  1. Nuclear Power 2010 Program: Combined Construction and Operating License &

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Design Certification Demonstration Projects Lessons Learned Report | Department of Energy Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report Nuclear Power 2010 Program: Combined Construction and Operating License & Design Certification Demonstration Projects Lessons Learned Report The Nuclear Power 2010 (NP 2010) Construction and Operating License/Design Certification (COL/DC) Demonstration program

  2. Land based crane operator training and licensing program

    SciTech Connect

    Borg, R. van der; Dingman, S.

    1995-12-31

    Working safely and having a healthy respect for safety has always been important to the Corps of Engineers. Because we recognize the increased importance of safety to crane operations, we have developed this Training and Licensing program for all crane operators. What the guidelines and this program intends is, think before you act and thinking requires a knowledge base. We feel the following program strengthens the guidelines to enable competent as well as confident crane operations by our personnel. This document outlines the Corps of Engineer`s Land Based Crane Training and Licensing Program for Class I, II, and III operators. The Corps of Engineer`s Portland District Operation`s Division melded guidelines from industry with specific Corps regulations to produce this program. The Crane Licensing and Training program includes three crane operator classes. Each class discusses licensing, physical and academic requirements and performance evaluations. Other related personnel and their responsibilities are also discussed. These include rigger/signalmen, maintenance staff, and inspectors. A section on testing requirements for specific needs follows with a glossary at the end of this document.

  3. Regulatory Guide 1. 149: Nuclear power plant simulation facilities for use in operator license examinations

    SciTech Connect

    Not Available

    1987-04-01

    Paragraph 55.45(a) of 10 CFR Part 55, ''Operators' Licenses,'' requires that an applicant for an operator or senior operator license demonstrate both an understanding of and the ability to perform certain essential job tasks. Paragraph 55.45(b) specifies that these operating tests will be administered, in part, either in a simulation facility consisting solely of a plant-referenced simulator that has been certified to the Commission by the facility licensee or in a simulation facility approved by the Commission after application has been made by the facility licensee. This regulatory guide describes a method acceptable to the NRC staff for complying with those portions of the Commission's regulations regarding (1) certification of a simulation facility consisting solely of a plant-reference simulator and (2) application for prior approval of a simulation facility.

  4. Licensed operating reactors. Status summary report data as of December 31, 1993

    SciTech Connect

    Hartfield, R.A.

    1994-03-01

    The Nuclear Regulatory Commissions annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December, the year to date (in this case calendar year 1993) and cumulative data, usually for the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  5. Licensed operating reactors. Status summary report data as of 12-31-94: Volume 19

    SciTech Connect

    1995-04-01

    The Nuclear Regulatory Commission`s annual summary of licensed nuclear power reactor data is based primarily on the report of operating data submitted by licensees for each unit for the month of December because that report contains data for the month of December, the year to date (in this case calendar year 1994) and cumulative data, usually from the date of commercial operation. The data is not independently verified, but various computer checks are made. The report is divided into two sections. The first contains summary highlights and the second contains data on each individual unit in commercial operation. Section 1 capacity and availability factors are simple arithmetic averages. Section 2 items in the cumulative column are generally as reported by the licensee and notes as to the use of weighted averages and starting dates other than commercial operation are provided.

  6. Master Software License Agreement

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... that system. 4. SCOPE OF LICENSE USE. Regardless of the ... and use the Product in support of GE's internal, research ... consolidate computer or network operations), andor other ...

  7. Licensing Technology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Licensing Technology Licensing Technology The primary function of Los Alamos Licensing Program is to move Los Alamos technology to the marketplace for the benefit of the U.S. economy. Our intellectual property may be licensed for commercial use, research applications, and U.S. government use. Contact thumbnail of Marcus Lucero Head of Licensing Marcus Lucero Richard P. Feynman Center for Innovation (505) 665-6569 Email Although Los Alamos's primary mission is national security, our technologies

  8. Full-power test of a string of magnets comprising a half-cell of the Superconducting Super Collider

    SciTech Connect

    Burgett, W.; Christianson, M.; Coombes, R.

    1992-10-01

    In this paper we describe the full-powered operation of a string of industrially-fabricated magnets comprising a half-cell of the Superconducting Super Collider (SSC). The completion of these tests marks the first successful operation of a major SSC subsystem. The five 15-m long dipole magnets in the string had an aperture of 50 mm and the single 5-m long quadrupole aperture was 40 mm. Power and cryogenic connections were made to the string through spool pieces that are prototypes for SSC operations. The string was cooled to cryogenic temperatures in early July, 1992, and power tests were performed at progressively higher currents up to the nominal SSC operating point above 6500 amperes achieved in mid-August. In this paper we report on the electrical and cryogenic performance of the string components and the quench protection system during these initial tests.

  9. Hot Zero and Full Power Validation of PHISICS RELAP-5 Coupling

    SciTech Connect

    F. Lodi; C. Rabiti; A. Alfonsi; A. Epiney; M. Sumini

    2013-06-01

    PHISICS is a reactor analysis toolkit developed in the last 3 years at the Idaho National Laboratory that has been also coupled with the thermo-hydraulic plant simulator RELAP5-3D. PHISICS is aimed to provide an optimal trade off between needed computational resources and accuracy in the range of 10~100 cores. In fact this range has been identified as the next 5 to 10 years average computational capability available to nuclear engineer designing and optimizing nuclear reactor cores. Different publication has been already presented [1] showing test of the single modules composing the PHISICS package. Lately the Idaho National Laboratory had the opportunity to access to plant data for the first cycle of a PWR including Hot Zero Power (HZP) and Hot Full Power (HFP). This data provided the opportunity to validate the transport solver, the interpolation capability for mixed macro and micro cross section and the criticality search option of the PHISICS package. In the following we will firstly recall briefly the structure of the different PHISICS modules and then we will illustrate the modeling process and some preliminary results.

  10. Solar Contractor Licensing

    Energy.gov [DOE]

    Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued...

  11. Solar Contractor Licensing

    Energy.gov [DOE]

    Utah's Division of Occupational and Professional Licensing requires installers of solar energy systems to be licensed contractors. General electrical contractors carrying an S200 or an S201...

  12. Solar Contractor Licensing

    Energy.gov [DOE]

    Hawaii offers several specialty licenses for solar contractors through Hawaii’s Department of Commerce and Consumer Affairs. The following specialty licenses are available: Solar Power Systems...

  13. NREL: Technology Transfer - Licensing Agreements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    using, and selling of the licensed technology, methods, or products. 5. Negotiate License Language The company then reviews and comments on the license agreement draft. If needed,...

  14. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Standard review plan and acceptance criteria. NUREG - 1537, Part 2

    SciTech Connect

    1996-02-01

    NUREG - 1537, Part 2 gives guidance on the conduct of licensing action reviews to NRC staff who review non-power reactor licensing applications. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  15. Nuclear Power 2010 Program Dominion Virginia Power Cooperative Project U.S. Department of Energy Cooperative Agreement DE-FC07-05ID14635 Construction and Operating License Demonstration Project Final Report

    SciTech Connect

    Eugene S. Grecheck David P. Batalo

    2010-11-30

    This report serves to summarize the major activities completed as part of Virginia Electric and Power Company's North Anna construction and operating license demonstration project with DOE. Project successes, lessons learned, and suggestions for improvement are discussed. Objectives of the North Anna COL project included preparation and submittal of a COLA to the USNRC incorporating ESBWR technology for a third unit a the North Anna Power Station site, support for the NRC review process and mandatory hearing, obtaining NRC approval of the COLA and issuance of a COL, and development of a business case necessary to support a decision on building a new nuclear power plant at the North Anna site.

  16. Renewable Energy Contractor Licensing

    Office of Energy Efficiency and Renewable Energy (EERE)

    Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of...

  17. Licensing Process | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Licensing Process Through licensing of its intellectual property rights, NREL provides industry with an opportunity to commercialize NREL-developed energy technologies and products. Our licensing opportunities are available to both small and large businesses-from start-ups to Fortune 500 companies. Step-by-Step Process 1. Identify and Qualify Opportunity To identify a licensing opportunity, a company can browse the Energy Innovation Portal. From the Portal, the company can review publically

  18. Mr. William f. Crow, Acting Director . Uranium Fuel Licensing...

    Office of Legacy Management (LM)

    ... concerning operations at this site was found in correspondence indicating a polonium spill in 1954. ENCLOSURE 3 NLO SUBCONTRACTORS - NO AEC LICENSE INDICATED ...

  19. Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 4: June 8, 2009 Vehicles per Licensed Driver Rising Fact #574: June 8, 2009 Vehicles per Licensed Driver Rising The number of vehicles in operation per licensed driver has risen steadily since 1950. In 1985, for the first time, there was one vehicle for every licensed driver. Since 1985, the number of vehicles in operation has exceeded the number of licensed drivers reaching a level of 1.21 vehicles per licensed driver in 2007. Vehicles per Licensed Driver, 1950-2007 Line graph

  20. Human Factors Guidance for Control Room and Digital Human-System Interface Design and Modification, Guidelines for Planning, Specification, Design, Licensing, Implementation, Training, Operation and Maintenance

    SciTech Connect

    R. Fink, D. Hill, J. O'Hara

    2004-11-30

    Nuclear plant operators face a significant challenge designing and modifying control rooms. This report provides guidance on planning, designing, implementing and operating modernized control rooms and digital human-system interfaces.

  1. Solar Contractor Licensing

    Energy.gov [DOE]

    In June 2005, Assembly Bill 3 amended the Nevada Revised Statutes, Chapter 618, to create a mandatory licensing program for contractors installing and maintaining photovoltaic systems, beginning...

  2. Licensing | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Argonne requires a commercialization plan from prospective licensees before licensing its intellectual property. The plan better enables Argonne and the prospective licensee to...

  3. Solar Contractor Licensing

    Energy.gov [DOE]

    The Arizona Registrar of Contractors does have a specific plumbing license which includes solar water heaters. R-37 is required for contractors installing or performing maintenance on residential...

  4. Guidelines for preparing and reviewing applications for the licensing of non-power reactors: Format and Content. NUREG-1537, Part 1

    SciTech Connect

    1996-02-01

    NUREG - 1537, Part 1 gives guidance to non-power reactor licensees and applicants on the format and content of applications to the Nuclear Regulatory Commission for licensing actions. These licensing actions include construction permits and initial operating licenses, license renewals, amendments, conversions from highly enriched uranium to low-enriched uranium, decommissioning, and license termination.

  5. License for the Konrad Deep Geological Repository

    SciTech Connect

    Biurrun, E.; Hartje, B.

    2003-02-24

    Deep geological disposal of long-lived radioactive waste is currently considered a major challenge. Until present, only three deep geological disposal facilities have worldwide been operated: the Asse experimental repository (1967-1978) and the Morsleben repository (1971-1998) in Germany as well as the Waste Isolation Pilot Plant (WIPP) in the USA (1999 to present). Recently, the licensing procedure for the fourth such facility, the German Konrad repository, ended with a positive ''Planfeststellung'' (plan approval). With its plan approval decision, the licensing authority, the Ministry of the Environment of the state of Lower Saxony, approved the single license needed pursuant to German law to construct, operate, and later close down this facility.

  6. License Iso. CM35

    Office of Legacy Management (LM)

    Reither this license nor my right under this licewe shall be uslgned or otherwise traneferred in violation of the pmvislont of the Atalc Finer&y Act oi 19%. ' Ibis licenae haJ..l ...

  7. Licensing Technologies | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Licensing Technologies Licensing Technologies New tack cloth leaves no sticky residue. A license is a means of transferring commercial rights for technologies developed at Y-12 to...

  8. TTWG Licensing Guide | Department of Energy

    Energy Saver

    TTWG Licensing Guide TTWG Licensing Guide PDF icon TTWG Licensing Guide More Documents & Publications ITP Aluminum: Technical Working Group on Inert Anode Technologies EIS-0333:...

  9. License Structure for Multi-Module Facilities

    SciTech Connect

    Thomas Hicks

    2010-08-01

    The Next Generation Nuclear Plant (NGNP) Project is intended to be the prototype for multi-module commercial high temperature gas reactors (HTGRs) for process heat and/or electricity generation. Part of the objectives of the project are to establish the conditions that would govern or enhance the design, licensing, construction and operation of numerous, modular nuclear plants, particularly suited for industrial applications or that could reduce the risk of such projects. A determination is desired regarding whether a multi-module reactor plant can be licensed with a single Nuclear Regulatory Commission (NRC) review, hearing, and safety evaluation report. If it is determined that a multi-modular reactor plant can be licensed under a single review/hearing process, the structure and the duration of the license for each module will also need to be determined. The purpose of this paper is to describe for the NRC the NGNP position on these two issues and obtain either NRC general concurrence or comments on the approach to these issues. While the current NGNP planning provides for only a single reactor module, the project is intended to provide the basis and establish a licensing framework that can be used by future commercial HTGRs and other reactor designs, including a variety of small modular reactor technologies, with configurations reflecting design standardization of multi-module plants. Therefore, it is important to identify a path for addressing these modular reactor plant issues so that the resolution can be factored into the NGNP Project planning. The NGNP position is that a single combined license (COL) application can be submitted for a multi-modular reactor facility, the COL application can undergo a single NRC review/hearing process, and each module should be issued a separate license.

  10. Solar Hot Water Contractor Licensing

    Energy.gov [DOE]

    In order to obtain one of these specialty licenses, installers must meet the following criteria. The applicant for a Restricted Solar Mechanic license must provide the Arkansas Department of...

  11. Licensable Life Science Technologies | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Licensable Life Science Technologies A selection of biology-based technologies available for licensing PDF icon licensablebiologicaltechnologies

  12. NREL: Technology Transfer - Technologies Available for Licensing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Ombuds. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Licensing Agreements Technologies Available for Licensing...

  13. Combined Construction and Operating License (COL)

    Energy Saver

    ... EIS QUARTERLY NUCLEAR POWER DEPLOYMENT SUMMARY ... Westinghouse AP1000 - Amended design certified on December ... 082609. COMPANY REACTOR SIZE (MWE) APPLICATION ...

  14. Combined Construction and Operating License (COL)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Updates available at: http://www.nuclear.gov NEXT UPDATE - April 2013 Page 1 News Updates  On October 22 Dominion Resources Inc. announced that it would close and decommission its Kewaunee Power Station located in Carlton, Wis. after failing to find a buyer for the plant. The company said that the plant closure was a purely economic decision resulting from low projected wholesale electricity prices. Power production will cease in the second quarter of 2013.  On November 20, 2012, the

  15. Ira Schneider, Licensing

    Office of Legacy Management (LM)

    Ira Schneider, Licensing Department of Energy Washingtof), DC 20585 NOV 2 6 2014 Food, Drug, and Radiation Safety-Radiologic Health Branch California Department of Public Health PO Box 997414, MS 7610 Sacramento, CA 95899-7414 Subject: U.S. Department of Energy, Office of Legacy Management Acceptance of Responsibility for Long-Term Surveillance and Maintenance of the Former Burris Park Field Station, Kings Colinty, California From 1956 to 1963, the U.S. Atomic Energy Commission (AEC) contracted

  16. NRC Licensing Status Summary Report for NGNP

    SciTech Connect

    Moe, Wayne Leland; Kinsey, James Carl

    2014-11-01

    The Next Generation Nuclear Plant (NGNP) Project, initiated at Idaho National Laboratory (INL) by the U.S. Department of Energy (DOE) pursuant to provisions of the Energy Policy Act of 2005, is based on research and development activities supported by the Department of Energy Generation IV Nuclear Energy Systems Initiative. The principal objective of the NGNP Project is to support commercialization of high temperature gas-cooled reactor (HTGR) technology. The HTGR is a helium-cooled and graphite moderated reactor that can operate at temperatures much higher than those of conventional light water reactor (LWR) technologies. The NGNP will be licensed for construction and operation by the Nuclear Regulatory Commission (NRC). However, not all elements of current regulations (and their related implementation guidance) can be applied to HTGR technology at this time. Certain policies established during past LWR licensing actions must be realigned to properly accommodate advanced HTGR technology. A strategy for licensing HTGR technology was developed and executed through the cooperative effort of DOE and the NRC through the NGNP Project. The purpose of this report is to provide a snapshot of the current status of the still evolving pre-license application regulatory framework relative to commercial HTGR technology deployment in the U.S. The following discussion focuses on (1) describing what has been accomplished by the NGNP Project up to the time of this report, and (2) providing observations and recommendations concerning actions that remain to be accomplished to enable the safe and timely licensing of a commercial HTGR facility in the U.S.

  17. AVAILABLE FOR LICENSING - IN-09-029

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AVAILABLE FOR LICENSING - IN-09-029 September 2016 CHALLENGE Automotive engines, gear boxes, and wind turbines already operate under harsh conditions. As future equipment designs evolve toward more compact, lighter-weight, and high-power-density analogs, lubricants are expected to provide better friction, wear, and scuffing performance; and longer intervals between oil changes. Although current lubricants include zinc dialkyldithiophosphate (ZDDP) and molybdenum dithiocarbamate (MoDTC) to

  18. Exclusive Patent License Agreement between Alliance and company

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Page 1 of 19 EXCLUSIVE PATENT LICENSE AGREEMENT Between Alliance for Sustainable Energy, LLC And [COMPANY NAME] This License Agreement (hereinafter "Agreement"), which shall be effective on the date it is executed by the last Party to sign (the "Effective Date") below, is between Alliance for Sustainable Energy, LLC (hereinafter "Alliance"), Management and Operating Contractor for the National Renewable Energy Laboratory (hereinafter "NREL") located at

  19. NETL Partnership and Licensing Agreements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Partnerships and Licensing Options Cooperative Research and Development Agreement (CRADA) A CRADA allows for joint research projects between NETL and either public or private entities. Small businesses are given preferential consideration for the agreements. Intellectual property ownership is defined and cost sharing is essential. Intellectual Property (IP) License An Intellectual Property License transfers NETL-owned IP from government sector to private sector ownership both exclusively and

  20. Licensing Opportunities | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and inventors share in any monetary success derived from DOE funded intellectual property. ... energy technologies available for licensing, and patents and patent applications. ...

  1. intellectual property license | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    intellectual property license Intellectual Property License Agreements transfer NETL-owned intellectual property (IP) from the government to the private sector both exclusively and...

  2. Property:FERC License | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    FERC License Jump to: navigation, search Property Name FERC License Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense&oldid610683...

  3. NREL: Technology Transfer - Nonexclusive and Exclusive Licenses

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    sold utilizing the licensed technology. The fees and payments vary depending on the business model, market(s), and the number of patents licensed. Exclusive NREL grants an...

  4. File System Licenses in SLURM

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    File System Licenses in SLURM Introduction Users can now specify the filesystems required for their jobs by requesting "licenses" for them in their batch scripts. With this new SLURM license feature, a batch job will not start if the specified file system is unavailable due to maintenance or an outage, or if we've detected that it's having performance issues. This will protect your jobs from failures or decreased performance from known issues. We encourage everyone to use the SLURM

  5. Solar and Wind Contractor Licensing

    Energy.gov [DOE]

    In June of 2014, SB 447 mandated that the Louisiana State Licencsing Board for Contractors develop new rules for solar contractors no later than January 1, 2015. Licensed contractors must be in c...

  6. Licensing Technologies | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Licensing Technologies Licensing Technologies New tack cloth leaves no sticky residue. A license is a means of transferring commercial rights for technologies developed at Y-12 to the private sector. A license authorizes a "licensee" to use a patent, copyright, trademark. A technology license can be the basis of a new product line, or even a new company. The technology transfer process can shortcircuit the lengthy and costly product development cycle, and provide the licensee with a

  7. intellectual property license | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    intellectual property license Intellectual Property License Agreements transfer NETL-owned intellectual property (IP) from the government to the private sector both exclusively and non-exclusively. NETL looks for licensing partners with a plan for technology development and marketing with a high probability for technology commercialization. Licensing partners should also plan to make the benefits of the licensed IP reasonably accessible to the public. Review the list of current NETL technology

  8. Impact of fuel cladding failure events on occupational radiation exposures at nuclear power plants. Case study: PWR during routine operations

    SciTech Connect

    Moeller, M.P.; Martin, G.F.; Haggard, D.L.

    1986-01-01

    The purpose of this report is to present data in support of evaluating the impact of fuel cladding failure events on occupational radiation exposure. To determine quantitatively whether fuel cladding failure contributes significantly to occupational radiation exposure, radiation exposure measurements were taken at comparable locations in two mirror-image pressurized-water reactors (PWRs) and their common auxiliary building. One reactor, Unit B, was experiencing degraded fuel characterized as 0.125% fuel pin-hole leakers and was operating at approximately 55% of the reactor's licensed maximum core power, while the other reactor, Unit A, was operating under normal conditions with less than 0.01% fuel pin-hole leakers at 100% of the reactor's licensed maximum core power. Measurements consisted of gamma spectral analyses, radiation exposure rates and airborne radionuclide concentrations. In addition, data from primary coolant sample results for the previous 20 months on both reactor coolant systems were analyzed. The results of the measurements and coolant sample analyses suggest that a 3560-megawatt-thermal (1100 MWe) PWR operating at full power with 0.125% failed fuel can experience an increase of 540% in radiation exposure rates as compared to a PWR operating with normal fuel. In specific plant areas, the degraded fuel may elevate radiation exposure rates even more.

  9. Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

    SciTech Connect

    Watson, B.A.; Buckley, J.T.; Craig, C.M.

    2006-07-01

    Trojan Nuclear Plant (Trojan) and Maine Yankee Nuclear Plant (Maine Yankee) were the first two power reactors to complete decommissioning under the U. S. Nuclear Regulatory Commission's (NRC's) License Termination Rule (LTR), 10 CFR Part 20, Subpart E. The respective owners' decisions to decommission the sites resulted in different approaches to both the physical aspects of the decommissioning, and the approach for obtaining approval for completing the decommissioning in accordance with regulations. Being in different States, the two single-unit pressurized water reactor sites had different State requirements and levels of public interest that impacted the decommissioning approaches. This resulted in significant differences in decommissioning planning, conduct of decommissioning operations, volumes of low- level radioactive waste disposed, and the final status survey (FSS) program. While both licensees have Independent Spent Fuel Storage Installations (ISFSIs), Trojan obtained a separate license for the ISFSI in accordance with the requirements of 10 CFR Part 72 and terminated their 10 CFR Part 50 license. Maine Yankee elected to obtain a general license under 10 CFR Part 50 for the ISFSI and reduce the physical site footprint to the ISFSI through a series of license amendments. While the NRC regulations are flexible and allow different approaches to ISFSI licensing there are separate licensing requirements that must be addressed. In 10 CFR 50.82, the NRC mandates public participation in the decommissioning process. For Maine Yankee, public input resulted in the licensee entering into an agreement with a concerned citizen group and resulted in State legislation that significantly lowered the dose limit below the NRC radiological criteria of 25 mrem (0.25 mSv) per year (yr) in 10 CFR 20.1402 for unrestricted use. The lowering of the radiological criteria resulted in a significant dose modeling effort using site-specific Derived Concentrations Guideline Levels (DCGLs

  10. T-564: Vulnerabilities in Citrix Licensing administration components

    Energy.gov [DOE]

    The vulnerabilities impact all current versions of the Citrix Licensing Administration Console, formerly known as the License Management Console.

  11. Registration/Licensing Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Registration/Licensing Resources Registration/Licensing Resources Federal agencies and certain state governments are required to acquire alternative fuel vehicles as part of the Energy Policy Act of 1992, though they are also entitled to choose a petroleum reduction path as an alternative to the mandate. Find registration/licensing resources below. Alternative Fuels Data Center: Laws and Incentives by State.

  12. License renewal demonstration program: NRC observations and lessons learned

    SciTech Connect

    Prato, R.J.; Kuo, P.T.; Newberry, S.F.

    1996-12-01

    This report summarizes the Nuclear Regulatory Commission staff`s observations and lessons learned from the five License Renewal Demonstration Program (LRDP) site visits performed by the staff from March 25, 1996, through August 16, 1996. The LRDP was a Nuclear Energy Institute (NEI) program intended to assess the effectiveness of the guidance provided by NEI 95-10, Revision 0, {open_quotes}Industry Guideline for Implementing the Requirements of 10 CFR Part 54 - The License Renewal Rule,{close_quotes} to implement the requirements of Title 10 of the Code of Federal Regulations, Part 54 (10 CFR Part 54), {open_quotes}Requirements for Renewal of Operating Licenses for Nuclear Power Plants.{close_quotes} In general, NEI 95-10 appeared to contain the basic guidance needed for scoping, screening, identifying aging effects, developing aging management programs, and performing time-limited aging analyses. However, inconsistent implementation of this guidance in some areas was an indication that clarification of existing guidance and/or the inclusion-of some new guidance may be needed for applicants to develop a license renewal program that is consistent with the intent of the rule.

  13. NNWSI [Nevada Nuclear Waste Storage Investigation] strategy for repository licensing

    SciTech Connect

    Plodinec, M.J.

    1987-01-16

    The Nevada Nuclear Waste Storage Investigation (NNWSI) has developed a strategy to license a nuclear waste repository in tuff. This strategy, which is currently circulating in draft form within the Department of Energy`s Office of Civilian Radioactive Waste Management, has important implications for DWPF waste form qualification activities, design of the DWPF process, and DWPF operations. In this report, the strategy and its implications for the DWPF are presented. 2 refs.

  14. AP1000{sup R} licensing and deployment in the United States

    SciTech Connect

    Jordan, R. P.; Russ, P. A.; Filiak, P. P.; Castiglione, L. L.

    2012-07-01

    In recent years, both domestic and foreign utilities have turned to the standardized Westinghouse AP1000 plant design in satisfying their near - and long-term - sustainable energy needs. As direct support to these actions, licensing the AP1000 design has played a significant role by providing one of the fundamental bases in clearing regulatory hurdles leading to the start of new plant construction. Within the U.S. alone, Westinghouse AP1000 licensing activities have reached unprecedented milestones with the approvals of both AP1000 Design Certification and Southern Company's combined construction permit and operating license (COL) application directly supporting the construction of two new nuclear plants in Georgia. Further COL application approvals are immediately pending for an additional two AP1000 plants in South Carolina. And, across the U.S. nuclear industry spectrum, there are 10 other COL applications under regulatory review representing some 16 new plants at 10 sites. In total, these actions represent the first wave of new plant licensing under the regulatory approval process since 1978. Fundamental to the Nuclear Regulatory Commission's AP1000 Design Certification is the formal recognition of the AP1000 passive safety design through regulatory acceptance rulemaking. Through recognition and deployment of the AP1000 Design Certification, the utility licensee / operator of this reactor design are now offered an opportunity to use a simplified 'one-step' combined license process, thereby managing substantial back-end construction schedule risk from regulatory and intervention delays. Application of this regulatory philosophy represents both acceptance and encouragement of standardized reactor designs like the AP1000. With the recent AP1000 Design Certification and utility COL acceptances, the fundamental licensing processes of this philosophy have successfully proven the attainment of significant milestones with the next stage licensing actions directed

  15. Nuclear Power 2010 Program: Combined Construction and Operating...

    Energy.gov [DOE] (indexed site)

    Power 2010 (NP 2010) Construction and Operating LicenseDesign Certification (COLDC) Demonstration program together with the financial incentives provided by the Energy Policy Act...

  16. Recreational Technical Assistance in Hydropower Licensing | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Recreational Technical Assistance in Hydropower LicensingPermittingRegulatory...

  17. Texas site selection and licensing status

    SciTech Connect

    Avant, R.V. Jr.

    1989-11-01

    Texas has identified a potential site in Hudspeth County in far West Texas near the town of Fort Hancock. Over the past year the Texas Low-Level Radioactive Waste Disposal Authority has been conducting detailed geology, hydrology, meteorology, soils, and flora and fauna evaluations. An authorization by the Board of Directors of the Authority to proceed with a license application, assuming that the detailed evaluation indicates that the site is suitable, is expected by September. A prototype license has been prepared in anticipation of the order to proceed with licensing, and the formal license application is expected to be submitted to the Texas Department of Health-Bureau of Radiation Control in December, meeting the license application milestone. Although site selection processes in all siting areas across the country have experienced organized opposition, El Paso County has funded a particularly well-organized, well-financed program to legally and technically stop consideration of the Fort Hancock site prior to the licensing process. Many procedural, regulatory, and technical issues have been raised which have required responses from the Authority in order to proceed with licensing. This has provided a unique perspective of what to expect from well-organized opposition at the licensing stage. This paper presents an update on the Texas siting activity with detailed information on the site evaluation and license application. Experience of dealing with issues raised by opposition relating to NRC guidelines and rules is also discussed.

  18. DEPARTMENT OF ENERGY NONEXCLUSIVE PATENT LICENSE APPLICATION...

    Energy.gov [DOE] (indexed site)

    licensed on DOE-owned patents applications in appropriate circumstances to applicants with satisfactory plans for development andor marketing of the invention. NONEXCLUSIVE PATENT ...

  19. Vermont Waste Transportation Permit and License Information ...

    OpenEI (Open Energy Information) [EERE & EIA]

    Waste Transportation Permit and License Information Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Vermont...

  20. FERC Licensing Processes Matrix | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Licensing Processes MatrixPermittingRegulatory GuidanceGuideHandbook...

  1. Technologies licensed | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    facilities and large sporting venues, as well as for other Department of Energy sites. Sustainable Environment Technologies, LLC (SET), licensed the Access Rate Control System...

  2. Nuclear reactor characteristics and operational history

    Gasoline and Diesel Fuel Update

    Nuclear > U.S. reactor operation status tables Nuclear Reactor Operational Status Tables Release date: November 22, 2011 Next release date: TBD See also: Table 1. Capacity and Generation, Table 2. Ownership Data Table 3. Nuclear Reactor Characteristics and Operational History PDF XLS Plant Name Generator ID Type Reactor Supplier and Model Construction Start Grid Connection Original Expiration Date License Renewal Application License Renewal Issued Extended Expiration Arkansas Nuclear One 1

  3. Regulatory Guide 1. 134: Medical evaluation of licensed personnel for nuclear power plants

    SciTech Connect

    Not Available

    1987-04-01

    This guide describes a method acceptable to the NRC staff for providing the information needed by the staff for its evaluation of the medical qualifications of applicants for initial or renewal operator or senior operator licenses for nuclear power plants and for providing notification to the NRC of an incapacitating disability or illness.

  4. Montana - Land Use License Application | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Land Use License Application Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Montana - Land Use License Application Author Montana Department of Natural...

  5. Title 50 CFR Part 221 Prescriptions in FERC Hydropower Licenses...

    OpenEI (Open Energy Information) [EERE & EIA]

    in FERC Hydropower LicensesLegal Abstract Regulations governing Department of Commerce review of FERC hydropower license conditions under Federal Power Act. Published NA...

  6. ORNL Licenses Rare Earth Magnet Recycling Process to Momentum...

    Office of Environmental Management (EM)

    ORNL Licenses Rare Earth Magnet Recycling Process to Momentum Technologies ORNL Licenses ... Dallas-based Momentum Technologies is focused on extraction of rare earth elements and ...

  7. NASA Partners License Nanotube Technology for Commercial Use...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NASA Partners License Nanotube Technology for Commercial Use (PR Newswire) External Link: http:www.prnewswire.comnews-releasesnasa-partners-license-nanotube-technolog... By ...

  8. Sandia Energy - NuMAD License and Disclaimer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Power Energy Conversion Efficiency Wind Energy Rotor Innovation Numerical Manufacturing And Design Tool (NuMAD) NuMAD License and Disclaimer NuMAD License and...

  9. FERC Handbook for Hydroelectric Project Licensing and 5 MW Exemptions...

    OpenEI (Open Energy Information) [EERE & EIA]

    Handbook for Hydroelectric Project Licensing and 5 MW Exemptions from Licensing Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  10. Professional Engineer Licenses are Symbol of Achievement for...

    Office of Environmental Management (EM)

    licenses from the state of California. ORP employees Kelly Ebert, left, and Anne McCartney, recently earned their professional engineer licenses from the state of California. ...

