARS/INL This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement  Implement field trials quantifying short- and long- term effects of harvesting agricultural residues (i.e., corn stover and wheat straw)  Develop methodologies

  9. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bio Energy Initiative for Connecticut Date: May 23, 2013 Technology Area Review: Bioenergy Technologies Principal Investigator: Steven L. Suib Organization: The University of Connecticut This presentation does not contain any proprietary, confidential, or otherwise restricted information 2 Goals of the Research 1. DOE recommends Poplar as one of the best Bioenergy Crops for the NE US and we have made Field Evaluations and Genetic Improvement of Poplar Trees. 2. Heterogeneous Catalysts have been

  10. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Feedstock Preprocessing User Facility Date: Thursday, May 23, 2013 Technology Area Review: Feedstock Supply & Logistics Principal Investigator: Neal A. Yancey Organization: Idaho National Laboratory This presentation does not contain any proprietary, confidential, or otherwise restricted information Energy Efficiency & Renewable Energy eere.energy.gov 2 Provide "at scale" an innovative tool to use technology transfer capabilities to demonstrate BETO Fundamentals and

  11. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hydrothermal Decomposition & Resource Recycling Date: May 21 st , 2013 Technology Area Review: BETO Principal Investigator: City of Allentown & Delta Thermo Energy Organization: City of Allentown This presentation does not contain any proprietary, confidential, or otherwise restricted information Goal Statement * Research & design an innovative solution using "Hydrothermal Decomposition" technology to transform municipal solid waste, biomass, biosolids waste into a

  12. Voluntary Protection Program Onsite Review, River Corridor Closure Project

    Office of Environmental Management (EM)

    Energy - February 2012 | Department of Energy Report from the Department of Energy - February 2012 Voluntary Protection Program Onsite Review, Report from the Department of Energy - February 2012 February 2012 This report summarizes the results of the HSS DOE-VPP Team's evaluation of Report from the Department of Energy during the period of February 13-22, 2012, and provides the Chief Health, Safety and Security Officer with the necessary information to make the final decision regarding the

  13. C:\\Work 102004\\2006 Projections\\NV Projections Review 2008 v45...

    National Nuclear Security Administration (NNSA)

    ... Solar projects in Clark County. The biggest gain will come if Nevada can become a center ... due to the calculations in the model and how much of it is predictive of an actual future. ...

  14. Pilot Scale Integration Project Presentation for BETO 2015 Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pilot Scale Integration Project March 25, 2015 Biochemical Conversion Area Daniel Schell NREL This presentation does not contain any proprietary, confidential or otherwise restricted information 2 High-Level Project Goal Support BETO's and the Biochemical Conversion Technology Area's mission to deploy cost-effective biofuels production technology. * Maintains pilot scale facility that is available for BETO and industry use * Generates process-relevant integrated performance data * Facilitates

  15. 2013 DOE Bioenergy Technologies Office (BETO) Project Peer Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Optimizing Co-Processing of Bio-Oil Technology Area Review: Bio-oil Technology Organization: PNNL Alan Zacher May 21, 2013 PNNL-SA-95398 2 | Bioenergy Technologies Office eere.energy.gov Goal/Objective Statement * Goal: Understand the minimum stabilization required to co-process bio-oil in a refinery and the quality of co-processing fuel product * DE-FOA-0000686: Bio-Oil Stabilization and Commoditization * Produce bio-oil feed to be used within a petroleum refinery * Leverage existing refinery

  16. ORISE: Independent verification

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Independent verification ORISE techinician performs environmental scanning The Oak Ridge Institute for Science and Education (ORISE) performs independent environmental assessments and verification to determine the effectiveness of radiological cleanup at decontamination and decommissioning (D&D) projects across the United States. Since 1980, ORISE has performed independent verification at more than 500 sites in 42 states and the District of Columbia. As the primary independent verification

  17. Director's CD-2/CD-3a Review of the MINERnA Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Director's CD-2/CD-3a Review of the MINERnA Project Main INjector ExpeRiment v-A August 1-3, 2006 | Overview | General Reference Material | CD-2/3a Documentation| Link to the Directorate Web Page for this review Review Overview Information Charge to the Committee (pdf) Agenda (pdf - with links to all of the plenary and breakout sessions) List of Prepared Breakout Talks (pdf) Review Committee (pdf) Video and Phone Connection Numbers Information for Visitors Bringing Laptops to Fermilab (doc)

  18. Independent Verification and Validation Of SAPHIRE 8 Risk Management Project Number: N6423 U.S. Nuclear Regulatory Commission

    SciTech Connect

    Kent Norris

    2009-11-01

    This report provides an evaluation of the risk management. Risk management is intended to ensure a methodology for conducting risk management planning, identification, analysis, responses, and monitoring and control activities associated with the SAPHIRE project work, and to meet the contractual commitments prepared by the sponsor; the Nuclear Regulatory Commission.

  19. Review of BPA Funded Sturgeon, Resident Fish and Wildlife Projects, 1989/1990.

    SciTech Connect

    United States. Bonneville Power Administration.

    1990-12-01

    The Bonneville Power Administration (BPA) held a public meeting on November 6-7, 1990, for the purpose of review, coordination, and consultation of the BPA-funded projects for sturgeon, resident fish, and wildlife in the Columbia River Basin (Basin). The comments received after the meeting were favorable and the participants agreed that the meeting was stimulating and productive. The information exchanged should lead to better coordination with other projects throughout the Basin. The following pages list the projects by title, the project leaders and BPA's project officers, and an abstract of each leaders presentation. These summaries are in some cases preliminary; they are subject to change and should not be quoted without consulting the project leader.

  20. Independent Activity Report, Richland Operations Office - April 2011 |

    Office of Environmental Management (EM)

    Department of Energy Richland Operations Office - April 2011 Independent Activity Report, Richland Operations Office - April 2011 April 2011 Operational Awareness Review of the Hanford Sludge Treatment Project [HIAR-RL-2011-04-07] This Independent Activity Report documents operational awareness activities conducted by Office of Health, Safety and Security's Office of Safety and Emergency Management Evaluations between November 2010 and April 2011 at the Hanford Site Sludge Treatment Project.