National Library of Energy BETA

Sample records for hanford federal facility

  1. Hanford Federal Facility Agreement and Consent Order quarterly progress report for the period ending June 30, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.

  2. Canyon Facilities - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    About Us Projects & Facilities Canyon Facilities About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental

  3. Beryllium Facilities & Areas - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Controlled Facilities that have been Demolished Outdoor Areas where Beryllium Contamination has been Identified Hanford Projects and Facilities - Descriptions Former Hanford...

  4. Volpentest HAMMER Federal Training Center - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Projects & Facilities Volpentest HAMMER Federal Training Center About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility

  5. Effluent Treatment Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Effluent Treatment Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal

  6. Cold Test Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Projects & Facilities Cold Test Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental

  7. Hanford Facility RCRA permit handbook

    SciTech Connect (OSTI)

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  8. Site Visit Report, Hanford Waste Encapsulation Storage Facility...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Visit Report, Hanford Waste Encapsulation Storage Facility - January 2011 Site Visit Report, Hanford Waste Encapsulation Storage Facility - January 2011 January 2011 Hanford ...

  9. Waste Sampling and Characterization Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Sampling and Characterization Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  10. Projects & Facilities - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    300 Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building Canyon ...

  11. Waste Encapsulation and Storage Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Encapsulation and Storage Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal

  12. Waste Receiving and Processing Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Receiving and Processing Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal

  13. Treated Effluent Disposal Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Treated Effluent Disposal Facility About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal

  14. Photo Gallery - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility Hanford LEED Gold Facility

  15. Hanford, WA Selected as Plutonium Production Facility | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Hanford, WA Selected as Plutonium Production Facility Hanford, WA Selected as Plutonium Production Facility Hanford, WA Groves selects Hanford, Washington, as site for full-scale plutonium production and separation facilities. Three reactors--B, D, and F--are built

  16. Mission analysis report - deactivation facilities at Hanford

    SciTech Connect (OSTI)

    Lund, D.P.

    1996-09-27

    This document examines the portion of the Hanford Site Cleanup Mission that deals with facility deactivation. How facilities get identified for deactivation, how they enter EM-60 for deactivation, programmatic alternatives to perform facility deactivation, the deactivation process itself, key requirements and objectives associated with the deactivation process, and deactivation planning are discussed.

  17. Hanford facility dangerous waste permit application

    SciTech Connect (OSTI)

    1991-09-18

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit.

  18. Integrated Disposal Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 ... Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility ...

  19. Site Visit Report, Hanford Waste Encapsulation Storage Facility - January

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2011 | Department of Energy Hanford Waste Encapsulation Storage Facility - January 2011 Site Visit Report, Hanford Waste Encapsulation Storage Facility - January 2011 January 2011 Hanford Waste Encapsulation Storage Facility Documented Safety Analysis results of a review conducted by the Department of Energy's Office of Health, Safety and Security (HSS) of the documented safety analysis for the Waste Encapsulation Storage Facility at DOE's Hanford Site. The review was performed from July

  20. Hanford Site Workers Apply Fixative to Lock Down Facility's Contamination

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Workers Apply Fixative to Lock Down Facility's Contamination Hanford Site Workers Apply Fixative to Lock Down Facility's Contamination August 31, 2016 - 12:30pm Addthis Hanford Site Workers Apply Fixative to Lock Down Facility’s Contamination Hanford Site Workers Apply Fixative to Lock Down Facility’s Contamination Hanford Site Workers Apply Fixative to Lock Down Facility’s Contamination Hanford Site Workers Apply Fixative to Lock Down Facility's

  1. ORP Projects & Facilities - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Facilities Office of River Protection About ORP ORP Projects & Facilities Tank Farms Waste Treatment & Immobilization Plant 222-S Laboratory 242-A Evaporator Newsroom Contracts &...

  2. Hanford Makes Progress Toward Vitrifying Waste with Facility...

    Office of Environmental Management (EM)

    Makes Progress Toward Vitrifying Waste with Facility's Groundbreaking Hanford Makes Progress Toward Vitrifying Waste with Facility's Groundbreaking March 16, 2016 - 12:30pm Addthis ...

  3. Hanford facility dangerous waste permit application, general information portion

    SciTech Connect (OSTI)

    Hays, C.B.

    1998-05-19

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report).

  4. Hanford Makes Progress Toward Vitrifying Waste with Facility's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Groundbreaking | Department of Energy Makes Progress Toward Vitrifying Waste with Facility's Groundbreaking Hanford Makes Progress Toward Vitrifying Waste with Facility's Groundbreaking March 16, 2016 - 12:30pm Addthis Workers excavate for the Effluent Management Facility site at Hanford’s Waste Treatment and Immobilization Plant. Workers excavate for the Effluent Management Facility site at Hanford's Waste Treatment and Immobilization Plant. RICHLAND, Wash. - EM's Office of River

  5. Medical Testing and Surveillance Facilities - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium...

  6. Assisting Federal Facilities with Energy Conservation Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Financing Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation ...

  7. Hanford Facility dangerous waste permit application, general information. Revision 1

    SciTech Connect (OSTI)

    Not Available

    1993-05-01

    The current Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (this document, number DOE/RL-91-28) and a treatment, storage, and/or disposal Unit-Specific Portion, which includes documentation for individual TSD units (e.g., document numbers DOE/RL-89-03 and DOE/RL-90-01). Both portions consist of a Part A division and a Part B division. The Part B division consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. Documentation contained in the General Information Portion (i.e., this document, number DOE/RL-91-28) is broader in nature and applies to all treatment, storage, and/or disposal units for which final status is sought. Because of its broad nature, the Part A division of the General Information Portion references the Hanford Facility Dangerous Waste Part A Permit Application (document number DOE/RL-88-21), a compilation of all Part A documentation for the Hanford Facility.

  8. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford F Reactor Inspection B-roll footage Hanford F Reactor Inspection B-roll footage Addthis Description A look at the inside of Hanford's F Reactor during a scheduled inspection October 2014

    06KE Rad Con Count Lab Facility September 23, 1999 January 26, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: 1960 End: 1960 Location(s) in facility that contained beryllium materials:

  9. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  10. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  11. Draft Advice for the Hanford Facility Dangerous Waste Permit

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Issue Managers Working Draft Page 1 of 19 Draft Advice for the Hanford Facility Dangerous Waste Permit (Site-Wide Permit) Background: The Draft Hanford Facility Dangerous Waste Permit for the Treatment, Storage, and Disposal of Dangerous Waste (Permit) is the Washington State Department of Ecology's (Ecology) tool for regulating hazardous waste at Hanford. The Permit(s) establish conditions that the U.S. Department of Energy (DOE) and its contractors must meet to protect human health and the

  12. Hanford Facility dangerous waste permit application, liquid effluent retention facility and 200 area effluent treatment facility

    SciTech Connect (OSTI)

    Coenenberg, J.G.

    1997-08-15

    The Hanford Facility Dangerous Waste Permit Application is considered to 10 be a single application organized into a General Information Portion (document 11 number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the 12 Unit-Specific Portion is limited to Part B permit application documentation 13 submitted for individual, `operating` treatment, storage, and/or disposal 14 units, such as the Liquid Effluent Retention Facility and 200 Area Effluent 15 Treatment Facility (this document, DOE/RL-97-03). 16 17 Both the General Information and Unit-Specific portions of the Hanford 18 Facility Dangerous Waste Permit Application address the content of the Part B 19 permit application guidance prepared by the Washington State Department of 20 Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency 21 (40 Code of Federal Regulations 270), with additional information needs 22 defined by the Hazardous and Solid Waste Amendments and revisions of 23 Washington Administrative Code 173-303. For ease of reference, the Washington 24 State Department of Ecology alpha-numeric section identifiers from the permit 25 application guidance documentation (Ecology 1996) follow, in brackets, the 26 chapter headings and subheadings. A checklist indicating where information is 27 contained in the Liquid Effluent Retention Facility and 200 Area Effluent 28 Treatment Facility permit application documentation, in relation to the 29 Washington State Department of Ecology guidance, is located in the Contents 30 Section. 31 32 Documentation contained in the General Information Portion is broader in 33 nature and could be used by multiple treatment, storage, and/or disposal units 34 (e.g., the glossary provided in the General Information Portion). Wherever 35 appropriate, the Liquid Effluent Retention Facility and 200 Area Effluent 36 Treatment Facility permit application documentation makes cross-reference to 37 the General Information Portion, rather than duplicating

  13. Resource book: Decommissioning of contaminated facilities at Hanford

    SciTech Connect (OSTI)

    Not Available

    1991-09-01

    In 1942 Hanford was commissioned as a site for the production of weapons-grade plutonium. The years since have seen the construction and operation of several generations of plutonium-producing reactors, plants for the chemical processing of irradiated fuel elements, plutonium and uranium processing and fabrication plants, and other facilities. There has also been a diversification of the Hanford site with the building of new laboratories, a fission product encapsulation plant, improved high-level waste management facilities, the Fast Flux test facility, commercial power reactors and commercial solid waste disposal facilities. Obsolescence and changing requirements will result in the deactivation or retirement of buildings, waste storage tanks, waste burial grounds and liquid waste disposal sites which have become contaminated with varying levels of radionuclides. This manual was established as a written repository of information pertinent to decommissioning planning and operations at Hanford. The Resource Book contains, in several volumes, descriptive information of the Hanford Site and general discussions of several classes of contaminated facilities found at Hanford. Supplementing these discussions are appendices containing data sheets on individual contaminated facilities and sites at Hanford. Twelve appendices are provided, corresponding to the twelve classes into which the contaminated facilities at Hanford have been organized. Within each appendix are individual data sheets containing administrative, geographical, physical, radiological, functional and decommissioning information on each facility within the class. 68 refs., 54 figs., 18 tabs.

  14. Idaho National Engineering Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order State Idaho Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts...

  15. Lawrence Livermore National Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Site 300) Agreement Name Lawrence Livermore National Laboratory Federal Facility Agreement Under CERCLA Section 120, June 29, 1992 State California Agreement Type Federal Facility ...

  16. Hanford Restarts Facility to Clean Up Wastewater | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Restarts Facility to Clean Up Wastewater Hanford Restarts Facility to Clean Up Wastewater May 31, 2016 - 12:45pm Addthis The Effluent Treatment Facility (at bottom) and the Liquid Effluent Retention Facility (at top). The Effluent Treatment Facility (at bottom) and the Liquid Effluent Retention Facility (at top). RICHLAND, Wash. - EM's Office of River Protection's (ORP) Effluent Treatment Facility (ETF) resumed operations May 19 after a two-year period that saw ORP assume its oversight from the

  17. Hanford Site Facility's 20th Anniversary Marks Career Milestone for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Engineer | Department of Energy Facility's 20th Anniversary Marks Career Milestone for Engineer Hanford Site Facility's 20th Anniversary Marks Career Milestone for Engineer July 28, 2016 - 1:05pm Addthis Michael Casbon’s first job for Hanford’s ERDF was helping with its conceptual design. This month, he celebrated the 20th anniversary of the facility’s operation as its resident engineer. Michael Casbon's first job for Hanford's ERDF was helping with its conceptual design. This

  18. Hanford Site existing irradiated fuel storage facilities description

    SciTech Connect (OSTI)

    Willis, W.L.

    1995-01-11

    This document describes facilities at the Hanford Site which are currently storing spent nuclear fuels. The descriptions provide a basis for the no-action alternatives of ongoing and planned National Environmental Protection Act reviews.

  19. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  20. Federal Facility Agreement progress report

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  1. Hanford Federal Facility Agreement & Consent Order

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PCB Transformer disposal. The nineteen Polychlorinated Biphenyl (PCB) electrical transformers at the FFTF will be disposed of after the transformers are removed from service....

  2. Liquid Effluent Retention Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 ... Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility ...

  3. Environmental Restoration Disposal Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Area 324 Building 325 Building 400 AreaFast Flux Test Facility 618-10 and 618-11 ... Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility ...

  4. Independent Oversight Review, Hanford K Basin and Cold Vacuum Drying Facility- August 2012

    Energy.gov [DOE]

    Review of Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations

  5. Agencies Decide to Dig Up Contaminated Soil at Hanford Site - Federal and

    Office of Environmental Management (EM)

    state agencies determine cleanup plans for four areas near central Hanford | Department of Energy Decide to Dig Up Contaminated Soil at Hanford Site - Federal and state agencies determine cleanup plans for four areas near central Hanford Agencies Decide to Dig Up Contaminated Soil at Hanford Site - Federal and state agencies determine cleanup plans for four areas near central Hanford October 7, 2011 - 12:00pm Addthis Media Contacts Geoff Tyree, DOE Geoffrey.Tyree@rl.doe.gov 509-376-4171

  6. Hanford Facility Highlights EM's Success in Meeting Cost and Schedule

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Targets | Department of Energy Facility Highlights EM's Success in Meeting Cost and Schedule Targets Hanford Facility Highlights EM's Success in Meeting Cost and Schedule Targets August 1, 2012 - 12:00pm Addthis EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System this month. EM Principal Deputy Assistant Secretary Tracy Mustin speaks during the operational kickoff event for the 200 West Pump and Treat System

  7. National Environmental Justice Advisory Council Federal Facilities Working Group Report

    Energy.gov [DOE]

    Environmental Justice and Federal Facilities: recommendations for improving stakeholder relations between federal facilities and environmental justice communities, October 2004

  8. 2014 Assisting Federal Facilities with Energy Conservation Technologie...

    Energy Savers

    Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients 2014 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding ...

  9. 2015 Assisting Federal Facilities with Energy Conservation Technologie...

    Energy Savers

    Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients 2015 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding ...

  10. AFFECT 2016: Assisting Federal Facilities with Energy Conservation...

    Office of Environmental Management (EM)

    AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar ...

  11. Lawrence Livermore National Laboratory Federal Facility Compliance...

    Office of Environmental Management (EM)

    Federal Facility Compliance Act Order for Lawrence Livermore National Laboratory ... treatment of mixed waste at Lawrence Livermore National Laboratory Parties DOE; State ...

  12. Potential Hydroelectric Development at Existing Federal Facilities...

    Open Energy Information (Open El) [EERE & EIA]

    Potential Hydroelectric Development at Existing Federal Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Potential Hydroelectric Development at...

  13. Waste Treatment Facility Passes Federal Inspection, Completes...

    Office of Environmental Management (EM)

    Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal ... The Idaho site today initiated the controlled, phased startup of a new waste treatment ...

  14. Evaluating Operational Irregularities at Hanford's Environmental Restoration Disposal Facility

    SciTech Connect (OSTI)

    Benson, C.H.; Albright, W.H.; Ray, D.P.; Smegal, J.S.; Robertson, Jr.O.C.; Gupta, D.C.

    2008-07-01

    This paper describes the findings of an independent technical review that investigated operational irregularities at the Environmental Restoration Disposal Facility (ERDF) at Hanford. The ERDF is a large-scale disposal facility authorized by the Environmental Protection Agency and the Washington State Department of Ecology to receive waste from Hanford cleanup activities. The irregularities included (i) failure to recognize that pumps for the leachate collection system were not functioning for an extended period and (ii) falsification of compaction data by a technician responsible for monitoring waste placement in the ERDF. Other issues related to compaction of the waste were also considered during the independent technical review. A number of important lessons were learned as part of this review. These lessons are summarized in the paper. They are relevant to the ERDF as well as other landfill operations at Department of Energy facilities. (authors)

  15. Risk management study for the retired Hanford Site facilities: Qualitative risk evaluation for the retired Hanford Site facilities. Volume 3

    SciTech Connect (OSTI)

    Coles, G.A.; Shultz, M.V.; Taylor, W.E.

    1993-09-01

    This document provides a risk evaluation of the 100 and 200 Area retired, surplus facilities on the Hanford Site. Also included are the related data that were compiled by the risk evaluation team during investigations performed on the facilities. Results are the product of a major effort performed in fiscal year 1993 to produce qualitative information that characterizes certain risks associated with these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1,450-km{sup 2} (570-mi{sup 2}) Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30-km (20 mi) southeast of the 200 Area. During walkdown investigations of these facilities, data on real and potential hazards that threatened human health or safety or created potential environmental release issues were identified by the risk evaluation team. Using these findings, the team categorized the identified hazards by facility and evaluated the risk associated with each hazard. The factors contributing to each risk, and the consequence and likelihood of harm associated with each hazard also are included in this evaluation.

  16. EM Marks 20 years of Cleanup Success at Hanford Disposal Facility |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 20 years of Cleanup Success at Hanford Disposal Facility EM Marks 20 years of Cleanup Success at Hanford Disposal Facility July 28, 2016 - 1:10pm Addthis ERDF is known as the “hub” of Hanford cleanup. ERDF is known as the "hub" of Hanford cleanup. RICHLAND, Wash. - July marked 20 successful years of environmental cleanup at one of EM's largest disposal facilities - the Environmental Restoration Disposal Facility (ERDF) on the Hanford Site. Since

  17. Procuring Solar for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procuring Solar for Federal Facilities Procuring Solar for Federal Facilities Pre-screening and Planning - understand federal requirements and conducting a site pre-screening ...

  18. Enterprise Assessments Operational Awareness Record for the Assessment of Construction at the Hanford Site K-West Annex Facility (OAR EA-HANFORD-2015-09-09)

    Office of Energy Efficiency and Renewable Energy (EERE)

    Operational Awareness Record for the Assessment of Construction at the Hanford Site K-West Annex Facility

  19. Hanford Staff Directory - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Illness Compensation Hanford Workers Compensation Projects & Facilities HERO PHOENIX Hanford Meteorological Station Definitions Abbreviations and Acronyms Visitor Control...

  20. Voluntary Protection Program Onsite Review, Fluor Hanford Fast Flux Test Facility Recertification- October 2007

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether Fluor Hanford Fast Flux Test Facility is continuing to perform at a level deserving DOE-VPP Star recognition.

  1. List of currently classified documents relative to Hanford Production Facilities Operations originated on the Hanford Site between 1961 and 1972

    SciTech Connect (OSTI)

    Not Available

    1993-04-01

    The United States Department of Energy (DOE) has declared that all Hanford plutonium production- and operations-related information generated between 1944 and 1972 is declassified. Any documents found and deemed useful for meeting Hanford Environmental Dose Reconstruction (HEDR) objectives may be declassified with or without deletions in accordance with DOE guidance by Authorized Derivative Declassifiers. The September 1992, letter report, Declassifications Requested by the Technical Steering Panel of Hanford Documents Produced 1944--1960, (PNWD-2024 HEDR UC-707), provides an important milestone toward achieving a complete listing of documents that may be useful to the HEDR Project. The attached listing of approximately 7,000 currently classified Hanford-originated documents relative to Hanford Production Facilities Operations between 1961 and 1972 fulfills TSP Directive 89-3. This list does not include such titles as the Irradiation Processing Department, Chemical Processing Department, and Hanford Laboratory Operations monthly reports generated after 1960 which have been previously declassified with minor deletions and made publicly available. Also Kaiser Engineers Hanford (KEH) Document Control determined that no KEH documents generated between January 1, 1961 and December 31, 1972 are currently classified. Titles which address work for others have not been included because Hanford Site contractors currently having custodial responsibility for these documents do not have the authority to determine whether other than their own staff have on file an appropriate need-to-know. Furthermore, these documents do not normally contain information relative to Hanford Site operations.

  2. Hanford facility dangerous waste permit application, general information portion. Revision 3

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1997-08-21

    Part B permit application documentation has been, or is anticipated to be, submitted. Documentation for treatment, storage, and/or disposal units undergoing closure, or for units that are, or are anticipated to be, dispositioned through other options, will continue to be submitted by the Permittees in accordance with the provisions of the Hanford Federal Facility Agreement and Consent Order. However, the scope of the General Information Portion includes information that could be used to discuss operating units, units undergoing closure, or units being dispositioned through other options. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the contents of the Part B permit application guidance documentation prepared by the Washington State Department of Ecology and the U.S. Environmental Protection Agency, with additional information needs defined by revisions of Washington Administrative Code 173-303 and by the Hazardous and Solid Waste Amendments. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (i.e., either operating units, units undergoing closure, or units being dispositioned through other options).

  3. Hanford site near-facility environmental monitoring annual report, calendar year 1996

    SciTech Connect (OSTI)

    Perkins, C.J.

    1997-08-05

    This document summarizes the results of the near-facility environmental monitoring results for 1996 in the 100, 200/600, and 300/400 areas of the Hanford Site in south-central Washington State. Surveillance activities included sampling and analyses of ambient air, surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. The monitoring implements applicable portions of DOE Orders 5400.1 (DOE 1988a), 5400.5 (DOE 1990), and 5820.2A (DOE 1988b); Washington Administrative Code (WAC) 246-247; and Title 40 Code of Federal Regulations (CFR) Part 61, Subpart H (EPA 1989). In addition, diffuse sources were monitored to determine compliance with federal, state, and/or local regulations. In general, although effects from nuclear facilities can still be observed on the Hanford Site and radiation levels were slightly elevated when compared to offsite locations, the differences are less than in previous years.

  4. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  5. Greening Federal Facilities: An Energy, Environmental, and Economic...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource ...

  6. Federal Facilities Maintenance, Repair Report Calls for Action

    SciTech Connect (OSTI)

    Bartlett, Rosemarie

    2012-10-01

    This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

  7. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility ...

  8. California Federal Facilities: Rate-Responsive Buidling Operating...

    Office of Environmental Management (EM)

    California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and ... for cost and energy savings in California federal facilities. ...

  9. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy ...

  10. Workplace Charging at Federal Facilities | Department of Energy

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    at Federal Facilities Workplace Charging at Federal Facilities Providing plug-in electric vehicle (PEV) charging stations at the workplace is one strategy by which agencies can ...

  11. LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP EXECUTION...

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP EXECUTION PLAN Los Alamos National ... Safety and Security LFRG Low-Level Waste Disposal Facility Federal Review Group LLW ...

  12. EIS-0017: Fusion Materials Irradiation Testing Facility, Hanford Reservation, Richland, Washington

    Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts associated with proposed construction and operation of an irradiation test facility, the Deuterium-Lithium High Flux Neutron Source Facility, at the Hanford Reservation.

  13. Hanford Site waste tank farm facilities design reconstitution program plan

    SciTech Connect (OSTI)

    Vollert, F.R.

    1994-09-06

    Throughout the commercial nuclear industry the lack of design reconstitution programs prior to the mid 1980`s has resulted in inadequate documentation to support operating facilities configuration changes or safety evaluations. As a result, many utilities have completed or have ongoing design reconstitution programs and have discovered that without sufficient pre-planning their program can be potentially very expensive and may result in end-products inconsistent with the facility needs or expectations. A design reconstitution program plan is developed here for the Hanford waste tank farms facility as a consequence of the DOE Standard on operational configuration management. This design reconstitution plan provides for the recovery or regeneration of design requirements and basis, the compilation of Design Information Summaries, and a methodology to disposition items open for regeneration that were discovered during the development of Design Information Summaries. Implementation of this plan will culminate in an end-product of about 30 Design Information Summary documents. These documents will be developed to identify tank farms facility design requirements and design bases and thereby capture the technical baselines of the facility. This plan identifies the methodology necessary to systematically recover documents that are sources of design input information, and to evaluate and disposition open items or regeneration items discovered during the development of the Design Information Summaries or during the verification and validation processes. These development activities will be governed and implemented by three procedures and a guide that are to be developed as an outgrowth of this plan.

  14. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  15. Low-Level Waste Disposal Facility Federal Review Group Manual...

    Office of Environmental Management (EM)

    Low-Level Waste Disposal Facility Federal Review Group Manual Low-Level Waste Disposal Facility Federal Review Group Manual This Revision 3 of the Low-Level Waste Disposal Facility ...

  16. Greening Federal Facilities: An Energy, Environmental, and Economic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Resource Guide for Federal Facility managers and Designers; Second Edition | Department of Energy Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition A nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the

  17. The Agreement - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Agreement Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links The Agreement Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Federal Facility Agreement and Consent Order by Washington State Department of

  18. AFFECT 2016: Assisting Federal Facilities with Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technologies Webinar | Department of Energy AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar Webinar describes the 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) funding opportunity offered by the Federal Energy Management Program. View the webinar slides.

  19. Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Agreement | Department of Energy Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act (TSCA) Uranium Enrichment Federal Facility Compliance Agreement establishes a plan to bring DOE's Uranium Enrichment Plants (and support facilities) located in Portsmouth, Ohio and Paducah, Kentucky and DOE's former Uranium Enrichment Plant (and support

  20. Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Judge | Department of Energy Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge October 6, 2010 - 12:00am Addthis RICHLAND, Wash. - The U.S. Department of Energy and Washington State Department of Ecology (Ecology) jointly filed a motion today in U.S. District Court asking the court to approve and enter a judicial consent decree that imposes a new, enforceable, and achievable

  1. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Appendix B, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision ... process for successfully planning for and installing solar technology on a federal site. ...

  2. Procuring Solar for Federal Facilities | Department of Energy

    Energy.gov (indexed) [DOE]

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers is a Web guide for federal site managers, site contractors, and procurement specialists to help them navigate ...

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    preparations December 13, 2011 PRESS RELEASE: Hanford Waste Treatment Plant completes concrete design for largest facility The Hanford Waste Treatment Plant Project recently issued...

  4. Toxic Substances Control Act Uranium Enrichment Federal Facility...

    Energy.gov (indexed) [DOE]

    Toxic Substances Control Act (TSCA) Uranium Enrichment Federal Facility Compliance Agreement establishes a plan to bring DOE's Uranium Enrichment Plants (and support facilities) ...

  5. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  6. Low-Level Waste Disposal Facility Federal Review Group Manual

    Office of Environmental Management (EM)

    LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP MANUAL REVISION 3 JUNE 2008 (This page ... 3, June 200S Concurrence The Low-Level Waste Disposal Facility Federal Review Group ...

  7. Renewable Energy Projects at Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Projects at Federal Facilities Renewable Energy Projects at Federal Facilities The Federal Energy Management Program (FEMP) tracks the following examples of renewable energy projects at federal facilities. To find a federal renewable energy project, browse the table by agency, technology, or project financials, or search by keyword. Click a column heading to sort the table. Case studies are also available. Contact FEMP to add your renewable energy project to the table below. Agency,

  8. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Newsroom Hanford Blog Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel Hanford Blog Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size November 2016 November 03, 2016 Demolition of One of Hanford's Most Hazardous Facilities Underway Demolition is underway at the Plutonium Finishing Plant (PFP), one of the most hazardous buildings on the Hanford Site in southeastern Washington state. October 2016 October 24,

  9. Hanford Tour Restrictions - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tour Restrictions Hanford Site Tours Hanford Tour Restrictions Hanford Tours for Governmental Officials Hanford Tours for Tribal Affairs Hanford Private Tours Hanford Tour Restrictions Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Prohibited Items The following items are prohibited anywhere on the Hanford Site or in site-associated facilities. Dangerous weapons Note: Prohibited knives include: blades exceeding four (4) inches in length; spring blade knives or

  10. Analysis of Hanford-based Options for Sustainable DOE Facilities on the West Coast

    SciTech Connect (OSTI)

    Warwick, William M.