  11. Energy Facility Licensing Process Developer's Guide | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Licensing Process Developer's Guide Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Energy Facility Licensing Process Developer's...

  12. Solar/Wind Contractor Licensing | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Licensing Louisiana InstallerContractor Photovoltaics Solar Water Heat Yes Tennessee Solar Panel Installation Specialty and Solar Thermal-Geothermal Licensing (Tennessee)...

  13. Property:FERC License Application Date | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    FERC License Application Date Jump to: navigation, search Property Name FERC License Application Date Property Type String Retrieved from "http:en.openei.orgw...

  14. Exclusive Patent License Agreement between Alliance and company

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    or indirectly by Alliance in the grant of a license to the Licensed Patents, from the United States of America, directly or indirectly without first complying with all...

  15. Non-exclusive patent license agreement between Alliance and company

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    or indirectly by Alliance in the grant of a license to the Licensed Patents, from the United States of America, directly or indirectly without first complying with all...

  16. Nuclear Safety Design Base for License Application (Technical...

    Office of Scientific and Technical Information (OSTI)

    Nuclear Safety Design Base for License Application Citation Details In-Document Search Title: Nuclear Safety Design Base for License Application You are accessing a document ...

  17. U-047: Siemens Automation License Manager Bugs Let Remote Users...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7: Siemens Automation License Manager Bugs Let Remote Users Deny Service or Execute Arbitrary Code U-047: Siemens Automation License Manager Bugs Let Remote Users Deny Service or...

  18. Licensed reactor nuclear safety criteria applicable to DOE reactors

    SciTech Connect

    Not Available

    1991-04-01

    The Department of Energy (DOE) Order DOE 5480.6, Safety of Department of Energy-Owned Nuclear Reactors, establishes reactor safety requirements to assure that reactors are sited, designed, constructed, modified, operated, maintained, and decommissioned in a manner that adequately protects health and safety and is in accordance with uniform standards, guides, and codes which are consistent with those applied to comparable licensed reactors. This document identifies nuclear safety criteria applied to NRC (Nuclear Regulatory Commission) licensed reactors. The titles of the chapters and sections of USNRC Regulatory Guide 1.70, Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants, Rev. 3, are used as the format for compiling the NRC criteria applied to the various areas of nuclear safety addressed in a safety analysis report for a nuclear reactor. In each section the criteria are compiled in four groups: (1) Code of Federal Regulations, (2) US NRC Regulatory Guides, SRP Branch Technical Positions and Appendices, (3) Codes and Standards, and (4) Supplemental Information. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

  19. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    SciTech Connect

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted

    2012-07-01

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

  20. QUARTERLY NUCLEAR POWER DEPLOYMENT SUMMARY JULY 2015

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    authority to issue a full power operating license to ... US-EPR design certification application. A Reference COL (R-COL) application has been submitted for five reactor ...

  1. Quarterly Nuclear Deployment Scorecard - July 2015 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    authority to issue a full power operating license to ... 3 (later withdrawn) Reactor Design Certification (DC) ... Westinghouse AP1000 - Amended design certified on ...

  2. Hydropower licensing: a case study of Massachusetts' streamlined procedure

    SciTech Connect

    Gardiner, P.

    1980-08-01

    Licensing procedures for hydroelectric projects in Massachusetts are enumerated, reviewed, and evaluated. (LCL)

  3. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    SciTech Connect

    Lima, Luiz Henrique; Magrini, Alessandra

    2010-02-15

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

  4. Land Use License | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Land Use LicenseLegal Published NA Year Signed or Took Effect 2013 Legal Citation Not...

  5. Guide for the preparation of applications for licenses to process source material. Proposed Revision 2 to Regulatory Guide 10. 4

    SciTech Connect

    Not Available

    1985-04-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals for the use of source material in such activities as research and development, the use of source material as shielding, manufacturing depleted uranium and thorium-magnesium alloy products, manufacturing glass containing uranium, manufacturing and distributing other products containing source material, or shaping, grinding, and polishing lenses containing thorium. Activities related to the reactor fuel cycle such as uranium and thorium mill operation and uranium hexafluoride production are not within the scope of this guide.

  6. Cleanup of Nuclear Licensed Facility 57

    SciTech Connect

    Jeanjacques, Michel; Bremond, Marie Pierre; Marchand, Carole; Poyau, Cecile; Viallefont, Cecile; Gautier, Laurent; Masure, Frederic

    2008-01-15

    This summary describes the operations to clean up the equipment of the Nuclear Licensed Facility 57 (NLF 57). Due to the diversity of the research and development work carried out on the reprocessing of spent fuel in it, this installation is emblematic of many of the technical and organizational issues liable to be encountered in the final closure of nuclear facilities. The French atomic energy commission's center at Fontenay aux Roses (CEA-FAR) was created in 1946 to house pile ZOE. Laboratories for fuel cycle research were installed in existing buildings at the site. Work was later concentrated on spent fuel reprocessing, in a pilot workshop referred to as the 'Usine Pu'. In the early sixties, after the dismantling of these first generation facilities, a radiochemistry laboratory dedicated to research and development work on reprocessing was constructed, designated Building 18. During the same decade, more buildings were added: Building 54, storehouses and offices, Building 91, a hall and laboratories for chemical engineering research on natural and depleted uranium. Together, these three building constitute NLF 57. Building 18 architecture featured four similar modules. Each module had three levels: a sub-level consisting of technical galleries and rooms for the liquid effluent tanks, a ground floor and roof space in which the ventilation was installed. Offices, change rooms, four laboratories and a hall were situated on the ground floor. The shielded lines were installed in the laboratories and the halls. Construction of the building took place between 1959 and 1962, and its commissioning began in 1961. The research and development programs performed in NLF 57 related to studies of the reprocessing of spent fuel, including dry methods and the Purex process, techniques for the treatment of waste (vitrification, alpha waste decontamination, etc.) as well as studies and production of transuranic elements for industry and research. In addition to this work, the

  7. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  8. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  9. Inspection of the Department`s export licensing process for dual-use and munitions commodities

    SciTech Connect

    Not Available

    1993-08-10

    The purpose of our inspection was to review the Department of Energy`s (Energy) export licensing process for dual-use and military (munitions) commodities subject to nuclear nonproliferation controls. Specifically, we reviewed Energy`s authorities, procedures, and policies pertaining to the export licensing process and examined procedures for safeguarding data transmitted between Energy and other agencies involved in the export licensing process. We also reviewed Energy`s role as a member of the Subgroup on Nuclear Export Coordination. Our review of the sample of 60 export cases did not find evidence to lead us to believe that Energy`s recommendations for these cases were inappropriate or incorrect. We identified, however, problems regarding management systems associated with the export license review process. We found that without documentation supporting export licensing decisions by the Export Control Operations Division (ECOD), we could not determine whether ECOD analysts considered all required criteria in their review of export cases referred to Energy. For example, we found that the ECOD did not retain records documenting the bases for its advice, recommendations, or decisions regarding its reviews of export license cases or revisions to lists of controlled commodities and, therefore, was not in compliance with certain provisions of the Export Administration Act, as amended, and Energy records management directives. Additionally, we found that the degree of compliance by Energy with the export licensing review criteria contained in the Export Administration Regulations and the Nuclear Non-Proliferation Act of 1978 could not be determined because ECOD did not retain records documenting the bases for its advice and recommendations on export cases.

  10. Renewing the licenses of US nuclear plants: An assessment of the socioeconomic impacts

    SciTech Connect

    Schweitzer, M.; Saulsbury, J.W. ); Schexnayder, S.M. )

    1993-01-01

    In recent years, increased national attention has been focused on the potential effects of renewing, or not renewing, the licenses of nuclear power plants as the oldest of them approach the end of the 40-year operating period allowed by their original licenses. As part of a larger study for the US Nuclear Regulatory commission (NRC), the authors conducted an assessment of the potential socioeconomic impacts to those communities throughout the country in which nuclear power plants are located and which, therefore, are most directly affected by renewal of nuclear power plant licenses. This paper focuses on six key issues that are traditionally considered essential in the assessment of social impacts: Population; housing; tax payments; local public services; land use and development; and economic structure.

  11. Kirkland gets license in hot Philippines area

    SciTech Connect

    Kirkland, A.S.

    1992-08-03

    This paper reports that Kirkland As, Oslo, has received a geophysical survey and exploration contract (GSEC) in a sizzling exploration and development theater off the Philippines. The license covers about 6,000 sq miles of undisputed waters, with depths mostly less than 300 ft, and lies in the Reed Bank area off Northwest Palawan Island, where several major oil and gas strikes have been made recently. Kirkland has 1 year in which to carry out its seismic work commitment. The terms of the GSEC then give an option to drill one well in a 6 month period. Once the results have been analyzed, the company can either drill another well or enter into a service contract for the license. Kirkland has a 65% share in the license, with the remainder split between Philippine companies Philodrill Corp., Beguet Mining Corp. subsidiary Petrofields, and Seafront Resources Corp. The Philippines is one of Kirkland's main areas of activity, the Kirkland Commercial Manager Ralph Baxter.

  12. Title 18 CFR 5 Integrated License Application Process | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    5 Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 5 Integrated License...

  13. ARS 41-1072 Licensing Time Frames | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    1-1072 Licensing Time Frames Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: ARS 41-1072 Licensing Time FramesLegal Abstract...

  14. CCC Federal License and Permit List | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    CCC Federal License and Permit List Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- OtherOther: CCC Federal License and Permit ListLegal Abstract...

  15. NASA Partners License Nanotube Technology for Commercial Use (PR Newswire)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    | Jefferson Lab NASA Partners License Nanotube Technology for Commercial Use (PR Newswire) External Link: http://www.prnewswire.com/news-releases/nasa-partners-license-nanotube-technolog... By jlab_admin on Tue, 2012-05-0

  16. Laboratory Licenses Hydrogen Sensor Technology - News Releases | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Laboratory Licenses Hydrogen Sensor Technology Nuclear Filter Technology Awarded Licenses for Fiber Optic Hydrogen Sensor February 23, 2006 Golden, Colo. - The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) today announced that Nuclear Filter Technology (NucFil) has been awarded licenses to manufacture Fiber Optic Hydrogen Sensors. The licenses, together with a Cooperative Research and Development Agreement (CRADA), allow NucFil to work with scientists and engineers at

  17. Nuclear Regulatory Commission Regulatory and Licensing Matters | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Regulatory Commission Regulatory and Licensing Matters Nuclear Regulatory Commission Regulatory and Licensing Matters GC-52 provides legal advice to DOE regarding Nuclear Regulatory Commission (NRC) regulatory and licensing matters of interest to DOE, either as an NRC license applicant or in connection with related authorities and responsibilities of DOE and NRC on nuclear material, nuclear waste, and nuclear nonproliferation matters. GC-52 attorneys provide advice and support on a

  18. NETL Issues Licenses for its Arc Position Sensing Technology | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Issues Licenses for its Arc Position Sensing Technology NETL Issues Licenses for its Arc Position Sensing Technology May 27, 2015 - 8:57am Addthis NETL Issues Licenses for its Arc Position Sensing Technology The U.S. Department of Energy's National Energy Technology Laboratory (NETL) has issued two licenses involving its Arc Position Sensing (APS) technology to KW Associates LLC, an Oregon-based company founded by the technology's inventors. APS technology is a patented,

  19. Sensor network based vehicle classification and license plate identification system

    SciTech Connect

    Frigo, Janette Rose; Brennan, Sean M; Rosten, Edward J; Raby, Eric Y; Kulathumani, Vinod K

    2009-01-01

    Typically, for energy efficiency and scalability purposes, sensor networks have been used in the context of environmental and traffic monitoring applications in which operations at the sensor level are not computationally intensive. But increasingly, sensor network applications require data and compute intensive sensors such video cameras and microphones. In this paper, we describe the design and implementation of two such systems: a vehicle classifier based on acoustic signals and a license plate identification system using a camera. The systems are implemented in an energy-efficient manner to the extent possible using commercially available hardware, the Mica motes and the Stargate platform. Our experience in designing these systems leads us to consider an alternate more flexible, modular, low-power mote architecture that uses a combination of FPGAs, specialized embedded processing units and sensor data acquisition systems.

  20. NRC antitrust licensing actions, 1978--1996

    SciTech Connect

    Mayer, S.J.; Simpson, J.J.

    1997-09-01

    NUREG-0447, Antitrust Review of Nuclear Power Plants, was published in May 1978 and includes a compilation and discussion of U.S. Nuclear Regulatory Commission (NRC) proceedings and activity involving the NRC`s competitive review program through February 1978, NUREG-0447 is an update of an earlier discussion of the NRC`s antitrust review of nuclear power plants, NR-AIG-001, The US Nuclear Regulatory Commission`s Antitrust Review of Nuclear Power Plants: The Conditioning of Licenses, which reviewed the Commission`s antitrust review function from its inception in December 1970 through April 1976. This report summarizes the support provided to NRC staff in updating the compilation of the NRC`s antitrust licensing review activities for commercial nuclear power plants that have occurred since February 1978. 4 refs., 4 tabs.

  1. The Atomic Safety and Licensing Board Panel

    SciTech Connect

    1998-03-01

    Through the Atomic Energy Act, Congress made is possible for the public to get a full and fair hearing on civilian nuclear matters. Individuals who are directly affected by any licensing action involving a facility producing or utilizing nuclear materials may participate in a formal hearing, on the record, before independent judges on the Atomic Safety and Licensing Board Panel (ASLBP or Panel). Frequently, in deciding whether a license, permit, amendment, or extension should be granted to a particular applicant, the Panel members must be more than mere umpires. If appropriate, they are authorized to go beyond the issues the parties place before them in order to identify, explore, and resolve significant questions involving threats to the public health and safety that come to a board`s attention during the proceedings. This brochure explains the purpose of the panel. Also addressed are: type of hearing handled; method of public participation; formality of hearings; high-level waste; other panel responsibilities and litigation technology.

  2. Strategic Basis for License Application Planning for a Potential Yucca Mountain Repository

    SciTech Connect

    Newberry, C. M.; Brocoum, S. J.; Gamble, R. P.; Murray, R. C.; Cline, M.

    2002-02-26

    If Yucca Mountain, Nevada is designated as the site for development of a geologic repository for disposal of spent nuclear fuel and high-level radioactive waste, the Department of Energy (DOE) must obtain Nuclear Regulatory Commission (NRC) approval first for repository construction, then for an operating license, and, eventually, for repository closure and decommissioning. The licensing criteria defined in Code of Federal Regulations, Title 10, Part 63 (10 CFR Part 63) establish the basis for these NRC decisions. Submittal of a license application (LA) to the NRC for authorization to construct a repository at the Yucca Mountain site is, at this point, only a potential future action by the DOE. The policy process defined in the Nuclear Waste Policy Act (NWPA), as amended, for recommendation and designation of Yucca Mountain as a repository site makes it difficult to predict whether or when the site might be designated. The DOE may only submit a LA to the NRC if the site designation takes effect. In spite of this uncertainty, the DOE must take prudent and appropriate action now, and over the next several years, to prepare for development and timely submittal of a LA. This is particularly true given the need for the DOE to develop, load, and certify the operation of its electronic information system to provide access to its relevant records as part of the licensing support network (LSN) in compliance with NRC requirements six months prior to LA submittal. The DOE must also develop a LA, which is a substantially different document from those developed to support a Site Recommendation (SR) decision. The LA must satisfy NRC licensing criteria and content requirements, and address the acceptance criteria defined by the NRC in its forthcoming Yucca Mountain Review Plan (YMRP). The content of the LA must be adequate to facilitate NRC acceptance and docketing for review, and the LA and its supporting documents must provide the documented basis for the NR C findings required

  3. NEXT GENERATION NUCLEAR PLANT LICENSING BASIS EVENT SELECTION WHITE PAPER

    SciTech Connect

    Mark Holbrook

    2010-09-01

    The Next Generation Nuclear Plant (NGNP) will be a licensed commercial high temperature gas-cooled reactor (HTGR) plant capable of producing the electricity and high temperature process heat for industrial markets supporting a range of end-user applications. The NGNP Project has adopted the 10 CFR 52 Combined License (COL) application process, as recommended in the Report to Congress, dated August 2008, as the foundation for the NGNP licensing strategy. NRC licensing of the NGNP plant utilizing this process will demonstrate the efficacy of licensing future HTGRs for commercial industrial applications. This white paper is one in a series of submittals that will address key generic issues of the COL priority licensing topics as part of the process for establishing HTGR regulatory requirements.

  4. Photovoltaics at DOE's National Renewable Energy Laboratory License |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Photovoltaics at DOE's National Renewable Energy Laboratory License Photovoltaics at DOE's National Renewable Energy Laboratory License Document describes a sample land use agreement surrounding the National Renewable Energy Laboratory Science and Technology Facility roof-top photovoltaic (PV) power purchase agreement (PPA). Download the photovoltaics at DOE's National Renewable Energy Laboratory license document. (256.08 KB) More Documents & Publications USA RS

  5. Department of Energy Files Motion to Withdraw Yucca Mountain License

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Application | Department of Energy Files Motion to Withdraw Yucca Mountain License Application Department of Energy Files Motion to Withdraw Yucca Mountain License Application March 3, 2010 - 12:00am Addthis WASHINGTON, D.C. - The U.S. Department of Energy today filed a motion with the Nuclear Regulatory Commission to withdraw the license application for a high-level nuclear waste repository at Yucca Mountain with prejudice. "President Obama is fully committed to ensuring that the

  6. DOE Announces Yucca Mountain License Application Schedule | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Yucca Mountain License Application Schedule DOE Announces Yucca Mountain License Application Schedule July 19, 2006 - 3:13pm Addthis New Director Ward Sproat Testifies on Revised Timeline WASHINGTON, DC - The Department of Energy (DOE) today announced that it will submit a license application to the Nuclear Regulatory Commission (NRC) for a nuclear waste repository at Yucca Mountain, Nevada, no later than June 30, 2008. The Department also announced that if requested legislative

  7. FERC Handbook for Hydroelectric Filings other than Licenses and...

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: FERC Handbook for Hydroelectric Filings other than Licenses and...

  8. FERC Hydroelectric Project Handbook for Filings other than Licenses...

    OpenEI (Open Energy Information) [EERE & EIA]

    Hydroelectric Project Handbook for Filings other than Licenses and Exemptions Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance -...

  9. Vermont Permit and License Information: NPDES Stormwater General...

    OpenEI (Open Energy Information) [EERE & EIA]

    General Permits for Construction SitesLegal Abstract Permit and licensing information for Clean Water Act 304 National Pollution Discharge Elimination System (NPDES) Permits for...

  10. Title 18 CFR 4 Licenses, Permits, Exemptions, and Determination...

    OpenEI (Open Energy Information) [EERE & EIA]

    for licenses, permits, exemptions, and determination of project costs associated with conservation of power and water resources. Published NA Year Signed or Took Effect 1979...

  11. NREL: Technology Transfer - New Energy License Encourages Investment...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    New Energy License Encourages Investment in Green Technologies August 5, 2015 The Energy Department's National Renewable Energy Laboratory (NREL) has developed a new technology ...

  12. 18 CFR 5: Integrated License Application Process | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    5: Integrated License Application Process Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: 18 CFR 5:...

  13. Los Alamos National Laboratory announces Express Licensing program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... This application enables users to locate technologies developed with DOE funding that are available for licensing. In addition to patents, potential licensees may also access a ...

  14. Non-exclusive patent license agreement between Alliance and company

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... PURPOSE; 7.2.5 NREL, DOE, ALLIANCE AND THE GOVERNMENT HEREBY SPECIFICALLY DISCLAIM ANY AND ALL WARRANTIES, EXPRESS OR IMPLIED, FOR ANY LICENSED PATENTS, PATENT APPLICATIONS, ...

  15. Guidelines to Consider for Participating in the Alternative Licensing...

    OpenEI (Open Energy Information) [EERE & EIA]

    to Consider for Participating in the Alternative Licensing Process Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Guide...

  16. FERC Hydropower Licensing Guidelines webpage | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Guidelines webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: FERC Hydropower Licensing Guidelines webpage Abstract This webpage provides...

  17. DOE Grant Recipients Technologies Available for Licensing - Energy...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Patent Search Success Stories News Events DOE Grant Recipients Technologies Available for Licensing In addition to National Laboratory research, the Department of Energy (DOE)...

  18. FERC Hydropower Licensing and Endangered Species - A Guide for...

    OpenEI (Open Energy Information) [EERE & EIA]

    FERC Hydropower Licensing and Endangered Species - A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library Permitting...

  19. Hydropower Licensing and Endangered Species A Guide for Applicants...

    OpenEI (Open Energy Information) [EERE & EIA]

    Hydropower Licensing and Endangered Species A Guide for Applicants, Contractors, and Staff Jump to: navigation, search OpenEI Reference LibraryAdd to library General: Hydropower...

  20. Microsoft PowerPoint - Nuclear Material Import Export License...

    National Nuclear Security Administration (NNSA)

    Material ImportExport License - Uses & Reporting processes Gary Langlie - Nuclear Regulatory Commission Karen Antizzo - Link Technologies Overview What is a Nuclear Regulatory ...

  1. Property:FERC License Issuance Date | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Issuance Date Jump to: navigation, search Property Name FERC License Issuance Date Property Type String Retrieved from "http:en.openei.orgwindex.php?titleProperty:FERCLicense...

  2. UDOT - Statewide Utility License Agreements | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    UDOT, 2013 DOI Not Provided Check for DOI availability: http:crossref.org Online Internet link for UDOT - Statewide Utility License Agreements Citation UDOT. UDOT - Statewide...

  3. DOE Signs Advanced Enrichment Technology License and Facility...

    Office of Environmental Management (EM)

    Under the patent license, USEC is granted non-exclusive rights in the United States to over 100 government-owned inventions related to gas centrifuge enrichment technology, ...

  4. NRC Licensing Strategy Development for the NGNP

    SciTech Connect

    Mark R. Holbrook; Trevor Cook

    2008-09-01

    The Next Generation Nuclear Plant (NGNP) project will provide the basis for commercialization of a new generation of advanced nuclear plants that utilize hightemperature gas-cooled reactor (HTGR) technology. The inherently safe HTGR design characteristics can be utilized to supply high-temperature process heat, co-generated electricity, and/or hydrogen for a number of industrial applications (e.g., petrochemical processes). Completion of the NGNP will result in a facility that demonstrates the safety and economics of the design, the commercial industrial potential of the technology, and the viability of the licensing strategy.

  5. Technical issues in licensing low-level radioactive waste facilities

    SciTech Connect

    Junkert, R.

    1993-03-01

    The California Department of Health Service spent two years in the review of an application for a low-level radioactive waste disposal facility in California. During this review period a variety of technical issues had to be evaluated and resolved. One of the first issues was the applicability and use of NRC guidance documents for the development of LLW disposal facilities. Other technical issues that required intensive evaluations included surface water hydrology, seismic investigation, field and numerical analysis of the unsaturated zone, including a water infiltration test. Source term verification became an issue because of one specific isotope that comprised more than 90% of the curies projected for disposal during the operational period. The use of trench liners and the proposed monitoring of the unsaturated zone were reviewed by a highly select panel of experts to provide guidance on the need for liners and to ensure that the monitoring system was capable of monitoring sufficient representative areas for radionuclides in the soil, soil gas, and soil moisture. Finally, concerns about the quality of the preoperational environmental monitoring program, including data, sample collection procedures, laboratory analysis, data review and interpretation and duration of monitoring caused a significant delay in completing the licensing review.

  6. ORNL Licenses Rare Earth Magnet Recycling Process to Momentum Technologies

    Energy.gov [DOE]

    The Department of Energy’s Oak Ridge National Laboratory and Momentum Technologies have signed a non-exclusive licensing agreement for an ORNL process designed to recover rare earth magnets from used computer hard drives.

  7. DOE Marks Milestone in Submitting Yucca Mountain License Application

    Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced submittal of a license application (LA) to the U.S. Nuclear Regulatory Commission (NRC) seeking authorization to construct...

  8. DEPARTMENT OF ENERGY EXCLUSIVE OR PARTIALLY EXCLUSIVE PATENT LICENSE APPLICATION

    Office of Energy Efficiency and Renewable Energy (EERE)

    It is the policy of the U.S. Department of Energy (DOE) to accord licenses on DOE-owned patents and patent applications in appropriate circumstances to applicants with satisfactory plans for...

  9. 33 USC 1341 Permits and Licenses - Certification | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    1341 Permits and Licenses - CertificationLegal Published NA Year Signed or Took Effect 1977 Legal Citation 33 USC 1341 (1977) DOI Not Provided Check for DOI availability: http:...

  10. US Fish and Wildlife Service Hydropower Licensing webpage | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    US Fish and Wildlife Service Hydropower Licensing webpage Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: US Fish and Wildlife Service Hydropower...

  11. Title 16 USC 2705 Simplified and Expeditious Licensing Procedures...

    OpenEI (Open Energy Information) [EERE & EIA]

    2705 Simplified and Expeditious Licensing Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Title 16 USC 2705 Simplified...

  12. Microsoft Word - Webdam_online_endusers_licensing_agreement_final...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    P D c LAWRENCE BERKELEY NATIONAL LAB END USER LICENSE AGREEMENT FOR SELECTED IMAGES FOR NON-COMMERCIAL USE Image title and description selected from http:photos.lbl.gov...

  13. 16 USC 799 License duration, conditions, revocation, alteration...

    OpenEI (Open Energy Information) [EERE & EIA]

    9 License duration, conditions, revocation, alteration, or surrender Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: 16 USC 799...

  14. ENERGY COMMISSION APPL.lCATION FOR SOURCE MATERIAL LICENSE

    Office of Legacy Management (LM)

    ... MATERIAL LICENSE . Pursuant to the Atomic Energy Act of 1954, and Title 10, Code of ... specified in Section 183 of the Atotic Energy Act of 1954 and is subject to all ...

  15. NREL Licenses Technology to Increase Solar Cell Efficiency - News Releases

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    | NREL NREL Licenses Technology to Increase Solar Cell Efficiency Natcore to develop 'black silicon' solar cells based on award-winning innovation December 20, 2011 The U.S. Department of Energy's National Renewable Energy Laboratory (NREL) announced today that Natcore Technology Inc. has been granted a patent license agreement to develop a line of black silicon products. Natcore and NREL also will enter a Cooperative Research and Development Agreement (CRADA) to develop commercial

  16. NREL Model Licensed to Improve Accuracy of Battery Simulations - News

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Releases | NREL Model Licensed to Improve Accuracy of Battery Simulations January 14, 2014 The Energy Department's National Renewable Energy Laboratory (NREL) has licensed its Equivalent Circuit Battery Model to software developer ThermoAnalytics for use in its recently updated RadTherm software package. The model is a part of the Battery Module within RadTherm, which is used by engineers to simulate the performance of battery cells and optimize multi-cell pack designs. Before the addition

  17. National Renewable Energy Laboratory Technologies Available for Licensing;

    Office of Scientific and Technical Information (OSTI)

    read more patents news at DOepatents | OSTI, US Dept of Energy Office of Scientific and Technical Information National Renewable Energy Laboratory Technologies Available for Licensing; read more patents news at DOepatents Back to the OSTI News Listing for 2011 The National Renewable Energy Laboratory (NREL) has a multitude of energy efficiency and renewable energy technologies that are available for licensing. Opportunities are available to both small and large businesses -- from start-ups

  18. First License for a CMI Invention | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    First License for a CMI Invention diagram of membrane solvent extraction system developed by CMI researchers Diagram of membrane solvent extraction system developed by CMI researchers at ORNL and INL. The first license for a CMI invention was granted for a recycling process developed by CMI researchers at Oak Ridge National Laboratory and Idaho National Laboratory. They have applied for a patent for "Membrane Solvent Extraction for Rare Earth Separations." Official news release from

  19. Technology Test Drive: PNNL Offers Exploratory Licenses | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Technology Test Drive: PNNL Offers Exploratory Licenses Technology Test Drive: PNNL Offers Exploratory Licenses May 10, 2016 - 11:59am Addthis News release from Pacific Northwest National Laboratory, May 9, 2016. RICHLAND, Wash. - Signing a two-page agreement and paying just $1,000 can get U.S. companies an opportunity to test drive promising technologies through a new, user-friendly commercialization option being offered at the Department of Energy's Pacific Northwest National

  20. Yucca Mountain licensing support network archive assistant.

    SciTech Connect

    Dunlavy, Daniel M.; Bauer, Travis L.; Verzi, Stephen J.; Basilico, Justin Derrick; Shaneyfelt, Wendy

    2008-03-01

    This report describes the Licensing Support Network (LSN) Assistant--a set of tools for categorizing e-mail messages and documents, and investigating and correcting existing archives of categorized e-mail messages and documents. The two main tools in the LSN Assistant are the LSN Archive Assistant (LSNAA) tool for recategorizing manually labeled e-mail messages and documents and the LSN Realtime Assistant (LSNRA) tool for categorizing new e-mail messages and documents. This report focuses on the LSNAA tool. There are two main components of the LSNAA tool. The first is the Sandia Categorization Framework, which is responsible for providing categorizations for documents in an archive and storing them in an appropriate Categorization Database. The second is the actual user interface, which primarily interacts with the Categorization Database, providing a way for finding and correcting categorizations errors in the database. A procedure for applying the LSNAA tool and an example use case of the LSNAA tool applied to a set of e-mail messages are provided. Performance results of the categorization model designed for this example use case are presented.

  1. TEAM 1 Drivers License.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Instrument Preparation Show how to check basic vacuum functionality and target pressures for valves Check gun operate "ON" and extraction voltage at 3700 Check ...

  2. Facility Operations and User Support | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Facility Operations and User Support This sub-program provides both necessary physical facility and operational support for reliable, cross-lab production computing and storage environments as well as a suite of user services for effective use of ASC tri-lab computing resources. The scope of the facility operations includes planning, integration and deployment, continuing product support, software license and maintenance fees, procurement of operational equipment and

  3. Word Pro - S8

    Energy Information Administration (EIA) (indexed site)

    Nuclear Energy Note 1. Operable Nuclear Reactors. A reactor is generally defined as operable while it possessed a full-power license from the Nuclear Regulatory Commission or its predecessor the Atomic Energy Commission, or equivalent permission to operate, at the end of the year or month shown. The definition is liberal in that it does not exclude units retaining full-power licenses during long, non-routine shutdowns that for a time rendered them unable to generate electricity. Examples are:

  4. PRECLOSURE CONSEQUENCE ANALYSES FOR LICENSE APPLICATION

    SciTech Connect

    S. Tsai

    2005-01-12

    Radiological consequence analyses are performed for potential releases from normal operations in surface and subsurface facilities and from Category 1 and Category 2 event sequences during the preclosure period. Surface releases from normal repository operations are primarily from radionuclides released from opening a transportation cask during dry transfer operations of spent nuclear fuel (SNF) in Dry Transfer Facility 1 (DTF 1), Dry Transfer Facility 2 (DTF 2), the Canister Handling facility (CHF), or the Fuel Handling Facility (FHF). Subsurface releases from normal repository operations are from resuspension of waste package surface contamination and neutron activation of ventilated air and silica dust from host rock in the emplacement drifts. The purpose of this calculation is to demonstrate that the preclosure performance objectives, specified in 10 CFR 63.111(a) and 10 CFR 63.111(b), have been met for the proposed design and operations in the geologic repository operations area. Preclosure performance objectives are discussed in Section 6.2.3 and are summarized in Tables 1 and 2.

  5. Reverse licensing: international technology transfer to the United States

    SciTech Connect

    Sharokhi, M.

    1985-01-01

    This dissertation, theoretically and empirically, focuses on US licensees as the recipient of foreign technology, and investigates characteristics of licensees, licenses, and licensed technology. The viability of reverse licensing, as an international growth strategy, is evaluated from the standpoint of two groups of firms. The first consists of thousands of small and medium sized US manufacturing firms, with few products and virtually no R and D expenditures. Without R and D, new technology and stiff international competition, they are forced into bankruptcies despite their extreme importance in the economy (48% of private workforce, 42% of sales, and 38% of GNP). The second group consists of thousands of small and medium sized firms overseas, with a relatively good supply of technology (i.e., patents) and anxious to exploit the US market but lack required resources for FDI. Technology licensing is, perhaps, the only viable option available to them. Reverse licensing provides both groups with a mechanism for their growth, survival, and prosperity. Many US firms have utilized this strategy for many years (i.e, 118 in Ohio) for tapping foreign sources including Soviet bloc technology.

