  1. Idaho National Engineering Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order State Idaho Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts...

  2. Lawrence Livermore National Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Site 300) Agreement Name Lawrence Livermore National Laboratory Federal Facility Agreement Under CERCLA Section 120, June 29, 1992 State California Agreement Type Federal Facility ...

  3. Federal Facility Agreement progress report

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  4. Savannah River Site Federal Facility Agreement, January 15, 1993...

    Office of Environmental Management (EM)

    Site Agreement Name Savannah River Site Federal Facility Agreement Under Section 120 of ... with past and present activities at the Savannah River Site are thoroughly investigated ...

  5. Federal Facility Compliance Agreement on Storage of Polychlorinated...

    Office of Environmental Management (EM)

    on Storage of Polychlorinated Biphenyls, August 8, 1996 State Washington Agreement Type Federal Facility Compliance Agreement Legal Driver(s) TSCA Scope Summary Address DOE and the ...

  6. Paducah Site Federal Facility Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Facility Agreement Paducah Site Federal Facility Agreement The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised Statute 224; and other laws and regulations identified in the FFA. Paducah

  7. Brookhaven National Laboratory Federal Facility Agreement, February 28, 1992 Summary

    Office of Environmental Management (EM)

    Brookhaven National Laboratory Agreement Name Brookhaven National Laboratory Federal Facility Agreement Under CERCLA Section 120, February 28, 1992 State New York Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Establish a procedural framework and schedule for developing, implementing and monitoring appropriate response actions at the Site Parties DOE; USEPA; New York State Department of Environmental Conservation (NYSDEC) Date 2/28/1992 SCOPE * Establish a

  8. Weldon Spring Site Federal Facility Agreement

    Office of Legacy Management (LM)

    ... 1341. The Antideficiency Act places limits on a federal agency's ability to spend money. ... 2) obligating the government to pay money before funds have been appropriated for ...

  9. MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1-

    Office of Legacy Management (LM)

    PROJECTS FEDERAL FACILITIES AGREEMENT REPORT Report Period: January 1- March 31, 2006 DOE Project Coordinator: Ray Plieness HIGHLIGHTS The Federal Facilities Agreement meeting was held February 21-22 in Salt Lake City, UT. Representatives from the U.S. Depattment of Energy (DOE), U.S. Environmental Protection Agency (EPA), Utah Department of Environmental Quality (UDEQ), and the DOE contractor attended. The schedule of work through the end of the fiscal year was determined. MSG-OUIII The scope

  10. Idaho National Engineering Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    VII. Regulatory Approach VIII. Consultation with U.S. EPA and IDHW IX. Resolution of ... Protection Agency, Region 10 ("U.S. EPA") enters into this Agreement pursuant to ...

  11. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    JUN 1 1 2013 Mr. Todd Mullins Federal Facility Agreement Manager Kentucky Department for Environmental Protection Division of Waste Management 200 Fair Oaks Lane, 2 nd Floor Frankfort, Kentucky 40601 Ms. Jennifer Tufts Federal Facility Agreement Manager U.S. Environmental Protection Agency, Region 4 61 Forsyth Street Atlanta, Georgia 30303 Dear Mr. Mullins and Ms. Tufts: PPPO-02-1813000-13B TRANSMITTAL OF THE COMMUNITY RELATIONS PLAN UNDER THE FEDERAL FACILITY AGREEMENT AT THE U.S. DEPARTMENT OF

  12. Federal Facility Agreement for the Laboratory for Energy-Related Health Research Summary

    Office of Environmental Management (EM)

    Energy Related Health Research Agreement Name Federal Facility Agreement for the Laboratory for Energy- Related Health Research State California Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA/RCRA Scope Summary Establish a procedural framework and schedule for developing, implementing and monitoring appropriate response actions at LEHR Parties DOE; USEPA; California Department of Toxic Substances Control; Central Valley Regional Water Quality Control Board; California

  13. Federal Facility Agreement for the Paducah Gaseous Diffusion...

    Office of Environmental Management (EM)

    Agreement Legal Driver(s) CERCLARCRA Scope Summary Ensure that the environmental ... Cabinet; U.S. EPA Date 2011998 SCOPE * Ensure all releases of hazardous ...

  14. Federal Facility Agreement (FFA) Signed at Oak Ridge

    Energy.gov [DOE]

    The Oak Ridge Reservation FFA was implemented on January 1, 1992. It is a CERCLA-required agreement among DOE, the United States Environmental Protection Agency, and the Tennessee Department of Environment and Conservation to promote cooperation and participation to clean and remediate the Oak Ridge Reservation.

  15. Federal Facility Agreement Annual Progress Report for FY 1998

    SciTech Connect (OSTI)

    Palmer, E.

    1999-08-04

    This FFA Annual Progress Report has been developed to summarize the information for activities performed during the Fiscal Year 1998 (October 1, 1997, to September 30, 1998) and activities planned for Fiscal Year 1999 by U.S. EPA, SCDHEC, and SRS at those units and areas identified for remediation in the Agreement.

  16. MONTICELLO NPL SITES Minutes and Action Items of the Federal Facilities Agreement Meeting

    Office of Legacy Management (LM)

    Minutes and Action Items of the Federal Facilities Agreement Meeting September 16 and 17,2008 Meeting Location U.S. Department of Energy Site Office, Monticello, Utah Meeting Attendees Jalena Dayvault- U.S. Department of Energy Tim Bartlett- S.M. Stoller Todd Moon- S.M. Stoller Linda Sheader- S. M. Stoller Paul Wetherstein- S.M. Stoller Brent Everett- Utah Department of Environmental Quality Duane Mortensen- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection

  17. Monticello NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items

    Office of Legacy Management (LM)

    NPL Sites Federal Facilities Agreement Meeting Minutes & Action Items Location Monticello, Utah- DOE Office of Legacy Management field office Date September 27,2006 Attendees David Bird- Utah Department of Environmental Quality Paul Mushovic- U.S. Environmental Protection Agency Att Kleinrath- U.S. Depmtment of Energy Tim Bartlett- S. M. Stoller Meeting topics and discussion points are summarized separately under the headings that follow. Attaclunent 1 to this report includes the agenda and

  18. Hanford Federal Facility Agreement and Consent Order quarterly progress report for the period ending June 30, 1991

    SciTech Connect (OSTI)

    Not Available

    1991-08-01

    This is the ninth quarterly report as required by the Hanford Federal Facility Agreement and Consent Order (Ecology et al. 1990), also known as the Tri-Party Agreement, established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology). The Tri-Party Agreement sets the plan and schedule for achieving regulatory compliance and cleanup of waste sites at the Hanford Site. This report covers progress for the quarter that ended June 30, 1991. A total of 87 milestones have been completed to date. 39 refs., 1 fig.

  19. Oak Ridge reservation federal facility agreement for the Environmental Restoration Program. Volume 1. Quarterly report, October--December 1993

    SciTech Connect (OSTI)

    Not Available

    1994-01-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is October through December 1993 (first quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  20. Oak Ridge Reservation Federal Facility Agreement for the Environmental Restoration Program. Volume 4. Quarterly report, July--September 1993

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered is July through September 1993 (fourth quarter of FY 1993). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments.

  1. Oak Ridge Reservation Federal Facility Agreement. Quarterly report for the Environmental Restoration Program. Volume 4, July 1995--September 1995

    SciTech Connect (OSTI)

    1995-10-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation Federal Facility Agreement (FFA) established between the U.S. Department of Energy (DOE), the U.S. Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is July through September 1995 (fourth quarter of FY 1995). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments.

  2. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 3: April--June 1995

    SciTech Connect (OSTI)

    1995-07-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  3. Oak Ridge Reservation Federal Facility Agreement quarterly report for the environmental restoration program. Volume 2: January--March 1995

    SciTech Connect (OSTI)

    1995-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1995 commitments. The report describes the technical status of the following: Y-12 Plant; Oak Ridge National Lab; K-25 Plant; and Oak Ridge Reservation boundary areas. The report also describes technical programs, namely: the Oak Ridge environmental information system, remote sensing and special survey program, and the risk assessment program.

  4. Oak Ridge Reservation Federal Facility agreement quarterly report for the Environmental Restoration Program, January--March 1994. Volume 2

    SciTech Connect (OSTI)

    Not Available

    1994-04-01

    This quarterly progress report satisfies requirements for the Environmental Restoration (ER) Program that are specified in the Oak Ridge Reservation (ORR) Federal Facility Agreement (FFA) established between the US Department of Energy (DOE), the US Environmental Protection Agency (EPA), and the Tennessee Department of Environment and Conservation (TDEC). The reporting period covered herein is January through March 1994 (second quarter of FY 1994). Sections 1.1 and 1.2 provide respectively the milestones scheduled for completion during the reporting period and a list of documents that have been proposed for transmittal during the following quarter but have not been approved as FY 1994 commitments. Section 2 covers significant accomplishments. Section 3 discusses technical status at the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, Oak Ridge K-25 Site, and Clinch River. Technical oversight and technical programs are also covered. Section 4 covers responds action contractor assignments.

  5. Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Agreement | Department of Energy Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act Uranium Enrichment Federal Facility Compliance Agreement Toxic Substances Control Act (TSCA) Uranium Enrichment Federal Facility Compliance Agreement establishes a plan to bring DOE's Uranium Enrichment Plants (and support facilities) located in Portsmouth, Ohio and Paducah, Kentucky and DOE's former Uranium Enrichment Plant (and support

  6. Program management assessment of Federal Facility Compliance Agreement regarding CAA-40 C.F.R. Part 61, Subpart H at the Los Alamos National Laboratory

    SciTech Connect (OSTI)

    1997-01-01

    An assessment of Los Alamos National Laboratory`s management system related to facility compliance with an element of the Clean Air Act was performed under contract by a team from Northern Arizona University. More specifically, a Federal Facilities Compliance Agreement (FFCA) was established in 1996 to bring the Laboratory into compliance with emissions standards of radionuclides, commonly referred to as Rad/NESHAP. In the fall of 1996, the four-person team of experienced environmental managers evaluated the adequacy of relevant management systems to implement the FFCA provisions. The assessment process utilized multiple procedures including document review, personnel interviews and re-interviews, and facility observations. The management system assessment was completed with a meeting among team members, Laboratory officials and others on November 1, 1996 and preparation of an assessment report.

  7. SANDIA NATIONAL LABORATORIES NFE AGREEMENTS NON-FEDERAL ENTITY AGREEMENTS

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    NATIONAL LABORATORIES NFE AGREEMENTS NON-FEDERAL ENTITY AGREEMENTS PURPOSE OF NFE AGREEMENTS To support its missions, Sandia National Laboratories' (SNL) engineers and scientists conduct research in many areas. Many of the technologies, processes, and special technical expertise they have developed have been applied to solving problems in the private sector through mutually beneficial, technology partnerships. A company working with SNL on such an endeavor is known as a non-Federal entity (NFE).

  8. Toxic Substances Control Act Uranium Enrichment Federal Facility...

    Energy.gov (indexed) [DOE]

    Toxic Substances Control Act (TSCA) Uranium Enrichment Federal Facility Compliance Agreement establishes a plan to bring DOE's Uranium Enrichment Plants (and support facilities) ...

  9. Uranium Processing Facility team signs partnering agreement ...

    National Nuclear Security Administration (NNSA)

    Uranium Processing Facility team signs partnering agreement Thursday, July 24, 2014 - 9:40am Officials from NNSA's Uranium Processing Facility Project Office and Consolidated ...

  10. Assisting Federal Facilities with Energy Conservation Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Financing Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation ...

  11. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Toxic Substance Control Act Uranium Enrichment Federal Facilities Compliance Agreement ... for bringing DOE's former and active Uranium Enrichment Plants in Paducah, Portsmouth, ...

  12. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  13. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  14. Federal-facilities Hazardous-Waste Compliance Manual. Final report

    SciTech Connect (OSTI)

    Not Available

    1990-01-09

    In the continuing effort to achieve a higher level of compliance with the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) at Federal facilities, the Federal Facilities Hazardous Waste Compliance Office (FFHWCO) has developed the Federal Facilities Hazardous Waste Compliance Manual. The manual includes an overview of the Federal-facilities hazardous-waste compliance program, relevant statutory authorities, model provisions for Federal facility agreements, enforcement and other applicable guidance, Federal facilities docket and NPL listings, data-management information, selected DOD and DOE program guidance, and organization charts and contacts. This compendium is intended to be used as a reference by Regional RCRA and CERCLA enforcement personnel and Regional Counsels, particularly as an orientation guide for new Federal facilities staff.

  15. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  16. Federal On-Site Renewable Power Purchase Agreements | Department...

    Energy.gov (indexed) [DOE]

    Federal On-Site Renewable Power Purchase Agreements On-site renewable power ... to fund renewable energy projects with minimal ... Distributed Generation Projects: Webinar ...

  17. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    Utah, was signed by DOE, UDEQ, and EPA. The last signature was obtained on June 2, ... Operable Units I and II DOE met with EPA and State regulators to discuss the results ...

  18. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... used to test sum stem 11112004 0 power pump activated pumps Ol I 11S2004 0 Oj I ... L.,:J - endmg Average wind speed. Prevailing wiud ...

  19. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... i&w& :Rj,h.. ,fhr '5iJthlkqtL, Average wind speed Average temperature, ... J102005 0 0 I 1172005 43 Power bump activated pump 0 I I 1242005 0 0 I i3l2005 oi ...

  20. MSG MONTICELLO PROJECTS FEDERAL FACILITIES AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... -..,c;:: .. ending Average. wind speed* Prevailing wind direction ...2005 0 0 l102005 0 0 I 11.72005 43 Power bump activated pump 0 0.0 0.0 I 124Z005 ...

  1. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... 0 1312005 0 0 l102005 0 0 11712005 43 Power bump activated pump 0 0.0 0.0 1242005 0 ... endmg Average wind speed Prevaililig wind ...

  2. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... MMTS. The pump and power supply cords on Leak Detection Sump 2 were replaced and tested. ... ending, Average wind speed. Prevailiilg wind direction. ...

  3. MRAP MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... for the period beginning ::iee Wea. Sending Average wind speed, Prevailfug wind direction Average temperature: High Temperature--- Low ...

  4. MSGOUID MONTICELLO PROJECTS *FEDERAL FACILITIES AGREEMENT REPORT

    Office of Legacy Management (LM)

    ... Meteorological Data for the period beginning :se,. cvlku- c:J4a- '1* endmg Average.wind speed Prevailing wind direction Average temperature High Temperature Low Temperature ...

  5. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT

    Office of Legacy Management (LM)

    August 2004 Report Period: July 1- August 31, 2004 DOE Project Coordinator: Art Kleinrath HIGHLIGHTS Two monitoring wells were installed, which completed the monitoring network for OU III. The following documents have been completed: * * Monticello Mill Tailings Site Operable Unit III Post-Record of Decision Monitoring Plan * Remedial Action/Remedial Design Workplan for the Monticello Mill Tailings Site Operable Unit III MRAP DOE is continuing discussions with the City of Monticello concerning

  6. Hanford Federal Facility Agreement & Consent Order

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PCB Transformer disposal. The nineteen Polychlorinated Biphenyl (PCB) electrical transformers at the FFTF will be disposed of after the transformers are removed from service....

  7. FEMP Offers Training on Federal On-Site Renewable Power Purchase Agreements

    Energy.gov [DOE]

    This refreshed eTraining core course provides federal energy and facility managers and contracting officers with up-to-date knowledge and best practices for developing an on-site renewable power purchase agreement (PPA) on a federal site and includes current definitions, references, and guidance to help launch or accelerate a PPA project.

  8. FERC Order No. 2003 Appendix 4 - Facilities Study Agreement ...

    Open Energy Information (Open El) [EERE & EIA]

    4 - Facilities Study Agreement Jump to: navigation, search OpenEI Reference LibraryAdd to library Form: FERC Order No. 2003 Appendix 4 - Facilities Study Agreement Abstract FERC...

  9. National Environmental Justice Advisory Council Federal Facilities Working Group Report

    Energy.gov [DOE]

    Environmental Justice and Federal Facilities: recommendations for improving stakeholder relations between federal facilities and environmental justice communities, October 2004

  10. 2014 Assisting Federal Facilities with Energy Conservation Technologie...

    Energy Savers

    Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients 2014 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding ...

  11. 2015 Assisting Federal Facilities with Energy Conservation Technologie...

    Energy Savers

    Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients 2015 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding ...

  12. AFFECT 2016: Assisting Federal Facilities with Energy Conservation...

    Office of Environmental Management (EM)

    AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar ...

  13. Lawrence Livermore National Laboratory Federal Facility Compliance...

    Office of Environmental Management (EM)

    Federal Facility Compliance Act Order for Lawrence Livermore National Laboratory ... treatment of mixed waste at Lawrence Livermore National Laboratory Parties DOE; State ...

  14. Potential Hydroelectric Development at Existing Federal Facilities...

    Open Energy Information (Open El) [EERE & EIA]

    Potential Hydroelectric Development at Existing Federal Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Report: Potential Hydroelectric Development at...

  15. Waste Treatment Facility Passes Federal Inspection, Completes...

    Office of Environmental Management (EM)

    Completes Final Milestone, Begins Startup Waste Treatment Facility Passes Federal ... The Idaho site today initiated the controlled, phased startup of a new waste treatment ...

  16. Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order with ROTC 1, Revision No. 0

    SciTech Connect (OSTI)

    Lynn Kidman

    2008-02-01

    Many Federal Facility Agreement and Consent Order (FFACO) Use Restrictions (URs) have been established at various corrective action sites (CASs) as part of FFACO corrective actions (FFACO, 1996; as amended January 2007). Since the signing of the FFACO in 1996, practices and procedures relating to the implementation of risk-based corrective action (RBCA) have evolved. This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). Based on this evaluation, the URs were sorted into the following categories: 1. Where sufficient information exists to determine that the current UR is consistent with the RCBA criteria 2. Where sufficient information exists to determine that the current UR may be removed or downgraded based on RCBA criteria. 3. Where sufficient information does not exist to evaluate the current UR against the RCBA criteria. After reviewing all the existing FFACO URs, the 49 URs addressed in this document have sufficient information to determine that these current URs may be removed or downgraded based on RCBA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RCBA criteria.

  17. Procuring Solar for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procuring Solar for Federal Facilities Procuring Solar for Federal Facilities Pre-screening and Planning - understand federal requirements and conducting a site pre-screening ...

