National Library of Energy BETA

Sample records for fernald environmental management

  1. Fernald Environmental Management Project Archived Soil & Groundwater...

    Office of Environmental Management (EM)

    Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald Environmental Management Project Archived Soil & Groundwater Master Reports Fernald ...

  2. DOE - Office of Legacy Management -- Fernald Environmental Management...

    Office of Legacy Management (LM)

    Fernald Environmental Management Project - 027 FUSRAP Considered Sites Site: Fernald Environmental Management Project (027) Designated Name: Alternate Name: Location: Evaluation ...

  3. EIS-0195: Remedial Actions at Operable Unit 4, Fernald Environmental Management Project, Fernald, Ohio

    Energy.gov [DOE]

    This EIS evaluates the potential environmental impacts of a proposal to conduct remedial action at Operable Unit 4 at the Fernald Environmental Management Project.

  4. An aerial radiological survey of the Fernald Environmental Management Project and surrounding area, Fernald, Ohio

    SciTech Connect

    Phoenix, K.A.

    1997-04-01

    An aerial radiological survey was conducted from May 17--22, 1994, over a 36 square mile (93 square kilometer) area centered on the Fernald Environmental Management Project located in Fernald, Ohio. The purpose of the survey was to detect anomalous gamma radiation in the environment surrounding the plant. The survey was conducted at a nominal altitude of 150 feet (46 meters) with a line spacing of 250 feet (76 meters). A contour map of the terrestrial gamma exposure rate extrapolated to 1 meter (3.3 feet) above ground was prepared and overlaid on an aerial photograph of the area. Analysis of the data for man made sources showed five sites within the boundaries of the Fernald Environmental Management Project having elevated readings. The exposure rates outside the plant boundary were typical of naturally occurring background radiation. Soil samples and pressurized ion chamber measurements were obtained at four locations within the survey boundaries to supplement the aerial data. It was concluded that although the radionuclides identified in the high-exposure-rate areas are naturally occurring, the levels encountered are greatly enhanced due to industrial activities at the plant.

  5. Fernald Environmental Management Project Director's Findings...

    Office of Environmental Management (EM)

    minimize potential environmental impacts to Paddy's Run, a best management practices (BMP) plan for the control of industrial wastes and other wastes that may be discharge from ...

  6. Enforcement Letter, Fernald Environmental Restoration- September 12, 1996

    Energy.gov [DOE]

    Issued to the Fernald Environmental Restoration Management Corporation related to the Radiation Control Technician Training Program at the Fernald Site

  7. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code ("ORC") ... I-V. FINDINGS OF FACT The Director of the Ohio EPA has determined the following findings ...

  8. Fernald Environmental Management Project 1995 site environmental report

    SciTech Connect

    1996-06-01

    The Fernald site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This 1995 Site Environmental Report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Also included in this report is information concerning the site`s progress toward achieving full compliance with requirements set forth by DOE, US Environmental Protection Agency (USEPA), and Ohio EPA.

  9. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    Restoration Management Corporation U.S. EPA ID No.: OH6890008976 CERTIFIED MAIL ... Snyder, OFFO, SWDO Pmeu on recyeo paper EPA 1613 (rev 94) I BEFORE OHIO ENWRONMENTAL ...

  10. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    & Orders U.S. Department of Energy Cincinnati, Ohio U.S. EPA ID No: OH6890008976 Mr. ... Environmental Protection Agency ("Ohio EPA") in Ohio Revised Code (lfORCIV) Sections ...

  11. 1995 annual epidemiologic surveillance report for Fernald Environmental Management Project

    SciTech Connect

    1995-12-31

    The US Department of Energy's (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. During the past several years, a number of DOE sites have participated in the Epidemiologic Surveillance Program. This program monitors illnesses and health conditions that result in an absence of five or more consecutive workdays, occupational injuries and illnesses, and disabilities and deaths among current workers. This report provides a summary of epidemiologic surveillance data collected from the Fernald Environmental Management Project (FEMP) from January 1, 1995 through December 31, 1995. The data were collected by a coordinator at FEMP and submitted to the Epidemiologic Surveillance Data Center, located at Oak Ridge Institute for Science and Education, where quality control procedures and data analyses were carried out.

  12. Fernald Preserve 2015 Site Environmental Report

    Office of Legacy Management (LM)

    Fernald Preserve U.S. Department of Energy Office of Legacy Management Issued May 2016 ... U.S. Department of Energy Office of Legacy Management's Geospatial Environmental Mapping ...

  13. Feasibility study on consolidation of Fernald Environmental Management Project depleted uranium materials

    SciTech Connect

    1995-11-30

    In 1991, the DOE made a decision to close the FMPC located in Fernald, Ohio, and end its production mission. The site was renamed FEMP to reflect Fernald`s mission change from uranium production to environmental restoration. As a result of this change, the inventory of strategic uranium materials maintained at Fernald by DOE DP will need to be relocated to other DOE sites. Although considered a liability to the Fernald Plant due to its current D and D mission, the FEMP DU represents a potentially valuable DOE resource. Recognizing its value, it may be important for the DOE to consolidate the material at one site and place it in a safe long-term storage condition until a future DOE programmatic requirement materializes. In August 1995, the DOE Office of Nuclear Weapons Management requested, Lockheed Martin Energy Systems (LMES) to assess the feasibility of consolidating the FEMP DU materials at the Oak Ridge Reservation (ORR). This feasibility study examines various phases associated with the consolidation of the FEMP DU at the ORR. If useful short-term applications for the DU fail to materialize, then long-term storage (up to 50 years) would need to be provided. Phases examined in this report include DU material value; potential uses; sampling; packaging and transportation; material control and accountability; environmental, health and safety issues; storage; project management; noneconomic factors; schedule; and cost.

  14. Audit of Work Force Restructuring at the Fernald Environmental Management Project, ER-B-96-01

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S. Department of Energy Office of Inspector General AUDIT OF WORK FORCE RESTRUCTURING AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT Report Number: ER-B-96-01 Eastern Regional Audit Office Date of Issue: April 23, 1996 Oak Ridge, Tennessee 37830 AUDIT OF WORK FORCE RESTRUCTURING AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT TABLE OF CONTENTS Page SUMMARY . . . . . . . . . . . . . . . . . . . . . 1 PART I - APPROACH AND OVERVIEW 3 Introduction . . . . . . . . . . . . . . . 3 Scope and

  15. 2003 Fernald Environmental Management Project Annual Illness and Injury Surveillance Report, Revised September 2007

    SciTech Connect

    U.S. Department of Energy, Office of Health, Safety and Security, Office of Illness and Injury Prevention Programs

    2007-10-04

    Annual Illness and Injury Surveillance Program report for 2003 for the Fernald Environmental Management Project. The U.S. Department of Energy’s (DOE) commitment to assuring the health and safety of its workers includes the conduct of epidemiologic surveillance activities that provide an early warning system for health problems among workers. The IISP monitors illnesses and health conditions that result in an absence of workdays, occupational injuries and illnesses, and disabilities and deaths among current workers.

  16. Environment, safety and health progress assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Not Available

    1991-11-01

    This report documents the results of the Environment, Safety, and Health (ES&H) Progress Assessment of the Fernald Environmental Management Project (FEMP), Fernald, Ohio, conducted from October 15 through October 25, 1991. The Secretary of Energy directed that small, focused, ES&H Progress Assessments be performed as part of the continuing effort to institutionalize line management accountability and the self-assessment process in the areas of ES&H. The FEMP assessment is the pilot assessment for this new program. The objectives for the FEMP ES&H Progress Assessment were to assess: (1) how the FEMP has progressed since the 1989 Tiger Assessment; (2) how effectively the FEMP has corrected specific deficiencies and associated root causes identified by that team; and (3) whether the current organization, resources, and systems are sufficient to proactively manage ES&H issues.

  17. 1992 Fernald Site Environmental Report

    SciTech Connect

    Not Available

    1993-06-01

    The Fernald site is a Department of Energy (DOE) owned facility that produced high-quality uranium metals for military defense for nearly 40 years. DOE suspended production at the Fernald site in 1989 and formally ended production in 1991. Although production activities have ceased, the site continues to examine the air and liquid pathways as possible routes through which pollutants from past operations and current remedial activities may leave the site. This report covers the reporting period from January 1, 1992, through December 31, 1992, with the exception of Chapter Three, which provides information from the first quarter of 1993 as well as calendar year 1992 information. This 1992 report provides the general public as well as scientists and engineers with the results from the site`s ongoing Environmental Monitoring Program. Use included in this report are summary data of the sampling conducted to determine if the site complies with DOE, US Environmental Protection Agency (USEPA), and Ohio EPA (OEPA) requirements. Finally, this report provides general information on the major waste management and environmental restoration activities during 1992.

  18. Fernald Environmental Management Project Archived Soil & Groundwater Master

    Office of Environmental Management (EM)

    Federal Register Notice, CBDPP Final Rule Federal Register Notice, CBDPP Final Rule December 8, 1999 Federal Register Notice, Final rule for 10 CFR part 850, CBDPP The Department of Energy (DOE) published a final rule to establish a chronic beryllium disease prevention program (CBDPP) to reduce the number of workers currently exposed to beryllium in the course of their work at DOE facilities managed by DOE or its contractors, minimize the levels of, and potential for, exposure to beryllium, and

  19. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  20. A vadose zone Transport Processes Investigation within the glacial till at the Fernald Environmental Management Project.

    SciTech Connect

    Schwing, J.; Roepke, Craig Senninger; Brainard, James Robert; Glass, Robert John, Jr.; Mann, Michael J. A.; Holt, Robert M.; Kriel, Kelly

    2007-08-01

    This report describes a model Transport Processes Investigation (TPI) where field-scale vadose zone flow and transport processes are identified and verified through a systematic field investigation at a contaminated DOE site. The objective of the TPI is to help with formulating accurate conceptual models and aid in implementing rational and cost effective site specific characterization strategies at contaminated sites with diverse hydrogeologic settings. Central to the TPI are Transport Processes Characterization (TPC) tests that incorporate field surveys and large-scale infiltration experiments. Hypotheses are formulated based on observed pedogenic and hydrogeologic features as well as information provided by literature searches. The field and literature information is then used to optimize the design of one or more infiltration experiments to field test the hypothesis. Findings from the field surveys and infiltration experiments are then synthesized to formulate accurate flow and transport conceptual models. Here we document a TPI implemented in the glacial till vadose zone at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio, a US Department of Energy (DOE) uranium processing site. As a result of this TPI, the flow and transport mechanisms were identified through visualization of dye stain within extensive macro pore and fracture networks which provided the means for the infiltrate to bypass potential aquatards. Such mechanisms are not addressed in current vadose zone modeling and are generally missed by classical characterization methods.

  1. Preliminary Notice of Violation, Fluor Fernald, Inc.- EA-2004-07

    Energy.gov [DOE]

    Issued to Fluor Fernald, Inc., related to Respiratory Protection Issues at the Fernald Environmental Management Project

  2. Fernald Preserve 2014 Site Environmental Report

    Office of Legacy Management (LM)

    Fernald Preserve U.S. Department of Energy Office of Legacy Management Issued May 2015 ... leak detection system LM DOE Office of Legacy Management LMICP Comprehensive Legacy ...

  3. Audit of Proposal to Acquire Land at the Fernald Environmental Management Project, ER-B-97-03

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    U.S. Department of Energy Office of Inspector General AUDIT OF PROPOSAL TO ACQUIRE LAND AT THE FERNALD ENVIRONMENTAL MANAGEMENT PROJECT The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP

  4. Integration of health physics, safety and operational processes for management and disposition of recycled uranium wastes at the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Barber, James; Buckley, James

    2003-02-23

    Fluor Fernald, Inc. (Fluor Fernald), the contractor for the U. S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP), recently submitted a new baseline plan for achieving site closure by the end of calendar year 2006. This plan was submitted at DOE's request, as the FEMP was selected as one of the sites for their accelerated closure initiative. In accordance with the accelerated baseline, the FEMP Waste Management Project (WMP) is actively evaluating innovative processes for the management and disposition of low-level uranium, fissile material, and thorium, all of which have been classified as waste. These activities are being conducted by the Low Level Waste (LLW) and Uranium Waste Disposition (UWD) projects. Alternatives associated with operational processing of individual waste streams, each of which poses potentially unique health physics, industrial hygiene and industrial hazards, are being evaluated for determination of the most cost effective and safe met hod for handling and disposition. Low-level Mixed Waste (LLMW) projects are not addressed in this paper. This paper summarizes historical uranium recycling programs and resultant trace quantity contamination of uranium waste streams with radionuclides, other than uranium. The presentation then describes how waste characterization data is reviewed for radiological and/or chemical hazards and exposure mitigation techniques, in conjunction with proposed operations for handling and disposition. The final part of the presentation consists of an overview of recent operations within LLW and UWD project dispositions, which have been safely completed, and a description of several current operations.

  5. DOE - Office of Legacy Management -- Fernald Reports

    Office of Legacy Management (LM)

    Reports Fernald Preserve, Ohio Site Reports All reports below are Adobe Documents PDF Site Environmental Reports 2015 Site Environmental Report 2014 Site Environmental Report 2013 Site Environmental Report 2012 Site Environmental Report 2011 Site Environmental Report 2010 Site Environmental Report 2009 Site Environmental Report 2008 Site Environmental Report 2007 Site Environmental Report 2006 Site Environmental Report 2005 Site Environmental Report 2004 Site Environmental Report Inspection

  6. Determination of total and isotopic uranium by inductively coupled plasma-mass spectrometry at the Fernald Environmental Management Project

    SciTech Connect

    Miller, F.L.; Bolin, R.N.; Feller, M.T.; Danahy, R.J.

    1995-04-01

    At the Fernald Environmental Management Project (FEMP) in southwestern Ohio, ICP-mass spectrometry (ICP-MS), with sample introduction by peristaltic pumping, is used to determine total and isotopic uranium (U-234, U-235, U-236 and U-238) in soil samples. These analyses are conducted in support of the environmental cleanup of the FEMP site. Various aspects of the sample preparation and instrumental analysis will be discussed. Initial sample preparation consists of oven drying to determine moisture content, and grinding and rolling to homogenize the sample. This is followed by a nitric/hydrofluoric acid digestion to bring the uranium in the sample into solution. Bismuth is added to the sample prior to digestion to monitor for losses. The total uranium (U-238) content of this solution and the U{sup 235}/U{sup 238} ratio are measured on the first pass through the ICP-MS. To determine the concentration of the less abundant U{sup 234} and U{sup 236} isotopes, the digestate is further concentrated by using Eichrom TRU-Spec extraction columns before the second pass through the ICP-MS. Quality controls for both the sample preparation and instrumental protocols will also be discussed. Finally, an explanation of the calculations used to report the data in either weight percent or activity units will be given.

  7. Final environmental assessment for the U.S. Department of Energy, Oak Ridge Operations receipt and storage of uranium materials from the Fernald Environmental Management Project site

    SciTech Connect

    1999-06-01

    Through a series of material transfers and sales agreements over the past 6 to 8 years, the Fernald Environmental Management Project (FEMP) has reduced its nuclear material inventory from 14,500 to approximately 6,800 metric tons of uranium (MTU). This effort is part of the US Department of energy`s (DOE`s) decision to change the mission of the FEMP site; it is currently shut down and the site is being remediated. This EA focuses on the receipt and storage of uranium materials at various DOE-ORO sites. The packaging and transportation of FEMP uranium material has been evaluated in previous NEPA and other environmental evaluations. A summary of these evaluation efforts is included as Appendix A. The material would be packaged in US Department of Transportation-approved shipping containers and removed from the FEMP site and transported to another site for storage. The Ohio Field Office will assume responsibility for environmental analyses and documentation for packaging and transport of the material as part of the remediation of the site, and ORO is preparing this EA for receipt and storage at one or more sites.

  8. Enforcement Letter, Fernald Environmental Restoration - September...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    - September 12, 1996 More Documents & Publications Preliminary Notice of Violation, Fluor Daniel Fernald Corporation - EA-97-05 Enforcement Letter, Sandia National Laboratories...

  9. The consequences of disposal of low-level radioactive waste from the Fernald Environmental Management Project: Report of the DOE/Nevada Independent Panel

    SciTech Connect

    Crowe, B.; Hansen, W.; Waters, R.; Sully, M.; Levitt, D.

    1998-04-01

    The Department of Energy (DOE) convened a panel of independent scientists to assess the performance impact of shallow burial of low-level radioactive waste from the Fernald Environmental Management Project, in light of a transportation incident in December 1997 involving this waste stream. The Fernald waste has been transported to the Nevada Test Site and disposed in the Area 5 Radioactive Waste Management Site (RWMS) since 1993. A separate DOE investigation of the incident established that the waste has been buried in stress-fractured metal boxes, and some of the waste contained excess moisture (high-volumetric water contents). The Independent Panel was charged with determining whether disposition of this waste in the Area 5 RWMS has impacted the conclusions of a previously completed performance assessment in which the site was judged to meet required performance objectives. To assess the performance impact on Area 5, the panel members developed a series of questions. The three areas addressed in these questions were (1) reduced container integrity, (2) the impact of reduced container integrity on subsidence of waste in the disposal pits and (3) excess moisture in the waste. The panel has concluded that there is no performance impact from reduced container integrity--no performance is allocated to the container in the conservative assumptions used in performance assessment. Similarly, the process controlling post-closure subsidence results primarily from void space within and between containers, and the container is assumed to degrade and collapse within 100 years.

  10. Fernald Preserve 2015 Site Environmental Report Appendix D Environment...

    Office of Legacy Management (LM)

    Ecological Restoration This page intentionally left blank U.S. Department of Energy ... D-35 Fernald Preserve 2015 Site Environmental Report U.S. Department of Energy Doc. No. ...

  11. Fernald Preserve 2015 Site Environmental Report Appendix A Supplementa...

    Office of Legacy Management (LM)

    Department of Energy Doc. No. S13591 May 2016 Page A-ii This page intentionally left blank U.S. Department of Energy Fernald Preserve 2015 Site Environmental Report May 2016 Doc. ...

  12. DOE - Office of Legacy Management -- Fernald Benefits

    Office of Legacy Management (LM)

    Ohio > Fernald Benefits Fernald Preserve, Ohio Former Fernald Workers' Employment Verification and Benefits Information Employment Verification Employment verification is made through a Privacy Act request. Medical and Life Plan Benefit Service Center All inquiries should be directed to ADP, (866) 553-5867, email: fernaldbenefits@adp.com. Retirement (Pension) Plan All inquiries should be directed to MetLife, (800) 638-5656. 401(k) Plan All inquiries should be directed to Hewitt Financial

  13. Preliminary Notice of Violation, Fluor Daniel Fernald Corporation- EA-97-05

    Energy.gov [DOE]

    Issued to Fluor Daniel Fernald Corporation related to Corrective Actions Implementation Deficiencies at the Fernald Environmental Management Project, (EA-97-05)

  14. DOE - Office of Legacy Management -- Fernald

    Office of Legacy Management (LM)

    The site transferred to the Office of Legacy Management in 2006 and requires operation and maintenance of remedial action systems, environmental monitoring, routine inspection and ...

  15. Achieving closure at Fernald

    SciTech Connect

    Bradburne, John; Patton, Tisha C.

    2001-02-25

    When Fluor Fernald took over the management of the Fernald Environmental Management Project in 1992, the estimated closure date of the site was more than 25 years into the future. Fluor Fernald, in conjunction with DOE-Fernald, introduced the Accelerated Cleanup Plan, which was designed to substantially shorten that schedule and save taxpayers more than $3 billion. The management of Fluor Fernald believes there are three fundamental concerns that must be addressed by any contractor hoping to achieve closure of a site within the DOE complex. They are relationship management, resource management and contract management. Relationship management refers to the interaction between the site and local residents, regulators, union leadership, the workforce at large, the media, and any other interested stakeholder groups. Resource management is of course related to the effective administration of the site knowledge base and the skills of the workforce, the attraction and retention of qualified a nd competent technical personnel, and the best recognition and use of appropriate new technologies. Perhaps most importantly, resource management must also include a plan for survival in a flat-funding environment. Lastly, creative and disciplined contract management will be essential to effecting the closure of any DOE site. Fluor Fernald, together with DOE-Fernald, is breaking new ground in the closure arena, and ''business as usual'' has become a thing of the past. How Fluor Fernald has managed its work at the site over the last eight years, and how it will manage the new site closure contract in the future, will be an integral part of achieving successful closure at Fernald.

  16. DOE - Office of Legacy Management -- Fernald

    Office of Legacy Management (LM)

    pdficon REVIEW: Draft 2017 Comprehensive Legacy Management and Institutional Controls Plan (LMICP) pdficon 2016 Comprehensive Legacy Management and Institutional Controls Plan ...

  17. How to accelerate the Fernald remediation

    SciTech Connect

    Yates, M.K.; Reising, J.

    1996-01-10

    The Fernald Environmental Management Project is unique among Department of Energy (DOE) sites by virtue of successful efforts by the Fernald Environmental Restoration Management Corporation (FERMCO) and DOE-Fernald Area Office (FN) in securing a stak-eholder-assisted final site closure vision and all Record of Decisions (ROD) or Interim RODs required to set the stage for final remediation. DOE and FERMCO have agreed in principle on a Ten Year Plan which accelerates all activities to remediate the site in approximately half the target schedule. This paper presents the path that led to the current Ten Year Plan, the key elements of the plan and the implementation strategies.

  18. Office of Legacy Management | Department of Energy

    Office of Environmental Management (EM)

    Office of Legacy Management Fernald Preserve, Ohio Fernald Preserve, Ohio Read more Grand Junction, Colorado, Site Grand Junction, Colorado, Site Read more National Environmental ...

  19. Environmental Survey preliminary report, Feed Materials Production Center, Fernald, Ohio

    SciTech Connect

    Not Available

    1987-03-01

    This report presents the preliminary findings from the first phase of the environmental survey of the United States Department of Energy (DOE) Feed Materials Production Center (FMPC), conducted June 16 through 27, 1986. The survey is being conducted by an interdisciplinary team of environmental specialists, led and managed by the Office of Environment, Safety and Health's Office of Environmental Audit. Individual team components are being supplied by a private contractor. The objective of the survey is to identify environmental problems and areas of environmental risk associated with the FMPC. The survey covers all environmental media and all areas of environmental regulation. It is being performed in accordance with the DOE Environmental Survey Manual. This phase of the survey involves the review of existing site environmental data, observations of the operations carried on at FMPC, and interviews with site personnel. The survey team developed a Sampling and Analysis Plan to assist in further assessing certain of the environmental problems identified during its onsite activities. The Sampling and Analysis Plan will be executed by a DOE national laboratory or a support contractor. When completed, the results will be incorporated into the FMPC Environmental Survey Interim Report. The Interim Report will reflect the final determinations of the FMPC survey. 41 refs., 20 figs., 25 tabs.

  20. Fernald Preserve: A Learning Destination

    Energy.gov [DOE]

    College-level environmental science class students are frequent visitors to the Fernald Preserve, Ohio, Site. Their visits are usually preceded by program-specific requests and Fernald site staff...

  1. Consent Order, Fluor Fernald, Inc. - EA-2003-05 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fernald, Inc. - EA-2003-05 Consent Order, Fluor Fernald, Inc. - EA-2003-05 August 18, 2003 Issued to Fluor Fernald, Inc., related to an Unposted High Radiation Area at the Fernald Environmental Management Project, (EA-2003-05) On August 18, 2003, the U.S. Department of Energy issued a Consent Order (EA-2003-05) to Fluor Fernald, Inc. related to an unposted High Radiation Area adjacent to the thermoluminescent dosimeter irradiation facility that existed for over a year before discovery. The

  2. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    portions of the STP, public notice by the Ohio EPA of availability of the revised STP, and consultation by Ohio EPA with affected states and U.S. EPA, pursuant to these ...

  3. Fernald Environmental Management Project Consent Agreement as...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sections 120 and 106(a), September 20, 1991 State Ohio Agreement Type Consent ... at the Site Parties DOE; US EPA Date 9201991 SCOPE * Establish a procedural framework ...

  4. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    FUNDING * No provision in this Order shall be interpreted to require obligation or payment of funds in violation of the Anti-Deficiency Act. PENALTIES * No specific monetary ...

  5. Fernald Environmental Management Project Consent Agreement and...

    Office of Environmental Management (EM)

    PENALTIES * Respondent shall pay a civil penalty in the amount of 95,000 within 30 days of the effective date of this Final Order. A late payment charge of 10 will be imposed for ...

  6. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    RCRACERCLA Scope Summary Integrate the Ohio EPA RCRA hazardous waste closure requirements ... Protection Agency Date 661996 SCOPE * Avoid duplication of efforts at the ...

  7. Fernald Environmental Management Project Director's Final Findings...

    Office of Environmental Management (EM)

    CERCLA Scope Summary Establish guidelines and deadlines for neutralizationremoval of the ... Protection Agency Date 12271994 SCOPE * Establish guidelines and deadlines for ...

  8. Fernald Environmental Management Project Stipulated Amendment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2, 1988, and Settlement of Charges in Contempt State Ohio Agreement Type Consent Decree Legal Driver(s) RCRA Scope Summary Settle alleged violations of the Consent Decree Parties...

  9. Fernald Preserve 2015 Site Environmental Report Appendix C Supplementa...

    Office of Legacy Management (LM)

    ... in excess of the dose that corresponds to an incremental lifetime cancer risk of 1 in 10,000, which is acceptable for U.S. Environmental Protection Agency (EPA) superfund sites. ...

  10. Characterization of Fernald Silo 3 Waste

    SciTech Connect

    Langton, C.A.

    2001-04-04

    This report summarizes characterization results for uranium residues from the Fernald Environmental Management Project (FEMP) Operable Unit (OU-4). These residues are currently stored in a one-million-gallon concrete silo, Silo 3, at the DOE Fernald Site, Ohio. Characterization of the Silo 3 waste is the first part of a three part study requested by Rocky Mountain Remedial Services (RMRS) through a Work for others Agreement, WFO-00-007, between the Westinghouse Savannah River Company (WSRC) and RMRS. Parts 2 and 3 of this effort include bench- and pilot-scale testing.

  11. Transition of the U.S. Department of Energy Fernald Closure Project (FCP) from Cleanup to Legacy Management

    SciTech Connect

    Powell, J.; Craig, J.R.; Jacobson, C.

