National Library of Energy BETA

Sample records for grand forks north

  1. Grand Forks County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Dakota. Its FIPS County Code is 035. It is classified as ASHRAE 169-2006 Climate Zone Number 7 Climate Zone Subtype A. Registered Energy Companies in Grand Forks County, North...

  2. Storm-water characterization and lagoon sediment analysis, Grand Forks Air Force Base, North Dakota. Final report

    SciTech Connect (OSTI)

    Garland, J.G.; Vaughn, R.W.; Scott, P.T.

    1990-08-01

    Sampling was conducted in the wastewater treatment lagoons and stormwater runoff at Grand Forks AFB. The base was concerned about whether the unlined lagoons were creating a potential groundwater contamination problem and whether their stormwater runoff met North Dakota state stream standards. Lagoon sediment did not contain Extraction Procedure hazardous chemicals. Stormwater runoff exceeded state standards for boron, phosphates, and phenols and contained trace levels of methylene chloride. Characterization of lagoon influent showed it to be generally representative of domestic sewage, but also contained trace levels of boron, phenols, toluene, cyanide, chloroform, methylene chloride and ethyl benzene.

  3. Longwall mining thrives in Colorado's North Fork Valley

    SciTech Connect (OSTI)

    Buchsbaum, L.

    2006-08-15

    With mining units poised for record-setting capacity and rail service restored, these mines in Colorado's North Fork valley are ready to cut coal. 4 photos.

  4. Rio Grande North | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    search Name Rio Grande North Facility Rio Grande North Sector Wind energy Facility Type Offshore Wind Facility Status Proposed Owner Baryonyx Corporation Developer Baryonyx...

  5. Grande

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke...

  6. Grande

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    breaks ground on key sediment control project November 5, 2009 Structures will limit flow of sediments toward Rio Grande Los Alamos, New Mexico, November 5, 2009- Crews broke ground this week on one of two engineered structures in a Los Alamos National Laboratory environmental project to reduce the flow of sediments down two canyons toward the Rio Grande. Called "grade-control" structures, the approximately $2 million features are up to eight feet high and made of rocks packed tightly

  7. Confederated Tribes of the Umatilla Indian Reservation North Fork John Day River Basin Anadromous Fish Enhancement Project, Annual Report for FY 2001.

    SciTech Connect (OSTI)

    Macy, Tom L.; James, Gary A.

    2003-03-01

    The CTUIR North Fork John Day River Basin Anadromous Enhancement Project (NFJDAFEP) identified and prioritized stream reaches in The North Fork John day River basin for habitat improvements during the 2000 project period. Public outreach was emphasized during this first year of the project. During the past year we concentrated on satisfying landowner needs, providing cost share alternatives, providing joint projects and starting implementation. We presented multiple funding and enhancement options to landowners. We concentrated on natural recovery methods, riparian fencing and offstream livestock water developments. Under this BPA contract four riparian easements have been signed protecting almost 5 miles of tributary streams. There are nine offstream water developments associated with these easements. Some landowners chose to participate in other programs based on Tribal outreach efforts. Some landowners chose NRCS programs for enhancement and others chose OWEB as a funding source. The exact amount of stream protection due to other funding sources probably exceeds that by BPA, however most would not have entered any program without initial Tribal outreach. Cooperation between the NRCS/FSA/SWCDs and the Tribe to create joint projects and develop alternative funding scenarios for riparian enhancement was a major effort. The Tribe also worked with the North Fork John Day Watershed Council, USFS and ODFW to coordinate projects and support similar projects throughout the John Day Basin.

  8. Confederated Tribes of the Umatilla Indian Reservation North Fork John Day River Basin Anadromous Fish Enhancement Project, Annual Report for FY 2000.

    SciTech Connect (OSTI)

    Macy, Tom L.; James, Gary A.

    2003-03-01

    The CTUIR North Fork John Day River Basin Anadromous Enhancement Project (NFJDAFEP) identified and prioritized stream reaches in The North Fork John day River basin for habitat improvements during the 2000 project period. Public out reach was emphasized during this first year of the project. We presented multiple funding and enhancement options to landowners. We concentrated on natural recovery methods, riparian fencing and off-stream livestock water developments. Under this BPA contract four riparian easements were signed protecting almost 5 miles of tributary streams. There are nine offstream water developments associated with these easements. Some landowners chose to participate in other programs based on Tribal outreach efforts. Two landowners chose NRCS programs for enhancement and one chose OWEB as a funding source. Two landowners implemented there own enhancement measures protecting 3 miles of stream. Cooperation between the NRCS/FSA/SWCDs and the Tribe to create joint projects and develop alternative funding scenarios for riparian enhancement was a major effort. The Tribe also worked with the North Fork John Day Watershed Council, USFS and ODFW to coordinate projects and support similar projects throughout the John Day Basin. We provided input to the John Day Summary prepared for the NWPPC by ODFW. The Tribe worked with the Umatilla National Forest on the Clear Creek Dredgetailings Rehabilitation project and coordinated regularly with USFS Fisheries, Hydrology and Range staff.

  9. Rio Grande County, Colorado: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    B. Places in Rio Grande County, Colorado Center, Colorado Del Norte, Colorado Monte Vista, Colorado South Fork, Colorado Retrieved from "http:en.openei.orgw...

  10. Spanish Fork Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Fork Wind Farm Jump to: navigation, search Name Spanish Fork Wind Farm Facility Spanish Fork Wind Farm Sector Wind energy Facility Type Commercial Scale Wind Facility Status In...

  11. Monitoring Fine Sediment; Grande Ronde and John Day Rivers, 2000 Annual Report.

    SciTech Connect (OSTI)

    Rhodes, Jonathan J.; Greene, M. Jonas; Purser, Michael D.

    2001-01-01

    Fine sediment in spawning substrate has a major effect on salmon survival from egg to smolt. Basin-wide restoration plans have established targets for fine sediment levels in spawning habitat. The project was initiated to monitor surface fine sediment levels and overwinter intrusion of fine sediment in spring chinook salmon spawning habitat in the North Fork John Day (NFJDR) and Grande Ronde Rivers, for five years. The project is also investigating the potential relationship between surface fine levels and overwinter sedimentation. It will provide data to assess trends in substrate conditions in monitored reaches and whether trends are consistent with efforts to improve salmon habitat conditions. The data on the magnitude of overwinter sedimentation will also be used to estimate salmon survival from egg to emergence. In Sept. 1998, 1999, and Aug. 2000, sites for monitoring overwinter sedimentation were established in salmon spawning habitat in the upper Grande Ronde River, Catherine Creek (a Grande Ronde tributary), the North Fork John Day River (NFJDR), and Granite Creek (a NFJDR tributary). Surface fine sediment levels were measured in these reaches via the grid method and visually estimated to test the relative accuracy of these two methods. In 1999 and 2000, surface fine sediment was also estimated via pebble counts at selected reaches to allow comparison of results among the methods. Overwintering substrate samples were collected in April 1999 and April-May 2000 to estimate the amount of overwinter sedimentation in clean gravels in spawning habitat. Monitoring methods and locations are described.

  12. Rio Grande

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its...

  13. Grand Challenges

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal...

  14. Design of a new portable fork detector for research reactor spent fuel

    SciTech Connect (OSTI)

    Hsue, S.T.; Menlove, H.O.; Rinard, P.M.

    1995-02-01

    There are many situations in nonproliferation and international safeguards when one needs to verify spent research-reactor fuel. Special inspections, a reactor coming under safeguards for the first time, and failed surveillance are prime examples. Several years ago, Los Alamos developed the FORK detector for the IAEA and EURATOM. This detector, together with the GRAND electronics package, is used routinely by inspectors to verify light-water-reactor spent fuels. Both the FORK detector and the GRAND electronics technologies have been transferred and are now commercially available. Recent incidents in the world indicate that research-reactor fuel is potentially a greater concern for proliferation than light-water-reactor fuels. A device similar to the FORK/GRAND should be developed to verify research-reactor spent fuels because the signals from light-water-reactor spent fuel are quite different than those from research-reactor fuels.

  15. East Fork Biodiesel LLC | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Fork Biodiesel LLC Jump to: navigation, search Name: East Fork Biodiesel, LLC Place: Algona, Iowa Sector: Renewable Energy Product: Biodiesel producer and co-developer, with...

  16. Rio Grande

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Rio Grande Rio Grande In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, 2013 river bank Banks of the Rio Grande Groundwater at LANL discharges to springs along the Rio Grande. Stream flow resulting from heavy storms and snowmelt also has the potential to reach the Rio Grande. RELATED IMAGES http://farm3.staticflickr.com/2818/9628464665_3a972e1387_t.jpg Enlarge

  17. Rio Grande

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    In New Mexico, the Rio Grande flows from one sediment-filled basin to another, cutting canyons between the basins and supporting a fragile ecosystem on its flood plain. August 1, ...

  18. Grand Challenges

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Grand Challenges Grand Challenges Our goals to live a sustainable future LANL stakeholders TA-21 cleanup activities water on LANL land Collaborate with our stakeholders and tribal governments to ensure that LANL's impact on the environment is as low as reasonably achievable Remove or stabilize pollutants from the Manhattan Project and Cold War eras Protect water resource quality and reduce water use Stormwater drainage at LANL LANL land waste workers at LANL Eliminate industrial emissions,

  19. Spanish Fork City Corporation (Utility Company) | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Spanish Fork City Corporation (Utility Company) Jump to: navigation, search Name: Spanish Fork City Corporation Place: Utah Phone Number: 801-804-4450 Website: www.spanishfork.org...

  20. Lower East Fork Poplar Creek | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    East Fork Poplar Creek Lower East Fork Poplar Creek This document discusses the Lower East Fork Poplar Creek. Topics include: * The area's safety * Any use limitations for the area * History and cleanup background for this area * How DOE's cleanup program addressed the problem Lower East Fork Poplar Creek fact sheet (837.15 KB) More Documents & Publications Upper East Fork Poplar Creek Lower Watts Bar Reservoir Clinch River/Poplar Creek Mercury Treatment Facility overview

  1. Upper East Fork Poplar Creek | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Upper East Fork Poplar Creek Upper East Fork Poplar Creek This document discusses the Upper East Fork Poplar Creek. Topics include: * The area's safety * Any use limitations for the area * History and cleanup background for this area * How DOE's cleanup program addressed the problem Upper East Fork Poplar Creek Watershed fact sheet (823.74 KB) More Documents & Publications Lower East Fork Poplar Creek Mercury Treatment Facility overview Recommendation 229: Recommendation on the Preferred

  2. PP-53 Rio Grande Electric Cooperative, Inc. | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. Presidential Permit authorizing Rio Grande Electric Cooperative, Inc.to construct, operate, and maintain electric transmission facilities at the U.S. - Mexico Border. PP-53 Rio Grande Electric Cooperative, Inc. (1.09 MB) More Documents & Publications PP-55 Roseau Electric Cooperative, Inc. PP-42 Roseau Electric Cooperative, Inc. PP-67 North Central Electric Cooperative, Inc.

  3. Ash Fork, Arizona: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Ash Fork, Arizona: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2250114, -112.4840675 Show Map Loading map... "minzoom":false,"mappingser...

  4. Roaring Fork Valley- Energy Smart Colorado Renewable Energy Rebate Program

    Energy.gov [DOE]

    Residents of Roaring Fork Valley and Eagle, Gunnison, Lake, and Summit Counties are eligible for energy efficiency and renewable energy assistance, rebates, and financing through the Energy Smart...

  5. Roaring Fork Valley- Energy Smart Colorado Energy Efficiency Rebate Program

    Energy.gov [DOE]

    Residents of Roaring Fork Valley and Eagle, Gunnison, Lake, and Summit Counties are eligible for energy efficiency and renewable energy assistance, rebates, and financing through the Energy Smart...

  6. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  7. GRAND CHALLENGE PROBLEMS

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    GRAND CHALLENGE PROBLEMS Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or to

  8. Chemical and biological sensing using tuning forks

    DOE Patents [OSTI]

    Tao, Nongjian; Boussaad, Salah

    2012-07-10

    A device for sensing a chemical analyte is disclosed. The device is comprised of a vibrating structure having first and second surfaces and having an associated resonant frequency and a wire coupled between the first and second surfaces of the vibrating structure, wherein the analyte interacts with the wire and causes a change in the resonant frequency of the vibrating structure. The vibrating structure can include a tuning fork. The vibrating structure can be comprised of quartz. The wire can be comprised of polymer. A plurality of vibrating structures are arranged in an array to increase confidence by promoting a redundancy of measurement or to detect a plurality of chemical analytes. A method of making a device for sensing a chemical analyte is also disclosed.

  9. Cherry Fork, Ohio: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    article is a stub. You can help OpenEI by expanding it. Cherry Fork is a village in Adams County, Ohio. It falls under Ohio's 2nd congressional district.12 References ...

  10. Coal Fork, West Virginia: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Coal Fork is a census-designated place in Kanawha County, West Virginia.1 References ...

  11. American Fork, Utah: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. American Fork is a city in Utah County, Utah. It falls under Utah's 2nd congressional...

  12. Spanish Fork, Utah: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Spanish Fork is a city in Utah County, Utah. It falls under Utah's 3rd congressional...

  13. Mountain View Grand | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Mountain View Grand Jump to: navigation, search Name Mountain View Grand Facility Mountain View Grand Sector Wind energy Facility Type Small Scale Wind Facility Status In Service...

  14. DOE - Office of Legacy Management -- Grand Junction Sites

    Office of Legacy Management (LM)

    Grand Junction Sites Grand Junction Sites gj_map Grand Junction Disposal Site Grand Junction Processing Site Grand Junction Site Contact Us

  15. Christopher Kinchin | Bioenergy | NREL

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Prior to joining NREL, Kinchin worked on biomass gasification and solid oxide fuel cell research at the Energy and Environmental Research Center in Grand Forks, North Dakota. ...

  16. EERC Center for Biomass Utilization | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Center for Biomass Utilization Jump to: navigation, search Name: EERC Center for Biomass Utilization Place: Grand Forks, North Dakota Sector: Biofuels, Biomass Product: The mission...

  17. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    of ND Grand Forks, ND Barr Engineering: Hibbing, MN FETDICCoalETP Charles Miller Investigation of Rare Earth Element Extraction from North Dakota Coal-Related... This...

  18. CX-001473: Categorical Exclusion Determination

    Energy.gov [DOE]

    Direct Coal Liquefaction Process Development Date: 04/02/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  19. EERC National Center for Hydrogen Technology | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    National Center for Hydrogen Technology Jump to: navigation, search Name: EERC National Center for Hydrogen Technology Place: Grand Forks, North Dakota Zip: 58203 Sector: Hydro,...

  20. Monitoring Fine Sediment; Grande Ronde and John Day Rivers, 1999 Annual Report.

    SciTech Connect (OSTI)

    Rhodes, Jonathan J.; Greene, M. Jonas; Purser, Michael D.

    2000-01-01

    This project was initiated to monitor surface fine sediment levels and overwinter intrusion of fine sediment in spring chinook salmon spawning habitat in the North Folk John Day and Grande Ronde Rivers, for five years.

  1. EIS-0184: South Fork Tolt River Hydroelectric Project

    Energy.gov [DOE]

    This EIS analyzes the Seattle City Light, a Department of the City of Seattle proposal to construct a hydroelectric project with an installed capacity of 15 MW on the South Fork Tolt River near the town of Carnation located in King County in the State of Washington.

  2. 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist Team

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Submissions | Department of Energy Race to Zero Competition Grand Winner and Grand Winner Finalist Team Submissions 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist Team Submissions Read the team submissions for the Grand Winner and Grand Winner Finalist teams from the 2015 Race to Zero Student Design Competition below. Learn more about the results of the 2015 competition. Grand Winner: Opti-MN, University of Minnesota (38.54 MB) Grand Winner Finalist: Team App,

  3. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January ...

  4. Nuclear Proliferation and Grand Challenges

    SciTech Connect (OSTI)

    McCarthy, Kathy

    2009-01-01

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  5. Nuclear Proliferation and Grand Challenges

    ScienceCinema (OSTI)

    McCarthy, Kathy

    2013-05-28

    Nuclear engineer Dr. Kathy McCarthy leads systems analysis. She talks about proliferation and the grand challenges of nuclear R&D. For more information about INL energy research, visit http://www.facebook.com/idahonationallaboratory.

  6. Clark Fork River Delta Restoration Project 1 Finding of No Significant...

    Energy.gov (indexed) [DOE]

    findings for its proposal to provide partial funding to the Idaho Department of Fish and Game's (IDFG) Clark Fork River Delta Restoration Project. The project would involve...

  7. Partnership connects North America NGL markets

    SciTech Connect (OSTI)

    Bodenhamer, K.

    1998-12-31

    The United States and Canadian NGL/LPG pipeline network became a larger North America system on April 2, 1997 with the opening of the Rio Grande Pipeline, delivering LPG from the United States to Mexico. This North American pipeline system now links three of the world`s largest LPG producing and consuming nations.

  8. SU(6) grand unified model

    SciTech Connect (OSTI)

    Dong, J.X.

    1986-03-14

    A model of grand unified theory based on SU(6) gauge group is proposed. It can accommodate two generations of ordinary fermions with V-A weak coupling and two generations of weird fermions with V+A weak coupling. In this model, a new discrete symmetry is introduced that insures existence of fermions with lower masses when SU(6) gauge symmetry is spontaneously broken. Simple Higgs fields with appropriate vacuum expectation values are chosen, so that the masses of weird fermions are heavier than those of ordinary fermions. This model also gives the same value of Weinberg angle, sin sq of Theta/sub w/ = 3/8, as in the usual SU(5) grand unified model at the grand unified scale.

  9. EA-33 Rio Grande Electric | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rio Grande Electric EA-33 Rio Grande Electric Order authorizing Rio Grande Electric to export electric energy to Mexico EA-33 Rio Grande Electric (555.17 KB) More Documents & Publications EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc PP-53 Rio Grande

  10. Plains CO2 Reduction Partnership PCOR | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Grand Forks, North Dakota Zip: 58202-9018 Product: North Dakota-based consortium researching CO2 storage options. PCOR is busy with the ECBM in the Unminable Lignite Research...

  11. DOE Grand Junction Projects Office Edgemont LTSP

    Office of Legacy Management (LM)

    DOE Grand Junction Projects Office Edgemont LTSP June 1996 Page ii Contents Page 1.0 Introduction ......

  12. CX-007108: Categorical Exclusion Determination

    Energy.gov [DOE]

    Energy-Saving Opportunities in Water Treatment and DistributionCX(s) Applied: B3.6Date: 10/12/2011Location(s): Grand Forks, Grand Forks County, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  13. EA-0956: South Fork Snake River/Palisades Wildlife Mitigation Project, Bonneville County, Idaho

    Energy.gov [DOE]

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Bonneville Power Administration proposal to fund the implementation of the South Fork Snake River Programmatic...

  14. EIS-0353: South Fork Flathead Watershed/Westlope Cutthroat Trout Conservation Project, Montana

    Energy.gov [DOE]

    In cooperation with Montana, Fish, Wildlife, and Parks, Bonneville Power Administration is proposing to implement a conservation program to preserve the genetic purity of the westslope cutthroat trout populations in the South Fork of the Flathead River drainage.

  15. EA-1969: Clark Fork River Delta Restoration Project, Bonner County, Idaho

    Energy.gov [DOE]

    Bonneville Power Administration prepared an environmental assessment to analyze the potential effects of a proposal to restore wetland and riparian (riverbank) habitat and to reduce erosion in the Clark Fork River delta located in Bonner County, Idaho.

  16. American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam

    SciTech Connect (OSTI)

    Fischer, Steve; Wilson, Matthew

    2013-09-30

    The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage since the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.

  17. Mississippi Nuclear Profile - Grand Gulf

    U.S. Energy Information Administration (EIA) (indexed site)

    Grand Gulf" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,"1,251","9,643",88.0,"BWR","application/vnd.ms-excel","application/vnd.ms-excel" ,"1,251","9,643",88.0 "Data for 2010" "BWR = Boiling Water Reactor."

  18. Destilaria Rio Grande | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    to: navigation, search Name: Destilaria Rio Grande Place: Fronteira, Minas Gerais, Brazil Zip: 38230-000 Product: Brazil based ethanol producer. References: Destilaria Rio...

  19. Usina Serra Grande | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    navigation, search Name: Usina Serra Grande Place: Maceio, Alagoas, Brazil Product: Ethanol producer Coordinates: -9.666479, -35.734954 Show Map Loading map......

  20. EV Everywhere Grand Challenge - Charging Infrastructure Enabling...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing Workshop Report Out & Lessons Learned EV Everywhere Grand ...

  1. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 9 PDF icon grandchallengesportfoliopg9.pdf More Documents & Publications ...

  2. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 8 PDF icon grandchallengesportfoliopg8.pdf More Documents & Publications ...

  3. Grand Challenge Portfolio: Driving Innovations in Industrial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 Grand Challenge Portfolio: Driving Innovations in Industrial Energy Efficiency, January 2011 - pg 6 PDF icon grandchallengesportfoliopg6.pdf More Documents & Publications ...

  4. Grand River Dam Authority | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    River Dam Authority Place: Oklahoma Phone Number: 918-256-5545 Website: www.grda.com Twitter: @okgrda Facebook: https:www.facebook.compagesGrand-River-Dam-Authority...

  5. PP-33 Rio Grande Electric Cooperative Inc

    Energy.gov [DOE]

    Presidential permit authorizing Grande Electric Cooperative Inc to construct, operate, and maintain electric transmission facilities at the U.S-Mexico border.

  6. EV Everywhere Grand Challenge - Battery Workshop Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ...2012 EV Everywhere Grand Challenge -- Battery Workshop Thursday, July 26, 2012 - ... Technologies Program 9:25-9:50 AM EV BATTERY TECHNOLOGY-CURRENT STATUS & COST ...

  7. EV Everywhere Grand Challenge Overview Presentation

    Energy.gov [DOE]

    Presentation by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI

  8. Grand Junction Office Founder Honored at the

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House The U.S. Department of Energy (DOE) Offce of Legacy Management (LM) held an open house and park dedication at the Grand Junction, Colorado, Offce to commemorate its place in the Manhattan Project and Cold War histories. The park, located in the middle of the Grand Junction Offce campus, was dedicated to Army Major (retired) Philip C. Leahy. Leahy came to Grand Junction in 1943 under secret

  9. 2015 Race to Zero Competition Grand Winner and Grand Winner Finalist...

    Energy.gov (indexed) [DOE]

    Learn more about the results of the 2015 competition. PDF icon Grand Winner: Opti-MN, University of Minnesota PDF icon Grand Winner Finalist: Team App, Appalachian State University ...

  10. Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A123 Systems Battery Plant | Department of Energy to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the

  11. Restoring The Azimuthal Symmetry Of Charged Particle Lateral Density In The Range Of KASCADE-Grande

    SciTech Connect (OSTI)

    Sima, O.; Rebel, H.; Apel, W. D.; Bekk, K.; Bozdog, H.; Daumiller, K.; Doll, P.; Engel, R.; Engler, J.; Finger, M.; Gils, H. J.; Haungs, A.; Heck, D.; Huege, T.; Isar, P. G.; Klages, H. O.; Mathes, H. J.; Mayer, H. J.; Milke, J.; Nehls, S.

    2010-11-24

    KASCADE-Grande, an extension of the former KASCADE experiment, is a multi-component Extensive Air Shower (EAS) experiment located in Karlsruhe Institute of Technology (Campus North), Germany. An important observable for analyzing the EAS is the lateral density of charged particles in the intrinsic shower plane. This observable is deduced from the basic information provided by the Grande scintillators - the energy deposit - first in the observation plane, by using a Lateral Energy Correction Function (LECF), then in the intrinsic shower plane, by applying an adequate mapping procedure. In both steps azimuthal.

  12. Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A123 Systems Battery Plant | Department of Energy to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant September 10, 2010 - 12:00am Addthis Washington D.C. - This Monday, U.S. Energy Secretary Steven Chu will speak at the dedication ceremony for the largest lithium-ion automotive battery production facility in North America. Funded in part by $249 million from the

  13. City of Grand Marais, Minnesota (Utility Company) | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Grand Marais Place: Minnesota Phone Number: (218) 387-3030 or (218)387-1848 Website: www.ci.grand-marais.mn.usinde Facebook: https:www.facebook.comGrandMaraisMN Outage Hotline:...

  14. 2014 Race to Zero Student Design Competition: Grand Winner Teams...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of ...

  15. EV Everywhere Grand Challenge Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2_danielson_caci.pdf (299.97 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Overview EV Everywhere Battery Workshop: Setting the Stage for the EV Everywhere Grand Challenge

  16. Rio Grande, TX Natural Gas Pipeline Exports to Mexico (Million...

    U.S. Energy Information Administration (EIA) (indexed site)

    Grande, TX Natural Gas Pipeline Exports to Mexico (Million Cubic Feet) Rio Grande, TX ... 05312016 Referring Pages: U.S. Natural Gas Pipeline Exports by Point of Exit Rio Grande

  17. Agropecuaria e Industrial Serra Grande | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    e Industrial Serra Grande Jump to: navigation, search Name: Agropecuaria e Industrial Serra Grande Place: So Raimundo das Mangabeiras, Maranhao, Brazil Product: Privately owned...

  18. Defining the Mechanisms of Friction: A Grand Challenge in Interfacial...

    Office of Scientific and Technical Information (OSTI)

    Defining the Mechanisms of Friction: A Grand Challenge in Interfacial Mechanics. Citation Details In-Document Search Title: Defining the Mechanisms of Friction: A Grand Challenge...

  19. East Grand St Bridge Snowmelt Low Temperature Geothermal Facility...

    Open Energy Information (Open El) [EERE & EIA]

    East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Jump to: navigation, search Name East Grand St Bridge Snowmelt Low Temperature Geothermal Facility Facility East...

  20. Rio Grande Rift Geothermal Region | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Region Data Acquisition-Manipulation At Rio Grande Rift Region (Morgan, Et Al., 2010) Ground Gravity Survey At Rio Grande Rift Region (Aiken & Ander, 1981) Magnetotellurics At...

  1. Preservationists Tour Historic Log Cabin at the Grand Junction...

    Office of Environmental Management (EM)

    Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office April 19, 2016 - ...

  2. Grand Junction Office Founder Honored at the Philip C. Leahy...

    Office of Environmental Management (EM)

    Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park ...

  3. Students from Grand Junction High School Triumph in Colorado...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Grand Junction High School Triumph in Colorado Science Bowl For more information contact: e:mail: Public Affairs Golden, Colo., Feb. 12, 2000 - Students from Grand Junction High ...