  18. NEGOTIATED AGREEMENT BETWEEN National Energy American Federation of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NEGOTIATED AGREEMENT BETWEEN National Energy American Federation of Technology Laboratory Government Employees U.S. Department of Energy Local #1104 March 25, 2013 Signatures This document is approved as the binding agreement between the parties and is approved on this 25th day of March 2013: Table of Contents PREAMBLE ................................................................................................................................. 3 ARTICLE 1: EXCLUSIVE RECOGNITION

  19. Project Labor Agreements- Federal Acquisition Circular 2005-41

    Energy.gov [DOE]

    A final rule was published in the Federal Register at 75 Fed. Reg. 19168 on April 13,201 0 implementing Executive Order 13502, which encourages agencies to consider using Project Labor Agreements on Federal construction projects at least $25,000,000 in total cost. A summary is attached for your information.

  20. Argonne User Facility Agreements | Advanced Photon Source

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Materials (CNM), The Argonne Leadership Computing Facility (ALCF), The Argonne Tandem Linac Accelerator System (ATLAS), and The Intermediate Voltage Electron Microscopy...

  1. Uranium Processing Facility team signs partnering agreement ...

    National Nuclear Security Administration (NNSA)

    This Site Budget IG Web Policy Privacy No Fear Act Accessibility FOIA Sitemap Federal Government The White House DOE.gov USA.gov Jobs Apply for Our Jobs Our Jobs Working at NNSA...

  2. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy...

  3. Greening Federal Facilities: An Energy, Environmental, and Economic...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource ...

  4. Federal Facilities Maintenance, Repair Report Calls for Action

    SciTech Connect (OSTI)

    Bartlett, Rosemarie

    2012-10-01

    This article is an overview of a recent report by the Federal Facilities Council on "Predicting Outcomes from Investments in Maintenance and Repair of Federal Facilities."

  5. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility ...

  6. California Federal Facilities: Rate-Responsive Buidling Operating...

    Office of Environmental Management (EM)

    California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and ... for cost and energy savings in California federal facilities. ...

  7. Federal Finance Facilities Available for Energy Efficiency Upgrades...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy ...

  8. Workplace Charging at Federal Facilities | Department of Energy

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    at Federal Facilities Workplace Charging at Federal Facilities Providing plug-in electric vehicle (PEV) charging stations at the workplace is one strategy by which agencies can ...

  9. LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP EXECUTION...

    Office of Environmental Management (EM)

    LOW-LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP EXECUTION PLAN Los Alamos National ... Safety and Security LFRG Low-Level Waste Disposal Facility Federal Review Group LLW ...

  10. Credibility and trust in federal facility cleanups

    SciTech Connect (OSTI)

    Raynes, D.B.

    1995-12-01

    The most important indicator of a well-managed site cleanup effort may no longer be funding or scientific expertise. While support for federal facility cleanup has included appropriations of more than $10 billion annually, these expenditures alone are unlikely to assure progress toward environmental remediation. {open_quotes}Trust{close_quotes} is now overwhelmingly mentioned as a prerequisite for progress with site cleanup in DOE`s weapons complex. In part, federal budget deficits are forcing participants to focus on factors that build consensus and lead to cost-effective cleanup actions. In some cases, the stakeholders at cleanup sites are making efforts to work cooperatively with federal agencies. A report by 40 representatives of federal agencies, tribal and state governments, associations, and others developed recommendations to create a {open_quotes}new era of trust and consensus-building that allows all parties to get on with the job of cleaning up federal facilities in a manner that reflects the priorities and concerns of all stakeholders.{close_quotes} Changes are underway affecting how federal agencies work with federal and state regulators reflecting this concept of shared responsibility for conducting cleanup. This paper addresses these changes and provides examples of the successes and failures underway.

  11. Low-Level Waste Disposal Facility Federal Review Group Manual...

    Office of Environmental Management (EM)

    Low-Level Waste Disposal Facility Federal Review Group Manual Low-Level Waste Disposal Facility Federal Review Group Manual This Revision 3 of the Low-Level Waste Disposal Facility ...

  12. Greening Federal Facilities: An Energy, Environmental, and Economic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Resource Guide for Federal Facility managers and Designers; Second Edition | Department of Energy Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition A nuts-and-bolts resource guide compiled to increase energy and resource efficiency, cut waste, and improve the

  13. AFFECT 2016: Assisting Federal Facilities with Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technologies Webinar | Department of Energy AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar Webinar describes the 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) funding opportunity offered by the Federal Energy Management Program. View the webinar slides.

  14. Federal On-Site Renewable Power Purchase Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Financing » Renewable Energy Procurement » Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements Federal On-Site Renewable Power Purchase Agreements The Federal Energy Management Program (FEMP) provides project assistance to federal agencies interested in power purchase agreements (PPAs) for on-site renewable energy projects. A PPA is a financing option under FEMP's Renewable Energy Procurement (REP) Program. FEMP assists agencies

  15. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Appendix B, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision ... process for successfully planning for and installing solar technology on a federal site. ...

  16. Procuring Solar for Federal Facilities | Department of Energy

    Energy.gov (indexed) [DOE]

    Procuring Solar Energy: A Guide for Federal Facility Decision Makers is a Web guide for federal site managers, site contractors, and procurement specialists to help them navigate ...

  17. Federal Finance Facilities Available for Energy Efficiency Upgrades

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  18. Low-Level Waste Disposal Facility Federal Review Group Manual

    Office of Environmental Management (EM)

    LEVEL WASTE DISPOSAL FACILITY FEDERAL REVIEW GROUP MANUAL REVISION 3 JUNE 2008 (This page ... 3, June 200S Concurrence The Low-Level Waste Disposal Facility Federal Review Group ...

  19. Renewable Energy Projects at Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Projects at Federal Facilities Renewable Energy Projects at Federal Facilities The Federal Energy Management Program (FEMP) tracks the following examples of renewable energy projects at federal facilities. To find a federal renewable energy project, browse the table by agency, technology, or project financials, or search by keyword. Click a column heading to sort the table. Case studies are also available. Contact FEMP to add your renewable energy project to the table below. Agency,

  20. 2015 Assisting Federal Facilities with Energy Conservation Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (AFFECT) Funding Recipients | Department of Energy 5 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients 2015 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients On March 6, 2015, the Federal Energy Management Program (FEMP) issued a funding opportunity announcement on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT), Fiscal Year 2015. On January 27, 2016,

  1. Federal Finance Facilities Available for Energy Efficiency Upgrades and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clean Energy Deployment | Department of Energy Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment The Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment resource guide lists the various federal financing programs for which energy efficiency and clean energy qualify - meant to make it easier for state, local

  2. Energy Management in Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Management in Federal Facilities Energy Management in Federal Facilities Data Centers Data Centers Federal data centers used nearly 10% of federal electricity use in 2013. Find out how to make data centers more energy efficient. Read more Laboratories Laboratories Laboratory activities and ventilation requirements can be energy intensive. Find out how to make laboratories more efficient. Read more Operations and Maintenance Operations and Maintenance Facilities rely on pumps, motors, and

  3. Federal Agency Facility Reporting Requirements and Performance Data |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Federal Agency Facility Reporting Requirements and Performance Data Federal Agency Facility Reporting Requirements and Performance Data The Federal Energy Management Program (FEMP) provides information and tools to help agencies report annual energy and water consumption and resource management efforts for federal facilities. FEMP also collects and publishes agency performance data. Reporting Requirements Agencies are required to report progress under two separate

  4. California Federal Facilities: Rate-Responsive Building Operating for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Deeper Cost and Energy Savings | Department of Energy Federal Facilities: Rate-Responsive Building Operating for Deeper Cost and Energy Savings California Federal Facilities: Rate-Responsive Building Operating for Deeper Cost and Energy Savings Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities. Download the Rate-Responsive Building Operating for Deeper Cost and Energy Savings

  5. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and Security Act of 2007 (EISA 432) requires federal agencies to identify "covered facilities" that constitute at least 75% of their total facility energy use as subject to the requirements of the statute. Each federal agency must designate an energy manager to be responsible for implementing

  6. Sample Documents for Federal On-Site Renewable Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Renewable Energy Procurement » Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal on-site renewable power purchase agreement (PPA) process, the Federal Energy Management Program works with agencies and partners to assemble sample documents from completed PPA projects. See these sample documents for examples of requests for proposals (RFPs), land

  7. Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Funding Opportunity | Department of Energy Project Financing » Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity The Federal Energy Management Program (FEMP) provides project assistance through the AFFECT funding opportunity. AFFECT provides grants for the development of capital projects to increase the energy efficiency and renewable energy

  8. Federal Finance Facilities Available for Energy Efficiency Upgrades and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clean Energy Deployment | Department of Energy Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment This webinar, held on Sept. 24, 2013, provides information on federal finance facilities available for energy efficiency upgrades and clean energy deployment. Examples include USDA's Electric Loan Program, HUD's PowerSaver Home Improvement Loans Program,

  9. Commissioning Process for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Process for Federal Facilities Commissioning Process for Federal Facilities The commissioning process for federal facilities (including new construction and existing buildings) can be completed in four steps. Step 1: Plan The planning step includes developing and agreeing upon the overall commissioning objectives and strategies, assembling the project team, and compiling and perusing building and equipment documentation. Objectives for this step are to: Optimize building operations to reduce

  10. EISA Federal Covered Facility Management and Benchmarking Data...

    Energy.gov (indexed) [DOE]

    Federal Government Compliance Overview FEMP offers covered facility management and ... Annual Energy Reporting Requirements FEMP Contacts Chris Tremper U.S. Department of ...

  11. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Solar Screening Evaluation Checklist, September 2010 Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010 This ...

  12. California Federal Facilities: Rate-Responsive Building Operating...

    Energy.gov (indexed) [DOE]

    California federal facilities. Download the Rate-Responsive Building Operating for Deeper Cost and Energy Savings fact sheet. (614.65 KB) More Documents & Publications California ...

  13. Adopting LED Technology: What Federal Facility Managers Need to Know

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document describes the presentation slides for the "Adopting LED Technology: What Federal Facility Managers Need to Know" webinar that took place on September 11, 2014.

  14. Nevada Agreement for Delegation of Federal PSD Program | Open...

    Open Energy Information (Open El) [EERE & EIA]

    of the Federal Prevention of Significant Deterioration Program. Author United States Environmental Protection Agency Recipient State of Nevada Division of Environmental...

  15. NEGOTIATED AGREEMENT BETWEEN National Energy American Federation of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    95 March 25, 2013 Signatures This document is approved as the binding agreement between the parties and is approved on this 25th day of March 2013: Table of Contents PREAMBLE ................................................................................................................................. 3 ARTICLE 1: EXCLUSIVE RECOGNITION ........................................................................... 4 ARTICLE 2: EFFECTIVE DATE AND AGREEMENT DURATION

  16. NEGOTIATED AGREEMENT BETWEEN National Energy American Federation of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    16 March 25, 2013 Signatures This document is approved as the binding agreement between the parties and is approved on this 25th day of March 2013: Table of Contents PREAMBLE ................................................................................................................................. 3 ARTICLE 1: EXCLUSIVE RECOGNITION ........................................................................... 4 ARTICLE 2: EFFECTIVE DATE AND AGREEMENT DURATION

  17. About Federal On-Site Renewable Power Purchase Agreements | Department...

    Energy.gov (indexed) [DOE]

    the National Renewable Energy Laboratory in Golden, Colorado. A PPA funded the photovoltaic system installed on the Research Support Facility at the National Renewable Energy ...

  18. Greening Federal Facilities: An Energy, Environmental, and Economic Resource Guide for Federal Facility managers and Designers; Second Edition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FEDERAL FACILITIES An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION DOE/GO-102001-1165 Section DOE/GO-102001-1165 NREL/BK-710-29267 May 2001 i Greening Federal Facilities An Energy, Environmental, and Economic Resource Guide for Federal Facility Managers and Designers SECOND EDITION "Then I say the earth belongs to each ... generation during its course, fully and in its own right, no generation can contract debts greater than

  19. SANDIA NATIONAL LABORATORIES NFE AGREEMENTS NON-FEDERAL ENTITY...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    private sector through mutually beneficial, technology partnerships. A company working with SNL on such an endeavor is known as a non-Federal entity (NFE). An NFE can be private ...

  20. Waste treatment facility passes federal inspection, completes...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    scheduled to begin treating 900,000 gallons of radioactive liquid waste stored in underground tanks at a former Cold War spent nuclear fuel reprocessing facility next month. ...

  1. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 4 - Nuclear Safety Basis Program Review During Facility Decommissioning and Environmental Restoration February 2015 i Standard Review Plan Volume 4 Nuclear Safety Basis Program Review during Facility Decommissioning and Environmental Restoration Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February

  2. Weldon Spring Federal Facility Agreement, January 28, 1992

    Office of Environmental Management (EM)

  3. Federal Facility Compliance Agreement on Storage of Polychlorinated...

    Office of Environmental Management (EM)

    IV. Statement of Facts & Conclusions of Law V. Compliance Requirements VI. Submittal ... IV (Statement of Facts and Conclusions of Law), paragraph 3, are included in this ...

  4. Weldon Spring Site Federal Facility Agreement UNITED STATES ENVIRONMEN...

    Office of Legacy Management (LM)

    ... is entered into by the PARTIES without trial or adjudication of any issues of fact or law. ... and punitive damages for any violation of law. 98 EPA and the MDNR reserve such rights as ...

  5. Mound Plant Federal Facility Agreement, July 15, 1993 Summary

    Office of Environmental Management (EM)

    Actions (IRAs) alternatives and implement US EPA and OEPA approved remedies for the site in accordance with CERCLA Parties EPA; Ohio EPA (OEPA); DOE Date 07151993 SCOPE * ...

  6. Weldon Spring Federal Facility Agreement, January 28, 1992 Summary

    Office of Environmental Management (EM)

    at the Weldon Spring Site Parties US EPA; US DOE Date 12892 SCOPE * Investigate ... of primary and secondary documents to EPA according to the guidelines of Section X of ...

  7. Monticello Mill site Federal Facility Agreement, December 22...

    Office of Environmental Management (EM)

    from the NPL XII. Consultation with U.S. EPA and the State: Review and Comment Process ... Protection Agency, Region VIII (U.S. EPA), enters into those portions of this ...

  8. Federal Facility Agreement for the Oak Ridge Reservation, January...

    Office of Environmental Management (EM)

    a basis for a determination that the DOE has completed the Remedial InvestigationFeasibility Study(s), remedial design(s), and remedial action(s) at the Site pursuant to CERCLA...

  9. MSG MONTICELLO PROJECTS FEDERAL FACILITY AGREEMENT REPORT March...

    Office of Legacy Management (LM)

    ... beginning d6e +4---... Average wind speed Prevailing wind direction ...2005 0 I ol I l102005 0 0 l172005 43 Power bump activnted pump 0 0.0 0.0 1242005 0 ...

  10. The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement...

    Office of Environmental Management (EM)

    payment or obligation of funds by DOE shall be subject to the availability of appropriated funds, and no provision herein shall be interpreted to require the obligation or payment ...

  11. FEDERAL FACILITY COMPLIANCE AGREEMENT (FFCA) STACK ISOLATION PROJECT FUNCTIONS & REQUIREMENTS

    SciTech Connect (OSTI)

    TRANBARGER, R.K.

    2003-12-16

    This document delineates the functions and requirements for the FFCA Stack Isolation Project for the 244-A, 244-BX, 244-5, and 244-TX DCRTs. The isolation of each ventilation system and stack includes the electrical, instrumentation, and mechanical isolation of the ventilation system and the installation of primary and annulus breather filters to provide passive ventilation to meet the FFCA requirements.

  12. Lawrence Livermore National Laboratory Federal Facility Agreement, June 29, 1992

    Office of Environmental Management (EM)

    California Refueling Stations | Department of Energy Developed Hydrogen Sensors Put to Test at Southern California Refueling Stations Lawrence Livermore Developed Hydrogen Sensors Put to Test at Southern California Refueling Stations October 31, 2016 - 12:13pm Addthis A close-up of a sensor element. Hydrogen sensor prototypes were installed at this refueling station in Burbank (right) and others to test how well the sensors detect hydrogen concentrations. A close-up of a sensor element.

  13. Mound Plant Federal Facility Agreement, July 15, 1993

    Office of Environmental Management (EM)

  14. Mr. Todd Mullins Federal Facility Agreement Manager Kentucky...

    Office of Environmental Management (EM)

    Protection Division of Waste Management 200 Fair Oaks ... AT THE U.S. DEPARTMENT OF ENERGY PADUCAH GASEOUS DIFFUSION ... Additionally, DOE provided municipal water to the affected ...

  15. Monticello Mill site Federal Facility Agreement, December 22...

    Office of Environmental Management (EM)

    of Environmental Health Date 12221988 SCOPE * Identify Interim Remedial Action (IRA) alternatives, if any, which are appropriate at the Site prior to the implementation of ...

  16. Title Federal Facility Agreement and Consent Order Author

    National Nuclear Security Administration (NNSA)

    ... and the Department of Energy for the Storage of Low-Level Land Disposal Restricted ... shall be provided split or duplicate 44 samples of all samples collected by DOE andor ...

  17. Title Federal Facility Agreement and Consent Order Author

    National Nuclear Security Administration (NNSA)

    ... IV.32.< "Nellis Air.Force Range" shall mean the property so described in Appendix I, ... "person" contained in the Nevada Water Pollution Control Law, NRS 445A.300vet seg.. and ...

  18. EXECUTIVE SUMMARY FOR HANFORD FEDERAL FACILITY AGREEMENT AND CONSENT ORDER

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    EXAMINATION REPORT: OAS-RA-13-27 EXAMINATION REPORT: OAS-RA-13-27 July 15, 2013 Commonwealth of Puerto Rico Energy Affairs Administration - Energy Efficiency and Conservation Block Grant Program Funds Provided by the American Recovery and Reinvestment Act of 2009 As part of the American Recovery and Reinvestment Act of 2009 (Recovery Act), the Energy Efficiency and Conservation Block Grant (EECBG) Program received $3.2 billion to develop, promote, implement and manage energy efficiency and

  19. Brookhaven National Laboratory Federal Facility Agreement, February 28, 1992

    Office of Environmental Management (EM)

  20. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Thomas L. McCall, Jr. http:www.em.doe.govffaaortsca.html 4252001 Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agree.. Page 12 of 26 Deputy...

  1. Toxic Substances Control Act Uranium Enrichment Federal Facilities...

    Office of Environmental Management (EM)

    Thomas L. McCall, Jr. http:www.em.doe.govffaaortsca.html 4252001 Toxic Substances Control Act Uranium Enrichment Federal Facilities Compliance Agree.. Page 12 of 26 Deputy ...

  2. Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal...

    Open Energy Information (Open El) [EERE & EIA]

    Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Terra-Gen Powers Coso Geothermal Facility Obtains Critical Federal Permit to Increase Its...

  3. FEMP Assisting Federal Facilities with Energy Conservation Technologies Webinar Transcript

    Energy.gov [DOE]

    Good afternoon. My name is Courtney Kendall from the National Renewable Energy Laboratory and I'd like to welcome you to today's webinar on AFFECT:  Assisting Federal Facilities with Energy...