  6. Licensed reactor nuclear safety criteria applicable to DOE reactors

    SciTech Connect

    Not Available

    1993-11-01

    This document is a compilation and source list of nuclear safety criteria that the Nuclear Regulatory Commission (NRC) applies to licensed reactors; it can be used by DOE and DOE contractors to identify NRC criteria to be evaluated for application to the DOE reactors under their cognizance. The criteria listed are those that are applied to the areas of nuclear safety addressed in the safety analysis report of a licensed reactor. They are derived from federal regulations, USNRC regulatory guides, Standard Review Plan (SRP) branch technical positions and appendices, and industry codes and standards.

  7. NETL Sorbents Licensed to Help Lower Power Draw of HVAC

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Sorbents Licensed To Help Lower Power Draw of HVAC Success Story NETL has licensed one of its patented CO 2 - removal sorbents to Boston-based technology company enVerid Systems. enVerid has adopted the sorbent for use in their proprietary Heat Load Reduction (HLR) module, a retrofit air-recirculation system it designed to increase the energy efficiency of commercial HVAC (heating, ventilation, and air conditioning) systems. HVAC is one of the largest draws of electric power in the United

  8. Application of coupled codes for safety analysis and licensing issues

    SciTech Connect

    Langenbuch, S.; Velkov, K.

    2006-07-01

    An overview is given on the development and the advantages of coupled codes which integrate 3D neutron kinetics into thermal-hydraulic system codes. The work performed within GRS by coupling the thermal-hydraulic system code ATHLET and the 3D neutronics code QUABOX/CUBBOX is described as an example. The application of the coupled codes as best-estimate simulation tools for safety analysis is discussed. Some examples from German licensing practices are given which demonstrate how the improved analytical methods of coupled codes have contributed to solve licensing issues related to optimized and more economical use of fuel. (authors)

  9. Site selection and licensing issues: Southwest Compact low-level radioactive waste disposal site

    SciTech Connect

    Grant, J.L.

    1989-11-01

    The low-level radioactive waste disposal site in California is being selected through a three-phase program. Phase 1 is a systematic statewide, regional, and local screening study. This program was conducted during 1986 and 1987, and culminated in the selection of three candidate sites fur further study. The candidate sites are identified as the Panamint, Silurian, and Ward Valley sites. Phase 2 comprises site characterization and environmental and socio-economic impact study activities at the three candidate sites. Based upon the site characterization studies, the candidate sites are ranked according to the desirability and conformance with regulatory requirements. Phase 3 comprises preparation of a license application for the selected candidate site. The license application will include a detailed characterization of the site, detailed design and operations plans for the proposed facility, and assessments of potential impacts of the site upon the environment and the local communities. Five types of siting criteria were developed to govern the site selection process. These types are: technical suitability exclusionary criteria, high-avoidance criteria beyond technical suitability requirements, discretionary criteria, public acceptance, and schedule requirements of the LLWR Policy Act Amendments. This paper discusses the application of the hydrological and geotechnical criteria during the siting and licensing studies in California. These criteria address site location and performance, and the degree to which present and future site behavior can be predicted. Primary regulatory requirements governing the suitability of a site are that the site must be hydrologically and geologically simple enough for the confident prediction of future behavior, and that the site must be stable enough that frequent or intensive maintenance of the closed site will not be required. This paper addresses the methods to measure site suitability at each stage of the process, methods to

  10. Table 9.1 Nuclear Generating Units, 1955-2011

    Energy Information Administration (EIA) (indexed site)

    1 Nuclear Generating Units, 1955-2011 Year Original Licensing Regulations (10 CFR Part 50) 1 Current Licensing Regulations (10 CFR Part 52) 1 Permanent Shutdowns Operable Units 7 Construction Permits Issued 2,3 Low-Power Operating Licenses Issued 3,4 Full-Power Operating Licenses Issued 3,5 Early Site Permits Issued 3 Combined License Applications Received 6 Combined Licenses Issued 3 1955 1 0 0 – – – – – – 0 0 1956 3 0 0 – – – – – – 0 0 1957 1 1 1 – – – – – – 0 1 1958 0 0 0 –

  11. Word Pro - Untitled1

    Energy Information Administration (EIA) (indexed site)

    71 Table 9.1 Nuclear Generating Units, 1955-2011 Year Original Licensing Regulations (10 CFR Part 50) 1 Current Licensing Regulations (10 CFR Part 52) 1 Permanent Shutdowns Operable Units 7 Construction Permits Issued 2,3 Low-Power Operating Licenses Issued 3,4 Full-Power Operating Licenses Issued 3,5 Early Site Permits Issued 3 Combined License Applications Received 6 Combined Licenses Issued 3 1955 1 0 0 - - - - - - 0 0 1956 3 0 0 - - - - - - 0 0 1957 1 1 1 - - - - - - 0 1 1958 0 0 0 - - - - -

  12. Fact #922: April 25, 2016 Share of Older Population Holding Driver’s Licenses is Up and Share of Younger Population Holding Driver’s Licenses is Down- Dataset

    Energy.gov [DOE]

    Excel file and dataset for Share of Older Population Holding Driver’s Licenses is Up and Share of Younger Population Holding Driver’s Licenses is Down

  13. ISO and software quality assurance - licensing and certification of software professionals

    SciTech Connect

    Hare, J.; Rodin, L.

    1997-11-01

    This report contains viewgraphs on licensing and certifing of software professionals. Discussed in this report are: certification programs; licensing programs; why became certified; certification as a condition of empolyment; certification requirements; and examination structures.

  14. AAC R17-1-102 Licensing Time Frames | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    1-102 Licensing Time Frames Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: AAC R17-1-102 Licensing Time FramesLegal...

  15. New York: EERE-Supported Catalyst Licensed for Use in Fuel Cell...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supported Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles New York: EERE-Supported Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles January 24, 2014 ...

  16. Fact #761: January 7, 2013 Smaller Share of Teenagers Have a Driver's License in 2010

    Energy.gov [DOE]

    In the 1980's, more than half of all teenagers 15 to 19 years old had a driver's license. But that has changed. Since 1995, less than half of that age group has a driver's license. In 2010, the...

  17. CATEGORIZATION OF EVENT SEQUENCES FOR LICENSE APPLICATION

    SciTech Connect

    G.E. Ragan; P. Mecheret; D. Dexheimer

    2005-04-14

    The purposes of this analysis are: (1) Categorize (as Category 1, Category 2, or Beyond Category 2) internal event sequences that may occur before permanent closure of the repository at Yucca Mountain. (2) Categorize external event sequences that may occur before permanent closure of the repository at Yucca Mountain. This includes examining DBGM-1 seismic classifications and upgrading to DBGM-2, if appropriate, to ensure Beyond Category 2 categorization. (3) State the design and operational requirements that are invoked to make the categorization assignments valid. (4) Indicate the amount of material put at risk by Category 1 and Category 2 event sequences. (5) Estimate frequencies of Category 1 event sequences at the maximum capacity and receipt rate of the repository. (6) Distinguish occurrences associated with normal operations from event sequences. It is beyond the scope of the analysis to propose design requirements that may be required to control radiological exposure associated with normal operations. (7) Provide a convenient compilation of the results of the analysis in tabular form. The results of this analysis are used as inputs to the consequence analyses in an iterative design process that is depicted in Figure 1. Categorization of event sequences for permanent retrieval of waste from the repository is beyond the scope of this analysis. Cleanup activities that take place after an event sequence and other responses to abnormal events are also beyond the scope of the analysis.

  18. The Texas concurrent characterization, licensing, and development process

    SciTech Connect

    Avant, R.V. Jr.

    1993-03-01

    The 72nd Texas Legislature specifically delineated a 400-square-mile area in southeast Hudspeth County where siting activities would be limited. The Authority was given unprecedented powers of property access and eminent domain and expanded budget authority to conduct site selection, characterization, and licensing. In the summer of 1991, the Authority identified five general siting areas in the prescribed region, and in the fall of 1991, the Authority narrowed the siting area to one large ranch composed of about 16,000 acres--called the Faskin Ranch. Site characterization began in 1991 and will be complete by September 1993. In September 1991, Authority staff began preparing the license application and included all available information on the Faskin Ranch. At its February meeting, the Authority`s board directed staff to submit the license application to the Texas Water Commission (the new Texas radiation control agency). The license application was submitted on March 2, 1992, and on April 15, 1992, the Commission determined that the application was sufficiently complete to begin review. Discrete technical packages such as groundwater hydrology, surface water hydrology, design, etc., will be submitted to the agency for review on the completion of each package. A schedule has been developed to allow the regulators the maximum time possible to review critical technical areas while minimizing the total review period.

  19. Energy Department Issues Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a final Request for Proposal (RFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities contract is for managing Spent Nuclear Fuel (SNF) storage facilities and licenses under NRC regulations.

  20. SPEAR Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations SPEAR Status SPEAR Status SPEAR Status Web Message Management (authorized access only) ED's stuff Run statistic (preliminary and unofficial) Training Sessions 10/20/03 rev-3 The schedule of talks listed below have a machine operations focus and are intended for operators, physicists and support personnel who will participate in SPEAR3 commissioning and operation. The talks are video taped and stored in the control room along with any pertinent hardcopies for future reference. Date

  1. Investing in the Energy Future: An Industry Guide to Licensing Technologies at the National Renewable Energy Laboratory (NREL) (Brochure)

    SciTech Connect

    Not Available

    2010-09-01

    Provides an overview of NREL's licensing opportunities and processes, and commercialization programs.

  2. License Agreement Moves Promising Technology Into the Marketplace

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    License Agreement Moves Promising Technology Into the Marketplace For information contact: e:mail: Public Affairs Golden, Colo., February 13, 1998 — A new pretreatment process may give cities better options in dealing with a persistent environmental problem: disposing the tons of sludge biosolids generated every day by sewage treatment plants. The pretreatment process was developed at the U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL), which recently issued a

  3. Technology available for license: Charging of liquid energy storage media

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    through radiolysis (ANL-IN-14-036) | Argonne National Laboratory Technology available for license: Charging of liquid energy storage media through radiolysis (ANL-IN-14-036) January 23, 2015 Tweet EmailPrint This technology utilizes radiolysis to charge liquid energy storage media including nanoelectrofuels. Charged liquid can be used in flow batteries for transportation and stationary energy-storage applications. Radiolysis charging can be conducted on aqueous and non-aqueous battery

  4. NATIONAL ENERGY TECHNOLOGY LABORATORY Technology Transfer NETL Licenses Transformational

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Licenses Transformational Technology for Carbon Dioxide Capture Success Story Carbon capture and storage from fossil fuel-based power generation systems are critical strategic components to curb emissions of atmospheric carbon dioxide (CO 2 ). Currently available carbon capture processes are limited-significantly reducing the efficiency of power generation and increasing electricity cost. Working in collaboration with partners at Carnegie Mellon University, NETL researchers have developed a

  5. University of Colorado Technologies Available for Licensing - Energy

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Innovation Portal CU Site Map Printable Version Share this resource About Search Categories (15) Advanced Materials Biomass and Biofuels Building Energy Efficiency Electricity Transmission Energy Analysis Energy Storage Geothermal Hydrogen and Fuel Cell Hydropower, Wave and Tidal Industrial Technologies Solar Photovoltaic Solar Thermal Startup America Vehicles and Fuels Wind Energy Partners (27) Visual Patent Search Success Stories University of Colorado Technologies Available for Licensing

  6. Operations Videos

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  7. operations center

    National Nuclear Security Administration (NNSA)

    servers and other critical Operations Center equipment

  8. Independent air supply system filtered to protect against biological and radiological agents (99.7%).
  9. <...

  10. Laboratory Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Hockaday is the associate director of the Experimental Physical Sciences Directorate and Cabbil is associate director for Nuclear and High Hazard Operations. - 12513 Norris ...

  11. Preparing to Submit a License Application for Yucca Mountain

    SciTech Connect

    W.J. Arthur; M.D. Voegele

    2005-03-14

    In 1982, the U.S. Congress passed the Nuclear Waste Policy Act, a Federal law that established U.S. policy for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Congress amended the Act in 1987, directing the Department of Energy to study only Yucca Mountain, Nevada as the site for a permanent geologic repository. As the law mandated, the Department evaluated Yucca Mountain to determine its suitability as the site for a permanent geologic repository. Decades of scientific studies demonstrated that Yucca Mountain would protect workers, the public, and the environment during the time that a repository would be operating and for tens of thousands of years after closure of the repository. A repository at this remote site would also: preserve the quality of the environment; allow the environmental cleanup of Cold War weapons facilities; provide the nation with additional protection from acts of terrorism; and support a sound energy policy. Throughout the scientific evaluation of Yucca Mountain, there has been no evidence to disqualify Yucca Mountain as a suitable site for the permanent disposal of spent nuclear fuel and high-level radioactive waste. Upon completion of site characterization, the Secretary of Energy considered the results and concluded that a repository at Yucca Mountain would perform in a manner that protects public health and safety. The Secretary recommended the site to the President in February 2002; the President agreed and recommended to Congress that the site be approved. The Governor of Nevada submitted a notice of disapproval, and both houses of Congress acted to override the disapproval. In July 2002, the President's approval allowed the Department to begin the process of submittal of a license application for Yucca Mountain as the site for the nation's first repository for spent nuclear fuel and high-level radioactive waste. Yucca Mountain is located on federal land in Nye County in southern Nevada, an arid region

  12. Threatened and endangered species evaluation for 75 licensed commercial nuclear power generating plants

    SciTech Connect

    Sackschewsky, M.R.

    1997-03-01

    The Endangered Species Act (ESA) of 1973, as amended, and related implementing regulations of the jurisdictional federal agencies, the U.S. Departments of Commerce and Interior, at 50 CFR Part 17. 1, et seq., require that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The U.S. Department of the Interior (through the Fish and Wildlife Service), and the U.S. Department of Commerce, share responsibility for administration of the ESA. The National Marine Fisheries Service (NMFS) deals with species that inhabit marine environments and anadromous fish, while the U.S. Fish and Wildlife Service (USFWS) is responsible for terrestrial and freshwater species and migratory birds. A species (or other distinct taxonomic unit such as subspecies, variety, and for vertebrates, distinct population units) may be classified for protection as `endangered` when it is in danger of extinction within the foreseeable future throughout all or a significant portion of its range. A `threatened` classification is provided to those animals and plants likely to become endangered within the foreseeable future throughout all or a significant portion of their ranges. As of February 1997, there were about 1067 species listed under the ESA in the United States. Additionally there were approximately 125 species currently proposed for listing as threatened or endangered, and another 183 species considered to be candidates for formal listing proposals.

  13. Operating Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  14. EERE Success Story-New York: EERE-Supported Catalyst Licensed...

    Energy Saver

    Supported Catalyst Licensed for Use in Fuel Cell Hybrid Advanced Vehicles EERE Success ... Facility Opened Using EERE-Supported Low-Cost Fuel Cell Manufacturing Methods Project ...

  15. Cold Test Operation of the German VEK Vitrification Plant

    SciTech Connect

    Fleisch, J.; Schwaab, E.; Weishaupt, M. [WAK GmbH, Eggenstein-Leopoldshafen (Germany); Gruenewald, W.; Roth, G.; Tobie, W. [Forschungszentrum Karlsruhe, Institut fur Nukleare Entsorgung, Eggenstein-Leopoldshafen (Germany)

    2008-07-01

    In 2007 the German High-Level Liquid Waste (HLLW) Vitrification plant VEK (Verglasungseinrichtung Karlsruhe) has passed a three months integral cold test operation as final step before entering the hot phase. The overall performance of the vitrification process equipment with a liquid-fed ceramic glass melter as main component proved to be completely in line with the requirements of the regulatory body. The retention efficiency of main radioactive-bearing elements across melter and wet off-gas treatment system exceeded the design values distinctly. The strategy to produce a specified waste glass could be successfully demonstrated. The results of the cold test operation allow entering the next step of hot commissioning, i.e. processing of approximately 2 m{sup 3} of diluted HLLW. In summary: An important step of the VEK vitrification plant towards hot operation has been the performance of the cold test operation from April to July 2007. This first integral operation was carried out under boundary conditions and rules established for radioactive operation. Operation and process control were carried out following the procedure as documented in the licensed operational manuals. The function of the process technology and the safe operation could be demonstrated. No severe problems were encountered. Based on the positive results of the cold test, application of the license for hot operation has been initiated and is expected in the near future. (authors)

  16. Procurement of a fully licensed radioisotope thermoelectric generator transportation system

    SciTech Connect

    Adkins, H.E.; Bearden, T.E.

    1990-10-01

    A fully licensed transportation system for Radioisotope Thermoelectric Generators and Light-Weight Radioisotope Heater Units is currently being designed and built. The system will comply with all applicable US Department of Transportation regulations without the use of a DOE Alternative.'' The US Department of Transportation has special double containment'' requirements for plutonium. The system packaging uses a doubly contained bell jar'' concept. A refrigerated trailer is used for cooling the high-heat payloads. The same packaging is used for both high- and low-heat payloads. The system is scheduled to be available for use by mid-1992. 4 refs., 4 figs., 2 tabs.

  17. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendices F-H, Volume 2, Part 4

    SciTech Connect

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis.

  18. Sodium fast reactor safety and licensing research plan. Volume I.

    SciTech Connect

    Sofu, Tanju; LaChance, Jeffrey L.; Bari, R.; Wigeland, Roald; Denman, Matthew R.; Flanagan, George F.

    2012-05-01

    This report proposes potential research priorities for the Department of Energy (DOE) with the intent of improving the licensability of the Sodium Fast Reactor (SFR). In support of this project, five panels were tasked with identifying potential safety-related gaps in available information, data, and models needed to support the licensing of a SFR. The areas examined were sodium technology, accident sequences and initiators, source term characterization, codes and methods, and fuels and materials. It is the intent of this report to utilize a structured and transparent process that incorporates feedback from all interested stakeholders to suggest future funding priorities for the SFR research and development. While numerous gaps were identified, two cross-cutting gaps related to knowledge preservation were agreed upon by all panels and should be addressed in the near future. The first gap is a need to re-evaluate the current procedures for removing the Applied Technology designation from old documents. The second cross-cutting gap is the need for a robust Knowledge Management and Preservation system in all SFR research areas. Closure of these and the other identified gaps will require both a reprioritization of funding within DOE as well as a re-evaluation of existing bureaucratic procedures within the DOE associated with Applied Technology and Knowledge Management.

  19. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    SciTech Connect

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis.

  20. Summary report on safety and licensing strategy support for the ABR prototype.

    SciTech Connect

    Cahalan, J. E.; Nuclear Engineering Division

    2007-09-18

    Argonne National Laboratory is providing support to the US Department of Energy in the Global Nuclear Energy Partnership (GNEP) in certification of an advanced, sodium-cooled fast reactor. The reactor is to be constructed as a prototype for future commercial power reactors that will produce electricity while consuming actinides recovered from light water reactor spent fuel. This prototype reactor has been called the Advanced Burner Reactor, or ABR, and is now often referred to as the advanced recycle reactor. As part of its activities, Argonne is providing technical services to assist definition of a safety and licensing strategy for the ABR prototype, and to further implementation of the strategy. In FY06, an organizational meeting was held for DOE and its laboratory contractors to discuss licensing alternatives and review previous licensing experience for the Fast Flux Test Facility (FFTF) and the Clinch River Breeder Reactor Plant (CRBRP). Near the end of FY06, a report summarizing the discussions and conclusions was written. One of the top-level conclusions recorded in the report was a recommendation to follow a licensing strategy that included the US Nuclear Regulatory Commission (NRC) as the regulatory review and licensing authority. In FY07, activities ar Argonne to support safety and licensing progress have continued. These activities have focused on further evaluation of licensing alternatives; assessment of design, analysis, and documentation implications of licensing paths; and initial technical interactions with the Nuclear Regulatory Commission. This report summarizes FY07 activities.

  21. Energy Department Issues Draft Request For Proposal for Nuclear Regulatory Commission Licensed Facilities Procurement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement. The NRC Licensed Facilities procurement is one of the four procurements that resulted from the Idaho Site Office of Environmental Management Post FY 2015 Acquisition Planning.

  22. Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached memorandum provides guidance for tracking inquiries received from outside parties regarding licensable inventions developed at Department of Energy facilities. To help ensure that the Facilities consistently track valid licensing inquiries, the guidance outlines a minimum set of information that must be collected from each inquiry and requires that this information be made available to the Technology Transfer Coordinator upon request.

  1. Total System Performance Assessment - License Application Methods and Approach

    SciTech Connect

    J. McNeish

    2003-12-08

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issues (KTIs) identified in agreements with the U.S. Nuclear Regulatory Commission, the ''Yucca Mountain Review Plan'' (YMRP), ''Final Report'' (NRC 2003 [163274]), and the NRC final rule 10 CFR Part 63 (NRC 2002 [156605]). This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are used in this document.

  2. Total System Performance Assessment-License Application Methods and Approach

    SciTech Connect

    J. McNeish

    2002-09-13

    ''Total System Performance Assessment-License Application (TSPA-LA) Methods and Approach'' provides the top-level method and approach for conducting the TSPA-LA model development and analyses. The method and approach is responsive to the criteria set forth in Total System Performance Assessment Integration (TSPAI) Key Technical Issue (KTI) agreements, the ''Yucca Mountain Review Plan'' (CNWRA 2002 [158449]), and 10 CFR Part 63. This introductory section provides an overview of the TSPA-LA, the projected TSPA-LA documentation structure, and the goals of the document. It also provides a brief discussion of the regulatory framework, the approach to risk management of the development and analysis of the model, and the overall organization of the document. The section closes with some important conventions that are utilized in this document.

  3. Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (~ii~,Richland Operations Office ~Z4TESO~Richland, Washington 99352 SEP 2 2009 CERTIFIED MAIL Ms. Sarah Washburn Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Ms. Washburn: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0067) You requested, pursuant to the Freedom of Information Act (FOJA), the following documents relating to: 1 . "The authorization, decision to use, and actual use of any and all pesticides and herbicides anywhere within the

  4. Operating internationally

    SciTech Connect

    Seeley, R.S.

    1994-02-01

    When Enron Power Corp. took over a 28 MW power facility at the former US Naval base in Subic Bay, the Philippines, the company was required to employ 139 people to run the plant. This large labor force was necessary not because of the plant's operational needs, but because of local labor practices and unemployment pressures. Independent power companies have become all too familiar with the high cost and complexity of developing projects in emerging international markets. Some of the most significant issues involve taxation, unfamiliar legal systems, changing regulations, and foreign investment restrictions. In addition, questions about currency exchange, national credit worthiness, and political stability add to the difficulty of international development. However, one of the most daunting challenges centers not on development, but on long-term operations and maintenance (O M). A key concern is finding qualified labor. Most developers and O M companies agree that local people should run the plant, with the top person, or persons, thoroughly trained in the developer's company philosophy.

  5. Cogeneration : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect

    Deshaye, Joyce; Bloomquist, R.Gordon

    1992-12-01

    This guidebook focuses on cogeneration development. It is one of a series of four guidebooks recently prepared to introduce the energy developer to the federal, state and local agencies that regulate energy facilities in Idaho, Montana, Oregon, and Washington (the Bonneville Power Administration Service Territory). It was prepared specifically to help cogeneration developers obtain the permits, licenses and approvals necessary to construct and operate a cogeneration facility. The regulations, agencies and policies described herein are subject to change. Changes are likely to occur whenever energy or a project becomes a political issue, a state legislature meets, a preexisting popular or valuable land use is thought threatened, elected and appointed officials change, and new directions are imposed on states and local governments by the federal government. Accordingly, cogeneration developers should verify and continuously monitor the status of laws and rules that might affect their plans. Developers are cautioned that the regulations described herein may only be a starting point on the road to obtaining all the necessary permits.

  6. Tritium Laboratory Karlsruhe: administrative and technical framework for isotope laboratory operation

    SciTech Connect

    Welte, S.; Besserer, U.; Osenberg, D.; Wendel, J.

    2015-03-15

    Originally licensed in 1993 the Tritium Laboratory Karlsruhe (TLK) is a unique pilot scale isotope laboratory focused on tritium handling and processing to conduct a variety of scientific experiments and development tasks in view of future fusion power plants. TLK currently operates 15 glove boxes of 125 m{sup 3} total volume in an experimental hall measuring nearly 1500 m{sup 2}. The tritium infrastructure, comprising of the tritium storage system, the tritium transfer system and the isotope separation system, is integrated into TLK as a closed loop system to supply tritium to the experiments. Having a license for handling of up to 40 g of tritium and a closed tritium processing loop, TLK is a unique institute in non-military tritium research. In order to fulfil all requirements regarding the license, a framework of regulations is applied as a basis for the operation of TLK, as well as the setup of new experiments and the design of components. This paper will give an overview on the framework of operation in view of licensing issues, as well as administrative and technical regulations mandatory to legally and reliably operate an isotope laboratory of this scale.

  7. Assessment of SPEAR-FCODE-BETA for fuel licensing. Final report. [PWR; BWR

    SciTech Connect

    Bradley, E.R.; Lanning, D.D.; Fiero, I.B.; Freeburn, H.R.; Garde, A.M.; Krammen, M.A.; Rotondo, P.L.

    1983-03-01

    The EPRI FCODE-BETA fuel performance code is the mechanistic model portion for the SPEAR-BETA fuel reliability code, which was developed for EPRI by Entropy Limited. FCODE-BETA was assessed by Battelle, Pacific Northwest Laboratories, and Combustion Engineering, Inc., for adequacy in simulating fuel performance in fuel licensing proceedings. The assessment included a detailed review of those thermal and mechanical performance models of greatest importance to fuel licensing, including fission gas release, fuel temperatures, and cladding uniform strain. It was concluded that the code is inadequate for licensing calculations in its present form. Recommendations for modeling and usability improvements are made.

  8. Overview of the earth mounded concrete bunker prototype license application project: Objectives and approach

    SciTech Connect

    Conner, J.E.

    1989-11-01

    This paper presents an overview of the objectives and approach taken in developing the Earth-mounded Concrete Bunker Prototype License Application Project. The Prototype License Application Project was initiated by the Department of Energy`s National Low-Level Waste Management Program in early 1987 and completed in November 1988. As part of this project a prototype safety analysis report was developed. The safety analysis report evaluates the licensibility of an earth-mounded concrete bunker for a low-level radioactive waste (LLW) disposal facility located on a hypothetical site in the northeastern United States. The project required approximately five person-years and twenty months to develop.

  9. Environmental Standard Review Plan for the review of license renewal applications for nuclear power plants

    SciTech Connect

    O'Brien, J.; Kim, T.J.; Reynolds, S.

    1991-08-01

    The Environmental Standard Review Plan for the Review of License Applications for Nuclear Power Plants (ESRP-LR) is to be used by the NRC staff when performing environmental reviews of applications for the renewal of power reactor licenses. The use of the ESRP-LR provides a framework for the staff to determine whether or not environmental issues important to license renewal have been identified and the impacts evaluated and provides acceptance standards to help the reviewers comply with the National Environmental Policy Act.

  10. Step-Wise Repository Licensing-Implementing the Scientific and Legislative Vision for the Next Phase of the Yucca Mountain Project

    SciTech Connect

    McCullum, R.; Kessler, J. H.; Eyre, M. L.

    2002-02-27

    International scientific consensus backing geologic disposal as the preferred method of long term management of used nuclear fuel and defense high level radioactive waste has existed since the 1950s. Furthermore, many believe that geologic disposal programs should be implemented in a staged or 'step-wise' approach. These principles have also been at the root of US waste management policy for which a regulatory framework for site selection, and the licensing of a site once selected, is set forth in a series of legislation. The US program has now matured to the point where these regulatory components are now in place. Sufficient data has also been gathered and evaluated to support a site recommendation decision. This decision--on whether or not to proceed with a repository site at Yucca Mountain, Nevada - is about to be put before the US President and Congress. If made in the affirmative, the decision would initiate the next phase in the US disposal process as originally envisioned by Congress--a three-step repository licensing process (Construction, Operation, & Closure). This paper explores the many facets of the licensing process that may lie ahead. Approaches that could be deployed to effectively implement this process are discussed and opportunities to optimize the process, by capitalizing on its evolutionary nature to assure that the best available science is always applied to the protection of public health and safety, are identified. Focus is also placed on a key prerequisite to the accomplishment of this goal--the definition of the level to which post closure repository performance must be addressed at each stage of the licensing process.

  11. Safety and licensing issues that are being addressed by the Power Burst Facility test programs. [PWR; BWR

    SciTech Connect

    McCardell, R.K.; MacDonald, P.E.

    1980-01-01

    This paper presents an overview of the results of the experimental program being conducted in the Power Burst Facility and the relationship of these results to certain safety and licensing issues. The safety issues that were addressed by the Power-Cooling-Mismatch, Reactivity Initiated Accident, and Loss of Coolant Accident tests, which comprised the original test program in the Power Burst Facility, are discussed. The resolution of these safety issues based on the results of the thirty-six tests performed to date, is presented. The future resolution of safety issues identified in the new Power Burst Facility test program which consists of tests which simulate BWR and PWR operational transients, anticipated transients without scram, and severe fuel damage accidents, is described.

  12. Calutron Operations | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Calutron Operations

  13. Model and Analytic Processes for Export License Assessments

    SciTech Connect

    Thompson, Sandra E.; Whitney, Paul D.; Weimar, Mark R.; Wood, Thomas W.; Daly, Don S.; Brothers, Alan J.; Sanfilippo, Antonio P.; Cook, Diane; Holder, Larry

    2011-09-29

    This paper represents the Department of Energy Office of Nonproliferation Research and Development (NA-22) Simulations, Algorithms and Modeling (SAM) Program's first effort to identify and frame analytical methods and tools to aid export control professionals in effectively predicting proliferation intent; a complex, multi-step and multi-agency process. The report focuses on analytical modeling methodologies that alone, or combined, may improve the proliferation export control license approval process. It is a follow-up to an earlier paper describing information sources and environments related to international nuclear technology transfer. This report describes the decision criteria used to evaluate modeling techniques and tools to determine which approaches will be investigated during the final 2 years of the project. The report also details the motivation for why new modeling techniques and tools are needed. The analytical modeling methodologies will enable analysts to evaluate the information environment for relevance to detecting proliferation intent, with specific focus on assessing risks associated with transferring dual-use technologies. Dual-use technologies can be used in both weapons and commercial enterprises. A decision-framework was developed to evaluate which of the different analytical modeling methodologies would be most appropriate conditional on the uniqueness of the approach, data availability, laboratory capabilities, relevance to NA-22 and Office of Arms Control and Nonproliferation (NA-24) research needs and the impact if successful. Modeling methodologies were divided into whether they could help micro-level assessments (e.g., help improve individual license assessments) or macro-level assessment. Macro-level assessment focuses on suppliers, technology, consumers, economies, and proliferation context. Macro-level assessment technologies scored higher in the area of uniqueness because less work has been done at the macro level. An approach to

  14. DOE Awards Contract for the Nuclear Regulatory Commission (NRC) Licensed Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati – The U.S. Department of Energy (DOE) today announced the award of a contract to Spectra Tech, Inc. for the Nuclear Regulatory Commission (NRC) Licensed Facilities procurement.

  15. Title 7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses...

    OpenEI (Open Energy Information) [EERE & EIA]

    7 CFR 1.601 et seq. Conditions in FERC Hydropower Licenses Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 7 CFR...

  16. New Licensing Agreement Opens Energy Patents to NGOs, Non-Profits

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of President Obama’s Global Humanitarian Initiative, a new licensing agreement opens a number of Energy Department patents to qualified non-governmental and non-profit organizations.

