National Library of Energy BETA

Sample records for id project size

  1. Yucca Mountain Project Integrated Data System (IDS); Final report, October 1, 1989--December 31, 1990

    SciTech Connect

    1991-05-23

    This final report for LANL Subcontract 9-XS8-2604-1 includes copies of all formal letters, memorandums, and reports provided by CAG to support the IDS effort in the LANL Test Managers Office, Las Vegas, Nevada from October 1, 1989 through the end of the contract on December 31, 1990. The material is divided into two sections; the Functional Requirements Document (FRD) and other reports, letters, and memorandums. All documents are arranged in chronological order with most recent last. Numerous draft copies of the FRD were prepared and cover sheets for all drafts are included. The complete text of only the last version supplied (July 27, 1990) is included in this document.

  2. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4, Rev 2 MSA Annual Categorical Exclusion for Small-Scale Research and Development, Laboratory Operations, and Pilot Projects under 10 CFR 1021, Subpart D, Appendix B, B3.6 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting,

  3. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4, Rev 1 MSA Annual Categorical Exclusion for Small-Scale Research and Development, Laboratory Operations, and Pilot Projects under 10 CFR 1021, Subpart D, Appendix B, B3.6 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting,

  4. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, in which the predominant activity is transportation, provided that (1)

  5. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, Rev 1 MSA Annual Categorical Exclusion for Support Buildings under 10 CFR 1021, Subpart D, Appendix B, Bl.l5 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction or modification, and operation of support buildings and

  6. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, Rev 1 MSA Annual Categorical Exclusion for Relocation of Buildings under 10 CFR 1021, Subpart D, Appendix B, Bl.22 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform relocation of buildings (including, but not limited to, trailers and

  7. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, Rev 1 MSA Annual Categorical Exclusion for Site Characterization and Environmental Monitoring under 10 CFR 1021, Subpart D, Appendix B, B3.1 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform site characterization and environmental

  8. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 MSA Annual Categorical Exclusion for Transfer Actions under 10 CFR 1021, Subpart D, Appendix B, Bl.30 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform transfer actions, in which the predominant activity is transportation, provided that

  9. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Air Conditioning Systems for Existing Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.4 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation or modification of air conditioning systems

  10. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, Rev 2 MSA Annual Categorical Exclusion for Polychlorinated Biphenyl Removal under 10 CFR 1021, Subpart D, Appendix B, Bl.l7 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform removal of polychlorinated biphenyl (PCB)-containing items

  11. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Building and Equipment Instrumentation under 10 CFR 1021, Subpart D, Appendix B, B2.2 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation of, or improvements to, building and equipment

  12. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, Rev 2 MSA Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B, B5.1 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions to conserve energy or water, demonstrate potential

  13. RL-721 REV7 I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    42 Radiological Survey Activities in the 600 Area of the Hanford Site Supporting Land Conveyance II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): The U.S. Department of Energy, Richland Operations (DOE-RL) proposes to conduct radiological surveys of a portion of the 600 Area of the Hanford Site. The surveys are needed to

  14. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8, Rev 2 MSA Annual Categorical Exclusion for Electronic Equipment under 10 CFR 1021, Subpart D, Appendix B, Bl.7 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform acquisition, installation, operation, modification, and removal of electricity

  15. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9, Rev 2 MSA Annual Categorical Exclusion for Training Exercises and Simulations under 10 CFR 1021, Subpart D, Appendix B, Bl.2 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform training exercises and simulations (including, but not limited

  16. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, Rev 1 MSA Annual Categorical Exclusion for Polychlorinated Biphenyl Removal under 10 CFR 1021, Subpart D, Appendix B, Bl.l7 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform removal of polychlorinated biphenyl (PCB)-containing items

  17. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Disconnection of Utilities under 10 CFR 1021, Subpart D, Appendix B, B1.27 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions that are required for the disconnection of utility services

  18. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8, Rev 1 MSA Annual Categorical Exclusion for Installation or Relocation of Machinery and Equipment under 10 CFR 1021, Subpart D, Appendix B, B1.31 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform installation or relocation and operation of

  19. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Drop-Off, Collection, and Transfer Facilities for Recyclable Materials under 10 CFR 1021, Subpart D, Appendix B, Bl.35 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction, modification,

  20. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility

  1. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, Rev 1 MSA Annual Categorical Exclusion for Actions to Conserve Energy or Water under 10 CFR 1021, Subpart D, Appendix B, B5.1 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform actions to conserve energy or water, demonstrate potential

  2. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9, Rev 1 MSA Annual Categorical Exclusion for Facilities to Store Packaged Hazardous Waste for 90 Days or Less under 10 CFR 1021, Subpart D, Appendix B, B6.4 for Calendar Year 2014 II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction, modification,

  3. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 MSA Annual Categorical Exclusion for Training Exercises and Simulations under 10 CFR 1021, Subpart D, Appendix B, Bl.2 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform training exercises and simulations (including, but not limited to,

  4. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Routine Maintenance and Custodial Services under 10 CFR 1021, Subpart D, Appendix B, Bl.3 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform routine maintenance activities and custodial services for

  5. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Drop-Off, Collection, and Transfer Facilities for Recyclable Materials under 10 CFR 1021, Subpart D, Appendix B, Bl.35 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction,

  6. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Facility Safety and Environmental Improvements under 10 CFR 1021, Subpart D, Appendix B, B2.5 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions -e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform safety and environmental improvements of a facility

  7. RL-721 REV? I. Project Title: NEPA REVIEW SCREENING FORM Document ID Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 MSA Annual Categorical Exclusion for Facilities to Store Packaged Hazardous Waste for 90 Days or Less under 10 CFR 1021, Subpart D, Appendix B, B6.4 for Calendar Year 2015. II. Project Description and Location (including Time Period over which proposed action will occur and Project Dimensions - e.g., acres displaced/disturbed, excavation length/depth, area/location/number of buildings, etc.): Mission Support Alliance (MSA) and its subcontractors perform siting, construction, modification,

  8. Project Financing: One Size Does Not Fit All

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Financing: One size does not fit all Jesse Maestas August 8, 2016 2 Learning Objectives * To understand the major types of alternatively financed contract mechanisms * Provide concepts for evaluation of which mechanism is the best fit for potential projects * Illustrate how key variables/choices impact the financial viability of projects. 3 Major Types of Alternatively Financed Projects * Government Owned Equipment - Energy Savings Performance Contract (ESPC) - ESPC ENABLE - Utility

  9. ID@Work

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ID@Work ID@Work ID@Work is a video feature that introduces DOE-ID employees and the jobs they perform. These videos are created in Windows Media Video (wmv) format and have no ...

  10. Blind Modal ID

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects » Blind Modal ID Blind separation of high-resolution vibration modes High-resolution video camera measurement of the structural vibration (the top video) could be separated into individual, monotone, vibration modes, which enable high-resolution visualization and analysis of structural dynamics. Contact Yongchao Yang (832) 335-3003 Email David Mascarenas dmascarenas@lanl.gov (505) 665-0881 Original video = Mode 1 - 6.34 Hz + Mode 2 - 17.96 Hz + Mode 3 - 25.89 Hz (higher

  11. Microsoft Word - DOE-ID-INL-15-056.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Description and Purpose: The E-85 fueling station (15,000 gallon E-85 underground storage tank UST DEQ Facility ID 6-120611Tank ID 98IRC00006 and associated ...

  12. 4-ID beamline layout

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Sector 4 beamline layout Overview Sector 4 uses a canted undulator straight section to operate two beamlines The 4-ID-C beamline operates between 500 and 3000 eV while the 4-ID-D...

  13. Department of Energy Idaho - Inside DOE-ID

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Inside ID Inside Idaho Operations Office (DOE-ID) DOE-ID Mission and Vision Brief History of the Idaho National Laboratory (INL) DOE-ID Agreement in Principle Organization Chart Employment Opportunities New Employee Orientation EOD Checklist - 68 KB EOD Forms - 261 KB DOE/Tribal Agreement in Principle Strategic Partnership Projects (formerly WFO) Idaho Site Contractor Timeline - 3.7 MB ID@Work Introduces some of the DOE-ID employees and the jobs they perform. Last Updated: 05/21/2015

  14. Beamline 29-ID

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    & Milestones IEX Advisory Committees FDR Beamline Information RSXS ARPES APS Ring Status Current APS Schedule Intermediate Energy X-Rays (29-ID): The Intermediate Energy...

  15. 2011 Annual Planning Summary for Idaho Operations Office (ID...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Idaho Operations Office (ID) (See Environmental Management). ...

  16. RAPID/Roadmap/3-ID-b | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us State Land Access Overview (3-ID-b) If a project is...

  17. Microsoft Word - DOE-ID-INL-15-074.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Fuels Complex (MFC)-1741 Modular Guard Station SECTION B. Project Description and ... machine shop activities), assembly, and DOE-ID NEPA CX DETERMINATION Idaho National ...

  18. Microsoft Word - DOE-ID-INL-16-045.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Frequency (HF) Shared Resources (SHARES) Station SECTION B. Project Description and ... onto 100' Tower at the SAF Bldg. DOE-ID NEPA CX DETERMINATION Idaho National ...

  19. Microsoft Word - DOE-ID-INL-14-054.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and the end user devices (hand held, mobile, and base station radios) currently deployed. ... In addition, the project would practice sustainable acquisition, as DOE-ID NEPA CX ...

  20. T ID CODE I

    National Nuclear Security Administration (NNSA)

    T ID CODE I DE- , I AC52- AMENDMENT OF SOLICITATIONMODIFICATlON OF CONTRACT I. CONTRAC I 06NA25396 I Los Alamos National Security, LLC 4200 West Jernez Road Suite 400 Los Alamos, ...

  1. 5 Super-Sized Solar Projects Transforming the Clean Energy Landscape |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Super-Sized Solar Projects Transforming the Clean Energy Landscape 5 Super-Sized Solar Projects Transforming the Clean Energy Landscape April 8, 2013 - 4:00pm Addthis The California Valley Solar Ranch has a capacity of 250 MW -- enough energy to power the equivalent of every home in San Luis Obispo County. | Photo courtesy of SunPower. The California Valley Solar Ranch has a capacity of 250 MW -- enough energy to power the equivalent of every home in San Luis Obispo

  2. 4-ID-D optics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4-ID-D Beamline Optics A schetch of the major optical components for beam line 4-ID-D are shown above. All these components located in the B-station upstream from the D...

  3. Real ID Act in brief

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Real Estate Approvals Real Estate Approvals Real Estate Approvals Policy Flash 2011-61, Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate (attachment)

    Badging, Badge Office » Real ID Act in brief Real ID Act in brief Effective Nov. 3, 2014, the Lab will implement requirements of the REAL ID Act. Contact Badge Office (505) 667-6901 Email REAL ID Act in brief REAL ID is a coordinated effort by the states and the Federal Government to improve the reliability and

  4. Microsoft Word - DOE-ID-INL-12-015.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ...Tank ID 05MFC00035 and replace the two tanks with a 10,000 gallon aboveground storage ... The proposed project actions will include: * Emptying the tanks of petroleum and removal ...

  5. DHSIsotopeID

    Energy Science and Technology Software Center

    2007-12-18

    DHSIsotopeID is an application designed to read and analyze radiation measurement files taken by radiation measurement files taken by radiation portal monitors, and in particular, by the advanced spectroscopic portals. It requires that the data files be in the N42 file format, compliant with the interface control documents for DNDO radiation measurement files. It carries out an automated analysis to determine which isotopes are present in the spectra, and then presents the results in graphicalmore » form to the user. It also enables further post-processing and analysis, for example by performing further analysis on selected regions of interest of the spectrum, as designated by the user via the graphical interface.« less

  6. DOE/ID-Number

    Office of Environmental Management (EM)

    Fuel Cycle Research & Development Initial Standardized Canister System Evaluation Prepared for US Department of Energy Nuclear Fuels Storage and Transportation Planning Project ...

  7. APS Beamline 6-ID-B,C

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6-ID-B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the...

  8. APS Beamline 6-ID-D

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MM-Group Home MMG Advisory Committees 6-ID-D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the...

  9. DOE/ID-Number

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dry Storage Cask Inventory Assessment Prepared for U.S. Department of Energy Nuclear Fuels Storage and Transportation Planning Project Robert H. Jones Jr. (SRNL) August 31, 2015 FCRD-NFST-2014-000602, Revision 1 SRNL-TR-2014-00193 DISCLAIMER This information was prepared as an account of work sponsored by an agency of the U.S. Government. Neither the U.S. Government nor any agency thereof, nor any of their employees, makes any warranty, expressed or implied, or assumes any legal liability or

  10. 1. CONTRACT ID CODE PAGE OF PAGES

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I1 1 1 3 2. AMvEND)MENfmODIFICATION NO. 3 EFFECT IVE DATE (M'D/)Y) 4 REQUISITION/PURCHASE REQ. NO 5.PROJECT NO. (If applicable, 240 See Block 16C 12EM000054 T 6. ISSUFD BY CODE 7. ADMINISTE'RED BY GIf aher than Item 6)1 CODE U.S. Department of Energy Office of River Protection P. 0. Box 450, MS 1-6-60 Richland, WA 99352 8 NAvM AND ADDRESS OF CONTRACTOR (No., wreel, county, Sltate and ZIP code) 9A. AMENDMENT OF

  11. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect

    Eugene S. Grecheck David P. Batalo

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  12. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  13. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    24, 2013 DOE-ID Operations Summary For the Period May 30, 2013 through June 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  14. DOE-ID Twitter Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Bradley Bugger doeidbug Bradley Bugger Want to know what's going on at DOE-Idaho? Follow DOE-ID public affairs supervisor Brad Bugger on Twitter at doeidbug. https://twitter.com/#!/doeidbug Editorial Date May 9, 2911 By Brad Bugger

  15. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    07, 2013 DOE-ID Operations Summary For the Period July 8, 2013 through July 28, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  16. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  17. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  18. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, 2013 DOE-ID Operations Summary For the Period August 26, 2013 through September 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  19. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  20. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  1. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    27, 2014 DOE-ID Operations Summary For the Period December 01, 2013 through January 15, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  2. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, 2015 Updated on April 28, 2015 DOE-ID Operations Summary For the Period September 30, 2014 through November 1, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle

  3. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period January 1, 2015 - January 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  4. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2015 DOE-ID Operations Summary For the Period February 1, 2015 - February 28, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  5. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, 2015 DOE-ID Operations Summary For the Period March 1, 2015 -March 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  6. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2015 DOE-ID Operations Summary For the Period April 1, 2015 - April 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information about health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  7. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4, 2015 DOE-ID Operations Summary For the Period May 1, 2015 - May 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  8. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    25, 2015 DOE-ID Operations Summary For the Period June 1, 2015 - June 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  9. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 2, 2015 DOE-ID Operations Summary For the Period September 1, 2015 - September 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  10. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period August 1, 2015 - August 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  11. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    February 11, 2016 DOE-ID Operations Summary For the Period November 1, 2015 - November 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  12. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 1, 2015 -December 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Idaho Operations Office (DOE-ID) December 17: The

  13. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    31, 2016 DOE-ID Operations Summary For the Period April 1-April 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  14. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2016 DOE-ID Operations Summary For the Period March 1-March 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  15. APS Beamline 6-ID-B,C

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    B,C Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-B,C Beamline 6-ID-B,C is operated by the Magnetic Materials Group in the X-ray...

  16. APS Beamline 6-ID-D

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    D Home Recent Publications Beamline Info Optics Instrumentation Software User Info Beamline 6-ID-D Beamline 6-ID-D is operated by the Magnetic Materials Group in the X-ray Science...

  17. DOE-ID Mission and Vision

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ID Mission and Vision You are here: DOE-ID Home > Inside ID > Our Mission and Vision The Idaho Operations Office (DOE-ID)/INL mission is: To develop and deliver cost-effective solutions to both fundamental and advanced challenges in nuclear energy and other energy resources, national security, and environmental management. The Department's expectations of its operations offices and laboratories are: to advance the national, economic and energy security of the United States; to promote

  18. Microsoft Word - DOE-ID-INL-12-016.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    No.: DOE-ID-INL-12-016 SECTION A. Project Title: Reverse Osmosis System Removal SECTION B. Project Description: The project will remove a reverse osmosis water treatment system (FU-HA-101) from TAN 681 room 182. The system is out-of-service, with no intent of future use. Work will involve removal of the reverse osmosis system, and associated plumbing/piping and electrical lines and conduit. The project will clear the area of obstacles and tripping hazards associated with unused/unnecessary

  19. U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    SciTech Connect

    Larsen, Peter; Goldman, Charles; Satchwell, Andrew

    2012-08-21

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a ?top-down? approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a ?bottom-up? analysis of a database of ~;;3,250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7percent per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25percent per year). We found that 2,484 ESCO projects in our database generated ~;;$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20percent of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ~;;$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures?including onsite generation and measures to address deferred maintenance?but this evolution has significant implications for customer project

  20. DOE Data ID Service - Digital object identifiers for DOE scientific...

    Office of Scientific and Technical Information (OSTI)

    DOE Data ID Service DataCite | Contact DOE Data ID Service DOE Data ID Service DOE Data ID Service The DOE Office of Scientific and Technical Information (OSTI) offers a service ...

  1. Employee Assistance Self-ID Form | Department of Energy

    Energy Saver

    Employee Assistance Self-ID Form Employee Assistance Self-ID Form Request Emergency Assistance Self-ID Form-HQ Employee Assistance Self-ID Form (93.71 KB) More Documents & ...

  2. File:USDA-CE-Production-GIFmaps-ID.pdf | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ID.pdf Jump to: navigation, search File File history File usage Idaho Ethanol Plant Locations Size of this preview: 776 600 pixels. Full resolution (1,650 1,275 pixels,...

  3. Waste Tank Size Determination for the Hanford River Protection Project Cold Test, Training, and Mockup Facility

    SciTech Connect

    Onishi, Yasuo; Wells, Beric E.; Kuhn, William L.

    2001-03-30

    The objective of the study was to determine the minimum tank size for the Cold Test Facility process testing of Hanford tank waste. This facility would support retrieval of waste in 75-ft-diameter DSTs with mixer pumps and SSTs with fluidic mixers. The cold test model will use full-scale mixer pumps, transfer pumps, and equipment with simulated waste. The study evaluated the acceptability of data for a range of tank diameters and depths and included identifying how the test data would be extrapolated to predict results for a full-size tank.

  4. Characteristics and sources of intermediate size particles in recovery boilers : final project report.

    SciTech Connect

    Baxter, Larry L.; Shaddix, Christopher R.; Verrill, Christopher L.; Wessel, Richard A.

    2005-02-01

    As part of the U.S. Department of Energy (DOE) Office of Industrial Technologies (OIT) Industries of the Future (IOF) Forest Products research program, a collaborative investigation was conducted on the sources, characteristics, and deposition of particles intermediate in size between submicron fume and carryover in recovery boilers. Laboratory experiments on suspended-drop combustion of black liquor and on black liquor char bed combustion demonstrated that both processes generate intermediate size particles (ISP), amounting to 0.5-2% of the black liquor dry solids mass (BLS). Measurements in two U.S. recovery boilers show variable loadings of ISP in the upper furnace, typically between 0.6-3 g/Nm{sup 3}, or 0.3-1.5% of BLS. The measurements show that the ISP mass size distribution increases with size from 5-100 {micro}m, implying that a substantial amount of ISP inertially deposits on steam tubes. ISP particles are depleted in potassium, chlorine, and sulfur relative to the fuel composition. Comprehensive boiler modeling demonstrates that ISP concentrations are substantially overpredicted when using a previously developed algorithm for ISP generation. Equilibrium calculations suggest that alkali carbonate decomposition occurs at intermediate heights in the furnace and may lead to partial destruction of ISP particles formed lower in the furnace. ISP deposition is predicted to occur in the superheater sections, at temperatures greater than 750 C, when the particles are at least partially molten.

  5. R&D100: IC ID

    SciTech Connect

    Hamlet, Jason; Pierson, Lyndon; Bauer, Todd

    2015-11-19

    Supply chain security to detect, deter, and prevent the counterfeiting of networked and stand-alone integrated circuits (ICs) is critical to cyber security. Sandia National Laboratory researchers have developed IC ID to leverage Physically Unclonable Functions (PUFs) and strong cryptographic authentication to create a unique fingerprint for each integrated circuit. IC ID assures the authenticity of ICs to prevent tampering or malicious substitution.

  6. THE SIZE DIFFERENCE BETWEEN RED AND BLUE GLOBULAR CLUSTERS IS NOT DUE TO PROJECTION EFFECTS

    SciTech Connect

    Webb, Jeremy J.; Harris, William E.; Sills, Alison

    2012-11-10

    Metal-rich (red) globular clusters in massive galaxies are, on average, smaller than metal-poor (blue) globular clusters. One of the possible explanations for this phenomenon is that the two populations of clusters have different spatial distributions. We test this idea by comparing clusters observed in unusually deep, high signal-to-noise images of M87 with a simulated globular cluster population in which the red and blue clusters have different spatial distributions, matching the observations. We compare the overall distribution of cluster effective radii as well as the relationship between effective radius and galactocentric distance for both the observed and simulated red and blue sub-populations. We find that the different spatial distributions does not produce a significant size difference between the red and blue sub-populations as a whole or at a given galactocentric distance. These results suggest that the size difference between red and blue globular clusters is likely due to differences during formation or later evolution.

