National Library of Energy BETA

Sample records for fee flag ribbon

  1. Fees

    Energy.gov [DOE]

    The DOE Loan Program is required to collect several fees from loan program Applicants. Please find an outline of these fees below. In addition, DOE is supported by outside consultants and legal...

  2. fees

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PRIME CONTRACTOR FEES ON SUBCONTRACTOR COSTS U.S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL OFFICE OF AUDIT SERVICES AUDIT REPORT DOE/IG-0427 SEPTEMBER 1998 September 11, 1998 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Acting Inspector General SUBJECT: INFORMATION : Audit Report on "The U.S. Department of Energy's Prime Contractor Fees on Subcontractor Costs" BACKGROUND In Fiscal Year 1996, the Department's prime contractors awarded $5.3 billion in subcontracts. The

  3. Flag rates for deletion? | OpenEI Community

    Open Energy Information (Open El) [EERE & EIA]

    some "rates" that don't belong; they are one-time connection fees instead of rates (e.g. with a 2,500 connection fee as a "fixed monthly charge"). Is there some way to flag...

  4. TWISTED RIBBON FUEL ELEMENT

    DOE Patents [OSTI]

    Breden, C.R.; Schultz, A.B.

    1961-06-01

    A reactor core formed of bundles of parallel fuel elements in the form of ribbons is patented. The fuel ribbons are twisted about their axes so as to have contact with one another at regions spaced lengthwise of the ribbons and to be out of contact with one another at locations between these spaced regions. The contact between the ribbons is sufficient to allow them to be held together in a stable bundle in a containing tube without intermediate support, while permitting enough space between the ribbon for coolant flowing.

  5. SR0008

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Wachenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut ...

  6. SR0018

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Rick Ford (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Graphic The Department of Energy (DOE) has determined the performance award fee earned by Wackenhut Services, ...

  7. Department Seal and Flag

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-05-18

    This directive sets forth the policy governing the use of the official seal and distinguishing flag of the Department of Energy (DOE) as described in Title 10, Code of Federal Regulations (CFR), Part 1002. Cancels DOE O 10002.A dated 1-8-90.

  8. Antiguided fiber ribbon laser

    DOE Patents [OSTI]

    Wilcox, Russel B.; Page, Ralph H.; Beach, Raymond J.; Feit, Michael D.; Payne, Stephen A.

    2003-05-27

    The invention is a ribbon of an optical material with a plurality of cores that run along its length. The plurality of cores includes lasing impurity doped cores in an alternating spaced arrangement with index-modifying impurity doped cores. The ribbon comprises an index of refraction that is substantially equal to or greater than the indices of refraction of said array of lasing impurity doped cores. Index-increasing impurity doped cores promote antiguiding and leaky modes which provide more robust single "supermode" operation.

  9. Blue Ribbon Panel Recommendations Report

    Energy.gov [DOE]

    The Department of Energy's Geothermal Technologies Office (formerly Geothermal Technologies Program) assembled a geothermal Blue Ribbon Panel on March 22-23, 2011 in Albuquerque, New Mexico for a...

  10. Melt dumping in string stabilized ribbon growth

    DOE Patents [OSTI]

    Sachs, Emanuel M.

    1986-12-09

    A method and apparatus for stabilizing the edge positions of a ribbon drawn from a melt includes the use of wettable strings drawn in parallel up through the melt surface, the ribbon being grown between the strings. A furnace and various features of the crucible used therein permit continuous automatic growth of flat ribbons without close temperature control or the need for visual inspection.

  11. SR0302

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    8, 2003 Media Contact: Rick Ford (803) 725-2889 DOE Announces WSI Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fee earned by ...

  12. SR9917

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    6, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by ...

  13. SR9805

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    16, 1999 Media Contact: Rick Ford (803) 725-2889 WSCR Receives Award Fee Flag Ribbon Art The Department of Energy (DOE) has determined the performance award fees earned by ...

  14. Geothermal Technologies Program Blue Ribbon Panel Recommendations

    SciTech Connect (OSTI)

    none,

    2011-06-17

    The Geothermal Technologies Program assembled a geothermal Blue Ribbon Panel on March 22-23, 2011 in Albuquerque, New Mexico for a guided discussion on the future of geothermal energy in the United States and the role of the DOE Program. The Geothermal Blue Ribbon Panel Report captures the discussions and recommendations of the experts. An addendum is available here: http://www.eere.energy.gov/geothermal/pdfs/gtp_blue_ribbon_panel_report_addendum10-2011.pdf

  15. Savannah River Site Museum Ribbon Cutting

    Energy.gov [DOE]

    A ribbon cutting ceremony marked the opening of the new SRS Museum, on October 27, 2014, at the former Dibble Library in Aiken, South Carolina.

  16. FERN Blue Ribbon Wind Farm I | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    FERN Blue Ribbon Wind Farm I Jump to: navigation, search Name FERN Blue Ribbon Wind Farm I Facility FERN Blue Ribbon Wind Farm I Sector Wind energy Facility Type Offshore Wind...

  17. Accelerating Fatigue Testing for Cu Ribbon Interconnects | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Accelerating Fatigue Testing for Cu Ribbon Interconnects Accelerating Fatigue Testing for Cu Ribbon Interconnects Presented at the 2013 Photovoltaic Module Reliability Workshop; ...

  18. Award Fee Determination Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, Attachment J.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: FY 2012 Base Period Fee Available Fee allocated to FY 2012* Performance Measures $10,399,033.60 Incremental Fee $4,490,000.00 Provisional Fee

  19. EM Contractor Fee

    Office of Environmental Management (EM)

    Portsmouth/Paducah Project Office Contract Name: Portsmouth D&D Contract Contractor: Fluor-BWXT Portsmouth LLC Contract Number: DE-AC30-10CC40017 Contract Type: Cost-Plus-Award-Fee Total Estimated Contract Cost: $2,505,496,484 Contract Base Period: March 29, 2011 - March 28, 2016 Contract Option Period: Option 1: 3/29/16 -9/30/18 Option 1a: 10/1/18 - 3/28/21 Fee Information Minimum Fee $0 Maximum Fee $184,024,974 Performance Period Fee Available Fee Earned FY2011 $6,190,992 $5,779,687 FY2012

  20. EM Contractor Fee

    Office of Environmental Management (EM)

    2016 Site: Portsmouth Paducah Project Office Contract Name: Paducah Deactivation Task Order Contractor: Fluor Federal Services Contract Number: DE-EM0001131-DE-DT0007774 Contract Type: Cost Plus Award Fee and FFP Total Estimated Contract Cost: $422,000,000 Contract Base Period: July 22, 2014 - July 21, 2017 Contract Option Period: N/A Fee Information Minimum Fee $0 Maximum Fee $17,278,589 Performance Period Fee Available Fee Earned FY2015 $6,170,759 $4,257,824 FY2016 $5,553,915 $0 FY2017

  1. EM Contractor Fee

    Office of Environmental Management (EM)

    Portsmouth Environmental Technical Services II Contractor: Restoration Services Inc Contract Number: DE-EM0002639 Contract Type: Cost Plus Award Fee Total Estimated Contract Cost: $51,615,957 Contract Base Period: October 1, 2013 - September 30, 2016 Contract Option Period: Option 1: 10/1/16 - 9/30/18 Fee Information Minimum Fee $0 Maximum Fee $1,179,075 Performance Period Fee Available Fee Earned FY2014 $389,929 $358,735 FY2015 $392,092 $360,725 FY2016 $397,054 FY2017 (Option) $0 FY2018

  2. Accelerating Fatigue Testing for Cu Ribbon Interconnects (Presentation)

    SciTech Connect (OSTI)

    Bosco, N.; Silverman, T.; Wohlgemuth , J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shioda, T.; Zenkoh, H.; Miyashita, M.; Tadanori, T.; Suzuki, S.

    2013-05-01

    This presentation describes fatigue experiments and discusses dynamic mechanical loading for Cu ribbon interconnects.

  3. Patterned helical metallic ribbon for continuous edge winding applications

    DOE Patents [OSTI]

    Liebermann, Howard H.; Frischmann, Peter G.; Rosenberry, Jr., George M.

    1983-04-19

    Metallic ribbon having cutout patterns therein is provided in continuous helical form. The cutout patterns may be situated to intersect either or both of the ribbon edges or may be situated entirely within the ribbon. The helical ribbon with the cutout patterns may additionally have a nesting, or self-stacking, feature.

  4. Carbon nanotube fiber spun from wetted ribbon

    DOE Patents [OSTI]

    Zhu, Yuntian T; Arendt, Paul; Zhang, Xiefei; Li, Qingwen; Fu, Lei; Zheng, Lianxi

    2014-04-29

    A fiber of carbon nanotubes was prepared by a wet-spinning method involving drawing carbon nanotubes away from a substantially aligned, supported array of carbon nanotubes to form a ribbon, wetting the ribbon with a liquid, and spinning a fiber from the wetted ribbon. The liquid can be a polymer solution and after forming the fiber, the polymer can be cured. The resulting fiber has a higher tensile strength and higher conductivity compared to dry-spun fibers and to wet-spun fibers prepared by other methods.

  5. Blue Ribbon Commission on America's Nuclear Future

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Blue Ribbon Commission on America's Nuclear Future Draft Report to the Secretary of Energy July 29, 2011 Draft Report of the Blue Ribbon Commission ii July 2011 PREAMBLE The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new plan. It is co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other

  6. Approval of VPP Logo and Flag

    Energy.gov [DOE]

    The Department of Energy Voluntary Protection Program, patterned after the Occupational Safety and Health Administration's Voluntary Protection Programs, is a visible symbol of our commitment to worker health and safety at Departmental facilities. One implementation activity remaining is formal authorization for flags to be awarded to sites in the program and permission to use a related logo.

  7. Blue Ribbon Commission Tour of Hanford Site

    SciTech Connect (OSTI)

    Paul Saueressig

    2010-07-14

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  8. Geothermal Technologies Program Blue Ribbon Panel Recommendations

    Energy.gov [DOE]

    This report describes the recommendations of the Geothermal Blue Ribbon Panel, a panel of geothermal experts assembled in March 2011 for a discussion on the future of geothermal energy in the U.S.

  9. Blue Ribbon Commission Tour of Hanford Site

    ScienceCinema (OSTI)

    Paul Saueressig

    2016-07-12

    The Blue Ribbon Commission on America's Nuclear Future toured the Department of Energy's Hanford Site on July 14, 2010. Commission members, invited guests, and members of the public visited facilities that store high-level, radioactive waste.

  10. NWP Fee Payments

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Expired Contracts Current Contracts Payment Information Nuclear Waste Partnership, LLC (NWP) 2017 Performance Evaluation & Measurement Plan (PEMP) 2016 Performance Evaluation & Measurement Plan (PEMP) 2015 Performance Evaluation & Measurement Plan (PEMP) 2014 Performance Evaluation & Measurement Plan (PEMP) 2013 Performance Evaluation & Measurement Plan (PEMP) Fee Determination and Scorecard NWP FY15 Fee Determination and Scorecard NWP FY14 Fee Determination Scorecard NWP

  11. FERN Blue Ribbon Wind Farm II* | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    II* Jump to: navigation, search Name FERN Blue Ribbon Wind Farm II* Facility FERN Blue Ribbon Wind Farm II* Sector Wind energy Facility Type Offshore Wind Facility Status Proposed...

  12. CIRCULAR RIBBON FLARES AND HOMOLOGOUS JETS

    SciTech Connect (OSTI)

    Wang Haimin; Liu Chang

    2012-12-01

    Solar flare emissions in the chromosphere often appear as elongated ribbons on both sides of the magnetic polarity inversion line (PIL), which has been regarded as evidence of a typical configuration of magnetic reconnection. However, flares having a circular ribbon have rarely been reported, although it is expected in the fan-spine magnetic topology involving reconnection at a three-dimensional (3D) coronal null point. We present five circular ribbon flares with associated surges, using high-resolution and high-cadence H{alpha} blue wing observations obtained from the recently digitized films of Big Bear Solar Observatory. In all the events, a central parasitic magnetic field is encompassed by the opposite polarity, forming a circular PIL traced by filament material. Consequently, a flare kernel at the center is surrounded by a circular flare ribbon. The four homologous jet-related flares on 1991 March 17 and 18 are of particular interest, as (1) the circular ribbons brighten sequentially, with cospatial surges, rather than simultaneously, (2) the central flare kernels show an intriguing 'round-trip' motion and become elongated, and (3) remote brightenings occur at a region with the same magnetic polarity as the central parasitic field and are co-temporal with a separate phase of flare emissions. In another flare on 1991 February 25, the circular flare emission and surge activity occur successively, and the event could be associated with magnetic flux cancellation across the circular PIL. We discuss the implications of these observations combining circular flare ribbons, homologous jets, and remote brightenings for understanding the dynamics of 3D magnetic restructuring.

  13. Award Fee Determination Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1 CH2M Hill Plateau Remediation Company Contract Number: DE-AC06-08RL14788 Final Fee Determination for Base funded and American Recovery and Reinvestment Act (Recovery) funded Performance Measures Basis of Evaluation: Completion of Performance Measures contained in Section J, AttachmentJ.4, Performance Evaluation and Measurement Plan, according to the identified completion criteria. Evaluation Results: Fiscal Year 2011 (Oct 1, 2010 - Sept 30, 2011) Base Funded Fee Recovery Funded Fee Available

  14. SR0009

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    June 8, 2000 Media Contact: Rick Ford (803) 725-2889 WSRC Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the ...

  15. SR0106

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    31, 2001 Media Contact: Rick Ford (803) 725-2889 DOE Announces Wackenhut Services Inc. Award Fee Flag Ribbon Art Note To Editors and News Directors: The Department of Energy (DOE) ...

  16. SR0015

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    , 2000 Media Contact: Jim Giusti (803) 725-2889 WSRC Receives Award Fee Flag Ribbon Graphic Note to Editors and News Directors The Department of Energy (DOE) has determined the ...

  17. SR9910

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2, 1999 Media Contact: Bill Taylor (803) 725-2889 Wackenhut Receives Award Fee Flag Ribbon Art Note to Editors and News Directors The Department of Energy (DOE) has determined the ...

  18. AWARD FEE DETERMINATION SCORECARD Contractor: Restoration Services...

    Office of Environmental Management (EM)

    Basis of Evaluation: FY14 Award Fee Plan for Restoration Services, Inc.; Portsmouth Environmental Technical Services II Award Fee Available: 349,708.00 Award Fee Earned:...

  19. Pseudo ribbon metal ion beam source

    SciTech Connect (OSTI)

    Stepanov, Igor B. Ryabchikov, Alexander I.; Sivin, Denis O.; Verigin, Dan A.

    2014-02-15

    The paper describes high broad metal ion source based on dc macroparticle filtered vacuum arc plasma generation with the dc ion-beam extraction. The possibility of formation of pseudo ribbon beam of metal ions with the parameters: ion beam length 0.6 m, ion current up to 0.2 A, accelerating voltage 40 kV, and ion energy up to 160 kV has been demonstrated. The pseudo ribbon ion beam is formed from dc vacuum arc plasma. The results of investigation of the vacuum arc evaporator ion-emission properties are presented. The influence of magnetic field strength near the cathode surface on the arc spot movement and ion-emission properties of vacuum-arc discharge for different cathode materials are determined. It was shown that vacuum-arc discharge stability can be reached when the magnetic field strength ranges from 40 to 70 G on the cathode surface.

  20. Fees | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    stub. You can help OpenEI by expanding it. Retrieved from "http:en.openei.orgwindex.php?titleFees&oldid542709" Feedback Contact needs updating Image needs updating...

  1. ," Excise"," LUST Fee ",," ...

    U.S. Energy Information Administration (EIA) (indexed site)

    ... For gasohol and biodiesel (1 to 10% blends), the prepaid rate is 0.10gal. Underground Storage Tank tax: 0.003gal; Environmental Impact Fee: 0.008gal. " "Indiana",0.18,0.151,0...

  2. EM Contractor Fee Payments

    Energy.gov [DOE]

    In the interest of furthering transparency in its government operations, the Department of Energy’s Office of Environmental Management (EM) herein is releasing information relating to fee payments...

  3. Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Blue Ribbon Commission on America's Nuclear Future Secretary Chu Announces Blue Ribbon Commission on America's Nuclear Future January 29, 2010 - 12:00am Addthis Washington, D.C. - As part of the Obama Administration's commitment to restarting America's nuclear industry, U.S. Secretary of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to provide recommendations for developing a safe, long-term solution to managing

  4. Faceted ceramic fibers, tapes or ribbons and epitaxial devices therefrom

    SciTech Connect (OSTI)

    Goyal, Amit

    2013-07-09

    A crystalline article includes a single-crystal ceramic fiber, tape or ribbon. The fiber, tape or ribbon has at least one crystallographic facet along its length, which is generally at least one meter long. In the case of sapphire, the facets are R-plane, M-plane, C-plane or A-plane facets. Epitaxial articles, including superconducting articles, can be formed on the fiber, tape or ribbon.

  5. Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    College Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:November 2, 2016 all issues All Issues » submit Ribbon cutting marks chemistry laboratory upgrades at Northern New Mexico College Los Alamos National Security, LLC provides support November 1, 2013 Ribbon cutting at Northern New Mexico College As others look on, Northern New Mexico College

  6. Faceted ceramic fibers, tapes or ribbons and epitaxial devices therefrom

    DOE Patents [OSTI]

    Goyal, Amit (Knoxville, TN)

    2012-07-24

    A crystalline article includes a single-crystal ceramic fiber, tape or ribbon. The fiber, tape or ribbon has at least one crystallographic facet along its length, which is generally at least one meter long. In the case of sapphire, the facets are R-plane, M-plane, C-plane or A-plane facets. Epitaxial articles, including superconducting articles, can be formed on the fiber, tape or ribbon.

  7. FOIA FEES | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FEES FOIA FEES The FOIA generally requires that requestors pay fees for processing their requests. If costs associated with the processing of a FOIA request are $15.00 or less, no fees are charged. Each FOIA request is reviewed for the purpose of placing a requestor in one of the fee categories described in the document below. FOIA FEES (16.8 KB) More Documents & Publications How to Make a FOIA Request FIA-11-0018 - In the Matter of Robert M. Balick FIA-11-0018 - In the Matter of Robert M.

  8. Secretary Chu Announces Blue Ribbon Commission on America's Nuclear...

    Energy.gov (indexed) [DOE]

    of Energy Steven Chu today announced the formation of a Blue Ribbon Commission on America's Nuclear Future to ... alternatives for the storage, processing, and disposal ...

  9. Louisiana Blue Ribbon Commission on Bayou Corne Safety

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Co-Evolution of Biofuels Lignocellulosic Biomass Microalgae Thermochemical Conversion ... Twitter Google + Vimeo Newsletter Signup SlideShare Louisiana Blue Ribbon Commission on ...

  10. SYMMETRY OF THE IBEX RIBBON OF ENHANCED ENERGETIC NEUTRAL ATOM...

    Office of Scientific and Technical Information (OSTI)

    HELIOSPHERE; INTERSTELLAR SPACE; KEV RANGE; MAGNETIC FIELDS; PLASMA; REFLECTION; SUN; SYMMETRY The circular ribbon of enhanced energetic neutral atom (ENA) emission...

  11. Progress in ejecta modeling in the FLAG code (u) (Conference...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Progress in ejecta modeling in the FLAG code (u) Authors: Harrison, Alan K 1 ; Fung, Jimmy 1 ; Chitanvis, Shirish 1 + Show Author ...

  12. Contractor Fee Payments- Small Sites

    Energy.gov [DOE]

    See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Small Sites office on these charts.

  13. Guidance system for low angle silicon ribbon growth

    DOE Patents [OSTI]

    Jewett, David N.; Bates, Herbert E.; Milstein, Joseph B.

    1986-07-08

    In a low angle silicon sheet growth process, a puller mechanism advances a seed crystal and solidified ribbon from a cooled growth zone in a melt at a low angle with respect to the horizontal. The ribbon is supported on a ramp adjacent the puller mechanism. Variations in the vertical position of the ribbon with respect to the ramp are isolated from the growth end of the ribbon by (1) growing the ribbon so that it is extremely thin, preferably less than 0.7 mm, (2) maintaining a large growth zone, preferably one whose length is at least 5.0 cm, and (3) spacing the ramp from the growth zone by at least 15 cm.

  14. RL's Fiscal Year 2013 Fee Evaluation Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    September 2013 Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: 21,030,647 Award Fee Earned: 19,352,402 (92%) Award Fee Area ...

  15. String stabilized ribbon growth a method for seeding same

    DOE Patents [OSTI]

    Sachs, Emanuel M. (39 Harding Ave., Belmont, MA 02178)

    1987-08-25

    This invention is a method of initiating or seeding the growth of a crystalline or polycrystalline ribbon by the String Stabilized Ribbon Growth Method. The method for seeding the crystal growth comprises contacting a melt surface with a seed and two strings used in edge stabilization. The wetted strings attach to the wetted seed as a result of the freezing of the liquid melt. Upon drawing the seed, which is attached to the strings, away from the melt surface a melt liquid meniscus, a seed junction, and a growth interface forms. Further pulling of the attached seed causes a crystal ribbon to grow at the growth interface. The boundaries of the growing ribbon are: at the top the seed junction, at the bottom the freezing boundary of the melt liquid meniscus, and at the edges frozen-in strings.

  16. A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag...

    Office of Scientific and Technical Information (OSTI)

    A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag Citation Details In-Document Search Title: A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag ...

  17. A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag...

    Office of Scientific and Technical Information (OSTI)

    A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag Citation Details In-Document Search Title: A 2D Radiation Transport Package with Mimetic Diffusion for ExaFlag...

  18. Microsoft Word - FY14 NWP Fee Scorecards

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    FY14 Fee Determination Scorecard Contractor: Nuclear Waste Partnership, LLC Contract: DE-EM0001971 Award Period: October 1, 2013 through September 30, 2014 Basis of Evaluation: Performance and Evaluation Plan (PEMP) for FY2014 The FY2014 PEMP for this contract is available at: http://www.wipp.energy.gov/NWPpayments/NWP.htm Award Fee Scorecard: Subjective Fee (Award Fee) Criteria Summary Table Criteria Maximum Available Fee Adjectival Rating Fee Range Available for Adjectival Ratings Percentage

  19. Alarm Response Training ribbon cutting | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Alarm Response Training ... Alarm Response Training ribbon cutting Posted: October 24, 2014 - 4:45pm The Alarm Response Training Academy officially celebrated its new location at the Y-12 National Security Complex Thursday,Oct. 23. On hand to cut the ribbon were (pictured from left) Teresa Robbins, NNSA Production Office Acting Assistant Manager for Environment, Safety, Health and Quality; Anne Harrington, NNSA Deputy Administrator, Defense Nuclear Nonproliferation; and Morgan Smith, Chief

  20. AMO's Kelly Visconti Joins Ribbon Cutting of $50 million Indiana

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Manufacturing Institute | Department of Energy Kelly Visconti Joins Ribbon Cutting of $50 million Indiana Manufacturing Institute AMO's Kelly Visconti Joins Ribbon Cutting of $50 million Indiana Manufacturing Institute July 29, 2016 - 4:21pm Addthis (From Left to Right) Dan Hasler, President, Purdue Research Foundation; Ian Steff, Executive Vice President and Chief Innovation Officer, Indiana Economic Development Corporation; Craig Blue, CEO Institute for Advanced Composites Manufacturing

  1. Solar Decathlon Opening Ceremony and VIP Ribbon Cutting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Opening Ceremony and VIP Ribbon Cutting Solar Decathlon Opening Ceremony and VIP Ribbon Cutting September 21, 2011 - 1:52pm Addthis Solar Decathlon 2011 at West Potomac Park Solar Decathlon 2011 at West Potomac Park Program Features Government Officials, Students and Foreign Dignitaries WASHINGTON, DC - A ceremony on Thursday featuring U.S. government officials, students, foreign dignitaries and event sponsors will officially open the solar village of the U.S. Department of Energy

  2. Blue Ribbon Commission on America's Nuclear Future Charter | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Blue Ribbon Commission on America's Nuclear Future Charter Blue Ribbon Commission on America's Nuclear Future Charter March 2, 2010 - 12:00am Addthis The Secretary of Energy, acting at the direction of the President, is establishing the Commission to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle, including all alternatives for the storage, processing, and disposal of civilian and defense used nuclear fuel, high-level waste, and

  3. FINE STRUCTURE OF FLARE RIBBONS AND EVOLUTION OF ELECTRIC CURRENTS

    SciTech Connect (OSTI)

    Sharykin, I. N.; Kosovichev, A. G.

    2014-06-10

    Emission of solar flares across the electromagnetic spectrum is often observed in the form of two expanding ribbons. The standard flare model explains flare ribbons as footpoints of magnetic arcades, emitting due to interaction of energetic particles with the chromospheric plasma. However, the physics of this interaction and properties of the accelerated particles are still unknown. We present results of multiwavelength observations of the C2.1 flare of 2013 August 15, observed with the New Solar Telescope of the Big Bear Solar Observatory, and the Solar Dynamics Observatory, GOES, and Fermi spacecraft. The observations reveal previously unresolved sub-arcsecond structure of flare ribbons in regions of strong magnetic field consisting from numerous small-scale bright knots. We observe a red-blue asymmetry of H{sub α} flare ribbons with a width as small as ∼100 km. We discuss the relationship between the ribbons and vertical electric currents estimated from vector magnetograms, and show that Joule heating can be responsible for energization of H{sub α} knots in the ribbons.

  4. Award Fee Determination Scorecard Contractor: Savannah River...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2 - September 30, 2013 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee ...

