National Library of Energy BETA

Sample records for grid-tied applications require

  1. Grid-tied PV battery systems.

    SciTech Connect

    Barrett, Keith Phillip; Gonzalez, Sigifredo; Hund, Thomas D.

    2010-09-01

    Grid tied PV energy smoothing was implemented by using a valve regulated lead-acid (VRLA) battery as a temporary energy storage device to both charge and discharge as required to smooth the inverter energy output from the PV array. Inverter output was controlled by the average solar irradiance over the previous 1h time interval. On a clear day the solar irradiance power curve is offset by about 1h, while on a variable cloudy day the inverter output power curve will be smoothed based on the average solar irradiance. Test results demonstrate that this smoothing algorithm works very well. Battery state of charge was more difficult to manage because of the variable system inefficiencies. Testing continued for 30-days and established consistent operational performance for extended periods of time under a wide variety of resource conditions. Both battery technologies from Exide (Absolyte) and East Penn (ALABC Advanced) proved to cycle well at a Partial state of charge over the time interval tested.

  2. Installing a Grid-Tied Photovoltaic System

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Generating Renewable Ideas for Development Alternatives GRID Alternatives - Solar Affordable Housing Program * Susie Chang, Director of Tribal Programs * Evelyn Blanco, Outreach Coordinator DOE Office of Indian Energy - Tribal Leader Forum - Financing and Investing in Tribal Renewable Energy Projects Generating Renewable Ideas for Development Alternatives Session Agenda  I. GRID Alternatives' Model  II. GRID and the SASH Program: Eligibility Requirements and Tribal Participation  III.

  3. Partially Shaded Operation of a Grid-Tied PV System: Preprint

    SciTech Connect

    Deline, C.

    2009-06-01

    This paper presents background and experimental results from a single-string grid-tied PV system, operated under a variety of shading conditions.

  4. Utility-scale grid-tied PV inverter reliability workshop summary report.

    SciTech Connect

    Granata, Jennifer E.; Quintana, Michael A.; Tasca, Coryne Adelle; Atcitty, Stanley

    2011-07-01

    A key to the long-term success of the photovoltaic (PV) industry is confidence in the reliability of PV systems. Inverters are the most commonly noted cause of PV system incidents triggered in the field. While not all of these incidents are reliability-related or even necessarily failures, they still result in a loss of generated power. With support from the U.S. Department of Energy's Solar Energy Technologies Program, Sandia National Laboratories organized a Utility-Scale Grid-Tied Inverter Reliability Workshop in Albuquerque, New Mexico, January 27-28, 2011. The workshop addressed the reliability of large (100-kilowatt+) grid-tied inverters and the implications when such inverters fail, evaluated inverter codes and standards, and provided discussion about opportunities to enhance inverter reliability. This report summarizes discussions and presentations from the workshop and identifies opportunities for future efforts.

  5. Public Response to Residential Grid-Tied PV Systems in Colorado: A Qualitative Market Assessment

    SciTech Connect

    Farhar, B. C.; Buhrmann, J.

    1998-07-01

    The early adopters of residential grid-tied photovoltaics (PV) have complex motivations to pay today's costs, including altruistic, environmental, and financial reasons. Focused interviews were conducted with a self-selected purposive sample interested in purchasing 2-kW or 3-kW PV systems with an installed cost of $8,000 to $12,000. The sample tended to be men or married couples ranging in age from their early thirties to their mid-eighties; professionals, managers, or small business owners; relatively financially secure, with experience with energy efficiency and renewable energy. Product attributes they preferred were net metering, warranties, guarantees, utility financing, maintenance, an option to own or lease, a battery option, and an aesthetically pleasing system. Potential PV customers needed more information before making a purchase decision.

  6. Future of Grid-Tied PV Business Models: What Will Happen When PV Penetration on the Distribution Grid is Significant? Preprint

    SciTech Connect

    Graham, S.; Katofsky, R.; Frantzis, L.; Sawyer, H.; Margolis, R.

    2008-05-01

    Eventually, distributed PV will become a more significant part of the generation mix. When this happens, it is expected that utilities will have to take on a more active role in the placement, operation and control of these systems. There are operational complexities and concerns of revenue erosion that will drive utilities into greater involvement of distributed PV and will create new business models. This report summarizes work done by Navigant Consulting Inc. for the National Renewable Energy Laboratory as part of the Department of Energy's work on Renewable System Integration. The objective of the work was to better understand the structure of these future business models and the research, development and demonstration (RD&D) required to support their deployment. This report describes potential future PV business models in terms of combinations of utility ownership and control of the PV assets, and the various relationships between end-users and third-party owners.

  7. HTGR Industrial Application Functional and Operational Requirements

    SciTech Connect

    L. E. Demick

    2010-08-01

    This document specifies the functional and performance requirements to be used in the development of the conceptual design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to a typical industrial facility. These requirements were developed from collaboration with industry and HTGR suppliers over the preceding three years to identify the energy needs of industrial processes for which the HTGR technology is technically and economically viable. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a conceptual design of the plant that will serve the broadest range of industrial applications.

  8. Data requirements for intermediate energy nuclear applications

    SciTech Connect

    Pearlstein, S.

    1990-01-01

    Several applications that include spallation neutron sources, space radiation effects, biomedical isotope production, accelerator shielding and radiation therapy make use of intermediate energy nuclear data extending to several GeV. The overlapping data needs of these applications are discussed in terms of what projectiles, targets and reactions are of interest. Included is a discussion of what is generally known about these data and what is needed to facilitate their use in intermediate energy applications. 40 refs., 2 figs., 2 tabs.

  9. Application of Engineering and Technical Requirements for DOE...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Nuclear Facilities Standard Review Plan (SRP) Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP) This Standard Review ...

  10. Application of Engineering and Technical Requirements for 30...

    Energy Saver

    30, 60, and 90% Design of DOE Nuclear Facilities Application of Engineering and Technical Requirements for 30, 60, and 90% Design of DOE Nuclear Facilities This Standard Review ...

  11. College Student Internship Program Requirements and Application Process |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Education & Training » Internships » College Student Internship Program Requirements and Application Process College Student Internship Program Requirements and Application Process Current full-time graduate students-who are familiar with Native American culture and tribal issues-are needed to support projects funded by the U.S. Department of Energy (DOE) Office of Indian Energy. Our student interns assist a cross-disciplinary team to perform specific technical

  12. PREPARING FOR EXASCALE: ORNL Leadership Computing Application Requirements and Strategy

    SciTech Connect

    Joubert, Wayne; Kothe, Douglas B; Nam, Hai Ah

    2009-12-01

    In 2009 the Oak Ridge Leadership Computing Facility (OLCF), a U.S. Department of Energy (DOE) facility at the Oak Ridge National Laboratory (ORNL) National Center for Computational Sciences (NCCS), elicited petascale computational science requirements from leading computational scientists in the international science community. This effort targeted science teams whose projects received large computer allocation awards on OLCF systems. A clear finding of this process was that in order to reach their science goals over the next several years, multiple projects will require computational resources in excess of an order of magnitude more powerful than those currently available. Additionally, for the longer term, next-generation science will require computing platforms of exascale capability in order to reach DOE science objectives over the next decade. It is generally recognized that achieving exascale in the proposed time frame will require disruptive changes in computer hardware and software. Processor hardware will become necessarily heterogeneous and will include accelerator technologies. Software must undergo the concomitant changes needed to extract the available performance from this heterogeneous hardware. This disruption portends to be substantial, not unlike the change to the message passing paradigm in the computational science community over 20 years ago. Since technological disruptions take time to assimilate, we must aggressively embark on this course of change now, to insure that science applications and their underlying programming models are mature and ready when exascale computing arrives. This includes initiation of application readiness efforts to adapt existing codes to heterogeneous architectures, support of relevant software tools, and procurement of next-generation hardware testbeds for porting and testing codes. The 2009 OLCF requirements process identified numerous actions necessary to meet this challenge: (1) Hardware capabilities must be

  13. Meeting PMU Data Quality Requirements for Mission Critical Applications

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meeting PMU Data Quality Requirements for Mission Critical Applications Anurag Srivastava School of Electrical Engineering and Computer Science Washington State University asrivast@eecs.wsu.edu PSERC Public Webinar Tuesday, November 17, 2015 2:00-3:00 p.m. Eastern Time (11:00-12:00 p.m. Pacific) If you plan to use the phone bridge, use the NEW number: 877-820-7831 (passcode: 965722#). Description: Phasor Measurement Units (PMU's) provide synchronized measurements at high rates for wide area

  14. Membrane Requirements for Back-up Power Applications

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    IdaTech Confidential and Proprietary. © 2002 2009 IdaTech, LLC. All Rights Reserved. Membrane Requirements for Back-up Power Applications DOE High Temperature Working Group Meeting November 16, 2009 Palm Springs, CA www.idatech.com info@idatech.com 63065 NE 18 th Street Bend, OR 97701 541.383.3390 - Technical Targets for Membranes - Automotive Characteristics Units Calendar Year 2003 Status 2005 2010 Membrane Conductivity @ 25% RH @ Operating Temperature Ω cm -1 0.02 0.05 0.1 @ Room

  15. Scientific Application Requirements for Leadership Computing at the Exascale

    SciTech Connect

    Ahern, Sean; Alam, Sadaf R; Fahey, Mark R; Hartman-Baker, Rebecca J; Barrett, Richard F; Kendall, Ricky A; Kothe, Douglas B; Mills, Richard T; Sankaran, Ramanan; Tharrington, Arnold N; White III, James B

    2007-12-01

    The Department of Energy s Leadership Computing Facility, located at Oak Ridge National Laboratory s National Center for Computational Sciences, recently polled scientific teams that had large allocations at the center in 2007, asking them to identify computational science requirements for future exascale systems (capable of an exaflop, or 1018 floating point operations per second). These requirements are necessarily speculative, since an exascale system will not be realized until the 2015 2020 timeframe, and are expressed where possible relative to a recent petascale requirements analysis of similar science applications [1]. Our initial findings, which beg further data collection, validation, and analysis, did in fact align with many of our expectations and existing petascale requirements, yet they also contained some surprises, complete with new challenges and opportunities. First and foremost, the breadth and depth of science prospects and benefits on an exascale computing system are striking. Without a doubt, they justify a large investment, even with its inherent risks. The possibilities for return on investment (by any measure) are too large to let us ignore this opportunity. The software opportunities and challenges are enormous. In fact, as one notable computational scientist put it, the scale of questions being asked at the exascale is tremendous and the hardware has gotten way ahead of the software. We are in grave danger of failing because of a software crisis unless concerted investments and coordinating activities are undertaken to reduce and close this hardwaresoftware gap over the next decade. Key to success will be a rigorous requirement for natural mapping of algorithms to hardware in a way that complements (rather than competes with) compilers and runtime systems. The level of abstraction must be raised, and more attention must be paid to functionalities and capabilities that incorporate intent into data structures, are aware of memory hierarchy

  16. Application of NEPA requirements to CERCLA remedial actions. Master's thesis

    SciTech Connect

    Strobbe, C.L.

    1994-06-01

    This study investigated the application of National Environmental Policy Act (NEPA) requirements to Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) actions. Similarities in the documentation and public participation requirements of NEPA and CERCLA include identification and evaluation of alternatives and public participation. Differences include document contents and timing of public participation. This study presented four options for ensuring NEPA compliance at CERCLA sites. Option one included a Programmatic Environmental Impact Statement (PEIS) with subsequent combined FS/EIS report for each subunit. Option two eliminated the PEIS, but retained a stand-alone NEPA document for each CERCLA subunit. Option three included a PEIS with a subsequent combined FS/EIS report for each subunit. Option four eliminated the PEIS but retained a combined FS/EIS report for each subunit. The model presented in this study can be used at any installation to determine the optimal approach for the site. The model's goal is to comply with NEPA and CERCLA while maintaining a balance between cost, schedule, and public acceptance.

  17. Laser wakefield accelerator based light sources: potential applications and requirements

    SciTech Connect

    Albert, F; Thomas, A G; Mangles, S P; Banerjee, S; Corde, S; Flacco, A; Litos, M; Neely, D; Viera, J; Najmudin, Z; Bingham, R; Joshi, C; Katsouleas, T

    2015-01-15

    In this article we review the prospects of laser wakefield accelerators as next generation light sources for applications. This work arose as a result of discussions held at the 2013 Laser Plasma Accelerators Workshop. X-ray phase contrast imaging, X-ray absorption spectroscopy, and nuclear resonance fluorescence are highlighted as potential applications for laser-plasma based light sources. We discuss ongoing and future eff orts to improve the properties of radiation from plasma betatron emission and Compton scattering using laser wakefi eld accelerators for these specifi c applications.

  18. Membrane Requirements for Back-up Power Applications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Membrane Requirements for Back-up Power Applications Membrane Requirements for Back-up Power Applications Presentation at the DOE High Temperature Work Group Meetings Nov. 16, 2009, Palm Springs, CA htmwg_nov09_membrane_requirements.pdf (276.69 KB) More Documents & Publications Minutes of the Fall 2009 High Temperature Membrane Working Group Fuel Cell Systems for Portable, Backup, and UPS Applications 2008 Fuel Cell Technologies Market Report

  19. Generalized Information Architecture for Managing Requirements in IBM?s Rational DOORS(r) Application.

    SciTech Connect

    Aragon, Kathryn M.; Eaton, Shelley M.; McCornack, Marjorie T.; Shannon, Sharon A.

    2014-12-01

    When a requirements engineering effort fails to meet expectations, often times the requirements management tool is blamed. Working with numerous project teams at Sandia National Laboratories over the last fifteen years has shown us that the tool is rarely the culprit; usually it is the lack of a viable information architecture with well- designed processes to support requirements engineering. This document illustrates design concepts with rationale, as well as a proven information architecture to structure and manage information in support of requirements engineering activities for any size or type of project. This generalized information architecture is specific to IBM's Rational DOORS (Dynamic Object Oriented Requirements System) software application, which is the requirements management tool in Sandia's CEE (Common Engineering Environment). This generalized information architecture can be used as presented or as a foundation for designing a tailored information architecture for project-specific needs. It may also be tailored for another software tool. Version 1.0 4 November 201

  20. Application of Engineering and Technical Requirements for 30, 60, and 90% Design of DOE Nuclear Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Standard Review Plan (SRP), Application of Engineering and Technical Requirements for 30, 60 and 90% Design of DOE Nuclear Facilities, was developed by the Office of Chief of Nuclear Safety (CNS), Office of the Environmental Management. The SRP is designed to help strengthen the technical rigor of line management oversight and federal monitoring of the design process of DOE nuclear facilities.

  1. Microsoft Word - Attachment J-6 List of Applicable DOE Directives and COntractor Requirements Documents.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    J-6-1 ATTACHMENT J.6 LIST OF APPLICABLE DOE DIRECTIVES AND CONTRACTOR REQUIREMENTS DOCUMENTS (LIST B) The following is a list of applicable DOE Directives and Orders appended to this Contract as prescribed in Section I, Clause I.3. This list is not all inclusive. Document Number Title CRD O 150.1 Continuity Programs CRD O 205.1b, Chg.3 DOE Cyber Program CRD O 206.1 DOE Privacy Program CRD O 243.1B, Admin. Chg 1. Records Management Program CRD O 414.1D, Admin Chg 1. Quality Assurance CRD O

  2. Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Agenda

    Office of Energy Efficiency and Renewable Energy (EERE)

    Agenda for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Workshop held on May 14, 2015.

  3. Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Materials

    Energy.gov [DOE]

    Training Materials for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE Nuclear Projects Training Workshop held on May 14, 2015.

  4. Catalog of CERCLA applicable or relevant and appropriate requirements (ARARs) - fact sheets

    SciTech Connect

    Not Available

    1990-07-01

    Section 121(d) of the Comprehensive Environmental Response Compensation and Liability Act (CERCLA) as amended by the Superfund Amendments and Reauthorization Act of 1986 (SARA), requires attainment of federal and state applicable or relevant and appropriate requirements (ARARs). Subpart E, Section 300.400(g) {open_quotes}Identification of applicable or relevant and appropriate requirements{close_quotes} of the National Oil and Hazardous Substances Pollution Contingency Plan (NCP)(55 FR 8666, March 8, 1990) describes the process for attaining ARARs. The purpose of this catalog is to provide DOE Program Offices and Field Organizations with all of the {open_quotes}Quick Reference Fact Sheets{close_quotes} on attaining ARARS. These fact sheets provide overviews of ARARs for CERCLA cleanup actions pertinent to DOE environmental restoration activities. All of the fact sheets in this catalog were prepared by the Environmental Protection Agency`s Office of Solid Waste and Emergency Response. Fact sheets 1-7 discuss land disposal restrictions (LDRs) and their applicability. LDRs may pertain to a number of CERCLA response actions at DOE facilities. Fact Sheets 8-13 are based on the CERCLA Compliance with Other Laws Manual: Parts I and II and provide an overview of many other CERCLA ARARs. Overview of ARARs-Focus on ARAR Waivers (fact sheet 11), provides a good introduction to ARARS. The last two fact sheets, 14 and 15, are periodic reports that describe additional fact sheets and clarify issues.

  5. Application of Engineering and Technical Requirements for DOE Nuclear Facilities Standard Review Plan (SRP)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This Standard Review Plan (SRP), Application of Engineering and Technical Requirements for DOE Nuclear Facilities, was developed by the Chief of Nuclear Safety (CNS)1, Office of the Under Secretary for Nuclear Security, to help strengthen the technical rigor of line management oversight and federal monitoring of DOE nuclear facilities. This SRP (hereafter refers to as the Engineering SRP) provides consistent review guidance to assure that engineering and technical requirements are appropriately applied for the design, operations and disposition2 of DOE nuclear facilities. It is one of a series of three SRPs developed by the CNS. The other two SRPs address: 1) nuclear safety basis program review; and 2) application of requirements of DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, and DOE-STD-1189, Integration of Safety into the Design Process, for DOE Critical Decision (CD) review and approval. These SRPs may be revised in the future to reflect changes in the DOE requirements, lessons learned, and experience/insights from nuclear facility design, operations, and disposition.

  6. Safety requirements, facility user needs, and reactor concepts for a new Broad Application Test Reactor

    SciTech Connect

    Ryskamp, J.M.; Liebenthal, J.L.; Denison, A.B.; Fletcher, C.D.

    1992-07-01

    This report describes the EG&G Laboratory Directed Research and Development Program (LDRD) Broad Application Test Reactor (BATR) Project that was conducted in fiscal year 1991. The scope of this project was divided into three phases: a project process definition phase, a requirements development phase, and a preconceptual reactor design and evaluation phase. Multidisciplinary teams of experts conducted each phase. This report presents the need for a new test reactor, the project process definition, a set of current and projected regulatory compliance and safety requirements, a set of facility user needs for a broad range of projected testing missions, and descriptions of reactor concepts capable of meeting these requirements. This information can be applied to strategic planning to provide the Department of Energy with management options.

  7. Safety requirements, facility user needs, and reactor concepts for a new Broad Application Test Reactor

    SciTech Connect

    Ryskamp, J.M.; Liebenthal, J.L.; Denison, A.B.; Fletcher, C.D.

    1992-07-01

    This report describes the EG G Laboratory Directed Research and Development Program (LDRD) Broad Application Test Reactor (BATR) Project that was conducted in fiscal year 1991. The scope of this project was divided into three phases: a project process definition phase, a requirements development phase, and a preconceptual reactor design and evaluation phase. Multidisciplinary teams of experts conducted each phase. This report presents the need for a new test reactor, the project process definition, a set of current and projected regulatory compliance and safety requirements, a set of facility user needs for a broad range of projected testing missions, and descriptions of reactor concepts capable of meeting these requirements. This information can be applied to strategic planning to provide the Department of Energy with management options.

  8. Additional requirements for leak-before-break application to primary coolant piping in Belgium

    SciTech Connect

    Roussel, G.

    1997-04-01

    Leak-Before-Break (LBB) technology has not been applied in the first design of the seven Pressurized Water Reactors the Belgian utility is currently operating. The design basis of these plants required to consider the dynamic effects associated with the ruptures to be postulated in the high energy piping. The application of the LBB technology to the existing plants has been recently approved by the Belgian Safety Authorities but with a limitation to the primary coolant loop. LBB analysis has been initiated for the Doel 3 and Tihange 2 plants to allow the withdrawal of some of the reactor coolant pump snubbers at both plants and not reinstall some of the restraints after steam generator replacement at Doel 3. LBB analysis was also found beneficial to demonstrate the acceptability of the primary components and piping to the new conditions resulting from power uprating and stretch-out operation. LBB analysis has been subsequently performed on the primary coolant loop of the Tihange I plant and is currently being performed for the Doel 4 plant. Application of the LBB to the primary coolant loop is based in Belgium on the U.S. Nuclear Regulatory Commission requirements. However the Belgian Safety Authorities required some additional analyses and put some restrictions on the benefits of the LBB analysis to maintain the global safety of the plant at a sufficient level. This paper develops the main steps of the safety evaluation performed by the Belgian Safety Authorities for accepting the application of the LBB technology to existing plants and summarizes the requirements asked for in addition to the U.S. Nuclear Regulatory Commission rules.

  9. Specification of requirements for the virtual environment for reactor applications simulation environment

    SciTech Connect

    Hess, S. M.; Pytel, M.

    2012-07-01

    In 2010, the United States Dept. of Energy initiated a research and development effort to develop modern modeling and simulation methods that could utilize high performance computing capabilities to address issues important to nuclear power plant operation, safety and sustainability. To respond to this need, a consortium of national laboratories, academic institutions and industry partners (the Consortium for Advanced Simulation of Light Water Reactors - CASL) was formed to develop an integrated Virtual Environment for Reactor Applications (VERA) modeling and simulation capability. A critical element for the success of the CASL research and development effort was the development of an integrated set of overarching requirements that provides guidance in the planning, development, and management of the VERA modeling and simulation software. These requirements also provide a mechanism from which the needs of a broad array of external CASL stakeholders (e.g. reactor / fuel vendors, plant owner / operators, regulatory personnel, etc.) can be identified and integrated into the VERA development plans. This paper presents an overview of the initial set of requirements contained within the VERA Requirements Document (VRD) that currently is being used to govern development of the VERA software within the CASL program. The complex interdisciplinary nature of these requirements together with a multi-physics coupling approach to realize a core simulator capability pose a challenge to how the VRD should be derived and subsequently revised to accommodate the needs of different stakeholders. Thus, the VRD is viewed as an evolving document that will be updated periodically to reflect the changing needs of identified CASL stakeholders and lessons learned during the progress of the CASL modeling and simulation program. (authors)

  10. Communication Requirements and Interconnect Optimization forHigh-End Scientific Applications

    SciTech Connect

    Kamil, Shoaib; Oliker, Leonid; Pinar, Ali; Shalf, John

    2007-11-12

    The path towards realizing peta-scale computing isincreasingly dependent on building supercomputers with unprecedentednumbers of processors. To prevent the interconnect from dominating theoverall cost of these ultra-scale systems, there is a critical need forhigh-performance network solutions whose costs scale linearly with systemsize. This work makes several unique contributions towards attaining thatgoal. First, we conduct one of the broadest studies to date of high-endapplication communication requirements, whose computational methodsinclude: finite-difference, lattice-bolzmann, particle in cell, sparselinear algebra, particle mesh ewald, and FFT-based solvers. Toefficiently collect this data, we use the IPM (Integrated PerformanceMonitoring) profiling layer to gather detailed messaging statistics withminimal impact to code performance. Using the derived communicationcharacterizations, we next present fit-trees interconnects, a novelapproach for designing network infrastructure at a fraction of thecomponent cost of traditional fat-tree solutions. Finally, we propose theHybrid Flexibly Assignable Switch Topology (HFAST) infrastructure, whichuses both passive (circuit) and active (packet) commodity switchcomponents to dynamically reconfigure interconnects to suit thetopological requirements of scientific applications. Overall ourexploration leads to a promising directions for practically addressingthe interconnect requirements of future peta-scale systems.

  11. Efficient Switches for Solar Power Conversion: Four Quadrant GaN Switch Enabled Three Phase Grid-Tied Microinverters

    SciTech Connect

    2012-02-13

    Solar ADEPT Project: Transphorm is developing power switches for new types of inverters that improve the efficiency and reliability of converting energy from solar panels into useable electricity for the grid. Transistors act as fast switches and control the electrical energy that flows in an electrical circuit. Turning a transistor off opens the circuit and stops the flow of electrical current; turning it on closes the circuit and allows electrical current to flow. In this way a transistor can be used to convert DC from a solar panel into AC for use in a home. Transphorm’s transistors will enable a single semiconductor device to switch electrical currents at high-voltage in both directions—making the inverter more compact and reliable. Transphorm is using Gallium Nitride (GaN) as a semiconductor material in its transistors instead of silicon, which is used in most conventional transistors, because GaN transistors have lower losses at higher voltages and switching frequencies.

  12. November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission Critical Applications

    Energy.gov [DOE]

    The DOE-funded Power Systems Engineering Research Center (PSERC) is offering a free public webinar presenting research activities related to development of a PMU performance analyzer (PPA) tool for in-lab and remove, in-field testing; and data mining approaches for data cleansing and for analyzing impacts of data quality on PMU applications. The talk will include a discussion of a real-time wide area monitoring and control test bed that will support the testing and validation of PMU's and PMU-based applications.

  13. Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2004-02-19

    The Notice establishes DOE policy requirements and responsibilities for remote connections to DOE and contractor information technology systems. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, to protect DOE information and information technology systems commensurate with the risk and magnitude of harm that could result from their unauthorized access, use, disclosure, modification or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06. No cancellations.

  14. The IAEA Workshop on Requirements and Potential Technologies for Replacement of 3He Detectors in IAEA Safeguards Applications

    SciTech Connect

    Pickrell, Mark; Lavietes, Anthony; Gavron, Victor A.; Henzlova, D.; Joyce, Malcolm J.; Kouzes, Richard T.; Menlove, H. O.

    2013-01-01

    From 22 – 24 March, 2011, the International Atomic Energy Agency (IAEA) held an international workshop to address the question of a possible replacement for helium-3 based neutron detectors. Within this wider scope, the workshop was focused on those applications used in IAEA verification activities. There were two principle objectives of the workshop: 1) to determine the specific requirements that a potential replacement technology would have to satisfy, and 2) to identify alternative detector technologies that appear promising for meeting those requirements. The workshop was successful in achieving both objectives. A set of detailed and quantitative specifications was developed and achieved a general consensus among the conference participants. These included operational considerations such as temperature stability, safety, weight, and cost in addition to a number of performance requirements. The performance requirements were derived from an analysis of the spectrum of IAEA applications that use neutron detectors. After analyzing these applications, it was determined that the most common application for 3He detectors was for neutron coincidence counting, comprising over 95% of 3He use. The details and rationale for this assessment will be provided. The performance requirements for neutron coincidence counting can be directly calculated from the standard variance expressions. From these, a basic figure of merit (FOM) was developed that can be used to rank various different options. For neutron coincidence counting, the figure of merit is: , where ε is the detection efficiency and is the detector die away time. Both the FOM and the calculations will be presented. The full list of requirements is included in this paper. The second purpose of the workshop was to identify promising replacement technologies. There were multiple presentations of candidate detection technologies over the course of the workshop, covering a wide spectrum of approaches and detection

  15. Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)

    SciTech Connect

    Not Available

    2010-11-01

    This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

  16. Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements

    SciTech Connect

    Not Available

    2013-03-01

    This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

  17. Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)

    SciTech Connect

    Sears, T.

    2014-01-01

    This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

  18. Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Brochure)

    SciTech Connect

    Not Available

    2014-06-01

    This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

  19. An Overview of Nuclear vs. Non-Nuclear Design Code Requirements for a Candidate Steam Supply System for Commercial Applications

    SciTech Connect

    Robert Jetter

    2011-04-01

    The objective is to identify (mostly for industrial end-users) the difference between a Section III nuclear steam generator (classified as Structures, Systems and Components (SSC)) and a Section VIII steam generator in the same general conditions, but used in a conventional application. Specifically, applicable temperature and pressure ranges and a more quantitative description of how materials change, design margins change and required design rigor changes are of interest. This overview focuses on the steam generator pressure boundary but the downstream piping will also be considered. Within the designations of Section III and Section VIII there are subcategories with their specific regions of applicability. Each of these subcategories has evolved their own unique features with respect to design rules and their implementation. A general overview of the various design codes will be provided in sufficient detail to illustrate the major differences; however, a detailed discussion of the various design requirements and their implementation is beyond the scope of this discussion. References (1) and (2) are sources of more detailed information. Also, example wall sizing calculations will be provided to illustrate the application of the relevant design codes under the candidate design conditions. The candidate steam supply Design Conditions are 600C (1112F) and 24MPa (3,480psi). The Operating Conditions or Service Levels will be somewhat lower and the difference shows up in some of the various design methodologies employed.

  20. AMI Communication Requirements to Implement Demand-Response: Applicability of Hybrid Spread Spectrum Wireless

    SciTech Connect

    Hadley, Mark D.; Clements, Samuel L.; Carroll, Thomas E.

    2011-09-30

    While holistically defining the smart grid is a challenge, one area of interest is demand-response. In 2009, the Department of Energy announced over $4 billion in grant and project funding for the Smart Grid. A significant amount of this funding was allotted to utilities for cost sharing projects to deploy Smart Grid technologies, many of whom have deployed and are deploying advanced metering infrastructure (AMI). AMI is an enabler to increase the efficiency of utilities and the bulk power grid. The bulk electrical system is unique in that it produces electricity as it is consumed. Most other industries have a delay between generation and consumption. This aspect of the power grid means that there must be enough generation capacity to meet the highest demand whereas other industries could over produce during off-peak times. This requires significant investment in generation capacity to cover the few days a year of peak consumption. Since bulk electrical storage doesn't yet exist at scale another way to curb the need for new peak period generation is through demand-response; that is to incentivize consumers (demand) to curtail (respond) electrical usage during peak periods. Of the various methods proposed for enabling demand-response, this paper will focus on the communication requirements for creating an energy market using transactional controls. More specifically, the paper will focus on the communication requirements needed to send the peak period notices and receive the response back from the consumers.

  1. Application

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Application Searchable Application Supplemental Information

  2. SOLERAS - Solar Controlled Environment Agriculture Project. Final report, Volume 5. Science Applications, Incorporated system requirements definition

    SciTech Connect

    Not Available

    1985-01-01

    This report sets forth the system requirements for a Solar Controlled-Environment Agriculture System (SCEAS) Project. In the report a conceptual baseline system description for an engineering test facility is given. This baseline system employs a fluid roof/roof filter in combination with a large storage tank and a ground water heat exchanger in order to provide cooling and heating as needed. Desalination is accomplished by pretreatment followed by reverse osmosis. Energy is provided by means of photovoltaics and wind machines in conjunction with storage batteries. Site and climatic data needed in the design process are given. System performance specifications and integrated system design criteria are set forth. Detailed subsystem design criteria are presented and appropriate references documented.