    2012-06-30

    Large-scale conventional energy projects result in lower costs of energy (COE). This is true for most renewable energy projects as well. The Office of Science is interested in its facilities meeting the renewable energy mandates set by Congress and the Administration. Those facilities on the west coast include a cluster in the Bay Area of California and at Hanford in central Washington State. Land constraints at the California facilities do not permit large scale projects. The Hanford Reservation has land and solar insolation available for a large scale solar project as well as access to a regional transmission system that can provide power to facilities in California. The premise of this study is that a large-scale solar project at Hanford may be able to provide renewable energy sufficient to meet the needs of select Office of Science facilities on the west coast at a COE that is competitive with costs in California despite the lower solar insolation values at Hanford. The study concludes that although the cost of solar projects continues to decline, estimated costs for a large-scale project at Hanford are still not competitive with avoided power costs for Office of Science facilities on the west coast. Further, although it is possible to transmit power from a solar project at Hanford to California facilities, the costs of doing so add additional costs. Consequently, development of a large- scale solar project at Hanford to meet the renewable goals of Office of Science facilities on the west coast is currently uneconomic. This may change as solar costs decrease and California-based facilities face increasing costs for conventional and renewable energy produced in the state. PNNL should monitor those cost trends.

  11. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2012 May 22, 2012 PRESS RELEASE: Hanford Waste Treatment Plant Receives and Sets Six-Ton Exhausters for Air-Filtration System The six-ton exhausters are key components in a complex air-filtration system that will ensure the facility's air emissions meet strict environmental regulations and requirements. May 17, 2012 PRESS RELEASE: CH2M HILL Awards $10.8 Million Subcontract to Local, Small Business Contract awarded to Federal Engineers & Constructors to modify facility that will support

  12. Project Hanford management contract quality assurance program implementation plan for nuclear facilities

    SciTech Connect (OSTI)

    Bibb, E.K.

    1997-10-15

    During transition from the Westinghouse Hanford Company (WHC) Management and Operations (M and O) contract to the Fluor Daniel Hanford (FDH) Management and Integration (M and I) contract, existing WHC policies, procedures, and manuals were reviewed to determine which to adopt on an interim basis. Both WHC-SP-1131,Hanford Quality Assurance Program and Implementation Plan, and WHC-CM-4-2, Quality Assurance Manual, were adopted; however, it was recognized that revisions were required to address the functions and responsibilities of the Project Hanford Management Contract (PHMC). This Quality Assurance Program Implementation Plan for Nuclear Facilities (HNF-SP-1228) supersedes the implementation portion of WHC-SP-1 13 1, Rev. 1. The revised Quality Assurance (QA) Program is documented in the Project Hanford Quality Assurance Program Description (QAPD), HNF-MP-599. That document replaces the QA Program in WHC-SP-1131, Rev. 1. The scope of this document is limited to documenting the nuclear facilities managed by FDH and its Major Subcontractors (MSCS) and the status of the implementation of 10 CFR 830.120, Quality Assurance Requirements, at those facilities. Since the QA Program for the nuclear facilities is now documented in the QAPD, future updates of the information provided in this plan will be by letter. The layout of this plan is similar to that of WHC-SP-1 13 1, Rev. 1. Sections 2.0 and 3.0 provide an overview of the Project Hanford QA Program. A list of Project Hanford nuclear facilities is provided in Section 4.0. Section 5.0 provides the status of facility compliance to 10 CFR 830.120. Sections 6.0, 7.0, and 8.0 provide requested exemptions, status of open items, and references, respectively. The four appendices correspond to the four projects that comprise Project Hanford.

  13. Federal-facilities Hazardous-Waste Compliance Manual. Final report

    SciTech Connect (OSTI)

    Not Available

    1990-01-09

    In the continuing effort to achieve a higher level of compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) at Federal facilities, the Federal Facilities Hazardous Waste Compliance Office (FFHWCO) has developed the Federal Facilities Hazardous Waste Compliance Manual. The manual includes an overview of the Federal-facilities hazardous-waste compliance program, relevant statutory authorities, model provisions for Federal facility agreements, enforcement and other applicable guidance, Federal facilities docket and NPL listings, data-management information, selected DOD and DOE program guidance, and organization charts and contacts. This compendium is intended to be used as a reference by Regional RCRA and CERCLA enforcement personnel and Regional Counsels, particularly as an orientation guide for new Federal facilities staff.

  14. 2015 Assisting Federal Facilities with Energy Conservation Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (AFFECT) Funding Recipients | Department of Energy 5 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients 2015 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients On March 6, 2015, the Federal Energy Management Program (FEMP) issued a funding opportunity announcement on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT), Fiscal Year 2015. On January 27, 2016,

  15. Federal Finance Facilities Available for Energy Efficiency Upgrades and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clean Energy Deployment | Department of Energy Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment The Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local

  16. Energy Management in Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Management in Federal Facilities Energy Management in Federal Facilities Data Centers Data Centers Federal data centers used nearly 10% of federal electricity use in 2013. Find out how to make data centers more energy efficient. Read more Laboratories Laboratories Laboratory activities and ventilation requirements can be energy intensive. Find out how to make laboratories more efficient. Read more Operations and Maintenance Operations and Maintenance Facilities rely on pumps, motors, and

  17. Federal Agency Facility Reporting Requirements and Performance Data |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Federal Agency Facility Reporting Requirements and Performance Data Federal Agency Facility Reporting Requirements and Performance Data The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts for federal facilities. FEMP also collects and publishes agency performance data. Reporting Requirements Agencies are required to report progress under two separate

  18. California Federal Facilities: Rate-Responsive Building Operating for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Deeper Cost and Energy Savings | Department of Energy Federal Facilities: Rate-Responsive Building Operating for Deeper Cost and Energy Savings California Federal Facilities: Rate-Responsive Building Operating for Deeper Cost and Energy Savings Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities. Download the Rate-Responsive Building Operating for Deeper Cost and Energy Savings

  19. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA 432) requires federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each federal agency must designate an energy manager to be responsible for implementing

  20. Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Funding Opportunity | Department of Energy Project Financing » Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity The Federal Energy Management Program (FEMP) provides project assistance through the AFFECT funding opportunity. AFFECT provides grants for the development of capital projects to increase the energy efficiency and renewable energy

  1. Federal Finance Facilities Available for Energy Efficiency Upgrades and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clean Energy Deployment | Department of Energy Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment This webinar, held on Sept. 24, 2013, provides information on federal finance facilities available for energy efficiency upgrades and clean energy deployment. Examples include USDA's Electric Loan Program, HUD's PowerSaver Home Improvement Loans Program,

  2. Paducah Site Federal Facility Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Facility Agreement Paducah Site Federal Facility Agreement The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised Statute 224; and other laws and regulations identified in the FFA. Paducah

  3. Commissioning Process for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Process for Federal Facilities Commissioning Process for Federal Facilities The commissioning process for federal facilities (including new construction and existing buildings) can be completed in four steps. Step 1: Plan The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step are to: Optimize building operations to reduce

  4. Savannah River Site Federal Facility Agreement, January 15, 1993...

    Office of Environmental Management (EM)

    Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of ... with past and present activities at the Savannah River Site are thoroughly investigated ...

  5. EISA Federal Covered Facility Management and Benchmarking Data...

    Energy.gov (indexed) [DOE]

    Federal Government Compliance Overview FEMP offers covered facility management and ... Annual Energy Reporting Requirements FEMP Contacts Chris Tremper U.S. Department of ...

  6. Federal Facility Compliance Agreement on Storage of Polychlorinated...

    Office of Environmental Management (EM)

    on Storage of Polychlorinated Biphenyls, August 8, 1996 State Washington Agreement Type Federal Facility Compliance Agreement Legal Driver(s) TSCA Scope Summary Address DOE and the ...

  7. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Toxic Substance Control Act Uranium Enrichment Federal Facilities Compliance Agreement ... for bringing DOE's former and active Uranium Enrichment Plants in Paducah, Portsmouth, ...

  8. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 This ...

  9. California Federal Facilities: Rate-Responsive Building Operating...

    Energy.gov (indexed) [DOE]

    California federal facilities. Download the Rate-Responsive Building Operating for Deeper Cost and Energy Savings fact sheet. (614.65 KB) More Documents & Publications California ...

  10. Adopting LED Technology: What Federal Facility Managers Need to Know

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document describes the presentation slides for the "Adopting LED Technology: What Federal Facility Managers Need to Know" webinar that took place on September 11, 2014.

  11. Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford

    Office of Environmental Management (EM)

    ERDF ETR Report Date: June 2007 ETR-6 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of the Operational Issues at the Environmental Restoration Disposal Facility(ERDF) at Hanford Why DOE-EM Did This Review The ERDF is a large- scale disposal facility authorized to receive waste from Hanford cleanup activities. It contains double-lined cells with a RCRA Subtitle C- type liner and leachate collection system. By 2007, 6.8 million tons of

  12. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FEDERAL FACILITIES An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION DOE/GO-102001-1165 Section DOE/GO-102001-1165 NREL/BK-710-29267 May 2001 i Greening Federal Facilities An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION "Then I say the earth belongs to each ... generation during its course, fully and in its own right, no generation can contract debts greater than

  13. EXECUTIVE SUMMARY FOR HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    EXAMINATION REPORT: OAS-RA-13-27 EXAMINATION REPORT: OAS-RA-13-27 July 15, 2013 Commonwealth of Puerto Rico Energy Affairs Administration - Energy Efficiency and Conservation Block Grant Program Funds Provided by the American Recovery and Reinvestment Act of 2009 As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Energy Efficiency and Conservation Block Grant (EECBG) Program received $3.2 billion to develop, promote, implement and manage energy efficiency and

  14. 400 Area/Fast Flux Test Facility - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent ... made hydrogen-3 (tritium) for the U.S. fusion research program, and conducted ...

  15. EIS-0089: PUREX Plant and Uranium Oxide Plant Facilities, Hanford Site, Richland, Washington

    Energy.gov [DOE]

    The U.S. Department of Energy developed this statement to evaluate the environmental impacts of resumption of operations of the PUREX/Uranium Oxide facilities at the Hanford Site to produce plutonium and other special nuclear materials for national defense needs.

  16. EIS-0364: Decommissioning of the Fast Flux Test Facility, Hanford Site, Richland, WA

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces its intent to prepare an Environmental Impact Statement (EIS), pursuant to the National Environmental Policy Act of 1969 (NEPA), on proposed decommissioning of the Fast Flux Test Facility (FFTF) at the Hanford Site, Richland, Washington.

  17. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    71B B Plant Support Building March 25, 1998 February 9, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: NO Form of beryllium: N/A Period of beryllium operations (dates): N/A End: N/A Location(s) in facility that contained beryllium materials: None that were known. Description of beryllium activities: This facility appeared on the original list of possible beryllium facilities. Reviews of documentation, facility personnel, a UW research representative, and DOE-RL

  18. Manhattan Project buildings and facilities at the Hanford Site: A construction history

    SciTech Connect (OSTI)

    Gerber, M.S.

    1993-09-01

    This document thoroughly examines the role that the Hanford Engineer Works played in the Manhattan project. The historical aspects of the buildings and facilities are characterized. An in depth look at the facilities, including their functions, methods of fabrication and appearance is given for the 100 AREAS, 200 AREAS, 300 AREAS, 500, 800 and 900 AREAS, 600 AREA, 700 AREA, 1100 AREA and temporary construction structures.

  19. Hanford Advisory Board Draft Letter Topic: Environmental Restoration and Disposal Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Topic: Environmental Restoration and Disposal Facility Authors: Mattson, Leckband, Suyama Originating Committee: River & Plateau Version #1 packet 1 Dear Ms. Charboneau and Mr. Faulk, The Tri-Party Agreement (TPA) agencies announced that they were proceeding with a vertical expansion approach for the Environmental Restoration and Disposal Facility (ERDF) during the Feb. 2016 full Hanford Advisory Board (Board) meeting, and again at the Feb. 2016 River and Plateau (RAP) committee meeting.

  20. Weldon Spring Site Federal Facility Agreement

    Office of Legacy Management (LM)

    ... 1341. The Antideficiency Act places limits on a federal agency's ability to spend money. ... 2) obligating the government to pay money before funds have been appropriated for ...

  1. Waste treatment facility passes federal inspection, completes...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. ...

  2. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2 Subject: Submittal to National Remedy Review Board February 23, 2012 Page 1 February 23, 2012 Ms. Amy Legare, NRRB Chair U.S. Environmental Protection Agency National Remedy Review Board 1200 Pennsylvania Avenue, NW MC5204P Washington, DC 20460 Re: Submittal to National Remedy Review Board Dear Ms. Legare, The Hanford Advisory Board is a U.S. Department of Energy Environmental Management Federal Advisory Committee Act board which has offered advice for the past 17 years to the Tri-Party

  3. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 4 - Nuclear Safety Basis Program Review During Facility Decommissioning and Environmental Restoration February 2015 i Standard Review Plan Volume 4 Nuclear Safety Basis Program Review during Facility Decommissioning and Environmental Restoration Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February

  4. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    November 2016 November 03, 2016 Demolition of One of Hanford's Most Hazardous Facilities Underway Demolition is underway at the Plutonium Finishing Plant (PFP), one of the most hazardous buildings on the Hanford Site in southeastern

  5. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    November 2016 November 03, 2016 Demolition of One of Hanford's Most Hazardous Facilities Underway Demolition is underway at the Plutonium Finishing Plant (PFP), one of the most hazardous buildings on the Hanford Site in southeastern

  6. EM Prepares to Demolish Most Hazardous Hanford Site Facility | Department

    Office of Environmental Management (EM)

    Plans | Department of Energy Marks Progress on Facilities, Outlines Safe Startup and Commissioning Plans EM Marks Progress on Facilities, Outlines Safe Startup and Commissioning Plans June 15, 2016 - 12:45pm Addthis Panelists at the event for the House Nuclear Cleanup Caucus included, left to right, Parsons Senior Vice President and Salt Waste Processing Facility Project Manager Frank Sheppard, EM Principal Deputy Assistant Secretary Mark Whitney, and Bechtel National Inc. Waste Treatment

  7. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    9-E Tank Farm Waste Support Facility February 23, 2004 March 20, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: Pre-1985 End: Pre-1997 Location(s) in facility that contained beryllium materials: Characterization sampling was conducted in 2010. The CAR and MIX rooms remained posted as potential beryllium contaminated systems due to the high radioactivity levels in the Gloveboxes and Hoods

  8. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1Z Materials Engineering Laboratory (Plutonium Metallurgy Lab) February 23, 2004 February 1, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: 1967 End: 1980 Location(s) in facility that contained beryllium materials: PNNL conducted various beryllium operations in this facility from 1967 to 1980. Confirmed rooms with past beryllium activities include 23, 24, 34, 39, and 49. No beryllium

  9. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Responsible Contractor: Contact: 2714W March 25, 1998 February 9, 2012 N/A Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: Potential Form of beryllium: SOLID (trace on coveralls) Period of beryllium operations (dates): Mid 1960s End: 1991 Location(s) in facility that contained beryllium materials: Laundering area and exterior settling pond. Description of beryllium activities: Potentially beryllium-contaminated laundry was laundered in the facility and wash water was

  10. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ZB Plutonium Storage Support Facility June 30, 2004 January 26, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Unknown Location(s) in facility that contained beryllium materials: Gloveboxes 642A through F in Room 642 were used to stabilize plutonium-containing waste material and repackage plutonium material. Miscellaneous plutonium products were stored in sealed 3013-type containers in Room 637.

  11. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    36Z Plutonium Storage Facility June 30, 2004 January 26, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Built in 1971. Unknown Location(s) in facility that contained beryllium materials: Miscellaneous plutonium products potentially containing trace quantities of beryllium were stored in sealed 3013-type containers within vaults 1, 3 and 4. Plutonium products stored in sealed containers in 2736Z

  12. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2009 October 30, 2009 Backgrounder on Reporting Hanford Job Creation Recovery Act job creation figures for the Hanford Site that are posted on recovery.gov and www.hanford.gov/recovery are different. They are counting different things. This backgrounder explains the different ways jobs creation is being tracked and reported. October 29, 2009 Vit Plant's Pretreatment Facility Expands Interior Installations The Pretreatment (PT) Facility at the Hanford Waste Treatment and Immobilization

  13. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2012 April 25, 2012 PRESS RELEASE: DOE Announces Intent to Extend Hanford Site Contract Five-Year Extension Planned for Cleanup Contractor CH2M Hill Plateau Remediation Company April 18, 2012 PRESS RELEASE: Sixth Chapter of Hanford Story Released to Public Chapter Covers History and Cleanup of Most Hazardous Facility at Hanford April 17, 2012 FACT SHEET: Plutonium Finishing Plant Vault Complex Demolition Complete One of Hanford's highest security facilities April 12, 2012 FACT SHEET:

  14. Enterprise Assessments Review, Hanford K-West Annex Facility...

    Energy.gov (indexed) [DOE]

    Facility Construction Quality The U.S. Department of Energy (DOE) independent Office of Enterprise Assessments (EA) conducted an independent assessment of construction quality at ...

  15. Section E Nuclear Facility D&D, Remainder of Hanford

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    months Completed annual surveillance of Redox facilities. Completed replacement of PUREX uninterruptible power supply (UPS) battery cell. EMS Objectives and Target Status...

  16. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Thomas L. McCall, Jr. http:www.em.doe.govffaaortsca.html 4252001 Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agree.. Page 12 of 26 Deputy...

  17. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Thomas L. McCall, Jr. http:www.em.doe.govffaaortsca.html 4252001 Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agree.. Page 12 of 26 Deputy ...

  18. Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal...

    Open Energy Information (Open El) [EERE & EIA]

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal Permit to Increase Its...

  19. FEMP Assisting Federal Facilities with Energy Conservation Technologies Webinar Transcript

    Energy.gov [DOE]

    Good afternoon. My name is Courtney Kendall from the National Renewable Energy Laboratory and I'd like to welcome you to today's webinar on AFFECT:  Assisting Federal Facilities with Energy...

  20. Beryllium Program - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Program About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium Health Advocates Primary Contractors/Employers Medical Testing and Surveillance Facilities General Resources Contact Us Beryllium

  1. MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1-

    Office of Legacy Management (LM)

    PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1- March 31, 2006 DOE Project Coordinator: Ray Plieness HIGHLIGHTS The Federal Facilities Agreement meeting was held February 21-22 in Salt Lake City, UT. Representatives from the U.S. Depattment of Energy (DOE), U.S. Environmental Protection Agency (EPA), Utah Department of Environmental Quality (UDEQ), and the DOE contractor attended. The schedule of work through the end of the fiscal year was determined. MSG-OUIII The scope

  2. Brookhaven National Laboratory Federal Facility Agreement, February 28, 1992 Summary

    Office of Environmental Management (EM)

    Brookhaven National Laboratory Agreement Name Brookhaven National Laboratory Federal Facility Agreement Under CERCLA Section 120, February 28, 1992 State New York Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing and monitoring appropriate response actions at the Site Parties DOE; USEPA; New York State Department of Environmental Conservation (NYSDEC) Date 2/28/1992 SCOPE * Establish a

  3. Readiness Assessment Plan, Hanford 200 areas treated effluent disposal facilities

    SciTech Connect (OSTI)

    Ulmer, F.J.

    1995-02-06

    This Readiness Assessment Plan documents Liquid Effluent Facilities review process used to establish the scope of review, documentation requirements, performance assessment, and plant readiness to begin operation of the Treated Effluent Disposal system in accordance with DOE-RLID-5480.31, Startup and Restart of Facilities Operational Readiness Review and Readiness Assessments.

  4. Criticality Safety Evaluation of Hanford Tank Farms Facility

    SciTech Connect (OSTI)

    WEISS, E.V.

    2000-12-15

    Data and calculations from previous criticality safety evaluations and analyses were used to evaluate criticality safety for the entire Tank Farms facility to support the continued waste storage mission. This criticality safety evaluation concludes that a criticality accident at the Tank Farms facility is an incredible event due to the existing form (chemistry) and distribution (neutron absorbers) of tank waste. Limits and controls for receipt of waste from other facilities and maintenance of tank waste condition are set forth to maintain the margin subcriticality in tank waste.

  5. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2S REDOX February 23, 2004 February 14 , 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: None known. Form of beryllium: N/A Period of beryllium operations (dates): Start: N/A End: N/A Location(s) in facility that contained beryllium materials: Two survey units in the facility are contaminated with beryllium. They are the east end of the Upper South Pipe (Operating) Gallery and the Administration rooms on the southwest side. It is not known how these areas were

  6. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    45Z Plutonium Fabrication Facility June 30, 2004 February 7, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: Yes Form of beryllium: SOLID Period of beryllium operations (dates): Start: 1961 End: 2012 Location(s) in facility that contained beryllium materials: Pure beryllium metallic powder was used in the Standards Lab Rooms 221C, 221D & 221E until mid-1980s. Approximately 25 grams of beryllium was stored in a vial in this area. Waste records document that the

  7. FEMP's Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AFFECT 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) June 8, 2016 David Boomsma AFFECT Program Manager Federal Energy Management Program (FEMP) Energy Efficiency and Renewable Energy Department of Energy Federal Energy Management Program 2 Event Date FOA Issue Date May 26, 2016 Letter of Intent (LOI) Deadline June 27, 2016 5:00pm ET Full Application Deadline July 27, 2016 5:00pm ET Notification of Award Selections October 28, 2016 Timeframe for Award

  8. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 2 -- Nuclear Safety Basis Program Review During Design February 2015 i Standard Review Plan Volume 2 Nuclear Safety Basis Program Review during Design Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  9. Chemical mixing study for the Hanford TWRS Supporting facilities (U)

    SciTech Connect (OSTI)

    Heal, D.W.; Brantley, W.M.

    1996-09-03

    This Engineering Calculation addresses consequences of mixing any two hazardous chemicals contained in the same section of TWRS supporting facilities, as screened in accordance with `Westinghouse Savannah River Company Engineering and Construction Services Division Guidelines and Methods.`

  10. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1713F Offices For Technical Personnel And Drafting Operation March 25, 1998 February 9, 2012 N/A Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: No Form of beryllium: N/A Period of beryllium operations (dates): Start: 1973 End: 1973 Location(s) in facility that contained beryllium materials: Potential beryllium contamination in the small animal quarters was investigated in 1973. Description of beryllium activities: Rats were exposed to beryllium oxide dust in the 331 Building

  11. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    22T Office Administration Building February 23, 2004 January 31, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: 1952 End: 1952 Location(s) in facility that contained beryllium materials: Data on the 1952 operations indicate beryllium was used inside a ventilation hood in Room 6. However, Room 6 could not be located on 8/5/99. The earlier data may refer to Room 106. No currently marked

  12. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    36Z Plutonium Reclamation Building June 30, 2004 February 9, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: VARIES Period of beryllium operations (dates): Start: 1973 End: 2004 Location(s) in facility that contained beryllium materials: Miscellaneous Treatment (MT) gloveboxes MT-1, MT-3, MT-4, MT-5, MT-6 and the connecting conveyor glovebox in Room 41. These enclosures and downstream ventilation systems in Room 26 are indicated with a

  13. Hanford Facility Beryllium Fact Sheet Building Number/Name:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Responsible Contractor: Contact: 272W Machine Shop Building September 23, 1999 January 26, 2012 CHPRC Kristy Kimmerle, CIH PAST OPERATIONS Beryllium brought in facility: YES Form of beryllium: SOLID Period of beryllium operations (dates): Start: 1955 End: 1980s Location(s) in facility that contained beryllium materials: Machine shop, tool and die shop Description of beryllium activities: Fabrication of electrical connectors using 0.61% beryllium alloy using a machining process and subsequent

  14. Hanford facility dangerous waste permit application, low-level burial grounds

    SciTech Connect (OSTI)

    Engelmann, R.H.

    1997-08-12

    The Hanford Facility Dangerous Plaste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, `operating` treatment, storage, and/or disposal units, such as the Low-Level Burial Grounds (this document, DOE/RL-88-20).

  15. Hanford Waste Treatment Plant places first complex piping module in Pretreatment Facility

    Energy.gov [DOE]

    Crews at the Hanford Waste Treatment Plant, also known as the "Vit Plant," placed a 19-ton piping module inside the Pretreatment Facility. The module was lifted over 98-foot-tall walls and lowered into a space that provided less than two inches of clearance on each side and just a few feet on each end. It was set 56 feet above the ground.

  16. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Energy Savers

    EIS0250F_Volume1_part2.pdf EIS0250F_Volume1_part2.pdf (10.84 MB) More Documents & Publications EIS-0250-S1: Final Supplemental Environmental Impact Statement crd title p1.ai EIS-0250-S1: Draft Supplemental Environmental Impact Statement Department of Energy

    Reporting & Data » Facilities » EISA Federal Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and

  17. Hanford Beryllium Awareness Group (BAG) - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Site Wide Programs Beryllium Program Hanford Beryllium Awareness Group (BAG) About Us Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium Health Advocates Primary Contractors/Employers Medical Testing and Surveillance Facilities General Resources Email

  18. Waste Tank Size Determination for the Hanford River Protection Project Cold Test, Training, and Mockup Facility

    SciTech Connect (OSTI)

    Onishi, Yasuo; Wells, Beric E.; Kuhn, William L.

    2001-03-30

    The objective of the study was to determine the minimum tank size for the Cold Test Facility process testing of Hanford tank waste. This facility would support retrieval of waste in 75-ft-diameter DSTs with mixer pumps and SSTs with fluidic mixers. The cold test model will use full-scale mixer pumps, transfer pumps, and equipment with simulated waste. The study evaluated the acceptability of data for a range of tank diameters and depths and included identifying how the test data would be extrapolated to predict results for a full-size tank.

  19. Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183- Sep. 19, 2008

    Energy.gov [DOE]

    Federal Register Notice of proposed rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008

  20. Environmental partnering at federal facilities success through communications and teamwork

    SciTech Connect (OSTI)

    Ferraro, P.

    1995-12-01

    Construction partnering has been used on many government and private construction projects for at least a decade while environmental partnering at federal facilities has only recently received some attention. The Federal government is exploring how to implement the concepts of environmental partnering at federal facilities. It appears that some federal facilities are utilizing partnering concepts while others are not. Environmental partnering as a federal facility consists of a cooperative effort by all facility stakeholders working as a team to achieve the goal of environmental restoration. The regulatory members must join with other stakeholders in dealing with environmental issues in a timely manner. The key elements of environmental partnering are: commitment, trust, common goals, timely response and continuous evaluation. The partnering process is only a guide since each project or program is unique and the stakeholder will vary requiring a tailored partnering approach. The process consists of: early preparation, identification of stakeholders, management commitments, kick-off meeting or workshop and periodic evaluations. This paper presents the concepts of environmental partnering, including benefits, stakeholders, and the environmental partnering process. It also discusses examples of construction partnering and environmental partnering.

  1. Annual report for RCRA groundwater monitoring projects at Hanford Site facilities for 1995

    SciTech Connect (OSTI)

    Hartman, M.J.