  5. Award Fee Determination Scorecard Contractor: Savannah River...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Performance and Evaluation Plan (PEMP) Award Fee: 3,370,000 Incentive Fee: ... each contract year is identified in the Performance Evaluation Measurement Plan (PEMP). ...

  6. Award Fee Determination Scorecard Contractor: Savannah River...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    4 - September 30, 2015 Basis of Evaluation: Performance and Evaluation Plan (PEMP) This is a Cost Plus Award Fee contract as defined by federal acquisition regulations (FAR). Fee ...

  7. Elastic buckling of AlN ribbons on elastomeric substrate

    SciTech Connect (OSTI)

    Seo, H.-C.; Petrov, Ivan; Jeong, Hyejin; Chapman, Patrick; Kim, Kyekyoon

    2009-03-02

    For optoelectronic applications requiring unconventional substrates, use of flexible forms of semiconductors may be inevitable. We have fabricated a flexible form of single crystalline AlN ribbons with periodic and wavelike structures on an elastomeric substrate. Single crystalline AlN films were grown on Si (111) substrate using high vacuum unbalanced magnetron sputtering. Crystallinity of the AlN films was confirmed with x-ray diffraction and pole figure. The AlN ribbons were transferred to a prestrained (3.1%) elastomeric substrate and the resulting ''wavy'' ribbons on the substrate were flexible up to 30% strain without any crack formation on the surface. As the film thickness changed from 300 to 900 nm, the periods of the waves varied from 95 to 277 {mu}m, which were within a 10% error of the calculated values. When we applied more than 30% strain, mechanical instability, such as the failure of AlN ribbons due to the cracks on the surface and the merged ribbons, was observed.

  8. CHPRC Fee Determination Summaries - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    CHPRC Fee Determination Summaries DOE-RL Contracts/Procurements RL Contracts & Procurements Home Prime Contracts Current Solicitations Other Sources DOE RL Contracting Officers DOE RL Contracting Officer Representatives CHPRC Fee Determination Summaries Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size CHPRC Fiscal Year 2015 Fee Evaluation Summary CHPRC Fiscal Year 2014 Fee Evaluation Summary CHPRC Fiscal Year 2013 Fee Evaluation Summary CHPRC Fiscal Year 2012

  9. Report of the Blue Ribbon Panel on the Review of the Radiation...

    Energy Savers

    Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation Report of the Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation October 11, ...

  10. Hydrostatic extrusion of Cu-Ag melt spun ribbon

    DOE Patents [OSTI]

    Hill, M.A.; Bingert, J.F.; Bingert, S.A.; Thoma, D.J.

    1998-09-08

    The present invention provides a method of producing high-strength and high-conductance copper and silver materials comprising the steps of combining a predetermined ratio of the copper with the silver to produce a composite material, and melt spinning the composite material to produce a ribbon of copper and silver. The ribbon of copper and silver is heated in a hydrogen atmosphere, and thereafter die pressed into a slug. The slug then is placed into a high-purity copper vessel and the vessel is sealed with an electron beam. The vessel and slug then are extruded into wire form using a cold hydrostatic extrusion process. 5 figs.

  11. Hydrostatic extrusion of Cu-Ag melt spun ribbon

    DOE Patents [OSTI]

    Hill, Mary Ann; Bingert, John F.; Bingert, Sherri A.; Thoma, Dan J.

    1998-01-01

    The present invention provides a method of producing high-strength and high-conductance copper and silver materials comprising the steps of combining a predetermined ratio of the copper with the silver to produce a composite material, and melt spinning the composite material to produce a ribbon of copper and silver. The ribbon of copper and silver is heated in a hydrogen atmosphere, and thereafter die pressed into a slug. The slug then is placed into a high-purity copper vessel and the vessel is sealed with an electron beam. The vessel and slug then are extruded into wire form using a cold hydrostatic extrusion process.

  12. Report of the Blue Ribbon Panel on the Review of the Radiation Effects

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Research Foundation | Department of Energy Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation Report of the Blue Ribbon Panel on the Review of the Radiation Effects Research Foundation October 11, 1995 This report summarizes the findings of the Blue Ribbon Panel's review of the RERF scientific projects and future research plans The report recommended that the core studies be continued for the next 20 years. Report of the Blue Ribbon Panel on the Review of the

  13. Extrusion of metal oxide superconducting wire, tube or ribbon

    DOE Patents [OSTI]

    Dusek, Joseph T. (Lombard, IL)

    1993-01-01

    A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

  14. Extrusion of metal oxide superconducting wire, tube or ribbon

    DOE Patents [OSTI]

    Dusek, Joseph T.

    1993-10-05

    A process for extruding a superconducting metal oxide composition YBa.sub.2 Cu.sub.3 O.sub.7-x provides a wire (tube or ribbon) having a cohesive mass and a degree of flexibility together with enhanced electrical properties. Wire diameters in the range of 6-85 mils have been produced with smaller wires on the order of 10 mils in diameter exhibiting enhanced flexibility for forming braided, or multistrand, configurations for greater current carrying capacity. The composition for extrusion contains a polymeric binder to provide a cohesive mass to bind the particles together during the extrusion process with the binder subsequently removed at lower temperatures during sintering. The composition for extrusion further includes a deflocculent, an organic plasticizer and a solvent which also are subsequently removed during sintering. Electrically conductive tubing with an inner diameter of 52 mil and an outer diameter of 87-355 mil has also been produced. Flat ribbons have been produced in the range of 10-125 mil thick by 100-500 mil wide. The superconducting wire, tube or ribbon may include an outer ceramic insulating sheath co-extruded with the wire, tubing or ribbon.

  15. Experimental investigation of the ribbon-array ablation process

    SciTech Connect (OSTI)

    Li Zhenghong; Xu Rongkun; Chu Yanyun; Yang Jianlun; Xu Zeping; Ye Fan; Chen Faxin; Xue Feibiao; Ning Jiamin; Qin Yi; Meng Shijian; Hu Qingyuan; Si Fenni; Feng Jinghua; Zhang Faqiang; Chen Jinchuan; Li Linbo; Chen Dingyang; Ding Ning; Zhou Xiuwen

    2013-03-15

    Ablation processes of ribbon-array loads, as well as wire-array loads for comparison, were investigated on Qiangguang-1 accelerator. The ultraviolet framing images indicate that the ribbon-array loads have stable passages of currents, which produce axially uniform ablated plasma. The end-on x-ray framing camera observed the azimuthally modulated distribution of the early ablated ribbon-array plasma and the shrink process of the x-ray radiation region. Magnetic probes measured the total and precursor currents of ribbon-array and wire-array loads, and there exists no evident difference between the precursor currents of the two types of loads. The proportion of the precursor current to the total current is 15% to 20%, and the start time of the precursor current is about 25 ns later than that of the total current. The melting time of the load material is about 16 ns, when the inward drift velocity of the ablated plasma is taken to be 1.5 Multiplication-Sign 10{sup 7} cm/s.

  16. SPATIAL RETENTION OF IONS PRODUCING THE IBEX RIBBON

    SciTech Connect (OSTI)

    Schwadron, N. A.; McComas, D. J.

    2013-02-10

    The ribbon observed by the Interstellar Boundary Explorer (IBEX) mission is a narrow, {approx}20 Degree-Sign wide feature that stretches across much of the sky in the global flux of energetic neutral atoms from the outer heliosphere. The ribbon remains an enigma despite its persistence after 3 years of IBEX observations and after almost a dozen theories that attempt to explain it. While each theory that has been posed has its strengths, each one also contradicts IBEX observations or demonstrates significant flaws in internal consistency. Here, we present a new theory that is different than any of the existing ideas and yet accounts for many of the key observations. We argue that the ribbon could be produced by a spatial region in the local interstellar medium where newly ionized atoms are temporarily contained through increased rates of scattering by locally generated waves in the electromagnetic fields. The particles in the ribbon are created predominantly from neutralized solar wind and neutralized pickup ions from inside the solar wind termination shock.

  17. Implementation and Validation of the BHR Turbulence Model in the FLAG

    Office of Scientific and Technical Information (OSTI)

    Hydrocode (Technical Report) | SciTech Connect Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode Citation Details In-Document Search Title: Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode The BHR-2 turbulence model, developed at Los Alamos National Laboratory for variable density and compressible flows, is implemented in an Arbitrary Lagrangian-Eulerian hydrocode, FLAG. The BHR-2 formulation is discussed, with emphasis on its

  18. Savannah River Site Cuts Ribbon for New Salt Waste Processing Facility |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Savannah River Site Cuts Ribbon for New Salt Waste Processing Facility Savannah River Site Cuts Ribbon for New Salt Waste Processing Facility June 30, 2016 - 12:55pm Addthis DOE and Parsons employees gather in front of SWPF after the ribbon-cutting ceremony. DOE and Parsons employees gather in front of SWPF after the ribbon-cutting ceremony. DOE and Parsons officials gather to cut the ribbon for SWPF. Pictured foreground, left to right, holding oversized scissors, DOE-SR

  19. Ejecta modeling in the FLAG hydrocode (u) (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Ejecta modeling in the FLAG hydrocode (u) Authors: Fung, Jimmy 1 ; Harrison, Alan K 1 ; Margulies, Jeremy 1 ; Buttler, William T ...

  20. Performance Period Total Fee Paid FY2008

    Office of Environmental Management (EM)

    1,339,286 FY 2012 38,126 FY 2013 42,265 Cumulative Fee Paid 1,766,600 42,265 Cost Plus Incentive FeeCost Plus Fixed Fee 36,602,425 Contract Period: September 2007 -...

  1. Compact multiwavelength transmitter module for multimode fiber optic ribbon cable

    DOE Patents [OSTI]

    Deri, Robert J.; Pocha, Michael D.; Larson, Michael C.; Garrett, Henry E.

    2002-01-01

    A compact multiwavelength transmitter module for multimode fiber optic ribbon cable, which couples light from an M.times.N array of emitters onto N fibers, where the M wavelength may be distributed across two or more vertical-cavity surface-emitting laser (VCSEL) chips, and combining emitters and multiplexer into a compact package that is compatible with placement on a printed circuit board. A key feature is bringing together two emitter arrays fabricated on different substrates--each array designed for a different wavelength--into close physical proximity. Another key feature is to compactly and efficiently combine the light from two or more clusters of optical emitters, each in a different wavelength band, into a fiber ribbon.

  2. Color and shape changing polymeric ribbons and sheets

    DOE Patents [OSTI]

    Stevens, Raymond C.; Cheng, Quan; Song, Jie

    2006-05-23

    The present invention herein provides the design, synthesis and characterization of compositions comprising asymmetric bolaamphiphilic lipids that form extended polymeric ribbons and wide sheets. These compositions may be doped, or interspersed, with various compounds to fine-tune the fluidity and rigidity of the bolaamphiphilic lipid composition, and promote other morphologies of the composition, including fluid vesicles and truncated flat sheets. Upon an increase in pH these compositions undergo a calorimetric and morphological transformation.

  3. Sandia National Laboratories Algae Raceway Testing Facility Ribbon Cutting

    Energy.gov [DOE]

    Sandia National Laboratories will be hosting a ribbon cutting on Feb. 4, 2016 at its Livermore Valley Open Campus to commemorate the opening of a new algae raceway testing facility. The new facility will allow researchers to better understand algal cultivation techniques, and is funded in part by the Bioenergy Technologies Office. Advanced Algal Systems Program Manager Alison Goss Eng and Technology Manager Daniel Fishman will be in attendance.

  4. Method and apparatus for drawing monocrystalline ribbon from a melt

    DOE Patents [OSTI]

    Ciszek, Theodore F.; Schwuttke, Guenter H.

    1981-11-10

    A method and apparatus for drawing a monocrystalline ribbon or web from a melt comprising utilizing a shaping die including at least two elements spaced one from the other each having a portion thereof located below the level of the melt and another portion located above the level of the melt a distance sufficient to form a raised meniscus of melt about the corresponding element.

  5. Tunable and angle-insensitive plasmon resonances in graphene ribbon arrays with multispectral diffraction response

    SciTech Connect (OSTI)

    Li, Kangwen; Ma, Xunpeng; Zhang, Zuyin; Xu, Yun, E-mail: xuyun@semi.ac.cn; Song, Guofeng [Institute of Semiconductors, Chinese Academy of Sciences, Beijing (China)

    2014-03-14

    Plasmon resonances in graphene ribbon arrays are investigated numerically by means of the Finite Element Method. Numerical analysis shows that a series of multipolar resonances take place when graphene ribbon arrays are illuminated by a TM polarized electromagnetic wave. Moreover, these resonances are angle-independent, and can be tuned greatly by the width and the doping level of the graphene ribbons. Specifically, we demonstrate that for graphene arrays with several sets of graphene ribbons, which have different widths or doping levels, each of these multipolar resonances will be split into several ones. In addition, as plasmon resonances can confine electromagnetic field at the ribbon edges, graphene ribbons with different widths or doping levels offer intriguing application for electrically tunable spectral imaging.

  6. Method of making patterned helical metallic ribbon for continuous edge winding applications

    DOE Patents [OSTI]

    Liebermann, H.H.; Frischmann, P.G.; Rosenberry, G.M. Jr.

    1982-08-10

    Metallic ribbon having cutout patterns therein is fabricated in continuous helical form by directing a melt stream or jet onto a rapidly moving patterned substrate surface. 10 figs.

  7. Method of making patterned helical metallic ribbon for continuous edge winding applications

    DOE Patents [OSTI]

    Liebermann, Howard H.; Frischmann, Peter G.; Rosenberry, Jr., George M.

    1982-08-10

    Metallic ribbon having cutout patterns therein is fabricated in continuous helical form by directing a melt stream or jet onto a rapidly moving patterned substrate surface.

  8. Title 43 CFR 3000.12 What is the Fee Schedule for Fixed Fees...

    Open Energy Information (Open El) [EERE & EIA]

    000.12 What is the Fee Schedule for Fixed Fees? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43...

  9. FLAG Simulations of the Elasticity Test Problem of Gavrilyuk et al.

    SciTech Connect (OSTI)

    Kamm, James R.; Runnels, Scott R.; Canfield, Thomas R.; Carney, Theodore C.

    2014-04-23

    This report contains a description of the impact problem used to compare hypoelastic and hyperelastic material models, as described by Gavrilyuk, Favrie & Saurel. That description is used to set up hypoelastic simulations in the FLAG hydrocode.

  10. Contractor Fee Payments - Idaho Operations Office | Department of Energy

    Office of Environmental Management (EM)

    Idaho Operations Office Contractor Fee Payments - Idaho Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts. Advanced Mixed Waste Treatment Project (34.47 KB) Idaho Cleanup Project (33.59 KB) More Documents & Publications Contractor Fee Payments - Richland Operations Office Contractor Fee Payments - Oak Ridge Operations Contractor Fee Payments - Savannah River

  11. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment and Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2015, to December 31, 2015 Basis of Evaluation: 2015 Performance Evaluation and Measurement Plan Award Fee Available: $12,600,000 Award Fee Earned: $8,310,000 (66.0* percent) Incentive B.1 - Award Fee-Project Management - Good The fee for Project

  12. Department of Environmental Conservation Stormwater Program Fee...

    Open Energy Information (Open El) [EERE & EIA]

    PermittingRegulatory Guidance - Supplemental Material: Department of Environmental Conservation Stormwater Program Fee SummaryPermittingRegulatory GuidanceSupplemental Material...

  13. Unique Fee-for-Service Revenues

    Energy.gov [DOE]

    Better Buildings Neighborhood Program Peer Exchange Calls on Program Sustainability: Unique Fee-for-Service Revenues, Call Slides and Discussion Summary, April 11, 2013.

  14. Award Fee Determination Scorecard Contractor: Washington River...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: ... Program Very Good SEA 5: Nuclear Safety Very Good SEA 6: Environmental Regulatory ...

  15. DOE - NNSA/NFO -- Nuclear Testing Archive Fee Schedule

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Nuclear Testing Archive > Fee Schedule NNSANFO Language Options U.S. DOENNSA - Nevada Field Office Nuclear Testing Archive (NTA) Fee Schedule The U.S. Department of Energy ...

  16. Spatial confinement of the IBEX Ribbon: A dominant turbulence mechanism

    SciTech Connect (OSTI)

    Isenberg, Philip A.

    2014-05-20

    The narrow ribbon of enhanced energetic neutral atom flux observed by the Interstellar Boundary Explorer spacecraft has prompted numerous ideas to explain its structure and properties. One of these ideas is the 'neutral solar wind' scenario, which identifies the source particles as pickup protons in the local interstellar medium originating in solar wind charge-exchange interactions. This scenario has been thought to require unrealistically weak pitch-angle scattering of the pickup protons to explain the narrow structure. Recently, Schwadron and McComas suggested that this structure could result from a spatial retention of the pickup protons, rather than from a restricted pitch-angle distribution. Here, we present a physically motivated, quantitative mechanism to produce such a spatial configuration. This mechanism is based on the 'dominant turbulence' assumption, which can be applied where the production of new pickup protons is slow, and has been used to successfully explain the level of turbulent heating observed in the outer solar wind. This formalism predicts a pickup isotropization process which adds or subtracts energy from the ambient turbulent fluctuations, depending on the initial pitch angle of the pickup protons. We show that a simple model of this process can yield a ribbon structure in qualitative agreement with the observations. The results of this simple model are not yet quantitatively satisfactory, but we suggest several improvements which may reduce the quantitative discrepancy.

  17. Performance Period Total Fee Paid FY2001

    Office of Environmental Management (EM)

    17,590,414 FY2011 17,558,710 FY2012 14,528,770 Cumulative Fee Paid 126,281,339 Cost Plus Award Fee DE-AC29-01AL66444 Washington TRU Solutions LLC Contractor: Contract Number:...

  18. Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting Blue Ribbon Commission on America's Nuclear Future to Hold First Meeting March 3, 2010 - 12:00am Addthis Washington, D.C. - On Thursday, March 25th and Friday, March 26th, the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former National Security Advisor General Brent Scowcroft, will hold its first meeting in Washington, D.C. At the direction

  19. Blue Ribbon Commission on America's Nuclear Future Report to the Secretary

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy | Department of Energy Blue Ribbon Commission on America's Nuclear Future Report to the Secretary of Energy Blue Ribbon Commission on America's Nuclear Future Report to the Secretary of Energy The Blue Ribbon Commission on America's Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was cochaired by Rep. Lee H.

  20. Alternative Fuels Data Center: State Fees as Transportation Funding

    Alternative Fuels and Advanced Vehicles Data Center

    Alternatives Fees as Transportation Funding Alternatives to someone by E-mail Share Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Facebook Tweet about Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Twitter Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Google Bookmark Alternative Fuels Data Center: State Fees as Transportation Funding Alternatives on Delicious Rank

  1. Richland Operations Office's Fiscal Year 2014 Fee Evaluation Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Operations Office's Fiscal Year 2014 Fee Evaluation Summary Contractor: CH2M HILL Plateau Remediation Company (CHPRC) Contract: Plateau Remediation Contract Contract Number: DE-AC06-08RL14788 Award Period: October 2013 through September 2014 (fiscal year 2014) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $9,815,000 Award Fee Earned: $9,659,555 Award Fee Area Adjectival Ratings: Excellent (Earnings represent 98 percent of available fee) Significant

  2. Richland Operations Office's Fiscal Year 2015 Fee Evaluation Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Office's Fiscal Year 2015 Fee Evaluation Summary Contractor: CH2M HILL Plateau Remediation Company (CHPRC) Contract: Plateau Remediation Contract Contract Number: DE-AC06-08RL14788 Award Period: October 2014 through September 2015 (fiscal year 2015) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $10,899,475 Award Fee Earned: $10,591,975 Award Fee Area Adjectival Ratings: Excellent (Earnings represent 95 percent of available fee) Significant

  3. Richland Operations Office's Fiscal Year 2013 Fee Evaluation Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Office's Fiscal Year 2013 Fee Evaluation Summary Contractor: CH2M HILL Plateau Remediation Company (CHPRC) Contract: Plateau Remediation Contract Contract Number: DE-AC06-08RL14788 Award Period: October 2012 through September 2013 (fiscal year 2013) Basis of Evaluation: Performance Evaluation and Measurement Plan (PEMP) Award Fee Available: $14,092,235 (includes fee set aside for multi-year incentives for the Plutonium Finishing Plant project) Award Fee Earned: $4,910,099 Award Fee Area

  4. Contractor Fee Payments - Oak Ridge Operations | Department of Energy

    Office of Environmental Management (EM)

    Oak Ridge Operations Contractor Fee Payments - Oak Ridge Operations See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Oak Ridge Operations on these charts. Transuranic Waste Processing - North Wind (33.63 KB) Transuranic Waste Processing - Wastren (36.67 KB) East Tennessee Technology Park (35.79 KB) More Documents & Publications Major Contracts Summary Contractor Fee Payments - Idaho Operations Office Contractor Fee

  5. Release of Department of Energy Award Fee and Incentive Fee Reports

    Energy.gov [DOE]

    To provide a consistent Department of Energy approach on the disclosure of award fee and incentive fee reports (fee determination reports) for management and operating contracts and other major contracts at the Department’s sites, the Department will, in the near future, be implementing the following policy: programs shall, at a minimum, publish a one-page score card for each contractor summarizing the fee determination and release the fee determination report upon request. However, programs will only release the fee determination report to the public after appropriate redactions are made. The Department’s Senior Procurement Executives, in consultation with the Heads of Contracting Activities and the Office of General Counsel, intend to develop and issue the policy shortly.

  6. THz near-field microscopy of graphene nano-ribbon arrays. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Title: THz near-field microscopy of graphene nano-ribbon arrays. Authors: Pan, Wei ; Brener, Igal ; Mitrofanov, O. ; Thompson, R ; Yu, W. ; berger, c ; de heer, w.a. ; Jiang, Z. ...

  7. Remarks by Rick McLeod Yucca Mountain Blue Ribbon Panel

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Rick McLeod Yucca Mountain Blue Ribbon Panel Executive Director March 25, 2010 Savannah River Site Community Reuse Organization 1 GOOD MORNING. I AM RICK MCLEOD...EXECUTIVE ...

  8. (U) A Gruneisen Equation of State for TPX. Application in FLAG

    SciTech Connect (OSTI)

    Fredenburg, David A.; Aslam, Tariq Dennis; Bennett, Langdon Stanford

    2015-11-02

    A Gruneisen equation of state (EOS) is developed for the polymer TPX (poly 4-methyl-1-pentene) within the LANL hydrocode FLAG. Experimental shock Hugoniot data for TPX is fit to a form of the Gruneisen EOS, and the necessary parameters for implementing the TPX EOS in FLAG are presented. The TPX EOS is further validated through one-dimensional simulations of recent double-shock experiments, and a comparison is made between the new Gruneisen EOS for TPX and the EOS representation for TPX used in the LANL Common Model.

  9. Green Flag for a New Era in Green Racing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Flag for a New Era in Green Racing Green Flag for a New Era in Green Racing January 28, 2014 - 5:14pm Addthis Karl Simon (from left) the Environmental Protection Agency’s Director of Transportation and Climate Division for the Office of Transportation and Air Quality; Michael Carr, the Energy Department’s Principal Deputy Assistant Secretary for the Office of Energy Efficiency and Renewable Energy; and Scott Atherton, President of International Motor Sports Association; pose with the

  10. Growing Graphene Ribbons in One Direction | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Growing Graphene Ribbons in One Direction Basic Energy Sciences (BES) BES Home About Research Facilities Science Highlights Benefits of BES Funding Opportunities Basic Energy Sciences Advisory Committee (BESAC) Community Resources Contact Information Basic Energy Sciences U.S. Department of Energy SC-22/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 P: (301) 903-3081 F: (301) 903-6594 E: Email Us More Information » 06.07.16 Growing Graphene Ribbons in One Direction New

  11. Under Secretary Klotz delivers remarks at PREP ribbon-cutting | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Under Secretary Klotz delivers remarks at PREP ribbon-cutting Wednesday, June 18, 2014 - 1:23pm Under Secretary Klotz delivered remarks at the Pantex Renewable Energy Project (PREP) ribbon-cutting this week. PREP establishes the largest federally-owned wind farm in the country and will generate approximately 47 million kilowatt-hours of electricity annually, more than 60 percent of the electricity needed for Pantex. The project will reduce CO2

  12. SEPARATION OF THE RIBBON FROM GLOBALLY DISTRIBUTED ENERGETIC NEUTRAL ATOM FLUX USING THE FIRST FIVE YEARS OF IBEX OBSERVATIONS

    SciTech Connect (OSTI)

    Schwadron, N. A.; Moebius, E.; Kucharek, H.; Lee, M. A.; Fairchild, K.; Fuselier, S. A.; McComas, D. J.; Allegrini, F.; Dayeh, M.; Livadiotis, G.; Reno, M.; Funsten, H. O.; Janzen, P.; Reisenfeld, D.; Bzowski, M.; Sokół, J. M.; Kubiak, M. A.; Christian, E. R.; DeMajistre, R.; Frisch, P.; and others

    2014-11-01

    The Interstellar Boundary Explorer (IBEX) observes the IBEX ribbon, which stretches across much of the sky observed in energetic neutral atoms (ENAs). The ribbon covers a narrow (∼20°-50°) region that is believed to be roughly perpendicular to the interstellar magnetic field. Superimposed on the IBEX ribbon is the globally distributed flux that is controlled by the processes and properties of the heliosheath. This is a second study that utilizes a previously developed technique to separate ENA emissions in the ribbon from the globally distributed flux. A transparency mask is applied over the ribbon and regions of high emissions. We then solve for the globally distributed flux using an interpolation scheme. Previously, ribbon separation techniques were applied to the first year of IBEX-Hi data at and above 0.71 keV. Here we extend the separation analysis down to 0.2 keV and to five years of IBEX data enabling first maps of the ribbon and the globally distributed flux across the full sky of ENA emissions. Our analysis shows the broadening of the ribbon peak at energies below 0.71 keV and demonstrates the apparent deformation of the ribbon in the nose and heliotail. We show global asymmetries of the heliosheath, including both deflection of the heliotail and differing widths of the lobes, in context of the direction, draping, and compression of the heliospheric magnetic field. We discuss implications of the ribbon maps for the wide array of concepts that attempt to explain the ribbon's origin. Thus, we present the five-year separation of the IBEX ribbon from the globally distributed flux in preparation for a formal IBEX data release of ribbon and globally distributed flux maps to the heliophysics community.