    2006-07-01

    The Fernald Closure Project encompasses a 1,050-acre tract of land northwest of Cincinnati, Ohio. Dedicated to the production of uranium feed materials from 1952 until 1989, the site was subsequently included on the U.S. Environmental Protection Agency's National Priorities List and slated for cleanup. Except for contaminated ground water, cleanup of the site will be completed in 2006; remediation of the aquifer will continue for 20 years. Transition of the project from the U.S. Department of Energy Office of Environmental Management to the Office of Legacy Management will be effected when site cleanup is completed, surface restoration is complete, and aquifer remediation is on-going. Office of Legacy Management activities will focus on the monitoring and maintenance of the on-site disposal facility, enforcement of restrictions on site access and use, and the protection of natural and cultural resources. The Site Transition Plan, developed in accordance with Site Transition Framework guidance, identifies organizational and financial responsibilities for attaining closeout. A Transition Matrix details more than 1,000 activities necessary for site transition and allows each task to be tracked. Responsibility Transition Plans address major areas of scope to be transferred, such as records and information management, infrastructure, and environmental monitoring. Much effort has been placed on the retention of staff to perform the identified Office of Legacy Management scope. (authors)

  12. THE ROLE OF LAND USE IN ENVIRONMENTAL DECISION MAKING AT THREE DOE MEGA-CLEANUP SITES FERNALD & ROCKY FLATS & MOUND

    SciTech Connect

    JEWETT MA

    2011-01-14

    This paper explores the role that future land use decisions have played in the establishment of cost-effective cleanup objectives and the setting of environmental media cleanup levels for the three major U.S. Department of Energy (DOE) sites for which cleanup has now been successfully completed: the Rocky Flats, Mound, and Fernald Closure Sites. At each site, there are distinct consensus-building histories throughout the following four phases: (1) the facility shut-down and site investigation phase, which took place at the completion of their Cold War nuclear-material production missions; (2) the decision-making phase, whereby stakeholder and regulatory-agency consensus was achieved for the future land-use-based environmental decisions confronting the sites; (3) the remedy selection phase, whereby appropriate remedial actions were identified to achieve the future land-use-based decisions; and (4) the implementation phase, whereby the selected remedial actions for these high-profile sites were implemented and successfully closed out. At each of the three projects, there were strained relationships and distrust between the local community and the DOE as a result of site contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholder groups - particularly in the role of final land use in the decision-making process, the site management teams at each respective site developed new public-participation strategies to open stakeholder communication channels with site leadership, technical staff, and the regulatory agencies. This action proved invaluable to the success of the projects and reaching consensus on appropriate levels of cleanup. With the implementation of the cleanup remedies now complete, each of the three DOE sites have become models for future environmental-remediation projects and associated decision making.

  13. DOE Cites Fluor Fernald Inc. for Nuclear Safety Violations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Fluor Fernald Inc. for Nuclear Safety Violations DOE Cites Fluor Fernald Inc. for Nuclear Safety Violations August 25, 2005 - 2:43pm Addthis Washington, D.C. - The Department of Energy (DOE) today notified Fluor Fernald, Inc. (Fluor Fernald) that it will fine the company $33,000 for violations of the department's nuclear safety requirements. Fluor Fernald is the department's contractor responsible for environmental cleanup activities at the Fernald Closure Project. The Preliminary

  14. DOE - Office of Legacy Management -- Fernald Environmental Management...

    Office of Legacy Management (LM)

    products between 1953 and 1989 for use in production reactors to make plutonium and tritium at other Department of Energy (DOE) sites in support of United States defense programs. ...

  15. April 29, 2004: Fernald Closure Site | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9, 2004: Fernald Closure Site April 29, 2004: Fernald Closure Site April 29, 2004: Fernald Closure Site April 29, 2004 Demolition crews bring down the Pilot Plant at DOE's Fernald Closure Site in Ohio. The plant was the last to be torn down of ten former uranium production complexes that produced high purity uranium metal from 1951 to 1989 to support the nation's weapons production needs. Environmental cleanup work at the site is projected to be completed in 2006

  16. Fernald Preserve Renewable Energy

    Energy.gov [DOE]

    Fernald Preserve Renewable Energy Brochure – Providing energy that is clean, abundant, reliable, and affordable

  17. LM Records Handling System-Fernald Historical Records System, Office of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Legacy Management | Department of Energy Fernald Historical Records System, Office of Legacy Management LM Records Handling System-Fernald Historical Records System, Office of Legacy Management LM Records Handling System-Fernald Historical Records System, Office of Legacy Management LM Records Handling System-Fernald Historical Records System, Office of Legacy Management (489.96 KB) More Documents & Publications LM Records Handling System (LMRHS01) - Electronic Records Keeping System,

  18. Applying a life cycle decision methodology to Fernald waste management alternatives

    SciTech Connect

    Yuracko, K.L.; Gresalfi, M.; Yerace, P.

    1996-07-01

    During the past five years, a number of U.S. Department of Energy (DOE) funded efforts have demonstrated the technical efficacy of converting various forms of radioactive scrap metal (RSM) into useable products. From the development of large accelerator shielding blocks, to the construction of low-level waste containers, technology has been applied to this fabrication process in a safe and stakeholder supported manner. The potential health and safety risks to both workers and the public have been addressed. The question remains: can products be fabricated from RSM in a cost efficient and market competitive manner? This paper presents a methodology for use within DOE to evaluate the costs and benefits of recycling and reusing some RSM, rather than disposing of this RSM in an approved burial site. This life cycle decision methodology, developed by both the Oak Ridge National Laboratory (ORNL) and DOE Fernald, is the focus of the following analysis.

  19. 1994 Fernald field characterization demonstration program data report

    SciTech Connect

    Rautman, C.A.; Cromer, M.V.; Newman, G.C.; Beiso, D.A.

    1995-12-01

    The 1994 Fernald field characterization demonstration program, hosted by Fernald Environmental Management Project, was established to investigate technologies that are applicable to the characterization and remediation of soils contaminated with uranium. An important part of this effort was evaluating field-screening tools potentially capable of acquiring high-resolution information on uranium contamination distribution in surface soils. Further-more, the information needed to be obtained in a cost- and time-efficient manner. Seven advanced field-screening technologies were demonstrated at a uranium-contaminated site at Fernald, located 29 kilometers northwest of Cincinnati, Ohio. The seven technologies tested were: (1) alpha-track detectors, (2) a high-energy beta scintillometer, (3) electret ionization chambers, (4) and (5) two variants of gamma-ray spectrometry, (6) laser ablation-inductively coupled plasma-atomic emission spectroscopy, and (7) long-range alpha detection. The goals of this field demonstration were to evaluate the capabilities of the detectors and to demonstrate their utility within the US Department of Energy`s Environmental Restoration Program. Identical field studies were conducted using four industry-standard characterization tools: (1) a sodium-iodide scintillometer, (2) a low-energy FIDLER scintillometer, (3) a field-portable x-ray fluorescence detector, and (4) standard soil sampling coupled with laboratory analysis. Another important aspect of this program was the application of a cost/risk decision model to guide characterization of the site. This document is a compilation of raw data submitted by the technologies and converted total uranium data from the 1994 Fernald field characterization demonstration.

  20. Authorized limits for Fernald copper ingots

    SciTech Connect

    Frink, N.; Kamboj, S.; Hensley, J.; Chen, S. Y.

    1997-09-01

    This development document contains data and analysis to support the approval of authorized limits for the unrestricted release of 59 t of copper ingots containing residual radioactive material from the U.S. Department of Energy (DOE) Fernald Environmental Management Project (FEMP). The analysis presented in this document comply with the requirements of DOE Order 5400.5, {open_quotes}Radiation Protection of the Public and the Environment,{close_quotes} as well as the requirements of the proposed promulgation of this order as 10 CFR Part 834. The document was developed following the step-by-step process described in the Draft Handbook for Controlling Release for Reuse or Recycle Property Containing Residual Radioactive Material.

  1. Environmental Management

    ScienceCinema

    None

    2016-07-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  2. Environmental Management

    SciTech Connect

    2014-11-12

    Another key aspect of the NNSS mission is Environmental Management program, which addresses the environmental legacy from historic nuclear weapons related activities while also ensuring the health and safety of present day workers, the public, and the environment as current and future missions are completed. The Area 5 Radioactive Waste Management site receives low-level and mixed low-level waste from some 28 different generators from across the DOE complex in support of the legacy clean-up DOE Environmental Management project. Without this capability, the DOE would not be able to complete the clean up and proper disposition of these wastes. The program includes environmental protection, compliance, and monitoring of the air, water, plants, animals, and cultural resources at the NNSS. Investigation and implementation of appropriate corrective actions to address the contaminated ground water facilities and soils resulting from historic nuclear testing activities, the demolition of abandoned nuclear facilities, as well as installation of ground water wells to identify and monitor the extent of ground water contamination.

  3. The Fernald Closure Project: Lessons Learned

    SciTech Connect

    Murphy, Cornelius M.; Carr, Dennis

    2008-01-15

    For nearly 37 years, the U.S. Department of Energy site at Fernald - near Cincinnati, Ohio - produced 230,000 metric tons (250,000 short tons) of high-purity, low-enriched uranium for the U.S. Defense Program, generating more than 5.4 million metric tons (6 million short tons) of liquid and solid waste as it carried out its Cold War mission. The facility was shut down in 1989 and clean up began in 1992, when Fluor won the contract to clean up the site. Cleaning up Fernald and returning it to the people of Ohio was a $4.4 billion mega environmental-remediation project that was completed in October 2006. Project evolved through four phases: - Conducting remedial-investigation studies to determine the extent of damage to the environment and groundwater at, and adjacent to, the production facilities; - Selecting cleanup criteria - final end states that had to be met that protect human health and the environment; - Selecting and implementing the remedial actions to meet the cleanup goals; - Executing the work in a safe, compliant and cost-effective manner. In the early stages of the project, there were strained relationships - in fact total distrust - between the local community and the DOE as a result of aquifer contamination and potential health effects to the workers and local residents. To engage citizens and interested stakeholders groups in the decision-making process, the DOE and Fluor developed a public-participation strategy to open the channels of communication with the various parties: site leadership, technical staff and regulators. This approach proved invaluable to the success of the project, which has become a model for future environmental remediation projects. This paper will summarize the history and shares lessons learned: the completion of the uranium-production mission to the implementation of the Records of Decision defining the cleanup standards and the remedies achieved. Lessons learned fall into ten categories: - Regulatory approach with end

  4. M E Environmental Management Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    safety  performance  cleanup  closure M E Environmental Management Environmental Management safety  performance  cleanup  closure M E Environmental Management Environmental Management M E Environmental Management Environmental Management Office of Site Restoration, EM-10 Office of D&D and Facility Engineering, EM-13 Facility Deactivation & Decommissioning (D&D) D&D Program Map Addendum: Impact of American Recovery and Reinvestment Act (ARRA) on EM's D&D

  5. COMPREHENSIVE LEGACY MANAGEMENT

    Office of Legacy Management (LM)

    Fernald Preserve, Fernald, Ohio Comprehensive Legacy Management and Institutional Controls ... blank LMSFERS03496-8.0 Comprehensive Legacy Management and Institutional Controls ...

  6. Environmental Management System

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System (EMS) is a set of processes and practices that enable an organization to reduce its...

  7. Measurement of Radon, Thoron, Isotopic Uranium and Thorium to Determine Occupational and Environmental Exposure and Risk at Fernald Feed Material Production Center

    SciTech Connect

    Naomi H. Harley, Ph.D.

    2004-07-01

    To develop a new and novel area and personal radon/thoron detector for both radon isotopes to better measure the exposure to low airborne concentrations of these gases at Fernald. These measurements are to be used to determine atmospheric dispersion and exposure to radon and thoron prior to and during retrieval and removal of the 4000 Ci of radium in the two silos at Fernald.

  8. Environmental Management System

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Management System Environmental Management System An Environmental Management System is a systematic method for assessing mission activities, determining the environmental impacts of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous improvement of our environmental performance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM

  9. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Environmental Management (EM)

    ... Assistant Secretary for Safety and Management Operations ... Management Advisory Board EM SSAB - Environmental ... ETR - External Technical Review ETTP - East Tennessee ...

  10. Development and testing of the Minimum Additive Waste Stabilization (MAWS) system for Fernald wastes. Phase 1, Final report

    SciTech Connect

    Fu, S.S.; Matlack, K.S.; Mohr, R.K.; Brandys, M. Hojaji, H.; Bennett, S.; Ruller, J.; Pegg, I.L.

    1994-12-01

    This report presents results of a treatability study for the evaluation of the MAWS process for wastes stored at the Fernald Environmental Management Project (FEMP) site. Wastes included in the study were FEMP Pit 5 sludges, soil-wash fractions, and ion exchange media from a water treatment system supporting a soil washing system. MAWS offers potential for treating a variety of waste streams to produce a more leach resistant waste form at a lower cost than, say, cement stabilization.

  11. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Review of the Environmental Management Waste Management Facility (EMWMF) at Oak Ridge ... INTRODUCTION The Environmental Management Waste Management Facility (EMWMF) is a land ...

  12. Environmental Management Advisory Board (EMAB) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board ...

  13. Multimedia environmental management

    SciTech Connect

    Soesilo, J.A.; Wiley, W.D.

    1999-09-01

    This book explores and supports the argument that effective environmental management must be based on a multimedia approach, which focuses simultaneously on air, water, and waste and enables managers to assess the resulting financial, operation, and management benefits. The multimedia approach, which can be used to design an effective compliance program, includes proper waste and material handling management, systematic monitoring, and record keeping requirements. This approach integrates a wide array of environmental requirements and decision processes, which the authors examine in sixteen chapters, organized into four parts: the role of environmental management; environmental aspects of business operation, environmental processes; and environmental management trends. Within these parts, the authors highlight the development of modern environmental management and provide an overview of federal laws pertinent to multimedia environmental management. They examine such issues as chemical storage and transportation, tank system operations and requirements, waste determination, spill response procedures, and employee training. Environmental processes addressed in the book include the management of solid and hazardous waste, wastewater treatment systems, stormwater management, air emission control, and site remediation. The authors also briefly discuss significant initiatives in US environmental management and look toward corporate sustainable development.

  14. Analytical electron microscopy characterization of uranium-contaminated soils from the Fernald Site, FY1993 report

    SciTech Connect

    Buck, E.C.; Cunnane, J.C.; Brown, N.R.; Dietz, N.L.

    1994-10-01

    A combination of optical microscopy, scanning electron microscopy with backscattered electron detection (SEM/BSE), and analytical electron microscopy (AEM) is being used to determine the nature of uranium in soils from the Fernald Environmental Management Project. The information gained from these studies is being used to develop and test remediation technologies. Investigations using SEM have shown that uranium is contained within particles that are typically 1 to 100 {mu}m in diameter. Further analysis with AEM has shown that these uranium-rich regions are made up of discrete uranium-bearing phases. The distribution of these uranium phases was found to be inhomogeneous at the microscopic level.

  15. Environmental Management System

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of those activities, prioritizing improvements, and measuring results. May 30, 2012 The continuous improvement cycle Our Environmental Management System encourages continuous...

  16. E M Environmental Management

    Office of Environmental Management (EM)

    E M Environmental Management safety performance cleanup closure EM RECOVERY ACT TOP LINE MESSAGES * The Department estimates the 6 billion Recovery Act investment has allowed us ...

  17. Fernald Environmental Management Project Consent Agreement and Final Order, September 30, 1993

    Office of Environmental Management (EM)

  18. Fernald Environmental Management Project Consent Agreement as Amended, September 20, 1991

    Office of Environmental Management (EM)

  19. Fernald Environmental Management Project Director's Findings and Final Orders, June 26, 1987

    Office of Environmental Management (EM)

  20. Fernald Environmental Management Project Stipulated Amendment to Consent Decree, January 22, 1993

    Office of Environmental Management (EM)

  1. Preliminary Notice of Violation, Fluor Daniel Fernald Corporation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fernald Corporation - EA-97-05 Preliminary Notice of Violation, Fluor Daniel Fernald Corporation - EA-97-05 July 29, 1997 Issued to Fluor Daniel Fernald Corporation related to...

  2. Environmental Requirements Management

    SciTech Connect

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  3. Nuclear Materials Stewardship Within the DOE Environmental Management Program

    SciTech Connect

    Bilyeu, J. D.; Kiess, T. E.; Gates, M. L.

    2002-02-26

    The Department of Energy (DOE) Environmental Management (EM) Program has made significant progress in planning disposition of its excess nuclear materials and has recently completed several noteworthy studies. Since establishment in 1997, the EM Nuclear Material Stewardship Program has developed disposition plans for excess nuclear materials to support facility deactivation. All nuclear materials have been removed from the Miamisburg Environmental Management Project (Mound), and disposition planning is nearing completion for the Fernald Environmental Management Project and the Rocky Flats Environmental Technology Site. Only a few issues remain for materials at the Hanford and Idaho sites. Recent trade studies include the Savannah River Site Canyons Nuclear Materials Identification Study, a Cesium/Strontium Management Alternatives Trade Study, a Liquid Technical Standards Trade Study, an Irradiated Beryllium Reflectors with Tritium study, a Special Performance Assessment Required Trade Study, a Neutron Source Trade Study, and development of discard criteria for uranium. A Small Sites Workshop was also held. Potential and planned future activities include updating the Plutonium-239 storage study, developing additional packaging standards, developing a Nuclear Material Disposition Handbook, determining how to recover or dispose of Pu-244 and U-233, and working with additional sites to define disposition plans for their nuclear materials.

  4. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Update and Discussion of Charges to the Board Mark Whitney, Principal Deputy Assistant Secretary for Environmental Management 2:30 p.m. Break 2:45 p.m. Public Comment Period ...

  5. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ENVIRONMENTAL MANAGEMENT ADVISORY BOARD to the U.S. DEPARTMENT OF ENERGY PUBLIC MEETING MINUTES Applied Research Center 301 Gateway Drive, Aiken, South Carolina 29803 May 11, 2016 2 PROCEEDINGS Ms. Kristen Ellis, the EMAB Designated Federal Officer called the Environmental Management Advisory Board meeting to order at 9:00 a.m. EST on Wednesday, May 11, 2016. Board members present: Mr. Sherrell R. Greene, Advanced Technology Insights, LLC Ms. Jane Hedges, Consultant Dr. Carolyn Huntoon,

  6. Environmental Management System

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  7. Comprehensive Environmental Management Process

    SciTech Connect

    Hjeresen, D.L.; Roybal, S.L.

    1994-08-01

    This report contains information about Los Alamos National Laboratory`s Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes.

  8. Summary - Environmental Management Waste Management Facility...

    Office of Environmental Management (EM)

    Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for ...

  9. Environmental Management Waste Management Facility (EMWMF) at...

    Office of Environmental Management (EM)

    Waste Management Facility (EMWMF) at Oak Ridge Environmental Management Waste Management Facility (EMWMF) at Oak Ridge Full Document and Summary Versions are available for download ...

  10. Environmental Management Associates | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Environmental Management Associates Jump to: navigation, search Name: Environmental Management Associates Abbreviation: EMA Website: www.emacorp.com Environmental Management...

  11. Environmental Management Disposal Facility overview

    Energy.gov [DOE]

    This fact sheet provides a brief overview for the need behind the Environmental Management Disposal Facility.

  12. Environmental Management System Plan

    SciTech Connect

    Fox, Robert; Thorson, Patrick; Horst, Blair; Speros, John; Rothermich, Nancy; Hatayama, Howard

    2009-03-24

    Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These

  13. Business Opportunities Session Office of Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Opportunities Session Office of Environmental Management Business Opportunities Session Office of Environmental Management Environmental Clean up PDF icon Business Opportunities ...

  14. PNNL: About - Environmental Management System

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    EMS Graphic The purpose of the Environmental Management System is to achieve and demonstrate environmental excellence by assessing and controlling the impact of Laboratory...

  15. Environmental Management Advisory Board Subcommittees | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EMAB Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE ...

  16. The Office of Environmental Management (EM) Defense Environmental...

    Office of Environmental Management (EM)

    The Office of Environmental Management (EM) Defense Environmental Cleanup The Office of Environmental Management (EM) Defense Environmental Cleanup Microsoft Word - 271C2C7B.doc ...

  17. Environmental management activities

    SciTech Connect

    1997-07-01

    The Office of Environmental Management (EM) has been delegated the responsibility for the Department of Energy`s (DOE`s) cleanup of the nuclear weapons complex. The nature and magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. Within the United States, operational DOE facilities, as well as the decontamination and decommissioning of inactive facilities, have produced significant amounts of radioactive, hazardous, and mixed wastes. In order to ensure worker safety and the protection of the public, DOE must: (1) assess, remediate, and monitor sites and facilities; (2) store, treat, and dispose of wastes from past and current operations; and (3) develop and implement innovative technologies for environmental restoration and waste management. The EM directive necessitates looking beyond domestic capabilities to technological solutions found outside US borders. Following the collapse of the Soviet regime, formerly restricted elite Soviet scientific expertise became available to the West. EM has established a cooperative technology development program with Russian scientific institutes that meets domestic cleanup objectives by: (1) identifying and accessing Russian EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) increasing US private sector opportunities in Russian in EM-related areas.

  18. Categorical Exclusion Determinations: Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued ...

  19. Effect of environmental variables upon in-situ gamma spectrometry data

    SciTech Connect

    Sutton, C.

    1999-06-01

    The Fernald Environmental Management Project (FEMP) is a US Department of Energy site that is undergoing total remediation and closure. Fernald is a former uranium refinery which produced high quality uranium metal. Soil in the Fernald site is pervasively contaminated with uranium and secondarily with thorium and radium isotopes. In-situ gamma spectrometry is routinely utilized in soil excavation operations at Fernald to provide high quality and timely analytical data on radionuclide contaminants in soil. To understand the effect of environmental conditions upon in-situ gamma spectrometry measurements, twice daily measurements were made, weather permitting, with a tripod-mounted high purity germanium detector (HPGe) at a single field location (field quality control station) at the Fernald Environmental Management Project. Such measurements are the field analogue of a laboratory control standard. The basic concept is that measurement variations over an extended period of time at a single location can be related to environmental parameters. Trends, peaks, and troughs in data might be correlative to both long-term and short-term environmental conditions. In this paper environmental variables/ conditions refer to weather related phenomena such as soil moisture, rainfall, atmospheric humidity, and atmospheric temperature.

  20. SUSTAINABILITY SUPERSTAR Environmental Management's

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management's Donna Green is retiring! Donna began her DOE career at Argonne National Lab in 1998 before moving to EM in 2008 and quickly assuming the lead on their Sustainability program. She has led the charge to integrate sustainable practices into all aspects of the EM mission, and is one of the 2012 DOE Sustainability Award winners for that effort. We wish her well in her new endeavors! Send us your champion! SUSTAINABILITY NEWS 11 DOE Sites Win Awards in EPA 2012 Federal

  1. ENVIRONMENTAL MANAGEMENT OFFICE OF ENVIRONMENTAL MANAGEMENT

    Office of Environmental Management (EM)

    ... 290 1,483 Moab 245 320 *Mound 0 54 Nevada National Security Site 63 748 Oak Ridge ... Demonstration Project 77 408 Title X UraniumThorium Reimbursements 9 9 Management & ...

  2. DOE Cites Fluor Fernald Inc. for Nuclear Safety Violations |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cites Fluor Fernald Inc. for Nuclear Safety Violations DOE Cites Fluor Fernald Inc. for Nuclear Safety Violations August 25, 2005 - 2:43pm Addthis Washington, D.C. - The Department...

  3. Environmental Management Associates | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Environmental Management Associates (Redirected from EMA Associates) Jump to: navigation, search Name: Environmental Management Associates Abbreviation: EMA Website:...

  4. Miamisburg Environmental Management Project Archived Soil & Groundwate...

    Office of Environmental Management (EM)

    Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports Miamisburg Environmental Management Project Archived Soil & Groundwater Master Reports ...

  5. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  6. Environmental Management (EM) Cleanup Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-09-24

    The guide supports DOE O 413.3A, Program and Project Management for the Acquisition of Capital Assets, and provides guidance on environmental management cleanup projects. Canceled by DOE N 251.105.

  7. ISO 14000 environmental management standard

    SciTech Connect

    Block, M.R.

    1995-12-01

    National standards organizations around the world are developing an environmental management standard to help organizations address significant environmental aspects of their activities. This standard, designated ISO 14000, will provide guidance for environmental management systems: environmental audits: Environmental performance evaluation: Environmental labeling and life-cycle assessment. The environmental management system specification, the lynch-pin of ISO 14000, will be published as an international standard in early 1996. Audit documents will follow shortly thereafter. Although conformance to ISO 14000 will be voluntary, US multinational companies are likely to discover that failure to participate creates trade barriers in Europe. The Environmental Commission created by NAFTA also is considering whether to make adherence to ISO 14000 a condition of trade. This presentation will provide an understanding of the ISO process to create the standard, key elements of ISO 14000, and implications for US companies. Such an understanding will enable organizations to determine whether adoption of ISO 14000 is strategically sound.

  8. Cost avoidance techniques through the Fernald controlled area trash segregation program and the RIMIA solid waste reduction program

    SciTech Connect

    Menche, C.E.

    1997-05-14

    The Fernald Environmental Management Project is a Department of Energy owned facility that produced high quality uranium metals for military defense. The Fernald mission has changed from one of production to remediation. Remediation is intended to clean up legacy (primary) waste from past practices. Little opportunity is available to reduce the amount of primary waste. However, there is an opportunity to reduce secondary waste generation, primarily through segregation. Two programs which accomplish this are the Controlled Area Trash Segregation Program and the RIMIA Solid Waste Reduction Program. With these two programs now in place at the FEMP, it has been estimated that a 60% reduction has been achieved in unnecessary clean waste being disposed as Low Level Waste at the Nevada Test Site. The cost savings associated with these programs (currently 79,000 cubic feet, $428,000) could easily run into the millions of dollars based on the upcoming restoration activities to be undertaken. The segregation of non-radiological waste in the radiologically Controlled Area not only establishes a firm commitment to send only low-level radioactive waste to the Nevada Test Site, but also results in substantial cost avoidance.

  9. Life Cycle Analysis for Treatment and Disposal of PCB Waste at Ashtabula and Fernald

    SciTech Connect

    Morris, M.I.

    2001-01-11

    This report presents the use of the life cycle analysis (LCA) system developed at Oak Ridge National Laboratory (ORNL) to assist two U.S. Department of Energy (DOE) sites in Ohio--the Ashtabula Environmental Management Project near Cleveland and the Fernald Environmental Management Project near Cincinnati--in assessing treatment and disposal options for polychlorinated biphenyl (PCB)-contaminated low-level radioactive waste (LLW) and mixed waste. We will examine, first, how the LCA process works, then look briefly at the LCA system's ''toolbox,'' and finally, see how the process was applied in analyzing the options available in Ohio. As DOE nuclear weapons facilities carry out planned decontamination and decommissioning (D&D) activities for site closure and progressively package waste streams, remove buildings, and clean up other structures that have served as temporary waste storage locations, it becomes paramount for each waste stream to have a prescribed and proven outlet for disposition. Some of the most problematic waste streams throughout the DOE complex are PCB low-level radioactive wastes (liquid and solid) and PCB low-level Resource Conservation and Recovery Act (RCRA) liquid and solid wastes. Several DOE Ohio Field Office (OH) sites have PCB disposition needs that could have an impact on the critical path of the decommissioning work of these closure sites. The Ashtabula Environmental Management Project (AEMP), an OH closure site, has an urgent problem with disposition of soils contaminated by PCB and low-level waste at the edge of the site. The Fernald Environmental Management Project (FEMP), another OH closure site, has difficulties in timely disposition of its PCB-low-level sludges and its PCB low-level RCRA sludges in order to avoid impacting the critical path of its D&D activities. Evaluation of options for these waste streams is the subject of this report. In the past a few alternatives for disposition of PCB low-level waste and PCB low-level RCRA

  10. Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

    Energy.gov [DOE]

    ISM Workshop Presentations Knoxville Convention Center, Knoxville, TN August 2009 Track 7: Environmental Protection, Environmental Management System (EMS), "Greening Initiatives"

  11. The highly successful safe remediation of the Fernald waste pits undertaken under the privatization model

    SciTech Connect

    Cherry, Mark; Lojek, Dave; Murphy, Con

    2003-02-23

    Remediation of eight waste pits at the Department of Energy (DOE) Fernald site, located northwest of Cincinnati, Ohio, involves excavating approximately one million tonnes in-situ of low-level waste which were placed in pits during Fernald's production era. This unique project, one of the largest in the history of CERCLA/Superfund, includes uranium and thorium contaminated waste, soils and sludges. These wet soils and sludges are thermally dried in a processing facility to meet Department of Transportation (DOT) transportation and disposal facility waste acceptance criteria, loaded into railcars and shipped to the Envirocare waste disposal facility at Clive, Utah. This project is now approximately 60% complete with more than 415,000 tonnes (460,000 tons) of waste material safely shipped in 74 unit trains to Envirocare. Work is scheduled to be completed in early 2005. Success to date demonstrates that a major DOE site remediation project can be safely and successfully executed in partnership with private industry, utilizing proven commercial best practices, existing site labor resources and support of local stakeholders. In 1997 under the DOE's privatization initiative, Fluor Fernald, Inc. (Fluor Fernald) solicited the services of the remediation industry to design, engineer, procure, construct, own and operate a facility that would undertake the remediation of the waste pits. The resulting procurement was awarded to IT Corporation, currently Shaw Environmental and Infrastructure, Inc. (Shaw). The contractor was required to finance the procurement and construction of its facilities and infrastructure. The contract was performance-based and payment would be made on the successful loadout of the waste from the facility on a per-ton basis meeting the Envirocare waste acceptance criteria. This paper details the performance to date, the challenges encountered, and the seamless partnering between DOE, the Environmental Protection Agency (EPA), Fluor Fernald, Shaw, labor

  12. Total quality environmental management: Integrating environmental and quality management systems

    SciTech Connect

    Carley, J.A.; Kubala, G.; Hudson, T.