    1996-02-01

    This report presents the annual hydrogeologic evaluation of 19 Resource Conservation and Recovery Act of 1976 facilities and 1 nonhazardous waste facility at the US Department of Energy`s Hanford Site. Although most of the facilities no longer receive dangerous waste, a few facilities continue to receive dangerous waste constituents for treatment, storage, or disposal. The 19 Resource Conservation and Recovery Act facilities comprise 29 waste management units. Nine of the units are monitored under groundwater quality assessment status because of elevated levels of contamination indicator parameters. The impact of those units on groundwater quality, if any, is being investigated. If dangerous waste or waste constituents have entered groundwater, their concentration profiles, rate, and extent of migration are evaluated. Groundwater is monitored at the other 20 units to detect leakage, should it occur. This report provides an interpretation of groundwater data collected at the waste management units between October 1994 and September 1995. Groundwater quality is described for the entire Hanford Site. Widespread contaminants include nitrate, chromium, carbon tetrachloride, tritium, and other radionuclides.

  2. The Field Lysimeter Test Facility (FLTF) at the Hanford Site: Installation and initial tests

    SciTech Connect (OSTI)

    Gee, G.W.; Kirkham, R.R.; Downs, J.L.; Campbell, M.D.

    1989-02-01

    The objectives of this program are to test barrier design concepts and to demonstrate a barrier design that meets established performance criteria for use in isolating wastes disposed of near-surface at the Hanford Site. Specifically, the program is designed to assess how well the barriers perform in controlling biointrusion, water infiltration, and erosion, as well as evaluating interactions between environmental variables and design factors of the barriers. To assess barrier performance and design with respect to infiltration control, field lysimeters and small- and large-scale field plots are planned to test the performance of specific barrier designs under actual and modified (enhanced precipitation) climatic conditions. The Field Lysimeter Test Facility (FLTF) is located in the 600 Area of the Hanford Site just east of the 200 West Area and adjacent to the Hanford Meteorological Station. The FLTF data will be used to assess the effectiveness of selected protective barrier configurations in controlling water infiltration. The facility consists of 14 drainage lysimeters (2 m dia x 3 m deep) and four precision weighing lysimeters (1.5 m x 1.5 m x 1.7 m deep). The lysimeters are buried at grade and aligned in a parallel configuration, with nine lysimeters on each side of an underground instrument chamber. The lysimeters were filled with materials to simulate a multilayer protective barrier system. Data gathered from the FLTF will be used to compare key barrier components and to calibrate and test models for predicting long-term barrier performance.

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 2010 July 30, 2010 Hanford Vitrification Plant Project begins complicated cooling panel installations Earlier this month, crews at the Hanford Vitrification Plant began a series of complicated cooling panel installations in the Low-Activity Waste Vitrification (LAW) Facility. July 27, 2010 Update on Recovery Act Spending and Work at Hanford A fact sheet showing Recovery Act funding spent to date and a list of major Hanford projects that have been funded and completed has been updated. July

  4. Requirements and impacts of the Federal Facility Compliance Act on the Department of Energy

    SciTech Connect (OSTI)

    Chang, L.; Tripp, S.C.

    1993-03-01

    The Federal Facilities Compliance Act (FFCA, the Act) was signed into law on October 6, 1992, primarily as a means of waiving sovereign immunity for federal facilities with respect to requirements under the Resource Conservation and Recovery Act. DOE`s implementation of the FFCA will have significant effects on current and future DOE waste management operations. DOE will need to rethink its strategy in the area of future compliance agreements to ensure commitments and deliverables are made consistent throughout the different DOE facilities. Several types of agreements that address mixed waste land disposal restriction (LDR) compliance have already been signed by both DOE and the regulators. These agreements are in place at the Hanford Reservation, the Savannah River Site, the Oak Ridge Reservation (Oak Ridge National Laboratory, K-25, Y-12), and the Paducah Gaseous Diffusion Plant. The Rocky Flats Agreement is now being renegotiated. Los Alamos National Laboratory, Sandia/Albuquerque National Laboratory, Lawrence Livermore National Laboratory, and Idaho National Engineering Laboratory agreements are in progress. Major components of the FFCA include provisions on: sovereign immunity waiver; cost reimbursements; mixed waste requirements, including inventory reports on mixed waste and treatment capacity and technologies; and plans for the development of treatment capacities and technologies. Each of these components is discussed within this paper.

  5. 1997 evaluation of tritium removal and mitigation technologies for Hanford Site wastewaters

    SciTech Connect (OSTI)

    Jeppson, D.W.; Biyani, R.K.; Duncan, J.B.; Flyckt, D.L.; Mohondro, P.C.; Sinton, G.L.

    1997-07-24

    This report contains results of a biennial assessment of tritium separation technology and tritium nitration techniques for control of tritium bearing wastewaters at the Hanford Site. Tritium in wastewaters at Hanford have resulted from plutonium production, fuel reprocessing, and waste handling operations since 1944. this assessment was conducted in response to the Hanford Federal Facility Agreement and Consent Order.

  6. Enterprise Assessments Review of the Hanford Site Waste Treatment and Immobilization Plant Hazards Analysis Report for the Low-Activity Waste Facility Reagent Systems – July 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Review of the Hanford Site Waste Treatment and Immobilization Plant Hazards Analysis Report for the Low-Activity Waste Facility Reagent Systems

  7. SUSTAINABILITY NEWS Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) DOE's Federal Energy Management Program (FEMP) recently issued a notice of intent to release a Funding Opportunity Announcement (FOA) for its new AFFECT program. The program intends to provide direct funding awards of up to $1 million per project to help finance renewable energy and combined heat and power (CHP) projects. Projects that apply for the funding are expected to leverage other financing mechanisms (such as

  8. High-Efficiency Parking Lighting in Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    High-Efficiency Parking Lighting in Federal Facilities FEdEraL EnErgy ManagEMEnt PrograM MC Realty Group Saving Energy and Money with the IRS MC Realty Group, LLC, won a 2014 LEEP Award for cutting energy use by 76% at the Internal Revenue Service (IRS) Facility Parking Garage in Kansas City, Missouri. MC Realty replaced 1,500 metal halide fxtures with an equal number of T8 fuorescent fxtures in the fve-story parking structure to cut energy use by 2 million kilowatt-hours (kWh) annually, which

  9. Environmental Radiation Dose Reconstruction for U.S. and Russian Weapons Production Facilities: Hanford and Mayak

    SciTech Connect (OSTI)

    Ansbaugh, Lynn R.; Degteva, M. O.; Kozheurov, V. P.; Napier, Bruce A.; Tolstykh, E. I.; Vorobiova, M. I.

    2003-05-01

    Another way to look at Cold War legacies is to examine the major environmental releases that resulted from past operation of Cold War-related facilities for the manufacture of nuclear weapons. Examining these historical releases and the resultant radiation dose to individuals living near these facilities is called environmental dose reconstruction. Dose reconstructions have been performed or are underway at most large Cold War installations in the United States, such as the Hanford facility; several are also underway in other countries, such as at the Mayak facility in Russia. The efforts in the United States are mostly based on historical operating records and current conditions, which are used to estimate environmental releases, transport, and human exposure. The Russian efforts are largely based on environmental measurements and measurements of human subjects; environmental transport modelling, when conducted, is used to organize and validate the measurements. Past operation of Cold War-related facilities for the manufacture of nuclear weapons has resulted in major releases of radionuclides into the environment. Reconstruction of the historical releases and the resultant radiation dose to individuals in the public living near these facilities is called environmental dose reconstruction. Dose reconstructions have been performed or are underway at most large Cold War installations in the United States; several are also underway in other countries. The types of activity performed, the operating histories, and the radionuclide releases vary widely across the different facilities. The U.S. Hanford Site and the Russian Mayak Production Association are used here to illustrate the nature of the assessed problems and the range of approaches developed to solve them.

  10. Groundwater monitoring plan for the Hanford Site 216-B-3 pond RCRA facility

    SciTech Connect (OSTI)

    Barnett, D.B.; Chou, C.J.

    1998-06-01

    The 216-B-3 pond system was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In operation since 1945, the B Pond system has been a RCRA facility since 1986, with Resource Conservation and Recovery Act (RCRA) interim-status groundwater monitoring in place since 1988. In 1994, discharges were diverted from the main pond, where the greatest potential for contamination was thought to reside, to the 3C expansion pond. In 1997, all discharges to the pond system were discontinued. In 1990, the B Pond system was elevated from detection groundwater monitoring to an assessment-level status because total organic halogens and total organic carbon were found to exceed critical means in two wells. Subsequent groundwater quality assessment failed to find any specific hazardous waste contaminant that could have accounted for the exceedances, which were largely isolated in occurrence. Thus, it was recommended that the facility be returned to detection-level monitoring.

  11. Hanford Site Solid Waste Acceptance Criteria

    SciTech Connect (OSTI)

    Not Available

    1993-11-17

    This manual defines the Hanford Site radioactive, hazardous, and sanitary solid waste acceptance criteria. Criteria in the manual represent a guide for meeting state and federal regulations; DOE Orders; Hanford Site requirements; and other rules, regulations, guidelines, and standards as they apply to acceptance of radioactive and hazardous solid waste at the Hanford Site. It is not the intent of this manual to be all inclusive of the regulations; rather, it is intended that the manual provide the waste generator with only the requirements that waste must meet in order to be accepted at Hanford Site TSD facilities.

  12. TWC Excerpts for August 7 Committee Meeting Draft Advice for the Hanford Facility Dangerous Waste Permit

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    TWC-Excerpts -- Issue Managers Working Draft Page 1 of 8 TWC Excerpts for August 7 Committee Meeting Draft Advice for the Hanford Facility Dangerous Waste Permit (Site-Wide Permit) General Advice Points: The Board advises Ecology to review all unit-specific Permits in light of these over-arching concerns as many are applicable to other units. 1. The Board advises Ecology to revise the Permit to address a general lack of clarity, rationale and logic presented in the document(s) The Board finds no

  13. Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility

    SciTech Connect (OSTI)

    Barnett, D BRENT.; Smith, Ronald M.; Chou, Charissa J.; McDonald, John P.

    2005-11-01

    The 216-B-3 Pond system was a series of ponds used for disposal of liquid effluent from past Hanford production facilities. In operation from 1945 to 1997, the B Pond System has been a Resource Conservation and Recovery Act (RCRA) facility since 1986, with RCRA interim-status groundwater monitoring in place since 1988. In 1994 the expansion ponds of the facility were clean closed, leaving only the main pond and a portion of the 216-B-3-3 ditch as the currently regulated facility. In 2001, the Washington State Department of Ecology (Ecology) issued a letter providing guidance for a two-year, trial evaluation of an alternate, intrawell statistical approach to contaminant detection monitoring at the B Pond system. This temporary variance was allowed because the standard indicator-parameters evaluation (pH, specific conductance, total organic carbon, and total organic halides) and accompanying interim status statistical approach is ineffective for detecting potential B-Pond-derived contaminants in groundwater, primarily because this method fails to account for variability in the background data and because B Pond leachate is not expected to affect the indicator parameters. In July 2003, the final samples were collected for the two-year variance period. An evaluation of the results of the alternate statistical approach is currently in progress. While Ecology evaluates the efficacy of the alternate approach (and/or until B Pond is incorporated into the Hanford Facility RCRA Permit), the B Pond system will return to contamination-indicator detection monitoring. Total organic carbon and total organic halides were added to the constituent list beginning with the January 2004 samples. Under this plan, the following wells will be monitored for B Pond: 699-42-42B, 699-43-44, 699-43-45, and 699-44-39B. The wells will be sampled semi-annually for the contamination indicator parameters (pH, specific conductance, total organic carbon, and total organic halides) and annually for

  14. Structural testing of corrugated asbestos-cement roof panels at the Hanford Facilities, Richland, Washington

    SciTech Connect (OSTI)

    Moustafa, S.E.; Rodehaver, S.M.; Frier, W.A.

    1993-10-01

    This report describes a roof testing program that was carried out at the 105KE/KW Spent Fuel Storage Basins and their surrounding facilities at the Hanford Site in Richland, Washington. The roof panels were constructed in the mid 1950`s of corrugated asbestos-cement (A/C), which showed common signs of aging. Based on the construction specifications, the panels capacity to meet current design standards was questioned. Both laboratory and in-situ load testing of the corrugated A/C panels was conducted. The objective of the complete test program was to determine the structural integrity of the existing A/C roof panels installed in the 105KE and 105KW facilities. The data from these tests indicated that the roofs are capable of resisting the design loads and are considered safe. A second phase test to address the roof resistance to personnel and roof removal/roofing system installation equipment was recommended and is underway.

  15. Expedited site characterization for remedial investigations at federal facilities

    SciTech Connect (OSTI)

    Burton, J.C.

    1994-04-01

    Argonne National Laboratory`s Expedited Side Characterization (ESC) methodology gives federal agencies a process for producing high-quality CERCLA and RCRA site characterizations and remedial investigations in a cost- and time-efficient manner. The ESC process has been successfully tested and applied at numerous federal facilities. Examples include expanded site investigations for the Department of Interior`s Bureau of Land Management and remedial investigations for the Commodity Credit Corporation/US Dept. of Agriculture (CCC/USDA). In particular, the CCC/USDA has been the major sponsor in the development of the ESC process at Argonne. The technical successes and the cost and time savings of the ESC process for these programs have been detailed in previous papers. The Argonne ESC is currently being implemented at a Department of Energy facility (Pantex) and is schedules for implementation in the Department of Defense base closure program in order to meet accelerated schedules for remedial actions by these agencies.

  16. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2014 May 29, 2014 FACT SHEET: Workers' Compensation Overview of the program for compensating Hanford Site workers for injuries on the job. May 23, 2014 FACT SHEET: Hanford Cleanup Progress Fact Sheet Check the stats on Hanford cleanup and read about where we are in the decades-long effort to remediate the Hanford Site. May 15, 2014 VIDEO: Boosting Treatment Capacity at Pump and Treat Facility Upgrades at 200 West Pump and Treat Facility will allow DOE and CH2M HILL to treat more contaminated

  17. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    SciTech Connect (OSTI)

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  18. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The purpose of this Guide is to provide U.S. Department of Energy (DOE) line management with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, date April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities.

  19. Helpful Links - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Helpful Links Helpful Links Helpful Links Hanford Staff Directory Hanford Site Wide Programs Energy Employees Occupational Illness Compensation Hanford Workers Compensation Projects & Facilities HERO PHOENIX Hanford Meteorological Station Definitions Abbreviations and Acronyms Visitor Control and Site Access Visitor Hanford Computer Access Request Helpful Links Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Contact Us Do you have a question? Contact Hanford

  20. Hanford Video - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Traffic Safety Video Title: Hanford Traffic Safety Video Keywords: Hanford, Traffic, Safety, Video Date: 01 February 2011 Description: Hanford Traffic Safety Video <-- Related Videos: -->

  1. AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar Slides

    Energy.gov [DOE]

    Webinar slides describe the 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) funding opportunity offered by the Federal Energy Management Program.

  2. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Energy.gov [DOE]

    Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities.

  3. Geochemical Data Package for the 2005 Hanford Integrated Disposal Facility Performance Assessment

    SciTech Connect (OSTI)

    Krupka, Kenneth M.; Serne, R JEFFREY.; Kaplan, D I.

    2004-09-30

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is designing and assessing the performance of an integrated disposal facility (IDF) to receive low-level waste (LLW), mixed low-level waste (MLLW), immobilized low-activity waste (ILAW), and failed or decommissioned melters. The CH2M HILL project to assess the performance of this disposal facility is the Hanford IDF Performance Assessment (PA) activity. The goal of the Hanford IDF PA activity is to provide a reasonable expectation that the disposal of the waste is protective of the general public, groundwater resources, air resources, surface-water resources, and inadvertent intruders. Achieving this goal will require prediction of contaminant migration from the facilities. This migration is expected to occur primarily via the movement of water through the facilities, and the consequent transport of dissolved contaminants in the vadose zone to groundwater where contaminants may be re-introduced to receptors via drinking water wells or mixing in the Columbia River. Pacific Northwest National Laboratory (PNNL) assists CH2M HILL in their performance assessment activities. One of the PNNL tasks is to provide estimates of the geochemical properties of the materials comprising the IDF, the disturbed region around the facility, and the physically undisturbed sediments below the facility (including the vadose zone sediments and the aquifer sediments in the upper unconfined aquifer). The geochemical properties are expressed as parameters that quantify the adsorption of contaminants and the solubility constraints that might apply for those contaminants that may exceed solubility constraints. The common parameters used to quantify adsorption and solubility are the distribution coefficient (Kd) and the thermodynamic solubility product (Ksp), respectively. In this data package, we approximate the solubility of contaminants using a more simplified construct, called the solution concentration limit, a constant value. The Kd values and

  4. Groundwater Monitoring Plan for the Hanford Site 216-B-3 Pond RCRA Facility

    SciTech Connect (OSTI)

    Barnett, D. Brent; Smith, Ronald M.; Chou, Charissa J.

    2000-11-28

    The 216-B-3 Pond was a series of ponds for disposal of liquid effluent from past Hanford production facilities. In 1990, groundwater monitoring at B Pond was elevated from "detection" to assessment status because total organic halides and total organic carbon were found to exceed critical means in two wells. Groundwater quality assessment, which ended in 1996, failed to find any specific hazardous waste contaminant that could have accounted for the isolated occurrences of elevated total organic halides and total organic carbon. Hence, the facility was subsequently returned to detection-level monitoring in 1998. Exhaustive groundwater analyses during the assessment period indicated that only two contaminants, tritium and nitrate, could be positively attributed to the B Pond System, with two others (arsenic and I-129) possibly originating from B Pond. Chemical and radiological analyses of soil at the main pond and 216-B-3-3 ditch has not revealed significant contamination. Based on the observed, minor contamination in groundwater and in the soil column, three parameters were selected for site-specific, semiannual monitoring; gross alpha, gross beta, and specific conductance. Total organic halides and total organic carbon are included as constituents because of regulatory requirements. Nitrate, tritium, arsenic, and iodine-129 will be monitored under the aegis of Hanford site-wide monitoring. Although the B Pond System is not scheduled to advance from RCRA interim status to final status until the year 2003, a contingency plan for an improved monitoring strategy, which will partially emulate final status requirements, will be contemplated before the official change to final status. This modification will allow a more sensible and effective screening of groundwater for the facility.

  5. Hanford Story: Groundwater - Questions - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The Hanford Story Hanford Story: Groundwater - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size How did contamination get into the groundwater beneath the Hanford Site? What has caused the level of contamination to decrease over the years? What is the 2015 vision for Hanford? What is the goal of the water treatment systems and facilities? What is being done to treat groundwater to remove contamination? Is contaminated groundwater

  6. 1999 Report on Hanford Site land disposal restriction for mixed waste

    SciTech Connect (OSTI)

    BLACK, D.G.

    1999-03-25

    This report was submitted to meet the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-26-011. This milestone requires the preparation of an annual report that covers characterization, treatment, storage, minimization, and other aspects of managing land-disposal-restricted mixed waste at the Hanford Facility.

  7. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2010 October 29, 2010 PHOTO GALLERY: See photos of Hanford workers demolishing more than six football fields worth of concrete at K West 380,000 square feet of concrete structures demolished October 29, 2010 PRESS RELEASE: TPA Agencies Sign On For Major Changes Governing Hanford's Central Plateau Agencies Agree To Integration of Soil, Facility, and Groundwater Cleanup Milestones at Hanford October 28, 2010 Contractor Recovery Act Update This newsletter is published by CH2M HILL Plateau

  8. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2011 March 25, 2011 TPA Agencies Hold Regional Hanford Meetings Seattle and Portland Dates Set To Discuss Hanford Cleanup March 17, 2011 PHOTOS: Records storage building dedicated at Hanford March 17, 2011 GRAPHIC: Turnover of WTP facilities to operations, color-coded by year. March 04, 2011 VIDEO: Explosive demolition takes down two 250-foot tall stacks and three 90-foot tall air filtration buildings by the 284 East Power House. March 04, 2011 PRESS RELEASE: Latest 200 Area Demolition

  9. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    69 Subject: Hanford Long-Term Stewardship Adopted: June 7, 2013 Page 1 June 7, 2013 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Hanford Long-Term Stewardship Dear Mr. McCormick, Background The purpose of this advice is to present Hanford Advisory Board (HAB or Board) recommendations to the U.S. Department of Energy - Richland Operations Office (DOE- RL) for consideration concerning the current 100-F Area and other planned

  10. Regulators, Boards, Councils - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Protection Agency Washington State Department of Ecology Defense Nuclear Facilities Safety Board Hanford History Hanford Site Wide Programs Contact Us Regulators, ...

  11. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    November 2011 November 23, 2011 PRESS RELEASE: Hanford Waste Treatment Plant receives and sets key air-filtration equipment for Low-Activity Waste Facility Last week, the Hanford Waste Treatment Plant received and placed a key piece of air-filtration equipment in the Low- Activity Waste Facility. The nearly 100-ton carbon bed adsorber is part of a complex air-filtration system that will ensure the facility's air emissions meet strict environmental regulations and requirements. November 18, 2011

  12. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    June 2011 June 30, 2011 UPDATE: Hanford Tank Waste Recovery Report Washington River Protection Solutions Tank Waste Recovery Act Report (June 2011) June 30, 2011 PRESS RELEASE: Construction continues to advance at Pretreatment Facility Hanford Waste Treatment Plant crews lifted and placed a nearly nine-ton rebar curtain above the 77-foot elevation at the Pretreatment Facility. The curtain measures 36 feet long, 22 feet high and is the last curtain to compose the facility's fifth concrete

  13. Audit Report: Modular Office Facilities for Recovery Act Program Activities at the Hanford Site, OAS-RA-13-04

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Audit Report Modular Office Facilities for Recovery Act Program Activities at the Hanford Site OAS-RA-L-13-04 July 2013 Department of Energy Washington, DC 20585 July 9, 2013 MEMORANDUM FOR THE MANAGER, RICHLAND OPERATIONS OFFICE FROM: David Sedillo, Director Western Audits Division Office of Inspector General SUBJECT: INFORMATION: Audit Report on "Modular Office Facilities for Recovery Act Program

  14. Ground-Source Heat Pumps Applied to Federal Facilities - Second Edition

    SciTech Connect (OSTI)

    2001-03-01

    Ground-Source Heat Pumps Applied to Federal Facilities, Second Edition, technology for reducing heating and air-conditioning costs.

  15. Distributed Energy Resources at Federal Facilities. Federal Energy Management Program (FEMP) Technical Assistance Fact Sheet

    SciTech Connect (OSTI)

    Pitchford, P.

    2001-07-16

    This two-page overview describes how the use of distributed energy resources at Federal facilities is being supported by the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP). Distributed energy resources include both existing and emerging energy technologies: advanced industrial turbines and microturbines; combined heat and power (CHP) systems; fuel cells; geothermal systems; natural gas reciprocating engines; photovoltaics and other solar systems; wind turbines; small, modular biopower; energy storage systems; and hybrid systems. DOE FEMP is investigating ways to use these alternative energy systems in government facilities to meet greater demand, to increase the reliability of the power-generation system, and to reduce the greenhouse gases associated with burning fossil fuels.

  16. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Kreid State of Oregon Lyle Smith Ken Niles Ex-Officio Confederated Tribes of the Umatilla Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 Hanford Advisory Board 2011O-01 Subject: Comments to Chronic Beryllium Disease Prevention Program Proposed Rule Changes February 11, 2011 Page 1 February 11, 2011 Agency: Office of Health, Safety and Security, Department of Energy Subject: Chronic

  17. Hanford News

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    News Demolition of One of Hanford&apos;s Most Hazardous Facilities Underway Demolition is underway at the Plutonium Finishing Plant (PFP), one of the most hazardous buildings on the Hanford Site in southeastern Washington state. Thu, 03 Nov 2016 00:00:00 GMT DOE Meets FY2016 Groundwater Cleanup Goals at Hanford Workers at the U.S. Department of Energy?s (DOE) Hanford Site are marking another year of significant achievements in protecting the Columbia River from contaminated groundwater. Mon,

  18. Material Open Test Assembly Specimen Retrieval from Hanford's Shielded Material Facility

    SciTech Connect (OSTI)

    Valdez, Patrick LJ; Rinker, Michael W.

    2009-06-14

    Hanford’s 324 Building, the Shielded Material Facility (SMF), was developed to provide containment for research and fabrication development studies on highly radioactive metallic and ceramic nuclear reactor fuels and structural materials. Between 1983 and 1992, the SMF was used in support of the Department of Energy (DOE)-funded Fast Flux Test Facility (FFTF) Materials Open Test Assembly (MOTA) program. In this program, metallurgical specimens were irradiated in FFTF and then sent to SMF for processing and storage in two cabinets. This effort was abruptly ended in early 1990s due to programmatic shifts within the DOE, leaving many specimens unexamined. In recent years, these specimens have become of high value to new DOE programs. Pacific Northwest National Laboratory (PNNL) was tasked with retrieving specimens from one of the cabinets in support of fuel clad and duct development for the Advanced Fuel Cycle Initiative. Cesium contamination of the cell and failure of the overhead crane system utilized for opening the cabinets prevented PNNL from using the built-in hot cell equipment to gain access to the cabinets. PNNL designed and tested a lifting device to fit through a standard 10 inch diameter mechanical manipulator port in the SMF South Cell wall. The tool was successfully deployed in June 2008 with the support of Washington Closure Hanford.