  7. Microsoft Word - DOE-ID-INL-14-015.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 CX Posting No.: DOE-ID-INL-14-015 SECTION A. Project Title: United States Geological Survey (USGS) Geotechnical Drilling for USGS-142 and USGS-143 SECTION B. Project Description: The U.S. Geological Survey (USGS) proposes to continuously core geotechnical boreholes USGS-142 and USGS-143 to a depth of 1,000 and 2,000 ft below land surface, respectively. Boreholes USGS-142 and USGS-143 would be constructed as monitoring wells and used to measure and collect aquifer data. Borehole USGS-142 (see

  8. Microsoft Word - DOE-ID-INL-16-080.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CX Determination Idaho National Laboratory Page 1 of 2 CX Posting No.: DOE-ID-INL-16-080 SECTION A. Project Title: Test Reactor Area (TRA)-621 Fume Hood Removal SECTION B. Project Description and Purpose: During the re-roofing of building TRA-621 at the Advanced Test Reactor (ATR) Complex, the out of service fume hood in the facility was determined to be no longer needed and needs to be removed. The proposed action would remove the fume hood, associated ducting, electronics, heaters,

  9. Data ID Service | DOE Data Explorer

    Office of Scientific and Technical Information (OSTI)

    DOE Data Explorer DOE Data ID Service DOE Data ID Service Note 1: This section pertains to datasets, dataset records, and Digital Object Identifiers (DOIs). It is not related to the collection citations in DDE. Note 2: See useful links at the end of this section. About the DOE Data ID Service The Office of Scientific and Technical Information (OSTI) became a member of, and a registering agency for, DataCite in 2011 and now assigns permanent identifiers, known as Digital Object Identifiers

  10. Data ID Service | DOE Data Explorer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE Data Explorer DOE Data ID Service DOE Data ID Service Note 1: This section pertains to datasets, dataset records, and Digital Object Identifiers (DOIs). It is not related to the collection citations in DDE. Note 2: See useful links at the end of this section. About the DOE Data ID Service The Office of Scientific and Technical Information (OSTI) became a member of, and a registering agency for, DataCite in 2011 and now assigns permanent identifiers, known as Digital Object Identifiers

  11. CAES Wind Project | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Wind Project Jump to: navigation, search Name CAES Wind Project Facility CAES Sector Wind energy Facility Type Community Wind Location ID Coordinates 43.522243, -112.053963...

  12. Mo Year Report Period: EIA ID NUMBER:

    Energy Information Administration (EIA) (indexed site)

    Mo Year Report Period: EIA ID NUMBER: http:www.eia.govsurveyformeia14instructions.pdf Mailing Address: Secure File Transfer option available at: (e.g., PO Box, RR) https:...

  13. Elink - About OSTI's Data ID Service

    Office of Scientific and Technical Information (OSTI)

    To learn more about the DOE Data ID Service, go to the OSTI home page, select "Science Search Tools" from the menu bar, then click on "Data Services." Follow the links to ...

  14. 1-ID Home Page | Advanced Photon Source

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1-ID Home Infrastructure Techniques Data Analysis Publications X-ray Resources Materials Physics and Engineering Group Useful Links Current APS status ESAF System GUP System X-Ray...

  15. Page 1, About DOE-ID

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 of 11 Previous Page About the U.S. Department of Energy, Idaho Operations Office (DOE-ID) As a new employee of the Department of Energy (DOE), you are entering a Cabinet-Level Executive Branch Agency with a long history of achievement. The Idaho Operations Office (DOE-ID)/INL mission is to develop and deliver cost-effective solutions to both fundamental and advanced challenges in nuclear energy and other energy resources, national security, and environmental management. The Department's

  16. IDS Climate Change and Development Centre Resources | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    IDS Climate Change and Development Centre Resources Jump to: navigation, search Tool Summary Name: IDS Climate Change and Development Centre Resources AgencyCompany Organization:...

  17. Physicists ID Mechanism that Stabilizes Plasma in Tokamaks

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Physicists ID Mechanism that Stabilizes Plasma in Tokamaks Physicists ID Mechanism that Stabilizes Plasma in Tokamaks Calculations Run at NERSC Create 3D Simulations of Fusion ...

  18. Data_ID_thumbnail.jpg | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information Data_ID

  19. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    November 1, 2014 - November 30, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  20. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 1, 2014 - December 31, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  1. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    January 1, 2016 -February 29, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  2. Id-1 and Id-2 genes and products as markers of epithelial cancer

    DOEpatents

    Desprez, Pierre-Yves; Campisi, Judith

    2011-10-04

    A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

  3. Id-1 and Id-2 genes and products as markers of epithelial cancer

    DOEpatents

    Desprez, Pierre-Yves; Campisi, Judith

    2008-09-30

    A method for detection and prognosis of breast cancer and other types of cancer. The method comprises detecting expression, if any, for both an Id-1 and an Id-2 genes, or the ratio thereof, of gene products in samples of breast tissue obtained from a patient. When expressed, Id-1 gene is a prognostic indicator that breast cancer cells are invasive and metastatic, whereas Id-2 gene is a prognostic indicator that breast cancer cells are localized and noninvasive in the breast tissue.

  4. Vehicle Technologies Office Merit Review 2014: Catalyst Characterization (Agreement ID:9130) Project ID:18519

    Energy.gov [DOE]

    Presentation given by Cummins at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about catalyst characterization.

  5. Vehicle Technologies Office Merit Review 2014: High Temperature Aluminum Alloys (Agreement ID:24034) Project ID:18518

    Energy.gov [DOE]

    Presentation given by Pacific Northwest National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about high...

  6. I.D I VI Figure

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ~press - ,~,.--;~ 3.1 ,,~-.::;:.--- ~ ( 3.1 ( ;-; t\ I.D I VI Figure 9-1. Location of the original Cypress Grove Set-Aside and the Stave Island and Georgia Power replacement Areas. Set-Aside 9: Cypress Grove, Stave Island, and Georgia Power

  7. CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    JLAB ACCESS: The REAL ID Act (Public Law 109-13) now determines which state driver's license can be presented and accepted as a valid ID document for access to Jefferson Lab. The...

  8. Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    SciTech Connect

    Larsen, Peter; Goldman, Charles A.; Satchwell, Andrew

    2012-05-08

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a “top-down” approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a “bottom-up” analysis of a database of -3,265 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of an economic recession, the U.S. ESCO industry managed to grow at about 7% per year between 2006 and 2008. ESCO industry revenues are relatively small compared to total U.S. energy expenditures (about $4.1 billion in 2008), but ESCOs anticipated accelerated growth through 2011 (25% per year). We found that 2,484 ESCO projects in our database generated -$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20% of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated -$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. We found that nearly 85% of all public and institutional projects met or exceeded the guaranteed level of savings. We estimated that a typical ESCO project generated $1.5 dollars of direct benefits for every dollar of customer

  9. Property:HPBD/ProjectId | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Showing 25 pages using this property. (previous 25) (next 25) H High Performance Buildings Database + 82 + High Performance Buildings Database + 1,016 + High Performance...

  10. DOE Data ID Service Top Navigation | OSTI, US Dept of Energy...

    Office of Scientific and Technical Information (OSTI)

    DOE Data ID Service Top Navigation DataCite | Contact DOE Data ID Service DataCite | Contact DOE Data ID Service

  11. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  12. Property:WFSPTurbineID | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    + Auburn-Washburn Wind Project + 120,012 + Avery County High School Wind Project + 110,607 + B Bancroft-Rosalie Public Schools Wind Project + 108,812 + Bloomfield Public Schools...

  13. CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS: The REAL ID Act (Public Law 109-13) now determines which state driver's license can be presented and accepted as a valid ID document for access to Jefferson Lab. The following states/US territories have been determined by the U.S. Department of Homeland Security to have failed to comply with the REAL ID Act: American Samoa, Minnesota, Missouri, Washington As of March 2, 2015, Jefferson Lab will begin using the REAL ID Act verification for all

  14. Airless drying -- Developments since IDS'94

    SciTech Connect

    Stubbing, T.J.

    1999-09-01

    Since its introduction to IDS'94 delegates, significant progress has been made with the development of airless drying technology. The ceramic industry internationally is beginning to benefit from both the energy use and drying time reductions it achieves, while on the basis of further theoretical work carried out since 1993 other industries, including the bioenergy sector, should also soon begin to exploit its advantages. As global warming becomes a reality and oil reserves decline, superheated steam drying and gasification of biomass will contribute to the mitigation of those problems.

  15. RAPID/Roadmap/14-ID-d | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us 401 Water Quality Certification (14-ID-d) IDEQ is...

  16. RAPID/Roadmap/14-ID-f | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us 401 NPDES Water Quality Certification (14-ID-f) Idaho...

  17. RAPID/Roadmap/4-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us State Exploration Process (4-ID-a) 04IDAStateExploration...

  18. RAPID/Roadmap/11-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us State Cultural Considerations (11-ID-a) Idaho has a statute that provides state...

  19. RAPID/Roadmap/17-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Contact Us Aesthetic Resource Assessment (17-ID-a) 17IDAAestheticResourceAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  20. RAPID/Roadmap/9-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Environmental Review Process (9-ID-a) Add overview. 09IDAStateEnvironmentalProcess.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  1. RAPID/Roadmap/5-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Geothermal Hydropower Solar Tools Contribute Contact Us Drilling and Well Development (5-ID-a) 05IDADrillingWellDevelopment.pdf Error creating thumbnail: Page number not in...

  2. RAPID/Roadmap/15-ID-b | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Air Quality Permit - Tier II Operating Permit (15-ID-b) Tier II Operating Permits are...

  3. RAPID/Roadmap/15-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Air Quality Permit - Permit to Construct (15-ID-a) The Idaho Department of Environmental...

  4. RAPID/Roadmap/8-ID-e | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ID-e < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools...

  5. RAPID/Roadmap/3-ID-e | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ID-e < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools...

  6. RAPID/Roadmap/14-ID-b | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    RAPIDRoadmap14-ID-b < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal...

  7. RAPID/Roadmap/8-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    RAPIDRoadmap8-ID-a < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  8. RAPID/Roadmap/6-ID-b | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    RAPIDRoadmap6-ID-b < RAPID | Roadmap Jump to: navigation, search RAPID Regulatory and Permitting Information Desktop Toolkit BETA About Bulk Transmission Geothermal Hydropower...

  9. Temporary EPA ID Number Request | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Temporary EPA ID Number RequestLegal Abstract A developer that may "generate hazardous waste only from an episodic event" may instead apply for a temporary hazardous waste...

  10. RAPID/Roadmap/14-ID-c | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Geothermal Hydropower Solar Tools Contribute Contact Us Underground Injection Control Permit (14-ID-c) Rule 40 of the Idaho Department of Water Resources' Drilling for...

  11. RAPID/Roadmap/12-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Contact Us State Biological Resource Considerations (12-ID-a) The Idaho Department of Fish & Game preserves wildlife against any direct take, including wild animals, birds, and...

  12. Microsoft Word - DOE-ID-INL-11-010.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Work will involve the removal of the inspection station, material transporters, laser ... Yes No Approved by Richard Kauffman, acting DOE-ID NEPA Compliance Officer on 8312011.

  13. Microsoft Word - DOE-ID-INL-15-007.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    water - cooling water lines above shower station will interfere with the shower linkage. ... Act) Yes No Approved by Jack Depperschmidt, DOE-ID NEPA Compliance Officer on: 217

  14. Microsoft Word - DOE-ID-INL-16-041.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    *Transfer piping and poly bottle sample station piping to the first isolation valves from ... Disturbing Cultural or Biological Resources DOE-ID NEPA CX DETERMINATION Idaho National ...

  15. Microsoft Word - DOE-ID-INL-14-008.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... and operation of machinery and equipment (including, but not limited to, laboratory equipment, electronic DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 ...

  16. Projecting

    Energy Information Administration (EIA) (indexed site)

    Projecting the scale of the pipeline network for CO2-EOR and its implications for CCS infrastructure development Matthew Tanner Office of Petroleum, Gas, & Biofuels Analysis U.S. Energy Information Administration October 25, 2010 This paper is released to encourage discussion and critical comment. The analysis and conclusions ex- pressed here are those of the author and not necessarily those of the U.S. Energy Information Administration. Author: Matthew Tanner, matthew.tanner@eia.gov

  17. Id-1 and Id-2 genes and products as therapeutic targets for treatment of breast cancer and other types of carcinoma

    DOEpatents

    Desprez, Pierre-Yves; Campisi, Judith

    2014-09-30

    A method for treatment and amelioration of breast, cervical, ovarian, endometrial, squamous cells, prostate cancer and melanoma in a patient comprising targeting Id-1 or Id-2 gene expression with a delivery vehicle comprising a product which modulates Id-1 or Id-2 expression.

  18. Microsoft Word - DOE-ID-INL-16-020.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    20 SECTION A. Project Title: Containment Tent for Opening of Containers at Materials and Fuels Complex (MFC)-793C SECTION B. Project Description and Purpose: The Sodium Components Maintenance Shop (SCMS) Storage building at the Materials and Fuels Complex (MFC) building MFC-793C is used for storage of Toxic Substances Control Act (TSCA)-regulated contact-handled low level waste (CH LLW) and mixed LLW. The building size is 40 × 30 ft with a 16-ft eave height. The floor of the storage building is

  19. JLab Registration/International Services - Researcher/Visitor ID

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements Researcher/Visitor ID Requirements CHANGE IN ACCEPTABLE ID DOCUMENTS FOR JLAB ACCESS U.S. Citizens must bring a valid Government issued ID card that contains a photo such as a passport or valid driver's license. Non-driver photo identification cards issued by the Department of Motor Vehicles can be used as proof of identification. Lawful Permanent Resident of the United States must bring their Green Card or passport with valid I-551 stamp AND a valid government issued

  20. Impact of aerosol size representation on modeling aerosol-cloud...

    Office of Scientific and Technical Information (OSTI)

    SciTech Connect Search Results Journal Article: Impact of aerosol size representation on ... OSTI Identifier: 15003527 Report Number(s): PNWD-SA--5600 Journal ID: ISSN 0148-0227 ...

  1. Final Report: DOE/ID/14215

    SciTech Connect

    Kenneth Bryden; J. Richard Hess; Thomas Ulrich; Robert Zemetra

    2008-08-18

    The proposed straw separation system developed in the research project harvests the large internode sections of the straw which has the greater potential as a feedstock for lignocellulosic ethanol production while leaving the chaff and nodes in the field. This strategy ensures sustainable agriculture by preventing the depletion of soil minerals, and it restores organic matter to the soil in amounts and particle sizes that accommodate farmers’ needs to keep tillage and fertilizer costs low. A ton of these nutrient-rich plant tissues contains as much as $10.55 worth of fertilizer (economic and energy benefits), in terms of nitrogen, phosphorus, potassium, and other nutrients provided to the soil when incorporated by tillage instead of being burned. Biomass conversion to fermentable sugars for the purpose of producing fuels, chemicals, and other industrial products is well understood. Most bioenergy strategies rely on low-cost fermentable sugars for sustainability and economic viability in the marketplace. Exploitation of the “whole crop”—specifically, wheat straw or other plant material currently regarded as residue or waste—is a practical approach for obtaining a reliable and low-cost source of sugars. However, industrial-scale production of sugars from wheat straw, while technically feasible, is plagued by obstacles related to capital costs, energy consumption, waste streams, production logistics, and the quality of the biomass feedstock. Currently available separation options with combine harvesters are not able to achieve sufficient separation of the straw/stover and chaff streams to realize the full potential of selective harvest. Since ethanol yield is a function of feedstock structural carbohydrate content, biomass anatomical fractions of higher product yield can have a significant beneficial impact on minimum ethanol selling price. To address this advanced biomass separation computation engineering models were developed to more effectively and

  2. RAPID/Roadmap/18-ID-b | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    demonstrate insurance coverage that would protect the community from incurring clean-up costs in the event of the developer's insolvency. 18-ID-b.5 - Facility siting license...

  3. Microsoft Word - DOE-ID-INL-15-070.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE-ID-INL-15-070 excluded petroleum and natural gas products that pre-exist in the environment such that there would be uncontrolled or unpermitted releases; (4) have the...

  4. RAPID/Roadmap/3-ID-d | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Toolkit BETA About Bulk Transmission Geothermal Hydropower Solar Tools Contribute Contact Us Land Use Permit (3-ID-d) The Idaho Department of Lands issues Land Use Permits for...

  5. Microsoft Word - DOE-ID-INL-14-034.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    No.: DOE-ID-INL-14-034 pollutants, contaminants, or CERCLA-excluded petroleum and natural gas products that pre-exist in the environment such that there would be uncontrolled...

  6. RAPID/Roadmap/6-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    load A load is overlegal if the load is: width over 8'6"; Over 14' tall; Truck and trailer combined are over 75' long; or The load weighs over 80,000 pounds. 6-ID-a.2 - Meet...

  7. RAPID/Roadmap/19-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    to 19-ID-a.5 - Is a Change in Point of Diversion, Place of Use, Period of Use, or Nature of Use Needed for an Existing Water Right If the proposed activity will require a...

  8. DOE Data ID Service - Digital object identifiers for DOE scientific...

    Office of Scientific and Technical Information (OSTI)

    How to Use the DOE Data ID Service For Grantees - Submit metadata to OSTI. Login not required For Individual Lab Researchers - Submit metadata to your lab's internal STI system or your ...

  9. RAPID/Roadmap/6-ID-c | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Tools Contribute Contact Us Drinking Water Permit (6-ID-c) 06IDCDrinkingWaterPermit.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  10. RAPID/Roadmap/7-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Contact Us Power Plant Siting Process (7-ID-a) 07IDAPowerPlantSitingConstruction.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  11. RAPID/Roadmap/13-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Contribute Contact Us State Land Use Assessment (13-ID-a) 13IDALandUseAssessment.pdf Error creating thumbnail: Page number not in range. Error creating thumbnail: Page number...

  12. Vermont Hazardous Waste Handler Site ID Form | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    to library Legal Document- Permit ApplicationPermit Application: Vermont Hazardous Waste Handler Site ID FormLegal Abstract This form is used to notify the Vermont Agency of...

  13. T-642: RSA SecurID update to Customers

    Energy.gov [DOE]

    RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products

  14. Microsoft Word - DOE-ID-INL-13-015.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... it out when required. 3. Bring in a self-contained comfort station and pump when required. ... DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: ...

  15. Microsoft Word - DOE-ID-INL-16-004.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (N&HS) personnel with a new field station office near the Safety Test Facility ... DOE-ID NEPA CX DETERMINATION Idaho National Laboratory Page 2 of 2 CX Posting No.: ...

  16. Microsoft Word - DOE-ID-INL-11-007.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... The FASS is a central station type vacuum system that continuously samples air within the ... 2012 Approximate Cost: 12,000,000 DOE-ID NEPA CX DETERMINATION IDAHO NATIONAL ...

  17. Microsoft Word - DOE-ID-INL-16-005.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The trailer will serve as a comfort station for use by men and women in remote areas ... that under reasonably foreseeable DOE-ID NEPA CX DETERMINATION Idaho National ...

  18. Microsoft Word - DOE-ID-INL-13-007.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of the U.S. Department of Energy Idaho Operations office (DOE-ID) and INL Management. ... long-term maintenance of the seismic station will be funded as part of BEA's annually ...

  19. Beamline 4-ID-C | Advanced Photon Source

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    C 4-ID-C Home Recent Publications XSD-MM Home MM Advisory Committees FAQs Beamline Info Instrumentation Magnet Materials Internal Useful Links Current APS status ESAF System GUP...

  20. RAPID/Roadmap/3-ID-a | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    the IDL becomes involved only if they are notified and the Land Board requests their involvement. 3-ID-a.3 - Consultation (optional) IDL may meet with any other state agency to...