    1996-11-01

    As the oilfield industry strives to globally sustain continuous movement of environmental and quality performance, companies have come to realize Total Quality Environmental Management (TQEM) is essential in product research, development manufacturing and services. As our industry endeavors to continuously improve, more emphasis is being placed upon the management systems we apply such as ISO 14000 and ISO 9000. These standards are tools for improving environmental and quality performance, meeting customer requirements, and increasing profitability. lbs paper presents actual examples of the successful integration of environmental and quality management systems into an operational TQEM system. Also presented are pilot study evaluations of the draft ISO 14000 standards by two certified ISO 9000 facilities. Examples of continuous improvement and cross-functional teams as means to merge environment and quality management into the functions of process control, corrective and preventive action, document control, and waste management are presented. Results and improvements from facilities involved with TQEM discussed along with their strategies and progress in consolidating the environmental and quality programs into a single, viable management system. The case histories from various facilities demonstrate the implementation of TQEM and in TQEM promotes a cleaner environment, reduces costs, con- serves energy and raw materials, minimizes pollutants and wastes, and reduces redundant paperwork.

  13. Keynote Address: Update on Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Address: Update on Environmental Management Keynote Address: Update on Environmental Management Keynote presentation made by David G. Huizenga for the NTSF annual meeting held from ...

  14. Advanced simulation capability for environmental management ...

    Office of Scientific and Technical Information (OSTI)

    environmental management (ASCEM): An overview of initial results Citation Details In-Document Search Title: Advanced simulation capability for environmental management (ASCEM): An ...

  15. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Report to the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted ...

  16. Transition of Sites from Environmental Management Memorandum...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from Environmental Management Memorandum of Understanding Transition of Sites from ...

  17. Environmental Management and Remediation Committee Roster | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management and Remediation Committee Roster Environmental Management and Remediation Committee Roster List of NNMCAB members that participate on the Environmental Monitoring and ...

  18. Waste Management Programmatic Environmental Impact Statement...

    Office of Environmental Management (EM)

    Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision Waste Management Programmatic Environmental Impact Statement (WM PEIS) ...

  19. Environmental Management Consolidated Business Center (EMCBC) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Services » Program Management » Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) Environmental Management Consolidated Business Center (EMCBC) SITE OVERVIEW The Department of Energy (DOE) established the EMCBC in Cincinnati, OH, on June 7, 2004, to provide Environmental Management customers with required and improved business and technical support services. Establishing the EMCBC allowed EM's Closure

  20. Joint Environmental Management System (EMS) Declaration of Conformance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services Environmental Management System Joint Environmental Management System (EMS) Declaration of Conformance Joint Environmental Management System (EMS) Declaration of ...

  1. Preliminary Notice of Violation, Fluor Fernald, Inc. - EA-2005...

    Office of Environmental Management (EM)

    Issued to Fluor Fernald, Inc., related to Radiation Protection and Quality Improvement ... Parts 830 and 835 associated with radiation protection and quality improvement ...

  2. Preliminary Notice of Violation, Fluor Fernald, Inc - EA-2001...

    Office of Environmental Management (EM)

    Issued to Fluor Fernald, Inc., related to Unplanned Radiation Exposures and Quality ... radioactivity levels and unmonitored radiation exposures at the Waste Pits Remedial ...

  3. Fernald Preserve Attracts 50,000 Visitors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fernald Preserve Attracts 50,000 Visitors Fernald Preserve Attracts 50,000 Visitors July 10, 2014 - 3:48pm Addthis What does this project do? Goal 4. Optimize the use of land and assets. 8205D-1997.jpg The Fernald Preserve Visitors Center opened in August 2008. Gary Studer, a longtime resident of the greater Cincinnati area, is a regular visitor to the Fernald Preserve in Ohio, enjoying activities like trail walks and bird watching. On Saturday, March 1, 2014, Gary became the 50,000th recipient

  4. Fernald Triparty Agreement as revised, July 18, 1986

    Office of Environmental Management (EM)

    Fernald Preserve Attracts 50,000 Visitors Fernald Preserve Attracts 50,000 Visitors July 10, 2014 - 3:48pm Addthis What does this project do? Goal 4. Optimize the use of land and assets. 8205D-1997.jpg The Fernald Preserve Visitors Center opened in August 2008. Gary Studer, a longtime resident of the greater Cincinnati area, is a regular visitor to the Fernald Preserve in Ohio, enjoying activities like trail walks and bird watching. On Saturday, March 1, 2014, Gary became the 50,000th recipient

  5. ORO Names New Assistant Manager for Environmental Management

    Energy.gov [DOE]

    The U.S. Department of Energy Oak Ridge Office names John Eschenberg as its Assistant Manager for Environmental Management.

  6. Environmental Management Science Program Workshop

    SciTech Connect

    1998-07-01

    This program summary book is a compendium of project summaries submitted by principal investigators in the Environmental Management Science Program and Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program). These summaries provide information about the most recent project activities and accomplishments. All projects will be represented at the workshop poster sessions, so you will have an opportunity to meet with the researchers. The projects will be presented in the same order at the poster session as they are presented in this summary book. Detailed questions about an individual project may be directed to the investigators involved.

  7. DOE Office of Environmental Management Project and Contract Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Improvement Timeline | Department of Energy Acquisition » DOE Office of Environmental Management Project and Contract Management Improvement Timeline DOE Office of Environmental Management Project and Contract Management Improvement Timeline Improving DOE contract and project management is a top priority of the Department's senior management and entire organization. View some highlights of EM's improvement actions here. DOE Office of Environmental Management Contract and Project Management

  8. The Office of Environmental Management Non-Defense Environmental...

    Energy Saver

    Non-Defense Environmental Cleanup The Office of Environmental Management Non-Defense Environmental Cleanup Microsoft Word - 8E2A4440.doc (100.45 KB) More Documents & Publications ...

  9. PIA - Environmental Management Consolidated Business Center (EMCBC) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) PIA - Environmental Management Consolidated Business Center (EMCBC) (3.42 MB) More Documents & Publications PIA - Bonneville Power Adminstration Ethics Helpline PIA - Advanced Test Reactor National Scientific User Facility Users Week 2009 LM Records Handling System (LMRHS01) - Rocky

  10. Rail transportation of Fernald remediation waste

    SciTech Connect

    Fellman, R.T.; Lojek, D.A.; Motl, G.P.; Weddendorf, W.K.

    1995-01-24

    Remediation of the Department of Energy (DOE) Fernald site located north of Cincinnati will generate large quantities of low-level radwaste. This volume includes approximately 1,050,000 tons of material to be removed from eight waste pits comprising Operable Unit 1 (OU-1). The remedial alternative selected includes waste material excavation, drying and transportation by rail to a burial site in the arid west for disposal. Rail transportation was selected not only because rail transportation is safer than truck transportation, but also because of the sheer magnitude of the project and the availability of bulk rail car unloading facilities at a representative disposal site. Based upon current waste quantity estimates as presented in the Feasibility Study for OUI, a fully-loaded 47-car unit train would depart the Fernald site weekly for five years. This paper illustrates the steps taken to obtain agency and public acceptance of the Record of Decision for the remedy which hinged on rail transportation. A preliminary, but detailed, rail transportation plan was prepared for the project to support a series of CERCLA public meetings conducted in late 1994. Some of the major issues addressed in the plan included the following: (1) Scope of project leading to selection of rail transportation; (2) Waste classification; (3) Rail Company overview; (4) Train configuration and rail car selection; (5) Routing; (6) Safety; (7) Prior Notification Requirements (8) Emergency Response. A series of three public meetings identified a number of issues of prime concern to Fernald stakeholders. Following resolution of these issues during the public comment period, a Record of Decision (ROD) approving implementation of the rail transportation strategy was approved pending incorporation of EPA and State of Ohio comments on December 22, 1994.

  11. Bechtel Environmental Integrated Database Management System

    Energy Science and Technology Software Center

    1995-04-11

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  12. Alaska Tribal Conference on Environmental Management

    Energy.gov [DOE]

    The Alaska Tribal Conference on Environmental Management is hosting its annual gathering that bring together tribes, nonprofits, and state and federal organizations for a week of environmental conversations.

  13. Environmental Management Science Education and Internship Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental worker near water Oak Ridge Office of Environmental Management offers students and recent college graduates opportunities to learn about the mission of the DOE-EM...

  14. Analytical electron microscopy characterization of Fernald soils. Annual report, October 1993--September 1994

    SciTech Connect

    Buck, E.C.; Brown, N.R.; Dietz, N.L.

    1995-03-01

    A combination of backscattered electron imaging and analytical electron microscopy (AEM) with electron diffraction have been used to determine the physical and chemical properties of uranium contamination in soils from the Fernald Environmental Management Project in Ohio. The information gained from these studies has been used in the development and testing of remediation technologies. Most chemical washing techniques have been reasonably effective with uranyl [U(VI)] phases, but U(IV) phases have proven difficult to remove from the soils. Carbonate leaching in an oxygen environment (heap leaching) has removed some of the U(IV) phases, and it appears to be the most effective technique developed in the program. The uranium metaphosphate, which was found exclusively at an incinerator site, has not been removed by any of the chemical methods. We suggest that a physical extraction procedure (either a magnetic separation or aqueous biphasic process) be used to remove this phase. Analytical electron microscopy has also been used to determine the effect of the chemical agents on the uranium phases. It has also been used to examine soils from the Portsmouth site in Ohio. The contamination there took the form of uranium oxide and uranium calcium oxide phases. Technology transfer efforts over FY 1994 have led to industry-sponsored projects involving soil characterization.

  15. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

    Tim Jackson (208) 526-8484 For Immediate Release May 29, 2014 Public invited to comment on Draft Environmental Assessment on the Disposition of Five Signature Properties at Idaho National Laboratory The

  16. Hanford Site environmental management specification

    SciTech Connect

    Grygiel, M.L.

    1998-06-10

    The US Department of Energy, Richland Operations Office (RL) uses this Hanford Site Environmental Management Specification (Specification) to document top-level mission requirements and planning assumptions for the prime contractors involved in Hanford Site cleanup and infrastructure activities under the responsibility of the US Department of Energy, Office of Environmental Management. This Specification describes at a top level the activities, facilities, and infrastructure necessary to accomplish the cleanup of the Hanford Site and assigns this scope to Site contractors and their respective projects. This Specification also references the key National Environmental Policy Act of 1969 (NEPA), Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA), and safety documentation necessary to accurately describe the cleanup at a summary level. The information contained in this document reflects RL`s application of values, priorities, and critical success factors expressed by those involved with and affected by the Hanford Site project. The prime contractors and their projects develop complete baselines and work plans to implement this Specification. These lower-level documents and the data that support them, together with this Specification, represent the full set of requirements applicable to the contractors and their projects. Figure 1-1 shows the relationship of this Specification to the other basic Site documents. Similarly, the documents, orders, and laws referenced in this specification represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  17. Department of Energy Idaho - Environmental Management

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Portion of the April 1995 Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Final...

  18. Environmental Resources Management ERM | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Resources Management ERM Jump to: navigation, search Name: Environmental Resources Management (ERM) Place: United Kingdom Sector: Services Product: ERM is a provider of consulting...

  19. West Valley Demonstration Project Waste Management Environmental...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Waste Management Environmental Impact Statement ... June 7, 2006 WVDP Waste Management US - Supplement Analysis Table of Contents 1.0 PURPOSE ...

  20. Letter: Incorporation of Input from the Environmental Management SSAB into Office of Legacy Management Activities

    Energy.gov [DOE]

    From: Assistant Secretary, Jessie H. Roberson (EM-1) To: Mr. James C. Bierer, Chair, Fernald Citizens Advisory Board

  1. Alaska Tribal Conference on Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alaska Tribal Conference on Environmental Management Alaska Tribal Conference on Environmental Management October 26, 2015 8:00AM PDT to October 29, 2015 5:00PM PDT Anchorage,...

  2. WIPP Documents - Environmental Management and Sustainability

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Management and Sustainability WIPP Environmental Policy Statement DOE/WIPP 04-3310, Rev 6 Environmental Management System Description DOE/WIPP-05-3318, Rev 6 WIPP Site Sustainability Plan DOE/WIPP-14-3542

  3. Environmental Management Performance Report 11/1999

    SciTech Connect

    EDER, D.M.

    2000-02-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management performance by: US Department of Energy, Richland Operation

  4. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ENERGY ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD (EM SSAB) HANFORD Application No. (Please leave blank) MEMBERSHIP APPLICATION (December 2015)...

  5. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Preserve, Fernald, Ohio Comprehensive Legacy Management and Institutional Controls Plan ... blank LMSFERS03496-9.0 Comprehensive Legacy Management and Institutional Controls ...

  6. Environmental Management Advisory Board Subcommittees | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy EMAB » Environmental Management Advisory Board Subcommittees Environmental Management Advisory Board Subcommittees ACQUISITION AND PROJECT MANAGEMENT SUBCOMMITTEE SUBCOMMITTEE PURPOSE: The Subcommittee will provide advice, information, and recommendations to the Assistant Secretary for Environmental Management (EM) relating to project management. Although, EM has a solid performance record for cleanup projects, EM must improve its ability to deliver all projects within cost and on

  7. Line Management Perspective: Office of Environmental Management (EM)

    Energy.gov [DOE]

    Slide Presentation by Matthew Moury, Deputy Assistant Secretary for Safety, Security and Quality Programs, Office of Environmental Management. EFCOG Integrated Safety Management Work Planning and Control.

  8. FY 2015 Environmental Management Budget Request to Congress ...

    Office of Environmental Management (EM)

    Environmental Management Budget Request to Congress FY 2015 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2015 ...

  9. Protocol_for_Environmental_Management_Cleanup_Projects_(clean...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf ProtocolforEnvironmentalManagementCleanupProjects(clean).pdf PDF icon ProtocolforEnvironmentalManagement...

  10. FY 2012 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Environmental Management Budget Request to Congress FY 2012 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2012 ...

  11. FY 2014 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Budget Request to Congress FY 2014 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2014 ...

  12. FY 2010 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0 Environmental Management Budget Request to Congress FY 2010 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2010 ...

  13. DOE - NNSA/NFO -- Photo Library Environmental Management

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Photo Library - Environmental Management The Environmental Management Program VisionMission ...

  14. 2012 Annual Planning Summary for Environmental Management | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management 2012 Annual Planning Summary for Environmental Management The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 ...

  15. VBZ-0005- In the Matter of Fluor Daniel Fernald

    Energy.gov [DOE]

    This decision will consider a Motion to Dismiss Fluor Daniel Fernald (FDF) filed on September 7, 1999. FDF moves to dismiss a Complaint filed by Thomas W. Dwyer under the Department of Energy's ...

  16. Groundwater Cleanup Operational Changes Are Being Implemented at Fernald Preserve

    Energy.gov [DOE]

    Uranium contamination in the Great Miami Aquifer—at the Fernald Preserve, Ohio, Site—is being removed from the groundwater through a pump-and-treatment operation, which until this year, involved...

  17. Deputy Under Secretary Klaus Visits the Fernald Preserve in Ohio...

    Energy Saver

    (U.S. Army Interagency Fellow), Tania Smith Taylor (DOE LM), Gwen Hooten (DOE LM), ... Tania Smith Taylor said,"It was great to have Mr. Klaus visit the Fernald Preserve to see ...

  18. OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Danielle Miller (208) 526-5709 For Immediate Release May 30, 2014 OFFICE OF ENVIRONMENTAL MANAGEMENT NAMES NEW IDAHO CLEANUP MANAGER Idaho Falls, ID - The U.S. Department of Energy Office of Environmental Management today announced that John (Jack) Zimmerman has been named Deputy Manager of its highly-successful Idaho Cleanup program, which oversees the environmental cleanup and waste management mission at DOE's Idaho site. Mr. Zimmerman has more than 25 years of experience in nuclear

  19. Fernald Preserve Visitors Center Grand Opening and LEED Platinum

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certification | Department of Energy Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification Fernald Preserve Visitors Center Grand Opening and LEED Platinum Certification October 16, 2008 - 4:14pm Addthis Remarks as Prepared for Acting Deputy Secretary Kupfer Thank you, Mike, for that introduction and to both you and Jane for hosting this event. You both have been instrumental in the dramatic transformation of this site. We made a commitment more than a decade ago to

  20. Environmental Management Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Systems Environmental Management Systems DOE uses Environmental Management Systems already in place at DOE facilities as a management framework to determine and achieve sustainability goals and targets. The Department of Energy (DOE) is committed to implement sustainability into all aspects of operations. Executive Order (EO) 13693, Planning for Federal Sustainability in the Next Decade, directs agencies to continue implementation of formal EMS where those systems have

  1. Hanford Site Environmental Management Specification

    SciTech Connect

    DAILY, J.L.

    2001-05-25

    The US Department of Energy, Richland Operations Office (RL) has established a document hierarchy as part of its integrated management system. The Strategic Plan defines the vision, values, missions, strategic goals, high-level outcomes, and the basic strategies in achieving those outcomes. As shown in Figure 1-1, the Site Specification derives requirements from the Strategic Plan and documents the top-level mission technical requirements for the work involved in the RL Hanford Site cleanup and infrastructure activities under the responsibility of the U.S. Department of Energy, Office of Environmental Management (EM). It also provides the basis for all contract technical requirements. Since this is limited to the EM work, neither the Fast Flux Test Facility (FFTF) nor the Pacific Northwest National Laboratory (PNNL) non-EM science activities are included. Figure 1-1 also shows the relationship between this Site Specification and the other Site management and planning documents. Similarly, the documents, orders, and laws referenced in this document represent only the most salient sources of requirements. Current and contractual reference data contain a complete set of source documents.

  2. OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) ORGANIZATION CHART Download Printable Version Mission & Functions Statement for the Office of Environmental Management

  3. Oak Ridge Environmental Management: 30 years in 30 minutes |...

    Office of Environmental Management (EM)

    Oak Ridge Environmental Management: 30 years in 30 minutes Oak Ridge Environmental Management: 30 years in 30 minutes Addthis

  4. Environmental Management and Planning Solutions, Inc | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Environmental Management and Planning Solutions, Inc Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation: EMPSi Website:...

  5. 2013 Annual Planning Summary for the Environmental Management...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Consolidated Business Center 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center The ongoing and projected...

  6. Categorical Exclusion Determinations: Environmental Management | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Categorical Exclusion Determinations: Environmental Management Categorical Exclusion Determinations issued by Environmental Management. DOCUMENTS AVAILABLE FOR DOWNLOAD October 13, 2011 CX-006923: Categorical Exclusion Determination Design and Install a Modification to the HB-Line Exhaust Fan Dampers CX(s) Applied: B2.5 Date: 10/13/2011 Location(s): Aiken, South Carolina Office(s): Environmental Management October 13, 2011 CX-006920: Categorical Exclusion Determination Install

  7. Advanced Simulation Capability for Environmental Management (ASCEM) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) Advanced Simulation Capability for Environmental Management (ASCEM) ASCEM is being developed to provide a tool and approach to facilitate robust and standardized development of performance and risk assessments for cleanup and closure activities throughout the EM complex. The ASCEM team is composed of scientists from eight National

  8. 2014 Annual Planning Summary for the Office of Environmental Management

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Office of Environmental Management.

  9. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Federal Project Director for Brookhaven National Laboratory by sattler DesignationofEMFedProjDir-BNL-SattlerEM.pdf -- PDF Document, 240 KB ID: NA Type:...

  10. Designation of Environmental Management Federal Project Director...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Federal Project Director for Separations Process Research Unit by feinberg DesignationofEMFedProjDir-SeparationsProcessResearchUnit-FeinbergEM.pdf -- PDF...

  11. Environmental Management Performance Reports - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Impact Statements Environmental Management Performance Reports FY 2016 Reports FY 2015 Reports FY 2014 Reports FY 2013 Reports FY 2012 Reports FY 2011 Reports FY 2010 ...

  12. Bureau of Land Management - Final Programmatic Environmental...

    OpenEI (Open Energy Information) [EERE & EIA]

    to: navigation, search OpenEI Reference LibraryAdd to library Report: Bureau of Land Management - Final Programmatic Environmental Impact Statement for Geothermal Leasing in the...

  13. Frequently Asked Questions | Environmental Management Science...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Frequently Asked Questions About the Oak Ridge Environmental Management Science Education and Internship Program 1. What kind of program is the OREM Science Education and...

  14. Vermont Department of Environmental Conservation, Watershed Management...

    OpenEI (Open Energy Information) [EERE & EIA]

    Strategy Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Department of Environmental Conservation, Watershed Management Division Surface Water...

  15. Vermont Department of Environmental Conservation, Watershed Management...

    OpenEI (Open Energy Information) [EERE & EIA]

    Strategy Website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Vermont Department of Environmental Conservation, Watershed Management Division...

  16. ADVANCED SIMULATION CAPABILITY FOR ENVIRONMENTAL MANAGEMENT

    Office of Scientific and Technical Information (OSTI)

    Key words: Environmental management; Simulation; Model; ... (GS-3, GS-4). 5. Develop predictive capabilities to ... to queue systems that control access Usability ...

  17. Oak Ridge Office of Environmental Management

    Office of Environmental Management (EM)

    Board Post Office Box 2001 Oak Ridge, Tennessee 37831 Dear Mr. ... ON FISCAL YEAR 2016 DOE OAK RIDGE ENVIRONMENTAL MANAGEMENT BUDGET REQUEST Reference: Letter from ...

  18. Department of Energy Environmental Management Consolidated Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Consolidated Business Center 250 East 5 th Street, Suite 500 Cincinnati, Ohio 45202 Media Contact: Lynette Chafin 513-246-0461 December 17, 2015 ...

  19. Contract Awarded for Environmental Management Consolidated Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Consolidated Business Center Mission Support Contract Awarded for ... DeliveryIndefinite Quantity (IDIQ) contract to SUNSi JV, LLC, of Pocatello, ID. ...

  20. Oak Ridge National Laboratory Environmental Management Portfolio...

    Office of Environmental Management (EM)

    Ridge Office of Environmental Management (OREM) East Tennessee Technology Park Portfolio Plan Jim Kopotic Portfolio Federal Project Director East Tennessee Technology Park...

  1. Environmental Management Los Alamos Field Office | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alamos National Laboratory in northern New Mexico. The Environmental Management Los Alamos Field Office (EM-LA) is located at Los Alamos National Laboratory in northern New Mexico. ...

  2. Integrated Safety Management and Environmental Management

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Laboratory | Department of Energy Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory (265.91 KB) More Documents & Publications TRAIN-PIA.pdf Occupational Medicine - Assistant PIA, Idaho National Laboratory PIA -

  3. Environmental Management Performance Report July 2000

    SciTech Connect

    EDER, D.M.

    2000-07-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcont.

  4. Enforcement Action - EA-2003-05 - Consent Order Between US DOE and Flour Fernald

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    18, 2003 Mr. Woodrow Jameson [ ] Fluor Fernald, Inc. P.O. Box 538704 Cincinnati, OH 45252-8704 EA-2003-05 Subject: Consent Order Incorporating Agreement between U.S. Department of Energy and Fluor Fernald, Inc. Dear Mr. Jameson: This letter refers to the Department of Energy's (DOE) evaluation of a recent investigation conducted by Fluor Fernald, Inc. (Fluor Fernald) into the facts and circumstances surrounding an unposted High Radiation Area adjacent to the small concrete building [ ] currently

  5. Competitive energy management and environmental technologies: Proceedings

    SciTech Connect

    1995-03-01

    This book contains the proceedings of the 17th World Energy Engineering Congress 4th Environmental Technology Expo held in December of 1994. The topics of the papers presented at this meeting include environmental management, water resource efficiency, energy management strategies, advances in lighting efficiency and applications, HVAC systems, competitive power technologies, federal energy management programs, and demand-side management. Selected papers are indexed separately for inclusion in the Energy Science and Technology Database.

  6. Environmental Management Richland Operations Office FY 2014 President's Budget FY 2015 Budget Request Regulator Briefing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management Advisory Board (EMAB) Environmental Management

  7. Department of Energy Office of Environmental Management 2015...

    Office of Environmental Management (EM)

    Department of Energy Office of Environmental Management 2015 Year in Review Department of Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental...

  8. FY 2016 Environmental Management Budget Request to Congress ...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2015 Environmental ...

  9. Department of Energy Office of Environmental Management 2015...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Office of Environmental Management 2015 Year in Review Department of Energy Office of Environmental Management 2015 Year in Review DOE Office of Environmental ...

  10. Characterization and remediation of soil prior to construction of an on-site disposal facility at Fernald

    SciTech Connect

    Hunt, A.; Jones, G.; Janke, R.; Nelson, K.

    1998-03-01

    During the production years at the Feed Materials Production Center (FMPC), the soil of the site and the surrounding areas was surficially impacted by airborne contamination. The volume of impacted soil is estimated at 2.2 million cubic yards. During site remediation, this contamination will be excavated, characterized, and disposed of. In 1986 the US Environmental Protection Agency (EPA) and the Department of Energy (DOE) entered into a Federal Facility Compliance Agreement (FFCA) covering environmental impacts associated with the FMPC. A site wide Remedial Investigation/Feasibility Study (RI/FS) was initiated pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act, as amended by the Superfund Amendments and Reauthorization Act (CERCLA). The DOE has completed the RI/FS process and has received approval of the final Records of Decision. The name of the facility was changed to the Fernald Environmental Management Project (FEMP) to emphasize the change in mission to environmental restoration. Remedial actions which address similar scopes of work or types of contaminated media have been grouped into remedial projects for the purpose of managing the remediation of the FEMP. The Soil Characterization and Excavation Project (SCEP) will address the remediation of FEMP soils, certain waste units, at- and below-grade material, and will certify attainment of the final remedial limits (FRLs) for the FEMP. The FEMP will be using an on-site facility for low level radioactive waste disposal. The facility will be an above-ground engineered structure constructed of geological material. The area designated for construction of the base of the on-site disposal facility (OSDF) is referred to as the footprint. Contaminated soil within the footprint must be identified and remediated. Excavation of Phase 1, the first of seven remediation areas, is complete.