  4. FEMP's Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AFFECT 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) June 8, 2016 David Boomsma AFFECT Program Manager Federal Energy Management Program (FEMP) Energy Efficiency and Renewable Energy Department of Energy Federal Energy Management Program 2 Event Date FOA Issue Date May 26, 2016 Letter of Intent (LOI) Deadline June 27, 2016 5:00pm ET Full Application Deadline July 27, 2016 5:00pm ET Notification of Award Selections October 28, 2016 Timeframe for Award

  5. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 2 -- Nuclear Safety Basis Program Review During Design February 2015 i Standard Review Plan Volume 2 Nuclear Safety Basis Program Review during Design Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  6. EISA Federal Facility Management and Benchmarking Reporting Requirements |

    Energy Savers

    EIS0250F_Volume1_part2.pdf EIS0250F_Volume1_part2.pdf (10.84 MB) More Documents & Publications EIS-0250-S1: Final Supplemental Environmental Impact Statement crd title p1.ai EIS-0250-S1: Draft Supplemental Environmental Impact Statement Department of Energy

    Reporting & Data » Facilities » EISA Federal Facility Management and Benchmarking Reporting Requirements EISA Federal Facility Management and Benchmarking Reporting Requirements Section 432 of the Energy Independence and

  7. Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183- Sep. 19, 2008

    Energy.gov [DOE]

    Federal Register Notice of proposed rulemaking and opportunity for comment on the coordination of federal authorizations for electric transmission facilities, September 19, 2008

  8. Environmental partnering at federal facilities success through communications and teamwork

    SciTech Connect (OSTI)

    Ferraro, P.

    1995-12-01

    Construction partnering has been used on many government and private construction projects for at least a decade while environmental partnering at federal facilities has only recently received some attention. The Federal government is exploring how to implement the concepts of environmental partnering at federal facilities. It appears that some federal facilities are utilizing partnering concepts while others are not. Environmental partnering as a federal facility consists of a cooperative effort by all facility stakeholders working as a team to achieve the goal of environmental restoration. The regulatory members must join with other stakeholders in dealing with environmental issues in a timely manner. The key elements of environmental partnering are: commitment, trust, common goals, timely response and continuous evaluation. The partnering process is only a guide since each project or program is unique and the stakeholder will vary requiring a tailored partnering approach. The process consists of: early preparation, identification of stakeholders, management commitments, kick-off meeting or workshop and periodic evaluations. This paper presents the concepts of environmental partnering, including benefits, stakeholders, and the environmental partnering process. It also discusses examples of construction partnering and environmental partnering.

  9. Fernald Triparty Agreement as revised, July 18, 1986 Summary

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Facility Compliance Agreement State Ohio Agreement Type Compliance Agreement Legal Driver(s) RCRACERCLACWA Scope Summary Establish a Compliance Plan to ensure compliance...

  10. Guidance for Fast-Track Cooperative Research And Development Agreement (CRADA) Programs at DOE Facilities.

    Energy.gov [DOE]

    This AL provides guidance for implementing a new Fast Track CRADA Program (Fast Track or Fast Track Program) at DOE Facilities (i.e., National Laboratories, single-purpose research facilities, and other Department facilities) (Facilities) that streamlines the execution of Cooperative Research and Development Agreements (CRADAs) across the DOE complex.

  11. Requirements and impacts of the Federal Facility Compliance Act on the Department of Energy

    SciTech Connect (OSTI)

    Chang, L.; Tripp, S.C.

    1993-03-01

    The Federal Facilities Compliance Act (FFCA, the Act) was signed into law on October 6, 1992, primarily as a means of waiving sovereign immunity for federal facilities with respect to requirements under the Resource Conservation and Recovery Act. DOE`s implementation of the FFCA will have significant effects on current and future DOE waste management operations. DOE will need to rethink its strategy in the area of future compliance agreements to ensure commitments and deliverables are made consistent throughout the different DOE facilities. Several types of agreements that address mixed waste land disposal restriction (LDR) compliance have already been signed by both DOE and the regulators. These agreements are in place at the Hanford Reservation, the Savannah River Site, the Oak Ridge Reservation (Oak Ridge National Laboratory, K-25, Y-12), and the Paducah Gaseous Diffusion Plant. The Rocky Flats Agreement is now being renegotiated. Los Alamos National Laboratory, Sandia/Albuquerque National Laboratory, Lawrence Livermore National Laboratory, and Idaho National Engineering Laboratory agreements are in progress. Major components of the FFCA include provisions on: sovereign immunity waiver; cost reimbursements; mixed waste requirements, including inventory reports on mixed waste and treatment capacity and technologies; and plans for the development of treatment capacities and technologies. Each of these components is discussed within this paper.

  12. SUSTAINABILITY NEWS Assisting Federal Facilities with Energy Conservation Technologies (AFFECT)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) DOE's Federal Energy Management Program (FEMP) recently issued a notice of intent to release a Funding Opportunity Announcement (FOA) for its new AFFECT program. The program intends to provide direct funding awards of up to $1 million per project to help finance renewable energy and combined heat and power (CHP) projects. Projects that apply for the funding are expected to leverage other financing mechanisms (such as

  13. High-Efficiency Parking Lighting in Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    High-Efficiency Parking Lighting in Federal Facilities FEdEraL EnErgy ManagEMEnt PrograM MC Realty Group Saving Energy and Money with the IRS MC Realty Group, LLC, won a 2014 LEEP Award for cutting energy use by 76% at the Internal Revenue Service (IRS) Facility Parking Garage in Kansas City, Missouri. MC Realty replaced 1,500 metal halide fxtures with an equal number of T8 fuorescent fxtures in the fve-story parking structure to cut energy use by 2 million kilowatt-hours (kWh) annually, which

  14. Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Judge | Department of Energy Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge Agreement on New Commitments for Hanford Tank Waste Cleanup Sent to Federal Judge October 6, 2010 - 12:00am Addthis RICHLAND, Wash. - The U.S. Department of Energy and Washington State Department of Ecology (Ecology) jointly filed a motion today in U.S. District Court asking the court to approve and enter a judicial consent decree that imposes a new, enforceable, and achievable

  15. Expedited site characterization for remedial investigations at federal facilities

    SciTech Connect (OSTI)

    Burton, J.C.

    1994-04-01

    Argonne National Laboratory`s Expedited Side Characterization (ESC) methodology gives federal agencies a process for producing high-quality CERCLA and RCRA site characterizations and remedial investigations in a cost- and time-efficient manner. The ESC process has been successfully tested and applied at numerous federal facilities. Examples include expanded site investigations for the Department of Interior`s Bureau of Land Management and remedial investigations for the Commodity Credit Corporation/US Dept. of Agriculture (CCC/USDA). In particular, the CCC/USDA has been the major sponsor in the development of the ESC process at Argonne. The technical successes and the cost and time savings of the ESC process for these programs have been detailed in previous papers. The Argonne ESC is currently being implemented at a Department of Energy facility (Pantex) and is schedules for implementation in the Department of Defense base closure program in order to meet accelerated schedules for remedial actions by these agencies.

  16. Federal Facilities Compliance Act, Conceptual Site Treatment Plan. Part 1

    SciTech Connect (OSTI)

    1993-10-29

    This Conceptual Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed in this document include: general discussion of the plan, including the purpose and scope; technical aspects of preparing plans, including the rationale behind the treatability groupings and a discussion of characterization issues; treatment technology needs and treatment options for specific waste streams; low-level mixed waste options; TRU waste options; and future waste generation from restoration activities.

  17. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-04-25

    The purpose of this Guide is to provide U.S. Department of Energy (DOE) line management with guidance that may be useful to them in effectively and efficiently implementing the requirements of DOE O 226.1B, Implementation of Department of Energy Oversight Policy, date April 25, 2011, as applied to Federal line management of hazard category 1, 2, and 3 nuclear facilities.

  18. AFFECT 2016: Assisting Federal Facilities with Energy Conservation Technologies Webinar Slides

    Energy.gov [DOE]

    Webinar slides describe the 2016 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) funding opportunity offered by the Federal Energy Management Program.

  19. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Energy.gov [DOE]

    Fact sheet from the Federal Energy Management Program (FEMP) describes rate-responsive building operations for cost and energy savings in California federal facilities.

  20. Occupational radiation Exposure at Agreement State-Licensed Materials Facilities, 1997-2010

    SciTech Connect (OSTI)

    U.S. Nuclear Regulatory Commission, Office of Nuclear Regulatory Research

    2012-07-07

    The purpose of this report is to examine occupational radiation exposures received under Agreement State licensees. As such, this report reflects the occupational radiation exposure data contained in the Radiation Exposure Information and Reporting System (REIRS) database, for 1997 through 2010, from Agreement State-licensed materials facilities.

  1. Miscellaneous agreements between the U.S. Department of Energy and Federal, State, and local agencies.

    SciTech Connect (OSTI)

    Meincke, Carol L.

    2010-08-01

    This document identifies and provides access to source documentation for the Site- Wide Environmental Impact Statement for Sandia National Laboratories/New Mexico. Specifically, it lists agreements between the U.S. Department of Energy (DOE), the National Nuclear Security Administration (NNSA), DOE/NNSA/Sandia Site Office (SSO), Sandia Corporation, and local and state government agencies, Department of Defense, Kirtland Air Force Base, and other federal agencies.

  2. AGREEMENT

    Office of Legacy Management (LM)

    ... for the job covered by this agreement. 13. The DOE reserves the right to review, audit, and disapprove of any charges submitted by the Principal for -3- reimbursement under ...

  3. Ground-Source Heat Pumps Applied to Federal Facilities - Second Edition

    SciTech Connect (OSTI)

    2001-03-01

    Ground-Source Heat Pumps Applied to Federal Facilities, Second Edition, technology for reducing heating and air-conditioning costs.

  4. Distributed Energy Resources at Federal Facilities. Federal Energy Management Program (FEMP) Technical Assistance Fact Sheet

    SciTech Connect (OSTI)

    Pitchford, P.

    2001-07-16

    This two-page overview describes how the use of distributed energy resources at Federal facilities is being supported by the U.S. Department of Energy's (DOE's) Federal Energy Management Program (FEMP). Distributed energy resources include both existing and emerging energy technologies: advanced industrial turbines and microturbines; combined heat and power (CHP) systems; fuel cells; geothermal systems; natural gas reciprocating engines; photovoltaics and other solar systems; wind turbines; small, modular biopower; energy storage systems; and hybrid systems. DOE FEMP is investigating ways to use these alternative energy systems in government facilities to meet greater demand, to increase the reliability of the power-generation system, and to reduce the greenhouse gases associated with burning fossil fuels.

  5. DOE uniform reporting system for Federal assistance (grants and cooperative agreements): guidelines

    SciTech Connect (OSTI)

    Not Available

    1981-04-01

    These guidelines establish a uniform reporting system (URS) for grants and cooperative agreements. The purpose is to simplify reporting requirements, standardize reporting, and ensure that no assistance recipient submits more reports than needed to achieve accountability for public funds. This system replaces the many reporting procedures previously imposed by DOE component organizations. Uniform terminology and data elements will minimize ambiguity of meaning and intent. A glossary of terms is provided. A checklist is used to identify all reporting requirements at the time of award. The recipient is encouraged to discuss the requirements before the time of award in order to ensure that they are appropriate. The Guidelines describe planning forms which can be included in the Federal assistance application or proposal to present the planned approach and desired results. Flexibility has been built into the system to ensure that the information requested is relative to the activity performed. A recipient of Federal assistance submits information only once in each reporting period. The reporting system provides recipients with a formal method for identifying problems, including those originated by the Federal government. For purposes of illustration, a hypothetical project - partially funded by DOE under a cooperative agreement - using all the Program Management forms is presented in Part II, Program Management. Part III, Technical Information uses a research grant to illustrate Technical Reporting. Appendix B provides a complete example of the reporting requirements on a research grant.

  6. Low-Level Waste Disposal Facility Federal Review Group (LFRG) | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Program Management » Compliance » Low-Level Waste Disposal Facility Federal Review Group (LFRG) Low-Level Waste Disposal Facility Federal Review Group (LFRG) The Low-Level Waste Disposal Facility Federal Review Group (LFRG) is an independent group within the Office of Environmental Management (EM) that ensures, through review, that Department of Energy (DOE) (including the National Nuclear Security Administration) radioactive waste disposal facilities are protective of the public

  7. The Agreement - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Agreement Tri-Party Agreement The Agreement Action Plan Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS Information Hanford Site Waste Management Units Report Hanford Public Involvement Plan Administrative Record (AR) Related Links The Agreement Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size Hanford Federal Facility Agreement and Consent Order by Washington State Department of

  8. The Department of Energy has opted to utilize the following agreement for Designated Non-Proprietary User Facilities transactions

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    agreement for Designated Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisons will require approval by the DOE Contracting Officer, WHICH WILL LIKEY DELAY YOUR ACCESS TO THE USER FACILITY. In

  9. Tri Party Agreement Administrative Record Presentation for ...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Protection Agency (US DOE and US EPA) - Consent Order between US DOE and ... with the Consent Order Why is there an EPA-DOE Federal Facility Agreement? 1980: ...

  10. Search for Efficient Technologies and Products for Federal Facilities

    Energy.gov [DOE]

    The Federal Energy Management Program provides information and resources about energy- and water-efficient technologies and products that are well suited for federal applications and can help agencies meet federal laws and requirements.

  11. 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA CHP Partnership Meeting, October 2002 | Department of Energy 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 This is an announcement of the 3rd Annual National CHP Roadmap Workshop which was held in conjunction with the CHP and Distributed Energy Resources for Federal Facilities Workshop, October 23-25,

  12. FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects

    Energy.gov [DOE]

    FEMP developed a guide to help federal agencies, as well as the developers and financiers that work with them, to successfully install large-scale renewable energy projects at federal facilities.

  13. EERE Success Story-FEMP Helps Federal Facilities Develop Large-Scale

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Renewable Energy Projects | Department of Energy FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects EERE Success Story-FEMP Helps Federal Facilities Develop Large-Scale Renewable Energy Projects August 21, 2013 - 12:00am Addthis EERE's Federal Energy Management Program issued a new resource that provides best practices and helpful guidance for federal agencies developing large-scale renewable energy projects. The resource, Large-Scale Renewable Energy Guide:

  14. Webinar: Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers

    Office of Energy Efficiency and Renewable Energy (EERE)

    Video recording and text version of the webinar titled, Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers, originally presented on May 8, 2012.

  15. Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

    Energy.gov [DOE]

    This presentation, given through the DOE's Technical Assitance Program (TAP), provides information on Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment.

  16. Federal Technical Capability Policy for Defense Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-12-10

    The policy regarding the Federal Technical Capability Program, which provides for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities.

  17. The Business Case for Sustainable Design in Federal Facilities

    SciTech Connect (OSTI)

    2003-08-01

    This document provides a better understanding of the Federal government's effort to build a more sustainable real estate portfolio.

  18. Using Distributed Energy Resources, A How-To Guide for Federal Facility Managers

    SciTech Connect (OSTI)

    Distributed Utility Associates

    2002-05-01

    The Department of Energy's Federal Energy Management Program (FEMP) established the Distributed Energy Resources (DER) Program to assist Federal agencies in implementing DER projects at their facilities. FEMP prepared this How-To Guide to assist facility managers in evaluating potential applications and benefits. It provides step-by-step advice on how to carry out a Federal DER project. It also describes and explains DER applications and potential benefits in Federal facilities; DER technologies and how to match them to applications; a step-by-step approach to implementing projects; potential barriers and how to overcome them; and resources to assist you in implementing new DER projects.

  19. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    Volume 3 - Nuclear Safety Basis Program Review During Facility Operations and Transitions February 2015 i Standard Review Plan Volume 3 Nuclear Safety Basis Program Review during Facility Operations and Transitions Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms

  20. Technology Potential of Thermal Energy Storage (TES) Systems in Federal Facilities

    SciTech Connect (OSTI)

    Chvala, William D.

    2001-07-31

    This document presents the findings of a technology market assessment for thermal energy storage (TES) in space cooling applications. The potential impact of TES in Federal facilities is modeled using the Federal building inventory with the appropriate climatic and energy cost data. In addition, this assessment identified acceptance issues and major obstacles through interviews with energy services companies (ESCOs), TES manufacturers, and Federal facility staff.

  1. Testing Promising Technologies: A Role for Federal Facilities

    Energy.gov [DOE]

    Presentation covers the testing of promising technologies and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  2. EERE Success Story-FEMP Helps Federal Facilities Develop Large...

    Energy.gov (indexed) [DOE]

    The Federal Energy Management Program (FEMP) works with key individuals to accomplish ... Addthis Related Articles EERE Success Story-FEMP and U.S. Army Corps of Engineers Partner ...

  3. Procuring Solar Energy: A Guide for Federal Facility Decision...

    Energy.gov (indexed) [DOE]

    process for successfully planning for and installing solar technology on a federal site. ... The solar project process is outlined in a concise, easy-to-understand, step-by-step ...

  4. Procuring Stationary Fuel Cells For CHP: A Guide for Federal Facility Decision Makers

    SciTech Connect (OSTI)

    Stinton, David P; McGervey, Joseph; Curran, Scott

    2011-11-01

    fuel cell projects easier to put into service. In this environment, federal decision makers can focus on being smart buyers of fuel cell energy instead of attempting to become experts in fuel cell technology. For agencies that want to pursue a fuel cell CHP this guide presents a four step process for a successful project. 1. Perform a preliminary screening of the energy needs energy costs and incentives. 2. Compare a detailed project plan. 3. Make a financing and contracting decision. 4. Execute the project plan including financing, installation, and operation. The simplest procurement method is designated funding for the outright purchase of the fuel cell CHP system, although this is usually not the most cost-effective option. This guide describes the following financing options: Power purchase agreement Energy savings performance contract Utility energy services contract Enhanced use lease Fuel cell CHP technology can help federal facility managers comply with agency objectives for reducing energy consumption and air pollution emissions. Fuel cells do not generate particulate pollutants, unburned hydrocarbons or the gases that produce acid rain. Fuel cells emit less carbon dioxide (CO2) than other, less efficient technologies and use of renewable fuels can make them carbon neutral. Fuel cell CHP technology can deliver reliable electricity and heat with high efficiency (70% to 85%) in a small physical footprint with little noise, making it a cost-effective option for federal facilities.

  5. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities.

  6. Federal Technology Alert: Ground-Source Heat Pumps Applied to Federal Facilities--Second Edition

    SciTech Connect (OSTI)

    Hadley, Donald L.