  13. RL's Fiscal Year 2013 Fee Evaluation Summary

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Evaluation and Measurement Plan (PEMP) Award Fee Available: 300,000.00 Award ... The FY 13 PEMP for this contract is available at: http:www.hanford.govfiles.cfm...

  14. Sacramento Ordinance to Waive Solar PV Fees

    Office of Energy Efficiency and Renewable Energy (EERE)

    This is an ordinance by the city of Sacramento to suspend for the calendar years 2007-2009 all fees related to installation of photovoltaic systems on existing residences.

  15. FY 14 Award Fee Determination Scorecard

    Office of Environmental Management (EM)

    14 Award Fee Determination Scorecard Contractor: Swift and Staley Inc. (SST) Contract: DE-AC30-10CC40021 Award Period: October 1,2013 - September 30,2014 Basis of Evaluation: FY 14 ...

  16. WAI Contract & Fee Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    It is contract DE-EM0000323, and it includes all sections through MOD80. PDF icon WAI Contract (DE-EM0000323) PDF icon Fee determination letter (Oct. 2014) More Documents & ...

  17. CONCUR: AWARD FEE PLAN - FY15

    Office of Environmental Management (EM)

    as Facility Support Services Contract Award Fee Plan Contract Number DE-CI0000004 3 editorial or personnel changes may be made and implemented without being provided to the...

  18. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: January 1, 2014 to June 30, 2014 Basis of Evaluation: 2014-A Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $3,970,000 (63.0%) Incentive B.1 - Award Fee-Project Management The fee for Project Management is divided into three Award Fee Objectives

  19. Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Bechtel National, Inc. (BNI) Contract: Design, Construction, and Commissioning of the Hanford Tank Waste Treatment & Immobilization Plant Contract Number: DE-AC27-01RV14136 Award Fee Period: July 1, 2014 to December 31, 2014 Basis of Evaluation: 2014-B Performance Evaluation and Measurement Plan Award Fee Available: $6,300,000 Award Fee Earned: $4,095,000 (65.0%) Incentive B.1 - Award Fee-Project Management - Good The fee for Project Management

  20. Award Fee Determination Scorecard Contractor: Washington River Protection Solutions, LLC

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Washington River Protection Solutions, LLC Contract: Tank Operations Contract Contract Number: DE-AC27-08RV14800 Award Fee Period: October 1, 2014 to September 30, 2015 Basis of Evaluation: FY 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available: $15,600,000 Award Fee Earned: $13,728,000 (88%) Award Fee Area Adjectival Ratings for each Award Fee Special Emphasis Area (SEA): Functional Element Adjectival Rating* SEA 1: Management of Single-Shell (SST) and Double-Shell

  1. Phloem Transport of Arsenic Species from Flag Leaf to Grain During Grain Filling

    SciTech Connect (OSTI)

    A Carey; G Norton; C Deacon; K Scheckel; E Lombi; T Punshon; M Guerinot; A Lanzirotti; M Newville; et al.

    2011-12-31

    Strategies to reduce arsenic (As) in rice grain, below concentrations that represent a serious human health concern, require that the mechanisms of As accumulation within grain be established. Therefore, retranslocation of As species from flag leaves into filling rice grain was investigated. Arsenic species were delivered through cut flag leaves during grain fill. Spatial unloading within grains was investigated using synchrotron X-ray fluorescence (SXRF) microtomography. Additionally, the effect of germanic acid (a silicic acid analog) on grain As accumulation in arsenite-treated panicles was examined. Dimethylarsinic acid (DMA) and monomethylarsonic acid (MMA) were extremely efficiently retranslocated from flag leaves to rice grain; arsenate was poorly retranslocated, and was rapidly reduced to arsenite within flag leaves; arsenite displayed no retranslocation. Within grains, DMA rapidly dispersed while MMA and inorganic As remained close to the entry point. Germanic acid addition did not affect grain As in arsenite-treated panicles. Three-dimensional SXRF microtomography gave further information on arsenite localization in the ovular vascular trace (OVT) of rice grains. These results demonstrate that inorganic As is poorly remobilized, while organic species are readily remobilized, from leaves to grain. Stem translocation of inorganic As may not rely solely on silicic acid transporters.

  2. Phloem transport of arsenic species from flag leaf to grain during grain filling

    SciTech Connect (OSTI)

    Carey, Anne-Marie; Norton, Gareth J.; Deacon, Claire; Scheckel, Kirk G.; Lombi, Enzo; Punshon, Tracy; Guerinot, Mary Lou; Lanzirotti, Antonio; Newville, Matt; Choi, Yongseong; Price, Adam H.; Meharg, Andrew A.

    2011-09-20

    Strategies to reduce arsenic (As) in rice grain, below concentrations that represent a serious human health concern, require that the mechanisms of As accumulation within grain be established. Therefore, retranslocation of As species from flag leaves into filling rice grain was investigated. Arsenic species were delivered through cut flag leaves during grain fill. Spatial unloading within grains was investigated using synchrotron X-ray fluorescence (SXRF) microtomography. Additionally, the effect of germanic acid (a silicic acid analog) on grain As accumulation in arsenite-treated panicles was examined. Dimethylarsinic acid (DMA) and monomethylarsonic acid (MMA) were extremely efficiently retranslocated from flag leaves to rice grain; arsenate was poorly retranslocated, and was rapidly reduced to arsenite within flag leaves; arsenite displayed no retranslocation. Within grains, DMA rapidly dispersed while MMA and inorganic As remained close to the entry point. Germanic acid addition did not affect grain As in arsenite-treated panicles. Three-dimensional SXRF microtomography gave further information on arsenite localization in the ovular vascular trace (OVT) of rice grains. These results demonstrate that inorganic As is poorly remobilized, while organic species are readily remobilized, from leaves to grain. Stem translocation of inorganic As may not rely solely on silicic acid transporters.

  3. ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE | Department...

    Energy.gov (indexed) [DOE]

    on provisional payment of fee for non management and operating contracts. PF2014-08 Acquisition Letter 2014-02 Provisional Payment of FeeAcquisition Letter 2014-02 Provisional ...

  4. Section L Attachment I - Summary and Fee Sheet Amendment 000002...

    National Nuclear Security Administration (NNSA)

    I Summary and Fee Sheet Amendment 000002 Nevada National Security Site Management and Operating (M&O) Contract PROPOSED 2017 Mgt Team Costs 2018 Mgt Team Costs Subtotal 0 FEE CLIN ...

  5. Utah Water Rights Fee Schedule | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Utah Water Rights Fee Schedule Abstract Water rights fee schedule based on amount appropriated....

  6. Title 18 CFR 381 Fees | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Regulation: Title 18 CFR 381 FeesLegal Abstract Part 381 Fees, Forms under Title 18: Conservation of Power and Water Resources of the U.S. Code of Federal Regulations, current...

  7. Title 11 Alaska Administrative Code Chapter 5 Fees | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    5 Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 11 Alaska Administrative Code Chapter 5 FeesLegal Abstract...

  8. Alaska Division of Water Permit Fees | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Water Permit Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Alaska Division of Water Permit Fees Author Alaska Division of Water Published...

  9. Contractor Fee Payments - Savannah River Site Office | Department...

    Energy.gov (indexed) [DOE]

    the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. Liquid Waste...

  10. Contractor Fee Payments - Savannah River Operations Office | Department of

    Office of Environmental Management (EM)

    Energy Savannah River Operations Office Contractor Fee Payments - Savannah River Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Savannah River Site Office on these charts. Comprehensive Security Services (35.16 KB) Site Management and Operations (35.73 KB) Liquid Waste Processing (35.48 KB) Salt Waste Processing Facility (37.07 KB) More Documents & Publications Contractor Fee Payments - Office of

  11. Evaluation of Dynamic Mechanical Loading as an Accelerated Test Method for Ribbon Fatigue: Preprint

    SciTech Connect (OSTI)

    Bosco, N.; Silverman, T. J.; Wohlgemuth, J.; Kurtz, S.; Inoue, M.; Sakurai, K.; Shinoda, T.; Zenkoh, H.; Hirota, K.; Miyashita, M.; Tadanori, T.; Suzuki, S.

    2015-04-07

    Dynamic Mechanical Loading (DML) of photovoltaic modules is explored as a route to quickly fatigue copper interconnect ribbons. Results indicate that most of the interconnect ribbons may be strained through module mechanical loading to a level that will result in failure in a few hundred to thousands of cycles. Considering the speed at which DML may be applied, this translates into a few hours o testing. To evaluate the equivalence of DML to thermal cycling, parallel tests were conducted with thermal cycling. Preliminary analysis suggests that one +/-1 kPa DML cycle is roughly equivalent to one standard accelerated thermal cycle and approximately 175 of these cycles are equivalent to a 25-year exposure in Golden Colorado for the mechanism of module ribbon fatigue.

  12. An analogue of Weyl’s law for quantized irreducible generalized flag manifolds

    SciTech Connect (OSTI)

    Matassa, Marco E-mail: mmatassa@math.uio.no

    2015-09-15

    We prove an analogue of Weyl’s law for quantized irreducible generalized flag manifolds. This is formulated in terms of a zeta function which, similarly to the classical setting, satisfies the following two properties: as a functional on the quantized algebra it is proportional to the Haar state and its first singularity coincides with the classical dimension. The relevant formulas are given for the more general case of compact quantum groups.

  13. A CIRCULAR-RIBBON SOLAR FLARE FOLLOWING AN ASYMMETRIC FILAMENT ERUPTION

    SciTech Connect (OSTI)

    Liu, Chang; Deng, Na; Lee, Jeongwoo; Wang, Haimin; Liu, Rui; Pariat, Étienne; Wiegelmann, Thomas; Liu, Yang; Kleint, Lucia

    2015-10-20

    The dynamic properties of flare ribbons and the often associated filament eruptions can provide crucial information on the flaring coronal magnetic field. This Letter analyzes the GOES-class X1.0 flare on 2014 March 29 (SOL2014-03-29T17:48), in which we found an asymmetric eruption of a sigmoidal filament and an ensuing circular flare ribbon. Initially both EUV images and a preflare nonlinear force-free field model show that the filament is embedded in magnetic fields with a fan-spine-like structure. In the first phase, which is defined by a weak but still increasing X-ray emission, the western portion of the sigmoidal filament arches upward and then remains quasi-static for about five minutes. The western fan-like and the outer spine-like fields display an ascending motion, and several associated ribbons begin to brighten. Also found is a bright EUV flow that streams down along the eastern fan-like field. In the second phase that includes the main peak of hard X-ray (HXR) emission, the filament erupts, leaving behind two major HXR sources formed around its central dip portion and a circular ribbon brightened sequentially. The expanding western fan-like field interacts intensively with the outer spine-like field, as clearly seen in running difference EUV images. We discuss these observations in favor of a scenario where the asymmetric eruption of the sigmoidal filament is initiated due to an MHD instability and further facilitated by reconnection at a quasi-null in corona; the latter is in turn enhanced by the filament eruption and subsequently produces the circular flare ribbon.

  14. Microsoft Word - DRAFT FY15 Award Fee Plan LATA - 09-19-2014...

    Office of Environmental Management (EM)

    Remediation Contract Award Fee Plan Contract Number: DE-AC30-10CC40020 AWARD FEE PLAN FOR LATA ... (if applicable), (b) one-page scorecard, (c) Award Fee Determination Letter, ...

  15. Contractor Fee Payments - Office of River Protection | Department of Energy

    Office of Environmental Management (EM)

    Office of River Protection Contractor Fee Payments - Office of River Protection See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Office of River Protection on these charts. Laboratory Analytical Services & Testing (34.64 KB) Tank Operations (110.98 KB) Hanford 222-S Laboratory Analysis and Testing Services (33.18 KB) Waste Treatment Plant Design & Construction (36.3 KB) More Documents & Publications Contractor

  16. Contractor Fee Payments - Richland Operations Office | Department of Energy

    Office of Environmental Management (EM)

    Richland Operations Office Contractor Fee Payments - Richland Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Richland Operations Office on these charts. Occupational Medical Services - HPM Corporation (34.22 KB) Infrastructure and Site Services Support (35.03 KB) Plateau Remediation (35.51 KB) River Corridor Closure (35.51 KB) Occupational Health Services (34.09 KB) More Documents & Publications

  17. UCOR Contract & Fee Determination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    UCOR Contract & Fee Determination UCOR Contract & Fee Determination The attached document is UCOR's conformed contract with the Oak Ridge Office of Environmental Managment. It is contract DE-SC0004645, and it includes all sections through MOD94. UCOR contract (DE-SC0004645) (4 MB) UCOR fee determination letter (July 2016) (571.83 KB) More Documents & Publications PPPO Contract Awards Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and

  18. Award Fee Determination Shows Performance Improvement in WTP Contractor |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Award Fee Determination Shows Performance Improvement in WTP Contractor Award Fee Determination Shows Performance Improvement in WTP Contractor April 14, 2016 - 1:15pm Addthis RICHLAND, Wash. - EM Office of River Protection (ORP) Waste Treatment and Immobilization Plant (WTP) contractor Bechtel National Inc. improved its performance slightly in calendar year 2015 compared to the last half of 2014, earning 66 percent of its possible award fee, or $8.31 million out of a

  19. Gordon Fee, part 1 | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  20. Gordon Fee, part 2 | Y-12 National Security Complex

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Blake Case Larry Case Patrick Case Dorothy Coker Gordon Fee Linda Fellers Louis Freels Marie Guy Nathan Henry Agnes Houser John Rice Irwin Harvey Kite Charlie Manning Alice...

  1. FY 2007 Fee Adequacy, Pub 2008 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the fee will provide sufficient revenues to offset the commercial utilities' share of the total life cycle costs of the Civilian Radioactive Waste Management Program (the Program). ...

  2. Sacramento Ordinance to Waive Fees for Solar Hot Water

    Energy.gov [DOE]

    An ordinance suspending for the calendar years 2007-2009 all fees related to installations of solar water heaters on existing residences.

  3. Inspection of Westinghouse Savannah River Company Fees for Managing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The ** **printed document may also contain charts and ... (IG-1), Department of ** **Energy, 1000 Independence Avenue, ... for MMC, before conversion to an award fee basis, ...

  4. Wetland Permit Application Fees 2015 | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Wetland Permit Application Fees 2015PermittingRegulatory GuidanceGuide...

  5. Oregon Fees for Underground Injection Control Program Fact Sheet...

    Open Energy Information (Open El) [EERE & EIA]

    Fees for Underground Injection Control Program Fact Sheet Jump to: navigation, search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - Supplemental Material:...

  6. Microsoft Word - Award Fee Determination Scorecard for FY 2013...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Area Adjectival Ratings: Functional Element Adjectival Rating* Conduct of ... Program Compliance Very Good Nuclear Safety Very Good Environmental Regulatory ...

  7. Award\tFee\tDetermination\tScorecard Contractor: Savannah River...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Performance and Evaluation Plan (PEMP) Award Fee: 3,000,000.00 Incentive Fee: ... each contract year is identified in the Performance Evaluation Measurement Plan (PEMP). ...

  8. Statement from Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations

    Energy.gov [DOE]

    "Secretary Chu appreciates the hard work done by the members of the Blue Ribbon Commission, and thanks them for a very thoughtful report. The interim report issued today is a strong step toward...

  9. Laser Assisted Crystallization of Ferromagnetic Amorphous Ribbons: A Multimodal Characterization and Thermal Model Study

    SciTech Connect (OSTI)

    Katakam, Shravana K.; Devaraj, Arun; Bowden, Mark E.; Santhanakrishnan, S.; Smith, Casey; Ramanujan, Raju; Thevuthasan, Suntharampillai; Banerjee, Rajarshi; Dahotre, Narendra B.

    2013-11-14

    This paper focuses on laser-based de-vitrification of amorphous soft magnetic Fe-Si-B ribbons and its consequent influence on the magnetic properties. Laser processing resulted in a finer scale of crystallites due to rapid heating and cooling during laser annealing compared to conventional furnace annealing process. A significant increase in saturation magnetization is observed for laser-annealed ribbons compared to both as-received and furnace annealed samples coupled with an increase in coercivity compared to as received sample. The combined effect of thermal histories and stresses developed during laser annealing results in the formation of nano-crystalline phase along the laser track. The phase evolution is traced with the aid of micro-XRD and TEM analysis. The solute partitioning and compositional variation within the phases are obtained by Local Electrode Atom probe analysis. The evolution of microstructure is rationalized using a Finite Element based heat transfer multi-physics model.

  10. STUDY OF TWO SUCCESSIVE THREE-RIBBON SOLAR FLARES ON 2012 JULY 6

    SciTech Connect (OSTI)

    Wang, Haimin; Liu, Chang; Deng, Na; Xu, Yan; Jing, Ju; Zeng, Zhicheng; Cao, Wenda

    2014-01-20

    This Letter reports two rarely observed three-ribbon flares (M1.9 and C9.2) on 2012 July 6 in NOAA AR 11515, which we found using Hα observations of 0.''1 resolution from the New Solar Telescope and Ca II H images from Hinode. The flaring site is characterized by an intriguing ''fish-bone-like'' morphology evidenced by both Hα images and a nonlinear force-free field (NLFFF) extrapolation, where two semi-parallel rows of low-lying, sheared loops connect an elongated, parasitic negative field with the sandwiching positive fields. The NLFFF model also shows that the two rows of loops are asymmetric in height and have opposite twists, and are enveloped by large-scale field lines including open fields. The two flares occurred in succession within half an hour and are located at the two ends of the flaring region. The three ribbons of each flare run parallel to the magnetic polarity inversion line, with the outer two lying in the positive field and the central one in the negative field. Both flares show surge-like flows in Hα apparently toward the remote region, while the C9.2 flare is also accompanied by EUV jets possibly along the open field lines. Interestingly, the 12-25 keV hard X-ray sources of the C9.2 flare first line up with the central ribbon then shift to concentrate on the top of the higher branch of loops. These results are discussed in favor of reconnection along the coronal null line, producing the three flare ribbons and the associated ejections.

  11. Ribbon-cutting Ceremony Set for New Radiological and Environmental Sciences Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS— On Monday, Aug. 22, an open house and ribbon-cutting ceremony will be held to mark the opening of the U.S. Department of Energy’s new Radiological and Environmental Sciences Laboratory. The mission of the RESL facility is to provide measurement quality assurance for programs that protect workers, the public and the environment. The media is welcome to join us and tour the new facility.

  12. Magnetocaloric properties of rapidly solidified Dy{sub 3}Co alloy ribbons

    SciTech Connect (OSTI)

    Sánchez Llamazares, J. L. Flores-Zúñiga, H.; Sánchez-Valdés, C. F.; Álvarez-Alonso, Pablo

    2015-05-07

    The magnetic and magnetocaloric (MC) properties of melt-spun ribbons of the Dy{sub 3}Co intermetallic compound were investigated. Samples were fabricated in an Ar environment using a homemade melt spinner system at a linear speed of the rotating copper wheel of 40 ms{sup −1}. X-ray diffraction analysis shows that ribbons crystallize into a single-phase with the Fe{sub 3}C-type orthorhombic crystal structure. The M(T) curve measured at 5 mT reveals the occurrence of a transition at 32 K from a first to a second antiferromagnetic (AFM) state and an AFM-to-paramagnetic transition at T{sub N} = 43 K. Furthermore, a metamagnetic transition is observed below T{sub N}, but the magnetization change ΔM is well below the one reported for bulk alloys. Below 12 K, large inverse MC effect and hysteresis losses are observed. This behavior is related to the metamagnetic transition. For a magnetic field change of 5 T (2 T) applied along the ribbon length, the produced ribbons show a peak value of the magnetic entropy change ΔS{sub M}{sup peak} of −6.5 (− 2.1) Jkg{sup −1}K{sup −1} occurring close to T{sub N} with a full-width at half-maximum δT{sub FWHM} of 53 (37) K, and refrigerant capacity RC = 364 (83) Jkg{sup −1} (estimated from the product |ΔS{sub M}{sup peak}| × δT{sub FWHM})

  13. THE SOLAR WIND AS A POSSIBLE SOURCE OF FAST TEMPORAL VARIATIONS OF THE HELIOSPHERIC RIBBON

    SciTech Connect (OSTI)

    Kucharek, H.; Lee, M. A.; Moebius, E.; Schwadron, N.; Fuselier, S. A.; McComas, D.; Wurz, P.; Pogorelov, N.; Borovikov, S.; Reisenfeld, D.; Funsten, H.

    2013-10-20

    We present a possible source of pickup ions (PUIs) the ribbon observed by the Interstellar Boundary EXplorer (IBEX). We suggest that a gyrating solar wind and PUIs in the ramp and in the near downstream region of the termination shock (TS) could provide a significant source of energetic neutral atoms (ENAs) in the ribbon. A fraction of the solar wind and PUIs are reflected and energized during the first contact with the TS. Some of the solar wind may be reflected propagating toward the Sun but most of the solar wind ions form a gyrating beam-like distribution that persists until it is fully thermalized further downstream. Depending on the strength of the shock, these gyrating distributions can exist for many gyration periods until they are scattered/thermalized due to wave-particle interactions at the TS and downstream in the heliosheath. During this time, ENAs can be produced by charge exchange of interstellar neutral atoms with the gyrating ions. In order to determine the flux of energetic ions, we estimate the solar wind flux at the TS using pressure estimates inferred from in situ measurements. Assuming an average path length in the radial direction of the order of a few AU before the distribution of gyrating ions is thermalized, one can explain a significant fraction of the intensity of ENAs in the ribbon observed by IBEX. With a localized source and such a short integration path, this model would also allow fast time variations of the ENA flux.

  14. Total Estimated Contract Cost: Performance Period Total Fee Paid

    Office of Environmental Management (EM)

    DE-AM09-05SR22405DE-AT30-07CC60011SL14 Contractor: Contract Number: Contract Type: Cost Plus Award Fee 357,223 597,797 894,699 EM Contractor Fee Site: Stanford Linear...

  15. Fee Determinations: Requirement to Obtain Acquisition Executive's Input

    Energy.gov [DOE]

    On January 28, 2013, the Deputy Secretary issued the attached memorandum to the Department's senior officials requiring any Fee Determining Official whose contract falls under the cognizance of an Acquisition Executive to brief and obtain the input of that Acquisition Executive before determining earned fee under the contract.

  16. WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    WEIGHTED GUIDELINES PROFIT/FEE OBJECTIVE DOE F 4220.23 (06-95) U.S. DEPARTMENT OF ENERGY 1. CONTRACTOR IDENTIFICATION 2. TYPE OF ACQUISTION ACTION (REFER TO OFPP MANUAL, FEDERAL PROCUREMENT DATA SYSTEMS - PRODUCT AND SERVICE CODES. APRIL 1980) a. Name c. Street address b. Division (If any) d. City e. State f. Zip code a. SUPPLIES & EQUIPMENT b. RESEARCH & DEVELOPMENT c. SERVICES: (1) ARCHITECT-ENGINEER: (2) MANAGEMENT SERVICES: (3) MEDICAL: (4) OTHER (e.g., SUPPORT SERVICES) 3.

  17. Award Fee Evaluation Period 6 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC

    Office of Environmental Management (EM)

    6 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC Contract: DE-AC30-10CC40017 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2015 to March 28, 2016) Basis of Evaluation: Award Fee Plan for Fluor-BWXT Portsmouth LLC Award Fee Evaluation Period 6 Categories of Performance: Subjective: $3,858,795 PBI: $9,003,856 Super PBI: $11,623,818 Stretch: $0 Award Fee Available: $24,486,469 Award Fee Earned: $6,823,811 (27.86%) Categories of Performance Award Fee Award Fee Area

  18. Paducah Infrastructure Contract Award Fee Plan Contract Number: DE-AC30-10CC40021

    Office of Environmental Management (EM)

    Paducah Infrastructure Contract Award Fee Plan Contract Number: DE-AC30-10CC40021 TABLE OF CONTENTS (i) PAGE 1. INTRODUCTION 1 2. DEFINITION OF TERMS 1 3. AWARD FEE STRUCTURE 1 4. ORGANIZATIONAL STRUCTURE 2 5. RESPONSIBILITIES 2 6. AWARD FEE AMOUNTS AND PERIODS 3 7. AWARD FEE PROCESS 4 8. TERMINATION FOR CONVENIENCE 6 EXHIBITS 1. Performance Evaluation Board Members and Advisors 7 2. Award Fee Rating Table, Award Fee Conversion Chart and Award Fee Calculations 8 3. Rating Criteria 9 4. Rating

  19. Acquisition Guide Chapter 70.15 - M&O Contractor Incentives - Fee, Rollover

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Performance Fee, and Award Term | Department of Energy 15 - M&O Contractor Incentives - Fee, Rollover of Performance Fee, and Award Term Acquisition Guide Chapter 70.15 - M&O Contractor Incentives - Fee, Rollover of Performance Fee, and Award Term Policy Flash 2008-62 (113.24 KB) Chapter 70.15 - M&O Contractor Incentives - Fee, Rollover of Performance Fee, and Award Term (96.21 KB) More Documents & Publications Microsoft Word - AcqGuide70pt15rev9-OPAM Before the Senate

  20. Fiscal year 1999 Battelle performance evaluation and fee agreement

    SciTech Connect (OSTI)

    DAVIS, T.L.