  11. Categorical Exclusion Determinations: Environmental Management Consolidated

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Business Service Center | Department of Energy Consolidated Business Service Center Categorical Exclusion Determinations: Environmental Management Consolidated Business Service Center Categorical Exclusion Determinations issued by Environmental Management Consolidated Business Service Center. DOCUMENTS AVAILABLE FOR DOWNLOAD No downloads found for this office.

  12. Audit Report: IG-0555 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    June 5, 2002 Closure of the Fernald Environmental Management Project From 1954 through 1989, the mission of the Department of Energy's Fernald Environmental Management Project...

  13. FY 2009 Environmental Management Budget Request to Congress | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy FY 2009 Environmental Management Budget Request to Congress FY 2009 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2009 Congressional Budget Request Department of Energy - Environmental Management FY 2009 Congressional Budget Request (3.67 MB) More Documents & Publications FY 2013 Environmental Management Budget Request to Congress FY 2011 Environmental Management Budget Request to Congress FY 2010 Environmental Management

  14. Environmental Management Science Program Workshop. Proceedings

    SciTech Connect

    1998-07-01

    The Department of Energy Office of Environmental Management (EM), in partnership with the Office of Energy Research (ER), designed, developed, and implemented the Environmental Management Science Program as a basic research effort to fund the scientific and engineering understanding required to solve the most challenging technical problems facing the government's largest, most complex environmental cleanup program. The intent of the Environmental Management Science Program is to: (1) Provide scientific knowledge that will revolutionize technologies and cleanup approaches to significantly reduce future costs, schedules, and risks. (2) Bridge the gap between broad fundamental research that has wide-ranging applications such as that performed in the Department's Office of Energy Research and needs-driven applied technology development that is conducted in Environmental Management's Office of Science and Technology. (3) Focus the nation's science infrastructure on critical Department of Energy environmental problems. In an effort to share information regarding basic research efforts being funded by the Environmental Management Science Program and the Environmental Management/Energy Research Pilot Collaborative Research Program (Wolf-Broido Program), this CD includes summaries for each project. These project summaries, available in portable document format (PDF), were prepared in the spring of 1998 by the principal investigators and provide information about their most recent project activities and accomplishments.

  15. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Release Phase I | Department of Energy I Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase I The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 1: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified 31

  16. Environmental Management Headquarters Corrective Action Plan - Radiological

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Release Phase II | Department of Energy II Environmental Management Headquarters Corrective Action Plan - Radiological Release Phase II The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Phase 2: Radiological Release Event at the Waste Isolation Pilot Plant (WIPP) on February 14, 2014. The report identified

  17. Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Environmental Management Office of Environmental Management Energy By The Numbers: Recovery Act EM's Paducah Site Completes Building Removals Savannah River Site Museum Ribbon Cutting F Reactor Inspection SRNL Laboratory Directed Research and Development Poster Session 351 Substation Demolition -- B Roll Hanford F Reactor Inspection B-roll footage Energy Secretary Talks About SRNL Hanford workers begin cleaning out historic McCluskey Room Traffic Safety Demo of below ground site that

  18. US - Former Soviet Union environmental management activities

    SciTech Connect

    1995-09-01

    The Office of Environmental Management (EM) has been delegated the responsibility for US DOE`s cleanup of nuclear weapons complex. The nature and the magnitude of the waste management and environmental remediation problem requires the identification of technologies and scientific expertise from domestic and foreign sources. This booklet makes comparisons and describes coordinated projects and workshops between the USA and the former Soviet Union.

  19. Report to the Environmental Management Advisory Board

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the Environmental Management Advisory Board Evaluation of the United States Department of Energy Environmental Management Strategic Planning Communication Tool Submitted by the Risk Communications Subcommittee September 2015 Additional Evaluations: In addition to the evaluation of the strategic planning tool, the EMAB Risk Communications Subcommittee had presentations of other studies and tools currently in use or under development at various DOE cleanup sites to understand their current or

  20. Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    This website highlights activities that support the mission of the Oak Ridge Office of Environmental Management (Oak Ridge Office of EM), which is to remove environmental legacies resulting from more than 60 years of nuclear weapons development and government-sponsored nuclear energy and scientific research.

  1. PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) PRESENTATION: OVERVIEW OF DOE OFFICE OF ENVIRONMENTAL MANAGEMENT (EM) A briefing to the SEAB Task Force on Technology Development for Environmental Management on the DOE Ofiice of Environmental Management. Overview of the Office of Environmental Management (2.12 MB) Overview of the Office of Environmental Management's Technology Development Program (658.68 KB) More Documents & Publications Focus on

  2. FY 2013 Environmental Management Budget Request to Congress ...

    Energy Saver

    FY 2013 Environmental Management Budget Request to Congress (4.02 MB) More Documents & Publications FY 2015 Environmental Management Budget Request to Congress FY 2011 ...

  3. Environmental Management and Planning Solutions, Inc | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Environmental Management and Planning Solutions, Inc (Redirected from EMPSi) Jump to: navigation, search Name: Environmental Management and Planning Solutions, Inc Abbreviation:...

  4. The New Gold Standard: Environmental Management Introduces the...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The New Gold Standard: Environmental Management Introduces the First LEED Gold ...

  5. FY 2011 Environmental Management Budget Request to Congress ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FY 2011 Environmental Management Budget Request to Congress Department of Energy - Environmental Management FY 2011 Congressional Budget Request PDF icon Department of Energy - ...

  6. Office of Environmental Management Taps Small Business for Waste...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant...

  7. Oak Ridge Operations Office of Environmental Management Overview...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview PDF icon Oak Ridge Operations Office of...

  8. Annex IV Environmental Webinar: Adaptive Management in the Marine...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy Industry Annex IV Environmental Webinar: Adaptive Management in the Marine Renewable Energy ...

  9. Environmental Management Internships | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Minority Serving Institution (MSI) MSIs are institutions of higher education enrolling populations with significant percentages of undergraduate minority students. Eligible Minority Serving Institutions Featured Videos Student Intern: Water Table Management Student Intern: Citizen Science Student Intern: Non-Traditional Water Resources Contact undergrad@anl.gov Environmental Management Internships The Minority Serving Institutions Partnership Program (MSIPP) was created by the Department of

  10. Environmental Restoration Information Resource Management Program Plan

    SciTech Connect

    Not Available

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program`s essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan.

  11. Environmental Management Waste Management Facility (EMWMF) at Oak Ridge

    Office of Environmental Management (EM)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  12. 2011 Annual Planning Summary for Environmental Management (EM)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2011 and 2012 within the Office of Environmental Management (EM).

  13. Environmental management system objectives & targets results summary :

    SciTech Connect

    Vetter, Douglas Walter

    2014-04-01

    Sandia National Laboratories/New Mexicos (SNL/NM) Environmental Management System is the integrated approach for members of the workforce to identify and manage environmental risks. Each Fiscal Year (FY) SNL/NM performs an analysis to identify environmental aspects, and the environmental programs associated with them are charged with the task of routinely monitoring and measuring the objectives and targets that are established to mitigate potential impacts of SNL/NMs operations on the environment. An annual summary of the results achieved towards meeting established Sandia Corporation and SNL/NM Site-specific objectives and targets provides a connection to, and rational for, annually revised environmental aspects. The purpose of this document is to summarize the results achieved and documented in FY2013.

  14. Environmental Management Performance Report April 2000

    SciTech Connect

    EDER, D.M.

    2000-04-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S and T) Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries.

  15. Environmental Management Performance Report for December 1999

    SciTech Connect

    EDER, D.M.

    2000-02-16

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: U. S. Department of Energy, Richland Operations Office, Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FHI) and its subcontractors, Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors, and Pacific Northwest National Laboratories (PNNL) for EM and EM Science and Technology (S&T) Mission. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A listing of what is contained in the sections can be found in the Table of Contents.

  16. Environmental Management Performance Report November 2000

    SciTech Connect

    EDER, D.M.

    2000-11-01

    The purpose of the Environmental Management Performance Report (EMPR) is to provide the Department of Energy Richland Operations Office's (DOE-RL's) report of Hanford's Environmental Management (EM) performance by: Project Hanford Management Contract (PHMC) through Fluor Hanford, Inc. (FH) and its subcontractors; Environmental Restoration Contract through Bechtel Hanford, Inc. (BHI), and its subcontractors; Pacific Northwest National Laboratories (PNNL) for Science and Technology support to the EM Mission; and Office of Safety Regulation of the TWRS Privatization Contractor. This report is a monthly publication that summarizes EM Site performance under RL Operations Office. It is organized by the four sections listed above, with each section containing an Executive Summary and Area Performance Summaries. A glossary of terms is provided at the end of this report for reference purposes.

  17. OSTIblog Articles in the Office of Environmental Management Topic | OSTI,

    Office of Scientific and Technical Information (OSTI)

    US Dept of Energy Office of Scientific and Technical Information Environmental Management

  18. Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management

    Energy.gov [DOE]

    Full text of Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

  19. Partnering Policy for the Office of Environmental Management | Department

    Office of Environmental Management (EM)

    of Energy Policy for the Office of Environmental Management Partnering Policy for the Office of Environmental Management Partnering Policy for the Office of Environmental Management (448.69 KB) More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Microsoft Word - ADR Revised Policy82508Reformatted.doc OMB and CEQ Joint Memorandum on Environmental Collaboration and Conflict Resolution (CEQ, 2012)

  20. Environmental remediation and waste management information systems

    SciTech Connect

    Harrington, M.W.; Harlan, C.P.

    1993-12-31

    The purpose of this paper is to document a few of the many environmental information systems that currently exist worldwide. The paper is not meant to be a comprehensive list; merely a discussion of a few of the more technical environmental database systems that are available. Regulatory databases such as US Environmental Protection Agency`s (EPA`s) RODS (Records of Decision System) database [EPA, 1993] and cost databases such as EPA`s CORA (Cost of Remedial Action) database [EPA, 1993] are not included in this paper. Section 2 describes several US Department of Energy (DOE) Environmental Restoration and Waste Management (EM) information systems and databases. Section 3 discusses several US EPA information systems on waste sites and technologies. Section 4 summarizes a few of the European Community environmental information systems, networks, and clearinghouses. And finally, Section 5 provides a brief overview of Geographical Information Systems. Section 6 contains the references, and the Appendices contain supporting information.

  1. Airborne Particle Size Distribution Measurements at USDOE Fernald

    SciTech Connect

    Harley, N.H.; Chittaporn, P.; Heikkinen, M.; Medora, R.; Merrill, R.

    2003-03-27

    There are no long term measurements of the particle size distribution and concentration of airborne radionuclides at any USDOE facility except Fernald. Yet the determinant of lung dose is the particle size, determining the airway and lower lung deposition. Beginning in 2000, continuous (6 to 8 weeks) measurements of the aerosol particle size distribution have been made with a miniature sampler developed under EMSP. Radon gas decays to a chain of four short lived solid radionuclides that attach immediately to the resident atmospheric aerosol. These in turn decay to long lived polonium 210. Alpha emitting polonium is a tracer for any atmospheric aerosol. Six samplers at Fernald and four at QC sites in New Jersey show a difference in both polonium concentration and size distribution with the winter measurements being higher/larger than summer by almost a factor of two at all locations. EMSP USDOE Contract DE FG07 97ER62522.

  2. Bonneville - Hood River Vegetation Management Environmental Assessment

    SciTech Connect

    N /A

    1998-08-01

    To maintain the reliability of its electrical system, BPA, in cooperation with the U.S. Forest Service, needs to expand the range of vegetation management options used to clear unwanted vegetation on about 20 miles of BPA transmission line right-of-way between Bonneville Dam and Hood River; Oregon, within the Columbia Gorge National Scenic Area (NSA). We propose to continue controlling undesirable vegetation using a program of Integrated Vegetation Management (IVM) which includes manual, biological and chemical treatment methods. BPA has prepared an Environmental Assessment (EA) (DOE/EA-1257) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an Environmental Impact Statement (EIS) is not required and BPA is issuing this FONSI.

  3. Environmental planning and priorities for the manager

    SciTech Connect

    Eggleston, T.E. )

    1993-01-01

    Industry and government spend in excess of $100 billion each year on pollution control. These funds are producing cleaner land, air, and water. They have also spawned a pollution control industry which today employs more than 175,000 people. While significant, this is only the initial investment of capital and human talent that cleaning up the environment will demand through the 1990's and into the next century. Industry is in the early phases of an explosion of environmentally-oriented activity. Industries who manage their priorities and respond proactively on environmental issues will be the more profitable in an economy increasingly influenced by environmental regulations and consumer activism. A series of issues will most likely dominate management of environmental concerns, including: pollution prevention--reducing pollutants before having to clean them up; recycling--reuse limits disposal problems while reducing pollutants generated by new manufacturing; private-public partnerships--these contractual relationships between public and private partners will become increasingly popular; energy use although large strides have been made in energy conservation, much remains to be done; technology innovation--this is the most fundamental tool for use in improving environmental quality. In order for industry to respond to the need, government will have to implement a series of economic, environmental, and social policies. Business then becomes the key element in advancing the policies established by government.

  4. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    IL (United States) Fernald Area Office (United States) Fernald Environmental Management Project, OH (United States) FluxNet General Atomics Site, San Diego, CA (United...

  5. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    IL (United States) Fernald Area Office (United States) Fernald Environmental Management Project, OH (United States) General Atomics Site, San Diego, CA (United States)...

  6. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    IL (United States) Fernald Area Office (United States) Fernald Environmental Management Project, OH (United States) FluxNet General Atomics Site, San Diego, CA (United States) ...

  7. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    (FNAL), Batavia, IL (United States) Fernald Area Office (United States) Fernald Environmental Management Project, OH (United States) FluxNet General Atomics Site, San...

  8. The Environmental Assessment Management modification of CADET

    Energy Science and Technology Software Center

    1996-05-01

    The original CADET system (finalized in September 1995 as version 1.3) is a data collection and transfer system developed for the Headquarters Air Force Space Command (HQAFSPC) Environmental Compliance Assessment and Management Program (ECAMP). The system was designed as a tool for ECAMP evaluators to use to enter compliance related data while in the field and to subsequently store, modify, sort, query, and print the data and to electronically transfer the data into the Airmore » Force''s Work Information Management System Environmental Subsystem (WIMSES). The original CADET system was designed to match the database structure of the WIMSES ECAMP module that came on-line in 1992. In June 1995, the Department of Defense issued The Environmental Assessment Management (TEAM) Guide and ECAMP Supplement to the TEAM Guide. These included changes to the type and amount of data collected during an ECAMP assessment. The WIMSES database structure was not modified to match the TEAM Guide; however, the need for collecting and storing the ECAMP data remained. The HQAFSC decided to modify the CADET system to incorporate the changes specified in the ECAMP Supplement and to convert the system from simply a data entry and transfer tool to a data entry and storage system to manage ECAMP findings in lieu of the WIMSES ECAMP module. The revised software is designated as version 2.0 and nicknamed TEAM CADET to distinguish it from the original CADET system.« less

  9. Environment, safety and health compliance assessment, Feed Materials Production Center, Fernald, Ohio

    SciTech Connect

    Not Available

    1989-09-01

    The Secretary of Energy established independent Tiger Teams to conduct environment, safety, and health (ES H) compliance assessments at US Department of Energy (DOE) facilities. This report presents the assessment of the Feed Materials Production Center (FMPC) at Fernald, Ohio. The purpose of the assessment at FMPC is to provide the Secretary with information regarding current ES H compliance status, specific ES H noncompliance items, evaluation of the adequacy of the ES H organizations and resources (DOE and contractor), and root causes for noncompliance items. Areas reviewed included performance under Federal, state, and local agreements and permits; compliance with Federal, state and DOE orders and requirements; adequacy of operations and other site activities, such as training, procedures, document control, quality assurance, and emergency preparedness; and management and staff, including resources, planning, and interactions with outside agencies.

  10. A Science Data Gateway for Environmental Management

    SciTech Connect

    Agarwal, Deborah, A; Faybishenko, Boris; Freedman, Vicky, L; Krishnan, Harinarayan; Kushner, Gary; Lansing, Carina; Porter, Ellen; Romosan, Alexandru; Shoshani, Arie; Wainwright, Haruko; Weidmer, Arthur; Wu, Kesheng

    2015-10-12

    Science data gateways are effective in providing complex science data collections to the world-wide user communities. In this paper we describe a gateway for the Advanced Simulation Capability for Environmental Management (ASCEM) framework. Built on top of established web service technologies, the ASCEM data gateway is specifically designed for environmental modeling applications. Its key distinguishing features include: (1) handling of complex spatiotemporal data, (2) offering a variety of selective data access mechanisms, (3) providing state of the art plotting and visualization of spatiotemporal data records, and (4) integrating seamlessly with a distributed workflow system using a RESTful interface. ASCEM project scientists have been using this data gateway since 2011.

  11. Five-Year Review Fourth Five-Year Review for the Fernald Preserve

    Office of Legacy Management (LM)

    Fourth Five-Year Review Report for the Fernald Preserve April 2016 - Draft LMS/FER/S13683 This page intentionally left blank This page intentionally left blank U.S. Department of Energy Fourth Five-Year Review Report for the Fernald Preserve April 2016 Doc No. S13683 Page i Contents Abbreviations ...................................................................................................................................v Executive Summary

  12. BEIDMS1. 3. Bechtel Environmental Integrated Database Management System

    SciTech Connect

    Forstrom, K.; Wallace, J.; Goodwin, D. )

    1994-09-09

    Bechtel Environmental Integrated Data Management System (BEIDMS1.3) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  13. BEIDMS1.4. Bechtel Environmental Integrated Database Management System

    SciTech Connect

    Wallace, J.; Goodwin, D.

    1994-09-09

    Bechtel Environmental Integrated Data Management System (BEIDMS1.4) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  14. BEIDMS1.3. Bechtel Environmental Integrated Database Management System

    SciTech Connect

    Forstrom, K.; Wallace, J.; Goodwin, D.

    1994-09-09

    Bechtel Environmental Integrated Data Management System (BEIDMS1.3) is an Oracle based relational database that stores data related to all aspects of environmental data collection.

  15. Office of Environmental Management MAJOR CONTRACTS SUMMARY

    Office of Environmental Management (EM)

    Environmental Management MAJOR CONTRACTS SUMMARY As of 10/11/2016 Page 1 of 12 Site Contract Description Contractor and Contract Number Current Contract Period Total Value Contract Type Carlsbad Field Office Waste Isolation Pilot Project Management and Operating Contract Nuclear Waste Partnership, LLC DE-EM0001971 Base Period: 10/01/2012 to 09/30/2017 Option 1 (1 Year): 10/01/2017 to 09/30/2018 Option 2 (4 Years): 10/01/2018 to 09/30/2022 $1.9B Cost Plus Award Fee Carlsbad Technical Assistance

  16. Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Congressional Nuclear Cleanup Caucus Mark Whitney Manager Oak Ridge, TN May 16, 2013 www.energy.gov/EM 2 EM Program Overview ETTP ORNL Y-12 City of Oak Ridge * Work is organized by Cleanup Por7olios * ETTP * Y-12 * ORNL www.energy.gov/EM 3 -3- * Approximately 10-Year Scope of Work * Regulatory Agreements * Partners and Stakeholders U-233 DisposiKon Project ETTP Cleanup and S&M TRU Waste Processing Center * Diverse, complex projects * Ongoing DOE

  17. Status of Environmental Management Initiatives to Accelerate the Reduction of Environmental Risks and Challenges Posed by the Legacy of the Cold War

    SciTech Connect

    2009-01-01

    Fifty years of nuclear weapons production and energy research in the United States during the Cold War generated large amounts of radioactive wastes, spent nuclear fuel (SNF), excess plutonium and uranium, thousands of contaminated facilities, and contaminated soil and groundwater. During most of that half century, the Nation did not have the environmental regulatory structure or nuclear waste cleanup technologies that exist today. The result was a legacy of nuclear waste that was stored and disposed of in ways now considered unacceptable. Cleaning up and ultimately disposing of these wastes is the responsibility of the U.S. Department of Energy (DOE). In 1989, DOE established the Office of Environmental Management (EM) to solve the large scale and technically challenging risks posed by the world's largest nuclear cleanup. This required EM to build a new nuclear cleanup infrastructure, assemble and train a technically specialized workforce, and develop the technologies and tools required to safely decontaminate, disassemble, stabilize, disposition, and remediate unique radiation hazards. The sites where nuclear activities produced legacy waste and contamination include the original Manhattan Project sites--Los Alamos, New Mexico; Hanford, Washington; and Oak Ridge, Tennessee--as well as major Cold War sites, such as Savannah River Site, South Carolina; the Idaho National Laboratory, Idaho; Rocky Flats Plant, Colorado; and Fernald, Ohio. Today EM has responsibility for nuclear cleanup activities at 21 sites covering more than two million acres in 13 states, and employs more than 30,000 Federal and contractor employees, including scientists, engineers and hazardous waste technicians. This cleanup poses unique, technically complex problems, which must be solved under the most hazardous of conditions, and which will require billions of dollars a year for several more decades. The EM program focus during its first 10 years was on managing the most urgent risks and

  18. Analysis of DOE international environmental management activities

    SciTech Connect

    Ragaini, R.C.

    1995-09-01

    The Department of Energy`s (DOE) Strategic Plan (April 1994) states that DOE`s long-term vision includes world leadership in environmental restoration and waste management activities. The activities of the DOE Office of Environmental Management (EM) can play a key role in DOE`s goals of maintaining U.S. global competitiveness and ensuring the continuation of a world class science and technology community. DOE`s interest in attaining these goals stems partly from its participation in organizations like the Trade Policy Coordinating Committee (TPCC), with its National Environmental Export Promotion Strategy, which seeks to strengthen U.S. competitiveness and the building of public-private partnerships as part of U.S. industrial policy. The International Interactions Field Office task will build a communication network which will facilitate the efficient and effective communication between DOE Headquarters, Field Offices, and contractors. Under this network, Headquarters will provide the Field Offices with information on the Administration`s policies and activities (such as the DOE Strategic Plan), interagency activities, as well as relevant information from other field offices. Lawrence Livermore National Laboratory (LLNL) will, in turn, provide Headquarters with information on various international activities which, when appropriate, will be included in reports to groups like the TPCC and the EM Focus Areas. This task provides for the collection, review, and analysis of information on the more significant international environmental restoration and waste management initiatives and activities which have been used or are being considered at LLNL. Information gathering will focus on efforts and accomplishments in meeting the challenges of providing timely and cost effective cleanup of its environmentally damaged sites and facilities, especially through international technical exchanges and/or the implementation of foreign-development technologies.

  19. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    Washington, D.C. 20585 April 25, 2013 2 Environmental Management Site-Specific Advisory Board - April 25, 2013 Meeting Minutes LIST OF ACRONYMS AB - Advisory Board ANL - Argonne National Laboratory ARP - Accelerator Retrieval Project BNL - Brookhaven National Laboratory BRC - Blue Ribbon Commission CAB - Citizens Advisory Board D&D - Decontamination & Decommissioning DDFO - Deputy Designated Federal Officer DOE - Department of Energy DUF6 - Depleted Uranium Hexafluoride DWPF - Defense

  20. Office of Environmental Management | Department of Energy

    Office of Environmental Management (EM)

    Office of Environmental Management EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment IDAHO FALLS, Idaho - EM's Idaho Site program and contractor Fluor Idaho have completed a significant cleanup accomplishment that further protects the underlying Snake River Plain Aquifer, the primary drinking and irrigation water source for more than 300,000 Idahoans. Read more EM Releases Supporting Materials from 2016 National

  1. Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Environmental Management EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment IDAHO FALLS, Idaho - EM's Idaho Site program and contractor Fluor Idaho have completed a significant cleanup accomplishment that further protects the underlying Snake River Plain Aquifer, the primary drinking and irrigation water source for more than 300,000 Idahoans. Read more EM Releases Supporting Materials from 2016 National

  2. Environmental management technology demonstration and commercialization

    SciTech Connect

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-12-31

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  3. User-centered guidelines for environmental management

    SciTech Connect

    Eike, D.R.; Fox, J.A.; Dailey, R.

    1993-08-01

    Environmental Management requirements facing US Department of Energy (DOE) facilities are detailed, complex, and often subject to rapid change. DOE`s Office of Environmental Guidance, RCRA/CERCLA Division (EH-231), is responsible for developing and issuing guidance to assist DOE facilities in interpreting and complying with Federal, State, and local requirements. Recognizing the potential for computerization of the guidance, EH-231 requested that Pacific Northwest Laboratory (PNL) develop an approach for preparing automated guidance. The approach developed by PNL, termed ``user-centered guidance,`` combines participatory design and traditional rapid prototyping techniques to produce a new form of environmental guidance that emphasizes the user`s needs. This paper describes the objectives, processes and current status of this effort.

  4. Environmental management technology demonstration and commercialization

    SciTech Connect

    Daly, D.J.; Erickson, T.A.; Groenewold, G.H.

    1995-10-01

    The Energy & Environmental Research Center (EERC), a contract-supported organization focused on technology research, development, demonstration, and commercialization (RDD&C), is entering its second year of a Cooperative Agreement with the U.S. Department of Energy (DOE) Morgantown Energy Technology Center (METC) to facilitate the development, demonstration, and commercialization of innovative environmental management (EM) technologies in support of the activities of DOE`s Office of Environmental Science and Technology (EM-50) under DOE`s EM Program. This paper reviews the concept and approach of the program under the METC-EERC EM Cooperative Agreement and profiles the role the program is playing in the commercialization of five EM technologies.

  5. Environmental Management Los Alamos Field Office Corrective Action...

    Energy Saver

    for management of the environmental restoration and the ... Nuclear Security Administration Los Alamos Field Office (NA-LA) continues with the responsibility for the management of ...

  6. Implementation Guide for Integrating Pollution Prevention into Environmental Management Systems

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2005-05-27

    This Guide suggests approaches to integrating pollution prevention into Integrated Safety Management/Environmental Management Systems. Canceled by DOE N 251.82.

  7. Operable Unit 3: Proposed Plan/Environmental Assessment for interim remedial action

    SciTech Connect

    Not Available

    1993-12-01

    This document presents a Proposed Plan and an Environmental Assessment for an interim remedial action to be undertaken by the US Department of Energy (DOE) within Operable Unit 3 (OU3) at the Fernald Environmental Management Project (FEMP). This proposed plan provides site background information, describes the remedial alternatives being considered, presents a comparative evaluation of the alternatives and a rationnale for the identification of DOE`s preferred alternative, evaluates the potential environmental and public health effects associated with the alternatives, and outlines the public`s role in helping DOE and the EPA to make the final decision on a remedy.

  8. Mission & Functions Statement for the Office of Environmental Management |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Mission & Functions Statement for the Office of Environmental Management Mission & Functions Statement for the Office of Environmental Management The mission of the Office of Environmental Management (EM) is to complete the safe cleanup of the environmental legacy brought about from five decades of nuclear weapons development and government-sponsored nuclear energy research. The program is one of the largest and most diverse and technically complex environmental

  9. Fernald Preserve 2015 site Environmental Report, Appendix B Supplement...

    Office of Legacy Management (LM)

    Treated Effluent Information This page intentionally left blank U.S. Department of Energy ... Plot for Location SWD-09 (Former Waste Storage Area) ......