  4. EV Everywhere EV Everywhere Grand Challenge - Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power ...

  5. CX-000453: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Efficient Regeneration of Physical and Chemical Solvents for Carbon Dioxide CaptureCX(s) Applied: B3.6Date: 12/07/2009Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  6. CX-003393: Categorical Exclusion Determination

    Energy.gov [DOE]

    Updating the Improved Guidelines for Solving Ash Deposition Problems in Utility Boilers ReportCX(s) Applied: A9Date: 08/11/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  7. CX-001451: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Fate and Control of Mercury and Trace ElementsCX(s) Applied: B3.6Date: 03/31/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  8. CX-006131: Categorical Exclusion Determination

    Energy.gov [DOE]

    Bench and Pilot-Scale Evaluation of Processing ConditionsCX(s) Applied: B3.6Date: 06/21/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  9. CX-005588: Categorical Exclusion Determination

    Energy.gov [DOE]

    Investigation of Improved Conductivity and Proppant Applications in the Bakken FormationCX(s) Applied: B3.6Date: 04/11/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  10. CX-001700: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Investigation of the Souring Bakken Oil ReservoirsCX(s) Applied: B3.6, A1Date: 04/22/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  11. CX-002396: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Montana Integrated Carbon to Liquids Technology (ICTL) Demonstration ProgramCX(s) Applied: B3.6Date: 05/24/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  12. CX-001471: Categorical Exclusion Determination

    Energy.gov [DOE]

    Electrochemically Promoted Microbial Hydrogen Production from Biomass and WastewaterCX(s) Applied: B3.6Date: 04/02/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  13. CX-005901: Categorical Exclusion Determination

    Energy.gov [DOE]

    Ammonia Production from Electricity, Water, and NitrogenCX(s) Applied: B3.6Date: 05/16/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  14. CX-004481: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gyroscope Guidance Sensor for Ultra-Deepwater ApplicationsCX(s) Applied: B3.6Date: 11/18/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  15. CX-004482: Categorical Exclusion Determination

    Energy.gov [DOE]

    Gyroscope Guidance Sensor for Ultra-Deepwater ApplicationsCX(s) Applied: B3.6Date: 11/18/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  16. CX-001441: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation of Novel Technologies for Carbon Dioxide CaptureCX(s) Applied: B3.6Date: 04/01/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  17. CX-002659: Categorical Exclusion Determination

    Energy.gov [DOE]

    Subtask 2.12 ? Carbon Dioxide Reduction by Titanium DioxideCX(s) Applied: B3.6Date: 06/04/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  18. CX-000768: Categorical Exclusion Determination

    Energy.gov [DOE]

    Determining the Variability of Continuous Mercury Monitors at Low Mercury LevelsCX(s) Applied: B3.6Date: 02/07/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  19. CX-002254: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Performance of Eskom Coal in Circulating Fluidized-Bed Combustor (CFBC)CX(s) Applied: B3.6Date: 05/12/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  20. CX-005042: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Hydrogen Production and Purification from Coal and Other Heavy FeedstocksCX(s) Applied: B3.6Date: 01/19/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  1. CX-002358: Categorical Exclusion Determination

    Energy.gov [DOE]

    Fischer-Tropsch Fuels DevelopmentCX(s) Applied: B3.6Date: 05/10/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  2. CX-001616: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Analysis of Multiple Pathways for Converting Coal to Liquid Transportation FuelsCX(s) Applied: B3.6Date: 04/12/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  3. CX-002653: Categorical Exclusion Determination

    Energy.gov [DOE]

    Subtask 2.11 - Carbon Dioxide Capture with an Aqueous FrothCX(s) Applied: B3.6Date: 06/04/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  4. CX-005597: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Extraction of Formation Water from Carbon Dioxide StorageCX(s) Applied: A9Date: 04/11/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  5. CX-001427: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Coal Ash Behavior in Reducing Environments (CABRE) III Phase IIICX(s) Applied: B3.6Date: 04/08/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  6. Website Provides Data for Key Oil Play in North Dakota, Eastern Montana |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Website Provides Data for Key Oil Play in North Dakota, Eastern Montana Website Provides Data for Key Oil Play in North Dakota, Eastern Montana July 19, 2011 - 1:00pm Addthis Washington, DC - A new web-based geographic information system designed to improve oil production in North Dakota and eastern Montana has been launched with support from the U.S. Department of Energy. The Bakken Decision Support System (BDSS) assembles data for the Bakken and Three Forks Formations

  7. Wintertime meteorology of the Grand Canyon region

    SciTech Connect (OSTI)

    Whiteman, C.D.

    1992-09-01

    The Grand Canyon region of the American Southwest is an interesting region meteorologically, but because of its isolated location, the lack of major population centers in the region, and the high cost of meteorological field experiments, it has historically received little observational attention. In recent years, however, attention has been directed to episodes of visibility degradation in many of the US National parks, and two recent field studies focused on this visibility problem have greatly increased the meteorological data available for the Grand Canyon region. The most recent and comprehensive of these studies is the Navajo Generating Station Winter Visibility Study of 1989--90. This study investigated the sources of visibility degradation in Grand Canyon National Park and the meteorological mechanisms leading to low visibility episodes. In this paper we present analyses of this rich data set to gain a better understanding of the key wintertime meteorological features of the Grand Canyon region.

  8. Grand Coulee & Hungry Horse SCADA Replacement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Gates Replacement This project is part of the Third Powerplant overhaul at Grand Coulee Dam. The full overhaul effort involves a mechanical overhaul of units G19 - G24. The...

  9. North Carolina - Compare - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) (indexed site)

    North Carolina North Carolina

  10. North Carolina - Rankings - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) (indexed site)

    North Carolina North Carolina

  11. North Carolina - Search - U.S. Energy Information Administration (EIA)

    U.S. Energy Information Administration (EIA) (indexed site)

    North Carolina North Carolina

  12. Grand Valley State University Checks Out Energy Savings at New Mary Idema Pew Library

    SciTech Connect (OSTI)

    none,

    2013-03-01

    Grand Valley State University (GVSU) partnered with the Department of Energy (DOE) to develop and implement solutions to build new, low-energy buildings that are at least 50% below Standard 90.1-2007 of the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), the American National Standards Institute (ANSI), and the Illuminating Engineering Society of North America (IESNA) as part of DOE’s Commercial Building Partnerships (CBP) Program.

  13. CMI Grand Challenge Problems | Critical Materials Institute

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    CMI Grand Challenge Problems Time is the biggest issue. Materials typically become critical in a matter of months, but solutions take years or decades to develop and implement. Our first two grand challenges address this discrepancy. Anticipating Which Materials May Go Critical In an ideal world, users of materials would anticipate supply-chain disruptions before they occur. They would undertake activities to manage the risks of disruption, including R&D to diversify and increase supplies or

  14. NorthEast Center for Chemical Energy Storage (NECCES) | U.S....

    Office of Science (SC) [DOE]

    Grand Challenges Addressed GrandChallenge 1 Grand Challenge 1 Grand Challenge 5 Grand Challenge 5 GrandChallenge 2 Grand Challenge 2 BES Reports Electrical Energy Storage

  15. Human HLTF mediates postreplication repair by its HIRAN domain-dependent replication fork remodelling

    DOE PAGES-Beta [OSTI]

    Achar, Yathish Jagadheesh; Balogh, David; Neculai, Dante; Juhasz, Szilvia; Morocz, Monika; Gali, Himabindu; Dhe-Paganon, Sirano; Venclovas, Česlovas; Haracska, Lajos

    2015-09-08

    Defects in the ability to respond properly to an unrepaired DNA lesion blocking replication promote genomic instability and cancer. Human HLTF, implicated in error-free replication of damaged DNA and tumour suppression, exhibits a HIRAN domain, a RING domain, and a SWI/SNF domain facilitating DNA-binding, PCNA-polyubiquitin-ligase, and dsDNA-translocase activities, respectively. Here, we investigate the mechanism of HLTF action with emphasis on its HIRAN domain. We found that in cells HLTF promotes the filling-in of gaps left opposite damaged DNA during replication, and this postreplication repair function depends on its HIRAN domain. Our biochemical assays show that HIRAN domain mutant HLTF proteinsmore » retain their ubiquitin ligase, ATPase and dsDNA translocase activities but are impaired in binding to a model replication fork. These data and our structural study indicate that the HIRAN domain recruits HLTF to a stalled replication fork, and it also provides the direction for the movement of the dsDNA translocase motor domain for fork reversal. We suggest functional similarities between the HIRAN, the OB, the HARP2, and other domains found in certain motor proteins, which may explain why only a subset of DNA translocases can carry out fork reversal.« less

  16. Human HLTF mediates postreplication repair by its HIRAN domain-dependent replication fork remodelling

    SciTech Connect (OSTI)

    Achar, Yathish Jagadheesh; Balogh, David; Neculai, Dante; Juhasz, Szilvia; Morocz, Monika; Gali, Himabindu; Dhe-Paganon, Sirano; Venclovas, Česlovas; Haracska, Lajos

    2015-09-08

    Defects in the ability to respond properly to an unrepaired DNA lesion blocking replication promote genomic instability and cancer. Human HLTF, implicated in error-free replication of damaged DNA and tumour suppression, exhibits a HIRAN domain, a RING domain, and a SWI/SNF domain facilitating DNA-binding, PCNA-polyubiquitin-ligase, and dsDNA-translocase activities, respectively. Here, we investigate the mechanism of HLTF action with emphasis on its HIRAN domain. We found that in cells HLTF promotes the filling-in of gaps left opposite damaged DNA during replication, and this postreplication repair function depends on its HIRAN domain. Our biochemical assays show that HIRAN domain mutant HLTF proteins retain their ubiquitin ligase, ATPase and dsDNA translocase activities but are impaired in binding to a model replication fork. These data and our structural study indicate that the HIRAN domain recruits HLTF to a stalled replication fork, and it also provides the direction for the movement of the dsDNA translocase motor domain for fork reversal. We suggest functional similarities between the HIRAN, the OB, the HARP2, and other domains found in certain motor proteins, which may explain why only a subset of DNA translocases can carry out fork reversal.

  17. Hydrogen Storage Grand Challenge Individual Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Individual Projects Hydrogen Storage Grand Challenge Individual Projects Hydrogen Storage Grand Challenge individual projects funded for three Centers of Excellence, led by the National Renewable Energy Laboratory, Sandia National Laboratories, and Los Alamos National Laboratory. grand_challenge_projects.pdf (68.62 KB) More Documents & Publications Hydrogen Storage Grand Challenge Centers of Excellence Learning Demonstration Teams Major DOE Biofuels Project Locations

  18. EV Everywhere Grand Challenge - Battery Workshop Agenda | Department of

    Energy Savers

    Energy Agenda EV Everywhere Grand Challenge - Battery Workshop Agenda Agenda for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. agenda_b.pdf (196.97 KB) More Documents & Publications EV Everywhere Grand Challenge - Charge to the Breakout Groups EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV Everywhere Grand Challenge Kick-Off

  19. Second report on the Oak Ridge Y-12 Plant fish kill for Upper East Fork Poplar Creek

    SciTech Connect (OSTI)

    Etnier, E.L.; Opresko, D.M.; Talmage, S.S.

    1994-08-01

    This report summarizes the monitoring of fish kills in upper East Fork Poplar Creek (EFPC) from July 1990 to June 1993. Since the opening of Lake Reality (LR) in 1988, total numbers of fish inhabiting upper EFPC have increased. However, species diversity has remained poor. Water quality data have been collected in upper EFPC during the time period covered in this report. Total residual chlorine (TRC) levels have exceeded federal and state water quality criteria over the years. However, with the installation of two dechlorination systems in late 1992, TRC levels have been substantially lowered in most portions of upper EFPC. By June 1993, concentrations of TRC were 0.04 to 0.06 mg/L at the north-south pipes (NSP) and below detection limits at sampling station AS-8 and were 0 to 0.01 mg/L at the inlet and outlet of LR. The daily chronic fish mortality in upper EFPC has been attributed to background stress resulting from the continuous discharge of chlorine into upper EFPC. Mean daily mortality rates for 22 acute fish kills were three fold or more above background and usually exceeded ten fish per day. Total number of dead fish collected per acute kill event ranged from 30 to over 1,000 fish; predominant species killed were central stonerollers (Campostoma anomalum) and striped shiners (Luxilus chrysocephalus). Spills or elevated releases of toxic chemicals, such as acids, organophosphates, aluminum nitrate, ammonia, or chlorine, were identified as possible causative agents; however, a definitive cause-effect relationship was rarely established for any acute kills. Ambient toxicity testing, in situ chemical monitoring, and streamside experiments were used to examine TRC dynamics and ambient toxicity in EFPC.

  20. Monopoles of SU(15) grand unification

    SciTech Connect (OSTI)

    Pal, P.B.

    1991-03-01

    In a recently analyzed grand unified model based on the gauge group SU(15), monopoles are automatically consistent with the cosmological mass density bound. The Parker bound of monopole flux puts some constaints on the model which can be easily satisfied.

  1. Middle Rio Grande Cooperative Water Model

    Energy Science and Technology Software Center (OSTI)

    2005-11-01

    This is computer simulation model built in a commercial modeling product Called Studio Expert, developed by Powersim, Inc. The simulation model is built in a system dynamics environment, allowing the simulation of the interaction among multiple systems that are all changing over time. The model focuses on hydrology, ecology, demography, and economy of the Middle Rio Grande, with Water as the unifying feature.

  2. DOE/EIS-0485 Final Environmental Impact Statement Grande Prairie...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grande Prairie Wind has applied to Western to interconnect the proposed Project to Western's 345-kilovolt (kV) Fort Thompson to Grand Island transmission line at a new switchyard. ...

  3. GreenHunter Biodiesel Refinery Grand Opening | Department of...

    Office of Environmental Management (EM)

    GreenHunter Biodiesel Refinery Grand Opening GreenHunter Biodiesel Refinery Grand Opening June 2, 2008 - 12:51pm Addthis Remarks as Prepared for (Acting) Deputy Secretary Kupfer ...

  4. Rio Grande LNG LLC- Dkt. No. 15-190-LNG

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Fossil Energy gives notice of receipt of an Application filed December 23, 2015, by Rio Grande LNG, LLC (Rio Grande), seeking a long-term multi-contract authorization to export...

  5. SunShot Grand Challenge: Summit and Technology Forum

    Energy.gov [DOE]

    The SunShot Grand Challenge: Summit and Technology Forum was the first event in a series of Department of Energy Grand Challenges. This event focused on SunShot Initiative goals of achieving grid...

  6. City of Grand Haven, Michigan (Utility Company) | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Grand Haven Place: Michigan Phone Number: (616) 846-6250 Website: www.ghblp.org Twitter: @ghblp Facebook: https:www.facebook.comGrandHavenBLP Outage Hotline: (616) 842-2241...

  7. Energy Secretary Steven Chu to Attend Grand Opening of Recovery...

    Energy Savers

    to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant Energy Secretary Steven Chu to Attend Grand Opening of Recovery Act-Funded A123 Systems Battery Plant ...

  8. Winning the Future: Grand Ronde Solar Projects Reduce Pollution...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs October 20, 2014 - 5:00pm Addthis PV panels ...

  9. SunShot Grand Challenge Summit Breakout Sessions Announced

    Energy.gov [DOE]

    The 2014 SunShot Grand Challenge Summit is only six weeks away! SunShot is excited to announce our thought-provoking lineup of Grand Challenge Breakout Sessions.

  10. Grand Challenges | U.S. DOE Office of Science (SC)

    Office of Science (SC) [DOE]

    Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights News & Events Publications History Grand Challenges BES Reports Document Archives Contests Contact BES Home History Grand Challenges Print Text Size: A A A FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored

  11. Grand Challenges | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Grand Challenges Energy Frontier Research Centers (EFRCs) EFRCs Home Centers Research Science Highlights News & Events Publications History Grand Challenges BES Reports Document Archives Contests Contact BES Home History Grand Challenges Print Text Size: A A A FeedbackShare Page Grand Challenge Report The Basic Energy Sciences Advisory Committee (BESAC) report, Directing Matter and Energy: Five Challenges for Science and the Imagination was the culmination of a series of BES-sponsored

  12. 2014 Race to Zero Student Design Competition: Grand Winner Teams |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams 2014 Race to Zero Student Design Competition: Grand Winner Teams, from the U.S. Department of Energy. rtz_grand_winner_team_rosters.pdf (59.94 KB) More Documents & Publications 2014 Race to Zero Student Design Competition: Montage Builders Team Submission 2014 Race to Zero Student Design Competition: Montage Builders Profile 2014 Race to Zero Student Design Competition: Auburn

  13. Winners Announced for the NNSA Grand Challenge Competition

    Energy.gov [DOE]

    Clark Atlanta University students' rocket tail component for Additive Manufacturing won the NNSA student Grand Challenge Competition.

  14. EV Everywhere Grand Challenge - Charge to the Breakout Groups | Department

    Energy Savers

    of Energy Charge to the Breakout Groups EV Everywhere Grand Challenge - Charge to the Breakout Groups Presentation given at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. 7_howell_b.pdf (796.65 KB) More Documents & Publications EV Everywhere - Charge to Breakout Sessions EV Everywhere Grand Challenge - Battery Workshop Agenda EV Everywhere EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric

  15. Hydrogen Storage Grand Challenge Centers of Excellence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Centers of Excellence Hydrogen Storage Grand Challenge Centers of Excellence DOE's Hydrogen Storage Grand Challenge Centers of Excellence and partners, led by NREL, SNL, and LANL grand_challenge_centers.pdf (62.21 KB) More Documents & Publications Hydrogen Storage Grand Challenge Individual Projects Final Solar and Wind H2 Report EPAct 812.doc Microsoft Word - H2 National Release 2.doc

  16. Grand Coulee-Creston_FONSI_and_MAP_27May2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grand Coulee-Creston Transmission Line Rebuild Project 1 Finding of No Significant Impact Grand Coulee-Creston Transmission Line Rebuild Project Finding of No Significant Impact (FONSI) Bonneville Power Administration DOE/EA-1950 May 2014 SUMMARY Bonneville Power Administration (BPA) announces its environmental findings on the Grand Coulee-Creston Transmission Line Rebuild Project. The project would rebuild nearly 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line

  17. EA-0930: Facility Operations at the U.S. DOE Grand Junction Projects Office, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the proposal to expand and upgrade the U.S. Department of Energy's Grand Junction Projects Office facilities and operations in Grand Junction, Colorado.

  18. Upper Rio Grande Simulation Model (URGSIM)

    Energy Science and Technology Software Center (OSTI)

    2010-08-05

    URGSIM estimates the location of surface water and groundwater resources in the upper Rio Grande Basin between the Colorado-New Mexico state line, and Caballo Reservoir from 1975 - 2045. It is a mass balance hydrology model of the Upper Rio Grande surface water, groundwater, and water demand systems which runs at a monthly timestep from 1975-1999 in calibration mode, 2000 – 2004 in validation mode, and 2005 – 2045 in scenario analysis mode.

  19. SunShot Grand Challenge | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SunShot Grand Challenge SunShot Grand Challenge Addthis SunShot Grand Challenge 1 of 28 SunShot Grand Challenge Participants gather for the plenary session at the SunShot Grand Challenge Summit and Technology Forum in Denver, Colorado. (Photo by DENNIS SCHROEDER / NREL) Date taken: 2012-06-13 07:10 Arun Majumdar, Founding Director, ARPA-E 2 of 28 Arun Majumdar, Founding Director, ARPA-E Arun Majumdar, Founding Director, ARPA-E gives the welcoming remarks. (Photo by DENNIS SCHROEDER / NREL) Date

  20. Rio Grande pipeline introduces LPG to Mexico

    SciTech Connect (OSTI)

    1997-06-01

    Rio Grande Pipeline, a joint venture between Mid-America Pipeline Co., Amoco Pipeline Co. and Navajo Pipeline Co., has broken new ground in the energy industry as the first LPG pipeline to cross the US-Mexico border. Plans for the project were announced in November 1995 and first deliveries started three months ago on March 21, 1997. The 8-inch, 265-mile pipeline originates near Odessa, TX, where it receives an 85-15 propane-butane mix via a connection to Mid-America Pipeline. From Odessa, product moves west through the Texas desert and crosses the Rio Grande River about 15 miles south of El Paso near Clint, TX and extends 20 miles into Mexico. Capacity of the line is 24,000 bpd and it has been averaging about 22,000 bpd since line-fill. All in all, it sounded like a reasonably feasible, routine project. But perceptions can be deceiving, or at least misleading. In other words, the project can be summarized as follows: one river, two cultures and a world of difference. The official border crossing for pipeline construction took place on Dec. 2, 1996, with a directional drill under the Rio Grande River, but in actuality, the joint venture partners were continually bridging differences in language, laws, customs and norms with Pemex and contracted workers from Mexico.

  1. Raptor Use of the Rio Grande Gorge

    SciTech Connect (OSTI)

    Ponton, David A.

    2015-03-20

    The Rio Grande Gorge is a 115 km long river canyon located in Southern Colorado (15 km) and Northern New Mexico (100 km). The majority of the canyon is under the administration of the Bureau of Land Management {BLM), and 77 km of the canyon south of the Colorado/New Mexico border are designated Wild River under the National Wild and Scenic Rivers Act of 1968. Visits I have made to the Rio Grande Gorge over the past 15 .years disclosed some raptor utilization. As the Snake River Birds of Prey Natural Area gained publicity, its similarity to the Rio Grande Gorge became obvious, and I was intrigued by the possibility of a high raptor nesting density in the Gorge. A survey in 1979 of 20 km of the northern end of the canyon revealed a moderately high density of red-tailed hawks and prairie falcons. With the encouragement of that partial survey, and a need to assess the impact of river-running on nesting birds of prey, I made a more comprehensive survey in 1980. The results of my surveys, along with those of a 1978 helicopter survey by the BLM, are presented in this report, as well as general characterization of the area, winter use by raptors, and an assessment of factors influencing the raptor population.

  2. In-Field Performance Testing of the Fork Detector for Quantitative Spent Fuel Verification

    SciTech Connect (OSTI)

    Gauld, Ian C.; Hu, Jianwei; De Baere, P.; Vaccaro, S.; Schwalbach, P.; Liljenfeldt, Henrik; Tobin, Stephen

    2015-01-01

    Expanding spent fuel dry storage activities worldwide are increasing demands on safeguards authorities that perform inspections. The European Atomic Energy Community (EURATOM) and the International Atomic Energy Agency (IAEA) require measurements to verify declarations when spent fuel is transferred to difficult-to-access locations, such as dry storage casks and the repositories planned in Finland and Sweden. EURATOM makes routine use of the Fork detector to obtain gross gamma and total neutron measurements during spent fuel inspections. Data analysis is performed by modules in the integrated Review and Analysis Program (iRAP) software, developed jointly by EURATOM and the IAEA. Under the framework of the US Department of Energy–EURATOM cooperation agreement, a module for automated Fork detector data analysis has been developed by Oak Ridge National Laboratory (ORNL) using the ORIGEN code from the SCALE code system and implemented in iRAP. EURATOM and ORNL recently performed measurements on 30 spent fuel assemblies at the Swedish Central Interim Storage Facility for Spent Nuclear Fuel (Clab), operated by the Swedish Nuclear Fuel and Waste Management Company (SKB). The measured assemblies represent a broad range of fuel characteristics. Neutron count rates for 15 measured pressurized water reactor assemblies are predicted with an average relative standard deviation of 4.6%, and gamma signals are predicted on average within 2.6% of the measurement. The 15 measured boiling water reactor assemblies exhibit slightly larger deviations of 5.2% for the gamma signals and 5.7% for the neutron count rates, compared to measurements. These findings suggest that with improved analysis of the measurement data, existing instruments can provide increased verification of operator declarations of the spent fuel and thereby also provide greater ability to confirm integrity of an assembly. These results support the application of the Fork detector as a fully quantitative spent fuel

  3. Photo-thermal quartz tuning fork excitation for dynamic mode atomic force microscope

    SciTech Connect (OSTI)

    Bontempi, Alexia; Teyssieux, Damien; Thiery, Laurent; Hermelin, Damien; Vairac, Pascal; Friedt, Jean-Michel

    2014-10-13

    A photo-thermal excitation of a Quartz Tuning Fork (QTF) for topographic studies is introduced. The non-invasive photo-thermal excitation presents practical advantages compared to QTF mechanical and electrical excitations, including the absence of the anti-resonance and its associated phase rotation. Comparison between our theoretical model and experiments validate that the optical transduction mechanism is a photo-thermal rather than photo-thermoacoustic phenomenon. Topographic maps in the context of near-field microscopy distance control have been achieved to demonstrate the performance of the system.

  4. Thermoelastic investigation of a quartz tuning fork used in infrared spectroscopy

    SciTech Connect (OSTI)

    Spajer, M. Cavallier, B.; Euphrasie, S.; Matten, G.; Vacheret, X.; Vairac, P.; Vernier, D.; Jalocha, A.

    2013-11-11

    The performances of quartz tuning forks (QTF) used in infrared spectroscopy for pollutant detection are investigated. The transduction between light and QTF vibration is elucidated, thanks to QTF encapsulation under vacuum. From the sensitivity enhancement which is obtained, we conclude that their interaction is photo-thermoelastic rather than photo-thermoacoustic. A mapping of the local sensitivity of the QTF is obtained by scanning its faces with the excitation probe beam. The comparison between the signal mapping and the theoretical strain mapping indicates that the most efficient areas of the QTF correspond to the areas where the strain or stress is the highest.

  5. SunShot Grand Challenge Summit

    Energy.gov [DOE]

    The SunShot Initiative at the U.S. Department of Energy (DOE) will host the second SunShot Grand Challenge Summit and Peer Review from May 19-22, 2014 at the Hilton Anaheim, California. The 2014 SunShot Summit brings together 800 esteemed members of the solar energy community including SunShot-funded project teams, industry leaders, innovative researchers and scientists, and local, state and federal government policymakers to review the progress made and discuss the challenges ahead to make solar energy more affordable and widespread across America.

  6. Saft America Advanced Batteries Plant Celebrates Grand Opening in

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jacksonville | Department of Energy Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville Saft America Advanced Batteries Plant Celebrates Grand Opening in Jacksonville September 16, 2011 - 12:30pm Addthis Department of Energy Investment Helps Support Job Creation, U.S. Economic Competitiveness and Advanced Vehicle Industry WASHINGTON, D.C. - Today, Secretary Steven Chu joined with Saft America to announce the grand opening of the company's Jacksonville, Florida,

  7. SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Signals in the Subsurface | Department of Energy SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface Grand Challenge Workshop -Imaging Subsurface.pdf (434.52 KB) More Documents & Publications AGU SubTER Town Hall Presentation 2015 SubTER Fact Sheet SubTER Presentation at Town Hall - American Geophysical Union

  8. DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Awardees for the Industrial Energy Efficiency Grand Challenge DOE Announces Awardees for the Industrial Energy Efficiency Grand Challenge May 5, 2010 - 12:00am Addthis WASHINGTON, DC - The U.S. Department of Energy announced today that 48 research and development projects across the country have been selected as award winners of the Industrial Energy Efficiency Grand Challenge. The grantees will receive a total of $13 million to fund the development of transformational

  9. Sandia Energy - SunShot Grand Challenge: Regional Test Centers

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Challenge: Regional Test Centers Home Videos Renewable Energy Energy Events News SunShot News & Events Photovoltaic Solar SunShot Grand Challenge: Regional Test Centers Previous...

  10. EV Everywhere Grand Challenge Kick-Off | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dearborn, MI framingworkshopagenda062112.pdf (85.02 KB) More Documents & Publications EV Everywhere Grand Challenge Overview Presentation EV Everywhere Framing Workshop - ...

  11. Grand Blanc, Michigan: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    5th congressional district.12 Registered Energy Companies in Grand Blanc, Michigan 21st century Green Solutions LLC References US Census Bureau Incorporated place and...

  12. Alpine Extensional Detachment Tectonics In The Grande Kabylie...

    Open Energy Information (Open El) [EERE & EIA]

    Extensional Detachment Tectonics In The Grande Kabylie Metamorphic Core Complex Of The Maghrebides (Northern Algeria) Jump to: navigation, search OpenEI Reference LibraryAdd to...

  13. Winning the Future: Grand Ronde Solar Projects Reduce Pollution...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    coastal range, the Confederated Tribes of the Grand Ronde Community of Oregon has a strong connection to the earth and nature and a deep commitment to environmental stewardship. ...

  14. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Agenda for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  15. EV Everywhere Grand Challenge: Consumer Acceptance and Charging...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA PDF icon ...