    1998-10-22

    Fiscal Year 1999 represents the third fill year utilizing a results-oriented, performance-based evaluation for the Contractor's operations and management of the DOE Pacific Northwest National Laboratory (here after referred to as the Laboratory). However, this is the first year that the Contractor's fee is totally performance-based utilizing the same Critical Outcomes. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of the Contractor's performance for the period October 1, 1998 through September 30, 1999, as required by Clauses entitled ''Use of Objective Standards of Performance, Self Assessment and Performance Evaluation'' and ''Performance Measures Review'' of the Contract DE-ACO6-76RL01830. Furthermore, it documents the distribution of the total available performance-based fee and the methodology set for determining the amount of fee earned by the Contractor as stipulated within the causes entitled ''Estimated Cost and Annual Fee,'' ''Total Available Fee'' and ''Allowable Costs and Fee.'' In partnership with the Contractor and other key customers, the Department of Energy (DOE) Headquarters (HQ) and Richland Operations Office (RL) has defined four critical outcomes that serve as the core for the Contractor's performance-based evaluation and fee determination. The Contractor also utilizes these outcomes as a basis for overall management of the Laboratory.

  1. Contractor Fee Payments - Portsmouth Paducah Project Office | Department of

    Office of Environmental Management (EM)

    Energy Portsmouth Paducah Project Office Contractor Fee Payments - Portsmouth Paducah Project Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Portsmouth Paducah Project Office on these charts. Operation of DUF6 (117 KB) Portsmouth D&D (118.65 KB) Paducah Deactivation Task Order (115.62 KB) Paducah Remediation - LATA of Kentucky (34.62 KB) Portsmouth Environmental Technical Services II (116.49 KB) Paducah

  2. IBEX satellite finds ribbon-like structure at edge of heliosphere

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    IBEX satellite IBEX satellite finds ribbon-like structure at edge of heliosphere The NASA IBEX mission has sent back data that indicates a "noodle soup" of solar material has accumulated at the outer fringes of the heliosphere bubble. October 15, 2009 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma

  3. Remarks by Federal Blue Ribbon Commission J. David Jameson Atlanta, GA

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Federal Blue Ribbon Commission J. David Jameson Atlanta, GA October 18, 2011 Good Morning. I am David Jameson. I am President and CEO of the Greater Aiken, South Carolina, Chamber of Commerce. I am here today in my capacity as current Chairman of the SRS Community Reuse Organization. The SRSCRO is a non-profit regional group supporting economic diversification and job creation in a five-county in Georgia and South Carolina near the Department of Energy's Savannah River Site. We are unique among

  4. Idaho Water Right Applications, Forms, and Fees Webpage | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Idaho Water Right Applications, Forms, and Fees Webpage Abstract This webpage provides an overview...

  5. Spent fuel management fee methodology and computer code user's manual.

    SciTech Connect (OSTI)

    Engel, R.L.; White, M.K.

    1982-01-01

    The methodology and computer model described here were developed to analyze the cash flows for the federal government taking title to and managing spent nuclear fuel. The methodology has been used by the US Department of Energy (DOE) to estimate the spent fuel disposal fee that will provide full cost recovery. Although the methodology was designed to analyze interim storage followed by spent fuel disposal, it could be used to calculate a fee for reprocessing spent fuel and disposing of the waste. The methodology consists of two phases. The first phase estimates government expenditures for spent fuel management. The second phase determines the fees that will result in revenues such that the government attains full cost recovery assuming various revenue collection philosophies. These two phases are discussed in detail in subsequent sections of this report. Each of the two phases constitute a computer module, called SPADE (SPent fuel Analysis and Disposal Economics) and FEAN (FEe ANalysis), respectively.

  6. FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor...

    Office of Environmental Management (EM)

    FISCAL YEAR 2014 AWARD FEE DETERMINATION SCORECARD Contractor: LATA Environmental Services of Kentucky, LLC Contract No.: DE-AC30-10CC40020 Award Period: October 1, 2013 through ...

  7. Award Fee Evaluation Period 5 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC Contract: DE-AC30-10CC40017 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, 2015) ...

  8. Award Fee Evaluation Period 6 Determination Scorecard Contractor...

    Office of Environmental Management (EM)

    6 Determination Scorecard Contractor: Wastren-EnergX Mission Support, LLC Contract: DE-CI0000004 Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September 30, ...

  9. Fact #901: November 30, 2015 States Assessing Fees on Electric...

    Energy.gov (indexed) [DOE]

    PEV Idaho 150 PEV Idaho 100 HEV North Carolina 100 EV Washington 100 EV ... all PEVs that can travel 30 miles using only battery power have an additional 50 fee. ...

  10. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2014 - September 30, 2015 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate and maintain an armed and uniformed protective force for the physical protection of United States Department of Energy (DOE) security interests and other such related duties at the Savannah River Site (SRS). The

  11. Accumulated destructive effect of nanosecond repetitive voltage pulses on the insulated coatings of Fe-based nanocrystalline ribbon

    SciTech Connect (OSTI)

    Zhang, Yu; Liu, Jinliang

    2013-03-11

    Fe-based nanocrystalline ribbon is widely employed in pulsed power devices and accelerators. A temperature accumulation model is put forward to explain the accumulated destructive effect of discharge plasma bombardment on the TiO{sub 2} coatings of nanocrystalline ribbon under 50 Hz/100 ns voltage pulses. Experimental results revealed that the plasma channel expansion caused by air breakdown in the coating crack heated the coating repetitively, and the coating temperature was increased and accumulated around the crack. The fact that repetitive voltage pulses were more destructive than a single pulse with the same amplitude was caused by the intensified coating ablation under the temperature accumulation effect.

  12. TEMPORAL EVOLUTION OF MULTIPLE EVAPORATING RIBBON SOURCES IN A SOLAR FLARE

    SciTech Connect (OSTI)

    Graham, D. R.; Cauzzi, G.

    2015-07-10

    We present new results from the Interface Region Imaging Spectrograph (IRIS) showing the dynamic evolution of chromospheric evaporation and condensation in a flare ribbon, with the highest temporal and spatial resolution to date. IRIS observed the entire impulsive phase of the X-class flare SOL2014-09-10T17:45 using a 9.4 s cadence “sit-and-stare” mode. As the ribbon brightened successively at new positions along the slit, a unique impulsive phase evolution was observed for many tens of individual pixels in both coronal and chromospheric lines. Each activation of a new footpoint displays the same initial coronal upflows of up to ∼300 km s{sup −1} and chromospheric downflows up to 40 km s{sup −1}. Although the coronal flows can be delayed by over 1 minute with respect to those in the chromosphere, the temporal evolution of flows is strikingly similar between all pixels and consistent with predictions from hydrodynamic flare models. Given the large sample of independent footpoints, we conclude that each flaring pixel can be considered a prototypical, “elementary” flare kernel.

  13. Mechanically stable, high aspect ratio, multifilar, wound, ribbon-type conductor and method for manufacturing same

    DOE Patents [OSTI]

    Cottingham, James G.

    1987-01-01

    A mechanically stable, wound, multifilar, ribbon-type conductor having a cross-sectional aspect ratio which may be greater than 12:1, comprising a plurality of conductive strands wound to form a flattened helix containing a plastic strip into which the strands have been pressed so as to form a bond between the strip and the strands. The bond mechanically stabilizes the conductor under tension, preventing it from collapsing into a tubular configuration. In preferred embodiments the plastic strip may be polytetrafluoroethylene, and the conductive strands may be formed from a superconductive material. Conductors in accordance with the present invention may be manufactured by winding a plurality of conductive strands around a hollow mandrel; the cross-section of a hollow mandrel; the cross-section of the mandrel continuously varying from substantially circular to a high aspect ratio elipse while maintaining a constant circumference. The wound conductive strands are drawn from the mandrel as a multifilar helix while simultaneously a plastic strip is fed through the hollow mandrel so that it is contained within the helix as it is withdrawn from the mandrel. The helical conductor is then compressed into a ribbon-like form and the strands are bonded to the plastic strip by a combination of heat and pressure.

  14. Electronically tunable extraordinary optical transmission in graphene plasmonic ribbons coupled to subwavelength metallic slit arrays

    DOE PAGES-Beta [OSTI]

    Kim, Seyoon; Jang, Min Seok; Brar, Victor W.; Tolstova, Yulia; Mauser, Kelly W.; Atwater, Harry A.

    2016-08-08

    In this paper, subwavelength metallic slit arrays have been shown to exhibit extraordinary optical transmission, whereby tunneling surface plasmonic waves constructively interfere to create large forward light propagation. The intricate balancing needed for this interference to occur allows for resonant transmission to be highly sensitive to changes in the environment. Here we demonstrate that extraordinary optical transmission resonance can be coupled to electrostatically tunable graphene plasmonic ribbons to create electrostatic modulation of mid-infrared light. Absorption in graphene plasmonic ribbons situated inside metallic slits can efficiently block the coupling channel for resonant transmission, leading to a suppression of transmission. Full-wave simulationsmore » predict a transmission modulation of 95.7% via this mechanism. Experimental measurements reveal a modulation efficiency of 28.6% in transmission at 1,397 cm–1, corresponding to a 2.67-fold improvement over transmission without a metallic slit array. This work paves the way for enhancing light modulation in graphene plasmonics by employing noble metal plasmonic structures.« less

  15. Anisotropic hot deformed magnets prepared from Zn-coated MRE-Fe-B ribbon powder (MRE?=?Nd?+?Y?+?Dy)

    SciTech Connect (OSTI)

    Tang, W; Zhou, L; Sun, K W; Dennis, K W; Kramer, M J; Anderson, I E; McCallum, R W

    2014-05-07

    Milled melt-spun ribbon flake of MRE-Fe-B coated with Zn coating using a vapor transport technique was found to have significant increase in coercivity without degrading the magnetization when the Zn thickness and heat treatment were optimized. Magnetic measurements show that 0.51?wt.?% Zn coating increases the coercivity about 1?kOe over the initial ribbon powder. After vacuum hot deformation (VHD), the VHD magnet with Zn coating of 0.5?wt.?% results in a nearly 3?kOe higher coercivity than an un-coated alloy magnet. An optimized VHD magnet with 0.5?wt.?% Zn coating obtains a coercivity of 11.2?kOe and (BH)max of 23.0 MGOe, respectively. SEM and TEM microstructures analysis demonstrates that the Zn coating on the surface of ribbon powder has diffused along the intergranular boundaries after the ribbon powder was annealed at 750?C for 30?min or was hot deformed at 700750?C.

  16. Innovative Approaches to Low-Cost Module Manufacturing of String Ribbon Si PV Modules; Final Subcontract Report, March 2002 - January 2005

    SciTech Connect (OSTI)

    Hanoka, J. I.

    2005-10-01

    As a result of this work, Evergreen Solar, Inc., is now poised to take String Ribbon technology to new heights. In the ribbon growth area, Project Gemini-the growth of dual ribbons from a single crucible-has reached or exceeded all the manufacturing goals set for it. This project grew from an R&D concept to a production pilot phase and finally to a full production phase, all within the span of this subcontract. A major aspect of the overall effort was the introduction of controls and instrumentation as in-line diagnostic tools. In the ribbon production area, the result has been a 12% increase in yields, a 10% increase in machine uptime, and the flattest ribbon ever grown at Evergreen. In the cell area, advances in process development and robotic handling of Gemini wafers have contributed, along with the advances in crystal growth, to a yield improvement of 6%. Particularly noteworthy in the cell area was the refinement of the no-etch process whereby the as-grown ribbon surface could be controlled sufficiently to allow this process to succeed as well as it has. This process obviates any need for wet chemistry or etching between ribbon growth and diffusion.

  17. Fiscal Year 2007 Civilian Radioactive Waste Management Fee Adequacy Assessment Report

    Energy.gov [DOE]

    U.S. Department of Energy Office of Civilian Radioactive Waste Management Fee Adequacy Assessment Report is to present an analysis of the adequacy of the fee being paid by nuclear power utilities...

  18. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination...

    Office of Environmental Management (EM)

    DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September ...

  19. The Time Needed to Implement the Blue Ribbon Commission Recommendation on Interim Storage - 13124

    SciTech Connect (OSTI)

    Voegele, Michael D.; Vieth, Donald

    2013-07-01

    The report of the Blue Ribbon Commission on America's Nuclear Future [1] makes a number of important recommendations to be considered if Congress elects to redirect U.S. high-level radioactive waste disposal policy. Setting aside for the purposes of this discussion any issues related to political forces leading to stopping progress on the Yucca Mountain project and driving the creation of the Commission, an important recommendation of the Commission was to institute prompt efforts to develop one or more consolidated storage facilities. The Blue Ribbon Commission noted that this recommended strategy for future storage and disposal facilities and operations should be implemented regardless of what happens with Yucca Mountain. It is too easy, however, to focus on interim storage as an alternative to geologic disposal. The Blue Ribbon Commission report does not go far enough in addressing the magnitude of the contentious problems associated with reopening the issues of relative authorities of the states and federal government with which Congress wrestled in crafting the Nuclear Waste Policy Act [2]. The Blue Ribbon Commission recommendation for prompt adoption of an interim storage program does not appear to be fully informed about the actions that must be taken, the relative cost of the effort, or the realistic time line that would be involved. In essence, the recommendation leaves to others the details of the systems engineering analyses needed to understand the nature and details of all the operations required to reach an operational interim storage facility without derailing forever the true end goal of geologic disposal. The material presented identifies a number of impediments that must be overcome before the country could develop a centralized federal interim storage facility. In summary, and in the order presented, they are: 1. Change the law, HJR 87, PL 107-200, designating Yucca Mountain for the development of a repository. 2. Bring new nuclear waste

  20. Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee Secretarial Determination of the Adequacy of the Nuclear Waste Fund Fee I adopt and approve the attached annual determination of the Director, Office of Standard Contract Management, that there is no reasonable basis at this time to conclude that either excess or insufficient funds are being collected and thus will not propose an adjustment to the fee to Congress; the fee will, therefore, remain at

  1. Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee April 27, 2016 - 12:20pm Addthis Nuclear Waste Partnership received about 86 percent of the available fee for the performance period as the Waste Isolation Pilot Plant management and operations contractor. Nuclear Waste Partnership received about 86 percent of the available fee for the performance period as the Waste

  2. Privacy Act Fees and Time Limits | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    | (NNSA) Fees and Time Limits The Act provides agencies to assess fees only for the cost of reproducing records. However, it is the policy of the DOE to provide an individual with one copy of his or her requested records free of charge. The Act does not stipulate a time frame for an agency to provide access to individual records; however, the DOE's regulation (10 CFR, Part 1008.7(b)) states "Every effort will be made to respond within ten working days of the date of receipt by the

  3. Award Fee Determination Scorecard Contractor: Advanced Technologies and Laboratories (ATL) International Inc.

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Advanced Technologies and Laboratories (ATL) International Inc. Contract: Laboratory Analytical Services and Testing Contract Contract Number: DE-AC27-10RV15051 Award Fee Period: January 1, 2015 to November 21, 2015 Basis of Evaluation: January 1, 2015 to November 21, 2015 Award Fee, Performance Evaluation and Measurement Plan Award Fee Available (PBI and SEA): $789,765.60 Award Fee Earned (PBI and SEA): $781,078.18 (98.9%) Award Fee Area Adjectival Ratings for each Performance Based Incentives

  4. Office of Inspector General audit report on Westinghouse Savannah River Company`s withdrawal of fees

    SciTech Connect (OSTI)

    1999-04-01

    As the operator of the Department`s Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making improvements in site operations that reduce total contract costs. The Department`s Contracting Officer notifies Westinghouse when fees are earned, and Westinghouse withdraws the authorized amounts from the Department`s letter-of-credit account. The audit objective was to determine whether Westinghouse withdrew the appropriate amount of fees from the letter-of-credit account in Fiscal Years (FY) 1997 an 1998.

  5. Blue Ribbon Commission on America's Nuclear Future: Report to the Secretary of Energy

    SciTech Connect (OSTI)

    2012-01-01

    Preamble The Blue Ribbon Commission on America’s Nuclear Future (BRC) was formed by the Secretary of Energy at the request of the President to conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle and recommend a new strategy. It was co-chaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners are Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, Ms. Susan Eisenhower, Sen. Chuck Hagel, Mr. Jonathan Lash, Dr. Allison M. Macfarlane, Dr. Richard A. Meserve, Dr. Ernest J. Moniz, Dr. Per Peterson, Mr. John Rowe, and Rep. Phil Sharp. The Commission and its subcommittees met more than two dozen times between March 2010 and January 2012 to hear testimony from experts and stakeholders, to visit nuclear waste management facilities in the United States and abroad, and to discuss the issues identified in its Charter. Additionally, in September and October 2011, the Commission held five public meetings, in different regions of the country, to hear feedback on its draft report. A wide variety of organizations, interest groups, and individuals provided input to the Commission at these meetings and through the submission of written materials. Copies of all of these submissions, along with records and transcripts of past meetings, are available at the BRC website (www.brc.gov). This report highlights the Commission’s findings and conclusions and presents recommendations for consideration by the Administration and Congress, as well as interested state, tribal and local governments, other stakeholders, and the public.

  6. DOE Completes Annual Determination of the Adequacy of the Nuclear Waste Fund Fee

    Energy.gov [DOE]

    As required by the Nuclear Waste Policy Act of 1982 (NWPA), DOE has completed its annual review of the adequacy of the Nuclear Waste Fund fee.

  7. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue- Dataset

    Energy.gov [DOE]

    Excel file and dataset for States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue

  8. Mechanically stable, high-aspect-ratio, multifilar, wound, ribbon-type conductor and method for manufacturing same

    DOE Patents [OSTI]

    Cottingham, J.G.

    1982-03-15

    A mechanically stable, wound, multifilar, ribbon-type conductor is described having a cross-sectional aspect ratio which may be greater than 12:1, comprising a plurality of conductive strands wound to form a flattened helix containing a plastic strip into which the strands have been pressed so as to form a bond between the strip and the strands. The bond mechanically stabilizes the conductor under tension, preventing it from collapsing into a tubular configuration. In preferred embodiments the plastic strip may be polytetrafluoroethylene, and the conductive strands may be formed from a superconductive material. Conductors in accordance with the present invention may be manufactured by winding a plurality of conductive strands around a hollow mandrel; the cross-section of a hollow mandrel; the cross-section of the mandrel continuously varying from substnatially circular to a high aspect ratio elipse while maintaining a constant circumference. The wound conductive strands are drawn from the mandrel as a multifilar helix while simultaneously a plastic strip is fed through the hollow mandrel so that it is contained within the helix as it is withdrawn from the mandrel. The helical conductor is then compressed into a ribbon-like form and the strands are bonded to the plastic strip by a combination of heat and pressure.

  9. The influence of microstructure on magnetic properties of nanocrystalline Fe-Pt-Nb-B permanent magnet ribbons

    SciTech Connect (OSTI)

    Randrianantoandro, N.; Greneche, J. M.; Crisan, A. D.; Crisan, O.; Marcin, J.; Kovac, J.; Hanko, J.; Skorvanek, I.; Svec, P.; Chrobak, A.

    2010-11-15

    A FePt-based hard-magnetic nanocomposite of exchange spring type was prepared by isothermal annealing of melt-spun Fe{sub 52}Pt{sub 28}Nb{sub 2}B{sub 18} (atomic percent) ribbons. The relationship between microstructure and magnetic properties was investigated by qualitative and quantitative structural analysis based on the x-ray diffraction, transmission electron microscopy, and {sup 57}Fe Moessbauer spectrometry on one hand and the superconducting quantum interference device magnetometry on the other hand. The microstructure consists of L1{sub 0}-FePt hard-magnetic grains (15-45 nm in diameter) dispersed in a soft magnetic medium composed by A1 FePt, Fe{sub 2}B, and boron-rich (FeB)PtNb remainder phase. The ribbons annealed at 700 deg. C for 1 h exhibit promising hard-magnetic properties at room temperature: M{sub r}/M{sub s}=0.69; H{sub c}=820 kA/m and (BH){sub max}=70 kJ/m{sup 3}. Strong exchange coupling between hard and soft magnetic phases was demonstrated by a smooth demagnetizing curve and positive {delta}M-peak in the Henkel plot. The magnetic properties measured from 5 to 750 K reveals that the hard characteristics remains rather stable up to 550 K, indicating a good prospect for the use of these permanent magnets in a wide temperature range.

  10. EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee EM's Oak Ridge Cleanup Contractor Earns 93 Percent of Available Fee July 28, 2016 - 12:45pm Addthis UCOR’s K-27 Building demolition project, pictured here, is ahead of schedule with actual costs projected to be less than planned, according to OREM’s correspondence regarding the contractor’s fee determination. UCOR's K-27 Building demolition project, pictured here, is ahead of schedule with

  11. FY 1997 performance evaluation and incentive fee agreement. Annual report

    SciTech Connect (OSTI)

    1997-04-01

    FY 1997 represents the second full year utilizing a results-oriented, performance-based contract. This document describes the critical outcomes, objectives, performance indicators, expected levels of performance, and the basis for the evaluation of PNNL performance for Oct. 1, 1996-Sept. 30, 1997, as required by Articles H-24 and H-25 of the contract. Section I provides the information regarding the determination of the overall performance rating for PNNL. In Section II, six critical outcomes were defined that serve as basis for overall management of PNNL: environmental molecular sciences laboratory, environmental technology, scientific excellence, environment/safety & health operations, leadership/management, and economic development (create new businesses). Section III describes the commitments for documenting and reporting PNNL self-evaluation. In Section IV, it is stated that discussions regarding FY97 fee are still ongoing.

  12. GC Commits to Transparency on Nuclear Waste Fund Fee Adequacy Decisions

    Energy.gov [DOE]

    Consistent with the Administration's commitment to transparency, DOE General Counsel Scott Blake Harris has decided that all future determinations as to the adequacy of the Nuclear Waste Fund fee...

  13. City of Santa Monica- Building Permit Fee Waiver for Solar Projects

    Energy.gov [DOE]

    In early 2002, the City of Santa Monica began waiving building permit fees for solar energy systems. In December 2008, after months of working with industry trainers, solar contractors and staff...

  14. NMAC 20.2.71 Air Quality Operating Permit Emissions Fees | Open...

    Open Energy Information (Open El) [EERE & EIA]

    1 Air Quality Operating Permit Emissions Fees Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: NMAC 20.2.71 Air Quality...

  15. Title 43 CFR 3203.12 What Fees Must I Pay to Nominate Lands?...

    Open Energy Information (Open El) [EERE & EIA]

    .12 What Fees Must I Pay to Nominate Lands? Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title 43 CFR...

  16. H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to...

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: H.A.R. 19-102 - Fee Schedule for the Issuance of a Permit to Perform Work on State...

  17. EM Richland Operations Office Contractor Earns 97 Percent of Available Fee

    Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) issued its fiscal year 2015 fee determination for Hanford Site contractor CH2M HILL Plateau Remediation Company (CH2M).

  18. 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security...

    Open Energy Information (Open El) [EERE & EIA]

    LibraryAdd to library Legal Document- RegulationRegulation: 16 TAC, part 1, chapter 3, rule 3.78 Fees and Financial Security RequirementsLegal Abstract These regulations...

  19. I.C. 42-221 - Appropriation of Water Fees | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: I.C. 42-221 - Appropriation of Water FeesLegal Abstract This statutory section provides for...

  20. Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services Incorporated (WSI) Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate, and maintain an armed and uniformed protective force for the physical protection of U.S. Department of Energy (DOE) security interests and other such related duties at

  1. Reclamation fee on coal production: an example of federal regulatory taxation

    SciTech Connect (OSTI)

    Reese, C.E.

    1983-09-01

    The coal mining reclamation fee is part of the federal government's efforts to regulate the strip mining of coal and to use proceeds from the fee for land use and pollution control problems associated with abandoned mines. Authorized by the 1977 Surface Mining Contol and Reclamation Act rather than the Internal Revenue Code, the exaction is still shown to be both a regulatory and a severance tax. 41 references. (DCK)

  2. Cost-plus-award-fee contracts-Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    With the issuance of Federal Acquisition Circular 2005-37, the FAR now requires, in addition to previous requirements, several new actions in using and administering a cost-plus-award-fee contract. Attached are the pre and post Federal Acquisition Circular 2005-37 requirements for using and administering cost-plus-award-fee contracts. Changes to current Departmental guidance are being considered and will be disseminated in future communications.

  3. SR-02-04

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Security Police Competition Flag Ribbon Art Aiken, SC - The Wackenhut Services -Savannah River Site (WSI-SRS) was awarded the Secretary's Trophy for first place Security ...

  4. SR9913

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    10, 1999 Media Contact: Jim Giusti (803) 725-2889 DOE Initiates Investigation Into FB Line Worker Contamination Flag Ribbon Art Aiken, SC - The Department of Energy's Savannah ...

  5. SR-01-04

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Security Police Competition Flag Ribbon Art Aiken, SC -- The U.S. Department of Energy (DOE) and Wackenhut Services Incorporated (WSI) will host the 32nd Annual Security ...

  6. SR-02-02

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    NNSA Release Accident Investigation Report On TEF Construction Worker Accident Flag Ribbon Art Aiken, SC - The National Nuclear Security Administration's (NNSA) Savannah River Site ...

  7. SR0007

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Environmental Cleanup Technology Conference To Be Held Flag Ribbon Art The Savannah River Operations Office of the Department of Energy is hosting the Environmental Restoration ...