  19. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Fax: (509) 942-1926 Hanford Advisory Board Subject: Appreciation June 5, 2014 2014O-04 Page 1 June 5, 2014 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-75) Richland, WA 99352 Re: Appreciation Dear Matt, The Hanford Advisory Board (Board) sincerely wishes to thank you for your leadership over the past four years. Clearly we have benefitted from your commitment to a more open and transparent engagement with the Board. In particular, the Board appreciates

  20. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Worker Safety and Communication Restrictions November 5, 2015 2016O-01 Page 1 November 5, 2015 Kevin Smith, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Re: Worker Safety and Communication Restrictions Dear Mr. Smith, Since the inception of the Hanford Advisory Board (Board), one of the Board's primary values is the protection of worker health and safety at the Hanford Site. The Board continues to be concerned about the consequences of

  1. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Advisory Board Subject: WTP White Paper Adopted: June 17, 2016 2016O-06 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942 1926 Advising: U.S. Dept. of Energy U.S. Environmental Protection Agency Washington State Dept. of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Derek Donley Liz Mattson Melanie Meyers Lynn Davison Rebecca Holland Local

  2. Low-Level Waste Disposal Facility Federal Review Group (LFRG) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Program Management » Compliance » Low-Level Waste Disposal Facility Federal Review Group (LFRG) Low-Level Waste Disposal Facility Federal Review Group (LFRG) The Low-Level Waste Disposal Facility Federal Review Group (LFRG) is an independent group within the Office of Environmental Management (EM) that ensures, through review, that Department of Energy (DOE) (including the National Nuclear Security Administration) radioactive waste disposal facilities are protective of the public

  3. Groundwater monitoring plan for the Hanford Site 200 Area Treated Effluent Disposal Facility

    SciTech Connect (OSTI)

    DB Barnett

    2000-05-17

    Seven years of groundwater monitoring at the 200 Area Treated Effluent Disposal Facility (TEDF) have shown that the uppermost aquifer beneath the facility is unaffected by TEDF effluent. Effluent discharges have been well below permitted and expected volumes. Groundwater mounding from TEDF operations predicted by various models has not been observed, and waterlevels in TEDF wells have continued declining with the dissipation of the nearby B Pond System groundwater mound. Analytical results for constituents with enforcement limits indicate that concentrations of all these are below Practical Quantitation Limits, and some have produced no detections. Likewise, other constituents on the permit-required list have produced results that are mostly below sitewide background. Comprehensive geochemical analyses of groundwater from TEDF wells has shown that most constituents are below background levels as calculated by two Hanford Site-wide studies. Additionally, major ion proportions and anomalously low tritium activities suggest that groundwater in the aquifer beneath the TEDF has been sequestered from influences of adjoining portions of the aquifer and any discharge activities. This inference is supported by recent hydrogeologic investigations which indicate an extremely slow rate of groundwater movement beneath the TEDF. Detailed evaluation of TEDF-area hydrogeology and groundwater geochemistry indicate that additional points of compliance for groundwater monitoring would be ineffective for this facility, and would produce ambiguous results. Therefore, the current groundwater monitoring well network is retained for continued monitoring. A quarterly frequency of sampling and analysis is continued for all three TEDF wells. The constituents list is refined to include only those parameters key to discerning subtle changes in groundwater chemistry, those useful in detecting general groundwater quality changes from upgradient sources, or those retained for comparison with end

  4. Hanford Cultural Resources - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    About Us Hanford Site Wide Programs Hanford's Tribal Program Hanford Cultural Resources About Us Hanford's Tribal Program Home Hanford Cultural Resources DOE American Indian Tribal...

  5. CHARACTERIZING DOE HANFORD SITE WASTE ENCAPSULATION STORAGE FACILITY CELLS USING RADBALL

    SciTech Connect (OSTI)

    Farfan, E.; Coleman, R.

    2011-03-31

    RadBall{trademark} is a novel technology that can locate and quantify unknown radioactive hazards within contaminated areas, hot cells, and gloveboxes. The device consists of a colander-like outer tungsten collimator that houses a radiation-sensitive polymer semi-sphere. The collimator has a number of small holes with tungsten inserts; as a result, specific areas of the polymer are exposed to radiation becoming increasingly more opaque in proportion to the absorbed dose. The polymer semi-sphere is imaged in an optical computed tomography scanner that produces a high resolution 3D map of optical attenuation coefficients. A subsequent analysis of the optical attenuation data using a reverse ray tracing or backprojection technique provides information on the spatial distribution of gamma-ray sources in a given area forming a 3D characterization of the area of interest. RadBall{trademark} was originally designed for dry deployments and several tests, completed at Savannah River National Laboratory and Oak Ridge National Laboratory, substantiate its modeled capabilities. This study involves the investigation of the RadBall{trademark} technology during four submerged deployments in two water filled cells at the DOE Hanford Site's Waste Encapsulation Storage Facility.

  6. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Changes to HAB Operating Ground Rules re: Term Limits Adopted: September 15, 2016 20160-07 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942 1926 Advising: US Dept. of Energy US Environmental Protection Agency Washington State Dept. of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Bob Legard Liz Mattson Melanie Myers Emmitt Jackson Rebecca Holland Local

  7. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Governm Russell Jim John Stanfill Public Health Margery Swint Howard Putter University Doug Mercer Richard Stout Public-at-Large Norma Jean Germond Keith Smith Bob Suyama Regional Environ- ment/Citizen Dan Serres Susan Leckband Paige Knight Gerald Pollet Floyd Hodges State of Oregon Lyle Smith Ken Niles Ex-Officio Confederated Tribes of the Umatilla Washington State Department of Health EnviroIssues ent Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax:

  8. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Rosenda Shippentower Public Health Tony Brooks Howard Putter University Doug Mercer Richard Stout Public-at-Large Norma Jean Germond Keith Smith Sam Dechter Bob Suyama Regional Environ- ment/Citizen Dan Serres Steve Hudson Floyd Hodges Susan Leckband Paige Knight Gerald Pollet State of Oregon Ken Niles Liaison Representatives Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 HAB Consensus

  9. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Rick Jansons Rob Davis Jerry Peltier Gary Garnant Bob Parks Tribal Government Russell Jim John Stanfill Rosenda Shippentower Public Health Tony Brooks Howard Putter University Doug Mercer Richard Stout Public-at-Large Norma Jean Germond Keith Smith Sam Dechter Bob Suyama Regional Environ- ment/Citizen Dan Serres Susan Leckband Steve Hudson Gerald Pollet Floyd Hodges State of Oregon Ken Niles Ex-Officio Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3

  10. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tacjett Rob Davis Jerry Peltier Gary Garnant Bob Parks Tribal Government Russell Jim John Stanfill Rosenda Shippentower Public Health Tony Brooks Howard Putter University Greg Korshin Richard Stout Public-at-Large Norma Jean Germond Keith Smith Sam Dechter Bob Suyama Regional Environ- ment/Citizen Dan Serres Susan Leckband Steve Hudson Gerald Pollet Floyd Hodges State of Oregon Ken Niles Mecal Samkow Ex-Officio Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin,

  11. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tackett Rob Davis Jerry Peltier Gary Garnant Bob Parks Tribal Government Russell Jim John Stanfill Rosenda Shippentower Public Health Tony Brooks Howard Putter University Greg Korshin Richard Stout Public-at-Large Norma Jean Germond Keith Smith Sam Dechter Bob Suyama Regional Environ- ment/Citizen Dan Serres Susan Leckband Steve Hudson Gerald Pollet Floyd Hodges State of Oregon Ken Niles Mecal Samkow Ex-Officio Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin,

  12. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    John Howieson University Gregory Korshin Yonas Demissie Public-at-Large Jan Catrell Alissa Cordner Sam Dechter Tom Galioto Regional Environ- ment/Citizen Shelley Cimon Steve Hudson Floyd Hodges Susan Leckband Gerald Pollet State of Oregon Ken Niles Mecal Seppalainen Liaison Representatives Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 HAB Consensus Advice # 285 Subject: M-091 Change

  13. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    University Gregory Korshin Yonas Demissie Public-at-Large Jan Catrell Alissa Cordner Sam Dechter Tom Galioto Regional Environ- ment/Citizen Shelley Cimon Steve Hudson Floyd Hodges Susan Leckband Gerald Pollet State of Oregon Ken Niles Mecal Seppalainen Liaison Representatives Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 HAB Consensus Advice # 286 Subject: Transportation Infrastructure

  14. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    8 Subject: FY 2017 Budget & FY 2018 Input Request Adopted: April 14, 2016 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942 1926 Advising: US Dept of Energy US Environmental Protection Agency Washington State Dept of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Derek Donley Liz Mattson Melanie Meyers Lynn Davison Rebecca Holland Local Environment Gene

  15. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Bob Parks Bob Adler Tribal Government Russell Jim John Stanfill Public Health Tony James Howard Putter University Doug Mercer Richard Stout Public-at-Large Norma Jean Germond Keith Smith Bob Suyama Regional Environ- ment/Citizen Dan Serres Paige Knight Gerald Pollet Susan Leckband Floyd Hodges State of Oregon Lyle Smith Ken Niles Ex-Officio Confederated Tribes of the Umatilla Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone:

  16. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    HAB Letter 2016O-02 Adopted: February 4, 2016 Page 1 February 4, 2016 Jane Hedges, Manager Washington State Department of Ecology 3100 Port of Benton Blvd. Richland, WA 99354 Re: Appreciation Dear Jane, On behalf of the Hanford Advisory Board, I wish to sincerely recognize and thank you for your professionalism and leadership in helping the Board to meet its obligations over the past years. The Board has been so very fortunate to have your expertise and enthusiasm stimulating our shared

  17. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ERDF Vertical Expansion Adopted: April 14, 2016 2016O-05 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942 1926 Advising: US Dept of Energy US Environmental Protection Agency Washington State Dept of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Derek Donley Liz Mattson Melanie Meyers Lynn Davison Rebecca Holland Local Environment Gene Van Liew Local

  18. Search for Efficient Technologies and Products for Federal Facilities

    Energy.gov [DOE]

    The Federal Energy Management Program provides information and resources about energy- and water-efficient technologies and products that are well suited for federal applications and can help agencies meet federal laws and requirements.

  19. 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA CHP Partnership Meeting, October 2002 | Department of Energy 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 This is an announcement of the 3rd Annual National CHP Roadmap Workshop which was held in conjunction with the CHP and Distributed Energy Resources for Federal Facilities Workshop, October 23-25,

  20. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    JUN 1 1 2013 Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection Division of Waste Management 200 Fair Oaks Lane, 2 nd Floor Frankfort, Kentucky 40601 Ms. Jennifer Tufts Federal Facility Agreement Manager U.S. Environmental Protection Agency, Region 4 61 Forsyth Street Atlanta, Georgia 30303 Dear Mr. Mullins and Ms. Tufts: PPPO-02-1813000-13B TRANSMITTAL OF THE COMMUNITY RELATIONS PLAN UNDER THE FEDERAL FACILITY AGREEMENT AT THE U.S. DEPARTMENT OF

  1. FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects

    Energy.gov [DOE]

    FEMP developed a guide to help federal agencies, as well as the developers and financiers that work with them, to successfully install large-scale renewable energy projects at federal facilities.

  2. Hanford Site Solid Waste Acceptance Program - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Program About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Tools Points of Contact Contact Us Hanford Site Solid Waste Acceptance Program Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Site operates waste treatment, storage and disposal facilities for the various types of radioactive waste onsite and from elsewhere in the U.S.

  3. EERE Success Story-FEMP Helps Federal Facilities Develop Large-Scale

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Renewable Energy Projects | Department of Energy FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects EERE Success Story-FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects August 21, 2013 - 12:00am Addthis EERE's Federal Energy Management Program issued a new resource that provides best practices and helpful guidance for federal agencies developing large-scale renewable energy projects. The resource, Large-Scale Renewable Energy Guide:

  4. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

    Office of Energy Efficiency and Renewable Energy (EERE)

    Video recording and text version of the webinar titled, Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers, originally presented on May 8, 2012.

  5. Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

    Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment.

  6. Hanford Single-Shell Tank Leak Causes and Locations - 241-B Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2013-07-11

    This document identifies 241-B Tank Farm (B Farm) leak cause and locations for the 100 series leaking tank (241-B-107) identified in RPP-RPT-49089, Hanford B-Farm Leak Inventory Assessments Report. This document satisfies the B Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  7. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    November 2010 November 26, 2010 PHOTO GALLERY: Josiah Pinkham, a cultural resource specialist with the Nez Perce tells Hanford managers about his culture. The training was part of the Richland Operations office efforts to improve cultural resource and tribal training for federal employees at Hanford. November 26, 2010 PHOTO GALLERY: American Indian Heritage Month speaker Virginia Beavert talks about teaching her native Sahaptin language. Beavert visited the Richland Operations Office to inform

  8. Hanford Leads the Way for Greener Classrooms

    Energy.gov [DOE]

    EM’s Richland Operations Office and contractor Mission Support Alliance (MSA) are leading the way to greener classrooms by developing a totally paperless class at the HAMMER Federal Training Facility at the Hanford site. MSA manages HAMMER on behalf of EM.

  9. A brief history of the T Plant facility at the Hanford Site. Addendum 1

    SciTech Connect (OSTI)

    Gerber, M.S.

    1994-05-16

    T Plant (221-T) was the first and largest of the early chemical separations plants at the Hanford Engineer Works (HEW) (World War II name for the Hanford Site). Officially designated as a Cell Building by the Manhattan Engineer District (MED) of the Army Corps of Engineers (agency responsible for HEW), T Plant served as the headquarters of chemical processing operations at Hanford from its construction until the opening of the REDOX Plant in January 1952. Because it formed a crucial link in the first full-scale plutonium production operations in world history, it meets criteria established in the National Historic Preservation Act of 1966 as a National Historic Structure.

  10. Hanford Disposal Facility Expands Vertically to Make Room for More Waste |

    Office of Environmental Management (EM)

    Deep Dig Removes Contaminated Soil Hanford Deep Dig Removes Contaminated Soil March 11, 2013 - 12:00pm Addthis An aerial view of Hanford’s D Area shows the D Reactor (lower left) and DR Reactor. Workers are digging 85 feet to groundwater at two sites there to remove chromium contamination. An aerial view of Hanford's D Area shows the D Reactor (lower left) and DR Reactor. Workers are digging 85 feet to groundwater at two sites there to remove chromium contamination. Workers remove soil

  11. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    January 2011 January 20, 2011 New Groundwater Facility Begins Operations The Department of Energy is boosting its capacity for treating groundwater to remove chromium near the Columbia River by 40 percent with the recent completion of a new treatment facility. January 13, 2011 Hanford Waste Treatment Plant sets massive protective shield door in Pretreatment Facility Earlier this week, a 102-ton protective shield door was set in the Pretreatment Facility at the Waste Treatment Plant. The door was

  12. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Richland Operations Office Newsroom News Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Press Releases News Calendar News Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size November 2016 November 03, 2016 Demolition of One of Hanford's Most Hazardous Facilities Underway Demolition is underway at the Plutonium Finishing Plant (PFP), one of the most hazardous buildings on the Hanford Site in

  13. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    December 2010 December 22, 2010 Hanford Waste Treatment Plant receives last pieces of equipment for quality control system The Waste Treatment Plant (WTP) recently received the last and most significant pieces of its autosampling system for the Low-Activity Waste (LAW) Facility. The system will ensure the glass produced by the Vit Plant meets all regulatory standards and requirements. December 21, 2010 Workers cut hole in Hanford's tank C-107 to improve waste retrieval Over the weekend

  14. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2011 October 31, 2011 VIDEO: Reusing Piping Saves Taxpayers $50,000 The Department of Energy and its contractors are on a constant hunt for innovations and practices to improve the way work is done to clean up the Hanford Site. This month, CH2M HILL Plateau Remediation Company's soil and groundwater team answered the call. October 27, 2011 PRESS RELEASE: Hanford Waste Treatment Plant receives decontamination vessels for High-Level Waste Facility The Waste Treatment Plant received two

  15. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2015 March 31, 2015 Operation of Effluent Treatment Facility transitioning to Washington River Protection Solutions Click to view the full news release. March 19, 2015 DOE-NNSA, Washington to take part in regional exercise in Benton and Franklin Counties Training designed to enable responders to work together effectively during radiological emergencies March 16, 2015 Hanford Landfill Reaches 17 Million Tons Disposed Waste disposal measures tremendous cleanup progress along Hanford's River

  16. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Public-at-Large Norma Jean Germond Keith Smith Bob Parazin Bob Suyama Regional Environ- ment/Citizen Dan Serres Susan Leckband Paige Knight Gerald Pollet State of Oregon Lyle Smith Ken Niles Ex-Officio Confederated Tribes of the Umatilla Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 HAB Consensus Advice # 246 Subject: RCBRA Adopted: June 3, 2011 Page 1 June 3, 2011 Matt McCormick,

  17. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    5 Subject: Employee Concerns Program Adopted: June 8, 2012 Page 1 June 8, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Employee Concerns Program Dear Messrs. Samuelson and McCormick, Background: The Employee Concerns Programs (ECP) at Hanford are an integral part of the safety culture. It is imperative

  18. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Theresa Labriola Steve Hudson Floyd Hodges Susan Leckband Gerald Pollet State of Oregon Ken Niles Mecal Seppalainen Liaison Representatives Washington State Department of Health EnviroIssues Hanford Project Office 713 Jadwin, Suite 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 HAB Consensus Advice # 280 Subject: 100-F/IU Area Proposed Plan Adopted: September 5, 2014 Page 1 September 5, 2014 Doug Shoop, Acting Manager U.S. Department of Energy, Richland Operations P.O. Box 550

  19. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    9 Subject: Master Acquisition Plan Adopted: June 9, 2016 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste. 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942 1926 Advising: U.S. Dept. of Energy U.S. Environmental Protection Agency Washington State Dept. of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Derek Donley Liz Mattson Melanie Meyers Lynn Davison Rebecca Holland Local Environment Gene Van Liew Local

  20. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    5 Subject: Preservation of Historical Properties & Artifacts Page 1 September 7, 2012 Scott Samuelson, Manager U.S. Department of Energy, Office of River Protection P.O. Box 450 (H6-60) Richland, WA 99352 Matt McCormick, Manager U.S. Department of Energy, Richland Operations P.O. Box 550 (A7-50) Richland, WA 99352 Re: Preservation of Historical Properties and Artifacts Dear Messrs Samuelson and McCormick, The Hanford Advisory Board (HAB or Board) congratulates the U.S. Department of Energy

  1. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PFP Worker Commendation September 10, 2015 2015O-03 Page 1 September 10, 2015 Stacy Charboneau U.S. Department of Energy - Richland Operations Office P.O. Box 550 (A7-75) Richland, WA 99352 John Ciucci CH2M Hill Plateau Remediation Company P.O. Box 1600 MSIN H7-30 Richland, WA 99352 Dear Ms. Charboneau and Mr. Ciucci, Reducing the risk to human health and the environment from the Plutonium Finishing Plant (PFP) has been a significant issue for the Hanford Advisory Board (Board) for many years.

  2. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Cesium White Paper Adopted: June 17, 2016 2016O-07 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste. 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942-1926 Advising: U.S. Dept. of Energy U.S. Environmental Protection Agency Washington State Dept. of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Derek Donley Liz Mattson Melanie Meyers Lynn Davison Rebecca Holland Local Environment Gene Van Liew Local

  3. HANFORD ADVISORY BOARD A Site Specific Advisory Board, Chartered under the Federal Advisory Committee Act

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    90 Subject: 100-D/H Proposed Plan Adopted: September 15, 2016 Page 1 EnviroIssues Hanford Project Office 713 Jadwin Ave, Ste 3 Richland, WA 99352 Phone: (509) 942-1906 Fax: (509) 942 1926 Advising: US Dept. of Energy US Environmental Protection Agency Washington State Dept. of Ecology CHAIR: Steve Hudson VICE CHAIR: Susan Leckband BOARD MEMBERS: Local Business Don Bouchey Labor/Work Force Bob Legard Liz Mattson Melanie Myers Emmitt Jackson Rebecca Holland Local Environment Gene Van Liew Local

  4. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 2016 July 20, 2016 DOE Marks 20 Years of Cleanup Success at ERDF This month marks 20 successful years of environmental cleanup at one of the U.S. Department of Energy (DOE)'s largest disposal facilities--the Environmental Restoration Disposal Facility (ERDF) on the Hanford Site in southeastern Washington state

  5. Hanford Site annual dangerous waste report: Volume 4, Waste Management Facility report, Radioactive mixed waste

    SciTech Connect (OSTI)

    1994-12-31

    This report contains information on radioactive mixed wastes at the Hanford Site. Information consists of shipment date, physical state, chemical nature, waste description, handling method and containment vessel, waste number, waste designation and amount of waste.

  6. Hanford Site baseline risk assessment methodology. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1993-03-01

    This methodology has been developed to prepare human health and environmental evaluations of risk as part of the Comprehensive Environmental Response, Compensation, and Liability Act remedial investigations (RIs) and the Resource Conservation and Recovery Act facility investigations (FIs) performed at the Hanford Site pursuant to the Hanford Federal Facility Agreement and Consent Order referred to as the Tri-Party Agreement. Development of the methodology has been undertaken so that Hanford Site risk assessments are consistent with current regulations and guidance, while providing direction on flexible, ambiguous, or undefined aspects of the guidance. The methodology identifies Site-specific risk assessment considerations and integrates them with approaches for evaluating human and environmental risk that can be factored into the risk assessment program supporting the Hanford Site cleanup mission. Consequently, the methodology will enhance the preparation and review of individual risk assessments at the Hanford Site.

  7. Hanford facility dangerous waste Part A, Form 3 and Part B permit application documentation, Central Waste Complex (WA7890008967)(TSD: TS-2-4)

    SciTech Connect (OSTI)

    Saueressig, D.G.

    1998-05-20

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating, treatment, storage, and/or disposal units, such as the Central Waste Complex (this document, DOE/RL-91-17). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the Central Waste Complex permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the Central Waste Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this Central Waste Complex permit application documentation is current as of May 1998.

  8. Hanford Lifecycle Reports - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Lifecycle Reports Hanford Lifecycle Reports Hanford Lifecycle Reports Hanford Lifecycle Reports Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2016 Hanford Lifecycle Report 2015 Hanford Lifecycle Report 2014 Hanford Lifecycle Report 2013 Hanford Lifecycle Report 2012 Hanford Lifecycle Report 2011 Hanford Lifecycle Report Share on Last Updated 02/22/2016 2:54

  9. Federal Technical Capability Policy for Defense Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-12-10

    The policy regarding the Federal Technical Capability Program, which provides for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities.

  10. Hanford Waste Services Ltd | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hanford Waste Services Ltd Jump to: navigation, search Name: Hanford Waste Services Ltd. Place: Wolverhampton, United Kingdom Zip: Wv2 1HR Product: Waste to Energy facility with...

  11. The Business Case for Sustainable Design in Federal Facilities

    SciTech Connect (OSTI)

    2003-08-01

    This document provides a better understanding of the Federal government's effort to build a more sustainable real estate portfolio.

  12. About Us - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Us About Us About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us About Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Cleanup of the Hanford Site is overseen by two Department of Energy Offices, the Richland Operations Office (RL) and the Office of River Protection (ORP). Each office has a staff of about 250 federal employees. The work largely involves contract oversight and safety and compliance-related work. The U.S.

  13. Using Distributed Energy Resources, A How-To Guide for Federal Facility Managers

    SciTech Connect (OSTI)

    Distributed Utility Associates

    2002-05-01

    The Department of Energy's Federal Energy Management Program (FEMP) established the Distributed Energy Resources (DER) Program to assist Federal agencies in implementing DER projects at their facilities. FEMP prepared this How-To Guide to assist facility managers in evaluating potential applications and benefits. It provides step-by-step advice on how to carry out a Federal DER project. It also describes and explains DER applications and potential benefits in Federal facilities; DER technologies and how to match them to applications; a step-by-step approach to implementing projects; potential barriers and how to overcome them; and resources to assist you in implementing new DER projects.

  14. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Volume 3 - Nuclear Safety Basis Program Review During Facility Operations and Transitions February 2015 i Standard Review Plan Volume 3 Nuclear Safety Basis Program Review during Facility Operations and Transitions Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  15. Annual Hanford Site Environmental Permitting Status Report

    SciTech Connect (OSTI)

    HOMAN, N.A.

    2000-10-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year.

  16. Technology Potential of Thermal Energy Storage (TES) Systems in Federal Facilities

    SciTech Connect (OSTI)

    Chvala, William D.

    2001-07-31

    This document presents the findings of a technology market assessment for thermal energy storage (TES) in space cooling applications. The potential impact of TES in Federal facilities is modeled using the Federal building inventory with the appropriate climatic and energy cost data. In addition, this assessment identified acceptance issues and major obstacles through interviews with energy services companies (ESCOs), TES manufacturers, and Federal facility staff.

  17. Testing Promising Technologies: A Role for Federal Facilities

    Energy.gov [DOE]

    Presentation covers the testing of promising technologies and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  18. GrayQbTM Single-Faced Version 2 (SF2) Hanford Plutonium Reclamation Facility (PRF) deployment report

    SciTech Connect (OSTI)

    Plummer, J. R.; Immel, D. M.; Serrato, M. G.; Dalmaso, M. J.; Shull, D. J.

    2015-11-18

    The Savannah River National Laboratory (SRNL) in partnership with CH2M Plateau Remediation Company (CHPRC) deployed the GrayQbTM SF2 radiation imaging device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon. The deployment goal was to locate radiological contamination hot spots in the PRF canyon, where pencil tanks were removed and decontamination/debris removal operations are on-going, to support the CHPRC facility decontamination and decommissioning (D&D) effort. The PRF canyon D&D effort supports completion of the CHPRC Plutonium Finishing Plant Decommissioning Project. The GrayQbTM SF2 (Single Faced Version 2) is a non-destructive examination device developed by SRNL to generate radiation contour maps showing source locations and relative radiological levels present in the area under examination. The Hanford PRF GrayQbTM Deployment was sponsored by CH2M Plateau Remediation Company (CHPRC) through the DOE Richland Operations Office, Inter-Entity Work Order (IEWO), DOE-RL IEWO- M0SR900210.

  19. Grout treatment facility land disposal restriction management plan

    SciTech Connect (OSTI)

    Hendrickson, D.W.

    1991-04-04

    This document establishes management plans directed to result in the land disposal of grouted wastes at the Hanford Grout Facilities in compliance with Federal, State of Washington, and Department of Energy land disposal restrictions. 9 refs., 1 fig.

  20. EERE Success Story-FEMP Helps Federal Facilities Develop Large...

    Energy.gov (indexed) [DOE]

    The Federal Energy Management Program (FEMP) works with key individuals to accomplish ... Addthis Related Articles EERE Success Story-FEMP and U.S. Army Corps of Engineers Partner ...

  1. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Energy.gov (indexed) [DOE]

    process for successfully planning for and installing solar technology on a federal site. ... The solar project process is outlined in a concise, easy-to-understand, step-by-step ...

  2. Hanford Speakers Bureau - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Bureau Hanford Speakers Bureau Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers Bureau Presentations FY2016 Hanford Speakers Bureau Presentations FY2015 Hanford Site Tours Hanford Speakers Bureau Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 'Speakers Bureau' Hanford Images The Hanford Speakers Bureau is a regional outreach program. Its goal is to provide timely

  3. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities.

  4. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect (OSTI)

    Hadley, Donald L.

    2001-03-01

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  5. N Reactor - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Projects & Facilities N Reactor About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  6. U Plant - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    About Us Projects & Facilities U Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration

  7. T Plant - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    T Plant About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental Restoration Disposal Facility F Reactor H

  8. Tank Farms - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    About Us Projects & Facilities Tank Farms About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental

  9. Performing Energy Security Assessments: A How-To Guide for Federal Facility Managers

    Office of Energy Efficiency and Renewable Energy (EERE)

    Guide describes the best practices and recommended process for federal facility managers to prepare for the following sections of a facility’s energy security plan: vulnerability assessments, energy preparedness and operations plans, and remedial action plans.

  10. FOA for Assisting Federal Facilities with Energy Conservation Technologies Informational Webinar

    Energy.gov [DOE]

    This webinar will highlight the funding opportunity announcement (FOA) that was issued on March 6, 2015. The AFFECT grant will provide funding for renewable energy projects at federal facilities...

  11. Federal Facility Agreement for the Laboratory for Energy-Related Health Research Summary

    Office of Environmental Management (EM)

    Energy Related Health Research Agreement Name Federal Facility Agreement for the Laboratory for Energy- Related Health Research State California Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish a procedural framework and schedule for developing, implementing and monitoring appropriate response actions at LEHR Parties DOE; USEPA; California Department of Toxic Substances Control; Central Valley Regional Water Quality Control Board; California

  12. 242-A Evaporator - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    began operating in 1977 to reduce the volume of waste stored in Hanford's underground tanks. The 242-A Evaporator is the only operating nuclear processing facility at Hanford. It...