  16. Statement by Energy Secretary Steven Chu on Today's Grand Opening...

    Energy Savers

    on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. ... to assist in the creation of a wind turbine manufacturing facility in Jonesboro, Arkansas. ...

  17. Field Studies of Geothermal Reservoirs: Rio Grande Rift, New...

    Open Energy Information (Open El) [EERE & EIA]

    Abstract The Rio Grande rift provides an excellent field laboratory to study the nature of geothermal systems in an extensional environment. Much of the geologic complexity...

  18. EV Everywhere Grand Challenge- Battery Status and Cost Reduction Prospects

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation given by technology manager David Howell at the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

  19. Sierra Grande Lodge Pool & Spa Low Temperature Geothermal Facility...

    Open Energy Information (Open El) [EERE & EIA]

    Spa Low Temperature Geothermal Facility Facility Sierra Grande Lodge Sector Geothermal energy Type Pool and Spa Location Truth or Consequences, New Mexico Coordinates 33.1284047,...

  20. EV Everywhere Grand Challenge- Battery Workshop attendees list

    Energy.gov [DOE]

    Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL.

  1. Grand Rapids Public Util Comm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    https:www.facebook.compagesGrand-Rapids-Public-Utilities108782819203449?skwall Outage Hotline: 218-326-4806 References: EIA Form EIA-861 Final Data File for 2010 -...

  2. Grand Opening of Abengoa's Biorefinery: Nation's Third Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The nation's third commercial-scale cellulosic ethanol biorefinery celebrates its grand ... The plant will produce cellulosic ethanol from non-edible corn stalks, stems, and leaves ...

  3. EV Everywhere Grand Challenge Introduction for Electric Drive...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, ...

  4. EV Everywhere Grand Challenge - Electric Drive (Power Electronics...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of ...

  5. SunShot Grand Challenge Summit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SunShot Grand Challenge Summit Online registration is now closed Online registration is now closed Limited onsite registration is available. Learn more. Read more Resources for ...

  6. Grand Junction, Colorado: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    district.12 Registered Energy Companies in Grand Junction, Colorado Ruby Canyon Engineering Inc References US Census Bureau Incorporated place and minor civil...

  7. Summary of Grand Challenge Products Selected for Award Negotiations

    SciTech Connect (OSTI)

    2010-04-26

    DOE provides $13 million in funding to 48 research and development projects across the country that were selected as award winners of the Industrial Energy Efficiency Grand Challenge.

  8. City of Grand Junction, Iowa (Utility Company) | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Iowa (Utility Company) Jump to: navigation, search Name: Grand Junction Municipal Utilities Place: Iowa Phone Number: (515) 738-2285 or (515) 738-2726 Facebook: https:...

  9. Chemical characterization of sediments and pore water from the upper Clark Fork River and Milltown Reservoir, Montana

    SciTech Connect (OSTI)

    Brumbaugh, W.G.; Ingersoll, C.G.; Kemble, N.E.; May, T.W.; Zajicek, J.L. . Midwest Science Center)

    1994-12-01

    The upper Clark Fork River basin in western Montana is widely contaminated by metals from past mining, milling, and smelting activities. As part of a comprehensive ecological risk assessment for the upper Clark Fork River, the authors measured physical and chemical characteristics of surficial sediment samples that were collected from depositional zones for subsequent toxicity evaluations. Sampling stations included five locations along the upper 200 km of the river, six locations in or near Milltown Reservoir and two tributary references. Concentrations of As, Cd, Cu, Mn, Pb, and Zn decreased from the upper stations to the downstream stations in the Clark Fork River but then increased in all Milltown Reservoir stations to levels similar to uppermost river stations. Large percentages of the total Cd, Cu, Pb, and Zn were extractable by dilute HCL for all samples. Copper and zinc accounted for greater than 95% of extractable metals on a molar basis. Acid-volatile sulfide (AVS) concentrations were typically moderate in grab sediment samples and appeared to regulate dissolved concentrations of Cd, Cu, and Zn in sediment pore waters. Acid-volatile sulfide is important in controlling metal solubility in the depositional areas of the Clark Fork River and should be monitored in any future studies. Spatial variability within a sampling station was high for Cu, Zn, and AVS; therefore, the potential for toxicity to sediment-dwelling organisms may be highly localized.

  10. Gas Phase Photoacoustic Spectroscopy in the long-wave IR using Quartz Tuning Forks and Amplitude Modulated Quantum Cascade Lasers

    SciTech Connect (OSTI)

    Wojcik, Michael D.; Phillips, Mark C.; Cannon, Bret D.

    2006-12-31

    A paper to accompany a 20 minute talk about the progress of a DARPA funded project called LPAS. ABSTRACT: We demonstrate the performance of a novel long-wave infrared photoacoustic laser absorbance spectrometer for gas-phase species using an amplitude modulated (AM) quantum cascade (QC) laser and a quartz tuning fork microphone. Photoacoustic signal was generated by focusing the output of a Fabry-Perot QC laser operating at 8.41 micron between the legs of a quartz tuning fork which served as a transducer for the transient acoustic pressure wave. The QC laser was modulated at the resonant frequency of the tuning fork (32.8 kHz). This sensor was calibrated using the infrared absorber Freon-134a by performing a simultanious absorption measurement using a 35 cm absorption cell. The NEAS of this instrument was determined to be 2 x 10^-8 W cm^-1 /Hz^1/2 and the fundamental sensitivity of this technique is limited by the noise floor of the tuning fork itself.

  11. Investigation of rifting processes in the Rio Grande Rift using data from an unusually large earthquake swarm. Final report, October 1, 1992--September 30, 1993

    SciTech Connect (OSTI)

    Sanford, A.; Balch, R. [New Mexico Institute of Mining and Technology, Socorro, NM (United States); Hartse, H.; House, L. [Los Alamos National Lab., NM (United States)

    1995-03-01

    Because the Rio Grande Rift is one of the best seismically instrumented rift zones in the world, studying its seismicity provides an exceptional opportunity to elucidate the active tectonic processes within continental rifts. Beginning on 29 November 1989, a 15 square km region near Bernardo, NM, produced the strongest and longest lasting sequence of earthquakes in the rift in 54 years. Our research focuses on the Bernardo swarm which occurred 40 km north of Socorro, New Mexico in the axial region of the central Rio Grande rift. Important characteristics concerning hypocenters, fault mechanisms, and seismogenic zones are discussed.

  12. Optimizing Data Locality for Fork/Join Programs Using Constrained Work Stealing

    SciTech Connect (OSTI)

    Lifflander, Jonathan; Krishnamoorthy, Sriram; Kale, Laxmikant

    2014-11-16

    We present an approach to improving data locality across different phases of fork/join programs scheduled using work stealing. The approach consists of: (1) user-specified and automated approaches to constructing a steal tree, the schedule of steal operations and (2) constrained work stealing algorithms that constrain the actions of the scheduler to mirror a given steal tree. These are combined to construct work stealing schedules that maximize data locality across computation phases while ensuring load balance within each phase. These algorithms are also used to demonstrate dynamic coarsening, an optimization to improve spatial locality and sequential overheads by combining many finer-grained tasks into coarser tasks while ensuring sufficient concurrency for locality-optimized load balance. Implementation and evaluation in Cilk demonstrate performance improvements of up to 2.5x on 80 cores. We also demonstrate that dynamic coarsening can combine the performance benefits of coarse task specification with the adaptability of finer tasks.

  13. South Fork Salmon River Watershed Restoration, 2008-2009 Annual Report.

    SciTech Connect (OSTI)

    Reaney, Mark D.

    2009-04-15

    The watershed restoration work elements within the project area, the South Fork Salmon River Watershed, follow the watershed restoration approach adopted by the Nez Perce Tribe Department of Fisheries Resource Management (DFRM) - Watershed Division. The vision of the Nez Perce Tribe DFRM-Watershed Division focuses on protecting, restoring, and enhancing watersheds and treaty resources within the ceded territory of the Nez Perce Tribe under the Treaty of 1855 with the United States Federal Government. The program uses a holistic approach, which encompasses entire watersheds, ridge top to ridge top, emphasizing all cultural aspects and strategies that rely on natural fish production and healthy river ecosystems. The Nez Perce Tribe DFRM-Watershed Division strives towards maximizing historic ecosystem productivity and health for the restoration of anadromous and resident fish populations and the habitat on which all depend on for future generations Originally, this project was funded to create a step/pool stream channel that was appropriate to restore fish passage where the 'Glory Hole Cascade' is currently located at the Stibnite Mine. Due to unforeseen circumstances at the time, the project is unable to move forward as planned and a request for a change in scope of the project and an expansion of the geographic area in which to complete project work was submitted. No additional funds were being requested. The ultimate goal of this project is to work with the holistic, ridge top to ridge top approach to protect and restore the ecological and biological functions of the South Fork Salmon River Watershed to assist in the recovery of threatened and endangered anadromous and resident fish species. FY 2008 Work Elements included two aquatic organism passage (AOP) projects to restore habitat connectivity to two fish-bearing tributaries to the East Fork South Fork Salmon River, Salt and Profile Creeks. The Work Elements also included road survey and assessment activities

  14. Data Compendium for the Logging Test Pits at the ERDA Grand Junction...

    Energy.gov (indexed) [DOE]

    Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound (December 1975) Data Compendium for the Logging Test Pits at the ERDA Grand Junction Compound ...

  15. Cass County, North Dakota: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota North River, North Dakota Oxbow, North Dakota Page, North Dakota Prairie Rose, North Dakota Reile's Acres, North Dakota Tower City, North Dakota West Fargo, North...

  16. Proposal to Control Tank Vapors Wins ORP's Grand Challenge | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Proposal to Control Tank Vapors Wins ORP's Grand Challenge Proposal to Control Tank Vapors Wins ORP's Grand Challenge October 17, 2016 - 12:50pm Addthis Mark Edgren, ORP chief of staff, left, presents Larry Shaffer and Clinton Summers with a plaque announcing their Grand Challenge-winning proposal. The two were part of a four-person team whose proposal aims to destroy organic bearing compounds and remove mercury by installing special skid-mounted treatment units to the vent pipes

  17. EV Everywhere Grand Challenge Blueprint | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EV Everywhere Grand Challenge Blueprint EV Everywhere Grand Challenge Blueprint Recognizing that vehicle electrification is an essential part of our countrys "all-of-the above" energy strategy, President Obama issued the EV Everywhere Grand Challenge to the nation in March 2012 with the bold goal to enable plug-in electric vehicles (PEVs) that are as affordable and convenient for the American family as gasoline-powered vehicles by 2022. This "Blueprint" provides an outline

  18. SUNSHOT GRAND CHALLENGE SUMMIT AND PEER REVIEW EVENT PROGRAM

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    GRAND CHALLENGE SUMMIT AND PEER REVIEW EVENT PROGRAM MAY 19-22 2014 ANAHEIM, CALIFORNIA Hilton Anaheim 3 Welcome to the SunShot Grand Challenge Summit and Peer Review 2014 Building on the success of the first SunShot Initiative Grand Challenge Summit in 2012, this year's premier gathering convenes hundreds of the best and the brightest in the solar community to review the progress made toward the SunShot goal - including 60% progress to achieving cost-competitive utility-scale solar electricity

  19. ORP Grand Challenges 2015 HLW Direct Vitrification

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ORNL/TM-2014/59 Emissions and Performance Benchmarking of a Prototype Dimethyl Ether-Fueled Heavy-Duty Truck February 2014 Prepared by James P. Szybist Oak Ridge National Laboratory Samuel McLaughlin Volvo North America Suresh Iyer The Pennsylvania State University DOCUMENT AVAILABILITY Reports produced after January 1, 1996, are generally available free via the U.S. Department of Energy (DOE) Information Bridge. Web site http://www.osti.gov/bridge Reports produced before January 1, 1996, may be

  20. Confirmatory Sampling and Analysis Plan for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-12-01

    This document describes the organization, strategy, and procedures to be used to confirm that mercury concentrations in soils in the remediated areas are statistically less than, or equal to, the cleanup standard of 400 ppm. It focuses on confirming the cleanup of the stretch of the Lower East Fork Popular Creed flowing from Lake Reality at the Y-12 Plant, through the City of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation and its associated flood plain.

  1. CX-002166: Categorical Exclusion Determination

    Energy.gov [DOE]

    Evaluation of Key Factors Affecting Successful Oil Production in the Bakken Formation, North DakotaCX(s) Applied: B3.6Date: 05/03/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  2. CX-005045: Categorical Exclusion Determination

    Energy.gov [DOE]

    Subtask 2.14 ? Beneficial Use of Carbon Dioxide for North Dakota Lignite-Fired PlantsCX(s) Applied: A9, B3.6Date: 01/19/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  3. EV Everywhere Grand Challenge Overview | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3_davis_caci.pdf (591.63 KB) More Documents & Publications EV Everywhere Framing Workshop Report Out & Lessons Learned EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Grand Challenge - Charge to the Breakout Groups

  4. SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon Grand Challenge Workshop -Imaging Subsurface.pdf More Documents & Publications AGU SubTER Town Hall Presentation 2015 SubTER Fact Sheet SubTER Presentation at Town Hall - ...

  5. EV Everywhere Grand Challenge Introduction for Electric Drive Workshop

    Energy.gov [DOE]

    Presentation given by EERE Assistant Secretary David Danielson at the EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop on July 24, 2012 held at the Doubletree O'Hare, Chicago, IL.

  6. EA-1037: Uranium Lease Management Program, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts of the U.S. Department of Energy's Grand Junction Projects Office's proposal to maintain and preserve the nation's immediately accessible supply of...

  7. Evaluation of Geothermal Potential of Rio Grande Rift and Basin...

    Open Energy Information (Open El) [EERE & EIA]

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Evaluation of Geothermal Potential of Rio Grande Rift and Basin and Range Province, New Mexico Abstract A...

  8. City of Grand Rapids- Green Power Purchasing Policy

    Energy.gov [DOE]

    In 2005, the City of Grand Rapids established a goal of purchasing 20% of its municipal power demand from renewable energy by 2008. In November 2007, the city signed a three-year agreement with a...

  9. EV Everywhere Grand Challenge - Battery Status and Cost Reduction...

    Energy.gov (indexed) [DOE]

    Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree O'Hare, Chicago, IL. 5howellb.pdf (1.24 MB) More Documents & Publications PHEV Battery Cost Assessment ...

  10. EV Everywhere Grand Challenge - Battery Workshop attendees list...

    Energy.gov (indexed) [DOE]

    Attendance list for the EV Everywhere Grand Challenge: Battery Workshop on July 26, 2012 held at the Doubletree OHare, Chicago, IL. companiesinattendanceb.pdf (149.45 KB) More ...

  11. 2014 SunShot Grand Challenge Summit Opening Session Photos |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date ... SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot ...

  12. Arroyo Grande, California: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    This article is a stub. You can help OpenEI by expanding it. Arroyo Grande is a city in San Luis Obispo County, California. It falls under California's 22nd congressional...

  13. Casa Grande, Arizona: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hide Map This article is a stub. You can help OpenEI by expanding it. Casa Grande is a city in Pinal County, Arizona. It falls under Arizona's 1st congressional...

  14. South Fork Flathead Watershed Westslope Cutthroat Trout Conservation Program, Annual Report 2002.

    SciTech Connect (OSTI)

    Grisak, Grant; Marotz, Brian

    2003-06-01

    In 1999, Montana Fish, Wildlife & Parks (MFWP) began a program aimed at conserving the genetically pure populations of westslope cutthroat trout in the South Fork Flathead River drainage. The objective of this program is to eliminate all of the exotic and hybrid trout that threaten the genetically pure westslope cutthroat populations in the South Fork Flathead. The exotic and hybrid trout populations occur in several headwater lakes and their outflow streams. In 2001 MFWP released a draft environmental assessment, pursuant to the Montana Environmental Policy Act (MEPA), that addressed the use of motorized equipment to deliver personnel and materials to some of these lakes in the Bob Marshall and Great Bear Wildernesses (Grisak 2001). After a 30-day public comment period, MFWP determined that the complexity of issues was too great and warranted a more detailed analysis. These issues included transportation options for personnel, equipment and materials, the use of motorized equipment in wilderness, fish removal methods, fish stocking, and the status and distribution of amphibian populations in the project area. Because the program also involves the U.S. Forest Service (USFS) and Bonneville Power Administration (BPA), the environmental analysis needs to comply with the National Environmental Policy Act (NEPA). In October 2001, pursuant to NEPA, MFWP, along with the USFS and BPA initiated an environmental assessment to address these issues. In June 2002, the three agencies determined that the scope of these issues warranted an Environmental Impact Statement. This specialist report describes the logistical, technical and biological issues associated with this project and provides an analysis of options for fish removal, transportation and fish stocking. It further analyzes issues and concerns associated with amphibian populations and creating new domesticated stocks of westslope cutthroat trout. Finally, this document provides a description of each lake, the best

  15. Fernald Preserve Visitors Center Grand Opening and LEED Platinum

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certification | Department of Energy Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to

  16. EV Everywhere Grand Challenge - Electric Drive (Power Electronics and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electric Machines) Workshop | Department of Energy - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of companies in attendance at the Electric Drive Workshop held on July 24, 2012 at the Doubletree O'Hare, Chicago, IL companies_in_attendance_ed.pdf (145.65 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV

  17. EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible

    Energy Savers

    EV Design | Department of Energy Charging Infrastructure Enabling Flexible EV Design EV Everywhere Grand Challenge - Charging Infrastructure Enabling Flexible EV Design Presentation given at the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA 5_slezak_caci.pdf (2 MB) More Documents & Publications EV Everywhere Framing Workshop - Report Out & Lessons Learned EV Everywhere Framing

  18. EV Everywhere Grand Challenge: Consumer Acceptance and Charging

    Energy Savers

    Electric Machines) Workshop | Department of Energy - Electric Drive (Power Electronics and Electric Machines) Workshop EV Everywhere Grand Challenge - Electric Drive (Power Electronics and Electric Machines) Workshop List of companies in attendance at the Electric Drive Workshop held on July 24, 2012 at the Doubletree O'Hare, Chicago, IL companies_in_attendance_ed.pdf (145.65 KB) More Documents & Publications EV Everywhere Grand Challenge Introduction for Electric Drive Workshop EV

  19. EV Everywhere Grand Challenge: Consumer Acceptance and Charging

    Energy Savers

    Infrastructure Workshop Attendence List | Department of Energy Attendence List EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop Attendence List Attnedance list for the EV Everywhere Grand Challenge: Consumer Acceptance and Charging Infrastructure Workshop on July 30, 2012 held at the LAX Marriott, Los Angeles, CA companies_in_attendance_caci.pdf (137.02 KB) More Documents & Publications EV Everywhere Consumer Acceptance and Charging Infrastructure

  20. Montage Builders Northern Forest, Ryerson University Selected as Grand

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Winners of First Student Design Competition for Zero Energy Ready Homes | Department of Energy Montage Builders Northern Forest, Ryerson University Selected as Grand Winners of First Student Design Competition for Zero Energy Ready Homes Montage Builders Northern Forest, Ryerson University Selected as Grand Winners of First Student Design Competition for Zero Energy Ready Homes April 29, 2014 - 2:15pm Addthis To help cut energy waste and improve U.S. energy productivity, the Energy

  1. SubTER Grand Challenge Roundtable: Imaging Geophysical and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SubTER Grand Challenge Roundtable: Imaging Geophysical and Geochemical Signals in the Subsurface The Grand Challenge SubTER Panel (Dr. Marcia McNutt, Chair) DOE Leads: Margaret Coleman, Julio Friedmann, Doug Hollett, and Harriet Kung Introduction The future of the world's energy production and deployment is closely tied to our understanding of the subsurface, as well as our capabilities in subsurface or geologic engineering. Developments over the past ten years, including the growth of natural

  2. EA-1338: Transfer of the Department of Energy Grand Junction Office to Non-DOE Ownership, Grand Junction, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    This EA evaluates the environmental impacts for the proposed transfer of real and personal property at the U.S. Department of Energy's Grand Junction Office to non-DOE ownership.

  3. Post construction report for Lower East Fork Poplar Creek Project, Phase 1, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-11-01

    This Phase 1 Remedial Action (RA) effort was conducted in accordance with the Record of Decision (ROD) for Lower East Fork Poplar Creek (LEFPC) as a Comprehensive Environmental Response, Compensation, and Liability Act action. The LEFPC, Phase 1 RA removed approximately 5,560 yd{sup 3} of mercury-contaminated soils, {ge} 400 ppm, from selected portions of the National Oceanographic and Atmospheric Administration (NOAA) site LEFPC floodplain from July 8, 1996--September 14, 1996. During excavation activities, pockets of elevated radiologically contaminated soils (greater than 35 pCi/g) were located by the continuous monitoring of the excavation areas and contaminated soils with radiological monitoring instruments. Through characterization sampling it has been determined that {approximately} 90 yd{sup 3} are less than 35 pCi/g uranium contaminated and will be transported to the Y-12 Landfill V for disposal and the remaining {approximately}40 yd{sup 3} do not meet the WAC for radiological constituents included in the Special Waste Permit for Landfill V. The radiologically contaminated soil will be placed in 21st Century containers for storage at the K-25 site.

  4. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy -1 and EA-33-A Rio Grande Electric Cooperative Inc PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc Rescission of Presidential Permit and Electricity Export Authorization for Rio Grande Electric Cooperative to Export electricity to Mexico. PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc (52.93 KB) More Documents & Publications EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. PP-53 Rio Grande Electric Cooperative, Inc. PP-33 Rio Grande Electric Cooperative

  5. Barnes County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    County, North Dakota Dazey, North Dakota Fingal, North Dakota Kathryn, North Dakota Leal, North Dakota Litchville, North Dakota Nome, North Dakota Oriska, North Dakota...

  6. Rolette County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota North Rolette, North Dakota Rolette, North Dakota Rolla, North Dakota Shell Valley, North Dakota South Rolette, North Dakota St. John, North Dakota Turtle...

  7. Burleigh County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota Lincoln, North Dakota Lincoln-Fort Rice, North Dakota Lyman, North Dakota Phoenix, North Dakota Regan, North Dakota Wilton, North Dakota Wing, North Dakota Retrieved...

  8. Mountrail County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota New Town, North Dakota Palermo, North Dakota Parshall, North Dakota Plaza, North Dakota Ross, North Dakota Southwest Mountrail, North Dakota Stanley, North...

  9. Cavalier County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Calvin, North Dakota Hannah, North Dakota Langdon, North Dakota Loma, North Dakota Milton, North Dakota Munich, North Dakota Nekoma, North Dakota Osnabrock, North Dakota...

  10. Northampton County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    North Carolina Conway, North Carolina Garysburg, North Carolina Gaston, North Carolina Jackson, North Carolina Lasker, North Carolina Rich Square, North Carolina Seaboard, North...

  11. Robeson County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    North Carolina Prospect, North Carolina Raemon, North Carolina Raynham, North Carolina Red Springs, North Carolina Rennert, North Carolina Rex, North Carolina Rowland, North...

  12. Environmental Audit of the Grand Junction Projects Office

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    The Grand Junction Projects Office (GJPO) is located in Mesa County, Colorado, immediately south and west of the Grand Junction city limits. The US Atomic Energy Commission (AEC) established the Colorado Raw Materials Office at the present-day Grand Junction Projects Office in 1947, to aid in the development of a viable domestic uranium industry. Activities at the site included sampling uranium concentrate; pilot-plant milling research, including testing and processing of uranium ores; and operation of a uranium mill pilot plant from 1954 to 1958. The last shipment of uranium concentrate was sent from GJPO in January, 1975. Since that time the site has been utilized to support various DOE programs, such as the former National Uranium Resource Evaluation (NURE) Program, the Uranium Mill Tailings Remedial Action Project (UMTRAP), the Surplus Facilities Management Program (SFMP), and the Technical Measurements Center (TMC). All known contamination at GJPO is believed to be the result of the past uranium milling, analyses, and storage activities. Hazards associated with the wastes impounded at GJPO include surface and ground-water contamination and potential radon and gamma-radiation exposure. This report documents the results of the Baseline Environmental Audit conducted at Grand Junction Projects Office (GJPO) located in Grand Junction, Colorado. The Grand Junction Baseline Environmental Audit was conducted from May 28 to June 12, 1991, by the Office of Environmental Audit (EH-24). This Audit evaluated environmental programs and activities at GJPO, as well as GJPO activities at the State-Owned Temporary Repository. 4 figs., 12 tabs.

  13. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment.

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... Golden, CO (United States) Grand Forks Energy Technology Center (United States) Grand Junction Project Office, Grand Junction, CO (United States) HSS Office of Classification ...

  15. SciTech Connect: Your connection to science, technology, and...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... Golden, CO (United States) Grand Forks Energy Technology Center (United States) Grand Junction Project Office, Grand Junction, CO (United States) HSS Office of Classification ...

  16. EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy -A and PP-33-1 Rio Grande Electric Cooperative, Inc. EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. Order authorizing Rio Grande Electric Cooperative, Inc to export electric energy to Mexico EA-33-A and PP-33-1 Rio Grande Electric Cooperative, Inc. (52.93 KB) More Documents & Publications PP-33-1 and EA-33-A Rio Grande Electric Cooperative Inc PP-53 Rio Grande Electric Cooperative, Inc. EA-288 Vermont

  17. 2014 SunShot Grand Challenge Summit Opening Session Photos | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 2014 SunShot Grand Challenge Summit Opening Session Photos 2014 SunShot Grand Challenge Summit Opening Session Photos Addthis SunShot Grand Challenge Summit Opening Session 1 of 35 SunShot Grand Challenge Summit Opening Session Anaheim Mayor Tom Tait with SunShot Director Minh Le Credit: SunShot Initiative Date taken: 2014-05-19 16:01 SunShot Grand Challenge Summit Opening Session 2 of 35 SunShot Grand Challenge Summit Opening Session SunShot Director Minh Le Credit: SunShot

  18. Grand Traverse Band of Ottawa and Chippewa Indians- 2005 Project

    Energy.gov [DOE]

    The Grand Traverse Band of Ottawa and Chippewa Indians (GTB) will conduct a feasibility study to determine the cost effectiveness and other economic, environmental, cultural, and social benefits of maximizing the diversity of energy sources used at GTB facilities. This includes an assessment of energy conservation measures as well as renewable energy sources such as wind, solar, and biomass.

  19. Mesa Grande Band of Mission Indians- 2004 Project

    Energy.gov [DOE]

    The Mesa Grande Band of Mission Indians, located in northern San Diego County, will conduct a study of the feasibility of reducing air pollution generated on the reservation by an over-reliance on wood-burning stoves, kerosene heaters, and gasoline generators, and to identify the types of renewable energy systems that could be used for residential structures and well-pump systems.