  8. SR0002

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    General Eugene Habiger, DOE Security Czar To Visit SRS Flag Ribbon Art General Eugene Habiger (USAF Retired), the Department of Energy's Security Czar and Director of Security and ...

  9. SR-05-04

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    NNSA And WSRC Reconition Of Progress In Key Tritium Facilities Flag Ribbon Art (Aiken, SC) -- Personnel from the National Nuclear Security Administration (NNSA) Savannah River Site ...

  10. SR0505

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Subcontract Awarded for MOX Facility Site Preparation Work Flag Ribbon Art Aiken, S.C. - The National Nuclear Security Administration's (NNSA) plutonium disposition program has ...

  11. SR0010

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1, 2000 Media Contact: Jim Giusti (803) 725-2889 DOE Hosts Radioactive Materials Transportation Workshop Flag Ribbon Art Note To Editors And News Directors: Aiken, SC - The ...

  12. SR0503

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Site Preparation Begins at Savannah River Site Flag Ribbon Art Aiken, S.C. - The National Nuclear Security Administration's (NNSA) plutonium disposition program today moved another ...

  13. SR-04-04

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Flag Ribbon Art Note to News Directors and Editors: AIKEN, S.C. (June 25, 2004)-The National Nuclear Security Administration (NNSA) Savannah River Site Office and Westinghouse ...

  14. Effluent fees: policy considerations on a source of revenue for infrastructure financing. Technical report

    SciTech Connect (OSTI)

    Casey, P.

    1988-01-01

    This project is part of the National Network for Environmental Management Studies conducted under the auspices of the Office of Cooperative Environmental Management - U.S. Environmental Protection Agency. With the phasing out of EPA's construction grants program and the implementation of State Revolving Funds (SRF's), it appears that more money will be needed for the financing of waste-water treatment facilities in the next twenty years. Infrastructure needs for waste-water treatment facilities will increase significantly due to required replacement and upgrading needs, while user fees may be significantly understated due to years of capital subsidies. With Federal seed capital for the SRF's stopping after 1994, alternative sources of funding will be necessary. An effluent fee program could both offer a way to make the polluter pay and provide a reliable financing mechanism for the SRF's. The paper discusses the experience of effluent fees in Europe, and proposes an effluent fee program that would provide needed capital to the State Revolving Fund. The fee would be tied into the National Pollutant Discharge Elimination System permits through gradual implementation. Various options for setting the fee and enforcement procedures are also discussed.

  15. Anomalous magnetic configuration of Mn{sub 2}NiAl ribbon and the role of hybridization in the martensitic transformation of Mn{sub 50}Ni{sub 50−x}Al{sub x} ribbons

    SciTech Connect (OSTI)

    Zhao, R. B.; Zhao, D. W.; Li, G. K.; Ma, L. E-mail: houdenglu@mail.hebtu.edu.cn; Zhen, C. M.; Hou, D. L. E-mail: houdenglu@mail.hebtu.edu.cn; Wang, W. H.; Liu, E. K.; Chen, J. L.; Wu, G. H.

    2014-12-08

    The magnetic configuration of Mn{sub 2}NiAl ribbon has been investigated. In contrast to Ni{sub 2}MnAl, the compound Mn{sub 2}NiAl with considerable disorder does exhibit ferromagnetism and, due to exchange interaction competition, both ferromagnetic and antiferromagnetic moment orientations can coexist between nearest neighbor Mn atoms. This is unexpected in Heusler alloys. Regarding the mechanism of the martensitic transformation in Mn{sub 50}Ni{sub 50−x}Al{sub x}, it is found that increasing the Al content results in an unusual change in the lattice constant, a decrease of the transformation entropy change, and enhancement of the calculated electron localization. These results indicate that the p-d covalent hybridization between Mn (or Ni) and Al atoms gradually increases at the expense of the d-d hybridization between Ni and Mn atoms. This leads to an increased stability of the austenite phase and a decrease of the martensitic transformation temperature. For 11 ≤ x ≤ 14, Mn{sub 50}Ni{sub 50−x}Al{sub x} ferromagnetic shape memory alloys are obtained.

  16. Payment Of the New Mexico Environment Department- Hazardous Waste Bureau Annual Business and Generation Fees Calendar Year 2011

    SciTech Connect (OSTI)

    Juarez, Catherine L.

    2012-08-31

    The purpose of this letter is to transmit to the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB), the Los alamos National Laboratory (LANL) Annual Business and Generation Fees for calendar year 2011. These fees are required pursuant to the provisions of New Mexico Hazardous Waste Act, Chapter 74, Article 4, NMSA (as amended). The Laboratory's Fenton Hill Facility did not generate any hazardous waste during the entire year, and is not required to pay a fee for calendar year 2011. The enclosed fee represents the amount for a single facility owned by the Department of Energy and co-operated by the Los Alamos National Security, LLC (LANS).

  17. Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

    SciTech Connect (OSTI)

    Devgun, Jas S.

    2013-07-01

    Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

  18. U.S. Department of Energy Office of Inspector General report on inspection of Westinghouse Savannah River Company fees for managing and operating the Savannah River Site

    SciTech Connect (OSTI)

    1995-08-03

    During the first five years of its contract with the Department of Energy, Westinghouse Savannah River Company was paid over $130 million in fees to manage and operate the Savannah River Site. Fees paid to Westinghouse steadily increased over the five year period. For example, fees paid for the last six months of this five year period were over three times as large as fees paid for the first six months. The purpose of this inspection was to review the Department`s annual negotiation of total available fees with Westinghouse, and to examine the reasons for the growth in fees over this five year period. The review disclosed that, after Fiscal Year 1989, the Department used an increasing number of fee bases in calculating Westinghouse Savannah River Company`s fixed-fee-equivalents from the maximum fee schedules within the Department of Energy Acquisition Regulation. The authors found that the Department had significantly increased the percentage of the dollar value of subcontracts being placed in Westinghouse`s fee bases for fee calculation purposes. They found that the Department had effectively increased Westinghouse`s fixed-fee-equivalents by approximately $3 million in both Fiscal Year 1993 and 1994 to, in large part, fund an unallowable employee incentive compensation program. They found that Westinghouse`s total paid fees for the five year period increased significantly over what they would have been had the terms resulting from the original competitive negotiations been maintained. The authors recommended that the Deputy Assist Secretary for Procurement and Assistance Management require that changes in either the number or composition of fee bases used in calculating fees from the maximum fee schedules be submitted to the Department`s Procurement Executive for approval.

  19. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015

    Energy.gov [DOE]

    DOE's Oak Ridge Environmental Management Office told URS | CH2M Oak Ridge LLC (UCOR) in a letter that it had completed its evaluation of the company's performance for the award fee period of April to September 2015 and determined that UCOR earned a fee of more than $4.4 million for the period.

  20. Paducah and DUF6 Award Fees Determined for Three Prime Contracts |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Paducah and DUF6 Award Fees Determined for Three Prime Contracts Paducah and DUF6 Award Fees Determined for Three Prime Contracts April 27, 2016 - 12:45pm Addthis A Swift & Staley heavy equipment operator loads a salt spreader at Paducah’s C-732 Salt Storage Facility. A Swift & Staley heavy equipment operator loads a salt spreader at Paducah's C-732 Salt Storage Facility. LEXINGTON, Ky. - EM has completed final performance evaluations of two prime

  1. Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Make Up For Lost Fuel Tax Revenue | Department of Energy 1: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue Fact #901: November 30, 2015 States Assessing Fees on Electric Vehicles to Make Up For Lost Fuel Tax Revenue SUBSCRIBE to the Fact of the Week The maintenance of our highways has traditionally been funded from a combination of Federal and state taxes collected at the pump from the sale of motor fuels. Because electric vehicles (EVs) do

  2. Section L Attachment I - Summary and Fee Sheet Amendment 000002.xlsx

    National Nuclear Security Administration (NNSA)

    I Summary and Fee Sheet Amendment 000002 Nevada National Security Site Management and Operating (M&O) Contract PROPOSED 2017 Mgt Team Costs 2018 Mgt Team Costs Subtotal $0 FEE CLIN 0001 - Management and Operation of NNSS Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 CLIN 0002 - Strategic Partnership Program Base Term Year 1 Year 2 Year 3 Year 4 Year 5 Option Term Year 1 Year 2 Year 3 Year 4 Year 5 Subtotal $0 TOTAL ALL $0 Mgt Team

  3. Office of Inspector General report on audit of Department of Energy management and operating contractor available fees

    SciTech Connect (OSTI)

    1996-05-01

    The Office of Procurement and Assistance Management has proposed changes to the method used to annually calculate and negotiate ``for profit`` management and operating contractor available fees. This proposal will increase contractor fees in exchange for the contractor`s purported assumption of additional risk. In 1991, the Department, through the Accountability Rule, increased contractor fees as an incentive to improve contractor performance and accountability. Despite the lack of measurable benefits of this effort, the Department is crafting a new fee policy which will, depending upon how it is executed, increase fees above the amount provided through the Accountability Rule as an incentive to the Department`s management and operating contractors. The objective of the audit was to determine whether the Department`s proposed change to the fee structure for determining management and operating contractor fees will be cost effective. This report describes the study`s approach, its findings and recommendations, management and auditor comments, and includes appendices with further data.

  4. EM’s West Valley Cleanup Contactor Receives 85 Percent of Available Fee Award

    Energy.gov [DOE]

    EST VALLEY, N.Y. – EM announced that the contractor at its West Valley Demonstration Project (WVDP) cleanup earned $250,000, or nearly 85 percent of the available fee award of $295,495 for the six-month period ending Feb. 29 this year.

  5. Ribbon cutting makes history

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    being built at the nation's capital were enlightening. I am sure Lawler Wood and Turner Construction personnel in the room must have swelled with pride to hear such grand...

  6. RESL Ribbon Cutting

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    INL Research Center in Idaho Falls, replaces an aging facility at the INL Site. Click on image to enlarge Click on image to enlarge Editorial Date August 25, 2010 By Brad Bugger...

  7. Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

  8. Equity of commercial low-level radioactive waste disposal fees. Report to Congress

    SciTech Connect (OSTI)

    1998-02-01

    In the Report accompanying the Fiscal Year 1997 Senate Energy and Water Development Appropriations Bill, the Senate Appropriations Committee directed the Department of Energy (DOE) to prepare a study of the costs of operating a low-level radioactive waste (LLW) disposal facility such as the one at Barnwell, South Carolina, and to determine whether LLW generators are paying equitable disposal fees. The disposal costs of four facilities are reviewed in this report, two operating facilities and two planned facilities. The operating facilities are located at Barnwell, South Carolina, and Richland, Washington. They are operated by Chem-Nuclear, LLC, (Chem-Nuclear), and US Ecology, Inc., (US Ecology), respectively. The planned facilities are expected to be built at Ward Valley, California, and Sierra Blanca, Texas. They will be operated by US Ecology and the State of Texas, respectively. This report found that disposal fees vary significantly among facilities for a variety of reasons. However, the information suggests that at each disposal facility, LLW generators pay equitable disposal fees.

  9. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  10. The public finance of a protective tariff: The case of an oil import fee

    SciTech Connect (OSTI)

    Bizer, D.S.; Stuart, C. Univ. of California, Santa Barbara )

    1987-12-01

    Recent debate has focused on the desirability of imposing an oil import fee or some broader tax on oil consumption in order to finance tax reform or for some other purposes. Optimal taxation requires that the government raise revenue using the tax instrument with the lowest efficiency cost per dollar of additional revenue. A highly stylized but conventional general-equilibrium model is used to evaluate the magnitude of this marginal efficiency cost for taxes on oil imports, oil consumption, and, as a reference for comparison, labor income.

  11. Magnetic properties of bulk, and rapidly solidified nanostructured (Nd1-xCex)2Fe14-yCoyB ribbons

    DOE PAGES-Beta [OSTI]

    Pathak, Arjun K.; Khan, M.; Gschneidner, Jr., K. A.; McCallum, R. W.; Zhou, L.; Sun, K.; Kramer, M. J.; Pecharsky, V. K.

    2015-11-06

    Magnetic properties of Ce and Co co-doped (Nd1-xCex)2Fe14-yCoyB compounds have been investigated both in bulk polycrystalline and rapidly solidified nanostructured ribbon forms. For certain Ce concentrations the materials exhibit spin re-orientation transitions below 140 K. The Curie temperatures, saturation magnetizations, and other magnetic properties relevant for applications as permanent magnets are controlled by Ce and Co substitutions for Nd and Fe, respectively. Most importantly, the results show that Ce, Co co-doped compounds are excellent replacements for several Dy-based high performance permanent magnets (dysprosium is one of the critical elements and is, therefore, in short supply). As a result, the highmore » temperature (>375 K) magnetic properties for Nd–Ce–Fe–Co–B based alloys show promise not only as a replacement for Dy-doped Nd2Fe14B permanent magnets, but the new alloys also require significantly lower amounts of Nd, which too is the critical element that can be replaced by a more abundant Ce.« less

  12. FOIA FEES

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2. Requestors who are representative of the news media: Responsible for reproduction costs after the first 100 pages. 3. Educational and non-commercial scientific institution ...

  13. Societal-Equity-Enhancing Criteria and Facility-Host Incentives Supporting Five Key Elements in the January 2012 Blue Ribbon Commission Report - 13015

    SciTech Connect (OSTI)

    Eriksson, Leif G.; Dials, George E.; George, Critz H.

    2013-07-01

    In February 2009, the Obama Administration announced it would abandon USA's only candidate SNF/HLW-disposal facility since 1987. In 2010, all related activities were stopped and the Blue Ribbon Commission on America's Nuclear Future was established 'to recommend a new strategy for managing the back end of the nuclear fuel cycle', which it did in January 2012, emphasizing eight key elements. However, Key Element 1, 'A new, consent-based approach to siting future nuclear facilities', is qualitative/indeterminate rather than quantitative/measurable. It is thus highly-susceptible to semantic permutations that could extend rather than, as intended, expedite the siting of future nuclear facilities unless it also defines: a) Whose consent is needed?; and b) What constitutes consent? The following 'generic', radiation-risk- and societal-equity-based criteria address these questions: 1. Identify areas affected by projected radiation and other health risks from: a. The proposed nuclear facility (facility stakeholders); and b. The related nuclear-materials-transportation routes (transportation stakeholders); then 2. Surround each stakeholder area with a buffer zone and use this enlarged foot print to identify: a. Stakeholder hosts; and b. Areas not hosting any stakeholder category (interested parties). 3. Define 'consent-based' as being at least 60 percent of the 'population' in the respective stakeholder category and apply this yardstick to both 'in favor' and 'against' votes. Although criteria 1 and 2 also need facility-based definitions to make Key Element 1 measurable, the described siting approach, augmented by related facility-host incentives, would expedite the schedule and reduce the cost for achieving Key Elements 4-6 and 8, politics permitting. (authors)

  14. 1986 Federal Interim Storage fee study: a technical and economic analysis

    SciTech Connect (OSTI)

    Not Available

    1986-09-01

    JAI examined alternative methods for structuring charges for federal interim storage (FIS) services and concluded that the combined interests of the Department and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with Section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under- or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

  15. 1985 Federal Interim Storage Fee Study: a technical and economic analysis

    SciTech Connect (OSTI)

    Not Available

    1985-09-01

    JAI examined alternative methods for structuring charges for FIS services and concluded that the combined interests of the Deaprtment and the users would be best served, and costs most appropriately recovered, by a two-part fee involving an Initial Payment upon execution of a contract for FIS services followed by a Final Payment upon delivery of the spent fuel to the Department. The Initial Payment would be an advance payment covering the pro rata share of preoperational costs, including (1) the capital costs of the required transfer facilities and storage area, (2) development costs, (3) government administrative costs including storage fund management, (4) impact aid payments made in accordance with section 136(e) of the Act, and (5) module costs (i.e., storage casks, drywells or silos). The Final Payment would be made at the time of delivery of the spent fuel to the Department and would be calculated to cover the sum of the following: (1) any under-or over-estimation in the costs used to calculate the Initial Payment of the fee (including savings due to rod consolidation), and (2) the total estimated cost of operation and decommissioning of the FIS facilities (including government administrative costs, storage fund management and impact aid). The module costs were included in the Initial Payment to preclude the possible need to obtain appropriations for federal funds to support the purchase of the modules in advance of receipt of the Final Payment. Charges for the transport of spent fuel from the reactor site to FIS facilities would be separately assessed at actual cost since these will be specific to each reactor site and destination.

  16. SR0207

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    30, 2002 Media Contact: Julie Petersen (803) 725-2889 Notice To Editors: DOE Releases SRS History Book Flag Ribbon Art WHO: U.S. Department of Energy (DOE) Savannah River ...

  17. SR9912

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    DOE Security Czar To Visit SRS August 18, 1999 Flag Ribbon Art General Eugene Habiger (USAF Ret.), the Department of Energy's Director of Security and Emergency Response will be at ...

  18. SR0111

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    4, 2001 Media Contact: Martha Merriweather (803) 725-2889 Dept. Of Energy Kicks Off Its 2001 Combined Federal Campaign Flag Ribbon Art AIKEN, SC - DOE employees at SRS begin their ...

  19. SR0103

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    7, 2001 Media Contact: James Giusti (803) 725-2889 Note to Editors and News Directors Flag Ribbon Art On May 8, media representatives are invited to observe the first shipment of ...

  20. SR0305

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    2, 2003 Media Contact: Jim Giusti (803) 725-2889 DOE Hosts Public Workshops on Historical Preservation of SRS' Cold War Resources Flag Ribbon Art Aiken, SC - The Department of ...

  1. SR0001

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    For Immediate Release January 12, 2000 Media Contact: Bill Taylor (803) 725-2889 Nuclear Security Oversight Panel Visits SRS As Part Of NSSA Tour Flag Ribbon Art Representatives ...

  2. SR0101

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    8, 2001 Media Contact: Bill Taylor (803) 725-2889 Savannah River Site's Martin Luther King, Jr., Day Observance Flag Ribbon Art Media organizations are invited to attend and cover ...

  3. SR0003

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    4, 2000 Media Contact: Bill Taylor (803) 725-2889 DOE To Present Savannah River Site's Upcoming Fiscal Year 2001 Budget Flag Ribbon Art Aiken, SC -- The public is invited to view ...

  4. SR0005

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 7, 2000 Media Contact: Rick Ford (803) 725-2889 Invitation To Cover Environmental Management Science Program National Workshop April 24-27 Flag Ribbon Art NOTE TO EDITORS AND ...

  5. Defect-Tolerant Diffusion Channels for Mg2+ Ions in Ribbon-Type Borates: Structural Insights into Potential Battery Cathodes MgVBO4 and Mgx Fe2–xB2O5

    DOE PAGES-Beta [OSTI]

    Bo, Shou-Hang; Grey, Clare P.; Khalifah, Peter G.

    2015-06-10

    The reversible room temperature intercalation of Mg2+ ions is difficult to achieve, but may offer substantial advantages in the design of next-generation batteries if this electrochemical process can be successfully realized. Two types of quadruple ribbon-type transition metal borates (MgxFe2-xB2O5 and MgVBO4) with high theoretical capacities (186 mAh/g and 360 mAh/g) have been synthesized and structurally characterized through the combined Rietveld refinement of synchrotron and time-of-flight neutron diffraction data. Neither MgVBO4 nor MgxFe2-xB2O5 can be chemically oxidized at room temperature, though Mg can be dynamically removed from the latter phase at elevated temperatures (approximately 200 - 500 °C). Findingsmore »show that Mg diffusion in the MgxFe2-xB2O5 structure is more facile for the inner two octahedral sites than for the two outer octahedral sites in the ribbons, a result supported by both the refined site occupancies after Mg removal and by bond valence sum difference map calculations of diffusion paths in the pristine material. Mg diffusion in this pyroborate MgxFe2-xB2O5 framework is also found to be tolerant to the presence of Mg/Fe disorder since Mg ions can diffuse through interstitial channels which bypass Fe-containing sites.« less

  6. Defect-Tolerant Diffusion Channels for Mg2+ Ions in Ribbon-Type Borates: Structural Insights into Potential Battery Cathodes MgVBO4 and Mgx Fe2–xB2O5

    DOE PAGES-Beta [OSTI]

    Bo, Shou-Hang; Grey, Clare P.; Khalifah, Peter G.

    2015-06-10

    The reversible room temperature intercalation of Mg2+ ions is difficult to achieve, but may offer substantial advantages in the design of next-generation batteries if this electrochemical process can be successfully realized. Two types of quadruple ribbon-type transition metal borates (MgxFe2-xB2O5 and MgVBO4) with high theoretical capacities (186 mAh/g and 360 mAh/g) have been synthesized and structurally characterized through the combined Rietveld refinement of synchrotron and time-of-flight neutron diffraction data. Neither MgVBO4 nor MgxFe2-xB2O5 can be chemically oxidized at room temperature, though Mg can be dynamically removed from the latter phase at elevated temperatures (approximately 200 - 500 °C). Findingsmore » show that Mg diffusion in the MgxFe2-xB2O5 structure is more facile for the inner two octahedral sites than for the two outer octahedral sites in the ribbons, a result supported by both the refined site occupancies after Mg removal and by bond valence sum difference map calculations of diffusion paths in the pristine material. Mg diffusion in this pyroborate MgxFe2-xB2O5 framework is also found to be tolerant to the presence of Mg/Fe disorder since Mg ions can diffuse through interstitial channels which bypass Fe-containing sites.« less

  7. Bi{sub 2}O{sub 3}CuOP{sub 2}O{sub 5} system: Two novel compounds built from the intergrowths oxocentered polycationic 1D-ribbons

    SciTech Connect (OSTI)

    Colmont, Marie; Endara, Diana; Aliev, Almaz; Terryn, Christine; Huv, Marielle; Mentr, Olivier

    2013-07-15

    Single crystals of two novel bismuth copper oxyphosphates were grown from a unique melt. They have been structurally characterized by means of single crystal X-Ray Diffraction (XRD). Bi{sub 29.4}Cu{sub 9.29}O{sub 32}(PO{sub 4}){sub 16}Cu{sub 2.63} (1) is orthorhombic, space group Pca2{sub 1}, a=33.0549(2)A, b=11.6991(4)A and c=5.2902(2)A, R{sub 1}=0.059 and wR{sub 2}=0.061. Bi{sub 37.2}Cu{sub 18.8}O{sub 44}(PO{sub 4}){sub 24}Cu{sub 5} (2) is orthorhombic, space group Pna2{sub 1}, a=11.6010(3)A, b=47.4384(5)A and c=5.267(2)A, R{sub 1}=0.0940 and wR{sub 2}=0.0981. Both compounds are formed of similar 1D building units (BUs) organized into two different 3D regular intergrowths mediated by phosphate groups. Here, the so-called 1D-BUs are infinite ribbons formed by edge-sharing O(Bi,M){sub 4} tetrahedra with n=4 and n=3 tetrahedra-wide units. Both compounds were analyzed from the viewpoint of their relationship with the parent ?-Bi{sub 2}O{sub 3} fluorite-like structure, where phosphorus atoms substitutes for some Bi sites. A non-exhaustive review of the related structural types is given. We have checked by second harmonic generacy (SHG) microscopy that the two non-centrosymmetric structures (despite polar subunits) lead to SHG before the samples are irreversibly damaged. - Graphical abstract: This paper reports the crystal structure of two new bismuth oxophosphate compounds. Both are built on the association of n=3 and 4 building unit ribbons surrounded by isolated PO4 tetrahedra and tunnels hosting Cu{sup 2+} cations. They come in addition to the numerous Bi-based compounds already pointed out. Once more, this is the proof of the richness of this crystal system. - Highlights: Two new bismuth oxophosphates were synthesized. Crystal structure were solved thanks to single crystal X-Ray diffraction. They show two different associations of n=3 and 4 ribbons built on [O,(Bi,M){sub 4}] tetrahedral sharing edges and surrounded by isolated PO4 groups. SHG microscopy

  8. The Environmental Protection Agency's Safety Standards for Disposal of Spent Nuclear Fuel: Potential Path Forward in Response to the Report of the Blue Ribbon Commission on America's Nuclear Future - 13388

    SciTech Connect (OSTI)

    Forinash, Betsy; Schultheisz, Daniel; Peake, Tom

    2013-07-01

    Following the decision to withdraw the Yucca Mountain license application, the Department of Energy created a Blue Ribbon Commission (BRC) on America's Nuclear Future, tasked with recommending a national strategy to manage the back end of the nuclear fuel cycle. The BRC issued its final report in January 2012, with recommendations covering transportation, storage and disposal of spent nuclear fuel (SNF); potential reprocessing; and supporting institutional measures. The BRC recommendations on disposal of SNF and high-level waste (HLW) are relevant to the U.S. Environmental Protection Agency (EPA), which shares regulatory responsibility with the Nuclear Regulatory Commission (NRC): EPA issues 'generally applicable' performance standards for disposal repositories, which are then implemented in licensing. For disposal, the BRC endorses developing one or more geological repositories, with siting based on an approach that is adaptive, staged and consent-based. The BRC recommends that EPA and NRC work cooperatively to issue generic disposal standards-applying equally to all sites-early in any siting process. EPA previously issued generic disposal standards that apply to all sites other than Yucca Mountain. However, the BRC concluded that the existing regulations should be revisited and revised. The BRC proposes a number of general principles to guide the development of future regulations. EPA continues to review the BRC report and to assess the implications for Agency action, including potential regulatory issues and considerations if EPA develops new or revised generic disposal standards. This review also involves preparatory activities to define potential process and public engagement approaches. (authors)

  9. Magnetic properties of bulk, and rapidly solidified nanostructured (Nd1-xCex)2Fe14-yCoyB ribbons

    SciTech Connect (OSTI)

    Pathak, Arjun K.; Khan, M.; Gschneidner, Jr., K. A.; McCallum, R. W.; Zhou, L.; Sun, K.; Kramer, M. J.; Pecharsky, V. K.