  10. Office of Environmental Management (EM) Organization Chart | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart Office of Environmental Management (EM) Organization Chart (200.68 KB) More Documents & Publications Chairs Meeting - August 2016 EM SSAB Conference Calls - August 11, 2015 EM SSAB Conference Calls - December 15, 2014

  11. Office of Environmental Management: A Journey to Excellence | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management: A Journey to Excellence Office of Environmental Management: A Journey to Excellence Office of Environmental Management: A Journey to Excellence (5.44 MB) More Documents & Publications Assistant Secretary Triay's FY 2012 EM Budget Rollout Presentation Chairs Meeting - June 2011 2012 Congressional Nuclear Cleanup Caucus Briefings

  12. Letter: The Environmental Management SSABs Recommendations on Transuranic

    Office of Environmental Management (EM)

    Activities of the Environmental Management SSABs | Department of Energy Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs Letter: Restructuring & Managing of the Procurement Mechanisms Supporting Activities of the Environmental Management SSABs From: Assistant Secretary, Jessie H. Roberson (EM-1) To: The Honorable J. Gresham Barrett U.S. House of Representatives This letter is in response to an August 8, 2003 letter

  13. Preliminary evaluation of the use of the greater confinement disposal concept for the disposal of Fernald 11e(2) byproduct material at the Nevada Test Site

    SciTech Connect

    Cochran, J.R.; Brown, T.J.; Stockman, H.W.; Gallegos, D.P.; Conrad, S.H.; Price, L.L. |

    1997-09-01

    This report documents a preliminary evaluation of the ability of the greater confinement disposal boreholes at the Nevada Test Site to provide long-term isolation of radionuclides from the disposal of vitrified byproduct material. The byproduct material is essentially concentrated residue from processing uranium ore that contains a complex mixture of radionuclides, many of which are long-lived and present in concentrations greater than 100,000 picoCuries per gram. This material has been stored in three silos at the fernald Environmental Management Project since the early 1950s and will be vitrified into 6,000 yd{sup 3} (4,580 m{sup 3}) of glass gems prior to disposal. This report documents Sandia National Laboratories` preliminary evaluation for disposal of the byproduct material and includes: the selection of quantitative performance objectives; a conceptual model of the disposal system and the waste; results of the modeling; identified issues, and activities necessary to complete a full performance assessment.

  14. TECHNICAL INTEGRATION ENVIRONMENTAL MANAGEMENT FOCUS AREAS

    SciTech Connect

    Carey R. Butler

    2001-10-01

    This contract involved a team of companies led by WPI (formerly the Waste Policy Institute). In addition to WPI, the team included four subcontractors--TRW (formerly BDM Federal), SAIC, Energetics, and the University of North Dakota Energy and Environmental Research Center (EERC). The team of companies functioned as a ''seamless team'' assembled to support the Environmental Management Program Focus Areas. Staff resources were applied in the following offices: Richland, Washington, Idaho Falls, Idaho, Morgantown, West Virginia, Grand Forks, North Dakota, Aiken, South Carolina, Gaithersburg, Maryland, and Blacksburg, Virginia. These locations represented a mixture of site support offices at the field focus area locations and central staff to support across the focus areas. The management of this dispersed resource base relied on electronic communication links to allow the team to function as a ''virtual office'' to address tasks with the best qualified staff matched to the task assignments. A variety of tasks were assigned and successfully completed throughout the life of the contract that involved program planning and analysis, program execution, program information management and communication and data transmission.

  15. Summary - Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN

    Office of Environmental Management (EM)

    Oak Ridge, TN EM Project: EM Waste Management Facility ETR Report Date: February 2008 ETR-11 United States Department of Energy Office of Environmental Management (DOE-EM) External Technical Review of Environmental Management Waste Management Facility (EMWMF) at Oak Ridge, TN Why DOE-EM Did This Review The Environmental Management Waste Management Facility (EMWMF) is a land disposal facility for wastes generated by environmental restoration activities being conducted at the US Department of

  16. Environmental Management Performance Report June 2000

    SciTech Connect

    EDER, D.M.

    2000-06-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a monthly summary of the Project Hanford Management Contractor's (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. In addition to project-specific information, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/Schedule data contained herein is as of April 30, 2000. All other information is updated as of May 19, unless otherwise noted.

  17. Environmental Management Performance Report May 2000

    SciTech Connect

    EDER, D.M.

    2000-05-01

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-FU) a report of the Project Hanford Management Contractors' (PHMC)' Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual Project (e.g., Waste Management, Spent Nuclear Fuels, etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, Metrics, and Cost/Schedule data contained herein is as of March 31, 2000. All other information is updated as noted.

  18. Environmental Management Performance Report March 2000

    SciTech Connect

    EDER, D.M.

    2000-03-16

    The purpose of this report is to provide the Department of Energy Richland Operations Office (DOE-RL) a report of the Project Hanford Management Contractors' (PHMC) Environmental Management (EM) performance by Fluor Hanford (FH) and its subcontractors. This report is a monthly publication that summarizes the PHMC EM performance. In addition, it includes some PHMC-level data not detailed elsewhere in the report. Section A, Executive Summary, provides an executive level summary of the cost, schedule, and technical performance described in this report. It summarizes performance for the period covered, highlights areas worthy of management attention, and provides a forward look to some of the upcoming key performance activities as extracted from the PHMC baseline. The remaining sections provide detailed performance data relative to each individual mission area (e.g., Waste Management, Spent Nuclear fuels , etc.), in support of Section A of the report. A glossary of terms is provided at the end of this report for reference purposes. Unless otherwise noted, the Safety, Conduct of Operations, and Cost/schedule data contained herein is as of January 31, 2000. All other information is as of March 1, 2000.

  19. Establishing the Office of Environmental Management Quality Assurance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Corporate Board | Department of Energy Establishing the Office of Environmental Management Quality Assurance Corporate Board Establishing the Office of Environmental Management Quality Assurance Corporate Board The purpose of this memorandum is to introduce the Office of Environmental Management (EM) Quality Assurance (QA) Corporate Board which implements EM's policy and guidance and promotes lessons learned and best practices across the sites. Establishing the Office of Environmental

  20. Independent Oversight Assessment, DOE Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Headquarters - November 2012 | Department of Energy DOE Office of Environmental Management Headquarters - November 2012 Independent Oversight Assessment, DOE Office of Environmental Management Headquarters - November 2012 November 2012 Assessment of Safety Culture at the U.S. Department of Energy Office of Environmental Management Headquarters This report provides the results of an independent assessment of the safety culture at the Department of Energy's (DOE) Office of Environmental

  1. NETL-EERC ENVIRONMENTAL MANAGEMENT COOPERATIVE AGREEMENT

    SciTech Connect

    Christina B. Behr-Andres; Daniel J. Daly

    2001-07-31

    This final report summarizes the accomplishments of the 6-year Environmental Management Cooperative Agreement (EMCA) between the Energy and Environmental Research Center (EERC), a nonprofit, contract-supported unit of the University of North Dakota, and the U.S. Department of Energy (DOE) National Energy Technology Laboratory (NETL). The first portion of the report summarizes EMCA's structure, activities, and accomplishments. The appendix contains profiles of the individual EMCA tasks. Detailed descriptions and results of the tasks can be found separately in published Final Topical Reports. EMCA (DOE Contract No. DE-FC21-94MC31388) was in place from the fall of 1994 to the summer of 2001. Under EMCA, approximately $5.4 million was applied in three program areas to expedite the commercialization of 15 innovative technologies for application in DOE's EM Program ($3.8 million, or 69% of funds), provide technical support to the Deactivation and Decommissioning Focus Area (DDFA; $1.04 million, or 19% of funds), and provide for the coordination of the EMCA activities ($0.62 million, or 11% of funds). The following sections profile the overall accomplishments of the EMCA program followed by a summary of the accomplishments under each of the EMCA areas: commercialization, DDFA technical support, and management. Table 1 provides an overview of EMCA, including program areas, program activities, the duration and funding of each activity, and the associated industry partner, if appropriate.

  2. Environmental Management Advisory Board Charter | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services » Communication & Engagement » EMAB » Environmental Management Advisory Board Charter Environmental Management Advisory Board Charter The Environmental Management Advisory Board's (EMAB)'s most recent charter outlines the objective, structure, and scope of the Board. EMAB Charter (120.69 KB) More Documents & Publications EM SSAB Charter EM SSAB Conference Calls - September 19, 2011 EMAB Meeting - April 2009 Waste Management Nuclear Materials & Waste Tank Waste and Waste

  3. Environmental Management Los Alamos Field Office Corrective Action Plan -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Radiological Release Phase II | Department of Energy Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Office Corrective Action Plan - Radiological Release Phase II On March 22, 2015, the Department of Energy established an Environmental Management Los Alamos Field Office (EM-LA) responsible for management of the environmental restoration and the legacy waste management programs at Los Alamos National Laboratory (LANL).

  4. Department of Energy Environmental Management Workshop | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management Workshop Department of Energy Environmental Management Workshop Presentation from the 2016 DOE National Cleanup Workshop by Ralph E. Holland, Deputy Assistant Secretary for Acquisition and Project Management. Department of Energy Environmental Management Workshop (935.92 KB) More Documents & Publications Update on Procurement Opportunities and Acquisition Process EM Major Contracts Awarded Since 2006 DUF6-Operations-Contract-DE-EM0004559-Conformed-Mod-02

  5. Resources of the future in environmental management

    SciTech Connect

    Bhada, R.K.; Morgan, D.; Jacquez, R.

    1994-12-31

    A major issue facing the generation and application of environmental technology is that of educating and training the work force that is needed to resolve the problems of the past and those for the next few decades. By necessity, this professional level workforce must have multidisciplinary education combined with research experience at the leading edge of technology. In order to satisfy this critical need, a unique type of organization was created for education and technology development in environmental areas. The Waste-management Education and Research Consortium (WERC) was created in 1990 by a cooperative agreement with the U.S. Department of Energy as a partnership of New Mexico State University, The University of New Mexico, and the New Mexico Institute of Mining and Technology in collaboration with Los Alamos National Laboratory and Sandia National Laboratories; the Navajo Community College joined as an affiliate in 1991. WERC has conclusively demonstrated that such a partnership collaborating with industry can be an effective tool to expand the nation`s resources to address issues related to the management of all forms of waste, via education, technology development and information transfer. The WERC program has implemented the following items: (1) College education at the technologist, undergraduate and graduate level; (2) Pre-college programs to involve young students in environmental activities; (3) Professional development and restraining series by satellite TV; (4) Technology development projects for solutions at the leading edge; (5) Four measurement and testing laboratories; (6) Technology transfer for information to communities, industry and government; (7) A University Design Contest for interaction between universities; and (8) A First Response Training Academy for emergency personnel. Currently this program is serving over 2000 students and professionals on an international bases.

  6. Environmental Management Assessment of the National Renewable Energy Laboratory (NREL)

    SciTech Connect

    Not Available

    1993-09-01

    This report documents the results of the environmental management assessment performed at the National Renewable Energy Laboratory (NREL) in Golden, Colorado. The onsite portion of the assessment was conducted from September 14 through September 27, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). During this assessment, the activities conducted by the assessment team included reviews of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and NREL contractor personnel; and inspections and observations of selected facilities and operations. The environmental management assessment of NREL focused on the adequacy of environmental management systems and assessed the formality of programs employing an approach that recognizes the level of formality implementing environmental programs may vary commensurate with non-nuclear research and development operations. The Assessment Team evaluated environmental monitoring, waste management and National Environmental Policy Act (NEPA) activities at NREL, from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section of this report. The scope of the NREL Environmental Management Assessment was comprehensive and included all areas of environmental management. At the same time, environmental monitoring, waste management, and NEPA activities were evaluated to develop a programmatic understanding of these environmental disciplines, building upon the results of previous appraisals, audits, and reviews performed at the NREL.

  7. Colorado Environmental Coalition v. Office of Legacy Management, Civil

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action No. 08-cv-01624 (February 27, 2012) | Department of Energy February 27, 2012) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (February 27, 2012) U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). U.S. District Court's Order of February 27, 2012, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No.

  8. Oak Ridge Operations Office of Environmental Management Overview |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview Oak Ridge Operations Office of Environmental Management Overview (2 MB) More Documents & Publications OREM Hosts Community Workshop ORSSAB Meeting - August 2013 Above on the left is K-25, at Oak Ridge before and after the 844,000 sq-ft demolition. In addition, on the right: K Cooling Tower at Savannah River Site demolition. Deactivation &

  9. SRNS Environmental Management System External Audit | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SRNS Environmental Management System External Audit SRNS Environmental Management System External Audit August 2009 Presenter: Eloy Saldivar, SRNS Track 7-1 Topics Covered: EMS Customer Satisfaction Contractor Profile/Integration Integration of EMS into ISM EMS External Audit EMS "Declaration of Conformance" EMS Configuration Control EMS Impact on SRS Processes, Products and Services SRNS Environmental Management System External Audit (973.43 KB) More Documents & Publications

  10. Environmental Management Completed Projects 2005-Present | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Completed Projects 2005-Present Environmental Management Completed Projects 2005-Present This document provides the list of completed EM cleanup projects from various sites across the country from 2005 to present, along with the each project's performance related to cost, schedule, and scope. Environmental Management Completed Projects 2005-Present (389.48 KB) More Documents & Publications Environmental Compliance Performance Scorecard - Third Quarter FY2012 Environmental

  11. Environmental Management System Steering Committee | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Environmental Management System Steering Committee The Environmental Management System Steering Committee (EMSSC) is a standing Ames Laboratory committee that advises the members of the Laboratory's Executive Council on environmentally-related objects and targets to help meet the Laboratory's and DOE's sustainability goals. For more information please see http://www.ameslab.gov/operations/esha/environmental EMS Charter The current members of the committee include David Byrd (Science and

  12. DOE - Office of Legacy Management -- Fernald Reports ASER

    Office of Legacy Management (LM)

    Information Appendix C: Supplemental Air Information Appendix D: Ecological ... Information Appendix C: Supplemental Air Information Appendix D: Ecological ...

  13. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 APPENDIX V RECHARGE SENSITIVITY ANALYSIS In the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM...

  14. Environmental Management Los Alamos Field Corrective Action Plan...

    Energy Saver

    Los Alamos Field Corrective Action Plan - Radiological Release Phase II Environmental Management Los Alamos Field Corrective Action Plan - Radiological Release Phase II On March...

  15. MEMORANDUM FOR JOHN R. ESCHENBERG ASSISTANT MANAGER FOR ENVIRONMENTAL...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    0 ENVIRONMENTAL MANAGEMENT SUBJECT: Delegation of Acquisition Executive Authority for Capital Asset Projects at Oak Ridge Office In accordance with the guidelines of Department of...

  16. Mr. Ken Blower, Manager Corporate Environmental Affairs Standard...

    Office of Legacy Management (LM)

    Ken Blower, Manager Corporate Environmental Affairs Standard Oil Company of Ohio Midland ... Research Laboratory (now Standard Oil Company of Ohio) to determine whether it ...

  17. Celebrating Successes of Environmental Management Recovery Act Projects

    Energy.gov [DOE]

    The Office of Environmental Management marked a milestone at the end of last month as they completed 84 American Recovery and Reinvestment Act-funded projects across America.

  18. Environmental management 1994. Progress and plans of the environmental restoration and waste management program

    SciTech Connect

    Not Available

    1994-02-01

    The Department of Energy currently faces one of the largest environmental challenges in the world. The Department`s Environmental Restoration and Waste Management program is responsible for identifying and reducing risks and managing waste at 137 sites in 34 States and territories where nuclear energy or weapons research and production resulted in radioactive, hazardous, and mixed waste contamination. The number of sites continues to grow as facilities are transferred to be cleaned up and closed down. The program`s main challenge is to balance technical and financial realities with the public`s expectations and develop a strategy that enables the Department to meet its commitments to the American people. This document provides a closer look at what is being done around the country. Included are detailed discussions of the largest sites in the region, followed by site activities organized by state, and a summary of activities at FUSRAP and UMTRA sites in the region.

  19. Environmental Management 1995: Progress and plans of the Environmental Management Program

    SciTech Connect

    1995-02-01

    Environmental Management 1995 is the second report prepared in response to the requirements of the National Defense Authorization Act for Fiscal Year l994. The first report, Environmental Management 1994, was published in February 1994. This report is intended to provide a broad overview of the Environmental Management program`s activities in 1994, 1995, and 1996. The first section of this report describes the Department of Energy`s Environmental Management program. This is followed by a closer look at what the program is doing across the country, organized by region to help the reader identify and locate sites of interest. Within each region, details of the largest sites are followed by site summaries reported by State and a summary of activities under the Formerly Utilized Sites Remedial Action Program (FUSRAP) and Uranium Mill Tailings Remedial Action Project (UMTRA). For the purposes of this report, a ``site`` is a Department of Energy installation; a ``facility`` is a building located on a Department of Energy site; and an ``area`` is a geographical area, operable unit, or waste area group of unspecified dimension within a site. Throughout this report, ``year`` refers to the Federal Government`s Fiscal Year, which begins on October 1. For example, Fiscal Year 1995 began on October 1, 1994 and will end on September 30, 1995. Budget totals for Hanford include the Hanford Site and Richland Operations Office. The Idaho National Engineering Laboratory includes the Idaho Chemical Processing Plant and the Idaho Operations Office. The Oak Ridge Reservation budget includes Oak Ridge National Laboratory, the Y-12 Plant, the K-25 Site, Oak Ridge Associated Laboratories, the Oak Ridge Operations Office, and funding for the FUSRAP program.

  20. Environmental Management FY 2006 Budget Request DRAFT

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Justice Environmental Justice The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations. This EO directs each Federal agency to "make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects

  1. U.S. Department of Energy Office of Legacy Management

    Office of Legacy Management (LM)

    U.S. Department of Energy Office of Legacy Management LMS 3047FER Page 1 of 2 02022010 ... No U.S. Department of Energy Office of Legacy Management Fernald Preserve Institutional ...

  2. U.S. Department of Energy Office of Legacy Management

    Office of Legacy Management (LM)

    X U.S. Department of Energy Office of Legacy Management Fernald Preserve Field ... Notes U.S. Department of Energy Office of Legacy Management LMS 3047FER Page 1 of 2 0202...

  3. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD AGENDA Pacific Northwest...

    Energy.gov [DOE] (indexed site)

    Hanford Site Welcome Doug Shoop, Richland Operations Office Site Deputy Manager Kevin Smith, Office of River Protection Site Manager Susan Leckband, Hanford Advisory ...

  4. Sandia National Laboratories, California Environmental Management System program manual

    SciTech Connect

    Larsen, Barbara L.

    2014-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  5. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2013-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 436.1.

  6. US Department of Energy environmental management advisory board public meeting

    SciTech Connect

    Not Available

    1994-03-01

    Contents of this publication include: list of participants; March 14, 1994--opening of public meeting and subcommittee reports, and public comment session; March 15, 1994--presentation by Thomas P. Grumbly, assistant secretary for environmental management, presentations by senior environmental management officials, and committee business.

  7. EMS - Environmental Management System | Princeton Plasma Physics Lab

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Directory Diversity and Inclusion Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer Contact Us Business Operations Careers/ Human Resources Directory Diversity and Inclusion Environment, Safety & Health Environmental Management System Joint Working Group for Fusion Safety Furth Plasma Physics Library Lab Leadership Organization Chart Technology Transfer EMS

  8. Environment, Environmental Restoration, and Waste Management Field Organization Directory

    SciTech Connect

    Not Available

    1993-07-01

    This directory was developed by the Office of Environmental Guidance, RCRA/CERCLA Division (EH-231) from an outgrowth of the Departments efforts to identify and establish the regulatory response lead persons in the Field Organizations. The directory was developed for intemal EH-231 use to identify both the DOE and DOE contractor Field Organizations in the Environment, Environmental Restoration and Waste Management areas. The Field Organization directory is divided into three substantive sections: (1) Environment; (2) Environmental Restoration; and (3) Waste Management which are organized to correspond to the management hierarchy at each Field Organization. The information provided includes the facility name and address, individual managers name, and telephone/fax numbers.

  9. Role of the environmental management commission in North Carolina

    SciTech Connect

    Watkins, R.V. )

    1993-01-01

    The state of North Carolina's 17-member Environmental Management Commission is the principal regulatory and environmental policy-making body in the state for issues affecting water, air, and land resources. The author traces the evolution of environmental programs in the state, and the history of the Environmental Management Commission from its origin in 1927, and reviews the Commission's role, mission, structure, organization, function, and regulatory/public participation process. The state's environmental regulatory rulemaking process and established provisions against conflict of interest are also reviewed.

  10. The Office of Environmental Management technical reports: A bibliography

    SciTech Connect

    1998-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995--that were published from October 1, 1996--September 30, 1997. This information is divided into the following categories: Miscellaneous, Focus Areas and Crosscutting Programs, Support Programs, Technology Integration and International Technology Exchange, are now included in the Miscellaneous category. The Office of Environmental Management within the Department of Energy (DOE) is responsible for environmental restoration, waste management, technology development and facility transition and management. Subjects include: subsurface contaminants; mixed waste characterization, treatment and disposal; radioactive tank waste remediation; plutonium; deactivation and decommissioning; robotics; characterization, monitoring, and sensor technology; and efficient separations. 880 refs.

  11. Integrated Safety & Environmental Management System | Stanford Synchrotron

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Radiation Lightsource Integrated Safety & Environmental Management System How do you plan for SAFETY in your job? In an effort to provide a formal and organized process to manage all aspects of Environment, Safety and Health (ES&H) issues at its laboratories, the DOE developed the Integrated Safety and Environmental Management System (ISEMS). In short, it's a process that allows people (such as staff and Users) at all levels to plan, perform, assess and improve their implementation

  12. Integrating Environmental, Safety, and Quality Management System Audits |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Integrating Environmental, Safety, and Quality Management System Audits Integrating Environmental, Safety, and Quality Management System Audits August 2009 Presenter: David Skipper, UT-Battelle Track 7-2 Topics Covered: External registration/validation of management systems is desirableUT-Battelle registrations ISO 9001 for isotope development process ISO 14001 for all UT-Battelle activities OHSAS 18001 for all UT-Battelle activities ISO 17025 for metrology laboratory

  13. Office of Environmental Management Work Planning and Control Oversight |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Office of Environmental Management Work Planning and Control Oversight Office of Environmental Management Work Planning and Control Oversight May 16, 2013 Presenter: Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office Topics Covered: Contractor Good Practices: All contractors evaluate WP&C as part of their CAS URS performing corporate Phase II implementation reviews at sites where they are EM's lead contractor NWP (WIPP contractor) implemented

  14. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  15. Environmental Management (EM) Quality Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Quality Procedure - Records Management Quality Procedure - MemoCorrespondence Control and Tracking Quality Procedure - Stop Work Quality Procedure - Supplier Qualification ...

  16. DOE methods for evaluating environmental and waste management samples.

    SciTech Connect

    Goheen, S C; McCulloch, M; Thomas, B L; Riley, R G; Sklarew, D S; Mong, G M; Fadeff, S K

    1994-04-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) provides applicable methods in use by. the US Department of Energy (DOE) laboratories for sampling and analyzing constituents of waste and environmental samples. The development of DOE Methods is supported by the Laboratory Management Division (LMD) of the DOE. This document contains chapters and methods that are proposed for use in evaluating components of DOE environmental and waste management samples. DOE Methods is a resource intended to support sampling and analytical activities that will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the US Environmental Protection Agency (EPA), or others.

  17. Integrating Environmental, Safety, and Quality Management System...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    An Approach to Sustainability that Improves Environmental and Safety Performance Utilizing Bacteria for Sustainable Manufacturing of Low-Cost Nanoparticles Performance Analysis of ...

  18. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    ... Validation * Independent reviews dramatically increased - All Recovery Act scope had EIR, IPR or Program Review - Five acquisition management reviews in 2009 (V&V in 2010) - EM ...

  19. Advanced Simulation Capability for Environmental Management ...

    Office of Scientific and Technical Information (OSTI)

    The modular and open source high performance computing tool will facilitate integrated ... Country of Publication: United States Language: English Subject: 12 MANAGEMENT OF ...

  20. ENVIRONMENTAL MANAGEMENT SITE SPECIFIC ADVISORY BOARD

    Office of Environmental Management (EM)

    of non-stockpile nuclear materials; excess facilities; future land use and long-term stewardship; risk assessment and management; and clean-up science and technology activities. ...

  1. Definition of Environmental Management (EM) Completion

    Energy.gov [DOE]

    The purpose of this memorandum is to provide you with additional clarification on: 1) the specific activities that must be accomplished before an environmental cleanup project is complete; and 2)...

  2. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    Environmental Contractor Mentors Young Students Environmental Contractor Mentors Young Students November 26, 2014 - 12:00pm Addthis Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Middle school students use water bottles and powdered drink mix to learn how contamination

  3. Oak Ridge EM Program DOE Oak Ridge Environmental Management Program

    Office of Environmental Management (EM)

    ... Offce of Environmental Management. Expansion of EMWMF (Cells ... Alpha 4 building at Y-12. History of the Oak Ridge EM Program (continued) New 1 megawatt solar array opens at ETTP under a ...

  4. The Office of Environmental Management Uranium Enrichment D&D...

    Energy Saver

    Uranium Enrichment D&D The Office of Environmental Management Uranium Enrichment D&D Microsoft Word - B996F741.doc (100.04 KB) More Documents & Publications Microsoft Word - PSRP ...

  5. Environmental Enterprise Risk Management Benefits for a Government Contractor

    SciTech Connect

    Linda Guinn

    2012-05-01

    An often overlooked advantage that an Environmental Enterprise Risk Management System (ERMS) has to organizations is the added protection from the Civil False Claims Act (FCA) for activities under a government contract.

  6. In-Situ Decommissioning: A Strategy for Environmental Management

    Office of Environmental Management (EM)

    In-Situ Decommissioning A Strategy for Environmental Management Reducing the Footprint of the Cold War For over a decade, the Department of Energy has focused on reducing the ...

  7. Implementation Guide for Integrating Environmental Management Systems into Integrated Safety Management Systems

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2004-08-20

    This Guide provides guidance to assist DOE sites in identifying those missing environmental management systems elements and integrating them into the site's integrated safety management system. Canceled by DOE N 251.96.

  8. Environmental Management Headquarters Corrective Action Plan - Truck Fire |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Truck Fire Environmental Management Headquarters Corrective Action Plan - Truck Fire The purpose of this Corrective Action Plan (CAP) is to specify U.S. Department of Energy (DOE) actions for addressing Office of Environmental Management (EM) Headquarters (HQ) issues identified in the Accident Investigation Report for the Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant (WIPP) February 5, 2014. The report identified 22 Conclusions and 35 Judgments of

  9. Environmental Management Scientist Sets His Sights on Mars | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Environmental Management Scientist Sets His Sights on Mars Environmental Management Scientist Sets His Sights on Mars September 4, 2012 - 3:29pm Addthis Curiosity, left, at NASA’s Jet Propulsion Laboratory in Pasadena, California, in late November 2011. Shown here is the flight hardware that was being assembled prior to shipment to Cape Canaveral Air Force Station in Florida for the launch. | Photo Credit Dr. Robert C. Nelson Curiosity, left, at NASA's Jet Propulsion Laboratory

  10. Environmental Management American Recovery & Reinvestment Act (ARRA)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lessons Learned | Department of Energy Environmental Management American Recovery & Reinvestment Act (ARRA) Lessons Learned Environmental Management American Recovery & Reinvestment Act (ARRA) Lessons Learned EM has compiled many valuable lessons learned from the American Recovery and Reinvestment Act Program. Here are a few examples: Use a phased approached to the release of funding based on performance; conduct monthly project reviews to track and monitor project performance and

  11. The New Gold Standard: Environmental Management Introduces the First LEED

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Gold Industrial Facility | Department of Energy The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility The New Gold Standard: Environmental Management Introduces the First LEED Gold Industrial Facility September 13, 2012 - 1:02pm Addthis The 200 West Groundwater Treatment Facility is shown here after completion of construction this summer. | Photo courtesy of Zachary Carter with Mission Support Alliance (MSA) at Hanford. The 200 West Groundwater

  12. Recommendation 233: Recommendations on the Proposed Environmental Managment

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Disposal Facility at the U.S. DOE Oak Ridge Reservation | Department of Energy 3: Recommendations on the Proposed Environmental Managment Disposal Facility at the U.S. DOE Oak Ridge Reservation Recommendation 233: Recommendations on the Proposed Environmental Managment Disposal Facility at the U.S. DOE Oak Ridge Reservation ORSSAB supports onsite disposal of Oak Ridge EM CERCLA wastes that meet the onsite waste acceptance criteria. The board affirms its commitment to the recommendations

  13. Office of Environmental Management MAJOR CONTRACTS SUMMARY

    Office of Environmental Management (EM)

    12 - 93017 1.33B Waste Isolation Pilot Project Management and Operating Contract Cost plus award fee 5-Yr Option 100117 - 93022 Portage, Inc. DE-EM0004007 Base Period 116...