  20. SUBTASK 1.7 EVALUATION OF KEY FACTORS AFFECTING SUCCESSFUL OIL PRODUCTION IN THE BAKKEN FORMATION, NORTH DAKOTA PHASE II

    SciTech Connect (OSTI)

    Darren D. Schmidt; Steven A. Smith; James A. Sorensen; Damion J. Knudsen; John A. Harju; Edward N. Steadman

    2011-10-31

    Production from the Bakken and Three Forks Formations continues to trend upward as forecasts predict significant production of oil from unconventional resources nationwide. As the U.S. Geological Survey reevaluates the 3.65 billion bbl technically recoverable estimate of 2008, technological advancements continue to unlock greater unconventional oil resources, and new discoveries continue within North Dakota. It is expected that the play will continue to expand to the southwest, newly develop in the northeastern and northwestern corners of the basin in North Dakota, and fully develop in between. Although not all wells are economical, the economic success rate has been near 75% with more than 90% of wells finding oil. Currently, only about 15% of the play has been drilled, and recovery rates are less than 5%, providing a significant future of wells to be drilled and untouched hydrocarbons to be pursued through improved stimulation practices or enhanced oil recovery. This study provides the technical characterizations that are necessary to improve knowledge, provide characterization, validate generalizations, and provide insight relative to hydrocarbon recovery in the Bakken and Three Forks Formations. Oil-saturated rock charged from the Bakken shales and prospective Three Forks can be produced given appropriate stimulation treatments. Highly concentrated fracture stimulations with ceramic- and sand-based proppants appear to be providing the best success for areas outside the Parshall and Sanish Fields. Targeting of specific lithologies can influence production from both natural and induced fracture conductivity. Porosity and permeability are low, but various lithofacies units within the formation are highly saturated and, when targeted with appropriate technology, release highly economical quantities of hydrocarbons.

  1. Bowman County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    A. Places in Bowman County, North Dakota Bowman, North Dakota Gascoyne, North Dakota Hart, North Dakota Rhame, North Dakota Scranton, North Dakota West Bowman, North Dakota...

  2. Wayne County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Places in Wayne County, North Carolina Brogden, North Carolina Elroy, North Carolina Eureka, North Carolina Fremont, North Carolina Goldsboro, North Carolina Mar-Mac, North...

  3. Alamance County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Burlington, North Carolina Elon, North Carolina Gibsonville, North Carolina Glen Raven, North Carolina Graham, North Carolina Green Level, North Carolina Haw River, North...

  4. Bladen County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Dublin, North Carolina East Arcadia, North Carolina Elizabethtown, North Carolina Kelly, North Carolina Tar Heel, North Carolina White Lake, North Carolina White Oak, North...

  5. Duplin County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Kenansville, North Carolina Magnolia, North Carolina Mount Olive, North Carolina Rose Hill, North Carolina Teachey, North Carolina Wallace, North Carolina Warsaw, North...

  6. Pembina County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    in Pembina County, North Dakota Bathgate, North Dakota Canton City, North Dakota Cavalier, North Dakota Crystal, North Dakota Drayton, North Dakota Hamilton, North Dakota...

  7. Wells County, North Dakota: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota Cathay, North Dakota Fessenden, North Dakota Hamberg, North Dakota Harvey, North Dakota Hurdsfield, North Dakota Sykeston, North Dakota Retrieved from "http:...

  8. Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22...

    Energy.gov (indexed) [DOE]

    2014 SunShot Grand Challenge Summit and Peer Review SunShot Grand Challenge Summit Opening Session Energy Department Announces New Prize Challenge to Drive Down Solar Costs

  9. The emerging multi-polar world and China's grand game (Journal...

    Office of Scientific and Technical Information (OSTI)

    Journal Article: The emerging multi-polar world and China's grand game Citation Details In-Document Search Title: The emerging multi-polar world and China's grand game You are ...

  10. Solar Community Comes Out in Full Force for SunShot Grand Challenge...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 9:58am Addthis ...

  11. Grand Coulee - Bell 500-kV Transmission Line Project, Draft Environmental Impact Statement

    SciTech Connect (OSTI)

    N /A

    2002-08-09

    BPA is proposing to construct a 500-kilovolt (kV) transmission line that would extend approximately 84 miles between the Grand Coulee 500-kV Switchyard, near Grand Coulee Dam, and the Bell Substation, in Mead just north of Spokane. The new line would cross portions of Douglas, Grant, Lincoln, and Spokane counties. In addition to the transmission line, new equipment would be installed at the substations at each end of the new line and at other facilities. The proposed action would remove an existing 115-kV transmission line and replace it with the new 500-kV line on existing right-of-way for most of its length. Additional right-of-way would be needed in the first 3.5 miles out of the Grand Coulee Switchyard to connect to the existing 115-kV right-of-way. Since the mid-1990s, the transmission path west of Spokane, called the West of Hatwai transmission pathway, has grown increasingly constrained. To date, BPA has been able to manage operation of the path through available operating practices, and customer needed have been met while maintaining the reliability of the path. however, in early 2001, operations showed that the amount of electricity that needs to flow from east to west along this path creates severe transmission congestion. Under these conditions, the system is at risk of overloads and violation of industry safety and reliability standards. The problem is particularly acute in the spring and summer months because of the large amount of power generated by dams east of the path. Large amounts of water cannot be spilled during that time in order for BPA to fulfill its obligation to protect threatened and endangered fish. The amount of power that needs to move through this area during these months at times could exceed the carrying capacity of the existing transmission lines. In additional capacity is not added, BPA will run a significant risk that it will not be able to continue to meet its contractual obligations to deliver power and maintain reliability

  12. Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Grand Ronde Solar Projects Reduce Pollution, Cut Costs Winning the Future: Grand Ronde Solar Projects Reduce Pollution, Cut Costs October 20, 2014 - 5:00pm Addthis PV panels installed on Grand Ronde Tribal Housing Authority carport. Photo from GRTHA, NREL 31797 PV panels installed on Grand Ronde Tribal Housing Authority carport. Photo from GRTHA, NREL 31797 Challenge: Situated on nearly 12,000 acres in the heart of Western Oregon's scenic coastal range, the

  13. Grand Traverse Band Renewable Energy Feasibility Study in Wind, Biomass and Solar

    SciTech Connect (OSTI)

    Suzanne McSawby, Project Director Steve Smiley, Principle Investigator Grand Traverse Resort, Cost Sharing Partner

    2008-12-31

    Renewable Energy Feasibility Study for wind, biomass, solar on the Grand Traverse Band tribal lands from 2005 - 2008

  14. Sampling and analysis plan for treatment water and creek water for the Lower East Fork Poplar Creek Operable Unit, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-04-01

    This document provides the Environmental Restoration Program with information about the methodology, organizational structure, quality assurance and health and safety practices to be employed during the water sampling and analysis activities associated with the remediation of the Lower East Fork Poplar Creek Operable Unit during remediation of the National Oceanic and Atmospheric Administration and Bruner sites.

  15. ARM North Slope of Alaska

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    sites on the North Slope of Alaska (NSA), to provide data about cloud and radiative ... More Information North Slope of Alaska Website NSA Fact Sheet Visit the North Slope of ...

  16. City of Grand Rapids Building Solar Roof Demonstration

    SciTech Connect (OSTI)

    DeClercq, Mark; Martinez, Imelda

    2012-08-31

    Grand Rapids, Michigan is striving to reduce it environmental footprint. The municipal government organization has established environmental sustainability policies with the goal of securing 100% of its energy from renewable sources by 2020. This report describes the process by which the City of Grand Rapids evaluated, selected and installed solar panels on the Water/Environmental Services Building. The solar panels are the first to be placed on a municipal building. Its new power monitoring system provides output data to assess energy efficiency and utilization. It is expected to generate enough clean solar energy to power 25 percent of the building. The benefit to the public includes the economic savings from reduced operational costs for the building; an improved environmentally sustainable area in which to live and work; and increased knowledge about the use of solar energy. It will serve as a model for future energy saving applications.

  17. EV Everywhere Grand Challenge Road to Success | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Road to Success EV Everywhere Grand Challenge Road to Success Initial progress report for EV Everywhere. The report highlights the significant cost reduction in batteries this year, which will enable increased PEV affordability for consumers. Also, the efforts on increasing the convenience of PEVs through the Workplace Charging Challenge, which calls on U.S. employers to help develop the nation's charging infrastructure. eveverywhere_road_to_success.pdf (4.01 MB) More Documents &

  18. Grande Ronde Basin Supplementation Program; Lostine River, 2000 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  19. Grande Ronde Basin Supplementation Program; Lostine River, 2001 Annual Report.

    SciTech Connect (OSTI)

    Onjukka, Sam T.; Harbeck, Jim

    2003-03-01

    The Northwest Power Planning Council (NPPC) identified supplementation as a high priority to achieve its goal of increasing runs of anadromous fish in the Columbia Basin. Supplementation activities in the Lostine River and associated monitoring and evaluation conducted by the Nez Perce Tribe relate directly to the needs addressed in the Columbia River Basin Fish and Wildlife Program (NPPC 1994). Measure 7.4L.1 of the Program mandates that appropriate research accompany any proposed supplementation. In addition, measure 7.3B.2 of the Program stresses the need for evaluating supplementation projects to assess their ability to increase production. Finally, Section 7.4D.3 encourages the study of hatchery rearing and release strategies to improve survival and adaptation of cultured fish. In 1997, Oregon Department of Fisheries and Wildlife (ODFW) requested a modification of Permit 1011 to allow the take of adult spring chinook salmon. In 1998, the Nez Perce Tribe also requested a permit specific to activities on Lostine River. The permit was issued in 2000. A special condition in the permits required the development of a long term management plan for the spring chinook salmon of the Grande Ronde Basin. The Nez Perce Tribe, ODFW, and the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) completed a formal long range plan entitled ''Grande Ronde Basin Endemic Spring Chinook Salmon Supplementation Program''. The program proposes to increase the survival of spring chinook salmon in the Grand Ronde Basin through hatchery intervention. Adult salmon from the Lostine River, Catherine Creek, and the Upper Grande Ronde River are used for a conventional supplementation program in the basin. The Nez Perce program currently operates under the ESA Section 10 Permit 1149.

  20. Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Winning Entry Proposes Efficiencies to Tank Waste Cleanup Grand Challenge Winning Entry Proposes Efficiencies to Tank Waste Cleanup December 29, 2015 - 12:55pm Addthis From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna, Pacific Northwest National Laboratory scientist; Albert Kruger, ORP glass scientist; and Kevin Smith, ORP manager. From left, Elaine Diaz, Office of River Protection (ORP) acting chief engineer; John Vienna,

  1. CX-001298: Categorical Exclusion Determination

    Energy.gov [DOE]

    Full-Scale Mercury Control Demonstrations: Information Collection Request Sampling with Mercury Control ElementsCX(s) Applied: A9, B3.6Date: 03/22/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  2. CX-004692: Categorical Exclusion Determination

    Energy.gov [DOE]

    Subtask 5.9 ? Finalizing American Society for Testing and Materials MethodCX(s) Applied: A9, A11, B3.3Date: 12/15/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  3. CX-004662: Categorical Exclusion Determination

    Energy.gov [DOE]

    Testing of Chinese Coal in a Transport Reactor Integrated Gasification (TRIG) SystemCX(s) Applied: B3.6Date: 12/09/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  4. CX-004679: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Enhanced Oil Recovery from the Bakken Shale Using Surfactant Imbibition Couple with Gravity DrainageCX(s) Applied: B3.6Date: 12/08/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  5. CX-005244: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Testing of an Advanced Dry Cooling Technology for Power Plants in Arid ClimatesCX(s) Applied: B3.6Date: 02/15/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  6. CX-002245: Categorical Exclusion Determination

    Energy.gov [DOE]

    Subtask 3.5 - Distributed Hydrogen Supply for Fuel Cell Electric VehiclesCX(s) Applied: B3.6Date: 05/13/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  7. CX-001798: Categorical Exclusion Determination

    Energy.gov [DOE]

    Subtask 4.12 - Algae Harvesting in an Integrated Power Plant-Algae SystemCX(s) Applied: B3.6Date: 04/20/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  8. CX-004507: Categorical Exclusion Determination

    Energy.gov [DOE]

    Center for Biomass Utilization 2010CX(s) Applied: A9, B3.6, B5.1Date: 11/19/2010Location(s): Grand Forks, North DakotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  9. CX-005329: Categorical Exclusion Determination

    Energy.gov [DOE]

    Fluid-Bed Testing of GreatPoint Energy's Direct Oxygen Injection Catalytic Gasification ProcessCX(s) Applied: B3.6Date: 02/28/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  10. CX-004476: Categorical Exclusion Determination

    Energy.gov [DOE]

    Testing of Indian Coal in a Transport Reactor Integrated Gasification (TRIG) SystemCX(s) Applied: B3.6Date: 11/18/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  11. CX-002361: Categorical Exclusion Determination

    Energy.gov [DOE]

    Testing of Modified Activated Carbon for Use in Hydrogen and Energy StorageCX(s) Applied: B3.6Date: 05/10/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  12. CX-001195: Categorical Exclusion Determination

    Energy.gov [DOE]

    Recovery Act: Electric Power Generation from Low to Intermediate Temperature Geothermal ResourcesCX(s) Applied: A9, B5.1, B5.2Date: 03/23/2010Location(s): Grand Forks, North DakotaOffice(s): Energy Efficiency and Renewable Energy, Golden Field Office

  13. CX-001459: Categorical Exclusion Determination

    Energy.gov [DOE]

    Air Quality VIII: An International Conference on Carbon Management, Mercury, Trace Elements, Sulfur Oxide (SOx), Nitrogen Oxide (NOx)CX(s) Applied: A9Date: 03/30/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  14. CX-002500: Categorical Exclusion Determination

    Energy.gov [DOE]

    The Northern Great Plains Water Consortium: Subtask 5.2, Budget Period 3CX(s) Applied: A9, A11Date: 06/02/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  15. CX-005638: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Extended Pilot-Scale Testing of the Pratt and Whitney Rocketdyne Compact ReformerCX(s) Applied: B3.6Date: 04/19/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  16. CX-002899: Categorical Exclusion Determination

    Office of Energy Efficiency and Renewable Energy (EERE)

    Fluid-Bed Testing of Greatpoint Energy?s Direct Oxygen Injection Catalytic Gasification ProcessCX(s) Applied: B3.6Date: 07/08/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  17. CX-005653: Categorical Exclusion Determination

    Energy.gov [DOE]

    Pilot-Scale Testing Evaluating the Effects of Bromine Additions on Continuous Mercury Monitors at Low Mercury ConcentrationsCX(s) Applied: A9, B3.6Date: 04/28/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  18. CX-004776: Categorical Exclusion Determination

    Energy.gov [DOE]

    Recovery Act: Innovative Carbon Dioxide Sequestration from Flue Gas using an In-Duct ScrubberCX(s) Applied: A9, A11, B3.6Date: 12/27/2010Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  19. CX-007121: Categorical Exclusion Determination

    Energy.gov [DOE]

    Full-Scale Mercury Control Demonstrations: Information Collection Request Sampling with Mercury Control ElementsCX(s) Applied: A9, B3.6Date: 10/04/2011Location(s): Grand Forks, North DakotaOffice(s): Fossil Energy, National Energy Technology Laboratory

  20. Microsoft Word - Poellot-MR.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Measurements of Cloud Liquid Water Over the SGP Site M. R. Poellot University of North Dakota Grand Forks, North Dakota R. T. Marchand Pacific Northwest National Laboratory Richland, Washington C. Twohy Oregon State University Corvallis, Oregon Introduction The University of North Dakota Citation aircraft made in situ measurements of liquid water clouds on six flights in stratus clouds during the Spring 2000 Cloud Intensive Operational Period (IOP) at the Southern Great Plains (SGP) site. Four

  1. ,"North Carolina Natural Gas Prices"

    U.S. Energy Information Administration (EIA) (indexed site)

    Data for" ,"Data 1","North Carolina Natural Gas Prices",8,"Monthly","... 10:49:13 AM" "Back to Contents","Data 1: North Carolina Natural Gas Prices" ...

  2. ,"North Dakota Natural Gas Prices"

    U.S. Energy Information Administration (EIA) (indexed site)

    Data for" ,"Data 1","North Dakota Natural Gas Prices",8,"Monthly","4... 10:49:14 AM" "Back to Contents","Data 1: North Dakota Natural Gas Prices" ...

  3. Environmental assessment of facility operations at the U.S. Department of Energy Grand Junction Projects Office, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-06-01

    The US Department of Energy (DOE) has prepared a sitewide environmental assessment (EA) of the proposed action to continue and expand present-day activities on the DOE Grand Junction Projects Office (GJPO) facility in Grand Junction, Colorado. Because DOE-GJPO regularly proposes and conducts many different on-site activities, DOE decided to evaluate these activities in one sitewide EA rather than in multiple, activity-specific documents. On the basis of the information and analyses presented in the EA, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined by the National Environmental Policy Act (NEPA) of 1969. Therefore, preparation of an environmental impact statement is not required for facility operations, and DOE is issuing this Finding of No Significant Impact (FONSI).

  4. Phase 2 confirmatory sampling data report, Lower East Fork Poplar Creek, Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1998-01-01

    A Remedial Investigation of East Fork Poplar Creek (EFPC) concluded that mercury is the principal contaminant of concern in the EFPC floodplain. The highest concentrations of mercury were found to be in a visually distinct black layer of soil that typically lies 15 to 30 cm (6 to 12 in.) below the surface. Mercury contamination was found to be situated in distinct areas along the floodplain, and generally at depths > 20 cm (8 in.) below the surface. In accordance with Comprehensive, Environmental Response, Compensation, and Liability Act (CERCLA), a feasibility study was prepared to assess alternatives for remediation, and a proposed plan was issued to the public in which a preferred alternative was identified. In response to public input, the plan was modified and US Department of Energy (DOE) issued a Record of Decision in 1995 committing to excavating all soil in the EFPC floodplain exceeding a concentration of 400 parts per million (ppm) of mercury. The Lower East Fork Poplar Creek (LEFPC) remedial action (RA) focuses on the stretch of EFPC flowing from Lake Reality at the Y-12 Plant, through the city of Oak Ridge, to Poplar Creek on the Oak Ridge Reservation (ORR) and its associated floodplain. Specific areas were identified that required remediation at the National Oceanographic and Atmospheric Administration (NOAA) Site along Illinois Avenue and at the Bruner Site along the Oak Ridge Turnpike. The RA was conducted in two separate phases. Phase 2, conducted from February to October 1997, completed the remediation efforts at the NOAA facility and fully remediated the Bruner Site. During both phases, data were collected to show that the remedial efforts performed at the NOAA and Bruner sites were successful in implementing the Record of Decision and had no adverse impact on the creek water quality or the city of Oak Ridge publicly owned treatment works.

  5. Factors affecting the failure of copper connectors brazed to copper bus bar segments on a 615-MVA hydroelectric generator at Grand Coulee Dam

    SciTech Connect (OSTI)

    Atteridge, D.G.; Klein, R.F.; Layne, R.; Anderson, W.E.; Correy, T.B.

    1988-01-01

    On March 21, 1986, the United States Bureau of Reclamation experienced a ground fault in the main parallel ring assembly of Unit G19 - a 615-MVA hydroelectric generator - at Grand Coulee Dam, Washington. Inspection of the unit revealed that the ground fault had been induced by fracture of one or more of the copper connectors used to join adjacent segments of one of the bus bars in the north half of the assembly. Various experimental techniques were used to detect and determine the presence of cracks, crack morphology, corrosion products, and material microstructure and/or embrittlement. The results of these inspections and recommendations are given. 7 refs., 27 figs.

  6. Technical basis for radiological release of Grand Junction Office Building 2. Volume 1, dose assessment

    SciTech Connect (OSTI)

    Morris, R.; Warga, J.; Thorne, D.

    1997-07-01

    Building 2 on the US Department of Energy (DOE) Grand Junction Office (GJO) site is part of the GJO Remedial Action Program (GJORAP). During evaluation of Building 2 for determination of radiological release disposition, some inaccessible surface contamination measurements were detected to be greater than the generic surface contamination guidelines of DOE Order 5400.5 (which are functionally equivalent to US Nuclear Regulatory Commission [NRC] Regulatory Guide 1.86). Although the building is nominal in size, it houses the site telecommunications system, that is critical to continued GJO operations, and demolition is estimated at $1.9 million. Because unrestricted release under generic surface contamination guidelines is cost-prohibitive, supplemental standards consistent with DOE Order 5400.5 are being pursued. This report describes measurements and dose analysis modeling efforts to evaluate the radiation dose to members of the public who might occupy or demolish Building 2, a 2,480 square-foot (ft) building constructed in 1944. The north portion of the building was used as a shower facility for Manhattan Project uranium-processing mill workers and the south portion was a warehouse. Many originally exposed surfaces are no longer accessible for contamination surveys because expensive telecommunications equipment have been installed on the floors and mounted on panels covering the walls. These inaccessible surfaces are contaminated above generic contamination limits.

  7. North Atlantic Science Objective

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    and Energy | Department of Energy North American Energy Ministers Establish a Working Group on Climate Change and Energy North American Energy Ministers Establish a Working Group on Climate Change and Energy May 25, 2015 - 2:25pm Addthis NEWS MEDIA CONTACT (202) 586-4940 DOENews@hq.doe.gov Merida, Mexico - The Honorable Greg Rickford, Canada's Minister of Natural Resources; Pedro Joaquin Coldwell, Mexico's Secretary of Energy; and Ernest J. Moniz, U.S. Secretary of Energy, today announced

  8. Iredell County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    in Iredell County, North Carolina Davidson, North Carolina Harmony, North Carolina Love Valley, North Carolina Mooresville, North Carolina Statesville, North Carolina Stony...

  9. Steele County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota M Power LLC Places in Steele County, North Dakota Finley, North Dakota Hope, North Dakota Luverne, North Dakota Sharon, North Dakota Retrieved from "http:...

  10. Cumberland County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Carolina Fayetteville, North Carolina Fort Bragg, North Carolina Godwin, North Carolina Hope Mills, North Carolina Linden, North Carolina Pope AFB, North Carolina Spring Lake,...

  11. Carteret County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Bogue, North Carolina Cape Carteret, North Carolina Cedar Point, North Carolina Emerald Isle, North Carolina Harkers Island, North Carolina Indian Beach, North Carolina...

  12. Dickey County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Climate Zone Subtype A. Places in Dickey County, North Dakota Ellendale, North Dakota Forbes, North Dakota Fullerton, North Dakota Ludden, North Dakota Monango, North Dakota...

  13. Granville County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    in Granville County, North Carolina Butner, North Carolina Creedmoor, North Carolina Oxford, North Carolina Stem, North Carolina Stovall, North Carolina Retrieved from "http:...

  14. Brunswick County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Island, North Carolina Belville, North Carolina Boiling Spring Lakes, North Carolina Bolivia, North Carolina Calabash, North Carolina Carolina Shores, North Carolina Caswell...

  15. LaMoure County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Edgeley, North Dakota Jud, North Dakota Kulm, North Dakota LaMoure, North Dakota Marion, North Dakota Verona, North Dakota Retrieved from "http:en.openei.orgw...

  16. Hoke County, North Carolina: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Carolina Dundarrach, North Carolina Five Points, North Carolina Raeford, North Carolina Red Springs, North Carolina Rockfish, North Carolina Silver City, North Carolina Retrieved...

  17. Nash County, North Carolina: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Carolina Middlesex, North Carolina Momeyer, North Carolina Nashville, North Carolina Red Oak, North Carolina Rocky Mount, North Carolina Sharpsburg, North Carolina Spring Hope,...

  18. Stanly County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Carolina New London, North Carolina Norwood, North Carolina Oakboro, North Carolina Red Cross, North Carolina Richfield, North Carolina Stanfield, North Carolina Retrieved...

  19. Forsyth County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Carolina King, North Carolina Lewisville, North Carolina Midway, North Carolina Rural Hall, North Carolina Tobaccoville, North Carolina Walkertown, North Carolina Winston-Salem,...

  20. Richmond County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    East Rockingham, North Carolina Ellerbe, North Carolina Hamlet, North Carolina Hoffman, North Carolina Norman, North Carolina Rockingham, North Carolina Retrieved from...

  1. Sioux County, North Dakota: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Zone Number 6 Climate Zone Subtype A. Places in Sioux County, North Dakota Cannon Ball, North Dakota Fort Yates, North Dakota North Sioux, North Dakota Selfridge, North...

  2. Henderson County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    East Flat Rock, North Carolina Etowah, North Carolina Flat Rock, North Carolina Fletcher, North Carolina Hendersonville, North Carolina Laurel Park, North Carolina Mills...

  3. Craven County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Dover, North Carolina Fairfield Harbour, North Carolina Havelock, North Carolina James City, North Carolina Neuse Forest, North Carolina New Bern, North Carolina River Bend,...

  4. Michael North | Argonne National Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    North collaborates with colleagues in the Global Security Sciences division. From right to left: Mike North, Pam Sydelko, Ignacio Martinez-Moyano, and Jessica Trail. Click image to enlarge. North collaborates with colleagues in the Global Security Sciences division. From right to left: Mike North, Pam Sydelko, Ignacio Martinez-Moyano, and Jessica Trail. Click image to enlarge. North maintains a healthy work-life balance by working out regularly at the Argonne Fitness Center. The gym is free,

  5. Reviewing the success of intentional flooding of the Grand Canyon

    SciTech Connect (OSTI)

    Wirth, B.D.

    1997-04-01

    A description and evaluation of the results of an intentional flooding experiment at the Grand Canyon are described. The purpose of the 7-day release of flood waters from the Glen Canyon Dam was to determine if managed floods have the ability to predictably restore the riverine environment. A summary of environmental conditions leading to the experiment is provided and flood results are listed. Initial results showed significant improvement in the size and number of the river`s beaches, creation of backwater habitat for endangered species, and no adverse impact to the trout fishery, Indian cultural sites, and other resources.

  6. Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Colorado, for Long-Term Radiation Variations (August 1978) | Department of Energy of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the Airport Calibration Pads at Walker Field, Grand Junction, Colorado, for Long-Term Radiation Variations (August 1978) Monitoring of the

  7. Statement by Energy Secretary Steven Chu on Today's Grand Opening of the

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Nordex Manufacturing Facility in Jonesboro, Arkansas | Department of Energy Today's Grand Opening of the Nordex Manufacturing Facility in Jonesboro, Arkansas Statement by Energy Secretary Steven Chu on Today's Grand Opening of the Nordex Manufacturing Facility in Jonesboro, Arkansas October 29, 2010 - 12:00am Addthis WASHINGTON, D.C. - U.S. Energy Secretary Steven Chu issued the following statement on today's grand opening of the Nordex wind turbine manufacturing facility in Jonesboro. The

  8. Updated Radiation Exhibit Unveiled at Math and Science Center in Grand

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Junction, Colorado | Department of Energy Updated Radiation Exhibit Unveiled at Math and Science Center in Grand Junction, Colorado Updated Radiation Exhibit Unveiled at Math and Science Center in Grand Junction, Colorado April 26, 2016 - 4:50pm Addthis What does this project do? Goal 6. Engage the Public, Governments, and Interested Parties A newly updated radiation exhibit, created by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) office in Grand Junction, Colorado,

  9. An Assessment of health risk associated with mercury in soil and sediment from East Fork Poplar Creek, Oak Ridge, Tennessee. Final report

    SciTech Connect (OSTI)

    Revis, N.; Holdsworth, G.; Bingham, G.; King, A.; Elmore, J.

    1989-04-01

    This report presents results from a study conducted to determine the toxicity of Mercury in soils sediments samples. Mice were fed via diet, soils and sediment, from various locations along the East Fork Poplar creek. Tissue distribution of pollutants was determined at various intervals. The tissue level relative to toxicity was used to determine the effect of a complex matrix on the gastrointestinal absorption and tissue distribution of the pollutants (other pollutants included cadmium and selenium).

  10. Geomorphology of plutonium in the Northern Rio Grande

    SciTech Connect (OSTI)

    Graf, W.L.