    2015-11-06

    Magnetic properties of Ce and Co co-doped (Nd1-xCex)2Fe14-yCoyB compounds have been investigated both in bulk polycrystalline and rapidly solidified nanostructured ribbon forms. For certain Ce concentrations the materials exhibit spin re-orientation transitions below 140 K. The Curie temperatures, saturation magnetizations, and other magnetic properties relevant for applications as permanent magnets are controlled by Ce and Co substitutions for Nd and Fe, respectively. Most importantly, the results show that Ce, Co co-doped compounds are excellent replacements for several Dy-based high performance permanent magnets (dysprosium is one of the critical elements and is, therefore, in short supply). As a result, the high temperature (>375 K) magnetic properties for Nd–Ce–Fe–Co–B based alloys show promise not only as a replacement for Dy-doped Nd2Fe14B permanent magnets, but the new alloys also require significantly lower amounts of Nd, which too is the critical element that can be replaced by a more abundant Ce.

  10. S. 42: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the Senate of the United States, One Hundredth First Congress, First Session, January 25, 1989

    SciTech Connect (OSTI)

    Not Available

    1989-01-01

    S. 42 is a bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products.

  11. Blue Ribbon Commission (BRC) Activities - SRSCRO

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    In 2009, the Obama administration canceled plans to build a permanent underground nuclear storage facility at Yucca Mountain in Nevada. The Department of Energy formed the ...

  12. Blue Ribbon Panel Recommendations Report Now Available

    Energy.gov [DOE]

    On March 22 and 23, 2011, the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy assembled a panel of geothermal experts in Albuquerque, New Mexico for a guided discussion on the future of geothermal energy in the U.S.

  13. EM Contractor Fee

    Office of Environmental Management (EM)

    Department of Energy Citizens Advisory Board Celebrates 20th Anniversary, Meets in Idaho EM Citizens Advisory Board Celebrates 20th Anniversary, Meets in Idaho September 30, 2014 - 12:00pm Addthis EM SSAB Chairs, Vice Chairs, and staff attend the September 2014 Chairs' meeting in Idaho Falls. EM SSAB Chairs, Vice Chairs, and staff attend the September 2014 Chairs' meeting in Idaho Falls. IDAHO FALLS, Idaho - The Environmental Management Site-Specific Advisory Board (EM SSAB) held its Chairs

  14. Defect-Tolerant Diffusion Channels for Mg2+ Ions in Ribbon-Type Borates: Structural Insights into Potential Battery Cathodes MgVBO4 and Mgx Fe2–xB2O5

    SciTech Connect (OSTI)

    Bo, Shou-Hang; Grey, Clare P.; Khalifah, Peter G.

    2015-06-10

    The reversible room temperature intercalation of Mg2+ ions is difficult to achieve, but may offer substantial advantages in the design of next-generation batteries if this electrochemical process can be successfully realized. Two types of quadruple ribbon-type transition metal borates (MgxFe2-xB2O5 and MgVBO4) with high theoretical capacities (186 mAh/g and 360 mAh/g) have been synthesized and structurally characterized through the combined Rietveld refinement of synchrotron and time-of-flight neutron diffraction data. Neither MgVBO4 nor MgxFe2-xB2O5 can be chemically oxidized at room temperature, though Mg can be dynamically removed from the latter phase at elevated temperatures (approximately 200 - 500 °C). Findings show that Mg diffusion in the MgxFe2-xB2O5 structure is more facile for the inner two octahedral sites than for the two outer octahedral sites in the ribbons, a result supported by both the refined site occupancies after Mg removal and by bond valence sum difference map calculations of diffusion paths in the pristine material. Mg diffusion in this pyroborate MgxFe2-xB2O5 framework is also found to be tolerant to the presence of Mg/Fe disorder since Mg ions can diffuse through interstitial channels which bypass Fe-containing sites.

  15. Extended write combining using a write continuation hint flag

    SciTech Connect (OSTI)

    Chen, Dong; Gara, Alan; Heidelberger, Philip; Ohmacht, Martin; Vranas, Pavlos

    2013-06-04

    A computing apparatus for reducing the amount of processing in a network computing system which includes a network system device of a receiving node for receiving electronic messages comprising data. The electronic messages are transmitted from a sending node. The network system device determines when more data of a specific electronic message is being transmitted. A memory device stores the electronic message data and communicating with the network system device. A memory subsystem communicates with the memory device. The memory subsystem stores a portion of the electronic message when more data of the specific message will be received, and the buffer combines the portion with later received data and moves the data to the memory device for accessible storage.

  16. Ejecta source and transport modeling in the FLAG hydrocode (Conference...

    Office of Scientific and Technical Information (OSTI)

    Resource Relation: Conference: MULTIMAT 2011: Int. Conf. on Num. Methods for Multi-Mat. Fluid Flows ; September 5, 2011 ; Arcachon, France Research Org: Los Alamos National ...

  17. 48 Star American Flag from Y-12 Plant in 1943

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    of the world. From the Manhattan Project to the Cold War to now waging the War on Terror, Y-12 has served a central role in supplying critical components for our nuclear...

  18. Ejecta source and transport modeling in the FLAG hydrocode (Conference...

    Office of Scientific and Technical Information (OSTI)

    Authors: Fung, Jimmy 1 ; Harrison, Alan K 1 ; Margulies, Jeremy 1 ; Chitanvis, Shirish 1 + Show Author Affiliations Los Alamos National Laboratory Publication Date: ...

  19. Progress in ejecta modeling in the FLAG code (u) (Conference...

    Office of Scientific and Technical Information (OSTI)

    A paper copy of this document is also available for sale to the public from the National Technical Information Service, Springfield, VA at www.ntis.gov. Authors: Harrison, Alan K ...

  20. Sweet Lake Geopressured-geothermal Project, Magma Gulf-Technadril/DOE Amoco Fee. Volume II. Surface installations reservoir testing. Annual report, February 28, 1981-February 10, 1982

    SciTech Connect (OSTI)

    Hoffman, K.S.

    1984-01-01

    The Magma Gulf-Technadril/Department of Energy Amoco Fee No. 1 (production) and salt water disposal wells were drilled in the period from August, 1980 to February 1981. Surface facilities were designed and constructed during March-June 1981. Flow testing began in June 1981 and continued until February, 1982. The Miogypsinoides interval contains seven discrete sands in the test well. These sands have been numbered 1 to 7, beginning at the top of the sequence. Data from wireline logs and core samples suggested that the first zone to be perforated should be Sand 5. Because of its high porosity and permeability, Sand 5 was thought to contain almost 50% of the total hydraulic capacity of the well. Flow testing of Sand 5 was performed in three stages, each of which is fully described in this report. Phase I was designed as an initial clean-up flow and a reservoir confirmation test. Phase II consisted of the reservoir limit determination test and lasted 17 days. Boundaries were confirmed which suggest that the Sweet Lake reservoir is fairly narrow, with boundaries on three sides, but is open in one direction with no closure for at least 4-1/4 miles. These boundaries approximate the shape of the graben in which the test well was drilled, but may or may not be directly related to the major faults forming the graben. Phase III testing was planned to be a long-term test at commercial design rates. Although Sand 5 alone would not support such rates, long-term production was demonstrated. Additional research not supported by DOE funding was also performed during the period covered by this report. This research, consisting of mud logging, micropaleontology, organic geochemistry, core analysis, and rock mechanics, is summarized in this report.

  1. H. R. 4662: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, April 22, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    A bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products was introduced and referred to the House Ways and Means Committee. The fee would apply to the first sale of crude or refined petroleum products following importation into the US and the first use. It exempts certain exports, but requires proof of eligibility for exemption. Sections of the bill outline procedures for determining prices and adjustments, the registration of affected parties, and penalties for non-compliance.

  2. S. 2886: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil or refined petroleum products. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, September 27, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    This bill amends Subtitle E of the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil or refined petroleum products. The bill inserts Chapter 54, which defines the rate of tax, procedures for its payment and for registration, and imposes penalties for non-compliance.

  3. S. 2779: a bill to amend the Internal Revenue Code of 1954 to impose a fee on the importation of crude oil and refined petroleum products to protect the national and energy security interests of the United States. Introduced in the Senate of the United States, Ninety-Ninth Congress, Second Session, August 15, 1986

    SciTech Connect (OSTI)

    Not Available

    1986-01-01

    The Energy Security Act of 1986 amends the Internal Revenue Code of 1954 to impose a fee on petroleum and petroleum product imports. The purpose is to protect the US national and energy security interests. The general tax rate shall be $4 per barrel, with a formula for reduction when the price is $18 or more. Exemptions include petroleum intended for export.

  4. QER- Comment of Christopher Fee

    Energy.gov [DOE]

    Until you stop subsidizing and worshipping at the altar of Big Energy, all this "We the people" crapola is just that. We no longer have. Democracy, Mr. Reed, because our government is owned by heartless men with big pockets. Sent from my iPhone. La dee freakin' da.

  5. SR0203

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    31, 2002 Media Contact: Julie Petersen (803) 725-2889 DOE Announces Availability Of Final EIS On SRS High-Level Waste Tank Closures Flag Ribbon Art AIKEN, SC; May 31 - The Department of Energy (DOE) Savannah River Site (SRS) announced today the availability of the Final Environmental Impact Statement (EIS) on the proposed closing of additional high-level waste (HLW) tanks at SRS. The EIS evaluated three alternatives regarding closure of the HLW tanks: (1) Stabilize Tanks; (2) Clean and Remove

  6. SR0304

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    12, 2003 Media Contact: Jim Giusti (803) 725-2889 NNSA Official Recognize Rapid Completion Of Key Tritium Processing Components Flag Ribbon Art AIKEN, S.C. (June 12)- Dr. Everet Beckner, Deputy Administrator for Defense Programs, of the National Nuclear Security Administration congratulated more than 200 craftsmen and other personnel who fabricated and installed the internals of the first two "gloveboxes" of the Site's new Tritium Extraction Facility, or TEF. This important work was

  7. SR9904

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 26, 1999 Media Contact: Bill Taylor (803) 725-2889 World's First Underground Waste Repository Begins Operations First Shipment of Transuranic Radioactive Waste Arrives at WIPP Flag Ribbon Art CARLSBAD, N.M. (March 26,1999) -- Energy Secretary Bill Richardson today announced that the first shipment of defense-generated transuranic radioactive waste arrived safely at the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP). Hundreds of people were on hand to watch this

  8. Amyloid-like ribbons of amelogenins in enamel mineralization

    DOE PAGES-Beta [OSTI]

    Carneiro, Karina M. M.; Zhai, Halei; Zhu, Li; Horst, Jeremy A.; Sitlin, Melody; Nguyen, Mychi; Wagner, Martin; Simpliciano, Cheryl; Milder, Melissa; Chen, Chun-Long; et al

    2016-03-24

    We report that enamel, the outermost layer of teeth, is an acellular mineralized tissue that cannot regenerate; the mature tissue is composed of high aspect ratio apatite nanocrystals organized into rods and inter-rod regions. Amelogenin constitutes 90% of the protein matrix in developing enamel and plays a central role in guiding the hierarchical organization of apatite crystals observed in mature enamel. To date, a convincing link between amelogenin supramolecular structures and mature enamel has yet to be described, in part because the protein matrix is degraded during tissue maturation. Here we show compelling evidence that amelogenin self-assembles into an amyloid-likemore » structure in vitro and in vivo. We show that enamel matrices stain positive for amyloids and we identify a specific region within amelogenin that self-assembles into β-sheets. Lastly, we propose that amelogenin nanoribbons template the growth of apatite mineral in human enamel. This is a paradigm shift from the current model of enamel development.« less

  9. ADVISORY: Blue Ribbon Commission on America's Nuclear Future...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Countries such as China, South Korea and India have recognized this and are making investments in nuclear power that are driving demand for nuclear technologies. Our choice is ...

  10. Blue Ribbon Commission on America's Nuclear Future Report to...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    It was cochaired by Rep. Lee H. Hamilton and Gen. Brent Scowcroft. Other Commissioners were Mr. Mark H. Ayers, the Hon. Vicky A. Bailey, Dr. Albert Carnesale, Sen. Pete Domenici, ...

  11. Task Force for Strategic Developments to Blue Ribbon Commission Recommendations

    Office of Environmental Management (EM)

    3. DOE Directives Requiring Central Technical Authority (CTA) Concurrence Prior to Any Revision or Cancellation DOE Directives 1 as of September 2016 (Corresponding archived Directives as listed in 2007 DOE O 410.1) Title Office of Primary Interest Responsible EM CNS Staff 1 DOE O 151.1D (DOE O 151.1C) Comprehensive Emergency Management System National Nuclear Security Administration (NA) Bill Weaver 2 DOE O 153.1 (DOE O 5530.3 Chg 1 ) Departmental Radiological Emergency Response Assets NA

  12. Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon...

    Office of Environmental Management (EM)

    are able to tour the houses, gather ideas to use in their own homes, and learn how energy-saving features can help them save money today. The overall winner will be...

  13. Electric Vehicle Ribbon Cutting Ceremony … August 14, 2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Patent and Trademark Office Federal Agency Workplace Charging Workshop October 19, 2016 Green at USPTO * Recycling * Energy-efficient Lighting * Telework USPTO Annual Green Fair ...

  14. Remarks by Federal Blue Ribbon Commission J. David Jameson ...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    I want to begin today by reiterating our region's continuing belief that the Administration's decision to halt work on Yucca Mountain is wrong headed and counter to the Nation's ...

  15. The Blue Ribbon Commission Offers Strong Step Forward

    Energy.gov [DOE]

    The interim report issued today is a strong step toward finding a workable solution to the challenges of the back end of the fuel cycle. The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future.

  16. Secretary of Energy Moniz Cuts Ribbon, Kicks Off Solar Decathlon...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    collegiate teams to design, build, and operate houses powered by the sun that are affordable, energy efficient, attractive, and easy to live in. "These inspiring collegiate ...

  17. SYMMETRY OF THE IBEX RIBBON OF ENHANCED ENERGETIC NEUTRAL ATOM...

    Office of Scientific and Technical Information (OSTI)

    English Subject: 79 ASTROPHYSICS, COSMOLOGY AND ASTRONOMY; ASYMMETRY; ATOMS; DETECTION; ENERGY DEPENDENCE; HELIOSPHERE; INTERSTELLAR SPACE; KEV RANGE; MAGNETIC FIELDS; PLASMA;...

  18. Task Force for Strategic Developments to Blue Ribbon Commission...

    Office of Environmental Management (EM)

    Planning Project Overview Used Nuclear Fuel Loading and Structural Performance Under Normal Conditions of Transport - Modeling, Simulation and Experimental Integration RD&D Plan...

  19. AMO's Kelly Visconti Joins Ribbon Cutting of $50 million Indiana...

    Energy Savers

    ... Professor of Engineering; Victor Smith, Indiana Secretary of Commerce; Leah ... Professor of Engineering; Victor Smith, Indiana Secretary of Commerce; Leah ...

  20. S. 65: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil and refined petroleum products. Introduced in the Senate of the United States, One Hundred Third Congress, First Session, January 21, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    S. 65 may be cited as the [open quotes]Domestic Petroleum Security Act of 1993.[close quotes] This Bill proposes a fee on imported crude oil or refined petroleum products. In general, Subtitle E of the Internal Revenue Code of 1986 is to be amended by adding at the end thereof the following new chapter: [open quotes]Chapter 55--Imported Crude Oil of Refined Petroleum Products.[close quotes] Section 5891 will be Imposition of Tax; Section 5892, Definitions; Section 5893, Registration; and Section 5894, Procedures, Returns, and Penalties.

  1. H. R. 838: A Bill to amend the Internal Revenue Code of 1986 to impose a fee on the importation of crude oil or refined petroleum products. Introduced in the House of Representatives, One Hundred Third Congress, First Session, February 4, 1993

    SciTech Connect (OSTI)

    Not Available

    1993-01-01

    H.R. 838 may be cited as the [open quotes]Energy Security Tax Act.[close quotes] The purpose of this Bill is to impose a fee on imported crude oil or refined petroleum products. In general, Subtitle E of the Internal Revenue Code of 1986 is to be amended by adding at the end thereof the following new chapter: [open quotes]Chapter 55--Imported Crude Oil, Refined Petroleum Products, and Petrochemical Feedstocks or Derivatives.[close quotes] Section 5886 will be concerned with Imposition of Tax; Section 5887 with Definitions; Section 5888 with Procedures, Returns, and Penalties; and Section 5890 with Adjustment for inflation.

  2. Logistics & Fees - Combustion Energy Frontier Research Center

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    are available to all participants. Participants may also choose to make arrangements to stay and dine at area hotels and restaurants. (1) Summer school dormitory facilities have...

  3. Revenue From Contractor Fees | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Better Buildings Neighborhood Program Sustainability Peer Exchange Call: Revenue from ... and Challenges for Program Sustainability Assessing Revenue Streams: What Is ...

  4. Federal Court Dismisses Waste Fee Challenges

    Energy.gov [DOE]

    The D.C. Circuit today dismissed petitions filed by the National Association of Regulatory Utility Commissioners (NARUC) and other entities seeking (1) to force the Department to issue an...

  5. FY2015AwardFeeApproved.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

  6. City of Asheville- Building Permit Fee Rebates

    Energy.gov [DOE]

    The City of Asheville offers rebates for building permits and plan reviews for certain renewable energy technologies and green building certifications for homes and mixed-use commercial buildings....

  7. UCOR fee determination letter (July 2016).pdf

    Energy Savers

    2016 Collegiate Wind Competition | Department of Energy Wind Program Announces New Round of Funding for 2016 Collegiate Wind Competition U.S. Department of Energy Wind Program Announces New Round of Funding for 2016 Collegiate Wind Competition October 30, 2014 - 5:30pm Addthis The U.S. Department of Energy's (DOE's) National Renewable Energy Laboratory today issued a Request for Proposals seeking teams of students to participate in the 2016 U.S. Department of Energy Collegiate Wind

  8. SR0014

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    November 30, 2000 Media Contact: Jim Giusti (803) 725-2889 Draft EIS Issued On Future Closures Of SRS High-Level Waste Tanks Flag Ribbon Graphic AIKEN, SC; November 30 - The Department of Energy (DOE) Savannah River Operations Office (SR) has published for public review and comment the Draft Environmental Impact Statement (EIS) on the proposed closing of additional high-level waste (HLW) tanks at the Savannah River Site (SRS). DOE-SR proposes to close the tank systems to protect human health and

  9. SR0205

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    19, 2002 Media Contact: Julie Petersen (803) 725-2889 DOE Announces Record Of Decision On SRS High-Level Waste Tank Closure Flag Ribbon Art AIKEN, SC -- The U.S. Department of Energy (DOE) announced that it has selected the Stabilize Tanks and Fill with Grout preferred alternative for additional closures of high-level waste tanks at the Savannah River Site (SRS). The Department's decision is outlined in a Record of Decision (ROD) published in today's Federal Register. An Environmental Impact

  10. SR9914

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    1, 1999 Media Contact: Bill Taylor (803) 725-2889 SRS Vehicles Begin Era Of Alternative Fuels Flag Ribbon Art Aiken S.C. (Sept. 28, 1999) - The Savannah River Site (SRS) began a new era of alternative fuel use today when special ethanol fuel became available in two 10,000 gallon fuel storage tanks that went into operation in the A and H areas. The E85 ethanol fuel, a mixture of 85 percent ethanol and 15 percent unleaded gasoline, will allow a new fleet of alternative fuel vehicles (AFV's) to

  11. Last Flag of the 2015 Green Racing Season | Department of Energy

    Energy.gov (indexed) [DOE]

    Oct. 11-Nov. 19, 2015 Golden, CO Information about the Lab-Corps cohort 1 teams, their technologies, and how Lab-Corps is helping the teams fine-tune their commercialization approaches are highlighted here. Argonne National Laboratory - Dynamic Aperture Argonne National Laboratory - Sonic LQ Idaho National Laboratory - ARAI Idaho National Laboratory - Switchable Polarity Solvent Forward Osmosis Lawrence Berkeley National Laboratory - Ring Burner Lawrence Livermore National Laboratory - C-BEST

  12. FLAG-SGH Sedov calculations (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    same physical dimensions as that for the 91 x 46 mesh, but consisting of increasing numbers of zones with refinement. Nominal mesh resolution: 91 x 46. Other mesh resolutions: 181 ...

  13. FLAG-SGH Sedov calculations (Technical Report) | SciTech Connect

    Office of Scientific and Technical Information (OSTI)

    Sponsoring Org: DOELANL Country of Publication: United States Language: English Subject: 97 MATHEMATICAL METHODS AND COMPUTING; DIMENSIONS; ENERGY SOURCES; RESOLUTION; SIMULATION; ...

  14. Ejecta modeling in the FLAG hydrocode (u) (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Authors: Fung, Jimmy 1 ; Harrison, Alan K 1 ; Margulies, Jeremy 1 ; Buttler, William T 1 ; Olson, Russell T 1 + Show Author Affiliations Los Alamos National Laboratory ...

  15. EM Celebrates Ribbon Cutting for New Biomass Plant at Savannah River Site

    Energy.gov [DOE]

    AIKEN, S.C. – Senior Advisor for Environmental Management David Huizenga and Under Secretary for Nuclear Security Thomas D’Agostino were among the officials who marked the operational startup of the Savannah River Site (SRS) Biomass Cogeneration Facility recently.

  16. DOE, State Officials Cut Ribbon for New WIPP Emergency Operations Center

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Oxy-Combustion Carbon Capture | Department of Energy DOE, Natural Resources Canada Announce Pilot Plant to Advance Oxy-Combustion Carbon Capture DOE, Natural Resources Canada Announce Pilot Plant to Advance Oxy-Combustion Carbon Capture October 18, 2016 - 3:30pm Addthis The U.S. Department of Energy (DOE) and Canada's Natural Resources Canada (NRCan) today announced the opening of a new 1 Megawatt Thermal (MWth) facility to test an advanced process to capture carbon dioxide (CO2) emissions

  17. Secretary Moniz's Remarks on "A Look Back on the Blue Ribbon...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    And all of them have major nuclear responsibilities. So it's something that just cuts ... risks focus on enrichment and reprocessing, for obvious reasons, as pathways to ...

  18. FY15FinalFeeDeterminationScorecard.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

  19. Microsoft Word - FY12 Fee Des.doc

    National Nuclear Security Administration (NNSA)

    NR0000031 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be

  20. SNLM448-FY2011Fee(12.7.11).pdf

    National Nuclear Security Administration (NNSA)

  1. MSA_FY2012_Award_Fee_Scorecard.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

  2. Policy Flash 2013-24 Fee Determinations: Requirement to Obtain...

    Energy.gov (indexed) [DOE]

    Requirement to Obtain Acquisition Executive's Input. Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance...

  3. EM Reviews Portsmouth, Paducah Site Contractor Performance, Determines Award Fees

    Energy.gov [DOE]

    LEXINGTON, Ky. – EM has completed annual performance evaluations of four prime contractors working on the deactivation, decontamination, and decommissioning of the former gaseous diffusion plants near Portsmouth, Ohio and Paducah, Kentucky.

  4. Award Fee Determination Scorecard Contractor: Centerra-Savannah...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The contractor will provide timely, accurate, reliable and actionable project and contractor cost, schedule, performance, risk, and forecast data, reports and information. This ...

  5. Local Option- Building Permit Fee Waivers for Renewable Energy Projects

    Energy.gov [DOE]

    Public Act 15-194 effective October 1st 2015, requires each municipality to incorporate residential solar photovoltaic systems on its building permit application process. The municipalities are...

  6. Contractor Fee Payments - Carlsbad Field Office | Department of Energy

    Office of Environmental Management (EM)

    Energy Contract Connections @ ChallengeHER, Norfolk VA, October 14 Contract Connections @ ChallengeHER, Norfolk VA, October 14 The U.S. Small Business Administration (SBA), Women Impacting Public Policy (WIPP), and American Express OPEN have partnered to host this special FREE contracting event for women business owners. American Express OPEN will hold a Contract Connections session at the ChallengeHER - Norfolk Event, on October 14th, 2014 at the Webb University Center, Norfolk, VA. Flyer

  7. Certificate of Public Good Application Fee Form | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    for in-state facilities under Sections 248a and 248 of Title 30. When applying for Public Service Board approval of an in-state facility under Sections 248a and 248, the...

  8. Award Fee Determination Scorecard Contractor: Mission Support Alliance, LLC (MSA)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    7.05 6.94 7.35 7.71 8.11 8.25 1973-2016 Alabama 10.20 10.63 10.62 11.31 11.74 11.88 1989-2016 Alaska 7.87 7.90 8.00 8.41 9.07 8.78 1989-2016 Arizona 9.74 9.07 8.78 8.70 8.72 8.62 1989-2016 Arkansas 7.23 6.97 7.23 7.35 7.02 7.28 1989-2016 California 8.18 7.19 7.35 7.44 8.08 8.76 1989-2016 Colorado 5.94 5.98 6.16 7.65 8.39 9.30 1989-2016 Connecticut 7.93 9.37 9.87 11.82 11.16 11.75 1989-2016 Delaware 8.79 9.33 10.03 10.87 11.51 12.11 1989-2016 District of Columbia 10.21 10.24 10.24 11.31 12.12

  9. Incentive Fee Determination Summary Contractor: Washington Closure Hanford LLC

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    5,557 5,025 1,826 4,649 2,302 525 905 473 Building floorspace (square feet) 1,001 to 5,000 2,777 2,422 824 2,192 925 106 299 108 5,001 to 10,000 1,229 1,120 396 1,045 517 99 201 94 10,001 to 25,000 884 832 311 786 427 140 181 112 25,001 to 50,000 332 322 135 308 194 74 96 61 50,001 to 100,000 199 194 89 189 138 53 71 48 100,001 to 200,000 90 89 45 85 65 30 34 28 200,001 to 500,000 38 37 20 37 30 17 18 17 Over 500,000 8 8 5 8 7 5 5 5 Principal building activity Education 389 389 97 382 176 57 50

  10. PERFORMANCE EVALUATION AND MEASUREMENT PLAN (PEMP) AWARD FEE...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... October 2012 - 30 September 2013 Item Justification Rating 1 Schedule Performance - The ... reports reflect monthly costs and show budgetschedule deviations at major milestones ...