  13. Photo Gallery - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PRC T Plant PRC T Plant PRC U Plant PRC U Plant PRC Waste and Fuels PRC Waste and Fuels Pretreatment Facility Pretreatment Facility Public Outreach Public Outreach Public Tours Public Tours Railcars at Hanford Railcars at Hanford Railcars Go To B Reactor Railcars Go To B Reactor Railroad Track Removal Railroad Track Removal Rattlesnake Communications Tower Rattlesnake Communications Tower Records Storage Facility Records Storage Facility Reducing Chromium in Groundwater Reducing Chromium in

  14. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    1 -- Nuclear Safety Basis Program Review Overview and Management Oversight February 2015 i Standard Review Plan Volume 1 Nuclear Safety Basis Program Review Overview and Management Oversight Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii

  15. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    5 - Nuclear Safety Basis Program Review of TSRs, USQs and SERs February 2015 i Standard Review Plan Volume 5 Nuclear Safety Basis Program Review of TSRs, USQs and SERs Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii Introduction

  16. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-14

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities. Supersedes DOE G 226.1-2

  17. AN APPLICATION OF THE SSHAC LEVEL 3 PROCESS TO THE PROBABILISTIC SEISMIC HAZARD ANALYSIS FOR NUCLEAR FACILITIES AT THE HANFORD SITE, EASTERN WASHINGTON, USA

    Office of Energy Efficiency and Renewable Energy (EERE)

    An Application of the SSHAC Level 3 Process to the Probabilistic Seismic Hazard Analysis for Nuclear Facilities at the Hanford Site, Eastern Washington, USA Kevin J. Coppersmith Coppersmith Consulting, Inc. Julian J. Bommer Consultant Robert W. Bryce Pacific Northwest National Laboratory U.S. Department of Energy Natural Phenomena Hazards Meeting October 21-22, 2014 Germantown, MD

  18. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2013 February 27, 2013 PHOTO GALLERY: 300 Area North Cleaned Up 98 Facilities Demolished, 58 Waste Sites Remediated February 27, 2013 300 Area North Section Cleaned Up 98 Facilities Demolished; 58 Waste Sites Remediated February 26, 2013 B Reactor Tour Registration Opens March 2 Families with children above the age of 12, along with middle schools and high schools, are invited to sign up for the coveted tour slots. February 25, 2013 Registration Starts Soon for 2013 Hanford Site Public

  19. Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility |

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Y-12 National Security Complex Largest Federally Owned ... Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility Posted: August 13, 2013 - 12:01pm WASHINGTON - Building on President Obama's Climate Action Plan, which calls for steady, responsible steps to reduce carbon pollution, the Energy Department today broke ground on the nation's largest federally owned wind project at the Pantex Plant in Amarillo, Texas. Once completed, this five-turbine 11.5 megawatt project will

  20. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2013 May 30, 2013 PHOTOS: U.S. Senator Patty Murray Visits Hanford Facility Senator Patty Murray visited the Hanford Site on May 30, 2013. One of the stops on her tour was the 200 West Pump and Treat System. May 13, 2013 Press Release: Workers Exceed Goal for Removing Groundwater Contamination Contractor CH2M HILL Platea Remediation Company has removed more than 500 pounds of hexavalent chromium from groundwater along the Columbia River six months ahead of schedule. May 09, 2013 PHOTOS:

  1. Estimation of natural ground water recharge for the performance assessment of a low-level waste disposal facility at the Hanford Site

    SciTech Connect (OSTI)

    Rockhold, M.L.; Fayer, M.J.; Kincaid, C.T.; Gee, G.W.

    1995-03-01

    In 1994, the Pacific Northwest Laboratory (PNL) initiated the Recharge Task, under the PNL Vitrification Technology Development (PVTD) project, to assist Westinghouse Hanford Company (WHC) in designing and assessing the performance of a low-level waste (LLW) disposal facility for the US Department of Energy (DOE). The Recharge Task was established to address the issue of ground water recharge in and around the LLW facility and throughout the Hanford Site as it affects the unconfined aquifer under the facility. The objectives of this report are to summarize the current knowledge of natural ground water recharge at the Hanford Site and to outline the work that must be completed in order to provide defensible estimates of recharge for use in the performance assessment of this LLW disposal facility. Recharge studies at the Hanford Site indicate that recharge rates are highly variable, ranging from nearly zero to greater than 100 mm/yr depending on precipitation, vegetative cover, and soil types. Coarse-textured soils without plants yielded the greatest recharge. Finer-textured soils, with or without plants, yielded the least. Lysimeters provided accurate, short-term measurements of recharge as well as water-balance data for the soil-atmosphere interface and root zone. Tracers provided estimates of longer-term average recharge rates in undisturbed settings. Numerical models demonstrated the sensitivity of recharge rates to different processes and forecast recharge rates for different conditions. All of these tools (lysimetry, tracers, and numerical models) are considered vital to the development of defensible estimates of natural ground water recharge rates for the performance assessment of a LLW disposal facility at the Hanford Site.

  2. U.S. Federal Facility Compliance Agreement for the Hanford Site, February 7, 1994

    Office of Environmental Management (EM)

    Research and Development Initiative | Department of Energy Agriculture and Energy Announce Funding for Biomass Research and Development Initiative U.S. Departments of Agriculture and Energy Announce Funding for Biomass Research and Development Initiative April 15, 2011 - 12:00am Addthis WASHINGTON, April 15, 2011- To support President Obama's goal of reducing America's oil imports by one-third by 2025, the U.S. Departments of Agriculture (USDA) and Energy (DOE) today jointly announced up to

  3. U.S. Federal Facility Compliance Agreement for the Hanford Site...

    Office of Environmental Management (EM)

    site into compliance with CAA Parties EPA; DOE; Richland Operations Office (RL) Date ... shall submit quarterly progress reports to EPA until the requirements contained in ...

  4. Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    basis through an online registration system. There is no cost to participate in the tours. All tours begin and end at the HAMMER Federal Training Center Facility, 2890 ...

  5. Hanford's Recovery Act Payments Jump Past $1 Billion

    Office of Environmental Management (EM)

    and research. * Demolished 56 facilities, which reduces surveillance and maintenance costs. * Completed expansion of Hanford's Environmental Restoration Disposal Facil- ity...

  6. Media Contacts - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Media Contacts Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel Media Contacts Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Richland Operations Office Office of River Protection River Corridor cleanup Reactor/facility cleanout and demolition Solid waste burial ground cleanup Groundwater remediation Central Plateau cleanup Waste Treatment (Vitrification) Plant construction Underground tank waste storage

  7. Hanford Treatment Facility Achieves First Gold Ranking for Sustainable Design in EM Complex: New groundwater treatment facility will be Hanford’s largest, greenest pump-and-treat system

    Energy.gov [DOE]

    RICHLAND, Wash. – A major facility for treating groundwater contaminated by plutonium production at the Hanford site has received the first Leadership for Energy and Environmental Design (LEED) gold certification for sustainable design in the U.S. Department of Energy Office of Environmental Management (EM) complex of sites that conducted nuclear weapons development and government-sponsored nuclear energy research.

  8. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    to Hanford. March 20, 2013 Firefighters at the Hanford Site Participate in Annual Leukemia & Lymphoma Society Event Firefighters from the Hanford Site recently raised...

  9. Annual Hanford Site environmental permitting status report

    SciTech Connect (OSTI)

    Sonnichsen, J.C.

    1998-09-17

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, `best efforts` means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  10. Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Children 03080006-052df Baseball Team, Hanford, 1913 03080006-052df Baseball Team, Hanford, 1913 092263-4 Hanford Grade School Students and Teacher, 1934 092263-4 Hanford Grade...

  11. Enforcement Letter, Westinghouse Hanford Corporation- September 22, 1995

    Energy.gov [DOE]

    Issued to Westinghouse Hanford Corporation related to Operational Safety Requirements Implementation at the B Plant/Waste Encapsulation and Storage Facility at the Hanford Site

  12. Enforcement Letter, Westinghouse Hanford Corporation- July 6, 1995

    Energy.gov [DOE]

    Issued to Westinghouse Hanford Corporation related to Radiological Work Control Deficiencies at the Plutonium Uranium Extraction Facility at the Hanford Site

  13. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility

    SciTech Connect (OSTI)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2013-01-11

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy’s (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE’s mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team’s successful integration of the project’s core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE’s mission objective, as well as attainment of LEED GOLD certification, which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award.

  14. Lessons Learned from the 200 West Pump and Treatment Facility Construction Project at the US DOE Hanford Site - A Leadership for Energy and Environmental Design (LEED) Gold-Certified Facility - 13113

    SciTech Connect (OSTI)

    Dorr, Kent A.; Freeman-Pollard, Jhivaun R.; Ostrom, Michael J.

    2013-07-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built to an accelerated schedule with American Recovery and Reinvestment Act (ARRA) funds. There were many contractual, technical, configuration management, quality, safety, and Leadership in Energy and Environmental Design (LEED) challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility to meet DOE's mission objective of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012. The project team's successful integration of the project's core values and green energy technology throughout design, procurement, construction, and start-up of this complex, first-of-its-kind Bio Process facility resulted in successful achievement of DOE's mission objective, as well as attainment of LEED GOLD certification (Figure 1), which makes this Bio Process facility the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. (authors)

  15. Contact Us - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contact Us About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Contact Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Contact Us Do you have a question? Contact Hanford DOE Logo Street Address: Federal Bldg: 825 Jadwin Ave., Suite 1 Richland, WA 99352 Map Mailing Address: DOE RL PO Box 550 Richland, WA 99352 Street Address: DOE ORP 2440 Stevens Center Place, H660 Richland, WA, 99354 Mailing Address: DOE ORP PO Box 450

  16. Beryllium Health Advocates - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Health Advocates About Us Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs...

  17. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2012 March 29, 2012 DOE Contractor Completes Massive Excavation Washington Closure disposes 650,000 tons of contaminated soil from the C-7 waste site March 09, 2012 DOE Lowers Age Limit for B Reactor Tours Families, schools invited to visit National Historic Landmark March 09, 2012 FACT SHEET: Removing Pencil Tanks Contractor CH2M HILL Plateau Remediation Company is removing plutonium processing equipment from the highest-hazard facility at Hanford. March 08, 2012 PRESS RELEASE: Fifth

  18. Hanford Press Releases

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Press Releases Department Of Energy:Demolition of One of Hanford&apos;s Most Hazardous Facilities Underway Demolition is underway at the Plutonium Finishing Plant (PFP), one of the most hazardous buildings on the Hanford Site in southeastern Washington state. Thu, 03 Nov 2016 00:00:00 GMT Department Of Energy:DOE Meets FY2016 Groundwater Cleanup Goals at Hanford Workers at the U.S. Department of Energy?s (DOE) Hanford Site are marking another year of significant achievements in protecting

  19. Large-Scale Renewable Energy Guide: Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    Energy.gov [DOE]

    The Large-Scale Renewable Energy Guide: Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities provides best practices and other helpful guidance for federal agencies developing large-scale renewable energy projects.

  20. Notice of Intent to Issue Funding Opportunity Announcement "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2017"

    Energy.gov [DOE]

    The Office of Energy Efficiency and Renewable Energy (EERE) intends to issue, on behalf of the Federal Energy Management Program (FEMP), a funding opportunity announcement (FOA) titled "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2017."

  1. Hanford Site Tours - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tours Hanford Site Tours Hanford Tour Restrictions Hanford Tours for Governmental Officials Hanford Tours for Tribal Affairs Hanford Private Tours Hanford Site Tours Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Site is a very unique place offering a number of tours for members of the public, elected officials and their staffs, tribal officials, stakeholders, and others. A list of the kinds of Hanford tours we provide is shown below, along with

  2. Hanford CBDPP Committee - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium...

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    August 2007 August 16, 2007 2006 Marked By Substantial Hanford Cleanup Progress 2006 Marked By Substantial Hanford Cleanup Progress

  4. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    SciTech Connect (OSTI)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  5. Wireless Occupancy Sensors for Lighting Controls: An Applications Guide for Federal Facility Managers

    Office of Energy Efficiency and Renewable Energy (EERE)

    This fact sheet provides federal facility managers with an overview of the energy savings potential of wireless lighting occupancy sensors for various room types, cost considerations, key steps to successful installation of wireless sensors, pros and cons of various technology options, light source considerations, and codes and standards.

  6. 2014 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients

    Office of Energy Efficiency and Renewable Energy (EERE)

    On November 5, 2013, FEMP issued a funding opportunity announcement (FOA) on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) DE-FOA-0000901. The release of the FOA followed the notice of intent, which was issued on July 9, 2013. On September 22, 2014, FEMP announced the following nine AFFECT projects.

  7. Energy Department Announces $5 Million to Develop Clean Energy Projects at Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department today announced $5 million in funding for nine projects that will advance the development of combined heat and power (CHP) and renewable energy technologies at facilities across the federal government and help meet energy efficiency, renewable energy, and greenhouse gas reduction goals.

  8. Hanford Contractor Assumes Responsibility of Three Wastewater...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Assumes Responsibility of Three Wastewater Facilities Hanford Contractor Assumes Responsibility of Three Wastewater Facilities April 29, 2015 - 12:00pm Addthis The ...

  9. HANFORD CONTAINERIZED CAST STONE FACILITY TASK 1 PROCESS TESTING & DEVELOPMENT FINAL TEST REPORT

    SciTech Connect (OSTI)

    LOCKREM, L L

    2005-07-13

    Laboratory testing and technical evaluation activities on Containerized Cast Stone (CCS) were conducted under the Scope of Work (SOW) contained in CH2M HILL Hanford Group, Inc. (CHG) Contract No. 18548 (CHG 2003a). This report presents the results of testing and demonstration activities discussed in SOW Section 3.1, Task I--''Process Development Testing'', and described in greater detail in the ''Containerized Grout--Phase I Testing and Demonstration Plan'' (CHG, 2003b). CHG (2003b) divided the CCS testing and evaluation activities into six categories, as follows: (1) A short set of tests with simulant to select a preferred dry reagent formulation (DRF), determine allowable liquid addition levels, and confirm the Part 2 test matrix. (2) Waste form performance testing on cast stone made from the preferred DRF and a backup DRF, as selected in Part I, and using low activity waste (LAW) simulant. (3) Waste form performance testing on cast stone made from the preferred DRF using radioactive LAW. (4) Waste form validation testing on a selected nominal cast stone formulation using the preferred DRF and LAW simulant. (5) Engineering evaluations of explosive/toxic gas evolution, including hydrogen, from the cast stone product. (6) Technetium ''getter'' testing with cast stone made with LAW simulant and with radioactive LAW. In addition, nitrate leaching observations were drawn from nitrate leachability data obtained in the course of the Parts 2 and 3 waste form performance testing. The nitrate leachability index results are presented along with other data from the applicable activity categories.

  10. Hanford Single-Shell Tank Leak Causes and Locations - 241-A Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2013-09-10

    This document identifies 241-A Tank Farm (A Farm) leak causes and locations for the 100 series leaking tanks (241-A-104 and 241-A-105) identified in RPP-ENV-37956, Hanford A and AX Farm Leak Assessment Report. This document satisfies the A Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  11. Hanford Single-Shell Tank Leak Causes and Locations - 241-U Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2013-12-02

    This document identifies 241-U Tank Farm (U Farm) leak causes and locations for the 100 series leaking tanks (241-U-104, 241-U-110, and 241-U-112) identified in RPP-RPT-50097, Rev. 0, Hanford 241-U Farm Leak Inventory Assessment Report. This document satisfies the U-Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  12. Hanford Single Shell Tank Leak Causes and Locations - 241-TX Farm

    SciTech Connect (OSTI)

    Girardot, C. L.; Harlow, D> G.

    2014-07-22

    This document identifies 241-TX Tank Farm (TX Farm) leak causes and locations for the 100 series leaking tanks (241-TX-107 and 241-TX-114) identified in RPP-RPT-50870, Rev. 0, Hanford 241-TX Farm Leak Inventory Assessment Report. This document satisfies the TX Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  13. Hanford Single-Shell Tank Leak Causes and Locations - 241-T Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2014-05-15

    This document identifies 241-T Tank Farm (T Farm) leak causes and locations for the 100 series leaking tanks (241-T-106 and 241-T-111) identified in RPP-RPT-55084, Rev. 0, Hanford 241-T Farm Leak Inventory Assessment Report. This document satisfies the T Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  14. Hanford Waste Vitrification Plant technical background document for toxics best available control technology demonstration

    SciTech Connect (OSTI)

    1992-10-01

    This document provides information on toxic air pollutant emissions to support the Notice of Construction for the proposed Hanford Waste Vitrification Plant (HWVP) to be built at the the Department of Energy Hanford Site near Richland, Washington. Because approval must be received prior to initiating construction of the facility, state and federal Clean Air Act Notices of construction are being prepared along with necessary support documentation.

  15. Hanford Single-Shell Tank Leak Causes and Locations - 241-C Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2013-07-30

    This document identifies 241-C Tank Farm (C Farm) leak causes and locations for the 100 series leaking tanks (241-C-101 and 241-C-105) identified in RPP-RPT-33418, Rev. 2, Hanford C-Farm Leak Inventory Assessments Report. This document satisfies the C Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  16. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    SciTech Connect (OSTI)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  17. California Federal Facilities: Rate-Responsive Building Operation for Deeper Cost and Energy Savings

    SciTech Connect (OSTI)

    2012-05-01

    Dynamic pricing electricity tariffs, now the default for large customers in California (peak demand of 200 kW and higher for PG&E and SCE, and 20 kW and higher for SDG&E), are providing Federal facilities new opportunities to cut their electricity bills and help them meet their energy savings mandates. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) has created this fact sheet to help California federal facilities take advantage of these opportunities through “rate-responsive building operation.” Rate-responsive building operation involves designing your load management strategies around your facility’s variable electric rate, using measures that require little or no financial investment.

  18. Hanford Story: PFP - Questions - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PFP - Questions The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Why did Hanford produce so much plutonium? How hazardous is the Plutonium Finishing Plant in comparison to other facilities on the Hanford Site? What was the other name for the Plutonium Finishing Plant? Why was security and secrecy required for the plant and its product - plutonium? When did the last of the last shipment of plutonium leave the plant? What is the main focus of work

  19. DEMONSTRATION OF SIMULATED WASTE TRANSFERS FROM TANK AY-102 TO THE HANFORD WASTE TREATMENT FACILITY

    SciTech Connect (OSTI)

    Adamson, D.; Poirier, M.; Steeper, T.

    2009-12-03

    In support of Hanford's AY-102 Tank waste certification and delivery of the waste to the Waste Treatment and Immobilization Plant (WTP), Savannah River National Laboratory (SRNL) was tasked by the Washington River Protection Solutions (WRPS) to evaluate the effectiveness of mixing and transferring the waste in the Double Shell Tank (DST) to the WTP Receipt Tank. This work is a follow-on to the previous 'Demonstration of Internal Structures Impacts on Double Shell Tank Mixing Effectiveness' task conducted at SRNL 1. The objective of these transfers was to qualitatively demonstrate how well waste can be transferred out of a mixed DST tank and to provide insights into the consistency between the batches being transferred. Twelve (12) different transfer demonstrations were performed, varying one parameter at a time, in the Batch Transfer Demonstration System. The work focused on visual comparisons of the results from transferring six batches of slurry from a 1/22nd scale (geometric by diameter) Mixing Demonstration Tank (MDT) to six Receipt Tanks, where the consistency of solids in each batch could be compared. The simulant used in this demonstration was composed of simulated Hanford Tank AZ-101 supernate, gibbsite particles, and silicon carbide particles, the same simulant/solid particles used in the previous mixing demonstration. Changing a test parameter may have had a small impact on total solids transferred from the MDT on a given test, but the data indicates that there is essentially no impact on the consistency of solids transferred batch to batch. Of the multiple parameters varied during testing, it was found that changing the nozzle velocity of the Mixer Jet Pumps (MJPs) had the biggest impact on the amount of solids transferred. When the MJPs were operating at 8.0 gpm (22.4 ft/s nozzle velocity, U{sub o}D=0.504 ft{sup 2}/s), the solid particles were more effectively suspended, thus producing a higher volume of solids transferred. When the MJP flow rate was

  20. Operation of N Reactor and Fuels Fabrication Facilities, Hanford Reservation, Richland, Benton County, Washington: Environmental assessment

    SciTech Connect (OSTI)

    Not Available

    1980-08-01

    Environmental data, calculations and analyses show no significant adverse radiological or nonradiological impacts from current or projected future operations resulting from N Reactor, Fuels Fabrication and Spent Fuel Storage Facilities. Nonoccupational radiation exposures resulting from 1978 N Reactor operations are summarized and compared to allowable exposure limits.

  1. Hanford Site Development Plan

    SciTech Connect (OSTI)

    Rinne, C.A.; Curry, R.H.; Hagan, J.W.; Seiler, S.W.; Sommer, D.J. ); Yancey, E.F. )

    1990-01-01

    The Hanford Site Development Plan (Site Development Plan) is intended to guide the short- and long-range development and use of the Hanford Site. All acquisition, development, and permanent facility use at the Hanford Site will conform to the approved plan. The Site Development Plan also serves as the base document for all subsequent studies that involve use of facilities at the Site. This revision is an update of a previous plan. The executive summary presents the highlights of the five major topics covered in the Site Development Plan: general site information, existing conditions, planning analysis, Master Plan, and Five-Year Plan. 56 refs., 67 figs., 31 tabs.

  2. UPDATE HANFORD SITE D & D PROGRAMS ACCELERATE EXPAND

    SciTech Connect (OSTI)

    GERBER, M.S.

    2004-04-22

    A large, new decontamination and decommissioning organization targeted toward rapid, focused work on aging and highly contaminated structures was formed at the DOE's Hanford Site in southeast Washington state in autumn 2003. Managed by prime contractor Fluor Hanford, the new organization has made significant progress during its first six months. Under the direction of Mike Lackey, who recently joined Fluor from the Portland General Electric Trojan Plant, the Fluor Hanford D&D organization is tackling the Plutonium Finishing Plant (PFP) complex and the Fast Flux Test Facility (FFTF), and is nearly finished demolishing the 233-S Plutonium Concentration Facility. In addition, the D&D organization is progressing through the development and public comment phases of its required environmental permitting, planning work and procurement services to D&D three other Hanford facilities: 224-T and 224-B Plutonium Concentration Facilities, and the U Plant radiochemical processing facility. It is also planning and beginning to D&D the spent fuel handling areas of the Site's 100-K Reactor Area. The 586-square mile Hanford Site, the oldest plutonium production center in the world, served as the ''workhorse'' of the American nuclear defense arsenal from 1944 through 1989. Hanford produced the special nuclear material for the plutonium cores of the Trinity (test) and Nagasaki explosions, and then went on to produce more than half of the weapons plutonium ever manufactured by the United States, and about one-fourth of that manufactured worldwide. As a result, Hanford, the top-secret ''Paul Bunyan'' in the desert, is one of the most contaminated areas in the world. Its cleanup agreement with state and federal regulators, known as the ''Tri-Party Agreement,'' celebrates its 15th anniversary this spring, at a time when operations dealing with unstable plutonium leftovers, corroded spent fuel, and liquids wastes in single-shelled tanks conclude. As these crucial jobs are coming to an end

  3. Hanford Private Tours - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Private Tours Hanford Site Tours Hanford Tour Restrictions Hanford Tours for Governmental Officials Hanford Tours for Tribal Affairs Hanford Private Tours Hanford Private Tours Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size While Hanford offers a very successful and extensive tour program for members of the public, Site tours for private entities are also considered on a case-by-case basis. Private tours are only permitted for those groups whose work scope is

  4. FLUOR HANFORD (FH) MAKES CLEANUP A REALITY IN NEARLY 11 YEARS AT HANFORD

    SciTech Connect (OSTI)

    GERBER, M.S.

    2007-05-24

    For nearly 11 years, Fluor Hanford has been busy cleaning up the legacy of nuclear weapons production at one of the Department of Energy's (DOE'S) major sites in the United States. As prime nuclear waste cleanup contractor at the vast Hanford Site in southeastern Washington state, Fluor Hanford has changed the face of cleanup. Fluor beginning on October 1, 1996, Hanford Site cleanup was primarily a ''paper exercise.'' The Tri-Party Agreement, officially called the Hanford Federal Facility Agreement and Consent Order - the edict governing cleanup among the DOE, U.S. Environmental Protection Agency (EPA) and Washington state - was just seven years old. Milestones mandated in the agreement up until then had required mainly waste characterization, reporting, and planning, with actual waste remediation activities off in the future. Real work, accessing waste ''in the field'' - or more literally in huge underground tanks, decaying spent fuel POO{approx}{approx}S, groundwater, hundreds of contaminated facilities, solid waste burial grounds, and liquid waste disposal sites -began in earnest under Fluor Hanford. The fruits of labors initiated, completed and/or underway by Fluor Hanford can today be seen across the site. Spent nuclear fuel is buttoned up in secure, dry containers stored away from regional water resources, reactive plutonium scraps are packaged in approved containers, transuranic (TRU) solid waste is being retrieved from burial trenches and shipped offsite for permanent disposal, contaminated facilities are being demolished, contaminated groundwater is being pumped out of aquifers at record rates, and many other inventive solutions are being applied to Hanford's most intransigent nuclear wastes. (TRU) waste contains more than 100 nanocuries per gram, and contains isotopes higher than uranium on the Periodic Table of the Elements. (A nanocurie is one-billionth of a curie.) At the same time, Fluor Hanford has dramatically improved safety records, and cost

  5. THE DEACTIVATION DECONTAMINATION & DECOMMISSIONING OF THE PLUTONIUM FINISHING PLANT (PFP) A FORMER PLUTONIUM PROCESSING FACILITY AT DOE HANFORD SITE

    SciTech Connect (OSTI)

    CHARBONEAU, S.L.

    2006-02-01

    The Plutonium Finishing Plant (PFP) was constructed as part of the Manhattan Project during World War II. The Manhattan Project was developed to usher in the use of nuclear weapons to end the war. The primary mission of the PFP was to provide plutonium used as special nuclear material (SNM) for fabrication of nuclear devices for the war effort. Subsequent to the end of World War II, the PFP's mission expanded to support the Cold War effort through plutonium production during the nuclear arms race and later the processing of fuel grade mixed plutonium-uranium oxide to support DOE's breeder reactor program. In October 1990, at the close of the production mission for PFP, a shutdown order was prepared by the Department of Energy (DOE) in Washington, DC and issued to the Richland DOE field office. Subsequent to the shutdown order, a team from the Defense Nuclear Facilities Safety Board (DNFSB) analyzed the hazards at PFP associated with the continued storage of certain forms of plutonium solutions and solids. The assessment identified many discrete actions that were required to stabilize the different plutonium forms into stable form and repackage the material in high integrity containers. These actions were technically complicated and completed as part of the PFP nuclear material stabilization project between 1995 and early 2005. The completion of the stabilization project was a necessary first step in deactivating PFP. During stabilization, DOE entered into negotiations with the U.S. Environmental Protection Agency (EPA) and the State of Washington and established milestones for the Deactivation and Decommissioning (D&D) of the PFP. The DOE and its contractor, Fluor Hanford (Fluor), have made great progress in deactivating, decontaminating and decommissioning the PFP at the Hanford Site as detailed in this paper. Background information covering the PFP D&D effort includes descriptions of negotiations with the State of Washington concerning consent-order milestones

  6. Report on the emergency response to the event on May 14, 1997, at the plutonuim reclamation facility, Hanford Site, Richland,Washington

    SciTech Connect (OSTI)

    Shoop, D.S.