  3. Rechargeable lithium battery for use in applications requiring a low to high power output

    DOEpatents

    Bates, John B.

    1997-01-01

    Rechargeable lithium batteries which employ characteristics of thin-film batteries can be used to satisfy power requirements within a relatively broad range. Thin-film battery cells utilizing a film of anode material, a film of cathode material and an electrolyte of an amorphous lithium phosphorus oxynitride can be connected in series or parallel relationship for the purpose of withdrawing electrical power simultaneously from the cells. In addition, such battery cells which employ a lithium intercalation compound as its cathode material can be connected in a manner suitable for supplying power for the operation of an electric vehicle. Still further, by incorporating within the battery cell a relatively thick cathode of a lithium intercalation compound, a relatively thick anode of lithium and an electrolyte film of lithium phosphorus oxynitride, the battery cell is rendered capable of supplying power for any of a number of consumer products, such as a laptop computer or a cellular telephone.

  4. Rechargeable lithium battery for use in applications requiring a low to high power output

    DOEpatents

    Bates, John B.

    1996-01-01

    Rechargeable lithium batteries which employ characteristics of thin-film batteries can be used to satisfy power requirements within a relatively broad range. Thin-film battery cells utilizing a film of anode material, a film of cathode material and an electrolyte of an amorphorus lithium phosphorus oxynitride can be connected in series or parallel relationship for the purpose of withdrawing electrical power simultaneously from the cells. In addition, such battery cells which employ a lithium intercalation compound as its cathode material can be connected in a manner suitable for supplying power for the operation of an electric vehicle. Still further, by incorporating within the battery cell a relatively thick cathode of a lithium intercalation compound, a relatively thick anode of lithium and an electrolyte film of lithium phosphorus oxynitride, the battery cell is rendered capable of supplying power for any of a number of consumer products, such as a laptop computer or a cellular telephone.

  5. A review of Title V operating permit application requirements caused by the use of waste-derived fuel at cement plants

    SciTech Connect

    Yarmac, R.F.

    1994-12-31

    The Clean Air Act Amendments of 1990 required the USEPA to establish a comprehensive operating permit program which is being administered by the states. Most major air pollution sources will be required to submit operating permit applications by November 15, 1995 or earlier. Portland cement plants that burn waste-derived fuel face some special permitting problems that need to be addressed during the permit application process. This paper presents a brief summary of the Title V application with special emphasis on the permitting requirements incurred by the utilization of waste fuel at cement plants.

  6. Sputnik Engineering AG | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Zip: CH-2502 Sector: Solar Product: Manufacturer of SolarMax grid tie inverters for photovoltaic applications. References: Sputnik Engineering AG1 This article is a stub. You can...

  7. Application of the office of civilian radioactive waste management QA requirements to the hanford spent nuclear fuel project

    SciTech Connect

    MCCORMACK, R.L.

    1999-05-12

    This document identifies, at a high-level, the Hanford SNF Project systems, structures, and components and activities that must implement to some degree the OCRWM QARD requirements to ensure compliance with RL direction. This document will also be used to support development of a QARD requirements matrix for the implementation of QARD requirements.

  8. Software requirements, design, and verification and validation for the FEHM application - a finite-element heat- and mass-transfer code

    SciTech Connect

    Dash, Z.V.; Robinson, B.A.; Zyvoloski, G.A.

    1997-07-01

    The requirements, design, and verification and validation of the software used in the FEHM application, a finite-element heat- and mass-transfer computer code that can simulate nonisothermal multiphase multicomponent flow in porous media, are described. The test of the DOE Code Comparison Project, Problem Five, Case A, which verifies that FEHM has correctly implemented heat and mass transfer and phase partitioning, is also covered.

  9. Permit applicants' guidance manual for exposure information requirements under RCRA (Resource Conservation and Recovery Act) Section 3019. Final report

    SciTech Connect

    Not Available

    1985-07-03

    The purpose of this document is to provide owners and operators of hazardous-waste landfills and surface impoundments that are subject to permitting under the Resource Conservation and Recovery Act (RCRA) with guidance for submitting information on the potential for public exposure to hazardous wastes, as required by Section 3019 of RCRA.

  10. Requirements Management Database

    Energy Science and Technology Software Center

    2009-08-13

    This application is a simplified and customized version of the RBA and CTS databases to capture federal, site, and facility requirements, link to actions that must be performed to maintain compliance with their contractual and other requirements.

  11. The design of steel for high strength line pipe requiring excellent notch toughness and corrosion properties for arctic applications

    SciTech Connect

    DeCaux, G.; Golini, F.; Rayner, T.J.

    1998-12-31

    Due to the cold climate and environmental requirements of Alaska`s North Slope and Western Canada`s oil production areas, line pipe steels intended for use in these areas must display not only high strength as required, but superior toughness. Additionally,if the line pipe is to be used in aggressive sour gas (i.e., H{sub 2}S containing) environments it must also have excellent resistance to hydrogen induced cracking (HIC). Such a steel has been designed, through selective chemistry, clean steel-making practices, nonmetallic inclusion control, and hot mill process control, that is capable of meeting stringent line pipe specifications covering X65 grade line pipe in Arctic service temperatures. This paper also examined the effect that hot rolling finishing temperature had on notch toughness. Steel-making knowledge developed for lower strength, HIC resistant X52 grade steel has been employed for the development of a X65 grade steel. Results of trial heats will be presented.

  12. Application of value of information of tank waste characterization: A new paradigm for defining tank waste characterization requirements

    SciTech Connect

    Fassbender, L.L.; Brewster, M.E.; Brothers, A.J.

    1996-11-01

    This report presents the rationale for adopting a recommended characterization strategy that uses a risk-based decision-making framework for managing the Tank Waste Characterization program at Hanford. The risk-management/value-of-information (VOI) strategy that is illustrated explicitly links each information-gathering activity to its cost and provides a mechanism to ensure that characterization funds are spent where they can produce the largest reduction in risk. The approach was developed by tailoring well-known decision analysis techniques to specific tank waste characterization applications. This report illustrates how VOI calculations are performed and demonstrates that the VOI approach can definitely be used for real Tank Waste Remediation System (TWRS) characterization problems.

  13. Evaluation of the applicability of existing nuclear power plant regulatory requirements in the U.S. to advanced small modular reactors.

    SciTech Connect

    LaChance, Jeffrey L.; Wheeler, Timothy A.; Farnum, Cathy Ottinger; Middleton, Bobby D.; Jordan, Sabina Erteza; Duran, Felicia Angelica; Baum, Gregory A.

    2013-05-01

    The current wave of small modular reactor (SMR) designs all have the goal of reducing the cost of management and operations. By optimizing the system, the goal is to make these power plants safer, cheaper to operate and maintain, and more secure. In particular, the reduction in plant staffing can result in significant cost savings. The introduction of advanced reactor designs and increased use of advanced automation technologies in existing nuclear power plants will likely change the roles, responsibilities, composition, and size of the crews required to control plant operations. Similarly, certain security staffing requirements for traditional operational nuclear power plants may not be appropriate or necessary for SMRs due to the simpler, safer and more automated design characteristics of SMRs. As a first step in a process to identify where regulatory requirements may be met with reduced staffing and therefore lower cost, this report identifies the regulatory requirements and associated guidance utilized in the licensing of existing reactors. The potential applicability of these regulations to advanced SMR designs is identified taking into account the unique features of these types of reactors.

  14. Unmanned Aerial Vehicle (UAV) Dynamic-Tracking Directional Wireless Antennas for Low Powered Applications that Require Reliable Extended Range Operations in Time Critical Scenarios

    SciTech Connect

    Scott G. Bauer; Matthew O. Anderson; James R. Hanneman

    2005-10-01

    The proven value of DOD Unmanned Aerial Vehicles (UAVs) will ultimately transition to National and Homeland Security missions that require real-time aerial surveillance, situation awareness, force protection, and sensor placement. Public services first responders who routinely risk personal safety to assess and report a situation for emergency actions will likely be the first to benefit from these new unmanned technologies. ‘Packable’ or ‘Portable’ small class UAVs will be particularly useful to the first responder. They require the least amount of training, no fixed infrastructure, and are capable of being launched and recovered from the point of emergency. All UAVs require wireless communication technologies for real- time applications. Typically on a small UAV, a low bandwidth telemetry link is required for command and control (C2), and systems health monitoring. If the UAV is equipped with a real-time Electro-Optical or Infrared (EO/Ir) video camera payload, a dedicated high bandwidth analog/digital link is usually required for reliable high-resolution imagery. In most cases, both the wireless telemetry and real-time video links will be integrated into the UAV with unity gain omni-directional antennas. With limited on-board power and payload capacity, a small UAV will be limited with the amount of radio-frequency (RF) energy it transmits to the users. Therefore, ‘packable’ and ‘portable’ UAVs will have limited useful operational ranges for first responders. This paper will discuss the limitations of small UAV wireless communications. The discussion will present an approach of utilizing a dynamic ground based real-time tracking high gain directional antenna to provide extend range stand-off operation, potential RF channel reuse, and assured telemetry and data communications from low-powered UAV deployed wireless assets.

  15. PIT Coating Requirements Analysis

    SciTech Connect

    MINTEER, D.J.

    2000-10-20

    This study identifies the applicable requirements for procurement and installation of a coating intended for tank farm valve and pump pit interior surfaces. These requirements are intended to be incorporated into project specification documents and design media. This study also evaluates previously recommended coatings and identifies requirement-compliant coating products.

  16. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance. Environmental Restoration Program

    SciTech Connect

    Etnier, E.L.; Eaton, L.A.

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  17. Applicable or relevant and appropriate requirements (ARARs) for remedial actions at the Paducah Gaseous Diffusion Plant: A compendium of environmental laws and guidance

    SciTech Connect

    Etnier, E.L.; Eaton, L.A. )

    1992-03-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances found at sites placed on the National Priorities List (NPL) by the US Environmental Protection Agency (EPA) must comply with applicable or relevant and appropriate requirements (ARARs) or standards under federal and state environmental laws. To date, the US Department of Energy (DOE) Paducah Gaseous Diffusion Plant (PGDP) has not been on the NPL. Although DOE and EPA have entered into an Administrative Consent Order (ACO), the prime regulatory authority for cleanup at PGDP will be the Resource Conservation and Recovery Act (RCRA). This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at PGDP in the event that the plant becomes included on the NPL or the ACO is modified to include CERCLA cleanup. A description of the terms applicable'' and relevant and appropriate'' is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Kentucky are listed in tables. In addition, the major provisions of RCRA, the Safe Drinking Water Act, the Clean Water Act, the Clean Air Act, and other acts, as they apply to hazardous and radioactive waste cleanup, are discussed.

  18. Reporting Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858...

  19. Applicable or Relevant and Appropriate Requirements (ARARs) for Remedial Action at the Oak Ridge Reservation: A compendium of major environmental laws. Environmental Restoration Program

    SciTech Connect

    Etnier, E.L.; McDonald, E.P.; Houlberg, L.M.

    1993-07-01

    Section 121 of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 specifies that remedial actions for cleanup of hazardous substances must comply with applicable or relevant and appropriate requirements (ARARS) or standards under federal and state environmental laws. The US Department of Energy (DOE) Oak Ridge Reservation (ORR) was placed on the National Priorities List by the US Environmental Protection Agency (EPA) on November 21, 1989, effective December 21, 1989. As a result of this listing, DOE, EPA, and the Tennessee Department of Environment and Conservation have signed a Federal Facility Agreement (FFA) for the environmental restoration of the ORR. Section XXI(F) of the FFA calls for the preparation of a draft listing of all ARARs as mandated by CERCLA {section}121. This report supplies a preliminary list of available federal and state ARARs that might be considered for remedial response at the ORR. A description of the terms ``applicable`` and ``relevant and appropriate`` is provided, as well as definitions of chemical-, location-, and action-specific ARARS. ARARs promulgated by the federal government and by the state of Tennessee are listed in tables. In addition, the major provisions of the Resource Conservation and Recovery Act, the Safe Drinking Water Act, the Clean Water Act, the Clean Air and other acts, as they apply to hazardous waste cleanup, are discussed. In the absence of ARARS, CERCLA {section}121 provides for the use of nonpromulgated federal criteria, guidelines, and advisories in evaluating the human risk associated with remedial action alternatives. Such nonpromulgated standards are classified as ``to-be-considered`` (TBC) guidance. A ion of available guidance is given; summary tables fist the available federal standards and guidance information. In addition, the substantive contents of the DOE orders as they apply to remediation of radioactively contaminated sites are discussed as TBC guidance.

  20. Animation Requirements

    Energy.gov [DOE]

    Animations include dynamic elements such as interactive images and games. For developing animations, follow these design and coding requirements.

  1. Application Components

    Energy.gov [DOE]

    A complete application consists of the following documents. Use this checklist to keep track of the required documents.

  2. Competition Requirements

    Office of Environmental Management (EM)

    - Chapter 6.1 (January 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal Acquisition Regulation (FAR) Subpart 6.3.

  3. Reporting Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reporting Requirements Reporting Requirements Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email The Fellow will be required to participate in the Actinide Science lecture series by both attending lectures and presenting a scientific lecture on actinide science in this series. Submission of a viewgraph and brief write-up of the project. Provide metrics information as requested. Submission of an overview article

  4. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ---------------------------------------- Chapter 6.1 (July 2011) 1 Competition Requirements [Reference: FAR 6 and DEAR 906] Overview This section discusses competition requirements and provides a model Justification for Other than Full and Open Competition (JOFOC). Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using full and open competition. Seven exceptions to using full and open competition are specifically identified in Federal

  5. Video Requirements

    Energy.gov [DOE]

    All EERE videos, including webinar recordings, must meet Section 508's requirements for accessibility. All videos should be hosted on the DOE YouTube channel.

  6. Deployment Requirements

    Energy.gov [DOE] (indexed site)

    Troy, Michigan June 13, 2014 THIS PRESENTATION DOES NOT CONTAIN ANY PROPRIETARY, CONFIDENTIAL OR OTHERWISE RESTRICTED INFORMATION 2 Outline of talk * SAE 2719 Requirements and ...

  7. applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    FEL Industrial Uses Laser glaze and anneal surfaces Carburize and nitride surfaces Create 3D patterns for Micro-Electro-Mechanical no dark Systems Surface Processing Microfabrication Investigate mechanisms for photodynamic cancer therapy FEL Medical Uses Light Therapy Evaluate the potential use of Terahertz light for applications such as land mine detection Defend Navy fleets using infrared light Fabricate ceramic components for miniature satellites using ultraviolet FEL light FEL Defense Uses

  8. Web Writing Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Web Writing Requirements When writing content for Office of Energy Efficiency and Renewable Energy (EERE) websites and applications, follow these requirements. Also see EERE's Web ...

  9. Eligibility Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Careers » Employee, Retiree Resources » New Hire » Benefits » Eligibility Requirements Eligibility Requirements A comprehensive benefits package with plan options for health care and retirement to take care of our employees today and tomorrow. Contact Benefits Office (505) 667-1806 Email Eligible employees The Laboratory offers an extensive benefits package to full and part time employees. Casual employees (excluding High School Coop, Lab Associates and Craft Employees) are eligible to

  10. Environmental Requirements Management

    SciTech Connect

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  11. ATVM requirements:

    Energy Saver

    Advanced Technology Vehicles Manufacturing Loan Program Effective Date: November 4, 2014 GUIDANCE FOR APPLICANTS TO THE ADVANCED TECHNOLOGY VEHICLES MANUFACTURING LOAN PROGRAM The Advanced Technology Vehicles Manufacturing Loan Program (ATVM Program) was authorized by Congress pursuant to Section 136 of the Energy Independence and Security Act of 2007, as amended (Section 136). The ATVM Program is administered by the U.S. Department of Energy's (DOE) Loan Programs Office (LPO). The purpose of

  12. Competition Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ---- ----------------------------------------------- Chapter 5.2 (April 2008) Synopsizing Proposed Non-Competitive Contract Actions Citing the Authority of FAR 6.302-1 [Reference: FAR 5 and DEAR 905] Overview This section discusses publicizing sole source actions as part of the approval of a Justification for Other than Full and Open Competition (JOFOC) using the authority of FAR 6.302-1. Background The Competition in Contracting Act (CICA) of 1984 requires that all acquisitions be made using

  13. EERE Postdoctoral Research Awards Application Checklist

    Energy.gov [DOE]

    EERE Postdoctoral Research Awards Application Checklist. Use this checklist to keep track of required application components.

  14. City of Dubuque- Solar Thermal Licensing Requirement

    Energy.gov [DOE]

    Installers are also required to obtain a permit before altering or installing a system. Application details are available on the program website.

  15. Requirements Flowdown and Graded Approach to QA

    Office of Environmental Management (EM)

    1. Requirements Flow Down 2. Adequate NQA-1 Suppliers 3. Commercial Grade Item and ... for Nuclear Facility Applications (NQA-1) version 2004 with addenda through 2007. ...

  16. Understanding DOE Quality Assurance Requirements and ASME NQA...

    Office of Environmental Management (EM)

    and ASME NQA-1 For Application in DOE Nuclear Projects Training Agenda Agenda for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in ...

  17. College Student Internship Program Requirements and Application...

    Energy Saver

    On-grid photovoltaic (PV) installations - New Mexico Off-grid PV electricity system - ... large PV array, microturbine, fuel cell, large battery bank - New Mexico (Sandia Labs). ...

  18. November 17 PSERC Webinar: Meeting PMU Data Quality Requirements...

    Office of Environmental Management (EM)

    November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission Critical Applications November 17 PSERC Webinar: Meeting PMU Data Quality Requirements for Mission...

  19. Understanding DOE Quality Assurance Requirements and ASME NQA...

    Energy.gov [DOE] (indexed site)

    Training Materials for the Understanding DOE Quality Assurance Requirements and ASME NQA-1 ... Understanding DOE Quality Assurance Requirements and ASME NQA-1 For Application in DOE ...

  20. FES Requirements Review 2014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    FES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 FES Attendees 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  1. BES Requirements Review 2014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    BES Requirements Review 2014 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 FES Requirements Review 2014 BES Requirements Review 2014 BES Attendees 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  2. BER Requirements Review 2015

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 BER Attendees 2015 ASCR Requirements...

  3. Requirements for Wind Development

    Office of Energy Efficiency and Renewable Energy (EERE)

    In 2015 Oklahoma amended the Oklahoma Wind Energy Development Act. The amendments added new financial security requirements, setback requirements, and notification requirements for wind energy...

  4. Feed tank transfer requirements

    SciTech Connect

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover; DOE responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements; records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor for use during Phase 1B.

  5. ASCR Requirements Review 2015

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ASCR Requirements Review 2015 ASCR Attendees 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » ASCR Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  6. Science Requirements Reviews

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  7. BER Requirements Review 2015

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    BER Attendees 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies News & Publications ESnet News Publications and Presentations Galleries ESnet Awards and Honors Blog ESnet Live Home » Science Engagement » Science Requirements Reviews » Network Requirements Reviews » BER Requirements Review 2015 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials

  8. Project X functional requirements specification

    SciTech Connect

    Holmes, S.D.; Henderson, S.D.; Kephart, R.; Kerby, J.; Kourbanis, I.; Lebedev, V.; Mishra, S.; Nagaitsev, S.; Solyak, N.; Tschirhart, R.; /Fermilab

    2012-05-01

    Project X is a multi-megawatt proton facility being developed to support a world-leading program in Intensity Frontier physics at Fermilab. The facility is designed to support programs in elementary particle and nuclear physics, with possible applications to nuclear energy research. A Functional Requirements Specification has been developed in order to establish performance criteria for the Project X complex in support of these multiple missions, and to assure that the facility is designed with sufficient upgrade capability to provide U.S. leadership for many decades to come. This paper will briefly review the previously described Functional Requirements, and then discuss their recent evolution.

  9. Feed tank transfer requirements

    SciTech Connect

    Freeman-Pollard, J.R.

    1998-09-16

    This document presents a definition of tank turnover. Also, DOE and PC responsibilities; TWRS DST permitting requirements; TWRS Authorization Basis (AB) requirements; TWRS AP Tank Farm operational requirements; unreviewed safety question (USQ) requirements are presented for two cases (i.e., tank modifications occurring before tank turnover and tank modification occurring after tank turnover). Finally, records and reporting requirements, and documentation which will require revision in support of transferring a DST in AP Tank Farm to a privatization contractor are presented.

  10. Regulators, Requirements, Statutes

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Air Act (CAA) Requirements for air quality and air emissions from facility operations Clean Water Act (CWA) Requirements for water quality and water discharges from facility...

  11. Requirements Review Reports

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Editors, "High Energy Physics and Nuclear Physics Network Requirements - Final Report", ESnet Network Requirements Workshop, August 2013, LBNL 6642E Download File: HEP-NP-Net-Req...

  12. ATVM APPLICATION PROCESS | Department of Energy

    Energy.gov [DOE] (indexed site)

    In order to apply for an ATVM direct loan, applicants must submit a substantially complete application meeting all applicable eligibility requirements. No payment of fees to the ...

  13. Alt Text Requirements for Web Images

    Energy.gov [DOE]

    Per Section 508 requirements, images on Office of Energy Efficiency and Renewable Energy (EERE) websites and applications must have alt text. Alt text describes what an image looks like in words, making it accessible to screen readers.

  14. Superconducting Super Collider Magnet System requirements. Revision A

    SciTech Connect

    1986-10-23

    This report discusses the Superconducting Super Collider magnet system requirements when the following categories: Functions; operational performance requirements; system configuration and essential features; structural requirements; availability/reliability; instrumentation and control requirements; design life; environment; maintenance requirements; interface systems; quality assurance; safety; and applicable codes and standards.

  15. Network Requirements Reviews

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reviews Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site

  16. Appendix IGP: Individual and Groundwater Protection Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    IGP-2014 Individual and Groundwater Protection Requirements United States Department of Energy Waste Isolation Pilot Plant Carlsbad Field Office Carlsbad, New Mexico Compliance Recertification Application 2014 Appendix IGP-2014 Individual and Groundwater Protection Requirements Table of Contents IGP-1.0 Introduction IGP-2.0 Individual Protection Requirements IGP-2.1 Compliance Assessment of Undisturbed Performance IGP-2.2 Dose Calculation IGP-2.2.1 Transport Pathway IGP-2.2.2 Bounding Analysis

  17. Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Requirements Requirements Statutes 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air ...

  18. Resume Based Application

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    borders, provide photos or list a Social Security Number or ... telephone numbers * Email address * Vacancy ... pages for other required documents in the application is not ...

  19. RMACS software requirements specification

    SciTech Connect

    Gneiting, B.C.

    1996-10-01

    This document defines the essential user (or functional) requirements of the Requirements Management and Assured Compliance System (RMACS), which is used by the Tank Waste Remediation System program (TWRS). RMACS provides a computer-based environment that TWRS management and systems engineers can use to identify, define, and document requirements. The intent of the system is to manage information supporting definition of the TWRS technical baseline using a structured systems engineering process. RMACS has the capability to effectively manage a complete set of complex requirements and relationships in a manner that satisfactorily assures compliance to the program requirements over the TWRS life-cycle.

  20. Requirement-Reviews.pptx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2 013 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading scientists using NERSC & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Reports From 6 Requirements Reviews Have Been Published 3 h%p://www.nersc.gov/science/requirements---reviews/ final---reports/ * Compu<ng a nd s torage requirements f or 2013/2014 * Execu<ve S ummary o f

  1. Other Requirements - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Other Requirements by Website Administrator More filters Less filters Other Policy Type Secretarial Memo Program Office Memo Invoked Technical Standards 100 Office of Primary Interest (OPI) Office of Primary Interest (OPI) All AD - Office of Administrative Services AU - Office of Environment, Health, Safety and Security CF - Office of the Chief Financial Officer CI - Office of Congressional and Intergovernmental Affairs CN - Office of Counterintelligence CP - Office of the Press Secretary CR -

  2. Amount of Zeolite Required to Meet the Constraints Established...

    Office of Environmental Management (EM)

    of Zeolite Required to Meet the Constraints Established by the Energetic Materials Research and Testing Center (EMRTC) Report RF 10-13: Application of Los Alamos National...

  3. Renewable Energy Requirement Guidance for EPAct 2005 | Department...

    Energy.gov [DOE] (indexed site)

    Guidance originally specified conditions for agencies to meet the renewable energy ... and is still applicable. Download the Renewable Energy Requirement Guidance for EPAct ...

  4. State Energy Program 2015 Administrative and Legal Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Administrative and Legal Requirements Document State Energy Program 2015 Administrative ... the annual grant applications under the State Energy Program for Program Year 2015. PDF ...

  5. State Energy Program 2014 Administrative and Legal Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Administrative and Legal Requirements Document State Energy Program 2014 Administrative ... the annual grant applications under the State Energy Program for Program Year 2014. PDF ...

  6. State Energy Program 2016 Administrative and Legal Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Administrative and Legal Requirements Document State Energy Program 2016 Administrative ... the annual grant applications under the State Energy Program for Program Year 2016. PDF ...

  7. RE: NBP RFI: Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Tropos Networks is pleased to submit the following commentary and information to the DOE regarding the communication requirements of utilities for Smart Grid applications based on ...

  8. BER Science Network Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Network Requirements Report of the Biological and Environmental Research Network Requirements Workshop Conducted July 26 and 27, 2007 BER Science Network Requirements Workshop Biological and Environmental Research Program Office, DOE Office of Science Energy Sciences Network Bethesda, MD - July 26 and 27, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by

  9. BES Science Network Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Network Requirements Report of the Basic Energy Sciences Network Requirements Workshop Conducted June 4-5, 2007 BES Science Network Requirements Workshop Basic Energy Sciences Program Office, DOE Office of Science Energy Sciences Network Washington, DC - June 4 and 5, 2007 ESnet is funded by the US Dept. of Energy, Office of Science, Advanced Scientific Computing Research (ASCR) program. Dan Hitchcock is the ESnet Program Manager. ESnet is operated by Lawrence Berkeley National Laboratory, which

  10. ESnet Requirements Workshops

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements Workshops Summary for Sites Eli Dart, Network Engineer ESnet Network Engineering Group ESnet Site Coordinating Committee Meeting Clemson, SC February 2, 2011 Lawrence Berkeley National Laboratory U.S. Department of Energy | Office of Science Overview ESnet requirements workshops - what are they? Common themes Discussion of subset of requirements learned * Examples of trends * Success stories * Upcoming needs that are currently unmet Thoughts for discussion 2/1/11 2 Lawrence Berkeley

  11. ASCR Requirements Review 2015

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ASCR Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  12. BES Requirements Review 2014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    BES Program Office. These requirements will serve as input to the ESnet architecture and planning processes, and will help ensure that ESnet continues to provide world-class...

  13. Unreviewed Safety Question Requirements

    Office of Environmental Management (EM)

    DOE G 424.1-1, Implementation Guide for Use in Addressing Unreviewed Safety Question Requirements Performance Objective 1: Contractor Program Documentation 1. The USQ ...

  14. Transuranic Waste Requirements

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1999-07-09

    The guide provides criteria for determining if a waste is to be managed in accordance with DOE M 435.1-1, Chapter III, Transuranic Waste Requirements.

  15. HPC Requirements Reviews

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reviews: Target 2017 Requirements Reviews: Target 2014 Overview Published Reports Case Study FAQs NERSC HPC Achievement Awards Accelerator Science Astrophysics & Cosmology...

  16. Required Annual Notices

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Required Annual Notices The Women's Health and Cancer Rights Act of 1998 (WHCRA) The medical programs sponsored by LANS will not restrict benefits if you or your dependent ...

  17. Residential Solar Permit Requirements

    Energy.gov [DOE]

    Washington's State Building Code sets requirements for the installation, inspection, maintenance and repair of solar photovoltaic (PV) energy systems. Local jurisdictions have the authority to...

  18. General Responsibilities and Requirements

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1999-07-09

    The material presented in this guide provides suggestions and acceptable ways of implementing DOE M 435.1-1 and should not be viewed as additional or mandatory requirements. The objective of the guide is to ensure that responsible individuals understand what is necessary and acceptable for implementing the requirements of DOE M 435.1-1.

  19. Writing testable software requirements

    SciTech Connect

    Knirk, D.

    1997-11-01

    This tutorial identifies common problems in analyzing requirements in the problem and constructing a written specification of what the software is to do. It deals with two main problem areas: identifying and describing problem requirements, and analyzing and describing behavior specifications.

  20. Integrated Management Requirements mapping

    SciTech Connect

    Holmes, J.T.; Andrews, N.S.

    1992-06-01

    This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia's approved program for implementing the Conduct of Operations Order.

  1. Integrated Management Requirements mapping

    SciTech Connect

    Holmes, J.T.; Andrews, N.S.

    1992-06-01

    This document contains five appendices documenting how Sandia implemented the DOE Conduct of Operations (5480.19) and DOE Quality Assurance (5700.6C) orders. It provides a mapping of the Sandia integrated requirements to the specific requirements of each Order and a mapping to Sandia`s approved program for implementing the Conduct of Operations Order.

  2. System requirements and design description for the environmental requirements management interface (ERMI)

    SciTech Connect

    Biebesheimer, E.

    1997-09-30

    This document describes system requirements and the design description for the Environmental Requirements Management Interface (ERMI). The ERMI database assists Tank Farm personnel with scheduling, planning, and documenting procedure compliance, performance verification, and selected corrective action tracking activities for Tank Farm S/RID requirements. The ERMI database was developed by Science Applications International Corporation (SAIC). This document was prepared by SAIC and edited by LMHC.

  3. Level III Mentoring Requirement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Level III applicants must be mentored (minimum of six months) by a Level III or IV FPD or demonstrate equivalency (see below Competency 3.12.2 in the PMCDP's CEG). A formal mentoring agreement must...

  4. Experiment Safety Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do I...? Complete an...

  5. Experiment Safety Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Experiment Safety Experiment Safety Requirements Print Safety at the ALS The mission of the ALS is to "Support users in doing outstanding science in a safe environment." How Do...

  6. Selected Guidance & Requirements

    Energy.gov [DOE]

    This page contains the most requested NEPA guidance and requirement documents and those most often recommended by the Office of NEPA Policy and Compliance. Documents are listed by agency, in...

  7. Green Building Requirement

    Office of Energy Efficiency and Renewable Energy (EERE)

    The new standards are phased in over the course of several years with publicly-owned buildings being the first required to comply. All new construction and substantial improvements of non...