  11. Nyseg non-residential adjustment fees? | OpenEI Community

    Open Energy Information (Open El) [EERE & EIA]

    MFC on Nyseg's site and each is less than 0.005kWh. That being said, the posted value matches my expectations more for high New York electricity rates (0.16kWh). Am I missing...

  12. Nuclear Nonproliferation and Arms Control Primer Prepared for the Blue Ribbon Commission on America’s Nuclear Future

    SciTech Connect (OSTI)

    Williams, Laura S.

    2011-05-25

    To provide a brief overview of key arms control and nonproliferation arrangements for the layperson that may be relevant to the Commission's comprehensive review of policies for managing the back end of the nuclear fuel cycle. Primer would be published by the Commission and made publicly available, probably as an appendix to a larger Commission report.

  13. L AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

    National Nuclear Security Administration (NNSA)

    ... This provisional fee payment is the only fee payment that will be made prior to the final fee determination. The final determination of fee will be made by the Fee Determining ...

  14. AIIEJIIDIENTOF IOLICITA~TIOit OF CONTRACT

    National Nuclear Security Administration (NNSA)

    ... This provisional fee payment is the only fee payment that will be made prior to the final fee determination. The final determination of fee will be made by the Fee Determining ...

  15. Total Estimated Contract Cost: Performance Period

    Office of Environmental Management (EM)

    FY2012 Fee Information Minimum Fee Maximum Fee September 2015 Contract Number: Cost Plus Incentive Fee Contractor: 3,264,909,094 Contract Period: EM Contractor Fee s Idaho...

  16. Reduced AC losses in HTS coated conductors

    DOE Patents [OSTI]

    Ashworth, Stephen P.

    2004-10-05

    Methods for reducing hysteresis losses in superconductor coated ribbons where a flux distribution is set into the superconductor coated ribbon prior to the application of alternating current.

  17. Microsoft Word - Appendix A - Annual Site Inspection Checklist...

    Office of Legacy Management (LM)

    flag and place flag marker in location of observation for follow up. Flag ID Evidence of Soil Erosion or Deposition Evidence of Cracks, Rills, Gullies Evidence of Sink Holes or...

  18. BPA-2014-01267-FOIA Request

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    - D-131 Subject: Case No FIA-14-0030 Follow Up Flag: Follow up Flag Status: Flagged Hi Kimm, Pursuant to the FOIA, I request all communication between the hearing officer and...

  19. Fermilab Today

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Extended forecast Weather at Fermilab Current Flag Status Flags at full staff Wilson Hall ... Wilson Hall Cafe menu Chez Leon Wednesday, Nov. 5 Lunch - Marinated flank steak - Parmesan ...

  20. Low-Cost Manufacturing of High-Efficiency, High-Reliability String Ribbon Si PV Modules: Final Subcontract Report, 24 June 2005 - 31 October 2008

    SciTech Connect (OSTI)

    Felton, L.

    2009-05-01

    Presents 2008 overall process improvements in adaptive thermal process, cut-on-the-fly manufacturing, and lamination.

  1. Secretary Moniz's Remarks on “A Look Back on the Blue Ribbon Commission on America’s Nuclear Future” at the Bipartisan Policy Center-- As Delivered

    Energy.gov [DOE]

    Secretary Moniz's remarks, as delivered, on Nuclear Waste Disposal at the Bipartisan Policy Center in Washington, D.C. on March 24, 2015.

  2. FY 2012 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    12 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2012 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  3. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    0 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  4. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    8 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  5. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    6 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  6. Section H: Special Contract Requirements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    .........14 H.17 Conditional Payment Of Fee Process ......H.17 Conditional Payment of Fee Process If the Fee Determining Official (FDO) or designee ...

  7. FY 2011 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2011 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2011 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  8. FY 2007 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2007 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2007 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  9. FY 2006 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2006 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2006 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  10. FY 2011 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2011 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2011 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  11. FY 2009 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2009 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2009 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  12. FY 2010 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2010 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2010 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  13. B

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ......... 6 B.8 AWARD FEE ADMINISTRATION ......Cost through Mod 364 10,895,964,333 Fee: A Final Fee Determination - Pre-Mod No. ...

  14. FY 2007 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2007 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2007 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  15. FY 2008 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2008 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2008 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  16. FY 2009 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2009 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2009 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  17. FY 2006 University of California (LLNL), PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2006 University of California (LLNL), PER Summary SUMMARY OF FY 2006 UNIVERISTY OF CALIFORNIA AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 4,300,000 ...

  18. FY 2008 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2008 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2008 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  19. FY 2006 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2006 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2006 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  20. FY 2009 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2009 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2009 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  1. FY 2011 Lawrence Livermore National Security, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2011 Lawrence Livermore National Security, LLC, PER Summary SUMMARY OF FY 2011 LAWRENCE LIVERMORE NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee ...

  2. FY 2008 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2008 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2008 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  3. FY 2010 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2010 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2010 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  4. FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2009 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2009 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  5. FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2011 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2011 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  6. FY 2007 National Security Technologies, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2007 National Security Technologies, LLC, PER Summary SUMMARY OF FY 2007 NATIONAL SECURITY TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  7. FY 2006 University of California (LANL), PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2006 University of California (LANL), PER Summary SUMMARY OF FY 2006 UNIVERSITY OF CALIFORNIA AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 5,800,000 ...

  8. FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary |...

    National Nuclear Security Administration (NNSA)

    FY 2010 Savannah River Nuclear Solutions, LLC, PER Summary SUMMARY OF FY 2010 SAVANNAH RIVER NUCLEAR SOLUTIONS, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  9. FY 2008 Washington Savannah River Company, LLC, PER Summary ...

    National Nuclear Security Administration (NNSA)

    FY 2008 Washington Savannah River Company, LLC, PER Summary SUMMARY OF FY 2008 WASHINGTON SAVANNAH RIVER COMPANY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned ...

  10. FY 2010 Los Alamos National Security, LLC, PER Summary | National...

    National Nuclear Security Administration (NNSA)

    FY 2010 Los Alamos National Security, LLC, PER Summary SUMMARY OF FY 2011 LOS ALAMOS NATIONAL SECURITY, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % ...

  11. Award Fee Evaluation Period 5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC

    Office of Environmental Management (EM)

    The Advanced Mixed Waste Treatment Facility Contract at the Idaho National Engineering and Environmental Laboratory DOE/IG-0622 September 2003

    Modernization of Tritium Requirements Systems DOE/IG-0632 December 2003

    Operations The Los Alamos Neutron Science Center DOE/IG-0666 November 2004

    Use and Management of Mobile Communications Services DOE/IG-0669 December 2004

    Report on Management Controls Over Contractor Tuition Reimbursements for Courses Leading to Degrees at

  12. DOE Rates EM's Savannah River Site Contractor as 'Very Good' in Fee

    Energy Savers

    2020 | Department of Energy Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by 2020 DOE Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by 2020 February 4, 2011 - 12:05pm Addthis U.S. Energy Secretary Steven Chu today announced additional details of the Department of Energy's "SunShot" initiative to reduce the total costs of photovoltaic solar energy systems by about 75% so that they are cost competitive at large scale with other forms of

  13. FISCAL YEAR 2016 A WARD FEE PLAN For BWXT Conversion Services, LLC

    Office of Environmental Management (EM)

    October 31, 2013 Mr. Christopher Lawrence Office of Electricity Delivery and Energy Reliability (OE-20) U.S. Department of Energy 1000 Independence Avenue, SW Washington, DC 20585 Submitted electronically via email to: Christopher.Lawrence@hq.doe.gov Re: Department of Energy - Improving Performance of Federal Permitting and Review of Infrastructure Projects, Request for Information, 78 Fed. Reg. 53436 (Aug. 29, 2013) Dear Mr. Lawrence: I. INTRODUCTION Western Energy Supply and Transmission

  14. FY15 Award Fee Determination Scorecard Contractor: B&W Conversion Services, LLC

    Office of Environmental Management (EM)

    6 Congressional Budget Request for OE FY 2016 Congressional Budget Request for OE OE drives electric grid modernization and resiliency in the energy infrastructure through research, partnerships, facilitation, modeling and analytics, and emergency preparedness. The FY 2016 request reflects the Administration's priority on modernizing the electric grid and boosting the resilience of infrastructure. The request accelerates ongoing efforts to support the Administration's all-of-the-above energy

  15. Microsoft Word - DRAFT FY15 Award Fee Plan LATA - 09-19-2014 clean

    Office of Environmental Management (EM)

    Inspections and Special Inquiries Inspection Report Internal Controls Over Sensitive Compartmented Information Access for Selected Field Intelligence Elements DOE/IG-0796 July 2008 INTERNAL CONTROLS OVER SENSITIVE COMPARTMENTED INFORMATION ACCESS FOR SELECTED FIELD INTELLIGENCE ELEMENTS TABLE OF CONTENTS OVERVIEW Introduction and Objective 1 Observations and Conclusions 2 DETAILS OF FINDINGS Background 3 Database Issues 3 Improper Facility Access 4 Los Alamos SCI Access Authorization Termination

  16. Microsoft Word - FPDP Award Fee Plan 2015-2016 Rev 4 (Final) (2)

    Office of Environmental Management (EM)

    0000131 Final 10-11-09.docx Microsoft Word - FOA 0000131 Final 10-11-09.docx Microsoft Word - FOA 0000131 Final 10-11-09.docx (230.58 KB) More Documents & Publications Microsoft Word - rDE-FOA-0000080.rtf Recovery Act: Clean Coal Power Initiative Microsoft Word - vDE-FOA-0000042.rtf

    cover sheet.doc Microsoft Word - FOA cover sheet.doc Microsoft Word - FOA cover sheet.doc (506.57 KB) More Documents & Publications Vehicle Technologies Office Merit Review 2014: Moving North Texas Forward

  17. Fee Waiver and Reduction Criteria | U.S. DOE Office of Science...

    Office of Science (SC) [DOE]

    Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker ... likely result from the release of the documents requested; The existence and magnitude ...

  18. Policy Flash 2014-08 ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE

    Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy Division, Office of Policy, Office Acquisition and Project Management at ...

  19. How to find fees, taxes, and other charges built into rate in...

    Open Energy Information (Open El) [EERE & EIA]

    and other charges built into rate in different locations Home > Groups > Utility Rate Hi, I am looking to find the rate charges beyond demand, generation, and transmission that...

  20. Fees in the Section 106 Review Process (ACHP, 2011) | Department of Energy

    Energy Savers

    6 1.0 PURPOSE Within the Office of Independent O\,ersight, the Office of Environment, Safety and Health (ES&H) Evaluations' mission is to assess the effectiveness of those environment, safety, and health systems and practices used by field organizations in implementing Integrated Safety Management and to provide clear, concise, and independent evaluatio~ls of performance in protecting our workers, the public, and the environment from the hazards associated with Department of Energy (DOE)

  1. 1988 Federal Interim Storage Fee study: A technical and economic analysis

    SciTech Connect (OSTI)

    Not Available

    1988-11-01

    This document is the latest in a series of reports that are published annually by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). The information in this report, which was prepared by E.R. Johnson Associates, Inc., under subcontract to PNL, will be used by the DOE to establish a payment schedule for interim storage of spent nuclear fuel under the Federal Interim Storage (FIS) Program. The FIS Program was mandated by the Nuclear Waste Policy Act of 1982. The information will be used to establish the schedule of charges for FIS services for the year commencing January 1, 1989. 13 refs.

  2. FY14 AWARD FEE DETERMINATION SCORECARD Contractor: Wastren-EnergX...

    Office of Environmental Management (EM)

    for the period. Significant Achievements: * Received the Federal Electronic Challenge Gold Award illustrating the site's commitment to sustainability. * Deployed the Virtual...

  3. Award\tFee\tDetermination\tScorecard Contractor: Savannah River...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... The lack of a functioning EVMS inhibited the ability to understand the true extent of cost ... While this causes no eminent danger to operations, it forces us to take a more ...

  4. HPMC_FY14_Performance_Assessment-Performance_Fee_Determination.pdf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

  5. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    15 (Fixed Fee) 346,377,995 Fee Information 2,039,246 EM Contractor Fee Oak Ridge Office - Oak Ridge, TN Transuranic Waste Processing Contract September 2015 Cost Plus Award Fee...

  6. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    350,000 Cumulative Fee 1,950,000 564,955 HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information 0 October 1, 2012 - September 30, 2014 EM Contractor Fee...

  7. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cost (Price of base): Contract Base Period: Contract Option Period: Minimum Fee Maximum Fee (Base Only) Performance Period Fee Available Fee Earned FY2012 15,763,807 15,087,078...

  8. Process for fabricating continuous lengths of superconductor

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    1998-01-01

    A process for manufacturing a superconductor. The process is accomplished by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon, overlaying a continuous length of a second substrate ribbon on said first substrate ribbon, and applying sufficient pressure to form a bound layered superconductor precursor between said first substrate ribbon and said second substrates ribbon. The layered superconductor precursor is then heat treated to form a super conductor layer.

  9. Performance Evaluation and Measurement Plan

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ......... 4 PEMP ORGANIZATION Fee Determining Official ... Evaluation and Measurement Plan (PEMP) is an award fee plan containing both ...

  10. U. S. Department of Energy Savannah River Operations Office - Contractor

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Performance Contractor Performance Contractor Performance SRNS FY 15 Award Fee Determination Scorecard Adobe Acrobat PDF FY 14 Award Fee Determination Scorecard Adobe Acrobat PDF FY 13 Award Fee Determination Scorecard Adobe Acrobat PDF Award Fee Determination for FY 13 Adobe Acrobat PDF Award Fee Determination for FY 12 Adobe Acrobat PDF Award Fee Determination for FY 11 Adobe Acrobat PDF Award Fee Determination for FY 10 Adobe Acrobat PDF Award Fee Determination for FY 09 Adobe Acrobat PDF

  11. Comprehensive Fuel Cycle - Community Perspective - 13093

    SciTech Connect (OSTI)

    McLeod, Richard V.; Frazier, Timothy A.

    2013-07-01

    Should a five-county region surrounding the Department of Energy's Savannah River Site ('SRS') use its assets to help provide solutions to closing the nation's nuclear fuel cycle? That question has been the focus of a local ad hoc multi-disciplinary community task force (Tier I) that has been at work in recent months outlining issues and identifying unanswered questions to determine if assuming a leadership role in closing the nuclear fuel cycle is in the community's interest. If so, what are the terms and conditions under which we the community would agree to participate? Our starting point was the President's Blue Ribbon Commission on America's Nuclear Future ('Commission') which made a total of eight (8) recommendations in its final report. There are several recommendations that are directly relevant to the Tier I group and potential efforts of the Region. These are the 'consent-based approach', the creation of an independent nuclear waste management entity funded from the existing nuclear waste fee; the 'prompt efforts to develop one or more consolidated storage facilities', and 'continued U.S. innovation in nuclear energy technology and for workforce development'. (authors)

  12. Displaced capillary dies

    DOE Patents [OSTI]

    Kalejs, Juris P. (Wellesley, MA); Chalmers, Bruce (Falmouth, MA); Surek, Thomas (Englewood, CO)

    1982-01-01

    An asymmetrical shaped capillary die made exclusively of graphite is used to grow silicon ribbon which is capable of being made into solar cells that are more efficient than cells produced from ribbon made using a symmetrically shaped die.

  13. Displaced capillary dies

    DOE Patents [OSTI]

    Kalejs, Juris P. (Wellesley, MA); Chalmers, Bruce (Falmouth, MA); Surek, Thomas (Englewood, CO)

    1984-01-01

    An asymmetrical shaped capillary die made exclusively of graphite is used to grow silicon ribbon which is capable of being made into solar cells that are more efficient than cells produced from ribbon made using a symmetrically shaped die.

  14. Washington: Putting More Solar on More Rooftops in Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    with a ribbon cutting at the Auto-Spa car wash. Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  15. EERE Success Story-Washington: Putting More Solar on More Rooftops...

    Energy.gov (indexed) [DOE]

    with a ribbon cutting at the Auto-Spa car wash. Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  16. World's First Fuel Cell Cargo Trucks Deployed at Memphis International...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A ribbon-cutting ceremony was held on April 9 to mark the kickoff of the two-year ... The ribbon cutting ceremony was hosted by FedEx Express and attended by U.S. Congressman ...

  17. Contractor: Swift & Staley, Inc. Contract: DE-AC30-10CC40021

    Office of Environmental Management (EM)

    Swift & Staley, Inc. Contract: DE-AC30-10CC40021 Award Fee Evaluation Determination Scorecard Award Fee Evaluation Period: October 1, 2014- November 30, 2015 Basis of Evaluation: Award Fee Plan Fiscal Year 2015, for Swift & Staley, Inc. (SSI) Categories of Performance: Subjective: $2,406,548 PBI: $912,046 Award Fee Available : $ 3,318,594 Award Fee Earned: $2,982,881 (89.9%) Categories of Performance Award Fee Award Fee Area Adjectival Ratings Fee Available : 73% of total available fee

  18. Investigation and evaluation of geopressured-geothermal wells. Final report, Tenneco Fee N No. 1 Well Terrebonne Paris, Louisiana

    SciTech Connect (OSTI)

    Dobson, R.J.; Hartsock, J.H.; McCoy, R.L.; Rodgers, J.A.

    1980-09-01

    The reservoir conditions that led to the choice of this well as the fifth well of opportunity are described as well as the attempts to complete the well for high-volume brine production. Individual opinions concerning underlying and conributing causes for the liner failure which aborted the completion attempt are included. (MHR)

  19. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Energy Savers

    Fee Target Fee Maximum Fee Performance Period Fee Available (NA) Fee Earned FY2002 15,829 FY2003 523,056 FY2004 276,342 FY2005 941,713 FY2006 2,856,570 FY2007 2,972,377 ...

  20. AES Appendix SFA-1

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.- Flag...

  1. EFS Appendix SFA-1

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    for U.S.-Flag Air Carriers (Jun 2003) Applies if performance of subcontract may involve international air transportation. FAR 52.247-64 Preference for Privately Owned U.S.-Flag...

  2. Interactive Jobs

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The following command requests 2 nodes using the interactive queue. hopper% qsub -I -q debug -l mppwidth48 The -I flag specifies an interactive job. The -q flag specifies the...

  3. Fermilab Today

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Secon Level 3 Current Flag Status Flags at full-staff Wilson Hall Cafe Monday, Aug. 27 - ... wrap - Breakfast pizza - Creole jambalaya Wilson Hall Cafe Menu Chez Leon Wednesday, Aug. ...

  4. --No Title--

    U.S. Energy Information Administration (EIA) (indexed site)

    Flags for HVAC, Lighting and Shell Conservation Features (cb86f14.csv) Ques- tion- ... Flags for HVAC, Lighting, and Shell Conservation Features (cb86f14.csv) (continued) ...

  5. DISCLAIMER

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... C tempthermoelectriccoolin gplate Physical temperature of thermoelectric cooling plate C 5.1.4 Data Quality Flags Data quality flags are named qc fieldname' (i.e. qctbsky1). ...

  6. THE 2011 FEBRUARY 15 X2 FLARE, RIBBONS, CORONAL FRONT, AND MASS EJECTION: INTERPRETING THE THREE-DIMENSIONAL VIEWS FROM THE SOLAR DYNAMICS OBSERVATORY AND STEREO GUIDED BY MAGNETOHYDRODYNAMIC FLUX-ROPE MODELING

    SciTech Connect (OSTI)

    Schrijver, Carolus J.; Title, Alan M.; Aulanier, Guillaume; Pariat, Etienne; Delannee, Cecile E-mail: title@lmsal.com E-mail: etienne.pariat@obspm.fr

    2011-09-10

    The 2011 February 15 X2.2 flare and associated Earth-directed halo coronal mass ejection were observed in unprecedented detail with high resolution in spatial, temporal, and thermal dimensions by the Atmospheric Imaging Assembly (AIA) on the Solar Dynamics Observatory, as well as by instruments on the two STEREO spacecraft, then at near-quadrature relative to the Sun-Earth line. These observations enable us to see expanding loops from a flux-rope-like structure over the shearing polarity-inversion line between the central {delta}-spot groups of AR 11158, developing a propagating coronal front ('EIT wave'), and eventually forming the coronal mass ejection moving into the inner heliosphere. The observations support the interpretation that all of these features, including the 'EIT wave', are signatures of an expanding volume traced by loops (much larger than the flux rope only), surrounded by a moving front rather than predominantly wave-like perturbations; this interpretation is supported by previously published MHD models for active-region and global scales. The lateral expansion of the eruption is limited to the local helmet-streamer structure and halts at the edges of a large-scale domain of connectivity (in the process exciting loop oscillations at the edge of the southern polar coronal hole). The AIA observations reveal that plasma warming occurs within the expansion front as it propagates over quiet Sun areas. This warming causes dimming in the 171 A (Fe IX and Fe X) channel and brightening in the 193 and 211 A (Fe XII-XIV) channels along the entire front, while there is weak 131 A (Fe VIII and Fe XXI) emission in some directions. An analysis of the AIA response functions shows that sections of the front running over the quiet Sun are consistent with adiabatic warming; other sections may require additional heating which MHD modeling suggests could be caused by Joule dissipation. Although for the events studied here the effects of volumetric expansion are much more obvious than true wave phenomena, we discuss how different magnetic environments within and around the erupting region can lead to the signatures of either or both of these aspects.

  7. ARM - Datastreams - mwrhf

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    flag None surfacerainflag ( time ) Ambient surface relative humidity % surfacerelativehumidity ( time ) Ambient surface temperature degC surfacetemperature ( time ) Microwave...

  8. ARM - Datastreams - aosaeth2spot

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    carbon concentration for spot 2 uncorrected for loading factors ngm3 equivalentblackcarbonspot2uncorrected ( time, wavelength ) Aethalometer instrument flags unitless...

  9. Interconnection Standards

    Energy.gov [DOE]

    Fees for interconnection requests increase with each Level. A Level 1 request must submit $50 fee; a Level 2 request must submit a fee of $50 plus $1/kW of generator capacity; a Level 3 request m...

  10. Major Contracts Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contracts Summary Major Contracts Summary Major Contracts Summary (267.71 KB) More Documents & Publications Contractor Fee Payments - Oak Ridge Operations Contractor Fee Payments - Idaho Operations Office Contractor Fee Payments - Office of River Protection

  11. Total Estimated Contract Cost: Contract Option Period: Performance

    Office of Environmental Management (EM)

    Contractor: Bechtel National Inc. Contract Number: DE-AC27-01RV14136 Contract Type: Cost Plus Award Fee NA Maximum Fee 599,588,540 Fee Available 102,622,325 10,868,785,789...

  12. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Cumulative Fee 5,985,266 2,636,218 5,985,266 Portage, Inc. DE-DT0002936 NA Cost Plus Award Fee 131,545,597 November 4, 2011 - September 30, 2016 0 EM Contractor Fee...

  13. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Energy.gov (indexed) [DOE]

    Cumulative Fee 570,363,260 394,157,083 EM Contractor Fee Savannah River Site Office, Aiken, SC Management & Operating Contract June 2015 DE-AC09-08SR22470 Cost Plus Award Fee...

  14. FY 2010 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2010 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2010 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 49,850,664 ...

  15. FY 2007 BWXT Pantex, LLC, PER Summary | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    FY 2007 BWXT Pantex, LLC, PER Summary SUMMARY OF FY 2007 BWXT PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 33,395,888 30,676,159 91.9% BWXT Pantex, the ...

  16. FY 2006 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2006 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2006 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 44,662,551 ...

  17. FY 2007 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2007 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2007 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 45,794,393 ...

  18. FY 2008 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2008 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2008 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 51,713,121 ...

  19. FY 2010 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2010 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2010 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 37,618,000 ...

  20. FY 2009 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2009 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2009 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 49,731,271 ...

  1. FY 2008 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2008 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2008 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 36,114,000 ...

  2. FY 2009 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2009 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2009 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 33,478,579 ...

  3. FY 2011 Babcock & Wilcox Technical Services Pantex, LLC, PER...

    National Nuclear Security Administration (NNSA)

    FY 2011 Babcock & Wilcox Technical Services Pantex, LLC, PER Summary SUMMARY OF FY 2011 B&W PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 34,878,800 ...

  4. FY 2006 BWXT Pantex, LLC, PER Summary | National Nuclear Security...

    National Nuclear Security Administration (NNSA)

    FY 2006 BWXT Pantex, LLC, PER Summary SUMMARY OF FY 2006 BWXT PANTEX AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 29,875,417 27,501,337 92.1% BWXT Pantex, the ...

  5. FY 2007 University of California, PER Summary | National Nuclear...

    National Nuclear Security Administration (NNSA)

    FY 2007 University of California, PER Summary SUMMARY OF FY 2007 UNIVERSITY OF CALIFORNIA AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 4,300,000 3,956,000 92% ...