  14. Waste Management Programmatic Environmental Impact Statement (WM PEIS) Reports and Records of Decision

    Energy.gov [DOE]

    The Final Waste Management Programmatic Environmental Impact Statement (WM PEIS) is a nationwide study examining the environmental impacts of managing more than 2 million cubic meters of...

  15. Statement from DOE Assistant Secretary for Environmental Management James Rispoli on the National Academy of Public Administration's Management Review of DOE's Office of Environmental Management

    Energy.gov [DOE]

    "Today the National Academy of Public Administration released their comprehensive management review of the Department of Energy's Office of Environmental Management (EM).  EM is a $5.6 billion per...

  16. Issuance of the Final Tank Closure and Waste Management Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement Issuance of the Final Tank Closure and Waste Management Environmental Impact Statement December 5, 2012 - 12:00pm Addthis Media Contacts Carrie Meyer, DOE (509) 376-0810 Carrie_C_Meyer@orp.doe.gov Erika Holmes, Ecology (509) 372-7880 Erika.Holmes@ecy.wa.gov Richland, WA - The U.S. Department of Energy (DOE) is issuing its Final Tank Closure and Waste Management

  17. The Office of Environmental Management technical reports: a bibliography

    SciTech Connect

    1997-07-01

    The Office of Environmental Management`s (EM) technical reports bibliography is an annual publication that contains information on scientific and technical reports sponsored by the Office of Environmental Management added to the Energy Science and Technology Database from July 1, 1995 through Sept. 30, 1996. This information is divided into the following categories: Focus Areas and Crosscutting Programs. Support Programs, Technology Integration and International Technology Exchange are now included in the General category. EM`s Office of Science and Technology sponsors this bibliography.

  18. 2014 Annual Planning Summary for the Environmental Management Energy Technology Engineering Center

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Environmental Management Energy Technology Engineering Center.

  19. 2013 Annual Planning Summary for the Environmental Management Consolidated Business Center

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2013 and 2014 within the Environmental Management Consolidated Business Center.

  20. 2014 Annual Planning Summary for the Oak Ridge Office of Environmental Management

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2014 and 2015 within the Oak Ridge Office of Environmental Management.

  1. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    SciTech Connect

    Not Available

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  2. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... William W ; UIUC) Natural products containing ...

  3. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    "Institute of Natural Sciences, Shanghai Jiao Tong ... States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ...

  4. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Energy Information Administration (EIA) Dallas Support ... Fernald Environmental Management Project, OH (United ... for Science and Education (ORISE), Oak Ridge, TN ...

  5. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Numbers: Site: All Alaska Power Administration, Juneau, ... States) Atmospheric System Research Bartlesville ... Fernald Environmental Management Project, OH (United ...

  6. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ConferenceEvent Journal Article Miscellaneous ... Fernald Environmental Management Project, OH (United ... Sciences, Institute for Academic Initiatives, Osaka ...

  7. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    DOEEI USDOE Energy Information Administration (EIA) ... (NE) Radioisotope Power Systems (RPS) Program Desert ... Fernald Environmental Management Project, OH (United ...

  8. Strategic plan for Hanford Site Environmental Restoration Information Management

    SciTech Connect

    Cowley, P.J.; Beck, J.E.; Gephart, R.E.

    1994-06-01

    This strategic plan addresses information management for the Environmental Restoration (ER) Program at the Hanford Site. This Program leads the cleanup of the Hanford Site`s soil, groundwater, buried waste, and the decontamination and decommissioning of facilities. The vision that drives this strategic plan is to ensure that quality information is available to the people who need it, when they need it, at a convenient location, in a usable form, and at an acceptable cost. Although investments are being made in managing the vast amounts of information, which include data, records and documents associated with the Hanford Site`s production history and new cleanup mission, it is widely recognized that efforts to date have not accomplished the vision. Effective information management involves more than the compilation of massive amounts of electronic and non-electronic information. It also involves integrating information management into business processes that support user`s needs and decisionmaking. Only then can information management complement and enable environmental restoration priorities and practices, help identify environmental restoration requirements, and enable communication within the Environmental Restoration Program and between the Program and its stakeholders. Successfully accomplishing the Hanford Site mission requires an integrated approach to information management that crosses organizational boundaries, streamlines existing systems, and builds new systems that support the needs of the future. This plan outlines that approach.

  9. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect

    Not Available

    2009-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004 and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services Environmental programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National

  10. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment

    SciTech Connect

    Irving, John S

    2003-04-01

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  11. Idaho National Engineering and Environmental Laboratory Wildland Fire Management Environmental Assessment - April 2003

    SciTech Connect

    Irving, J.S.

    2003-04-30

    DOE prepared an environmental assessment (EA)for wildland fire management activities on the Idaho National Engineering and Environmental Laboratory (INEEL) (DOE/EA-1372). The EA was developed to evaluate wildland fire management options for pre-fire, fire suppression, and post fire activities. Those activities have an important role in minimizing the conversion of the native sagebrush steppe ecosystem found on the INEEL to non-native weeds. Four alternative management approaches were analyzed: Alternative 1 - maximum fire protection; Alternative 2 - balanced fire protection; Alternative 2 - balanced fire protection; Alternative 3 - protect infrastructure and personnel; and Alternative 4 - no action/traditional fire protection.

  12. Environmental Management Performance Report October 2000

    SciTech Connect

    EDER, D.M.

    2000-10-01

    This section provides an executive level summary of the performance information covered in this report and is intended to bring to Management's attention that information considered to be most noteworthy. All cost, schedule, milestone commitments, performance measures. and safety data is current as of August 31. Accomplishments, Issues and Integration items are current as of September 18 unless otherwise noted. The section begins with a description of notable accomplishments that have occurred since the last report and are considered to have made the greatest contribution toward safe, timely, and cost-effective clean up. Following the accomplishment section is an overall fiscal year-to-date summary analysis addressing cost, schedule, and milestone performance. Overviews of safety ensue. The next segment of the Executive Summary, entitled Critical Issues, is designed to identify the high-level challenges to achieving cleanup progress. The next section includes FY 2000 EM Management Commitment High Visibility Project Milestones and Critical Few Performance Measures. The Key Integration Activities section follows next, highlighting PHMC activities that cross contractor boundaries and demonstrate the shared value of partnering with other Site entities to accomplish the work. Concluding the Executive Summary, a forward-looking synopsis of Upcoming Planned Key Events is provided.

  13. Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

    Energy.gov [DOE]

    Development and Demonstration of Advanced Forecasting, Power and Environmental Planning and Management Tools and Best Practices

  14. Recommendation 224: Recommendations on the FY 2016 DOE Oak Ridge Environmental Management Budget Request

    Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2016.

  15. Recommendation 232: Recommendations on the FY 2018 DOE Oak Ridge Environmental Management Budget Request

    Energy.gov [DOE]

    ORSSAB provides recommendations on the DOE Oak Ridge Environmental Management budget request for FY 2018.

  16. Joint Environmental Management System (EMS) Declaration of Conformance

    Energy Saver

    Jason Bordoff About Us Jason Bordoff - Associate Director for Energy and Climate Change at the White House Council on Environmental Quality and a Senior Advisor for Energy and Environmental Policy at the National Economic Council Most Recent Unlocking the Power of Energy Data May 23

    Jason Hartke About Us Jason Hartke - Commercial Buildings Integration Program Manager Most Recent Game On: DOE Initiative Supports Leadership in Sports Venues August 29 UC Berkeley Captures Energy Savings by

  17. DOE model conference on waste management and environmental restoration

    SciTech Connect

    Not Available

    1990-01-01

    Reports dealing with current topics in waste management and environmental restoration were presented at this conference in six sessions. Session 1 covered the Hot Topics'' including regulations and risk assessment. Session 2 dealt with waste reduction and minimization; session 3 dealt with waste treatment and disposal. Session 4 covered site characterization and analysis. Environmental restoration and associated technologies wee discussed in session 5 and 6. Individual papers have been cataloged separately.

  18. Data Management Plan for the Environmental Restoration Program

    SciTech Connect

    Bryd, P.

    1994-01-01

    The purpose of this handbook is to assist environmental restoration (ER) projects in the preparation of a data management implementation plan (DMIP). The DMIP identifies and documents an ER project's requirements and responsibilities for the management, quality assurance, use, and archival of its environmental data. It is important that a project complete its DMIP in the early planning phase to ensure that the necessary and appropriate data management systems and personnel are in place before the project begins acquiring data. All ER projects that collect or use environmental data at the Oak Ridge National Laboratory, the Oak Ridge Y-12 Plant, the Oak Ridge K-25 Site, the Paducah Gaseous Diffusion Plant, the Portsmouth Gaseous Diffusion Plant, and surrounding onsite and offsite areas must prepare a DMIP. Project types that often collect environmental data include surveillance and maintenance, decontamination and decommissioning, remedial design/remedial action, and remedial investigation/feasibility studies. Even if a project does little environmental data management, a DMIP is required to document this fact.

  19. Sandia National Laboratories, California Environmental Management System program manual.

    SciTech Connect

    Larsen, Barbara L.

    2012-03-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 436.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site first received ISO 14001 certification in September 2006 and recertification in 2009. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy and Water Resource Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups

  20. Sandia National Laboratories, California Environmental Management System Program Manual.

    SciTech Connect

    Larsen, Barbara L.

    2011-04-01

    The Sandia National Laboratories, California (SNL/CA) Environmental Management System (EMS) Program Manual documents the elements of the site EMS Program. The SNL/CA EMS Program conforms to the International Standard on Environmental Management Systems, ISO 14001:2004and Department of Energy (DOE) Order 450.1. Sandia National Laboratories, California (SNL/CA) has maintained functional environmental programs to assist with regulatory compliance for more than 30 years. During 2005, these existing programs were rolled into a formal environmental management system (EMS) that expands beyond the traditional compliance focus to managing and improving environmental performance and stewardship practices for all site activities. An EMS is a set of inter-related elements that represent a continuing cycle of planning, implementing, evaluating, and improving processes and actions undertaken to achieve environmental policy and goals. The SNL/CA EMS Program conforms to the International Standard for Environmental Management Systems, ISO 14001:2004 (ISO 2004). The site received ISO 14001 certification in September 2006. SNL/CA's EMS Program is applicable to the Sandia, Livermore site only. Although SNL/CA operates as one organizational division of the overall Sandia National Laboratories, the EMS Program is site-specific, with site-specific objectives and targets. SNL/CA (Division 8000) benefits from the organizational structure as it provides corporate level policies, procedures, and standards, and established processes that connect to and support elements of the SNL/CA EMS Program. Additionally, SNL/CA's EMS Program benefits from two corporate functional programs (Facilities Energy Management and Fleet Services programs) that maintain responsibility for energy management and fleet services for all Sandia locations. Each EMS element is further enhanced with site-specific processes and standards. Division 8000 has several groups operating at Sandia National Laboratories, New

  1. Colorado Environmental Coalition v. Office of Legacy Management, Civil

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Action No. 08-cv-01624 (October 18, 2011) | Department of Energy October 18, 2011) Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (October 18, 2011) U.S. District Court's Order of October 18, 2011, in Colorado Environmental Coalition v. Office of Legacy Management, Civil Action No. 08-cv-01624 (D. Colo.). The Court has issued the injunctive relief described on pages 51-52 of the Order. U.S. District Court's Order of October 18, 2011, in Colorado

  2. Implications of pollution prevention experience for environmental management

    SciTech Connect

    Schramm, W.

    1993-06-01

    Conventional wisdom in the US is that firms face a trade-off between environmental efforts and profit because of the belief that environmental protection invariably involves costs that reduce profits. Firms, therefore, generally perceive environmental protection as an impediment to their goal of profit maximization. Environmental efforts are viewed as an added hurdle in producing a product, rather than an as intrinsic part of well-designed operations. From this perspective, firms have no incentive to engage in environmental protection efforts, and will do so only if they are forced (or are given incentives) by government or if they perceive in advance potential profits from their efforts (e.g., a market for environmental products). The concept of a trade-off between the environment and profit, however, has been challenged recently. A common argument raised for questioning this trade-off is that efforts directed at environmental protection will lead to the development of new technologies and will give US firms a competitive advantage in the emerging environmental industry. It is argued that opportunities available within this growth field outweigh costs of entry and research. Recent publications (World Wildlife Fund, 1992; Resources for the Future, 1993) have proposed that government actions, may encourage the development of the environmental industry and, thus, improve both economic and environmental performance. Suggested governmental actions include using market incentives rather than command and control regulation to achieve environmental goals, integrating environmental values into governmental policy analysis, and supporting investments in environmental technologies. This paper details the economics and benefits of various waste management efforts.

  3. U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (Rev 1) 1 U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD Report of Activities for May 22, 2014 Public Meeting Submitted by the EMAB Acquisition and Project Management Subcommittee (APMS) May 22, 2014 Background: The APMS presented its last written report on its efforts at the EMAB meeting on June 14, 2013. The public meeting scheduled for November 19, 2013 was cancelled because of scheduling issues with the partial government shutdown. The Subcommittee has continued to hold

  4. ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS PROGRESS CY2014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Objectives & Targets Rev. 1.2, 8/29/2014 Page 1 of 3 ENVIRONMENTAL MANAGEMENT SYSTEM OBJECTIVES AND TARGETS PROGRESS CY2014 for SOUTHWESTERN POWER ADMINISTRATION Activity Legal Requirement Aspect Objective Target** see important note 2014 Target Achievements Real Estate Management DOE O 436.1 E.O. 13423 & 13514 EPAct 1992 and 2005 EISA 2007 NECPA 1978 Natural resource depletion and GHG emissions from resource intensive facilities Increase sustainability of facility resources, reduce

  5. Environmental Assessment : Squawfish Management Program : Final.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-05-01

    Bonneville Power Administration (BPA) proposes to decrease the number of northern squawfish (Ptychocheilus oregonensis) in reservoirs in the Columbia River system. The goal of the Squawfish Management Program is to reduce losses of outmigrating juvenile salmon and steelhead (salmonids) to northern squawfish predation. The objective is to reduce the number of northern squawfish that feed on juvenile salmonids (smolts) by 10 to 20 percent to alter the age and size structure of the northern squawfish population. The hypothesis, based on computer modeling, indicates that sustained northern squawfish harvest (5 to 10 years) and the resultant population restructuring may reduce losses of juvenile salmonids to predation by up to 50 percent or more within 10 years. The proposed action would target northern squawfish 11 inches and longer, the size in which northern squawfish being preying significantly on juvenile salmonids. BPA proposes to fund three types of fisheries to harvest northern squawfish. BPA also proposes to fund monitoring activities of these fisheries to determine whether desired or other results occur. The three fisheries methods proposed are: (1) commercial Tribal fishing; (2) sport reward fishing; and (3) fishing from restricted areas of each dam ( dam angling''). These fisheries were tested in 1990 and 1991.

  6. Ecological risks of DOE`s programmatic environmental restoration alternatives

    SciTech Connect

    Not Available

    1994-06-01

    This report assesses the ecological risks of the Department of Energy`s (DOE) Environmental Restoration Program. The assessment is programmatic in that it is directed at evaluation of the broad programmatic alternatives outlined in the DOE Implementation Plan. It attempts to (1) characterize the ecological resources present on DOE facilities, (2) describe the occurrence and importance of ecologically significant contamination at major DOE facilities, (3) evaluate the adverse ecological impacts of habitat disturbance caused by remedial activities, and (4) determine whether one or another of the programmatic alternatives is clearly ecologically superior to the others. The assessment focuses on six representative facilities: the Idaho National Engineering Laboratory (INEL); the Fernald Environmental Management Project (FEMP); the Oak Ridge Reservation (ORR), including the Oak Ridge National Laboratory (ORNL), Y-12 plant, and K-25 plant; the Rocky Flats Plant; the Hanford Reservation; and the Portsmouth Gaseous Diffusion Plant.

  7. Chasing a specter: Risk management for global environmental change

    SciTech Connect

    O'Riordan, T. ); Rayner, S. )

    1989-10-01

    Global environmental change is both a concept and a process that changes in meaning with scientific discovery, public concern, and political responsiveness. It is the relationship between the problems as perceived and the various institutions that help shape and adapt to such problems that defines global environmental change. There is a kind of race between scientific detective work and political adjustment to lessen the likely impacts that predictive science is trying to verify. Risk analysis, because of its capacity to recognize this relationship in many spheres of problem identification, can contribute to the political debate, mostly by proposing institutional redesign of the relationship among scientific research, public entry, and experimental readjustments to consensus formation and international action. This paper discusses the factors involved in global environmental change, the risk management involved, the holistic interpretation, and the environmental impacts. 21 refs., 5 figs., 5 tabs.

  8. Management initiatives to waste management decisions and environmental compliance in Oak Ridge, Tennessee

    SciTech Connect

    Jones, C.G.

    1988-01-01

    Martin Marietta Energy Systems, Inc. (MMES) has been the operating contractor for the nuclear production and research facilities at Oak Ridge, Tennessee and Paducah, Kentucky for about four and one-half years. Environmental compliance, regulatory interaction, and public confidence have been very significant issues during this time. This presentation will review the environmental situation in Oak Ridge in 1984 and will discuss management initiatives and experience in the development and implementation of effective environmental and waste management and health and safety programs committed to the protection of the environment, our workers and the public with an overall goal of full compliance with all current and anticipated regulations.

  9. * David Borak, EM SSAB Designated Federal Officer * Scott Wade, Assistant Manager for Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Wednesday, August 31 8:00 am Registration 8:30 am Welcome and Opening Remarks * David Borak, EM SSAB Designated Federal Officer * Scott Wade, Assistant Manager for Environmental Management * Donna Hruska, Chair, Nevada Site Specific Advisory Board 8:50 am Meeting Overview * Eric Roberts, Facilitator 9:00 am EM Program Update * Dr. Monica Regalbuto, Assistant Secretary for Environmental Management 9:45 am Break 10:00 am Chairs' Round Robin 11:10 am WIPP Recovery & National TRU Program Update

  10. Managing environmental information in the age of outsourcing.

    SciTech Connect

    Perkins, S.; Smith, K.; Whorton, M.; Williams, G.

    1999-03-08

    As more data gathering, analysis, and tracking tasks are outsourced the need for multiple contractors and military personnel to input, update, access, store, and track Mormation is becoming critical to efficient functioning and managing of environmental projects and programs at military installations. This paper presents two case studies detailing the way two organizations--the Rocky Mountain Arsenal (RMA) in Colorado, and the 611th Air Support Group (611 ASG) in Alaska--are managing complex data using web-based technology. RMA is involved in one of the largest environmental cleanup programs in the Department of Defense. As such, large volumes of environmental data and documents must be generates stored, and tracked. Often these documents are prepared by multiple contractors and are reviewed by several parties or groups. To manage environmental information and to ensure that it meets compliance requirements more efficiently, RMA has developed an electronic document tracking and distribution system. This system allows access to up-to-date information, including a detailed review of all pertinent regulatory and other requirements at RMA. The dynamic system includes milestones, review deadlines, submission deadlines, and other requirements for managing the environmental program. The 611 ASG manages more than 30 remote installations in Alaska, many of which are operated by contractor personnel. These installations contain hundreds of buildings that are constantly being modified because of exposure to harsh arctic climates; some of them have been determined to be eligible for the National Register of Historic Places. To meet regulatory requirements for cultural resources management as well as engineering requirements for upkeep of buildings, a database was developed to store and analyze building data. The database has a web-based interface that allows anyone with the correct access codes to input new data, modify existing data, or query the database using a number of

  11. Closure & Waste Management Environmental Impact Statement (EfS)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hanlord 'fank Closure & Waste Management Environmental Impact Statement (EfS) ()ctober 2006 Hanford Tarrk Closure ancl Wtrste Management Environment Intpact Statement (EIS) Review Report REVI N,W AND .{P'PROVAN.: Prepared by: ' QualirY & SaIetY Divisio't ldaho OPerati ons Officc ...) Revievv Tcitnt Leadc, t / Ld'rtc&a'r* o^,*,ttl4t- Roberl C. Barr Director, Envimnmcnal, Safel, and QualitY Offics of Rirer Protection Approvcd by: t i i / D a r e : " ' / . i ' i / ; t ' Chief

  12. Environmental Management Site-Specific Advisory Board Chairs Meeting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 20-21, 2016 DoubleTree Hotel, 215 S. Illinois Ave., Oak Ridge, TN Wednesday, April 20 8:00 am Registration 8:30 am Welcome and Opening Remarks  David Borak, EM SSAB Designated Federal Officer  Warren Gooch, Mayor, City of Oak Ridge  Jay Mullis, Deputy Manager for Environmental Management, Oak Ridge  Belinda Price, Chair, Oak Ridge Site Specific Advisory Board 8:50 am Meeting Overview  Eric Roberts, Facilitator 9:00 am EM Program Update  Mark Whitney, Principal Deputy

  13. Written Statement of David Huizenga Senior Advisor for Environmental Management

    Office of Environmental Management (EM)

    House of Representatives May 9, 2013 Good morning, Mr. Chairman, Ranking Member Cooper, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide the Members with an overview of the EM program, key accomplishments during the past year, 2013 planned accomplishments and progress to date, the projected impacts of sequestration, and planned accomplishments under the FY 2014 Request.

  14. Written Statement of David Huizenga Senior Advisor for Environmental Management

    Office of Environmental Management (EM)

    Senate May 8, 2013 Good afternoon, Mr. Chairman, Ranking Member Sessions, and Members of the Subcommittee. I am pleased to be here today to represent the Department of Energy's (DOE) Office of Environmental Management (EM). I would like to provide the Members with an overview of the EM program, key accomplishments during the past year, 2013 planned accomplishments and progress to date, the projected impacts of sequestration, and planned accomplishments under the FY 2014 Request. Overview of the

  15. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD CHAIRS' MEETING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CHAIRS' MEETING for the U.S. DEPARTMENT OF ENERGY PUBLIC MEETING MINUTES Las Vegas Marriott 325 Convention Center Drive Las Vegas, NV 89109 August 31-September 1, 2016 2 Environmental Management Site-Specific Advisory Board Chairs' Meeting - August 31-September 1, 2016 Meeting Minutes LIST OF ACRONYMS ALARA - As Low As Reasonably Achievable CAB - Citizens Advisory Board CBFO - (DOE) Carlsbad Field Office (WIPP) CD - Critical Decision CR - Continuing Resolution D&D - Decontamination &

  16. United States-Russia: Environmental management activities, Summer 1998

    SciTech Connect

    1998-09-01

    A Joint Coordinating Committee for Environmental Restoration and Waste Management (JCCEM) was formed between the US and Russia. This report describes the areas of research being studied under JCCEM, namely: Efficient separations; Contaminant transport and site characterization; Mixed wastes; High level waste tank remediation; Transuranic stabilization; Decontamination and decommissioning; and Emergency response. Other sections describe: Administrative framework for cooperation; Scientist exchange; Future actions; Non-JCCEM DOE-Russian activities; and JCCEM publications.

  17. Oak Ridge Office of Environmental Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Oak Ridge Office of Environmental Management Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition Oak Ridge Looks Ahead to Vision 2020 After K-27 Demolition After a decade of demolition, Oak Ridge became the world's first to remove all of its uranium enrichment processing buildings. Despite this monumental achievement, the celebration lasted only moments before workers started taking down another structure to bring them closer to the next big goal... Read more Federal Ingenuity Gives

  18. Technologies for improved soil carbon management and environmental quality

    SciTech Connect

    Reicosky, D.C.

    1997-12-31

    The objective of this paper is to create an environmental awareness of and to provide insight into the future balance of environment and economic issues in developing new technologies that benefit the farmer, the public, and agricultural product sales. Agricultural impacts of tillage-induced CO{sub 2} losses are addressed along with new and existing technologies to minimize tillage-induced flow of CO{sub 2} to the atmosphere, Emphasis is placed on the carbon cycle and the cost of environmental damage to illustrate the need for improved technologies leading to reduced environmental impacts by business ventures. New technologies and concepts related to methods of tillage and stover management for carbon sequestration with the agricultural production systems are presented. 16 refs., 3 figs.

  19. Including environmental concerns in management strategies for depleted uranium hexafluoride

    SciTech Connect

    Goldberg, M.; Avci, H.I.; Bradley, C.E.

    1995-12-31

    One of the major programs within the Office of Nuclear Energy, Science, and Technology of the US Department of Energy (DOE) is the depleted uranium hexafluoride (DUF{sub 6}) management program. The program is intended to find a long-term management strategy for the DUF{sub 6} that is currently stored in approximately 46,400 cylinders at Paducah, KY; Portsmouth, OH; and Oak Ridge, TN, USA. The program has four major components: technology assessment, engineering analysis, cost analysis, and the environmental impact statement (EIS). From the beginning of the program, the DOE has incorporated the environmental considerations into the process of strategy selection. Currently, the DOE has no preferred alternative. The results of the environmental impacts assessment from the EIS, as well as the results from the other components of the program, will be factored into the strategy selection process. In addition to the DOE`s current management plan, other alternatives continued storage, reuse, or disposal of depleted uranium, will be considered in the EIS. The EIS is expected to be completed and issued in its final form in the fall of 1997.

  20. Community Surveys: Low Dose Radiation. Fernald, Ohio and Rocky Flats, Colorado

    SciTech Connect

    C. K. Mertz; James Flynn; Donald G. MacGregor; Theresa Satterfield; Stephen M. Johnson; Seth Tuler; Thomas Webler

    2002-10-16

    This report is intended to present a basic description of the data from the two community surveys and to document the text of the questions; the methods used for the survey data collection; and a brief overview of the results. Completed surveys were conducted at local communities near the Rocky Flats, Colorado and the Fernald, Ohio sites; no survey was conducted for the Brookhaven, New York site. Fernald. The Fernald sample was randomly selected from 98% of all potential residential telephones in the townships of Ross, Morgan, and Crosby. The only telephone exchanges not used for the Fernald study had 4%, or fewer, of the holders of the telephone numbers actually living in either of the three target townships. Surveying started on July 24, 2001 and finished on August 30, 2001. A total of 399 completed interviews were obtained resulting in a CASRO response rate of 41.8%. The average length of an interview was 16.5 minutes. Rocky Flats. The sample was randomly selected from all potential residential telephones in Arvada and from 99% of the potential telephones in Westminster. Surveying started on August 10, 2001 and finished on September 25, 2001. A total of 401 completed interviews were obtained with a CASRO response rate of 32.5%. The average length of an interview was 15.7 minutes. Overall, respondents hold favorable views of science. They indicate an interest in developments in science and technology, feel that the world is better off because of science, and that science makes our lives healthier, easier, and more comfortable. However, respondents are divided on whether science should decide what is safe or not safe for themselves and their families. The majority of the respondents think that standards for exposure to radiation should be based on what science knows about health effects of radiation and on what is possible with today's technology. Although few respondents had visited the sites, most had heard or read something about Fernald or Rocky Flat s in the

  1. Environmental management during economic transition: Ukraine--A case study

    SciTech Connect

    Kempen van, T.H.; Demydenko, A.O.