  8. Requirements for security signalling

    SciTech Connect

    Pierson, L.G.; Tarman, T.D.

    1995-02-05

    There has been some interest lately in the need for ``authenticated signalling``, and the development of signalling specifications by the ATM Forum that support this need. The purpose of this contribution is to show that if authenticated signalling is required, then supporting signalling facilities for directory services (i.e. key management) are also required. Furthermore, this contribution identifies other security related mechanisms that may also benefit from ATM-level signalling accommodations. For each of these mechanisms outlined here, an overview of the signalling issues and a rough cut at the required fields for supporting Information Elements are provided. Finally, since each of these security mechanisms are specified by a number of different standards, issues pertaining to the selection of a particular security mechanism at connection setup time (i.e. specification of a required ``Security Quality of Service``) are also discussed.

  9. Promulgating Nuclear Safety Requirements

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1996-05-15

    Applies to all Nuclear Safety Requirements Adopted by the Department to Govern the Conduct of its Nuclear Activities. Cancels DOE P 410.1. Canceled by DOE N 251.85.

  10. ARM - Reporting Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    required to report to the DOE ARM Program Director, to the DOE's Office of Biological and Environmental Research, and to the White House Office of Management and Budget. A primary...

  11. NERSC Requirements Workshop November

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    What will this mean for computing requirements? Example of possible smoking gun d W s W b W V ud V us V ub V cd V cs V cb V td V ts V tb ...

  12. Regulators, Requirements, Statutes

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Regulators, Requirements, Statutes Regulators, Requirements, Statutes The Laboratory must comply with environmental laws and regulations that apply to Laboratory operations. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Environmental laws and regulations LANL complies with more than 30 state and federal regulations and policies designed to protect human health and the environment. Regulators Regulators Environmental

  13. State Energy Program 2014 Administrative and Legal Requirements Document |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Administrative and Legal Requirements Document State Energy Program 2014 Administrative and Legal Requirements Document This Administrative and Legal Requirements Document (ALRD) is to solicit the annual grant applications under the State Energy Program for Program Year 2014. SEP-ALRD-2014.pdf (5.99 MB) More Documents & Publications State Energy Program 2015 Administrative and Legal Requirements Document State Energy Program 2016 Administrative and Legal Requirements

  14. State Energy Program 2015 Administrative and Legal Requirements Document |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Administrative and Legal Requirements Document State Energy Program 2015 Administrative and Legal Requirements Document This Administrative and Legal Requirements Document (ALRD) is to solicit the annual grant applications under the State Energy Program for Program Year 2015. SEP 2015 Administrative and Legal Requirements Document (3.47 MB) More Documents & Publications State Energy Program 2016 Administrative and Legal Requirements Document State Energy Program 2014

  15. State Energy Program 2016 Administrative and Legal Requirements Document |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Administrative and Legal Requirements Document State Energy Program 2016 Administrative and Legal Requirements Document This Administrative and Legal Requirements Document (ALRD) is to solicit the annual grant applications under the State Energy Program for Program Year 2016. SEP 2016 Administrative and Legal Requirements Document (3.35 MB) More Documents & Publications State Energy Program 2015 Administrative and Legal Requirements Document State Energy Program 2014

  16. Requirements | Photosynthetic Antenna Research Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements Requirements Students must earn a total of 11 points from the following options: Please note: To receive points toward the certificate, student are required to submit...

  17. NP Science Network Requirements

    SciTech Connect

    Dart, Eli; Rotman, Lauren; Tierney, Brian

    2011-08-26

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. To support SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2011, ESnet and the Office of Nuclear Physics (NP), of the DOE SC, organized a workshop to characterize the networking requirements of the programs funded by NP. The requirements identified at the workshop are summarized in the Findings section, and are described in more detail in the body of the report.

  18. Table 1 - DOE Requirements Requiring Central Technical Authority (CTA)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Concurrence Prior to Granting Exemptions or Exceptions | Department of Energy 1 - DOE Requirements Requiring Central Technical Authority (CTA) Concurrence Prior to Granting Exemptions or Exceptions Table 1 - DOE Requirements Requiring Central Technical Authority (CTA) Concurrence Prior to Granting Exemptions or Exceptions Table 1 - DOE Requirements Requiring Central Technical Authority (CTA) Concurrence Prior to Granting Exemptions or Exceptions Table 1 - DOE Requirements Requiring Central

  19. Utah Application to Appropriate Water | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Utah Application to Appropriate Water Abstract Required application for obtaining a right to appropriate water in Utah. Form Type ApplicationNotice Form Topic Filing for Water...

  20. Vermont Section 401 Water Quality Certification Application ...

    OpenEI (Open Energy Information) [EERE & EIA]

    Abstract Application required for Section 401 water quality certification under the Clean Water Act. Form Type ApplicationNotice Form Topic Section 401 Water Quality...

  1. Hanford analytical services quality assurance requirements documents

    SciTech Connect

    Hyatt, J.E.

    1997-09-25

    Hanford Analytical Services Quality Assurance Requirements Document (HASQARD) is issued by the Analytical Services, Program of the Waste Management Division, US Department of Energy (US DOE), Richland Operations Office (DOE-RL). The HASQARD establishes quality requirements in response to DOE Order 5700.6C (DOE 1991b). The HASQARD is designed to meet the needs of DOE-RL for maintaining a consistent level of quality for sampling and field and laboratory analytical services provided by contractor and commercial field and laboratory analytical operations. The HASQARD serves as the quality basis for all sampling and field/laboratory analytical services provided to DOE-RL through the Analytical Services Program of the Waste Management Division in support of Hanford Site environmental cleanup efforts. This includes work performed by contractor and commercial laboratories and covers radiological and nonradiological analyses. The HASQARD applies to field sampling, field analysis, and research and development activities that support work conducted under the Hanford Federal Facility Agreement and Consent Order Tri-Party Agreement and regulatory permit applications and applicable permit requirements described in subsections of this volume. The HASQARD applies to work done to support process chemistry analysis (e.g., ongoing site waste treatment and characterization operations) and research and development projects related to Hanford Site environmental cleanup activities. This ensures a uniform quality umbrella to analytical site activities predicated on the concepts contained in the HASQARD. Using HASQARD will ensure data of known quality and technical defensibility of the methods used to obtain that data. The HASQARD is made up of four volumes: Volume 1, Administrative Requirements; Volume 2, Sampling Technical Requirements; Volume 3, Field Analytical Technical Requirements; and Volume 4, Laboratory Technical Requirements. Volume 1 describes the administrative requirements

  2. Contractor Legal Management Requirements

    Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  3. Requirements Definition Stage

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-05-21

    This chapter addresses development of a Software Configuration Management Plan to track and control work products, analysis of the system owner/users' business processes and needs, translation of those processes and needs into formal requirements, and planning the testing activities to validate the performance of the software product.

  4. Data Crosscutting Requirements Review

    SciTech Connect

    Kleese van Dam, Kerstin; Shoshani, Arie; Plata, Charity

    2013-04-01

    In April 2013, a diverse group of researchers from the U.S. Department of Energy (DOE) scientific community assembled to assess data requirements associated with DOE-sponsored scientific facilities and large-scale experiments. Participants in the review included facilities staff, program managers, and scientific experts from the offices of Basic Energy Sciences, Biological and Environmental Research, High Energy Physics, and Advanced Scientific Computing Research. As part of the meeting, review participants discussed key issues associated with three distinct aspects of the data challenge: 1) processing, 2) management, and 3) analysis. These discussions identified commonalities and differences among the needs of varied scientific communities. They also helped to articulate gaps between current approaches and future needs, as well as the research advances that will be required to close these gaps. Moreover, the review provided a rare opportunity for experts from across the Office of Science to learn about their collective expertise, challenges, and opportunities. The "Data Crosscutting Requirements Review" generated specific findings and recommendations for addressing large-scale data crosscutting requirements.

  5. Requirements for Xenon International

    SciTech Connect

    Hayes, James C.; Ely, James H.

    2013-09-26

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  6. Managing routine bioassay requirements

    SciTech Connect

    Baumann, B.L., Westinghouse Hanford, Richland, WA

    1997-10-08

    The Hanford Site is a very diverse Department of Energy (DOE) Nuclear Site in Eastern Washington State that includes: retired reactor facilities, spent fuel storage facilities, chemical separations facilities, laboratories, and plutonium separations facilities. As a result worker routine bioassays requirements may include routine whole body counting for mixed fission products, chest counting for uranium or plutonium, and/or urinalyses for plutonium, ura@u@ strontium-90, and tritium depending on work assignments. In such a situation it is easy to perform unnecessary bioassays and incur unnecessary cost. Program Implementation Fluor Daniel Hanford has been working with the Pacific Northwest National. Laboratories to reduce the number of routine bioassays in the internal dosimetry program while ensuring the program is compliant with regulatory requirements. This has been accomplished by: 1. Clearly identifying what work requires routine bioassay 2. Clearly identifying what routine bioassay is required 3. Having a system in place to make sure personnel who need routine bioassay get it and 4. Taking measures to ensure that workers who doiVt need routine bioassay don`t get it.

  7. Requirements for Xenon International

    SciTech Connect

    Hayes, James C.; Ely, James H.; Haas, Derek A.; Harper, Warren W.; Heimbigner, Tom R.; Hubbard, Charles W.; Humble, Paul H.; Madison, Jill C.; Morris, Scott J.; Panisko, Mark E.; Ripplinger, Mike D.; Stewart, Timothy L.

    2015-12-30

    This document defines the requirements for the new Xenon International radioxenon system. The output of this project will be a Pacific Northwest National Laboratory (PNNL) developed prototype and a manufacturer-developed production prototype. The two prototypes are intended to be as close to matching as possible; this will be facilitated by overlapping development cycles and open communication between PNNL and the manufacturer.

  8. LASSO* - Science Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LASSO* - Science Requirements *LES ARM Symbiotic Simulation and Observation (LASSO) workflow Andy Vogelmann 1 , William I Gustafson Jr 2 Zhijin Li 3,4 , Xiaoping Cheng 3 , Satoshi Endo 1 , Tami Toto 1 , and Heng Xiao 2 1 Brookhaven National Laboratory 2 Pacific Northwest National Laboratory 3 University of California Los Angeles 4 NASA Jet Propulsion Laboratory And TONS of people from the rest of ARM! LASSO Webpage: http://www.arm.gov/science/themes/lasso LASSO e-mail list sign up:

  9. BER Science Network Requirements

    SciTech Connect

    Alapaty, Kiran; Allen, Ben; Bell, Greg; Benton, David; Brettin, Tom; Canon, Shane; Dart, Eli; Cotter, Steve; Crivelli, Silvia; Carlson, Rich; Dattoria, Vince; Desai, Narayan; Egan, Richard; Tierney, Brian; Goodwin, Ken; Gregurick, Susan; Hicks, Susan; Johnston, Bill; de Jong, Bert; Kleese van Dam, Kerstin; Livny, Miron; Markowitz, Victor; McGraw, Jim; McCord, Raymond; Oehmen, Chris; Regimbal, Kevin; Shipman, Galen; Strand, Gary; Flick, Jeff; Turnbull, Susan; Williams, Dean; Zurawski, Jason

    2010-11-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2010 ESnet and the Office of Biological and Environmental Research, of the DOE Office of Science, organized a workshop to characterize the networking requirements of the science programs funded by BER. The requirements identified at the workshop are summarized and described in more detail in the case studies and the Findings section. A number of common themes emerged from the case studies and workshop discussions. One is that BER science, like many other disciplines, is becoming more and more distributed and collaborative in nature. Another common theme is that data set sizes are exploding. Climate Science in particular is on the verge of needing to manage exabytes of data, and Genomics is on the verge of a huge paradigm shift in the number of sites with sequencers and the amount of sequencer data being generated.

  10. LEGACY MANAGEMENT REQUIRES INFORMATION

    SciTech Connect

    CONNELL, C.W.; HILDEBRAND, R.D.

    2006-12-14

    ''Legacy Management Requires Information'' describes the goal(s) of the US Department of Energy's Office of Legacy Management (LM) relative to maintaining critical records and the way those goals are being addressed at Hanford. The paper discusses the current practices for document control, as well as the use of modern databases for both storing and accessing the data to support cleanup decisions. In addition to the information goals of LM, the Hanford Federal Facility Agreement and Consent Order, known as the ''Tri-Party Agreement'' (TPA) is one of the main drivers in documentation and data management. The TPA, which specifies discrete milestones for cleaning up the Hanford Site, is a legally binding agreement among the US Department of Energy (DOE), the Washington State Department of Ecology (Ecology), and the US Environmental Protection Agency (EPA). The TPA requires that DOE provide the lead regulatory agency with the results of analytical laboratory and non-laboratory tests/readings to help guide them in making decisions. The Agreement also calls for each signatory to preserve--for at least ten years after the Agreement has ended--all of the records in its or its contractors, possession related to sampling, analysis, investigations, and monitoring conducted. The tools used at Hanford to meet TPA requirements are also the tools that can satisfy the needs of LM.

  11. ATVM APPLICATION PORTAL | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PORTAL ATVM APPLICATION PORTAL ATVM APPLICATION PORTAL The ATVM online application portal guides users through the Advanced Technology Vehicles Manufacturing (ATVM) direct loan application process. The system is designed to guide users through the submission of a ATVM direct loan application. HOWEVER, before beginning an application, potential applicants are strongly encouraged to first: Review ATVM project eligibility requirements. Understand all applicable fees for the ATVM application

  12. EERE Postdoctoral Research Award Application Components

    Energy.gov [DOE]

    A complete application consists of the following documents. Use this checklist PDF to keep track of the required documents.

  13. Applications from Universities and Other Research Institutions...

    Office of Science (SC)

    Applications from Universities and Other Research Institutions Basic Energy Sciences (BES) BES Home ... Award Search Public Abstracts Additional Requirements and ...

  14. Gas Test Loop Functional and Technical Requirements

    SciTech Connect

    Glen R. Longhurst; Soli T. Khericha; James L. Jones

    2004-09-01

    This document defines the technical and functional requirements for a gas test loop (GTL) to be constructed for the purpose of providing a high intensity fast-flux irradiation environment for developers of advanced concept nuclear reactors. This capability is needed to meet fuels and materials testing requirements of the designers of Generation IV (GEN IV) reactors and other programs within the purview of the Advanced Fuel Cycle Initiative (AFCI). Space nuclear power development programs may also benefit by the services the GTL will offer. The overall GTL technical objective is to provide developers with the means for investigating and qualifying fuels and materials needed for advanced reactor concepts. The testing environment includes a fast-flux neutron spectrum of sufficient intensity to perform accelerated irradiation testing. Appropriate irradiation temperature, gaseous environment, test volume, diagnostics, and access and handling features are also needed. This document serves to identify those requirements as well as generic requirements applicable to any system of this kind.

  15. BES Science Network Requirements

    SciTech Connect

    Biocca, Alan; Carlson, Rich; Chen, Jackie; Cotter, Steve; Tierney, Brian; Dattoria, Vince; Davenport, Jim; Gaenko, Alexander; Kent, Paul; Lamm, Monica; Miller, Stephen; Mundy, Chris; Ndousse, Thomas; Pederson, Mark; Perazzo, Amedeo; Popescu, Razvan; Rouson, Damian; Sekine, Yukiko; Sumpter, Bobby; Dart, Eli; Wang, Cai-Zhuang -Z; Whitelam, Steve; Zurawski, Jason

    2011-02-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivityfor the US Department of Energy Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of the Office ofScience programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years.

  16. Required Annual Notices

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A Token Requesting A Token RSA_SecurID_SID800.jpg Step One - Registering with the DOE's Management Information System (MIS) Before you request a DOE Digital Identity, you must register in DOE's Management Information System (MIS). Please note that DOE Federal employees are already registered and do not need to complete this step. They may skip to step two. During the registration process, you will be required to select a DOE sponsor. Your sponsor is the DOE employee who certifies that you have a

  17. Mentor-Protege Application

    Energy.gov [DOE]

    Before you submit the application please review these requirements: Must be a small business; Must be in business a minimum of two (2) years; Must already have a Department of Energy (DOE) Mentor and DOE contract number to be used on agreement before submitting for review/approval; Application must be completed in its entirety; Must meet all other DOE Mentor-Protégé Program requirements found at www.smallbusiness.energy.gov .

  18. Requirements Management System Browser (RMSB) software design description

    SciTech Connect

    Frank, D.D.

    1996-09-30

    The purpose of this document is to provide an ``as-built`` design description for the Requirements Management System Browser (RMSB) application. The Graphical User Interface (GUI) and database structure design are described for the RMSB application, referred to as the ``Browser.`` The RMSB application provides an easy to use PC-based interface to browse systems engineering data stored and managed in a UNIX software application. The system engineering data include functions, requirements, and architectures that make up the Tank Waste Remediation System (TWRS) technical baseline.

  19. Guidance for Potential ATVM Applicants (June 2016)

    Energy.gov [DOE]

    The Advanced Technology Vehicles Manufacturing Loan Program (ATVM Program) is administered by the U.S. Department of Energy’s (DOE) Loan Programs Office (LPO). This guidance for the ATVM Program applicants covers the following areas: General Eligibility Requirements, General Application Requirements, Pre-Application Consultation, and Application Process.

  20. Equipment Operational Requirements

    SciTech Connect

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  1. communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Utilities to Inform Federal Smart Grid Policy Re: NBP RFI: Communications Requirements NBP RFI: Communications Requirements- Comments of Lake Region Electric Cooperative- Minnesota

  2. ASCR Science Network Requirements

    SciTech Connect

    Dart, Eli; Tierney, Brian

    2009-08-24

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In April 2009 ESnet and the Office of Advanced Scientific Computing Research (ASCR), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by ASCR. The ASCR facilities anticipate significant increases in wide area bandwidth utilization, driven largely by the increased capabilities of computational resources and the wide scope of collaboration that is a hallmark of modern science. Many scientists move data sets between facilities for analysis, and in some cases (for example the Earth System Grid and the Open Science Grid), data distribution is an essential component of the use of ASCR facilities by scientists. Due to the projected growth in wide area data transfer needs, the ASCR supercomputer centers all expect to deploy and use 100 Gigabit per second networking technology for wide area connectivity as soon as that deployment is financially feasible. In addition to the network connectivity that ESnet provides, the ESnet Collaboration Services (ECS) are critical to several science communities. ESnet identity and trust services, such as the DOEGrids certificate authority, are widely used both by the supercomputer centers and by collaborations such as Open Science Grid (OSG) and the Earth System Grid (ESG). Ease of use is a key determinant of the scientific utility of network-based services. Therefore, a key enabling aspect for scientists beneficial use of high

  3. ETA-HAC05 - Training and Certification Requirements for Personnel...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Procedure ETA-HAC05 Revision 0 7 2004 Electric Transportation Applications All Rights Reserved 7.3 DOE Order 5700.6C - "Quality Assurance Program Basic Requirements." 7.4 HEV ...

  4. Environmental Impact Statement Filing Guidance and Requirements |

    Energy Saver

    Assessments Environmental Assessments The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPO's due diligence process for issuing a Department of Energy loan or loan guarantee. With the exception of a Record of Decision, the posting of these documents should not be construed as recommending a decision about the issuance of a loan or loan guarantee. Documents Available for Download November 6,

  5. Application Process and Eligibility

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Program » Application Process and Eligibility Application Process and Eligibility Both US and non-US citizens are eligible to apply, but US citizenship may be required for some research. Contacts Director Albert Migliori Deputy Franz Freibert 505 667-6879 Email Professional Staff Assistant Susan Ramsay 505 665 0858 Email Applications for the program shall consist of a clearly defined research proposal of up to 300 words, written by the sponsor, describing the candidate's proposed research in

  6. Selected Requirements | Department of Energy

    Energy Saver

    Requirements Selected Requirements This page contains frequently used NEPA requirements. For more topic specific requirements, see Guidance and Requirements Categories. STATUTES 42 U.S.C. 4321: National Environmental Policy Act of 1969 42 U.S.C. 4371: Environmental Quality Improvement Act of 1970 42 U.S.C. 7401: Clean Air Act, Section 309 CEQ REGULATIONS 40 CFR Part 1500-1508: CEQ - Regulations for Implementing NEPA DOE REGULATIONS AND ORDERS 10 CFR Part 1021: NEPA Implementing Procedures 10 CFR

  7. Launch vehicle integration requirements for SP-100

    SciTech Connect

    Shaw, L.T. Jr.; Womack, J.R.

    1984-01-31

    SP-100 is the designation for a nuclear reactor-based power plant being developed for both civil and military missions beginning in the 1990s for such potential space applications as communication satellites, space radar, electric propulsion and space stations. Typically, a system using the SP-100 along with a selected upper stage system would be launched by the National Space Transportation System (NSTS) Space Shuttle System into a near-earth orbit, deployed, and through upper stage propulsion burn(s) be inserted/transferred to its mission orbit. The nature of the advanced design SP-100 gives rise to a set of issues that require special attention to assure that payloads using this power plant are physically and functionally compatible with the NSTS and meet the safety requirements thereof. The purpose of this document is to define and present the requirements and interface provisions that, when satisfied, will ensure technical compability between SP-100 systems and the NSTS.

  8. Requirements identification: How do we know what to do

    SciTech Connect

    Not Available

    1990-01-01

    The Nuclear Information and Records Management Association (NIRMA) Task Force on Requirements Identification is currently involved in a four part project. During the course of the next year the Task Force will: (1) identify the generic requirements documents which have common applicability to nuclear utilities and DOE organizations; (2) research the requirements documents to identify individual requirements; (3) develop and implement a PC based tracking system to present and maintain the research data; and (4) implement a process for ongoing review of requirements. This report discusses these issues.

  9. Software Requirements Specification Verifiable Fuel Cycle Simulation (VISION) Model

    SciTech Connect

    D. E. Shropshire; W. H. West

    2005-11-01

    The purpose of this Software Requirements Specification (SRS) is to define the top-level requirements for a Verifiable Fuel Cycle Simulation Model (VISION) of the Advanced Fuel Cycle (AFC). This simulation model is intended to serve a broad systems analysis and study tool applicable to work conducted as part of the AFCI (including costs estimates) and Generation IV reactor development studies.

  10. Technical guidance document for environmental requirements of commercial OTEC licensing regulations (15 CFR Part 981)

    SciTech Connect

    Not Available

    1981-09-01

    This document provides a potential OTEC applicant with the insights believed needed to satisfy the environmental information requirements of the regulations for licensing commercial OTEC facilities and plantships. This information should be used by applicants to define the site-specific details of the needed environmental assessment, and the details should then form a basis for pre-application consultations on the environmental requirements.

  11. PEM fuel cell bipolar plate material requirements for transportation applications

    SciTech Connect

    Borup, R.L.; Stroh, K.R.; Vanderborgh, N.E.

    1996-04-01

    Cost effective bipolar plates are currently under development to help make proton exchange membrane (PEM) fuel cells commercially viable. Bipolar plates separate individual cells of the fuel cell stack, and thus must supply strength, be electrically conductive, provide for thermal control of the fuel stack, be a non-porous materials separating hydrogen and oxygen feed streams, be corrosion resistant, provide gas distribution for the feed streams and meet fuel stack cost targets. Candidate materials include conductive polymers and metal plates with corrosion resistant coatings. Possible metals include aluminium, titanium, iron/stainless steel and nickel.

  12. DOE Proposes Requirement for Certification of Admissibility for Covered

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Products and Equipment | Department of Energy Proposes Requirement for Certification of Admissibility for Covered Products and Equipment DOE Proposes Requirement for Certification of Admissibility for Covered Products and Equipment February 22, 2016 - 6:26pm Addthis DOE has issued a Notice of Proposed Rulemaking (NOPR) in which it proposes to require that a person importing into the United States any covered product or equipment subject to an applicable energy conservation standard provide,

  13. B plant standards/requirements identification document (S/RID)

    SciTech Connect

    Maddox, B.S., Westinghouse Hanford

    1996-07-29

    This Standards/Requirements Identification Document (S/RID) set forth the Environmental Safety and Health (ES{ampersand}H) standards/requirements for the B Plant. This S/RID is applicable to the appropriate life cycle phases of design, construction,operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

  14. DOE DIRECTIVES, DELEGATIONS, AND OTHER REQUIREMENTS PORTAL What's New?

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DIRECTIVES, DELEGATIONS, AND OTHER REQUIREMENTS PORTAL What's New? DOE DIRECTIVES, DELEGATIONS, AND REQUIREMENTS PORTAL Overview * The Policy Portal application is an enterprise content and document management system for policies and procedures that allows us to organize Directives, Delegations, and other requirements information simply and quickly in a secure, robust environment. * Documents are organized by number, subject, source, issue date, and relevance-and the Policy Portal lets us craft

  15. Transportation Infrastructure Requirement Resources | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Find infrastructure requirement resources below. DOE Resource Alternative Fuels Data Center: Natural Gas Fueling Infrastructure Development. Other Resource National Governors ...

  16. Considering Project Requirements and Recommendations

    Office of Energy Efficiency and Renewable Energy (EERE)

    Considering the requirements and recommendations of the project is the fourth step in planning for a federal site solar installation.

  17. Regulatory Requirements | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Regulatory Requirements Executive Order 13423, Strengthening Federal Environment, Energy, and Transportation Management (January 26, 2007) and Executive Order 13514, Federal...

  18. Testing Web Application Accessibility | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Testing Web Application Accessibility Testing Web Application Accessibility Section 508 requires all federal agencies to make their electronic and information technologies accessible to people with disabilities. EERE has specific guidelines for testing applications for accessibility. Use this checklist to see if your applications meet Section 508 requirements. Testing Web Application Accessibility (74.11 KB) More Documents & Publications Web Content Analysis and Inventories: Template and FY

  19. NAC 408.427 - Application | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NAC 408.427 - ApplicationLegal Abstract This regulation governs application requirements...

  20. Emerging Technologies Applicable to the Safe and Secure Transportation...

    Office of Environmental Management (EM)

    Mode Importance Rating 5 Functional Requirements * Generic requirements applicable to all 5 transport modes: A. Package Integrity B. Equipment Reliability C. Operator Performance ...

  1. Laboratory Equipment Donation Program - On-Line Application

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Application Please do not leave any required field blank; if no information is available, enter an "X". * denotes required fields. *Item Control Number: Please verify the Item ...

  2. Managing System of Systems Requirements with a Requirements Screening Group

    SciTech Connect

    Ronald R. Barden

    2012-07-01

    Figuring out an effective and efficient way to manage not only your Requirements Baseline, but also the development of all your individual requirements during a Programs/Projects Conceptual and Development Life Cycle Stages can be both daunting and difficult. This is especially so when you are dealing with a complex and large System of Systems (SoS) Program with potentially thousands and thousands of Top Level Requirements as well as an equal number of lower level System, Subsystem and Configuration Item requirements that need to be managed. This task is made even more overwhelming when you have to add in integration with multiple requirements development teams (e.g., Integrated Product Development Teams (IPTs)) and/or numerous System/Subsystem Design Teams. One solution for tackling this difficult activity on a recent large System of Systems Program was to develop and make use of a Requirements Screening Group (RSG). This group is essentially a Team made up of co-chairs from the various Stakeholders with an interest in the Program of record that are enabled and accountable for Requirements Development on the Program/Project. The RSG co-chairs, often with the help of individual support team, work together as a Program Board to monitor, make decisions on, and provide guidance on all Requirements Development activities during the Conceptual and Development Life Cycle Stages of a Program/Project. In addition, the RSG can establish and maintain the Requirements Baseline, monitor and enforce requirements traceability across the entire Program, and work with other elements of the Program/Project to ensure integration and coordination.

  3. Requirements definition for Hanford Access Control System

    SciTech Connect

    Curry, R.H.; Anema, R.J.; Byers, W.R.; Champion, R.E.; Forsberg, J.I.; Fritz, R.L.; Glasscock, J.A.; Keck, R.D.; McRae, L.P.; Morales, T.P.; Sams, M.A.; Schwartz, M.J.; Vickery, E.A.

    1990-03-01

    This document defines the philosophy for access control strategy at the Department of Energy (DOE) Hanford Site. It describes the required elements necessary for effective access control system applications. The document specifies performance requirements for various levels and types of access control equipment. It also discusses methods for measuring the performance of access control equipment and processes. Selected guidance related to testing and maintenance of various levels and types of access control equipment also is included. This document addresses an essential element of the overall security program at Hanford. It supports the DOE philosophy for security programs as defined in the DOE Orders. As stated in DOE Order 5632.1A (Protection Program Operations), ``physical protection of security interests encompasses three major activities: physical security systems, protective forces, and system performance tests.``

  4. API Requirements for Dynamic Graph Prediction

    SciTech Connect

    Gallagher, B; Eliassi-Rad, T

    2006-10-13

    Given a large-scale time-evolving multi-modal and multi-relational complex network (a.k.a., a large-scale dynamic semantic graph), we want to implement algorithms that discover patterns of activities on the graph and learn predictive models of those discovered patterns. This document outlines the application programming interface (API) requirements for fast prototyping of feature extraction, learning, and prediction algorithms on large dynamic semantic graphs. Since our algorithms must operate on large-scale dynamic semantic graphs, we have chosen to use the graph API developed in the CASC Complex Networks Project. This API is supported on the back end by a semantic graph database (developed by Scott Kohn and his team). The advantages of using this API are (i) we have full-control of its development and (ii) the current API meets almost all of the requirements outlined in this document.

  5. Physics Division Work Planning Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements The following is Physics Division requirements related to work planning, control and authorization for work projects and test set ups in division work areas across the laboratory. For the testing and commissioning of experimental equipment the consequences/cost of said equipment should receive careful consideration when doing the risk analysis. * Any small setup or task with total duration of less than two weeks requires an informal task hazard analysis. Informal means we can do

  6. Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Regular participation in a student green group may also earn credit. Create a PARC Education & Outreach Video Earn 2 points Work with PARC Multimedia Specialist Dan Allen ...

  7. Stellar Astrophysics Requirements NERSC Forecast

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements for m461:Stellar Explosions in Three Dimensions Tomek Plewa (Florida State University) + 3 graduate students, Artur Gawryszczak (Warsaw), Konstantinos Kifonidis ...

  8. Future missions require improving LANSCE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Future missions require improving LANSCE capabilities to support five principal research ... Science Critical to DOE and NNSA Missions for Over 35 Years Hydrodynamics with Proton ...

  9. Travel Requirements - ITER (June 2014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Travel Requirements - ITER (June 2014) Prior to any travel under this subcontract, the ... approval, with a copy to the identified US ITER Project Office Travel Administrative ...