  1. Physicists ID Mechanism that Stabilizes Plasma in Tokamaks

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Physicists ID Mechanism that Stabilizes Plasma in Tokamaks Physicists ID Mechanism that Stabilizes Plasma in Tokamaks Calculations Run at NERSC Create 3D Simulations of Fusion Plasmas January 4, 2016 Contact: Kathy Kincade, kkincade@lbl.gov, +1 510 495 2124 jardinfusion A cross-section of the virtual plasma showing where the magnetic field lines intersect the plane. The central section has field lines that rotate exactly once. Image: Stephen Jardin A team of physicists led by Stephen Jardin of

  2. NERSC Helps Physicists ID New Molecules With Unique Features

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NERSC Helps Physicists ID New Molecules With Unique Features NERSC Helps Physicists ID New Molecules With Unique Features Hollow magnetic cage molecules may have applications in technology, healthcare August 10, 2013 NERSC supercomputing resources helped Virginia Commonwealth University (VCU) researchers determine it may be possible to create large, hollow magnetic cage molecules that could be used in medicine as a drug delivery system to noninvasively treat tumors and in other emerging

  3. Poster - DOE Data ID Service | OSTI, US Dept of Energy, Office...

    Office of Scientific and Technical Information (OSTI)

    ID Service Document Files and References Available Downloads for this Document: applicationpdf icon Poster DOE Data ID Service Last updated on Tuesday 22 December

  4. Department of Energy Idaho - Strategic Partnership Projects (formerly WFO)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Inside ID > Strategic Partnership Projects blank, used for page layout only Strategic Partnership Projects Formerly Work For Others (WFO) SPP Administrator Jose Elizondo (208) 526-0965 wfo@id.doe.gov Technology Partnerships Program Specialist Sara Twining (208) 526-5987 wfo@id.doe.gov Office of Chief Counsel Stewart Forbes (208) 526-3715 Budget Services Division Laurie Acosta Peterson (208) 526-0459 Contracting Officer Jeff Fogg (208) 526-4958 Classification Officer John Gilmore (208)

  5. Vehicle Technologies Office Merit Review 2014: Biofuel Impacts on Aftertreatment Devices (Agreement ID:26463) Project ID:18519

    Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about biofuel impacts...

  6. Vehicle Technologies Office Merit Review 2014: Durability of Diesel Particulate Filters (Agreement ID:10461) Project ID:18519

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about durability of...

  7. Vehicle Technologies Office Merit Review 2014: Materials Issues Associated with EGR Systems (Agreement ID:18571) Project ID:18518

    Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about materials...

  8. Vehicle Technologies Office Merit Review 2014: Enabling Materials for High Temperature Power Electronics (Agreement ID:26461) Project ID:18516

    Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about enabling...

  9. Vehicle Technologies Office Merit Review 2014: Applied ICME for New Propulsion Materials (Agreement ID:26391) Project ID:18865

    Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about applied ICME...

  10. Vehicle Technologies Office Merit Review 2014: Materials for Advanced Turbocharger Designs (Agreement ID:17257) Project ID:18518

    Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about materials for...

  11. Vehicle Technologies Office Merit Review 2014: Friction Reduction through Surface Modification (Agreement ID:23284) Project ID:18518

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by Oak Ridge National Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about friction...

  12. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    -------------------------------------------------------- AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE I PAGE OF PAGES 1 I 2 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If applicable) 0246 See Block 16C 6. ISSUED BY CODE 05003 7. ADMINISTERED BY (If other than Item 6) CODE 105003 NNSA/Los Alamos Site Office NNSA/Los Alamos Site Office U.S. Department of Energy U.S. Department of Energy NNSA/Los Alamos Site Office Los

  13. Microsoft Word - DOE-ID-13-044 Idaho EC B3-6.doc

    Office of Environmental Management (EM)

    10-2008 CONCLUDING MATERIAL Review Activity: Preparing Activity: DOE Operations Offices Field Offices DOE-HS-11 NA NNSA Service Center HS CH OH Project Number: EM ID GFO FSC 6910-0069 NE NV SC OR RL OAK SR RP National Laboratories Area Offices BNL Pantex Site Office LLNL Ashtabula Area Office LANL Carlsbad Area Office PNNL Columbus Area Office Sandia Fernald Area Office FNL Los Alamos Area Office West Valley Area Office Kirtland Area Office Pinellas Area Office Kansas City Area Office Miamisburg

  14. AMEN DMENT OF SOLICITATION/MODIFICATION OF CONTRACT r* CONTRACT ID CODE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AMEN DMENT OF SOLICITATION/MODIFICATION OF CONTRACT r* CONTRACT ID CODE I PAGE OF PAGES 1 I 1 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. ,5. PROJECT NO. (If applicable) 0234 10/08/2013 6.1SSUED BY CODE 00603 7. ADMINISTERED BY (If other than Item 6) CODE I00603 Office of River Protection u.s. Department of Energy Office of River Protection P.O. Box 450 Richland WA 99352 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state and ZIP Code) ASHINGTON

  15. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT ,1. CONTRACT ID CODE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ,1. CONTRACT ID CODE I PAGE OF PAGES 1 I 2 2. AM ENDMENT/MODIFICAT ION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REO. NO. ,5. PROJECT NO. (If appficable) 0542 See Block 16C 15SC002265 Item 00003 6. ISSUED BY CODE 005 16 u . s . Department of Energy ORNL Site Office P.O. Box 2008 Oak Ri dge TN 37831 8 NAME AND ADDRESS OF CONTRACTOR (No., street, oounty, State and ZIP Code) AK RIDGE ASSOCIATED UNIVERS IT I ES , 0 p INC . . 0 . BOX 117 0 AK RIDGE TN 37 830-6218 CODE 0411522 2 4 FACILITY CODE 7.

  16. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1.CONTRACT ID CODE PAGE OF PAGES

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CONTRACT ID CODE PAGE OF PAGES T 1 1 13 2 AMENDIMENT/MODIFICATION NO 3. EFFECTIVE DATE 4 -REGUISITION/PURCHASE RED. NO 5. PROJECT NO. (If epplicable) 032 04/14/2011 11EM002244 6 ISSUED BY CODE 00603 7 ADMINISTERED BY (Iftherthan temrt6) CODE J00603 Office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy Office of River Protection office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 Richland WA 99352 8 NAME AND ADDRESS OF

  17. AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT 1. CONTRACT ID CODE P AE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    OF CONTRACT 1. CONTRACT ID CODE P AE 2. AMEN DMENT/MODIF ICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE RED. NO. 5. PROJECT NO. (If applicable) 073 See Block 16C 12EM002951/12EM003004 6. ISSUED BY CODE 100603 7. ADMINISTERED BY (If other than Item 6) CODE 100603 Office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy Office of River Protection Office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 Richland WA 99352 8. NAME

  18. AMENDMENT OF SOUCITATIONIMODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1. CONTRACT ID CODE PAGE OF PAGES II 11 9 2. AMEN DMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REOUISITIONIPURCHASE REQ. NO. 5. PROJECT NO. (If elpicable) 169 See Block 16C 12EM0020631 6. ISSUED BY CODE 00603 7. ADMINISTERED BY (If otherthan Item 6) CODE 100603 Office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy Office of River Protection Office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 MS: H6-60

  19. 11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

    National Nuclear Security Administration (NNSA)

    11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 258 6. ISSUED BY CODE 3. EFFECTIVE DATE See Block 16C 05008 4. REQUISITION/PURCHASE REQ. NO. 7. ADMINISTERED BY (If other than Item 6) 15. PROJECT NO. (If applicable) CODE 1 0 5 0 0 8 NNSA/Oakridge Site Office NNSA/Oakridge Site Office U.S. Department of Energy U. S. Department of Energy NNSA/Y-12 Site Office NNSA/Y-12 Site Office P.O. Box 2050 P.O. Box 2050 Building 9704-2

  20. 1,CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 1 (10.63 MB) More Documents & Publications Microsoft Word - GJPPGPracticesDraft.doc Updated Section H Greening Clauses DOE Purchase Card Policy

    ,CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I 11 3 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE (M D Y) 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO, (If applicable) 221 See Block 16C 11 EM0026551 6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy Office of

  1. DOE Extends Idaho Cleanup Project Contract | Department of Energy

    Office of Environmental Management (EM)

    Idaho Cleanup Project Contract DOE Extends Idaho Cleanup Project Contract September 29, 2015 - 6:00pm Addthis Media Contact Danielle Miller, 208-526-5709 Idaho Falls, ID - The U.S. ...

  2. Geothermal Resource Exploration and Definition Projects | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Hills (U-Boat), NV, and Lightning Dock, NM. The seven GRED II projects are located at Raft River, ID, Blue Mountain, NV, Truckhaven, CA, Animas Valley, NM, Lake City, CA, Glass...

  3. Microsoft Word - DOE-ID-INL-16-056.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: Advanced Test Reactor (ATR) Nuclear Instrumentation Replacement Project SECTION B. Project Description and Purpose: This proposed action is to replace ...

  4. Microsoft Word - DOE-ID-13-023 Vanderbilt EC B3-15.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Development of a Nano-modified Concrete for Next Generation of ... incorporation of nano-sized and nano-structured particles based on enhanced reactivity. ...

  5. DOE-ID FOIA Electronic Reading Room Documents

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Electronic Reading Room Documents Electronic Reading Room Documents The information contained here represents DOE-ID's responses to FOIA requests that have been or are likely to be of broad public interest, as stipulated under the Electronic Freedom of Information Act Amendments of 1996. As required by the Act, documents created after November 1997, which meet the criteria for electronic presentation, will be made available here. Other documents requested under the FOIA will also be made

  6. Finding Utility Companies Under a Given Utility ID | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    utility company pages under a given utility id. From the Special Ask page, in the query box enter the following: Category:Utility CompaniesEiaUtilityId::15248 substituting...

  7. DOI-BLM-ID-T020-2012-0003-CX | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ID-T020-2012-0003-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-T020-2012-0003-CX CX for GeothermalExploration CX for Seismic Survey at ?? Geothermal...

  8. DOE Data ID Service Benefits | OSTI, US Dept of Energy Office...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE Data ID Service Benefits DataCite | Contact DOE Data ID Service When you submit metadata to OSTI about a dataset, you are basically "announcing" that it exists and you are ...

  9. DOE Data ID Service Background | OSTI, US Dept of Energy Office...

    Office of Scientific and Technical Information (OSTI)

    DOE Data ID Service Background DataCite | Contact DOE Data ID Service In 2011, the DOE Office of Scientific and Technical Information (OSTI) joined DataCite to facilitate citing, ...

  10. EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 1: Areva Eagle Rock Enrichment Facility in Bonneville County, ID EIS-0471: Areva Eagle Rock Enrichment Facility in Bonneville County, ID May 20, 2011 delete me old download page duplicate

  11. Microsoft Word - DOE-ID-INL-16-093.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    93 SECTION A. Project Title: Nuclear Science User Facilities (NSUF) University of Central Florida Experiment SECTION B. Project Description and Purpose: Understanding depleted ...

  12. Microsoft Word - DOE-ID-INL-15-067.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Microgrid Research Laboratory Remodel SECTION B. Project Description and Purpose: The Microgrid Research Laboratory is located in the Energy Systems ...

  13. Microsoft Word - DOE-ID-INL-15-008.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Ceramic Sensor Experiments in the Analytical Laboratory SECTION B. Project Description: The purpose of the proposed action is to research the...

  14. Microsoft Word - DOE-ID-INL-11-002.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Facility Construction and Modification in Support of the ... of Impact: Air Emissions: Project construction activities may involve the use of ...

  15. Microsoft Word - DOE-ID-INL-14-051.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    B. Project Description: The project scope consists of modifying two (2) separate ... heads) from MFC-768 to MFC-768E. Work scope includes: 1) Demolition of existing piping ...

  16. Microsoft Word - DOE-ID-INL-16-010.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Radioisotope Power System Heat Source Storage Project SECTION B. ... the receipt and storage capacity and management capability for the amount and type of ...

  17. Microsoft Word - DOE-ID-INL-11-013.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Modifications to Central Facilities Area (CFA)-Live Fire Range and Main Gate Drinking Water SECTION B. Project Description: Modification of the drinking...

  18. Class 8 Truck Freight Efficiency Improvement Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Daimler Trucks and Buses 1 Super Truck Program: Vehicle Project Review Recovery Act -Class 8 Truck Freight Efficiency Improvement Project Project ID: ARRAVT080 This presentation does not contain any proprietary, confidential, or otherwise restricted information Derek Rotz (PI & Presenter) Dr. Maik Ziegler Daimler Truck North America LLC June 19 th , 2014 Daimler Trucks and Buses 2 Overview * Project start: April 2010 * Project end: March 2015 * Percent complete: 80% * Resolve thermal &

  19. IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3/26/2004 13:39 FAX IdJOO2 UNITED STATES ENVIRONMENTAL PROTECTION AGENCY WASHINGTON, D.C. 20460 MAR 26 2004 OFFICE OF AIR AND RADIATION R. Paul Detwiler, Acting Manager Carlsbad Field Office U.S. Department of Energy P.O. Box 3090 Carlsbad, NM 88221-3090 Dear Dr. Detwiler: This letter announces the U.S. Environmental Protection Agency's (EPA's) final decision to approve the Department of Energy's (DOE's) remote handled (RH) transuranic (TRU) Waste Characterization Program Implementation Plan

  20. DOE-ID Procurement Services � the action team

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE-ID Procurement Services � the action team Passage of the American Recovery and Reinvestment Act of 2009 included billions of dollars in additional funding for energy efficiency improvements to U.S. homes and businesses. By early July, the U.S. Department of Energy was hard pressed to get that funding to the communities who needed it to reduce their power bills. That�s when DOE�s Office of Energy Efficiency asked the department�s Idaho Operations Office for support from DOE-ID�s

  1. Material Safety Data Sheet MSDS ID NO.: 0137SPE012

    Alternative Fuels and Advanced Vehicles Data Center

    Material Safety Data Sheet MSDS ID NO.: 0137SPE012 Revision date: 05/25/2011 1. CHEMICAL PRODUCT AND COMPANY INFORMATION Product name: Speedway E85 Synonym: Speedway ED75/ED85; E-75; E75; E-85; E85; Ethanol/Gasoline Fuel Blend; Fuel Ethanol ED75/ED85 Chemical Family: Gasoline/Ethanol Formula: Mixture Manufacturer: Speedway LLC P.O. Box 1500 Enon, OH 45501 Other information: 419-421-3070 Emergency telephone number: 877-627-5463 2. COMPOSITION/INFORMATION ON INGREDIENTS E85 is a mixture of ethyl

  2. Microsoft Word - DOE-ID-INL-15-024.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: Materials and Fuels Complex (MFC) MH50 Fiber Optic Installation Project SECTION B. Project Description: MFC has a facility entry fiber bottleneck that limits the ability to recover networks and telecommunications in the event of a single fiber strand failure. The proposed project would provide available fibers in a failure situation and reduce risks to MFC Operations. The proposed project would install approximately 6,700 feet of fiber optic telecommunication cable

  3. 1. CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CON'I'AC'r ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II 11 3 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE (M/D.'F) 4. REQUISITION/PURCHASE RE-Q. NO. S. PROJECT1 NO. t7fapplieoble) 27See Block 16C 12EM001839 6. ISUED13Y ODE7. ADMINISTER.ED BY (If uI/wr ius /tem 6) CODE U.S. Department of Energy Office or River Protection P. 0. Box 450, MS 146-60 Richland, WA 99352 1. NAME AND ADDRESS OF CONTRACTOR (No.,stree, county State and Z11' code) 9A, AMENDMEN f

  4. 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I11 5

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Ap5,sval 2700042 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT I11 5 2. AMENDMENT/MOOIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.5 PROJECT NO. (If applicable) A077 See 16C 06-08RL-14383.O1 1 6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODEJ US. Department of Energy Same as item 6. Richland Operations Office DOE Contracting POC: Richard Stimmrrel P. 0. Box 550, MSIN A7-80 (509) 376-2882 Richland, WA 99352 8 NAME AND

  5. JFNK_Projection.dvi

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Notes on Newton-Krylov based Incompressible Flow Projection Solver R.R. Nourgaliev a , M.Christon b , J.Bakosi c a Idaho National Laboratory, Nuclear Science and Technology Division, Thermal Science & Safety Analysis Department, 2525 North Fremont Ave. Idaho Falls, ID 83415-3860 Email: Robert.Nourgaliev@inl.gov b Los Alamos National Laboratory, Computer, Computational and Statistical Sciences Division, Computational Physics Group (CCS-2)) Los Alamos, NM 87545 Email: christon@lanl.gov c Los

  6. Summary - Preliminary TRA of the Calcine Disposition Project

    Office of Environmental Management (EM)

    Calcine The Id materi Dec. 2 Press additiv form w those project anticip 2012 a CD-1 a ... ROD (is y a Hot Isostati cess, possibly w monolithic was comparable to lcine ...

  7. The MAJORANA Project (Journal Article) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    The MAJORANA Project Citation Details In-Document Search Title: The ... Publication Date: 2009-06-01 OSTI Identifier: 1228360 Report Number(s): PNNL-SA--102132 Journal ID: ISSN ...

  8. DOEdataID_C218_4X9.jpg | OSTI, US Dept of Energy Office of Scientific and

    Office of Scientific and Technical Information (OSTI)

    Technical Information DOEdataID_C218_4X9

  9. Microsoft Word - DOE-ID-INL-15-012.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Replacement of Control Panel 670-E-80 (Outer Shim and Safety Rod Drive Motor Control Centers) SECTION B. Project Description: The 670-E-80 Motor Control Center ...

  10. Microsoft Word - DOE-ID-INL-14-046.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    B. Project Description: The project scope consists of adding fire water suppression ... detection will be added to RM-A116. Work scope includes: 1) installation of piping and ...

  11. Microsoft Word - DOE-ID-INL-16-086.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: 2016 Materials and Fuels Complex (MFC) Campus Improvement Projects SECTION B. Project Description and Purpose: Various facilities at Idaho National Laboratory's (INL's) MFC have dated interiors and other facility components that need to be upgraded, repaired, or replaced. The purpose of the MFC Campus Improvement Projects is to improve facility appearance and enhance the workplace environment. The proposed action would remodel conference rooms, offices, and bathrooms

  12. MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho

    Office of Environmental Management (EM)

    MAJOR CONFORMED CONTRACTS LINKS Site/Project Contract Link Idaho Idaho Cleanup Project http://www.id.doe.gov/doeid/ICPContract/ICPContract.htm Advance Mixed Waste Treatment http://www.id.energy.gov/doeid/AMWTPContract/AMWTPcontract.htm Oak Ridge http://science.energy.gov/isc/foia/electronic-reading-room/#MajorContractsAwarded Office of River Protection http://www.hanford.gov/page.cfm/DOE-ORPPrimeContracts EMCBC and Small Sites https://www.emcbc.doe.gov/About/PrimeContracts Richland

  13. Underground Storage Tank Integrated Demonstration (UST-ID). Technology summary

    SciTech Connect

    Not Available

    1994-02-01

    The DOE complex currently has 332 underground storage tanks (USTs) that have been used to process and store radioactive and chemical mixed waste generated from weapon materials production. Very little of the over 100 million gallons of high-level and low-level radioactive liquid waste has been treated and disposed of in final form. Two waste storage tank design types are prevalent across the DOE complex: single-shell wall and double-shell wall designs. They are made of stainless steel, concrete, and concrete with carbon steel liners, and their capacities vary from 5000 gallons (19 m{sup 3}) to 10{sup 6} gallons (3785 m{sup 3}). The tanks have an overburden layer of soil ranging from a few feet to tens of feet. Responding to the need for remediation of tank waste, driven by Federal Facility Compliance Agreements (FFCAs) at all participating sites, the Underground Storage Tank Integrated Demonstration (UST-ID) Program was created by the US DOE Office of Technology Development in February 1991. Its mission is to focus the development, testing, and evaluation of remediation technologies within a system architecture to characterize, retrieve, treat to concentrate, and dispose of radioactive waste stored in USTs at DOE facilities. The ultimate goal is to provide safe and cost-effective solutions that are acceptable to the public and the regulators. The UST-ID has focused on five DOE locations: the Hanford Site, which is the host site, in Richland, Washington; the Fernald Site in Fernald, Ohio; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; the Oak Ridge Reservation in Oak Ridge, Tennessee, and the Savannah River Site in Savannah River, South Carolina.

  14. Idaho National Laboratory Supervisory Control and Data Acquisition Intrusion Detection System (SCADA IDS)

    SciTech Connect

    Jared Verba; Michael Milvich

    2008-05-01

    Current Intrusion Detection System (IDS) technology is not suited to be widely deployed inside a Supervisory, Control and Data Acquisition (SCADA) environment. Anomaly- and signature-based IDS technologies have developed methods to cover information technology-based networks activity and protocols effectively. However, these IDS technologies do not include the fine protocol granularity required to ensure network security inside an environment with weak protocols lacking authentication and encryption. By implementing a more specific and more intelligent packet inspection mechanism, tailored traffic flow analysis, and unique packet tampering detection, IDS technology developed specifically for SCADA environments can be deployed with confidence in detecting malicious activity.

  15. OSTIblog Articles in the DOE Data ID Service Topic | OSTI, US...

    Office of Scientific and Technical Information (OSTI)

    ID Service Topic OSTI Helping High Energy Physics Collaboration to Register Datasets by Sara ... researcher in the High Energy Physics (HEP) community to register scientific ...