  17. NSNFP Activities in Support of Repository Licensing for Disposal of DOE SNF

    SciTech Connect

    Henry H. Loo; Brett W.. Carlsen; Sheryl L. Morton; Larry L. Taylor; Gregg W. Wachs

    2004-09-01

    The U.S. Department of Energy (DOE) Office of Civilian Radioactive Waste Management is in the process of preparing the Yucca Mountain license application for submission to the Nuclear Regulatory Commission as the nation’s first geologic repository for spent nuclear fuel (SNF) and high-level waste. Because the DOE SNF will be part of the license application, there are various components of the license application that will require information relative to the DOE SNF. The National Spent Nuclear Fuel Program (NSNFP) is the organization that directs the research, development, and testing of treatment, shipment, and disposal technologies for all DOE SNF. This report documents the work activities conducted by the NSNFP and discusses the relationship between these NSNFP technical activities and the license application. A number of the NSNFP activities were performed to provide risk insights and understanding of DOE SNF disposal as well as to prepare for anticipated questions from the regulatory agency.

  18. Title 18 CFR Subpart E Application for License for Major Unconstructed...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 18 CFR Subpart E Application for License for Major Unconstructed Project and Major Modified Project Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  19. Title 18 CFR 6.2 Surrender of License | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 18 CFR 6.2 Surrender of License Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 6.2 Surrender of...

  20. Title 43 CFR 3273 How To Apply for a Site License | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Title 43 CFR 3273 How To Apply for a Site License Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  1. DOE-STD-0100T; DOE Standard Licensed Reactor Nuclear Safety Criteria...

    Office of Environmental Management (EM)

    Superseding DOENE-0100T April 1991 DOE STANDARD LICENSED REACTOR NUCLEAR SAFETY CRITERIA ... Description 4.2 Fuel System Design 4.3 Nuclear Design 4.4 Thermal and Hydraulic Design ...

  2. Title 18 CFR 4.200 et seq. Application for Amendment of License...

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 4.200 et seq. Application for Amendment of LicenseLegal Abstract Regulations providing for...

  3. Title 18 CFR Subpart G Application for License for Minor Water...

    OpenEI (Open Energy Information) [EERE & EIA]

    G Application for License for Minor Water Power Projects and Major Water Power Projects 5 Megawatts or Less Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal...

  4. Title 18 CFR Subpart F Application for License for Major Project...

    OpenEI (Open Energy Information) [EERE & EIA]

    CFR Subpart F Application for License for Major Project -- Existing Dam Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation:...

  5. Colorado - C.R.S. 24-4-101 et seq., Rule-making and Licensing...

    OpenEI (Open Energy Information) [EERE & EIA]

    Colorado - C.R.S. 24-4-101 et seq., Rule-making and Licensing Procedures by State Agencies Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  6. Colorado - C.R.S. 24-4-104, Licenses-issuance, suspension, or...

    OpenEI (Open Energy Information) [EERE & EIA]

    Colorado - C.R.S. 24-4-104, Licenses-issuance, suspension, or revocation, renewal Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute:...

  7. Statement by Deputy Secretary of Energy Clay Sell on NRG's License

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Application | Department of Energy by Deputy Secretary of Energy Clay Sell on NRG's License Application Statement by Deputy Secretary of Energy Clay Sell on NRG's License Application September 25, 2007 - 2:49pm Addthis "Today marks the most significant and tangible step to date, towards the construction of the first new nuclear power plant in the United States in over 30 years. DOE is confident that with NRG's reactor design selection and cooperation with their partners, General

  8. Sodium fast reactor safety and licensing research plan. Volume II.

    SciTech Connect

    Ludewig, H.; Powers, D. A.; Hewson, John C.; LaChance, Jeffrey L.; Wright, A.; Phillips, J.; Zeyen, R.; Clement, B.; Garner, Frank; Walters, Leon; Wright, Steve; Ott, Larry J.; Suo-Anttila, Ahti Jorma; Denning, Richard; Ohshima, Hiroyuki; Ohno, S.; Miyhara, S.; Yacout, Abdellatif; Farmer, M.; Wade, D.; Grandy, C.; Schmidt, R.; Cahalen, J.; Olivier, Tara Jean; Budnitz, R.; Tobita, Yoshiharu; Serre, Frederic; Natesan, Ken; Carbajo, Juan J.; Jeong, Hae-Yong; Wigeland, Roald; Corradini, Michael; Thomas, Justin; Wei, Tom; Sofu, Tanju; Flanagan, George F.; Bari, R.; Porter D.; Lambert, J.; Hayes, S.; Sackett, J.; Denman, Matthew R.

    2012-05-01

    Expert panels comprised of subject matter experts identified at the U.S. National Laboratories (SNL, ANL, INL, ORNL, LBL, and BNL), universities (University of Wisconsin and Ohio State University), international agencies (IRSN, CEA, JAEA, KAERI, and JRC-IE) and private consultation companies (Radiation Effects Consulting) were assembled to perform a gap analysis for sodium fast reactor licensing. Expert-opinion elicitation was performed to qualitatively assess the current state of sodium fast reactor technologies. Five independent gap analyses were performed resulting in the following topical reports: (1) Accident Initiators and Sequences (i.e., Initiators/Sequences Technology Gap Analysis), (2) Sodium Technology Phenomena (i.e., Advanced Burner Reactor Sodium Technology Gap Analysis), (3) Fuels and Materials (i.e., Sodium Fast Reactor Fuels and Materials: Research Needs), (4) Source Term Characterization (i.e., Advanced Sodium Fast Reactor Accident Source Terms: Research Needs), and (5) Computer Codes and Models (i.e., Sodium Fast Reactor Gaps Analysis of Computer Codes and Models for Accident Analysis and Reactor Safety). Volume II of the Sodium Research Plan consolidates the five gap analysis reports produced by each expert panel, wherein the importance of the identified phenomena and necessities of further experimental research and code development were addressed. The findings from these five reports comprised the basis for the analysis in Sodium Fast Reactor Research Plan Volume I.

  9. Microsoft PowerPoint - Nuclear Material Import Export License … Uses & Reporting processes_Gary Langlie_Karen Antizzo [Compatib

    National Nuclear Security Administration (NNSA)

    Material Import/Export License - Uses & Reporting processes Gary Langlie - Nuclear Regulatory Commission Karen Antizzo - Link Technologies Overview  What is a Nuclear Regulatory Commission (NRC) import/export license? - Licenses for imports - Licenses for exports - Export license monitoring  Highlights of imports/exports in 2014 - Nuclear material imported to the U.S. - Nuclear material exported from the U.S. - Types of materials shipped - Typical uses and applications  What is

  10. Breakthrough Los Alamos software is available for licensing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Begins Full-Scale Operations | Department of Energy Breakthrough Industrial Carbon Capture, Utilization and Storage Project Begins Full-Scale Operations Breakthrough Industrial Carbon Capture, Utilization and Storage Project Begins Full-Scale Operations May 10, 2013 - 11:36am Addthis NEWS MEDIA CONTACT (202) 586-4940 WASHINGTON - The Energy Department's Acting Assistant Secretary for Fossil Energy Christopher Smith today attended a dedication ceremony at the Air Products and Chemicals

  11. Resolution of thermal-hydraulic safety and licensing issues for the system 80+{sup {trademark}} design

    SciTech Connect

    Carpentino, S.E.; Ritterbusch, S.E.; Schneider, R.E.

    1995-09-01

    The System 80+{sup {trademark}} Standard Design is an evolutionary Advanced Light Water Reactor (ALWR) with a generating capacity of 3931 MWt (1350 MWe). The Final Design Approval (FDA) for this design was issued by the Nuclear Regulatory Commission (NRC) in July 1994. The design certification by the NRC is anticipated by the end of 1995 or early 1996. NRC review of the System 80+ design has involved several new safety issues never before addressed in a regulatory atmosphere. In addition, conformance with the Electric Power Research Institute (EPRI) ALWR Utility Requirements Document (URD) required that the System 80+ plant address nuclear industry concerns with regard to design, construction, operation and maintenance of nuclear power plants. A large number of these issues/concerns deals with previously unresolved generic thermal-hydraulic safety issues and severe accident prevention and mitigation. This paper discusses the thermal-hydraulic analyses and evaluations performed for the System 80+ design to resolve safety and licensing issues relevant to both the Nuclear Stream Supply System (NSSS) and containment designs. For the NSSS design, the Safety Depressurization System mitigation capability and resolution of the boron dilution concern are described. Examples of containment design issues dealing with containment shell strength, robustness of the reactor cavity walls and hydrogen mixing under severe accident conditions are also provided. Finally, the overall approach used in the application of NRC`s new (NUREG-1465) radiological source term for System 80+ evaluation is described. The robustness of the System 80+ containment design to withstand severe accident consequences was demonstrated through detailed thermal-hydraulic analyses and evaluations. This advanced design to shown to meet NRC severe accident policy goals and ALWR URD requirements without any special design features and unnecessary costs.

  12. Development and Assessment of the Appendix K Version of RELAP5-3D for LOCA Licensing Analysis

    SciTech Connect

    Liang, Thomas K.S.; Chang, C.-J.; Hung, H.-J

    2002-09-15

    In light water reactors, particularly the pressurized water reactor (PWR), the severity of a loss-of-coolant accident (LOCA) would limit how high the reactor power can operate. Although the best-estimate LOCA licensing methodology can provide the greatest margin on the peak cladding temperature (PCT) evaluation during a LOCA, it generally takes much more resources to develop. Instead, implementation of evaluation models required by Appendix K of 10CFR50 on an advanced thermal-hydraulic platform such as RELAP5, TRAC, etc., also can gain significant margin for the PCT calculation. Through compliance evaluation against Appendix K of 10CFR50, all of the required evaluation models have been implemented in RELAP5-3D. To verify and assess the development of the Appendix K version of RELAP5-3D, nine kinds of separate-effects experiments and eight sets of LOCA integral experiments were adopted. Through the assessments against separate-effects experiments, the success of the code modification in accordance with Appendix K of 10CFR50 was demonstrated. Besides, one set of a typical integral large-break LOCA from Loss-of-Fluid Test Facility experiments (L2-5) has also been applied to preliminarily evaluate the integral performance of the Appendix K version of RELAP5-3D. The PCT predicted by the evaluation models is greater than the one from best-estimate calculation in the whole LOCA history with the conservatism of 150 K, and the measured PCTs of L2-5 are also well bounded by the evaluation model calculation. Another seven sets of integral-effect experiments will be further applied in the next step to ensure the reasonable integral conservatism of the newly developed LOCA licensing analysis code (RELAP5-3DK/INER), which can cover all the phases of both large- and small LOCA in one code.

  13. Policy Flash 2013-26 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities

    Energy.gov [DOE]

    Attached is Policy Flash 2013-26 Guidance for tracking inquiries related to the licensing of inventions developed at DOE facilities

  14. Statement from U.S. Secretary of Energy Samuel W. Bodman Regarding the Docketing of DOE's Yucca Mountain License Application

    Energy.gov [DOE]

    WASHINGTON, DC - Today, September 8, 2008, the Nuclear Regulatory Commission (NRC) announced it has docketed the U.S. Department of Energy's (DOE) Yucca Mountain license application seeking...

  15. Knowledge and abilities catalog for nuclear power plant operators: Pressurized water reactors. Revision 1

    SciTech Connect

    1995-08-01

    This document provides the basis for the development of content-valid licensing examinations for reactor operators and senior reactor operators. The examinations developed using the PWR catalog will cover those topics listed under Title 10, (ode of Federal Regulations Part 55. The PWR catalog contains approximately 5100 knowledge and ability (K/A) statements for reactor operators and senior reactor operators. The catalog is organized into six major sections: Catalog Organization; Generic Knowledge and Abilities; Plant Systems; Emergency and Abnormal Plant Evolutions; Components and Theory.

  16. Application of the IBERDROLA RETRAN Licensing Methodology to the Confrentes BWR-6 110% Extended Power Uprate

    SciTech Connect

    Fuente, Rafael de la; Iglesias, Javier; Sedano, Pablo G.; Mata, Pedro

    2003-04-15

    IBERDROLA (Spanish utility) and IBERDROLA INGENIERIA (engineering branch) have been developing during the last 2 yr the 110% Extended Power Uprate Project for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved in advance by the Spanish Nuclear Regulatory Authority. This methodology has been applied to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 and 13 and to develop a significant number of safety analyses of the Cofrentes Extended Power.Because the scope of the licensing process of the Cofrentes Extended Power Uprate exceeds the range of analysis included in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients. This is the case of the total loss of feedwater (TLFW) transient.The content of this paper shows the benefits of having an in-house design and licensing methodology and describes the process to extend the applicability of the Cofrentes RETRAN model to the analysis of new transients, particularly in this paper the TLFW transient.

  17. Line Equipment Operator

    Energy.gov [DOE]

    There are several Line Equipment Operator positions located in Washington and Oregon. A successful candidate in this position will perform Line Equipment Operator work operating trucks and all...

  18. Knowledge and abilities catalog for nuclear power plant operators: Boiling water reactors, Revision 1

    SciTech Connect

    1995-08-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWRs) (NUREG-1123, Revision 1) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog along with the Operator Licensing Examiner Standards (NUREG-1021) and the Examiner`s Handbook for Developing Operator Licensing Written Examinations (NUREG/BR-0122), will cover the topics listed under Title 10, Code of Federal Regulations, Part 55 (10 CFR 55). The BWR Catalog contains approximately 7,000 knowledge and ability (K/A) statements for ROs and SROs at BWRs. The catalog is organized into six major sections: Organization of the Catalog, Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Functions, Emergency and Abnormal Plant Evolutions, Components, and Theory. Revision 1 to the BWR Catalog represents a modification in form and content of the original catalog. The K/As were linked to their applicable 10 CFR 55 item numbers. SRO level K/As were identified by 10 CFR 55.43 item numbers. The plant-wide generic and system generic K/As were combined in one section with approximately one hundred new K/As. Component Cooling Water and Instrument Air Systems were added to the Systems Section. Finally, High Containment Hydrogen Concentration and Plant Fire On Site evolutions added to the Emergency and Abnormal Plant Evolutions section.

  19. Redesignation Order No. 00-09.01-01 to the Manager of Department of Energy Idaho Operations Office

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2006-05-12

    Redesignation of the Manager of the Idaho Operations Office as the representative to perform as the "authorized representative," as that term is used in the NRC regulations at 10 CFR 72.16(b), and as name holder of the NRC license under 10 CFR 72 for the Idaho Spent Fuel Facility Independent Spent Fuel Storage Installation.

  20. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1. Volume 2, Part 1C: Analysis of core damage frequency from internal events for plant operational State 5 during a refueling outage, Main report (Sections 11--14)

    SciTech Connect

    Whitehead, D.; Darby, J.; Yakle, J.

    1994-06-01

    This document contains the accident sequence analysis of internally initiated events for Grand Gulf, Unit 1 as it operates in the Low Power and Shutdown Plant Operational State 5 during a refueling outage. The report documents the methodology used during the analysis, describes the results from the application of the methodology, and compares the results with the results from two full power analyses performed on Grand Gulf.

  1. Emergency preparedness source term development for the Office of Nuclear Material Safety and Safeguards-Licensed Facilities

    SciTech Connect

    Sutter, S.L.; Mishima, J.; Ballinger, M.Y.; Lindsey, C.G.

    1984-08-01

    In order to establish requirements for emergency preparedness plans at facilities licensed by the Office of Nuclear Materials Safety and Safeguards, the Nuclear Regulatory Commission (NRC) needs to develop source terms (the amount of material made airborne) in accidents. These source terms are used to estimate the potential public doses from the events, which, in turn, will be used to judge whether emergency preparedness plans are needed for a particular type of facility. Pacific Northwest Laboratory is providing the NRC with source terms by developing several accident scenarios for eleven types of fuel cycle and by-product operations. Several scenarios are developed for each operation, leading to the identification of the maximum release considered for emergency preparedness planning (MREPP) scenario. The MREPP scenarios postulated were of three types: fire, tornado, and criticality. Fire was significant at oxide fuel fabrication, UF/sub 6/ production, radiopharmaceutical manufacturing, radiopharmacy, sealed source manufacturing, waste warehousing, and university research and development facilities. Tornadoes were MREPP events for uranium mills and plutonium contaminated facilities, and criticalities were significant at nonoxide fuel fabrication and nuclear research and development facilities. Techniques for adjusting the MREPP release to different facilities are also described.

  2. Operating Experience Committee Charter

    Energy.gov [DOE]

    The Operating Experience Committee (OEC) charter provides a description of the OEC's purpose, background, membership, functions, and operations.

  3. and Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    and Operations

  4. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    SciTech Connect

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L.; Forester, J.; Johnson, J.

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

  5. Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decision, July 1972 - June 1995

    SciTech Connect

    1996-04-01

    This is the seventh edition of the Nuclear Regulatory Commission (NRC) Staff Practice and Procedure Digest. It contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to June 1995 interpreting the NRC rules of practice in 10 CFR part 2.

  6. Human Factors Aspects of Operating Small Reactors

    SciTech Connect

    OHara, J.M.; Higgins, J.; Deem, R.; Xing, J.; DAgostino, A.

    2010-11-07

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. They are considering small modular reactors (SMRs) as one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants, and so may require a concept of operations (ConOps) that also is different. The U.S. Nuclear Regulatory Commission (NRC) has begun examining the human factors engineering- (HFE) and ConOps- aspects of SMRs; if needed, they will formulate guidance to support SMR licensing reviews. We developed a ConOps model, consisting of the following dimensions: Plant mission; roles and responsibilities of all agents; staffing, qualifications, and training; management of normal operations; management of off-normal conditions and emergencies; and, management of maintenance and modifications. We are reviewing information on SMR design to obtain data about each of these dimensions, and have identified several preliminary issues. In addition, we are obtaining operations-related information from other types of multi-module systems, such as refineries, to identify lessons learned from their experience. Here, we describe the project's methodology and our preliminary findings.

  7. Selection of Licensing Basis Events for the U.S. Design Certification of the PBMR

    SciTech Connect

    Silady, Fred A.; Fleming, Karl N.; Wallace, Edward G.

    2006-07-01

    In support of the pre-application interactions with the Nuclear Regulatory Commission (NRC), leading to the design certification of the Pebble Bed Modular Reactor (PBMR) in the U.S., Licensing Basis Events (LBEs) are being selected with information derived from a reactor- and design- specific Probabilistic Risk Assessment (PRA). This approach builds upon the risk-informed licensing approach that was developed by the Department of Energy (DOE) for the MHTGR in the 1980's [1,2] and the more recent experience with the Exelon-proposed licensing approach for the PBMR [3]. The key elements of this technology-neutral approach include (1) the use of accident frequency vs. radiological dose criteria that are derived from current U.S. licensing requirements, referred to as Top Level Regulatory (TLRC), (2) use of a full-scope PRA to select the LBEs, (3) development of reactor-specific functions, selection of the corresponding safety-related Systems, Structures, and Components (SSCs), and their regulatory design criteria, and (4) deterministic design conditions and special treatment requirements for the safety-related SSCs. The purpose of this paper is to focus on the elements of the approach that are important for the selection of LBEs. (authors)

  8. Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010

    SciTech Connect

    U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

    2012-07-07

    The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

  9. Technical guidance document for environmental requirements of commercial OTEC licensing regulations (15 CFR Part 981)

    SciTech Connect

    Not Available

    1981-09-01

    This document provides a potential OTEC applicant with the insights believed needed to satisfy the environmental information requirements of the regulations for licensing commercial OTEC facilities and plantships. This information should be used by applicants to define the site-specific details of the needed environmental assessment, and the details should then form a basis for pre-application consultations on the environmental requirements.

  10. NETL Technology for Safer, Cleaner Corrosion-Protecting Metal Coatings Licensed by Pittsburgh Start-Up

    Energy.gov [DOE]

    The Energy Department’s National Energy Technology Laboratory (NETL) teamed up with Carnegie Mellon University to create a revolutionary, cost-effective technology to reduce the impact of corrosion, which costs the US economy an estimated $276 billion per year. This partnership resulted in the creation of a new spin-off company that signed a licensing agreement with NETL this past June.

  11. Richland Operations Office - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office...

  12. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans

    SciTech Connect

    LePoire, D.; Arnish, J.; Cheng, J.J.; Kamboj, S.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2007-07-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include 1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and 2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting

  13. Web-based training related to NRC staff review of dose modeling aspects of license termination and decommissioning plans.

    SciTech Connect

    LePoire, D.; Arnish, J.; Cheng, J. J.; Kamboj, S.; Richmond, P.; Chen, S. Y.; Barr, C.; McKenney, C.; Environmental Science Division; NRC

    2007-01-01

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course is being developed in 2006 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The training course consists of the core and advanced modules tailored to specific NRC job functions. Topics for individual modules include identifying the characteristics of simple and complex sites, identifying when outside expertise or consultation is needed, demonstrating how to conduct acceptance and technical reviews of dose modeling, and providing details regarding the level of justification needed for realistic scenarios for both dose modeling and derivation of DCGLs. Various methods of applying probabilistic uncertainty analysis to demonstrate compliance with dose-based requirements are presented. These approaches include: (1) modeling the pathways of radiological exposure and estimating doses to receptors from a combination of contaminated media and radionuclides, and (2) using probabilistic analysis to determine an appropriate set of input parameters to develop derived concentration guideline limits or DCGLs (DCGLs are media- and nuclide-specific concentration limits that will meet dose-based, license termination rule criteria found in 10 CFR Part 20, Subpart E). Calculation of operational (field) DCGL's from media- and nuclide-specific DCGLs and use of operational DCGLs in conducting

  14. ARM - AMF2 Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AMF2 Organization and Contacts Management and Operations Operations Overview ARM Links BCR | ECR ECO, EWO Extraview PIF, CAR, DQR & DQPR Operations Status System i.arm.gov AMF2 ...

  15. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices E (Sections E.1--E.8). Volume 2, Part 3A

    SciTech Connect

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. The authors recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful.

  16. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    SciTech Connect

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

  17. Operating Experience Committee Charter

    Energy.gov [DOE]

    The Operating Experience Committe Charter explains the purpose of the Department of Energy (DOE) Operating Experience Committee (OEC), which is to support line management within DOE and the DOE community in developing and sustaining effective oeprating experience programs so that lessons from inernal and external operating experience lead to improvement in future operational and safety performance.

  18. Operation Warfighter Internship Fair

    Energy.gov [DOE]

    Attendees: Participants of Operation Warfighter Program Cost: Free Supports: Veteran and Disability Employment Programs

  19. US nuclear power plant operating cost and experience summaries

    SciTech Connect

    Kohn, W.E.; Reid, R.L.; White, V.S.

    1998-02-01

    NUREG/CR-6577, U.S. Nuclear Power Plant Operating Cost and Experience Summaries, has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants. Cost incurred after initial construction are characterized as annual production costs, representing fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operating summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from annual operating reports submitted by the licensees, plant histories contained in Nuclear Power Experience, trade press articles, and the Nuclear Regulatory Commission (NRC) web site (www.nrc.gov).

  20. ARM - Historical Operational Statistics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operational Statistics 2016 Quarterly Reports First Quarter (PDF) Second Quarter (PDF) Third Quarter (PDF) Fourth Quarter (PDF) Past Quarterly Reports Historical Statistics Field Campaigns Operational Visitors and Accounts Data Archive and Usage (October 1995 - Present) Historical Operational Statistics The reporting requirements for DOE national user facilities are based on time. These requirements concern the actual hours of operation (ACTUAL) and the established maximum operation or uptime

  1. Standard Review Plan for the review of a license application for a low-level radioactive waste disposal facility. Revision 3

    SciTech Connect

    Not Available

    1994-04-01

    The Standard Review Plan (SRP) (NUREG-1200) provides guidance to staff reviewers in the Office of Nuclear Material Safety and Safeguards who perform safety reviews of applications to construct and operate low-level radioactive waste disposal facilities. The SRP ensures the quality and uniformity of the staff reviews and presents a well-defined base from which to evaluate proposed changes in the scope and requirements of the staff reviews. The SRP makes information about the regulatory licensing process widely available and serves to improve the understanding of the staff`s review process by interested members of the public and the industry. Each individual SRP addresses the responsibilities of persons performing the review, the matters that are reviewed, the Commission`s regulations and acceptance criteria necessary for the review, how the review is accomplished, the conclusions that are appropriate, and the implementation requirements.

  2. Tri-State Synfuels Project Review: Volume 8. Commercial status of licensed process units. [Proposed Henderson, Kentucky coal to gasoline plant; licensed commercial processes

    SciTech Connect

    Not Available

    1982-06-01

    This document demonstrates the commercial status of the process units to be used in the Tri-State Synfuels Project at Henderson, Kentucky. The basic design philosophy as established in October, 1979, was to use the commercial SASOL II/III plants as a basis. This was changed in January 1982 to a plant configuration to produce gasoline via a methanol and methanol to gasoline process. To accomplish this change the Synthol, Oil workup and Chemical Workup Units were eliminated and replaced by Methanol Synthesis and Methanol to Gasoline Units. Certain other changes to optimize the Lurgi liquids processing eliminated the Tar Distillation and Naphtha Hydrotreater Units which were replaced by the Partial Oxidation Unit. The coals to be gasified are moderately caking which necessitates the installation of stirring mechanism in the Lurgi Dry Bottom gasifier. This work is in the demonstration phase. Process licenses either have been obtained or must be obtained for a number of processes to be used in the plant. The commercial nature of these processes is discussed in detail in the tabbed sections of this document. In many cases there is a list of commercial installations at which the licensed equipment is used.

  3. Advanced Reactor Licensing: Experience with Digital I&C Technology in Evolutionary Plants

    SciTech Connect

    Wood, RT

    2004-09-27

    This report presents the findings from a study of experience with digital instrumentation and controls (I&C) technology in evolutionary nuclear power plants. In particular, this study evaluated regulatory approaches employed by the international nuclear power community for licensing advanced l&C systems and identified lessons learned. The report (1) gives an overview of the modern l&C technologies employed at numerous evolutionary nuclear power plants, (2) identifies performance experience derived from those applications, (3) discusses regulatory processes employed and issues that have arisen, (4) captures lessons learned from performance and regulatory experience, (5) suggests anticipated issues that may arise from international near-term deployment of reactor concepts, and (6) offers conclusions and recommendations for potential activities to support advanced reactor licensing in the United States.

  4. Special Report on "Allegations of Conflict of Interest Regarding Licensing of PROTECT by Argonne National Laboratory"

    SciTech Connect

    2009-08-01

    In February 2009, the Office of Inspector General received a letter from Congressman Mark Steven Kirk of Illinois, which included constituent allegations that an exclusive technology licensing agreement by Argonne National Laboratory was tainted by inadequate competition, conflicts of interest, and other improprieties. The technology in question was for the Program for Response Options and Technology Enhancements for Chemical/Biological Terrorism, commonly referred to as PROTECT. Because of the importance of the Department of Energy's technology transfer program, especially as implementation of the American Recovery and Reinvestment Act matures, we reviewed selected aspects of the licensing process for PROTECT to determine whether the allegations had merit. In summary, under the facts developed during our review, it was understandable that interested parties concluded that there was a conflict of interest in this matter and that Argonne may have provided the successful licensee with an unfair advantage. In part, this was consistent with aspects of the complaint from Congressman Kirk's constituent.

  5. Licensing topical report: application of probabilistic risk assessment in the selection of design basis accidents. [HTGR

    SciTech Connect

    Houghton, W.J.

    1980-06-01

    A probabilistic risk assessment (PRA) approach is proposed to be used to scrutinize selection of accident sequences. A technique is described in this Licensing Topical Report to identify candidates for Design Basis Accidents (DBAs) utilizing the risk assessment results. As a part of this technique, it is proposed that events with frequencies below a specified limit would not be candidates. The use of the methodology described is supplementary to the traditional, deterministic approach and may result, in some cases, in the selection of multiple failure sequences as DBAs; it may also provide a basis for not considering some traditionally postulated events as being DBAs. A process is then described for selecting a list of DBAs based on the candidates from PRA as supplementary to knowledge and judgments from past licensing practice. These DBAs would be the events considered in Chapter 15 of Safety Analysis Reports of high-temperature gas-cooled reactors (HTGRs).

  6. Review of safety guidelines and licensing procedures applicable in Italy with regard to fusion machines

    SciTech Connect

    Sgalambro, G.

    1993-06-01

    A consistent set of general safety criteria has been set up in Italy dealing with fusion machines, considering also the most recent recommendations issued by ICRP. The paper gives a short discussion of the more safety relevant aspects in the design of fusion machines starting from the consideration of the applicable dose limits. The procedure for the licensing of fusion machines is presented in the second part of the paper.

  7. Testing, licensing, and code requirements for seismic isolation systems (for nuclear power plants)

    SciTech Connect

    Seidensticker, R.W.

    1987-01-01

    The use of seismic isolation as an earthquake hazard mitigation strategy for nuclear reactor power plants is rapidly receiving interest throughout the world. Seismic isolation has already been used on at least two French PWR plants, was to have been used for plants to be built in Iran, and is under serious consideration for advanced LMR plants (in the US, UK, France, and Japan). In addition, there is a growing use of seismic isolation throughout the world for other critical facilities such as hospitals, emergency facilities, buildings with very high-cost equipment (e.g., computers) and as a strategy to reduce loss of life and expensive equipment in earthquakes. Such a design approach is in complete contrast to the conventional seismic design strategy in which the structure and components are provided with sufficient strength and ductility to resist the earthquake forces and to prevent structural collapses or failure. The use of seismic isolation for nuclear plants can, therefore, be expected to be a significant licensing issue. For isolation, the licensing process must shift away in large measure from the superstructure and concentrate on the behavior of the seismic isolation system. This paper is not intended to promote the advantages of seismic isolation system, but to explore in some detail those technical issues which must be satisfactorily addressed to achieve full licensability of the use of seismic isolation as a viable, attractive and economical alternative to current traditional design approaches. Special problems and topics associated with testing and codes and standards development are addressed. A positive program for approach or strategy to secure licensing is presented.

  8. Spent Nuclear Fuel Project path forward: nuclear safety equivalency to comparable NRC-licensed facilities

    SciTech Connect

    Garvin, L.J.

    1995-11-01

    This document includes the Technical requirements which meet the nuclear safety objectives of the NRC regulations for fuel treatment and storage facilities. These include requirements regarding radiation exposure limits, safety analysis, design and construction. This document also includes administrative requirements which meet the objectives of the major elements of the NRC licensing process. These include formally documented design and safety analysis, independent technical review, and oppportunity for public involvement.

  9. Inspection report: the Department of Energy's export licensing process for dual-use and munitions commodities

    SciTech Connect

    Friedman, Gregory H.

    1999-05-01

    Export of commodities, encouraged by both the private sector and the Federal Government, helps to improve our position in the global economy and is in the national interest of the US. However, exports of commodities or technologies, without regard to whether they may significantly contribute to the military potential of individual countries or combination of countries or enhance the proliferation of weapons of mass destruction, may adversely affect the national security of the US. The Federal Government, therefore, implements several laws, Executive Orders, and regulations to control the export of certain commodities and technologies. These commodities and technologies require a license for export. Some of the controlled items are designated as ''dual-use,'' that is, commodities and technologies that have both civilian and military application. Some dual-use commodities are designated as ''nuclear dual-use''--items controlled for nuclear nonproliferation purposes. Another group of controlled commodities is designated as munitions, which are goods and technologies that have solely military uses. The Department of Energy (Energy) conducts reviews of export license applications for nuclear dual-use items and certain munitions. On August 26, 1998, the Chairman of the Senate Committee on Governmental Affairs requested that the Inspectors General from the Departments of Commerce, Defense, Energy, State, and Treasury, and the Central Intelligence Agency (CIA), update and expand on a 1993 interagency review conducted by the Inspectors General of the Departments of Commerce, Defense, Energy, and State of the export licensing processes for dual-use and munitions commodities.

  10. Application Of The Iberdrola Licensing Methodology To The Cofrentes BWR-6 110% Extended Power Up-rate

    SciTech Connect

    Mata, Pedro; Fuente, Rafael de la; Iglesias, Javier; Sedano, Pablo G.