    2001-03-01

    This Federal Technology Alert, which was sponsored by the U.S. Department of Energy's Office of Federal Energy Management Programs, provides the detailed information and procedures that a Federal energy manager needs to evaluate most ground-source heat pump applications. This report updates an earlier report on ground-source heat pumps that was published in September 1995. In the current report, general benefits of this technology to the Federal sector are described, as are ground-source heat pump operation, system types, design variations, energy savings, and other benefits. In addition, information on current manufacturers, technology users, and references for further reading are provided.

  7. Performing Energy Security Assessments: A How-To Guide for Federal Facility Managers

    Office of Energy Efficiency and Renewable Energy (EERE)

    Guide describes the best practices and recommended process for federal facility managers to prepare for the following sections of a facility’s energy security plan: vulnerability assessments, energy preparedness and operations plans, and remedial action plans.

  8. FOA for Assisting Federal Facilities with Energy Conservation Technologies Informational Webinar

    Energy.gov [DOE]

    This webinar will highlight the funding opportunity announcement (FOA) that was issued on March 6, 2015. The AFFECT grant will provide funding for renewable energy projects at federal facilities...

  9. Guidance Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract

    Energy.gov [DOE]

    Document addresses potential refinancing, restructuring, or modifying of a loan agreement entered into by an energy services company (ESCO) under a federal energy savings performance contract (ESPC).

  10. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    1 -- Nuclear Safety Basis Program Review Overview and Management Oversight February 2015 i Standard Review Plan Volume 1 Nuclear Safety Basis Program Review Overview and Management Oversight Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii

  11. Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities

    Office of Environmental Management (EM)

    5 - Nuclear Safety Basis Program Review of TSRs, USQs and SERs February 2015 i Standard Review Plan Volume 5 Nuclear Safety Basis Program Review of TSRs, USQs and SERs Facility Life Cycle Applicability CD-1 CD-2 CD-3 CD-4 Operations and Transitions Decommissioning & Environmental Restoration February 2015 ii Table of Contents Acronyms ................................................................................................................................... iii Introduction

  12. Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-14

    The Guide was developed in support of DOE O 226.1B to provide guidance that may be useful to DOE line management organizations in meeting the provisions of that order when applied to nuclear facilities. Supersedes DOE G 226.1-2

  13. Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility |

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Y-12 National Security Complex Largest Federally Owned ... Largest Federally Owned Wind Farm Breaks Ground at U.S. Weapons Facility Posted: August 13, 2013 - 12:01pm WASHINGTON - Building on President Obama's Climate Action Plan, which calls for steady, responsible steps to reduce carbon pollution, the Energy Department today broke ground on the nation's largest federally owned wind project at the Pantex Plant in Amarillo, Texas. Once completed, this five-turbine 11.5 megawatt project will

  14. PFP Tentative Agreement.PDF

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    AGREEMENT ON NEGOTIATIONS FOR THE PLUTONIUM FINISHING PLANT PROJECT In accordance with the requirements of the Plutonium Finishing Plant (PFP) Agreement in Principle, the State of Washington Department of Ecology (Ecology), the U.S. Environmental Protection Agency (EPA), and the U.S. Department of Energy (DOE) (Parties) have concluded negotiations on the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Section 8 commitments for transition and selected dispositio n

  15. TENTATIVE AGREEMENT ON NEGOTIATIONS

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ON NEGOTIATIONS Acceleration of K Basins Sludge Treatment and Disposal, Basin Remediation, and Delay in Sludge Retrieval The U.S. Department of Energy, Richland Operations Office (RL) and the U.S. Environmental Protection Agency (EPA) have concluded negotiations on the Hanford Federal Facility Agreement and Consent Order (Tri- Party Agreement) M-034 and M-016 commitments for removal of sludge, debris, water and the K Basins. The M-016 commitments involve the removal of the basins and initiate

  16. Tentative Agreement.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tentative Agreement on Hanford Federal Facility Agreement and Consent Order (HFFACO) Negotiations for the Management of Hanford RCRA and CERCLA Wastes (HFFACO Milestone Series M-091 and M-016) The U.S. Department of Energy, Richland Operations Office (RL), the State of Washington, Department of Ecology, and the U.S. Environmental Protection Agency (EPA), hereinafter referred to as the Parties, have concluded negotiations for the management of Hanford RCRA and CERCLA wastes under HFFACO Milestone

  17. Large-Scale Renewable Energy Guide: Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    Energy.gov [DOE]

    The Large-Scale Renewable Energy Guide: Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities provides best practices and other helpful guidance for federal agencies developing large-scale renewable energy projects.

  18. Notice of Intent to Issue Funding Opportunity Announcement "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2017"

    Energy.gov [DOE]

    The Office of Energy Efficiency and Renewable Energy (EERE) intends to issue, on behalf of the Federal Energy Management Program (FEMP), a funding opportunity announcement (FOA) titled "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2017."

  19. Federal Facility Agreement Annual Progress Report for Fiscal Year 1999 Oak Ridge, Tennessee

    SciTech Connect (OSTI)

    Bechtel Jacobs Company LLC

    2000-01-01

    The U.S. Department of Energy-Oak Ridge Operations (DOE-ORO) EM Program adopted a watershed approach for performing Remedial Investigations (RIs) and characterizations for ORR because it is an effective system for determining the best methods for protecting and restoring aquatic ecosystems and protecting human health. The basic concept is that water quality and ecosystem problems are best solved at the watershed level rather than at the individual water-body or discharger level. The watershed approach requires consideration of all environmental concerns, including needs to protect public health, critical habitats such as wetlands, biological integrity, and surface and ground waters. The watershed approach provides an improved basis for management decisions concerning contaminant sources and containment. It allows more direct focus by stakeholders on achieving ecological goals and water quality standards rather than a measurement of program activities based on numbers of permits or samples. The watershed approach allows better management strategies for investigations, therefore maximizing the utilization of scarce resources. Feasibility studies (FSs) evaluate various alternatives in terms of environmental standards, the protection of human health and the environment, and the costs of implementation to find the optimum solution among them. Society has to decide how much it is willing to spend to meet the standards and to be protective. Conducting FSs is the process of trading off those criteria to pick that optimum point that society wants to achieve. Performing this analysis at the watershed scale allows those trade-offs to be made meaningfully. In addition, a Land Use Control Assurance Plan for the ORR was prepared to identify the strategy for assuring the long-term effectiveness of land use controls. These land use controls will be relied upon to protect human health and the environment at areas of the ORR undergoing remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act and/or the Resource Conservation and Recovery Act. This plan will be implemented by means of a Memorandum of Understanding (MOU) incorporating its terms with the United States EPA and TDEC. The majority of projects described in this report are grouped into five watersheds. They are the East Tennessee Technical Park (ETTP) Watershed (formerly the K-25 Site), the Melton Valley (MV) and Bethel Valley (BV) Watersheds at the Oak Ridge National Laboratory (ORNL), and the Bear Creek Valley (BCV) and Upper East Fork Poplar Creek (UEFPC) Watersheds at the Y-12 Plant.

  20. Savannah River Site Federal Facility Agreement, January 15, 1993 (First Half)

    Office of Environmental Management (EM)

  1. Savannah River Site Federal Facility Agreement, January 15, 1993 (Second Half)

    Office of Environmental Management (EM)

  2. The Oak Ridge Reservation PCB Federal Facilities Compliance Agreement, October 28, 1996

    Office of Environmental Management (EM)

    The Inside of a Wind Turbine The Inside of a Wind Turbine 1 of 17 Tower: 2 of 17 Tower: Made from tubular steel (shown here), concrete, or steel lattice. Supports the structure of the turbine. Because wind speed increases with height, taller towers enable turbines to capture more energy and generate more electricity. Generator: 3 of 17 Generator: Produces 60-cycle AC electricity; it is usually an off-the-shelf induction generator. High-speed shaft: 4 of 17 High-speed shaft: Drives the generator.

  3. U.S. Federal Facility Compliance Agreement for the Hanford Site, February 7, 1994

    Office of Environmental Management (EM)

    Research and Development Initiative | Department of Energy Agriculture and Energy Announce Funding for Biomass Research and Development Initiative U.S. Departments of Agriculture and Energy Announce Funding for Biomass Research and Development Initiative April 15, 2011 - 12:00am Addthis WASHINGTON, April 15, 2011- To support President Obama's goal of reducing America's oil imports by one-third by 2025, the U.S. Departments of Agriculture (USDA) and Energy (DOE) today jointly announced up to

  4. U.S. Federal Facility Compliance Agreement for the Hanford Site...

    Office of Environmental Management (EM)

    site into compliance with CAA Parties EPA; DOE; Richland Operations Office (RL) Date ... shall submit quarterly progress reports to EPA until the requirements contained in ...

  5. Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: April-June 2016

    Office of Legacy Management (LM)

    6 July 2016 LMS/MNT/S14438 This page intentionally left blank U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: April-June 2016 July 2016 Doc. No. S14438 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Quarterly Site

  6. Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: January-March 2016

    Office of Legacy Management (LM)

    6 April 2016 LMS/MNT/S14013 This page intentionally left blank U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: January-March 2016 April 2016 Doc. No. S14013 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1 Quarterly

  7. Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: October-December 2015

    Office of Legacy Management (LM)

    5 January 2016 LMS/MNT/S13666 This page intentionally left blank U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: October-December 2015 January 2016 Doc. No. S13666 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction ............................................................................................................................1 1.1

  8. Federal Facility Agreement for the Laboratory for Energy-Related Health Research

    Office of Environmental Management (EM)

  9. Federal Facility Agreement for the Oak Ridge Reservation, January 1, 1992

    Office of Environmental Management (EM)

  10. Wireless Occupancy Sensors for Lighting Controls: An Applications Guide for Federal Facility Managers

    Office of Energy Efficiency and Renewable Energy (EERE)

    This fact sheet provides federal facility managers with an overview of the energy savings potential of wireless lighting occupancy sensors for various room types, cost considerations, key steps to successful installation of wireless sensors, pros and cons of various technology options, light source considerations, and codes and standards.

  11. 2014 Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Recipients

    Office of Energy Efficiency and Renewable Energy (EERE)

    On November 5, 2013, FEMP issued a funding opportunity announcement (FOA) on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) DE-FOA-0000901. The release of the FOA followed the notice of intent, which was issued on July 9, 2013. On September 22, 2014, FEMP announced the following nine AFFECT projects.

  12. Energy Department Announces $5 Million to Develop Clean Energy Projects at Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Energy Department today announced $5 million in funding for nine projects that will advance the development of combined heat and power (CHP) and renewable energy technologies at facilities across the federal government and help meet energy efficiency, renewable energy, and greenhouse gas reduction goals.

  13. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    SciTech Connect (OSTI)

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall

  14. California Federal Facilities: Rate-Responsive Building Operation for Deeper Cost and Energy Savings

    SciTech Connect (OSTI)

    2012-05-01

    Dynamic pricing electricity tariffs, now the default for large customers in California (peak demand of 200 kW and higher for PG&E and SCE, and 20 kW and higher for SDG&E), are providing Federal facilities new opportunities to cut their electricity bills and help them meet their energy savings mandates. The U.S. Department of Energy’s (DOE) Federal Energy Management Program (FEMP) has created this fact sheet to help California federal facilities take advantage of these opportunities through “rate-responsive building operation.” Rate-responsive building operation involves designing your load management strategies around your facility’s variable electric rate, using measures that require little or no financial investment.

  15. Guidance Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regarding Refinancing, Restructuring, or Modifying Loan Agreements Entered into by an Energy Services Company Under a Federal Energy Savings Performance Contract This FEMP guidance addresses potential refinancing, restructuring, or modifying of loan agreements (collectively called a "debt modification") entered into by an Energy Services Company (ESCO) under federal Energy Savings Performance Contracts (ESPCs). In considering the impact of debt modifications on ESPCs, it is important

  16. Uranium-Loaded Water Treatment Resins: 'Equivalent Feed' at NRC and Agreement State-Licensed Uranium Recovery Facilities - 12094

    SciTech Connect (OSTI)

    Camper, Larry W.; Michalak, Paul; Cohen, Stephen; Carter, Ted

    2012-07-01

    Community Water Systems (CWSs) are required to remove uranium from drinking water to meet EPA standards. Similarly, mining operations are required to remove uranium from their dewatering discharges to meet permitted surface water discharge limits. Ion exchange (IX) is the primary treatment strategy used by these operations, which loads uranium onto resin beads. Presently, uranium-loaded resin from CWSs and mining operations can be disposed as a waste product or processed by NRC- or Agreement State-licensed uranium recovery facilities if that licensed facility has applied for and received permission to process 'alternate feed'. The disposal of uranium-loaded resin is costly and the cost to amend a uranium recovery license to accept alternate feed can be a strong disincentive to commercial uranium recovery facilities. In response to this issue, the NRC issued a Regulatory Issue Summary (RIS) to clarify the agency's policy that uranium-loaded resin from CWSs and mining operations can be processed by NRC- or Agreement State-licensed uranium recovery facilities without the need for an alternate feed license amendment when these resins are essentially the same, chemically and physically, to resins that licensed uranium recovery facilities currently use (i.e., equivalent feed). NRC staff is clarifying its current alternate feed policy to declare IX resins as equivalent feed. This clarification is necessary to alleviate a regulatory and financial burden on facilities that filter uranium using IX resin, such as CWSs and mine dewatering operations. Disposing of those resins in a licensed facility could be 40 to 50 percent of the total operations and maintenance (O and M) cost for a CWS. Allowing uranium recovery facilities to treat these resins without requiring a license amendment lowers O and M costs and captures a valuable natural resource. (authors)

  17. Federal Facility Compliance Act, Proposed Site Treatment Plan: Background Volume. Executive Summary

    SciTech Connect (OSTI)

    1995-03-24

    This Federal Facility Compliance Act Site Treatment Plan discusses the options of radioactive waste management for Ames Laboratory. This is the background volume which discusses: site history and mission; framework for developing site treatment plans; proposed plan organization and related activities; characterization of mixed waste and waste minimization; low level mixed waste streams and the proposed treatment approach; future generation of TRU and mixed wastes; the adequacy of mixed waste storage facilities; and a summary of the overall DOE activity in the area of disposal of mixed waste treatment residuals.

  18. Mr. Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 October 11, 2011 PATH FORWARD: 2011 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 447, NEVADA Dear Mr. Murphy: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is providing this Short-Term Data Acquisition Plan for the Project Shoal Area (Shoal), Subsurface Corrective Action Unit 447, near

  19. Federal Facilities Compliance Act, Draft Site Treatment Plan: Background Volume, Part 2, Volume 1

    SciTech Connect (OSTI)

    1994-08-31

    This Draft Site Treatment Plan was prepared by Ames Laboratory to meet the requirements of the Federal Facilities Compliance Act. Topics discussed include: purpose and scope of the plan; site history and mission; draft plant organization; waste minimization; waste characterization; preferred option selection process; technology for treating low-level radioactive wastes and TRU wastes; future generation of mixed waste streams; funding; and process for evaluating disposal issues in support of the site treatment plan.

  20. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book

    2 Annual Energy Expenditures per Gross Square Foot of Federal Floorspace Stock, by Year ($2010) FY 1985 2.13 FY 2000 1.36 FY 2001 1.58 FY 2002 1.49 FY 2003 1.45 FY 2004 1.54 FY 2005 1.59 FY 2006 2.01 (1) FY 2007 2.01 Note(s): Source(s): Total Federal buildings and facilities energy expenditures in FY 2006 were $5.79 billion (in $2010). 1) Increase due to change in FEMP categorization of Federal buildings. DOE/FEMP, Annual Report to Congress on FEMP FY 2007, Jan. 2010, Table A-9, p. 97 and Table

  1. Comments by the American Electric Power System on Proposed Coordination of Federal Authorizations for Electric Transmission Facilities

    Energy.gov [DOE]

     Proposed Coordination of Federal Authorizations for Electric Transmission Facilities – Interim Final Rule and Proposed Rule (DOE, 10 CR Part 900): The utility operating companies of the American...

  2. Buildings Energy Data Book: 4.2 Federal Buildings and Facilities Characteristics

    Buildings Energy Data Book

    2 Federal Buildings and Facilities Characteristics March 2012 4.2.1 Federal Building Gross Floorspace, by Year and Agency Fiscal Year Agency FY 1985 3.37 DOD 63% FY 1986 3.38 USPS 10% FY 1987 3.40 GSA 6% FY 1988 3.23 VA 5% FY 1989 3.30 DOE 3% FY 1990 3.40 Other 13% FY 1991 3.21 Total 100% FY 1992 3.20 FY 1993 3.20 FY 1994 3.11 FY 1995 3.04 FY 1996 3.03 FY 1997 3.02 FY 1998 3.07 FY 1999 3.07 FY 2000 3.06 FY 2001 3.07 FY 2002 3.03 FY 2003 3.04 FY 2004 2.97 FY 2005 2.96 FY 2006 3.10 FY 2007 3.01

  3. Ms. Chris Andres, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Ms. Chris Andres, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 June 16,2014 PATH FORWARD: 2014 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 44 7, NEVADA Dear Ms. Andres: The U.S. Departtnent of Energy (DOE) Office of Legacy Management (LM) is providing this Short- Term Data Acquisition Plan for the Shoal, Nevada, Site, Subsurface Corrective Action Unit 447, near

  4. California Federal Facilities: Rate-Responsive Buidling Operating for Deeper Cost and Energy Savings

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rouggly, energy manager at SSA's Frank Hagel Federal Building in Richmond California, reports that the facility garnered $35,000 in credits in 2011 on PG&E's Peak Day Pricing (PDP) tariff. "Frankly I was stunned! It's getting a lot of positive attention with our management," said Rouggly. "We were able to drop 400 kW by pre-cooling the building and shutting down one chiller during peak events. We also turned off 2 of our 8 elevators and reduced lighting in corridors to

  5. EIS-0412: Federal Loan Guarantee to Support Construction of the TX Energy LLC, Industrial Gasification Facility near Beaumont, Texas

    Energy.gov [DOE]

    The Department of Energy is assessing the potential environmental impacts for its proposed action of issuing a Federal loan guarantee to TX Energy, LLC (TXE). TXE submitted an application to DOE under the Federal loan guarantee program pursuant to the Energy Policy Act of 2005 (EPAct 2005) to support construction of the TXE industrial Gasification Facility near Beaumont, Texas.

  6. Notice of Intent to Issue Funding Opportunity Announcement "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2016"

    Energy.gov [DOE]

    The Office of Energy Efficiency and Renewable Energy (EERE), U.S. Department of Energy (DOE) intends to issue, on behalf of the Federal Energy Management Program (FEMP), a funding opportunity announcement (FOA) titled "Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2016" this April or May.

  7. Vulnerability Assessments and Resilience Planning at Federal Facilities. Preliminary Synthesis of Project

    SciTech Connect (OSTI)

    Moss, R. H.; Delgado, A.; Malone, E L.