  16. IDS-NF Impact of Neutrino Cross Section Impact of Neutrino Cross Section

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    IDS-NF Impact of Neutrino Cross Section Impact of Neutrino Cross Section Knowledge on Oscillation Knowledge on Oscillation Measurements Measurements M. Sorel, IFIC (CSIC and U. of Valencia) IDS-NF, RAL, Jan 16-17 2008 M. Sorel - IFIC (Valencia U. & CSIC) 2 IDS-NF Neutrino Cross Sections: At What Energies Needed? Superbeams: Solid: T2K Dashed: NovA M. Sorel - IFIC (Valencia U. & CSIC) 3 IDS-NF Neutrino Cross Sections: At What Energies Needed? Superbeams: Solid: T2K Dashed: NovA Beta

  17. Origin State>> CA CA ID ID IL KY NJ NM NY NY NV OH OH OH SC

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mound Closure Project Portsmouth Gaseous Diffusion Plant Fernald Closure Project Savannah River Site BWXT Y-12 Plant Duratek Nuclear Fuels UT-Battelle Bechtel Jacobs Permafix M&EC ...

  18. Step 3: Project Refinement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 1/28/2016 2 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about

  19. Origin State>> CA CA ID ID IL KY NJ NM NY NY NV OH OH OH SC

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mix Wastew Treatment Project Argonne National Laboratory Paducah Gaseous Diffusion Plant Princeton Plasma Physics Laboratory Sandia National Laboratory Brookhaven National ...

  20. Microsoft Word - DOE-ID-INL-12-019.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 SECTION A. Project Title: INL Administration Building (IAB)Telephone Room 112 Heating, Ventilating, and Air Conditioning (HVAC) Upgrade SECTION B. Project Description: The proposed project will install a new air conditioning unit in the INL Administration Building room 112. The new air conditioning system will handle the equipment heat loads within this room. Room 112 is an unclassified telephone room that is not normally occupied. This room has one supply air diffuser and one return air

  1. Microsoft Word - DOE-ID-INL-15-028.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Advanced Test Reactor (ATR) Complex Street Lights Project SECTION B. Project Description: The ATR Complex street lighting has been taken out of service and needs to be replaced due to poor condition. An engineering inspection in October 2014 revealed numerous deficiencies with poles, guys, transformers, etc. The system was installed in 1965, is degraded and antiquated, and requires removal and replacement. The initial phase of the proposed action would remove the old

  2. Microsoft Word - DOE-ID-INL-15-072.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Test Area North (TAN)-601 Fiber Optic Cable Installation SECTION B. Project Description and Purpose: Idaho National Laboratory (INL) needs additional fiber optic services at the Specific Manufacturing Capability (SMC). INL has a lease contract with Syringa Wireless, and Syringa wireless would perform the proposed action to extend fiber services at INL. The proposed service project would install approximately 2644 ft. of fiber optic cable from the TAN-601 Dial Room to

  3. Microsoft Word - DOE-ID-INL-16-039.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    39 SECTION A. Project Title: Idaho National Laboratory (INL) Identity Credential Access Management (ICAM) Project SECTION B. Project Description and Purpose: To achieve Identity Credential Access Management (ICAM) objectives stipulated by Department of Energy (DOE) Order 206.2, Idaho National Laboratory (INL) needs to establish an access management system that incorporates issuance of an Homeland Security Presidential Directive (HSPD)-12 credential to each Battelle Energy Alliance, LLC (BEA) and

  4. Microsoft Word - DOE-ID-INL-16-099.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 SECTION A. Project Title: Materials and Fuels Complex (MFC)-1734 Deactivation and Demolition SECTION B. Project Description and Purpose: Building 1734 at the Materials and Fuels Complex (MFC-1734) is a temporary trailer that once housed construction personnel during asbestos abatement activities at MFC. The structure is no longer needed and is located where future buildings are proposed to be located (e.g., Sample Preparation Laboratory). The proposed project will remove and excess interior

  5. Microsoft Word - DOE-ID-INL-16-100.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    0 SECTION A. Project Title: Lighting Replacements in Test Reactor Area (TRA)-653 (Weld Shop) and TRA-662 (Warehouse) SECTION B. Project Description and Purpose: In order to lower energy use, the proposed action would upgrade the lighting in the TRA-653 Weld Shop and the TRA-662 warehouse and machine shop with new lighting systems. Benefits also include higher light level at the working surface, better color rendition, and lower operating temperature. This project will include both material and

  6. Microsoft Word - DOE-ID-INL-16-111.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Materials and Fuels Complex (MFC) Metal Storage Shed (No Building Number) South of MFC-777 Removal SECTION B. Project Description and Purpose: The proposed project will dismantle and remove the storage shed (no building number) located south and adjacent to Building 777 at the Materials and Fuels Complex which is no longer needed. This storage shed was used for equipment storage only and has no utilities or hazardous components associated with the structure. The shed

  7. Microsoft Word - DOE-ID-INL-14-023.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    B. Project Description: The existing combined firepotable water supply and distribution system at Materials and Fuels Complex (MFC), including the Transient Reactor Test ...

  8. Microsoft Word - DOE-ID-INL-11-008.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title: Parking area expansion along road to Range 7 SECTION B. Project ... Historically, participants have parked their vehicles on the gravel road leading to range ...

  9. Microsoft Word - DOE-ID-INL-13-023.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Area (TRA)-680 Road Widening SECTION B. Project Description: The purpose and need for the proposed action is to widen the gravel interior perimeter road within the Advanced ...

  10. Microsoft Word - DOE-ID-INL-13-024.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Laboratory (INL) Road Sign InstallationMaintenance SECTION B. Project Description: The proposed action is to install new and repairreplace existing road signs and ...

  11. Microsoft Word - DOE-ID-INL-14-045.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Center (IORC) Emergency Generator Installation SECTION B. Project Description: The proposed activity would install an emergency power engine-generator at the IORC facility. ...

  12. Microsoft Word - DOE-ID-INL-16-067.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Main Gate Shelter Complex Non-Emergency Generator Installation SECTION B. Project ... of an outdoor Tier 4 non-emergency generator and concrete slab, sidewalk demolition ...

  13. Microsoft Word - DOE-ID-INL-15-043.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION C. Environmental Aspects or Potential Sources of Impact: Air Emissions Project activities may generate fugitive dust. If generation of fugitive dust is expected from ...

  14. Microsoft Word - DOE-ID-INL-16-058.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Transient Reactor Test (TREAT) Parking Area Grading and Paving ... associated with restart on the TREAT Reactor Building (MFC-720), the TREAT Reactor ...

  15. Microsoft Word - DOE-ID-INL-11-014.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Advanced Test Reactor Core Internals Changeout (CIC) Outage - ... (CIC) outage of the Advanced Test Reactor (ATR), which is housed in building Test ...

  16. Microsoft Word - DOE-ID-INL-15-039.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Description: The purpose of this work is to build storage for explosive magazines. ... Building IF- 682 is approved for explosive operations. Heating and cooling of the addition ...

  17. Microsoft Word - DOE-ID-INL-10-017.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    property and provide reliability of communications and ... An emergency diesel generator will be required so that power ... compressors, and generators will be used during the project. ...

  18. Microsoft Word - DOE-ID-INL-16-068.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and Purpose: The purpose of this revision is to capture additional project scope. ... This additional scope does not include historic properties eligible for the National ...

  19. Microsoft Word - DOE-ID-INL-14-001.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Door SECTION B. Project Description: The scope of work is to install an additional ... The work scope includes: - Terminate and remove electrical conduits and conductors ...

  20. Microsoft Word - DOE-ID-INL-12-004.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Storage Building (CESB) Conversion Scope Change SECTION B. Project Description: ... This additional scope and resulting requirements were not identified in EC INL-10- 074 (OA ...

  1. Microsoft Word - DOE-ID-10-005.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION B. Project Description The scope of work will be to repair andor replace ... The scope will be to repair the existing system or identify an energy efficient ...

  2. Microsoft Word - DOE-ID-INL-16-006.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    B. Project Description and Purpose: The primary pump pit platforms have clearance issues. ... The purpose of this work scope is to alleviate the clearance issues described above by ...

  3. Microsoft Word - DOE-ID-INL-15-029.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Advanced Test Reactor 2A Loop Chemistry Control SECTION B. Project Description: Research and Development (R&D) experiments associated with the National Scientific User Facility ...

  4. Microsoft Word - DOE-ID-INL-16-046.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title: Central Facility (CF)-615 Sustainability Upgrades SECTION B. Project Description and Purpose: In order to meet sustainability goals and reduce energy consumption, ...

  5. Microsoft Word - 140602DOE-ID_OperationsSummary.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    POC -Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP) April 8, 2014: ... Memorial Institute. The new facility has 148,000 square feet of ...

  6. Microsoft Word - DOE-ID-INL-15-057.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Fuels Complex (MFC)-774 Central Alarm Station (CAS) Remodel SECTION B. Project ... exemptions 2 and 8 (Department of Energy Idaho Operations Office DOEID- 10997 rev. 5). ...

  7. Microsoft Word - DOE-ID-INL-14-006.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Demonstration Unit Biomass Dryer Exhaust Stack Installation SECTION B. Project Description: The proposed action is needed to allow operation of the Process Demonstration Unit ...

  8. Microsoft Word - DOE-ID-INL-14-049.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 SECTION A. Project Title: Process Demonstration Unit (PDU) Fueling Station SECTION B. ... Energy Systems Laboratory (ESL) in support of Process Demonstration Unit (PDU) operations. ...

  9. Microsoft Word - DOE-ID-INL-16-060.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... (lathes, mills, saws, metallurgical mounting equipment, and cutting or sizing equipment). ... Motor control centers would be installed to supply power to pump, blower, fan, heater, and ...

  10. Microsoft Word - DOE-ID-INL-14-013.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Modifications are limited to removing the starters from the motor control center (MCC) ... supply fan motors in MFC-777 with like size motors and VFDs. 13. Modify the ...

  11. Femtosecond dark-field imaging with an X-ray free electron laser (CXIDB ID 19)

    DOE Data Explorer

    Martin, A. V.

    This data was collected as part of the same experiment as the data deposited in [ID16](id-16.html). Experiment details are given in [Loh, N.D. et al.](http://dx.doi.org/10.1038/nature11222)

  12. Femtosecond dark-field imaging with an X-ray free electron laser (CXIDB ID 19)

    DOE Data Explorer

    Martin, A. V.

    2012-08-25

    This data was collected as part of the same experiment as the data deposited in [ID16](id-16.html). Experiment details are given in [Loh, N.D. et al.](http://dx.doi.org/10.1038/nature11222)

  13. Deactivation, Decontamination and Decommissioning Project Summaries

    SciTech Connect

    Peterson, David Shane; Webber, Frank Laverne

    2001-07-01

    This report is a compilation of summary descriptions of Deactivation, Decontamination and Decommissioning, and Surveillance and Maintenance projects planned for inactive facilities and sites at the INEEL from FY-2002 through FY-2010. Deactivations of contaminated facilities will produce safe and stable facilities requiring minimal surveillance and maintenance pending further decontamination and decommissioning. Decontamination and decommissioning actions remove contaminated facilities, thus eliminating long-term surveillance and maintenance. The projects are prioritized based on risk to DOE-ID, the public, and the environment, and the reduction of DOE-ID mortgage costs and liability at the INEEL.

  14. PROJECT NAME/ID",,,"Jobs figures to report",,"October 2010 Report...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... ,1945,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1946,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1947,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1948,,,,,,0,,0,,0,,0,,0,,0,,0,0 ,1949,,,,,,0,,0,,0,,0,,0,,0...

  15. Microsoft Word - DOE-ID-INL-14-025.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: Fiscal Year (FY)-14 Wireless Test Bed Fiber Optic Cable to Gate 1 and Experimental Breeder Reactor-I (EBR-I) Cell Sites SECTION B. Project Description: The purpose of this work is to install new fiber optic cable to support new wireless technology (4G) which will not work as well on existing microwave backhaul technology. Future projects using the new cable will be separately documented. New fiber optic cables would be installed between the Idaho National Laboratory

  16. Microsoft Word - DOE-ID-INL-16-017.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title: B27-601 and B8-601 Emergency Generator Replacement SECTION B. Project ... The generator in building B27-601 has not operated since the 2007 timeframe, and the ...

  17. Microsoft Word - DOE-ID-INL-12-014.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Area TRA-670) so a portable diesel generator, procured by the project, could be used ... A diesel generator with an 80 gallon tank, and extension cords, will be used to supply ...

  18. Microsoft Word - DOE-ID-INL-11-001.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    will be shared with the INL. Upon completion of the R&D work, the hex blocks will be returned to the INL. The project will be divided into two parts (Phase I and Phase II). ...

  19. Microsoft Word - DOE-ID-INL-10-018.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Active Measurements Campaign (AMC) at the Materials and Fuels Complex (MFC) - Zero Power Physics Reactor (ZPPR) SECTION B. Project Description: . The Department of Energy (DOE) Office of Dismantlement and Transparency (NA-241) is funding an AMC at the Idaho National Laboratory (INL) that would be conducted at the ZPPR building at the MFC and will involve experimenters from several national laboratories and the United Kingdom (UK). These experimenters will determine

  20. Microsoft Word - DOE-ID-INL-10-021.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    21 SECTION A. Project Title: Geotechnical Investigation for INL Remote-Handled Low-Level Waste Disposal SECTION B. Project Description: The proposed action would conduct geotechnical investigations at two 4-6 acre candidate sites for a Remote-Handled Low-Level Waste (RH LLW) Facility at the Idaho National Laboratory (INL). One site is located southwest of the Advanced Test Reactor (ATR)-Complex and the other site is located west of and across Lincoln Blvd. from the Idaho Comprehensive

  1. Microsoft Word - DOE-ID-INL-15-023.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    23 SECTION A. Project Title: Central Facilities Area (CFA) Live Fire Range Fiber Optic Connection SECTION B. Project Description: The CFA Live Fire Range currently does not have fiber optic cable connectivity to support daily operations. Fiber optic cable was recently installed at a power pole adjacent to the Gate 3 Guard Post to support National & Homeland Security Wireless Test Bed capabilities, and it has sufficient capacity to support some connectivity to the CFA Live Fire Range. This

  2. Microsoft Word - DOE-ID-INL-16-009.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 SECTION A. Project Title: U.S. High Performance Research Reactor Fuel Development Post Irradiation Examination SECTION B. Project Description and Purpose: The purpose of the first revision to this environmental checklist (EC) (see Idaho National Laboratory [INL]-13-039 R1) was to capture the work activities and environmental aspects of additional Post Irradiation Examination (PIE) activities, specifically dissolution of aluminum cladding and bend testing in the Hot Fuels Examination Facility

  3. Microsoft Word - DOE-ID-INL-16-013.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Irradiated Materials Characterization Laboratory (IMCL) Ventilation Modifications SECTION B. Project Description and Purpose: The Materials and Fuels Complex (MFC) Irradiated Materials Characterization Laboratory (IMCL), building MFC-1729, was constructed and placed into operational status approximately two years ago. During this period, operational experience has shown that air flow across the laboratory is minimal and does not meet expectations for radiological

  4. Microsoft Word - DOE-ID-INL-16-022.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Small Modular Reactor (SMR) Site Inspection Visit SECTION B. Project Description and Purpose: This Environmental Checklist (EC) covers several visits (between March and June) to four sites proposed as possible locations for siting a small modular reactor (SMR). The purpose of the visits is to: 1) establish corner boundaries (corner stakes/markers into or on top the ground), and 2) provide an on-site evaluation of site-specific parameters; such as, terrain, vegetation,

  5. Microsoft Word - DOE-ID-INL-16-033.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Replace/Upgrade 670-HVA-3, Process Control Room Air Conditioner SECTION B. Project Description and Purpose: This Environmental Checklist (EC) is being revised to add additional scope to include disconnecting and removing the drinking fountain outside the east door to the Advanced Test Reactor (ATR) Process Control Room. Both the potable water supply line and the cold waste drain will remain in place but will be capped. Scope of the original EC is included below: The

  6. Microsoft Word - DOE-ID-INL-16-036.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: Materials and Fuels Complex (MFC) Hot Fuel Examination Facility (HFEF) Purification System Modernization SECTION B. Project Description and Purpose: This Environmental Checklist (EC) is being revised to include work activities, conditions, and instructions associated with encountering asbestos containing building materials. The proposed action would modernize the argon purification system in the Hot Fuel Examination Facility (HFEF) at the Materials and Fuels Complex

  7. Microsoft Word - DOE-ID-INL-16-043.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Replace Tank TK-5175 in Materials and Fuels Complex (MFC)-765 Truck Lock SECTION B. Project Description and Purpose: The Fuel Conditioning Facility (FCF), building MFC-765, truck lock 3000-gallon industrial wastewater tank (TK-5175), located in the southwest corner of the truck lock, has degraded and there is potential for water seepage into the tank from water infiltration from the surface. There is no evidence the tank leaks. Monthly inspections of the tank have

  8. Microsoft Word - DOE-ID-INL-16-049.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Materials and Fuels Complex (MFC)-718 Decontamination and Decommissioning (D&D) and MFC Protected Area Intrusion Detection Upgrade SECTION B. Project Description and Purpose: Security at Idaho National Laboratory's (INL's) Materials and Fuels Complex (MFC) requires the use of infrastructure-related efforts to assure appropriate controls, systems, and security personnel are available to protect special nuclear materials, classified matter, and high value property

  9. Microsoft Word - DOE-ID-INL-16-050.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Advanced Test Reactor (ATR) Fuel Oil Leak Excavation and Cleanup SECTION B. Project Description and Purpose: A leak in the underground fuel oil transfer piping between buildings Test Reactor Area (TRA)-627 and tank TRA-776 (located in an underground vault immediately north of TRA-670) has been confirmed at the Advanced Test Reactor (ATR) Complex. The line containing the leak is approximately 1000 feet of buried 1.5" carbon steel piping between the pump house

  10. Microsoft Word - DOE-ID-INL-16-061.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Transient Reactor Test (TREAT) Outdoor Chemical Storage Prefabricated Building SECTION B. Project Description and Purpose: The Transient Reactor Test (TREAT) Facility at Idaho National Laboratory's Materials and Fuels Complex (MFC) needs flammable and combustible liquids storage space. The proposed action is to procure an outdoor, prefabricated chemical storage building designed for storage of 55 gallon drums containing flammable or combustible liquids. The facility

  11. Microsoft Word - DOE-ID-INL-16-062.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Central Facilities Area (CFA)-609 and B21-608 Information Technology (IT) Upgrades SECTION B. Project Description and Purpose: The proposed action would upgrade the Information Technology (IT) systems at both CFA-609 (Security Headquarters) and B21-608 (CFA Live Fire Range). This upgrade would include the following actions:  Remove and replace phone and data boxes  Install wireless access point utility boxes  Install Category 6A (CAT 6A) cable to new

  12. Microsoft Word - DOE-ID-INL-16-063.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Energy Innovation Laboratory (EIL) Laboratory B209 Fume Hoods Installation SECTION B. Project Description and Purpose: The proposed action would install and test two chemical fume hoods in the Energy Innovation Laboratory (EIL), building Idaho Falls (IF)-688, in laboratory B209 to support research and development (R&D) activities that utilize aqueous separations. Air emissions from on-going R&D activities are expected to remain within the limits established in

  13. Microsoft Word - DOE-ID-INL-16-064.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: Install Heaters and Switchable Glass Panels in Engineering Research Office Building (EROB) (Idaho Falls [IF]-654) SECTION B. Project Description and Purpose: Two areas of the Engineering Research Office Building (EROB), building IF-654, need modification. First, the east wing men's and women's restrooms on the third floor lack heat. Second, glass in the laboratory director's office (room 190) needs to be modified to meet security requirements. The proposed action

  14. Microsoft Word - DOE-ID-INL-16-065.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: United States Geological Survey (USGS) Geotechnical Drilling for USGS-144 SECTION B. Project Description and Purpose: The U.S. Geological Survey (USGS) needs geologic, stratigraphic, and hydraulic data for the purpose of characterizing groundwater flow and water quality in the eastern Snake River Plain aquifer. Monitoring wells are constructed to obtain the needed data, and the USGS has identified the need for an additional monitoring well. The proposed well is needed

  15. Microsoft Word - DOE-ID-INL-16-066.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: Central Facilities Area (CFA)-622 and CFA-624 Building Modifications SECTION B. Project Description and Purpose: Idaho National Laboratory's (INL's) Power Management needs additional space for program activities. The portion of building 622 at the Central Facilities Area (CFA [CFA]-622) previously occupied by the High Temperature Laboratory has been rarely used since the High Temperature Laboratory was moved to the Research and Education Campus (REC) in Idaho Falls.