  10. Federal Requirements for the Web

    Energy.gov [DOE]

    Federal laws and requirements govern the Office of Energy Efficiency and Renewable Energy (EERE) with regards to its websites and other digital media.

  11. ESPC ENABLE Final Proposal Requirements

    Energy.gov [DOE]

    Document describes the final proposal requirements for consideration by an energy service company (ESCO) for an agency’s Request for Quote/Notice of Opportunity or final proposal. If selected to perform a site investment grade audit, the ESCO will be required to present the findings from the IGA and a project price to the agency in the form of a final proposal.

  12. Special Applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Capabilities » Special Applications Special Applications Special Applications sensors in action-aerospace, climate, energy, space. Special Applications: Aerospace, Climate, Energy, and Space Capabilities-for Collaboration View our capability sheets: get details of what we do. Optimized Sensing Networking Design Steady State Acoustic Wavenumber Spectromer How we deploy innovation special applications bubble Los Alamos National Laboratory invented swept frequency acoustic interferometry (SFAI) to

  13. Tank waste remediation system functions and requirements document

    SciTech Connect

    Carpenter, K.E

    1996-10-03

    This is the Tank Waste Remediation System (TWRS) Functions and Requirements Document derived from the TWRS Technical Baseline. The document consists of several text sections that provide the purpose, scope, background information, and an explanation of how this document assists the application of Systems Engineering to the TWRS. The primary functions identified in the TWRS Functions and Requirements Document are identified in Figure 4.1 (Section 4.0) Currently, this document is part of the overall effort to develop the TWRS Functional Requirements Baseline, and contains the functions and requirements needed to properly define the top three TWRS function levels. TWRS Technical Baseline information (RDD-100 database) included in the appendices of the attached document contain the TWRS functions, requirements, and architecture necessary to define the TWRS Functional Requirements Baseline. Document organization and user directions are provided in the introductory text. This document will continue to be modified during the TWRS life-cycle.

  14. Automotive Turbocharging: Industrial Requirements and Technology...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Turbocharging: Industrial Requirements and Technology Developments Automotive Turbocharging: Industrial Requirements and Technology Developments Significant improvements in ...

  15. Oregon Underground Injection Control Registration Application...

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Form: Oregon Underground Injection Control Registration Application Fees (DEQ Form UIC 1003-GIC) Abstract Required fees and form...

  16. Writing reports to facilitate patent applications.

    SciTech Connect

    Libman, George H.; Doerry, Armin Walter

    2004-06-01

    Brief disclosures may often be sufficient for the filing of a Technical Advance with Sandia's Intellectual Property Center, but still be inadequate to facilitate an optimum patent application where more detail and explanation are required. Consequently, the crafting of a patent application may require considerably more additional interaction between the application preparer and the inventors. This inefficiency can be considerably mitigated if the inventors address some critical aspects of a patent application when they write a technical report.

  17. Chart of communications requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chart of communications requirements Chart of communications requirements Chart of communications requirements for BGE Chart of communications requirements (109.11 KB) More Documents & Publications BGE Communications Requirements Lower Colorado River Authority Lower Colorado River Authority

  18. BGE Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    BGE Communications Requirements BGE Communications Requirements Chart of BGE Communications Requirements BGE Communications Requirements (186.73 KB) More Documents & Publications Chart of communications requirements Lower Colorado River Authority Lower Colorado River Authority

  19. Applicant Information

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Applicant Information General Information for Applicants Bringing together top, space science students with internationally recognized researchers at Los Alamos in an educational...

  20. Program Evaluation: Minimum EERE Requirements

    Energy.gov [DOE]

    The minimum requirements for EERE's in-progress peer reviews are described below. Given the diversity of EERE programs and activities, a great deal of flexibility is provided within these...

  1. Meeting Federal Energy Security Requirements

    Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  2. DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Site map An overview of the available content on this site. Keep the pointer still over an item for a few seconds to get its description. Directives Delegations Other Requirements Top 10 Directives Help Directives Tools RevCom

  3. Quality Assurance Requirements and Description

    Office of Environmental Management (EM)

    ... 2.2.11B and C.2 to include ANSIASME NQA-1a, 1983 additional requirement sources; ... Subsection 3.2.2H to be consistent with NQA-1; Revised Subsection 3.2.2K to clarify the ...

  4. Implementation of subsidence control regulatory requirements

    SciTech Connect

    Barkley, D.

    1999-07-01

    Underground coal mining in Illinois has shown an increasing percentage of total coal mined relative to surface mining. In the past 20 years, the percentage of underground to surface mine production has steadily increased. Underground mining is expected to continue to dominate Illinois coal production into the 21st century. The drive for higher production and lower operating costs should increase the number of longwall and high extraction retreat mines. This will be achieved through conversion of existing room and pillar mines or initiation of new underground mining operations. The environmental regulations that govern the mitigation of surface impacts have evolved at both the state and federal level. Federal regulations passed in 1995 modifying the Surface Mining Control and Reclamation Act mandated additional restrictions and regulatory requirements beyond those adopted in 1977. State regulatory bodies that implement the regulations are now working to bring their regulations and procedures into compliance with the oversight federal counterpart. many states have raised concerns over the practical application of certain aspects of the new permitting requirements. This paper describes past and present subsidence regulations in Illinois, their impact on the coal industry and on the landowners above underground coal mining. Potential problems in implementation of the new regulatory requirements as well as additional burdens placed on coal companies to comply with the regulations are explored.

  5. POLICY GUIDANCE MEMORANDUM #33 - Requirements for DOE Delegated Examining

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures | Department of Energy 3 - Requirements for DOE Delegated Examining Procedures POLICY GUIDANCE MEMORANDUM #33 - Requirements for DOE Delegated Examining Procedures The purpose of this guidance is to establish the Department of Energy's (DOE's) Delegated Examining policy and procedures in order to ensure an effective competitive examining program that supports mission accomplishments and is in accordance with merit system principles and applicable laws and regulations. Policy

  6. Requirements for GNEP Transmutation Fuels

    SciTech Connect

    D. C. Crawford; M. K. Meyer; S. L. Hayes

    2007-03-01

    The purpose of this document is to provide a baseline set of requirements to guide fuel fabrication development and irradiation testing performed as part of the AFCRD Transmutation Fuel Development Program. This document can be considered a supplement to the GNEP TRU Fuel Development and Qualification Plan, and will be revised as necessary to maintain a documented set of fuel testing objectives and requirements consistent with programmatic decisions and advances in technical knowledge.

  7. Core Design Applications

    Energy Science and Technology Software Center

    1995-07-12

    CORD-2 is intended for core desigh applications of pressurized water reactors. The main objective was to assemble a core design system which could be used for simple calculations (such as frequently required for fuel management) as well as for accurate calculations (for example, core design after refueling).

  8. Adaptive Sampling Proxy Application

    Energy Science and Technology Software Center

    2012-10-22

    ASPA is an implementation of an adaptive sampling algorithm [1-3], which is used to reduce the computational expense of computer simulations that couple disparate physical scales. The purpose of ASPA is to encapsulate the algorithms required for adaptive sampling independently from any specific application, so that alternative algorithms and programming models for exascale computers can be investigated more easily.

  9. HEP/NP Requirements Review 2013

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    HEP/NP Requirements Review 2013 Science Engagement Move your data Programs & Workshops Science Requirements Reviews Network Requirements Reviews Documents and Background Materials FAQ for Case Study Authors BER Requirements Review 2015 ASCR Requirements Review 2015 Previous Reviews HEP/NP Requirements Review 2013 HEP Attendees 2013 FES Requirements Review 2014 BES Requirements Review 2014 Requirements Review Reports Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1

  10. Directives Requiring Additional Documentation - DOE Directives,

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Delegations, and Requirements Requiring Additional Documentation by Website Administrator PDF document icon DirectivesRequiringAdditionalDocumentation (1).pdf - PDF document, 35 KB (36219

  11. Digital Data Management Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Requirements Digital Data Management Requirements To integrate data management planning into an overall research plan, the following requirements will apply to all Office of Energy ...

  12. Triggering requirements for SSC physics

    SciTech Connect

    Gilchriese, M.G.D.

    1989-04-01

    Some aspects of triggering requirements for high P{sub T} physics processes at the Superconducting Super Collider (SSC) are described. A very wide range of trigger types will be required to enable detection of the large number of potential physics signatures possible at the SSC. Although in many cases trigger rates are not now well understood, it is possible to conclude that the ability to trigger on transverse energy, number and energy of jets, number and energy of leptons (electrons and muons), missing energy and combinations of these will be required. An SSC trigger system must be both highly flexible and redundant to ensure reliable detection of many new physics processes at the SSC.

  13. Authorization basis requirements comparison report

    SciTech Connect

    Brantley, W.M.

    1997-08-18

    The TWRS Authorization Basis (AB) consists of a set of documents identified by TWRS management with the concurrence of DOE-RL. Upon implementation of the TWRS Basis for Interim Operation (BIO) and Technical Safety Requirements (TSRs), the AB list will be revised to include the BIO and TSRs. Some documents that currently form part of the AB will be removed from the list. This SD identifies each - requirement from those documents, and recommends a disposition for each to ensure that necessary requirements are retained when the AB is revised to incorporate the BIO and TSRs. This SD also identifies documents that will remain part of the AB after the BIO and TSRs are implemented. This document does not change the AB, but provides guidance for the preparation of change documentation.

  14. Buddy Tag CONOPS and Requirements.

    SciTech Connect

    Brotz, Jay Kristoffer; Deland, Sharon M.

    2015-12-01

    This document defines the concept of operations (CONOPS) and the requirements for the Buddy Tag, which is conceived and designed in collaboration between Sandia National Laboratories and Princeton University under the Department of State Key VerificationAssets Fund. The CONOPS describe how the tags are used to support verification of treaty limitations and is only defined to the extent necessary to support a tag design. The requirements define the necessary functions and desired non-functional features of the Buddy Tag at a high level

  15. Johnson Noise Thermometry System Requirements

    SciTech Connect

    Britton Jr, Charles L; Roberts, Michael; Ezell, N Dianne Bull; Qualls, A L; Holcomb, David Eugene

    2013-01-01

    This document is intended to capture the requirements for the architecture of the developmental electronics for the ORNL-lead drift-free Johnson Noise Thermometry (JNT) project conducted under the Instrumentation, Controls, and Human-Machine Interface (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only the performance of the system but also the allowable measurement environment of the probe and the allowable physical environment of the associated electronics. A more extensive project background including the project rationale is available in the initial project report [1].

  16. Microsoft Word - S07566_Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for the 25 DOE FUSRAP Sites (S01649), December 2006 March 2011 LMS/FUSRAP/S07566 This page intentionally left blank LMS/FUSRAP/S07566 Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites This document supersedes DOE-LM/GJ1242-2006, Long-Term Surveillance and Maintenance Needs Assessment for

  17. Capital budgeting for utilities: The revenue requirements method: Final report

    SciTech Connect

    Not Available

    1986-10-01

    This report is an exposition of the revenue requirements method for project evaluation in the electric utility industry. The results are developed from first principles of economics and finance. Application of the results is illustrated by a series of hypothetical calculations. Revenue requirements are a way of expressing the costs associated with an investment. The revenue requirements method can be used to choose among alternatives that provide an equivalent amount and quality of service. If alternatives do not provide equivalent service, then the appropriate economic comparison depends on the value of service as well as the cost. Market discount rates rather than so-called ''customer discount rates'' should be used to calculate the present value of revenue requirements. In general, however, the risk-adjusted discount rates that are appropriate for calculating the present value of revenue requirements differ from those used to calculate net present value.

  18. 2004 WIPP Compliance Recertification Application

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2004 WIPP Compliance Recertification Application DOE/WIPP 04-3231 March 2004 Content of the CRA As required by Title 40 CFR, Parts 191 and 194, the 2004 Compliance Recertification Application addresses a wide range of topics. It incorporates portions of the first Compliance Certification Application (CCA) and provides updates in those areas where approved changes occurred. It also presents new data and associated analyses. In addition, the appliacation responds to specific requests from EPA for

  19. Audio Requirements for the Web

    Energy.gov [DOE]

    Audio-only files—whether they are downloaded from a page or distributed via a podcast—must be accessible to all visitors of the Office of Energy Efficiency and Renewable Energy (EERE) website. For developing and posting audio-only files, follow these requirements and best practices.

  20. UCNI Review Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    UCNI Review Requirement UCNI Review Requirement What are the requirements for reviewing a document that may contain UCNI? 1017.15(a) requires you to have a document that may ...

  1. Surveillance & Maintenance: The Requirements Based Surveillance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Surveillance & Maintenance: The Requirements Based Surveillance and Maintenance Review Process (RBSM) Surveillance & Maintenance: The Requirements Based Surveillance and ...

  2. Requirements to coordinate agreements, milestones and decision...

    Office of Environmental Management (EM)

    Requirements to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental ...

  3. Updated Reporting Requirement Checklists and Research Performance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Updated Reporting Requirement Checklists and Research Performance Progress Report (RPPR) Policy ...

  4. IP-Based Video Modem Extender Requirements

    SciTech Connect

    Pierson, L G; Boorman, T M; Howe, R E

    2003-12-16

    Visualization is one of the keys to understanding large complex data sets such as those generated by the large computing resources purchased and developed by the Advanced Simulation and Computing program (aka ASCI). In order to be convenient to researchers, visualization data must be distributed to offices and large complex visualization theaters. Currently, local distribution of the visual data is accomplished by distance limited modems and RGB switches that simply do not scale to hundreds of users across the local, metropolitan, and WAN distances without incurring large costs in fiber plant installation and maintenance. Wide Area application over the DOE Complex is infeasible using these limited distance RGB extenders. On the other hand, Internet Protocols (IP) over Ethernet is a scalable well-proven technology that can distribute large volumes of data over these distances. Visual data has been distributed at lower resolutions over IP in industrial applications. This document describes requirements of the ASCI program in visual signal distribution for the purpose of identifying industrial partners willing to develop products to meet ASCI's needs.

  5. Laser applications

    SciTech Connect

    Edelson, M.C. )

    1989-11-01

    The breadth of current applications of laser technology is described. It is used as the basis for extrapolating to future application in such activities as AVLIS, SIS, ICP-MS, and RIMs.

  6. Renewal Application

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Renewal Individual Permit Renewal Application The Permit expires March 31, 2014 and existing permit conditions will be in effect until a new permit is issued. The Permittees submitted a renewal application to EPA on March 27, 2014. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Individual Permit Renewal Application February 10, 2015 NPDES Permit No. NM0030759, Supplemental Information for Permit Renewal Application

  7. Mathematical Applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Math Mathematical Applications Mathematica Mathematica is a fully integrated environment for technical computing. It performs symbolic manipulation of equations, integrals, ...

  8. Lattice QCD and NERSC requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    QCD and NERSC requirements Rich Brower, Steven Gottlieb and Doug Toussaint November 26, 2012 Rich Brower, Steven Gottlieb and Doug Toussaint () Lattice QCD at NERSC November 26, 2012 1 / 17 Lattice Gauge Theory at NERSC First-principles computations in QCD Computations in other strongly coupled field theories Find hadronic factors to get fundamental physics from experiments Understand structure and interactions of hadrons Understand QCD: confinement and chiral symmetry breaking Other strongly

  9. DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Website Administrator The DOE Directives, Regulations, and Requirements Portal is operated by Doxcelerate Corporation for the Office of Information Resources (MA-90). Location: Santa Fe, NM, USA Author's external home page... Select a document from the list below to leave feedback for the writer. For contact information, use the DOE Phonebook. Latest content created by this user May 22, 2015 Recently Approved Justification Memoranda May 20, 2015 DRAFT - DOE O 331.1D, Employee Performance and

  10. DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Contact form Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. Directives and Delegations Program Management Emily Stanton, (202) 287-5641 Directives Program Point of Contact Rachel Mack, (202) 287-6804 Delegations Program Point of Contact Gail Cephas,(202) 586-1049 Web Site Administration Technical Support Staff, (505) 663-1302 Fill in this form to contact us. Name Please

  11. Present and Future Computing Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Computational Cosmology DES LSST Presenter: Salman Habib Argonne National Laboratory Jim Ahrens (LANL) Scott Dodelson (FNAL) Katrin Heitmann (ANL) Peter Nugent (LBNL) Anze Slosar (BNL) Risa Wechsler (SLAC) 1 Cosmic Frontier Computing Collaboration Computational Cosmology SciDAC-3 Project Ann Almgren (LBNL) Nick Gnedin (FNAL) Dave Higdon (LANL) Rob Ross (ANL) Martin White (UC Berkeley/ LBNL) Large Scale Production Computing and Storage Requirements for High Energy Physics Research A DOE Technical

  12. New Solutions Require New Thinking

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solutions Require New Thinking America's demand for power threatens to overburden an already congested electric system. The U.S. Department of Energy is addressing these energy challenges with innovative solutions to energy generation. Its Renewable and Distributed Systems Integration (RDSI) Program is helping to alleviate congestion, reduce greenhouse gas emissions, and improve reliability by investigating answers such as * Microgrid technologies * Distributed generation * Two-way communication

  13. DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Patricia Greeson Select a document from the list below to leave feedback for the writer. For contact information, use the DOE Phonebook. Latest content created by this user Aug 04, 2016 Departmental Elements Oversight of Departmental Requirements Oct 24, 2016 Justification Memo - DOE Oct 24, 2016 Cancellation Notice - Policies, Notices, Orders Oct 24, 2016 Cancellation Notice - Guide Sep 15, 2016 New - DOE O 474.2 Chg 4 (PgChg), Nuclear Material Control and Accountability Aug 29, 2016 Department

  14. Seeking Applicants!

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements: Candidates must meet the following requirements: * Ability to obtain a DOE "Q" clearance * Ph.D. (3.5 undergraduate and 3.7 graduate GPA preferred) awarded within the ...

  15. Factsheets Web Application

    SciTech Connect

    VIGIL,FRANK; REEDER,ROXANA G.

    2000-10-30

    The Factsheets web application was conceived out of the requirement to create, update, publish, and maintain a web site with dynamic research and development (R and D) content. Before creating the site, a requirements discovery process was done in order to accurately capture the purpose and functionality of the site. One of the high priority requirements for the site would be that no specialized training in web page authoring would be necessary. All functions of uploading, creation, and editing of factsheets needed to be accomplished by entering data directly into web form screens generated by the application. Another important requirement of the site was to allow for access to the factsheet web pages and data via the internal Sandia Restricted Network and Sandia Open Network based on the status of the input data. Important to the owners of the web site would be to allow the published factsheets to be accessible to all personnel within the department whether or not the sheets had completed the formal Review and Approval (R and A) process. Once the factsheets had gone through the formal review and approval process, they could then be published both internally and externally based on their individual publication status. An extended requirement and feature of the site would be to provide a keyword search capability to search through the factsheets. Also, since the site currently resides on both the internal and external networks, it would need to be registered with the Sandia search engines in order to allow access to the content of the site by the search engines. To date, all of the above requirements and features have been created and implemented in the Factsheet web application. These have been accomplished by the use of flat text databases, which are discussed in greater detail later in this paper.

  16. Advanced Modular Inverter Technology Development

    SciTech Connect

    Adam Szczepanek

    2006-02-04

    was to design and validate new gate drive circuits to provide the capability of high temp operation. The new power stages and controls were later validated through extensive performance, durability and environmental tests. To further validate the design, two power stages and controls were integrated into a grid-tied load bank test fixture, a real application for field-testing. This fixture was designed to test motor drives with PWM output up to 50kW. In the second part of this program the new control topology based on sub-phases control and interphase transformer technology was successfully developed and validated. The main advantage of this technology is to reduce magnetic mass, loss and current ripple. This report summarizes the results of the advanced modular inverter technology development and details: (1) Power stage development and fabrication (2) Power stage validation testing (3) Grid-tied test fixture fabrication and initial testing (4) Interphase transformer technology development

  17. DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    www.directives.doe.gov Directives are the Department of Energy's primary means of establishing policies, requirements, responsibilities, and procedures for Departmental elements and contractors. New - DOE O 552.1A Chg 2 (Minor Revision), Travel and Policy Procedures https://www.directives.doe.gov/news/new-doe-0-552.1a-chg2-minrev The Order supplements the Federal Travel Regulation as principal source of policy for Federal employee travel and relocation and establishes DOE M 552.1-1A, U.S.

  18. Order - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Order by Website Administrator application/vnd.openxmlformats-officedocument.wordprocessingml.document icon order template.docx - application/vnd.openxmlformats-officedocument.wordprocessingml.document, 48 KB (49165

  19. DOE-STD-1104 Requirements Crosswalk

    Office of Environmental Management (EM)

    09 to DOE-STD-1104-2014 Requirements Matrix - 1 - No. Section Page Number DOE-STD-1104-2009 Requirement DOE-STD-1104-2014 Requirements Comment Gen DOE-STD-1104-2009 was broadly ...

  20. WPN 14-1 Administrative and Legal Requirements Document (ALRD)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ADMINISTRATIVE AND LEGAL REQUIREMENTS DOCUMENT (ALRD) U.S. Department of Energy Office of Energy Efficiency and Renewable Energy Weatherization Assistance Program Program Year 2014 Formula Grants WAP-ALRD-2014 CFDA Number: 81.042 Weatherization Assistance for Low-Income Persons WAP Program Year Ending Application Due Date March 31, 2014 60 Days from Issuance June 30, 2014 60 Days from Issuance September 30, 2014 July 31, 2014 The complete application package will be due no later than 12:00 pm

  1. Guide for reviewing safety analysis reports for packaging: Review of quality assurance requirements

    SciTech Connect

    Moon, D.W.

    1988-10-01

    This review section describes quality assurance requirements applying to design, purchase, fabrication, handling, shipping, storing, cleaning, assembly, inspection, testing, operation, maintenance, repair, and modification of components of packaging which are important to safety. The design effort, operation's plans, and quality assurance requirements should be integrated to achieve a system in which the independent QA program is not overly stringent and the application of QA requirements is commensurate with safety significance. The reviewer must verify that the applicant's QA section in the SARP contains package-specific QA information required by DOE Orders and federal regulations that demonstrate compliance. 8 refs.

  2. 30 TAC, part 1, chapter 116, rule 116.111 General Application...

    OpenEI (Open Energy Information) [EERE & EIA]

    ApplicationLegal Abstract These rules explain the general application requirements for air quality control permits in Texas. Published NA Year Signed or Took Effect 1998 Legal...

  3. Government Printing Office Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Government Printing Office Requirements Government Printing Office Requirements This section describes the Government Printing Office (GPO) requirements for all print materials, whether printed electronically or on paper. This includes requirements for printing and copying for all EERE publications. Approved Printers Executive Order 12873, signed by President Clinton, requires that all government offices and their contractors are required to use GPO-approved printers to print and copy all

  4. Genome informatics: Requirements and challenges

    SciTech Connect

    Robbins, R.J.

    1993-12-31

    Informatics of some kind will play a role in every aspect of the Human Genome Project (HGP); data acquisition, data analysis, data exchange, data publication, and data visualization. What are the real requirements and challenges? The primary requirement is clear thinking and the main challenge is design. If good design is lacking, the price will be failure of genome informatics and ultimately failure of the genome project itself. Scientists need good designs to deliver the tools necessary for acquiring and analyzing DNA sequences. As these tools become more efficient, they will need new tools for comparative genomic analyses. To make the tools work, the scientists will need to address and solve nomenclature issues that are essential, if also tedious. They must devise systems that will scale gracefully with the increasing flow of data. The scientists must be able to move data easily from one system to another, with no loss of content. As scientists, they will have failed in their responsibility to share results, should repeating experiments ever become preferable to searching the literature. Their databases must become a new kind of scientific literature and the scientists must develop ways to make electronic data publishing as routine as traditional journal publishing. Ultimately, they must build systems so advanced that they are virtually invisible. In summary, the HGP can be considered the most ambitious, most audacious information-management project ever undertaken. In the HGP, computers will not merely serve as tools for cataloging existing knowledge. Rather, they will serve as instruments, helping to create new knowledge by changing the way the scientists see the biological world. Computers will allow them to see genomes, just as radio telescopes let them see quasars and electron microscopes let them see viruses.

  5. Improving CSE Software through Reproducibility Requirements....

    Office of Scientific and Technical Information (OSTI)

    Improving CSE Software through Reproducibility Requirements. Citation Details In-Document Search Title: Improving CSE Software through Reproducibility Requirements. Abstract not ...

  6. Requirements Based Surveillance and Maintenance Review Process...

    Energy Saver

    Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and Maintenance Review Process Interview Form Requirements Based Surveillance and ...

  7. Facility Safety - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    0.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised,...

  8. Requirements for Bridge Inspection | Department of Energy

    Office of Environmental Management (EM)

    Requirements for Bridge Inspection Requirements for Bridge Inspection More Documents & Publications Microsoft PowerPoint - 2009.10.27 Bridge Inspection Follow-up Slide 1 National...

  9. California Waste Discharge Requirements Website | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Requirements Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: California Waste Discharge Requirements Website Abstract This website contains...

  10. Cooperating Agencies in Implementing the Procedural Requirements...

    Energy Saver

    Agencies in Implementing the Procedural Requirements of the National Environmental Policy Act Cooperating Agencies in Implementing the Procedural Requirements of the National...

  11. Civilian Radioactive Waste Management System Requirements Document...

    Office of Environmental Management (EM)

    Civilian Radioactive Waste Management System Requirements Document Civilian Radioactive Waste Management System Requirements Document This document specifies the top-level ...

  12. Cold vacuum drying facility design requirements

    SciTech Connect

    IRWIN, J.J.

    1999-07-01

    This document provides the detailed design requirements for the Spent Nuclear Fuel Project Cold Vacuum Drying Facility. Process, safety, and quality assurance requirements and interfaces are specified.

  13. Adjustable Speed Pumping Applications | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pumping Applications Adjustable Speed Pumping Applications This tip sheet provides practical tips on the application of adjustable speed drives in industrial pumping systems. PUMPING SYSTEMS TIP SHEET #11 Adjustable Speed Pumping Applications (January 2007) (276.35 KB) More Documents & Publications Control Strategies for Centrifugal Pumps with Variable Flow Rate Requirements Adjustable Speed Drive Part-Load Efficiency Improving Pumping System Performance: A Sourcebook for Industry - Second

  14. Applications of Nuclear Resonance Fluorescence

    SciTech Connect

    Warren, Glen A.; Detwiler, Rebecca S.; Peplowski, Patrick N.

    2010-11-11

    Nuclear Resonance Fluorescence (NRF) has the potential of addressing a wide variety of applications, which require isotopic and/or elemental information about a sample. We have investigated a variety of non-proliferation applications that may be addressed by NRF. From these applications, we have selected two, measuring uranium enrichment in UF6 cylinders and material verification in dismantlement, to investigate in more detail. Analytical models have been developed to evaluate these applications, and test measurements have been conducted to validate those models. We found that it is unlikely with current technology to address the requirements for UF6 cylinder enrichment measurements. In contrast, NRF is a very promising approach for material verification for dismantlement.

  15. Requirements for being an IREC Certified Instructor and Master Trainer

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    IREC Candidate Handbook v.11 June 2014 11 IREC Certified Instructor and Master Trainer IREC certification as Instructor or Master Trainer indicates a breadth and depth of experience that the individual brings with them wherever they teach. Affiliation with an IREC Accredited Training Provider is not required in order to apply for or maintain certification. To become certified as an Instructor or Master Trainer, a candidate must demonstrate through the application and assessment process that s/he

  16. Requirements and Designs for Mars Rover RTGs

    SciTech Connect

    Schock, Alfred; Shirbacheh, M; Sankarankandath, V

    2012-01-19

    The current-generation RTGs (both GPHS and MOD) are designed for operation in a vacuum environment. The multifoil thermal insulation used in those RTGs only functions well in a good vacuum. Current RTGs are designed to operate with an inert cover gas before launch, and to be vented to space vacuum after launch. Both RTGs are sealed with a large number of metallic C-rings. Those seals are adequate for retaining the inert-gas overpressure during short-term launch operations, but would not be adequate to prevent intrusion of the Martian atmospheric gases during long-term operations there. Therefore, for the Mars Rover application, those RTGs just be modified to prevent the buildup of significant pressures of Mars atmosphere or of helium (from alpha decay of the fuel). In addition, a Mars Rover RTG needs to withstand a long-term dynamic environment that is much more severe than that seen by an RTG on an orbiting spacecraft or on a stationary planetary lander. This paper describes a typical Rover mission, its requirements, the environment it imposes on the RTG, and a design approach for making the RTG operable in such an environment. Specific RTG designs for various thermoelectric element alternatives are presented.; Reference CID #9268 and CID #9276.

  17. Evaluating Application Resilience with XRay

    SciTech Connect

    Chen, Sui; Bronevetsky, Greg; Li, Bin; Casas-Guix, Marc; Peng, Lu

    2015-05-07

    The rising count and shrinking feature size of transistors within modern computers is making them increasingly vulnerable to various types of soft faults. This problem is especially acute in high-performance computing (HPC) systems used for scientific computing, because these systems include many thousands of compute cores and nodes, all of which may be utilized in a single large-scale run. The increasing vulnerability of HPC applications to errors induced by soft faults is motivating extensive work on techniques to make these applications more resiilent to such faults, ranging from generic techniques such as replication or checkpoint/restart to algorithmspecific error detection and tolerance techniques. Effective use of such techniques requires a detailed understanding of how a given application is affected by soft faults to ensure that (i) efforts to improve application resilience are spent in the code regions most vulnerable to faults and (ii) the appropriate resilience technique is applied to each code region. This paper presents XRay, a tool to view the application vulnerability to soft errors, and illustrates how XRay can be used in the context of a representative application. In addition to providing actionable insights into application behavior XRay automatically selects the number of fault injection experiments required to provide an informative view of application behavior, ensuring that the information is statistically well-grounded without performing unnecessary experiments.

  18. Kill operation requires thorough analysis

    SciTech Connect

    Abel, L.W.

    1995-05-15

    Full control of a blowout well requires a properly designed post-capping kill operation because failures in regaining well control usually occur during the kill operation, not during capping. Capping (the installation of pressure control or diverter equipment on the wellhead) is generally very reliable in gaining control of a blowout well. The following techniques are some of the viable means of killing blowout wells once the capping assemblies are in place: direct shut in of the flow; bullheading; momentum kill; volumetric control for migration of fluids or lubrication after migration ceases; and dynamic kills (friction-based dynamic kills or mass flow rate kills) The objective of most post-capping operations is to stop the flow and put the well under hydrostatic control. The means of killing a blowout once capping assemblies are in place should be chosen with care to avoid problems such as cratering, equipment failure, and underground blowouts. The particular circumstances and well integrity will dictate which kill method will be the most viable. Each of these five methods are explained.