    1993-03-01

    Nearly all of the plutonium in the natural environment of the Northern Rio Grande is associated with soils and sediment, and river processes account for most of the mobility of these materials. A composite regional budget for plutonium based on multi-decadal averages for sediment and plutonium movement shows that 90 percent of the plutonium moving into the system is from atmospheric fallout. The remaining 10 percent is from releases at Los Alamos. Annual variation in plutonium flux and storage exceeds 100 percent. The contribution to the plutonium budget from Los Alamos is associated with relatively coarse sediment which often behaves as bedload in the Rio Grande. Infusion of these materials into the main stream were largest in 1951, 1952, 1957, and 1968. Because of the schedule of delivery of plutonium to Los Alamos for experimentation and weapons manufacturing, the latter two years are probably the most important. Although the Los Alamos contribution to the entire plutonium budget was relatively small, in these four critical years it constituted 71--86 percent of the plutonium in bedload immediately downstream from Otowi.

  11. Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review April 14, 2014 - 4:27pm Addthis Media Invitation: 2014 SunShot Grand Challenge Summit and Peer Review You're Invited: 2014 SunShot Grand Challenge Summit and Peer Review Hear from solar's brightest visionaries about what's on the horizon for the U.S. solar energy industry WASHINGTON, D.C. -- Members of the media are invited to attend

  12. 2011 Annual Planning Summary for Office of Legacy Management (LM), Grand Junction (See LM APS)

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Legacy Management (LM), Grand Junction (See LM APS).

  13. EIS-0344: Grand Coulee-Bell 500 kV Transmission Line

    Energy.gov [DOE]

    This EIS analyzes DOE's proposed action for the construction and operation of the proposed Grand Coulee-Bell 500-kV Transmission Line Project.

  14. SunShot Grand Challenge Highlights Ambitious Efforts along the Entire Solar Spectrum

    Energy.gov [DOE]

    Today at the SunShot Grand Challenge Summit in Denver, Energy Secretary Steven Chu lauded progress in driving down the cost of solar.

  15. EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project...

    Office of Environmental Management (EM)

    LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, Willacy, and Cameron Counties, Texas EIS-0519: Rio Grande LNG Project and Rio Bravo Pipeline Project; Kleberg, Kenedy, ...

  16. Feasibility for Reintroducing Sockeye and Coho Salmon in the Grande Ronde Basin, 1998 Final Report.

    SciTech Connect (OSTI)

    Cramer, Steven P.; Witty, Kenneth L.

    1998-07-01

    A report concerning the feasibility of reintroducing Sockeye Salmon into Wallowa Lake and Coho Salmon into the Grande Ronde River Basin.

  17. Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA Save the Date: 2014 SunShot Grand Challenge Summit, May 19-22, Anaheim, CA January 9, 2014 - 10:02am Addthis The SunShot Initiative at the U.S. Department of Energy (DOE) will host the second 2014 SunShot Grand Challenge Summit and Peer Review from May 19-22 in Anaheim, California. Building on the success of the first Grand Challenge Summit in 2012, this conference will bring together more than

  18. EV Everywhere EV Everywhere Grand Challenge- Electric Drive (Power Electronics and Electric Machines) Workshop Agenda

    Energy.gov [DOE]

    Agenda for the EV Everywhere Grand Challenge - Electric Drive Workshop on July 24, 2012 at the Doubletree O'Hare, Chicago, IL

  19. INTEGRATED OUTCROP AND SUBSURFACE STUDIES OF THE INTERWELL ENVIRONMENT OF CARBONATE RESERVOIRS: CLEAR FORK (LEONARDIAN-AGE) RESERVOIRS, WEST TEXAS AND NEW MEXICO

    SciTech Connect (OSTI)

    F. Jerry Lucia

    2002-01-31

    This is the final report of the project ''Integrated Outcrop and Subsurface Studies of the Interwell Environment of Carbonate Reservoirs: Clear Fork (Leonardian-Age) Reservoirs, West Texas and New Mexico'', Department of Energy contract no. DE-AC26-98BC15105 and is the third in a series of similar projects funded jointly by the U.S. Department of Energy and The University of Texas at Austin, Bureau of Economic Geology, Reservoir Characterization Research Laboratory for Carbonates. All three projects focus on the integration of outcrop and subsurface data for the purpose of developing improved methods for modeling petrophysical properties in the interwell environment. The first project, funded by contract no. DE-AC22-89BC14470, was a study of San Andres outcrops in the Algerita Escarpment, Guadalupe Mountains, Texas and New Mexico, and the Seminole San Andres reservoir, Permian Basin. This study established the basic concepts for constructing a reservoir model using sequence-stratigraphic principles and rock-fabric, petrophysical relationships. The second project, funded by contract no. DE-AC22-93BC14895, was a study of Grayburg outcrops in the Brokeoff Mountains, New Mexico, and the South Cowden Grayburg reservoir, Permian Basin. This study developed a sequence-stratigraphic succession for the Grayburg and improved methods for locating remaining hydrocarbons in carbonate ramp reservoirs. The current study is of the Clear Fork Group in Apache Canyon, Sierra Diablo Mountains, West Texas, and the South Wasson Clear Fork reservoir, Permian Basin. The focus was on scales of heterogeneity, imaging high- and low-permeability layers, and the impact of fractures on reservoir performance. In this study (1) the Clear Fork cycle stratigraphy is defined, (2) important scales of petrophysical variability are confirmed, (3) a unique rock-fabric, petrophysical relationship is defined, (4) a porosity method for correlating high-frequency cycles and defining rock-fabric flow layers

  20. Second report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect (OSTI)

    Hinzman, R.L.; Adams, S.M.; Black, M.C.

    1993-06-01

    As stipulated in the National Pollutant Discharge Elimination System (NDPES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1986, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of BMAP are (1) to demonstrate that the current effluent limitations established for the Y-12 Plant protect the classified uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) and (2) to document the ecological effects resulting from implementation of a Water Pollution Control Program that includes construction of several large wastewater treatment facilities. BMAP consists of four major tasks: (1) ambient toxicity testing; (2) bioaccumulation studies; (3) biological indicator studies; and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic (bottom-dwelling) macroinvertebrates, and fish. This document, the second in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted between July 1986 and July 1988, although additional data collected outside this time period are included, as appropriate.

  1. First report on the Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program for East Fork Poplar Creek

    SciTech Connect (OSTI)

    Loar, J.M.; Adams, S.M.; Allison, L.J.; Boston, H.L.; Huston, M.A.; McCarthy, J.F.; Smith, J.G.; Southworth, G.R.; Stewart, A.J. ); Black, M.C. ); Gatz, A.J. Jr. ); Hinzman, R.L. ); Jimenez, B.D. (Puerto Rico Univ.,

    1992-07-01

    As stipulated in the National Pollutant Discharge Elimination System (NPDES) permit issued to the Oak Ridge Y-12 Plant on May 24, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for the receiving stream, East Fork Poplar Creek (EFPC). The objectives of the BMAP are (1) to demonstrate that the current effluent limitations established for the Oak Ridge Y-12 Plant protect the uses of EFPC (e.g., the growth and propagation of fish and aquatic life), as designated by the Tennessee Department of Environment and Conservation (TDEC) [formerly the Tennessee Department of Health and Environment (TDHE)], and (2) to document the ecological effects resulting from implementation of a water pollution control program that includes construction of several large wastewater treatment facilities. The BMAP consists of four major tasks: (1) ambient toxicity testing, (2) bioaccumulation studies, (3) biological indicator studies, and (4) ecological surveys of stream communities, including periphyton (attached algae), benthic macroinvertebrates, and fish. This document, the first in a series of reports on the results of the Y-12 Plant BMAP, describes studies that were conducted from May 1985 through September 1986.

  2. Final report for the pilot-scale thermal treatment of Lower East Fork Poplar Creek floodplain soils

    SciTech Connect (OSTI)

    1994-09-01

    IT Corporation (IT) was contracted by Martin Marietta Energy Systems, Inc. (Energy Systems) to perform a pilot-scale demonstration of the effectiveness of thermal desorption as a remedial technology for removing mercury from the Lower East Fork Poplar Creek (LEFPC) floodplain soil. Previous laboratory studies by Energy Systems suggested that this technology could reduce mercury to very low levels. This pilot-scale demonstration study was initiated to verify on an engineering scale the performance of thermal desorption. This report includes the details of the demonstration study, including descriptions of experimental equipment and procedures, test conditions, sampling and analysis, quality assurance (QA), detailed test results, and an engineering assessment of a conceptual full-scale treatment facility. The specific project tasks addressed in this report were performed between October 1993 and June 1994. These tasks include soil receipt, preparation, and characterization; prepilot (bench-scale) desorption tests; front-end materials handling tests; pilot tests; back-end materials handling tests; residuals treatment; and engineering scale-up assessment.

  3. Sanyo North America Co | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    North America Co Jump to: navigation, search Name: Sanyo North America Co Place: San Diego, California Zip: CA 92154 Product: Sanyo North America Co, a subsidiary of Japanese...

  4. NorthWinds Renewables | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    NorthWinds Renewables Jump to: navigation, search Name: NorthWinds Renewables Place: Harrison, New York Zip: 10528 Sector: Renewable Energy, Wind energy Product: NorthWinds...

  5. ,"North Dakota Natural Gas Summary"

    U.S. Energy Information Administration (EIA) (indexed site)

    ...3","N3010ND3","N3020ND3","N3035ND3","NA1570SND3","N3045ND3" "Date","North Dakota Natural Gas Wellhead Price (Dollars per Thousand Cubic Feet)","North Dakota Natural Gas Imports ...

  6. ,"North Carolina Natural Gas Summary"

    U.S. Energy Information Administration (EIA) (indexed site)

    ...,"N3035NC3","N3045NC3" "Date","Natural Gas Citygate Price in North Carolina (Dollars per Thousand Cubic Feet)","North Carolina Price of Natural Gas Delivered to Residential ...

  7. ,"North Dakota Natural Gas Summary"

    U.S. Energy Information Administration (EIA) (indexed site)

    ...","N3035ND3","N3045ND3" "Date","Natural Gas Citygate Price in North Dakota (Dollars per Thousand Cubic Feet)","North Dakota Price of Natural Gas Delivered to Residential Consumers ...

  8. ,"North Dakota Natural Gas Summary"

    U.S. Energy Information Administration (EIA) (indexed site)

    ...D3","N3035ND3","NA1570SND3","N3045ND3" "Date","North Dakota Natural Gas Wellhead Price (Dollars per Thousand Cubic Feet)","North Dakota Natural Gas Imports Price (Dollars per ...

  9. Cenozoic stratigraphic evolution, North Sea and Labrador Sea

    SciTech Connect (OSTI)

    Gradstein, F.M.; Grant, A.C.; Mudford, B.S. ); Berggren, W.A. ); Kaminski, M.A. ); D'Lorio, M.A. ); Cloetingh, S. ); Griffiths, C.M. )

    1990-05-01

    The authors are studying Cenozoic correlation patterns, burial trends, and subsidence history of the Central North Sea, Labrador, and Orphan basins. The authors objectives are (1) to detail intraregional mid-high latitude biozonations using noise filtering and probabilistic zonation techniques; (2) to detail paleobathymetric trends from basin margins to centers; (3) to apply this knowledge to model basin evolution, in the perspective of the evolving North Atlantic Ocean; (4) to evaluate causes for the occurrence of major hiatuses and rapid changes of subsidence; and (5) to relate rapid changes in sedimentation in the last few millions of years to model observed undercompaction trends. Cenozoic microfossil assemblages in these basins are similar, related to similarities in sedimentary and paleoeceanographic conditions. In more basinal wells, flysch-type agglutinated foraminiferal assemblages occur, also known from Carpathians, Trinidad, and Moroccan foredeeps. Over 90% of agglutinated taxa are common between these basins, although local stratigraphic ranges vary sufficiently to rely on the concept of average ranges, rather than total ones for correlations. Cenozoic stratigraphic resolution in the North Sea and Labrador basins generally is in 3-5-Ma units. and paleobathymetric zonations define a minimum of five niches, from inner shelf to middle slope regimes. Significant hiatuses occurred in the late Eocene through the Miocene, particularly in northern Labrador and northern North Sea. Subsidence in the Labrador/Grand Banks passive margin half grabens was strongly influenced by Labrador Sea opening between anomalies 34 (Campanian) and 13 (early Oligocene), when subsidence exceeded sedimentation and bathyal conditions prevailed along the margin. Thermally induced subsidence in the central North Sea grabens was considerable in the late Paleocene, when the Norwegian Sea started to open.

  10. Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

    SciTech Connect (OSTI)

    McGowan, Vance R.; Morton, Winston H.

    2008-12-30

    On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by

  11. Salto Grande. [1890-MW project on Vruguay River

    SciTech Connect (OSTI)

    de Hoyos, R.J.

    1980-09-01

    A joint hydroelectric project, the Salto Grande Dam on the Uruguay River, serves six million people in Argentina and Uruguay. The construction day was continuous from April 1974 until the first turbine began on schedule in July 1979. Although planning began in 1890 by individual visionaries who saw the river's potential, serious efforts did not get underway for another 50 years. The project became a technical training school and has built up a recognized management team in the process. Financing became available only after the 1973 oil embargo. The benefits of regional cooperation to develop a common resource enables the two countries to provide water resources, electric power, navigable streams for commerce and recreation, a common highway, and an interconnecting railroad. The cooperative infrastructure established to meet the needs of project personnel has improved living conditions for the area. (DCK)

  12. A Leptophobic Z' And Dark Matter From Grand Unification

    SciTech Connect (OSTI)

    Buckley, Matthew R.; Hooper, Dan; Rosner, Jonathan L.

    2011-09-01

    We explore the phenomenology of Grand Unified Models based on the E_6 group, focusing on the Z' with suppressed couplings to leptons that can appear in such models. We find that this Z' can accommodate the W+dijets anomaly reported by the CDF collaboration. Furthermore, a viable dark matter candidate in the form of a right-handed sneutrino is also present within the fundamental 27-dimensional representation of E_6. Through its sizable couplings to the Z', the dark matter is predicted to possess an elastic scattering cross section with neutrons which can generate the signals reported by the CoGeNT and DAMA/LIBRA collaborations. To avoid being overproduced in the early universe, the dark matter must annihilate to leptons through the exchange of charged or neutral fermions which appear in the 27 of E_6, providing an excellent fit to the gamma ray spectrum observed from the Galactic Center by the Fermi Gamma Ray Space Telescope.

  13. Precision welding cuts downtime at Grand Coulee Dam

    SciTech Connect (OSTI)

    Light, S.; White, E.

    1997-03-01

    The three large 700-MW generators at Grand Coulee Dam--originally built and installed by Canadian General Electric in the late 1970s--are being upgraded using precision welding techniques and leading edge installation technology. These generators suffered from numerous water leaks at and around the bar water connections, resulting in a significant number of forced repair outages that were increasing in frequency. The US Bureau of Reclamation, in conjunction with the Bonneville Power Administration, decided to overhaul these machines. The design from Siemens Power Corp. provided state-of-the-art materials and included a rating increase from 700 to 805 MW, which would make these three machines the highest output single-unit hydrogenerators in the world. The upgrade was to be accomplished with only the replacement of the stator components; there would be no changes to the rotating element. The cost for all three machines is approximately $27.5 million. This project is described in this paper.

  14. Scientific Grand Challenges Workshop Series | U.S. DOE Office of Science

    Office of Science (SC) [DOE]

    (SC) Scientific Grand Challenges Workshop Series Advanced Scientific Computing Research (ASCR) ASCR Home About Research Facilities Science Highlights Benefits of ASCR Funding Opportunities Advanced Scientific Computing Advisory Committee (ASCAC) Community Resources Featured Content ASCR Discovery ASCR Program Documents ASCR Workshops and Conferences Workshops & Conferences Archive DOE Simulations Summit Scientific Grand Challenges Workshop Series SciDAC Conferences HPC Operations Review

  15. Stokes County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Climate Zone Subtype A. Places in Stokes County, North Carolina Danbury, North Carolina King, North Carolina Tobaccoville, North Carolina Walnut Cove, North Carolina Retrieved from...

  16. Pender County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Climate Zone Number 3 Climate Zone Subtype A. Places in Pender County, North Carolina Atkinson, North Carolina Burgaw, North Carolina St. Helena, North Carolina Surf City, North...

  17. Hettinger County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    in Hettinger County, North Dakota Central Hettinger, North Dakota Mott, North Dakota New England, North Dakota Regent, North Dakota Retrieved from "http:en.openei.orgw...

  18. Pitt County, North Carolina: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Carolina Greenville, North Carolina Grifton, North Carolina Grimesland, North Carolina Simpson, North Carolina Winterville, North Carolina Retrieved from "http:en.openei.orgw...

  19. Dunn County, North Dakota: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    A. Places in Dunn County, North Dakota Dodge, North Dakota Dunn Center, North Dakota Halliday, North Dakota Killdeer, North Dakota Retrieved from "http:en.openei.orgw...

  20. Ransom County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    North Dakota Enderlin, North Dakota Fort Ransom, North Dakota Lisbon, North Dakota Sheldon, North Dakota Retrieved from "http:en.openei.orgwindex.php?titleRansomCounty,N...

  1. Sampson County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Roseboro, North Carolina Salemburg, North Carolina Spiveys Corner, North Carolina Turkey, North Carolina Vann Crossroads, North Carolina Retrieved from "http:en.openei.org...

  2. Kidder County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Climate Zone Number 7 Climate Zone Subtype A. Places in Kidder County, North Dakota Dawson, North Dakota Kickapoo, North Dakota Pettibone, North Dakota Robinson, North Dakota...

  3. Columbus County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Zone Number 3 Climate Zone Subtype A. Places in Columbus County, North Carolina Boardman, North Carolina Bolton, North Carolina Brunswick, North Carolina Cerro Gordo, North...

  4. Lewis-S.PDF

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Microphysical Measurements of Cirrus Properties During ARM 2000 IOP S. Lewis and A. J. Heymsfield National Center for Atmospheric Research Boulder, Colorado C. Twohy Oregon State University Corvallis, Oregon M. R. Poellot University of North Dakota Grand Forks, North Dakota Introduction Retrievals of cirrus properties from remote sensing instruments need a good base for proper inter- pretation. We will investigate some important microphysical parameters that should help towards this

  5. matrosov-98.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Intercomparisons Between Remote and In Situ Measurements of Ice Cloud Microphysics During the Spring 1997 Cloud IOP S. Y. Matrosov and B. E. Martner National Oceanic and Atmospheric Administration Boulder, Colorado A. J. Heymsfield National Center for Atmospheric Research Boulder, Colorado G. G. Mace University of Utah Salt Lake City, Utah M. R. Poellot University of North Dakota Grand Forks, North Dakota Introduction The spring 1997 Cloud Intensive Observation Period (IOP) was conducted at the

  6. 1

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    GCM Parameterization of Bimodal Size Spectra for Mid-latitude Cirrus Clouds D. Ivanova, D. L. Mitchell, and W. P. Arnott Division of Atmospheric Sciences Desert Research Institute Reno, Nevada M. R. Poellot Department of Atmospheric Science University of North Dakota Grand Forks, North Dakota Introduction The solar radiative properties of ice clouds are primarily a function of the ice water content (IWC) and the effective diameter (Mitchell et al. 1998; Wyser and Yang 1998), defined as D eff =

  7. Modification and Application of a New Method for Retrieving Water-Cloud Microphysics Vertical Profile

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Modification and Application of a New Method for Retrieving Water-Cloud Microphysics Vertical Profile F.-L Chang and Z. Li Earth System Science Interdisciplinary Center University of Maryland College Park, Maryland Z. Li Department of Meteorology University of Maryland College Park, Maryland X. Dong Department of Atmospheric Sciences University of North Dakota Grand Forks, North Dakota Introduction Low- level boundary layer clouds have the most significant influence on cloud radiative forcing

  8. Simulation of Post-Frontal Boundary Layers Observed During the ARM 2000 Cloud IOP

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Simulation of Post-Frontal Boundary Layers Observed During the ARM 2000 Cloud IOP D. B. Mechem and Y. L. Kogan Cooperative Institute for Mesoscale Meteorological Studies University of Oklahoma Norman, Oklahoma M. Poellot University of North Dakota Grand Forks, North Dakota Introduction Large-eddy simulation (LES) models have been widely employed in the study of radiatively forced cloud topped boundary layers (CTBL). These boundary layers are typically well mixed and characterized by a sharp jump

  9. Categorical Exclusion Determinations: North Carolina | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Carolina Categorical Exclusion Determinations: North Carolina Location Categorical Exclusion Determinations issued for actions in North Carolina. DOCUMENTS AVAILABLE FOR DOWNLOAD ...

  10. North Carolina State Historic Preservation Programmatic Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North Carolina State Historic Preservation Programmatic Agreement North Carolina State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between ...

  11. Kelsey North Geothermal Project | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    North Geothermal Project Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Development Project: Kelsey North Geothermal Project Project Location Information...

  12. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... Golden, CO (United States) Grand Forks Energy Technology Center (United States) Grand ... Idaho National Laboratory Specific Manufacturing Plant Idaho National Laboratory, Idaho ...

  13. Developing a Natural Gas-Powered Bus Rapid Transit Service: A Case Study on Leadership: Roaring Fork Transportation Authority (Presentation); NREL (National Renewable Energy Laboratory)

    SciTech Connect (OSTI)

    Schroeder, A.

    2015-03-01

    The Roaring Fork Transportation Authority (RFTA) represents a series of unique successes in alternative fuel deployment by pushing the envelope with innovative solutions. In the last year, RFTA demonstrated the ability to utilize compressed natural gas buses at a range of altitudes, across long distances, in extreme weather conditions and in a modern indoor fueling and maintenance facility - allwhile saving money and providing high-quality customer service. This case study will highlight how the leadership of organizations and communities that are implementing advances in natural gas vehicle technology is paving the way for broader participation.

  14. DOE Tour of Zero: The Depot Neighborhood by Habitat for Humanity, Grand

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Traverse Region | Department of Energy Depot Neighborhood by Habitat for Humanity, Grand Traverse Region DOE Tour of Zero: The Depot Neighborhood by Habitat for Humanity, Grand Traverse Region 1 of 22 Habitat for Humanity, Grand Traverse Region, built this 1,352-square-foot home in Traverse City, Michigan, to the performance criteria of the U.S. Department of Energy Zero Energy Ready Home (ZERH) program. 2 of 22 The builder installed a 7.43-kW solar photovoltaic electric system that should

  15. DOE Tour of Zero: The Depot Neighborhood by Habitat for Humanity, Grand

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Traverse Region | Department of Energy Depot Neighborhood by Habitat for Humanity, Grand Traverse Region DOE Tour of Zero: The Depot Neighborhood by Habitat for Humanity, Grand Traverse Region Addthis 1 of 22 Habitat for Humanity, Grand Traverse Region, built this 1,352-square-foot home in Traverse City, Michigan, to the performance criteria of the U.S. Department of Energy Zero Energy Ready Home (ZERH) program. 2 of 22 The builder installed a 7.43-kW solar photovoltaic electric system that

  16. Grand challenge problems in environmental modeling and remediation: Groundwater contaminant transport. Final project report 1998

    SciTech Connect (OSTI)

    1998-04-01

    The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997.

  17. Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    as a Feedstock | Department of Energy Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock Grand Opening for Project LIBERTY: Nation's First Plant to Use Corn Waste as a Feedstock August 28, 2014 - 12:33pm Addthis POET-DSM's Project LIBERTY in Emmetsburg, Iowa, will celebrate its grand opening September 3, 2014, becoming the first commercial-scale cellulosic ethanol plant to use corn waste as a feedstock. Developed through a joint venture between POET LLC

  18. Highlights from the 2014 SunShot Grand Challenge Summit | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Highlights from the 2014 SunShot Grand Challenge Summit Highlights from the 2014 SunShot Grand Challenge Summit Addthis Packed House 1 of 12 Packed House An energetic crowd of hundreds of leaders throughout the solar community gathered for the 2014 SunShot Grand Challenge Summit to work together to reduce the costs of solar energy technologies. Image: SunShot Initiative, Energy Department. Solar Tech Forum 2 of 12 Solar Tech Forum Attendees enter the SunShot Summit Technology forum --

  19. Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit May 22, 2014 - 10:13am Addthis Packed House 1 of 12 Packed House An energetic crowd of hundreds of leaders throughout the solar community gathered for the 2014 SunShot Grand Challenge Summit to work together to reduce the costs of solar energy technologies. Image: SunShot Initiative, Energy Department. Solar Tech Forum 2

  20. Preservationists Tour Historic Log Cabin at the Grand Junction, Colorado, Office

    Energy.gov [DOE]

    A working committee of local historic preservation specialists held their monthly meeting at the U.S. Department of Energy Office of Legacy Management (LM) Grand Junction, Colorado, Office on...

  1. EIS-0485: Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska

    Energy.gov [DOE]

    DOE’s Western Area Power Administration prepared an EIS to evaluate the environmental impacts of interconnecting the proposed Grande Prairie Wind Farm, in Holt County, near O’Neill, Nebraska, to Western’s power transmission system.

  2. Grand Junction Office Founder Honored at the Philip C. Leahy Memorial Park Dedication and Open House

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) held an open house and park dedication at the Grand Junction, Colorado, Office to commemorate its place in the Manhattan Project...

  3. Grand Challenge Kicks Off with 34 Entries to Improve ORP Mission

    Energy.gov [DOE]

    RICHLAND, Wash. – The 2016 EM Office of River Protection (ORP) Grand Challenge submissions are in, with 34 entries ranging in subject from methods to treat waste in Hanford’s western tank farms to software for waste processing.

  4. Top 5 Reasons to Attend the SunShot Grand Challenge Solar Summit

    Office of Energy Efficiency and Renewable Energy (EERE)

    Anticipation for the SunShot Grand Challenge Summit is heating up. Register now for the event, which is taking place May 19 to May 22 in Anaheim, California.

  5. Solar Community Comes Out in Full Force for SunShot Grand Challenge Summit

    Energy.gov [DOE]

    This week in sunny Anaheim, California, more than 800 solar industry leaders gathered for the 2014 SunShot Grand Challenge Summit. The Summit, launched by the Energy Department’s SunShot Initiative...