    2002-07-01

    Iberdrola (spanish utility) and Iberdrola Ingenieria (engineering branch) have been developing during the last two years the 110% Extended Power Up-rate Project (EPU 110%) for Cofrentes BWR-6. IBERDROLA has available an in-house design and licensing reload methodology that has been approved by the Spanish Nuclear Regulatory Authority. This methodology has been already used to perform the nuclear design and the reload licensing analysis for Cofrentes cycles 12 to 14. The methodology has been also applied to develop a significant number of safety analysis of the Cofrentes Extended Power Up-rate including: Reactor Heat Balance, Core and Fuel performance, Thermal Hydraulic Stability, ECCS LOCA Evaluation, Transient Analysis, Anticipated Transient Without Scram (ATWS) and Station Blackout (SBO) Since the scope of the licensing process of the Cofrentes Extended Power Up-rate exceeds the range of analysis included in the Cofrentes generic reload licensing process, it has been required to extend the applicability of the Cofrentes licensing methodology to the analysis of new transients. This is the case of the TLFW transient. The content of this paper shows the benefits of having an in-house design and licensing methodology, and describes the process to extend the applicability of the methodology to the analysis of new transients. The case of analysis of Total Loss of Feedwater with the Cofrentes Retran Model is included as an example of this process. (authors)

  11. Climate Data Operators (CDO)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Climate Data Operators (CDO) Climate Data Operators (CDO) Description and Overview CDO is a large tool set for working on climate data. NetCDF 34, GRIB including SZIP compression, ...

  12. Paducah Operations Timeline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Timeline Paducah Operations Timeline Paducah Operations Timeline

  13. Calutron Operators | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operators Calutron Operators Young women recruited to operate the calutrons

  14. LLW Processing and Operational Experience using a Plasma ARC Centrifugal Treatment (PACT{sup TM}) System

    SciTech Connect

    Shuey, M.W.; Ottmer, P.P.

    2006-07-01

    After several years of development, a commercially available high-temperature treatment system has been developed, licensed, and installed that treats heterogeneous low-level radioactive waste. High temperature plasma processing, unique torch design and operating features make it feasible to achieve a volume reduced, permanent, high integrity waste form while eliminating the personnel exposure and costs associated with conventional sorting, characterizing and handling. The Plasma Arc Centrifugal Treatment system or PACT{sup TM} manufactured by Retech Systems LLC is a licensed thermal plasma system that processes and consolidates low level radioactive wastes. The first PACT{sup TM} thermal plasma system to be licensed was at ZWILAG (Zwischenlager Wuerenlingen AG, Switzerland) in May 2004, and the second is utilized by the Japan Atomic Power Company (JAPC) in Tsuruga, Japan in March 2005. ZWILAG uses a drum feeder that processes the 200-liter drums from storage horizontally and pours the molten slag into molds. The drums contain organic and inorganic wastes (mixed waste), and by processing the drums directly lowers exposure to processing personnel. ZWILAG production data mid-2004 through mid-June 2005 has fed 9.4 E+10 Bq of mixed waste and stabilized 8.5 E+10 Bq in slag with a mean activity of 2.1 E+09 Bq/drum. The operational experience demonstrated by ZWILAG and JAPC has been a testament to the success of thermal plasma and their unique status has proven the real benefits of using the PACT{sup TM} system. (authors)

  15. ARM - NSA Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    AlaskaNSA Operations NSA Related Links Virtual Tour Facilities and Instruments Barrow Atqasuk Oliktok Point (AMF3) ES&H Guidance Statement Operations Science Field Campaigns Visiting the Site NSA Fact Sheet Images Information for Guest Scientists Contacts NSA Operations Barrow Facility Instrumentation at the Barrow facility operates 7 days a week, 24 hours a day, year around. The instrumentation is routinely maintained using an extensive "daily rounds" checklist 5 days a week,

  16. SWPF Crane Lift Operation

    SciTech Connect

    2010-01-01

    A multiple vview shot of the SWPF crane lift operation at the Savannah River Site. Funded by the Recovery Act.

  17. Preparation for Early Termination of Ignalina NPP Operation

    SciTech Connect

    Poskas, P.; Poskas, R.

    2003-02-26

    Seimas (Parliament of Lithuania) approved updated National Energy strategy where it is indicated that first Unit will be shutdown before the year 2005 and second Unit in 2009 if funding for decommissioning is available from EU and other donors. In accordance to Ignalina NPP Unit 1 Closure Law the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until year 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, o n the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned activities, licensing requirements for decommissioning, progress in preparation of the Final Decommissioning Plan is discussed.

  18. Application of the New Decommissioning Regulation to the Nuclear Licensed Facilities (NLF) at Fontenay-aux-Roses's Nuclear Center (CEA)

    SciTech Connect

    Sauret, Josiane; Piketty, Laurence; Jeanjacques, Michel

    2008-01-15

    This abstract describes the application of the new decommissioning regulation on all Nuclear Licensed Facilities (NLF is to say INB in French) at Fontenay-aux-Roses's Center (CEA/FAR). The decommissioning process has been applied in six buildings which are out of the new nuclear perimeter proposed (buildings no 7, no 40, no 94, no 39, no 52/1 and no 32) and three buildings have been reorganized (no 54, no 91 and no 53 instead of no 40 and no 94) in order to increase the space for temporary nuclear waste disposal and to reduce the internal transports of nuclear waste on the site. The advantages are the safety and radioprotection improvements and a lower operating cost. A global safety file was written in 2002 and 2003 and was sent to the French Nuclear Authority on November 2003. The list of documents required is given in the paragraph I of this paper. The main goals were two ministerial decrees (one decree for each NLF) getting the authorization to modify the NLF perimeter and to carry out cleaning and dismantling activities leading to the whole decommissioning of all NLF. Some specific authorizations were necessary to carry out the dismantling program during the decommissioning procedure. They were delivered by the French Nuclear Safety Authority (FNSA) or with limited delegation by the General Executive Director (GED) on the CEA Fontenay-aux-Roses's Center, called internal authorization. Some partial dismantling or decontamination examples are given below: - evaporator for the radioactive liquid waste treatment station (building no 53): FNSA authorization: phase realised in 2002/2003. - disposal tanks for the radioactive liquid waste treatment station (building no 53) FNSA authorization: phase realised in 2004, - incinerator for the radioactive solid waste treatment station (building no 07): FNSA authorization: operation realised in 2004, - research equipments in the building no. 54 and building no. 91: internal authorization ; realised in 2005, - sample

  19. The role of non-destructive assay in support of the exemption of solid waste from nuclear licensed sites

    SciTech Connect

    Fisher, Alan; Adsley, Ian; Green, Tommy

    2007-07-01

    Available in abstract form only. Full text of publication follows: Nuclear Site License Holders within the United Kingdom are increasingly re-examining the options available for disposal of solid waste produced during routine operations and decommissioning activities. The incentives to do so include: 'Compliance with the requirement to minimise radioactive waste, as stipulated in Disposal Authorisations issued by the Environment Agency' Reducing the burden on the UK Low Level Waste Repository (LLWR)' Achieving cost savings on waste management, by avoiding expensive conditioning, transport and disposal costs for certain wastes. Wastes may be exempted from regulation under the Radioactive Substances Act, 1993 (RSA 93) provided they comply with the conditions laid out in the relevant Exemption Orders. In effect, they may be legally disposed as if they were non-radioactive waste. A national Code of Practice on Clearance and Exemption Principles, Processes and Practices was introduced in 2005 to clarify the requirements of these Exemption Orders and provide guidance on their practical application. In order to demonstrate compliance with these Exemption Orders, it is essential to have good knowledge of the items' history and their potential for contamination. Monitoring is frequently used as definitive evidence that the radioactivity content of waste items does not exceed limits proscribed in the relevant Exemption Orders. The practicalities of monitoring require careful consideration in order to achieve meaningful results and be capable of achieving the low specific activity limits quoted in the Exemption Orders. The Cross Industry Assay Working Group is a national collection of non-destructive assay specialists from a range of companies, which meets regularly to discuss challenges relating to the assay of all categories of waste. In this paper, the Group presents examples of how NDA techniques are being used to support the exemption of waste items. (authors)

  20. Site Operator Program

    SciTech Connect

    Warren, J.F.

    1991-01-01

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  1. Site Operator Program

    SciTech Connect

    Warren, J.F.

    1991-12-31

    Collectively, the organizations participating in the Site Operator Program have over forty years of EV experience and have operated electric vehicles (EVs) for over 600,000 miles, providing the most extensive EV operating and knowledge base in the country. The Site Operator Program is intended to provide financial and technical support and organizational resources to organizations active in the advancement of electric vehicles. Support is provided for the demonstration of vehicles and the test and evaluation of vehicles, components, and batteries. Support is also provided for the management and support of the program for the participating organizations. The Program provides a forum for participants to exchange information among the group, as well as with vehicle and equipment manufacturers and suppliers, and the public. A central data base at the Idaho National Engineering Laboratory provides a repository for-data on the vehicles being operated by the Program participants. Data collection emphasis is in the areas of operations, maintenance, and life cycle costs.

  2. Cask fleet operations study

    SciTech Connect

    Not Available

    1988-01-01

    The Nuclear Waste Policy Act of 1982 assigned to the Department of Energy's (DOE) Office of Civilian Waste Management the responsibility for disposing of high-level waste and spent fuel. A significant part of that responsibility involves transporting nuclear waste materials within the federal waste management system; that is, from the waste generator to the repository. The lead responsibility for transportation operations has been assigned to Oak Ridge Operations, with Oak Ridge National Laboratory (ORNL) providing technical support through the Transportation Operations Support Task Group. One of the ORNL support activities involves assessing what facilities, equipment and services are required to assure that an acceptable, cost-effective and safe transportation operations system can be designed, operated and maintained. This study reviews, surveys and assesses the experience of Nuclear Assurance Corporation (NAC) in operating a fleet of spent-fuel shipping casks to aid in developing the spent-fuel transportation system.

  3. Operations Research Analysts

    Energy Information Administration (EIA) (indexed site)

    Operations Research Analysts The U.S. Energy Information Administration (EIA) within the Department of Energy has forged a world-class information program that stresses quality, teamwork, and employee growth. In support of our program, we offer a variety of profes- sional positions, including the Operations Research Analyst, whose work is associated with the development and main- tenance of energy modeling systems. Responsibilities: Operations Research Analysts perform or participate in one or

  4. Assessment of a large break loss of coolant accident scenario requiring operator action to initiate safety injection

    SciTech Connect

    Grendys, R.C.; Nissley, M.E.; Baker, D.C.

    1996-11-01

    As part of the licensing basis for a nuclear power plant, the acceptability of the Emergency Core Cooling Systems (ECCS) following a postulated Loss-of-Coolant Accident (LOCA) as described in the Code of Federal Regulations (CFR), Title 10, Chapter 1, Part 50.46, must be verified. The LOCA analysis is performed with an acceptable ECCS Evaluation Model and results must show compliance with the 10 CFR 50.46 acceptance criteria. Westinghouse Electric Corporation performs Large and Small Break LOCA and LOCA-related analyses to support the licensing basis of various nuclear power plants and also performs evaluations against the licensing basis analyses as required. Occasionally, the need arises for the holder of an operating license of a nuclear power plant to submit a Licensee Event Report (LER) to the US Nuclear Regulatory Commission (USNRC) for any event of the type described in the Code of Federal Regulations, Title 10, Chapter 1, Part 50.73. To support the LER, a Justification for Past Operation (JPO) may be performed to assess the safety consequences and implications of the event based on previous operating conditions. This paper describes the work performed for the Large Break LOCA to assess the impact of an event discovered by Florida Power and Light and reported in LER-94-005-02. For this event, it was determined that under certain circumstances, operator action would have been required to initiate safety injection (SI), thus challenging the acceptability of the ECCS. This event was specifically addressed for the Large Break LOCA by using an advanced thermal hydraulic analysis methodology with realistic input assumptions.

  5. APS Operational Statistics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Downtime Log Yearly Operation Statistics 2016 Statistics 2015 Statistics 2014 Statistics 2013 Statistics 2012 Statistics 2011 Statistics 2010 Statistics 2009 Statistics 2008...

  6. ARM - AMF Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2009-2010 Shouxian, China, 2008 Black Forest, Germany, 2007 Niamey, Niger, 2006 Point Reyes, California, 2005 AMF Operations Members of the AMF1 installation team prepare the...

  7. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 ...

  8. APS User Operations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Schedules APS Schedule Useful Links Beamline Design Library (former Design Exchange) Machine Status Link Bunch Clock Information APS Systems Status Storage Ring Operating Status...

  9. Operator interface for vehicles

    DOEpatents

    Bissontz, Jay E

    2015-03-10

    A control interface for drivetrain braking provided by a regenerative brake and a non-regenerative brake is implemented using a combination of switches and graphic interface elements. The control interface comprises a control system for allocating drivetrain braking effort between the regenerative brake and the non-regenerative brake, a first operator actuated control for enabling operation of the drivetrain braking, and a second operator actuated control for selecting a target braking effort for drivetrain braking. A graphic display displays to an operator the selected target braking effort and can be used to further display actual braking effort achieved by drivetrain braking.

  10. TYPE OF OPERATION

    Office of Legacy Management (LM)

    & RESIDUE 0 AECMED INVOLVEME?JT AT SITE ...----------- Control a Health Physics Protection 0 AECfMED managed operations G Little or None 0 AEUMED respansible far C ...

  11. TYPE OF OPERATION

    Office of Legacy Management (LM)

    . .' .,Ec-itkED I' NVULVEFY l- AT SITE '---------... .Control c Health Physics Protection 0 AECMED managed operations G Little or None :kf AECMED responsible for ...

  12. Operating Experience Summaries

    Energy.gov [DOE]

    The Office of Environment, Health, Safety and Security (AU) Office of Analysis publishes the Operating Experience Summary to exchange lessons-learned information between DOE facilities.

  13. Operations Committee Report

    Energy.gov [DOE] (indexed site)

    Presented to the Commission to Review Effectiveness of National Energy Laboratories Jeff Smith Deputy for Operations Oak Ridge National Laboratory February 24, 2015 The Importance ...

  14. Y-12 cleaning technology licensed by local engineering firm | Y-12 National

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Security Complex cleaning technology ... Y-12 cleaning technology licensed by local engineering firm Posted: October 31, 2012 - 10:00am MK Technologies CEO and founder Mike Carroll and director of strategic development and acquisition Chris Van Beke met Y-12 chemist and inventor Ron Simandl in his Y-12 laboratory to see the SIMWyPES® production process along with a sampling of its numerous applications. From left, Simandl shows Van Beke and Carroll two of a variety of items enhanced with

  15. Business Operations Organization Chart

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Business Operations Organization Chart Office of Business Operations Michael Budney, Director Project Management Coordination Office Scott Hine, Director Information and Technology Services Office Steve VonVital, Director (Acting) Workforce Management Office Jennifer Blankenheim, Director Golden Field Office Timothy Meeks, Director

  16. Stirling machine operating experience

    SciTech Connect

    Ross, B.; Dudenhoefer, J.E.

    1991-01-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that Stirling machines are capable of reliable and lengthy lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and were not expected to operate for any lengthy period of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered.

  17. Negotiable Licensing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Current Diamond Film Field Emission Cathode Room Temperature Dispenser Photocathode Biotechnology (0) None currently. Chemistry (2) Insensitive Extrudable Explosive Silica Scaling...

  18. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    SciTech Connect

    Jo, J.; Lin, C.C.; Neymotin, L.

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

  19. Stirling machine operating experience

    SciTech Connect

    Ross, B.; Dudenhoefer, J.E.

    1994-09-01

    Numerous Stirling machines have been built and operated, but the operating experience of these machines is not well known. It is important to examine this operating experience in detail, because it largely substantiates the claim that stirling machines are capable of reliable and lengthy operating lives. The amount of data that exists is impressive, considering that many of the machines that have been built are developmental machines intended to show proof of concept, and are not expected to operate for lengthy periods of time. Some Stirling machines (typically free-piston machines) achieve long life through non-contact bearings, while other Stirling machines (typically kinematic) have achieved long operating lives through regular seal and bearing replacements. In addition to engine and system testing, life testing of critical components is also considered. The record in this paper is not complete, due to the reluctance of some organizations to release operational data and because several organizations were not contacted. The authors intend to repeat this assessment in three years, hoping for even greater participation.

  20. NEAMS Software Licensing, Release, and Distribution: Implications for FY2013 Work Package Planning

    SciTech Connect

    Bernholdt, David E

    2012-06-01

    The vision of the NEAMS program is to bring truly predictive modeling and simulation (M&S) capabilities to the nuclear engineering community in order to enable a new approach to the analysis of nuclear systems. NEAMS anticipates issuing in FY 2018 a full release of its computational 'Fermi Toolkit' aimed at advanced reactor and fuel cycles. The NEAMS toolkit involves extensive software development activities, some of which have already been underway for several years, however, the Advanced Modeling and Simulation Office (AMSO), which sponsors the NEAMS program, has not yet issued any official guidance regarding software licensing, release, and distribution policies. This motivated an FY12 task in the Capability Transfer work package to develop and recommend an appropriate set of policies. The current preliminary report is intended to provide awareness of issues with implications for work package planning for FY13. We anticipate a small amount of effort associated with putting into place formal licenses and contributor agreements for NEAMS software which doesn't already have them. We do not anticipate any additional effort or costs associated with software release procedures or schedules beyond those dictated by the quality expectations for the software. The largest potential costs we anticipate would be associated with the setup and maintenance of shared code repositories for development and early access to NEAMS software products. We also anticipate an opportunity, with modest associated costs, to work with the Radiation Safety Information Computational Center (RSICC) to clarify export control assessment policies for software under development.

  1. Unique Regulatory Approach for Licensing the Port Hope Remediation Project in Canada - 13315

    SciTech Connect

    Kostova, M.; Howard, D.; Elder, P.

    2013-07-01

    The Port Hope remediation project is a part of a larger initiative of the Canadian Federal Government the Port Hope Area Initiative (PHAI) which is based upon a community proposal. The Government of Canada, through Natural Resources Canada (NRCan) is investing $1.28 billion over 10 years to clean up historic low-level radioactive waste in the Port Hope Area and to provide long-term safe management of the low-level radioactive wastes in the Port Hope Area. These wastes arose from the activities of a former Federal Crown Corporation (Eldorado Nuclear) and its private sector predecessors. In Canada, historic waste are defined as low-level radioactive waste that was managed in a manner no longer considered acceptable, but for which the original producer cannot reasonably be held responsible or no longer exists and for which the Federal Government has accepted responsibility. In Canada, under the current regulatory framework, the environmental remediation is not considered as a distinct phase of the nuclear cycle. The regulatory approach for dealing with existing sites contaminated with radioactive residues is defined on the basis of risk and application of existing regulations. A unique regulatory approach was taken by the Canadian Nuclear Safety Commission (CNSC) to address the various licensing issues and to set out the requirements for licensing of the Port Hope Project within the current regulatory framework. (authors)

  2. Operations & Administration - JCAP

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Sustainability Performance Office U.S. Department of Energy, MA-20 1000 Independence Ave., SW Washington, DC 20585 John Shonder Director john.shonder@hq.doe.gov 202-586-8645 Office of Aviation Management U.S.

  3. Licensing Guide and Sample License

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TEI:HNOL06Y TRANSFER WORKIN6 6ROUP Lic:en!iing Guide and Sample Lic:en!ie *~ ICan.u City Plan I OFermilab ~OAK ~RIDGE Nuioul~.<o-.,. Arg9..QDe t.AIOUTOlY SRNL .............. ~ A o LOs Alamos MATIO NA L l .U ORUORY / BROOKHAVEN NATIONAL LABORATORY :.:..,/ PRIN. C£loN PlASMA PHYSICS t ABOAATORV .:~ Ul!J Lawrence Uvermore National Laboratory Jef[;?on Lab t1NREL ~ ..................... sandia National Laboratories Laboratory or Facility Representative Email Addresses Phone # Ames Laboratory

  4. Knowledge and abilities catalog for nuclear power plant operators: boiling water reactors

    SciTech Connect

    Not Available

    1986-09-01

    The Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling-Water Reactors (BWR) (NUREG-1123) provides the basis for the development of content-valid licensing examinations for reactor operators (ROs) and senior reactor operators (SROs). The examinations developed using the BWR Catalog and Examiners' Handbook for Developing Operator Licensing Examinations (NUREG-1121) will cover those topics listed under Title 10, Code of Federal Regulations, Part 55. The BWR Catalog contains approximately 7000 knowledge and ability (K/A) statements for ROs and SROs at boiling water reactors. Each K/A statement has been rated for its importance to the safe operation of the plant in a manner ensuring personnel and public health and safety. The BWR K/A Catalog is organized into five major sections: Plant-wide Generic Knowledge and Ability Statements, Plant Systems grouped by Safety Function, Emergency and Abnormal Plant Evolutions, Components, and Theory. The BWR Catalog represents a modification of the form and content of the K/A Catalog for Nuclear Power Plant Operators: Pressurized Water Reactors (NUREG-1122). First, categories of knowledge and ability statements have been redefined. Second, the scope of the definition of emergency and abnormal plant evolutions has been revised in line with a symptom-based approach. Third, K/As related to the operational applications of theory have been incorporated into the delineations for both plant systems and emergency and abnormal plant evolutions, while K/As pertaining to theory fundamental to plant operation have been delineated in a separate theory section. Finally, the components section has been revised.

  5. Summary and analysis of public comments on NUREG-1317: Regulatory options for nuclear plant license renewal: Final report

    SciTech Connect

    Ligon, D.M.; Seth, S.S.

    1989-03-01

    On August 29, 1988, the US Nuclear Regulatory Commission (NRC) issued an Advance Notice of Proposed Rulemaking on nuclear plant license renewal and solicited public comments on NUREG-1317, ''Regulatory Options for Nuclear Plant License Renewal.'' NUREG-1317 presents a discussion of fifteen topics involving technical, environmental, and procedural issues and poses a set of related questions. As part of its ongoing task for the NRC, The MITRE Corporation has summarized and analyzed the public comments received. Fifty-three written comments were received. Of these, 83 percent were from nuclear industry representatives; the remaining comments represented federal and state agencies, public interest groups, and a private citizen.

  6. Assessment and recommendations for fissile-material packaging exemptions and general licenses within 10 CFR Part 71

    SciTech Connect

    Parks, C.V.; Hopper, C.M.; Lichtenwalter, J.L.

    1998-07-01

    This report provides a technical and regulatory assessment of the fissile material general licenses and fissile material exemptions within Title 10 of the Code of Federal Regulations Part 71. The assessment included literature studies and calculational analyses to evaluate the technical criteria; review of current industry practice and concerns; and a detailed evaluation of the regulatory text for clarity, consistency and relevance. Recommendations for potential consideration by the Nuclear Regulatory Commission staff are provided. The recommendations call for a simplification and consolidation of the general licenses and a change in the technical criteria for the first fissile material exemptions.

  7. CH Packaging Operations Manual

    SciTech Connect

    Washington TRU Solutions LLC

    2005-06-13

    This procedure provides instructions for assembling the CH Packaging Drum payload assembly, Standard Waste Box (SWB) assembly, Abnormal Operations and ICV and OCV Preshipment Leakage Rate Tests on the packaging seals, using a nondestructive Helium (He) Leak Test.

  8. Reduction/Transformation Operators

    Energy Science and Technology Software Center

    2006-09-01

    RTOp (reduction/transformation operators) is a collection of C++ software that provides the basic mechanism for implementinig vector operations in a flexible and efficient manner. This is the main interface utilized by Thyra to allow for the specification of specific vector reduction and/or transformation operations. The RTOp package contains three different types of software. (a) a small number of interoperability interfaces. (b) support software including code for the parallel SPMD mode based on only Teuchos::Comm(and notmore » MPl directly(, and (c) a library of pre-implemented RTOp subclasses for everything from simple AXPYs and norms, to more specialized vector operations. RTOp allows an algorithm developer to implement their own RTOp subclasses in a way that is independent from any specific serial, parallel, out-of-core or other type of vector implementation. RTOp is a required package by Thyra and MOOCHO. (c)« less

  9. Nuclear material operations manual

    SciTech Connect

    Tyler, R.P.

    1981-02-01

    This manual provides a concise and comprehensive documentation of the operating procedures currently practiced at Sandia National Laboratories with regard to the management, control, and accountability of nuclear materials. The manual is divided into chapters which are devoted to the separate functions performed in nuclear material operations-management, control, accountability, and safeguards, and the final two chapters comprise a document which is also issued separately to provide a summary of the information and operating procedures relevant to custodians and users of radioactive and nuclear materials. The manual also contains samples of the forms utilized in carrying out nuclear material activities. To enhance the clarity of presentation, operating procedures are presented in the form of playscripts in which the responsible organizations and necessary actions are clearly delineated in a chronological fashion from the initiation of a transaction to its completion.

  10. Continuity of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2005-01-14

    The notice defines requirements and responsibilities for continuity of operations planning within the DOE to ensure the capability to continue essential Departmental functions across a wide range of all hazard emergencies. Does not cancel other directives.

  11. Operations Security Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1992-04-30

    To establish policies, responsibilities and authorities for implementing and sustaining the Department of Energy (DOE) Operations Security (OPSEC) Program. Cancels DOE O 5632.3B. Canceled by DOE O 471.2 of 9-28-1995.

  12. Operating plan FY 1998

    SciTech Connect

    1997-10-01

    This document is the first edition of Argonne`s new Operating Plan. The Operating Plan complements the strategic planning in the Laboratory`s Institutional Plan by focusing on activities that are being pursued in the immediate fiscal year, FY 1998. It reflects planning that has been done to date, and it will serve in the future as a resource and a benchmark for understanding the Laboratory`s performance. The heart of the Institutional Plan is the set of major research initiatives that the Laboratory is proposing to implement in future years. In contrast, this Operating Plan focuses on Argonne`s ongoing R&D programs, along with cost-saving measures and other improvements being implemented in Laboratory support operations.

  13. Deputy Chief Operating Officer

    Energy.gov [DOE]

    This position will be filled at either Morgantown, WV or Pittsburgh, PA. A successful candidate in this position will serve as the Deputy Chief Operating Officer assigned to the Laboratory...

  14. Conduct of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Admin Chg 2, dated 12-3-14, supersedes Admin Chg 1.

  15. TYPE OF OPERATION

    Office of Legacy Management (LM)

    b RESIDUE q GOUT LECISED CONTReCTOR CONTRCICTOR -EEL ---LEeSED Control Health Physics 0 AEWMED managed operations q Little or No 0 AECMED responsible for AEWMED resp ...

  16. TYPE OF OPERATION

    Office of Legacy Management (LM)

    181 WASTE & RESIDUE q ,r . ,, A&MED I NVOLVEMENI-AT SITE I - . : Control 1 Health Physics Protection ' I, 0 AEWHED managed operations 0 Little or None 13 AEWHED responsible for ...

  17. TYPE OF OPERATION

    Office of Legacy Management (LM)

    WASTE G RESIDUE a i-CtlED INVOLVE"ENT-AT SITE -'---... Control ci Health Physics Protection 0 AECtlED managed operations c Little or None G AECMED rea' poneible for ...

  18. Corporate Operating Experience Program

    Energy.gov [DOE]

    The DOE Corporate Operating Experience Program helps to prevent the recurrence of significant adverse events/trends by sharing performance information, lessons learned and good practices across the DOE complex.

  19. Conduct of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, 6-25-13

  20. Protection Program Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2014-10-14

    This Order establishes requirements for the management and operation of the Department of Energy (DOE) Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE.

  1. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    /: -. !~t. Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 Nav 0 4 ?nn~ 05-AMCP-OO46 Mr. Todd Martin, Chair Hanford Advisory Board 1933 Jadwin, Suite 135 Richland, Washington 99352 Dear Mr. Martin: HANFORD ADVISORY BOARD (HAB) ADVICE #166 -FUND U PLANT AREA REMEDIATION ACTIVITIES In response to your letter dated September 10, 2004, the U.S. Department of Energy, Richland Operations Office (RL), appreciates your recommendations contained in HAB Consensus

  2. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    2000-08-28

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2015 are projected based on generation trends of the past 12 months. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement. Assumptions were current as of June. 2000.

  3. Operational Waste Volume Projection

    SciTech Connect

    STRODE, J.N.

    1999-08-24

    Waste receipts to the double-shell tank system are analyzed and wastes through the year 2018 are projected based on assumption as of July 1999. A computer simulation of site operations is performed, which results in projections of tank fill schedules, tank transfers, evaporator operations, tank retrieval, and aging waste tank usage. This projection incorporates current budget planning and the clean-up schedule of the Tri-Party Agreement.

  4. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991

    SciTech Connect

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  5. United States Nuclear Regulatory Commission staff practice and procedure digest: Commission, Appeal Board and Licensing Board decisions, July 1972--December 1991. Digest 6, Revision 4

    SciTech Connect

    Not Available

    1992-11-01

    This 4th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to December 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  6. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992

    SciTech Connect

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC's Rules of Practice in 10 CFR Part 2.

  7. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1971: Revision 2

    SciTech Connect

    Not Available

    1992-05-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  8. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--March 1991: Revision 1

    SciTech Connect

    Not Available

    1992-02-01

    This revision of the sixth edition of the NRC Practice and Procedure Digest contains a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1991, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  9. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1992: Digest No. 6, Revision No. 7

    SciTech Connect

    Not Available

    1993-08-01

    This 7th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  10. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board Decisions, July 1972--June 1992: Digest 6, Revision 6

    SciTech Connect

    Not Available

    1993-05-01

    This 6th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to June 30, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  11. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest: Commission, Appeal Board and Licensing Board decisions, July 1972--March 1992. Digest 6, Revision 5

    SciTech Connect

    Not Available

    1993-02-01

    This 5th revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to March 31, 1992, interpreting the NRC`s Rules of Practice in 10 CFR Part 2.

  12. United States Nuclear Regulatory Commission Staff Practice and Procedure Digest. Commission, Appeal Board and Licensing Board decisions, July 1972--September 1991: Digest 6, Revision 3

    SciTech Connect

    Not Available

    1992-08-01

    This 2nd revision of the sixth edition of the NRC Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period of July 1, 1972 to September 30, 1991, interpreting the NRC`s Rules of Pratice in 10 CFR Part 2.

  13. Storage of LWR spent fuel in air: Volume 1: Design and operation of a spent fuel oxidation test facility

    SciTech Connect

    Thornhill, C.K.; Campbell, T.K.; Thornhill, R.E.

    1988-12-01

    This report describes the design and operation and technical accomplishments of a spent-fuel oxidation test facility at the Pacific Northwest Laboratory. The objective of the experiments conducted in this facility was to develop a data base for determining spent-fuel dry storage temperature limits by characterizing the oxidation behavior of light-water reactor (LWR) spent fuels in air. These data are needed to support licensing of dry storage in air as an alternative to spent-fuel storage in water pools. They are to be used to develop and validate predictive models of spent-fuel behavior during dry air storage in an Independent Spent Fuel Storage Installation (ISFSI). The present licensed alternative to pool storage of spent fuel is dry storage in an inert gas environment, which is called inerted dry storage (IDS). Licensed air storage, however, would not require monitoring for maintenance of an inert-gas environment (which IDS requires) but does require the development of allowable temperature limits below which UO/sub 2/ oxidation in breached fuel rods would not become a problem. Scoping tests at PNL with nonirradiated UO/sub 2/ pellets and spent-fuel fragment specimens identified the need for a statistically designed test matrix with test temperatures bounding anticipated maximum acceptable air-storage temperatures. This facility was designed and operated to satisfy that need. 7 refs.

  14. Chapter 10: FTU Operation

    SciTech Connect

    Angelini, B.M.; Apicella, M.L.; Buceti, G.; Centioli, C.; Crisanti, F.; Iannone, F.; Mazza, G.; Mazzitelli, G.; Panella, M.; Vitale, V.

    2004-05-15

    Some specific points of the Frascati Tokamak Upgrade (FTU) operation are presented for plasma performance as well as for the machine availability and the development of new tools needed to operate in a complex scenario needed for tokamak research. The different techniques adopted for wall conditioning of the FTU are reviewed. Plasmas with low Z{sub eff} have been achieved including those at low density and high additional heating power. The obtained experimental results are discussed in terms of better operation and plasma performance achieved. As with any other large - and thus long-lasting - experiments, a mixture of old and new technological solutions inserted in an open source framework characterizes the FTU data control and acquisition systems. We give some information on the original architecture and try to detail its current state. The high level of reliability presently achieved is discussed.