  19. Grantee Checklist for the Inspection & Monitoring Requirement

    Energy.gov [DOE]

    This document walks Grantees through the Inspection and Monitoring requirement of the Quality Work Plan.

  20. Photovoltaic module electrical termination design requirement study. Final report

    SciTech Connect

    Mosna, F.J. Jr.; Donlinger, J.

    1980-07-01

    Motorola Inc., in conjunction with ITT Cannon, has conducted a study to develop information to facilitate the selection of existing, commercial, electrical termination hardware for photovoltaic modules and arrays. Details of the study are presented in this volume. Module and array design parameters were investigated and recommendations were developed for use in surveying, evaluating, and comparing electrical termination hardware. Electrical termination selection criteria factors were developed and applied to nine generic termination types in each of the four application sectors. Remote, residential, intermediate and industrial. Existing terminations best suited for photovoltaic modules and arrays were identified. Cost information was developed to identify cost drivers and/or requirements which might lead to cost reductions. The general conclusion is that there is no single generic termination that is best suited for photovoltaic application, but that the appropriate termination is strongly dependent upon the module construction and its support structure as well as the specific application sector.

  1. Tax Credits, Rebates & Savings | Department of Energy

    Energy.gov [DOE] (indexed site)

    power program designed to encourage the use of renewable energy in North Carolina, offers production payments for grid-tied electricity generated by solar, wind, ... Eligibility:...

  2. Project Reports for Bishop Paiute Tribe – 2015 Project

    Energy.gov [DOE]

    Under this grant, the Bishop Paiute Tribe will conduct their solar program project's design, installation, inspection, and interconnection of 22 grid-tied solar electric systems.

  3. Sandia National Laboratories

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Utility-Scale Grid-Tied PV Inverter Reliability Technical Workshop Phillips Technology ... Inverter Manufacturer Perspective on Reliability Jim Perkinson, Satcon 9:00 Integrator ...

  4. Tax Credits, Rebates & Savings | Department of Energy

    Energy.gov [DOE] (indexed site)

    a statewide green power program designed to encourage the use of renewable energy in North Carolina, offers production payments for grid-tied electricity generated by solar,...

  5. Advanced Energy | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Rockies Area Sector: Solar Product: Solar cell, passive-solar architectural glass, solar grid-tie inverter, semiconductor, flat panel display, data storage Number of...

  6. Company Name Company Name Address Place Zip Sector Product Website

    OpenEI (Open Energy Information) [EERE & EIA]

    Point Drive Fort Collins Colorado Solar Solar cell passive solar architectural glass solar grid tie inverter semiconductor flat panel display data storage http www advanced...

  7. Region Solar Inc Solar Inc California Renewable Energy Solar...

    OpenEI (Open Energy Information) [EERE & EIA]

    Point Drive Fort Collins Colorado Solar Solar cell passive solar architectural glass solar grid tie inverter semiconductor flat panel display data storage http www advanced...

  8. Would-Be Solar Electric Homeowners Sought For Project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A grid-tied rooftop photovoltaic system consists of solar panels that convert sunlight to electricity mounted on a customer's roof and connected to the conventional electric ...

  9. PHOTOVOLTAIC LIGHTING SYSTEM PERFORMANCE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Laboratories, PO Box 5800, Albuquerque, New Mexico, USA ABSTRACT Grid-tied PV energy ... Inverter output was controlled by the average solar irradiance over the previous 1h ...

  10. A DSP-based power electronics interface for alternate/renewable energy systems: Inventions and innovation project fact sheet

    SciTech Connect

    2000-06-19

    This is a fact sheet written for the Inventions and Innovation Program about a new grid-tied inverter technology for alternate/renewable energy systems.

  11. Alaska - 3 AAC 48.645 - Applications | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    StatuteStatute: Alaska - 3 AAC 48.645 - ApplicationsLegal Abstract This section sets forth the notice, deadline and public hearing requirements for an application for a CPCN....

  12. Biological Applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Biological Applications Biological Applications Bioscience technologies for biosecurity, infectious disease, and other threats. Bioscience Capabilities-for Collaboration View our capability sheets: get details of what we do. Atomic Magnetometer Micro Imaging MOL PCR Raman LIBS Waveguide Biosensor How we deploy innovation bioscience-foundational-science Cell biology hasn't been the same since Los Alamos pioneered flow cytometry in mid-1960s when a Lab scientist invented a cell separator that

  13. Application Acceleration

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Department of Energy Services » Diversity and Inclusion » Employee Resource Groups » Application & Guidelines for Chartering an Employee Resource Group Application & Guidelines for Chartering an Employee Resource Group Employee Resource Groups (ERGs) are grassroots groups formed by employees across all demographics-race, national origin, gender, sexual orientation, disability, education, geography, military status, occupation, energy field, etc. ERGs are established by submission

  14. Ridefinders Application

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    23 (05-92) Ridefinders Application Please submit this application to the U.S. Department of Energy (DOE) Employee Transportation Coordinator, Room 7A-156, Forrestal. U.S. Department of Energy Privacy Act Statement Check all transportation options which interest you: Carpool: Driver Share Driving Rider Vanpool: Driver Share Driving Rider Do you wish to meet your pool in your neighborhood? No (If no, see Alternate Pickup Locations below.) Yes Participation in the Federal Facility Ridesharing

  15. Additional Requirements and Guidance for Digital Data Management | U.S. DOE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Office of Science (SC) Opportunities » Additional Requirements and Guidance for Digital Data Management Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Closed Funding Opportunity Announcements (FOAs) Closed Lab Announcements Award Search / Public Abstracts Additional Requirements and Guidance for Digital Data Management Peer Review Policies EFRCs FOA Applications from Universities and Other Research Institutions

  16. WPN 98-3- Revised Weatherization Assistance Program Application Package

    Energy.gov [DOE]

    To issue the revised application package and reporting requirements for the low-income Weatherization Assistance Program for use by the states.

  17. WAC 173-400-111 - Processing Notice of Construction Applications...

    OpenEI (Open Energy Information) [EERE & EIA]

    and Portable SourcesLegal Abstract Construction application requirements for sources of air pollution. Published NA Year Signed or Took Effect 2011 Legal Citation WAC...

  18. Performance Analysis, Modeling and Scaling of HPC Applications...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Performance Analysis, Modeling and Scaling of HPC Applications and Tools PI Name: Abhinav ... This in turn requires providing scalable performance analysis tools and modeling ...

  19. Electric Transportation Applications All Rights Reserved ETA...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Effective March 1, 1997 Braking Test Prepared by Electric Transportation Applications ... Activity Requirements 6 5.3 Dry Controlled Test 7 5.4 Wet Controlled Test 9 5.5 Wet Panic ...

  20. Feasibility Study of Economics and Performance of Solar Photovoltaics at Johnson County Landfill

    SciTech Connect

    Salasovich, J.; Mosey, G.

    2012-01-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Johnson County Landfill in Shawnee, Kansas, for a feasibility study of renewable energy production. Citizens of Shawnee, city planners, and site managers are interested in redevelopment uses for landfills in Kansas that are particularly well suited for grid-tied solar photovoltaic (PV) installation. This report assesses the Johnson County Landfill for possible grid-tied PV installations and estimates the cost, performance, and site impacts of three different PV options: crystalline silicon (fixed tilt), crystalline silicon (single-axis tracking), and thin film (fixed tilt). Each option represents a standalone system that can be sized to use an entire available site area. In addition, the report outlines financing options that could assist in the implementation of a system. The feasibility of PV systems installed on landfills is highly impacted by the available area for an array, solar resource, operating status, landfill cap status, distance to transmission lines, and distance to major roads. The report findings are applicable to other landfills in the surrounding area.

  1. Plutonium Finishing Plant (PFP) Standards/Requirements Identification Document (S/RID)

    SciTech Connect

    Maddox, B.S.

    1996-01-01

    This Standards/Requirements Identification Document (S/RID) sets forth the Environmental Safety and Health (ESH) standards/requirements for the Plutonium Finishing Plant (PFP). This S/RID is applicable to the appropriate life cycle phases of design, construction, operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

  2. Waste encapsulation storage facility (WESF) standards/requirements identification document (S/RIDS)

    SciTech Connect

    Maddox, B.S., Westinghouse Hanford

    1996-07-29

    This Standards/Requirements Identification Document (S/RID) sets forth the Environmental Safety and Health (ES{ampersand}H) standards/requirements for the Waste Encapsulation Storage Facility (WESF). This S/RID is applicable to the appropriate life cycle phases of design, construction, operation, and preparation for decommissioning. These standards/requirements are adequate to ensure the protection of the health and safety of workers, the public, and the environment.

  3. land requirements | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    land requirements Home Sfomail's picture Submitted by Sfomail(48) Member 25 June, 2013 - 12:10 Solar Land Use Data on OpenEI acres csp land use how much land land requirements pv...

  4. Salt Lake City- High Performance Buildings Requirement

    Energy.gov [DOE]

    Salt Lake City's mayor issued an executive order in July 2005 requiring that all public buildings owned and controlled by the city be built or renovated to meet the requirements of LEED "silver"...

  5. NEPA Guidance and Requirements- Search Index

    Energy.gov [DOE]

    The NEPA Guidance and Requirements - Search Index is a one-stop solution providing you with DOE's Guidance and Requirements documents combined into one file for easy download and use.

  6. Federal Prison Industries-Requirement for Market

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    WWVv .acQnet.govfarlF ACfac200 1-21.i2Qf Effective Date: March 26, 2004 Federal Prison Industries-Requirement for Market 023) This interira rule amends FAR parts 8, Required...

  7. Federal Metering Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Metering Requirements Federal Metering Requirements Presentation-given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting-covers the 42 USC 8253 Energy Management Requirement; Executive Order 13514(g) High-Performance Sustainable Federal Buildings; federal metering needs, history, and status; and utility/agency opportunities. Download the Federal Metering Requirements presentation given by Brad Gustafson. (351.32 KB) More Documents & Publications Federal Utility

  8. Quality Assurance Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Requirements Quality Assurance Requirements The QARD provides the framework for both the achievement and verification of quality. Quality Assurance Requirements and Description (1.37 MB) More Documents & Publications Office of Civilian Radioactive Waste Management-Quality Assurance Requirements and Description QA Corporate Board Meeting - December 2013 Protocol for EM Review/Field Self-Assessment of Site Specific Quality Assurance Programs/Quality Implementation Plans

  9. Review Policy / Proposal Guidelines / Reporting Requirements...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Review Policy Proposal Guidelines Reporting Requirements High Energy Physics (HEP) HEP ... HEP Early Career Opportunities Review Policy Proposal Guidelines Reporting ...

  10. Building America Retrofit Participation Requirements and Release

    Energy.gov [DOE]

    This form is for Building America team members and homeowners to complete verifying health and safety requirements have been met.

  11. SIENA Customer Problem Statement and Requirements

    SciTech Connect

    L. Sauer; R. Clay; C. Adams; H. Walther; B. Allan; R. Mariano; C. Poore; B. Whiteside; B. Boughton; J. Dike; E. Hoffman; R. Hogan; C. LeGall

    2000-08-01

    This document describes the problem domain and functional requirements of the SIENA framework. The software requirements and system architecture of SIENA are specified in separate documents (called SIENA Software Requirement Specification and SIENA Software Architecture, respectively). While currently this version of the document describes the problems and captures the requirements within the Analysis domain (concentrating on finite element models), it is our intention to subsequent y expand this document to describe problems and capture requirements from the Design and Manufacturing domains. In addition, SIENA is designed to be extendible to support and integrate elements from the other domains (see SIENA Software Architecture document).

  12. Requirements for self-magnetically insulated transmission lines

    DOE PAGES [OSTI]

    VanDevender, J. Pace; Pointon, Timothy D.; Seidel, David B.; Struve, Kenneth W.; Jennings, Christopher; Oliver, Bryan V.; Schneider, Larry X.

    2015-03-01

    Self-magnetically insulated transmission lines (MITLs) connect pulsed-power drivers with a load. Although the technology was originally developed in the 1970s and is widely used today in super power generators, failure of the technology is the principal limitation on the power that can be delivered to an experiment. We address issues that are often overlooked, rejected after inadequate simulations, or covered by overly conservative assumptions: (i) electron retrapping in coupling MITLs to loads, (ii) the applicability of collisionless versus collisional electron flow, (iii) power transport efficiency as a function of the geometry at the beginning of the MITL, (iv) gap closuremore » and when gap closure can be neglected, and (v) the role of negative ions in causing anode plasmas and enhancing current losses. We suggest a practical set of conservative design requirements for self-magnetically insulated electron flow based on the results discussed in this paper and on previously published results. The requirements are not necessarily severe constraints in all MITL applications; however, each of the 18 suggested requirements should be examined in the design of a MITL and in the investigation of excessive losses.« less

  13. Requirements for satellite accumulation areas. RCRA Information Brief

    SciTech Connect

    Powers, J.

    1993-07-01

    In 1980, EPA promulgated hazardous waste management regulations under the Resource Conservation and Recovery Act (RCRA), which included standard for generators of hazardous waste. With respect to storage of hazardous waste on-site by generators, these regulations originally made no distinction between the initial accumulation of hazardous waste at various points of generation (i.e., ``satellite`` accumulation) and storage at locations where hazardous waste is consolidated for on-site management or transportation off-site. EPA amended the hazardous waste generator regulations on December 20, 1984, to allow generators to store hazardous waste in satellite areas as long as certain conditions were met. State programs, however, do not have to allow for the accumulation of hazardous waste in satellite areas or may have more stringent requirements for these waste accumulation areas. A satellite accumulation area is a storage location at or near any point of generation where hazardous wastes initially accumulate, which is under the control of the operator of the process generating the waste. Wastes stored in these areas are subject to regulatory requirements that are less stringent than requirements applicable to hazardous wastes stored in permitted, interim status, or 90-day storage areas meeting the applicable provisions of 40 CFR 264, 265, or 262.34(a), respectively.

  14. Requirements for self-magnetically insulated transmission lines

    SciTech Connect

    VanDevender, J. Pace; Pointon, Timothy D.; Seidel, David B.; Struve, Kenneth W.; Jennings, Christopher; Oliver, Bryan V.; Schneider, Larry X.

    2015-03-01

    Self-magnetically insulated transmission lines (MITLs) connect pulsed-power drivers with a load. Although the technology was originally developed in the 1970s and is widely used today in super power generators, failure of the technology is the principal limitation on the power that can be delivered to an experiment. We address issues that are often overlooked, rejected after inadequate simulations, or covered by overly conservative assumptions: (i) electron retrapping in coupling MITLs to loads, (ii) the applicability of collisionless versus collisional electron flow, (iii) power transport efficiency as a function of the geometry at the beginning of the MITL, (iv) gap closure and when gap closure can be neglected, and (v) the role of negative ions in causing anode plasmas and enhancing current losses. We suggest a practical set of conservative design requirements for self-magnetically insulated electron flow based on the results discussed in this paper and on previously published results. The requirements are not necessarily severe constraints in all MITL applications; however, each of the 18 suggested requirements should be examined in the design of a MITL and in the investigation of excessive losses.

  15. Industrial Applications of Low Temperature Plasmas

    SciTech Connect

    Bardsley, J N

    2001-03-15

    The use of low temperature plasmas in industry is illustrated by the discussion of four applications, to lighting, displays, semiconductor manufacturing and pollution control. The type of plasma required for each application is described and typical materials are identified. The need to understand radical formation, ionization and metastable excitation within the discharge and the importance of surface reactions are stressed.

  16. Solar Photovoltaic (PV) System Permit Application Checklist

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Permit Application Checklist is intended to be used as a best management practice when establishing local government requirements for residential and commercial solar photovoltaic (PV) system permits. Local governments may modify this checklist to accommodate their local ordinances, code requirements, and permit procedures.

  17. TITLE XVII APPLICATION PORTAL

    Energy.gov [DOE]

    The Title XVII online application portal guides users through the Title XVII loan guarantee application process.

  18. Launch vehicle integration requirements for SP-100. Technical information report

    SciTech Connect

    Shaw, L.T. Jr.; Womack, J.R.

    1984-03-01

    SP-100 is the designation for a nuclear reactor-based power plant being developed for both civil and military missions beginning in the 1990s for such potential space applications as communication satellites, space radar, electric propulsion and space stations. Typically, a system using the SP-100 along with a selected upper stage system would be launched by the National Space Transportation System (NSTS) Space Shuttle System into a near-earth orbit, deployed, and through upper stage propulsion burn(s) be inserted/transferred to its mission orbit. The nature of the advanced design SP-100 payloads using this power plant are physically and functionally compatible with the NSTS and meet the safety requirements thereof. The purpose of this document is to define and present the requirements and interface provisions that, when satisfied, will ensure technical compatibility between SP-100 systems and the NSTS.

  19. Solar Permit Application and Checklist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solar Permit Application and Checklist Solar Permit Application and Checklist This Photovoltaic System Application and Checklist may be used by any jurisdiction in the Kansas City area as a standardized document to be used by those seeking a solar system permit for residential or commercial photovoltaic systems under 15kW. The Application and Checklist clarifies the permitting steps for small solar systems and details the information and documentation that is required in the permit application.

  20. Facility Safety - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    O 420.1C Chg 1, Facility Safety by Pranab Guha Functional areas: DNFSB, Defense Nuclear Facility Safety and Health Requirement, Facility Safety, Requires Crosswalk When Revised, Safety, Security The Order establishes facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH) mitigation, and System Engineer Program. This Page Change is limited in scope to changes necessary to invoke

  1. Weatherization Assistance Program Quality Work Plan Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Quality Work Plan Requirements Weatherization Assistance Program Quality Work Plan Requirements Four square graphic of a document, a conversation bubble, a checkbox and a certification seal. The U.S. Department of Energy's Weatherization Assistance Program (WAP) has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars are used to purchase weatherization

  2. Conditions and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Postdoctoral Research Awards » Award Information » Conditions and Requirements Conditions and Requirements Conditions and requirements for Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are spelled out below: Length of the Appointment The Energy Efficiency and Renewable Energy (EERE) Postdoctoral Research Awards are for two years. The initial appointment period for the EERE Postdoctoral Research Awards is one year. Appointments may be extended for a second year

  3. Performance requirements for the double-shell tank system: Phase 1

    SciTech Connect

    Claghorn, R.D.

    1998-03-05

    This document establishes performance requirements for the double-shell tank system. These requirements, in turn, will be incorporated in the System Specification for the Double-Shell Tank System (Grenard and Claghorn 1998). This version of the document establishes requirements that are applicable to the first phase (Phase 1) of the Tank Waste Remediation System (TWRS) mission described in the TWRS Mission Analysis Report (Acree 1998). It does not specify requirements for either the Phase 2 mission or the double-shell tank system closure period.

  4. POTENTIAL APPLICATIONS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    POTENTIAL APPLICATIONS  Bio-fuel production  Hydrogen generation  Direct coal liquefaction  Oil refining TECHNOLOGICAL BENEFITS  Uniformly allows specially tunable reactions  The next generation of fuel cell synthesis points towards growing trend in these "workhorse" catalysts  Provides greater efficiency through nanomaterials Transition Metal Sulfides (TMS), such as molybdenum disulfide (MoS₂), are the petroleum industry's "workhorse" catalysts for

  5. Chemistry Applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Chemistry Chemistry Applications Gaussian 09 Gaussian 09 is a connected series of programs for performing semi-empirical, density functional theory and ab initio molecular orbital calculations. Read More » GAMESS GAMESS (General Atomic and Molecular Electronic Structure System) is a general ab initio quantum chemistry package. Read More » AMBER AMBER (Assisted Model Building with Energy Refinement) is the collective name for a suite of programs designed to carry out molecular dynamics

  6. Thompson named VP of Northwest Requirements Marketing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Thompson-named-VP-of-Northwest-Requirements-Marketing Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand...

  7. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    ... The contractor shall ensure that the content of the DRDs is not duplicative of the information provided in the Civil and Electrical Design Requirements document. Appendix K: ...

  8. REQUIREMENTS BASED SURVEILLANCE AND MAINTENANCE REVIEW PROCESS...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    I. Approximate number of personnel and man-hours required to complete the activity ... time) Number of Personnel:... Man- Hours:... J. Comments: RBSM ...

  9. Richard Gerber! Harvey Wasserman! Requirements Reviews Organizers

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9, 2 014 Requirements Reviews * 1½-day reviews with each Program Office * Computing and storage requirements for next 5 years * Participants - DOE ADs & Program Managers - Leading NERSC users & key potential users - NERSC staff 2 High Energy Physics Fusion R esearch Adv. C omp. S cience R esearch J an. 2 014 Basic E nergy S ciences O ct 2 014 Reports From 8 Requirements Reviews Have Been Published 3 h@p://www.nersc.gov/science/hpc---requirements---reviews/reports/ * CompuFng a nd s

  10. Quality Work Plan Requirements | Department of Energy

    Energy.gov [DOE] (indexed site)

    has introduced a comprehensive Quality Work Plan (QWP) that will establish a benchmark for quality home energy upgrades. This plan defines what is required when federal dollars ...

  11. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    System shall have the capacity to contain all documents, including task orders, proposals, reporting requirements and other documents related to taskdelivery orders awarded under ...

  12. All Required: Safety Training - Chris Westerfeldt

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    TUNL Summer 2013 Lectures & Tutorials Thursday May 30 st - 9 AM - 3:30 PM (LSRC Room A247) All Required: Safety Training - Chris Westerfeldt Friday May 31 st - 9 AM REU Required: TUNL, LENA & FEL Tour - (Meet in TUNL Lobby) Monday June 10 th - 10 AM - 11:30 AM (DFELL Conference Room, 117) REU Required: Building Blocks of Nuclei - Mohammad Ahmed Monday June 10 th - 2 PM - 3:30 PM (DFELL Conference Room, 117) REU Required: N-N Interactions and Local Accelerators - Mohammad Ahmed Wednesday

  13. Biosafety Facilities - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, Biosafety Facilities by David Freshwater Functional areas: Defense Nuclear Facility Safety and Health Requirement, Safety and Security, The Guide assists DOENNSA field elements...

  14. Facility Safety - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    facility and programmatic safety requirements for DOE and NNSA for nuclear safety design criteria, fire protection, criticality safety, natural phenomena hazards (NPH)...

  15. Directives - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  16. Delegation Procedures - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  17. Delegations - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  18. Help - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  19. News & Updates - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  20. Rescinded Delegations - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible...

  1. 02-HellandNERSC-Requirements.pptx

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, 2014 Barbara Helland Advanced Scientific Computing Research NERSC-ASCR Requirements Review 1 ASCR 2 ... Production Computing for the Office of Science * Characterized by a ...

  2. Directives Tools - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accessibility Text size: (Requires JavaScript) Large Normal Small This site uses the Open Source Content Management System Plone and has been designed to be completely accessible ...

  3. Studying the Communications Requirements of Electric Utilities...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Electric Utilities to Inform Federal Smart Grid Policies- Public Meeting Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid ...

  4. Training and Certification Requirements for Personnel Utilizing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    GAC005 Revision 1 Effective June 2008 Training and Certification Requirements for ... 6 Appendices Appendix A - TrainingBriefing Attendance Sheet ...

  5. Federal / State Legislative & Regulatory Changes Required for...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ethanol blends Federal State Legislative & Regulatory Changes Required for Introduction of E15 (2.81 MB) More Documents & Publications Vehicle Certification Test Fuel and Ethanol ...

  6. NERSC HPC Requirements Reviews: Target 2017

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Basic Energy Sciences (BES) Biological and Environmental Research (BER) Fusion Energy Sciences (FES) High Energy Physics (HEP) Nuclear Physics (NP) Requirements Reviews: Target ...

  7. Physical Protection - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2A, Physical Protection by jcronin Functional areas: Security, This Manual establishes requirements for the physical protection of interests under the U.S. Department of Energys...

  8. Web Requirements and Best Practices for PDFs

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Energy Efficiency and Renewable Energy (EERE) has requirements for creating PDFs that are compliant with Section 508 and are optimized for search engine optimization.

  9. FY 2013 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2013 DARM ...

  10. FY 2012 Real Property Deferred, Actual, and Required Maintenance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM ...

  11. Load Balancing Scientific Applications

    SciTech Connect

    Pearce, Olga Tkachyshyn

    2014-12-01

    The largest supercomputers have millions of independent processors, and concurrency levels are rapidly increasing. For ideal efficiency, developers of the simulations that run on these machines must ensure that computational work is evenly balanced among processors. Assigning work evenly is challenging because many large modern parallel codes simulate behavior of physical systems that evolve over time, and their workloads change over time. Furthermore, the cost of imbalanced load increases with scale because most large-scale scientific simulations today use a Single Program Multiple Data (SPMD) parallel programming model, and an increasing number of processors will wait for the slowest one at the synchronization points. To address load imbalance, many large-scale parallel applications use dynamic load balance algorithms to redistribute work evenly. The research objective of this dissertation is to develop methods to decide when and how to load balance the application, and to balance it effectively and affordably. We measure and evaluate the computational load of the application, and develop strategies to decide when and how to correct the imbalance. Depending on the simulation, a fast, local load balance algorithm may be suitable, or a more sophisticated and expensive algorithm may be required. We developed a model for comparison of load balance algorithms for a specific state of the simulation that enables the selection of a balancing algorithm that will minimize overall runtime.

  12. Regulations which require employee training: An overview

    SciTech Connect

    Gilfus, L.J.

    1995-11-01

    In order to identify the Occupational Safety and Health Administration (OSHA) regulations which apply to a certain plant or facility, one needs to find the reference materials that are needed and that can be trusted. An overview is presented of the following: Title 29 -- Labor, OSHA Training Requirements; Title 40, Environmental Protection Agency Training Requirements; and Title 49, Department of Transportation Training Regulations.

  13. Part V: Section H - Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    H SPECIAL CONTRACT REQUIREMENTS DE-AC36-08GO28308 Modification M962 Section H - Page 2 of 52 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries ............................................................................................. 4 H.2 Reserved ............................................................................................................................ 4 H.3 Employee Compensation: Pay and Benefits

  14. Requirements for transporting the TMI-2 core

    SciTech Connect

    Wilkins, D.E.

    1983-08-01

    This report summarizes the requirements associated with the actual transport of core debris from the damaged Three Mile Island Unit 2 reactor to the Idaho National Engineering Laboratory. The requirements are discussed under six headings: accountability, security, quality, safety, environment, and transportation.

  15. EERE Digital Data Management Planning Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    To integrate data management planning into an overall research plan, here are requirements which apply to all EERE research solicitations and invitations for new, renewal, and some supplemental funding issued on or after Oct. 1, 2014. These requirements apply to proposals from all organizations, including academic institutions, DOE national laboratories, and others.

  16. Conduct of Operations Requirements for DOE Facilities

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1990-07-09

    "To provide requirements and guidelines for Departmental Elements, including the National Nuclear Security Administration (NNSA), to use in developing directives, plans, and/or procedures relating to the conduct of operations at DOE facilities. The implementation of these requirements and guidelines should result in improved quality and uniformity of operations. Change 2, 10-23-2001. Canceled by DOE O 422.1.

  17. Laboratory Applications

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Laboratory Applications What are contaminants normally found in hydrogen from fueling nozzle? JP Hsu SmartChemistry.com Particulates are most common found in Hydrogen - 96% hydrogen fuel contains particulates in 108 Particulate Samplings. Typical Particulate filter - 0.035mg/kg SmartChemistry.com H 2 Station X Particulate Sample Particulate Concentration at 700 Bar: 2.0 mg/kg Particulate filter after sampling, in which 4.001mg particulates are found in 2 kilogram hydrogen SmartChemistry.com H 2

  18. Using Hadoop for HPC Applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Using Hadoop for HPC Applications Using Hadoop for HPC Applications October 5, 2011 Lavanya-Ramikrishnan.jpg NERSC Training Event 10:00 - 14:00 PDT Oct. 5, 2011 Concurrently presented on the web and at NERSC's Oakland Scientific Facility No registration is required for NERSC users; for others registration is now closed. NERSC Users: Log in to the web site with your NERSC username and password and click on the "Web Meeting Info" link to the left to join. Using Hadoop for HPC

  19. FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting

    Energy Saver

    Requirement | Department of Energy Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement FY 2012 DARM Transmittal Letter and Attachment Final.pdf (406.93 KB) More Documents & Publications FY 2013 Real Property Deferred, Actual, and Required Maintenance Reporting Requirement Real Property Maintenance Reporting Requirement Memorandum (July 13, 2010)

  20. Optical manufacturing requirements for an AVLIS plant

    SciTech Connect

    Primdahl, K.; Chow, R.; Taylor, J.R.

    1997-07-14

    A uranium enrichment plant utilizing Atomic Vapor Laser Isotope Separation (AVLIS) technology is currently being planned. Deployment of the Plant will require tens of thousands of commercial and custom optical components and subsystems. The Plant optical system will be expected to perform at a high level of optical efficiency and reliability in a high-average-power-laser production environment. During construction, demand for this large number of optics must be coordinated with the manufacturing capacity of the optical industry. The general requirements and approach to ensure supply of optical components is described. Dynamic planning and a closely coupled relationship with the optics industry will be required to control cost, schedule, and quality.

  1. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  2. DE-SOL-0008449 REPORTING REQUIREMENTS CHECKLIST

    National Nuclear Security Administration (NNSA)

    employee personnel, identified by the Contracting Officer's Representative (COR), who require access to the system on behalf of the U.S. Government. 1.4 DOE Laboratory Personnel- Employees of DOE Laboratory M&O contractors, identified by the COR, who require access to the system in support of Federal Personnel. 1.5 Administrative Contractor Personnel- Employees of non-M&O DOE contractors, identified by the COR, and approved by the Contractor, who require access to the system in support

  3. Quality Assurance Source Requirements Traceability Database

    SciTech Connect

    MURTHY, R., NAYDENOVA, A., DEKLEVER, R., BOONE, A.

    2006-01-30

    At the Yucca Mountain Project the Project Requirements Processing System assists in the management of relationships between regulatory and national/industry standards source criteria, and Quality Assurance Requirements and Description document (DOE/R W-0333P) requirements to create compliance matrices representing respective relationships. The matrices are submitted to the U.S. Nuclear Regulatory Commission to assist in the commission's review, interpretation, and concurrence with the Yucca Mountain Project QA program document. The tool is highly customized to meet the needs of the Office of Civilian Radioactive Waste Management Office of Quality Assurance.

  4. Fuel Reformation: Catalyst Requirements in Microchannel Architectures

    SciTech Connect

    King, David L.; Brooks, Kriston P.; Fischer, Christopher M.; Pederson, Larry R.; Rawlings, Gregg C.; Stenkamp, Victoria S.; TeGrotenhuis, Ward E.; Wegeng, Robert S.; Whyatt, Greg A.