    2015-08-15

    U.S. government agencies are now directed to assess the vulnerability of their operations and facilities to climate change and to develop adaptation plans to increase their resilience. Specific guidance on methods is still evolving based on the many different available frameworks. Agencies have been experimenting with these frameworks and approaches. This technical paper synthesizes lessons and insights from a series of research case studies conducted by the investigators at facilities of the U.S. Department of Energy and the Department of Defense. The purpose of the paper is to solicit comments and feedback from interested program managers and analysts before final conclusions are published. The paper describes the characteristics of a systematic process for prioritizing needs for adaptation planning at individual facilities and examines requirements and methods needed. It then suggests a framework of steps for vulnerability assessments at Federal facilities and elaborates on three sets of methods required for assessments, regardless of the detailed framework used. In a concluding section, the paper suggests a roadmap to further develop methods to support agencies in preparing for climate change. The case studies point to several preliminary conclusions; (1) Vulnerability assessments are needed to translate potential changes in climate exposure to estimates of impacts and evaluation of their significance for operations and mission attainment, in other words into information that is related to and useful in ongoing planning, management, and decision-making processes; (2) To increase the relevance and utility of vulnerability assessments to site personnel, the assessment process needs to emphasize the characteristics of the site infrastructure, not just climate change; (3) A multi-tiered framework that includes screening, vulnerability assessments at the most vulnerable installations, and adaptation design will efficiently target high-risk sites and infrastructure

  8. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Solar Screening Evaluation Checklist, September 2010

    Energy.gov [DOE]

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  9. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    SciTech Connect (OSTI)

    Stoltenberg, B.; Partyka, E.

    2010-09-01

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  10. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, Appendix B, September 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  11. Procuring Solar Energy: A Guide for Federal Facility Decision Makers, September 2010

    Office of Energy Efficiency and Renewable Energy (EERE)

    This guide presents an overview of the process for successfully planning for and installing solar technology on a federal site. It is specifically targeted to managers of federal buildings and sites, contracting officers, energy and sustainability officers, and regional procurement managers. The solar project process is outlined in a concise, easy-to-understand, step-by-step format. Information includes a brief overview of legislation and executive orders related to renewable energy and the compelling reasons for implementing a solar project on a federal site. It also includes how to assess a facility to identify the best solar installation site, project recommendations and considerations to help avoid unforeseen issues, and guidance on financing and contracting options. Case studies with descriptions of successful solar deployments across multiple agencies are presented. In addition, detailed information and sample documents for specific tasks are referenced with Web links or included in the appendixes. The guide concentrates on distributed solar generation and not large, centralized solar energy generation.

  12. Federal Facility Compliance Act: Conceptual Site Treatment Plan for Lawrence Livermore National Laboratory, Livermore, California

    SciTech Connect (OSTI)

    Not Available

    1993-10-01

    The Department of Energy (DOE) is required by section 3021(b) of the Resource Conservation and Recovery Act (RCRA), as amended by the Federal Facility Compliance Act (the Act), to prepare plans describing the development of treatment capacities and technologies for treating mixed waste. The Act requires site treatment plans (STPs or plans) to be developed for each site at which DOE generates or stores mixed waste and submitted to the State or EPA for approval, approval with modification, or disapproval. The Lawrence Livermore National Laboratory (LLNL) Conceptual Site Treatment Plan (CSTP) is the preliminary version of the plan required by the Act and is being provided to California, the US Environmental Protection Agency (EPA), and others for review. A list of the other DOE sites preparing CSTPs is included in Appendix 1.1 of this document. Please note that Appendix 1.1 appears as Appendix A, pages A-1 and A-2 in this document.

  13. Property Accountability and Protection of Federal Sensitive Unclassified Information Under the Cooperative Agreement with the Incorporated County of Los Alamos, IG-0859

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Inspection Report Property Accountability and Protection of Federal Sensitive Unclassified Information Under the Cooperative Agreement with the Incorporated County of Los Alamos DOE/IG-0859 February 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 February 17, 2012 MEMORANDUM FOR THE SECRETARY FROM Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Inspection Report on "Property Accountability and

  14. Chiller Controls-related Energy Saving Opportunities in FederalFacilities

    SciTech Connect (OSTI)

    Webster, Tom

    2003-01-01

    Chillers are a significant component of large facility energy use. The focus of much of the development of chilled water systems in recent years has been on optimization of set point and staging controls, improvements in chiller design to increase efficiency and accommodate chlorofluorocarbon (CFC) refrigerant replacements. Other improvements have been made by upgrading controls to the latest digital technologies, improving access and monitoring via communications and sophisticated liquid crystal displays (LCD), more robust fault diagnostics and operating and maintenance information logging. Advances have also been made in how chiller plant systems are designed and operated, and in the diversity of chiller products that are available to support innovative approaches. As in many industries, these improvements have been facilitated by advances in, and lower costs for, enabling technologies, such as refrigerants, compressor design, electronics for controls and variable frequency drives (VFD). Along with the improvements in electronics one would expect that advances have also been made in the functionality of unit controls included with chillers. Originally, the primary purpose of this project was to investigate the state of practice of chiller unit controllers in terms of their energy saving capabilities. However, early in the study it was discovered that advances in this area did not include incorporation of significantly different capabilities than had existed 10-15 years ago. Thus the scope has been modified to provide an overview of some of the basic controls-related energy saving strategies that are currently available along with guideline estimates of their potential and applicability. We have minimized consideration of strategies that could be primarily implemented via design practices such as chiller selection and plant design, and those that can only be implemented by a building management system (BMS). Also, since most of the floor space of federal buildings

  15. Federal Register

    Energy Savers

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  16. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book

    3 Energy Independence and Security Act of 2007, Provisions Affecting Energy Consumption in Federal Buildings Source(s): Standard Relating to Solar Hot Water - Requires new Federal buildings, or Federal buildings undergoing major renovations, to meet at least 30 percent of hot water demand through the use of solar hot water heaters, if cost-effective. [Section 523] Federally-Procured Appliances with Standby Power - Requires all Federal agencies to procure appliances with standby power consumption

  17. Tentative Agreement as it went to public comment.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Tentative Agreement on Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Negotiations on the Overall Strategy and Approach for Hanford Groundwater Protection, Monitoring and Remediation (Tri-Party Agreement Milestone Series M-024) The U.S. Department of Energy, Richland Operations Office (RL), the State of Washington, Department of Ecology, and the U.S. Environmental Protection Agency (EPA), hereinafter referred to as the parties, have concluded negotiations on an

  18. The Whistleblower Protection Enhancement Act of 2012 and How It Affects Federal Employee Non-Disclosure Policies, Forms, Certificates, Agreements and Acknowledgments

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter (AL) 2013-08 and Financial Assistance Letter (FAL) 2013-05 provide Contracting Officers with notice of the recently passed, Whistleblower Protection Enhancement Act of 2012 (WPEA), Pub.L. 112-199, and the DOECAST issued in response on April 24, 2013. This AL/FAL informs DOE/NNSA Contracting Officers to update any Non-Disclosure Policies, Forms, Certificates, Agreements, and Acknowledgements (collectively "NDAs") to be used with Federal employees participating in proposal or application evaluations, source selection situations as well as in merit review situations, to conform to the new requirements of this law. It also informs DOE/NNSA Contracting Officers on how to document the notification to Federal employees of the new protections stated in the WPEA if they have signed NDAs without the new statement as required by the WPEA.

  19. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book

    2 Executive Order 13423, Provisions Affecting Energy Consumption in Federal Buildings Source(s): -- Requires Federal agencies to improve energy efficiency and reduce greenhouse gas emissions by either 3 percent annual reductions through FY 2015, or by 30 percent by 2015, as compared to FY 2003. -- Requires Federal agencies to obtain at least half of required renewable energy from new renewable sources. Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation

  20. Monticello, Utah, National Priorities List Sites Federal Facility Agreement (FFA) Quarterly Report: July 1…September 30, 2015

    Office of Legacy Management (LM)

    (FFA) Quarterly Report: July 1-September 30, 2015 October 2015 LMS/MNT/S13350 This page intentionally left blank U.S. Department of Energy Monticello NPL Sites FFA Quarterly Report: July-September 2015 October 2015 Doc. No. S13350 Page i Contents Abbreviations .................................................................................................................................. ii 1.0 Introduction

  1. Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the Government of the United States and the Government of the Russian Federation has on the

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Report on the Effect the Low Enriched Uranium Delivered Under the Highly Enriched Uranium Agreement Between the Government of the United States of America and the Government of the Russian Federation has on the Domestic Uranium Mining, Conversion, and Enrichment Industries and the Operation of the Gaseous Diffusion Plant 2008 Information Date: December 31, 2008 1 Introduction The Agreement Between the Government of the United States of America and the Government of the Russian Federation

  2. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    SciTech Connect (OSTI)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.

  3. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    3 Direct Appropriations on Federal Buildings Energy Conservation Retrofits and Capital Equipment (2010 Million) FY 1985 FY 1986 FY 1987 FY 1988 FY 1989 FY 1990 Source(s): DOE...

  4. Buildings Energy Data Book: 4.4 Legislation Affecting Energy Consumption of Federal Buildings and Facilities

    Buildings Energy Data Book

    1 Energy Policy Act of 2005, Provisions Affecting Energy Consumption in Federal Buildings Source(s): Energy Management Requirements - Amended reduction goals set by the National Energy Conservation Policy Act, and requires increasing percentage reductions in energy consumption through FY 2015, with a final energy consumption reduction goal of 20 percent savings in FY 2015, as compared to the baseline energy consumption of Federal buildings in FY 2003. (These goals were superseded by Section 431

  5. Federated Wind Farm | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Federated Wind Farm Jump to: navigation, search Name Federated Wind Farm Facility Federated Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  6. Notice of Intent to Revise DOE G 226.1-2, Federal Line Management Oversight of Department of Energy Nuclear Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-04-04

    This revision will incorporate new content devoted to Federal oversight and evaluation of effectiveness of activity-level work planning and control (WP&C) at Hazard Category 1, 2, and 3 nuclear facilities.

  7. Guidebook to excellence: A directory of federal facilities and other resources for mathematics and science education improvement. [Contains acronym list

    SciTech Connect (OSTI)

    Shipman, T.

    1993-01-01

    The Guidebook to Excellence is a State-by-State directory of Federal facilities and other resources for improving mathematics and science education. This directory, the first of its kind, is being published to assist educators, parents, and students across the country in attaining the National Education Goals, particularly Goal No. 4: By the year 2000, US students will be first in the world in science and mathematics achievement. Some of the larger research facilities in this directory, such as those of NASA, EPA and the Departments of Energy, Commerce, and the Interior, provide a wide range of education programs, and some offer students and teachers hands on experience with state-of-the-art research in world class facilities. Other sites, such as those of the Department of Transportation or Agriculture may be quite small, but can provide assistance in a single field of research or workforce expertise. Also listed are individuals responsible for State or regional coordination of major programs, such as the US Department of Education's Eisenhower Mathematics and Science Education Program, or the National Science Foundation's Statewide Systemic Initiative Program. In addition, each State listing includes facilities or coordinators providing regional assistance from neighboring States.

  8. Federal Sector

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture About five percent of BPA's total electric supply goes to power facilities around...

  9. Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Facilities Facilities World-class facilities provide unique problem-solving opportunities. Unique research facilities support data-driven, agile solutions. Los Alamos National Laboratory has a number of facilities that support work related to sensor technologies and solutions including: Center for Integrated Nanotechnologies Dual-Axis Radiographic Hydrodynamic Test Facility The Explosives Center Lujan Neutron Scattering Center Materials Science Laboratory National High Magnetic Field Laboratory

  10. Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Nuclear Energy Defense Waste Management Programs Advanced Nuclear Energy Nuclear Energy Safety Technologies Facilities Battery Abuse Testing Laboratory Cylindrical Boiling Facility ...

  11. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility

    SciTech Connect (OSTI)

    Stephen Schey; Jim Francfort

    2014-10-01

    This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  12. Proprietary User Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Alliance/NREL 10-12-15 The Department of Energy has opted to utilize the following agreement for Designated Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisions will require approval by the DOE

  13. Buildings Energy Data Book: 4.3 Federal Buildings and Facilities Expenditures

    Buildings Energy Data Book

    1 FY 2007 Federal Buildings Energy Prices and Expenditures, by Fuel Type ($2010) Fuel Type Electricity 23.68 (1) 4,009 Natural Gas 9.37 1,138 Fuel Oil 15.25 419 Coal 3.62 63 Purchased Steam 24.30 318 LPG/Propane 17.06 44 Other 16.19 37 Average 17.05 Total 6,029 Note(s): Source(s): Average Fuel Prices Total Expenditures ($/million BTU) ($ million) (2) Prices and expenditures are for Goal-Subject buildings. 1) $0.0776/kWh. 2) Energy used in Goal-Subject buildings in FY 2007 accounted for 33.8% of

  14. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2003 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2004-02-01

    The 2003 spring flows were within 7 kcfs of last year's flows, but the summer flows were significantly lower, averaging 194 kcfs compared to 278 kcfs last year. Late summer and fall flows were within 20 kcfs of last year's flows. These flow levels provided good migration conditions for juvenile salmonids, comparable to last year, except in June and July. Monthly average river flows were lower than the historical averages. The number of fish handled at John Day decreased from 257,741 last year to 166,209 this year. Part of this decline is due to reduced research effort which lowers the total number of fish needed. Descaling, compared to last year, varied by species, increasing for yearling chinook and clipped and unclipped steelhead, decreasing for coho and sockeye, and remaining about the same for subyearling chinook. Descaling was well below the average for the airlift years for all species except unclipped steelhead. This may be a function of unclipped hatchery steelhead being counted as unclipped steelhead, a category traditionally reserved for wild steelhead. Mortality continues to be low, at or below last year's levels for yearling chinook, subyearling chinook, clipped steelhead and sockeye; slightly higher than last year for unclipped steelhead and coho. With the exception of sockeye, mortality rates at the new facility are well below the average for the years of sampling with the airlift system. The spring migrants generally started migrating later and finished earlier, for a shorter overall duration. Sub-yearling chinook did just the opposite, starting earlier and ending later for a longer middle 80% duration. This was the fourth year of index level sampling at the Hamilton Island Juvenile Monitoring Facility at Bonneville. The number of fish handled declined from 85,552 last year to 80,303 this year. Descaling for all species was similar to the previous two years (within 2%) but in all cases lower than the historical average. Mortality was lower than last

  15. VPP Interagency Agreement Between DOE and DOL

    Energy.gov [DOE]

    The purpose of thia agreement ie for the U. S. Department Of Labor's (DOL) Occupational Safety and Health Administration (OSHA) Directorate of Federal-State Operation8 (FSO) to provide aeeistance to the U. S. Department of Energy’s (DOE) Office of Occupational safety (EH-31) in the development bf the DOE Voluntary Protection Program (DOE-WP) at Government-~ned-or-LeaBed Contractor-Operated (GOCO) facilities.

  16. Monitoring of Downstream Salmon and Steelhead at Federal Hydroelectric Facilities, 2004-2005 Annual Report.

    SciTech Connect (OSTI)

    Martinson, Rick D.; Kamps, Jeffrey W.; Kovalchuk, Gregory M.

    2005-02-02

    yearling Chinook and unclipped steelhead runs took longer to pass Bonneville than any previous year, at 44 and 45 days, respectively. For subyearling Chinook, the middle 80% of the fish passed during the last three weeks of June and the first week of July, taking 35 days to pass the project, the same as last year. Descaling for all species was slightly higher than the average of the last five years. Compared to last year, descaling varied by species, increasing for yearling Chinook, coho, and sockeye and lower for subyearling Chinook and steelhead. Since sampling began in the juvenile monitoring facility, descaling has been quite consistent, staying below 3.6% for yearling and subyearling Chinook, unclipped steelhead and coho, and above 4.7% for clipped steelhead and sockeye. Mortality was slightly higher than last year and the historical average for yearling and subyearling Chinook and steelhead. Coho and sockeye mortality was lower than last year and the historical average. Mortality for all species was below 1%. Powerhouse 2 operational priority and research results showing higher survival of fish passing through the PH1 turbines rather than through the bypass system resulted in a complete disuse of the PH1 bypass system. Consequently, we removed the historic PH1 data from this report and refer readers to any prior report for information regarding first powerhouse fish sampling.

  17. Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... It also provides an outstanding controlled environment for Sandia's recent spent nuclear fuel combustion experiments. HPC Facilities CSRIBldghomepg The Computer Science Research ...

  18. Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    First Power for SWiFT Turbine Achieved during Recommissioning Facilities, News, Renewable Energy, SWIFT, Wind Energy, Wind News First Power for SWiFT Turbine Achieved during ...

  19. Decommissioning of German Nuclear Research Facilities under the Governance of the Federal Ministry of Education and Research

    SciTech Connect (OSTI)

    Weigl, M. [Forschungszentrum Karlsruhe GmbH, Projekttragerforschungszentrum Karlsruhe (PTKA-WTE), Karlsruhe (Germany)

    2008-07-01

    Since the announcement of the first nuclear program in 1956, nuclear R and D in Germany has been supported by the Federal Government under four nuclear programs and later on under more general energy R and D programs. The original goal was to help German industry to achieve safe, low-cost generation of energy and self-sufficiency in the various branches of nuclear technology, including the fast breeder reactor and the fuel cycle. Several national research centers were established to host or operate experimental and demonstration plants. These are mainly located at the sites of the national research centers at Juelich and Karlsruhe. In the meantime, all these facilities were shut down and most of them are now in a state of decommissioning and dismantling (D and D). Meanwhile, Germany is one of the leading countries in the world in the field of D and D. Two big demonstration plants, the Niederaichbach Nuclear Power Plant (KKN) a heavy-water cooled pressure tube reactor with carbon-dioxide cooling and the Karlstein Superheated Steam Reactor (HDR) a boiling light water reactor with a thermal power of 100 MW, are totally dismantled and 'green field' is reached. For two other projects the return to 'green field' sites will be reached by the end of this decade. These are the dismantling of the Multi-Purpose Research Reactor (MZFR) and the Compact Sodium Cooled Reactor (KNK) both located at the Forschungszentrum Karlsruhe. Within these projects a lot of new solutions und innovative techniques were tested, which were developed at German universities and in small and medium sized companies mostly funded by the Federal Ministry of Education and Research (BMBF). For example, high performance underwater cutting technologies like plasma arc cutting and contact arc metal cutting. (authors)

  20. Long-Term Surveillance and Maintenance Plan for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis

    Office of Legacy Management (LM)

    for the Former Laboratory for Energy-Related Health Research Federal Facility University of California, Davis September 2016 LMS/LEH/S07300-5.0 This page intentionally left blank U.S. Department of Energy LEHR Long-Term Surveillance and Maintenance Plan September 2016 Doc. No. S07300-5.0 Page i Contents Abbreviations ................................................................................................................................. iii 1.0 Introduction

  1. Model Cooperative Agreement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Model Cooperative Agreement The Model Cooperative Agreement is comprised of the following documents: Assistance Agreement Special Terms and Conditions Statement of Project Objectives and Milestone Summary Table Federal Assistance Reporting Checklist and Instructions Budget Information SF-424A Intellectual Property Provisions Please note that for an actual award, documents may be added, removed and/or modified as required.   