  15. About APPLE II Operation

    SciTech Connect

    Schmidt, T.; Zimoch, D.

    2007-01-19

    The operation of an APPLE II based undulator beamline with all its polarization states (linear horizontal and vertical, circular and elliptical, and continous variation of the linear vector) requires an effective description allowing an automated calculation of gap and shift parameter as function of energy and operation mode. The extension of the linear polarization range from 0 to 180 deg. requires 4 shiftable magnet arrrays, permitting use of the APU (adjustable phase undulator) concept. Studies for a pure fixed gap APPLE II for the SLS revealed surprising symmetries between circular and linear polarization modes allowing for simplified operation. A semi-analytical model covering all types of APPLE II and its implementation will be presented.

  16. Superfund Policy Statements and Guidance Regarding Disposition of Radioactive Waste in Non-NRC Licensed Disposal Facilities - 13407

    SciTech Connect

    Walker, Stuart

    2013-07-01

    This talk will discuss EPA congressional testimony and follow-up letters, as well as letters to other stakeholders on EPA's perspectives on the disposition of radioactive waste outside of the NRC licensed disposal facility system. This will also look at Superfund's historical practices, and emerging trends in the NRC and agreement states on waste disposition. (author)

  17. Operational Area Monitoring Plan

    Office of Legacy Management (LM)

    ' SECTION 11.7B Operational Area Monitoring Plan for the Long -Term H yd rol og ical M o n i to ri ng - Program Off The Nevada Test Site S . C. Black Reynolds Electrical & Engineering, Co. and W. G. Phillips, G. G. Martin, D. J. Chaloud, C. A. Fontana, and 0. G. Easterly Environmental Monitoring Systems Laboratory U. S. Environmental Protection Agency October 23, 1991 FOREWORD This is one of a series of Operational Area Monitoring Plans that comprise the overall Environmental Monitoring Plan

  18. Web-Based Training on Reviewing Dose Modeling Aspects of NRC Decommissioning and License Termination Plans

    SciTech Connect

    LePoire, D.; Cheng, J.J.; Kamboj, S.; Arnish, J.; Richmond, P.; Chen, S.Y.; Barr, C.; McKenney, C.

    2008-01-15

    NRC licensees at decommissioning nuclear facilities submit License Termination Plans (LTP) or Decommissioning Plans (DP) to NRC for review and approval. To facilitate a uniform and consistent review of these plans, the NRC developed training for its staff. A live classroom course was first developed in 2005, which targeted specific aspects of the LTP and DP review process related to dose-based compliance demonstrations or modeling. A web-based training (WBT) course was developed in 2006 and 2007 to replace the classroom-based course. The advantage of the WBT is that it will allow for staff training or refreshers at any time, while the advantage of a classroom-based course is that it provides a forum for lively discussion and the sharing of experience of classroom participants. The objective of this course is to train NRC headquarters and regional office staff on how to review sections of a licensee's DP or LTP that pertain to dose modeling. The DP generally refers to the decommissioning of non-reactor facilities, while the LTP refers specifically to the decommissioning of reactors. This review is part of the NRC's licensing process, in which the NRC determines if a licensee has provided a suitable technical basis to support derived concentration guideline levels (DCGLs)1 or dose modeling analyses performed to demonstrate compliance with dose-based license termination rule criteria. This type of training is one component of an organizational management system. These systems 'use a range of practices to identify, create, represent, and distribute knowledge for reuse, awareness and learning'. This is especially important in an organization undergoing rapid change or staff turnover to retain organizational information and processes. NRC is committed to maintaining a dynamic program of training, development, and knowledge transfer to ensure that the NRC acquires and maintains the competencies needed to accomplish its mission. This paper discusses one specific project

  19. THE DECISION TO RECOMMEND YUCCA MOUNTAIN AND THE NEXT STEPS TOWARD LICENSED REPOSITORY DEVELOPMENT

    SciTech Connect

    Barrett, L. H.

    2002-02-25

    After more than 20 years of carefully planned and reviewed scientific field work by the U.S. Department of Energy, the U.S. Geological Survey, and numerous other organizations, Secretary of Energy Abraham concluded in January that the Yucca Mountain site is suitable, within the meaning of the Nuclear Waste Policy Act, for development as a permanent nuclear waste and spent fuel repository. In February, the Secretary recommended to the President that the site be developed for licensed disposal of these wastes, and the President transmitted this recommendation to Congress. This paper summarizes key technical and national interest considerations that provided the basis for the recommendation. It also discusses the program's near-term plans for repository development if Congress designates the site.

  20. Current regulatory and licensing status for byproduct sources, facilities and applications

    SciTech Connect

    Tingey, G.L.; Jensen, G.A.; Hazelton, R.F.

    1985-02-01

    Public use of nuclear byproducts, especially radioactive isotopes, will require approval by various regulatory agencies. Use of cesium-137 as an irradiation source for sterilizing medical products will require US Nuclear Regulatory Commission (NRC) approval. Two applications have been filed with NRC, and approval is expected soon. Widespread use of irradiation for food products depends on a favorable ruling by the Food and Drug Administration (FDA). A ruling is pending that would permit irradiation of fruits and vegetables up to 100 krad. NRC also controls the use of isotopes in remote power generators, but little regulatory action has been required in recent years. Recent development of radioluminescent (RL) lighting for runway lights has led to interest by commercial manufacturers. At the present time, a license has been issued to at least one manufacturer for sale of tritium-powered runway lights. 28 refs., 1 fig.

  1. Geothermal : A Regulatory Guide to Leasing, Permitting, and Licensing in Idaho, Montana, Oregon, and Washington.

    SciTech Connect

    Bloomquist, R.Gordon

    1991-10-01

    The actual geothermal exploration and development may appear to be a simple and straightforward process in comparison to the legal and institutional maze which the developer must navigate in order to obtain all of the federal, state, and local leases, permits, licenses, and approvals necessary at each step in the process. Finally, and often most difficult, is obtaining a contract for the sale of thermal energy, brine, steam, or electricity. This guide is designed to help developers interested in developing geothermal resource sites in the Bonneville Power Administration Service Territory in the state of Idaho, Montana, Oregon, and Washington better understand the federal, state, and local institutional process, the roles and responsibilities of each agency, and how and when to make contact in order to obtain the necessary documents.

  2. Licensing of spent fuel dry storage and consolidated rod storage: A Review of Issues and Experiences

    SciTech Connect

    Bailey, W.J.

    1990-02-01

    The results of this study, performed by Pacific Northwest Laboratory (PNL) and sponsored by the US Department of Energy (DOE), respond to the nuclear industry's recommendation that a report be prepared that collects and describes the licensing issues (and their resolutions) that confront a new applicant requesting approval from the US Nuclear Regulatory Commission (NRC) for dry storage of spent fuel or for large-scale storage of consolidated spent fuel rods in pools. The issues are identified in comments, questions, and requests from the NRC during its review of applicants' submittals. Included in the report are discussions of (1) the 18 topical reports on cask and module designs for dry storage fuel that have been submitted to the NRC, (2) the three license applications for dry storage of spent fuel at independent spent fuel storage installations (ISFSIs) that have been submitted to the NRC, and (3) the three applications (one of which was later withdrawn) for large-scale storage of consolidated fuel rods in existing spent fuel storage pools at reactors that were submitted tot he NRC. For each of the applications submitted, examples of some of the issues (and suggestions for their resolutions) are described. The issues and their resolutions are also covered in detail in an example in each of the three subject areas: (1) the application for the CASTOR V/21 dry spent fuel storage cask, (2) the application for the ISFSI for dry storage of spent fuel at Surry, and (3) the application for full-scale wet storage of consolidated spent fuel at Millstone-2. The conclusions in the report include examples of major issues that applicants have encountered. Recommendations for future applicants to follow are listed. 401 refs., 26 tabs.

  3. Concept of Operations: Essence

    SciTech Connect

    Hutton, William J.

    2014-04-01

    This concept of operations is designed to give the reader a brief overview of the National Rural Electric Cooperative Association’s Essence project and a description of the Essence device design. The data collected by the device, how the data are used, and how the data are protected are also discussed in this document.

  4. LCLS Operating Schedule

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 103009 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S...

  5. Manually operated coded switch

    DOEpatents

    Barnette, Jon H.

    1978-01-01

    The disclosure relates to a manually operated recodable coded switch in which a code may be inserted, tried and used to actuate a lever controlling an external device. After attempting a code, the switch's code wheels must be returned to their zero positions before another try is made.

  6. Office of Business Operations

    Energy.gov [DOE]

    The Office of Business Operations manages financial and acquisition management programs throughout the Associate Under Secretary for the Office of Environment, Health, Safety and Security (AU), including the formulation and execution of the AU budget; funding control and accounting activities; preparation of management studies; and provision of acquisition management support.

  7. Protection Program Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2016-03-23

    The Order establishes requirements for the management and operation of the DOE Federal Protective Forces (FPF), Contractor Protective Forces (CPF), and the Physical Security of property and personnel under the cognizance of DOE. Supersedes DOE O 473.3. NOTE: Safeguards and Security Alarm Management and Control Systems, of DOE O 473.3, is retained as Attachment 3, Annex 1.

  8. Guiding drilling operations

    SciTech Connect

    Not Available

    1985-06-01

    Artificial intelligence (AI) was the overriding theme at this year's Offshore Technology Conference (OTC) exhibition and conference, with the emphasis more on drilling rather than production methods. A wide range of electronic aids to improve accuracy and speed in drilling operations - from calculators to computers - is described.

  9. Intelligent Potroom Operation

    SciTech Connect

    Jan Berkow; Larry Banta

    2003-07-29

    The Intelligent Potroom Operation project focuses on maximizing the performance of an aluminum smelter by innovating components for an intelligent manufacturing system. The Intelligent Potroom Advisor (IPA) monitors process data to identify reduction cells exhibiting behaviors that require immediate attention. It then advises operational personnel on those heuristic-based actions to bring the cell back to an optimal operating state in order to reduce the duration and frequency of substandard reduction cell performance referred to as ''Off-Peak Modes'' (OPMs). Techniques developed to identify cells exhibiting OPMs include the use of a finite element model-based cell state estimator for defining the cell's current operating state via advanced cell noise analyses. In addition, rule induction was also employed to identify statistically significant complex behaviors that occur prior to OPMs. The intelligent manufacturing system design, concepts and formalisms developed in this project w ere used as a basis for an intelligent manufacturing system design. Future research will incorporate an adaptive component to automate continuous process improvement, a technology platform with the potential to improve process performance in many of the other Industries of the Future applications as well.

  10. Electromagnetically Operated Counter

    DOEpatents

    Goldberg, H.D.; Goldberg, M.I.

    1951-12-18

    An electromagnetically operated counter wherein signals to be counted are applied to cause stepwise rotation of a rotatable element which is connected to a suitable register. The mechanism involved consists of a rotatable armature having three spaced cores of magnetic material and a pair of diametrically opposed electromagnets with a suitable pulsing circuit to actuate the magnets.

  11. Conduct of Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-06-29

    This Order defines the requirements for establishing and implementing Conduct of Operations Programs at Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facilities and projects. Cancels DOE O 5480.19. Admin Chg 1, dated 6-25-13, cancels DOE O 422.1. Certified 12-3-14.

  12. Operational Pause at Savannah River Site Benefits Safety Culture, Operations

    Energy.gov [DOE]

    AIKEN, S.C. – EM and the Savannah River Site (SRS) management and operations contractor are seeing positive impacts on safety culture as the site works to restore operations following last year’s operational pause.

  13. Guide for the preparation of applications for licenses for the use of radioactive materials in leak-testing services. Draft regulatory guide and value/impact statement

    SciTech Connect

    Not Available

    1985-06-01

    The purpose of this regulatory guide is to provide assistance to applicants and licensees in preparing applications for new licenses, license amendments, and license renewals. This guide describes the information the NRC staff needs to evaluate an application for a license for the use of radioactive material in performing certain commercial services for NRC or Agreement State licensees. The services covered by this guide are leak-testing sealed sources, analyzing leak-test samples, and supplying preregistered leak-test kits. This regulatory guide is intended to provide the applicant or licensee with information that will enable him to understand specific regulatory requirements and licensing policies as they apply to his services. The information in this guide is not a substitute for training in radiation safety. After the applicant is issued a license, he must conduct his program in accordance with (1) the statements, representations, and procedures contained in his application, (2) the terms and conditions of the license, and (3) the NRC's regulations. The information provided in the application should be clear, specific, and accurate.

  14. Operations building | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations building Operations building Chemical recycling columns in an operations building

  15. THERMALLY OPERATED VAPOR VALVE

    DOEpatents

    Dorward, J.G. Jr.

    1959-02-10

    A valve is presented for use in a calutron to supply and control the vapor to be ionized. The invention provides a means readily operable from the exterior of the vacuum tank of the apparatuss without mechanical transmission of forces for the quick and accurate control of the ionizing arc by a corresponding control of gas flow theretos thereby producing an effective way of carefully regulating the operation of the calutron. The invention consists essentially of a tube member extending into the charge bottle of a calutron devices having a poppet type valve closing the lower end of the tube. An electrical heating means is provided in the valve stem to thermally vary the length of the stem to regulate the valve opening to control the flow of material from the charge bottle.

  16. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    j;. ~.Department of Energy Richland Operations Office P.O. Box 550 ZATES~Richland, Washington 99352 July 29, 2010 Certified Mail Mr. Alec Osenbach Heart of America Northwest 1314 NE 56 1hStreet Suite 100 Seattle, Washington 98105 Dear Mr. Osenbach: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-01599) You requested, pursuant to the Freedom of Information Act (FOJA), the following information: 1 . Documents and records relating to the potential duration of storage for soil excavated since 2009

  17. San Francisco Operations Office

    Office of Legacy Management (LM)

    San Francisco Operations Office 1333 Broadway Oakland, California 94612 Dr. Joseph 0. Ward, Chief Radiological Health Section Department of Health Services 744 P Street Sacramento, California, 95814 SUBJECT: Certification Docket of Gilman Hall Dear Dr. Ward: The Department of Energy (DOE) has completed and reviewed the remedial ac- tions of Gilman Hall located at the University of California, Berkeley, California. Based on this review, DOE certifies that the condition of Gilman Hall is

  18. Transmission and Storage Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission and Storage Operations Natural Gas Infrastructure R&D and Methane Mitigation Workshop Mary Savalle, PMP, LSSGB Compression Reliability Engineer November 12, 2014 Agenda * DTE Gas Snapshot * NOx & CO - Combustion stability * Methane - Packing - Blowdowns * Capture vs Flare 2 SNAPSHOT * DTE Gas - 41 Units * Age Range: 8-59yrs (Average 45yrs) - 118,200HP * 1,000-15,000HP - 7 different manufacturers * Cooper-Bessemer, Solar, Waukesha, DeLaval, IR, CAT, Ariel - Complete Mixture *

  19. Fermilab | Tevatron | Tevatron Operation

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Tevatron Operation Fermilab's Accelerator Complex Fermilab's Accelerator Complex has 10 accelerators. The Tevatron, which shuts down on Sept. 30, is one of those accelerators. The Cockcroft Walton accelerates negative hydrogen ions to 740 kilo electron volts (KeV). The negative ions are then accelerated down the LINAC to 400 MeV. The particles enter the booster where the electrons are stripped off, leaving the protons. In the Booster, the protons are then accelerated to 8 GeV. Once the protons

  20. Operational health physics training

    SciTech Connect

    1992-06-01

    The initial four sections treat basic information concerning atomic structure and other useful physical quantities, natural radioactivity, the properties of {alpha}, {beta}, {gamma}, x rays and neutrons, and the concepts and units of radiation dosimetry (including SI units). Section 5 deals with biological effects and the risks associated with radiation exposure. Background radiation and man-made sources are discussed next. The basic recommendations of the ICRP concerning dose limitations: justification, optimization (ALARA concepts and applications) and dose limits are covered in Section seven. Section eight is an expanded version of shielding, and the internal dosimetry discussion has been extensively revised to reflect the concepts contained in the MIRD methodology and ICRP 30. The remaining sections discuss the operational health physics approach to monitoring radiation. Individual sections include radiation detection principles, instrument operation and counting statistics, health physics instruments and personnel monitoring devices. The last five sections deal with the nature of, operation principles of, health physics aspects of, and monitoring approaches to air sampling, reactors, nuclear safety, gloveboxes and hot cells, accelerators and x ray sources. Decontamination, waste disposal and transportation of radionuclides are added topics. Several appendices containing constants, symbols, selected mathematical topics, and the Chart of the Nuclides, and an index have been included.

  1. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    SciTech Connect

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a single operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.

  2. Richland Operations Office - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office Richland Operations Office Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size RL2016LogoVert DougShoop Welcome to the Richland Operations Office page! At the Richland office, our 235 employees work toward protecting the workers, public, and environment by further reducing risk, providing the necessary infrastructure for continued safe and effective cleanup operations, and restoring

  3. Richland Operations Office - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Richland Operations Office Richland Operations Office Richland Operations Office River Corridor Central Plateau Groundwater Mission Support Newsroom Richland Operations Office Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Forward UNITED STATES DEPARTMENT OF ENERGY Richland Operations Office RL2016LogoVert DougShoop Welcome to the Richland Operations Office page! At the Richland office, our 235 employees work toward protecting the workers, public, and

  4. Total Number of Operable Refineries

    Energy Information Administration (EIA) (indexed site)

    Data Series: Total Number of Operable Refineries Number of Operating Refineries Number of Idle Refineries Atmospheric Crude Oil Distillation Operable Capacity (B/CD) Atmospheric Crude Oil Distillation Operating Capacity (B/CD) Atmospheric Crude Oil Distillation Idle Capacity (B/CD) Atmospheric Crude Oil Distillation Operable Capacity (B/SD) Atmospheric Crude Oil Distillation Operating Capacity (B/SD) Atmospheric Crude Oil Distillation Idle Capacity (B/SD) Vacuum Distillation Downstream Charge

  5. License Amendment Request for Storing Exelon Sister Nuclear Stations Class B/C LLRW in the LaSalle Station Interim Radwaste Storage Facility - 13620

    SciTech Connect

    Azar, Miguel; Gardner, Donald A.; Taylor, Edward R.

    2013-07-01

    Exelon Nuclear (Exelon) designed and constructed an Interim Radwaste Storage Facility (IRSF) in the mid-1980's at LaSalle County Nuclear Station (LaSalle). The facility was designed to store low-level radioactive waste (LLRW) on an interim basis, i.e., up to five years. The primary reason for the IRSF was to offset lack of disposal in case existing disposal facilities, such as the Southeast Compact's Barnwell Disposal Facility in Barnwell, South Carolina, ceased accepting radioactive waste from utilities not in the Southeast Compact. Approximately ninety percent of the Radwaste projected to be stored in the LaSalle IRSF in that period of time was Class A, with the balance being Class B/C waste. On July 1, 2008 the Barnwell Disposal Facility in the Southeast Compact closed its doors to out of- compact Radwaste, which precluded LaSalle from shipping Class B/C Radwaste to an outside disposal facility. Class A waste generated by LaSalle is still able to be disposed at the 'Envirocare of Utah LLRW Disposal Complex' in Clive, Utah. Thus the need for utilizing the LaSalle IRSF for storing Class B/C Radwaste for an extended period, perhaps life-of-plant or more became apparent. Additionally, other Exelon Midwest nuclear stations located in Illinois that did not build an IRSF heretofore also needed extended Radwaste storage. In early 2009, Exelon made a decision to forward Radwaste from the Byron Nuclear Station (Byron), Braidwood Nuclear Station (Braidwood), and Clinton Nuclear Station (Clinton) to LaSalle's IRSF. As only Class B/C Radwaste would need to be forwarded to LaSalle, the original volumetric capacity of the LaSalle IRSF was capable of handling the small number of additional expected shipments annually from the Exelon sister nuclear stations in Illinois. Forwarding Class B/C Radwaste from the Exelon sister nuclear stations in Illinois to LaSalle would require an amendment to the LaSalle Station operating license. Exelon submitted the License Amendment Request

  6. Equipment Operational Requirements

    SciTech Connect

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  7. GMRES and integral operators

    SciTech Connect

    Kelley, C.T.; Xue, Z.Q.

    1994-12-31

    Many discretizations of integral equations and compact fixed point problems are collectively compact and strongly convergent in spaces of continuous functions. These properties not only lead to stable and convergent approximations but also can be used in the construction of fast multilevel algorithms. Recently the GMRES algorithm has become a standard coarse mesh solver. The purpose of this paper is to show how the special properties of integral operators and their approximations are reflected in the performance of the GMRES iteration and how these properties can be used to strengthen the norm in which convergence takes place. The authors illustrate these ideas with composite Gauss rules for integral equations on the unit interval.

  8. Rich land Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    TG Department of Energy Rich land Operations Office P.O. Box 550 AES Richland, Washington 99352 CERTIFIED MAIL NOV~ 2 10 2009 Mr. Gerald Pollet Heart of America Northwest 1314 N.E. 5 6 th Street Suite 100 Seattle, Washington 98105 Dear Mr. Pollet: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) The purpose of this letter is to inform you that we have withdrawn our response dated September 14, 2009, and have issued the following determination regarding item 8 of your request. In response to

  9. Rich land Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Rich land Operations Office P.O. Box 550 July 10, 2009 CERTIFIED MAIL Mr. Ryan Jarvis Heart of America Northwest 1314 N.E. 56h" Street Suite 100 Seattle, Washington 98105 Dear Mr. Jarvis: FREEDOM OF INFORMATION ACT REQUEST (FOI 2009-0054) Pursuant to the Freedom of Information Act (FOJA), you requested the following information as stated below: 1. "The RCRA permit (both Parts A and B) for the mixed waste disposal trenches 31 and 34 located in the 200 West area of Hanford, including,

  10. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    to) Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 r OV( 4 2009 CERTIFIED MAIL Mr. Bryan Evenson Thorner, Kennedy & Gano P.S. P.O. Box 1410 Yakima, Washington 98907-14 10 Dear Mr. Evenson: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-00208) Pursuant to the Freedom of Information Act, you requested two prints, a negative, and a high resolution digital scan of May 1943 aerial photographs L26-12 and L-26-3. In addition, you requested the photographs be

  11. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    :4Tsc1 ~Richland, Washington 99352 December 18, 2009 CERTIFIED MAIL Ms. Shannon Dininny The Associated Press P.O. Box 1349 Yakima, Washington 98901 Dear Ms. Dininny: FREEDOM OF INFORMATION ACT REQUEST (FOI 20 10-00644) Your Freedom of Information Act (FOIA) request dated December 2, 2009, addressed to the U.S. Department of Energy, Headquarters FOJA Office has been forwarded to this office for response as well as to the DOE Office of Environmental Management (EM), the Oak Ridge Operations Office

  12. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    c~t2 Richland Operations Office P.O. Box 550 ArES Richland, Washington 99352 July 7, 2010 Certified Mail Mr. Tom Carpenter Hanford Challenge 219 1 St Avenue South Suite 120 Seattle, Washington 98104 Dear Mr. Carpenter: FREEDOM OF INFORMATION ACT REQUEST (FOI 2010-015 17) You requested, pursuant to the Freedom of Information Act (FOIA), "any and all DOE Surveillance reports generated at or related to the Hanford Site since January 1, 2009, to the present, and any and all responses to such

  13. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 TL~ Rich land, Washington 99352 APR 0 22012 1 2-EMD-0057 Addressees - See Attached SUPPLEMENT TO DOE/RL-201 1-27, HANFORD SITE AIR OPERATING PERMIT (AOP) RENEWAL APPLICATION: COVERING THE PERIOD JANUARY 1, 2011, THROUGH DECEMBER 31, 2011 (DOE/RL-201 2-04, REV. 0) Enclosed is DOE/RL-20 12-04, Supplement to DOE/RL-20 11-27, "Hanford Site AOP Renewal Application: Covering the period January 1, 2011, through December 31, 2011." The AOP Renewal Application Supplement is being submitted in

  14. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ITEM 1 Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 15-PRO-0175 APR 3 0 205 Mr. J. A. Ciucci, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Ciucci: CONTRACT NO. DE-ACO6-08RL 14788 - FISCAL YEAR (FY) 2014 FINAL FEE DETERMINATION FOR PLATEAU REMEDIATION CONTRACT The purpose of this letter is to provide the final fee determination for the FY 2014 evaluation period. Pursuant to the

  15. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ATESORichland, Washington 99352 16-PRO-0061 DEC 17 2015 Ms. H. P. Mooers, President HPM Corporation 4304 West 2 4 th Aye, Suite 100 Kennewick, Washington 99338 Dear Ms. Mooers: CONTRACT NO. DE-EM0002043 - HPM CORPORATION (HPMC) FISCAL YEAR 2015 PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) FEE DETERMINATION The U.S. Department of Energy Richland Operation Office (RL) has completed its evaluation of I-PMC's performance for the period of October 1, 2014, through September 30, 2015. As the Fee

  16. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    otoM of 06735761 53 ~ Department of Energy Richland Operations Office P.O. Box 550 Richland, Washington 99352 05-AMRC-OO38 Distribution TRANSMITTAL OF COMMENT RESPONSE MATRIX FOR THE, "RlSK ASSESSMENT WORK PLAN FOR THE 100 AREA AND 300 AREA COMPONENT OF THE RCBRA" (DOE/RL-2004-37 DRAFT A) Thank you for your comments submitted on Draft A of the Risk Assessment Work Plan for the 100 Area and 300 Area Component of the RCBRA (DOE~2004-37, Draft A). Attached is the comment-response matrix

  17. Richland Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Department of Energy Richland Operations Office P.O. Box 550 &?ATES0~Richland, Washington 99352 10O-AMSE-0054 A PR I~ ~~ Mr. J. G. Lehew III, President and Chief Executive Officer CH2M HILL Plateau Remediation Company Richland, Washington 99352 Dear Mr. Lehew: CONTRACT NO. DE-AC06-08RL14788 - DE MINIMIS CHANGES TO THE HANFORD ANALYTICAL SERVICES QUALITY ASSURANCE REQUIREMENTS DOCUMENT (HASQARD) Compliance with the HASQARD, DOE/RL-96-68, is required by your Contract (Attachment J.2, List B:

  18. Operations | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations November 2016 « Prev Next » Event Type - Any - Audit/Review Holiday Lab Wide Retirement Speaker/Demo Training Visitors Apply Sun Mon Tue Wed Thu Fri Sat 30 31 1 2 3 4 5 6 7 8 9 10 11 12 4th Japan-US Bilateral Meeting on Rare Metals Spedding A/B 8:00am to 5:00pm General Employee Training (AL-001) 140 TASF 9:00am Spill Prevention, Control & Countermeasures (AL-218) 140 TASF 10:00am Sprains & Strains Prevention (AL-183) 140 TASF 2:00pm Aerial Lift Training (AL-179) 140 TASF

  19. Oak Ridge Operations.

    Office of Legacy Management (LM)

    4s - 22 Department of Energy Oak Ridge Operations. S~I9J>liB~~ ~P.O. Box 2001 Oak Ridge. Tennessee 37831-8723 October 21, 1994 Mr. Charles A. Duritsa Regional Director Pennsylvania Department of Environmental Resources 400 Waterfront Drive Pittsburgh, Pennsylvania 15222-4745 Dear Mr. Duritsa: FUSRAP PENNSYLVANIA SITES - LETTER OF APPRECIATION I would like to express my appreciation for the assistance Jim Yusko, Hark Russell, Dennis Angelo, Steve Hepler, and Roy Woods provided to the

  20. Idaho Operations Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    31,2010 Rod Wetsch 420 County Road 26 Beulah, ND 58523 SUBJECT: FOIA Response (10-035) (ID-2010-01986-F) (OM-PA-I0-061) Dear Mr. Wetsch: This is in final response from the Idaho Operations Office (DOE-ID), regarding your June 2, 2010, Freedom of Information Act Request. In that e-mail you requested documents relating to: "vulnerabilities of running desktop applications (Word, Excel, and PowerPoint) on the same platform as the process control systems applications." The administrator for

  1. Evaluating the Probabilistic Land-Use Scenarios in the Radiological Dose Assessment for License Termination

    SciTech Connect

    Chen, S.Y.; Yu, C.; Kamboj, S.; Allison, T.; LePoire, D.; Mo, T.

    2006-07-01

    A recent trend in establishing regulatory policy regarding environmental cleanup has been the adoption of a risk-informed decision approach. This approach places an emphasis on the development of a defensible technical basis upon which cleanup decisions can be understood and accepted by stakeholders. The process has been exemplified by the U.S. Nuclear Regulatory Commission's (NRC's) approach to implement its License Termination Rule in Title 10, Part 20, Subpart E of the Code of Federal Regulations (10 CFR 20, Subpart E), for which probabilistic radiological dose assessment has been a key technical element for demonstrating compliance. Further guidance including NUREG-1757 and its supplemental document are also prepared for this purpose. The approach also entails extensive data collection to cover the range of parameter variability, along with interpretations of the probabilistic dose results and demonstration of compliance. One major remaining issue, however, involves the future use of the land following cleanup. Land use is a key factor that may profoundly influence dose assessment, which in turn will affect the level of cleanup and therefore the associated costs. Despite this, incorporation of land-use considerations into the current probabilistic dose assessment approach has not actually been performed in the regulatory process. In order to address the issue, a study was initiated to evaluate the potential influence of land use on dose analysis, to understand the possible ramifications in cleanup decision-making. A probabilistic distribution based on land use was developed as input into the probabilistic RESRAD analysis for the demonstration of this approach.. This results in an understanding of the characteristics of dose distributions as exhibited by various land-use scenarios. By factoring in the probability distribution of land-use scenarios, the potential 'levels of conservatism' can be explicitly defined and evaluated. The results allow the

  2. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    SciTech Connect

    Zeitoun, A.

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  3. A solid oxide fuel cell power system: 1992--1993 field operation

    SciTech Connect

    Veyo, S.E.; Kusunoki, A.; Takeuchi, S.; Kaneko, S.; Yokoyama, H.

    1994-05-01

    Westinghouse has deployed fully integrated, automatically controlled, packaged solid oxide fuel cell (SOFC) power generation systems in order to obtain useful customer feedback. Recently, Westinghouse has deployed 20 kW class natural gas fueled SOFC generator modules integrated into two 25 kW SOFC systems, the first with The UTILITIES, a Japanese consortium. The UTILITIES 25 kW SOFC system is the focus of this paper. The unit was shipped to the Rokko Island Test Center for Advanced Energy Systems (near Kobe, Japan) operated by Kansai Electric Power Co.; testing was initiated February 1992. Module A operated for 2601 hours at an ave output 16.6 kW dc; final shutdown was induced by current stability problems with dissipator (restart not possible because of damaged cells). Module B operated for 1579 hours at ave output 17.8 kWdc. The unit was damaged by operation at excessively high fuel utilization > 91%. It was rebuilt and returned to Rokko Island. This module B2 operated for 1843 hours on PNG; shutdown was cuased by air supply failure. After a new blower and motor were installed July 1993, the system was restarted August 5, 1993 and operated continuously until November 10, 1993, when an automatic shutdown was induced as part of a MITI licensing inspection. After restart, the unit passed 6000 hours of operation on desulfurized PNG on January 25, 1994. Westinghouse`s future plans are outlined.

  4. U.S. Nuclear Power Plant Operating Cost and Experience Summaries

    SciTech Connect

    Reid, RL

    2003-09-18

    The ''U.S. Nuclear Power Plant Operating Cost and Experience Summaries'' (NUREG/CR-6577, Supp. 2) report has been prepared to provide historical operating cost and experience information on U.S. commercial nuclear power plants during 2000-2001. Costs incurred after initial construction are characterized as annual production costs, which represent fuel and plant operating and maintenance expenses, and capital expenditures related to facility additions/modifications, which are included in the plant capital asset base. As discussed in the report, annual data for these two cost categories were obtained from publicly available reports and must be accepted as having different degrees of accuracy and completeness. Treatment of inconclusive and incomplete data is discussed. As an aid to understanding the fluctuations in the cost histories, operations summaries for each nuclear unit are provided. The intent of these summaries is to identify important operating events; refueling, major maintenance, and other significant outages; operating milestones; and significant licensing or enforcement actions. Information used in the summaries is condensed from operating reports submitted by the licensees, the Nuclear Regulatory Commission (NRC) database for enforcement actions, and outage reports.