  6. Twenty-Five Years of Ecological Recovery of East Fork Poplar Creek: Review of Environmental Problems and Remedial Actions

    SciTech Connect (OSTI)

    Smith, John G; Loar, James M; Stewart, Arthur J

    2011-01-01

    In May 1985, a National Pollutant Discharge Elimination System permit was issued for the Department of Energy s Y-12 National Security Complex (Y-12 Complex) in Oak Ridge, Tennessee, USA, allowing discharge of effluents to East Fork Poplar Creek (EFPC). The effluents ranged from large volumes of chlorinated oncethrough cooling water and cooling tower blow-down to smaller discharges of treated and untreated process wastewaters, which contained a mixture of heavy metals, organics, and nutrients, especially nitrates. As a condition of the permit, a Biological Monitoring and Abatement Program (BMAP) was developed to meet two major objectives: demonstrate that the established effluent limitations were protecting the classified uses of EFPC, and document the ecological effects resulting from implementing a Water Pollution Control Program at the Y-12 Complex. The second objective is the primary focus of the other papers in this special series. This paper provides a history of pollution and the remedial actions that were implemented; describes the geographic setting of the study area; and characterizes the physicochemical attributes of the sampling sites, including changes in stream flow and temperature that occurred during implementation of the BMAP. Most of the actions taken under the Water Pollution Control Program were completed between 1986 and 1998, with as many as four years elapsing between some of the most significant actions. The Water Pollution Control Program included constructing nine new wastewater treatment facilities and implementation of several other pollution-reducing measures, such as a best management practices plan; area-source pollution control management; and various spill-prevention projects. Many of the major actions had readily discernable effects on the chemical and physical conditions of EFPC. As controls on effluents entering the stream were implemented, pollutant concentrations generally declined and, at least initially, the volume of water

  7. EV Everywhere Grand Challenge Kick-off Parameters and Analysis | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy off Parameters and Analysis EV Everywhere Grand Challenge Kick-off Parameters and Analysis Presentation at the EV Everywhere Grand Challenge Kick-Off meeting held on June 21, 2012 at the Hyatt Regency, Dearborn, MI. 4-jake.pdf (464.38 KB) More Documents & Publications EV Everywhere Electric Drive Workshop: Preliminary Target-Setting Framework EV Everywhere Battery Workshop: Preliminary Target-Setting Framework EV Everywhere Consumer/Charging Workshop: Target-Setting Framework

  8. U.S. Department of Energy Grand Junction Office Listed on National Register

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Historic Places | Department of Energy U.S. Department of Energy Grand Junction Office Listed on National Register of Historic Places U.S. Department of Energy Grand Junction Office Listed on National Register of Historic Places November 2, 2016 - 12:45pm Addthis NEWS CONTACTS Laurena Davis, Navarro Historian/Public Participation Specialist DOE Legacy Management Support Contractor (970) 248-6141 laurena.davis@lm.doe.gov Terri Benson, The Business Incubator Center Marketing Manager (970)

  9. Grand Traverse Band of Ottawa & Chippewa Indians - Renewable Energy Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Tribal Energy Program Review DOE Tribal Energy Program Review Denver, Colorado Denver, Colorado November 5 November 5 - - 8, 2007 8, 2007 Final Report Final Report December 2007 December 2007 Grand Traverse Band Grand Traverse Band * * 4,023 Members 4,023 Members * * 2,370 Acres 2,370 Acres - - Checkerboard Checkerboard * * Six Six - - County Service Area County Service Area * * EDC: 2 Casinos, Resort (424 Rooms), EDC: 2 Casinos, Resort (424 Rooms), Gas Station, etc. Gas Station, etc. * *

  10. Grand Traverse Band of Ottawa and Chippewa Indians - Renewable Energy Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Tribal Energy Forum DOE Tribal Energy Forum October 25, 2006 October 25, 2006 Grand Traverse Band Grand Traverse Band * * 3,988 Members 3,988 Members * * 2,370 Acres 2,370 Acres - - Checkerboard Checkerboard * * Six Six - - County Service Area County Service Area * * EDC: 2 Casinos, Resort (424 Rooms), Gas EDC: 2 Casinos, Resort (424 Rooms), Gas Station, etc. Station, etc. * * Gov Gov ' ' t: Administration, Housing, Medicine t: Administration, Housing, Medicine Lodge, Strong Heart Center,

  11. Grand Traverse Band of Ottawa and Chippewa Indians - Renewable Energy Feasibility Study

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Renewable Energy & Energy Efficiency Feasibility Study DOE Tribal Energy Program Review Denver, Colorado November 14 - 20, 2008 November 2008 Grand Traverse Band * 3,988 Members * 2,370 Acres - Checkerboard * Six-County Service Area * EDC: 2 Casinos, Resort Hotels (600 Rooms), Gas Station, etc. * Gov't: Administration, Housing, Medicine Lodge, Strong Heart Center, Day Care, etc. Grand Traverse Resort and Spa Turtle Creek Casino Hotel (June 08) GTB Energy Vision & Plan Three Focus Areas:

  12. Deep Production Well for Geothermal Direct-Use Heating of A Large Commercial Greenhouse, Radium Springs, Rio Grande Rift, New Mexico

    SciTech Connect (OSTI)

    James C. Witcher

    2002-01-02

    Expansion of a large commercial geothermally-heated greenhouse is underway and requires additional geothermal fluid production. This report discusses the results of a cost-shared U.S. Department of Energy (DOE) and A.R. Masson, Inc. drilling project designed to construct a highly productive geothermal production well for expansion of the large commercial greenhouse at Radium Springs. The well should eliminate the potential for future thermal breakthrough from existing injection wells and the inducement of inflow from shallow cold water aquifers by geothermal production drawdown in the shallow reservoir. An 800 feet deep production well, Masson 36, was drilled on a US Bureau of Land Management (BLM) Geothermal Lease NM-3479 at Radium Springs adjacent to the A. R. Masson Radium Springs Farm commercial greenhouse 15 miles north of Las Cruces in Dona Ana County, New Mexico just west of Interstate 25 near the east bank of the Rio Grande. The area is in the Rio Grande rift, a tectonically-active region with high heat flow, and is one of the major geothermal provinces in the western United State.

  13. Development of a quartz tuning-fork-based force sensor for measurements in the tens of nanoNewton force range during nanomanipulation experiments

    SciTech Connect (OSTI)

    Oiko, V. T. A. Rodrigues, V.; Ugarte, D.; Martins, B. V. C.; Silva, P. C.

    2014-03-15

    Understanding the mechanical properties of nanoscale systems requires new experimental and theoretical tools. In particular, force sensors compatible with nanomechanical testing experiments and with sensitivity in the nN range are required. Here, we report the development and testing of a tuning-fork-based force sensor for in situ nanomanipulation experiments inside a scanning electron microscope. The sensor uses a very simple design for the electronics and it allows the direct and quantitative force measurement in the 1100 nN force range. The sensor response is initially calibrated against a nN range force standard, as, for example, a calibrated Atomic Force Microscopy cantilever; subsequently, applied force values can be directly derived using only the electric signals generated by the tuning fork. Using a homemade nanomanipulator, the quantitative force sensor has been used to analyze the mechanical deformation of multi-walled carbon nanotube bundles, where we analyzed forces in the 540 nN range, measured with an error bar of a few nN.

  14. A GRAND DESIGN FOR GALAXY CLUSTERS: CONNECTIONS AND PREDICTIONS

    SciTech Connect (OSTI)

    Cavaliere, A.; Lapi, A.; Fusco-Femiano, R.

    2011-11-20

    We analyze with our entropy-based Supermodel a library of 12 galaxy clusters featuring extended X-ray observations of their intracluster plasma (ICP). The few intrinsic parameters of the model-basically, the central level and the outer slope of the entropy profile-enable us to uniformly derive not only robust snapshots of the ICP thermal state, but also the 'concentration' parameter marking the age of the host dark matter (DM) halo. We test these profiles for consistency with numerical simulations and observations. We find the central and the outer entropy correlate, so that these clusters split into two main classes defined on the basis of low (LE) or high entropy (HE) conditions prevailing throughout the ICP. We also find inverse correlations between the central/outer entropy and the halo concentration. We interpret these in terms of mapping the ICP progress on timescales around 5 Gyr toward higher concentrations, under the drive of the DM halo development. The progress proceeds from HE clusters to LE clusters, toward states of deeper entropy erosion by radiative cooling in the inner regions and of decreasing outer entropy production as the accretion peters out. We propose these radial and time features constitute a cluster Grand Design that we use here to derive a number of predictions. For HE clusters we predict sustained outer temperature profiles. For LEs we expect the outer entropy ramp to bend over; hence the temperature declines before steepening at low z; this feature goes together with an increasing turbulent support, a condition that can be directly probed with the Sunyaev-Zel'dovich effect. We finally discuss the looming out of two intermediate subsets: a wiggled HE-tilde at low z that features central temperature profiles retaining imprints of entropy discharged by active galactic nuclei or deep mergers and high-z LEs where the cosmogony/cosmology had little time to enforce a sharp outer entropy bending.

  15. High performance computing and communications grand challenges program

    SciTech Connect (OSTI)

    Solomon, J.E.; Barr, A.; Chandy, K.M.; Goddard, W.A., III; Kesselman, C.

    1994-10-01

    The so-called protein folding problem has numerous aspects, however it is principally concerned with the {ital de novo} prediction of three-dimensional (3D) structure from the protein primary amino acid sequence, and with the kinetics of the protein folding process. Our current project focuses on the 3D structure prediction problem which has proved to be an elusive goal of molecular biology and biochemistry. The number of local energy minima is exponential in the number of amino acids in the protein. All current methods of 3D structure prediction attempt to alleviate this problem by imposing various constraints that effectively limit the volume of conformational space which must be searched. Our Grand Challenge project consists of two elements: (1) a hierarchical methodology for 3D protein structure prediction; and (2) development of a parallel computing environment, the Protein Folding Workbench, for carrying out a variety of protein structure prediction/modeling computations. During the first three years of this project, we are focusing on the use of two proteins selected from the Brookhaven Protein Data Base (PDB) of known structure to provide validation of our prediction algorithms and their software implementation, both serial and parallel. Both proteins, protein L from {ital peptostreptococcus magnus}, and {ital streptococcal} protein G, are known to bind to IgG, and both have an {alpha} {plus} {beta} sandwich conformation. Although both proteins bind to IgG, they do so at different sites on the immunoglobin and it is of considerable biological interest to understand structurally why this is so. 12 refs., 1 fig.

  16. ,"North Dakota Natural Gas Summary"

    U.S. Energy Information Administration (EIA) (indexed site)

    Prices" "Sourcekey","N3050ND3","N3010ND3","N3020ND3","N3035ND3","N3045ND3" "Date","Natural Gas Citygate Price in North Dakota (Dollars per Thousand Cubic Feet)","North Dakota Price ...

  17. Environmental monitoring report on the US Department of Energy's Grand Junction Projects Office facility, Grand Junction, Colorado, for calendar year 1987

    SciTech Connect (OSTI)

    Not Available

    1988-05-01

    This report presents results of environmental monitoring activities conducted in 1987 at the US Department of Energy's (DOE) Grand Junction Projects Office (GJPO) Facility in Colorado. The site is included under the DOE's Defense Decontamination and Decommissioning (Defense D and D) Program.

  18. Washington County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Zone Number 3 Climate Zone Subtype A. Places in Washington County, North Carolina Creswell, North Carolina Plymouth, North Carolina Roper, North Carolina Retrieved from "http:...

  19. Stark County, North Dakota: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Dakota Gladstone, North Dakota Richardton, North Dakota South Heart, North Dakota Taylor, North Dakota Retrieved from "http:en.openei.orgwindex.php?titleStarkCounty,Nor...

  20. McDowell County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Zone Number 4 Climate Zone Subtype A. Places in McDowell County, North Carolina Marion, North Carolina Old Fort, North Carolina West Marion, North Carolina Retrieved from...

  1. Davie County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Zone Number 4 Climate Zone Subtype A. Places in Davie County, North Carolina Bermuda Run, North Carolina Cooleemee, North Carolina Mocksville, North Carolina Retrieved from...

  2. Stora Enso, North America | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Stora Enso, North America Stora Enso, North America Stora Enso, North America (33.68 KB) More Documents & Publications NewPage Corporation Slide 1 NewPage Demonstration-Scale ...

  3. Post-closure permit application for the Upper East Fork Poplar Creek hydrogeologic regime at the Y-12 Plant: New Hope Pond and Eastern S-3 ponds plume. Revision 2

    SciTech Connect (OSTI)

    1995-02-01

    The intent of this Post-Closure, Permit Application (PCPA) is to satisfy the post-closure permitting requirements of the Tennessee Department of Environment and Conservation (TDEC) Rule 1200-1-11. This application is for the entire Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is within the Bear Creek Valley (BCV). This PCPA has been prepared to include the entire East Fork Regime because, although there are numerous contaminant sources within the regime, the contaminant plumes throughout the East Fork Regime have coalesced and can no longer be distinguished as separate plumes. This PCPA focuses on two recognized Resource Conservation and Recovery Act (RCRA) interim status units: New Hope Pond (NHP) and the eastern S-3 Ponds plume. This PCPA presents data from groundwater assessment monitoring throughout the regime, performed since 1986. Using this data, this PCPA demonstrates that NHP is not a statistically discernible source of groundwater contaminants and that sites upgradient of NHP are the likely sources of groundwater contamination seen in the NHP vicinity. As such, this PCPA proposes a detection monitoring program to replace the current assessment monitoring program for NHP.

  4. North Sea platforms revamped

    SciTech Connect (OSTI)

    O'Hare, J.

    1999-12-01

    Many of the early North Sea platforms are reaching their end-of-field life. Most are still equipped with their original drilling package. In a few cases the package has either been removed or decommissioned. The early installations were designed for much simpler and less demanding wells than the horizontal, extended-reach or designer wells common today. Extended-reach wells now can be drilled realistically from ageing platforms, without incurring massive capital expenditure. This can be achieved using the existing drilling package to the limit of its capabilities and supplementing where necessary with relatively minor upgrades or the use of temporary equipment. Drilling even a few more wells from existing platforms not only prolongs field life, it enables any surplus processing capacity to be made available to develop near-field potential with extended-reach drilling (ERD) or by tying back subsea satellite wells, or for processing third-party fluids. The paper describes well design, surface equipment, mud pumps, shakers and solids control equipment, drill cuttings disposal systems, derrick and hoisting system, top drive and drillstring, downhole equipment, well planning, casing wear, logistics, rig preparations, and ERD vs. subsea tie-backs.

  5. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report (40.43 KB) More Documents & Publications North American Electric Reliability Council Power Outage Update ...

  6. EDP Renewables North America | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    EDP Renewables North America Jump to: navigation, search Name: EDP Renewables North America Address: 808 Travis St, Suite 700 Place: Houston, Texas Zip: 77002 Region: Texas Area...

  7. RES North America LLC | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    RES North America LLC Jump to: navigation, search Name: RES North America LLC Place: Portland, Oregon Zip: 97258 Sector: Wind energy Product: US development arm of RES Ltd....

  8. Volvo Trucks North America | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Volvo Trucks North America Jump to: navigation, search Name: Volvo Trucks North America Place: Dublin, VA Information About Partnership with NREL Partnership with NREL Yes...

  9. North Dakota/Incentives | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Renewable Energy Tax Credit (North Dakota) Corporate Tax Credit Yes Residential Energy Efficiency Rebates (Offered by 5 Utilities) (North Dakota) Utility Rebate Program Yes...

  10. University of North Carolina | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Carolina Jump to: navigation, search Name: University of North Carolina Place: Chapel Hill, North Carolina Zip: 27514 Sector: Solar, Wind energy Product: Chapel Hill-based public...

  11. North Carolina State University | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    University Jump to: navigation, search Name: North Carolina State University Place: Raleigh, North Carolina Zip: 27695 Sector: Biofuels, Biomass, Solar Product: Public university...

  12. 2015 North Carolina Building Performance Conference | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2015 North Carolina Building Performance Conference 2015 North Carolina Building Performance Conference September 1, 2015 9:00AM EDT to September 3, 2015 5...

  13. North Cove Capital Advisors | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Cove Capital Advisors Jump to: navigation, search Name: North Cove Capital Advisors Place: Connecticut Sector: Carbon Product: North Cove is an advisory firm that works...

  14. North America Power Partners | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    North America Power Partners Place: Mount Laurel, New Jersey Product: New Jersey-based demand response specialists focusing on large scale energy savings. References: North...

  15. Invest North Pty Ltd | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Invest North Pty Ltd Jump to: navigation, search Name: Invest North Pty Ltd Place: Darwin, Northern Territory, Australia Sector: Solar Product: Onwer of a solar power system atop...

  16. North American Electric Reliability Corporation Interconnections...

    Energy.gov (indexed) [DOE]

    Map of the North American Electric Reliability Corporation Interconnection showing the Eastern, Western, and Teaxs Interconnectins. North American Electric Reliability Corporation...

  17. Comments of North American Electric Reliability Corporation ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability Corporation ...

  18. North American Electric Reliability Corporation (NERC): Ensuring...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North American Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk Electric System North American Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk ...

  19. North Carolina/Incentives | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    for North Carolina CSV (rows 1 - 24) Incentive Incentive Type Active Ashe County - Wind Energy System Ordinance (North Carolina) SolarWind Permitting Standards Yes Building...

  20. Sources of Mercury to East Fork Poplar Creek Downstream from the Y-12 National Security Complex: Inventories and Export Rates

    SciTech Connect (OSTI)

    Southworth, George R; Greeley Jr, Mark Stephen; Peterson, Mark J; Lowe, Kenneth Alan; Ketelle, Richard H; Floyd, Stephanie B

    2010-02-01

    East Fork Poplar Creek (EFPC) in Oak Ridge, Tennessee, has been heavily contaminated with mercury (also referred to as Hg) since the 1950s as a result of historical activities at the U.S. Department of Energy (DOE) Y-12 National Security Complex (formerly the Oak Ridge Y-12 Plant and hereinafter referred to as Y-12). During the period from 1950 to 1963, spills and leaks of elemental mercury (Hg{sup 0}) contaminated soil, building foundations, and subsurface drainage pathways at the site, while intentional discharges of mercury-laden wastewater added 100 metric tons of mercury directly to the creek (Turner and Southworth 1999). The inventory of mercury estimated to be lost to soil and rock within the facility was 194 metric tons, with another estimated 70 metric tons deposited in floodplain soils along the 25 km length of EFPC (Turner and Southworth 1999). Remedial actions within the facility reduced mercury concentrations in EFPC water at the Y-12 boundary from > 2500 ng/L to about 600 ng/L by 1999 (Southworth et al. 2000). Further actions have reduced average total mercury concentration at that site to {approx}300 ng/L (2009 RER). Additional source control measures planned for future implementation within the facility include sediment/soil removal, storm drain relining, and restriction of rainfall infiltration within mercury-contaminated areas. Recent plans to demolish contaminated buildings within the former mercury-use areas provide an opportunity to reconstruct the storm drain system to prevent the entry of mercury-contaminated water into the flow of EFPC. Such actions have the potential to reduce mercury inputs from the industrial complex by perhaps as much as another 80%. The transformation and bioaccumulation of mercury in the EFPC ecosystem has been a perplexing subject since intensive investigation of the issue began in the mid 1980s. Although EFPC was highly contaminated with mercury (waterborne mercury exceeded background levels by 1000-fold, mercury in

  1. Grande Ronde Basin Spring Chinook Salmon Captive Broodstock Program, 1995-2002 Summary Report.

    SciTech Connect (OSTI)

    Hoffnagle, Timothy; Carmichael, Richard; Noll, William

    2003-12-01

    The Grande Ronde Basin once supported large runs of chinook salmon Oncorhynchus tshawytscha and estimated peak escapements in excess of 10,000 occurred as recently as the late 1950's (U.S. Army Corps of Engineers 1975). Natural escapement declines in the Grande Ronde Basin have been severe and parallel those of other Snake River populations. Reduced productivity has primarily been attributed to increased mortality associated with downstream and upstream migration past eight dams and reservoirs in the Snake and Columbia rivers. Reduced spawner numbers, combined with human manipulation of previously important spawning and rearing habitat in the Grande Ronde Basin, have resulted in decreased spawning distribution and population fragmentation of chinook salmon in the Grande Ronde Basin (Figure 1; Table 1). Escapement of spring/summer chinook salmon in the Snake River basin included 1,799 adults in 1995, less than half of the previous record low of 3,913 adults in 1994. Catherine Creek, Grande Ronde River and Lostine River were historically three of the most productive populations in the Grande Ronde Basin (Carmichael and Boyce 1986). However, productivity of these populations has been poor for recent brood years. Escapement (based on total redd counts) in Catherine Creek and Grande Ronde and Lostine rivers dropped to alarmingly low levels in 1994 and 1995. A total of 11, 3 and 16 redds were observed in 1994 in Catherine Creek, upper Grande Ronde River and Lostine River, respectively, and 14, 6 and 11 redds were observed in those same streams in 1995. In contrast, the maximum number of redds observed in the past was 505 in Catherine Creek (1971), 304 in the Grande Ronde River (1968) and 261 in 1956 in the Lostine River (Tranquilli et al 2003). Redd counts for index count areas (a standardized portion of the total stream) have also decreased dramatically for most Grande Ronde Basin streams from 1964-2002, dropping to as low as 37 redds in the 119.5 km in the index survey

  2. North American LNG Project Sourcebook

    SciTech Connect (OSTI)

    2007-06-15

    The report provides a status of the development of LNG Import Terminal projects in North America, and includes 1-2 page profiles of 63 LNG projects in North America which are either in operation, under construction, or under development. For each project, the sourcebook provides information on the following elements: project description, project ownership, project status, projected operation date, storage capacity, sendout capacity, and pipeline interconnection.

  3. Grande Ronde Endemic Spring Chinook Salmon Supplementation Program : Facility Operation and Maintenance Facilities, Annual Report 2003.

    SciTech Connect (OSTI)

    McLean, Michael L.; Seeger, Ryan; Hewitt, Laurie

    2004-01-01

    Anadromous salmonid stocks have declined in both the Grande Ronde River Basin (Lower Snake River Compensation Plan (LSRCP) Status Review Symposium 1998) and in the entire Snake River Basin (Nehlsen et al. 1991), many to the point of extinction. The Grande Ronde River Basin historically supported large populations of fall and spring chinook (Oncorhynchus tshawytscha), sockeye (O. nerka), and coho (O. kisutch) salmon and steelhead trout (O. mykiss) (Nehlsen et al. 1991). The decline of chinook salmon and steelhead populations and extirpation of coho and sockeye salmon in the Grande Ronde River Basin was, in part, a result of construction and operation of hydroelectric facilities, over fishing, and loss and degradation of critical spawning and rearing habitat in the Columbia and Snake River basins (Nehlsen et al. 1991). Hatcheries were built in Oregon, Washington and Idaho under the Lower Snake River Compensation Plan (LSRCP) to compensate for losses of anadromous salmonids due to the construction and operation of the lower four Snake River dams. Lookingglass Hatchery (LGH) on Lookingglass Creek, a tributary of the Grande Ronde River, was completed under LSRCP in 1982 and has served as the main incubation and rearing site for chinook salmon programs for Grande Ronde and Imnaha rivers in Oregon. Despite these hatchery programs, natural spring chinook populations continued to decline resulting in the National Marine Fisheries Service (NMFS) listing Snake River spring/summer chinook salmon as ''threatened'' under the federal Endangered Species Act (1973) on 22 April 1992. Continuing poor escapement levels and declining population trends indicated that Grande Ronde River basin spring chinook salmon were in imminent danger of extinction. These continuing trends led fisheries co-managers in the basin to initiate the Grande Ronde Endemic Spring Chinook Salmon Supplementation Program (GRESCSSP) in order to prevent extinction and preserve options for use of endemic fish stocks

  4. Grand Challenges in Modeling, Simulation and Analysis: Extraction and Visualization of Power Systems

    SciTech Connect (OSTI)

    Fernandez, Steven J; Omitaomu, Olufemi A

    2010-01-01

    Threats to the national electric power grid often require the coupling of real-time state data with look-ahead or forecasting models to provide timely disruption warnings. However, successful accomplishment of this capability presents a grand challenge in modeling, simulation, and analysis. Analysis of inter-area oscillatory modes may provide a new path to anticipate power system stability and address this grand challenge. An algorithm is presented for the identification and analysis of such modes from high resolution phasor measurement data that might indicate a pathway to meet this grand challenge. The process outlined includes data collection, conditioning, extraction of the primary oscillatory frequency, and determination of participating areas of the system.

  5. UMTRA Project water sampling and analysis plan, Grand Junction, Colorado. Revision 1, Version 6

    SciTech Connect (OSTI)

    1995-09-01

    This water sampling and analysis plan describes the planned, routine ground water sampling activities at the Grand Junction US DOE Uranium Mill Tailings Remedial Action (UMTRA) Project site (GRJ-01) in Grand Junction, Colorado, and at the Cheney Disposal Site (GRJ-03) near Grand Junction. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequencies for the routine monitoring stations at the sites. Regulatory basis is in the US EPA regulations in 40 CFR Part 192 (1994) and EPA ground water quality standards of 1995 (60 FR 2854). This plan summarizes results of past water sampling activities, details water sampling activities planned for the next 2 years, and projects sampling activities for the next 5 years.

  6. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36 was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  7. McHenry County, North Dakota: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    McHenry, North Dakota Towner, North Dakota Upham, North Dakota Velva, North Dakota Voltaire, North Dakota Retrieved from "http:en.openei.orgwindex.php?titleMcHenryCounty,...

  8. Microsoft PowerPoint - baeARM_5th_final1.ppt

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    comparison of arctic cirrus microphysical properties with mid-latitude and tropical cirrus features Kenny Bae 1 , Greg M. McFarquhar 1 , Gong Zhang 1 and Michael R. Poellot 2 1 University of Illinois, Urbana 2 University of North Dakota, Grand Forks Summary * Vertical profiles of crystal shapes observed in arctic cirrus consistent with 3-layer conceptual model of mid- latitude cirrus (nucleation zone of small crystals, growth zone of pristine crystals and sublimation zone with sublimating

  9. 2014 SunShot Grand Challenge Summit Day Two Photos | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Grand Challenge Summit Day Two Photos 2014 SunShot Grand Challenge Summit Day Two Photos Addthis Day 2 Subprogram Overviews 9 1 of 39 Day 2 Subprogram Overviews 9 Photo Credit: SunShot Date taken: 2014-05-20 14:41 Day 2 Subprogram Overviews 8 2 of 39 Day 2 Subprogram Overviews 8 Photo Credit: SunShot Date taken: 2014-05-20 14:37 Day 2 Subprogram Overviews 7 3 of 39 Day 2 Subprogram Overviews 7 Photo Credit: SunShot Date taken: 2014-05-20 14:36 Day 2 Subprogram Overviews 6 4 of 39 Day 2

  10. DuPont's Cellulosic Ethanol Grand Opening Marks a Milestone for the

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Advanced Biofuels Industry | Department of Energy DuPont's Cellulosic Ethanol Grand Opening Marks a Milestone for the Advanced Biofuels Industry DuPont's Cellulosic Ethanol Grand Opening Marks a Milestone for the Advanced Biofuels Industry November 20, 2015 - 12:49pm Addthis DuPont’s cellulosic ethanol biorefinery in Nevada, Iowa, opened on October 30, 2015. | Photo courtesy of DuPont DuPont's cellulosic ethanol biorefinery in Nevada, Iowa, opened on October 30, 2015. | Photo courtesy

  11. SunShot Shoots for the Moon with First Grand Challenge Event | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Shoots for the Moon with First Grand Challenge Event SunShot Shoots for the Moon with First Grand Challenge Event May 23, 2012 - 11:40am Addthis The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. The Energy Department's SunShot Initiative focuses on making solar electricity cost-competitive by the end of the decade. | Photo courtesy of Dennis Schroeder/NREL. Ramamoorthy

  12. ,"Rio Grande, TX Natural Gas Pipeline Exports to Mexico (MMcf)"

    U.S. Energy Information Administration (EIA) (indexed site)

    Grande, TX Natural Gas Pipeline Exports to Mexico (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Rio Grande, TX Natural Gas Pipeline Exports to Mexico (MMcf)",1,"Annual",2015 ,"Release Date:","10/31/2016" ,"Next Release Date:","11/30/2016" ,"Excel File

  13. Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Program, 2000 Annual Report.

    SciTech Connect (OSTI)

    Carmichael, Richard W.

    2003-03-01

    Endangered Species Permit Number 1011 (formerly Permit No. 973) authorizes ODFW to take listed spring chinook salmon juveniles from Catherine Creek (CC), Lostine River (LR) and Grande Ronde River (GR) for research and enhancement purposes. Modification 2 of this permit authorizes ODFW to take adults for spawning and the production and release of smolts for the Captive and Conventional broodstock programs. This report satisfies the requirement that an annual report be submitted. Herein we report on activities conducted and provide cursory data analyses for the Grande Ronde spring chinook salmon Captive and Conventional broodstock projects from 1 January-31 December 2000.