  16. Microsoft Word - DOE-ID-INL-16-071.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Idaho Falls (IF)-608 (Information Operations and Research Center [IORC]) Room E-8 Secure Area Office Modifications SECTION B. Project Description and Purpose: Room E-8 in the Information Operations and Research Center (IORC), building IF-608, needs additional office area space. The proposed action would remodel room E-8 to increase office area space and supply adequate heating, ventilation, and air conditioning (HVAC) to each office. The area is approximately 18 feet

  17. Microsoft Word - DOE-ID-INL-16-077.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Test Reactor Area (TRA)-670 New Window in Advanced Test Reactor (ATR) Production Control Center SECTION B. Project Description and Purpose: The window in the Production Control Center (PCC) at the Advanced Test Reactor (ATR), building TRA-670, is not operational and a new, functional window is needed. The proposed action would construct a new window to the PCC. The activity would require block removal for installation of a framed opening on the south wall. The new

  18. Microsoft Word - DOE-ID-INL-16-079.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 SECTION A. Project Title: Modify Rapid Insertion Port Argon Panels in the Hot Fuels Examination Facility SECTION B. Project Description and Purpose: The argon gas panels (2) for the Hot Fuels Examination Facility (HFEF) Main Cell Rapid Insertion Port (RIP) system need modification to support periodic leak testing as part of Safety Analysis Report (SAR)-405 implementation. Panels are located on the second floor of HFEF. On each panel, the flowmeters would be replaced with flowmeters calibrated

  19. Microsoft Word - DOE-ID-INL-16-085.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    85 SECTION A. Project Title: Vehicle Access at the Intermediate Measurement Location SECTION B. Project Description and Purpose: Environmental checklist (EC) INL-13-017 (OA 5) analyzed the environmental impacts of placing a temporary Intermediate Measurement Location (IML) to support power line testing. Initially, only foot traffic was allowed in this area. The purpose of this EC is to address access controls at the IML. Unrestricted vehicle access is needed at the IML. The proposed action would

  20. Microsoft Word - DOE-ID-INL-16-087.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    87 SECTION A. Project Title: United States Geological Survey (USGS) Geotechnical Drilling for USGS-142 and USGS-143 Rev 1 USGS-142A SECTION B. Project Description and Purpose: Concrete was used during construction of geotechnical borehole United States Geological Survey (USGS)-142, and cement overflowed into the section of the borehole where water levels were needed to be measured. The purpose of this revision is to drill an additional borehole, USGS-142A, approximately 10 to 25 feet from

  1. Microsoft Word - DOE-ID-INL-16-090.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    0 SECTION A. Project Title: Transfer Waste Management Activities from Central Facilities Area (CFA)-637 to CFA-674 SECTION B. Project Description and Purpose: Windy conditions recently caused an electrical conduit anchored into the concrete retaining wall of the Hazardous Chemical Storage Facility, Building CFA-637, to fall and disconnect power from the facility. Repair of the retaining wall to restore facility power is not possible due to the age and condition of the facility, and waste

  2. Microsoft Word - DOE-ID-INL-16-091.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Materials and Fuels Complex (MFC) Laydown Area SECTION B. Project Description and Purpose: The laydown area northeast of Materials and Fuels Complex (MFC) building 721 does not provide adequate space for staging equipment and materials for work conducted in the area. The proposed action would add additional space to the laydown area by grading areas adjacent to the current disturbed area (see Figure 1). The area to be graded would not exceed one acre. In compliance

  3. Microsoft Word - DOE-ID-INL-16-092.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Materials and Fuels Complex (MFC)-752 Analytical Laboratory Installation of Air Conditioning Units SECTION B. Project Description and Purpose: There is insufficient cooling in rooms B102, B103 and B116 in the Materials and Fuels Complex (MFC) building 752AL. The proposed action would install individual air conditioning (AC) units in each room to provide additional cooling and maintain desired temperature. Installation of AC units would include installation of

  4. Microsoft Word - DOE-ID-INL-16-095.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: Materials and Fuels Complex (MFC) Research Collaboration Building SECTION B. Project Description and Purpose: Work at Idaho National Laboratory's (INL's) Materials and Fuels Complex (MFC) involves research and technology development, with results disseminated openly and shared with the scientific community or made available to private industry. The quality of such work depends on open dialogue and exchange of information. In this capacity, MFC hosts many foreign

  5. Microsoft Word - DOE-ID-INL-16-096.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: Research and Education Campus (REC) Fiscal Year (FY) 2016 Through FY2017 Interior Updates SECTION B. Project Description and Purpose: The Idaho National Laboratory (INL) maintains numerous office and support buildings in Idaho Falls. These facilities provide office space, cafeteria, mail room, copy center, and document storage, and they contain electrical and mechanical rooms. Support, administrative, and engineering personnel are based in the REC facilities. Potable

  6. Microsoft Word - DOE-ID-INL-16-097.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: National Aeronautics and Space Administration (NASA) Mars Methane Plume Tracer SECTION B. Project Description and Purpose: The Mars Methane Plume Tracer Field Experiment will be conducted under NASA Science Mission Directorate (SMD) Planetary Science Division (PSD) funding to support Astrobiology Science and Technology for Exploring Planets (ASTEP). Specifically, a grant under the ASTEP program to Cornell University was awarded to study the nature of astrobiologically

  7. Microsoft Word - DOE-ID-INL-16-101.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Idaho National Laboratory Safeguards and Security Training Exercises and Simulations SECTION B. Project Description and Purpose: Safeguards and Security (S&S) personnel at Idaho National Laboratory (INL) conduct a variety of training exercises and security simulations including force-on-force exercises, recapture and recovery, and active shooter tests. These exercises require participation by S&S and Emergency Services personnel and the use of S&S and

  8. Microsoft Word - DOE-ID-INL-16-102.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Central Facilities Area (CFA)-696 Compressed Air System Upgrade SECTION B. Project Description and Purpose: . The compressed air system at the Central Facilities Area (CFA) Big Shop, building CFA-696, does not provide adequate air for facility needs. The proposed action would upgrade the compressed air system with a new electrical compressed air system. The scope consists of the proposed action includes the following:  Remove old air piping, equipment and

  9. Microsoft Word - DOE-ID-INL-16-103.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Electron Beam Welder for Fabrication of Advanced Instrumentation SECTION B. Project Description and Purpose: Idaho National Laboratory's (INL's) High Temperature Test Laboratory (HTTL) is located at the Energy Innovations Laboratory (EIL) in Idaho Falls. Research and Development (R&D) activities at the HTTL include high temperature material property testing and instrumentation development and testing from a host of nuclear and non-nuclear programs. HTTL's efforts

  10. Microsoft Word - DOE-ID-INL-16-105.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: Central Facilities Area/Materials and Fuels Complex (CFA/MFC) Live Fire Range Modifications SECTION B. Project Description and Purpose: The CFA and MFC Live Fire Ranges are in need of modifications to meet the training needs of Protective Forces. Proposed modification to the MFC range includes the following: 1. Extend three concrete shooting slabs, and associated gravel base, to the west of the existing concrete slabs. 2. Install 30 shooting barricade posts/pockets.

  11. Microsoft Word - DOE-ID-INL-16-106.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: Sink Valve Replacement in Test Reactor Area (TRA)-670 Battery Room SECTION B. Project Description and Purpose: Potable water is not needed in the Battery Room of the Advanced Test Reactor (ATR), building TRA-670, and presents the risk of inadvertent filling of batteries with potable water instead of the required demineralized water. Both potable water and low-pressure demineralized water (LDW) is provided from separate faucets to a single sink in the Battery Room, and

  12. Microsoft Word - DOE-ID-INL-16-107.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Irradiated Graphite Characterization - Glove Box Installation SECTION B. Project Description and Purpose: A new glovebox is needed to support graphite characterization at the Idaho National Laboratory (INL) Research Complex (IRC) that is conducted for research associated with the Very High Temperature Reactor (VHTR) program. The proposed action would install a new glovebox in Lab C18-B at IRC, building Idaho Falls (IF)-603 and would provide supply and exhaust

  13. Microsoft Word - DOE-ID-INL-16-109.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9 SECTION A. Project Title: Materials and Fuels Complex (MFC) Hot Fuels Examination Facility (HFEF) Facility Equipment Upgrades SECTION B. Project Description and Purpose: The Hot Fuel Examination Facility (HFEF) at Idaho National Laboratory's (INL's) Materials and Fuels Complex (MFC) is a hot cell complex for preparation and examination of irradiated experiments for a wide variety of programs and process demonstrations. A wide range of remote operations and examinations are performed in the

  14. Microsoft Word - DOE-ID-INL-16-112.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Hot Fuel Examination Facility (HFEF) Spray Chamber Water Conditioner Removal SECTION B. Project Description and Purpose: The Hot Fuel Examination Facility needs to remove the water conditioner (i.e., water softener) from the spray chamber process. Conditioned water was used in the chamber to decontaminate objects and would leave water spots on the viewing window decreasing visibility into the spray chamber. Therefore, the facility switched to using de-ionized water in

  15. Capital Asset Project List-Sep.xlsx

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Number PARS II Project ID Project Name Site Critical Decision Total Project Cost Approved Project End Date 15-D-411 001024 Safety Significant Confinement Ventilation System Carlsbad CD-1 $280,000,000 3/31/2021 15-D-412 001064 Exhaust Shaft Carlsbad CD-1 $118,000,000 5/31/2021 CBC-ETEC-0040.C1 001049 Energy Technology Engineering Center Demolition Project ETEC CD-1 $34,000,000 9/30/2019 15-D-401 001011 KW Basin Sludge Removal Project Hanford Site CD-3 $311,000,000 11/30/2019 RL-0011.C1 000402

  16. A short Id2 protein fragment containing the nuclear export signal forms amyloid-like fibrils

    SciTech Connect

    Colombo, Noemi [Fakultaet fuer Chemie und Pharmazie, Universitaet Regensburg, Universitaetsstrasse 31, 93053 Regensburg (Germany); Schroeder, Josef [Institut fuer Pathologie, Zentrales EM-Labor, Fakultaet fuer Medizin, Universitaet Regensburg, Franz-Josef-Strauss-Allee 11, 93053 Regensburg (Germany); Cabrele, Chiara [Fakultaet fuer Chemie und Pharmazie, Universitaet Regensburg, Universitaetsstrasse 31, 93053 Regensburg (Germany)]. E-mail: chiara.cabrele@chemie.uni-regensburg.de

    2006-07-21

    The negative regulator of DNA-binding/cell-differentiation Id2 is a small protein containing a central helix-loop-helix (HLH) motif and a C-terminal nuclear export signal (NES). Whereas the former is essential for Id2 dimerization and nuclear localization, the latter is responsible for the transport of Id2 from the nucleus to the cytoplasm. Whereas the isolated Id2 HLH motif is highly helical, large C-terminal Id2 fragments including the NES sequence are either unordered or aggregation-prone. To study the conformational properties of the isolated NES region, we synthesized the Id2 segment 103-124. The latter was insoluble in water and only temporarily soluble in water/alcohol mixtures, where it formed quickly precipitating {beta}-sheets. Introduction of a positively charged N-terminal tail prevented aggressive precipitation and led to aggregates consisting of long fibrils that bound thioflavin T. These results show an interesting structural aspect of the Id2 NES region, which might be of significance for both protein folding and function.

  17. Id-1 gene and gene products as therapeutic targets for treatment of breast cancer and other types of carcinoma

    SciTech Connect

    Desprez, Pierre-Yves; Campisi, Judith

    2014-08-19

    A method for treatment of breast cancer and other types of cancer. The method comprises targeting and modulating Id-1 gene expression, if any, for the Id-1 gene, or gene products in breast or other epithelial cancers in a patient by delivering products that modulate Id-1 gene expression. When expressed, Id-1 gene is a prognostic indicator that cancer cells are invasive and metastatic.

  18. Wnt/{beta}-catenin signaling changes C2C12 myoblast proliferation and differentiation by inducing Id3 expression

    SciTech Connect

    Zhang, Long; Shi, Songting; Zhang, Juan; Zhou, Fangfang; Dijke, Peter ten

    2012-03-02

    Highlights: Black-Right-Pointing-Pointer Expression of Id3 but not Id1 is induced by Wnt3a stimulation in C2C12 cells. Black-Right-Pointing-Pointer Wnt3a induces Id3 expression via canonical Wnt/{beta}-catenin pathway. Black-Right-Pointing-Pointer Wnt3a-induced Id3 expression does not depend on BMP signaling activation. Black-Right-Pointing-Pointer Induction of Id3 expression is critical determinant in Wnt3a-induced cell proliferation and differentiation. -- Abstract: Canonical Wnt signaling plays important roles in regulating cell proliferation and differentiation. In this study, we report that inhibitor of differentiation (Id)3 is a Wnt-inducible gene in mouse C2C12 myoblasts. Wnt3a induced Id3 expression in a {beta}-catenin-dependent manner. Bone morphogenetic protein (BMP) also potently induced Id3 expression. However, Wnt-induced Id3 expression occurred independent of the BMP/Smad pathway. Functional studies showed that Id3 depletion in C2C12 cells impaired Wnt3a-induced cell proliferation and alkaline phosphatase activity, an early marker of osteoblast cells. Id3 depletion elevated myogenin induction during myogenic differentiation and partially impaired Wnt3a suppressed myogenin expression in C2C12 cells. These results suggest that Id3 is an important Wnt/{beta}-catenin induced gene in myoblast cell fate determination.

  19. Microsoft Word - DOE-ID-INL-11-005.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: INL - USGS Geotechnical Drilling Program (USGS 137) SECTION B. Project Description: The U.S. Geological Survey (USGS) proposes to drill a 2,000-foot deep geotechnical corehole (USGS 137) into the eastern Snake River Plain aquifer. Geotechnical borehole USGS 137 is located 3.0 miles south of RWMC at the Southeast Quarter of the Southwest Quarter, Section 31, Township 02 North, Range 29 East. USGS 137 will be located approximately 50 ft northeast of USGS 109 and within

  20. Microsoft Word - DOE-ID-INL-11-006.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SECTION A. Project Title: INL - USGS Geotechnical Drilling Program (USGS 131A) SECTION B. Project Description: The U.S. Geological Survey (USGS) proposes to use an existing well pad to construct a replacement well, USGS131A, about 25 ft north of the original well head (USGS 131). USGS 131A will be drilled to about 1,300 ft below surface level (BSL) then instrumented with a multilevel monitoring system in FY 2012. The new well will replace USGS 131, which will be abandoned or used as a water

  1. Microsoft Word - DOE-ID-INL-16-018.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Advanced Test Reactor (ATR)-1D-N and 2B-SE Asbestos Abatement and Insulation Installation SECTION B. Project Description and Purpose: The experiment loop primary cubicles at the Advanced Test Reactor (ATR) contain all of the "out of pile" piping and equipment to operate the experiment loops. Most of this equipment was originally insulated with Asbestos Containing Material (ACM). This becomes problematic when work needs to be performed on equipment in the

  2. Microsoft Word - DOE-ID-INL-16-019.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    19 SECTION A. Project Title: Removal of West Overhead Door in Energy Systems Laboratory (ESL) (Idaho Falls [IF]-685) SECTION B. Project Description and Purpose: The proposed action would remove the west overhead door from the ESL C-Wing, Room C100 to provide additional interior floor space. The opening (~20 feet wide X 25 feet high) would be filled-in with the same concrete block material that is currently in the building. There is concrete footing under the door opening; therefore no excavation

  3. Microsoft Word - DOE-ID-INL-16-031.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Install Energy Innovation Laboratory (EIL) (Idaho Falls [IF]-688) Entry Vestibule and Staircase SECTION B. Project Description and Purpose: Currently, there is only one west side entrance to building IF-688, and it is located in the A-wing of the facility. With the large west side parking lot, it is desirable to install an additional west side vestibule entry in the passageway between the A-wing and B-wing of the facility. Installation of an outside metal staircase in

  4. Microsoft Word - DOE-ID-INL-16-035.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: Test Reactor Area (TRA)-622 and TRA-628 Voice Paging System SECTION B. Project Description and Purpose: Personnel in buildings TRA-622 and TRA-628 cannot hear announcements over the Advanced Test Reactor (ATR) Complex voice paging system. The proposed work scope is to install voice paging speakers in each building and tie into speakers in adjacent buildings. The new voice paging speaker in TRA-622 will tie into the speaker in TRA-616. Work scope will include running

  5. Microsoft Word - DOE-ID-INL-16-040.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    40 SECTION A. Project Title: Cleanup of Test Reactor Area (TRA)-786 Diesel Spill SECTION B. Project Description and Purpose: Diesel fuel from the supply tank for TRA-786-M-1 diesel was released to soil when the supply line failed. This proposed action is to complete the cleanup of diesel contaminated soil that could not be removed at the time of the spill due to the location of the stabilizer barriers located under the 786-M-1 trailer. The 786-M-1 diesel trailer, electrical wiring, control

  6. Microsoft Word - DOE-ID-INL-16-082.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Upgrade Willow Creek Building (WCB) (Idaho Falls [IF]-616) Room 240B Sound Barrier Rating SECTION B. Project Description and Purpose: Department of Energy (DOE) has requested Room 240B in the Willow Creek Building (WCB), building IF-616, be upgraded to a Society for Technical Communication (STC) 45 sound barrier rating. The four walls would be modified to meet the sound barrier standards as described in DOE Order 470.6. In order to support the wall modifications,

  7. Microsoft Word - DOE-ID-INL-16-083.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Idaho Falls (IF)-616 Willow Creek Building (WCB) Room 184/187 Office Suite Remodel SECTION B. Project Description and Purpose: The office suite in rooms 184 and 187 in the Willow Creek Building, building IF-616, needs to be remodeled to accommodate new tenants. The proposed action would reconfigure rooms 127A, 184A, 184B, 184C, 187A, 187B, 1SE101, 1SE102, 1SE202 which, when combined, cover approximately 1,850 square feet. The proposed remodel includes the following

  8. Microsoft Word - DOE-ID-INL-16-088.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Computer Network Connection for the Advanced Test Reactor Critical (ATR-C) Facility SECTION B. Project Description and Purpose: The proposed activity would install a computer network connection in the Advanced Test Reactor Critical (ATR-C) Facility by running conduit from the west side office area near the entry into ATR-C and pulling in four category 5E (Cat5E) cables. The proposed activity would include running the Cat5E cables and associated conduit approximately

  9. Microsoft Word - DOE-ID-INL-16-108.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: 670-M-42 and 670-M-43 Diesel Fuel Strainer Removal and Bypass SECTION B. Project Description and Purpose: The proposed action is the removal and bypass of diesel fuel oil strainers on diesel generator engines 670-M-42 and 670-M-43. Diesel fuel oil strainer parts are no longer available for these units. Hoses, fittings, and tubing need to be replaced to bypass the diesel oil strainers. The strainer on unit 670-M-43 allows air to enter the fuel system causing a drop in

  10. Microsoft Word - DOE-ID-INL-16-110.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10 SECTION A. Project Title: Central Facilities Area (CFA) 12.5-kV Switchgear Reconfiguration SECTION B. Project Description and Purpose: The Central Facilities Area (CFA) 12.5 kV switchgear located in the Scoville substation at Idaho National Laboratory (INL) was built using old standards and has safety issues due to low-to-ground exposure. The switchgear consists of overhead bus, breakers, switches and instrument transformers that are needed to feed the 12.5 kV distribution system. These

  11. YEAR","UTILITY_ID","UTILITY_NAME","PLANT_ID","PLANT_NAME","SCHEDULE","LINENO","A

    Energy Information Administration (EIA) (indexed site)

    UTILITY_ID","UTILITY_NAME","PLANT_ID","PLANT_NAME","SCHEDULE","LINENO","AMOUNTS","DESCRIPTION" 2001,298,"Alexandria City of",6558,"DG Hunter",9,"Line 1","STEAM","Kind of Plant" 2001,298,"Alexandria City of",6558,"DG Hunter",9,"Line 2",1956,"Year Originally Constructed" 2001,298,"Alexandria City of",6558,"DG

  12. UCRL-ID-119665 LLNL Small-Scale Drop-Hammer Impact Sensitivity...

    Office of Scientific and Technical Information (OSTI)

    UCRL-ID-119665 LLNL Small-Scale Drop-Hammer Impact Sensitivity Test L. Richard Simpson M. ... LLNL Small-Scale Drop-Hammer Impact Sensitivity Test L. Richard Simpson, and M. Frances ...

  13. AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT ( I. ID CODE

    National Nuclear Security Administration (NNSA)

    ( I. ID CODE DE-ACO4-OOAL6662O ' 10s. DATED (SEE ITEM 13) PAGE I OF 2 PAGES Babcock & W C O X Technical Services Pantex, LLC 800 Main Street Lynchburg, VA 24505 9B. DATED ...

  14. DOE-ID FOIA Type A Accident Investigation Board Report - July...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Library You are here: DOE-ID Home > FOIA > Type A Accident Investigation Board Report - July 28, 1998 Type A Accident Investigation Board Report - July 28, 1998 Fatality ...

  15. DOI-BLM-ID-B010-2010-0083-CX | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    0083-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-B010-2010-0083-CX CX for GeothermalExploration, CX for Thermal Gradient Holes for Geothermal...

  16. DOI-BLM-ID-I020-2012-0017-CX | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    I020-2012-0017-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-I020-2012-0017-CX CX at Bingham-Caribou Geothermal Area for GeothermalExploration CX for...