  2. Interconnection Agreements for Onsite Generation

    Energy.gov [DOE]

    Presentation covers Interconnection Agreements for Onsite Generation and is given at the Spring 2011 Federal Utility Partnership Working Group (FUPWG) meeting.

  3. GSA-Utility Interconnection Agreements

    Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—covers the General Service Administration's (GSA's) utility interconnection agreements.

  4. Commissioning for Federal Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The building annual Energy Use In- dex (EUI) is the common bench- mark used to make ... The establishment of an annual en- ergy use index (EUI) provides a baseline to estimate ...

  5. Proposed Open Access Requirement for International Electric Transmission Facilities and Delegation to the Federal Energy Regulatory Commission: Federal Register Notice Volume 64, No. 143- Jul. 27, 1999

    Energy.gov [DOE]

    Notice is given of the Department of Energy’s (DOE or Department) intention to amend existing Presidential permits issued for the construction, operation, maintenance, or connection of facilities...

  6. Sample Documents for Federal On-Site Renewable Power Purchase...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal ...

  7. User Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    User Facilities User Facilities User facility agreements allow Los Alamos partners and other entities to conduct research at our unique facilities. In 2011, LANL hosted more than 1,200 users at CINT, LANSCE, and NHMFL. Users came from across the DOE complex, from international academia, and from industrial companies from 45 states across the U.S. Unique world-class user facilities foster rich research opportunities Through its technology transfer efforts, LANL can implement user facility

  8. Agreement Mechanisms

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Agreement Mechanisms Agreement Mechanisms World-class experts and capabilities countering all aspects of explosive threats, and aiming predominantly at enhanced detection capabilities. CRADA: Cooperative Research and Development Agreement What is it? Work performed in collaboration with a sponsor. What does it do? Enables Los Alamos staff to participate with industry, academia, and nonprofit entities on collaborative R&D activities of mutual benefit. When is it used? An organization's

  9. Non-Proprietary User Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    8 Alliance/NREL 1-21-16 The Department of Energy has opted to utilize the following agreement for Designated Non-Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisons will require approval by the DOE

  10. Agreement Matrix

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    be limited to 5 years. Certification: The Lab provided this DOE technology transfer matrix and explained all the options available including the availability of WFO agreements...

  11. NETLMemorandum of Understanding or Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Memorandum of Understanding or Agreement Memorandums of Understanding (MOUs) OR Memorandums of Agreement (MOAs) are written agreements between NETL and other entities that state of scope of work for a specific project or state the terms of a partnering relationship. Parties to these agreements may include other federal agencies, local, state, international, or other government entities; the private sector; and educational institutions. An MOU or MOA is not considered a binding contract. It

  12. Sustainability in Existing Federal Buildings | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities Sustainable Buildings & Campuses Sustainability in Existing Federal Buildings Sustainability in Existing Federal Buildings The General Services Administration ...

  13. Program management plan for development, demonstration, testing, and evaluation efforts associated with Oak Ridge Reservation`s Land Disposal Restrictions Federal Facility Compliance Agreement

    SciTech Connect (OSTI)

    Conley, T.B.

    1994-04-01

    This program management plan covers the development, demonstration, testing, and evaluation efforts necessary to identify treatment methods for all the waste listed in Appendix B of the ORR`s LDR/FFCA as well as any new wastes which meet Appendix B criteria. To successfully identify a treatment method, at least a proof-of-principle level of understanding must be obtained: that is, the candidate processes must be demonstrated as effective in treating the wastes to the LDR; however, an optimized process is not required. Where applicable and deemed necessary and where the budgets will support them, pilot-scale demonstrations will be pursued. The overall strategy being adopted in this program will be composed of the following activities: Scoping of the study; characterization; development and screening of alternatives; treatability investigations; and detailed analysis of alternatives.

  14. Denver Federal Center Solar Park | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Federal Center Solar Park Jump to: navigation, search Name Denver Federal Center Solar Park Facility Denver Federal Center Sector Solar Facility Type Photovoltaic Owner SunEdison...

  15. Novation Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    202 August 2016 ______________________________________________________________________________ 1 Novation Agreements [References: FAR 42.12, FAR 4.11, 41 U.S.C. 6305(a)] 1.0 Summary of Latest Changes This update: (1) implements the Government policy pursuant to the references listed within this Chapter and (2) establishes policies, assigns responsibilities, and provides procedures for novation, change-of-name, and business recombination (restructuring) agreements. 2.0 Discussion This chapter

  16. Prototype Programmatic Agreement Guidance

    Energy.gov [DOE]

    Prototype programmatic agreements are a type of program alternative that the Advisory Council on Historic Preservation (ACHP) can designate to assist federal agencies in their efforts to comply with the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). Prototype agreements may be used for the same type of program or undertaking in more than one case or area, and typically establish efficiencies and protocols for implementing these undertakings. This ACHP guidance describes the process for developing prototype agreements, the involvement of interested parties, and other important components to be considered when exploring the use of a prototype agreement as a program alternative.

  17. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  18. Memorandum of Understanding Regarding Coordination in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, ...

  19. Tri-Party Agreement databases, access mechanism and procedures

    SciTech Connect (OSTI)

    Brulotte, P.J.; Christensen, K.C.

    1993-10-01

    This document contains the information required for the Washington State Department of Ecology (Ecology) and the US Environmental Protection Agency (EPA) to access databases related to the Hanford Federal Facility Agreement and Consent Order [also known as the Tri-Party Agreement (TPA)] (Ecology et al. 1992). It identifies the procedure required to obtain access to the Hanford computer networks and the TPA related databases. It addresses security requirements, access methods, database availability dates, database access procedures, and the minimum computer hardware and software configurations required to operate within the Hanford networks.

  20. On-Site Renewable Power Purchase Agreements for Renewable Energy Projects

    Office of Energy Efficiency and Renewable Energy (EERE)

    An on-site renewable power purchase agreement (PPA) enables Federal agencies to fund a renewable energy project by contracting to purchase the power generated by the system. The renewable energy equipment is installed and owned by a developer but located on-site at the agency facility.

  1. Facility Floorplan

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    facility floorplan Facility Floorplan

  2. Sandia National Laboratories: Strategic Partnership Projects, Non-Federal

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Entity (SPP/NFE) Agreements Strategic Partnership Projects, Non-Federal Entity (SPP/NFE) Agreements Alt text Potential Sponsors Funding Terms and Conditions Click here to learn more... Potential Partners Our Process Process Flow Click here to learn more... Facilities Explore Sandia Click here to explore Sandia. Projects To support its missions, many of the technologies, processes, and special technical expertise developed at Sandia have been applied to solving problems in the private sector

  3. MOBILITY AGREEMENT

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MOBILITY AGREEMENT I hereby acknowledge that, as a condition of my employment as a Criminal Investigator with the Department of Energy, Office of Inspector General, I may be required to relocate to an OIG office in another geographic location based on the needs of the organization. I understand that my failure to accept such a directed reassignment could be a basis for my separation from the service. _______________________________ Signature Date

  4. INTERNATIONAL AGREEMENTS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    INTERNATIONAL AGREEMENTS Signed by Secretary Spencer Abraham January 2001-December 2004 TABLE OF CONTENTS Joint Statement of ntent between the Department of Energy of the United States ofAmerica and The Ministry of Energy and Mines of the Republic ofPeru on Cooperation in the Field of Energy -Tab 1 Fifth Hemispheric Energy Ministers Meeting Mexico City, Mexico - March 9, 2001. Mexico Declaration - Energy: A Crucial Factor for Integration and Sustainable Development in the Hemisphere - Tab 2

  5. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2010-06-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  6. Quick Guide: Power Purchase Agreements (Fact Sheet)

    SciTech Connect (OSTI)

    Not Available

    2011-07-01

    Introduction to Federal power purchase agreements (PPAs), including available FEMP services and technical assistance as well as questions to ask when evaluating PPAs for a Federal renewable energy project.

  7. Fixed Rate Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fixed Rate Agreement Fixed Rate Agreement Fixed Rate Agreement (110.33 KB) More Documents & Publications Floating Rate Agreement Notice of Proposed Rulemaking (August 6, 2009) Federal Loan Guarantees for Projects that Manufacture Commercial Technology Renewable Energy Systems and Components: August 10, 2010

  8. Notice, Revised Classified Information Nondisclosure Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The WPEA strengthens protections for federal employees who disclose evidence of waste, fraud, or abuse. The WPEA requires that each agreement contained in an SF 312, "Classified...

  9. FFTF Authorization Agreement

    SciTech Connect (OSTI)

    DAUTEL, W.A.

    2000-09-25

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently in the Fast Flux Test Facility (FFTF). Work must be accomplished in a manner that achieves high levels of quality while protecting the environment and the safety and health of workers and the public, and complying with applicable contractual and regulatory requirements. It is the intent of this Agreement to address those items of significant importance in establishing and supporting the FFTF Authorization Envelope, but this Agreement in no way alters the terms and conditions of the Project Hanford Management Contract (PHMC), Contract Number DE-AC06-96RL13200.

  10. User Agreements | Stanford Synchrotron Radiation Lightsource

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Agreements Institutional Agreements Required to Access DOE National User Facilities In recognition of the nation's expanding need to engage businesses and universities in the areas of commercial and basic science research, the U.S. Department of Energy (DOE) has developed two special types of agreements for use at all DOE National Laboratories with approved designated user facilities. A USER AGREEMENT IS REQUIRED FOR ALL USERS AND MUST BE EXECUTED IN ADVANCE BY THE APPROPRIATE USER INSTITUTION

  11. User Agreements | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    User Agreements User Facilities User Facilities Home User Facilities at a Glance User Resources Getting Started User Safety Access Models User Agreements Data Management Resources Acknowledging User Facilities User Statistics Policies and Processes Frequently Asked Questions User Facility Science Highlights User Facility News Contact Information Office of Science U.S. Department of Energy 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5430 User Resources User Agreements Print Text

  12. Combined Heat and Power: A Federal Manager's Resource Guide, March 2000

    Energy.gov [DOE]

    Report providing guidance to Federal Energy Managers regarding the potential of CHP technologies in Federal facilities.

  13. Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Planning » Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land.

  14. Pinellas Remediation Agreement Summary

    Office of Environmental Management (EM)

    Pinellas Agreement Name Remediation Agreement for the Four and One-Half Acre Site in Largo, Pinellas County, Florida State Florida Agreement Type Remediation Agreement Legal ...

  15. Federal Line Management Oversight of Department of Energy Nuclear...

    Office of Environmental Management (EM)

    Federal Line Management Oversight of Department of Energy Nuclear Facilities Federal Line Management Oversight of Department of Energy Nuclear Facilities This Guide provides U.S. ...

  16. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers This ...

  17. New Course Teaches Best Practices for Water Management for Federal...

    Energy Savers

    Course Teaches Best Practices for Water Management for Federal Facilities New Course Teaches Best Practices for Water Management for Federal Facilities May 8, 2014 - 11:13am ...

  18. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers Federal Facilities Guide to Fuel Cells May 8, 2012 - Outline * Distributed Generation and ...

  19. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 4 - Nuclear Safety Basis Program Review During Facility ...

  20. Sustainable Federal Buildings and Campuses | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities Sustainable Federal Buildings and Campuses Sustainable Federal Buildings and Campuses An air-intake structure outside this high-performance federal building lowers ...

  1. Facility Disposition Safety Strategy RM

    Energy.gov [DOE]

    The Facility Disposition Safety Strategy (FDSS) Review Module is a tool that assists DOE federal project review teams in evaluating the adequacy of the facility documentation, preparations or...

  2. Chapter 14 - Grants and Cooperative Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    02-06-12 14-1 CHAPTER 14 GRANTS, COOPERATIVE AGREEMENTS, AND TECHNOLOGY INVESTMENT AGREEMENTS 1. INTRODUCTION. Grants, cooperative agreements, and technology investment agreements are financial assistance instruments, rather than acquisition instruments, used by the Department of Energy (DOE) to transfer money or property to a recipient to accomplish a public purpose authorized by Federal statute. a. Purpose. This chapter prescribes policies and general procedures for the accounting and

  3. US Department of Energy`s Federal Facility Compliance Act Chief Financial Officer`s Report to Congress for fiscal year 1993

    SciTech Connect (OSTI)

    Not Available

    1993-12-01

    The Federal Facility Compliance Act of 1992 (FFCAct) (Public Law 102-386) was enacted into law on October 6, 1992. In addition to amending the Resource Conservation and Recovery Act (RCRA), the FFCAct requires the US Department of Energy (DOE) to prepare an annual report from the Chief Financial Officer to the Congress on compliance activities undertaken by the DOE with regard to mixed waste streams and provide an accounting of the fines and penalties imposed upon the DOE for violations involving mixed waste. This document has been prepared to report the necessary information. Mixed waste is defined by the FFCAct to include those wastes containing both hazardous waste as defined in the RCRA and source, special nuclear, or byproduct material subject to the Atomic Energy Act of 1954, as amended (42 U.S.C. Section 2001 et seq.). Section 2 of this report briefly summarizes DOE Headquarters` activities conducted during Fiscal Year 1993 (FY 1993) to comply with the requirements of the FFCAct. Section 3 of this report provides an overview of the site-specific RCRA compliance activities, relating to mixed waste streams, conducted in FY 1993 for those sites that currently generated or store mixed waste that are subject to regulation under RCRA. Section 4 provides information on notifications of alleged RCRA violations involving mixed waste imposed upon the DOE during FY 1993 and an accounting of any fines and penalties associated with these violations. Appendix A provides site-specific summaries of RCRA compliance activities, relating to mixed waste streams, conducted in FY 1993 for those sites that currently generate or store mixed waste that are subject to regulation under RCRA.

  4. Federal Railroad Administration | Department of Energy

    Office of Environmental Management (EM)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  5. Federal Technical Capability Manual

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2000-06-05

    The Federal Technical Capability Manual provides the process for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities at defense nuclear facilities. Canceled by DOE M 426.1-1A. Does not cancel other directives.

  6. DOE Cooperative Research and Development Agreements

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-01-12

    To establish Department of Energy (DOE) policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. No cancellation.

  7. DOE Cooperative Research and Development Agreements

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2013-11-06

    The order establishes policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Supersedes DOE O 483.1 Admin Chg 1 and DOE M 483.1-1.

  8. Technology Partnership Agreements | NREL

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Technology Investment Agreements Technology Investment Agreements Guidance Policy Flash 2006-31 - Technology Investment Agreements Financial Assistance Letter 2006-03 - Guidance for Awarding Technology Investment Agreements Final Rule - Financial Assistance Regulations - Technology Investment Agreements Templates Company Template (Expenditure-Based) Consortium Template (Expenditure-Based) Company Template (Fixed Support) Consortium Support (Fixed Support) Training Technology Investment

  9. Tribal Programs, Special Initiatives, and Cooperative Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Programs, Special Initiatives, and Cooperative Agreements Tribal Programs, Special Initiatives, and Cooperative Agreements EM is involved in the cleanup of nuclear waste at nationwide sites and facilities. The waste, a result of the production of nuclear weapons, has affected sovereign Tribal nations located near these facilities. These Tribal nations have been impacted by different types of waste contamination, and their participation in the EM mission is critical.

  10. Public Service Company of Colorado v. Batt Agreement Summary

    Office of Environmental Management (EM)

    Public Service Company of Colorado v. Batt State Idaho Agreement Type Settlement Agreement Legal Driver(s) Federal Court Order Scope Summary To control and set schedules for the...

  11. Power Purchase Agreements

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation covers the power purchase agreements taken from the FEMP Alternative Finance Options (AFO) webinar.

  12. STEP Participation Agreement

    Energy.gov [DOE]

    STEP Participation Agreement, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  13. 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DER for Federal Facilities EPA CHP Partnership Meeting, October 2002 3rd Annual National CHP Roadmap Workshop CHP and DER for Federal Facilities EPA CHP Partnership Meeting, ...

  14. FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY Federal Financing Programs for Clean Energy.pdf (2.55 MB) More Documents & Publications FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY Federal Financing Programs for Clean Energy Guide to Federal Financing for Energy Efficiency and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

  15. Memorandum of Understanding Regarding Coordination in Federal Agency Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Electric Transmission Facilities on Federal Land, October 23, 2009 | Department of Energy Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve

  16. Commitments/Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    DOE-ID Agreements & Commitments You are here: DOE-ID Home > Inside ID > DOE-ID Agreements & Commitments Spent Fuel Settlement Agreement The Spent Fuel Settlement Agreement agreement permits DOE to receive up to 1,133 shipments of spent nuclear fuel at the Idaho National Laboratory for storage over the next 40 years. In return, the agreement sets a timetable for the treatment of high-level waste now stored at the Idaho Nuclear Technology and Engineering Center, and the removal of

  17. Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RIN 3150-AJ48 Definition of a Utilization Facility AGENCY: Nuclear Regulatory Commission. ... the application assigned docket number 50- 608, to the definition of utilization facility. ...

  18. Intellectual Property Provisions (GNP-115) Grant and Cooperative Agreement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Research, Development, or Demonstration Non-Federal Entity (State, Local government, Indian tribe, Institution of higher education, or Nonprofit organization) | Department of Energy GNP-115) Grant and Cooperative Agreement Research, Development, or Demonstration Non-Federal Entity (State, Local government, Indian tribe, Institution of higher education, or Nonprofit organization) Intellectual Property Provisions (GNP-115) Grant and Cooperative Agreement Research, Development, or Demonstration

  19. Federal Energy and Water Efficiency Project Financing | Department...

    Energy.gov (indexed) [DOE]

    The Federal Energy Management Program (FEMP) offers financing options for agencies that ... Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) FEMP provides ...

  20. Federal Task Force Issues Recommendations to Increase the Safety...

    Office of Environmental Management (EM)

    Federal Task Force Issues Recommendations to Increase the Safety and Reliability of U.S. Natural Gas Storage Facilities Federal Task Force Issues Recommendations to Increase the ...

  1. PP-03 Federal Power Commission | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission facilities at te U.S-Mexico border. PDF icon PP-03 Federal Power ...

  2. Federal On-Site Renewable Power Purchasing Issues

    Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—covers on-site renewable power purchasing issues for federal facilities.