  6. FY 2011 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary...

    National Nuclear Security Administration (NNSA)

    FY 2011 Babcock & Wilcox Technical Services Y-12, LLC, PER Summary SUMMARY OF FY 2011 B&W Y-12 AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % 52,532,710 ...

  7. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Electric Vehicle (EV) Annual Fee The owner of an EV that does not rely on a non-electric source of power must pay a fee of 130 in addition to any other required registration fees ...

  8. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Drive Vehicle Fee In addition to standard registration fees, plug-in electric vehicle owners must pay an annual fee of 140 and hybrid electric vehicle owners must pay an annual ...

  9. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Plug-In Electric Vehicle (PEV) Fee PEV owners must pay an annual fee of 50, in addition to other registration fees, for a PEV decal. The decal will authorize PEV owners to use ...

  10. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Plug-In Electric Vehicle (PEV) Registration Fees Beginning January 2017, PEVs, are subject to an increased vehicle registration fee. These fees apply to all-electric vehicles (EVs) ...

  11. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Plug-In Electric Vehicle (PEV) Fee All-electric vehicle operators must pay an annual vehicle registration renewal fee of 100. This fee expires if the legislature imposes a vehicle ...

  12. Apparatus for fabricating continuous lengths of superconductor

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    2001-01-01

    A process and apparatus for manufacturing a superconductor. The process is accomplished by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon, overlaying a continuous length of a second substrate ribbon on said first substrate ribbon, and applying sufficient pressure to form a bound layered superconductor comprising a layer of said superconducting precursor powder between said first substrate ribbon and said second substrates ribbon. The layered superconductor is then heat treated to establish the superconducting phase of said superconductor precursor powder.

  13. Apparatus for fabricating continuous lengths of superconductor

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    2002-01-01

    A process and apparatus for manufacturing a superconductor. The process is accomplished by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon, overlaying a continuous length of a second substrate ribbon on said first substrate ribbon, and applying sufficient pressure to form a bound layered superconductor comprising a layer of said superconducting precursor powder between said first substrate ribbon and said second substrates ribbon. The layered superconductor is then heat treated to establish the superconducting phase of said superconductor precursor powder.

  14. Continuous lengths of oxide superconductors

    DOE Patents [OSTI]

    Kroeger, Donald M.; List, III, Frederick A.

    2000-01-01

    A layered oxide superconductor prepared by depositing a superconductor precursor powder on a continuous length of a first substrate ribbon. A continuous length of a second substrate ribbon is overlaid on the first substrate ribbon. Sufficient pressure is applied to form a bound layered superconductor precursor powder between the first substrate ribbon and the second substrate ribbon. The layered superconductor precursor is then heat treated to establish the oxide superconducting phase. The layered oxide superconductor has a smooth interface between the substrate and the oxide superconductor.

  15. Contract No. DE-AC27-OIRV14136

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Evaluation and Measurement Plan (PEMP) determination made for Award Fee Period ... Evaluation and Measurement Plan (PEMP) determination made for Award Fee Period ...

  16. The following revisions are included in this modification:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    9 B.8 FEE DETERMINATION AND PAYMENT ......13 B.12 DEAR 970.5215-3, CONDITIONAL PAYMENT OF FEE, PROFIT, AND OTHER INCENTIVES - ...

  17. SECTIONS B THROUGH H

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    B-9 B.8 FEE DETERMINATION AND PAYMENT ......B-13 B.12 DEAR 970.5215-3, CONDITIONAL PAYMENT OF FEE, PROFIT, AND OTHER INCENTIVES - ...

  18. G

    Energy.gov (indexed) [DOE]

    Subject: Provisional Payment of Fee References: FAR Part 16 Types of Contracts FAR ... considering providing for provisional payment of fee under their non management and ...

  19. Acquisition Letter No. AL 2014-02 | Department of Energy

    Energy Savers

    SUBJECT: ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE SUMMARY: The subject Acquisition Letter's purpose is to provide guidance on provisional payment of fee for non ...

  20. FEDERAL ACQUISITION CIRCULAR 2005-38 SUMMARY Item Subject FAR...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notification of Employee Rights Concerning Payment of Union Dues or Fees. I1 ...... of Employee Rights Concerning Payment of Union Dues or Fees (FAR Case 2009-017) ...

  1. SF6432-CR (02-01-13) Cost Reimbursement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    OF POTENTIAL DELAY ORDER OF PRECEDENCE PAYMENT PERFORMANCE EVALUATION PROGRAM PRICING OF ... ALLOWABLE COSTS AND FEE (a) Payment for allowable cost as hereinafter defined, and of fee, ...

  2. Part II: Section B - Supplies, Services, and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ......... 2 B.5 Provisional Payment of Performance Fee ......B.5 Provisional Payment of Performance Fee The Contractor may, subject to the approval of ...

  3. Section B: Supplies, Services and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    .........3 B.5 Provisional Payment of Performance Fee......B.5 Provisional Payment of Performance Fee The Contractor may, subject to the approval of ...

  4. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contract Option Period: Minimum Fee Target Fee Maximum Fee Performance Period Fee Available Fee Earned FY2016 $10,640,886 $0 FY2017 $10,200,736 $0 Cumulative Fee $20,841,622 $0 EM Contractor Fee Los Alamos Los Alamos Legacy Cleanup Bridge Contract September 2016 $20,841,622 CPAF Los Alamos National Security LLC $319,151,570 DE-EM0003528 $0 Fee Information September 30, 2015 - September 30, 2016 $0 October 1, 2016 - September 30, 2017 (Option Period

  5. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Contract Option Period: Minimum Fee Maximum Fee Performance Period Fee Availability Fee Earned FY2013 $300,000 $284,250 FY2014 $310,000 $280,705 FY2015 $320,000 $287,680 FY2016 $330,000 FY2017 $340,000 FY2018 $350,000 Cumulative Fee $1,950,000 $852,635 HPM Corporation DE-EM0002043 Firm Fixed Price Plus Award Fee Fee Information $0 October 1, 2012 - September 30, 2014 EM Contractor Fee Richland Operations Office - Richland, WA Occupational Medical Services at Hanford September 2016 $100,100,000

  6. BPA-2011-00940-FOIA Request

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    photocopies Type of Requester (if provided): An individual seeking information for personal use and not for commercial use. Fees and Fee Waivers: I request a waiver or...

  7. Honeywell FM&T, LLC

    National Nuclear Security Administration (NNSA)

    ... Such costs are actuarial and trustee fees, corporate office administrative costs associated with all governmental filings for obtaining IRS approval and money manager fees. ...

  8. APPENDIX A

    National Nuclear Security Administration (NNSA)

    ... Such costs are actuarial and trustee fees, corporate office administrative costs associated with all governmental filings for obtaining IRS approval and money manager fees. Section ...

  9. G

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to the Contractor for that incentive and for the Contractor to have any right to retain the provisionally paid fee. Regarding the requirements for provisional payment of fee...

  10. Microsoft Word - InstituteFlyer2016.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    There is no registration fee or other fees for participating in the institute itself. The steering committee, Matthew Brake (SNL), Pascal Reuss (Daimler), Christoph Schwingshackl ...

  11. Contractor: Restoration Services, Inc. Contract: DE-EM0002639

    Office of Environmental Management (EM)

    Restoration Services, Inc. Contract: DE-EM0002639 Award Fee Evaluation Period 2 Determination Scorecard Award Fee Evaluation Period: Fiscal Year 2015 (October 1, 2014 to September ...

  12. Oregon Underground Injection Control Registration Application...

    Open Energy Information (Open El) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library Form: Oregon Underground Injection Control Registration Application Fees (DEQ Form UIC 1003-GIC) Abstract Required fees and form...

  13. 1127i.pmk

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    state: city: nights: Lodging state: city: nights: 10. Official PhoneFax: 11. ATM Fees: 12. Lodging with Friends and Relatives 13. Registration Fee: Lab Issued? Yes...

  14. Slide 1

    Energy.gov (indexed) [DOE]

    Late payment fee assessed, which typically is higher than the prompt payment interest. Frauddelinquency losses borne by the bank Comparison of Charge Card FeesLiabilities Office...

  15. March 4, 2007

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Accordingly, we respectfully request a waiver of all search, printing, and duplication costs (please see attached fee waiver justification). A fee waiver is appropriate when ...

  16. March 4, 2007

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    search, printing, and duplication costs (please see attached fee waiver justification). ... Sincerely, Anna Clark Compliance Specialist Attachment: Fee Waiver Justification dmp

  17. March 4, 2007

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    search, printing, and duplication costs (please see attached fee waiver justification). ... Sincerely, Anna L. Clark Senior Compliance Specialist Attachment: Fee Waiver Justification

  18. March 4, 2007

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    search, printing, and duplication costs (please see attached fee waiver justification). ... Sincerely, Anna Clark Compliance Specialist Attachment: Fee Waiver Justification lrp

  19. Portland HQ Letterhead

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    "All award fee letters to Management and Operations Contractors at Department of Energy facilities in which an award fee was reduced or eliminated as a result of a...

  20. Centrifugally decoupling touchdown bearings

    DOE Patents [OSTI]

    Post, Richard F

    2014-06-24

    Centrifugally decoupling mechanical bearing systems provide thin tensioned metallic ribbons contained in a support structure. This assembly rotates around a stationary shaft being centered at low speeds by the action of the metal ribbons. Tension springs are connected on one end to the ribbons and on the other end to the support structure. The ribbons pass through slots in the inner ring of the support structure. The spring preloading thus insures contact (or near-contact) between the ribbons and the shaft at rotation speeds below the transition speed. Above this speed, however, the centrifugal force on the ribbons produces a tensile force on them that exceeds the spring tensile force so that the ribbons curve outward, effectively decoupling them from mechanical contact with the shaft. They still remain, however, in position to act as a touchdown bearing in case of abnormally high transverse accelerations.

  1. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Available (N/A) Fee Earned FY 2016 $0 $0 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 Cumulative Fee $0 $0 EM Contractor Fee Idaho Operations Office - Idaho Falls, ID Idaho Cleanup Project (ICP) Core September 2016 $0 N/A Cost Plus Incentive Fee $1,534,451,782 Fluor Idaho, LLC DE-EM0004083 $152,790,417 Fee Information June 1, 2016 - May 31, 2021

  2. Microsoft Word - CSC Scorecard.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Energy Fee Determination Posting Requirements Office of Environmental Management Attachment 2 Award Fee Determination Scorecard Contractor: Computer Sciences Corporation (CSC) Contract: Occupational Health Services Contract Number: DE-AC06-04RL14383 Award Period: 10/01/2011 to 09/30/2012 Basis of Evaluation: Performance and Evaluation Plan (PEMP) for Period FY 2012 Award Fee Available: $916,130.00 Award Fee Earned: $824,517.00 (90%) Award Fee Area Adjectival Ratings: Performance Incentive

  3. Audit Report: ER-B-99-05 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 Audit Report: ER-B-99-05 April 8, 1999 Westinghouse Savannah River Company's Withdrawal of Fees As the operator of the Department's Savannah River Site, Westinghouse Savannah River Company (Westinghouse) receives three types of fees: (1) award fees commensurate with the overall performance rating, (2) Performance Based Incentive (PBI) fees for achieving measurable goals or defined tasks as specified in annual operating plans, and (3) Cost Reduction Incentive Program (CRIP) fees for making

  4. Sensor assembly

    DOE Patents [OSTI]

    Bennett, Thomas E.; Nelson, Drew V.

    2004-04-13

    A ribbon-like sensor assembly is described wherein a length of an optical fiber embedded within a similar lengths of a prepreg tow. The fiber is ""sandwiched"" by two layers of the prepreg tow which are merged to form a single consolidated ribbon. The consolidated ribbon achieving a generally uniform distribution of composite filaments near the embedded fiber such that excess resin does not ""pool"" around the periphery of the embedded fiber.

  5. Microsoft Word - BRC Charter

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Blue Ribbon Commission on America's Nuclear Future U.S. Department of Energy Advisory Committee Charter 1. Committee's Official Designation. Blue Ribbon Commission on America's Nuclear Future (the Commission). 2. Authority. The Commission is being established in accordance with the provisions of the Federal Advisory Committee Act (FACA), as amended, 5 U.S.C. App. 2, and as directed by the President's Memorandum for the Secretary of Energy dated January 20, 2010: Blue Ribbon Commission on

  6. Polymer film composite transducer

    DOE Patents [OSTI]

    Owen, Thomas E.

    2005-09-20

    A composite piezoelectric transducer, whose piezoeletric element is a "ribbon wound" film of piezolectric material. As the film is excited, it expands and contracts, which results in expansion and contraction of the diameter of the entire ribbon winding. This is accompanied by expansion and contraction of the thickness of the ribbon winding, such that the sound radiating plate may be placed on the side of the winding.

  7. Statement of Intent between the US Department of Energy and UK Nuclear Decommissioning Authority

    Energy Savers

    the Blue Ribbon Commission's Interim Recommendations | Department of Energy Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations Statement from Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations July 29, 2011 - 3:27pm Addthis "The Obama Administration continues to believe that nuclear energy has an important role to play as America moves to a clean energy future.

  8. Sweet Lake geopressured-geothermal project, Magma Gulf-Technadril/DOE Amoco fee. Volume III. Final report. Annual report, February 1982-March 1985

    SciTech Connect (OSTI)

    Durham, C.O. Jr.; O'Brien, F.D.; Rodgers, R.W.

    1985-01-01

    This report presents the results of the testing of Sand 3 (15,245 to 15,280 feet in depth) which occurred from November 1983 to March 1984 and evaluates these new data in comparison to results from the testing of Sand 5 (15,385 to 15,415 feet in depth) which occurred from June 1981 to February 1982. It also describes the reworking of the production and salt water disposal wells preparatory to the Sand 3 testing as well as the plug and abandon procedures requested to terminate the project. The volume contains two parts: Part 1 includes the text and accompanying plates, figures and tables; Part 2 consists of the appendixes including auxiliary reports and tabulations.

  9. Geopressured-geothermal drilling and testing plan: Magma Gulf/Technadril-Dept. of Energy MGT-DOE AMOCO Fee No. 1 well, Cameron Parish, Lousiana

    SciTech Connect (OSTI)

    Not Available

    1980-07-01

    The following topics are covered: generalized site activities, occupational health and safety, drilling operations, production testing, environmental assessment and monitoring plan, permits, program management, reporting, and schedule. (MHR)

  10. Los Alamos National Laboratory Scientific Excellence for...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... (NEDO) with Los Alamos County PRObe Supercomputing Center ribbon-cutting "Smart House" Technology Transfer Labs & Universities International Partnerships New Mexico ...

  11. Shenmao Technology | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Shenmao Technology Jump to: navigation, search Name: Shenmao Technology Place: Taoyuan, Taiwan Zip: 328 Product: Maker of solder paste and PV ribbons. Coordinates: 25.001909,...

  12. Calling All Majors: Sparking Clean Energy Interest from Students...

    Energy Savers

    ... policy or to pursue an energy concentration within the electrical engineering program. ... Pascrell, John Lushetsky and other officials at the ribbon cutting. Largest Solar Panel ...

  13. Helping Ensure High-Quality Installation of Solar Power Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technology Maximizes Taxpayer's Investment Mercer Island celebrates the 500th Solarize installation in the state of Washington with a ribbon cutting at the Auto-Spa car wash. ...

  14. Scanning Defect Mapping | Photovoltaic Research | NREL

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PVScan images showing defect density distributions for a cast wafer (a-upper) and ribbon (b-lower) PVsubstrates. Defect density (Nd) distributions in photovoltaic (PV) substrates ...

  15. Microsoft Word - ADM 6

    Energy.gov (indexed) [DOE]

    since heshe accomplishes the actual payment of public monies to proper Federal ... All copies except the certified payment or collection copy, usually the original or ribbon ...

  16. Sensitive Instrument Facility Dedication | The Ames Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Sensitive Instrument Facility Dedication Secretary of Energy Ernest Moniz helped cut the ribbon to dedicate Ames Laboratory's Sensitive Instrument Facility on May 6, 2016

  17. Before House Committee on Science, Space, and Technology

    Energy.gov [DOE]

    Subject: Assessing America's Nuclear Future - A review of the Blue Ribbon Commission's Report to the Secretary of Energy By: Peter Lyons

  18. "Title","Creator/Author","Publication Date","OSTI Identifier...

    Office of Scientific and Technical Information (OSTI)

    HELIOSPHERE; INTERSTELLAR SPACE; KEV RANGE; MAGNETIC FIELDS; PLASMA; REFLECTION; SUN; SYMMETRY",,"The circular ribbon of enhanced energetic neutral atom (ENA) emission...

  19. TITLE AUTHORS SUBJECT SUBJECT RELATED DESCRIPTION PUBLISHER AVAILABILI...

    Office of Scientific and Technical Information (OSTI)

    DEPENDENCE HELIOSPHERE INTERSTELLAR SPACE KEV RANGE MAGNETIC FIELDS PLASMA REFLECTION SUN SYMMETRY The circular ribbon of enhanced energetic neutral atom ENA emission observed...

  20. Archives - SRSCRO

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Community Issues Archives Blue Ribbon Commission Activities Infrastructure Improvements SRSCRO Letter on SRS M&O Contract The Future of SRS: The Community Perspective What's Next...

  1. Evergreen Solar Inc | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Massachusetts Zip: 1752 Product: US manufacturer of multicrystalline silicon wafers, cells, modules and systems; uses a proprietary technology called String Ribbon for wafer...

  2. Sovello AG formerly EverQ GmbH | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Zip: 6766 Sector: Renewable Energy, Solar Product: JV between Evergreen Solar, Q-Cells and Renewable Energy Corp to develop PV wafers, cells and panels through string ribbon...

  3. PREP

    National Nuclear Security Administration (NNSA)

    the Pantex Renewable Energy Project (PREP) ribbon-cutting this week. PREP establishes...

  4. OSTIblog Articles in the ambient-gas Topic | OSTI, US Dept of...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  5. OSTIblog Articles in the nanomaterials Topic | OSTI, US Dept...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  6. OSTIblog Articles in the William Watson Topic | OSTI, US Dept...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  7. OSTIblog Articles in the plasma Topic | OSTI, US Dept of Energy...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  8. OSTIblog Articles in the geomagnetic storms Topic | OSTI, US...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  9. OSTIblog Articles in the OSTI collections Topic | OSTI, US Dept...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  10. OSTIblog Articles in the spaceship propulsion Topic | OSTI, US...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  11. OSTI, US Dept of Energy Office of Scientific and Technical Information...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  12. OSTIblog Articles in the microwave thrusters Topic | OSTI, US...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  13. OSTIblog Articles in the auroras Topic | OSTI, US Dept of Energy...

    Office of Scientific and Technical Information (OSTI)

    ribbons of colors from a fluorescent green to brilliant purple to a vivid crimson ... physics, chemistry, energy security, advanced space propulsion, and material science. ...

  14. Layout 1

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... preferred method of nuclear waste storage." The group also challenged Secretary of Energy Stephen Chu to name a community representative to his Blue Ribbon Panel on America's ...

  15. EECBG Success Story: Light Shines on Better Budget for Glendale...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Efficiency in New Mexico Frees Money in Local Coffers Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the ...

  16. EECBG Success Story: While Summer Heats Up, Birmingham Community...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Learn more. Addthis Related Articles Boaz, Alabama Mayor Tim Walker, along with state representatives and community leaders, cut the ribbon for the state's solar LED light pilot ...

  17. Microsoft Word - DOE-ID-INL-11-003.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    was to destroy classified cold waste such as paper, typewriter ribbons, and computer disks. With advances in technology, the need for this method of classified material ...

  18. Part 5 of 11

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Specific objectives include methods for improving surface and bulk quality of as-grown ribbon , techniques for wrap-around solar cell efficiency improvement , extensive reliability ...

  19. Flipping Photoelectron Spins in Topological Insulators

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    is an insulator, but electrons (grey spheres) move swiftly on the surface as if through a metal. They are spin polarized, however, with their momenta (directional ribbons) and...

  20. Solar Blog | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rep. Pascrell, John Lushetsky and other officials at the ribbon cutting. Largest Solar Panel Installation at a U.S. University Goes Live John Lushetsky, Program Manager of...

  1. Understanding and Predicting Self-Assembly | U.S. DOE Office...

    Office of Science (SC) [DOE]

    "removed" to show how the backbone's alternating rotational states give the backbones a snake-like appearance (red and blue ribbons). Surrounding water molecules are red and white. ...

  2. PREP

    National Nuclear Security Administration (NNSA)

    nnsa.energy.govmediaroompressreleasesprep" target"blank">Pantex Renewable Energy Project (PREP) ribbon-cutting this week. PREP establishes thelargest...

  3. NE Press Releases | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the Blue Ribbon Commission on America's Nuclear Future, co-chaired by former Congressman Lee Hamilton and former National Security Advisor General Brent Scowcroft, will hold its...

  4. 7-27-20100-US_FinTestimony_Kristina_Johnson.pdf

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    a Blue Ribbon Commission on America's Nuclear Future chaired by former Congressman Lee Hamilton and General Brent Scowcroft. The Commission is evaluating options and will...

  5. Giant Protease TPP II's Structure, Mechanism Uncovered

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The protein "skeleton" of this giant protease is depicted in magenta ribbon. The grey enclosure represents a lower-resolution surface and is included to aid visualization of...

  6. Data Room - Facilities - Radiation Effects Facility / Cyclotron...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    types of cables permanently installed. These included: five ribbon cables, two DB9 serial cables, three DB25 serial cables, and two GPIB cables. Permanently installed cables....

  7. Statement from Acting Department of Energy Press Secretary Damien...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acting Department of Energy Press Secretary Damien LaVera on the Blue Ribbon Commission's Interim Recommendations Statement from Acting Department of Energy Press Secretary Damien ...

  8. Method for compression of binary data

    DOE Patents [OSTI]

    Berlin, G.J.

    1996-03-26

    The disclosed method for compression of a series of data bytes, based on LZSS-based compression methods, provides faster decompression of the stored data. The method involves the creation of a flag bit buffer in a random access memory device for temporary storage of flag bits generated during normal LZSS-based compression. The flag bit buffer stores the flag bits separately from their corresponding pointers and uncompressed data bytes until all input data has been read. Then, the flag bits are appended to the compressed output stream of data. Decompression can be performed much faster because bit manipulation is only required when reading the flag bits and not when reading uncompressed data bytes and pointers. Uncompressed data is read using byte length instructions and pointers are read using word instructions, thus reducing the time required for decompression. 5 figs.

  9. Method for compression of binary data

    DOE Patents [OSTI]

    Berlin, Gary J.

    1996-01-01

    The disclosed method for compression of a series of data bytes, based on LZSS-based compression methods, provides faster decompression of the stored data. The method involves the creation of a flag bit buffer in a random access memory device for temporary storage of flag bits generated during normal LZSS-based compression. The flag bit buffer stores the flag bits separately from their corresponding pointers and uncompressed data bytes until all input data has been read. Then, the flag bits are appended to the compressed output stream of data. Decompression can be performed much faster because bit manipulation is only required when reading the flag bits and not when reading uncompressed data bytes and pointers. Uncompressed data is read using byte length instructions and pointers are read using word instructions, thus reducing the time required for decompression.

  10. X:\\ARM_19~1\\P283-315.WPD

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... flag is particularly useful when computing radiance derivatives with respect to ... for all layers, a complete calculation can be performed in memory for each sub-interval. ...

  11. This Week In Petroleum Printer-Friendly Version

    Gasoline and Diesel Fuel Update

    in the corresponding monthly surveys. Several quality control procedures are executed. Cell values determined to be unusual or inconsistent with other cell values are flagged. The...

  12. christy-99.PDF

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    These instruments transmit an acoustic signal vertically into the atmosphere and, in ... is an objective technique that flags data points that are significantly different ...

  13. ARM - PI Product - SGP and TWP (Manus) Ice Cloud Vertical Velocities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    removed, however a multi-layer flag is included. Data Details Contact Heike Kalesse Leibniz Institute for Tropospheric Research kalesse@tropos.de Permoserstr. 15 Leipzig, 04318...

  14. Microsoft Word - Attachment A-1 Performance Work Statement Amended...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... right pocket on shirts and cold weather coat 7 Uniform Shield DOE (Government ... left shoulder of shirts and cold weather coat 14 Patch American flag; display on right ...

  15. Microsoft Word - Final formatted Nano-Vol_II-Field_Reports.doc

    Energy Savers

    are met. The questionnaire is given to employees annually and when they change jobs. It flags individuals as nanomaterial workers and informs appropriate site personnel...

  16. RAPID/Roadmap/9-FD-a | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    will help to identify the universe of matters that need to be addressed with particular care and flag issues for thorough consideration, thereby defusing potential conflict that,...

  17. Droplet Number Concentration Value-Added Product (Technical Report...

    Office of Scientific and Technical Information (OSTI)

    LWP is from the adiabatic case. quality control (QC) flags (qcdropnumberconc), an ... Sponsoring Org: USDOE Office of Science (SC), Biological and Environmental Research (BER) ...

  18. Fermilab Today

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Status Flags at full staff Wilson Hall Cafe Thursday, Feb. 19 - Breakfast: Canadian bacon, egg and cheese Texas toast - Breakfast: all-American breakfast - Chicken cordon bleu...

  19. Categorical Exclusion Determinations: B1.20 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    fish and wildlife habitat Small-scale activities undertaken to protect cultural resources (such as fencing, labeling, and flagging) or to protect, restore, or improve fish and ...

  20. CoverSheet

    Office of Scientific and Technical Information (OSTI)

    86 Approved for public release; distribution is unlimited. Title: Implementation and Validation of the BHR Turbulence Model in the FLAG Hydrocode Author(s): Denissen, Nicholas A....