    1997-08-20

    On the evening of May 14,1997, a chemical explosion Occurred at the Plutonium Reclamation Facility (PRF) in the 200 West Area(200-W) of the Hanford Site. The event warranted the declaration of an Alert emergency, activation of the Hanford Emergency Response Organization (BRO), and notification of offsite agencies. As a result of the emergency declaration, a subsequent evaluation was conducted to assess: 9 the performance of the emergency response organization o the occupational health response related to emergency activities o event notifications to offsite and environmental agencies. Additionally, the evaluation was designed to: 9 document the chronology of emergency and occupational health responses and environmental notifications connected with the explosion at the facility 0 assess the adequacy of the Hanford Site emergency preparedness activities; response readiness; and emergency management actions, occupational health, and environmental actions 0 provide an analysis of the causes of the deficiencies and weaknesses in the preparedness and response system that have been identified in the evaluation of the response a assign organizational responsibility to correct deficiencies and weaknesses a improve future performance 0 adjust elements of emergency implementing procedures and emergency preparedness activities.

  7. Hanford Single-Shell Tank Leak Causes and Locations - 241-BY and 241-TY Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2014-09-04

    This document identifies 241-BY Tank Farm (BY Farm) and 241-TY Tank Farm (TY Farm) lead causes and locations for the 100 series leaking tanks (241-BY-103, 241-TY-103, 241-TY-104, 241-TY-105 and 241-TY-106) identified in RPP-RPT-43704, Hanford BY Farm Leak Assessments Report, and in RPP-RPT-42296, Hanford TY Farm Leak Assessments Report. This document satisfies the BY and TY Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  8. Hanford Single-Shell Tank Leak Causes and Locations - 241-BY and 241-TY Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2013-11-19

    This document identifies 241-BY Tank Farm (BY Farm) and 241-TY Tank Farm (TY Farm) leak causes and locations for the 100 series leaking tanks (241-BY-103, 241-TY-103, 241-TY-104, 241-TY-105, and 241-TY-106) identified in RPP-RPT-43704, Hanford BY Farm Leak Assessments Report, and in RPP-RPT-42296, Hanford TY Farm Leak Assessments Report. This document satisfies the BY and TY Farm portion of the target (T04) in Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  9. Resource Conservation and Recovery Act ground-water monitoring projects for Hanford Facilities: Progress report for the period July 1 to September 30, 1989 - Volume 1 - Text

    SciTech Connect (OSTI)

    Smith, R.M.; Bates, D.J.; Lundgren, R.E.

    1989-12-01

    This is Volume 1 of a two-volume document that describes the progress of 14 Hanford Site ground-water monitoring projects for the period July 1 to September 30, 1989. This volume discusses the projects; Volume 2 provides as-built diagrams, completion/inspection reports, drilling logs, and geophysical logs for wells drilled, completed, or logged during this period. Volume 2 can be found on microfiche in the back pocket of Volume 1. The work described in this document is conducted by the Pacific Northwest Laboratory under the management of Westinghouse Hanford Company for the US Department of Energy. Concentrations of ground-water constituents are compared to federal drinking water standards throughout this document for reference purposes. All drinking water supplied from the sampled aquifer meets regulatory standards for drinking water quality.

  10. Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary

    SciTech Connect (OSTI)

    1995-03-24

    This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals.

  11. Photo Gallery - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    American Recovery and Reinvestment Act ARRA Press Conference with U.S. Sen. Patty Murray at Hanford's HAMMER training facility. Search Search Search Filter: American Recovery and Reinvestment Act All Galleries 284 East Explosive Demolition Settlers B Reactor 100DX Groundwater Treatment Facility 100HX Groundwater Treatment Facility 200 West Groundwater Treatment Facility Construction 200 West Groundwater Treatment LEED Facility 200W Pump and Treat Event 2010 Fire Season 2013 Safety EXPO 209-E

  12. MONTICELLO NPL SITES Minutes and Action Items of the Federal Facilities Agreement Meeting

    Office of Legacy Management (LM)

    Minutes and Action Items of the Federal Facilities Agreement Meeting September 16 and 17,2008 Meeting Location U.S. Department of Energy Site Office, Monticello, Utah Meeting Attendees Jalena Dayvault- U.S. Department of Energy Tim Bartlett- S.M. Stoller Todd Moon- S.M. Stoller Linda Sheader- S. M. Stoller Paul Wetherstein- S.M. Stoller Brent Everett- Utah Department of Environmental Quality Duane Mortensen- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection

  13. Monticello NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items

    Office of Legacy Management (LM)

    NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items Location Monticello, Utah- DOE Office of Legacy Management field office Date September 27,2006 Attendees David Bird- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Att Kleinrath- U.S. Depmtment of Energy Tim Bartlett- S. M. Stoller Meeting topics and discussion points are summarized separately under the headings that follow. Attaclunent 1 to this report includes the agenda and

  14. Mr. Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 October 11, 2011 PATH FORWARD: 2011 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 447, NEVADA Dear Mr. Murphy: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is providing this Short-Term Data Acquisition Plan for the Project Shoal Area (Shoal), Subsurface Corrective Action Unit 447, near

  15. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect (OSTI)

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  16. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book

    2 Annual Energy Expenditures per Gross Square Foot of Federal Floorspace Stock, by Year ($2010) FY 1985 2.13 FY 2000 1.36 FY 2001 1.58 FY 2002 1.49 FY 2003 1.45 FY 2004 1.54 FY 2005 1.59 FY 2006 2.01 (1) FY 2007 2.01 Note(s): Source(s): Total Federal buildings and facilities energy expenditures in FY 2006 were $5.79 billion (in $2010). 1) Increase due to change in FEMP categorization of Federal buildings. DOE/FEMP, Annual Report to Congress on FEMP FY 2007, Jan. 2010, Table A-9, p. 97 and Table

  17. Washington Closure Hanford: Cleanup Progress Along Hanford's...

    Energy.gov (indexed) [DOE]

    Sax, President, Washington Closure Hanford. Washington Closure Hanford: Cleanup Progress Along Hanford's River Corridor More Documents & Publications 2014 Congressional Nuclear...

  18. Transuranic Waste Retrieval and Certification - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Transuranic Waste Retrieval and Certification About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility Environmental

  19. Hanford Site Wide Programs - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Page | Print Print Page |Text Increase Font Size Decrease Font Size Hanford Site-Wide Programs Hanford Safety and Health Hanford Site Wide Programs Hanford Fire Department...

  20. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    June 2011 June 07, 2011 PRESS RELEASE: Hanford Projects Receive Sustainability Awards Hanford's Department of Energy offices and their contractors received special recognition for...

  1. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2013 April 22, 2013 Green Initiatives Keep Hanford Site Environmentally Responsible Hanford has made great strides in making sure cleanup work is performed as environmentally...

  2. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 2015 July 13, 2015 Hanford Cleanup Progress Fact Sheet DOE fact sheet includes latest statistics on Hanford Site cleanup progress through May 2015

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    January 17, 2013 PHOTO GALLERY: Tokyo Electric Power Company Visits Hanford Officials learn about Hanford cleanup technologies for use at Fukushima January 16, 2013 STATEMENT: ...

  4. Ground-water monitoring compliance projects for Hanford Site facilities: Progress Report for the Period July 1 to September 30, 1987

    SciTech Connect (OSTI)

    Not Available

    1987-11-01

    This report documents the progress of four Hanford Site ground-water monitoring projects for the period from July 1 to September 310, 1987. The four disposal facilities are the 300 Area Process Trenches, 183-H Solar Evaporation Basins, 200 Area Low-Level Burial Grounds, and Nonradioactive Dangerous Waste (NRDW) Landfill. This report is the fifth in a series of periodic status reports. During this reporting period, field activities consisted of completing repairs on five monitoring wells originally present around the 183-H Basins and completing construction of 25 monitoring wells around the 200 Area Burial Grounds. The 14 wells in the 200 East Area were completed by Kaiser Engineers Hanford (KEH) and the 11 wells in the 200 West Area were compelted by ONWEGO Well Drilling. The NRDW Landfill interim characterization report was submitted to the WDOE and the USEPA in August 1987. Analytical results for the 300 Area, 183-H, and the NRDW Landfill indicate no deviations from previously established trends. Results from the NRDW Land-fill indiate that the facility has no effect on the ground-water quality beneath the facility, except for the detection of coliform bacteria. A possible source of this contamination is the solid-waste lanfill (SWL) adjacent to the NRDW Landfill. Ground-water monitoring data for the NRDW and SWL will be evaluated together in the future. Aquifer testing was completed in the 25 new wells surrounding the 200 Area buiral grounds. 13 refs., 19 refs., 13 tabs.

  5. Photo Gallery - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Plutonium Finishing Plant HA-9A glove box removal Workers Remove Most Contaminated Processing Equipment from Hanford Plutonium Finishing Plant Search Search Search Filter: Plutonium Finishing Plant HA-9A glove box removal All Galleries 284 East Explosive Demolition Settlers B Reactor 100DX Groundwater Treatment Facility 100HX Groundwater Treatment Facility 200 West Groundwater Treatment Facility Construction 200 West Groundwater Treatment LEED Facility 200W Pump and Treat Event 2010 Fire Season

  6. ORP Mission - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Mission Office of River Protection About ORP ORP Mission ORP Team Message from the Manager ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP ORP Mission Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Recah & Columbia River Panorama Our Mission To safeguard the nuclear waste stored in Hanford's 177 underground tanks, and to manage the waste safely and responsibly until it can be treated in the Waste Treatment and

  7. Hanford Dangerous Waste Permit

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Waste Treatment and Immobilization Plant (vit plant) Operating Unit #10 Aerial view of construction, July 2011 Where will the waste go? LAW canisters will go to shallow disposal at Hanford's Integrated Disposal Facility. HLW canisters will go to a For scale, here's the parking lot! Safe disposition of our nation's most dangerous waste relies on the vit plant's safe completion and ability to process waste for 20+ years. * Permitted for storage and treatment of Hanford's tank waste in unique

  8. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  9. Buildings Energy Data Book: 4.2 Federal Buildings and Facilities Characteristics

    Buildings Energy Data Book

    2 Federal Buildings and Facilities Characteristics March 2012 4.2.1 Federal Building Gross Floorspace, by Year and Agency Fiscal Year Agency FY 1985 3.37 DOD 63% FY 1986 3.38 USPS 10% FY 1987 3.40 GSA 6% FY 1988 3.23 VA 5% FY 1989 3.30 DOE 3% FY 1990 3.40 Other 13% FY 1991 3.21 Total 100% FY 1992 3.20 FY 1993 3.20 FY 1994 3.11 FY 1995 3.04 FY 1996 3.03 FY 1997 3.02 FY 1998 3.07 FY 1999 3.07 FY 2000 3.06 FY 2001 3.07 FY 2002 3.03 FY 2003 3.04 FY 2004 2.97 FY 2005 2.96 FY 2006 3.10 FY 2007 3.01

  10. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    January 2014 January 28, 2014 FACT SHEET: Hanford Site Cleanup Progress This fact sheet has been updated with statistics on Hanford Site cleanup progress through the end of December 2013. January 22, 2014 Massive Hanford Test Reactor Removed Plutonium Recycle Test Reactor removed from Hanford's 300 Area

  11. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2016 April 25, 2016 Hanford Cleanup Progress Fact Sheet April 2016 The updated Hanford Site progress fact sheet April 05, 2016 Additional Hanford Cleanup Tours Announced Due to popular demand, the U.S. Department of Energy (DOE) has announced 10 additional Hanford cleanup tours for the 2016 season. The announcement comes after the initially scheduled 15 tours filled up quickly

  12. Ms. Chris Andres, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Ms. Chris Andres, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 June 16,2014 PATH FORWARD: 2014 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 44 7, NEVADA Dear Ms. Andres: The U.S. Departtnent of Energy (DOE) Office of Legacy Management (LM) is providing this Short- Term Data Acquisition Plan for the Shoal, Nevada, Site, Subsurface Corrective Action Unit 447, near

  13. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rouggly, energy manager at SSA's Frank Hagel Federal Building in Richmond California, reports that the facility garnered $35,000 in credits in 2011 on PG&E's Peak Day Pricing (PDP) tariff. "Frankly I was stunned! It's getting a lot of positive attention with our management," said Rouggly. "We were able to drop 400 kW by pre-cooling the building and shutting down one chiller during peak events. We also turned off 2 of our 8 elevators and reduced lighting in corridors to

  14. Hanford Fun Facts - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    For Students and Kids Hanford Fun Facts Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Site consists of 586 square miles, which is about the same size as half of the state of Rhode Island There are 205 species of birds and almost 1000 species of insects found on the Hanford Site Thirty different kinds of grass is found on the Hanford Site A herd of wild horses

  15. EIS-0412: Federal Loan Guarantee to Support Construction of the TX Energy LLC, Industrial Gasification Facility near Beaumont, Texas

    Energy.gov [DOE]

    The Department of Energy is assessing the potential environmental impacts for its proposed action of issuing a Federal loan guarantee to TX Energy, LLC (TXE). TXE submitted an application to DOE under the Federal loan guarantee program pursuant to the Energy Policy Act of 2005 (EPAct 2005) to support construction of the TXE industrial Gasification Facility near Beaumont, Texas.

  16. Notice of Intent to Issue Funding Opportunity Announcement "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2016"

    Energy.gov [DOE]

    The Office of Energy Efficiency and Renewable Energy (EERE), U.S. Department of Energy (DOE) intends to issue, on behalf of the Federal Energy Management Program (FEMP), a funding opportunity announcement (FOA) titled "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2016" this April or May.

  17. Hanford Speakers Bureau - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Speakers Bureau Hanford Speakers Bureau Hanford Speakers Bureau Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size To request a Hanford Speakers Bureau presentation for your meeting or event, simply complete and submit this form. The Hanford Speakers Bureau can also perform remote presentations by use of SKYPE or GoToMeeting. Skype allows users to communicate with peers via video conferencing over the Internet. Video conference calls to other users within

  18. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2016 March 21, 2016 Hanford Cleanup Tour Registration Begins in April The U.S. Department of Energy (DOE) will open online registration for the 2016 Hanford cleanup tour program April 5 at 9 a.m. on the Hanford Site website, www.hanford.gov. February 2016 February 25, 2016 Workers Remove Most Contaminated Processing Equipment from Hanford Plutonium Finishing Plant Workers have finished cutting up and removing the two most highly contaminated pieces of processing equipment, called glove

  19. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2016 March 31, 2016 Manhattan Project National Historical Park at Hanford Expands 2016 Tour Season RICHLAND, Wash. - In partnership with the National Park Service (NPS), the U.S. Department of Energy (DOE) will open registration for the Manhattan Project National Historical Park's 2016 public tour season at the Hanford, Wash., sites on Monday, Apr March 28, 2016 Hanford Cleanup Progress Fact Sheet March 2016 The updated Hanford Site progress fact sheet March 21, 2016 Hanford Cleanup Tour

  20. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    June 2016 June 30, 2016 Hanford Cleanup Progress Fact Sheet June 2016 The updated Hanford Site progress fact sheet through June 30, 2016. June 29, 2016 Washington Closure Hanford reaches a new safety milestone - 7 million safe work hours Washington Closure Hanford (WCH) and its subcontractor employees have achieved a significant safety milestone by working 7 million hours without a lost workday injury. June 01, 2016 Registration for Additional Hanford Site Cleanup Tours Begin on June 1 Due to

  1. Preliminary Notice of Violation, Fluor Hanford Incorporated- EA-2005-07

    Energy.gov [DOE]

    Issued to Fluor Hanford, Incorporated, related to issues at the Plutonium Finishing Plant and K-Basins facilities at the Hanford Site

  2. Preliminary Notice of Violation, Washington Closure Hanford, LLC- WEA-2010-02

    Energy.gov [DOE]

    Issued to Washington Closure Hanford, LLC related an Employee Fall at the High Bay Testing Facility (336 Building) at the Hanford Site

  3. Cleaning Up the Hanford River Corridor and Improving Site Operations

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Cleanup Progress Update Hanford Advisory Board Greg Jones Department of Energy, Richland Operations Office, Assistant Manger for Business and Finance March 2014 2 Richland Operations Office * Site landlord (utilities, security, emergency services) * Move buried waste, contaminated soil away from Columbia River * Treat contaminated groundwater * Deactivate and decommission facilities * Isolate/contain contamination on Central Plateau * Approx. 4,300 contractor and federal employees 3 Richland

  4. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    SciTech Connect (OSTI)

    Moss, R. H.; Delgado, A.; Malone, E L.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  5. Annual Hanford Site Environmental Permitting status report

    SciTech Connect (OSTI)

    SONNICHSEN, J.C.

    1999-10-18

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies.

  6. Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

    SciTech Connect (OSTI)

    Stinton, David P; McGervey, Joseph; Curran, Scott

    2011-11-01

    Federal agency leaders are expressing growing interest in using innovative fuel cell combined heat and power (CHP) technology at their sites, motivated by both executive branch sustainability targets and a desire to lead by example in the transition to a clean energy economy. Fuel cell CHP can deliver reliable electricity and heat with 70% to 85% efficiency. Implementing this technology can be a high efficiency, clean energy solution for agencies striving to meet ambitious sustainability requirements with limited budgets. Fuel cell CHP systems can use natural gas or renewable fuels, such as biogas. Procuring Stationary Fuel Cells for CHP: A Guide for Federal Facility Decision Makers presents an overview of the process for planning and implementing a fuel cell CHP project in a concise, step-by-step format. This guide is designed to help agency leaders turn their interest in fuel cell technology into successful installations. This guide concentrates on larger (100 kW and greater) fuel cell CHP systems and does not consider other fuel cell applications such as cars, forklifts, backup power supplies or small generators (<100 kW). Because fuel cell technologies are rapidly evolving and have high up front costs, their deployment poses unique challenges. The electrical and thermal output of the CHP system must be integrated with the building s energy systems. Innovative financing mechanisms allow agencies to make a make versus buy decision to maximize savings. This guide outlines methods that federal agencies may use to procure fuel cell CHP systems with little or no capital investment. Each agency and division, however, has its own set of procurement procedures. This guide was written as a starting point, and it defers to the reader s set of rules if differences exist. The fuel cell industry is maturing, and project developers are gaining experience in working with federal agencies. Technology improvements, cost reductions, and experienced project developers are making

  7. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010

    Energy.gov [DOE]

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  8. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    SciTech Connect (OSTI)

    Stoltenberg, B.; Partyka, E.

    2010-09-01

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  9. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Appendix B, September 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  10. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  11. Press Releases - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Newsroom Press Releases Newsroom Press Releases Media Contacts Photo Gallery The Hanford Story Hanford Blog Hanford YouTube Channel

  12. Westinghouse Hanford Company operational environmental monitoring annual report, calendar year 1994

    SciTech Connect (OSTI)

    Schmidt, J.; Fassett, J.W.; Johnson, A.R.; Johnson, V.G.; Markes, B.M.; McKinney, S.M.; Moss, K.J.; Perkins, C.J.; Richterich, L.R.

    1995-08-01

    This document presents the results of the Westinghouse Hanford Company near-facility operational environmental monitoring for 1994 in the 100, 200/600, and 300/400 Areas of the Hanford Site, in south-central Washington State. Surveillance activities included sampling and analyses of ambient air surface water, groundwater, soil, sediments, and biota. Also, external radiation measurements and radiological surveys were taken at waste disposal sites, radiologically controlled areas, and roads. These activities were conducted to assess and control the effects of nuclear facilities and waste sites on the local environment. In addition, diffuse sources were monitored to determine compliance with Federal, State, and/or local regulations. In general, although effects from nuclear facilities are still seen on the Hanford Site and radiation levels are slightly elevated when compared to offsite locations, the differences are less than in previous years.

  13. Photo Gallery - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Settlers This historic collection features approximately 200 local area images circa 1894 - 1945. Photos depict the life and times of the early settlers of the White Bluffs area prior to the establishment of The Hanford Project by the U.S. Army Corps of Engineers in 1943. Search Search Search Filter: Settlers All Galleries 284 East Explosive Demolition Settlers B Reactor 100DX Groundwater Treatment Facility 100HX Groundwater Treatment Facility 200 West Groundwater Treatment Facility Construction

  14. Retrieval Of Hanford's Single Shell Nuclear Waste Tanks Using Technologies Foreign And Domestic

    SciTech Connect (OSTI)

    Eacker, J. A.; Thompson, W. T.; Gibbons, P. W.

    2003-02-26

    Significant progress has been made on the Hanford single shell tank (SST) retrieval projects since they were initiated as part of the modified Hanford Federal Facility Agreement and Consent Order (Tri-party Agreement) in 2000. Four of the 149 SSTs at the U.S. Department of Energy (DOE) Office of River Protection (ORP) Hanford facility are being retrieved to meet Tri-Party Agreement commitments. An additional tank is being retrieved to demonstrate an alternate technical approach. As the Hanford Site transitions to an accelerated retrieval and closure mission, these methods will be the baseline methods for SST retrieval. The five SSTs are located within the Hanford 200- Area tank farms operated by CH2M HILL Hanford Group (CH2M HILL) for ORP. Included in this paper will be discussions on the technologies selected for retrieval of each tank; electrical resistance technologies that are being evaluated for ex-tank leak detection and monitoring; and the Cold Test Training Facility (CTTF) used for testing of and training on the different retrieval systems.

  15. Photo Gallery - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Secretary of Energy, Dr. Steven Chu Visit August 2009 Secretary of Energy, Dr. Steven Chu Visit August 2009 Senator Murray Visits Hanford Senator Murray Visits Hanford Shipping Mixed, Low-Level Waste Shipping Mixed, Low-Level Waste Spent Nuclear Fuel Spent Nuclear Fuel TEPCO Visit TEPCO Visit Tribal Program Tribal Program U Ancillary Facilities U Ancillary Facilities U Canyon -- D10 Tank U Canyon -- D10 Tank U Canyon Deck U Canyon Deck U Canyon Grout U Canyon Grout VPP Program VPP Program

  16. Outreach - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tribal Program Hanford Advisory Board Hanford Site Tours Hanford Speakers Bureau FOIA Reading Room Hanford For Students Administrative Record (AR) Outreach Email Email Page |...

  17. Hanford Video - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tags Search Search Popular Keywords: B Reactor CHPRC Chu Cleanup Cold War Cold War Patriots Day DOE office of river protection ERDF Fire Hanford ORP Press Conference Recovery Richland Safety Steven Chu Video WCH demolition department of energy environmental explosive management nuclear projects stack tank farms technology training waste

  18. Expanded public notice: Washington State notice of intent for corrective action management unit, Hanford Environmental Restoration Disposal

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This document is to serve notice of the intent to operate an Environmental Restoration Disposal Facility (ERDF), adjacent to the 200 West Area of the Hanford Facility, Richland, Washington, as a Corrective Action Management Unit (CAMU), in accordance with 40 Code of Federal Regulation (CFR) 264.552. The ERDF CAMU will serve as a management unit for the majority of waste (primarily soil) excavated during remediation of waste management sites on the Hanford Facility. Only waste that originates from the Hanford Facility can be accepted in this ERDF CAMU. The waste is expected to consist of dangerous waste, radioactive waste, and mixed waste. Mixed waste contains radioactive and dangerous components. The primary features of the ERDF could include the following: one or more trenches, rail and tractor/trailer container handling capability, railroads, an inventory control system, a decontamination building, and operational offices.

  19. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

  20. Near-facility environmental monitoring quality assurance project plan

    SciTech Connect (OSTI)

    McKinney, S.M.

    1997-11-24

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site.

  1. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 26, 2011 PRESS RELEASE: Recovery Act Funds Expand Groundwater Treatment at Hanford Site Workers at the Hanford Site have surpassed goals for drilling wells to detect and remove ...

  2. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2013 October 31, 2013 FACT SHEET: Hanford Site Cleanup Progress This fact sheet has been updated with statistics on Hanford Site cleanup progress through the end of September 2013.

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 2015 July 13, 2015 Hanford Cleanup Progress Fact Sheet - May 2015 This is a DOE fact sheet with the latest statistics on Hanford Site cleanup progress through the end of May 2015

  4. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2016 April 05, 2016 Additional Hanford Cleanup Tours Announced Due to popular demand, the U.S. Department of Energy (DOE) has announced 10 additional Hanford cleanup tours for the 2016 season

  5. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    June 2016 June 29, 2016 Washington Closure Hanford reaches a new safety milestone Washington Closure Hanford (WCH) and its subcontractor employees have achieved a significant safety milestone by working 7 million hours without a lost workday injury

  6. Washington Closure Hanford - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contracting Washington Closure Hanford Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions Washington Closure Hanford Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Washington Closure Hanford (WCH) logo A prime contractor for environmental

  7. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2009 September 30, 2009 Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site September 30, 2009 Photos of 200 North area building demolition Photos of 200 North area building demolition September 28, 2009 Cleanup of Soil Under K East Basin Begins Contractor CH2M HILL Plateau Remediation Company has begun cleaning up soil underneath the former location of the K East Basin, near the Columbia River.

  8. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    January 2010 January 27, 2010 Radioactive Liquid Waste Retrieved from Hanford's 12th Single-Shell Tank Washington River Protection Solutions has started retrieving waste from another of Hanford's aging single-shell tanks, making it the 12th such tank to undergo waste retrieval. Click to view the full press release. January 15, 2010 Recovery Act Jobs Count Changes at Hanford The Hanford Site has implemented new guidance from the Department of Energy's Office of Environmental Management (EM) on

  9. Hanford Meteorological Station - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    of Energy Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office Hanford Identification (HID) PIA, Richland Operations Office (69.08 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory Manchester Software 1099 Reporting PIA, Idaho National

  10. Accident investigation board report on the May 14, 1997, chemical explosion at the Plutonium Reclamation Facility, Hanford Site,Richland, Washington - final report

    SciTech Connect (OSTI)

    Gerton, R.E.