  17. DOI-BLM-ID-B010-2010-??-CX | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    ??-CX Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-B010-2010-??-CX CX at Weiser Geothermal Area for GeothermalExploration CX at Weiser Geothermal Area for...

  18. DOI-BLM-ID-110-2009-3825-CE | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    110-2009-3825-CE Jump to: navigation, search NEPA Document Collection for: DOI-BLM-ID-110-2009-3825-CE CX at Crane Creek Geothermal Area for GeothermalExploration Crane Creek...

  19. DOE Data ID Service Background | OSTI, US Dept of Energy Office...

    Office of Scientific and Technical Information (OSTI)

    The DOE Data ID Service is a useful tool for increasing access to digital data, as the DOE Public Access Plan noted: "The Department's Office of Scientific and Technical ...

  20. DOE Data ID Service Benefits | OSTI, US Dept of Energy Office...

    Office of Scientific and Technical Information (OSTI)

    ... How to Use the DOE Data ID Service For Grantees - Submit metadata to OSTI. Login not required For Individual Lab Researchers - Submit metadata to your lab's internal STI system or your ...

  1. DOE Data ID Service Top Navigation | OSTI, US Dept of Energy...

    Office of Scientific and Technical Information (OSTI)

    Service Top Navigation DOE Data ID Service Top Navigation My Profile Create Review OSTI.Gov Newsletter - Issue 16 Manage Search form Search this site Search Who's online There ...

  2. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 5)

    DOE Data Explorer

    Nelson, Johanna

    2011-07-22

    This is the second of five exposures of the same sample at different tilts. This one is at +15 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  3. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 7)

    DOE Data Explorer

    Nelson, Johanna

    2011-07-22

    This is the fourth of five exposures of the same sample at different tilts. This one is at -15 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  4. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 6)

    DOE Data Explorer

    Nelson, Johanna

    2011-07-22

    This is the third of five exposures of the same sample at different tilts. This one is at +30 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  5. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 8)

    DOE Data Explorer

    Nelson, Johanna

    2011-07-22

    This is the fifth of five exposures of the same sample at different tilts. This one is at -30 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  6. High-resolution x-ray diffraction microscopy of specifically labeled yeast cells (CXIDB ID 4)

    DOE Data Explorer

    Nelson, Johanna

    2011-07-22

    This is the first of five exposures of the same sample at different tilts. This one is at +0 degrees tilt. Check CXI IDs 4 to 8 for the complete set.

  7. 11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATION...

    National Nuclear Security Administration (NNSA)

    11. CONTRACT ID CODE PAGE OF PAGES I AMENDMENT OF SOLICITATIONMODIFICATION OF CONTRACT 1 I 2. AMENDMENTIMODIFICATION NO. 258 6. ISSUED BY CODE 3. EFFECTIVE DATE See Block 16C ...

  8. File:08-ID-c - Certificate of Public Convenience and Necessity...

    OpenEI (Open Energy Information) [EERE & EIA]

    modified from its original state, some details may not fully reflect the modified file. Image title Lucidchart Author None Short title 08-ID-c - Certificate of Public Convenience...

  9. Implementation of the REAL ID Act | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Visiting Us / Entry Requirements / Implementation of the REAL ... Implementation of the REAL ID Act Congress, acting on the recommendations of the 9/11 Commission, passed the REAL ID Act in an effort to reduce fraud and deter acts of terrorism using fraudulent identification. This Act sets minimum standards for the issuance of driver's licenses and other identification documents. In accordance with the Act, the Department of Homeland Security established implementing standards. Among these is a

  10. Specific Manufacturing Capability Project presented with special thank-you

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    note Specific Manufacturing Capability Project presented with special thank-you note From left, DOE-ID's Ray Furstenau, INL's Riley Chase, SMC's Joel Duling, Army's Ltc. Evans and Mike Martell, and DOE-ID's Jim Malmo stand with the flag recently presented in recognition of work performed by the Specific Manufacturing Capability project. A thank-you note in the form of a United States flag was presented by the U.S. Army to employees at the Specific Manufacturing Capability (SMC) project at

  11. Kenya-GEF Projects | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    database1 GEF Climate Projects in Kenya 1780 Kenya Joint Geophysical Imaging (JGI) Methodology for Geothermal Reservoir Assessment Climate Change UNEP Medium Size Project, GEF...

  12. Microsoft Word - DOE-ID-INL-13-002 _INL-13-008_.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Advanced Test Reactor (ATR) Near Term Remote Monitoring and Management Project SECTION B. Project Description: This project provides for the capability to ...

  13. Comments on Docket ID: DOE-HQ-2011-0014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    on Docket ID: DOE-HQ-2011-0014 Comments on Docket ID: DOE-HQ-2011-0014 This letter comprises the comments of the Pacific Gas and Electric Company (PG&E), Southern California Gas Company (SCGC), San Diego Gas and Electric (SDG&E), and Southern California Edison (SCE) in response to the U.S. Department of Energy's (DOE) Request for Information on Regulatory Burden. The signatories of this letter, collectively referred to herein as the California Investor Owned Utilities (CA IOUs) represent

  14. Idaho National Lab Contract DE-AC07-05ID14517

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Contract No. DE-AC07-05ID14517 Modifications You are here: DOE-ID Home > Contracts, Financial Assistance & Solicitations > INL Contract > INL Basic Contract Blue Line Free Acrobat Reader Link The documents listed below represent an electronic copy of modifications to the contract for the Management and Operation of the INL awarded to Battelle Energy Alliance, LLC. These documents are in PDF format. The Adobe Reader is required to access them. If you do not currently have the Acrobat

  15. Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 1)

    DOE Data Explorer

    Seibert, M. Marvin; Ekeberg, Tomas; Maia, Filipe R.N.C.

    These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 1 are the pattern and configuration files for the pattern showed in Figure 2a in the paper.

  16. Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 2)

    DOE Data Explorer

    Seibert, M. Marvin; Ekeberg, Tomas

    2011-02-02

    These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 2 are the pattern and configuration files for the pattern showed in Figure 2b in the paper.

  17. Single mimivirus particles intercepted and imaged with an X-ray laser (CXIDB ID 1)

    DOE Data Explorer

    Seibert, M. Marvin; Ekeberg, Tomas; Maia, Filipe R.N.C.

    2011-02-02

    These are the files used to reconstruct the images in the paper "Single Mimivirus particles intercepted and imaged with an X-ray laser". Besides the diffracted intensities, the Hawk configuration files used for the reconstructions are also provided. The files from CXIDB ID 1 are the pattern and configuration files for the pattern showed in Figure 2a in the paper.

  18. Certification of Completion of Item 2 of ASC FY07 Level-2 Milestone ID #2380

    SciTech Connect

    Lipari, D A

    2007-03-28

    This report documents the completion of Item 2 of the three milestone deliverables that comprise Milestone ID 2380: Deploy selected Tri-Lab resource manager at LLNL and develop support model. Specifically: LLNL will integrate and support a commercial resource manager software product at LLNL to be used across the tri-lab HPC facilities.

  19. Id1 expression promotes peripheral CD4{sup +} T cell proliferation and survival upon TCR activation without co-stimulation

    SciTech Connect

    Liu, Chen; Jin, Rong; Wang, Hong-Cheng; Tang, Hui; Liu, Yuan-Feng; Qian, Xiao-Ping; Sun, Xiu-Yuan; Ge, Qing; Sun, Xiao-Hong; Zhang, Yu

    2013-06-21

    Highlights: •Id1 expression enables naïve T cell proliferation without anti-CD28 co-stimulation. •Id1 expression facilitates T cells survival when stimulated with anti-CD3. •Elevation of IL-2 production by Id1 contributes increased proliferation and survival. •Id1 potentiates NF-κB activation by anti-CD3 stimulation. -- Abstract: Although the role of E proteins in the thymocyte development is well documented, much less is known about their function in peripheral T cells. Here we demonstrated that CD4 promoter-driven transgenic expression of Id1, a naturally occurring dominant-negative inhibitor of E proteins, can substitute for the co-stimulatory signal delivered by CD28 to facilitate the proliferation and survival of naïve CD4{sup +} cells upon anti-CD3 stimulation. We next discovered that IL-2 production and NF-κB activity after anti-CD3 stimulation were significantly elevated in Id1-expressing cells, which may be, at least in part, responsible for the augmentation of their proliferation and survival. Taken together, results from this study suggest an important role of E and Id proteins in peripheral T cell activation. The ability of Id proteins to by-pass co-stimulatory signals to enable T cell activation has significant implications in regulating T cell immunity.

  20. Microsoft Word - DOE-ID-12-041 INL EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Monitoring and Control of the Hybrid Laser-Gas Metal Arc Welding Process - Idaho National Laboratory SECTION B. Project Description This project will...

  1. Microsoft Word - DOE-ID-12-009 Colorado School of Mines.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    09 SECTION A. Project Title: Upgrades to the Colorado School of Mines Neutron Imaging Beam-Line SECTION B. Project Description The Colorado School Mines project has three...

  2. Hopper Job Size Charts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Job Size Charts Hopper Job Size Charts Fractional Jobs The following charts show the fraction of hours used on Hopper in each of five job-core-size bins: 2014 Usage by Job Size Chart 2013 2012 2011 Large Jobs The following charts show the fraction of hours used on Hopper by jobs using greater than 16,384 cores: 2014 2013 2012 Usage by Job Size Chart 2011 Last edited: 2016-05-02 09:20:42

  3. About Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE Projects MicroBooNE Project Web Pages The Project Pages hold information and links for the collaboration and its Project Managers, and also hold links to project Director's and ...

  4. Active DOE Completed Projects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Completed) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Review Date P1137-2007REV Fire ProtecƟon Engineering FAQS DOE-STD-1137-2014 Karen Boardman (NNSA) P1181-2004REV Facility Maintenance Management DOE-STD-1181-2014 Karen Boardman FuncƟon Area QualiĮcaƟon Standard (HS-70) P1182-2004REV Civil Structural Engineering, FuncƟonal DOE-STD-1182-2014 Karen Boardman Area QualiĮcaƟon Standard (AU-70) P2013-03 ProtecƟve Force ConƟngency Planning DOE-HDBK-1213-2014

  5. Classroom Projects - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hanford For Students and Kids Classroom Projects Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size If you've been assigned to write a report or complete a classroom assignment that involves Hanford, we've got some tools that might help you with your project! Photographs The first is an online photo gallery of pictures. We've got thousands of photographs that you can print

  6. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    Energy.gov [DOE]

    Idaho Falls, ID – The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE’s Idaho site.

  7. OSTIblog Articles in the DOE Data ID Service Topic | OSTI, US Dept of

    Office of Scientific and Technical Information (OSTI)

    Energy Office of Scientific and Technical Information Data ID Service Topic OSTI Helping High Energy Physics Collaboration to Register Datasets by Sara Studwell 01 Apr, 2016 in The Department of Energy (DOE) Office of Scientific and Technical Information (OSTI) is working with a researcher in the High Energy Physics (HEP) community to register scientific datasets produced by a domain collaboration, a recent blog post has reported. OSTI offers a service for registering datasets to help

  8. Edison Job Size Charts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reports » Edison Job Size Charts Edison Job Size Charts Fraction of Hours Used per Job Size Note: Interactive charts with current and past Cori and Edison data are now available on MyNERSC This chart shows the fraction of hours used on Edison in each of 5 job-core-size bins. 2015 Usage by Job Size Chart 2014 Fraction of Hours Used by Big Jobs This chart shows the fraction of hours used on Edison by jobs using 16,384 or more cores. 2015 Usage by Job Size Chart 2014 Last edited: 2016-04-21

  9. Summary - Preliminary TRA of the Calcine Disposition Project

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TRA R Un Calcine The Id materi Dec. 2 Press additiv form w those project anticip 2012 a CD-1 a selecte Level ( assess Eleme assign prepar The as below achiev * R * Ba * C The Ele Site: I roject: C Report Date: ited States Prelim Why DOE e HIP Treatment daho high-level al designated t 2009) to underg (HIP) process. ves, converts th with durability a of borosilicate t is currently in pates Critical D authorizing the approval, it is t ed technology (TRL) of 4 or h sment was to id ents (CTEs) of t n

  10. IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    doe logo Media Contact: Brad Bugger (208) 526-0833 For Immediate Release: Wednesday, June 29, 2011 IDAHO OPERATIONS OFFICE NAMES NEW IDAHO CLEANUP PROJECT MANAGER Idaho Falls, ID � The Department of Energy Idaho Operations Office today announced that James Cooper has been named deputy manager of its highly-successful Idaho Cleanup Project, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Cooper has more than 30 years of experience in commercial and

  11. Microsoft Word - DOE-ID-INL-12-008 _INL-12-032_.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and why is it being performed), projected start and end dates and the approximate project costs. Environmental Checklist (EC) INL-09-084 disclosed the environmental aspects and...

  12. Microsoft Word - DOE-ID-14-089 Westinghouse EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Development of Thermo-Acoustic Sensors for Sodium-cooled Fast Reactors - Westinghouse Electric Company LLC SECTION B. Project Description Westinghouse ...

  13. Microsoft Word - DOE-ID-13-061 South Carolina EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Structural Health Monitoring of Nuclear Spent Fuel Storage Facilities - University of South Carolina SECTION B. Project Description The University of ...

  14. Microsoft Word - DOE-ID-13-027 Utah EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Risk Assessment of Structural Integrity of Transportation Casks - University of Utah SECTION B. Project Description The University of Utah proposes to...

  15. Microsoft Word - DOE-ID-14-039 Oregon State University _1 EC...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Fluid Stratification Separate Effects Analysis, Testing, and Benchmarking- Oregon State University SECTION B. Project Description Oregon State University...

  16. Microsoft Word - DOE-ID-12-021 Virginia Tech.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Virginia Tech Radiation Measurement, Simulation and Visualization Laboratory SECTION B. Project Description Virginia Tech aims to establish a laboratory ...

  17. Microsoft Word - DOE-ID-13-034 NC State B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: A Positron Microprobe Spectrometer for Defects and Nano-Vacancy Characterization in Materials - North Carolina State University SECTION B. Project ...

  18. Microsoft Word - DOE-ID-13-038 UC-Berkeley B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Research and Teaching Equipment for Nuclear Materials Characterization - U.C.-Berkeley SECTION B. Project Description The University of...

  19. Microsoft Word - DOE-ID-13-037 Washington State B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Spectroscopy System for Teaching and Research- Washington State University SECTION B. Project Description Washington State University proposes to...

  20. Microsoft Word - DOE-ID-13-032 Illinois B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana-Champaign SECTION B. Project Description The...

  1. Microsoft Word - DOE-ID-11-004 Illinois EC.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: Nuclear Engineering Teaching and Research Facilities Upgrade at the University of Illinois at Urbana Champaign SECTION B. Project Description The scope...

  2. Microsoft Word - DOE-ID-13-084 Maryland EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: Enhancement of the Extraction of Uranium from Seawater - University of Maryland SECTION B. Project Description The University of Maryland, in ...

  3. Microsoft Word - DOE-ID-13-052 Chicago EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Development of Novel Porous Sorbents for Extraction of Uranium from Seawater - The University of Chicago SECTION B. Project Description The University ...

  4. Microsoft Word - DOE-ID-15-027 Maryland EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Enhancement of the Extraction of Uranium from Seawater - University of Maryland SECTION B. Project Description The University of Maryland proposes to ...

  5. Microsoft Word - DOE-ID-14-045 Georgia Institute of Tech. ...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Zeolite Membranes for KryptonXenon Separation from Spent Nuclear Fuel Reprocessing Off-Gas - Georgia Tech Research Corporation SECTION B. Project Description ...

  6. Microsoft Word - DOE-ID-15-041 Wisconsin EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Radiation-induced Swelling and Microcracking in SiC Cladding for LWRs - University of Wisconsin SECTION B. Project Description The University of...

  7. Microsoft Word - DOE-ID-12-025 Ohio State.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Safety and Radiological Monitoring Systems for the Ohio State University Nuclear Reactor SECTION B. Project Description The objective of this project is for the Ohio State ...

  8. Microsoft Word - DOE-ID-12-008 Missouri EC.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Nuclear Instrumentation Upgrade for MURR Reactor Power Level Monitoring - University of Missouri SECTION B. Project Description The objective of this ...

  9. Microsoft Word - DOE-ID-13-047 Arizona State EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Radiation Hardened Electronics Destined for Severe Nuclear Reactor Environments - Arizona State University SECTION B. Project Description Arizona State ...

  10. Microsoft Word - DOE-ID-15-081 Oregon State B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Computational and Experimental Benchmarking for Transient Fuel Testing - Oregon State University SECTION B. Project Description Oregon State University,...

  11. AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I CONTRACT ID CODE PAGE OF PAGES

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    I CONTRACT ID CODE PAGE OF PAGES 1 14 2. AMENDMENT/MODIFICATION NO. 3 EFFECTIVE DATE 4. REQUISITION/PURCHASE RED. NO 5. PRtOJECT NO. (if pplicable) 186 See Block 16CL 6. ISSUED BY CODE j 0603 7. ADMINISTERED BY (If other than Item 6) CODE 00603 office of River Protection Office of River Protection U.S. Department of Energy U.S. Department of Energy office of River Protection office of River Protection P.O. Box 450 P.O. Box 450 Richland WA 99352 MS: H6-60 Richland WA 99352 6. NAME AND ADDRESS OF

  12. ,"Eastport, ID Natural Gas Pipeline Imports From Canada (MMcf)"

    Energy Information Administration (EIA) (indexed site)

    Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Eastport, ID Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2015 ,"Release Date:","10/31/2016" ,"Next Release Date:","11/30/2016" ,"Excel File

  13. Here�s What�s Going on with DOE-ID

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Here�s What�s Going on with DOE-ID As you know, we initiated a survey under �Voice of the People� last month, in order to get your input on how we can make this website more useful to you. In response to your feedback, one thing we did is develop a monthly article that attempts to capsulize the activities and opportunities for public input, all in one place. This is the first of those articles. Public Involvement Opportunities You have until close of business on June 21 to provide input

  14. ARM - Measurement - Hydrometeor size

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    size ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Hydrometeor size The size of a hydrometeor, measured directly or derived from other measurements. Categories Cloud Properties Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available measurements, including those

  15. An interactive version of PropID for the aerodynamic design of horizontal axis wind turbines

    SciTech Connect

    Ninham, C.P.; Selig, M.S.

    1997-12-31

    The original PROP code developed by AeroVironment, Inc. and its various versions have been in use for wind turbine performance predictions for over ten years. Due to its simplicity, rapid execution times and relatively accurate predictions, it has become an industry standard in the US. The Europeans have similar blade-element/momentum methods in use for design. Over the years, PROP has continued to be improved (in its accuracy and capability), e.g., PROPSH, PROPPC, PROP93, and PropID. The latter version incorporates a unique inverse design capability that allows the user to specify the desired aerodynamic characteristics from which the corresponding blade geometry is determined. Through this approach, tedious efforts related to manually adjusting the chord, twist, pitch and rpm to achieve desired aerodynamic/performance characteristics can be avoided, thereby making it possible to perform more extensive trade studies in an effort to optimize performance. Past versions of PropID did not have supporting graphics software. The more current version to be discussed includes a Matlab-based graphical user interface (GUI) and additional features that will be discussed in this paper.

  16. Active DOE Technical Projects

    Office of Environmental Management (EM)

    ID SLM ORG Author Phone Email Status Status Date P1107- 1997REV Knowledge, ... on of Documented Safety Analysis for Decommissioning and Environmental Restora on Ac vi es ...

  17. Does size matter?

    SciTech Connect

    Carreras, B. A.; Physics Department, College of Natural Science and Mathematics and Geophysical Institute, University of Alaska, Fairbanks, Alaska 99775; Physics Department, Universidad Carlos III de Madrid, Madrid ; Newman, D. E.; Dobson, Ian

    2014-06-15

    Failures of the complex infrastructures society depends on having enormous human and economic cost that poses the question: Are there ways to optimize these systems to reduce the risks of failure? A dynamic model of one such system, the power transmission grid, is used to investigate the risk from failure as a function of the system size. It is found that there appears to be optimal sizes for such networks where the risk of failure is balanced by the benefit given by the size.

  18. Identifying Renewable Energy Projects for Federal Agencies |...

    Energy.gov [DOE] (indexed site)

    projects that can help federal agencies meet their 30% renewable electricity by 2025 target. This research is summarized on this page. Renewable Energy Markets The size of the...

  19. Microsoft Word - DOE-ID-INL-14-004 (1).docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION A. Project Title: Remove Plasma Equipment from Idaho National Laboratory Research Center (IRC) Labs C78 and C16 to IRC Bay for pick up by COGENT SECTION B. Project ...

  20. Microsoft Word - DOE-ID-INL-12-028-1.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The project would use equipment that was installed at two locations in Texas near wind turbine farms in support of the DOE-NOAA Wind Forecast Improvement Project. The use of re- ...

  1. Microsoft Word - DOE-ID-15-057 Oregon State EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 SECTION A. Project Title: Modeling and Validation of Irradiation Damage in Ni-based Alloys for Long-Term LWR Applications - Oregon State University SECTION B. Project Description...