  14. Wildlife Mitigation and Restoration for Grand Coulee Dam: Blue Creek Project, Phase 1.

    SciTech Connect (OSTI)

    Merker, Christopher

    1993-04-01

    This report is a recommendation from the Spokane Tribe to the Northwest Power Planning Council (NPPC) for partial mitigation for the extensive wildlife and wildlife habitat losses on the Spokane Indian Reservation caused by the construction of Grand Coulee Dam. NPPC`s interim wildlife goal over the next 7 years for the Columbia hydropower system, is to protect, mitigate and enhance approximately 35% basin wide of the lost habitat units. Grand Coulee Dam had the greatest habitat losses of any Dams of the Wildlife Rule.

  15. North America Energy Efficiency Standards and Labeling

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North American Energy Efficiency Standards and Labeling North American Energy Working Group NORTH AMERICAN ENERGY WORKING GROUP The North American Energy Working Group (NAEWG) was established in spring of 2001 by the Canadian Minister of Natural Resources, the Mexican Secretary of Energy and the U.S. Secretary of Energy, to enhance North American energy cooperation. The Group is led by officials from Natural Resources Canada, the Mexican Secretariat of Energy, and the U.S. Department of Energy.

  16. McLean County, North Dakota: Energy Resources | Open Energy Informatio...

    Open Energy Information (Open El) [EERE & EIA]

    Dakota Mercer, North Dakota North Central McLean, North Dakota Riverdale, North Dakota Ruso, North Dakota South McLean, North Dakota Turtle Lake, North Dakota Underwood, North...

  17. Geology of the Western Part of Los Alamos National Laboratory (TA-3 to TA-16), Rio Grande Rift, New Mexico

    SciTech Connect (OSTI)

    C.J.Lewis; A.Lavine; S.L.Reneau; J.N.Gardner; R.Channell; C.W.Criswell

    2002-12-01

    We present data that elucidate the stratigraphy, geomorphology, and structure in the western part of Los Alamos National Laboratory between Technical Areas 3 and 16 (TA-3 and TA-16). Data include those gathered by geologic mapping of surficial, post-Bandelier Tuff strata, conventional and high-precision geologic mapping and geochemical analysis of cooling units within the Bandelier Tuff, logging of boreholes and a gas pipeline trench, and structural analysis using profiles, cross sections, structure contour maps, and stereographic projections. This work contributes to an improved understanding of the paleoseismic and geomorphic history of the area, which will aid in future seismic hazard evaluations and other investigations. The study area lies at the base of the main, 120-m (400-ft) high escarpment formed by the Pajarito fault, an active fault of the Rio Grande rift that bounds Los Alamos National Laboratory on the west. Subsidiary fracturing, faulting, and folding associated with the Pajarito fault zone extends at least 1,500 m (5,000 ft) to the east of the main Pajarito fault escarpment. Stratigraphic units in the study area include upper units of the Tshirege Member of the early Pleistocene Bandelier Tuff, early Pleistocene alluvial fan deposits that predate incision of canyons on this part of the Pajarito Plateau, and younger Pleistocene and Holocene alluvium and colluvium that postdate drainage incision. We discriminate four sets of structures in the area between TA-3 and TA-16: (a) north-striking faults and folds that mark the main zone of deformation, including a graben in the central part of the study area; (b) north-northwest-striking fractures and rare faults that bound the eastern side of the principal zone of deformation and may be the surface expression of deep-seated faulting; (c) rare northeast-striking structures near the northern limit of the area associated with the southern end of the Rendija Canyon fault; and (d) several small east

  18. Biofuels and Sustainable Development: An Executive Session on the Grand Challenges of the Sustainability Transition

    SciTech Connect (OSTI)

    Lee, Henry; Clark, William C.; Devereaux, Charan

    2008-05-20

    This report is the result of the second in a series of intense workshops and study sessions on Grand Challenges of the Sustainability Transition, organized by the Sustainability Science Program at Harvard University, hosted by Venice International University, and supported by the Italian Ministry of Environment, Land and Sea.

  19. Recovery sequences for a station blackout accident at the Grand Gulf Nuclear Station

    SciTech Connect (OSTI)

    Carbajo, J.J. [Martin Marietta Energy Systems, Oak Ridge, TN (United States)

    1995-12-31

    Recovery sequences for a low-pressure, short term, station blackout severe accident at the Grand Gulf power plant have been investigated using the computer code MELCOR, version 1.8.3 PN. This paper investigates the effect of reflood timing and mass flow rate on accident recovery.

  20. Grand Coulee Dam Wildlife Mitigation Program : Pygmy Rabbit Programmatic Management Plan, Douglas County, Washington.

    SciTech Connect (OSTI)

    Ashley, Paul

    1992-06-01

    The Northwest Power Planning Council and the Bonneville Power Administration approved the pygmy rabbit project as partial mitigation for impacts caused by the construction of Grand Coulee Dam. The focus of this project is the protection and enhancement of shrub-steppe/pygmy rabbit habitat in northeastern Washington.

  1. EV Everywhere Grand Challenge: DOE's 10-Year Vision for Plug-in Electric Vehicles

    Office of Energy Efficiency and Renewable Energy (EERE)

    EV Everywhere is a Clean Energy Grand Challenge to have the U.S. become the first nation in the world to produce plug-in electric vehicles that are as affordable for the average American family as today's gasoline-powered vehicles within the next 10 years.

  2. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards.

  3. EA-1950: Grand Coulee-Creston Transmission Line Rebuild; Grant and Lincoln Counties, Washington

    Energy.gov [DOE]

    Bonneville Power Administration prepared this EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington.

  4. Project Reports for Grand Traverse Band of Ottawa and Chippewa Indians- 2005 Project

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Grand Traverse Band of Ottawa and Chippewa Indians (GTB) will conduct a feasibility study to determine the cost effectiveness and other economic, environmental, cultural, and social benefits of maximizing the diversity of energy sources used at GTB facilities. This includes an assessment of energy conservation measures as well as renewable energy sources such as wind, solar, and biomass.

  5. SunShot Grand Challenge Summit: Bright Outlook to Achieve SunShot Goal

    Office of Energy Efficiency and Renewable Energy (EERE)

    Last week, hundreds of solar energy leaders gathered in southern California to participate in SunShot’s biennial Grand Challenge Summit. Read a recap of the four-day event, which focused on making solar energy fully cost-competitive with traditional forms of energy by 2020.

  6. Grande Ronde Basin Chinook Salmon Captive Brood and Conventional Supplementation Programs, 1999 Annual Report.

    SciTech Connect (OSTI)

    Carmichael, Richard W.

    2003-03-01

    Permit Number 1011 (formerly Permit No. 973) authorized ODFW to take listed spring chinook salmon juveniles from Catherine Creek and the Lostine and Grande Ronde rivers for scientific research and enhancement purposes. Special condition 2a specified the need for an annual report prior to initiation of next year's work.

  7. Grand Opening of Abengoa’s Biorefinery: Nation’s Third Commercial-Scale Facility

    Energy.gov [DOE]

    The nation’s third commercial-scale cellulosic ethanol biorefinery celebrates its grand opening on October 17, 2014, in Hugoton, Kansas. The Abengoa Bioenergy Biomass of Kansas (ABBK) facility is the first of its kind to use a proprietary enzymatic hydrolysis process which turns cellulosic biomass into fermentable sugars that are then converted into transportation fuels.

  8. Comparative flow measurements: Grand Coulee pumping-generating plant unit P/G9. Final report

    SciTech Connect (OSTI)

    Heigel, L.; Lewey, A.B.; Greenwood, J.B.

    1986-10-01

    In extensive testing, two acoustic flow measurement systems compared well in accuracy and repeatability with conventional methods at a power plant at Grand Coulee Dam. Acoustic flow measurement systems offer utilities an inexpensive, real-time method for optimizing hydro plant efficiency.

  9. North Central","West North Central","South Atlantic","East South...

    U.S. Energy Information Administration (EIA) (indexed site)

    ...heast",,"Midwest",,"South",,,"West" ,,"New England","Middle Atlantic","East North Central","West North Central","South Atlantic","East South Central","West South ...

  10. Superfund Record of Decision (EPA Region 8): Silver Bow Creek/Butte Area NPL site, Warm Springs Ponds Operable Unit, Upper Clark Fork River Basin, MT. (First remedial action), September 1990

    SciTech Connect (OSTI)

    Not Available

    1990-09-28

    The Silver Bow Creek site is a mining and processing area in the Upper Clark Fork River Basin, Deer Lodge County, Southwestern Montana. The Record of Decision (ROD) documents the selected interim remedial action for one of eleven operable units for the site, the Warm Springs Ponds operable unit, which covers approximately 2,500 acres just above the beginning of the Clark Fork River. Contamination at the site is the result of over 100 years of mining and process operations in the area. Mining, milling, and smelting waste were dumped directly into Silver Bow Creek and transported downstream to the Clark Fork River with final deposition downstream as far as 130 miles. Principal threats from the site include the possibility of pond berm failure due to flood and earthquake damage that could release millions of cubic yards of tailings and sediment to the river. Furthermore, the creeks are contaminated with dissolved metals, and exposed soil and tailings are contaminated with elevated levels of several metals. The primary contaminants of concern affecting the soil, sediment, ground water, and surface water are metals including arsenic, cadmium, copper, lead, and zinc.

  11. Calendar year 1993 groundwater quality report for the Upper East Fork Poplar Creek Hydrogeologic Regime, Y-12 Plant, Oak Ridge, Tennessee. 1993 groundwater quality data and calculated rate of contaminant migration, Part 1

    SciTech Connect (OSTI)

    Not Available

    1994-02-01

    This report contains groundwater quality data obtained during the 1993 calendar year (CY) at several waste management facilities and petroleum fuel underground storage tank (UST) sites associated with the US Department of Energy (DOE) Y-12 Plant located on the DOE Oak Ridge Reservation (ORR) southeast of Oak Ridge, Tennessee. These sites are within the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), which is one of three regimes defined for the purposes of groundwater and surface-water quality monitoring at the Y-12 Plant. The Environmental Management Department of the Y-12 Plant Health, Safety, Environment, and Accountability Organization manages the groundwater monitoring activities in each regime as part of the Y-12 Plant Groundwater Protection Program (GWPP). The annual groundwater report for the East Fork Regime is completed in two-parts; Part 1 (this report) containing the groundwater quality data and Part 2 containing a detailed evaluation of the data. The primary purpose of this report is to serve as a reference for the groundwater data obtained each year under the lead of the Y-12 Plant GWPP. However, because it contains information needed to comply with the Resource Conservation and Recovery Act (RCRA) interim status assessment monitoring reporting requirements, this report is submitted to the Tennessee Department of Health and Environment (TDEC) by the RCRA reporting deadline.

  12. North Carolina's 13th congressional district: Energy Resources...

    Open Energy Information (Open El) [EERE & EIA]

    of North Carolina CPS Biofuels Clean Burn Fuels LLC Eaton Powerware INI Power Systems Methane Power Inc Microcell Corp North Carolina State Energy Office North Carolina State...

  13. Chatham County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Energy Companies in Chatham County, North Carolina CPS Biofuels INI Power Systems Methane Power Inc Piedmont Biofuels Places in Chatham County, North Carolina Cary, North...

  14. Caswell County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Climate Zone Number 4 Climate Zone Subtype A. Places in Caswell County, North Carolina Milton, North Carolina Yanceyville, North Carolina Retrieved from "http:en.openei.orgw...

  15. Soleil Energy Solutions Greensboro North Carolina | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Soleil Energy Solutions Greensboro North Carolina Jump to: navigation, search Logo: Soleil Energy Solutions Greensboro North Carolina Name: Soleil Energy Solutions Greensboro North...

  16. Biofuels Center of North Carolina | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Center of North Carolina Jump to: navigation, search Name: Biofuels Center of North Carolina Place: Oxford, North Carolina Zip: 27565 Sector: Biofuels Product: State-funded,...

  17. The Biofuels Center of North Carolina | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Biofuels Center of North Carolina Jump to: navigation, search Name: The Biofuels Center of North Carolina Place: Oxford, North Carolina Website: www.biofuelscenter.org...

  18. Luverne Wind Farm (North Field) | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Luverne Wind Farm (North Field) Jump to: navigation, search Name Luverne Wind Farm (North Field) Facility Luverne Wind Farm (North Field) Sector Wind energy Facility Type...

  19. PP-67 North Central Electric Cooperative, Inc. | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 North Central Electric Cooperative, Inc. PP-67 North Central Electric Cooperative, Inc. Presidential Permit authorizing North Central Electric Cooperative, Inc. to construct, ...

  20. Surry County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    4 Climate Zone Subtype A. Registered Energy Companies in Surry County, North Carolina Pike Electric Corporation Places in Surry County, North Carolina Dobson, North Carolina...

  1. Cabarrus County, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Subtype A. Energy Generation Facilities in Cabarrus County, North Carolina Charlotte Motor Speedway Biomass Facility Places in Cabarrus County, North Carolina Concord, North...

  2. NorthWestern Energy | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Number: (800) 245-6977 Website: www.northernelectric.coop Twitter: @NorthWesternSD Facebook: https:www.facebook.comNorthWesternEnergy Outage Hotline: (800) 245-6977...

  3. Schott North America Inc | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Schott North America Inc Jump to: navigation, search Name: Schott North America Inc Address: 555 Taxter Road Place: Elmsford, New York Zip: 10523 Region: Northeast - NY NJ CT PA...

  4. North Sky River | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Sky River Jump to: navigation, search Name North Sky River Facility North Sky River Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner NextEra...

  5. ,"North Dakota Natural Gas Marketed Production (MMcf)"

    U.S. Energy Information Administration (EIA) (indexed site)

    9:53:45 AM" "Back to Contents","Data 1: North Dakota Natural Gas Marketed Production (MMcf)" "Sourcekey","N9050ND2" "Date","North Dakota Natural Gas Marketed Production ...

  6. NREL: North American Renewable Integration Study

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    North American Renewable Integration Study Subscribe Stay up to date on NREL's North American Renewable Integration Study with periodic emails regarding progress and reports. Name*: Organization*: Email*: * Indicates a required field. Submit NREL's North American Renewable Integration Study (NARIS) will analyze pathways to modernize the North American power system through the efficient planning of transmission, generation, and demand. As wind, solar, hydropower, and natural gas continue to grow,

  7. North American Electric Reliability Corporation Interconnections...

    Energy Savers

    Map of the North American Electric Reliability Corporation Interconnection showing the ... MB) More Documents & Publications Interconnection Transmission Planning: Awards 2009 ...

  8. Quartz enhanced photoacoustic H{sub 2}S gas sensor based on a fiber-amplifier source and a custom tuning fork with large prong spacing

    SciTech Connect (OSTI)

    Wu, Hongpeng; Liu, Xiaoli; Zheng, Huadan; Yin, Xukun; Ma, Weiguang; Zhang, Lei; Yin, Wangbao; Jia, Suotang; Sampaolo, Angelo; Dong, Lei; Patimisco, Pietro; Spagnolo, Vincenzo; Tittel, Frank K.

    2015-09-14

    A quartz enhanced photoacoustic spectroscopy (QEPAS) sensor, employing an erbium-doped fiber amplified laser source and a custom quartz tuning fork (QTF) with its two prongs spaced ∼800 μm apart, is reported. The sensor employs an acoustic micro-resonator (AmR) which is assembled in an “on-beam” QEPAS configuration. Both length and vertical position of the AmR are optimized in terms of signal-to-noise ratio, significantly improving the QEPAS detection sensitivity by a factor of ∼40, compared to the case of a sensor using a bare custom QTF. The fiber-amplifier-enhanced QEPAS sensor is applied to H{sub 2}S trace gas detection, reaching a sensitivity of ∼890 ppb at 1 s integration time, similar to those obtained with a power-enhanced QEPAS sensor equipped with a standard QTF, but with the advantages of easy optical alignment, simple installation, and long-term stability.

  9. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect (OSTI)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one or more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.

  10. Groundwater quality assessment for the Upper East Fork Poplar Creek Hydrogeologic Regime at the Y-12 Plant. 1991 groundwater quality data and calculated rate of contaminant migration

    SciTech Connect (OSTI)

    Not Available

    1992-02-01

    This report contains groundwater quality data obtained during the 1991 calendar year at several waste management facilities and petroleum fuel underground storage tank (UST) sites associated with the Y-12 Plant. These sites are within the Upper East Fork Poplar Creek Hydrogeologic Regime (UEFPCHR), which is one of three regimes defined for the purposes of groundwater and surface-water quality monitoring and remediation. This report was prepared for informational purposes. Included are the analytical data for groundwater samples collected from selected monitoring wells during 1991 and the results for quality assurance/quality control (QA/QC) samples associated with each groundwater sample. This report also contains summaries of selected data, including ion-charge balances for each groundwater sample, a summary of analytical results for nitrate (a principle contaminant in the UEFPCHR), results of volatile organic compounds (VOCs) analyses validated using the associated QA/QC sample data, a summary of trace metal concentrations which exceeded drinking-water standards, and a summary of radiochemical analyses and associated counting errors.

  11. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    SciTech Connect (OSTI)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52 was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.

  12. The North Carolina Field Test

    SciTech Connect (OSTI)

    Sharp, T.R.; Ternes, M.P.

    1990-08-01

    The North Carolina Field Test will test the effectiveness of two weatherization approaches: the current North Carolina Low-Income Weatherization Assistance Program and the North Carolina Field Test Audit. The Field Test Audit will differ from North Carolina's current weatherization program in that it will incorporate new weatherization measures and techniques, a procedure for basing measure selection of the characteristics of the individual house and the cost-effectiveness of the measure, and also emphasize cooling energy savings. The field test will determine the differences of the two weatherization approaches from the viewpoints of energy savings, cost effectiveness, and implementation ease. This Experimental Plan details the steps in performing the field test. The field test will be a group effort by several participating organizations. Pre- and post-weatherization data will be collected over a two-year period (November 1989 through August 1991). The 120 houses included in the test will be divided into a control group and two treatment groups (one for each weatherization procedure) of 40 houses each. Weekly energy use data will be collected for each house representing whole-house electric, space heating and cooling, and water heating energy uses. Corresponding outdoor weather and house indoor temperature data will also be collected. The energy savings of each house will be determined using linear-regression based models. To account for variations between the pre- and post-weatherization periods, house energy savings will be normalized for differences in outdoor weather conditions and indoor temperatures. Differences between the average energy savings of treatment groups will be identified using an analysis of variance approach. Differences between energy savings will be quantified using multiple comparison techniques. 9 refs., 8 figs., 5 tabs.

  13. Lower Rio Grande Valley transboundary air pollution project (TAPP). Project report 1996--1997

    SciTech Connect (OSTI)

    Mukerjee, S.; Shadwick, D.S.; Dean, K.E.; Carmichael, L.Y.; Bowser, J.J.

    1999-04-01

    The Lower Rio Grande Valley Transboundary Air Pollution Project (TAPP) was a US-Mexico Border XXI project to find out if air pollutants were moving across the border from Mexico into the Lower Rio Grande Valley of Texas and to see what levels of air pollutants were present. Ambient measurements and meteorology were collected data for a year (March 1996-March 1997) at three fixed sites in and near Brownsville, Texas very close to the US-Mexico border on a continuous and 24-h internal basis. Overall levels of air pollution were similar to or lower than other areas in Texas and elsewhere. Based on wind sector analyses, transport of air pollution across the border did not appear to adversely impact air quality on the US side of the Valley. Southeasterly winds from the Gulf of Mexico were largely responsible for the clean air conditions.

  14. A simple grand canonical approach to compute the vapor pressure of bulk and finite size systems

    SciTech Connect (OSTI)

    Factorovich, Matas H.; Scherlis, Damin A.

    2014-02-14

    In this article we introduce a simple grand canonical screening (GCS) approach to accurately compute vapor pressures from molecular dynamics or Monte Carlo simulations. This procedure entails a screening of chemical potentials using a conventional grand canonical scheme, and therefore it is straightforward to implement for any kind of interface. The scheme is validated against data obtained from Gibbs ensemble simulations for water and argon. Then, it is applied to obtain the vapor pressure of the coarse-grained mW water model, and it is shown that the computed value is in excellent accord with the one formally deduced using statistical thermodynamics arguments. Finally, this methodology is used to calculate the vapor pressure of a water nanodroplet of 94 molecules. Interestingly, the result is in perfect agreement with the one predicted by the Kelvin equation for a homogeneous droplet of that size.

  15. EA-373 EDF Trading North America, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EDF Trading North America, LLC EA-373 EDF Trading North America, LLC Order authorizong EDF Trading North America, LLCto exprto electric energy to Mexico. EA-373 EDF Trading North ...

  16. EA-367 EDF Trading North America, LLC | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 EDF Trading North America, LLC EA-367 EDF Trading North America, LLC Order authorizing EDF Trading North America, LLC to export electric energy to Canada EA-367 EDF Trading North ...

  17. North Dome decision expected soon

    SciTech Connect (OSTI)

    Not Available

    1981-08-01

    Decisions soon will be made which will set in motion the development of Qatar's huge North Dome gas field. The government and state company, Qatar General Petroleum Corp. (QGPC) is studying the results of 2 feasibility studies on the economics of LNG export, although initially North Dome exploitation will be aimed at the domestic market. Decisions on the nature and timing of the North Dome development are the most important that have had to be faced in the short 10-yr history of the small Gulf state. The country's oil production is currently running at approximately 500,000 bpd, with 270,000 bpd originating from 3 offshore fields. Output is expected to decline through 1990, and it generally is accepted that there is little likelihood of further major crude discoveries. Therefore, Qatar has to begin an adjustment from an economy based on oil to one based on gas, while adhering to the underlying tenets of long-term conservation and industrial diversification.

  18. Haze in the Grand Canyon: An evaluation of the Winter Haze Intensive Tracer Experiment

    SciTech Connect (OSTI)

    Not Available

    1990-10-01

    The Grand Canyon is one of the most spectacular natural sights on earth. Approximately 4 million visitors travel to Grand Canyon National Park (GCNP) each year to enjoy its majestic geological formations and intensely colored views. However, visibility in GCNP can be impaired by small increases in concentrations of fine suspended particles that scatter and absorb light; the resulting visibility degradation is perceived as haze. Sulfate particles are a major factor in visibility impairment at Grand Canyon in summer and winter. Many wintertime hazes at GCNP are believed to result from the accumulation of emissions from local sources during conditions of air stagnation, which occur more frequently in winter than in summer. In January and February 1987, the National Park Service (NPS) carried out a large-scale experiment known as the Winter Haze Intensive Tracer Experiment (WHITEX) to investigate the causes of wintertime haze in the region of GCNP and Canyonlands National Park. The overall objective of WHITEX was to assess the feasibility of attributing visibility impairment in specific geographic regions to emissions from a single point source. The experiment called for the injection of a tracer, deuterated methane (CD{sub 4}), into one of the stacks of the Navajo Generating Station (NGS), a major coal-fired power plant located 25 km from the GCNP boundary and 110 km northeast of Grand Canyon Village. A network of field stations was established in the vicinity -- mostly to the northeast of GCNP and NGS -- to measure CD{sub 4} concentrations, atmospheric aerosol and optical properties, and other chemical and physical attributes. 19 refs., 3 figs.

  19. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    SciTech Connect (OSTI)

    Simmons, Mary Ann; Johnson, Robert L.; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2004-01-01

    This report documents the third year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  20. University of Texas Rio Grande Valley Regional High School Science Bowl |

    Office of Science (SC) [DOE]

    U.S. DOE Office of Science (SC) University of Texas Rio Grande Valley Regional High School Science Bowl National Science Bowl® (NSB) NSB Home About Regional Competitions Rules, Forms, and Resources High School Regionals Middle School Regionals National Finals Volunteers Key Dates Frequently Asked Questions News Media Contact Us WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 E: Email Us

  1. University of Texas Rio Grande Valley Regional Middle School Science Bowl |

    Office of Science (SC) [DOE]

    U.S. DOE Office of Science (SC) University of Texas Rio Grande Valley Regional Middle School Science Bowl National Science Bowl® (NSB) NSB Home About Regional Competitions Rules, Forms, and Resources High School Regionals Middle School Regionals National Finals Volunteers Key Dates Frequently Asked Questions News Media Contact Us WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 E: Email

  2. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    SciTech Connect (OSTI)

    Johnson, Robert L.; Simmons, Mary Ann; McKinstry, Craig A.; Simmons, Carver S.; Cook, Chris B.; Brown, Richard S.; Tano, Daniel K.; Thorsten, Susan L.; Faber, Derrek M.; Lecaire, Richard; Francis, Stephen

    2005-02-25

    This report documents the fourth year of a four-year study to assess the efficacy of a prototype strobe light system to elicit a negative phototactic response in kokanee salmon (Oncorhynchus nerka) and rainbow trout (O. mykiss) in the forebay to the third powerplant at Grand Coulee Dam. This work was conducted for the Bonneville Power Administration, U.S. Department of Energy, by Pacific Northwest National Laboratory (PNNL) in conjunction with the Confederated Tribes of the Colville Reservation (Colville Confederated Tribes).

  3. Habitat Evaluation Procedures (HEP) Report : Grand Coulee Dam Mitigation, 1996-1999 Technical Report.

    SciTech Connect (OSTI)

    Kieffer, B.; Singer, Kelly; Abrahamson, Twa-le

    1999-07-01

    The purpose of this Habitat Evaluation Procedures (HEP) study was to determine baseline habitat units and to estimate future habitat units for Bonneville Power Administration (BPA) mitigation projects on the Spokane Indian Reservation. The mitigation between BPA and the Spokane Tribe of Indians (STOI) is for wildlife habitat losses on account of the construction of Grand Coulee Dam. Analysis of the HEP survey data will assist in mitigation crediting and appropriate management of the mitigation lands.

  4. Emily North | Center for Bio-Inspired Solar Fuel Production

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Principal Investigators Postdoctoral Fellows Center researchers Graduate Students Undergraduate Students All Bisfuel Center Personnel Emily North Michael Kenney Emily North ...

  5. Competition and Reliability in North American Electricity Markets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop Competition and Reliability in North American ...

  6. Liquid Propane Injection Technology Conductive to Today's North...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technology Conductive to Today's North American Specification Liquid Propane Injection Technology Conductive to Today's North American Specification Liquid propane injection ...

  7. Key wintertime meteorological features of the Grand Canyon and the Colorado Plateaus Basin

    SciTech Connect (OSTI)

    Whiteman, C.D.; Allwine, K.J.

    1992-06-01

    In the winter of 1989--1990 a major meteorological and air pollution experiment was conducted in the Colorado Plateaus Basin (Richards et al., 1991). The focus of the experiment, conducted by Arizona's Soft River Project, was to investigate the influence of three 750-MW coal-fired power plant units at the Navajo Generating Station near Page, Arizona, on visibility at Grand Canyon National Park. As part of the meteorological experiment, surface and upper air data were collected from multiple sites within the basin. This data set is the most comprehensive meteorological data set ever collected within the region, and the purpose of this paper is to briefly summarize the key wintertime meteorological features of the Colorado Plateaus Basin and the Grand Canyon, through which the basin drains, using analyses of the Winter Visibility Study data. Our analyses focused primarily on thermally driven circulations within the basin and the Grand Canyon, but we also investigated the surface energy budget that drives these circulations and the interactions between the thermal circulations and the overlying synoptic-scale flows.

  8. Key wintertime meteorological features of the Grand Canyon and the Colorado Plateaus Basin

    SciTech Connect (OSTI)

    Whiteman, C.D.; Allwine, K.J.