    1997-07-25

    On May 14, 1997, at 7:53 p.m. (PDT), a chemical explosion occur-red in Tank A- 109 in Room 40 of the Plutonium Reclamation Facility (Facility) located in the 200 West Area of the Hanford Site, approximately 30 miles north of Richland, Washington. The inactive processing Facility is part of the Plutonium Finishing Plant (PFP). On May 16, 1997, Lloyd L. Piper, Deputy Manager, acting for John D. Wagoner, Manager, U.S. Department of Energy (DOE), Richland Operations Office (RL), formally established an Accident Investigation Board (Board) to investigate the explosion in accordance with DOE Order 225. 1, Accident Investigations. The Board commenced its investigation on May 15, 1997, completed the investigation on July 2, 1997, and submitted its findings to the RL Manager on July 26, 1997. The scope of the Board`s investigation was to review and analyze the circumstances of the events that led to the explosion; to analyze facts and to determine the causes of the accident; and to develop conclusions and judgments of need that may help prevent a recurrence of the accident. The scope also included the application of lessons learned from similar accidents within DOE. In addition to this detailed report, a companion document has also been prepared that provides a concise summary of the facts and conclusions of this report, with an emphasis on management issues (DOE/RL-97-63).

  11. The Hanford Story - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The Hanford Story The Hanford Story The Hanford Story The Hanford Story Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size "A lot of the people come here with a lot of questions, and a lot of people come here with some concerns." Rich Buel, Department of Energy This quote by Rich Buel, a Department of Energy employee, summarizes a common public view of the Hanford site in southeastern Washington State. Many in the Pacific Northwest region are aware the

  12. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 2014 July 31, 2014 FACT SHEET: Hanford Cleanup Progress Fact Sheet Check the latest stats on Hanford cleanup progress and employment at the site. July 31, 2014 Washington Closure Hanford reaches 4 million safe hours For the second time since beginning work on the River Corridor Closure Project in 2005 July 02, 2014 NEWS RELEASE: Workers Prepare to Enter One of Hanford's Most Hazardous Rooms When workers enter the hazardous and historic McCluskey Room at the Hanford Site this summer, they

  13. Beryllium Program Points of Contact - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Program Points of Contact About Us Beryllium Program Beryllium Program Points of Contact Beryllium Facilities & Areas Beryllium Program Information Hanford CBDPP Committee Beryllium FAQs Beryllium Related Links Hanford Beryllium Awareness Group (BAG) Program Performance Assessments Beryllium Program Feedback Beryllium Health Advocates Primary Contractors/Employers Medical Testing and Surveillance Facilities General Resources Beryllium Program Points of Contact Email Email Page | Print Print

  14. Hanford Speakers Bureau Presentations FY2014 - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    4 Hanford Speakers Bureau Hanford Speakers Bureau Request Form Hanford Speakers Bureau Frequently Asked Questions Why Hanford? Video Hanford Speakers Bureau Presentations FY2015...

  15. The Hanford Story | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Hanford Story The Hanford Story Addthis Description Washington Closure Hanford depicting The Hanford Story

  16. Hanford.gov Site Maintenance - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Hanford.gov Site Maintenance Email Email Page | Print Print Page | Text Increase Font Size ...

  17. Tank Farms - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Farms Office of River Protection About ORP ORP Projects & Facilities Tank Farms Retrieval Activities PHOENIX - Tank Monitoring Waste Treatment & Immobilization Plant 242-A Evaporator 222-S Laboratory Newsroom Contracts & Procurements Contact ORP Tank Farms Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Tank Farms What are Tank Farms? For more than 40 years, facilities at the Hanford Site produced plutonium Tanks by the Numbers critical to the

  18. Hanford Waste Vitrification Plant technical manual

    SciTech Connect (OSTI)

    Larson, D.E.; Watrous, R.A.; Kruger, O.L.

    1996-03-01

    A key element of the Hanford waste management strategy is the construction of a new facility, the Hanford Waste Vitrification Plant (HWVP), to vitrify existing and future liquid high-level waste produced by defense activities at the Hanford Site. The HWVP mission is to vitrify pretreated waste in borosilicate glass, cast the glass into stainless steel canisters, and store the canisters at the Hanford Site until they are shipped to a federal geological repository. The HWVP Technical Manual (Manual) documents the technical bases of the current HWVP process and provides a physical description of the related equipment and the plant. The immediate purpose of the document is to provide the technical bases for preparation of project baseline documents that will be used to direct the Title 1 and Title 2 design by the A/E, Fluor. The content of the Manual is organized in the following manner. Chapter 1.0 contains the background and context within which the HWVP was designed. Chapter 2.0 describes the site, plant, equipment and supporting services and provides the context for application of the process information in the Manual. Chapter 3.0 provides plant feed and product requirements, which are primary process bases for plant operation. Chapter 4.0 summarizes the technology for each plant process. Chapter 5.0 describes the engineering principles for designing major types of HWVP equipment. Chapter 6.0 describes the general safety aspects of the plant and process to assist in safe and prudent facility operation. Chapter 7.0 includes a description of the waste form qualification program and data. Chapter 8.0 indicates the current status of quality assurance requirements for the Manual. The Appendices provide data that are too extensive to be placed in the main text, such as extensive tables and sets of figures. The Manual is a revision of the 1987 version.

  19. Facility effluent monitoring plan for the tank farm facility

    SciTech Connect (OSTI)

    Crummel, G.M.

    1998-05-18

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  20. Grout Isolation and Stabilization of Structures and Materials within Nuclear Facilities at the U.S. Department of Energy, Hanford Site, Summary - 12309

    SciTech Connect (OSTI)

    Phillips, S.J.; Phillips, M.; Etheridge, D.; Chojnacki, D.W.; Herzog, C.B.; Matosich, B.J.; Steffen, J.M.; Sterling, R.T.; Flaucher, R.H.; Lloyd, E.R.

    2012-07-01

    Per regulatory agreement and facility closure design, U.S. Department of Energy Hanford Site nuclear fuel cycle structures and materials require in situ isolation in perpetuity and/or interim physicochemical stabilization as a part of final disposal or interim waste removal, respectively. To this end, grout materials are being used to encase facilities structures or are being incorporated within structures containing hazardous and radioactive contaminants. Facilities where grout materials have been recently used for isolation and stabilization include: (1) spent fuel separations, (2) uranium trioxide calcining, (3) reactor fuel storage basin, (4) reactor fuel cooling basin transport rail tanker cars and casks, (5) cold vacuum drying and reactor fuel load-out, and (6) plutonium fuel metal finishing. Grout components primarily include: (1) portland cement, (2) fly ash, (3) aggregate, and (4) chemical admixtures. Mix designs for these typically include aggregate and non aggregate slurries and bulk powders. Placement equipment includes: (1) concrete piston line pump or boom pump truck for grout slurry, (2) progressive cavity and shearing vortex pump systems, and (3) extendable boom fork lift for bulk powder dry grout mix. Grout slurries placed within the interior of facilities were typically conveyed utilizing large diameter slick line and the equivalent diameter flexible high pressure concrete conveyance hose. Other facilities requirements dictated use of much smaller diameter flexible grout conveyance hose. Placement required direct operator location within facilities structures in most cases, whereas due to radiological dose concerns, placement has also been completed remotely with significant standoff distances. Grout performance during placement and subsequent to placement often required unique design. For example, grout placed in fuel basin structures to serve as interim stabilization materials required sufficient bearing i.e., unconfined compressive strength, to

  1. Hanford Workers Compensation Flow - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Site Wide Programs Hanford Workers Compensation Hanford Workers Compensation Flow About Us Hanford Workers Compensation PENSER Representatives Hanford Workers Compensation Flow Compensation Claim Process Presentations Related Information Vocational Rehabilitation Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Worker's Compensation Flow - Printable Version (PDF) WC_Flowchart Share on Last Updated 02/14/2016 4:51

  2. Contact Hanford Fire Department - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Department Contact Hanford Fire Department Hanford Fire Department Hanford Fire Department Home About Hanford Fire Department Fire and Life Safety Information Hot Links to Cool Spots Contact Hanford Fire Department Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size HanfordFire@rl.gov

  3. Chiller Controls-related Energy Saving Opportunities in FederalFacilities

    SciTech Connect (OSTI)

    Webster, Tom

    2003-01-01

    Chillers are a significant component of large facility energy use. The focus of much of the development of chilled water systems in recent years has been on optimization of set point and staging controls, improvements in chiller design to increase efficiency and accommodate chlorofluorocarbon (CFC) refrigerant replacements. Other improvements have been made by upgrading controls to the latest digital technologies, improving access and monitoring via communications and sophisticated liquid crystal displays (LCD), more robust fault diagnostics and operating and maintenance information logging. Advances have also been made in how chiller plant systems are designed and operated, and in the diversity of chiller products that are available to support innovative approaches. As in many industries, these improvements have been facilitated by advances in, and lower costs for, enabling technologies, such as refrigerants, compressor design, electronics for controls and variable frequency drives (VFD). Along with the improvements in electronics one would expect that advances have also been made in the functionality of unit controls included with chillers. Originally, the primary purpose of this project was to investigate the state of practice of chiller unit controllers in terms of their energy saving capabilities. However, early in the study it was discovered that advances in this area did not include incorporation of significantly different capabilities than had existed 10-15 years ago. Thus the scope has been modified to provide an overview of some of the basic controls-related energy saving strategies that are currently available along with guideline estimates of their potential and applicability. We have minimized consideration of strategies that could be primarily implemented via design practices such as chiller selection and plant design, and those that can only be implemented by a building management system (BMS). Also, since most of the floor space of federal buildings

  4. FLUOR HANFORD SAFETY MANAGEMENT PROGRAMS

    SciTech Connect (OSTI)

    GARVIN, L. J.; JENSEN, M. A.

    2004-04-13

    This document summarizes safety management programs used within the scope of the ''Project Hanford Management Contract''. The document has been developed to meet the format and content requirements of DOE-STD-3009-94, ''Preparation Guide for US. Department of Energy Nonreactor Nuclear Facility Documented Safety Analyses''. This document provides summary descriptions of Fluor Hanford safety management programs, which Fluor Hanford nuclear facilities may reference and incorporate into their safety basis when producing facility- or activity-specific documented safety analyses (DSA). Facility- or activity-specific DSAs will identify any variances to the safety management programs described in this document and any specific attributes of these safety management programs that are important for controlling potentially hazardous conditions. In addition, facility- or activity-specific DSAs may identify unique additions to the safety management programs that are needed to control potentially hazardous conditions.

  5. HANFORD SCIENCE & TECHNOLOGY NEEDS STATEMENTS 2002

    SciTech Connect (OSTI)

    WIBLE, R.A.

    2002-04-01

    This document: (a) provides a comprehensive listing of the Hanford sites science and technology needs for fiscal year (FY) 2002; and (b) identifies partnering and commercialization opportunities within industry, other federal and state agencies, and the academic community. These needs were prepared by the Hanford projects (within the Project Hanford Management Contract, the Environmental Restoration Contract and the River Protection Project) and subsequently reviewed and endorsed by the Hanford Site Technology Coordination Group (STCG). The STCG reviews included participation of DOE-RL and DOE-ORP Management, site stakeholders, state and federal regulators, and Tribal Nations. These needs are reviewed and updated on an annual basis and given a broad distribution.

  6. Federal Register

    Energy Savers

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  7. Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Site Cleanup Tours Hanford Site Cleanup Tours Tour Registration Required Forms of ID Tour Information Tour Route Find Confirmation Seat Notification Frequently Asked Questions Media Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size This website will not function with Javascript disabled Tour Information Registration for the 2016 Hanford Site Cleanup Tours is now closed Updates for the 2017 season will be posted when available Hanford Site Cleanup Tours The

  8. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book

    3 Energy Independence and Security Act of 2007, Provisions Affecting Energy Consumption in Federal Buildings Source(s): Standard Relating to Solar Hot Water - Requires new Federal buildings, or Federal buildings undergoing major renovations, to meet at least 30 percent of hot water demand through the use of solar hot water heaters, if cost-effective. [Section 523] Federally-Procured Appliances with Standby Power - Requires all Federal agencies to procure appliances with standby power consumption

  9. RCRA facility investigation/corrective measures study work plan for the 200-UP-2 Operable Unit, Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1993-06-01

    The 200-UP-2 Operable Unit is one of two source operable units at the U Plant Aggregate Area at the Hanford Site. Source operable units include waste management units and unplanned release sites that are potential sources of radioactive and/or hazardous substance contamination. This work plan, while maintaining the title RFI/CMS, presents the background and direction for conducting a limited field investigation in the 200-UP-2 Operable Unit, which is the first part of the process leading to final remedy selection. This report discusses the background, prior recommendations, goals, organization, and quality assurance for the 200-UP-2 Operable Unit Work Plan. The discussion begins with a summary of the regulatory framework and the role of the work plan. The specific recommendations leading into the work plan are then addressed. Next, the goals and organization of the report are discussed. Finally, the quality assurance and supporting documentation are presented.

  10. Hanford Single-Shell Tank Leak Causes and Locations - 241-SX Farm

    SciTech Connect (OSTI)

    Girardot, Crystal L.; Harlow, Donald G.

    2014-01-08

    This document identifies 241-SX Tank Farm (SX Farm) leak causes and locations for the 100 series leaking tanks (241-SX-107, 241-SX-108, 241-SX-109, 241-SX-111, 241-SX-112, 241-SX-113, 241-SX-114, and 241-SX-115) identified in RPP-ENV-39658, Rev. 0, Hanford SX-Farm Leak Assessments Report. This document satisfies the SX Farm portion of the target (T04) in the Hanford Federal Facility Agreement and Consent Order milestone M-045-91F.

  11. Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Board River and Plateau (RAP) Meeting Public Involvement Meetings Hanford Advisory Board Health, Safety, and Environmental Protection (HSEP) Committee Meeting Public Involvement...

  12. Full Focus Needed on Finishing Hanford's Waste Treatment Plant - 12196

    SciTech Connect (OSTI)

    Dahl, Suzanne; Biyani, Rabindra; Holmes, Erika

    2012-07-01

    The United States Department of Energy's (US DOE's) Hanford Nuclear Site has 177 underground waste storage tanks located 19 to 24 km (12 to 15 miles) from the Columbia River in south-central Washington State. Hanford's tanks now hold about 212,000 cu m (56 million gallons) of highly radioactive and chemically hazardous waste. Sixty-seven tanks have leaked an estimated 3,785 cu m (1 million gallons) of this waste into the surrounding soil. Further releases to soil, groundwater, and the Columbia River are the inevitable result of the tanks continuing to age. The risk from this waste is recognized as a threat to the Northwest by both State and Federal governments. US DOE and Bechtel National, Inc., are building the Waste Treatment and Immobilization Plant (WTP) to treat and vitrify (immobilize in glass) the waste from Hanford's tanks. As is usual for any groundbreaking project, problems have arisen that must be resolved as they occur if treatment is to take place as specified in the court-enforceable Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) and the Consent Decree, entered into by US DOE, the U.S. Environmental Protection Agency, and the Washington State Department of Ecology (Ecology). At times, US DOE's approach to solving these critical issues seems to have caused undue wastes of time, energy, and, ultimately, public funds. Upon reviewing the history of Hanford's tank waste treatment project, Ecology hopes that constructive criticism of past failures and praise of successes will inspire US DOE to consider changing practices, be more transparent with regulatory agencies and the public, and take a 'lean production' approach to successfully completing this project. All three Tri-Party Agreement agencies share the goal of completing WTP on time, ensuring it is operational and in compliance with safety standards. To do this, Ecology believes US DOE should: - Maintain focus on the primary goal of completing the five major facilities of

  13. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2009 May 12, 2009 DOE Issues Notice to Proceed to Mission Support Contractor Today, the Department of Energy Richland Operations Office issued a Notice to Proceed to Mission Support Alliance, LLC, and the contractor is now authorized to begin mission support work at the Hanford Site. May 08, 2009 First 400 Hired with Recovery Act Funding at Hanford Four hundred employees hired using American Recovery and Reinvestment Act funding are reporting to work at the Hanford Site and receiving

  14. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    December 2013 December 16, 2013 DOE Exercises Option for Mission Support Contract The Department of Energy is extending Mission Support Alliance's contract for infrastructure and site services at the Hanford Site in southeastern Washington state by three years. December 13, 2013 DOE Announces Record of Decision on Hanford Tank Closure and Waste Management December 05, 2013 Washington Closure Hanford Reaches $1 billion in Small Business Subcontracting $783 million goes to businesses in Washington

  15. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2014 April 22, 2014 FACT SHEET: Cleanup Progress at Hanford Check the metrics on Hanford Site cleanup since 1989 in this fact sheet that is updated periodically (this version: March 2014). April 22, 2014 VIDEO: Managing Safety Equipment at Hanford Through teamwork and sharing of information, Plutonium Finishing Plant industrial hygiene employees increase safety for all plant employees. April 18, 2014 Department of Energy Responds to Washington State's Proposal to Amend the Consent Decree

  16. Hanford Workers Compensation - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    at the Hanford Site, the Department of Energy (DOE) wants to hear from you. Our mission is to improve communication among DOE, DOE's third party administrator, Penser...

  17. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    has posted on its website a report on its independent inspection of the Hanford Site Chronic Beryllium Disease Prevention Program (Released June 2, 2010) June 02, 2010 Inspection...

  18. Hanford Fire Department - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The other services provided to Hanford Site contractors include functional testing and preventive and corrective maintenance of installed, automatic life safety fire detection and ...

  19. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2010 May 27, 2010 Recovery Act Progress at Hanford Read the full report on ARRA progress (through 3/31) at the Hanford Site. May 25, 2010 Cleaning Up After The Cold War: Hanford's Tank Waste In a recent article for the Daily Kos, former Hanford radiochemist Page van der Linden explains the complexity and importance of tank waste retrieval and processing. May 24, 2010 Department of Energy Strengthens Management of the Waste Treatment Plant in Washington State U.S. Energy Secretary Steven Chu

  20. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2010 September 28, 2010 PHOTO GALLERY: See progress to construct the 200 West pump and treat system at Hanford. Steel is on the rise at the construction site of the 200 West Groundwater Treatment System. Check out these photos of a 100-ton crane hoisting the first structural steel for what will become Hanford's largest pump-and-treat system to date. September 27, 2010 Hanford Firefighters Bring 2010 Fire Season To A Close This year, Hanford firefighters fought 31 fires that burned a

  1. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2011 February 28, 2011 PRESS RELEASE: TPA Agencies To Hold "State of the Site" Meetings Richland, Seattle, and Portland Dates Set To Discuss Hanford Cleanup February 24, 2011 PRESS RELEASE: Online Registration Dates Set for 2011 Hanford Tours Numerous Tours of both the Hanford Site and the B Reactor Continue in 2011 February 23, 2011 PRESS RELEASE: Major Recovery Act Project Completed at Hanford -- Super Cells 9 and 10 Two New Super Cells Go Into Service To Accept Contaminated

  2. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book

    2 Executive Order 13423, Provisions Affecting Energy Consumption in Federal Buildings Source(s): -- Requires Federal agencies to improve energy efficiency and reduce greenhouse gas emissions by either 3 percent annual reductions through FY 2015, or by 30 percent by 2015, as compared to FY 2003. -- Requires Federal agencies to obtain at least half of required renewable energy from new renewable sources. Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation

  3. RADIONUCLIDE AIR EMISSIONS REPORT FOR THE HANFORD SITE CY2003

    SciTech Connect (OSTI)

    ROKKAN, D.J.

    2004-06-11

    This report documents radionuclide air emissions from the US Department of Energy (DOE) Hanford Site in 2003 and the resulting effective dose equivalent (EDE) to the maximally exposed individual (MEI) member of the public. The report has been prepared in accordance with the Code of Federal Regulations (CFR), Title 40, Protection of the Environment, Part 61, National Emission Standards for Hazardous Air Pollutants, Subpart H, ''National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities''; Washington Administrative Code (WAC) Chapter 246-247, ''Radiation Protection-Air Emissions''; 10 CFR 830.120, Quality Assurance; DOE Order 414.1B, Quality Assurance; NQA-1, Quality Assurance Requirements for Nuclear Facility Application; EPA QA/R-2, EPA Requirements for Quality Management Plans; and EPA QA/R-5, Requirements for Quality Assurance Project Plans. The federal regulations in Subpart H of 40 CFR 61 require the measurement and reporting of radionuclides emitted from DOE facilities and the resulting public dose from those emissions. A standard of 10 mrem/yr EDE is not to be exceeded. The EDE to the MEI due to routine and nonroutine emissions in 2003 from Hanford Site point sources was 0.022 mrem (0.00022 mSv), or 0.22 percent of the federal standard. The portions of the Hanford Site MEI dose attributable to individual point sources as listed in Section 2.0 are appropriate for use in demonstrating the compliance of abated stack emissions with applicable terms of the Hanford Site Air Operating Permit and of Notices of Construction. The state has adopted the 40 CFR 61 standard of 10 mrem/yr EDE into their regulations, yet further requires that the EDE to the MEI be calculated not only from point source emissions but also from diffuse and fugitive sources of emissions. WAC 246-247 also requires the reporting of radionuclide emissions from all Hanford Site sources during routine as well as nonroutine operations. The EDE from

  4. Hanford For Students and Kids - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford For Students and Kids Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Hanford For Students and Kids Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Nuclear Reservation is a pretty amazing place. Located in the present-day southeast corner of Washington State, the area where Hanford sits has a history that actually began thousands of years ago when wild animals roamed free and Indians were the only

  5. Franklin Matthias - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Franklin Matthias Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert ...

  6. Albert Einstein - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Albert Einstein Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert ...

  7. Gilbert Church - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Gilbert Church Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert ...

  8. Leslie Groves - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Leslie Groves Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert ...

  9. Glenn Seaborg - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Glenn Seaborg Hanford For Students and Kids Hanford Fun Facts Classroom Projects Famous People of Hanford Albert Einstein Enrico Fermi Leslie Groves Franklin Matthias Gilbert ...

  10. Land Management - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Land Management About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us Land Management Email Email Page | Print Print Page |Text Increase Font Size...

  11. Environmental - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Documents Environmental Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site ...

  12. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2012 February 16, 2012 PRESS RELEASE: Fourth Chapter of Hanford Story Released to Public The "Tank Waste Cleanup" focuses on the work conducted by the Office of River Protection to retrieve, treat and ultimately dispose of the 56 million gallons of Hanford's tank waste

  13. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    December 2015 December 29, 2015 The Department of Energy's Office of Environmental Management Update Newsletter Spotlights River Corridor Cleanup at Hanford Site EM marks the many accomplishments the Richland Operations Office and its contractors have achieved in cleanup along the Columbia River corridor at the Hanford Site

  14. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2016 October 24, 2016 DOE Meets FY2016 Groundwater Cleanup Goals at Hanford Workers at the U.S. Department of Energy's (DOE) Hanford Site are marking another year of significant achievements in protecting the Columbia River from contaminated groundwater

  15. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2016 February 25, 2016 Workers Remove Most Contaminated Processing Equipment from Hanford Plutonium Finishing Plant Workers have finished cutting up and removing the two most highly contaminated pieces of processing equipment, called glove boxes, from the Plutonium Finishing Plant at the Hanford Site in

  16. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2015 May 07, 2015 Washington State University to Manage Hanford's Manhattan Project and Cold War-era Artifacts and Archives The U.S. Department of Energy's Richland Operations Office (RL), through site contractor Mission Support Alliance (MSA), has begun a new partnership with Washington State University Tri-Cities that will provide expert care of Hanford Site artifacts

  17. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    August 2015 August 25, 2015 Workers Remove Iconic Glove Boxes from Hanford&apos;s Historic McCluskey Room Workers recently finished removing three pieces of history from one of the most hazardous rooms at the Hanford Site in Washington State

  18. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2016 October 24, 2016 DOE Meets FY2016 Groundwater Cleanup Goals at Hanford Workers at the U.S. Department of Energy's (DOE) Hanford Site are marking another year of significant achievements in protecting the Columbia River from contaminated groundwater. October 13, 2016 MSA Releases Rehabilitated Owl Recently, Mission Support Alliance (MSA) wildlife biologists released a rehabilitated barn owl back into the wild

  19. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2016 February 25, 2016 Workers Remove Most Contaminated Processing Equipment from Hanford Plutonium Finishing Plant Workers have finished cutting up and removing the two most highly contaminated pieces of processing equipment, called glove boxes, from the Plutonium Finishing Plant at the Hanford Site in

  20. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2016 May 30, 2016 Registration for Additional Hanford Site Cleanup Tours Begin on June 1 Due to popularity of the Hanford Site cleanup tour, registration for 10 additional tours will begin at 9 a.m. on Tuesday, June 1

  1. Hanford analytical services quality assurance requirements documents

    SciTech Connect (OSTI)

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  2. Hanford Site Voluntary Protection Program - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Site Voluntary Protection Program Hanford Site Voluntary Protection Program Hanford Site Voluntary Protection Program VPP Home VPP Hanford Site Champions Committee Getting Started Maintaining STAR VPP Communications VPP Conferences Hanford Site Voluntary Protection Program Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2013 VPPPA Outreach Award Winners VPP Committee Business Case (PDF)

  3. Evaluation of mitigation strategies in Facility Group 1 double-shell flammable-gas tanks at the Hanford Site

    SciTech Connect (OSTI)

    Unal, C.; Sadasivan, P.; Kubic, W.L.; White, J.R.

    1997-11-01

    Radioactive nuclear waste at the Hanford Site is stored in underground waste storage tanks at the site. The tanks fall into two main categories: single-shell tanks (SSTs) and double-shell tanks (DSTs). There are a total of 149 SSTs and 28 DSTs. The wastes stored in the tanks are chemically complex. They basically involve various sodium salts (mainly nitrite, nitrate, carbonates, aluminates, and hydroxides), organic compounds, heavy metals, and various radionuclides, including cesium, strontium, plutonium, and uranium. The waste is known to generate flammable gas (FG) [hydrogen, ammonia, nitrous oxide, hydrocarbons] by complex chemical reactions. The process of gas generation, retention, and release is transient. Some tanks reach a quasi-steady stage where gas generation is balanced by the release rate. Other tanks show continuous cycles of retention followed by episodic release. There currently are 25 tanks on the Flammable Gas Watch List (FGWL). The objective of this report is to evaluate possible mitigation strategies to eliminate the FG hazard. The evaluation is an engineering study of mitigation concepts for FG generation, retention, and release behavior in Tanks SY-101, AN-103, AN 104, An-105, and Aw-101. Where possible, limited quantification of the effects of mitigation strategies on the FG hazard also is considered. The results obtained from quantification efforts discussed in this report should be considered as best-estimate values. Results and conclusions of this work are intended to help in establishing methodologies in the contractor`s controls selection analysis to develop necessary safety controls for closing the FG unreviewed safety question. The general performance requirements of any mitigation scheme are discussed first.