  5. TOKOPS: Tokamak Reactor Operations Study: The influence of reactor operations on the design and performance of tokamaks with solid-breeder blankets: Final report

    SciTech Connect

    Conn, R.W.; Ghoniem, N.M.; Firestone, M.A.

    1986-09-01

    Reactor system operation and procedures have a profound impact on the conception and design of power plants. These issues are studied here using a model tokamak system employing a solid-breeder blanket. The model blanket is one which has evolved from the STARFIRE and BCSS studies. The reactor parameters are similar to those characterizing near-term fusion engineering reactors such as INTOR or NET (Next European Tokamak). Plasma startup, burn analysis, and methods for operation at various levels of output power are studied. A critical, and complicating, element is found to be the self-consistent electromagnetic response of the system, including the presence of the blanket and the resulting forces and loadings. Fractional power operation, and the strategy for burn control, is found to vary depending on the scaling law for energy confinement, and an extensive study is reported. Full-power reactor operation is at a neutron wall loading pf 5 MW/m/sup 2/ and a surface heat flux of 1 MW/m/sup 2/. The blanket is a pressurized steel module with bare beryllium rods and low-activation HT-9-(9-C-) clad LiAlO/sub 2/ rods. The helium coolant pressure is 5 MPa, entering the module at 297/sup 0/C and exiting at 550/sup 0/C. The system power output is rated at 1000 MW(e). In this report, we present our findings on various operational scenarios and their impact on system design. We first start with the salient aspects of operational physics. Time-dependent analyses of the blanket and balance of plant are then presented. Separate abstracts are included for each chapter.

  6. QUARTERLY NUCLEAR POWER DEPLOYMENT SUMMARY JULY 2015

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 Updates available at: www.energy.gov/ne NEXT UPDATE - October 2015 Page 1 News Updates  DTE Energy has received a license to build and operate an ESBWR light water reactor at its Fermi site in Newport, Michigan; the company has not committed to building a new plant, but is retaining the option for long-term planning purposes.  The Nuclear Regulatory Commission has voted to grant the Director of Nuclear Reactor Regulation authority to issue a full power operating license to Tennessee

  7. Plant Operational Status - Pantex Plant

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Plant Operational Status Plant Operational Status Page Content Shift 1 - Day The Pantex Plant is open for normal Day Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 2 - Swing The Pantex Plant is open for normal Swing Shift operations. Plant personnel are to report as assigned. Personnel may call 477-3000, Option 1 for additional details. Shift 3 - Grave The Pantex Plant is open for normal Graveyard Shift operations.

  8. Business Operations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Business Operations The Office of Business Operations is the central organization for all Office of Energy Efficiency and Renewable Energy (EERE) organizational products and services, processes, and systems. The four main offices and managers of Business Operations - the Project Management Coordination Office, the Information Technology and Services Office, Workforce Management Office and the Golden Field Office - are outlined in the Business Operations organization chart. Offices

  9. Step 5: Operations and Maintenance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Process Step 5: Project Operations and Maintenance Project Development Process 1 Potential 5 Operations & Maintenance 3 Refinement 2 Options 4 Implementation 2 1/28/2016 2 Presentation Agenda * Step 5: Project Operations and Maintenance (O&M) * Post-procurement activities * Drivers * Technology examples * Activity 3 Potential Options Refinement Implementation Operations & Maintenance Step 5: Operations & Maintenance 4 Photo by Warren Getz, NREL 00180 Purpose: Conduct or ensure

  10. A review of the new ISC-PRIME model and implications for power plant licensing in Maryland

    SciTech Connect

    Gill, S.; Garrison, M.; Sherwell, J.

    1999-07-01

    The Maryland Department of Natural Resources (DNR) Power Plant Research Program (PPRP) manages the consolidated review of environmental, engineering, socioeconomic, cost, and need issues that new and modified power plants in Maryland must address as part of the power plant licensing process. Power plant licensing cases in Maryland have included the addition or replacement of small diesel or combustion turbine electrical generation units, or the addition of new, larger simple-cycle combustion turbine units. Air quality modeling, including an assessment of the effects of building downwash, is often a part of the licensing process. The Electric Power Research Institute (EPRI) has sponsored the development of an improved building downwash model through its PRIME (Plume Rise Model Enhancements) project, involving the design and development of algorithms intended to address deficiencies in the widely used ISCST3. EPA recently provided a version of ISC that incorporates the PRIME model (ISC-PRIME) for review and comment by the public prior to deciding on the suitability and regulatory status of ISC-PRIME. The present paper focuses on a systematic evaluation of ISC-PRIME as it relates to short stacks with exhaust characteristics similar to diesel generators and combustion turbines, using both routine hourly meteorology and synthesized meteorological data covering a wide variety of stability and wind speed combinations. The goals of the paper are two-fold: first, to understand and explain the implications of this new model for power plant licensing decisions in the State of Maryland; and second, to broaden the experience base of the potential ISC-PRIME user community with information on model performance details that are not otherwise readily available.

  11. EnergySolution's Clive Disposal Facility Operational Research Model - 13475

    SciTech Connect

    Nissley, Paul; Berry, Joanne

    2013-07-01

    EnergySolutions owns and operates a licensed, commercial low-level radioactive waste disposal facility located in Clive, Utah. The Clive site receives low-level radioactive waste from various locations within the United States via bulk truck, containerised truck, enclosed truck, bulk rail-cars, rail boxcars, and rail inter-modals. Waste packages are unloaded, characterized, processed, and disposed of at the Clive site. Examples of low-level radioactive waste arriving at Clive include, but are not limited to, contaminated soil/debris, spent nuclear power plant components, and medical waste. Generators of low-level radioactive waste typically include nuclear power plants, hospitals, national laboratories, and various United States government operated waste sites. Over the past few years, poor economic conditions have significantly reduced the number of shipments to Clive. With less revenue coming in from processing shipments, Clive needed to keep its expenses down if it was going to maintain past levels of profitability. The Operational Research group of EnergySolutions were asked to develop a simulation model to help identify any improvement opportunities that would increase overall operating efficiency and reduce costs at the Clive Facility. The Clive operations research model simulates the receipt, movement, and processing requirements of shipments arriving at the facility. The model includes shipment schedules, processing times of various waste types, labor requirements, shift schedules, and site equipment availability. The Clive operations research model has been developed using the WITNESS{sup TM} process simulation software, which is developed by the Lanner Group. The major goals of this project were to: - identify processing bottlenecks that could reduce the turnaround time from shipment arrival to disposal; - evaluate the use (or idle time) of labor and equipment; - project future operational requirements under different forecasted scenarios. By identifying

  12. SCALE: A modular code system for performing standardized computer analyses for licensing evaluation

    SciTech Connect

    1997-03-01

    This Manual represents Revision 5 of the user documentation for the modular code system referred to as SCALE. The history of the SCALE code system dates back to 1969 when the current Computational Physics and Engineering Division at Oak Ridge National Laboratory (ORNL) began providing the transportation package certification staff at the U.S. Atomic Energy Commission with computational support in the use of the new KENO code for performing criticality safety assessments with the statistical Monte Carlo method. From 1969 to 1976 the certification staff relied on the ORNL staff to assist them in the correct use of codes and data for criticality, shielding, and heat transfer analyses of transportation packages. However, the certification staff learned that, with only occasional use of the codes, it was difficult to become proficient in performing the calculations often needed for an independent safety review. Thus, shortly after the move of the certification staff to the U.S. Nuclear Regulatory Commission (NRC), the NRC staff proposed the development of an easy-to-use analysis system that provided the technical capabilities of the individual modules with which they were familiar. With this proposal, the concept of the Standardized Computer Analyses for Licensing Evaluation (SCALE) code system was born. This manual covers an array of modules written for the SCALE package, consisting of drivers, system libraries, cross section and materials properties libraries, input/output routines, storage modules, and help files.

  13. REMOTELY OPERATED MANIPULATOR

    DOEpatents

    Hutto, E.L.

    1961-08-15

    A manipulator is described for performing, within an entirely enclosed cell containling radioactive materials, various mechanical operations. A rod with flexible fingers is encompassed by a tubular sleeve shorter than the rod. Relative movement between the rod and sleeve causes the fingers to open and close. This relative movement is effected by relative movement of permanent magnets in magnetic coupling relation to magnetic followers affixed to the ends of the rod and sleeve. The rod and its sleeve may be moved as a unit axially or may be rotated by means of the magnetic couplings. The manipulator is enclosed within a tubular member which is flexibly sealed to an opening in the cell. (AEC)

  14. RHIC Polarized proton operation

    SciTech Connect

    Huang, H.; Ahrens, L.; Alekseev, I.G.; Aschenauer, E.; Atoian, G.; Bai, M.; Bazilevsky, A.; Blaskiewicz, M.; Brennan, J.M.; Brown, K.A.; Bruno, D.; Connolly, R.; Dion, A.; D'Ottavio, T.; Drees, K.A.; Fischer, W.; Gardner, C.; Glenn, J.W.; Gu, X.; Harvey, M.; Hayes, T.; Hoff, L.; Hulsart, R.L.; Laster, J.; Liu, C.; Luo, Y.; MacKay, W.W.; Makdisi, Y.; Marr, G.J.; Marusic, A.; Meot, F.; Mernick, K.; Michnoff, R,; Minty, M.; Montag, C.; Morris, J.; Nemesure, S.; Poblaguev, A.; Ptitsyn, V.; Ranjibar, V.; Robert-Demolaize, G.; Roser, T.; J.; Severino, F.; Schmidke, B.; Schoefer, V.; Severino, F.; Smirnov, D.; Smith, K.; Steski, D.; Svirida, D.; Tepikian, S.; Trbojevic, D.; Tsoupas, N.; Tuozzolo, J. Wang, G.; Wilinski, M.; Yip, K.; Zaltsman, A.; Zelenski, A.; Zeno, K.; Zhang, S.Y.

    2011-03-28

    The Relativistic Heavy Ion Collider (RHIC) operation as the polarized proton collider presents unique challenges since both luminosity(L) and spin polarization(P) are important. With longitudinally polarized beams at the experiments, the figure of merit is LP{sup 4}. A lot of upgrades and modifications have been made since last polarized proton operation. A 9 MHz rf system is installed to improve longitudinal match at injection and to increase luminosity. The beam dump was upgraded to increase bunch intensity. A vertical survey of RHIC was performed before the run to get better magnet alignment. The orbit control is also improved this year. Additional efforts are put in to improve source polarization and AGS polarization transfer efficiency. To preserve polarization on the ramp, a new working point is chosen such that the vertical tune is near a third order resonance. The overview of the changes and the operation results are presented in this paper. Siberian snakes are essential tools to preserve polarization when accelerating polarized beams to higher energy. At the same time, the higher order resonances still can cause polarization loss. As seen in RHIC, the betatron tune has to be carefully set and maintained on the ramp and during the store to avoid polarization loss. In addition, the orbit control is also critical to preserve polarization. The higher polarization during this run comes from several improvements over last run. First we have a much better orbit on the ramp. The orbit feedback brings down the vertical rms orbit error to 0.1mm, much better than the 0.5mm last run. With correct BPM offset and vertical realignment, this rms orbit error is indeed small. Second, the jump quads in the AGS improved input polarization for RHIC. Third, the vertical tune was pushed further away from 7/10 snake resonance. The tune feedback maintained the tune at the desired value through the ramp. To calibrate the analyzing power of RHIC polarimeters at any energy above

  15. FRMAC Operations Manual

    SciTech Connect

    Frandsen, K.

    2010-05-01

    In the event of a major radiological incident, the Federal Radiological Monitoring and Assessment Center (FRMAC) will coordinate the federal agencies that have various statutory responsibilities. The FRMAC is responsible for coordinating all environmental radiological monitoring, sampling, and assessment activities for the response. This manual describes the FRMAC’s response activities in a radiological incident. It also outlines how FRMAC fits in the National Incident Management System (NIMS) under the National Response Framework (NRF) and describes the federal assets and subsequent operational activities which provide federal radiological monitoring and assessment of the affected areas. In the event of a potential or existing major radiological incident, the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) is responsible for establishing and managing the FRMAC during the initial phases.

  16. Motor-operated gearbox efficiency

    SciTech Connect

    DeWall, K.G.; Watkins, J.C.; Bramwell, D.; Weidenhamer, G.H.

    1996-12-01

    Researchers at the Idaho National Engineering Laboratory recently conducted tests investigating the operating efficiency of the power train (gearbox) in motor-operators typically used in nuclear power plants to power motor-operated valves. Actual efficiency ratios were determined from in-line measurements of electric motor torque (input to the operator gearbox) and valve stem torque (output from the gearbox) while the operators were subjected to gradually increasing loads until the electric motor stalled. The testing included parametric studies under reduced voltage and elevated temperature conditions. As part of the analysis of the results, the authors compared efficiency values determined from testing to the values published by the operator manufacturer and typically used by the industry in calculations for estimating motor-operator capabilities. The operators they tested under load ran at efficiencies lower than the running efficiency (typically 50%) published by the operator manufacturer.

  17. Web Operational Status Boards

    SciTech Connect

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information?support the timely sharing of information?with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharing methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB?s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any new

  18. Web Operational Status Boards

    Energy Science and Technology Software Center

    2004-04-16

    Web Operational Status Boards (WebOSB)is a web-based application designed to acquire, display, and update highly dynamic status information between multiple users and jurisdictions. WebOSB is able to disseminate real-time status information—support the timely sharing of information—with constant, dynamic updates via personal computers and the Internet between emergency operations centers (EOCs), incident command centers, and to users outside the EOC who need to know the information (hospitals, shelters, schools). The WebOSB application far exceeds outdated information-sharingmore » methods used by emergency workers: whiteboards, Word and Excel documents, or even locality-specific Web sites. WebOSB’s capabilities include the following elements: - Secure access. Multiple users can access information on WebOSB from any personal computer with Internet access and a secure ID. Privileges are use to control access and distribution of status information and to identify users who are authorized to add or edit information. - Simultaneous update. WebOSB provides options for users to add, display, and update dynamic information simultaneously at all locations involved in the emergency management effort, A single status board can be updated from multiple locations enabling shelters and hospitals to post bed availability or list decontamination capability. - On-the-fly modification. Allowing the definition of an existing status board to be modified on-the-fly can be an asset during an emergency, where information requirements can change quickly. The status board designer feature allows an administrator to quickly define, modi,, add to, and implement new status boards in minutes without needing the help of Web designers and computer programmers. - Publisher/subscriber notification. As a subscriber, each user automatically receives notification of any new information relating to specific status boards. The publisher/subscriber feature automatically notified each user of any

  19. LCLS Operating Schedule

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LCLS Operating Schedule August - December 2009 Ver: 2 10/30/09 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M 0000-0800 MD MD MD MD MD 0800-1600 ROD MD AMO ROD MD AMO 1600-2400 MD MD Commissioning MD MD Comm. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 T W Th F S Su M T W Th F S Su M T W Th F S Su M T W Th F S Su M T W 0000-0800 MD MD MD MD MD MD MD MD

  20. The Bender-Dunne basis operators as Hilbert space operators

    SciTech Connect

    Bunao, Joseph; Galapon, Eric A. E-mail: eric.galapon@upd.edu.ph

    2014-02-15

    The Bender-Dunne basis operators, T{sub ?m,n}=2{sup ?n}?{sub k=0}{sup n}(n/k )q{sup k}p{sup ?m}q{sup n?k} where q and p are the position and momentum operators, respectively, are formal integral operators in position representation in the entire real line R for positive integers n and m. We show, by explicit construction of a dense domain, that the operators T{sub ?m,n}'s are densely defined operators in the Hilbert space L{sup 2}(R)

  1. DOE Corporate Operating Experience Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-04-08

    The Order institutes a DOE wide program for the management of operating experience to prevent adverse operating incidents and facilitate the sharing of good work practices among DOE sites. Supersedes DOE O 210.2.

  2. State Energy Program Operations Manual

    Energy.gov [DOE]

    The State Energy Program Operations Manual is a reference tool for the SEP network states and program officials within DOE.

  3. ARM - ARM Operations Quarterly Reports

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Quarterly Reports Publications Journal Articles Conference Documents Program Documents Technical Reports Publications Database Public Information Materials Image Library...

  4. Jefferson Lab Chief Operating Officer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    COO Privacy and Security Notice Skip over navigation Search the JLab Site Chief Operating Officer Please upgrade your browser. This site's design is only visible in a graphical browser that supports web standards, but its content is accessible to any browser. Concerns? Group Navigation COO Home Lab Contracts print version Mike Maier Chief Operating Officer mmaier@jlab.org, ext. 7538 Chief Operating Officer (COO) The Chief Operating Officer is responsible for the business functions of Jefferson

  5. PNNL Electricity Infrastructure Operations Center | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Electricity Infrastructure Operations Center Jump to: navigation, search Logo: Electricity Infrastructure Operations Center Name Electricity Infrastructure Operations Center...

  6. Operating Reserves and Variable Generation

    SciTech Connect

    Ela, E.; Milligan, M.; Kirby, B.

    2011-08-01

    This report tries to first generalize the requirements of the power system as it relates to the needs of operating reserves. It also includes a survey of operating reserves and how they are managed internationally in system operations today and then how new studies and research are proposing they may be managed in the future with higher penetrations of variable generation.

  7. Assessment of the US regulations for fissile exemptions and fissile material general licenses

    SciTech Connect

    Parks, C.V.; Hopper, C.M.; Lichtenwalter, J.J. [Oak Ridge National Lab., TN (United States); Easton, E.P.; Brochman, P.G. [NRC, Washington, DC (United States)

    1997-05-01

    The paragraphs for general licenses for fissile material and exemptions (often termed exceptions in the international community) for fissile material have long been a part of the US Code of Federal Regulations (CFR) 10 CFR Part 71, Packaging and Transportation of Radioactive Material. More recently, the Nuclear Regulatory Commission (NRC) issued a final rule on Part 71 via emergency rule-making procedures in order to address an identified deficiency related to one of the fissile exemptions. To address the specified deficiency in a general fashion, the emergency rule adopted the approach of the 1996 Edition of the IAEA: Regulations for the Safe Transport of Radioactive Material (IAEA 1996), which places restrictions on certain moderating materials and limits the quantity of fissile material in a consignment. The public comments received by the NRC indicated general agreement with the need for restrictions on certain moderators (beryllium, deuterium, and graphite). The comments indicated concern relative to both the degree of restriction imposed (not more than 0.1% of fissile material mass) and the need to limit the fissile material mass of the consignment, particularly in light of the subsequent NRC staff position that the true intent was to provide control for limiting the fissile mass of the conveyance. The purpose of the review is to identify potential deficiencies that might be adverse to maintaining adequate subcriticality under normal conditions of transport and hypothetical accident conditions. In addition, ORNL has been asked to identify changes that would address any identified safety issues, enable inherently safe packages to continue to be unencumbered in transport, and seek to minimize the impact on current safe practices.

  8. Implementing comprehensive de-licensing process for the West Jefferson North Facility

    SciTech Connect

    Anderson, Keith

    2007-07-01

    Available in abstract form only. Full text of publication follows: Implementation of the comprehensive de-licensing process for the West Jefferson North (WJN) facility was documented through the Final Certification of Completion. The Final Certification of Completion summarizes the performance and results of the final status surveys of the affected and unaffected areas of the West Jefferson North (WJN) site as part of the completion of the Columbus Closure Project (CCP). Final status survey processes adhered to the requirements of the 'Radiological Characterization and Final Status Plan for Battelle Columbus Laboratories Decommissioning Project, West Jefferson Site' DD-97-02, Rev. 0 (hereinafter DD-97-02), as reflecting the requirements of draft NUREG 5849. Surveys were performed throughout the decommissioning and remediation activities performed at the WJN and documented in Final Status Survey Reports (FSSR). Throughout the project, the CCP activity engaged the oversight of the US Department of Energy (DOE), the Battelle Memorial Institute (BMI), and the Environmental Survey and Site Assessment Program (ESSAP) of the Oak Ridge Institute for Science and Education (ORISE). The ESSAP of the ORISE fulfilled the Independent Verification Contractor (IVC) role for the CCP under contract to the Oak Ridge Office of the DOE. The US Nuclear Regulatory Commission (NRC) also performed independent review of the in-process final status surveys. The FSSR, in conjunction with the IVC Letter Reports and the NRC inspection reports, document that the endpoint criteria objectives of the NRC-approved Decommissioning Plan have been met for WJN site as covered by the CCP. (author)

  9. Coiled tubing; Operations and services

    SciTech Connect

    Welch, J.L.; Stephens, R.K. )

    1992-09-01

    This paper reports on coiled tubing units which are used for many types of remedial well operations, including sand plugbacks, cement squeezes, fill cleanouts, underreaming, acid stimulations, and fishing. Fishing operations include removal of inflatable bridge plugs, lock mandrels stuck in profile nipples, coiled tubing, coiled tubing bottomhole assemblies (BHAs) and wireline. Recommended guidelines for selecting candidates, proper tool string configuration and operational techniques are presented here to assist coiled tubing supervisors and company representatives in the planning and implementation of efficient and effective fishing operations. Treatment of these areas are not intended to be exhaustive, but rather generally representative of common applications. Each fishing operation requires individualized analysis and planning.

  10. Operations & Maintenance Best Practices Guide: Chapter 3

    Energy.gov [DOE]

    Guide describes chapter 3 of the Operations & Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Operations Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations Team Operations Team Ebony Vauss Headshot Ebony-Vauss.jpg Ebony Vauss is the operations supervisor for the Solar Energy Technologies Office, a position that she has held since March 2014. Prior to joining SETO, Ebony served as a lead budget analyst managing the Weatherization and Intergovernmental Programs portfolio. Ebony began her federal service in 1999 in the Office of Science and went on to manage the Office of Science's internship and fellowship programs within the Office of

  12. Operating Innovative Networks Workshop Series

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operating Innovative Networks Workshop Series Science Engagement Move your data Programs & Workshops CrossConnects Workshop Series Operating Innovative Networks Workshop Series Enlighten Your Research Global Program Science Requirements Reviews Case Studies Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net Operating Innovative

  13. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    07, 2013 DOE-ID Operations Summary For the Period July 8, 2013 through July 28, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  14. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2013 DOE-ID Operations Summary For the Period July 29, 2013 through August 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709. Advanced

  15. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10, 2013 DOE-ID Operations Summary For the Period August 12, 2013 through August 26, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  16. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5, 2013 DOE-ID Operations Summary For the Period August 26, 2013 through September 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  17. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8, 2013 DOE-ID Operations Summary For the Period September 30, 2013 through October 31, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  18. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2014 DOE-ID Operations Summary For the Period November 01, 2013 through November 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  19. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    27, 2014 DOE-ID Operations Summary For the Period December 01, 2013 through January 15, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle Miller, (208) 526-5709.

  20. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, 2015 Updated on April 28, 2015 DOE-ID Operations Summary For the Period September 30, 2014 through November 1, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC -Danielle

  1. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period January 1, 2015 - January 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  2. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6, 2015 DOE-ID Operations Summary For the Period February 1, 2015 - February 28, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  3. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3, 2015 DOE-ID Operations Summary For the Period March 1, 2015 -March 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  4. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2015 DOE-ID Operations Summary For the Period April 1, 2015 - April 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information about health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  5. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4, 2015 DOE-ID Operations Summary For the Period May 1, 2015 - May 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  6. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    25, 2015 DOE-ID Operations Summary For the Period June 1, 2015 - June 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced

  7. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 2, 2015 DOE-ID Operations Summary For the Period September 1, 2015 - September 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  8. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7, 2015 DOE-ID Operations Summary For the Period August 1, 2015 - August 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709.

  9. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    February 11, 2016 DOE-ID Operations Summary For the Period November 1, 2015 - November 30, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208)

  10. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 1, 2015 -December 31, 2015 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Idaho Operations Office (DOE-ID) December 17: The

  11. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    31, 2016 DOE-ID Operations Summary For the Period April 1-April 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  12. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1, 2016 DOE-ID Operations Summary For the Period March 1-March 31, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed

  13. Vice President, Transmission System Operations

    Energy.gov [DOE]

    The VP for Transmission System Operations provides strategic leadership, direction, and oversight of the people, business processes, and systems that are responsible for the safe, reliable, and...

  14. Project Analysis Standard Operating Procedure

    Office of Environmental Management (EM)

    Standard Operating Procedure (EPASOP) Issued by Office of Acquisition and Project Management MA-63 March 12, 2014 DEPARTMENT OF ENERGY Office of Acquisition and Project...

  15. Sustainability in Real Estate Operations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Convention Center * Phoenix, Arizona Sustainability in Real Estate Operations Sustainability Sustainability Planning Eleni Reed GSA Public Buildings Service August 11, 2015 ...

  16. SPECTR System Operational Test Report

    SciTech Connect

    W.H. Landman Jr.

    2011-08-01

    This report overviews installation of the Small Pressure Cycling Test Rig (SPECTR) and documents the system operational testing performed to demonstrate that it meets the requirements for operations. The system operational testing involved operation of the furnace system to the design conditions and demonstration of the test article gas supply system using a simulated test article. The furnace and test article systems were demonstrated to meet the design requirements for the Next Generation Nuclear Plant. Therefore, the system is deemed acceptable and is ready for actual test article testing.

  17. Operations Division at Berkeley Lab

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    deliver exceptional operational services in support of the scientific mission of Berkeley Lab. Vision Berkeley Lab will be the best place in the world to conduct scientific...

  18. Jefferson Lab Chief Operating Officer

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    COO Privacy and Security Notice Skip over navigation Search the JLab Site Chief Operating Officer Please upgrade your browser. This site's design is only visible in a graphical ...

  19. State Energy Program Operations Manual

    Energy.gov [DOE] (indexed site)

    ENERGY PROGRAM Operations Manual (This page intentionally left blank) Introduction 3 Table ... Table of Contents, Using the Manual, Terms, Acronyms Chapter 1: State Energy Program ...

  20. Energy San Francisco Operations Office

    Office of Legacy Management (LM)

    Depariment of ' Energy San Francisco Operations Office 1333 Broadway Oakland, California 94612 FEB 6 1984 Mr. c:c. canners Energy Systems Group Rockwell International Corporation ...

  1. Analysis and evaluation of operational data. Annual report, 1996

    SciTech Connect

    1997-12-01

    The United States Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) has published reports of its activities since 1984. The first report covered January through June of 1984, and the second report covered July through December of 1984. After those first two semiannual reports, AEOD published annual reports of its activities from 1985 through 1993. Beginning with report for 1986, AEOD Annual Reports have been published as NUREG-1272. Beginning with the report for 1987, NUREG-1272 has been published in two parts, No. 1 covering power reactors and No. 2 covering nonreactors (changed to `nuclear materials` with the 1993 report). AEOD changed its annual report from a calendar year (CY) to a fiscal year report, and added part No. 3 covering technical training, beginning with the combined Annual Report for CY 1994 and fiscal year 1995, NUREG-1272, Vol. 9, Nos. 1-3. This report, NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns associated with the use of licensed material in applications other than power reactores. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the fiscal year 1996 operating experience of the nuclear power industry from the NRC perspective. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission. Throughout these reports, whenever information is presented for a calendar year, it is so designated. Fiscal year information is designated by the four digits of the fiscal year.

  2. Office of Emergency Operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Office of Emergency Operations

  3. DOE Corporate Operating Experience Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2006-06-12

    The Order establishes a DOE wide program for management of operating experience to prevent adverse operating incidents and to expand the sharing of good work practices among DOE sites. Canceled by DOE O 210.2A. Does not cancel other directives.

  4. Field Operations Program Chevrolet S-10 (Lead-Acid) Accelerated Reliability Testing - Final Report

    SciTech Connect

    J. Francfort; J. Argueta; M. Wehrey; D. Karner; L. Tyree

    1999-07-01

    This report summarizes the Accelerated Reliability testing of five lead-acid battery-equipped Chevrolet S-10 electric vehicles by the US Department of Energy's Field Operations Program and the Program's testing partners, Electric Transportation Applications (ETA) and Southern California Edison (SCE). ETA and SCE operated the S-10s with the goal of placing 25,000 miles on each vehicle within 1 year, providing an accelerated life-cycle analysis. The testing was performed according to established and published test procedures. The S-10s' average ranges were highest during summer months; changes in ambient temperature from night to day and from season-to-season impacted range by as much as 10 miles. Drivers also noted that excessive use of power during acceleration also had a dramatic effect on vehicle range. The spirited performance of the S-10s created a great temptation to inexperienced electric vehicle drivers to ''have a good time'' and to fully utilize the S-10's acceleration capability. The price of injudicious use of power is greatly reduced range and a long-term reduction in battery life. The range using full-power accelerations followed by rapid deceleration in city driving has been 20 miles or less.

  5. Modal Analysis for Grid Operation

    Energy Science and Technology Software Center

    2011-03-03

    MANGO software is to provide a solution for improving small signal stability of power systems through adjusting operator-controllable variables using PMU measurement. System oscillation problems are one of the major threats to the grid stability and reliability in California and the Western Interconnection. These problems result in power fluctuations, lower grid operation efficiency, and may even lead to large-scale grid breakup and outages. This MANGO software aims to solve this problem by automatically generating recommendedmore » operation procedures termed Modal Analysis for Grid Operation (MANGO) to improve damping of inter-area oscillation modes. The MANGO procedure includes three steps: recognizing small signal stability problems, implementing operating point adjustment using modal sensitivity, and evaluating the effectiveness of the adjustment. The MANGO software package is designed to help implement the MANGO procedure.« less

  6. Integrated Operation Scenarios ITPA Topical Group Meeting | Princeton...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    at PPPL, adult visitors must show a government-issued photo I.D. - for example, a passport or a driver's license. Non-U.S. citizens must show a government-issued photo I.D.,...

  7. United States Nuclear Regulatory Commission staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972-September 1985. Digest No. 4, Revision No. 1

    SciTech Connect

    Not Available

    1986-04-01

    This Revision 1 of the fourth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to September 30, 1985 interpreting the NRC's Rules of Practice in 10 CFR Part 2. This Revision 1 replaces earlier editions and supplements and includes appropriate changes reflecting the admendments to the Rules of Practice effective through September 20, 1985.

  8. United States Nuclear Regulatory Commission Staff practice and procedure digest. Commission, Appeal Board and Licensing Board decisions, July 1972--December 1990

    SciTech Connect

    Not Available

    1991-12-01

    This sixth edition of the NRC Staff Practice and Procedure Digest contains a digest of a number of Commission, Atomic Safety and Licensing Appeal Board, and Atomic Safety and Licensing Board decisions issued during the period from July 1, 1972 to December 31, 1990 interpreting the NRC`s Rules of Practice in 10 CFR Part 2. This sixth edition replaces in part earlier editions and revisions and includes appropriate changes reflecting the amendments to the Rules of Practice effective through December 31, 1990.