    1992-06-01

    In the winter of 1989--1990 a major meteorological and air pollution experiment was conducted in the Colorado Plateaus Basin (Richards et al., 1991). The focus of the experiment, conducted by Arizona`s Soft River Project, was to investigate the influence of three 750-MW coal-fired power plant units at the Navajo Generating Station near Page, Arizona, on visibility at Grand Canyon National Park. As part of the meteorological experiment, surface and upper air data were collected from multiple sites within the basin. This data set is the most comprehensive meteorological data set ever collected within the region, and the purpose of this paper is to briefly summarize the key wintertime meteorological features of the Colorado Plateaus Basin and the Grand Canyon, through which the basin drains, using analyses of the Winter Visibility Study data. Our analyses focused primarily on thermally driven circulations within the basin and the Grand Canyon, but we also investigated the surface energy budget that drives these circulations and the interactions between the thermal circulations and the overlying synoptic-scale flows.

  9. National Uranium Resource Evaluation. Bibliographic index of Grand Junction office uranium reports

    SciTech Connect (OSTI)

    Johnson, J.B.

    1981-05-01

    In October 1978, Mesa College entered into subcontract with Bendix Field Engineering Corporation (BFEC) to prepare a bibliographic index of the uranium raw materials reports issued by the Grand Junction Office of the US Department of Energy (DOE). Bendix, prime contractor to the Grand Junction Office, operates the Technical Library at the DOE facility. Since the early 1950s, approximately 2700 reports have been issued by the Grand Junction Office. These reports were the results of uranium investigations conducted by federal agencies and their subcontractors. The majority of the reports cover geology, mineralogy, and metallurgy of uranium and/or thorium. No single, complete list of these reports existed. The purpose of this subcontract was to compile a comprehensive index to these reports. The Mesa College geology faculty worked with the BFEC and DOE staffs to develop the format for the index. Undergraduate geology students from Mesa compiled a master record sheet for each report. All reports issued up to January 1, 1979 were included in the bibliography. The bibliography is in preliminary, unedited form. It is being open-filed at this time, on microfiche, to make the information available to the public on a timely basis. The bibliography is divided into a master record list arranged in alpha-numeric order by report identification number, with separate indices arranged by title, author, state and county, 1/sup 0/ x 2/sup 0/ NTMS quadrangle, key words, and exploration area.

  10. Finite element analysis of the I-40 bridge over the Rio Grande

    SciTech Connect (OSTI)

    Farrar, C.R.; Duffey, T.A.; Goldman, P.A.; Jauregui, D.V.; Vigil, J.S.

    1996-01-01

    In the 1960s and 1970s numerous bridges were built in the US with a design similar to those on Interstate 40 (I-40) over the Rio Grande in Albuquerque, New Mexico. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway and Transportation Department (NMSH and TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture-critical bridges over the Rio Grande. Because the I-40 Bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce damage into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. A previous report (LA-12767-MS) summarizes the results of the experimental modal analyses. This report summarizes the numerical analyses of the bridges and compares the results of these analyses to the experimental results.

  11. Grand Challenge Problems in Environmental Modeling and Remediation: Groundwater Contaminant Transport (Partnerships in Computational Science)

    SciTech Connect (OSTI)

    Sharpley, Robert C.

    1997-12-01

    The over-reaching goal of the Groundwater Grand Challenge component of the Partnership in Computational Science (PICS) was to develop and establish the massively parallel approach for the description of groundwater flow and transport and to address the problem of uncertainties in the data and its interpretation. This necessitated the development of innovative algorithms and the implementation of massively parallel computational tools to provide a suite of simulators for groundwater flow and transport in heterogeneous media. This report summarizes the activities and deliverables of the University of South Carolina component of the Groundwater Grand Challenge project funded through the High Performance Computing grand challenge program of the Department of Energy from 1995 through 1997. Seven institutions were primarily involved in this project: Brookhaven National Laboratory, Oak Ridge National Laboratory, Princeton University, SUNY at Stony Brook, Texas A&M University, The University of South Carolina, and the University of Texas at Austin, with contributing efforts from the Westinghouse Savannah River Technology Center. Each institution had primary responsibility for specific research components, but strong collaboration among all institutions was essential for the success of the project and in producing the final deliverables. PICS deliverables include source code for the suite of research simulators and auxiliary HPC tools, associated documentation, and test problems. These materials will be available as indicated from each institution's web page or from the Center for Computational Sciences Oak Ridge National Laboratory in January 1998.

  12. Work plan for ground water elevation data recorder/monitor well injection at Grand Junction, Colorado

    SciTech Connect (OSTI)

    Not Available

    1994-07-18

    The purpose of this document is to describe the work that will be performed and the procedures that will be followed during installation of ground water monitor wells and ground water elevation data recorders (data loggers) at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. The monitor wells and data loggers will be used to gather required time-dependent data to investigate the interaction between the shallow aquifer and the Colorado River. Data collection objectives (DCO) identify reasons for collecting data. The following are DCOs for the Grand Junction ground water elevation data recorder/monitor well installation project: long-term continuous ground water level data and periodic ground water samples will be collected to better understand the relationship between surface and ground water at the site; water level and water quality data will eventually be used in future ground water modeling to more firmly establish boundary conditions in the vicinity of the Grand Junction processing site; modeling results will be used to demonstrate and document the potential remedial alternative of natural flushing.

  13. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    SciTech Connect (OSTI)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer.

  14. Final report of the radiological release survey of Building 11 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 11 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  15. Final audit report of remedial action construction at the UMTRA Project, Grand Junction, Colorado, processing site

    SciTech Connect (OSTI)

    1995-02-01

    This final audit report (FAR) for remedial action at the Grand Junction, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project processing site consists of a summary of the radiological surveillances/ audits, the quality assurance (QA) in-process surveillances, and the QA final close-out inspection performed by the US Department of Energy (DOE) and Technical Assistance Contractor (TAC). The FAR also summarizes other surveillances performed by the US Nuclear Regulatory Commission (NRC). To summarize, a total of one finding and 127 observations were noted during DOE/TAC audit and surveillance activities. The NRC noted general site-related observations during the OSCRs. Follow-up to responses required from MK-Ferguson for the DOE/TAC finding and observations indicated that all issues related to the Grand Junction processing site were resolved and closed out to the DOE`s satisfaction. The NRC OSCRs resulted in no issues related to the Grand Junction processing site requiring a response from MK-Ferguson.

  16. Final report of the radiological release survey of Building 19 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 19 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  17. Final report of the radiological release survey of Building 54 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailings during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 54 and the underlying soil were found not to be radiologically contaminated, and can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual release report for each GJO building.

  18. Final report of the radiological release survey of Building 29 at the Grand Junction Office Facility

    SciTech Connect (OSTI)

    Johnson, R.K.; Corle, S.G.

    1997-09-01

    The U.S. Department of Energy (DOE) Grand Junction Office (GJO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore concentrates and mill tailing during vanadium refining activities of the Manhattan Engineer District, and during sampling, assaying, pilot milling, storage, and brokerage activities conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJO Remedial Action Project (GJORAP) to clean up and restore the facility lands, improvements, and underlying aquifer. WASTREN-Grand Junction is the site contractor for the facility and the remedial action contractor for GJORAP. Building 29 and the underlying soil were found not to be radiologically contaminated; therefore, the building can be released for unrestricted use. Placards have been placed at the building entrances indicating the completion of the radiological release survey and prohibiting the introduction of any radioactive materials within the building without written approvals from the GJO Facilities Operations Manager. This document was prepared in response to a DOE-GJO request for an individual final release report for each GJO building.

  19. Ecosystem level assessment of the Grand Calumet Lagoons, Indiana Dunes National Lakeshore

    SciTech Connect (OSTI)

    Stewart, P.M. [National Biological Service, Porter, IN (United States)

    1995-12-31

    The Grand Calumet Lagoons make up the eastern section of the Grand Calumet River (GCR), Indiana Harbor and Ship Canal and nearshore Lake Michigan Area of Concern (AOC). The GCR AOC is the only one of the 42 Great Lakes Areas of Concern identified by the International Joint Commission with all 14 designated uses classified as impaired. Included within the boundaries of the Indiana Dunes National Lakeshore (INDU), is the central section of the Grand Calumet Lagoons. A number of biotic and abiotic factors were tested to determine the effects of an industrial landfill that borders the lagoons to assess the potential impact on park resources. Analysis included water quality testing, assessments of macroinvertebrate, fish, algae and aquatic plant communities and contaminant concentrations in water, sediment and plant and fish tissue. Surface water testing found very few contaminants, but significantly higher nutrient levels were found in the water column closest to the landfill. Macroinvertebrate, aquatic plant and fish communities all showed significant impairment in relationship to their proximity to the landfill. Aquatic plant growth habit became limited next to the landfill with certain growth habits disappearing entirely. Aquatic plants collected close to the landfill had high concentrations of several heavy metals in their stems and shoots. Using the index of biotic integrity (IBI), fish community assessment indicated impairment in the areas adjacent to the landfill. Sediments tested at one site had over 12% polycyclic aromatic hydrocarbons (PAH) and carp (Cyprinus carpio) collected from this site had whole fish tissue concentrations over 1 mg/kg PAH.

  20. EIS-0126: Remedial Actions at the Former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy developed this EIS to assess the environmental impacts of remediating the residual radioactive materials left from the inactive uranium processing site and associated properties located in Grand Junction, Colorado.

  1. North Dakota Energy Workforce Development

    SciTech Connect (OSTI)

    Carter, Drake

    2014-12-29

    Bismarck State College, along with its partners (Williston State College, Minot State University and Dickinson State University), received funding to help address the labor and social impacts of rapid oilfield development in the Williston Basin of western North Dakota. Funding was used to develop and support both credit and non-credit workforce training as well as four major symposia designed to inform and educate the public; enhance communication and sense of partnership among citizens, local community leaders and industry; and identify and plan to ameliorate negative impacts of oil field development.

  2. North American Natural Gas Markets

    SciTech Connect (OSTI)

    Not Available

    1989-02-01

    This report summarizes die research by an Energy Modeling Forum working group on the evolution of the North American natural gas markets between now and 2010. The group's findings are based partly on the results of a set of economic models of the natural gas industry that were run for four scenarios representing significantly different conditions: two oil price scenarios (upper and lower), a smaller total US resource base (low US resource case), and increased potential gas demand for electric generation (high US demand case). Several issues, such as the direction of regulatory policy and the size of the gas resource base, were analyzed separately without the use of models.

  3. North American Natural Gas Markets

    SciTech Connect (OSTI)

    Not Available

    1988-12-01

    This report sunnnarizes the research by an Energy Modeling Forum working group on the evolution of the North American natural gas markets between now and 2010. The group's findings are based partly on the results of a set of economic models of the natural gas industry that were run for four scenarios representing significantly different conditions: two oil price scenarios (upper and lower), a smaller total US resource base (low US resource case), and increased potential gas demand for electric generation (high US demand case). Several issues, such as the direction of regulatory policy and the size of the gas resource base, were analyzed separately without the use of models.

  4. Virginia Nuclear Profile - North Anna

    U.S. Energy Information Administration (EIA) (indexed site)

    North Anna" "Unit","Summer capacity (mw)","Net generation (thousand mwh)","Summer capacity factor (percent)","Type","Commercial operation date","License expiration date" 1,920,"6,780",84.1,"PWR","application/vnd.ms-excel","application/vnd.ms-excel" 2,943,"6,620",80.1,"PWR","application/vnd.ms-excel","application/vnd.ms-excel"

  5. Site characterization summary report for dry weather surface water sampling upper East Fork Poplar Creek characterization area Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    1996-08-01

    This report describes activities associated with conducting dry weather surface water sampling of Upper East Fork Poplar Creek (UEFPC) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This activity is a portion of the work to be performed at UEFPC Operable Unit (OU) 1 [now known as the UEFPC Characterization Area (CA)], as described in the RCRA Facility Investigation Plan for Group 4 at the Oak- Ridge Y-12 Plant, Oak Ridge, Tennessee and in the Response to Comments and Recommendations on RCRA Facility Investigation Plan for Group 4 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Volume 1, Operable Unit 1. Because these documents contained sensitive information, they were labeled as unclassified controlled nuclear information and as such are not readily available for public review. To address this issue the U.S. Department of Energy (DOE) published an unclassified, nonsensitive version of the initial plan, text and appendixes, of this Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Plan in early 1994. These documents describe a program for collecting four rounds of wet weather and dry weather surface water samples and one round of sediment samples from UEFPC. They provide the strategy for the overall sample collection program including dry weather sampling, wet weather sampling, and sediment sampling. Figure 1.1 is a schematic flowchart of the overall sampling strategy and other associated activities. A Quality Assurance Project Plan (QAPJP) was prepared to specifically address four rounds of dry weather surface water sampling and one round of sediment sampling. For a variety of reasons, sediment sampling has not been conducted and has been deferred to the UEFPC CA Remedial Investigation (RI), as has wet weather sampling.

  6. U.S. Department of Energy at Grand Junction 2003 Annual Inspection⎯M...

    Office of Legacy Management (LM)

    ... the footprint of disposed tailings and do not affect the integrity of the disposal cell. ... north side of the pond showed evidence of solar degradation and should be replaced (PL-8). ...

  7. Chicago North, Illinois, Site Fact Sheet

    Office of Legacy Management (LM)

    North, Illinois, Site. This site is managed by the U.S. Department of Energy Office of Legacy Management under the Formerly Utilized Sites Remedial Action Program. Chicago North, Illinois, Site Chicago North Site Chicago Cicero Evanston Gary Hammond ILLINOIS INDIANA 45 41 12 20 231 14 6 30 41 55 80 90 294 88 65 94 290 57 80 94 90 294 Lake Michigan M:\LTS\111\0001\10\S03052\S0305200.mxd smithw 09/15/2011 1:00:05 PM 0 10 20 Miles Springfield ILLINOIS Location of the Chicago North, Illinois, Site

  8. North Country Ethanol LLC | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Country Ethanol LLC Jump to: navigation, search Name: North Country Ethanol LLC Place: Rosholt, South Dakota Zip: 57260 Product: 20mmgy (75.7m litresy) ethanol producer....

  9. North American Biodiesel | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    North American Biodiesel Place: Menmonee Falls, Wisconsin Product: Biodiesel producer currently developing a biodiesel plant in Butler, Wisconsin and with plans to develop another...

  10. Enel North America | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    America Jump to: navigation, search Name: Enel North America Address: One Tech Drive Place: Andover, Massachusetts Zip: 01810 Region: Greater Boston Area Sector: Wind energy...

  11. North Reading, Massachusetts: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    ,"address":"","icon":"","group":"","inlineLabel":"","visitedicon":"" Hide Map North Reading is a town in Middlesex County, Massachusetts.1 US Recovery Act Smart Grid Projects...

  12. Hillsborough, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    North Carolina: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 36.0754183, -79.0997347 Show Map Loading map... "minzoom":false,"mappingservice...

  13. Transylvania County, North Carolina: Energy Resources | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Transylvania County, North Carolina: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.2190534, -82.7778579 Show Map Loading map......

  14. North Carolina Solar Center | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Solar Center Jump to: navigation, search Name: North Carolina Solar Center Sector: Renewable Energy Product: Promotes the use of renewable energy technologies with funding from the...

  15. Hendersonville, North Carolina: Energy Resources | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Hendersonville, North Carolina: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 35.3187279, -82.4609528 Show Map Loading map......

  16. PROGRAM REACHES DIVERSE NORTH CAROLINA COMMUNITY

    Energy.gov [DOE]

    The City of Greensboro, North Carolina, sought to reach a diverse community with energy efficiency improvements through the BetterBuildings for Greensboro Program. While all residential and...

  17. North American Biofuels | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Biofuels Jump to: navigation, search Name: North American Biofuels Place: Bohemia, New York Product: Biodiesel eqwuipment manufacturer and producer of biodiesel Coordinates:...

  18. North Associated Power Corporation | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    navigation, search Name: North Associated Power Corporation Place: Huhehaote, Inner Mongolia Autonomous Region, China Zip: 10020 Product: A company generating power for Inner...

  19. Sandia Energy - North American Electric Reliability Corporation...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    North American Electric Reliability Corporation (NERC) Report Posted Home Energy Assurance Infrastructure Security Grid Integration News News & Events Transmission Grid Integration...

  20. REpower North China Ltd | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    China Ltd Jump to: navigation, search Name: REpower North (China) Ltd Place: Baotou, Inner Mongolia Autonomous Region, China Zip: 14033 Product: Joint venture to manufacture 2MW...

  1. North American Hydro | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Hydro Jump to: navigation, search Name: North American Hydro Place: Schofield, Wisconsin Zip: 54476 Sector: Hydro Product: Focused on developing, upgrading, owning, and operating...

  2. North American Coating Laboratories | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Coating Laboratories Jump to: navigation, search Name: North American Coating Laboratories Address: 9450 Pineneedle Drive Place: Mentor, Ohio Zip: 44060 Sector: Services, Solar...

  3. SouthSouthNorth | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    policy environment. SouthSouthNorth contributed to the development of the International Gold Standard label which ensures the highest standards of practice throughout CDM project...

  4. Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande

    SciTech Connect (OSTI)

    Farrar, C.R.; Baker, W.E.; Bell, T.M.; Cone, K.M.; Darling, T.W.; Duffey, T.A.; Eklund, A.; Migliori, A.

    1994-06-01

    In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway and Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.

  5. Late Pleistocene landslide-dammed lakes along the Rio Grande, White Rock Canyon, New Mexico

    SciTech Connect (OSTI)

    Reneau, S.L.; Dethier, D.P.

    1996-11-01

    Massive slump complexes composed of Pliocene basaltic rocks and underlying Miocene and Pliocene sediments flank the Rio Grande along 16 km of northern White Rock Canyon, New Mexico. The toe area of at least one slump complex was active in the late Pleistocene, damming the Rio Grande at least four times during the period from 18 to 12 {sup 14}C ka and impounding lakes that extended 10-20 km upriver. Stratigraphic relationships and radiocarbon age constraints indicate that three separate lakes formed between 13.7 and 12.4 {sup 14}C ka. The age and dimensions of the ca. 12.4 ka lake are best constrained; it had an estimated maximum depth of {approx}30 m, a length of {approx}13 km, a surface area of {approx}2.7 km{sup 2}, and an initial volume of {approx}2.5 x 10{sup 7} m{sup 3}. The youngest landslide-dammed lakes formed during a period of significantly wetter regional climate, strongly suggesting that climate changes were responsible for reactivation of the slump complexes. We are not certain about the exact triggering mechanisms for these landslides, but they probably involved removal of lateral support due to erosion of the slope base by the Rio Grande during periods of exceptionally high flood discharge or rapid incision; increased pore pressures associated with higher water tables; higher seepage forces at sites of ground-water discharge; or some combination of these processes. Seismic shaking could also have contributed to triggering of some of the landslides, particularly if aided by wet antecedent conditions. 54 refs., 19 figs., 3 tabs.

  6. ,"Grand Island, NY Natural Gas Pipeline Exports to Canada (Million Cubic Feet)"

    U.S. Energy Information Administration (EIA) (indexed site)

    Exports to Canada (Million Cubic Feet)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Grand Island, NY Natural Gas Pipeline Exports to Canada (Million Cubic Feet)",1,"Annual",2015 ,"Release Date:","10/31/2016" ,"Next Release Date:","11/30/2016" ,"Excel File

  7. ,"Grand Island, NY Natural Gas Pipeline Imports From Canada (MMcf)"

    U.S. Energy Information Administration (EIA) (indexed site)

    Imports From Canada (MMcf)" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","Grand Island, NY Natural Gas Pipeline Imports From Canada (MMcf)",1,"Annual",2015 ,"Release Date:","10/31/2016" ,"Next Release Date:","11/30/2016" ,"Excel File

  8. PCB usage at the Grand Junction Area Office Facility. Final report

    SciTech Connect (OSTI)

    Miller, M.E.; Donivan, S.

    1982-06-01

    The development, implementation, and results of the polychlorinated biphenyl (PCB) identification project at the Grand Junction Area Office (GJAO) are summarized. Methodology for the PCB analysis is described, and results are tabulated. Of the 51 transformers and disconnects in use at GJAO, 15 unites were determined to be PCB-contaminated or filled with PCBs. This number falls within EPA's estimate of 25 to 40 percent of all transformers in use being at least contaminated. Approximately 324 gallons of PCBs and 515 gallons of PCB-contaminated fluids are being used currently. No contaminated transformers or disconnects are in a position to contaminate food or feed products at the facility.

  9. Interim long-term surveillance plan for the Cheney disposal site near, Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-08-01

    This interim long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site in Mesa County near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney disposal site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  10. Long-term surveillance plan for the Cheney disposal site near Grand Junction, Colorado

    SciTech Connect (OSTI)

    1997-07-01

    This long-term surveillance plan (LTSP) describes the U.S. Department of Energy`s (DOE) long-term care program for the Uranium Mill Tailings Remedial Action (UMTRA) Project Cheney Disposal Site near Grand Junction, Colorado. This LSTP describes the long-term surveillance program the DOE will implement to ensure the Cheney Disposal Site performs as designed and is cared for in a manner that protects the public health and safety and the environment. Before each disposal site is licensed for custody and long-term care, the Nuclear Regulatory Commission (NRC) requires the DOE to submit such a site-specific LTSP.

  11. Strobe Light Deterrent Efficacy Test and Fish Behavior Determination at Grand Coulee Dam Third Powerplant Forebay

    SciTech Connect (OSTI)

    Johnson, Robert L. ); Simmons, Mary Ann ); Simmons, Carver S. ); McKinstry, Craig A. ); Cook, Chris B. ); Thorsten, Susan L. ); Lecaire, Richard; Francis, Stephen

    2003-01-29

    This report describes the work conducted during the second year of a multi-year study to assess the efficacy of a prototype strobe light system in eliciting a negative phototactic response in kokanee and rainbow trout. The strobe light system is being evaluated as a means to prevent entrainment (and subsequent loss) of fish at the entrance to the forebay adjacent to the third powerplant at Grand Coulee Dam. Pacific Northwest National Laboratory and the Confederated Tribes of the Colville Reservation are collaborating on the three-year study being conducted for the Bonneville Power Administration and the Northwest Power Planning Council.

  12. Communication: Reduced density matrices in molecular systems: Grand-canonical electron states

    SciTech Connect (OSTI)

    Bochicchio, Roberto C.; Miranda-Quintana, Ramn A.; Rial, Diego

    2013-11-21

    Grand-canonical like descriptions of many electron atomic and molecular open systems which are characterized by a non-integer number of electrons are presented. Their associated reduced density matrices (RDMs) are obtained by introducing the contracting mapping for this type of distributions. It is shown that there is loss of information when connecting RDMs of different order by partial contractions. The energy convexity property of these systems simplifies the description. Consequently, this formulation opens the possibility to a new look for chemical descriptors such as chemical potential and reactivity among others. Examples are presented to discuss the theoretical aspects of this work.

  13. NETL F 451.1/1-1, Categorical Exclusion Designation Form

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    FC26-08NT43291 Univ of North Dakota Dunn County, ND Prime: EERC - University of Dakota, 15 North 23rd Street, Stop 9018, Grand Forks, ND 58202 Sub: XTO Energy, Ltd., 810 Houston St., Fort Worth, Texas 76102 FE/TDIC/Coal/Carbon Storage Team Mary Sullivan Bakken CO2 Storage and Enhanced Recovery Program Field Test A pilot-scale CO2 storage and oil mobilization test will be conducted in the Bakken Formation in Dunn County, ND. The test will be conducted in an existing oil well at a depth of appx.

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Project, OH (United States) General Atomics Site, San Diego, CA (United States) General Electric Company Golden Field Office, Golden, CO (United States) Grand Forks Energy...

  15. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    General Atomics Site, San Diego, CA (United States) General Electric Company Golden Field Office, Golden, CO (United States) Grand Forks Energy Technology Center (United...

  16. Polk County, Minnesota: Energy Resources | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Crookston, Minnesota East Grand Forks, Minnesota Erskine, Minnesota Fertile, Minnesota Fisher, Minnesota Fosston, Minnesota Gully, Minnesota Lengby, Minnesota McIntosh, Minnesota...

  17. North Dakota Refining Capacity Study

    SciTech Connect (OSTI)

    Dennis Hill; Kurt Swenson; Carl Tuura; Jim Simon; Robert Vermette; Gilberto Marcha; Steve Kelly; David Wells; Ed Palmer; Kuo Yu; Tram Nguyen; Juliam Migliavacca

    2011-01-05

    According to a 2008 report issued by the United States Geological Survey, North Dakota and Montana have an estimated 3.0 to 4.3 billion barrels of undiscovered, technically recoverable oil in an area known as the Bakken Formation. With the size and remoteness of the discovery, the question became 'can a business case be made for increasing refining capacity in North Dakota?' And, if so what is the impact to existing players in the region. To answer the question, a study committee comprised of leaders in the region's petroleum industry were brought together to define the scope of the study, hire a consulting firm and oversee the study. The study committee met frequently to provide input on the findings and modify the course of the study, as needed. The study concluded that the Petroleum Area Defense District II (PADD II) has an oversupply of gasoline. With that in mind, a niche market, naphtha, was identified. Naphtha is used as a diluent used for pipelining the bitumen (heavy crude) from Canada to crude markets. The study predicted there will continue to be an increase in the demand for naphtha through 2030. The study estimated the optimal configuration for the refinery at 34,000 barrels per day (BPD) producing 15,000 BPD of naphtha and a 52 percent refinery charge for jet and diesel yield. The financial modeling assumed the sponsor of a refinery would invest its own capital to pay for construction costs. With this assumption, the internal rate of return is 9.2 percent which is not sufficient to attract traditional investment given the risk factor of the project. With that in mind, those interested in pursuing this niche market will need to identify incentives to improve the rate of return.

  18. North Star Refrigerator: Order (2013-CE-5355)

    Energy.gov [DOE]

    DOE ordered North Star Refrigerator Co., Inc. to pay a $8,000 civil penalty after finding North Star Refrigerator had failed to certify that any basic models of walk-in cooler and freezer components comply with the applicable energy conservation standards.

  19. North Carolina State Historic Preservation Programmatic Agreement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy North Carolina State Historic Preservation Programmatic Agreement North Carolina State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office. state_historic_preservation_programmatic_agreement_nc.pdf (541.87 KB) More Documents & Publications Indiana State Historic Preservation Programmatic Agreement South Dakota State Historic Preservation Programmatic Agreement

  20. A Coupled Modeling System to Simulate Water Resources in the Rio Grande Basin

    SciTech Connect (OSTI)

    Bossert, J.E.; Breshears, D.D.; Campbell, K.; Costigan, K.R.; Greene, R.K.; Keating, E.H.; Kleifgen, L.M.; Langley, D.L.; Martens, S.N.; Sanderson, J.G.; Springer, E.P.; Stalker, J.R.; Tartakovsky, D.M.; Winter, C.L.; Zyvoloski, G.A.

    1999-01-11

    Limited availability of fresh water in arid and semi-arid regions of the world requires prudent management strategies from accurate, science-based assessments. These assessments demand a thorough understanding of the hydrologic cycle over long time periods within the individual water-sheds that comprise large river basins. Measurement and simulation of the hydrologic cycle is a tremendous challenge, involving a coupling between global to regional-scale atmospheric precipitation processes with regional to local-scale land surface and subsurface water transport. Los Alamos National Laboratory is developing a detailed modeling system of the hydrologic cycle and applying this tool at high resolution to assess the water balance within the upper Rio Grande river basin. The Rio Grande is a prime example of a river system in a semiarid environment, with a high demand from agricultural, industrial, recreational, and municipal interests for its water supply. Within this river basin, groundwater supplies often augment surface water. With increasing growth projected throughout the river basin, however, these multiple water users have the potential to significantly deplete groundwater resources, thereby increasing the dependence on surface water resources.