  4. Gold Awards - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Site Wide Programs DOE Human Resources Management Recognition and Awards Program Gold Awards About Us DOE Human Resources Management Division DOE Employment Recognition and Awards Program Gold Awards Silver Award Federal Employees Union (AFGE Local 788) Work Schedules / Pay and Leave Benefits and Services EEO & Diversity Gold Awards Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Recognition is provided through monetary, non-monetary, and honorary

  5. Silver Award - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    About Us Hanford Site Wide Programs DOE Human Resources Management Recognition and Awards Program Silver Award About Us DOE Human Resources Management Division DOE Employment Recognition and Awards Program Gold Awards Silver Award Federal Employees Union (AFGE Local 788) Work Schedules / Pay and Leave Benefits and Services EEO & Diversity Silver Award Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Recognition is provided through monetary, non-monetary, and

  6. Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    of 06934566 .l\ ~ ~ ~~9 u.s. Department of Energy Hanford Site OEC 2 8 2004 04-0RP-O78 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin Avenue, Suite 135 Rich1and, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) CONSENSUS ADVICE #167 -STOP WORK AUTHORITY Reference: HAB letter from T. Martin to P. Golan and J. Shaw, DOE-HQ; K. Klein, RL; R. Schepens, ORP; L. Hoffman, Ecology; and R. Kreizeneeck, EPA, "Stop Work Authority," dated November 5, 2004. This letter

  7. An Application of the SSHAC Level 3 Process to the Probabilistic Seismic Hazard Analysis for Nuclear Facilities at the Hanford Site, Eastern Washington, USA

    SciTech Connect (OSTI)

    Coppersmith , Kevin J.; Bommer, Julian J.; Bryce, Robert W.; Mcduffie, Stephen M.; Lisle, Greg A.

    2013-08-22

    Under the sponsorship of the US Department of Energy (DOE) and the electric utility Energy Northwest, the Pacific Northwest National Laboratory (PNNL) is conducting a probabilistic seismic hazard analysis (PSHA) within the framework of a SSHAC Level 3 procedure (Senior Seismic Hazard Analysis Committee; Budnitz et al., 1997). Specifically, the project is being conducted following the guidelines and requirements specified in NUREG-2117 (USNRC, 2012b) and consistent with approach given in the American Nuclear Standard ANSI/ANS-2.29-2008 Probabilistic Seismic Hazard Analysis. The collaboration between DOE and Energy Northwest is spawned by the needs of both organizations for an accepted PSHA with high levels of regulatory assurance that can be used for the design and safety evaluation of nuclear facilities. DOE committed to this study after performing a ten-year review of the existing PSHA, as required by DOE Order 420.1C. The study will also be used by Energy Northwest as a basis for fulfilling the NRC’s 10CFR50.54(f) requirement that the western US nuclear power plants conduct PSHAs in conformance with SSHAC Level 3 procedures. The study was planned and is being carried out in conjunction with a project Work Plan, which identifies the purpose of the study, the roles and responsibilities of all participants, tasks and their associated schedules, Quality Assurance (QA) requirements, and project deliverables. New data collection and analysis activities are being conducted as a means of reducing the uncertainties in key inputs to the PSHA. It is anticipated that the results of the study will provide inputs to the site response analyses at multiple nuclear facility sites within the Hanford Site and at the Columbia Generating Station.

  8. About ORP - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ORP Office of River Protection About ORP ORP Mission ORP Team Message from the Manager ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP About ORP Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 'Office of River Protection' U.S. Department of Energy Office of River Protection The U.S. Department of Energy's (DOE) Hanford Site in southeast Washington State is home to 56 million gallons of chemical and radioactive waste stored in

  9. Contact ORP - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contact ORP Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements Contact ORP Contact ORP Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Do you have a question? Contact the Office of River Protection DOE Logo Street Address: DOE ORP 2440 Stevens Center Place, H660 Richland, WA, 99354 Mailing Address: DOE ORP PO Box 450 Richland, WA 99352 Phone Contact: Hanford Site Operator 509-376-7411 ORP Office of

  10. Operational Issues at the Environmental Restoration Disposal Facility at

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hanford | Department of Energy Operational Issues at the Environmental Restoration Disposal Facility at Hanford Operational Issues at the Environmental Restoration Disposal Facility at Hanford Full Document and Summary Versions are available for download Operational Issues at the Environmental Restoration Disposal Facility at Hanford (238.34 KB) Summary - Operational Issues at the Environmental Restoration Disposal Facility (ERDF) at Hanford (56.27 KB) More Documents & Publications Idaho

  11. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  12. HAB Hanford Advisory Board

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    HAB Hanford Advisory Board Annual Report 2014 On the cover: Demolition at Hanford's 300 Area. Hanford Advisory Board 2014 The Hanford Advisory Board would like to acknowledge the following resources used for the content of the Board's Annual Report: * Washington State Department of Ecology website (www.ecy.wa.gov/programs/nwp/index.html) * U.S. Department of Energy Hanford Site website (www.hanford.gov) * Hanford Facebook page (www.facebook.com/HanfordSite) * Tri-Party Agreement agency

  13. Radionuclide air emissions report for the Hanford site, Calendar year 1994

    SciTech Connect (OSTI)

    Gleckler, B.P.; Diediker, L.P.; Jette, S.J.; Rhoads, K.; Soldat, S.K.

    1995-06-01

    This report documents radionuclide air emissions from the Hanford Site in 1994, and the resulting effective dose equivalent to the maximally exposed member of the public, referred to as the ``MEI.`` The report has been prepared and will be submitted in accordance with reporting requirements in the Code of Federal Regulations, title 40, Protection of the Environment, Part 61, ``National Emissions Standards for Hazardous Air Pollutants,`` Subpart H, ``National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.``

  14. Radionuclide air emissions report for the Hanford Site, calendar year 1992

    SciTech Connect (OSTI)

    Diediker, L.P.; Johnson, A.R.; Rhoads, K.; Klages, D.L.; Soldat, J.K.; Rokkan, D.J.

    1993-06-01

    This report documents radionuclide air emissions from the Hanford Site in 1992 and the resulting effective dose equivalent to an member of the public. The report has been prepared and will be submitted in accordance with reporting requirements in the Code of Federal Regulations, Title 40, Protection of the Environment, Part 61, ``National Emissions Standards for Hazardous Air Pollutants,`` Subpart H, ``National Emission Standards for Emissions of Radionuclides Other than Radon from Department of Energy Facilities.``

  15. Department of Energy's Tribal Program - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford's Tribal Program About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford's Tribal Program Home Hanford Cultural Resources DOE American Indian...

  16. Routine environmental audit of the Hanford Site, Richland, Washington

    SciTech Connect (OSTI)

    Not Available

    1994-05-01

    This report documents the results of the routine environmental audit of the Hanford Site (Hanford), Richland, Washington. During this audit, the activities conducted by the audit team included reviews of internal documents an reports from previous audits and assessments; interviews with US Department of Energy (DOE), State of Washington regulatory, and contractor personnel; and inspections and observations of selected facilities and operations. The onsite portion of the audit was conducted May 2--13, 1994, by the DOE Office of Environmental Audit (EH-24), located within the Office of Environment, Safety and Health (EH). The audit evaluated the status of programs to ensure compliance with Federal, State, and local environmental laws and regulations; compliance with DOE orders, guidance, and directives; and conformance with accepted industry practices and standards of performance. The audit also evaluated the status and adequacy of the management systems developed to address environmental requirements.

  17. Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Did You Know Did You Know Calendar Hanford Blog Archive Search Site Feeds Site Index Weather What's New Did You Know Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Close Did you know.... Close

  18. Tritium monitoring in groundwater and evaluation of model predictions for the Hanford Site 200 Area Effluent Treatment Facility

    SciTech Connect (OSTI)

    Barnett, D.B.; Bergeron, M.P.; Cole, C.R.; Freshley, M.D.; Wurstner, S.K.

    1997-08-01

    The Effluent Treatment Facility (ETF) disposal site, also known as the State-Approved Land Disposal Site (SALDS), receives treated effluent containing tritium, which is allowed to infiltrate through the soil column to the water table. Tritium was first detected in groundwater monitoring wells around the facility in July 1996. The SALDS groundwater monitoring plan requires revision of a predictive groundwater model and reevaluation of the monitoring well network one year from the first detection of tritium in groundwater. This document is written primarily to satisfy these requirements and to report on analytical results for tritium in the SALDS groundwater monitoring network through April 1997. The document also recommends an approach to continued groundwater monitoring for tritium at the SALDS. Comparison of numerical groundwater models applied over the last several years indicate that earlier predictions, which show tritium from the SALDS approaching the Columbia River, were too simplified or overly robust in source assumptions. The most recent modeling indicates that concentrations of tritium above 500 pCi/L will extend, at most, no further than {approximately}1.5 km from the facility, using the most reasonable projections of ETF operation. This extent encompasses only the wells in the current SALDS tritium-tracking network.

  19. Independent Oversight Review, Hanford K Basin and Cold Vacuum...

    Energy.gov (indexed) [DOE]

    Hanford K Basin and Cold Vacuum Drying Facility Found Fuel Multi-Canister Overpack Operations This report provides the results of an independent oversight review of operations...

  20. Hanford Tank Waste Retrieval, Treatment, and Disposition Framework...

    Energy Savers

    wastes stored in 177 underground tanks (tank farms) located on Hanford's Central Plateau. ... and the ultimate closure of the tanks and decommissioning of the treatment facilities. ...

  1. Enterprise Assessments Review of the Hanford Site Waste Treatment...

    Office of Environmental Management (EM)

    Low-Activity Waste Facility Hazards Analysis Reports for the Melter and Melter Offgas Systems - September 2015 Enterprise Assessments Review of the Hanford Site Waste Treatment and ...

  2. Hanford ARRA News - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Recovery Act of 2009 Hanford ARRA News Recovery Act of 2009 Hanford ARRA News Hanford ARRA News Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size 2010 July 26, 2010 K East Reactor Stack Taken Down (PDF) DOE and contractor CH2M HILL Plateau Remediation Company used Recovery Act funding to take down the stack of the K East Reactor using explosives on July 23, 2010. July 21, 2010 Helicopter Removes Aging Truck From Steep Rattlesnake Ravine (PDF) A Sikorsky S-64

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    July 2013 July 19, 2013 ORP Update on Status of Double Shell Tank AY-102 July 16, 2013 VIDEO: 300 Area Proposed Plan Overview The 300 Area, just north of Richland, Washington, was where fuel for Hanford's nine plutonium production reactors was manufactured. July 15, 2013 NEWS RELEASE: Hanford Site Treating Record Amount of Groundwater Contractor CH2M HILL met annual goal for treating 1.4 billion gallons 3 months early and removed 36 tons of contaminants. July 09, 2013 Hanford Landfill Reaches 15

  4. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2014 February 27, 2014 Registration Starts Soon for Hanford's Two Annual Public Tour Programs The U.S. Department of Energy (DOE) will open online registration for both of its public tour programs in early March. The Hanford Site public tours focus on environmental cleanup while the B Reactor tours focus on Hanford's role in the top secret Manhattan Project during World War II. February 14, 2014 1,153-ton Waste Vault Removed from 300 Area Vault held waste tanks with contamination from

  5. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2016 March 31, 2016 Manhattan Project National Historical Park at Hanford Expands 2016 Tour Season In partnership with the National Park Service (NPS), the U.S. Department of Energy (DOE) will open registration for the Manhattan Project National Historical Park's 2016 public tour season at the Hanford, Wash., sites on Monday, April 4, at 8:00 a.m. March 21, 2016 Hanford Cleanup Tour Registration Begins in April The U.S. Department of Energy (DOE) will open online registration for the 2016

  6. Hanford Natural Resource Trustee Council - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Council About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Hanford Natural Resource Trustee Council HNRTC Members HNRTC History & Accomplishments Contact Us Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The Hanford Natural Resource Trustee Council is a collaborative working group chartered to address natural resources impacted by Hanford Site releases of hazardous substances. The objectives of the NRTC are: White Bluffs To help ensure

  7. Hanford Site Safety Standards - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Hanford Site Safety Standards Documents Documents Hanford Site Cleanup Completion Framework Tri-Party Agreement Freedom of Information and Privacy Act Hanford Site Budget Hanford Site Safety Standards Hanford Hoisting and Rigging Manual DOE - ORP Contracts/Procurements DOE - RL Contracts/Procurements Integrated Waste Feed Delivery Plan Single-Shell Tank Evaluations Deep Vadose Zone 100-F RI/FS 100-D/H Operable Units RI/FS Sitewide Probabilistic Seismic Hazard Analysis Environmental Hanford Site

  8. Hanford Site Cleanup By the Numbers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hanford Site Cleanup By the Numbers Hanford Site Cleanup By the Numbers Hanford Site Cleanup By the Numbers In 2015, EM developed site infographics highlighting each sites history and important metrics including: Decontamination and demolition of facilities and waste sites Secure storage of spent fuel Retrieval of radioactive sludge and saltcake from tanks Treatment of contaminated groundwater Waste safely stored in an underground repository Available for Download Hanford Site Cleanup By the

  9. Development and implementation of an analytical quality assurance plan at the Hanford site

    SciTech Connect (OSTI)

    Kuhl-Klinger, K.J.; Taylor, C.D.; Kawabata, K.K.

    1995-08-01

    The Hanford Analytical Services Quality Assurance Plan (HASQAP) provides a uniform standard for onsite and offsite laboratories performing analytical work in support of Hanford Site environmental cleanup initiatives. The Hanford Site is a nuclear site that originated during World War 11 and has a legacy of environmental clean up issues. In early 1993, the need for and feasibility of developing a quality assurance plan to direct all analytical activities performed to support environmental cleanup initiatives set forth in the Hanford Federal Facility Agreement and Consent Order were discussed. Several group discussions were held and from them came the HASQAP. This document will become the quality assurance guidance document in a Federal Facility Agreement and Consent Order. This paper presents the mechanics involved in developing a quality assurance plan for this scope of activity, including the approach taken to resolve the variability of quality control requirements driven by numerous regulations. It further describes the consensus building process and how the goal of uniting onsite and offsite laboratories as well as inorganic, organic, and radioanalytic disciplines under a common understanding of basic quality control concepts was achieved.

  10. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    3 Direct Appropriations on Federal Buildings Energy Conservation Retrofits and Capital Equipment (2010 Million) FY 1985 FY 1986 FY 1987 FY 1988 FY 1989 FY 1990 Source(s): DOE...

  11. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book

    1 Energy Policy Act of 2005, Provisions Affecting Energy Consumption in Federal Buildings Source(s): Energy Management Requirements - Amended reduction goals set by the National Energy Conservation Policy Act, and requires increasing percentage reductions in energy consumption through FY 2015, with a final energy consumption reduction goal of 20 percent savings in FY 2015, as compared to the baseline energy consumption of Federal buildings in FY 2003. (These goals were superseded by Section 431

  12. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2009 February 18, 2009 Briefing on Cleanup to Washington State Legislature Representatives of the two DOE field offices briefed Washington State legislators in Olympia on cleanup progress at the Hanford Site

  13. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 28, 2011 PHOTO GALLERY: Demolition of a Coal-Fired Power House (284W) Contractor ... September 09, 2011 PRESS RELEASE: Hanford Waste Treatment Plant receives and sets key ...

  14. HANFORD SITE RIVER PROTECTION PROJECT (RPP) TANK FARM CLOSURE

    SciTech Connect (OSTI)

    JARAYSI, M.N.; SMITH, Z.; QUINTERO, R.; BURANDT, M.B.; HEWITT, W.

    2006-01-30

    The U. S. Department of Energy, Office of River Protection and the CH2M HILL Hanford Group, Inc. are responsible for the operations, cleanup, and closure activities at the Hanford Tank Farms. There are 177 tanks overall in the tank farms, 149 single-shell tanks (see Figure 1), and 28 double-shell tanks (see Figure 2). The single-shell tanks were constructed 40 to 60 years ago and all have exceeded their design life. The single-shell tanks do not meet Resource Conservation and Recovery Act of 1976 [1] requirements. Accordingly, radioactive waste is being retrieved from the single-shell tanks and transferred to double-shell tanks for storage prior to treatment through vitrification and disposal. Following retrieval of as much waste as is technically possible from the single-shell tanks, the Office of River Protection plans to close the single-shell tanks in accordance with the Hanford Federal Facility Agreement and Consent Order [2] and the Atomic Energy Act of 1954 [3] requirements. The double-shell tanks will remain in operation through much of the cleanup mission until sufficient waste has been treated such that the Office of River Protection can commence closing the double-shell tanks. At the current time, however, the focus is on retrieving waste and closing the single-shell tanks. The single-shell tanks are being managed and will be closed in accordance with the pertinent requirements in: Resource Conservation and Recovery Act of 1976 and its Washington State-authorized Dangerous Waste Regulations [4], US DOE Order 435.1 Radioactive Waste Management [5], the National Environmental Policy Act of 1969 [6], and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 [7]. The Hanford Federal Facility Agreement and Consent Order, which is commonly referred to as the Tri-Party Agreement or TPA, was originally signed by Department of Energy, the State of Washington, and the U. S. Environmental Protection Agency in 1989. Meanwhile, the

  15. Hanford Advisory Board - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Board Hanford Advisory Board Convening Report SSAB Guidance Memorandum of Understanding Membership Nomination and Appointment Process Operating Ground Rules Calendars Advice and Responses Full Board Meeting Information Committee Meeting Information Outgoing Board Correspondence Key Board Products and Special Reports HAB Annual Report HAB and Committee Lists Points of Contact Related Links Hanford Advisory Board Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size

  16. Hanford Meteorological Station - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Meteorological Station Hanford Meteorological Station Real Time Met Data from Around the Site Current and Past 48 Hours HMS Observations Daily HMS Extremes in Met Data Met and Climate Data Summary Products Contacts / Hours Current NWS Forecast for the Tri-Cities NWS Windchill Chart Hanford Meteorological Station Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The HMS is operated by Mission Support Alliance for the U.S. Department of Energy. The HMS provides a

  17. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2007 February 05, 2007 U.S. Secretary of Energy Samuel W. Bodman announced President Bush's $24.3 billion budget request for the DOE for FY08. U.S. Secretary of Energy Samuel W. Bodman announced President Bush's $24.3 billion budget request for the DOE for FY08. February 05, 2007 Hanford Cleanup Progress Video - "A Few Good Things" - Available Hanford Cleanup Progress Video - "A Few Good Things" - Available

  18. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    November 2009 November 24, 2009 MSNBC Story on Impact of Recovery Act Funding MSNBC recently posted an article on its website comparing how communities in Benton County, Wash., and Elkhart, Ind., are faring with Recovery Act funding going to projects in those communities, including environmental cleanup work at the Hanford Site. November 23, 2009 Vit Plant's 50-percent complete mark celebration video In October, 2009, the Hanford Waste Treatment and Immobilization Plant (WTP) Project celebrated

  19. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    December 2009 December 31, 2009 Highlights of 2009 Accomplishments: Richland Operations Office The DOE Richland Operations Office and its contractors at the Hanford Site made tremendous progress in several key cleanup categories in 2009. December 28, 2009 Photos of visit to Plutonium Finishing Plant Officials, Hanford Site employees, the media, and visitors celebrated a major accomplishment at the Plutonium Finishing Plant. Recently, workers finished moving all plutonium and reactor fuel

  20. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2009 March 26, 2009 DOE Solicits Proposals for Workers' Compensation Administration Contract The DOE Richland Operations Office is soliciting contract proposals from companies interested in being the "third party administrator" of Hanford employee workers' compensation claims. March 18, 2009 Potential Work Scope for Recovery Funding Managers of DOE's Office of River Protection and Richland Operations Office briefed tribes and the Hanford Advisory board on potential projects that

  1. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    August 2009 August 25, 2009 Mission Support Alliance begins operations at Hanford The Department of Energy's mission support contractor began operations Monday, August 24 to provide essential services to the DOE and Hanford contractors to support environmental cleanup efforts. August 25, 2009 Photos of Transition to New Mission Support Contractor The Mission Support Alliance (MSA) assumed responsibility on August 24, 2009 for providing site-wide services to the Department of Energy and its

  2. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2010 April 28, 2010 Contractor Recovery Act Update: April 23, 2010 DOE Contractor CH2M HILL Plateau Remediation Company produces a weekly newsletter with information on environmental cleanup projects funded by the Recovery Act. April 26, 2010 Completion of 300 Area Waste Sites Meets TPA Milestone DOE met a Tri-Party Agreement milestone by completing cleanup work on 11 different waste sites at Hanford's 300 Area just north of Richland, Wash. April 23, 2010 Hanford Site to Activate Emergency

  3. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    January 2012 January 30, 2012 PRESS RELEASE: Chief Joseph Middle School to Host Speaker from Hanford January 31 Cameron Salony, DOE, to speak to more than 200 students about the history and cleanup of the Hanford Site and demonstrate protective equipment. January 30, 2012 PHOTO GALLERY: DOE Gives Mission Support Alliance Top Safety Award Ceremony held on January 27, 2012 January 27, 2012 DOE Gives Mission Support Alliance Top Safety Award Contractor's mission support services receive top marks

  4. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    June 2012 June 20, 2012 NEWS RELEASE: New Chapter of Hanford Story Released "River Corridor" provides viewers with a look at the cleanup of hundreds of contaminated buildings and more than one thousand areas where soil was contaminated along the 50-mile stretch of the Columbia River that flows through the Hanford Site. June 19, 2012 Mobile Arm Retrieval System (MARS) named DOE EM's Project of the Month June 19, 2012 FACT SHEET: Shuffling Highly Radioactive Capsules Workers recently

  5. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2012 September 19, 2012 PHOTO GALLERY: F Reactor Media Event Pictures of the F Reactor Area and the Media Availability held on September 19, 2012. September 19, 2012 F Reactor Area Cleanup Complete First at Hanford to Finish Buildings, Waste Sites, and Cocooning September 17, 2012 VIDEO: C-104 Retrieval Completion September 17, 2012 Retrieval of the Tenth Single-Shell Tank Complete at Hanford Washington River Protection Solutions (WRPS) has advised the U.S. Department of Energy (DOE)

  6. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 2014 October 30, 2014 Hanford Tank Vapor Assessment Report The Department of Energy remains committed to protecting workers, members of the public and the environment. October 28, 2014 DOE, Washington Closure complete recycling project at Hanford About $400,000 saved by recycling electrical substation components in 300 Area October 22, 2014 Workers Enter Cocooned F Reactor for Scheduled Inspection Inspection by DOE ensures reactors are safe, secure

  7. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    August 2014 August 12, 2014 NEWS RELEASE: Contractor Removes More Than 650 Pounds of Contamination from Groundwater For a second year in a row, and four months ahead of schedule, CH2M HILL Plateau Remediation Company exceeded the Department of Energy's annual goal. August 11, 2014 NEWS RELEASE: Workers Creating Demolition Zone at Hanford's Plutonium Finishing Plant Over the last few weeks, the look of Hanford's main plutonium plant has changed as crews have removed or demolished eight buildings

  8. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    May 2015 May 21, 2015 Briefing to Homebuilders' Association of Tri-Cities Richland Operations Office Manager Stacy Charboneau provided an overview of the Hanford Site to the Homebuilders' Association of the Tri-Cities in May 2015. May 07, 2015 Washington State University to manage Hanford's Manhattan Project and Cold War-era artifacts and archives The U.S. Department of Energy's Richland Operations Office (RL), through site contractor Mission Support Alliance (MSA), has begun a new partnership

  9. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2015 September 29, 2015 DOE-Richland contractors, programs earn safety honors All three major contractors of the Department of Energy's Richland Operations Office (DOE-RL) and one individual employee were recently recognized with DOE and national safety awards by the Voluntary Protection Program Participants September 29, 2015 Workers treat record amount of Hanford groundwater Workers at the U.S. Department of Energy's (DOE) Hanford Site treated a record amount of groundwater to remove

  10. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2015 September 29, 2015 DOE-Richland Contractors, Programs Earn Safety Honors All three major contractors of the Department of Energy's Richland Operations Office (DOE-RL) and one individual employee were recently recognized with DOE and national safety awards. September 28, 2015 Workers Treat Record Amount of Hanford Groundwater Workers at the U.S. Department of Energy's (DOE) Hanford Site treated a record amount of groundwater to remove contamination in the last year, operating

  11. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2015 September 29, 2015 DOE-Richland Contractors, Programs Earn Safety Honors All three major contractors of the Department of Energy's Richland Operations Office (DOE-RL) and one individual employee were recently recognized with DOE and national safety awards. September 28, 2015 Workers Treat Record Amount of Hanford Groundwater Workers at the U.S. Department of Energy's (DOE) Hanford Site treated a record amount of groundwater to remove contamination in the last year, operating

  12. Federated Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Federated Wind Farm Jump to: navigation, search Name Federated Wind Farm Facility Federated Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  13. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  14. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2016-07-12

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  15. Notice of Intent to Revise DOE G 226.1-2, Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    This revision will incorporate new content devoted to Federal oversight and evaluation of effectiveness of activity-level work planning and control (WP&C) at Hazard Category 1, 2, and 3 nuclear facilities.

  16. 1998 report on Hanford Site land disposal restrictions for mixed waste

    SciTech Connect (OSTI)

    Black, D.G.

    1998-04-10

    This report was submitted to meet the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-26-01H. This milestone requires the preparation of an annual report that covers characterization, treatment, storage, minimization, and other aspects of managing land-disposal-restricted mixed waste at the Hanford Facility. The US Department of Energy, its predecessors, and contractors on the Hanford Facility were involved in the production and purification of nuclear defense materials from the early 1940s to the late 1980s. These production activities have generated large quantities of liquid and solid mixed waste. This waste is regulated under authority of both the Resource Conservation and Recovery Act of l976 and the Atomic Energy Act of 1954. This report covers only mixed waste. The Washington State Department of Ecology, US Environmental Protection Agency, and US Department of Energy have entered into the Tri-Party Agreement to bring the Hanford Facility operations into compliance with dangerous waste regulations. The Tri-Party Agreement required development of the original land disposal restrictions (LDR) plan and its annual updates to comply with LDR requirements for mixed waste. This report is the eighth update of the plan first issued in 1990. The Tri-Party Agreement requires and the baseline plan and annual update reports provide the following information: (1) Waste Characterization Information -- Provides information about characterizing each LDR mixed waste stream. The sampling and analysis methods and protocols, past characterization results, and, where available, a schedule for providing the characterization information are discussed. (2) Storage Data -- Identifies and describes the mixed waste on the Hanford Facility. Storage data include the Resource Conservation and Recovery Act of 1976 dangerous waste codes, generator process knowledge needed to identify the waste and to make LDR determinations, quantities

  17. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  18. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  19. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    SciTech Connect (OSTI)

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  20. Guidebook to excellence: A directory of federal facilities and other resources for mathematics and science education improvement. [Contains acronym list

    SciTech Connect (OSTI)

    Shipman, T.

    1993-01-01

    The Guidebook to Excellence is a State-by-State directory of Federal facilities and other resources for improving mathematics and science education. This directory, the first of its kind, is being published to assist educators, parents, and students across the country in attaining the National Education Goals, particularly Goal No. 4: By the year 2000, US students will be first in the world in science and mathematics achievement. Some of the larger research facilities in this directory, such as those of NASA, EPA and the Departments of Energy, Commerce, and the Interior, provide a wide range of education programs, and some offer students and teachers hands on experience with state-of-the-art research in world class facilities. Other sites, such as those of the Department of Transportation or Agriculture may be quite small, but can provide assistance in a single field of research or workforce expertise. Also listed are individuals responsible for State or regional coordination of major programs, such as the US Department of Education's Eisenhower Mathematics and Science Education Program, or the National Science Foundation's Statewide Systemic Initiative Program. In addition, each State listing includes facilities or coordinators providing regional assistance from neighboring States.