  9. Transportation System Concept of Operations

    SciTech Connect

    N. Slater-Thompson

    2006-08-16

    The Nuclear Waste Policy Act of 1982 (NWPA), as amended, authorized the DOE to develop and manage a Federal system for the disposal of SNF and HLW. OCRWM was created to manage acceptance and disposal of SNF and HLW in a manner that protects public health, safety, and the environment; enhances national and energy security; and merits public confidence. This responsibility includes managing the transportation of SNF and HLW from origin sites to the Repository for disposal. The Transportation System Concept of Operations is the core high-level OCRWM document written to describe the Transportation System integrated design and present the vision, mission, and goals for Transportation System operations. By defining the functions, processes, and critical interfaces of this system early in the system development phase, programmatic risks are minimized, system costs are contained, and system operations are better managed, safer, and more secure. This document also facilitates discussions and understanding among parties responsible for the design, development, and operation of the Transportation System. Such understanding is important for the timely development of system requirements and identification of system interfaces. Information provided in the Transportation System Concept of Operations includes: the functions and key components of the Transportation System; system component interactions; flows of information within the system; the general operating sequences; and the internal and external factors affecting transportation operations. The Transportation System Concept of Operations reflects OCRWM's overall waste management system policies and mission objectives, and as such provides a description of the preferred state of system operation. The description of general Transportation System operating functions in the Transportation System Concept of Operations is the first step in the OCRWM systems engineering process, establishing the starting point for the lower level

  10. DOE - NNSA/NFO -- Operation Clean Desert

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ZONE > Operation Clean Desert NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Operation Clean Desert FUN FOR ALL AGES Dr. Proton Graphic Adam - Smiling Operation ...

  11. Independent Oversight Review, Richland Operations Office - November...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Richland Operations Office - November 2012 Independent Oversight Review, Richland Operations Office - November 2012 November 2012 Review of the Richland Operations Office Oversight...

  12. Operational Awareness Records and Activity Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operational Awareness Records and Activity Reports Operational Awareness Records and Activity Reports December 10, 2015 Enterprise Assessments Operational Awareness Record for the...

  13. Coiled tubing; Operations and services

    SciTech Connect

    Sas-Jaworsky, A. II )

    1991-12-01

    This article outlines the minimum safety requirements that should be considered for onshore and offshore oil well service operations with coiled tubing equipment. These guidelines comply with Minerals Management Service (MMS) regulations issued on May 31, 1988, for offshore work. Where specific MMS regulations are sited, the regulation reference, Incident of Non-Compliance (INC), number is provided. These guidelines can be used by operators and contractors, and although U.S. offshore operations are emphasized, they are applicable wherever coiled tubing services are used.

  14. Operational Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operational Management Operational Management Operational Management Leadership Contact Information Office of Resource Management and Planning U.S. Department of Energy, MA-1.1 1000 Independence Ave., SW Washington, DC 20585 Marilyn L. Dillon Director marilyn.dillon@hq.doe.gov 202-586-4919 Sustainability Performance Office U.S. Department of Energy, MA-20 1000 Independence Ave., SW Washington, DC 20585 John Shonder Director john.shonder@hq.doe.gov 202-586-8645 Office of Aviation Management U.S.

  15. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    June 5, 2013 DOE-ID Operations Summary For the Period May 16, through May 30, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  16. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    24, 2013 DOE-ID Operations Summary For the Period May 30, 2013 through June 12, 2013 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory, managed by DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC - Shannon Brennan, DOE-ID, (208) 526-3993.

  17. Standard format and content for the health and safety sections of License Renewal Applications for uranium processing and fuel fabrication. Draft regulatory guide and value/impact statement. Revision 1

    SciTech Connect

    Not Available

    1985-07-01

    This regulatory guide, ''Standard Format and Content for the Health and Safety Sections of License Renewal Applications for Uranium Processing and Fuel Fabrication'' (herein referred to as the Standard Format), has been prepared to provide more specific guidance for the preparation of the health and safety sections of license renewal applications. The Environmental Report is submitted as a separate document. The renewal application for the health and safety sections of the license consists of two major parts. The first part contains the proposed license conditions stating the performance requirements to which the applicant proposes to commit. The second part contains detailed safety information and descriptive information demonstrating the applicant's adherence to the conditions of the first part. This Standard Format is designed to separate the requirements in Part I (license conditions) from the descriptive information in Part II (demonstration and performance record).

  18. DIII-D research operations

    SciTech Connect

    Baker, D.

    1993-05-01

    This report discusses the research on the following topics: DIII-D program overview; divertor and boundary research program; advanced tokamak studies; tokamak physics; operations; program development; support services; contribution to ITER physics R D; and collaborative efforts.

  19. LCLS Operations Schedule January February...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Operations Schedule January February March April May June July August September October November December 2009 Run 1 Oct. 1-Dec. 17 2010 Run 2 Run 3 May 6 - Sep. 13 Oct. 7 - Dec....

  20. WIPP Activates Emergency Operations Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    August 5, 2015 WIPP Activates Emergency Operations Center At approximately 7:00 p.m. MDT on Tuesday, August 4, the Waste Isolation Pilot Plant (WIPP) activated the Emergency...

  1. Midcontinent Independent System Operator, Inc.

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Midcontinent Independent System Operator, Inc. 317.249-5400 www.misoenergy.org PO Box 4202 ... Inc. 317.249-5400 www.misoenergy.org PO Box 4202 Carmel, Indiana 46037 2985 Ames ...

  2. An operational subsea wireline system

    SciTech Connect

    Dines, C.; Cowan, P.; Headworth, C.

    1989-02-01

    This paper describes an operational subsea wireline system that is self-contained and flexible and offers a safe, economical, and proven method for riserless re-entry into any subsea well.

  3. Lease Operations Environmental Guidance Document

    SciTech Connect

    Bureau of Land Management

    2001-02-14

    This report contains discussions in nine different areas as follows: (1) Good Lease Operating Practices; (2) Site Assessment and Sampling; (3) Spills/Accidents; (4) Containment and Disposal of Produced Waters; (5) Restoration of Hydrocarbon Impacted Soils; (6) Restoration of Salt Impacted Soils; (7) Pit Closures; (8) Identification, Removal and Disposal of Naturally Occurring Radioactive Materials (NORM); and (9) Site Closure and Construction Methods for Abandonment Wells/Locations. This report is primary directed towards the operation of oil and gas producing wells.

  4. Operation Periods: Single Column Model

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2 Fall 2002 Intensive Operation Periods: Single Column Model and Unmanned Aerospace Vehicle In an Intensive Operation Period (IOP) on November 3-23, 2002, researchers at the SGP CART site are collecting a detailed data set for use in improving the Single Column Model (SCM), a scaled- down climate model. The SCM represents one vertical column of air above Earth's surface and requires less computation time than a full-scale global climate model. Researchers first use the SCM to efficiently improve

  5. Conduct of operations implementation plan

    SciTech Connect

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  6. Reactor operation safety information document

    SciTech Connect

    Not Available

    1990-01-01

    The report contains a reactor facility description which includes K, P, and L reactor sites, structures, operating systems, engineered safety systems, support systems, and process and effluent monitoring systems; an accident analysis section which includes cooling system anomalies, radioactive materials releases, and anticipated transients without scram; a summary of onsite doses from design basis accidents; severe accident analysis (reactor core disruption); a description of operating contractor organization and emergency planning; and a summary of reactor safety evolution. (MB)

  7. operations | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    operations NNSA Achieves Major Milestone in BUILDER Implementation WASHINGTON, D.C. - The Department of Energy's National Nuclear Security Administration (DOE/NNSA) achieved a major milestone in improving the management of the Nuclear Security Enterprise's infrastructure through the successful migration of all current information on building... Infrastructure and Operations NNSA's missions require a secure production and laboratory infrastructure meeting immediate and long term needs. The

  8. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    November 1, 2014 - November 30, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  9. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    December 1, 2014 - December 31, 2014 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  10. DOE-ID Operations Summary

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    January 1, 2016 -February 29, 2016 EDITOR'S NOTE: The following is a summary of contractor operations at the Idaho National Laboratory Site, managed by the DOE- Idaho Operations Office. It has been compiled in response to a request from stakeholders for more information on health, safety and environmental incidents at DOE facilities in Idaho. It also includes a brief summary of accomplishments at the Site. POC: Danielle Miller, (208) 526-5709. Advanced Mixed Waste Treatment Project (AMWTP)

  11. Review of a license application for construction of a repository for spent

    Office of Environmental Management (EM)

    Residential Buildings » Home Energy Score » Home Energy Score Publications » Review of Selected Home Energy Auditing Tools Review of Selected Home Energy Auditing Tools This study reviews widely used energy audit tools that are used to evaluate home improvements and to maximize its operational and energy efficiency. auditing_tool_review.pdf (7.35 MB) More Documents & Publications Analysis Methods and Tools Standing Technical Committee Strategic Plan Challenges and Opportunities To Achieve

  12. AUDIT REPORT The Department of Energy's Small Modular Reactor Licensing Technical Support Program

    Energy Saver

    of Contractor Intergovernmental Personnel Act Assignments DOE/IG-0928 November 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 12, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Follow-Up Audit of Contractor Intergovernmental Personnel Act Assignments" BACKGROUND The Department of Energy maintains 16 contractor-operated

  13. External Independent Review (EIR) Standard Operating Procedure...

    Energy.gov [DOE] (indexed site)

    External Independent Review (EIR) Standard Operating Procedure (SOP) - September 2010 More Documents & Publications External Independent Review (EIR) Standard Operating Procedure...

  14. Operations & Maintenance Best Practices Guide: Chapter 6

    Energy.gov [DOE]

    Guide describes chapter 6 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  15. PNNL Electricity Infrastructure Operations Center | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    PNNL Electricity Infrastructure Operations Center (Redirected from Electricity Infrastructure Operations Center) Jump to: navigation, search Logo: Electricity Infrastructure...

  16. Operations & Maintenance Best Practices Guide: Chapter 9

    Energy.gov [DOE]

    Guide describes chapter 9 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  17. Enterprise Assessments Operational Awareness Record, Waste Treatment...

    Office of Environmental Management (EM)

    Enterprise Assessments Operational Awareness Record, Waste Treatment and Immobilization Plant - March 2015 March 2015 Enterprise Assessments Operational Awareness Record, Waste ...

  18. Management and Operating Contractors' Subcontract Audit Coverage...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management and Operating Contractors' Subcontract Audit Coverage DOEIG-0885 April 2013 ... INFORMATION: Special Report on "Management and Operating Contractors' Subcontract ...

  19. Operations & Maintenance Best Practices Guide: Appendix a

    Energy.gov [DOE]

    Guide describes Appendix A of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  20. Operations & Maintenance Best Practices Guide: Front Matter

    Energy.gov [DOE]

    Guide describes the front matter of the Operations and Maintenance Best Practices: a Guide to Achieving Operational Efficiency.

  1. Operations & Maintenance Best Practices Guide: Appendix d

    Energy.gov [DOE]

    Guide describes Appendix D of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  2. Operations & Maintenance Best Practices Guide: Chapter 2

    Energy.gov [DOE]

    Guide describes chapter 2 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  3. Operations & Maintenance Best Practices Guide: Chapter 1

    Energy.gov [DOE]

    Guide describes chapter 1 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  4. Operations & Maintenance Best Practices Guide: Chapter 5

    Energy.gov [DOE]

    Guide describes chapter 5 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  5. Operations & Maintenance Best Practices Guide: Chapter 8

    Energy.gov [DOE]

    Guide describes chapter 8 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  6. Operations & Maintenance Best Practices Guide: Chapter 7

    Energy.gov [DOE]

    Guide describes chapter 7 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  7. Operations & Maintenance Best Practices Guide: Chapter 10

    Energy.gov [DOE]

    Guide describes chapter 10 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  8. Operations & Maintenance Best Practices Guide: Appendix c

    Energy.gov [DOE]

    Guide describes Appendix C of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  9. Operations & Maintenance Best Practices Guide: Appendix B

    Energy.gov [DOE]

    Guide describes Appendix B of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  10. Operations & Maintenance Best Practices Guide: Chapter 11

    Energy.gov [DOE]

    Guide describes chapter 11 of the Operations and Maintenance Best Practices: A Guide to Achieving Operational Efficiency.

  11. Defense waste processing facility radioactive operations. Part 1 - operating experience

    SciTech Connect

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-12-31

    The Savannah River Site`s Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation`s first and the world`s largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge{trademark} level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs.

  12. Issues in the review of a license application for an above grade low-level radioactive waste disposal facility

    SciTech Connect

    Ringenberg, J.D.

    1993-03-01

    In December 1987, Nebraska was selected by the Central Interstate Compact (CIC) Commission as the host state for the construction of a low-level radioactive waste disposal facility. After spending a year in the site screening process, the Compact`s developer, US Ecology, selected three sites for detailed site characterization. These sites were located in Nemaha, Nuckolls and Boyd Counties. One year later the Boyd County site was selected as the preferred site and additional site characterization studies were undertaken. On July 29, 1990, US Ecology submitted a license application to the Nebraska Department of Environmental Control (now Department of Environmental Quality-NDEQ). This paper will present issues that the NDEQ has dealt with since Nebraska`s selection as the host state for the CIC facility.

  13. Coiled tubing; Operations and services

    SciTech Connect

    Welch, J.L. ); Whitlow, R.R. )

    1992-07-01

    This paper reports that pulling tubing to clean out a production liner at Prudhoe Bay Unit Western Operating Area (PBU WOA) averages $600,000 to $800,000. Coiled tubing underreaming was developed to accomplish this objective at lower costs. Beginning in 1988, these operations have been improved through several generations of procedures and tool designs. Using current technology, the underreamer, in conjunction with coiled tubing, can reduce the cost of drilling out to a liner to about $50,000 or $100,000, depending on the amount and type of material to be removed. PBU WOA, operated by BP Exploration, produces about 600,000 bopd from 395 wells. Another 61 wells are used to inject produced water, seawater and miscible fluids. Most of the remedial well servicing operations are conducted using coiled tubing (CT). Three contract coiled tubing units (CTUs) work daily, performing wellbore cleanouts, stimulations, inflatable bridge plug installations and cement squeeze operations. About 42 underreaming jobs were performed from 1990 to 1991 at PBU WOA for an average cost of between $75,000 and $100,000, a cost savings of $500,000 power well compared to pulling tubing and cleaning out the wells conventionally.

  14. Safety Evaluation Report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391). Supplement No. 12

    SciTech Connect

    Tam, P.S.

    1993-10-01

    Supplement No. 12 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County, Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation of (1) additional information submitted by the applicant since Supplement No. 11 was issued, and (2) matters that the staff had under review when Supplement No. 11 was issued.

  15. Safety evaluation report related to the operation of Watts Bar Nuclear Plant, Units 1 and 2 (Docket Nos. 50-390 and 50-391): Supplement No. 19

    SciTech Connect

    1995-11-01

    Supplement No. 19 to the Safety Evaluation Report for the application filed by the Tennessee Valley Authority for license to operate Watts Bar Nuclear Plant, Units 1 and 2, Docket Nos. 50-390 and 50-391, located in Rhea County Tennessee, has been prepared by the Office of Nuclear Reactor Regulation of the Nuclear Regulatory Commission. The purpose of this supplement is to update the Safety Evaluation with (1) additional information submitted by the applicant since Supplement No. 18 was issued, and (2) matters that the staff had under review when Supplement No. 18 was issued.

  16. Surveillance dosimetry of operating power plants

    SciTech Connect

    McElroy, W.N.; Davis, A.I.; Gold, R.

    1981-10-16

    The main focus of the research efforts presently underway is the LWR power reactor surveillance program in which metallurgical test specimens of the reactor PV and dosimetry sensors are placed in three or more surveillance capsules at or near the reactor PV inner wall. They are then irradiated in a temperature and neutron flux-spectrum environment as similar as possible to the PV itself for periods of about 1.5 to 15 effective full-power years (EFPY), with removal of the last capsule at a fluence corresponding to the 30- to 40-year plant end-of-life (EOL) fluence. Because the neutron flux level at the surveillance position is greater than at the vessel, the test is accelerated wit respect to the vessel exposure, allowing early assessment of EOL conditions.

  17. Performing a local barrier operation

    DOEpatents

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value of the counter, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  18. Performing a local barrier operation

    DOEpatents

    Archer, Charles J; Blocksome, Michael A; Ratterman, Joseph D; Smith, Brian E

    2014-03-04

    Performing a local barrier operation with parallel tasks executing on a compute node including, for each task: retrieving a present value of a counter; calculating, in dependence upon the present value of the counter and a total number of tasks performing the local barrier operation, a base value of the counter, the base value representing the counter's value prior to any task joining the local barrier; calculating, in dependence upon the base value and the total number of tasks performing the local barrier operation, a target value, the target value representing the counter's value when all tasks have joined the local barrier; joining the local barrier, including atomically incrementing the value of the counter; and repetitively, until the present value of the counter is no less than the target value of the counter: retrieving the present value of the counter and determining whether the present value equals the target value.

  19. Electrochemical cell operation and system

    DOEpatents

    Maru, Hansraj C.

    1980-03-11

    Thermal control in fuel cell operation is affected through sensible heat of process gas by providing common input manifolding of the cell gas flow passage in communication with the cell electrolyte and an additional gas flow passage which is isolated from the cell electrolyte and in thermal communication with a heat-generating surface of the cell. Flow level in the cell gas flow passage is selected based on desired output electrical energy and flow level in the additional gas flow passage is selected in accordance with desired cell operating temperature.

  20. Turnaround team revitalizes mining operations

    SciTech Connect

    Buchsbaum, L.

    2005-11-01

    Starting from scratch, the Broe Companies' Century Coal trains the next generation. The article describes how the newly created Century Coal LLC, controlled by Denver-based Broe Companies investment firm, is rebuilding and expanding its highwall mining operations, increasing production from a current 1 million tons to 5 to 6 million tons in 2006 and 2007. The company has a $100,000 outreach program with 95% of these funds going to local communities. Present coal mining operations are spread around Bell, Clay, Harlan Knox and Leslie Counties. A priority is the renovation of the WenLar preparation plant in Bell County. 5 photos.

  1. Site Environmental Report for calendar year 1998, DOE operations at Rocketdyne Propulsion and Power

    SciTech Connect

    Rutherford, P.D.

    1999-09-22

    This Annual Site Environmental Report for 1998 describes the environmental conditions related to work performed for the Department of Energy (DOE) at Area IV of the Rocketdyne Santa Susana Field Laboratory (SSFL) and De Soto facilities. In the past, these operations included development, fabrication, and disassembly of nuclear reactors, reactor fuel, and other radioactive materials, under the Atomics International (AI) Division. Other activities included the operation of large-scale liquid metal facilities for testing of liquid metal fast breeder components at the Energy Technology Engineering Center (ETEC), a government-owned company-operated, test facility within Area IV. AI was merged into Rocketdyne in 1984 and many of the AI functions were transferred to existing Rocketdyne departments. All nuclear work was terminated in 1988, and subsequently, all radiological work has been directed toward decontamination and decommissioning (D and D) of the previously used nuclear facilities and associated site areas. Large-scale D and D activities of the sodium test facilities began in 1996. Results of the radiological monitoring program for the calendar year of 1998 continue to indicate that there are no significant releases of radioactive material from Rocketdyne sites. All potential exposure pathways are sampled and/or monitored, including air, soil, surface water, groundwater, and direct radiation. All radioactive wastes are processed for disposal at DOE disposal sites and other sites approved by DOE and licensed for radioactive waste. Liquid radioactive wastes are not released into the environment and do not constitute an exposure pathway.

  2. Office for Analysis and Evaluation of Operational Data 1996 annual report. Volume 10, Number 1: Reactors

    SciTech Connect

    1997-12-01

    This annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) describes activities conducted during 1996. The report is published in three parts. NUREG-1272, Vol. 10, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports and reports to the NRC`s Operations Center. NUREG-1272, Vol. 10, No. 2, covers nuclear materials and presents a review of the events and concerns during 1996 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued from CY 1980 through 1996. NUREG-1272, Vol. 10, No. 3, covers technical training and presents the activities of the Technical Training Center in support of the NRC`s mission in 1996.

  3. Office for Analysis and Evaluation of Operational Data. 1992 annual report: Nonreactors: Volume 7, No. 2

    SciTech Connect

    Not Available

    1993-10-01

    The annual report of the US Nuclear Regulatory Commission`s Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1992. The report is published in two separate parts. NUREG-1272, Vol. 7, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC`s Operations Center. NUREG-1272, Vol. 7, No. 2, covers nonreactors and presents a review of the events and concerns during 1992 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. Both reports also contain a discussion of the Incident Investigation Team program and summarize both the Incident Investigation Team and Augmented Inspection Team reports. Each volume contains a list of the AEOD reports issued for 1981--1992.

  4. Online Condition Monitoring to Enable Extended Operation of Nuclear Power Plants

    SciTech Connect

    Meyer, Ryan M.; Bond, Leonard J.; Ramuhalli, Pradeep

    2012-03-31

    Safe, secure, and economic operation of nuclear power plants will remain of strategic significance. New and improved monitoring will likely have increased significance in the post-Fukushima world. Prior to Fukushima, many activities were already underway globally to facilitate operation of nuclear power plants beyond their initial licensing periods. Decisions to shut down a nuclear power plant are mostly driven by economic considerations. Online condition monitoring is a means to improve both the safety and economics of extending the operating lifetimes of nuclear power plants, enabling adoption of proactive aging management. With regard to active components (e.g., pumps, valves, motors, etc.), significant experience in other industries has been leveraged to build the science base to support adoption for online condition-based maintenance and proactive aging management in the nuclear industry. Many of the research needs are associated with enabling proactive management of aging in passive components (e.g., pipes, vessels, cables, containment structures, etc.). This paper provides an overview of online condition monitoring for the nuclear power industry with an emphasis on passive components. Following the overview, several technology/knowledge gaps are identified, which require addressing to facilitate widespread online condition monitoring of passive components.

  5. Office for Analysis and Evaluation of Operational Data 1990 annual report

    SciTech Connect

    1991-07-01

    The annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1990. The report is published in two separate parts. This document NUREG-1272, Vol. 5, No. 1, covers power reactors and presents an overview of the operating experience of the nuclear power industry from the NRC perspective, including comments about the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year and summarizes information from such sources as licensee event reports, diagnostic evaluations, and reports to the NRC's Operations Center. NUREG-1272, Vol.5, No. 2, covers nonreactors and presents a review of the events and concerns during 1990 associated with the use of licensed material in nonreactor applications, such as personnel overexposures and medical misadministrations. The reports contain a discussion of the Incident Investigation Team program and summarize the Incident Investigation Team and Augmented Inspection Team reports for that group of licensees. Each volume contains a list of the AEOD reports issued for 1980 through 1990. 9 figs., 8 tabs.

  6. Auditing of Programs and Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-03-22

    To set forth audit responsibilities for the promotion of economy and efficiency in the administration of, or the prevention or detection of fraud, waste, and abuse in, programs and operations of the Department of Energy (DOE). Cancels DOE 2321.1B. Canceled by DOE O 224.2A.

  7. Risk assessment in international operations

    SciTech Connect

    Stricklin, Daniela L.

    2008-11-15

    During international peace-keeping missions, a diverse number of non-battle hazards may be encountered, which range from heavily polluted areas, endemic disease, toxic industrial materials, local violence, traffic, and even psychological factors. Hence, elevated risk levels from a variety of sources are encountered during deployments. With the emphasis within the Swedish military moving from national defense towards prioritization of international missions in atypical environments, the risk of health consequences, including long term health effects, has received greater consideration. The Swedish military is interested in designing an optimal approach for assessment of health threats during deployments. The Medical Intelligence group at FOI CBRN Security and Defence in Umea has, on request from and in collaboration with the Swedish Armed Forces, reviewed a variety of international health threat and risk assessment models for military operations. Application of risk assessment methods used in different phases of military operations will be reviewed. An overview of different international approaches used in operational risk management (ORM) will be presented as well as a discussion of the specific needs and constraints for health risk assessment in military operations. This work highlights the specific challenges of risk assessment that are unique to the deployment setting such as the assessment of exposures to a variety of diverse hazards concurrently.

  8. Transparent communications permit unmanned operations

    SciTech Connect

    1995-07-01

    Not-normally-manned platforms are not a new development. However, their use in harsher environments has until recently, been limited. Development of reliable communications networks capable of handling the large amounts of data required for process control in real time with distributed control systems (DCSs) has been a key factor in making the concept viable for harsher, more remote environments. The article below examines the transparent communications network and DCS installed on Pickerill field, offshore UK, by Fisher-Rosemount Systems and its operational parameters. Pickerill field, some 50 mi off the Lincolnshire coast, comprises two small unmanned platforms producing gas under remote control from Arco`s operations base at Great Yarmouth about 60 mi south. Reliable communication is required both with the two platforms offshore and with Conoco`s gas processing operators at Theddlethorpe. Fundamental to project success was the ability of the process control system to provide entirely secure and transparent communication with equipment offshore and thus enable operators at Great Yarmouth to interact with the process as if it were local to their control center.

  9. Coiled tubing operations and services

    SciTech Connect

    Jaworsky, A.S. II )

    1991-11-01

    Coiled tubing offers many advantages over conventional jointed tubing used for drilling in oil fields, including time savings, pumping flexibility, fluid placement, reduced formation damage and safety. The article gives an overview of coiled tubing history and development. Operating concepts are explained, along with descriptions of the major equipment and components associated with coiled tubing use in the oil field today.

  10. Signal and Image Processing Operations

    Energy Science and Technology Software Center

    1995-05-10

    VIEW is a software system for processing arbitrary multidimensional signals. It provides facilities for numerical operations, signal displays, and signal databasing. The major emphasis of the system is on the processing of time-sequences and multidimensional images. The system is designed to be both portable and extensible. It runs currently on UNIX systems, primarily SUN workstations.

  11. Emergency Operating Records Protection Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1991-10-23

    To establish the policy, responsibilities, and requirements for a Departmental Emergency Operating Records Protection Program to safeguard that core or records deemed necessary to assure continuity of essential Governmental activities during and following disaster and attack-related emergency conditions. Cancels DOE 5500.7A. Chanceled by DOE O 151.1 of 9-25-1995.

  12. COE1 Calorimeter Operations Manual

    SciTech Connect

    Santi, Peter Angelo

    2015-12-15

    The purpose of this manual is to describe the operations of the COE1 calorimeter which is used to measure the thermal power generated by the radioactive decay of plutonium-bearing materials for the purposes of assaying the amount of plutonium within the material.

  13. Safety of Nuclear Explosive Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-08-07

    This directive establishes responsibilities and requirements to ensure the safety of routine and planned nuclear explosive operations and associated activities and facilities. Cancels DOE O 452.2A and DOE G 452.2A-1A. Canceled by DOE O 452.2C.

  14. Auditing of Programs and Operations

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2007-11-09

    To set forth audit requirements and responsibilities for the promotion of economy and efficiency in the administration of or the prevention or detection of fraud, waste, and abuse in programs and operations of the Department of Energy. Supersedes DOE O 224.2.

  15. Richland Operations Office technology summary

    SciTech Connect

    Not Available

    1994-05-01

    This document has been prepared by the Department of Energy`s Environmental Management Office of Technology Development to highlight its research, development, demonstration, testing, and evaluation activities funded through the Richland Operations Office. Technologies and processes described have the potential to enhance cleanup and waste management efforts.

  16. LANL continuity of operations plan

    SciTech Connect

    Senutovitch, Diane M

    2010-12-22

    The Los Alamos National Laboratory (LANL) is a premier national security research institution, delivering scientific and engineering solutions for the nation's most crucial and complex problems. Our primary responsibility is to ensure the safety, security, and reliability of the nation's nuclear stockpile. LANL emphasizes worker safety, effective operational safeguards and security, and environmental stewardship, outstanding science remains the foundation of work at the Laboratory. In addition to supporting the Laboratory's core national security mission, our work advances bioscience, chemistry, computer science, earth and environmental sciences, materials science, and physics disciplines. To accomplish LANL's mission, we must ensure that the Laboratory EFs continue to be performed during a continuity event, including localized acts of nature, accidents, technological or attack-related emergencies, and pandemic or epidemic events. The LANL Continuity of Operations (COOP) Plan documents the overall LANL COOP Program and provides the operational framework to implement continuity policies, requirements, and responsibilities at LANL, as required by DOE 0 150.1, Continuity Programs, May 2008. LANL must maintain its ability to perform the nation's PMEFs, which are: (1) maintain the safety and security of nuclear materials in the DOE Complex at fixed sites and in transit; (2) respond to a nuclear incident, both domestically and internationally, caused by terrorist activity, natural disaster, or accident, including mobilizing the resources to support these efforts; and (3) support the nation's energy infrastructure. This plan supports Continuity of Operations for Los Alamos National Laboratory (LANL). This plan issues LANL policy as directed by the DOE 0 150.1, Continuity Programs, and provides direction for the orderly continuation of LANL EFs for 30 days of closure or 60 days for a pandemic/epidemic event. Initiation of COOP operations may be required to support an

  17. Threatened and Endangered Species Evaluation for Operating Commercial Nuclear Power Generating Plants

    SciTech Connect

    Sackschewsky, Michael R.

    2004-01-15

    The Endangered Species Act (ESA) of 1973 requires that federal agencies ensure that any action authorized, funded, or carried out under their jurisdiction is not likely to jeopardize the continued existence of any threatened or endangered (T&E) species or result in the destruction or adverse modification of critical habitats for such species. The issuance and maintenance of a federal license, such as a construction permit or operating license issued by the U.S. Nuclear Regulatory Commission (NRC) for a commercial nuclear power generating facility is a federal action under the jurisdiction of a federal agency, and is therefore subject to the provisions of the ESA. The Office of Nuclear Reactor Regulation (NRR) staff have performed appropriate assessments of potential impacts to threatened or endangered species, and consulted with appropriate agencies with regard to protection of such species in authorizing the construction, operation, and relicensing of nuclear power generating facilities. However, the assessments and consultations concerning many facilities were performed during the 1970's or early 1980's, and have not been re-evaluated in detail or updated since those initial evaluations. A review of potential Endangered Species Act issues at licensed nuclear power facilities was completed in 1997. In that review 484 different ESA-listed species were identified as potentially occurring near one or more of the 75 facility sites that were examined. An update of the previous T&E species evaluation at this time is desired because, during the intervening 6 years: nearly 200 species have been added to the ESA list, critical habitats have been designated for many of the listed species, and significantly more information is available online, allowing for more efficient high-level evaluations of potential species presence near sites and the potential operation impacts. The updated evaluation included searching the NRC's ADAMS database to find any documents related to T

  18. Emergency Operations Training Academy | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration Emergency Operations Training Academy Emergency Operations Training Academy The Office of Emergency Operations, NA-40-The Emergency Operations Training Academy (EOTA) EOTA provides training and education to enhance the readiness of personnel in the radiological-nuclear emergency operations community. For more information or to contact us, visit the EOTA website at

  19. DETERMINATION OF THE QUANTITY OF I-135 RELEASED FROM THE AGR-1 TEST FUELS AT THE END OF ATR OPERATING CYCLE 138B

    SciTech Connect

    J. K. Hartwell; D. M. Scates; J. B. Walter; M. W. Drigert

    2007-05-01

    The AGR-1 experiment is a multiple fueled-capsule irradiation experiment being conducted in the Advanced Test Reactor (ATR) in support of the Advanced Gas Reactor (AGR) Fuel Development and Qualification Program. The experiment began irradiation in the ATR with a cycle that reached full power on December 26, 2006 and ended with shutdown of the reactor for a brief outage on February 10, 2007 at 0900. The AGR-1 experiment will continue cyclical irradiation for about 2.5 years. In order to allow estimation of the amount of radioiodine released during the first cycle, purge gas flow to all capsules continued for about 4 days after reactor shutdown. The FPMS data acquired during part of that shutdown flow period has been analyzed to elucidate the level of 135I released during the operating cycle.

  20. Fermilab SRF cryomodule operational experience

    SciTech Connect

    Martinez, A.; Klebaner, A.L.; Theilacker, J.C.; DeGraff, B.D.; White, M.; Johnson, G.S.; /Fermilab

    2011-06-01

    Fermi National Accelerator Laboratory is constructing an Advanced Accelerator Research and Development facility at New Muon Lab. The cryogenic infrastructure in support of the initial phase of the facility consists of two Tevatron style standalone refrigerators, cryogenic distribution system as well as an ambient temperature pumping system to achieve 2K operations with supporting purification systems. During this phase of the project a single Type III plus 1.3 GHz cryomodule was installed, cooled and tested. Design constraints of the cryomodule required that the cryomodule individual circuits be cooled at predetermined rates. These constraints required special design solutions to achieve. This paper describes the initial cooldown and operational experience of a 1.3 GHz cryomodule using the New Muon Lab cryogenic system.