    2005-09-06

    Microchannel reactors have unique capabilities for onboard hydrocarbon fuel processing, due to their ability to provide process intensification through high heat and mass transfer, leading to smaller and more efficient reactors. The catalyst requirements in microchannel devices are demanding, requiring high activity, very low deactivation rates, and strong adherence to engineered substrate. Each unit operation benefits from microchannel architecture: the steam reforming reactor removes heat transfer limitations, allowing the catalyst to operate at elevated temperatures at the kinetic limit; the water gas shift reactor uses unique temperature control to reduce catalyst volume requirements; the PROX reactor provides high CO conversion and minimizes H2 oxidation through effective control of reactor temperature.

  5. TWRS configuration management requirement source document

    SciTech Connect

    Vann, J.M.

    1997-09-17

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made.

  6. Smart gun technology requirements preliminary report

    SciTech Connect

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    1995-05-01

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  7. DOE Challenge Home, California Program Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... CZ's 3-4 2 in IECC CZ's 5-7 1.5 in IECC CZ 8 Windows 25, ,26, 27 Hot Climates Mixed Climates Cold Climates Applicable to Homes in California Permitted after January 1, ...

  8. Part V: Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DE-AC36-08GO28308 Modification M801 Section H - Page 2 of 50 PART I SECTION H SPECIAL CONTRACT REQUIREMENTS TABLE OF CONTENTS H.1 No Third Party Beneficiaries...

  9. Johnson Noise Thermometry System Requirements (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    (ICHMI) research pathway of the U.S. Department of Energy (DOE) Advanced Small Modular Reactor (SMR) Research and Development (R&D) program. The requirements include not only...

  10. Deepwater Offshore Wind Technology Research Requirements (Poster)

    SciTech Connect

    Musial, W.

    2005-05-01

    A poster presentation for AWEA's WindPower 2005 conference in Denver, Colorado, May 15-18, 2005 that provides an outline of the requirements for deepwater offshore wind technology development

  11. Energy Star Procurement Requirement for Agencies

    Energy.gov [DOE]

    SB 2300 was enacted June 25, 2009 and later codified into law. It requires future office equipment, appliances, lighting, and heating and cooling products and systems purchased by and for the state...

  12. EPA State Manifest Requirements | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: EPA State Manifest RequirementsLegal Abstract Provided by the EPA, this website provides...

  13. Quality Assurance - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    services meet or exceed customers' requirements and expectations. Cancels DOE O 414.1C. Adm Chg 1, 5-8-13 o414.1d4-25-11.pdf -- PDF Document, 243 KB Writer: Colette Broussard...

  14. Guam- Solar-Ready Residential Building Requirement

    Energy.gov [DOE]

    The Guam Energy Code, which became effective in October of 2000, requires that piping stub outs be provided for water heaters installed in low-rise residential buildings to enable the future inst...

  15. San Bernardino County- Green Building Requirement

    Energy.gov [DOE]

    In August 2007, the San Bernardino County Board of Supervisors approved a policy requiring that all new county buildings and major renovations be built to LEED Silver standards. The decision was...

  16. NERSC HPC Program Requirements Review Reports

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NERSC-PRR-HEP-2017.pdf | Adobe Acrobat PDF file Large Scale Computing and Storage Requirements for High Energy Physics - Target 2017 NERSC-NP2017FINAL.pdf | Adobe Acrobat PDF file ...

  17. Automotive Turbocharging: Industrial Requirements and Technology Developments

    Energy.gov [DOE]

    Significant improvements in turbocharger performance will be difficult to achieve requires a proper understanding of the trade-offs and engine effects and impacts must be part of turbocharger development

  18. Technical requirements specification for tank waste retrieval

    SciTech Connect

    Lamberd, D.L.

    1996-09-26

    This document provides the technical requirements specification for the retrieval of waste from the underground storage tanks at the Hanford Site. All activities covered by this scope are conducted in support of the Tank Waste Remediation System (TWRS) mission.

  19. Cold vacuum drying facility design requirements

    SciTech Connect

    Irwin, J.J.

    1997-09-24

    This release of the Design Requirements Document is a complete restructuring and rewrite to the document previously prepared and released for project W-441 to record the design basis for the design of the Cold Vacuum Drying Facility.

  20. Energy Efficiency Requirements for State Government

    Office of Energy Efficiency and Renewable Energy (EERE)

    Public Act No. 07-242 of 2007 established mandatory efficiency requirements for certain equipment purchased by the state. The Connecticut Department of Administrative Services and agencies with p...

  1. Code requirements for concrete repository and processing facilities

    SciTech Connect

    Hookham, C.J. [Black & Veatch, Ann Arbor, MI (United States); Palaniswamy, R. [Bechtel Savannah River, Inc., North Augusta, SC (United States)

    1993-04-01

    The design and construction of facilities and structures for the processing and safe long-term storage of low- and high-level radioactive wastes will likely employ structural concrete. This concrete will be used for many purposes including structural support, shielding, and environmental protection. At the present time, there are no design costs, standards or guidelines for repositories, waste containers, or processing facilities. Recently, the design and construction guidelines contained in American Concrete Institute (ACI), Code Requirements for Nuclear Safety Related Concrete Structures (ACI 349), have been cited for low-level waste (LLW) repositories. Conceptual design of various high-level (HLW) repository surface structures have also cited the ACI 349 Code. However, the present Code was developed for nuclear power generating facilities and its application to radioactive waste repositories was not intended. For low and medium level radioactive wastes, concrete has a greater role and use in processing facilities, engineered barriers, and repository structures. Because of varied uses and performance/safety requirements this review of the current ACI 349 Code document was required to accommodate these special classes of structures.

  2. Overall requirements for an advanced underground coal extraction system

    SciTech Connect

    Goldsmith, M.; Lavin, M.L.

    1980-10-15

    This report presents overall requirements on underground mining systems suitable for coal seams exploitable in the year 2000, with particular relevance to the resources of Central Appalachia. These requirements may be summarized as follows: (1) Production Cost: demonstrate a return on incremental investment of 1.5 to 2.5 times the value required by a low-risk capital project. (2) Miner Safety: achieve at least a 50% reduction in deaths and disabling injuries per million man-hours. (3) Miner Health: meet the intent of all applicable regulations, with particular attention to coal dust, carcinogens, and mutagens; and with continued emphasis on acceptable levels of noise and vibration, lighting, humidity and temperature, and adequate work space. (4) Environmental Impact: maintain the value of mined and adjacent lands at the pre-mining value following reclamation; mitigation of off-site impacts should not cost more than the procedures used in contemporary mining. (5) Coal Conservation: the recovery of coal from the seam being mined should be at least as good as the best available contemporary technology operating in comparable conditions. No significant trade-offs between production cost and other performance indices were found.

  3. Directives Help - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Help by Website Administrator All DOE directives are available through this site. While it may seem overwhelming, given the number of documents, we have provided a number of ways in which you may get to the information you need. Navigating the DOE Directives, Delegations, and Requirements Portal A guide for using the new portal is available here. Navigation Tools The links at the top of the page will take you to the major elements of the site--directives, delegations and requirements. The

  4. Visitor Security Requirements | Savannah River Ecology Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Visitor Security Requirements NOTE: These requirements do not apply to events held at the SREL Conference Center, which is located outside the security barricade. Before you arrive: I. Obtaining a visitor's badge II. Prohibited articles III. Electronics policy IV. Vehicle inspections When you arrive: Proceed to the badge office (map). Present two forms of identification from the list of acceptable documents, including one photo ID, to receive your badge. You will not receive a badge without

  5. Present and Future Computing Requirements for PETSc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and Future Computing Requirements for PETSc Jed Brown jedbrown@mcs.anl.gov Mathematics and Computer Science Division, Argonne National Laboratory Department of Computer Science, University of Colorado Boulder NERSC ASCR Requirements for 2017 2014-01-15 Extending PETSc's Hierarchically Nested Solvers ANL Lois C. McInnes, Barry Smith, Jed Brown, Satish Balay UChicago Matt Knepley IIT Hong Zhang LBL Mark Adams Linear solvers, nonlinear solvers, time integrators, optimization methods (merged TAO)

  6. Requirements for CEC POP machine protection system

    SciTech Connect

    Pinayev, I.

    2015-02-18

    The requirements of CEC POP machine protection system are meant to prevent damage to a vacuum chamber by a missteered electron beam. In this example, beam energy = 22 MeV, Maximal bunch charge = 5 nC, Maximal repetition rate = 78 kHz, Normalized emittance = 5 mm mrad, Minimal β-function = 1 m. From this information the requirements of the protection system can be calculated by factoring the information into equations to find beam densities and temperature excursions.

  7. Home - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages

    Personal tools Log in Site Map | Contact Us | Help U.S. Department of Energy Office of Management Current Documents Archived Documents Entire Site Search Site Search only in current section Advanced Search Home Directives Delegations Other Requirements RevCom DPC Resources Directives Tools References Delegation Procedures Archives help Help Directives, Delegations, and Other Requirements Directives Directives All current, archived and draft Directives Delegations Delegations Legal instrument

  8. Training and Required Reading Management Tool

    Energy Science and Technology Software Center

    2009-08-13

    This tool manages training and required reading for groups, facilities, etc – abilities beyond the site training systems. TRRMTool imports training data from controlled site data sources/systems and provides greater management and reporting. Clients have been able to greatly reduce the time and effort required to manage training, have greater accuracy, foster individual accountability, and be proactive in verifying training of support personnel, to maintain compliance.

  9. NBP RFI: Communications Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This paper has two objectives: 1) Define the need for dedicated wireless spectrum for Utilities. 2) Provide information to support Utilities' communication needs. NBP RFI: Communications Requirements (401.84 KB) More Documents & Publications Re: DOE Request for Information - Implementing the National Broadband Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Re: NBP RFI-Implementing the National Broadband Plan by Studying the

  10. Goals and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Goals and Requirements Goals and Requirements The U.S. Department of Energy's (DOE) Sustainability Performance Office (SPO) oversees departmental compliance with goals outlined in Executive Order (E.O.) 13693, Planning for Sustainability in the Next Decade, and related statutes. Issued on March 19, 2015, E.O. 13693 revokes E.O.s 13514 and 13423, while setting reduction targets for energy use intensity, water use intensity, and greenhouse gas emissions and prescribing other sustainability goals

  11. Requirements for Samples | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Requirements for Samples Requirements for Samples This presentation by James Fenton was given at the High Temperature Membrane Working Group Meeting in October 10, 2007 in Washington, D.C. htmwg_oct07_fenton_samples.pdf (134.79 KB) More Documents & Publications In-Plane Conductivity Testing Procedures and Results In Plane Conductivity Testing, BekkTech LLC High Temperature Membrane Working Group Minutes

  12. JLab Registration/International Services - Training Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Special Note for High School and Undergraduate Students Click Here All High School Studenta and Undergraduate students must also complete the Student Safety and Security Training prior to gaining access to work areas. This course cannot be taken online. Contact the Science Education Office (education@jlab.org) to schedule this training. Training Requirements In order to provide a safe and secure place to work, Jefferson Lab requires all individuals to complete training courses which are designed

  13. Justification Memoranda - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Justification Memoranda by Diane Johnson Notice of Intent to Revise Department of Energy Order 350.1, Contractor Human Resources Management Program - by Robert Myers - last modified Jun 19, 2014 11:17 AM DOE O 350.1 establishes responsibilities, requirements, and cost allow-ability criteria for the management an oversight of contractor human resource management programs, is being revised to remove contractor requirements from Chapter IV, Compensation, Chapter V, Benefits, and Chapter VI Pensions

  14. Deficiency tracking system, conceptual business process requirements

    SciTech Connect

    Hermanson, M.L.

    1997-04-18

    The purpose of this document is to describe the conceptual business process requirements of a single, site-wide, consolidated, automated, deficiency management tracking, trending, and reporting system. This description will be used as the basis for the determination of the automated system acquisition strategy including the further definition of specific requirements, a ''make or buy'' determination and the development of specific software design details.

  15. Individual Reporting Requirements | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Individual Reporting Requirements DOE Order 472.2, Personnel Security, sets forth reporting requirements for all DOE employees, contractors, and others involved in applying for or holding a DOE access authorization. Reporting must be done verbally within two business days of the event followed by a written confirmation within three additional business days to the Office of Personnel and Facility Clearances and Classification (OPFCC), to include: Legal action effected

  16. Determining Allocation Requirements | Argonne Leadership Computing Facility

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Allocation Management Determining Allocation Requirements Querying Allocations Using cbank Mira/Cetus/Vesta Cooley Policies Documentation Feedback Please provide feedback to help guide us as we continue to build documentation for our new computing resource. [Feedback Form] Determining Allocation Requirements Estimating CPU-Hours for ALCF Blue Gene/Q Systems When estimating CPU-hours for the ALCF Blue Gene/Q systems, it is important to take into consideration the unique aspects of the Blue Gene

  17. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable

  18. Cyclotron Requirements for Multi-disciplinary Programs

    SciTech Connect

    Armbruster, John M.

    2009-03-10

    As time has passed, the various Cyclotron programs have changed over the years. In the ''early'' times of Cyclotron operations, the emphasis was on a more single sided approach such as Clinical or Research or Production. However, as time passed, the disciplines became more interconnected until today, it is unusual to have a Cyclotron and only have a single program unless it is pure production. More and more, especially in public areas such as Universities or Health Centers, you are seeing programs that do all three types of disciplines: Production; Clinical or Patient Diagnostics and/or Treatment; and Research, either in the development and manufacture of new Radio-Isotopes, new Diagnostic or Therapeutic Compound Development, or Clinical Research involving subject testing. While all three of these disciplines have some common requirements, they also have some very different requirements that may be completely counterproductive to other requirements. For a program where all three disciplines are required to be successful, it is necessary come up with some sort of compromise that meets all the various requirements. During this talk, we will try to identify some of these different requirements for the various disciplines and how these could impact the other disciplines. We will also discuss ideas for some possible compromises that might reduce the conflict between the various disciplines.

  19. LANL surveillance requirements management and surveillance requirements from NA-12 tasking memo

    SciTech Connect

    Hills, Charles R

    2011-01-25

    Surveillance briefing to NNSA to support a tasking memo from NA-12 on Surveillance requirements. This talk presents the process for developing surveillance requirements, discusses the LANL requirements that were issued as part of that tasking memo, and presents recommendations on Component Evaluation and Planning Committee activities for FY11.

  20. ASC-ATDM Performance Portability Requirements for 2015-2019

    SciTech Connect

    Edwards, Harold C.; Trott, Christian Robert

    2015-03-01

    This report outlines the research, development, and support requirements for the Advanced Simulation and Computing (ASC ) Advanced Technology, Development, and Mitigation (ATDM) Performance Portability (a.k.a., Kokkos) project for 2015 - 2019 . The research and development (R&D) goal for Kokkos (v2) has been to create and demonstrate a thread - parallel programming model a nd standard C++ library - based implementation that enables performance portability across diverse manycore architectures such as multicore CPU, Intel Xeon Phi, and NVIDIA Kepler GPU. This R&D goal has been achieved for algorithms that use data parallel pat terns including parallel - for, parallel - reduce, and parallel - scan. Current R&D is focusing on hierarchical parallel patterns such as a directed acyclic graph (DAG) of asynchronous tasks where each task contain s nested data parallel algorithms. This five y ear plan includes R&D required to f ully and performance portably exploit thread parallelism across current and anticipated next generation platforms (NGP). The Kokkos library is being evaluated by many projects exploring algorithm s and code design for NGP. Some production libraries and applications such as Trilinos and LAMMPS have already committed to Kokkos as their foundation for manycore parallelism an d performance portability. These five year requirements includes support required for current and antic ipated ASC projects to be effective and productive in their use of Kokkos on NGP. The greatest risk to the success of Kokkos and ASC projects relying upon Kokkos is a lack of staffing resources to support Kokkos to the degree needed by these ASC projects. This support includes up - to - date tutorials, documentation, multi - platform (hardware and software stack) testing, minor feature enhancements, thread - scalable algorithm consulting, and managing collaborative R&D.

  1. End User Functional and Performance Requirements for HTGR Energy Supply to Industrial Processes

    SciTech Connect

    L.E. Demick

    2010-09-01

    This document specifies end user functional and performance requirements to be used in the development of the design of a high temperature gas-cooled reactor (HTGR) based plant supplying energy to industrial processes. These requirements were developed from collaboration with industry and HTGR suppliers and from detailed evaluation of integration of the HTGR technology in industrial processes. The functional and performance requirements specified herein are an effective representation of the industrial sector energy needs and an effective basis for developing a plant design that will serve the broadest range of industrial applications.

  2. Critique of Hanford Waste Vitrification Plant off-gas sampling requirements

    SciTech Connect

    Goles, R.W.

    1996-03-01

    Off-gas sampling and monitoring activities needed to support operations safety, process control, waste form qualification, and environmental protection requirements of the Hanford Waste Vitrification Plant (HWVP) have been evaluated. The locations of necessary sampling sites have been identified on the basis of plant requirements, and the applicability of Defense Waste Processing Facility (DWPF) reference sampling equipment to these HWVP requirements has been assessed for all sampling sites. Equipment deficiencies, if present, have been described and the bases for modifications and/or alternative approaches have been developed.

  3. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2016 DOCKETS |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2016 DOCKETS SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2016 DOCKETS Companies with authorizations to export LNG are required to file, on a semi-annual basis, written reports describing the progress of the planned liquefaction facility project that is part of the company's LNG export application and order. These reports are due by April 1 and October 1 of each year, and shall include the following: A

  4. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    SciTech Connect

    Banaee, Jila

    2002-08-01

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  5. Planning for Site Transition to Long-Term Stewardship: Identification of Requirements and Issues

    SciTech Connect

    Banaee, J.

    2002-05-16

    A systematic methodology is presented and applied for the identification of requirements and issues pertaining to the planning for, and transition to, long term stewardship (LTS). The method has been applied to three of the twelve identified LTS functions. The results of the application of the methodology to contaminated and uncontaminated federal real property in those three functions are presented. The issues that could be seen as impediments to the implementation of LTS are also identified for the three areas under consideration. The identified requirements are significant and in some cases complex to implement. It is clear that early and careful planning is required in all circumstances.

  6. Method and apparatus for collaborative use of application program

    DOEpatents

    Dean, Craig D.

    1994-01-01

    Method and apparatus permitting the collaborative use of a computer application program simultaneously by multiple users at different stations. The method is useful with communication protocols having client/server control structures. The method of the invention requires only a sole executing copy of the application program and a sole executing copy of software comprising the invention. Users may collaboratively use a set of application programs by invoking for each desired application program one copy of software comprising the invention.

  7. Variable Speed Pumping: A Guide to Successful Applications - Executive

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Summary | Department of Energy Variable Speed Pumping: A Guide to Successful Applications - Executive Summary Variable Speed Pumping: A Guide to Successful Applications - Executive Summary This document describes the cost and energy savings potential of pumping system applications with variable duty requirements. Variable Speed Pumping: A Guide to Successful Applications - Executive Summary (May 2004) (1.09 MB) More Documents & Publications Energy Conservation Program: Test Procedure for

  8. Large Scale Computing and Storage Requirements for Fusion Energy...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Home Science at NERSC HPC Requirements Reviews Requirements Reviews: Target 2014 Fusion Energy Sciences (FES) Large Scale Computing and Storage Requirements for Fusion ...

  9. States with NEPA-like Environmental Planning Requirements | Department...

    Energy Saver

    States with NEPA-like Environmental Planning Requirements States with NEPA-like Environmental Planning Requirements Several states have environmental planning requirements that are...

  10. Web Writing Requirements and Best Practices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Web Writing Requirements and Best Practices Web Writing Requirements and Best Practices The Office of Energy Efficiency and Renewable Energy (EERE) has requirements and best ...

  11. Technical requirements for bioassay support services

    SciTech Connect

    Hickman, D.P.; Anderson, A.L. )

    1991-05-01

    This document provides the technical basis for the Chem-Nuclear Geotech (Geotech) bioassay program. It includes information and details that can be used as a model in providing technical contents and requirements for bioassay laboratory support, either internally or in solicitations by Geotech to obtain subcontractor laboratory support. It provides a detailed summary and description of the types of bioassay samples to be expected in support of Geotech remedial projects for the US Department of Energy and the bioassay services and analytical requirements necessary to process such samples, including required limits of sensitivity. General responsibilities of the bioassay laboratory are also addressed, including quality assurance. Peripheral information of importance to the program is included in the appendices of this document. 7 tabs.

  12. World nuclear fuel cycle requirements 1991

    SciTech Connect

    Not Available

    1991-10-10

    The nuclear fuel cycle consists of mining and milling uranium ore, processing the uranium into a form suitable for generating electricity, burning'' the fuel in nuclear reactors, and managing the resulting spent nuclear fuel. This report presents projections of domestic and foreign requirements for natural uranium and enrichment services as well as projections of discharges of spent nuclear fuel. These fuel cycle requirements are based on the forecasts of future commercial nuclear power capacity and generation published in a recent Energy Information Administration (EIA) report. Also included in this report are projections of the amount of spent fuel discharged at the end of each fuel cycle for each nuclear generating unit in the United States. The International Nuclear Model is used for calculating the projected nuclear fuel cycle requirements. 14 figs., 38 tabs.

  13. Civilian Radioactive Waste Management System Requirements Document

    SciTech Connect

    C.A. Kouts

    2006-05-10

    The CRD addresses the requirements of Department of Energy (DOE) Order 413.3-Change 1, ''Program and Project Management for the Acquisition of Capital Assets'', by providing the Secretarial Acquisition Executive (Level 0) scope baseline and the Program-level (Level 1) technical baseline. The Secretarial Acquisition Executive approves the Office of Civilian Radioactive Waste Management's (OCRWM) critical decisions and changes against the Level 0 baseline; and in turn, the OCRWM Director approves all changes against the Level 1 baseline. This baseline establishes the top-level technical scope of the CRMWS and its three system elements, as described in section 1.3.2. The organizations responsible for design, development, and operation of system elements described in this document must therefore prepare subordinate project-level documents that are consistent with the CRD. Changes to requirements will be managed in accordance with established change and configuration control procedures. The CRD establishes requirements for the design, development, and operation of the CRWMS. It specifically addresses the top-level governing laws and regulations (e.g., ''Nuclear Waste Policy Act'' (NWPA), 10 Code of Federal Regulations (CFR) Part 63, 10 CFR Part 71, etc.) along with specific policy, performance requirements, interface requirements, and system architecture. The CRD shall be used as a vehicle to incorporate specific changes in technical scope or performance requirements that may have significant program implications. Such may include changes to the program mission, changes to operational capability, and high visibility stakeholder issues. The CRD uses a systems approach to: (1) identify key functions that the CRWMS must perform, (2) allocate top-level requirements derived from statutory, regulatory, and programmatic sources, and (3) define the basic elements of the system architecture and operational concept. Project-level documents address CRD requirements by further

  14. HEP Science Network Requirements--Final Report

    SciTech Connect

    Bakken, Jon; Barczyk, Artur; Blatecky, Alan; Boehnlein, Amber; Carlson, Rich; Chekanov, Sergei; Cotter, Steve; Cottrell, Les; Crawford, Glen; Crawford, Matt; Dart, Eli; Dattoria, Vince; Ernst, Michael; Fisk, Ian; Gardner, Rob; Johnston, Bill; Kent, Steve; Lammel, Stephan; Loken, Stewart; Metzger, Joe; Mount, Richard; Ndousse-Fetter, Thomas; Newman, Harvey; Schopf, Jennifer; Sekine, Yukiko; Stone, Alan; Tierney, Brian; Tull, Craig; Zurawski, Jason

    2010-04-27

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the US Department of Energy Office of Science, the single largest supporter of basic research in the physical sciences in the United States. In support of the Office of Science programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 20 years. In August 2009 ESnet and the Office of High Energy Physics (HEP), of the DOE Office of Science, organized a workshop to characterize the networking requirements of the programs funded by HEP. The International HEP community has been a leader in data intensive science from the beginning. HEP data sets have historically been the largest of all scientific data sets, and the communty of interest the most distributed. The HEP community was also the first to embrace Grid technologies. The requirements identified at the workshop are summarized below, and described in more detail in the case studies and the Findings section: (1) There will be more LHC Tier-3 sites than orginally thought, and likely more Tier-2 to Tier-2 traffic than was envisioned. It it not yet known what the impact of this will be on ESnet, but we will need to keep an eye on this traffic. (2) The LHC Tier-1 sites (BNL and FNAL) predict the need for 40-50 Gbps of data movement capacity in 2-5 years, and 100-200 Gbps in 5-10 years for HEP program related traffic. Other key HEP sites include LHC Tier-2 and Tier-3 sites, many of which are located at universities. To support the LHC, ESnet must continue its collaborations with university and international networks. (3) While in all cases the deployed 'raw' network bandwidth must exceed the user requirements in order to meet the data transfer and reliability requirements, network engineering for trans-Atlantic connectivity

  15. Advanced Scientific Computing Research Network Requirements

    SciTech Connect

    Bacon, Charles; Bell, Greg; Canon, Shane; Dart, Eli; Dattoria, Vince; Goodwin, Dave; Lee, Jason; Hicks, Susan; Holohan, Ed; Klasky, Scott; Lauzon, Carolyn; Rogers, Jim; Shipman, Galen; Skinner, David; Tierney, Brian

    2013-03-08

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet to be a highly successful enabler of scientific discovery for over 25 years. In October 2012, ESnet and the Office of Advanced Scientific Computing Research (ASCR) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the ASCR program office. The requirements identified at the review are summarized in the Findings section, and are described in more detail in the body of the report.

  16. MarFS-Requirements-Design-Configuration-Admin

    SciTech Connect

    Kettering, Brett Michael; Grider, Gary Alan

    2015-07-08

    This document will be organized into sections that are defined by the requirements for a file system that presents a near-POSIX (Portable Operating System Interface) interface to the user, but whose data is stored in whatever form is most efficient for the type of data being stored. After defining the requirement the design for meeting the requirement will be explained. Finally there will be sections on configuring and administering this file system. More and more, data dominates the computing world. There is a “sea” of data out there in many different formats that needs to be managed and used. “Mar” means “sea” in Spanish. Thus, this product is dubbed MarFS, a file system for a sea of data.

  17. Development of Regulatory Technical Requirements for the Advanced Integral Type Research Reactor

    SciTech Connect

    Jo, Jong Chull; Yune, Young Gill; Kim, Woong Sik; Kim, Hho Jung

    2004-07-01

    This paper presents the current status of the study on the development of regulatory technical requirements for the licensing review of an advanced integral type research reactor of which the license application is expected in a few years. According to the Atomic Energy Act of Korea, both research and education reactors are subject to the technical requirements for power reactors in the licensing review. But, some of the requirements may not be applicable or insufficient for the licensing reviews of reactors with unique design features. Thus it is necessary to identify which review topics or areas can not be addressed by the existing requirements and to develop the required ones newly or supplement appropriately. Through the study performed so far, it has been identified that the following requirements need to be developed newly for the licensing review of SMART-P: the use of proven technology, the interfacial facility, the non-safety systems, and the metallic fuels. The approach and basis for the development of each of the requirements are discussed. (authors)

  18. 2006 Final Transmission Proposal: Revenue Requirements Study.

    SciTech Connect

    United States. Bonneville Power Administration.

    2005-06-01

    The purpose of the Revenue Requirement Study (Study) is to establish the level of revenues needed from rates for Bonneville Power Administration's (BPA's) transmission and ancillary services to recover, in accordance with sound business principles, costs associated with the transmission of electric power over the Federal Columbia River Transmission System (FCRTS). The FCRTS is part of the larger Federal Columbia River Power System (FCRPS) which also includes the hydroelectric, multipurpose facilities constructed and operated by the U.S. Army Corps of Engineers and the Bureau of Reclamation in the Pacific Northwest. The FCRPS costs that are not included in the FCRTS costs are funded and repaid through BPA power rates. The transmission revenue requirements herein include: recovery of the Federal investment in transmission and transmission-related assets; the operations and maintenance (O&M) and other annual expenses associated with the provision of transmission and ancillary services; the cost of generation inputs for ancillary services and other between business-line services necessary for the transmission of power; and all other transmission-related costs incurred by the Administrator. The cost evaluation period for this rate proposal includes Fiscal Years (FYs) 2005-2007, the period extending from the last year for which historical information is available through the proposed rate test period. The Study includes the transmission revenue requirements for the rate test period, FYs 2006-2007 (Rate Period) and the results of transmission repayment studies. This Study outlines the policies, forecasts, assumptions, and calculations used to determine BPA's transmission revenue requirements. Legal requirements are summarized in Chapter 5 of this Study. The Revenue Requirement Study Documentation (Documentation), TR-06-FS-BPA-01A, contains key technical assumptions and calculations, the results of the transmission repayment studies, and a further explanation of the

  19. New applications for high average power beams

    SciTech Connect

    Neau, E.L.; Turman, B.N.; Patterson, E.L.

    1993-08-01

    The technology base formed by the development of high peak power simulators, laser drivers, FEL`s, and ICF drivers from the early 60`s through the late 80`s is being extended to high average power short-pulse machines with the capabilities of supporting new types of manufacturing processes and performing new roles in environmental cleanup applications. This paper discusses a process for identifying and developing possible commercial applications, specifically those requiring very high average power levels of hundreds of kilowatts to perhaps megawatts. The authors discuss specific technology requirements and give examples of application development efforts. The application development work is directed at areas that can possibly benefit from the high specific energies attainable with short pulse machines.

  20. Ootw Tool Requirements in Relation to JWARS

    SciTech Connect

    Hartley III, D.S.; Packard, S.L.

    1998-01-01

    This document reports the results of the CMke of the Secretary of Defense/Program Analysis & Evaluation (OSD/PA&E) sponsored project to identify how Operations Other Than War (OOTW) tool requirements relate to the Joint Warfare Simulation (JWARS) and, more generally, to joint analytical modeling and simulation (M&S) requirements. It includes recommendations about which OOTW tools (and functionality within tools) should be included in JWARS, which should be managed as joint analytical modeling and simulation (M&S) tools, and which should be left for independent development.