  2. Microsoft Word - DOE-ID-15-082 ESER B1-20.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION B. Project Description The purpose and need for the project is to restore habitat for Greater sage-grouse as a conservation measure in the Candidate Conservation Agreement. ...

  3. Microsoft Word - DOE-ID-14-076 Penn State EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Novel Dissimilar Joints Between Alloy 800H and 2.25%Cr and 1%Mo Steel - The Pennsylvania State University SECTION B. Project Description The Pennsylvania ...

  4. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LaboratoryNational Security Education Center Menu NSEC Educational Programs Los Alamos Dynamics Summer School Science of Signatures Advanced Studies Institute Judicial Science School SHM Data Sets and Software Research Projects Current Projects Past Projects Publications NSEC » Engineering Institute » Research Projects » Joint Los Alamos National Laboratory/UCSD research projects Past Research Projects Previous collaborations between Los Alamos National Laboratory and the University of

  5. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Current Research Projects Joint Los Alamos National LaboratoryUCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San...

  6. Project Accounts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Accounts Project Accounts A redirector page has been set up without anywhere to redirect to. Last edited: 2016-04-29 11:34:50

  7. Project Financing

    Office of Environmental Management (EM)

    evaluate a Federal Energy Efficiency Project across three broad risk categories: - Contract Risk - Project Risk - Participant Risk * Ultimately, pricing and terms are set by ...

  8. Project Gnome

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Gnome Double Beta Decay Dark Matter Biology Repository Science Renewable Energy The first underground physics experiment near Carlsbad was Project Gnome, December 10, 1961 ...

  9. North Portal Fuel Storage System Fire Hazard Analysis-ESF Surface Design Package ID

    SciTech Connect

    N.M. Ruonavaara

    1995-01-18

    The purpose of the fire hazard analysis is to comprehensively assess the risk from fire within the individual fire areas. This document will only assess the fire hazard analysis within the Exploratory Studies Facility (ESF) Design Package ID, which includes the fuel storage system area of the North Portal facility, and evaluate whether the following objectives are met: 1.1.1--This analysis, performed in accordance with the requirements of this document, will satisfy the requirements for a fire hazard analysis in accordance with U.S. Department of Energy (DOE) Order 5480.7A. 1.1.2--Ensure that property damage from fire and related perils does not exceed an acceptable level. 1.1.3--Provide input to the ESF Basis For Design (BFD) Document. 1.1.4 Provide input to the facility Safety Analysis Report (SAR) (Paragraph 3.8).

  10. Project Execution Plan Review Module (RM) | Department of Energy

    Energy.gov [DOE] (indexed site)

    Project Execution Plan (PEP) Review Module (RM) is a tool that assists DOE federal project ... any size and complexity. Project Execution Plan RM (2.32 MB) More Documents & Publications ...

  11. Environmental Science and Research Foundation annual technical report to DOE-ID, January , 1995--December 31, 1995

    SciTech Connect

    1996-06-01

    The foundation conducts an environmental monitoring and surveillance program over an area covering much of the upper Snake River Plain and provide environmental education and support services related to INEL natural resource issues. Also, the foundation, with its university affiliates, conducts ecological and radioecological research on the Idaho National Environmental Research Park. This research benefits major DOE-ID programs including waste management, environmental restoration, spent nuclear fuels, and land management issues. Major accomplishments during CY1995 can be divided into five categories: environmental surveillance program, environmental education, environmental services and support, ecological risk assessment, and research benefitting the DOE-ID mission.

  12. Project Controls

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Project controls are systems used to plan, schedule, budget, and measure the performance of a project/program. The cost estimation package is one of the documents that is used to establish the baseline for project controls. This chapter gives a brief description of project controls and the role the cost estimation package plays.

  13. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 1 Smart Grid Demonstration Project Locations NH MA 16 Awards Support Projects in 21 States

  14. Project Information

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Information Slider award map The REE Program funds projects focused on developing economically feasible and environmentally benign technologies for recovering REEs from coal and/or coal by-products. Project Information The listed projects represent the current REE program portfolio. Agreement Number Project Title Performer Name FWP-RIC REE FY2016-2020 Rare Earth Elements (REE) from Coal and Coal By-Products National Energy Technology Laboratory FE0027167 High Yield and Economical

  15. Mission Need Statement: Idaho Spent Fuel Facility Project

    SciTech Connect

    Barbara Beller

    2007-09-01

    Approval is requested based on the information in this Mission Need Statement for The Department of Energy, Idaho Operations Office (DOE-ID) to develop a project in support of the mission established by the Office of Environmental Management to "complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research". DOE-ID requests approval to develop the Idaho Spent Fuel Facility Project that is required to implement the Department of Energy's decision for final disposition of spent nuclear fuel in the Geologic Repository at Yucca Mountain. The capability that is required to prepare Spent Nuclear Fuel for transportation and disposal outside the State of Idaho includes characterization, conditioning, packaging, onsite interim storage, and shipping cask loading to complete shipments by January 1,2035. These capabilities do not currently exist in Idaho.

  16. Microsoft Word - DOE-ID-INL-16-049 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    R1 SECTION A. Project Title: Materials and Fuels Complex Mobile Structure Decontamination and Decommissioning (D&D) and MFC Protected Area Intrusion Detection Upgrade SECTION B. Project Description and Purpose: The purpose of this revision is to capture project scope not included in the original Environmental Checklist (EC). Specifically, this revision adds the construction of three storm water dry wells to provide adequate storm water drainage for the site. Original EC: Security at Idaho

  17. Microsoft Word - DOE-ID-INL-16-050 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    R1 SECTION A. Project Title: Advanced Test Reactor (ATR) Fuel Oil Leak Excavation and Cleanup SECTION B. Project Description and Purpose: The purpose of this revision is to expand the project scope to include asbestos disturbance and removal from the fuel line between Test Reactor Area (TRA)-627 and TRA-670. During excavation of the fuel line, asbestos containing insulation was discovered on the pipe. All other activities from the original Environmental Checklist (EC) remain the same, as

  18. https://bluedart.phe.com/owa/?ae=Item&t=IPM.Note&id=RgAAAAA%2f3

    National Nuclear Security Administration (NNSA)

    Phyllis Radack Manager, Regulatory Services 702-295-6582 702-858-5587 (cell) 702-295-7699 ...idRgAAAAA%2f3mOqqZ%2bfSq... 702-858-5587 (cell) 702-295-7699 (fax) From: Morris, Patrick ...

  19. Microsoft Word - DOE-ID-12-026 Illinois Tech.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    This project limits the allowed radioactive materials to uranium and thorium compounds. All samples will be returned to the researchers' host institution for disposal as current ...

  20. Microsoft Word - DOE-ID-13-033 NC State B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: A Positron Generator System in Support of High Brightness Materials Characterization at the Pulstar Reactor - North Carolina State University SECTION B. ...

  1. Microsoft Word - DOE-ID-15-063 Idaho EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3 SECTION A. Project Title: Characterization of Creep-Fatigue Crack Growth in Alloy 709 and Prediction of Service Lives in Nuclear Reactor Components - University of Idaho SECTION...

  2. Microsoft Word - DOE-ID-14-051 University of South Carolina...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    for Dry Cask Storage - University of South Carolina SECTION B. Project Description The University of South Carolina will construct a mock nuclear used fuel assembly using...

  3. Microsoft Word - DOE-ID-13-071 Hunter College EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 SECTION A. Project Title: Recovery of Uranium from Seawater: Polymer-Supported Aminophosphinates as Selective - Hunter College of the City University of New York SECTION B....

  4. Microsoft Word - DOE-ID-14-080 South Florida EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of Uranium from Seawater - The University of South Florida SECTION B. Project Description The University of South Florida proposes to address the design, synthesis, and ...

  5. Microsoft Word - DOE-ID-14-057 University of Florida EC B3-6...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Evolution for NEAMS tool MARMOT - University of Florida SECTION B. Project Description The University of Florida will experimentally validate the NEAMS tool for the ...

  6. Microsoft Word - DOE-ID-13-019 Florida EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Nuclear Materials Safeguarding - University of Florida SECTION B. Project Description The University of Florida will develop and manufacture Bil 3 detector devices, ...

  7. Microsoft Word - DOE-ID-13-018 Florida EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the Fuel Cladding Chemical Interactions - University of Florida SECTION B. Project Description The University of Florida proposes to conduct applied and fundamental research ...

  8. Microsoft Word - DOE-ID-15-043 Florida EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Neutron Energy Discrimination Analysis - University of Florida SECTION B. Project Description The University of Florida proposes to build and demonstrate a prototype detector ...

  9. Microsoft Word - DOE-ID-13-001 General Atomics EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Development of ASTM Standard for SiC-SiC Joint Testing - General ... and health, including requirements of DOE orders; 2) require siting and construction ...

  10. Microsoft Word - DOE-ID-12-018 Texas.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Counting Facility - University of Texas at Austin SECTION B. Project Description The prime objective of this University of Texas proposal is to implement a dedicated ...

  11. Microsoft Word - DOE-ID-14-086 Virginia Tech EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Polytechnic Institute and State University SECTION B. Project Description Virginia Tech, in collaboration with Idaho National Laboratory and Oak Ridge National Laboratory, ...

  12. Microsoft Word - DOE-ID-14-084 Virginia Tech EC B3-15.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Polytechnic Institute and State University SECTION B. Project Description Virginia Tech proposes to design and study gradient nanocomposites that are composed of ...

  13. Microsoft Word - DOE-ID-15-075 Colorado School of Mines B3-6...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    research project is focused on the prediction of canister chloride-induced stress corrosion cracking (CISCC) and its effect on canister integrity during long-term interim...

  14. Microsoft Word - DOE-ID-11-006 Clemson EC.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    B. Project Description Clemson University will purchase an isothermal titration calorimeter. The calorimeter will primarily be utilized in the determination of aqueous...

  15. Microsoft Word - DOE-ID-13-044 Idaho EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title: Off-gas Treatment: Evaluation of Nano-structured Sorbents for Selective Removal ... - The project involves formulation of nano-structured sorbents for treatment and ...

  16. Microsoft Word - DOE-ID-INL-16-012 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    add additional scope to the original Environmental Checklist (EC). The revised project scope would remove and replace all of Swordfish Boulevard, Mackerel Street, and Bass Avenue. ...

  17. Microsoft Word - DOE-ID-11-002 DOE Direct cooling system [1...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SECTION B. Project Description The scope of work includes the purchase and ... The concrete pad will be provided by DOE. The scope of work includes purchasing an ...

  18. Microsoft Word - DOE-ID-14-053 Boise State University EC B3...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Nanostructured Bulk Thermoelectric Generator for Efficient Power ... is to develop efficient and reliable thermoelectric generators (TEGs) based on ...

  19. Microsoft Word - DOE-ID-12-040 ORNL EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    a novel in situ method established at ORNL to demonstrate materials with increased resistance to radiation and thermal degradation. In order to complete the project objectives,...

  20. Microsoft Word - DOE-ID-15-054 Pittsburgh EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Validation Data and Computational Models for Turbulent Mixing of Bypass and Coolant Jet flows in Gas-Cooled Reactors - University of Pittsburgh SECTION B. Project Description...

  1. Microsoft Word - DOE-ID-14-041 Oregon State University _2 EC...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    State University SECTION B. Project Description Oregon State University will build a prototype system for monitoring spent nuclear fuel dry storage casks (DSCs) using cosmic ray...

  2. Microsoft Word - DOE-ID-15-046 UCLA EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Title: The Influences of Neutron Irradiation on Aggregate Induced Degradation of Concrete - University of California, Los Angeles SECTION B. Project Description The University...

  3. Microsoft Word - DOE-ID-15-042 Notre Dame EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Prefabricated High-Strength Rebar Systems with High-Performance Concrete for Accelerated Construction of Nuclear Concrete Structures - University of Notre...

  4. Microsoft Word - DOE-ID-12-010 VCU EC.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10 SECTION A. Project Title: Radiation Detection and Nuclear Materials Laboratory Equipment in Support of Student Training and Research by the Department of Mechanical and Nuclear ...

  5. Microsoft Word - DOE-ID-13-051 Oregon St EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    New Mechanistic Models of Creep-Fatigue Crack Growth Interactions for Advanced High Temperature Reactor Components- Oregon State University SECTION B. Project Description Oregon ...

  6. Microsoft Word - DOE-ID-11-008 Wisconsin - Allen EC.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Title: Advanced Nuclear Technology Development ... Acquire and establish an electron backscatter detection ... in the Wisconsin Ion Beam Laboratory, a key component ...

  7. Microsoft Word - DOE-ID-15-044 Wisconsin EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A. Project Title: Development and Demonstration of an In-situ Tritium Scavenger - ... conducted to verify a concept before demonstration actions, provided that construction or ...

  8. Microsoft Word - DOE-ID-15-062 EPRI EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Title: Nuclear Qualification Demonstration of a Cost Effective Common Cause ... conducted to verify a concept before demonstration actions, provided that construction or ...

  9. Microsoft Word - DOE-ID-13-004 Westinghouse EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Modeling and Validation of Sodium Plugging for Heat Exchangers in Sodium-cooled Fast Reactor Systems - Westinghouse Electric Company LLC SECTION B. Project Description ...

  10. Microsoft Word - DOE-ID-14-033 Tennessee EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Computational and Experimental Study of Radiation Damage Effects in Grade 92 Steel and Alloy 709 - University of Tennessee SECTION B. Project Description The University ...

  11. Microsoft Word - DOE-ID-13-056 Arizona State EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Testing and Multiscale Simulation for Creep Fatigue Damage Analysis of Alloy 617 - Arizona State University SECTION B. Project Description Arizona State University proposes to...

  12. Active DOE Technical Standards Projects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AcƟve) Project Number Title Document ID SLM / ORG Author / Phone / Email Status / Status Date P1020- 2012REV Natural Phenomena Hazards Analysis and Design Criteria for DOE FaciliƟes P1020-2012REV James O'Brien (AU-32) Sharon Jasim-Hanif In coordinaƟon - Review and Comment P1026- 2009REV P1046- 2008REV P1063- 2011REV P1066- 2012REV P1073- 2003REV P1095- 2011REV P1098- 2008REV NNSA Packaging CerƟĮcaƟon Engineer FAQS (DOE-STD-1026-2009) P1026-2009REV Ahmad Al-Daouk (NA-53) Temporary Emergency

  13. Phase-retrieval X-ray microscopy by Wigner-distribution deconvolution (CXIDB ID 24)

    DOE Data Explorer

    Chapman, Henry, N.

    2014-10-30

    64x64 scan of a group of latex spheres with 45 nm step size, used for demonstrating Wigner-distribution deconvolution.

  14. Microsoft Word - DOE-ID-14-062 University of Cal., Regents EC...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    force fields and extraction thermodynamic and kinetic data. 2. Compare and validate CFD simulations of extraction processes for AnLn separation using different sizes (and ...

  15. A 12-MW-scale pilot study of in-duct scrubbing (IDS) using a rotary atomizer

    SciTech Connect

    Samuel, E.A.; Murphy, K.R.; Demian, A.

    1989-11-01

    A low-cost, moderate-removal efficiency, flue gas desulfurization (FGD) technology was selected by the US Department of Energy for pilot demonstration in its Acid Rain Precursor Control Technology Initiative. The process, identified as In-Duct Scrubbing (IDS), applies rotary atomizer techniques developed for lime-based spray dryer FGD while utilizing existing flue gas ductwork and particulate collectors. IDS technology is anticipated to result in a dry desulfurization process with a moderate removal efficiency (50% or greater) for high-sulfur coal-fired boilers. The critical elements for successful application are: (1) adequate mixing of sorbent droplets with flue gas for efficient reaction contact, (2) sufficient residence time to produce a non-wetting product, and (3) appropriate ductwork cross-sectional area to prevent deposition of wet reaction products before particle drying is comple. The ductwork in many older plants, previously modified to meet 1970 Clean Air Act requirements for particulate control, usually meet these criteria. A 12 MW-scale IDS pilot plant was constructed at the Muskingum River Plant of the American Electric Power System. The pilot plant, which operates from a slipstrem attached to the air-preheater outlet duct from the Unit 5 boiler at the Muskingum River Plant (which burns about 4% sulfur coal), is equipped with three atomizer stations to test the IDS concept in vertical and horizontal configurations. In addition, the pilot plant is equipped to test the effect of injecting IDS off- product upstream of the atomizer, on SO{sub 2}and NO{sub x} removals.

  16. Microsoft Word - DOE-ID-14-014 Utah B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: Development of Capabilities to Study the Thermodynamics of Nuclear Energy Related Infrastructure at the Utah Nuclear Engineering Program - University of Utah SECTION B. Project Description The University of Utah proposes to acquire an isothermal titration calorimeter (ITC) for the measurement of thermodynamic properties of actinide complexes, and the enhancement of coursework and research efforts

  17. Microsoft Word - DOE-ID-14-015 Idaho State B1-31.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 SECTION A. Project Title: Idaho State University Reactor Laboratory Modernization SECTION B. Project Description Idaho State University proposes to modernize radiation detectors and associated instruments used to perform laboratory experiments and research in the Idaho State University Reactor Laboratory. ISU will upgrade radiation detectors, the sub-critical assembly grid plates, tank filling and draining equipment, and handrails

  18. Line Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Grand Coulee Transmission Line Replacement Project Hooper Springs McNary-John Day Montana-to-Washington Transmission System Upgrade Project - M2W Olympia-Grand Coulee No. 1...

  19. Project Benefits

    Energy.gov [DOE]

    Benefits of the Guidelines for Home Energy Professionals project including reducing energy upgrade costs for consumers, employers, and program administrators.

  20. Hydropower Projects

    Energy.gov [DOE]

    This report covers the Wind and Water Power Technologies Office's hydropower project funding from fiscal years 2008 to 2014.

  1. Aerosol mobility size spectrometer

    DOEpatents

    Wang, Jian; Kulkarni, Pramod

    2007-11-20

    A device for measuring aerosol size distribution within a sample containing aerosol particles. The device generally includes a spectrometer housing defining an interior chamber and a camera for recording aerosol size streams exiting the chamber. The housing includes an inlet for introducing a flow medium into the chamber in a flow direction, an aerosol injection port adjacent the inlet for introducing a charged aerosol sample into the chamber, a separation section for applying an electric field to the aerosol sample across the flow direction and an outlet opposite the inlet. In the separation section, the aerosol sample becomes entrained in the flow medium and the aerosol particles within the aerosol sample are separated by size into a plurality of aerosol flow streams under the influence of the electric field. The camera is disposed adjacent the housing outlet for optically detecting a relative position of at least one aerosol flow stream exiting the outlet and for optically detecting the number of aerosol particles within the at least one aerosol flow stream.

  2. Demand response medium sized industry consumers (Smart Grid Project...

    OpenEI (Open Energy Information) [EERE & EIA]

    demand and regulation power in Danish Industry consumers via a price and control signal from the supplier of electricity. The aim is to develop a valuable solution for the...

  3. Microsoft Word - DOE-ID-INL-16-031 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    R1 SECTION A. Project Title: Install Energy Innovation Laboratory (EIL) (Idaho Falls [IF]-688) Entry Vestibule, Dock Area Staircase, and Door Canopies SECTION B. Project Description and Purpose: This revision of environmental checklist INL-16-031 is to capture additional project scope. Work would include adding canopies to doors on the south side of C-wing and the north and south sides of B-wing. These canopies would be located over the doors to shelter personnel from the weather and to reduce

  4. Building America Case Study: Project Overcoat: Airtightness Strategies and Impacts for 1-1/2 Story Homes, Minneapolis, Minnesota (Fact Sheet), Technology Solutions for Existing Homes, Energy Efficiency & Renewable Energy (EERE)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Overcoat: Airtightness Strategies and Impacts for 1½-Story Homes Minneapolis, Minnesota PROJECT INFORMATION Project Name: Project Overcoat: A Focus on Cost-Effective Options for Roof Applications Location: Minneapolis, MN Partners: Cocoon, cocoon-solutions.com NorthernSTAR Building America Partnership, environment.umn.edu/ forms/project_view.php?id=273 Building Components: Building envelope, roof/attic air seal, and insulation Application: Retrofit, single-family Year Tested: 2013

  5. The Five-Step Development Process Step 3: Project Refinement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Project Refinement 2 1 Potential 3 Refinement 4 Implementation 5 Operations & Maintenance 2 Options 3 Refinement 3 FUNDING AND FINANCING OPTIONS Project Ownership Financing structure is highly dependent on size of the project and the capital available for a given project: * Tribe owns the project (cash purchase or debt) * Tribe hosts the project and buys the electricity (power purchase agreement) * Tribe partners with private sector and co-owns the project (uncertainties about receipt of

  6. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 2 1 Energy Storage Demonstration Project Locations NH 16 Awards Support Projects in 9 States MA

  7. Microsoft Word - DOE-ID-INL-16-006 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    revision is to 1) update the Project Description with corrections to the program name changes, 2) to add in- town Research and Development (R&D) facilities, and 3) to ...