    1995-12-01

    After dissolution of Soviet Union, each new States had to confront the legacy of an unsustainable, and ultimately failed, economic and political system. Enormous environmental problems resulted from centrally planned economics, which promoted rapid growth through exploitation of the former Soviet Union`s (FSU) vast natural resources. Unconstrained by scarcity-based pricing, extractive and heavy industry ministries created huge, inefficient, and heavily polluting enterprises. The region also experienced extensive forest-cutting, steady deterioration of soils, and contaminated runoff and infiltration from over-excessive application of agrichemicals. The fate of the environment will depend largely on successful transition to a market-based economy. Funds for environmental protection will remain scarce, and poor technology combined with a degraded and overworked infrastructure will slow cleanup of contaminated regions. With failed economies, policy-makers and legislators will be forced to overlook sustainable development as they exploit natural resources in an effort to produce food and obtain hard currency. Ukraine, the second-most populous republic of the FSU, experienced possibly the world`s greatest single environment disaster--the 1986 Chernobyl catastrophe. Today, heavy industry, with its resource-intensive and highly polluting technologies, contributes 61% of Ukraine`s GNP, in comparison with 34% in the European Union. Energy production is grossly inefficient. Environmental agencies in Ukraine are new, with limited legal or economic tools, financial resources, or technical skills. Yet the country has commenced environmental management initiatives that, when combined with economic reforms, will start to improve environmental conditions. This paper presents an overview of Ukraine`s environmental and economic conditions, steps already undertaken to manage the environment, and additional measures needed to improve the situation.

  2. Environmental Survey Report for the ETTP: Environmental Management Waste Management Facility (EMWMF) Haul Road Corridor, Oak Ridge, Tennessee

    SciTech Connect

    Peterson, M.J.

    2005-12-20

    This report summarizes the results of environmental surveys conducted within the corridor of a temporary haul road (''Haul Road'') to be constructed from East Tennessee Technology Park (ETTP) to the Environmental Management Waste Management Facility (EMWMF) located just west of the Y-12 National Security Complex (Y-12). Environmental surveys were conducted by natural resource experts at Oak Ridge National Laboratory who routinely assess the significance of various project activities on the Oak Ridge Reservation (ORR). ORNL assistance to the Haul Road Project included environmental assessments necessary to determine the best route for minimizing impacts to sensitive resources such as wetlands or rare plants. Once the final route was chosen, environmental surveys were conducted within the corridor to evaluate the impacts to sensitive resources that could not be avoided. The final Haul Road route follows established roads and a power-line corridor to the extent possible (Fig. 1). Detailed explanation regarding the purpose of the Haul Road and the regulatory context associated with its construction is provided in at least two major documents and consequently is not presented here: (1) Explanation of Significant Differences for the Record of Decision for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (January 2005, DOE/OR/01-2194&D2), and (2) Environmental Monitoring Plan for The ETTP to EMWMF Haul Road for the Disposal of Oak Ridge Reservation Comprehensive Environmental Response, Compensation, and Liability Act of 1980 Waste, Oak Ridge, Tennessee (April 2005, BJC/OR-2152). The focus of this report is a description of the sensitive resources to be impacted by Haul Road construction. Following a short description of the methods used for the environmental surveys, results and observations are presented in the following subsections: (1) General description of the affected

  3. United States Department of Energy Environmental Management Advisory Board: Public meeting

    SciTech Connect

    Not Available

    1994-07-15

    This meeting of the Environmental Management Advisory Board was held to discuss environmental concerns that everybody has and to provide a strategy for dealing with the problems. Plans for the Environmental Management Programmatic Environmental Impact Statement are presented. A report is included of the subcommittee on institutional barriers to advanced technology use. The subcommittee on environmental restoration cost effectiveness also presents a report. The status of public involvement activities is evaluated. A presentation on the status of spent fuel management is included.

  4. U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final

    Office of Legacy Management (LM)

    Project Shoal Site Environmental Management End State Vision - January 2005 DOE/NV--955 U.S. DEPARTMENT OF ENERGY Project Shoal Site ENVIRONMENTAL MANAGEMENT END STATE VISION Final Final - Project Shoal Site Environmental Management End State Vision - January 2005 Executive Summary The Environmental Management End State Vision is to be used as the primary tool for communicating the individual site end state to the involved parties (e.g., U.S. Department of Energy [DOE], regulators, public

  5. Evolution and History of the Department of Energy and the Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE)

    An overview of the Evolution and History of the Department of Energy and the Office of Environmental Management.

  6. Independent Oversight Review, Oak Ridge Office of Environmental Management- February 2012

    Energy.gov [DOE]

    Review of the Implementation Verification Review Processes at the Oak Ridge Office of Environmental Management for Building 3019

  7. DOE methods for evaluating environmental and waste management samples

    SciTech Connect

    Goheen, S.C.; McCulloch, M.; Thomas, B.L.; Riley, R.G.; Sklarew, D.S.; Mong, G.M.; Fadeff, S.K.

    1994-10-01

    DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods) is a resource intended to support sampling and analytical activities for the evaluation of environmental and waste management samples from U.S. Department of Energy (DOE) sites. DOE Methods is the result of extensive cooperation from all DOE analytical laboratories. All of these laboratories have contributed key information and provided technical reviews as well as significant moral support leading to the success of this document. DOE Methods is designed to encompass methods for collecting representative samples and for determining the radioisotope activity and organic and inorganic composition of a sample. These determinations will aid in defining the type and breadth of contamination and thus determine the extent of environmental restoration or waste management actions needed, as defined by the DOE, the U.S. Environmental Protection Agency, or others. The development of DOE Methods is supported by the Analytical Services Division of DOE. Unique methods or methods consolidated from similar procedures in the DOE Procedures Database are selected for potential inclusion in this document. Initial selection is based largely on DOE needs and procedure applicability and completeness. Methods appearing in this document are one of two types, {open_quotes}Draft{close_quotes} or {open_quotes}Verified{close_quotes}. {open_quotes}Draft{close_quotes} methods that have been reviewed internally and show potential for eventual verification are included in this document, but they have not been reviewed externally, and their precision and bias may not be known. {open_quotes}Verified{close_quotes} methods in DOE Methods have been reviewed by volunteers from various DOE sites and private corporations. These methods have delineated measures of precision and accuracy.

  8. Joint Environmental Management System (EMS) | Department of Energy

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (EMS) has two areas of focus: environmental compliance and environmental sustainability. ... The environmental sustainability aspect promotes and integrates sustainability initiatives ...

  9. Microsoft Word - 2011_SER.doc

    Office of Legacy Management (LM)

    Fernald Preserve U.S. Department of Energy Office of Legacy Management Issued May 2012 ... U.S. Department of Energy Fernald Preserve 2011 Site Environmental Report May 2012 Doc. ...

  10. Environmental Monitoring and the Gas Industry: Program Manager Handbook

    SciTech Connect

    Gregory D. Gillispie

    1997-12-01

    This document has been developed for the nontechnical gas industry manager who has the responsibility for the development of waste or potentially contaminated soil and groundwater data or must make decisions based on such data for the management or remediation of these materials. It explores the pse of common analytical chemistry instrumentation and associated techniques for identification of environmentally hazardous materials. Sufficient detail is given to familiarize the nontechnical reader with the principles behind the operation of each technique. The scope and realm of the techniques and their constituent variations are portrayed through a discussion of crucial details and, where appropriate, the depiction of real-life data. It is the author's intention to provide an easily understood handbook for gas industry management. Techniques which determine the presence, composition, and quantification of gas industry wastes are discussed. Greater focus is given to traditional techniques which have been the mainstay of modem analytical benchwork. However, with the continual advancement of instrumental principles and design, several techniques have been included which are likely to receive greater attention in fiture considerations for waste-related detection. Definitions and concepts inherent to a thorough understanding of the principles common to analytical chemistry are discussed. It is also crucial that gas industry managers understand the effects of the various actions which take place before, during, and after the actual sampling step. When a series of sample collection, storage, and transport activities occur, new or inexperienced project managers may overlook or misunderstand the importance of the sequence. Each step has an impact on the final results of the measurement process; errors in judgment or decision making can be costly. Specific techniques and methodologies for the collection, storage, and transport of environmental media samples are not described or

  11. Office of Legacy Management (LM) Program Update, October¬タモDecember 2011

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fernald Preserve in Harrison, Ohio, hosted a workers reunion event in the Visitors Center on Saturday, October 15, 2011. More than 300 former workers from the Production Era (1950 to 1989) and the Cleanup Era (1989 to 2006) mingled with each other and the current staff representing the site's legacy management mission (2006 to present day) during the day-long event. A presentation was given that recognized the efforts of all these former and current site workers. Jane Powell, Fernald Preserve

  12. ORNL long-range environmental and waste management plan

    SciTech Connect

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  13. Final Environmental assessment for the Uranium Lease Management Program

    SciTech Connect

    1995-07-01

    The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment of the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    (United States) Fernald Environmental Management Project, OH (United States) FluxNet ... and Diversity Office of Environmental Management-Consolidated Business Center Office of ...

  15. DOE OFFICE OF ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ENVIRONMENTAL MANAGEMENT 2015 YEAR IN REVIEW "I am proud of all of the work we in EM-both at headquarters and in the field-have accomplished this year. While facing the most complex cleanup challenges, measurable progress was made in 2015-a testament to our skilled workforce. The considerable investment made in cleanup this year has led to strong results across the EM complex. The foundation and planning put in place this year will enable EM to hit the ground running in 2016. I was honored

  16. Lantana landfill: A history of environmental management 1965--96

    SciTech Connect

    Statom, R.A.

    1997-08-01

    The Lantana Sanitary Landfill (LSL) is located in central Palm Beach County, Florida. The history of this landfill is a case study of the changes in environmental law, demography, solid waste management, hydrogeology, and public opinion in south Florida in the last 30 years. In 1983 Palm Beach County transferred ownership of the LSL to the Palm Beach County Solid Waste Authority (SWA). Environmental regulation enacted by Florida in the mid 1980`s resulted in negotiations to close the LSL. Closure was completed in 1988 utilizing a synthetic top liner, a landfill gas extraction/flare system, and a stormwater management system. In 1990 a groundwater mitigation system was installed to remediate the eastern plume. Closure of the LSL, extension of municipal water to local residents, and extensive public education by the SWA all served to answer most of the complaints of the local residents. In 1996 the LSL fell under a new series of air regulations and was required to apply for a Title V permit.

  17. Tank Farm Closure & Waste Management Environmental Impact Statement <br>

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (DOE/EIS-0391) - Hanford Site Statements Tank Closure & WM EIS Info Documents CERCLA Five-Year Review NEPA - Categorical Exclusions NEPA - Environmental Assessments NEPA - Environmental Impact Statements Environmental Management Performance Reports Tank Farm Closure & Waste Management Environmental Impact Statement (DOE/EIS-0391) Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size The U.S. Department of Energy (USDOE) has prepared a Final Environmental

  18. Environmental management compliance reengineering project, FY 1997 report

    SciTech Connect

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  19. The Department of Energy's Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation, IG-0883

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation DOE/IG-0883 April 2013 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 April 9, 2013 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "The Department of Energy's Use of the Environmental Management Waste Management Facility at the Oak Ridge Reservation"

  20. Environmental management requirements/defensible costs project. Final report

    SciTech Connect

    1996-02-01

    Lockheed Idaho Technologies Company (LITCO) used a systems engineering approach to develop the first formal requirements baseline for Idaho National Engineering Laboratory (INEL) Environmental Management (EM) Programs. The recently signed Settlement Agreement with the State of Idaho (Batt Agreement), along with dramatically reduced EM funding targets from Department of Energy (DOE) headquarters, drove the immediacy of this effort. Programs have linked top-level requirements to work scope to cost estimates. All EM work, grouped by decision units, was scrubbed by INEL EM programs and by an independent {open_quotes}Murder Board.{close_quotes} Direct participation of upper level management from LITCO and the DOE-Idaho Operations Office ensured best information and decisions. The result is a scrubbed down, defensible budget tied to top-level requirements for use in the upcoming DOE-Headquarters` budget workout, the Internal Review Board, the FY98 Activity Data Sheets submittal, and preparation of the FY97 control accounts and out-year plans. In addition to the remarkable accomplishments during the past eight weeks, major issues were identified and documented and follow-on tasks are underway which will lead to further improvements in INEL EM program management.

  1. An environmentally sustainable decision model for urban solid waste management

    SciTech Connect

    Costi, P.; Minciardi, R.; Robba, M.; Rovatti, M.; Sacile, R

    2004-07-01

    The aim of this work is to present the structure and the application of a decision support system (DSS) designed to help decision makers of a municipality in the development of incineration, disposal, treatment and recycling integrated programs. Specifically, within a MSW management system, several treatment plants and facilities can generally be found: separators, plants for production of refuse derived fuel (RDF), incinerators with energy recovery, plants for treatment of organic material, and sanitary landfills. The main goal of the DSS is to plan the MSW management, defining the refuse flows that have to be sent to recycling or to different treatment or disposal plants, and suggesting the optimal number, the kinds, and the localization of the plants that have to be active. The DSS is based on a decision model that requires the solution of a constrained non-linear optimization problem, where some decision variables are binary and other ones are continuous. The objective function takes into account all possible economic costs, whereas constraints arise from technical, normative, and environmental issues. Specifically, pollution and impacts, induced by the overall solid waste management system, are considered through the formalization of constraints on incineration emissions and on negative effects produced by disposal or other particular treatments.

  2. [DOE method for evaluating environmental and waste management samples: Revision 1, Addendum 1

    SciTech Connect

    Goheen, S.C.

    1995-04-01

    The US Dapartment of Energy`s (DOE`s) environmental and waste management (EM) sampling and analysis activities require that large numbers of samples be analyzed for materials characterization, environmental surveillance, and site-remediation programs. The present document, DOE Methods for Evaluating Environmental and Waste Management Samples (DOE Methods), is a supplemental resource for analyzing many of these samples.

  3. Occurrence of Schoenoplectus mucronatus at the U.S. Department of Energy Fernald Preserve

    SciTech Connect

    Homer, John; Decker, Ashlee; Bien, Stephanie

    2010-01-01

    Bog bulrush (Schoenoplectus mucronatus) is a perennial wetland species native to Africa, Asia, and Europe. Its documented occurrence in the United States includes California, Hawaii, Iowa, Kentucky, Missouri, New Jersey, New York, Pennsylvania, Washington, and Tennessee. This species spreads through seed, rhizomes, and stolons, and has shown resistance to certain herbicides. Online plant databases do not show the distribution of the species reaching into Ohio or Indiana; however, local experts have indicated that specimens are in both states. Various reports indicate that S. mucronatus is locally abundant but not yet widespread regionally. In recent years, S. mucronatus has become increasingly abundant at the Fernald Preserve, a U.S. Department of Energy site in northwest Hamilton County, Ohio. The 425- hectare (1,050-acre) site has undergone extensive remediation and subsequent ecological restoration, and various wetlands have been constructed across the site. S. mucronatus was first observed at the Fernald Preserve in 2008, in one constructed basin. During monitoring in 2009, S. mucronatus was seen in 8 of 23 basins surveyed. This increase has raised concern that the species may become a regional problem. This poster aims to alert botanists and ecological restoration personnel of the species regional occurrence, and prompt discussion of its potential impacts and how it can be controlled.

  4. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    SciTech Connect

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

  5. The role of metadata in managing large environmental science datasets. Proceedings

    SciTech Connect

    Melton, R.B.; DeVaney, D.M.; French, J. C.

    1995-06-01

    The purpose of this workshop was to bring together computer science researchers and environmental sciences data management practitioners to consider the role of metadata in managing large environmental sciences datasets. The objectives included: establishing a common definition of metadata; identifying categories of metadata; defining problems in managing metadata; and defining problems related to linking metadata with primary data.

  6. The Use of Ecological Restoration Principles To Achieve Remedy Protection At the Fernald Preserve and Weldon Spring Sites

    SciTech Connect

    Powell, J.; Johnston, F.; Homer, J.; Deyo, Y.

    2008-07-01

    At both the Fernald Preserve and the Weldon Spring Site, the development of ecological restoration goals and objectives was used to complement and even enhance achievement of selected remedies. Warm-season native grasses and forbs were used for revegetation of remediated areas. The hardiness and ability to establish in low-nutrient conditions make native grasses ideal candidates for reestablishment of vegetation in excavated areas. At the Fernald Preserve, native grasses were used for vegetative cover on an on-site disposal facility as well. Also at the Fernald Preserve, excavation footprints were optimized to increase the quantity and quality of created wetlands. Drainage features in a couple instances provide passive groundwater recharge, potentially accelerating groundwater remediation efforts. In addition, a number of clean materials and structures were beneficially reused as part of ecological restoration designs, including wood-chip mulch and woody debris, clean concrete, and a rail trestle. At the Weldon Spring Site, several methods were used to control erosion for three years after the initial seeding of native species. A field evaluation of soil conditions and general species diversity was performed in 2007 and it was determined that erosion at the site was typical and repairing naturally. These approaches resulted in 'win-win' strategies needed to successfully remediate and restore complex projects such as the Fernald Preserve and Weldon Spring. (authors)

  7. Visual Data Analysis as an Integral Part of Environmental Management

    SciTech Connect

    Meyer, Joerg; Bethel, E. Wes; Horsman, Jennifer L.; Hubbard, Susan S.; Krishnan, Hari; Romosan, Alex; Keating, Elizabeth; Monroe, Laura M.; Strelitz, Richard; Moore, Philip; Taylor, Glenn; Torkian, Ben; Johnson, Timothy C.; Gorton, Ian

    2012-12-01

    The U.S. Department of Energy's (DOE) Office of Environmental Management (DOE/EM) currently supports an effort to understand and predict contaminant fate and transport in natural and engineered systems. Geologists, hydrologists, physicists and computer scientists are working together to create models of existing contaminated sites and to simulate their behavior. Simulation results are verified based on historical data and extrapolated into the future. Visualization is used for model setup verification, visual analysis of high-performance computing simulation results, and uncertainty quantification. This article describes the challenges and solutions for visual data analysis, which impacts the decision-making process for each of the contaminated sites. Lessons learned from these simulations will also have an impact on deciding on treatment measures for other, similarly contaminated areas, including those affected by more recent events, such as Chernobyl and Fukushima.

  8. Uranium Management - Preservation of a National Asset

    SciTech Connect

    Jackson, J. D.; Stroud, J. C.

    2002-02-27

    The Uranium Management Group (UMG) was established at the Department of Energy's (DOE's) Oak Ridge Operations in 1999 as a mechanism to expedite the de-inventory of surplus uranium from the Fernald Environmental Management Project site. This successful initial venture has broadened into providing uranium material de-inventory and consolidation support to the Hanford site as well as retrieving uranium materials that the Department had previously provided to universities under the loan/lease program. As of December 31, 2001, {approx} 4,300 metric tons of uranium (MTU) have been consolidated into a more cost effective interim storage location at the Portsmouth site near Piketon, OH. The UMG continues to uphold its corporate support mission by promoting the Nuclear Materials Stewardship Initiative (NMSI) and the twenty-five (25) action items of the Integrated Nuclear Materials Management Plan (1). Before additional consolidation efforts may commence to remove excess inventory from Environmental Management closure sites and universities, a Programmatic Environmental Assessment (PEA) must be completed. Two (2) noteworthy efforts currently being pursued involve the investigation of re-use opportunities for surplus uranium materials and the recovery of usable uranium from the shutdown Portsmouth cascade. In summary, the UMG is available as a DOE complex-wide technical resource to promote the responsible management of surplus uranium.

  9. Using FRAMES to Manage Environmental and Water Resources

    SciTech Connect

    Whelan, Gene; Millard, W. David; Gelston, Gariann M.; Khangaonkar, Tarang P.; Pelton, Mitch A.; Strenge, Dennis L.; Yang, Zhaoqing; Lee, Cheegwan; Sivaraman, Chitra; Stephan, Alex J.; Hoopes, Bonnie L.; Castleton, Karl J.

    2007-05-16

    The Framework for Risk Analysis in Multimedia Environmental Systems FRAMES) is decision-support middleware that provides users the ability to design software solutions for complex problems. It is a software platform that provides seamless and transparent communication between modeling components by using a multi-thematic approach to provide a flexible and holistic understanding of how environmental factors potentially affect humans and the environment. It incorporates disparate components (e.g., models, databases, and other frameworks) that integrate across scientific disciplines, allowing for tailored solutions to specific activities. This paper discusses one example application of FRAMES, where several commercialoff-the-shelf (COTS) software products are seamlessly linked into a planning and decision-support tool that helps manage water-based emergency situations and sustainable response. Multiple COTS models, including three surface water models, and a number of databases are linked through FRAMES to assess the impact of three asymmetric and simultaneous events, two of which impact water resources. The asymmetric events include 1) an unconventional radioactive release into a large potable water body, 2) a conventional contaminant (oil) release into navigable waters, and 3) an instantaneous atmospheric radioactive release.

  10. 2016 Annual Workforce Analysis and Staffing Plan Report - DOE Oak Ridge Office of Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (4193) United States Government Department of Energy Oak Ridge Office of Environmental Management memorandum DATE: January 19, 2016 REPLY TO ATTN OF: EM-90:Cange SUBJECT: 2015 OAK RIDGE OFFICE OF ENVIRONMENTAL MANAGEMENT ANNUAL WORKFORCE ANALYSIS AND STAFFING PLAN TO: Karen L. Boardman, Chairperson, Federal Technical Capability Panel, HS-70 The Oak Ridge Office of Environmental Management (OREM) has produced the required OREM Annual Workforce Analysis and Staffing Plan. The attached report

  11. U.S. Department of Energy REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    REPORT TO THE ENVIRONMENTAL MANAGEMENT ADVISORY BOARD DOE-EM Technology Development and Deployment Program Submitted by the EMAB Science & Technology Subcommittee Introduction: This report provides a summary of the work of the Science and Technology Subcommittee of the Environmental Management Advisory Board (EMAB), since its inception in December 2012. In Fiscal Year 2013, the Acting Assistant Secretary, David Huizenga, U.S. Department (DOE) Office of the Environmental Management (EM)

  12. PRESENTATION: OVERVIEW OF PROPOSED "DARPA-INSPIRED" APPROACH TO ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT

    Energy.gov [DOE]

    A briefing to the SEAB Task Force on Technology Development for Environmental Management (EM) on a proposed "DARPA-Inspired" approach to technology development for EM.

  13. Report of the Task Force on Technology Development for Environmental Management

    Office of Energy Efficiency and Renewable Energy (EERE)

    SEAB findings and recommendations on the value of a renewed environmental management science and technology development effort and how such a program would be structured.

  14. Dr. Monica Regalbuto Confirmed as DOE Assistant Secretary for Environmental Management

    Energy.gov [DOE]

    WASHINGTON, D.C. – Dr. Monica Regalbuto was confirmed by the Senate Wednesday as the Department of Energy’s Assistant Secretary for Environmental Management.

  15. July 15, 2014 SEAB Task Force Meeting on Technology Development for Environmental Management

    Energy.gov [DOE]

    The SEAB Task Force on Technology Development for Environmental Management met at U.S. Department of Energy in Washington, DC.

  16. Lesson Learned by Environmental Management Complex-wide Activity-level Work Planning and Control

    Energy.gov [DOE]

    Slide Presentation by Roger Claycomb, Work Control Program Manager, DOE Idaho Operations Office. Office of Environmental Management Work Planning and Control Oversight. Contractor Good Practices and DOE EM Good Practices.

  17. DOE Awards Task Order Modification for Support Services to Office of Environmental Management

    Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a modification to Task Order DE-DT0005235 to J.G. Management Systems, Inc. of Grand Junction, CO for administrative and program analytical support for the Office of Environmental Management.

  18. DOE/NV--808

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... degree (e.g., the routes used by the FEMP, Earthline, and MEMP, all three located in ... States Environmental Protection Agency FEMP Fernald Environmental Management Project ...

  19. Analytical Electron Microscopy examination of uranium contamination at the DOE Fernald operation site

    SciTech Connect

    Buck, E.C.; Dietz, N.L.; Bates, J.K.; Cunnane, J.C.

    1993-02-01

    Analytical Electron Microscopy (AEM) has been used to identify uranium-bearing phases present in contaminated soils from the DOE Fernald operation site. A combination of optical microscopy, scanning electron microscopy with backscattered electron detection (SEM/BSE), and AEM was used in isolating and characterizing uranium-rich regions of the contaminated soils. Soil samples were prepared for transmission electron microscopy (TEM) by ultramicrotomy using an embedding resin previously employed for aquatic colloids and biological samples. This preparation method allowed direct comparison between SEM and TEM images. At the macroscopic level much of the uranium appears to be associated with clays in the soils; however, electron beam analysis revealed that the uranium is present as discrete phases, including iron oxides, silicates (soddyite), phosphates (autunites), and fluorite. Only low levels of uranium were actually within the clay minerals. The distribution of uranium phases was inhomogeneous at the submicron level.

  20. Visual Data Analysis as an Integral Part of Environmental Management

    SciTech Connect

    Meyer, Joerg; Bethel, E. Wes; Horsman, Jennifer L.; Hubbard, Susan S.; Krishnan, Harinarayan; Romosan,, Alexandru; Keating, Elizabeth H.; Monroe, Laura; Strelitz, Richard; Moore, Phil; Taylor, Glenn; Torkian, Ben; Johnson, Timothy C.; Gorton, Ian

    2012-10-01

    The U.S. Department of Energy's (DOE) Office of Environmental Management (DOE/EM) currently supports an effort to understand and predict the fate of nuclear contaminants and their transport in natural and engineered systems. Geologists, hydrologists, physicists and computer scientists are working together to create models of existing nuclear waste sites, to simulate their behavior and to extrapolate it into the future. We use visualization as an integral part in each step of this process. In the first step, visualization is used to verify model setup and to estimate critical parameters. High-performance computing simulations of contaminant transport produces massive amounts of data, which is then analyzed using visualization software specifically designed for parallel processing of large amounts of structured and unstructured data. Finally, simulation results are validated by comparing simulation results to measured current and historical field data. We describe in this article how visual analysis is used as an integral part of the decision-making process in the planning of ongoing and future treatment options for the contaminated nuclear waste sites. Lessons learned from visually analyzing our large-scale simulation runs will also have an impact on deciding on treatment measures for other contaminated sites.

  1. ENVIRONMENTAL MANAGEMENT ADVISORY BOARD U.S. DEPARTMENT OF ENERGY

    Office of Environmental Management (EM)

    ... overall project management performance results Lessons learned - NASA James Webb Space Telescope (NASA) Project Management Institute view on the pulse of the industry and ...

  2. Environmental Management Advisory Board U.S. Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Advisory Board U.S. Department of Energy Advisory Board Charter 1. Committee's ... program including, but not limited to, project management and oversight, costbenefit ...