  1. Comparison of 2006 IECC and 2009 IECC Commercial Energy Code Requirements for Kansas City, MO

    SciTech Connect

    Huang, Yunzhi; Gowri, Krishnan

    2011-03-22

    This report summarizes code requirements and energy savings of commercial buildings in climate zone 4 built to the 2009 IECC when compared to the 2006 IECC. In general, the 2009 IECC has higher insulation requirements for exterior walls, roof, and windows and have higher efficiency requirements for HVAC equipment (HVAC equipment efficiency requirements are governed by National Appliance Conversion Act of 1987 (NAECA), and are applicable irrespective of the IECC version adopted). The energy analysis results show that residential and nonresidential commercial buildings meeting the 2009 IECC requirements save between 6.1% and 9.0% site energy, and between 6.4% and 7.7% energy cost when compared to 2006 IECC. Analysis also shows that semiheated buildings have energy and cost savings of 3.9% and 5.6%.

  2. Optical coatings for laser fusion applications

    SciTech Connect

    Lowdermilk, W.H.; Milam, D.; Rainer, F.

    1980-04-24

    Lasers for fusion experiments use thin-film dielectric coatings for reflecting, antireflecting and polarizing surface elements. Coatings are most important to the Nd:glass laser application. The most important requirements of these coatings are accuracy of the average value of reflectance and transmission, uniformity of amplitude and phase front of the reflected or transmitted light, and laser damage threshold. Damage resistance strongly affects the laser's design and performance. The success of advanced lasers for future experiments and for reactor applications requires significant developments in damage resistant coatings for ultraviolet laser radiation.

  3. A Lightweight Material for Heat Exchange Applications

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Continuous Processing of High Thermal Conductivity Polyethylene Fibers and Sheets A Lightweight Material for Heat Exchange Applications Introduction Thermal conductivity is an important consideration in choosing materials for different manufacturing applications. For example, materials used in heat exchang- ers require high thermal conductivity because heat must be transferred between substances located at a distance from one another. Historically, heat exchang- ers have been manufactured from

  4. DOE Proposes Requirement for Certification of Admissibility for...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    subject to an applicable energy conservation standard provide, prior to ... compliant with all applicable energy conservation standards, using DOE's Compliance ...

  5. Power feature required for PEFC powered electric propulsion ship

    SciTech Connect

    Yoshida, Isao; Oka, Masaru

    1996-12-31

    This report covers part of a joint study on a PEFC system for ship propulsion, summarized in a presentation to this Seminar, entitled {open_quote}Study on a Polymer Electrolyte Fuel Cell (PEFC) Propulsion System for Surface Ships{close_quotes}, and which envisages application to a 1,500 DWT cargo vessel. The aspect treated here concerns an analysis of the load-following performance required and estimated of a PEFC system to power the envisaged ship. The analysis proved that difficulty should be expected of the fuel supply circuit in following with adequate rapidity the sharp changes of load on fuel cell under certain conditions. Further integrated experiments and simulation exercises are currently in progress to further analyze the response characteristics of the fuel supply circuit-particularly of the methanol reformer and gas reservoir-to determine the best measure to be adopted for overcoming the expected difficulty.

  6. Moly99 Production Facility: Report on Beamline Components, Requirements, Costs

    SciTech Connect

    Bishofberger, Kip A.

    2015-12-23

    In FY14 we completed the design of the beam line for the linear accelerator production design concept. This design included a set of three bending magnets, quadrupole focusing magnets, and octopoles to flatten the beam on target. This design was generic and applicable to multiple different accelerators if necessary. In FY15 we built on that work to create specifications for the individual beam optic elements, including power supply requirements. This report captures the specification of beam line components with initial cost estimates for the NorthStar production facility.This report is organized as follows: The motivation of the beamline design is introduced briefly, along with renderings of the design. After that, a specific list is provided, which accounts for each beamline component, including part numbers and costs, to construct the beamline. After that, this report details the important sections of the beamline and individual components. A final summary and list of follow-on activities completes this report.

  7. Induction linear accelerator technology for SDIO applications

    SciTech Connect

    Birx, D.; Reginato, L.; Rogers, D.; Trimble, D.

    1986-11-01

    The research effort reported concentrated primarily on three major activities. The first was aimed at improvements in the accelerator drive system of an induction linac to meet the high repetition rate requirements of SDI applications. The second activity centered on a redesign of the accelerator cells to eliminate the beam breakup instabilities, resulting in optimized beam transport. The third activity sought to improve the source of electrons to achieve a higher quality beam to satisfy the requirement of the free electron laser. (LEW)

  8. CRAD, Facility Safety- Technical Safety Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Technical Safety Requirments (TSA).

  9. Requirements and Submission Process for Qualified Software

    Office of Energy Efficiency and Renewable Energy (EERE)

    These documents provide a complete list of requirements and submission details to have software qualified for calculating energy and power cost savings for commercial building tax deductions under tax code Section 179D for systems or buildings placed in service on or after January 1, 2016, or on or before December 31, 2015.

  10. FY 1998 waste information requirements document

    SciTech Connect

    Poppiti, J.A.

    1997-09-05

    The Waste Information Requirements Document describes the activities of the Tank Waste Remediation System (TWRS) Characterization Project that provide characterization information on Hanford Site waste tanks. The characterization information is required to perform operations and meet the commitments of TWRS end users. These commitments are derived from the Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement; the Recommendation 93-5 Implementation Plan to the Defense Nuclear Facilities Safety Board (DNFSB); and other directives as listed in Section 4.0. This Waste Information Requirement Document applies to Fiscal Years 1997 and 1998 activities. Its contents are based on the best information available in August 1997. The format and content are based on the directions of DOE-RL (Sieracki, 1997) and Fluor Daniel Hanford Incorporated (Umek, 1997). Activities, such as the revision of the Tank Characterization Technical Sampling Basis (Brown et al. 1997), the revision of the data quality objectives (DQOs), issue closures, discussions with Ecology, and management decisions may cause subsequent updates to the Waste Information Requirements Document.

  11. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE

    Energy.gov [DOE]

    The Department has issued a Final Rule revising the existing contractor regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). One unusual aspect of the Final Rule is that it requires Contracting Officers to attempt to execute bilateral modifications to existing affected contracts to apply the Final Rule's revisions to those contracts. We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "… are designed to clarify and streamline existing requirements, improve efficiency of contractor legal management, and facilitate oversight over the expenditure of taxpayer dollars." The contract modifications will state the revisions will only apply to costs incurred from date the bilateral modifications are executed forward. The revisions are administrative in nature. Regarding costs contractors have not yet incurred, the revisions could have been communicated to contractors without using a Final Rule to incorporate them into current contracts. Consequently, the modifications do not require equitable adjustments.)

  12. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    a. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.a. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is for an assisted acquisition. An assisted acquisition is a type of interagency acquisition where the servicing agency and requesting agency enter into a written interagency agreement pursuant to which the

  13. Long-Term Stewardship Science and Technology Requirements

    SciTech Connect

    McDonald, J.K.; Nickelson, R.A.

    2002-05-16

    To ensure technology developed for long-term stewardship will meet existing requirements, a review of requirements was performed. In addition to identifying existing science and technology related requirements, gaps and conflicts of requirements were identified.

  14. Long-term Stewardship Science and Technology Requirements

    SciTech Connect

    Mcdonald, Jaimee Kristen; Nickelson, Reva Anne

    2002-08-01

    To ensure technology developed for long-term stewardship will meet existing requirements, a review of requirements was performed. In addition to identifying existing science and technology related requirements, gaps and conflicts of requirements were identified.

  15. Analysis of IECC2003 Chiller Heat Recovery for Service Water Heating Requirement for New York State

    SciTech Connect

    Winiarski, David W.

    2004-08-15

    The state of New York asked the U.S. Department of Energy to evaluate the cost-effectiveness of the requirement for Heat Recovery for Service Water Heating that exists in the 2003 International Energy Conservation Code to determine whether this requirement should be adopted into the New York State Energy Code. A typical hotel application that would trigger this requirement was examined using whole building simulation software to generate baseline annual chiller and service hot water loads, and a spreadsheet was used to examine the energy savings potential for heat recovery using hourly load files from the simulation. An example application meeting the code requirement was developed, and the energy savings, energy cost savings, and first costs for the heat recovery installation were developed. The calculated payback for this application was 6.3 years using 2002 New York state average energy costs. This payback met the minimum requirements for cost effectiveness established for the state of New York for updating the commercial energy conservation code.

  16. COMPARATIVE STUDIES OF PROTON ACCELERATORS FOR HIGH POWER APPLICATIONS.

    SciTech Connect

    WENG, W.T.

    2006-05-29

    There are many applications requiring high power proton accelerators of various kinds. However, each type of proton accelerator can only provide beam with certain characteristics, hence the match of accelerators and their applications need careful evaluation. In this talk, the beam parameters and performance limitations of linac, cyclotron, synchrotron, and FFAG accelerators are studied and their relative merits for application in neutron, muon, neutrino, and ADS will be assessed in terms of beam energy, intensity, bunch length, repetition rate, and beam power requirements. A possible match between the applications and the accelerator of choice is presented in a matrix form. The accelerator physics and technology issues and challenges involved will also be discussed.

  17. Table 2 - DOE Regulations Requiring Central Technical Authority (CTA)

    Office of Environmental Management (EM)

    Concurrence Prior to Granting Exemptions or Exceptions | Department of Energy

    1 - DOE Requirements Requiring Central Technical Authority (CTA) Concurrence Prior to Granting Exemptions or Exceptions Table 1 - DOE Requirements Requiring Central Technical Authority (CTA) Concurrence Prior to Granting Exemptions or Exceptions Table 1 - DOE Requirements Requiring Central Technical Authority (CTA) Concurrence Prior to Granting Exemptions or Exceptions Table 1 - DOE Requirements Requiring

  18. Ambient Corporation's response to NBP RFI: Communications Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ambient Corporation's response to NBP RFI: Communications Requirements Ambient Corporation's response to NBP RFI: Communications Requirements Ambient Corporation's comments on ...

  19. European Utility Requirements (EUR) Volume 3 Assessment for AP1000

    SciTech Connect

    Demetri, K.J.; Saiu, Gianfranco

    2004-07-01

    The EUR (European Utility Requirements) effort was launched in December 1991 by several European Utilities. The main objective of the EUR organization is to produce a common set of utility requirements, endorsed by major European utilities for the next generation of Light Water Reactor (LWR) nuclear power plants. In 1997 an effort was undertaken by the EUR organization to jointly develop a document which would become 'Volume 3' of the EUR. The objectives of Volume 3 are: - develop a description of the standard nuclear island designs; - assessment of design compliance with the EUR Volume 1 and 2 against these designs; - define the requirements for the specific nuclear island designs. Five subsets of EUR Volume 3, based on EUR Revision B, are already published; all of which are next generation plant designs being developed for Europe beyond 2000. They include: - EP1000 - Passive Pressurized Light Water Reactor (3-Loop, 1000 MWe); - EPR - Evolutionary Pressurized Light Water Reactor (1500 MWe); - BWR90/90+ - Evolutionary Boiling Water Reactor (1400 MWe); - ABWR - Evolutionary Boiling Water Reactor (1400 MWe); - SWR 1000 - Boiling Water Reactor With Passive Features (1000 MWe). Other subsets being developed or proposed include: - AP1000 - Passive Pressurized Light Water Reactor (2-Loop, 1117 MWe); - VVER AES 92 - Pressurized Water Reactor With Passive Features (1000 MWe). The purpose of this paper is to provide an overview of the program, which will take place in 2004-2005 with the EUR group to prepare an EUR Volume 3 Subset for the AP1000 nuclear plant design. The AP1000 EUR compliance assessment, to be performed against EUR Revision C requirements, is an important step for the evaluation of the AP1000 design for application in Europe. The AP1000 relies heavily on the AP600 and has inherited design features (e.g., low boron core design) from the EP1000, for which compliance with EUR Revision B was a key design criterion. The EP1000, which also heavily relies on the AP

  20. Architectural requirements for the Red Storm computing system.

    SciTech Connect

    Camp, William J.; Tomkins, James Lee

    2003-10-01

    This report is based on the Statement of Work (SOW) describing the various requirements for delivering 3 new supercomputer system to Sandia National Laboratories (Sandia) as part of the Department of Energy's (DOE) Accelerated Strategic Computing Initiative (ASCI) program. This system is named Red Storm and will be a distributed memory, massively parallel processor (MPP) machine built primarily out of commodity parts. The requirements presented here distill extensive architectural and design experience accumulated over a decade and a half of research, development and production operation of similar machines at Sandia. Red Storm will have an unusually high bandwidth, low latency interconnect, specially designed hardware and software reliability features, a light weight kernel compute node operating system and the ability to rapidly switch major sections of the machine between classified and unclassified computing environments. Particular attention has been paid to architectural balance in the design of Red Storm, and it is therefore expected to achieve an atypically high fraction of its peak speed of 41 TeraOPS on real scientific computing applications. In addition, Red Storm is designed to be upgradeable to many times this initial peak capability while still retaining appropriate balance in key design dimensions. Installation of the Red Storm computer system at Sandia's New Mexico site is planned for 2004, and it is expected that the system will be operated for a minimum of five years following installation.

  1. Proposal for grid computing for nuclear applications

    SciTech Connect

    Idris, Faridah Mohamad; Ismail, Saaidi; Haris, Mohd Fauzi B.; Sulaiman, Mohamad Safuan B.; Aslan, Mohd Dzul Aiman Bin.; Samsudin, Nursuliza Bt.; Ibrahim, Maizura Bt.; Ahmad, Megat Harun Al Rashid B. Megat; Yazid, Hafizal B.; Jamro, Rafhayudi B.; Azman, Azraf B.; Rahman, Anwar B. Abdul; Ibrahim, Mohd Rizal B. Mamat; Muhamad, Shalina Bt. Sheik; Hassan, Hasni; Abdullah, Wan Ahmad Tajuddin Wan; Ibrahim, Zainol Abidin; Zolkapli, Zukhaimira; Anuar, Afiq Aizuddin; Norjoharuddeen, Nurfikri; and others

    2014-02-12

    The use of computer clusters for computational sciences including computational physics is vital as it provides computing power to crunch big numbers at a faster rate. In compute intensive applications that requires high resolution such as Monte Carlo simulation, the use of computer clusters in a grid form that supplies computational power to any nodes within the grid that needs computing power, has now become a necessity. In this paper, we described how the clusters running on a specific application could use resources within the grid, to run the applications to speed up the computing process.

  2. Report of the Federal Internetworking Requirements Panel

    SciTech Connect

    1994-05-31

    The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

  3. RADIOACTIVE MATERIAL PACKAGING TORQUE REQUIREMENTS COMPLIANCE

    SciTech Connect

    Watkins, R.; Leduc, D.

    2011-03-24

    Shipping containers used to transport radioactive material (RAM) in commerce employ a variety of closure mechanisms. Often, these closure mechanisms require a specific amount of torque be applied to a bolt, nut or other threaded fastener. It is important that the required preload is achieved so that the package testing and analysis is not invalidated for the purpose of protecting the public. Torque compliance is a means of ensuring closure preload, is a major factor in accomplishing the package functions of confinement/containment, sub-criticality, and shielding. This paper will address the importance of applying proper torque to package closures, discuss torque value nomenclature, and present one methodology to ensure torque compliance is achieved.

  4. Improvements to Technical Specifications surveillance requirements

    SciTech Connect

    Lobel, R.; Tjader, T.R.

    1992-12-01

    In August 1983 an NRC task group was formed to investigate problems with surveillance testing required by Technical Specifications, and to recommend approaches to effect improvements. NUREG-1024 ( Technical Specifications-Enhancing Safety Impact'') resulted, and it contained recommendations to review the basis for test frequencies; to ensure that the tests promote safety and do not degrade equipment; and to review surveillance tests so that they do not unnecessarily burden personnel. The Technical Specifications Improvement Program (TSIP) was established in December 1984 to provide the framework for rewriting and improving the Technical Specifications. As an element of the TSIP, all Technical Specifications surveillance requirements were comprehensively examined as recommended in NUREG-1024. The results of that effort are presented in this report. The study found that while some testing at power is essential to verify equipment and system operability, safety can be improved, equipment degradation decreased, and unnecessary personnel burden relaxed by reducing the amount of testing at power.

  5. Frequency Control Performance Measurement and Requirements

    SciTech Connect

    Illian, Howard F.

    2010-12-20

    Frequency control is an essential requirement of reliable electric power system operations. Determination of frequency control depends on frequency measurement and the practices based on these measurements that dictate acceptable frequency management. This report chronicles the evolution of these measurements and practices. As technology progresses from analog to digital for calculation, communication, and control, the technical basis for frequency control measurement and practices to determine acceptable performance continues to improve. Before the introduction of digital computing, practices were determined largely by prior experience. In anticipation of mandatory reliability rules, practices evolved from a focus primarily on commercial and equity issues to an increased focus on reliability. This evolution is expected to continue and place increased requirements for more precise measurements and a stronger scientific basis for future frequency management practices in support of reliability.

  6. WPN 99-4- Updated Weatherization Assistance Program Application Package and Revised Reporting Forms

    Energy.gov [DOE]

    To issue the revised application package and reporting requirements for the low-income Weatherization Assistance Program for use by the states.

  7. Pipe crawlers: Versatile adaptations for real applications

    SciTech Connect

    Hapstack, M.; Talarek, T.R.

    1990-01-01

    A problem at the Savannah River Site requires the unique application of a pipe crawler. A number of stainless steel pipes buried in concrete require ultrasonic inspection of the heat affected zones of the welds for detection of flaws or cracks. The paper describes the utilization of an inch-worm motion pipe crawler which negotiates a 90 degree reducing elbow with significant changes in diameter and vertical sections before entering the area of concern. After a discussion of general considerations and problem description, special requirements to meet the objectives and the design approach regarding the tractor, control system, instrument carriage, and radiation protection are discussed. 2 refs., 11 figs. (MB)

  8. ASME Code requirements for multi-canister overpack design and fabrication

    SciTech Connect

    SMITH, K.E.

    1998-11-03

    The baseline requirements for the design and fabrication of the MCO include the application of the technical requirements of the ASME Code, Section III, Subsection NB for containment and Section III, Subsection NG for criticality control. ASME Code administrative requirements, which have not historically been applied at the Hanford site and which have not been required by the US Nuclear Regulatory Commission (NRC) for licensed spent fuel casks/canisters, were not invoked for the MCO. As a result of recommendations made from an ASME Code consultant in response to DNFSB staff concerns regarding ASME Code application, the SNF Project will be making the following modifications: issue an ASME Code Design Specification and Design Report, certified by a Registered Professional Engineer; Require the MCO fabricator to hold ASME Section III or Section VIII, Division 2 accreditation; and Use ASME Authorized Inspectors for MCO fabrication. Incorporation of these modifications will ensure that the MCO is designed and fabricated in accordance with the ASME Code. Code Stamping has not been a requirement at the Hanford site, nor for NRC licensed spent fuel casks/canisters, but will be considered if determined to be economically justified.

  9. Cyber Security Requirements for Risk Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2004-02-19

    The Notice ensures that system owners consistently assess the threats to and vulnerabilities of systems in order to implement adequate security controls. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, and protect DOE information and information systems from unauthorized access, use, disclosure, modification, or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06.

  10. Acronyms - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Acronyms by Website Administrator CRD - Contractor Requirements Document DNFSB - Defense Nuclear Facilities Safety Board DMTeam - Directives Management Team (MA-90) DOE P - Department of Energy Policy DOE N - Department of Energy Notice DOE O - Department of Energy Order DOE M - Department of Energy Manual DOE G - Department of Energy Guide DPC - Directives Point of Contact DRB - Directives Review Board established by DOE O 251.1C OPI - Office of Primary Interest (the writing organization)

  11. Biological and Environmental Research Network Requirements Review

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Network Requirements Review Final Report September 18-19, 2015 Disclaimer This document was prepared as an account of work sponsored by the United States Government. While this doc- ument is believed to contain correct informa on, neither the United States Government nor any agency thereof, nor The Regents of the University of California, nor any of their employees, makes any warranty, express or implied, or assumes any legal responsibility for the accuracy, completeness, or usefulness

  12. TWRS safety SSCs: Requirements and characteristics

    SciTech Connect

    Smith-Fewell, M.A.

    1997-12-30

    Safety Systems, Structures, and Components (SSCs) have been identified from hazard and accident analyses. These analyses were performed to support the Tank Waste Remediation System (TWRS) Final Safety Analysis Report (FSAR) and Basis for Interim Operation (BID). The text identifies and evaluates the SSCs and their supporting SSCs to show that they either prevent the occurrence of the accident or mitigate the consequences of the accident to below the acceptance guidelines. The requirements for the SSCs to fulfill these tasks are described.

  13. NERSC HPC Program Requirements Reviews Overview

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Overview NERSC HPC Program Requirements Reviews Overview Scope These workshops are focused on determining the computational challenges facing research teams and the computational resources scientists will need to meet their research objectives. The goal is to assure that NERSC, the DOE Office of Science, and its program offices, will be able to provide the high performance computing and storage resources necessary to support the Office of Science's scientific goals. The merits of the scientific

  14. Biological and Environmental Research Network Requirements

    SciTech Connect

    Balaji, V.; Boden, Tom; Cowley, Dave; Dart, Eli; Dattoria, Vince; Desai, Narayan; Egan, Rob; Foster, Ian; Goldstone, Robin; Gregurick, Susan; Houghton, John; Izaurralde, Cesar; Johnston, Bill; Joseph, Renu; Kleese-van Dam, Kerstin; Lipton, Mary; Monga, Inder; Pritchard, Matt; Rotman, Lauren; Strand, Gary; Stuart, Cory; Tatusova, Tatiana; Tierney, Brian; Thomas, Brian; Williams, Dean N.; Zurawski, Jason

    2013-09-01

    The Energy Sciences Network (ESnet) is the primary provider of network connectivity for the U.S. Department of Energy (DOE) Office of Science (SC), the single largest supporter of basic research in the physical sciences in the United States. In support of SC programs, ESnet regularly updates and refreshes its understanding of the networking requirements of the instruments, facilities, scientists, and science programs that it serves. This focus has helped ESnet be a highly successful enabler of scientific discovery for over 25 years. In November 2012, ESnet and the Office of Biological and Environmental Research (BER) of the DOE SC organized a review to characterize the networking requirements of the programs funded by the BER program office. Several key findings resulted from the review. Among them: 1) The scale of data sets available to science collaborations continues to increase exponentially. This has broad impact, both on the network and on the computational and storage systems connected to the network. 2) Many science collaborations require assistance to cope with the systems and network engineering challenges inherent in managing the rapid growth in data scale. 3) Several science domains operate distributed facilities that rely on high-performance networking for success. Key examples illustrated in this report include the Earth System Grid Federation (ESGF) and the Systems Biology Knowledgebase (KBase). This report expands on these points, and addresses others as well. The report contains a findings section as well as the text of the case studies discussed at the review.

  15. Advanced Neutron Sources: Plant Design Requirements

    SciTech Connect

    Not Available

    1990-07-01

    The Advanced Neutron Source (ANS) is a new, world class facility for research using hot, thermal, cold, and ultra-cold neutrons. At the heart of the facility is a 350-MW{sub th}, heavy water cooled and moderated reactor. The reactor is housed in a central reactor building, with supporting equipment located in an adjoining reactor support building. An array of cold neutron guides fans out into a large guide hall, housing about 30 neutron research stations. Office, laboratory, and shop facilities are included to provide a complete users facility. The ANS is scheduled to begin operation at the Oak Ridge National Laboratory at the end of the decade. This Plant Design Requirements document defines the plant-level requirements for the design, construction, and operation of the ANS. This document also defines and provides input to the individual System Design Description (SDD) documents. Together, this Plant Design Requirements document and the set of SDD documents will define and control the baseline configuration of the ANS.

  16. Vehicle Technologies Office Merit Review 2015: Technology Requirements for High Power Applications of Wireless Power Transfer

    Energy.gov [DOE]

    Presentation given by Oak Ridge National Laboratory at 2015 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about technology...

  17. PNNL VOLTTRON Application Development

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    by PNNL Apps Walkthrough of an Application Development Lessons Learned Concluding Remarks 3 Application Development Environment and Language Support VOLTTRON is a native Linux ...

  18. Application Porting and Performance

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    In the web pages that follow we document strategies for improving your application's ... if your application is memory bandwidth bound, memory latency bound or compute bound. ...

  19. Natural Gas Applications

    Annual Energy Outlook

    Gas Applications. If you need assistance viewing this page, please call (202) 586-8800. Energy Information Administration Home Page Home > Natural Gas > Natural Gas Applications...

  20. ORISE: Multimedia Applications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Multimedia Applications Multimedia Applications The Oak Ridge Institute for Science and Education (ORISE) collaborates with government agencies and organizations to develop ...

  1. Requirements, guidance and logic in planning environmental investigations: Approval versus implementation

    SciTech Connect

    Brice, D.A. [3D/Environmental Services, Inc., Cincinnati, OH (United States); Meredith, D.V.; Harris, M.Q. [Fernald Environmental Restoration Management Corp., Cincinnati, OH (United States). Fernald Environmental Management Project

    1993-09-09

    In today`s litigious society, it is important for both private parties and government to plan and conduct environmental investigations in a scientifically sound manner, documenting the purpose, methods, and results in a consistent fashion throughout the exercise. Planning documents are prepared during the initial phases of environmental investigations. Project objectives, including data quality requirements, specific work to be conducted to fulfill data needs, and operating procedures are specified. Regulatory agency approval of these documents is often required prior to plan implementation. These approvals are necessary and appropriate to fulfilling the agency`s mandated role. Many guidance documents prepared by regulatory agencies suggest the content and format of various scoping documents. These guidances help standardize thought processes and considerations in planning, and provide a template to ensure that both the plan and the proposed work will fulfill regulatory requirements. This work describes the preparation and use of guidance documents for planning environmental studies. The goals and some of the pitfalls of such documents are discussed. Guidance should include the following elements: the purpose of the guidance and a description of where it applies; the type of items to be addressed in planning; identification of requirements are applicable to all projects for which the guidance is intended; identification of requirements only applicable in certain situations; a description of items to facilitate planning; a suggested format for fulfilling requirements; example applications of the guidance. Disagreements arise between planners and reviewers/approvers when elements of guidance are used as leverage to require work not directly related to project objectives. Guidance may be inappropriately used as a milestone by which site-specific plans are judged. Regulatory agency review and approval may be regarded as a primary objective of the plan.

  2. Variable speed pumping: A guide to successful applications - Executive summary

    SciTech Connect

    None, None

    2004-05-01

    This document is the result of a collaboration between the Hydraulic Institute, Europump, and the U.S. DOE Industrial Technologies Program, and describes the cost and energy savings potential of pumping applications with variable duty requirements.

  3. Investigation of gigawatt millimeter wave source applications

    SciTech Connect

    Bruder, J.A.; Belcher, M.L.

    1991-09-01

    The Georgia Tech Research Institute (GTRI) investigated potential applications of millimeter wave (MMW) sources with peak powers on the order of a gigawatt. This power level is representative of MMW devices such as the free electron laser (FEL) and the cyclotron auto-resonance maser (CARM) that are under development at the Lawrence Livermore National Laboratory (LLNL). In addition to determining the technical requirements for these applications, the investigation considered potential users and how a high power MMW system would expand their current capabilities. Two of the more promising applications were examined in detail to include trade-off evaluations system parameters. The trade-off evaluations included overall system configuration, frequency and coherence, component availability, and performance estimates. Brainstorming sessions were held to try and uncover additional applications for a gigawatt MMW source. In setting up guidelines for the session, the need to attempt to predict applications for the years 2000 to 2030 was stressed. Also, possible non-DoD applications needed to be considered. While some of these applications could not in themselves justify the costs involved in the development of the radar system, they could be considered potential secondary applications of the system. As a result of the sessions, a number of interesting potential applications evolved including: space object identification; low angle tracking; illuminator for space-based radar; radio astronomy; space vehicle navigation; space debris location; atmospheric research; wind shear detection; electronic countermeasures; low observable detection; and long range detection via ducting.

  4. Washington DOE ZERH Program Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Washington DOE ZERH Program Requirements Washington DOE ZERH Program Requirements Washington specific program requirements for the U.S. Department of Energy's Zero Energy Ready Home Program. ch_washington_requirements8-23-13.pdf (289.63 KB) More Documents & Publications DOE Challenge Home, California Program Requirements Version Tracking Document for DOE Challenge Homes, National Program Requirements (Rev. 03) DOE Zero Energy Ready Home National Program Requirements (Rev. 04)

  5. Laboratory Equipment Donation Program - On-Line Application

    Office of Scientific and Technical Information (OSTI)

    Application Please do not leave any required field blank; if no information is available, enter an "X". * denotes required fields. *Item Control Number: Please verify the Item Control Number School Information (Note: LEDP Eligibility Guidelines must be met and verified below) *School Name: *Department Name: *Department Head Name: Applicant's Information *First Name: Middle Initial: *Last Name: *Address: Address 2: Building: *City: *State: *Zip: *Telephone Number: (###) ###-#### Fax

  6. Laboratory Equipment Donation Program - On-Line Application

    Office of Scientific and Technical Information (OSTI)

    Application Please verify the Item Control Number and the Equipment Name. Please do not leave any required field blank; if no information is available, enter an "X". * denotes required fields. Item Control Number: Equipment Name: School Information (Note: LEDP Eligibility Guidelines must be met and verified below) *School Name: *Department Name: *Department Head Name: Applicant's Information *First Name: Middle Initial: *Last Name: *Address: Address 2: Building: *City: *State: *Zip:

  7. Drum inspection robots: Application development

    SciTech Connect

    Hazen, F.B.; Warner, R.D.

    1996-02-01

    Throughout the Department of Energy (DOE), drums containing mixed and low level stored waste are inspected, as mandated by the Resource Conservation and Recovery Act (RCRA) and other regulations. The inspections are intended to prevent leaks by finding corrosion long before the drums are breached. The DOE Office of Science and Technology (OST) has sponsored efforts towards the development of robotic drum inspectors. This emerging application for mobile and remote sensing has broad applicability for DOE and commercial waste storage areas. Three full scale robot prototypes have been under development, and another project has prototyped a novel technique to analyze robotically collected drum images. In general, the robots consist of a mobile, self-navigating base vehicle, outfitted with sensor packages so that rust and other corrosion cues can be automatically identified. They promise the potential to lower radiation dose and operator effort required, while improving diligence, consistency, and documentation.

  8. Extending and automating a Systems-Theoretic hazard analysis for requirements generation and analysis.

    SciTech Connect

    Thomas, John

    2012-05-01

    Systems Theoretic Process Analysis (STPA) is a powerful new hazard analysis method designed to go beyond traditional safety techniques - such as Fault Tree Analysis (FTA) - that overlook important causes of accidents like flawed requirements, dysfunctional component interactions, and software errors. While proving to be very effective on real systems, no formal structure has been defined for STPA and its application has been ad-hoc with no rigorous procedures or model-based design tools. This report defines a formal mathematical structure underlying STPA and describes a procedure for systematically performing an STPA analysis based on that structure. A method for using the results of the hazard analysis to generate formal safety-critical, model-based system and software requirements is also presented. Techniques to automate both the analysis and the requirements generation are introduced, as well as a method to detect conflicts between the safety and other functional model-based requirements during early development of the system.