  8. Microsoft Word - DOE-ID-12-013 Colorado School of Mines.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    School of Mines SECTION B. Project Description The Colorado School of Mines will purchase a Robo-Met.3D automated polishing, serial-sectioning, and image acquisition station. ...

  9. Microsoft Word - DOE-ID-13-059 UC Irvine EC B3-15.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    59 SECTION A. Project Title: Multiphase Nanocrystalline Ceramic Concept for Nuclear Fuel- University of California, Irvine SECTION B. Project Description The University of California, Irvine, in collaboration with the University of California, San Diego, University of Tennessee, and Los Alamos National Laboratory, proposes to explore the use of nanoparticles and nanostructured materials to create improved materials that can extend the service life for nuclear fuel. Work at UC-Irvine will include

  10. Microsoft Word - DOE-ID-15-028 New Mexico EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 SECTION A. Project Title: Experimental Validation of a Compact Double-Walled Twisted-Tube Heat Exchanger Concept - University of New Mexico SECTION B. Project Description The University of New Mexico proposes to investigate a new compact double-walled heat exchanger concept for fluoride salt-cooled high-temperature reactors (FHRs) that utilize an outer twisted tube configuration in order to enhance shell-side heat transfer and make the overall bundle more compact while utilizing a traditional

  11. Microsoft Word - DOE-ID-15-052 Houston EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 SECTION A. Project Title: Multiple Degradation Mechanisms in Reinforced Concrete Structures, Modeling and Risk Analysis - The University of Houston SECTION B. Project Description The University of Houston proposes to complement ongoing Light Water Reactor Sustainability (LWRS)-funded Grizzly (component aging code) efforts by providing improved multi-physics models that will be incorporated into Grizzly's framework. These new developments include 1) coupling between mechanical damage and

  12. DOE-ID Bi-Weekly Summary For June 15 to July 6, 2009

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2009 EDITOR'S NOTE: The following is a regular summary of operations at DOE's Idaho Site. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the laboratory. The report is broken down by contractor: Advanced Mixed Waste Treatment Project (AMWTP), Idaho Cleanup Project (ICP) and Idaho National Laboratory (INL). This summary will be

  13. Microsoft Word - DOE-ID-INL-15-013 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    used in high voltage switchgear to reduce the size of equipment and increase reliability. ... Each switch on the sectionalizer could have the ability to be motor operated for circuit ...

  14. Solar Energy Science Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Resource Center Solar Energy Resource Center Sub Program Topic Resource Search Results Title Date Author SubProgram Topic Description

    Science Projects Curriculum: Solar Power -(thermodynamics, light/electromagnetic, radiation, energy transformation, conduction/convection, seasons, trigonometry) Grade Level: Middle or High School Size: Whole class or small groups (3 to 4) Time: Activities range from 2 to 5 class periods, depending on abilities of students. Summary: The first three activities

  15. DOE Issues Final RFP for Idaho Cleanup Project Core

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Consolidated Business Center 250 E. 5th Street, Suite 500, Cincinnati, Ohio 45202 Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov March 16, 2015 DOE Issues Final RFP for Idaho Cleanup Project Core Cincinnati - The U.S. Department of Energy (DOE) today issued the final Request for Proposal (RFP) for the Idaho Cleanup Project (ICP) Core procurement. At the end of this contract the majority of cleanup will be

  16. Project Tour

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Tour Project Tour See NMSSUP from the ground NMSSUP Phase II Construction Project Tour Transportation Transportation to the tour will be provided from Hilton Santa Fe Buffalo Thunder to Los Alamos National Laboratory, Technical Area 55. After the tour, transportation will be provided back to Hilton Santa Fe Buffalo Thunder. What to wear Wear comfortable pants and leather shoes (flat, comfortable, closed-toe; no tennis shoes or high heels). Schedule There will be a one-hour, no-host lunch

  17. PROJECT INFORMATION

    Office of Scientific and Technical Information (OSTI)

    PROJECT INFORMATION DOE award number: DE EE0000621 Name of recipient: San Francisco Public Utilities Commission Project title: San Francisco Biofuel Program Name of project: Brown Grease to Biodiesel Demonstration Director/principal investigator: Domenec Jolis Consortium/teaming members: Environmental Protection Agency (EPA) California Energy Commission (CEC) URS Corporation EXECUTIVE SUMMARY Municipal wastewater treatment facilities have typically been limited to the role of accepting

  18. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    structure whose behavior is fundamentally nonlinear. Thus, the students assigned to this project will develop control techniques that will allow an electrodynamic shake table to...

  19. Custom Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Energy Management Small Industrial Lighting Compressed Air ESUE Motors Federal Agriculture Custom Projects No two industrial customers are alike; each has its own unique...

  20. project management

    National Nuclear Security Administration (NNSA)

    %2A en Project Management and Systems Support http:nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  1. project management

    National Nuclear Security Administration (NNSA)

    3%2A en Project Management and Systems Support http:www.nnsa.energy.govaboutusouroperationsapmprojectmanagementandsystemssupport

  2. Project Complete

    Energy.gov [DOE]

    DOE has published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA process...

  3. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San ...

  4. Project Construction

    Office of Energy Efficiency and Renewable Energy (EERE)

    Integrating renewable energy into Federal new construction or major renovations requires effective structuring of the construction team and project schedule. This overview discusses key construction team considerations for renewable energy as well as timing and expectations for the construction phase. The project construction phase begins after a project is completely designed and the construction documents (100%) have been issued. Construction team skills and experience with renewable energy technologies are crucial during construction, as is how the integration of renewable energy affects the project construction schedule.

  5. DOE Awards Contract for Idaho Clean-up Project (ICP) Core | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Idaho Clean-up Project (ICP) Core DOE Awards Contract for Idaho Clean-up Project (ICP) Core February 4, 2016 - 6:15pm Addthis Media Contacts Lynette Chafin, 513-246-0461 Lynette.Chafin@emcbc.doe.gov Danielle Miller, 208-526-5709 millerdc@id.doe.gov Cincinnati -- The U.S. Department of Energy (DOE) today announced the award of a contract to Fluor Idaho, LLC, for the performance of ongoing Advanced Mixed Waste Treatment Project (AMWTP) and Idaho Clean-up Project (ICP) work scopes in

  6. Microsoft Word - DOE-ID-INL-16-055 R1.docx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5 R1 SECTION A. Project Title: Materials and Fuels Complex (MFC) Vault-Type Room SECTION B. Project Description and Purpose: The purpose of this revision to add the construction of a breezeway between the Irradiated Materials Characterization Laboratory (IMCL) and the vault type room (VTR). The breezeway will be constructed from concrete masonry unit (CMU) block. The breezeway will be approximately 6 ft. wide x 30 ft. long x 12 ft. high. An existing concrete walkway will be removed and a new

  7. Awarded projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    projects Awarded projects 2016 Allocation Awards This page lists the allocation awards for NERSC for the 2016 allocation year (Jan 12, 2016 through Jan 09, 2017). Read More » Previous Year Awards Last edited: 2016-04-29 11:35:1

  8. T-559: Stack-based buffer overflow in oninit in IBM Informix Dynamic Server (IDS) 11.50 allows remote execution

    Energy.gov [DOE]

    Stack-based buffer overflow in oninit in IBM Informix Dynamic Server (IDS) 11.50 allows remote execution attackers to execute arbitrary code via crafted arguments in the USELASTCOMMITTED session environment option in a SQL SET ENVIRONMENT statement

  9. T-582: RSA systems has resulted in certain information being extracted from RSA systems that relates to RSA SecurID

    Energy.gov [DOE]

    RSA investigation has revealed that the attack resulted in certain information being extracted from RSA's systems. Some of that information is related to RSA's SecurID two-factor authentication products.

  10. Information Technology Project Execution Model Guide for Small and Medium Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2015-12-21

    The guide supports consistent and effective implementation of DOE O 415.1 and assists IT Project Managers in effectively managing and applying sound project management to IT projects of small and medium size. Does not cancel/supersede other directives.

  11. Developing Government Renewable Energy Projects

    SciTech Connect

    Kurt S. Myers; Thomas L. Baldwin; Jason W. Bush; Jake P. Gentle

    2012-07-01

    The US Army Corps of Engineers has retained Idaho National Laboratory (INL) to conduct a study of past INL experiences and complete a report that identifies the processes that are needed for the development of renewable energy projects on government properties. The INL has always maintained expertise in power systems and applied engineering and INL’s renewable energy experiences date back to the 1980’s when our engineers began performing US Air Force wind energy feasibility studies and development projects. Over the last 20+ years of working with Department of Defense and other government agencies to study, design, and build government renewable projects, INL has experienced the do’s and don’ts for being successful with a project. These compiled guidelines for government renewable energy projects could include wind, hydro, geothermal, solar, biomass, or a variety of hybrid systems; however, for the purpose of narrowing the focus of this report, wind projects are the main topic discussed throughout this report. It is our thought that a lot of what is discussed could be applied, possibly with some modifications, to other areas of renewable energy. It is also important to note that individual projects (regardless the type) vary to some degree depending on location, size, and need but in general these concepts and directions can be carried over to the majority of government renewable energy projects. This report focuses on the initial development that needs to occur for any project to be a successful government renewable energy project.

  12. Projects | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Projects Thomas Jefferson Site Office (TJSO) TJSO Home About Projects Contract Management NEPA Documents Resources Contact Information Thomas Jefferson Site Office U.S. Department of Energy 12000 Jefferson Avenue Newport News, VA 23606 P: (757) 269-7140 Projects Print Text Size: A A A FeedbackShare Page 12 GeV Upgrade Project Link to Website External link Technology Engineering Development Facility Project .pdf file (29KB) Utilities Infrastructure Modernization Project .pdf file (25KB) Last

  13. FutureGen Project Report

    SciTech Connect

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This document is the continuation of the one reported as OSTI ID = 1116018. The full text file was divided into two parts, of which this is the second.

  14. Microsoft Word - DOE-ID-15-034 Colorado SofM EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 SECTION A. Project Title: KrXe Separation over Metal Organic Framework Membranes - Colorado School of Mines SECTION B. Project Description The Colorado School of Mines proposes ...

  15. Microsoft Word - DOE-ID-15-035 Colorado SofM EC B3-6.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Project Title: Assessment of Aging Degradation Mechanisms of Alloy 709 for Sodium Fast Reactors - Colorado School of Mines SECTION B. Project Description The Colorado School of ...

  16. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 1 Locations of Smart Grid Demonstration and Large-Scale Energy Storage Projects NH 32 Awards Support Projects in 24 States 6 11 MA

  17. VA VT CT RI MT WY CO ID UT OR NV CA AZ NM WA TN WV NC AR OK

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 1 Locations of Smart Grid Demonstration and Large-Scale Energy Storage Projects NH 32 Awards Support Projects in 24 States 6 11 MA

  18. Microsoft PowerPoint - ID 876 TourBooklet_revb_Geology [Compatibility Mode]

    Office of Environmental Management (EM)

    Office of Small and Disadvantaged Business Utilization (OSDBU) Presenter: Nickolas A. Demer Senior Procurement Analyst Business Opportunities Session Charleston, West Virginia November 14, 2011 EVOLUTION OF DOE EVOLUTION OF DOE EVOLUTION OF DOE EVOLUTION OF DOE Manhattan Project - August 1941 - Development of nuclear energy warheads Atomic Energy Act of 1946 - Established the Atomic Energy Commission (AEC) - Established the Atomic Energy Commission (AEC) - Civilian control of atomic energy

  19. Project 1027697

    Office of Scientific and Technical Information (OSTI)

    William Apel and Frank Roberto at) the Biotechnology Department at the INEEL. Each part of this project is funded under a different contract with the Science Division of the US ...

  20. RENOTER Project

    Energy.gov [DOE]

    Overview of French project on thermoelectric waste heat recovery for cars and trucks with focus on cheap, available, efficient, and sustainable TE materials, as well as efficient material integration and production process.

  1. EGS Projects

    Energy.gov [DOE]

    EGS projects span research, development, and demonstration. Unlike traditional hydrothermal systems, EGS capture heat from areas that traditional geothermal energy cannot—where fluid and/or...

  2. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects » Past Research Projects Composite-to-Steel Joint Integrity Monitoring and Assessment Collaboration between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email UCSD Faculty and Graduate

  3. Research Projects

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Projects Joint Los Alamos National Laboratory/UCSD Research Projects Collaborations between Los Alamos National Laboratory and the University of California at San Diego (UCSD) Jacobs School of Engineering Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Professional Staff Assistant Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email "Since 2003, LANL has funded numerous collaborative

  4. AMENDMENT OF SOLlClTATlONlMODlFlCATlON OF CONTRACT I I. CONTRA'T ID CODE

    National Nuclear Security Administration (NNSA)

    CONTRA'T ID CODE BWXT Pantex, LLC Route 726, Mt. Athos Road Lynchburg, V A 24506 PAGE I OF 2 PAGES Albuquerque, NM 871 85-5400 / Amarillo, TX 79120 I I 9B. DATED (SEE ITEM 11) 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) I 10A. MODIFICATION OF CONTRACTIORDER NO. 2. AMENDMENTIMODIFICATION NO. M I 0 8 9A. AMENDMENT OF SOLICITATION NO. DE-AC04-00AL66620 1 1 108. DATED (SEE ITEM 13) 3. EFFECTIVE DATE See Block 16C Offers must acknowledge receipt of this amendment prior to

  5. Pore size distribution and accessible pore size distribution...

    Office of Scientific and Technical Information (OSTI)

    both rank and type (expressed as either hydrogen or vitrinite content) in the size range ... Subject: 01 COAL, LIGNITE, AND PEAT; 03 NATURAL GAS; 08 HYDROGEN; AMBIENT TEMPERATURE; ...

  6. DOE Project Scorecards

    Energy.gov [DOE]

    DOE Project Scorecards DOE project scorecards summarize capital asset project performance compared to the current approved baseline. 

  7. DOE Project Scorecards

    Energy.gov [DOE]

    DOE Project Scorecards DOEproject scorecards summarize capital asset project performance compared to the current approved baseline.

  8. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    l PAGE 1 OF 3PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. I 5. PROJECT NO. (If applicable) 180 See Block 16 C 6.1SSUEDBY CODE 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Los Alamos Site Office 3747 West Jemez Road Los Alamos, NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, state, ZIP Code) 9A. AMENDMENT OF SOLICITATION NO. Los Alamos National Security, LLC

  9. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    I PAGE 1 OF 1 PAGES 2. AMENDMENT/MODIFICATION NO. I 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REO. NO. I 5. PROJECT NO. (If applicable) 212 See Block 16 C 6.1SSUEDBY CODE 7. ADMINISTERED BY (If other than Item 6) CODE U.S. Department of Energy National Nuclear Security Administration Manager, Los Alamos Site Office 3747 West Jemez Road Los Alamos, NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county. state, ZIP Code} 9A. AMENDMENT OF SOLICITATION NO. Los Alamos National Security, LLC

  10. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    I PAGE OF PAGES 1 I 2 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (ff applicable) 0259 See Block 16C 6. ISSUED BY CODE 05003 7. ADMINISTERED BY (If other than Item 6) coDE 105003 NNSA/Los Alamos Site Office NNSA/Los Alamos Site Office u. s. Department of Energy u. s. Department of Energy NNSA/Los Alamos Site Office Los Alamos Site Off ice 3747 West Jemez Road 3747 West Jemez Road Los Alamos NM 87544 Los Alamos NM 87544 8. NAME AND ADDRESS OF

  11. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE

    National Nuclear Security Administration (NNSA)

    l PAGE OF PAGES 1 I 3 2. AMENDMENT/MODIFICATION NO. See Block 16C 4. REQUISITION/PURCHASE REQ. NO. 15. PROJECT NO. (If applicable) 3. EFFECTIVE DA TE 0264 6. ISSUED BY CODE 05003 NNSA/Los Alamos Site Office U.S. Department of Energy NNSA/Los Alamos Site Office 3747 West Jemez Road Los Alamos NM 87544 8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) LOS ALAMOS NATIONAL SECURITY, LLC Attn: STEVE K. SHOOK P.O. BOX 1663, MS P222 LOS ALAMOS NM 875450001 CODE 175252894

  12. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    I PAGE OF PAGES 1 1 2 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REaUISITIONIPURCHASE REa. NO. 15. PROJECT NO. (If applicable) 335 See Block 16C 12SCOO0484 Item 7 6. ISSUED BY CODE 00518 7. ADMINISTERED 8Y (If other than Item 6) CODE 100518 Oak Ridge Oak Ridge U.S. Department of Energy U.S. Department of Energy P.O. Box 2001 P.O. Box 2001 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .* stroot. COlUlty. Stato and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION

  13. AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 11. CONTRACT ID CODE 1 PAGE OF PAGES

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 PAGE OF PAGES 1 I 2 2. AMENDMENTIMODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITIONIPURCHASE REO. NO. 15. PROJECT NO. (If applicable) 352 See Block 16C 12SC001876 Item 3 6. ISSUED BY CODE 00518 7. ADMINISTERED BY (If other than Item 6) CODE 100518 Oak Ridge Oak Ridge U.S. Department of Energy U.S. Department of Energy P.O. Box 2001 P.O. Box 2001 Oak Ridge TN 37831 Oak Ridge TN 37831 8. NAME AND ADDRESS OF CONTRACTOR (No .* stteet. county. Stete and ZIP Coda) (X) 9A. AMENDMENT OF SOLICITATION

  14. 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I111 5

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT I111 5 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applica ble) A078 See 16C 06-08RL14383.012 6. ISSUED BY CODE1 7. ADMINISTERED BY (If other than Item ) CODEJ U.S. Department of Energy Same as item 6. Richland Operations Office DOE Contracting POC: Richard Stimmel P. 0. Box 550, MSIN A7-80 (509) 376-2882 Richland, WA 99352 8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, Stale and

  15. 1. CONTRACT ID CODE PAGE OF PAGES AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II11 5

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AMENDMENT OF SOLICITATIONIMODIFICATION OF CONTRACT II11 5 2. AMEN DMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REOUISITIONIPURCHASE REQ. NO. 5. PROJECT NO. (if applicable) A07 I ee 6C06-08RL143 83 .013 6.ISE YCDJ7. ADMINISTERED BY If lother than Item 6) CODEJ U.S. Department of Energy Same as item 6. Richland Operations Office DOE Contracting POC: Richard Stimmel P. 0. Box 550, MSTN A7-80 (509) 376-2882 Richland, WA 99352 _________ 8. NAME AND ADDRESS OF CONTRACTOR (No. Street, county, State and

  16. Nucla CFB Demonstration Project

    SciTech Connect

    Not Available

    1990-12-01

    This report documents Colorado-Ute Electric Association's Nucla Circulating Atmospheric Fluidized-Bed Combustion (AFBC) demonstration project. It describes the plant equipment and system design for the first US utility-size circulating AFBC boiler and its support systems. Included are equipment and system descriptions, design/background information and appendices with an equipment list and selected information plus process flow and instrumentation drawings. The purpose of this report is to share the information gathered during the Nucla circulating AFBC demonstration project and present it so that the general public can evaluate the technical feasibility and cost effectiveness of replacing pulverized or stoker-fired boiler units with circulating fluidized-bed boiler units. (VC)

  17. Debt collection project report

    SciTech Connect

    Not Available

    1980-05-01

    In October 1979 the Office of Management and Budget initiated a review of debt collection within the Federal Government. A DOE Debt Collection Project Team was established, and seven activites were selected for review. These were Albuquerque Operations Office; Bonneville Power Administration; Chicago Operations and Regional Office; Naval Petroleum Reserves, California; Oak Ridge Operations Office; Washington Financial Services Division; and Western Area Power Administration. The team visited each of these activities to collect data on the size, age, and types of receivables managed and procedures for billing, aging, and handling overdue accounts. Various deficiencies were found to exist at several of the DOE entities that are not consistent with good management practices in the performance of their debt collection functions. Also, the Debt Collection Project Team identified a wide variation in the procedures followed by DOE activities in the management of accounts receivable, and a wide variation in the effectiveness of the debt management functions. 1 figure, 17 tables. (RWR)

  18. ARM - Measurement - Aerosol particle size

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    particle size ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Aerosol particle size Linear size (e.g. radius or diameter) of an aerosol particle. Categories Aerosols Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available measurements, including those recorded for

  19. ARM - Measurement - Cloud droplet size

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    droplet size ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Cloud droplet size Linear size (e.g. radius or diameter) of a cloud particle Categories Cloud Properties Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available measurements, including those recorded for

  20. ARM - Measurement - Particle size distribution

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    size distribution ARM Data Discovery Browse Data Comments? We would love to hear from you! Send us a note below or call us at 1-888-ARM-DATA. Send Measurement : Particle size distribution The number of particles present in any given volume of air within a specified size range. Categories Aerosols Instruments The above measurement is considered scientifically relevant for the following instruments. Refer to the datastream (netcdf) file headers of each instrument for a list of all available