  3. Agreement Execution Process Study: CRADAs and NF-WFO Agreements and the Speed of Business

    SciTech Connect (OSTI)

    Harrer, Bruce J.; Cejka, Cheryl L.; Macklin, Richard; Miksovic, Ann

    2011-02-01

    This report summarizes the findings of a study on the execution of Cooperative Research and Development Agreements (CRADAs) and Non-Federal Work for Others (NF-WFO) agreements across the U.S. Department of Energy (DOE) laboratory complex. The study provides quantitiative estimates of times required to negotiate and execute these agreements across the DOE complex. It identifies factors impacting on cycle times and describes best practicies used at various laboratories and site offices that reduce cycle times.

  4. International petroleum development agreements

    SciTech Connect (OSTI)

    Smith, E.E.

    1993-12-31

    There are recognizable legal elements in all of the international arrangements for petroleum development currently in use but no arrangements are exactly like the typical American oil and gas lease. This article discusses differences and approaches to the differences in legal aspects of international petroleum development agreements. Topics covered include the following: oil and national sovereignty; obtaining a development agreement; concession and production sharing agreements; participation; differences among agreements.

  5. Energy Conservation Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    about the energy efficiency federal sector or to ask a question, please contact Allie Robbins Mace, Federal Sector Programs Lead at arrobbins@bpa.gov, or contact your Energy...

  6. Overview of transparency issues under the US-Russian highly enriched uranium purchase agreement

    SciTech Connect (OSTI)

    Bieniawski, A.J.; Dougherty, D.R.

    1995-12-31

    The US has signed an Agreement with the Russian Federation for the purchase of 500 metric tons of highly enriched uranium (HEU) derived from dismantled Russian nuclear weapons. The BEU will be blended down to low-enriched uranium (LEU) in Russia and will be transported to the US to be used by fuel Fabricators to make fuel for commercial nuclear power plants. Both the United States and Russia have been preparing to institute transparency measures to provide confidence that the nonproliferation, physical protection, and material control and accounting requirements specified in the Agreement are met. This paper provides a background on the Agreement and subsequent on-going negotiations to develop transparency measures suited to the facilities and processes which are expected to be involved.

  7. Utilization of General Services Administration Federal Strategic Sourcing

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Initiative Blanket Purchase Agreements for Office Supplies | Department of Energy Utilization of General Services Administration Federal Strategic Sourcing Initiative Blanket Purchase Agreements for Office Supplies Utilization of General Services Administration Federal Strategic Sourcing Initiative Blanket Purchase Agreements for Office Supplies The Deputy Secretary's Memorandum signed July 25, 2013, requires the use of the General Services Administration's (GSA) Federal Strategic Sourcing

  8. CRAD, Facility Safety- Nuclear Facility Safety Basis

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Safety Basis.

  9. CRAD, Facility Safety- Nuclear Facility Design

    Office of Energy Efficiency and Renewable Energy (EERE)

    A section of Appendix C to DOE G 226.1-2 "Federal Line Management Oversight of Department of Energy Nuclear Facilities." Consists of Criteria Review and Approach Documents (CRADs) that can be used for assessment of a contractor's Nuclear Facility Design.

  10. Certification of U.S. instrumentation in Russian nuclear processing facilities

    SciTech Connect (OSTI)

    D.H. Powell; J.N. Sumner

    2000-07-12

    Agreements between the United States (U.S.) and the Russian Federation (R.F.) require the down-blending of highly enriched uranium (HEU) from dismantled Russian Federation nuclear weapons. The Blend Down Monitoring System (BDMS) was jointly developed by the Los Alamos National Laboratory (LANL) and the Oak Ridge National Laboratory (ORNL) to continuously monitor the enrichments and flow rates in the HEU blending operations at the R.F. facilities. A significant requirement of the implementation of the BDMS equipment in R.F. facilities concerned the certification of the BDMS equipment for use in a Russian nuclear facility. This paper discusses the certification of the BDMS for installation in R.F. facilities, and summarizes the lessons learned from the process that can be applied to the installation of other U.S. equipment in Russian nuclear facilities.

  11. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    4 Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Commercial Grade Dedication (CGD) August 2013 2 of 14 OFFICE OF ...

  12. Strengthening Line Management Oversight and Federal Monitoring...

    Office of Environmental Management (EM)

    Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities Standard Review Plan Volume 2 -- Nuclear Safety Basis Program Review During Design February ...

  13. Recommendations and Justifications for Modifications To Downgrade Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order, Revision 1

    SciTech Connect (OSTI)

    Birney, Cathleen; Krauss, Mark J

    2013-10-01

    This document is part of an effort to reevaluate 37 FFACO and Administrative URs against the current Soils Risk-Based Corrective Action Evaluation Process. After reviewing 37 existing FFACO and Administrative URs, 11 URs addressed in this document have sufficient information to determine that these current URs may be downgraded to Administrative URs based on the RBCA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RBCA criteria.

  14. Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order, Revision 0

    SciTech Connect (OSTI)

    Lynn Kidman

    2008-02-01

    This document is part of an effort to re-evaluate all FFACO URs against the current RBCA criteria (referred to in this document as the Industrial Sites [IS] RBCA process) as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). Based on this evaluation, the URs were sorted into the following categories: 1. Where sufficient information exists to determine that the current UR is consistent with the RCBA criteria 2. Where sufficient information exists to determine that the current UR may be removed or downgraded based on RCBA criteria. 3. Where sufficient information does not exist to evaluate the current UR against the RCBA criteria. After reviewing all the existing FFACO URs, the 49 URs addressed in this document have sufficient information to determine that these current URs may be removed or downgraded based on RCBA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RCBA criteria.

  15. Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order, Revision 0

    SciTech Connect (OSTI)

    Birney, Cathleen; Krauss, Mark J

    2013-09-01

    This document is part of an effort to reevaluate 37 FFACO and Administrative URs against the current Soils Risk-Based Corrective Action Evaluation Process. After reviewing 37 existing FFACO and Administrative URs, 3 URs addressed in this document have sufficient information to determine that these current URs may be removed, based on the RBCA criteria. This document presents recommendations on modifications to existing URs that will be consistent with the RBCA criteria.

  16. Sandia National Laboratories: Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Agreements Agreements We have transferred technology to the commercial sector for more than three decades, and make it possible for partners to access our world-class science, people, and infrastructure. Sandia National Laboratories has a robust technology transfer mission that is facilitated by several types of agreements. In compliance with the various statutory and administrative requirements, Sandia provides its expertise, technology and capabilities for benefit of the United States economy

  17. Energy Department Investment Drives Clean Energy Innovation at Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities | Department of Energy Investment Drives Clean Energy Innovation at Federal Facilities Energy Department Investment Drives Clean Energy Innovation at Federal Facilities January 27, 2016 - 1:30pm Addthis The U.S. Department of Energy (DOE) today announced $2.85 million in funding for four projects that will advance the development of renewable energy technologies at facilities across the federal government. As the nation's largest single user of energy, the federal government is

  18. Federal Building Energy Use Benchmarking Guidance, August 2014 Update

    Energy.gov [DOE]

    Guidance describes the Energy Independence and Security Act of 2007 Section 432 requirement for benchmarking federal facilities.

  19. New Course Teaches Best Practices for Water Management for Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities | Department of Energy New Course Teaches Best Practices for Water Management for Federal Facilities New Course Teaches Best Practices for Water Management for Federal Facilities May 8, 2014 - 11:13am Addthis The Federal Energy Management Program (FEMP) now offers Best Practices for Comprehensive Water Management for Federal Facilities, a new e-Training core course that provides the knowledge and skills to increase efficiency and reduce water use through sound operations and

  20. Power Purchase Agreement Webinars

    Energy.gov [DOE]

    Provides a listing of past power purchase agreement webinars and associated files. Author: U. S. Department of Energy, Energy Efficiency & Renewable Energy

  1. Solar Power Purchase Agreements

    Energy.gov [DOE]

    Provides an overview of solar power purchase agreements including how they work, benefits and challenges and eligibility. Author: United States Environmental Protection Agency (EPA)

  2. Establish a User Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    is the document that permits the User andor the home organization to retain ownership of intellectual property. Without the user agreement in place, the University of California...

  3. Technical Services Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    attached and incorporated herein. It is understood by the Parties that, except for the intellectual property provisions of this Agreement, NREL is obligated to comply with the...

  4. Non-Disclosure Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    on specific technical areas Contact NDA Team Richard P. Feynman Center for Innovation (505) 667-9911 Email A Non-Disclosure Agreement (NDA) protects proprietary information ...

  5. Partnership Agreement Form

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    software tools, training webinars, technical guidance documents, and peer-to-peer networking opportunities Agreement: My organization is committed to continuous improvement in ...

  6. ARM - Facility News Article

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 31, 2008 Facility News Interagency Land Use Agreement Signed for North Slope of Alaska Bookmark and Share As scientific neighbors on Alaska's North Slope, the ARM site at...

  7. Community celebrates K-25 historic preservation agreement

    Energy.gov [DOE]

    In a ceremony attended by representatives of federal, state, and local historic preservation groups, DOE announced the formal completion of an agreement that will preserve the historic contributions of Oak Ridge’s K-25 site to the World War II Manhattan Project.

  8. GovEnergy 2008 Session Presentation on Power Purchase Agreements |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy GovEnergy 2008 Session Presentation on Power Purchase Agreements GovEnergy 2008 Session Presentation on Power Purchase Agreements Presentation describes an overview of power purchase agreements given at GovEnergy 2008. The document includes several case studies and considerations for Federal agencies. Download the GovEnergy 2008 session presentation on power purchase agreements. (1.53 MB) More Documents & Publications GovEnergy 2008 Session Presentation on Power

  9. Sandia National Laboratories: Corporate Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Corporate Agreements Corporate agreements are used by Sandia Labs for goods or services that are required across the laboratories. Sandia relies on long-term corporate agreements ...

  10. DOE Cooperative Research and Development Agreements

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-01-12

    To establish Department of Energy (DOE) policy, requirements, and responsibilities for the oversight, management, and administration of Cooperative Research and Development Agreement (CRADA) activities at DOE facilities. Admin Chg, dated 9-18-2013. Canceled by DOE O 483.1A.

  11. GENERAL PRINCIPLES OF AGREEMENT

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PRINCIPLES OF AGREEMENT HWB-14-20 and HWB-14-21 These General Principles of Agreement ("Principles of Agreement") are agreed upon by the New Mexico Environment Department ("NMED"), and the United States Department of Energy ("DOE"), Los Alamos National Security, LLC ("LANS"), and Nuclear Waste Partnership, LLC ("NWP") (collectively, with DOE and LANS, the "DOE Permittees") for the purpose of resolving Compliance Order Nos. HWB-14- 20

  12. Federal Register

    Office of Environmental Management (EM)

    Department of Energy Organization Act (Public Law 95-91), and rules and regulations issued ... SUMMARY: Pursuant to the provisions of the Federal Advisory Committee Act (Public Law ...

  13. Strengthening Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Office of the Federal Environ- mental Executive, which shall be maintained in the ... Council on, performance by agencies of functions assigned by sections 2 and 3 of this ...

  14. Agreement to Mediate

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Washington, D.C. 20585 AGREEMENT TO MEDIATE We agree to engage in mediation in a good faith attempt to resolve our issues. We understand that the mediator's role is to assist us...

  15. ZERH Lender Partnership Agreement

    Energy.gov [DOE]

    What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Lender partners may be any person...

  16. ZERH Verifier Partnership Agreement

    Office of Energy Efficiency and Renewable Energy (EERE)

    What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Verifier partners must be...

  17. ZERH Trainer Partnership Agreement

    Office of Energy Efficiency and Renewable Energy (EERE)

    What is expected of partners? Every type of partner has its own role. Review the partnership agreement package below for more information on partner expectations.Training partners may be any...

  18. Material Transfer Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Material Transfer Agreements Material Transfer Agreements Enables the transfer of tangible consumable research materials between two organizations, when the recipient intends to use the material for research purposes Contact thumbnail of Marcus Lucero Head of Licensing Marcus Lucero Richard P. Feynman Center for Innovation (505) 665-6569 Email Overview The ability to exchange materials freely and without delay is an important part of a healthy scientific laboratory. Los Alamos National

  19. Quick Guide: Power Purchase Agreements (Fact Sheet), Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Policy Act (EPAct) of 2005 requires no less than five percent of total agency electricity consumption to come from renewable energy in fiscal years (FY) 2010 through 2012, and no...

  20. Federal On-Site Renewable Power Purchase Agreements | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    projects: 14.2 megawatt (MW) photovoltaic (PV) array at Nellis Air Force Base 2 MW PV ... What is the proposed renewable energy project (type, location, size, estimated ...

  1. Prototype Programmatic Agreement Guidance (ACHP, 2012)

    Energy.gov [DOE]

    Prototype programmatic agreements are a type of program alternative that the Advisory Council on Historic Preservation (ACHP) can designate to assist federal agencies in their efforts to comply with the requirements of Section 106 of the National Historic Preservation Act (16 U.S.C. 470f) and its implementing regulations (36 CFR Part 800). Prototype agreements may be used for the same type of program or undertaking in more than one case or area, and typically establish efficiencies and protocols for implementing these undertakings. This ACHP guidance describes the process for developing prototype agreements, the involvement of interested parties, and other important components to be considered when exploring the use of a prototype agreement as a program alternative.

  2. Agreement Template for Energy Conservation and Demand Side Management Services

    Office of Energy Efficiency and Renewable Energy (EERE)

    Template agreement between a federal agency and a utility company for the implementation of energy conservation measures and demand side management services. A detailed description of the template is also available below.

  3. 17.1 - Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    17.1 (June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal

  4. Acknowledging User Facilities | U.S. DOE Office of Science (SC...

    Office of Science (SC) [DOE]

    User Facilities Home User Facilities at a Glance User Resources Getting Started User Safety Access Models User Agreements Data Management Resources Acknowledging User Facilities ...

  5. Technical Services Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    TSA-AGMT.DOC (9/06/01) 04/14/13 Technical Services Agreement No. TSA- The National Renewable Energy Laboratory (hereinafter "NREL") Operating under Prime Contract No. DE-AC36-08GO28308 for the Department of Energy And <Sponsor>` (hereinafter "Sponsor") I. Parties to the Technical Services Agreement. The Alliance for Sustainable Energy, LLC as Management and Operating (M&O) Contractor for the National Renewable Energy Laboratory ("Contractor"), under U.S.

  6. Microsoft Word - Agreement Reached

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contact: Susan Scott Public Affairs (575) 234-7204 www.trusolutionsnm.com Washington TRU Solutions LLC Waste Isolation Pilot Plant P.O. Box 2078 Carlsbad, New Mexico 88221 For Immediate Release Agreement Reached Between WTS and Union Employees CARLSBAD, N.M., October 14, 2009 -Washington TRU Solutions (WTS) officials said today that company and United Steel Workers Union representatives have agreement on a new two-year contract. "Frankly, we're elated with the outcome. We have an important

  7. Title 43 CFR 3272 Utilization Plan and Facility Construction...

    Open Energy Information (Open El) [EERE & EIA]

    2 Utilization Plan and Facility Construction Permit Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- Federal RegulationFederal Regulation: Title...

  8. FFTF Authorization Agreement

    SciTech Connect (OSTI)

    DAUTEL, W.A.

    2000-02-25

    The purpose of the Authorization Agreement is to serve as a mechanism whereby the U.S. Department of Energy, Richland Operations Office (RL) and Fluor Hanford (FH) jointly clarify and agree to key conditions for conducting work safely and efficiently.

  9. Cooperative Agreement Awarded

    Energy.gov [DOE]

    Cincinnati - The Department of Energy today awarded a cooperative agreement to the National Governors Association Center for Best Practices (NGA Center) to continue efforts to engage states and to work collaboratively to solve continued challenges posed by waste management and cleanup at DOE sites.

  10. Programmatic Agreement for Colorado

    Energy.gov [DOE]

    U.S. Department of Energy (DOE), Energy Efficiency and Conservation Block Grant Program (EECBG), Weatherization Assistance Program (WAP), State Energy Plan (SEP), Colorado State Historic Preservation Office (SHPO), Colorado Governors Energy Office (GEO), historic preservation, Section 106 of the National Historic Preservation Act, National Register of Historic Places, National Historic Preservation Act (NHPA), Programmatic Agreement for Colorado.

  11. Laser Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Laser Facilities Current Schedule of Experiments Operation Schedule Janus Titan Europa COMET Facility Floorplan

  12. Standard Review Plan Preparation for Facility Operations Strengthening...

    Office of Environmental Management (EM)

    Standard Review Plan Preparation for Facility Operations Strengthening Line Management Oversight and Federal Monitoring of Nuclear Facilities August 2013 2 OFFICE OF ENVIRONMENTAL ...

  13. Federal Energy Management Reporting and Data | Department of Energy

    Energy Savers

    Reporting and Data Federal Energy Management Reporting and Data The Federal Energy Management Program (FEMP) provides agencies with guidance on how to report progress made toward federal energy management laws and requirements. FEMP also collects and manages performance data for the federal government. Learn about reporting and data for: Federal facilities: Find guidance on comprehensive annual reporting and Energy Independence and Security Act Section 432 (EISA 432) facility management and

  14. Efficient Technologies and Products for Federal Facilities |...

    Energy.gov (indexed) [DOE]

    Find products and technologies covered by a specific efficiency program. ENERGY STAR EPEAT FEMP Designated FEMP Low Standby Power FEMP Promising Technologies WaterSense Advanced ...

  15. Environmental Justice and Federal Facilities: Recommendations...

    Energy Savers

    ... trainings, and community-based organized activities. ... and their contents were removed (generally by hot water wash). ... and soil vapor extraction in the on-base source areas. ...

  16. Postdoctoral Mentoring Agreement | Argonne National Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Agreement Agreement to participate in the Argonne Postdoctoral Mentoring Program. PDF icon Postdoctoral-Mentoring-Agreement...