  3. U.S. Department of Energy ENVIRONMENTAL MANAGEMENT ADVISORY BOARD

    Office of Environmental Management (EM)

    ... overall project management performance results Lessons learned - NASA James Webb Space Telescope (NASA) Project Management Institute view on the pulse of the industry and ...

  4. Advanced Simulation Capability for Environmental Management (ASCEM) Phase II Demonstration

    SciTech Connect

    Freshley, M.; Hubbard, S.; Flach, G.; Freedman, V.; Agarwal, D.; Andre, B.; Bott, Y.; Chen, X.; Davis, J.; Faybishenko, B.; Gorton, I.; Murray, C.; Moulton, D.; Meyer, J.; Rockhold, M.; Shoshani, A.; Steefel, C.; Wainwright, H.; Waichler, S.

    2012-09-28

    In 2009, the National Academies of Science (NAS) reviewed and validated the U.S. Department of Energy Office of Environmental Management (EM) Technology Program in its publication, Advice on the Department of Energy’s Cleanup Technology Roadmap: Gaps and Bridges. The NAS report outlined prioritization needs for the Groundwater and Soil Remediation Roadmap, concluded that contaminant behavior in the subsurface is poorly understood, and recommended further research in this area as a high priority. To address this NAS concern, the EM Office of Site Restoration began supporting the development of the Advanced Simulation Capability for Environmental Management (ASCEM). ASCEM is a state-of-the-art scientific approach that uses an integration of toolsets for understanding and predicting contaminant fate and transport in natural and engineered systems. The ASCEM modeling toolset is modular and open source. It is divided into three thrust areas: Multi-Process High Performance Computing (HPC), Platform and Integrated Toolsets, and Site Applications. The ASCEM toolsets will facilitate integrated approaches to modeling and site characterization that enable robust and standardized assessments of performance and risk for EM cleanup and closure activities. During fiscal year 2012, the ASCEM project continued to make significant progress in capabilities development. Capability development occurred in both the Platform and Integrated Toolsets and Multi-Process HPC Simulator areas. The new Platform and Integrated Toolsets capabilities provide the user an interface and the tools necessary for end-to-end model development that includes conceptual model definition, data management for model input, model calibration and uncertainty analysis, and model output processing including visualization. The new HPC Simulator capabilities target increased functionality of process model representations, toolsets for interaction with the Platform, and model confidence testing and verification for

  5. Fernald Attendance

    Office of Legacy Management (LM)

    2,000 4,000 6,000 8,000 10,000 12,000 14,000 VISITORS CENTER AND PROGRAM ATTENDANCE 2008 2009 2010 2011 2012 2013 2014 Annual attendance is determined by combining Visitors Center...

  6. Waste Acceptance Decisions and Uncertainty Analysis at the Oak Ridge Environmental Management Waste Management Facility

    SciTech Connect

    Redus, K. S.; Patterson, J. E.; Hampshire, G. L.; Perkins, A. B.

    2003-02-25

    The Waste Acceptance Criteria (WAC) Attainment Team (AT) routinely provides the U.S. Department of Energy (DOE) Oak Ridge Operations with Go/No-Go decisions associated with the disposition of over 1.8 million yd3 of low-level radioactive, TSCA, and RCRA hazardous waste. This supply of waste comes from 60+ environmental restoration projects over the next 15 years planned to be dispositioned at the Oak Ridge Environmental Management Waste Management Facility (EMWMF). The EMWMF WAC AT decision making process is accomplished in four ways: (1) ensure a clearly defined mission and timeframe for accomplishment is established, (2) provide an effective organization structure with trained personnel, (3) have in place a set of waste acceptance decisions and Data Quality Objectives (DQO) for which quantitative measures are required, and (4) use validated risk-based forecasting, decision support, and modeling/simulation tools. We provide a summary of WAC AT structure and performance. We offer suggestions based on lessons learned for effective transfer to other DOE.

  7. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE/EIS-0391 Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington Summary U.S. Department of Energy November 2012 1 Cover Sheet Responsible Agency: U.S. Department of Energy (DOE) Cooperating Agencies: Washington State Department of Ecology (Ecology) U.S. Environmental Protection Agency (EPA) Title: Final Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (TC & WM EIS)

  8. Ashtabula Environmental Management Project Main Extrusion Plant Demolition Project. Demolition of the Ashtabula Environmental Management Project's Main Extrusion Plant

    SciTech Connect

    Colborn, Kurt; Johnson, Kathryn K.

    2003-02-27

    Significant progress was made this year toward closure of the Department of Energy's Ashtabula Environmental Management Project (AEMP) with the demolition of the 9-building Main Extrusion Plant Complex. The 44,000 square foot building complex formerly housed uranium extrusion facilities and equipment. At the start of the project in October of 2001, the buildings still contained a RCRA Part B storage area, operating mixed waste treatment facilities, active waste shredding and compacting process areas, and a state EPA permitted HEPA ventilation system. This paper presents a discussion of the multidisciplinary effort to bring the building to a safe shutdown condition in just six months, including relocation of existing process areas, utility isolation, and preliminary decontamination. Also discussed is the demolition strategy in which portions of the facility remained active while demolition was proceeding in other areas. Other details of the technical approach to the demolition are also discussed, including innovative techniques for demolition, galbestos removal, contamination control, and waste minimization. These techniques contributed to the early completion of demolition in July of 2002, fully two months ahead of schedule and $1.5 million under budget.

  9. Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific Advisory Boards

    Energy.gov [DOE]

    Letter from EM-1, Assistant Secretary, Jessie H. Roberson regarding restructuring and managing the procurement mechanisms that support the activities of the Environmental Management Site Specific...

  10. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    JUN 1 1 2013 Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection Division of Waste Management 200 Fair Oaks Lane, 2 nd Floor Frankfort, Kentucky 40601 Ms. Jennifer Tufts Federal Facility Agreement Manager U.S. Environmental Protection Agency, Region 4 61 Forsyth Street Atlanta, Georgia 30303 Dear Mr. Mullins and Ms. Tufts: PPPO-02-1813000-13B TRANSMITTAL OF THE COMMUNITY RELATIONS PLAN UNDER THE FEDERAL FACILITY AGREEMENT AT THE U.S. DEPARTMENT OF

  11. Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    APPENDIX B CONTRACTOR AND SUBCONTRACTOR NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENTS NATIONAL ENVIRONMENTAL POLICY ACT DISCLOSURE STATEMENT FOR PREPARATION OF THE TANK CLOSURE AND WASTE MANAGEMENT ENVIRONMENTAL IMPACT STATEMENT FOR THE HANFORD SITE, RICHLAND, WASHINGTON The Council of Environmental Quality regulations at Title 40 of the Code of Federal Regulatiolls (CFR), Section 1506.5(c), which have been adopted by the U.S. Department of Energy (10 CFR 1021), require contractors and

  12. Senior Managers' Implementation Guide for Use with DOE O 450.1, Environmental Protection Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2004-10-25

    This Guide provides a summary description of environmental management systems (EMSs) for DOE senior managers, including their responsibilities as they apply to the successful implementation of an Integrated Safety Management Systems/EMS and the expected benefits to be derived from such implementation. Canceled by DOE N 251.82.

  13. ENVIRONMENTAL MANAGEMENT SITE-SPECIFIC ADVISORY BOARD CHAIRS...

    Office of Environmental Management (EM)

    Dave Borak, EM SSAB Designated Federal Officer Matt McCormick, DOE-RL Manager Kevin Smith, DOE-ORP Manager Jane Hedges, Washington State Department of Ecology Dennis Faulk, U.S. ...

  14. EIS-0200: Waste Management Programmatic Environmental Impact Statement for Managing Treatment, Storage, and Disposal of Radioactive and Hazardous Waste

    Energy.gov [DOE]

    This Programmatic EIS evaluates the potential environmental and cost impacts of strategic management alternatives for managing five types of radioactive and hazardous wastes that have resulted and will continue to result from nuclear defense and research activities at a variety of sites around the United States.

  15. Brazil-US EPA Environmental Management Activities | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    navigation, search Name Brazil-US EPA Program AgencyCompany Organization United States Environmental Protection Agency Sector Energy, Land Topics Background analysis Website...

  16. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... The SST (149 tanks) and DST (28 tanks) systems contain both hazardous and radioactive waste (mixed waste). The second set of proposed actions analyzed in this environmental impact ...

  17. In-Situ Decommissioning: A Strategy for Environmental Management

    Energy.gov [DOE]

    In-Situ Decommissioning (ISD) is an effective decommissioning practice offering a safe and environmentally-favorable alternative to completely demolishing a facility and transporting its debris...

  18. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the potential long-term environmental and human health impacts associated with ... 3 above de minimis values. 5.2.2 Human Health Impacts Potential human health ...

  19. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    SciTech Connect

    Not Available

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  20. Environmental Management Waste Management Facility (EMWMF) Site-Specific Health and Safety Plan, Oak Ridge, Tennessee

    SciTech Connect

    Flynn, N.C. Bechtel Jacobs

    2008-04-21

    The Bechtel Jacobs Company LLC (BJC) policy is to provide a safe and healthy workplace for all employees and subcontractors. The implementation of this policy requires that operations of the Environmental Management Waste Management Facility (EMWMF), located one-half mile west of the U.S. Department of Energy (DOE) Y-12 National Security Complex, be guided by an overall plan and consistent proactive approach to environment, safety and health (ES&H) issues. The BJC governing document for worker safety and health, BJC/OR-1745, 'Worker Safety and Health Program', describes the key elements of the BJC Safety and Industrial Hygiene (IH) programs, which includes the requirement for development and implementation of a site-specific Health and Safety Plan (HASP) where required by regulation (refer also to BJC-EH-1012, 'Development and Approval of Safety and Health Plans'). BJC/OR-1745, 'Worker Safety and Health Program', implements the requirements for worker protection contained in Title 10 Code of Federal Regulations (CFR) Part 851. The EMWMF site-specific HASP requirements identifies safe operating procedures, work controls, personal protective equipment, roles and responsibilities, potential site hazards and control measures, site access requirements, frequency and types of monitoring, site work areas, decontamination procedures, and outlines emergency response actions. This HASP will be available on site for use by all workers, management and supervisors, oversight personnel and visitors. All EMWMF assigned personnel will be briefed on the contents of this HASP and will be required to follow the procedures and protocols as specified. The policies and procedures referenced in this HASP apply to all EMWMF operations activities. In addition the HASP establishes ES&H criteria for the day-to-day activities to prevent or minimize any adverse effect on the environment and personnel safety and health and to meet standards that define acceptable waste management practices. The

  1. Proposed Resource Management Plan/Final Environmental Impact...

    National Nuclear Security Administration (NNSA)

    ... owl (BLM sensitive species) * Sunnyside green gentian (BLM sensitive species) To manage ... Monitoring wind energy development projects; and * Rehabilitating areas damaged by fires. ...

  2. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and the State of Idaho, e.g., under the Resource Conservation and Recovery Act (RCRA). ... Requirements 10 CFR 1022 Hazardous Waste and Materials Management Resource Conservation ...

  3. Natural resource management activities at the Savannah River Site. Environmental Assessment

    SciTech Connect

    Not Available

    1993-07-01

    This environmental assessment (EA) reviews the environmental consequences of ongoing natural resource management activities on the Savannah River Site (SRS). Appendix A contains the Natural Resources Management Plant (NRMP). While several SRS organizations have primary responsibilities for different elements of the plan, the United States Department of Agriculture (USDA), Forest Service, Savannah River Forest Station (SRFS) is responsible for most elements. Of the river scenarios defined in 1985, the High-Intensity Management alternative established the upper bound of environmental consequences; it represents a more intense level of resource management than that being performed under current resource management activities. This alternative established compliance mechanisms for several natural resource-related requirements and maximum practical timber harvesting. Similarly, the Low-Intensity Management alternative established the lower bound of environmental consequences and represents a less intense level of resource management than that being performed under current resource management activities. This alternative also established compliance mechanisms, but defined a passively managed natural area. The Proposed Action of this EA describes the current level of multiple-natural resource management. This EA reviews the proposed action, and the high and low intensity alternative scenarios.

  4. Executive Order 13423 Strengthening Federal Environmental, Energy, and Transportation Management

    Energy.gov [DOE]

    It is the policy of the United States that Federal agencies conduct their environmental, transportation, and energy-related activities under the law in support of their respective missions in an...

  5. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hanford Site, Richland, Washington (Final TC & WM EIS) U.S. Environmental Protection Agency (EPA), Region 10 Foreword After receiving the EPA comments on the Draft TC & WM EIS, the ...

  6. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the U.S. Environmental Protection Agency (EPA), Region 10, which participated as ... can be found in Section 7.1. 2 DOE invited EPA to be a cooperating agency in 2002 and to ...

  7. EO 13423: Strengthening Federal Environmental, Energy, and Transportation Management (2007)

    Energy.gov [DOE]

    It is the policy of the United States that Federal agencies conduct their environmental, transportation, and energy-related activities under the law in support of their respective missions in an...

  8. EO 13148: Greening the Government Through Leadership in Environmental Management

    Energy.gov [DOE]

    The head of each Federal agency is responsible for ensuring that all necessary actions are taken to integrate environmental accountability into agency day-to-day decisionmaking and long-term...

  9. Richland Environmental Restoration Project management action process document

    SciTech Connect

    1996-04-01

    This document is the prescribed means for providing direct input to the US Department of Energy Headquarters regarding the status, accomplishments, strategy, and issues of the Richland Environmental Restoration Project. The project mission, organizational interfaces, and operational history of the Hanford Site are provided. Remediation strategies are analyzed in detail. The document includes a status of Richland Environmental Restoration project activities and accomplishments, and it presents current cost summaries, schedules, and technical baselines.

  10. United States of America, Department of Energy Environmental Restoration and Waste Management Advisory Committee Public Meeting

    SciTech Connect

    Not Available

    1993-07-01

    This report is a transcript of the public hearing of the US DOE Environmental Restoration and Waste Management Advisory Committee held in Golden, Colorado June 16--18, 1993.

  11. Energy Department Issues Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Request for Proposal (RFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement

  12. Bureau of Land Management - 4.0 Chapter 4 - Environmental Effects...

    OpenEI (Open Energy Information) [EERE & EIA]

    OpenEI Reference LibraryAdd to library Legal Document- OtherOther: Bureau of Land Management - 4.0 Chapter 4 - Environmental EffectsLegal Abstract This chapter discloses the...

  13. United States of America Department of Energy Environmental Management Advisory Committee Public Meeting

    SciTech Connect

    Not Available

    1993-12-01

    This reports contains documentation of presentations given at the United States of America Department of Energy Environmental Management Advisory Committee Public Meeting held December 14--15, 1993 in Alexandria, Virginia.

  14. Environmental management assessment of the Waste Isolation Pilot Plant (WIPP), Carlsbad, New Mexico

    SciTech Connect

    Not Available

    1993-07-01

    This document contains the results of the Environmental Management Assessment of the Waste Isolation Pilot Plant (WIPP). This Assessment was conducted by EH-24 from July 19 through July 30, 1993 to advise the Secretary of Energy of the adequacy of management systems established at WIPP to ensure the protection of the environment and compliance with Federal, state, and DOE environmental requirements. The mission of WIPP is to demonstrate the safe disposal of transuranic (TRU) waste. During this assessment, activities and records were reviewed and interviews were conducted with personnel from the management and operating contractors. This assessment revealed that WIPP`s environmental safety and health programs are satisfactory, and that all levels of the Waste Isolation Division (WID) management and staff consistently exhibit a high level of commitment to achieve environmental excellence.

  15. Strategic Plan for Sustainable Energy Management and Environmental Stewardship for Los Angeles Unified School District

    SciTech Connect

    Walker, A.; Beattie, D.; Thomas, K.; Davis, K.; Sim, M.; Jhaveri, A.

    2007-11-01

    This Strategic Plan for Sustainable Energy Management and Environmental Stewardship states goals, measures progress toward goals and how actions are monitored to achieve continuous improvement for the Los Angeles Unified School District.

  16. DOE Awards Small Business Contract for Support, Planning Services to Office of Environmental Management

    Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a $1.5 million contact (task order) to Trinity Engineering Associates, Inc. of Cincinnati, Ohio for planning and support functions for the Office of Environmental Management.

  17. Office of Environmental Management Taps Small Business for Waste Isolation Pilot Plant Contract

    Energy.gov [DOE]

    This week, Celeritex, LLC landed a contract worth up to $17.8 million with the Office of Environmental Management, having demonstrated through a competetive process that this small business is up...

  18. DOE Awards Small Business Task Order for Technical Support to the Office of Environmental Management

    Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a task order for technical support services to Boston Government Services, LLC of Lenoir City, Tennessee for support services to the DOE Office of Environmental Management.

  19. Energy Department Issues Draft Request For Proposal for the Environmental Management Headquarters Information Technology Services Procurement

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (DRFP) for the Environmental Management (EM) Headquarters (HQ) Information Technology (IT) Services procurement.

  20. U.S. Department of Energy Environmental Management Site-Specific

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Management Site-Specific Advisory Board Policies and Procedures Desk Reference Prepared by The Office of Intergovernmental and Community Activities June 2013 Table of Contents Foreword I. Background and Introduction ................................................................. 2 II. Roles and Responsibilities ........................................................................ 3 A. DOE Headquarters

  1. The Secretary of Energy Advisory Board (SEAB) Task Force on Technology Development for Environmental Management

    Energy.gov [DOE]

    While the Department's Office of Environmental Management (EM) has made significant progress in closing a number of projects, many of the most challenging projects remain and will for decades to...

  2. Lab Day on the Hill Shines Light on Latest Environmental Management Advances

    Energy.gov [DOE]

    WASHINGTON, D.C. – Work performed by the best and brightest scientists tackling environmental management challenges at DOE’s national laboratories was on display and in the spotlight at a recent exhibition for members of Congress.

  3. Oak Ridge Environmental Management Program Completes Work at Bethel Valley Burial Grounds

    Energy.gov [DOE]

    Department of Energy’s (DOE) Oak Ridge Environmental Management (EM) program recently completed upgrades and soil remediation work at the Bethel Valley Burial Grounds, using approximately $17.5 million in American Recovery and Reinvestment Act funds.

  4. Report to Congress on the U.S. Department of Energy`s Environmental Management Science Program: Research funded and its linkages to environmental cleanup problems, and Environmental Management Science Program research award abstracts. Volume 2 of 3 -- Appendix B

    SciTech Connect

    1998-04-01

    The Department of Energy`s Environmental Management Science Program (EMSP) serves as a catalyst for the application of scientific discoveries to the development and deployment of technologies that will lead to reduction of the costs and risks associated with cleaning up the nation`s nuclear complex. Appendix B provides details about each of the 202 research awards funded by the EMSP. This information may prove useful to researchers who are attempting to address the Department`s environmental management challenges in their work, program managers who are planning, integrating, and prioritizing Environmental Management projects, and stakeholders and regulators who are interested in the Department`s environmental challenges. The research award information is organized by the state and institution in which the lead principal investigator is located. In many cases, the lead principal investigator is one of several investigators at a number of different institutions. In these cases, the lead investigator (major collaborator) at each of the additional institutions is listed. Each research award abstract is followed by a list of high cost projects that can potentially be impacted by the research results. High cost projects are Environmental Management projects that have total costs greater than $50 million from the year 2007 and beyond, based on the March 1998 Accelerating Cleanup: Paths to Closure Draft data, and have costs or quantities of material associated with an Environmental Management problem area. High cost projects which must remain active in the year 2007 and beyond to manage high risk are also identified. Descriptions of these potentially related high cost Environmental Management projects can be found in Appendix C. Additional projects in the same problem area as a research award can be located using the Index of High Cost Environmental Management Projects by Problem Area, at the end of Appendices B and C.

  5. NATIONAL ENVIRONMENTAL POLICY ACT Management Review Team Conc~~rrence Sign-Off

    Office of Legacy Management (LM)

    NATIONAL ENVIRONMENTAL POLICY ACT Management Review Team Conc~~rrence Sign-Off April 24,2001 ACTION: DRAFT ENVIRONMENT ASSESSMENT OF GROUND WATER COMPLIANCE ACTIVITIES AT THE URANIUM MILL TAILINGS SITE, SHIPROCK, NEW MEXICO ISSUE: DraR Environmental Assessment of Ground Water Compliance at the Uranium Mill Tailings Site, Shiprock, New Mexico, to the Navajo Nation, federal and tribal regulatoly agencies, and other interested stakeholders for review and comment. RECOMMENDATION: The Management

  6. Assignment of Responsibilities for Executive Order 131 48, Greening the Government Through Leadership In Environmental Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2000-04-21

    Executive Order 13148, Greening the Government Through Leadership in Environmental Management, was signed by the President on April 21, 2000. This Order establishes new goals and requirements for Federal agencies that complement many Department of Energy (DOE) initiatives under way. These new goals and requirements affirm DOE's approach to improving environmental performance through the use of management systems and aggressive pollution prevention initiatives. Does not cancel other directives.

  7. Oak Ridge Office of Environmental Management Pursues Vision of Future While

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Remembering Past | Department of Energy Office of Environmental Management Pursues Vision of Future While Remembering Past Oak Ridge Office of Environmental Management Pursues Vision of Future While Remembering Past December 27, 2012 - 12:00pm Addthis Demolition of K-25, DOE’s largest-ever demolition project, is ongoing. Demolition of K-25, DOE's largest-ever demolition project, is ongoing. This graphic shows the status of activities at the East Tennessee Technology Park as of this

  8. I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ' I U.S. Department of Energy Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation ' Pilot Plant February SJ 2014 Washington, DC 20585 August 2014 Corrective Action Plan for Environmental Management Headquarters Accident Investigation Report Underground Salt Haul Truck Fire at the Waste Isolation Pilot Plant February 5, 2014 Prepared : James Hutton Acting Deputy Assistant Secretary for Safety,

  9. Proposed framework for the Western Area Power Administration Environmental Risk Management Program

    SciTech Connect

    Glantz, C.S.; DiMassa, F.V.; Pelto, P.J.; Brothers, A.J.; Roybal, A.L.

    1994-12-01

    The Western Area Power Administration (Western) views environmental protection and compliance as a top priority as it manages the construction, operation, and maintenance of its vast network of transmission lines, substations, and other facilities. A recent Department of Energy audit of Western`s environmental management activities recommends that Western adopt a formal environmental risk program. To accomplish this goal, Western, in conjunction with Pacific Northwest Laboratory, is in the process of developing a centrally coordinated environmental risk program. This report presents the results of this design effort, and indicates the direction in which Western`s environmental risk program is heading. Western`s environmental risk program will consist of three main components: risk communication, risk assessment, and risk management/decision making. Risk communication is defined as an exchange of information on the potential for threats to human health, public safety, or the environment. This information exchange provides a mechanism for public involvement, and also for the participation in the risk assessment and management process by diverse groups or offices within Western. The objective of risk assessment is to evaluate and rank the relative magnitude of risks associated with specific environmental issues that are facing Western. The evaluation and ranking is based on the best available scientific information and judgment and serves as input to the risk management process. Risk management takes risk information and combines it with relevant non-risk factors (e.g., legal mandates, public opinion, costs) to generate risk management options. A risk management tool, such as decision analysis, can be used to help make risk management choices.

  10. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... of collision energy is a natural consequence of the fact ...

  11. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... recognition by a human Natural Killer T-cell receptor ...

  12. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... mimicry of LFA-1's natural ligands, the ICAM ...

  13. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... comparative analysis of natural interferon-alpha mixtures ...

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... On the Relationship between the Natural Line Width and ...

  15. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Amarillo National Resource Center for Plutonium, ... Fernald Environmental Management Project, OH (United ... potential of oxygen in natural and experimental samples ...

  16. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Global aerosol model results highlight that the largest positive top-of-atmosphere ...

  17. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... to the violation of the global symmetry (custodial symmetry) in the Higgs sector. ...

  18. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... The onset of global ferromagnetic order at Tsub c coincides with the percolation ...

  19. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... A Mechanism of Global Shape-dependent Recognition and Phosphorylation of Filamin by ...

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... rather than through global constraints on the moments of the fissioning nucleus. ...

  1. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... system, including the sources of global greenhouse gases (GHGs) and short-lived ...

  2. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... sector consumes nearly 40% of annual global primary energy use and is responsible ...

  3. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... elucidates the connection between the global conformation of a star polymer and the ...

  4. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... being made, including DIS and global PDF fits, tau-decays, electro-weak ...

  5. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... backbone was varied from 8 to 85. The global conformation of the polymers in toluene ...

  6. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... are improving our understanding of global climate, with the goal of reducing the ...

  7. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... and demonstrate the importance of global models to supplement and interpret ...

  8. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... However, since the PW method uses a global Fourier basis, with strictly uniform ...

  9. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... However, if instead a global property, like the local level-density function is ...

  10. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Global electronic structure of semiconductor alloys through direct large-scale ...

  11. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Lai R. ; Luo, Yunfeng Although the global average surface temperature has ...

  12. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Rapid global structure determination of large RNA and RNA complexes using NMR and ...

  13. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... By combining global structural prediction and first-principles calculations, we have ...

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... these results? A Mechanism of Global Shape-dependent Recognition and ...

  15. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Finally, we incorporate a global optimization technique and propose an iterative ...

  16. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... To address the complexity of the search issue, the term global discovery is used for ...

  17. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... regarding increasing energy prices, global warming and renewable resources ...

  18. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... enables efficient implementation of the global address space programming languages. ...

  19. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Evaluation of this scheme using Global Atmospheric Research Atlantic Tropical ...

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... carbon dioxide (CO2) has caused serious concern of the progression of global warming. ...

  1. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... order: an uninterrupted, perfect, global Bravais lattice, in which the two ...

  2. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... of vanadium oxides: Local versus global effects Ramirez, Juan Gabriel ; ...

  3. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Have feedback or suggestions for a way to improve these results? Global Simulation ...

  4. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... now serving a growing, global user community with a wide range of computing needs. ...

  5. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Delta 2 associated with a global symmetry current, resulting in a ...

  6. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Global and regional evolution of short-lived radiatively-active gases and aerosols in ...

  7. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... lattice parameters depend upon the global extent of delithiation and on the ...

  8. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... This model explicitly elucidates the link between the global conformation of a ...

  9. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... of alternative vehicle technologies in anmore overall global perspective. ...

  10. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Evaluation of Air-to-Refrigerant Heat Exchangers using Alternative Lower Global ...

  11. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Global search for new physics at CDF Xie, Si ; MIT, LNS No abstract prepared. Full ...

  12. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Global Profiling of Shewanella oneidensis MR-1: Expression of Hypothetical Genes and ...

  13. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Model (CESM) is a fully-coupled, global climate model that provides ...

  14. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... could be used to evaluate and improve global climate model (GCM) simulations and ...

  15. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... and Space Administration's (NASA's) Global Precipitation Measurement (GPM) mission ...

  16. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    States) Fernald Environmental Management Project, OH (United States) FluxNet General ... improve these results? Dependence of Global Superconductivity on Inter-island ...

  17. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... Full Text Available May 2015 The Global Positioning System constellation as a space ...

  18. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... sub N preserving vacuum to be the global minimum, electroweak precision tests, ...

  19. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... The development of the temperature map of the oven provides insight into the global ...

  20. Search for: All records | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    ... States) Fernald Environmental Management Project, OH (United States) FluxNet General ... ESRL. The SGP site is included in the NOAA Cooperative Global Air Sampling Network. ...