  9. Atmospheric tracer technology and applications

    SciTech Connect

    Heiken, J.H.

    1986-01-01

    This book presents information on atmospheric tracer technology and applications. It summarizes the state of the art, provides information exchange for members of the atmospheric community, defines areas for future applications of tracers, and identifies requirements for tracer techniques. A major objective of research in atmospheric science over the past several decades has been to obtain an enhanced description of transport, transformation, and deposition of trace constituents present in the atmosphere. Interest in these processes has been hightened with the recognition that pollutant materials transported over long distances may exert significant effects at receptor locations, and the consequent desire to improve knowledge of source-receptor relationships. There is a wide range of practical applications for tracer experiments. In many cases the tracer allows 1) the documentation of a potential airborne hazard without actually emitting hazardous material or 2) the evaluation of the expected outcome of an expensive process alteration. Some examples of the former case are testing of rocket fuels, developing chemical defense strategies, establishing safety procedures for possible accidents in the handling and transportation of hazardous materials, and assessing the fire and explosion hazards present in handling special materials such as liquified natural gas. The practical use of tracers for economic benefit includes designing emissions systems, for both air quality control and dissemination systems such as in forest and crop spraying or cloud seeding, and siting of industrial facilities. Other applications include source attribution, which is currently of interest in the acid rain problem.

  10. Environmental Restoration Program quality system requirements for the Hanford Site. Revision 2

    SciTech Connect

    Cote, R.F.

    1993-11-01

    This document defines the quality system requirements for the US Department of Energy, Richland Operations Office, Environmental Restoration Program at the Hanford Site. The Quality System Requirements (OSR) for the Hanford Site integrates quality assurance requirements from the US Department of Energy Orders, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), and applicable industry standards into a single source document for the development of quality systems applicable to the Environmental Restoration Program activities. This document, based on fifteen criteria and divided intro three parts, provides user organizations with the flexibility to incorporate only those criteria and parts applicable to their specific scopes of work. The requirements of this document shall be applied to activities that affect quality based on a graded approach that takes into consideration the risk inherent in, as well as the importance of, specific items, services, and activities in terms of meeting ER Program objectives and customer expectations. The individual quality systems developed in accordance with this document are intended to provide an integrated management control system that assures the conduct of ER Program activities in a manner that protects human health and the environment.

  11. Requirements for a multifunctional code architecture

    SciTech Connect

    Tiihonen, O.; Juslin, K.

    1997-07-01

    The present paper studies a set of requirements for a multifunctional simulation software architecture in the light of experiences gained in developing and using the APROS simulation environment. The huge steps taken in the development of computer hardware and software during the last ten years are changing the status of the traditional nuclear safety analysis software. The affordable computing power on the safety analysts table by far exceeds the possibilities offered to him/her ten years ago. At the same time the features of everyday office software tend to set standards to the way the input data and calculational results are managed.

  12. Catalytic oxidizers and Title V requirements

    SciTech Connect

    Uberoi, M.; Rach, S.E.

    1999-07-01

    Catalytic oxidizers have been used to reduce VOC emissions from various industries including printing, chemical, paint, coatings, etc. A catalytic oxidizer uses a catalyst to reduce the operating temperature for combustion to approximately 600 F, which is substantially lower than thermal oxidation unit. Title V requirements have renewed the debate on the best methods to assure compliance of catalytic oxidizers, with some suggesting the need for continuous emission monitoring equipment. This paper will discuss the various aspects of catalytic oxidation and consider options such as monitoring inlet/outlet temperatures, delta T across the catalyst, periodic laboratory testing of catalyst samples, and preventive maintenance procedures as means of assuring continuous compliance.

  13. News - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    News by Website Administrator Site News New - DOE O 552.1A Chg 2 (Minor Revision), Travel and Policy Procedures - by Diane Johnson - last modified Oct 28, 2016 03:54 PM The Order supplements the Federal Travel Regulation as principal source of policy for Federal employee travel and relocation and establishes DOE M 552.1-1A, U.S. Department of Energy Travel Manual, dated 2-17-06, as the repository for supplementary travel requirements information. Supersedes DOE O 552.1A Chg 1 (Admin Chg), dated

  14. Requirements for Parallel I/O,

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements for Parallel I/O, ! Visualization and Analysis Prabhat 1 , Q uincey K oziol 2 1 LBL/NERSC 2 The H DF G roup NERSC A SCR R equirements f or 2 017 January 1 5, 2 014 LBNL 1. Project Description! * m636 r epo * LBL V is B ase P rogram ( Bethel P I) [ PM: N owell] * Conduct f undamental a nd a pplied vis/analyEcs R &D t o address e xascale c hallenges * ExaHDF5 P roject ( Prabhat, Q uincey P Is) [ PM: Nowell] * Scale P arallel I /O, a nd d ata m anagement t echnologies f or current

  15. 10 CFR 850 Implementation of Requirements

    SciTech Connect

    Lee, S

    2012-01-05

    10 CFR 850 defines a contractor as any entity, including affiliated entities, such as a parent corporation, under contract with DOE, including a subcontractor at any tier, with responsibility for performing work at a DOE site in furtherance of a DOE mission. The Chronic Beryllium Disease Prevention Program (CBDPP) applies to beryllium-related activities that are performed at the Lawrence Livermore National Laboratory (LLNL). The CBDPP or Beryllium Safety Program is integrated into the LLNL Worker Safety and Health Program and, thus, implementation documents and responsibilities are integrated in various documents and organizational structures. Program development and management of the CBDPP is delegated to the Environment, Safety and Health (ES&H) Directorate, Worker Safety and Health Functional Area. As per 10 CFR 850, Lawrence Livermore National Security, LLC (LLNS) periodically submits a CBDPP to the National Nuclear Security Administration/Livermore Site Office (NNSA/LSO). The requirements of this plan are communicated to LLNS workers through ES&H Manual Document 14.4, 'Working Safely with Beryllium.' 10 CFR 850 is implemented by the LLNL CBDPP, which integrates the safety and health standards required by the regulation, components of the LLNL Integrated Safety Management System (ISMS), and incorporates other components of the LLNL ES&H Program. As described in the regulation, and to fully comply with the regulation, specific portions of existing programs and additional requirements are identified in the CBDPP. The CBDPP is implemented by documents that interface with the workers, principally through ES&H Manual Document 14.4. This document contains information on how the management practices prescribed by the LLNL ISMS are implemented, how beryllium hazards that are associated with LLNL work activities are controlled, and who is responsible for implementing the controls. Adherence to the requirements and processes described in the ES&H Manual ensures that ES

  16. SRNL ALL-PATHWAYS APPLICATION

    SciTech Connect

    Koffman, L; Elmer Wilhite, E; Leonard Collard, L

    2007-05-29

    The Environmental Analysis and Performance Modeling group of Savannah River National Laboratory (SRNL) performs performance assessments of the Savannah River Site (SRS) low-level waste facilities to meet the requirements of DOE Order 435.1. One of the performance objectives in the DOE Order is that the radiological dose to representative members of the public shall not exceed 25 mrem in a year total effective dose equivalent from all exposure pathways, excluding radon. Analysis to meet this performance objective is generally referred to as all-pathways analysis. SRNL performs detailed transient groundwater transport analysis for the waste disposal units, which has been used as input for the groundwater part of all-pathways analysis. The desire to better integrate all-pathways analysis with the groundwater transport analysis lead to the development of a software application named the SRNL All-Pathways Application. Another requirement of DOE Order 435.1 is to assess the impact of nuclear waste disposal on water resources, which SRS has interpreted for groundwater protection as meeting the EPA regulations for radionuclides in drinking water. EPA specifies four separate criteria as part of their implementation guidance for radionuclides, which are specified as maximum contaminant levels (MCL). (1) Beta/gamma emitters have a combined dose limit of 4 mrem/year. (2) Alpha emitters have a combined concentration limit of 15 pCi/L (called gross alpha), excluding uranium and radon, but including radium-226. (3) Combined radium-226 and radium-228 have a concentration limit of 5 pCi/L. (4) Isotopes of uranium have a combined concentration limit of 30 {micro}g/L. The All-Pathways Application was designed to be an easy-to-use software application that utilizes transient concentration results from groundwater transport analysis to (1) calculate the groundwater part of all-pathways dose and to (2) evaluate the four EPA criteria for groundwater protection.

  17. Alaska START Application

    Energy.gov [DOE]

    Download the application for the START Program for Community Energy Planning and Projects–Round Three.

  18. Radiant energy required for infrared neural stimulation

    SciTech Connect

    Tan, Xiaodong; Rajguru, Suhrud; Young, Hunter; Xia, Nan; Stock, Stuart R.; Xiao, Xianghui; Richter, Claus-Peter

    2015-08-25

    Infrared neural stimulation (INS) has been proposed as an alternative method to electrical stimulation because of its spatial selective stimulation. Independent of the mechanism for INS, to translate the method into a device it is important to determine the energy for stimulation required at the target structure. Custom-designed, flat and angle polished fibers, were used to deliver the photons. By rotating the angle polished fibers, the orientation of the radiation beam in the cochlea could be changed. INS-evoked compound action potentials and single unit responses in the central nucleus of the inferior colliculus (ICC) were recorded. X-ray computed tomography was used to determine the orientation of the optical fiber. Maximum responses were observed when the radiation beam was directed towards the spiral ganglion neurons (SGNs), whereas little responses were seen when the beam was directed towards the basilar membrane. The radiant exposure required at the SGNs to evoke compound action potentials (CAPs) or ICC responses was on average 18.9 ± 12.2 or 10.3 ± 4.9 mJ/cm2, respectively. For cochlear INS it has been debated whether the radiation directly stimulates the SGNs or evokes a photoacoustic effect. The results support the view that a direct interaction between neurons and radiation dominates the response to INS.

  19. Belle-II Experiment Network Requirements

    SciTech Connect

    Asner, David; Bell, Greg; Carlson, Tim; Cowley, David; Dart, Eli; Erwin, Brock; Godang, Romulus; Hara, Takanori; Johnson, Jerry; Johnson, Ron; Johnston, Bill; Dam, Kerstin Kleese-van; Kaneko, Toshiaki; Kubota, Yoshihiro; Kuhr, Thomas; McCoy, John; Miyake, Hideki; Monga, Inder; Nakamura, Motonori; Piilonen, Leo; Pordes, Ruth; Ray, Douglas; Russell, Richard; Schram, Malachi; Schroeder, Jim; Sevior, Martin; Singh, Surya; Suzuki, Soh; Sasaki, Takashi; Williams, Jim

    2013-05-28

    The Belle experiment, part of a broad-based search for new physics, is a collaboration of ~400 physicists from 55 institutions across four continents. The Belle detector is located at the KEKB accelerator in Tsukuba, Japan. The Belle detector was operated at the asymmetric electron-positron collider KEKB from 1999-2010. The detector accumulated more than 1 ab-1 of integrated luminosity, corresponding to more than 2 PB of data near 10 GeV center-of-mass energy. Recently, KEK has initiated a $400 million accelerator upgrade to be called SuperKEKB, designed to produce instantaneous and integrated luminosity two orders of magnitude greater than KEKB. The new international collaboration at SuperKEKB is called Belle II. The first data from Belle II/SuperKEKB is expected in 2015. In October 2012, senior members of the Belle-II collaboration gathered at PNNL to discuss the computing and neworking requirements of the Belle-II experiment with ESnet staff and other computing and networking experts. The day-and-a-half-long workshop characterized the instruments and facilities used in the experiment, the process of science for Belle-II, and the computing and networking equipment and configuration requirements to realize the full scientific potential of the collaboration's work.

  20. Radiant energy required for infrared neural stimulation

    DOE PAGES [OSTI]

    Tan, Xiaodong; Rajguru, Suhrud; Young, Hunter; Xia, Nan; Stock, Stuart R.; Xiao, Xianghui; Richter, Claus-Peter

    2015-08-25

    Infrared neural stimulation (INS) has been proposed as an alternative method to electrical stimulation because of its spatial selective stimulation. Independent of the mechanism for INS, to translate the method into a device it is important to determine the energy for stimulation required at the target structure. Custom-designed, flat and angle polished fibers, were used to deliver the photons. By rotating the angle polished fibers, the orientation of the radiation beam in the cochlea could be changed. INS-evoked compound action potentials and single unit responses in the central nucleus of the inferior colliculus (ICC) were recorded. X-ray computed tomography wasmore » used to determine the orientation of the optical fiber. Maximum responses were observed when the radiation beam was directed towards the spiral ganglion neurons (SGNs), whereas little responses were seen when the beam was directed towards the basilar membrane. The radiant exposure required at the SGNs to evoke compound action potentials (CAPs) or ICC responses was on average 18.9 ± 12.2 or 10.3 ± 4.9 mJ/cm2, respectively. For cochlear INS it has been debated whether the radiation directly stimulates the SGNs or evokes a photoacoustic effect. The results support the view that a direct interaction between neurons and radiation dominates the response to INS.« less

  1. Strategic forces: Future requirements and options

    SciTech Connect

    Speed, R.D.

    1990-11-01

    In the wake of the collapse of the Warsaw Pact and the apparent ending of the Cold War, there have been renewed calls for radical cuts in US strategic forces to levels far below the 10,000 or so warheads allowed each side under the current START proposal. Since it now appears that NATO for the first time will have the capability to defeat a Soviet conventional attack without the necessity of threatening to resort to nuclear weapons, this should pave the way for the rethinking of US strategy and the reduction of US strategic weapons requirements. In this new environment, it seems plausible that, with a modification of the Flexible Response doctrine to forego attempts to disarm the Soviet Union, deterrence could be maintained with 1500 or so survivable strategic weapons. With a new strategy that confined US strategic weapons to the role of deterring the use of nuclear weapons by other countries, a survivable force of about 500 weapons would seem sufficient. With this premise, the implications for the US strategic force structure are examined for two cases: a treaty that allows each side 3000 warheads and one that allows each side 1000 warheads. In Part 1 of this paper, the weapons requirements for deterrence are examined in light of recent changes in the geopolitical environment. In Part 2, it is assumed that the President and Congress have decided that deep cuts in strategic forces are acceptable. 128 refs., 12 figs., 12 tabs. (JF)

  2. Safeguard Requirements for Fusion Power Plants

    SciTech Connect

    Robert J. Goldston and Alexander Glaser

    2012-08-10

    Nuclear proliferation risks from magnetic fusion energy associated with access to fissile materials can be divided into three main categories: 1) clandestine production of fissile material in an undeclared facility, 2) covert production and diversion of such material in a declared and safeguarded facility, and 3) use of a declared facility in a breakout scenario, in which a state openly produces fissile material in violation of international agreements. The degree of risk in each of these categories is assessed, taking into account both state and non-state actors, and it is found that safeguards are required for fusion energy to be highly attractive from a non-proliferation standpoint. Specific safeguard requirements and R&D needs are outlined for each category of risk, and the technical capability of the ITER experiment, under construction, to contribute to this R&D is noted. A preliminary analysis indicates a potential legal pathway for fusion power systems to be brought under the Treaty for the Non-Proliferation of Nuclear Weapons. "Vertical" proliferation risks associated with tritium and with the knowledge that can be gained from inertial fusion energy R&D are outlined.

  3. Functional performance requirements for seismic network upgrade

    SciTech Connect

    Lee, R.C.

    1991-08-18

    The SRL seismic network, established in 1976, was developed to monitor site and regional seismic activity that may have any potential to impact the safety or reduce containment capability of existing and planned structures and systems at the SRS, report seismic activity that may be relevant to emergency preparedness, including rapid assessments of earthquake location and magnitude, and estimates of potential on-site and off-site damage to facilities and lifelines for mitigation measures. All of these tasks require SRL seismologists to provide rapid analysis of large amounts of seismic data. The current seismic network upgrade, the subject of this Functional Performance Requirements Document, is necessary to improve system reliability and resolution. The upgrade provides equipment for the analysis of the network seismic data and replacement of old out-dated equipment. The digital network upgrade is configured for field station and laboratory digital processing systems. The upgrade consists of the purchase and installation of seismic sensors,, data telemetry digital upgrades, a dedicated Seismic Data Processing (SDP) system (already in procurement stage), and a Seismic Signal Analysis (SSA) system. The field stations and telephone telemetry upgrades include equipment necessary for three remote station upgrades including seismic amplifiers, voltage controlled oscillators, pulse calibrators, weather protection (including lightning protection) systems, seismometers, seismic amplifiers, and miscellaneous other parts. The central receiving and recording station upgrades will include discriminators, helicopter amplifier, omega timing system, strong motion instruments, wide-band velocity sensors, and other miscellaneous equipment.

  4. Postdoc Application Process

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Program » Application Process Postdoc Application Process Point your career towards Los Alamos: work with the best minds on the planet in an inclusive environment that is rich in intellectual vitality and opportunities for growth. Submit general application or apply for specific posted position For initial consideration, you can submit a general application to the Postdoctoral Research program and/or for a specific posted position. Access the general application or view specific posted postdoc

  5. Science of Signatures Application

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of Signatures Advanced Studies Institute Application Form Do not use MAC Preview tool to edit this form as it corrupts the data. Application deadline is February 21, 2016 5:00 PM (US Mountain Standard) A complete application package includes: * This Application Form * Cover Letter - 1 page cover letter describing your describing your interest in participating as an Advanced Studies Scholar and of your professional goals. * CV (resume) * One (1) Letter of Recommendation from a Reference Applicant

  6. City of El Paso- Residential and Commercial Green Building Requirements

    Energy.gov [DOE]

    El Paso offers several incentives for projects meeting the Alternative Energy Conservation Code. First, all approved applicants receive expedited plan review. Second, approved applicants receive ...

  7. Requirements for status for volume fuel cell manufacturing |...

    Energy.gov [DOE] (indexed site)

    Backup Power Applications Direct Hydrogen PEMFC Manufacturing Cost Estimation for Automotive Applications: Fuel Cell Tech Team Review Fuel Cell Manufacturing: American Energy and ...

  8. City of Lancaster- Mandatory Solar Requirement for New Homes

    Energy.gov [DOE]

    PV is not required on all homes within a production subdivision, but the builder must meet the aggregate requirement within the subdivision. For example, one house with twice the required PV can ...

  9. National Bridge Inventory Record Data Submission Requirement | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy National Bridge Inventory Record Data Submission Requirement National Bridge Inventory Record Data Submission Requirement More Documents & Publications Information and Records Management Transition Guidance FY 2010 E-Government Act Report Requirements for Bridge Inspection

  10. Technical safety requirements control level verification

    SciTech Connect

    STEWART, J.L.

    1999-05-21

    A Technical Safety Requirement (TSR) control level verification process was developed for the Tank Waste Remediation System (TWRS) TSRs at the Hanford Site in Richland, WA, at the direction of the US. Department of Energy, Richland Operations Office (RL). The objective of the effort was to develop a process to ensure that the TWRS TSR controls are designated and managed at the appropriate levels as Safety Limits (SLs), Limiting Control Settings (LCSs), Limiting Conditions for Operation (LCOs), Administrative Controls (ACs), or Design Features. The TSR control level verification process was developed and implemented by a team of contractor personnel with the participation of Fluor Daniel Hanford, Inc. (FDH), the Project Hanford Management Contract (PHMC) integrating contractor, and RL representatives. The team was composed of individuals with the following experience base: nuclear safety analysis; licensing; nuclear industry and DOE-complex TSR preparation/review experience; tank farm operations; FDH policy and compliance; and RL-TWRS oversight. Each TSR control level designation was completed utilizing TSR control logic diagrams and TSR criteria checklists based on DOE Orders, Standards, Contractor TSR policy, and other guidance. The control logic diagrams and criteria checklists were reviewed and modified by team members during team meetings. The TSR control level verification process was used to systematically evaluate 12 LCOs, 22 AC programs, and approximately 100 program key elements identified in the TWRS TSR document. The verification of each TSR control required a team consensus. Based on the results of the process, refinements were identified and the TWRS TSRs were modified as appropriate. A final report documenting key assumptions and the control level designation for each TSR control was prepared and is maintained on file for future reference. The results of the process were used as a reference in the RL review of the final TWRS TSRs and control suite. RL

  11. Successful horizontal completions require an integrated approach

    SciTech Connect

    Richard, B.; Smejkal, K.; Penberthy, W. Jr.

    1997-01-01

    While a perfect well completion may not exist, depleting a hydrocarbon resource at a sustained high rate--without a workover--is the ultimate goal. Unfortunately, many horizontal well completions fail to achieve this due to wellbore damage or loss of reservoir pressure. These conditions manifest themselves in reduced production rates, extended well life and reduced profitability. Standard completion techniques are not always compatible with each other for site specific well applications. The combination of two incompatible technologies or slight changes in a completion procedure may negatively impact productivity. Hence, the most successful horizontal completion results are obtained using a compatible integrated system approach--an approach that carefully combines the best completion tools and processes to deliver an undamaged well completed at the lowest possible cost. After studying the compatibilities of various drill-in fluids, screens, filter cakes and gravel packs, recommended procedures are presented for successfully completing horizontal wells.

  12. Cost comparison of energy projects: discounted cash flow and revenue requirement methods

    SciTech Connect

    Phung, D.L.

    1980-05-01

    Both the discounted-cash-flow (DCF) and the revenue-requirement (RR) methods are frequently used in the cost analysis of energy projects. Each is uniquely needed in special circumstances, but in the early stages of most ventures, the RR method appears to be more useful. This paper provides simple formulations for the two methods and some special cases of interest to costing practices. Both formulations are applicable to either free or regulated enterprises and in constant or inflated dollars. It is stressed that the interpretation of cost results depends on the selection of cash-flow streams and/or the intent of revenue requirements. Several numerical examples are given.

  13. Audit Requirements for For-Profit Recipients | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Audit Requirements for For-Profit Recipients Audit Requirements for For-Profit Recipients In association with the Office of Risk management, we are issuing guidance implementing the requirements of 10 CFR 600.316 which contains audit requirements for for-profit recipients of financial assistance awards (prime awards) and sub-awards. PF2011-07 Audit Requirements for For-Profit Recipients (70.94 KB) More Documents & Publications Updated Reporting Requirement Checklists and Research Performance

  14. DOE Zero Energy Ready Home National Program Requirements (Rev. 04) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Home National Program Requirements (Rev. 04) DOE Zero Energy Ready Home National Program Requirements (Rev. 04) U.S. Department of Energy Zero Energy Ready Home National Program Requirements (Rev. 04) DOE Zero Energy Ready Home National Program Requirements Rev04.pdf (291.11 KB) More Documents & Publications DOE Zero Energy Ready Home National Program Requirements (Rev. 05) California DOE ZERH Program Requiremets DOE Challenge Home, California Program Requirement

  15. DOE Challenge Home, California Program Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Challenge Home, California Program Requirements DOE Challenge Home, California Program Requirements DOE Challenge Home, California Program Requirements, as posted on the U.S. Department of Energy's DOE Challenge Home website. ch_california_requirements2013.pdf (296.75 KB) More Documents & Publications Washington DOE ZERH Program Requirements DOE Zero Energy Ready Home National Program Requirements (Rev. 04) California DOE ZERH Program Requiremets

  16. Communications Requirements of Smart Grid Technologies | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Communications Requirements of Smart Grid Technologies Communications Requirements of Smart Grid Technologies This report sets forth the findings of the U.S. Department of Energy (DOE) on the communications requirements of electric utilities and proposes specific recommendations for next steps to support these requirements. In order to analyze these requirements properly, this report will review the projected requirements of various components of the Smart Grid. The template used in

  17. KENT_NERSC_BES_Requirements_20131008.ppt

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    m 526: C omputa0onal R esources f or t he Nanomaterials T heory I ns0tute a t t he Center f or Nanophase M aterials S ciences Paul R . C . K ent CNMS, O RNL NERSC BES Requirements for 2017 October 8-9, 2013 Gaithersburg, MD 1. P roject D escrip0on P I, C o---PIs: K ent ( PI)+CNMS N TI S taff ( Co---PIs) * Predic0ve c alcula0ons i nto t he b ehavior & p roper0es of nanosystems: g raphene, c atalysts, m olecular electronics, nanomaterials s ynthesis... * Supports C NMS u ser p rojects a s w

  18. Specification of advanced safety modeling requirements (Rev. 0).

    SciTech Connect

    Fanning, T. H.; Tautges, T. J.

    2008-06-30

    The U.S. Department of Energy's Global Nuclear Energy Partnership has lead to renewed interest in liquid-metal-cooled fast reactors for the purpose of closing the nuclear fuel cycle and making more efficient use of future repository capacity. However, the U.S. has not designed or constructed a fast reactor in nearly 30 years. Accurate, high-fidelity, whole-plant dynamics safety simulations will play a crucial role by providing confidence that component and system designs will satisfy established design limits and safety margins under a wide variety of operational, design basis, and beyond design basis transient conditions. Current modeling capabilities for fast reactor safety analyses have resulted from several hundred person-years of code development effort supported by experimental validation. The broad spectrum of mechanistic and phenomenological models that have been developed represent an enormous amount of institutional knowledge that needs to be maintained. Complicating this, the existing code architectures for safety modeling evolved from programming practices of the 1970s. This has lead to monolithic applications with interdependent data models which require significant knowledge of the complexities of the entire code in order for each component to be maintained. In order to develop an advanced fast reactor safety modeling capability, the limitations of the existing code architecture must be overcome while preserving the capabilities that already exist. To accomplish this, a set of advanced safety modeling requirements is defined, based on modern programming practices, that focuses on modular development within a flexible coupling framework. An approach for integrating the existing capabilities of the SAS4A/SASSYS-1 fast reactor safety analysis code into the SHARP framework is provided in order to preserve existing capabilities while providing a smooth transition to advanced modeling capabilities. In doing this, the advanced fast reactor safety models will

  19. WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Trucks and Heavy-Duty Vehicles Technical Requirements and Gaps for Lightweight and Propulsion Materials WORKSHOP REPORT: Trucks and Heavy-Duty Vehicles Technical Requirements and ...

  20. City of San Jose - Photovoltaic Permit Requirements | Department...

    Energy.gov [DOE] (indexed site)

    panels is required when applying for a building permit. Electrical Plan Review for photovoltaic systems is required for all multi-family, commercial and industrial installations....

  1. DOE RFI 2010-11129 NBP RFI: Communications Requirements Titled...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Plan by Studying the Communications Requirements of Electric Utilities to Inform Federal Smart Grid Policy Silver Spring Networks comments on DOE NBP RFI: Comms Requirements

  2. Audit Services Requirements Discussed In Guide Chapter 42.101...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services Requirements Discussed In Guide Chapter 42.101- By Contract Types (Contract types ... contracts) See the audit services requirements above for fixed-price ...

  3. Policy Flash 2013-49 Updating Reporting Requirement Checklist...

    Energy Saver

    Policy Flash 2013-49 Updating Reporting Requirement Checklist including the research performance progress report Policy Flash 2013-49 Updating Reporting Requirement Checklist...

  4. POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS...

    Energy Saver

    POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING...

  5. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Energy Saver

    Legal Management Requirements.pdf More Documents & Publications POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS...

  6. Structural Requirements and Reaction Pathways in Dimethyl Ether...

    Office of Scientific and Technical Information (OSTI)

    saturated with chemisorbed oxygen are required for DME chemisorption. DFT calculations show that although these surface vacancies are required, higher oxygen coverages lead to ...

  7. BER Science Network Requirements (Technical Report) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: BER Science Network Requirements Citation Details In-Document Search Title: BER Science Network Requirements The Energy Sciences Network (ESnet) is the primary ...

  8. DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS DOE CYBER SECURITY EBK: MINIMUM CORE COMPETENCY TRAINING REQUIREMENTS puzzle-693870960720.jpg DOE CYBER SECURITY ...

  9. Long-Term Surveillance and Maintenance Requirements for Remediated...

    Energy Saver

    Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term Surveillance and Maintenance Requirements for Remediated FUSRAP Sites Long-Term ...

  10. Requirements-Based Surveillance and Maintenance Review Guide...

    Office of Environmental Management (EM)

    Requirements-Based Surveillance and Maintenance Review Guide Requirements-Based Surveillance and Maintenance Review Guide Use of the Guidance Manual This manual was developed to ...

  11. Quality Work Plan Training Requirement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Training Requirement Quality Work Plan Training Requirement Graphic of a certification seal. The Weatherization Assistance Program's (WAP) comprehensive Quality Work Plan ...

  12. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Questions concerning this policy...

  13. Infrastructure Requirements for an Expanded Fuel Ethanol Industry

    SciTech Connect

    Reynolds, Robert E.

    2002-01-15

    This report provides technical information specifically related to ethanol transportation, distribution, and marketing issues. This report required analysis of the infrastructure requirements for an expanded ethanol industry.

  14. FY09_Federal_Real_Property_Reporting_Requirements.pdf | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    yReportingRequirements.pdf More Documents & Publications 2013 guidance fo real Property Inventory Reporting FY 2012 Federal Real Property Reporting Requirement Guidance for...

  15. Requirements-Driven Diesel Catalyzed Particulate Trap Design...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Requirements-Driven Diesel Catalyzed Particulate Trap Design and Optimization Requirements-Driven Diesel Catalyzed Particulate Trap Design and Optimization 2005 Diesel Engine ...

  16. SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015 DOCKETS SEMI-ANNUAL REPORTING REQUIREMENTS (LNG EXPORTERS) 2010-2015 DOCKETS Companies with authorizations to export ...

  17. States with NEPA-like Environmental Planning Requirements

    Office of Energy Efficiency and Renewable Energy (EERE)

    Several states have environmental planning requirements that are similar to NEPA. These requirements are either State laws, regulations, or executive orders. Please click below for additional...

  18. Fuel Requirements for HCCI Engine Operation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Requirements for HCCI Engine Operation Fuel Requirements for HCCI Engine Operation 2002 DEER Conference Presentation: Southwest Research Institute PDF icon 2002deerryan.pdf More ...

  19. Large Scale Production Computing and Storage Requirements for...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Large Scale Production Computing and Storage Requirements for Fusion Energy Sciences: Target 2017 The NERSC Program Requirements Review "Large Scale Production Computing and ...

  20. Large Scale Computing and Storage Requirements for Advanced Scientific...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Large Scale Computing and Storage Requirements for Advanced Scientific Computing Research: Target 2014 ASCRFrontcover.png Large Scale Computing and Storage Requirements for ...