  17. Nuclear Facilities Production Facilities

    National Nuclear Security Administration (NNSA)

    Facilities Production Facilities Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000. Sand 2011-4582P. ENERGY U.S. DEPARTMENT OF Gamma Irradiation Facility (GIF) The GIF provides test cells for the irradiation of experiments with high-intensity gamma ray sources. The main features

  18. Metering in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities » Operations & Maintenance » Metering in Federal Buildings Metering in Federal Buildings The U.S. Department of Energy is required by the Energy Policy Act of 2005 and Executive Order 13693 to establish guidelines for agencies to meter their federal buildings for energy (electricity, natural gas, and steam) and water use. To help agencies meet these metering requirements, the Federal Energy Management Program (FEMP) provides guidance materials, an implementation plan template,

  19. PERFORMANCE GUARANTEE AGREEMENT

    National Nuclear Security Administration (NNSA)

    F PERFORMANCE GUARANTEE SEE ATTACHED Appendix F - Page 308 PERFORMANCE GUARANTEE AGREEMENT For value received, and in consideration of, and in order to induce the United States (the Government) to enter into Contract DE-AC52-07NA27344 for the management and operation of the Lawrence Livermore National Laboratory (the "Contract") dated __________, by and between the Government and Lawrence Livermore National Security LLC (Contractor), the undersigned, Bechtel National, Inc. (Guarantor),

  20. International Agreements FAQ

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    International Trade Agreements and the Recovery Act Buy American Provisions: Frequently Asked Questions Scope: This FAQ applies to all state, local and tribal government recipients and sub- recipients (grantees and subgrantees) of Recovery Act financial assistance from the Office of Energy Efficiency and Renewable Energy (EERE). The Buy American provision in the American Recovery and Reinvestment Act of 2009 (section 1605 of Title XVI), provides that, subject to three listed exceptions

  1. Agreement Type Union

    National Nuclear Security Administration (NNSA)

    Type Union Local #/Name Number of Employees Project Labor Agreement International Association of Heat and Frost Insulators and Allied Workers 135 2 International Brothehood of Boilermakers, Iron Ship Builders, Blacksmith Forgers and Helpers 92 0 International Union of Bricklayers & Allied Craftsmen 13 0 Regional Council of Carpenters 1780 & 1977 13 Operative Plasterers and Cement Mason International Association Operative Plasterers and Cement Mason International Association 1

  2. EPA and the Federal Technology Transfer Act: Opportunity knocks

    SciTech Connect (OSTI)

    Gatchett, A.M.; Fradkin, L.; Moore, M.; Gorman, T.; Ehrlich, A.

    1990-12-31

    In 1986, the Federal Technology Transfer Act (FTTA) was established to promote a closer, collaborative relationship between federal government agencies and the private sector. With the increasing need for new cost-effective technologies to prevent and control pollution, both the US Environmental Protection Agency (EPA) and private industry are encouraged to facilitate the transfer of knowledge and technology under this Act. The FTTA removed several of the legal and institutional barriers to cooperative research that existed before the Act`s passage. Through the FTTA, the government strives to promote the movement of its products, processes, skills, and knowledge into the private sector for further development and commercialization by encouraging the exchange of technical personnel and the sharing of facilities and other resources. Collaborative efforts between industry, federal agencies, and academia are made possible through cooperative research and development agreements (CRADAs). Forty-two CRADAs and five licensing agreements have been initiated with EPA under this program. This paper provides an overview of this new and innovative program within the EPA. 1 fig., 2 tabs.

  3. Federal Renewable Energy Screening Assistant

    SciTech Connect (OSTI)

    Shelpuk, B; Walker, A

    1994-10-01

    The Federal Renewable Energy Screening Assistant is a software tool to be used by energy auditors to prioritize future studies of potentially cost-effective renewable energy applications at federal facilities. This paper describes the structure and function of the tool, gives an inventory of renewable energy technologies represented in the tool, and briefly describes the algorithms used to rank opportunities by the savings-to-investment ratio.

  4. Attachment 2: Draft Settlement Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    made by the Parties in all prior discussions, negotiations and agreements, whether oral or written, relating to the subject matter of this Agreement. 11. DRAFTING OF THE...

  5. Non-Treaty Storage Agreement

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Doing Business Skip navigation links Initiatives Columbia River Treaty Non Treaty Storage Agreement 2012 Long Term NTSA Previous Agreements NEPA Planning and Review Documents...

  6. Microsoft Word - Short Form CRADA Agreement Boilerplate Approved June 2014

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    agreement, which is uniform across the Departmental facilities, for small value transactions. Except for minor modifications to the terms of this agreement made by CONTRACTOR, most changes will require approval by the DOE Contracting Officer, WHICH WILL LIKELY DELAY THE START DATE OF THE PROJECT. If substantive changes are required, the DOE Model CRADA may be more appropriate due to the increased flexibility such agreements afford. STEVENSON-WYDLER (15 U.S.C. 3710a) SHORT FORM COOPERATIVE

  7. West Valley Demonstration Project Phase I Decommissioning - Facility...

    Office of Environmental Management (EM)

    West Valley Demonstration Project Phase I Decommissioning - Facility Disposition Partnering Performance Agreement The Department of Energy, West Valley Demonstration Project ...

  8. Facilities Initiatives | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities Initiatives Facilities Initiatives The Headquarters Office of Administration, Office of Logistics and Facility Operations, has several energy saving initiatives in place or in progress at their Headquarters' facilities in the Forrestal Building in Washington, DC, and Germantown Maryland. Many of these initiatives are part of their Energy Savings Performance Contract (ESPC). ESPCs allow Federal agencies to accomplish energy savings projects without up-front capital costs and without

  9. DOE Federal and Eligible Contractor Use | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Federal and Eligible Contractor Use 071615.docx (28.88 KB) More Documents & Publications List of Enterprise-Wide Agreements Acquisition Career Management Handbook Change - ...

  10. Confidentiality Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Confidentiality Agreement Confidentiality Agreement This document sets out the ground rules for the confidentiality of the mediation session and is signed at the mediation session by all who are present. ADRO-HQ-007 Final - Confidentiality Agreement.pdf (53.05 KB) More Documents & Publications Agreement to Mediate Mediation Process Management Reminders

  11. Categorical Exclusion 4564, Sort and Segregation Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    and Guidelines OA 14- Approval of technical exchange arrangements OA IS - International umbrella agreements for energy R&D Facility Operations OB 1.2 - Training exercises and...

  12. Arid Lands Ecology Facility management plan

    SciTech Connect (OSTI)

    None

    1993-02-01

    The Arid Lands Ecology (ALE) facility is a 312-sq-km tract of land that lies on the western side of the Hanford Site in southcentral Washington. The US Atomic Energy Commission officially set aside this land area in 1967 to preserve shrub-steppe habitat and vegetation. The ALE facility is managed by Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE) for ecological research and education purposes. In 1971, the ALE facility was designated the Rattlesnake Hills Research Natural Area (RNA) as a result of an interagency federal cooperative agreement, and remains the largest RNA in Washington. it is also one of the few remaining large tracts of shrub-steppe vegetation in the state retaining a predominant preeuropean settlement character. This management plan provides policy and implementation methods for management of the ALE facilities consistent with both US Department of Energy Headquarters and the Richland Field Office decision (US Congress 1977) to designate and manage ALE lands as an RNA and as a component of the DOE National Environmental Research Park System.

  13. ORPS Facility Registration Form | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon ORPS Facility Registration Form More Documents & Publications ORPS User Registration Form Design Code Survey Form Federal Building Energy Use Benchmarking Guidance, August ...

  14. Sandia National Laboratories: Research: Facilities: Technology...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Radiation Detection Materials Characterization Laboratory This facility provides assistance to users from federal laboratories, U.S. industry and academia in the following areas:...

  15. ITEP Greening Tribal Operations and Facilities Trainings

    Energy.gov [DOE]

    The Institute for Tribal Environmental Professionals (ITEP) is offering our Greening Tribal Operations and Facilities training course for employees of federally-recognized tribes.

  16. Federal Energy Management Laws and Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Laws and Requirements Federal Energy Management Laws and Requirements Federal Energy Management Laws and Requirements To help agencies comply with federal laws and requirements, the Federal Energy Management Program (FEMP) analyzes energy management mandates from legal authorities and publishes notices and rules related to federal energy management. FEMP also provides tools to help agencies report annual facility and fleet progress toward federal laws and requirements. Get Started Start meeting

  17. ARM - SGP Extended Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Extended Facility SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration...

  18. ARM - SGP Intermediate Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Intermediate Facility SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration...

  19. ARM - SGP Central Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Central Facility SGP Related Links Virtual Tour Facilities and Instruments Central Facility Boundary Facility Extended Facility Intermediate Facility Radiometric Calibration...

  20. 2006 Federal Energy and Water Management Award Winners

    Energy.gov [DOE]

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable nergy technologies at federal facilities.

  1. Federal Energy Management Program Issues 2016 AFFECT Funding Opportunity Announcement

    Energy.gov [DOE]

    On May 26, 2016, the Federal Energy Management Program (FEMP) issued a funding opportunity announcement (FOA) on the EERE Exchange titled Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) 2016.

  2. Federal Procurement of Energy-Efficient Products January 2013 Update

    Energy.gov [DOE]

    Welcome to the seventh issue of Federal Energy-Efficient Product Procurement! This bi-monthly update helps Federal procurement officials, facility managers, and others remain up to date on events, training, technology, and changes to acquisition requirements.

  3. 2005 Federal Energy and Water Management Award Winners

    Energy.gov [DOE]

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities.

  4. Environmentally and Economically Beneficial Practices on Federal Landscaped Grounds

    Energy.gov [DOE]

    This Environmental Protection Agency report contains recommendations for a series of environmental actions, including those to increase environmental and economically beneficial landscaping practices at Federal facilities and federally funded projects.

  5. 2010 Federal Energy and Water Management Award Winners

    Energy.gov [DOE]

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities.

  6. 2007 Federal Energy and Water Management Award Winners

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities.

  7. 2008 Federal Energy and Water Management Award Winners

    Energy.gov [DOE]

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities.

  8. 2013 Federal Energy and Water Management Award Winners Video

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for the outstanding use of energy- and water-efficiency technologies at Federal facilities. This video honors the 25 individuals and teams that received awards in 2013.

  9. Geothermal heat pumps for federal buildings

    SciTech Connect (OSTI)

    1999-09-02

    Geothermal heat pumps (GHPs) can provide significant energy savings to a wide range of Federal facilities. GHP equipment can be obtained and installed at no up-front cost through Energy Savings Performance Contracts (ESPCs) through energy service companies (ESCOs).

  10. Federal Correctional Institution - Phoenix, Arizona | Department...

    Energy Savers

    Photo of a Parabolic-Trough Solar Water-Heating System Installed at the Federal Correctional Institution Facility north of Phoenix, Arizona A parabolic-trough solar water-heating ...

  11. Joint Facilities User Forum

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) Joint Environmental Management System (EMS) The environmental management system (EMS) has two areas of focus: environmental compliance and environmental sustainability. The environmental compliance aspect of the EMS consists of regulatory compliance and monitoring programs that implement federal, state, local, and tribal requirements; agreements; and permits under the Legacy Management contract. The

  12. Regulatory Facility Guide for Tennessee

    SciTech Connect (OSTI)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O.; Rymer, A.C.

    1994-02-28

    This guide provides detailed compilations of international, federal, and state transportation related regulations applicable to shipments originating at or destined to Tennessee facilities. Information on preferred routes is also given.

  13. Title 10 CFR 900 Coordination of Federal Authorizations for Electric...

    Open Energy Information (Open El) [EERE & EIA]

    900 Coordination of Federal Authorizations for Electric Transmission Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  14. Effects of Climate Change on Federal Hydropower (Report to Congress...

    Energy.gov (indexed) [DOE]

    dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of ...

  15. Federal Energy Management Success Stories | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy's (EERE) successes in cost-effective energy management and investment practices save money by saving energy within federal government facilities and fleets. Explore...

  16. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Importantly, numerous federal facilities will lose power, including those crucial to the security, safety, and welfare of the whole country, such as the FBI, the Justice ...

  17. Energy Savings Performance Contracts for Federal Agencies | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy savings performance contracts (ESPCs) allow federal agencies to procure energy savings and facility improvements with no up-front capital costs or special appropriations ...

  18. Procuring Fuel Cells for Stationary Power: A Guide for Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procuring Fuel Cells for Stationary Power: A Guide for Federal Facility Decision Makers OCTOBER 2011 Fuel Cell Technologies Program Oak Ridge National Laboratory 2 October 2011 ...

  19. Facilities Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operations » Facilities Management Facilities Management INL is a multiprogram, federally funded research and development center (FFRDC) emphasizing applied engineering to provide solutions for use across the DOE complex, as well as regionally, nationally, and world wide. INL is a multiprogram, federally funded research and development center (FFRDC) emphasizing applied engineering to provide solutions for use across the DOE complex, as well as regionally, nationally, and world wide. Overview

  20. Floating Rate Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Floating Rate Agreement Floating Rate Agreement Floating Rate Agreement (99.85 KB) More Documents & Publications Fixed Rate Agreement Energy Efficiency Loan Program Agreement Template Energy Efficiency Loan Program Agreement-Template

  1. Huntington Resource Recovery Facility Biomass Facility | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Resource Recovery Facility Biomass Facility Jump to: navigation, search Name Huntington Resource Recovery Facility Biomass Facility Facility Huntington Resource Recovery Facility...

  2. Wheelabrator Sherman Energy Facility Biomass Facility | Open...

    Open Energy Information (Open El) [EERE & EIA]

    Sherman Energy Facility Biomass Facility Jump to: navigation, search Name Wheelabrator Sherman Energy Facility Biomass Facility Facility Wheelabrator Sherman Energy Facility Sector...

  3. Florida State Historic Preservation Programmatic Agreement |...

    Energy Savers

    Florida State Historic Preservation Programmatic Agreement Florida State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State ...

  4. Delaware State Historic Preservation Programmatic Agreement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Delaware State Historic Preservation Programmatic Agreement Delaware State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State ...

  5. Connecticut State Historic Preservation Programmatic Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Connecticut State Historic Preservation Programmatic Agreement Connecticut State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, ...

  6. Massachusetts State Historic Preservation Programmatic Agreement...

    Energy Savers

    Massachusetts State Historic Preservation Programmatic Agreement Massachusetts State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE,...

  7. North Carolina State Historic Preservation Programmatic Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North Carolina State Historic Preservation Programmatic Agreement North Carolina State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between ...

  8. New Hampshire State Historic Preservation Programmatic Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    New Hampshire State Historic Preservation Programmatic Agreement New Hampshire State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, ...

  9. Sandia National Laboratories: Corporate Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Corporate Agreements Corporate agreements are used by Sandia Labs for goods or services that are required across the laboratories. Sandia relies on long-term corporate agreements to meet ongoing needs. Just in Time (JIT) Corporate Purchasing Agreements (CPAs) facilitate an easy and efficient method for purchasing commercially available goods and services directly from the supplier. JIT contracts are based on volume of actions, dollars expended, and labwide use. JIT suppliers also provide value

  10. Creating a Partnership Agreement Worksheet

    Energy.gov [DOE]

    Creating a Partnership Agreement Worksheet, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website.

  11. 303-K Storage Facility closure plan. Revision 2

    SciTech Connect (OSTI)

    Not Available

    1993-12-15

    Recyclable scrap uranium with zircaloy-2 and copper silicon alloy, uranium-titanium alloy, beryllium/zircaloy-2 alloy, and zircaloy-2 chips and fines were secured in concrete billets (7.5-gallon containers) in the 303-K Storage Facility, located in the 300 Area. The beryllium/zircaloy-2 alloy and zircaloy-2 chips and fines are designated as mixed waste with the characteristic of ignitability. The concretion process reduced the ignitability of the fines and chips for safe storage and shipment. This process has been discontinued and the 303-K Storage Facility is now undergoing closure as defined in the Resource Conservation and Recovery Act (RCRA) of 1976 and the Washington Administrative Code (WAC) Dangerous Waste Regulations, WAC 173-303-040. This closure plan presents a description of the 303-K Storage Facility, the history of materials and waste managed, and the procedures that will be followed to close the 303-K Storage Facility. The 303-K Storage Facility is located within the 300-FF-3 (source) and 300-FF-5 (groundwater) operable units, as designated in the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) (Ecology et al. 1992). Contamination in the operable units 300-FF-3 and 300-FF-5 is scheduled to be addressed through the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980 remedial action process. Therefore, all soil remedial action at the 304 Facility will be conducted as part of the CERCLA remedial action of operable units 300-FF-3 and 300-FF-5.

  12. Uranium Processing Facility Team Signs Partnering Agreement | Y-12 National

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Uranium Marketing Annual Report With Data for 2015 | Release Date: May 24, 2016 | Next Release Date: May 2017 | full report Previous reports Year: 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 2003 2002 2001 2000 1999 1998 1997 1996 1995 1994 1993 1992 Go Uranium purchases and prices Owners and operators of U.S. civilian nuclear power reactors ("civilian owner/operators" or "COOs") purchased a total of 57 million pounds U3O8e (equivalent1) of deliveries from U.S.

  13. Volpentest HAMMER Federal Training Center - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Projects & Facilities Volpentest HAMMER Federal Training Center About Us About Hanford Cleanup Hanford History Hanford Site Wide Programs Contact Us 100 Area 118-K-1 Burial Ground 200 Area 222-S Laboratory 242-A Evaporator 300 Area 324 Building 325 Building 400 Area/Fast Flux Test Facility 618-10 and 618-11 Burial Grounds 700 Area B Plant B Reactor C Reactor Canister Storage Building and Interim Storage Area Canyon Facilities Cold Test Facility D and DR Reactors Effluent Treatment Facility

  14. Ashton Extended Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Ashton Extended Facility Map

  15. Byron Extended Facility

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Byron Extended Facility Map

  16. United States and International Partners Initial ITER Agreement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy International Partners Initial ITER Agreement United States and International Partners Initial ITER Agreement May 24, 2006 - 10:48am Addthis Paves the Way for Large-Scale, Clean Fusion Energy Project BRUSSELS, BELGIUM - Representing the United States, Dr. Raymond L. Orbach, Director of the U.S. Department of Energy's (DOE) Office of Science, joined counterparts from China, the European Union, India, Japan, the Republic of Korea, and the Russian Federation today to

  17. Regulatory facility guide for Ohio

    SciTech Connect (OSTI)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.; Gove, R.M.; Johnson, P.E.; Kovac, F.M.; Mynatt, J.O.; Rymer, A.C.

    1994-02-28

    The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

  18. User Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Collaboration User Facilities collaborationassetsimagesicon-collaboration.jpg User Facilities A new research frontier awaits Our door is open and we thrive on mutually...

  19. 324 Facility special-case waste assessment in support of 324 closure (TPA milestone M-89-05)

    SciTech Connect (OSTI)

    Hobart, R.L.

    1998-06-25

    Hanford Federal Facility Agreement and Consent Order, also known as the Tri-Party Agreement Milestone M-89-05, requires US Department of Energy, Richland Operations Office to complete a 324 Facility Special-Case Waste Assessment in Support of 324 Closure. This document, HNF-1270, has been prepared with the intent of meeting this regulatory commitment. Alternatives for the special-case wastes located in the 324 Building were defined and analyzed. Based on the criteria of safety, environmental, complexity of interfaces, risk, cost, schedule, and long-term operability and maintainability, the best alternative was chosen. Waste packaging and transportation options are also included in the recommendations. The waste disposition recommendations for the B-Cell dispersibles/tank heels and High-Level Vault packaged residuals are to direct them to the Plutonium Uranium Extraction Facility (PUREX) Number 2 storage tunnel.

  20. Large-Scale Federal Renewable Energy Projects | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Large-Scale Federal Renewable Energy Projects Large-Scale Federal Renewable Energy Projects Renewable energy projects larger than 10 megawatts (MW), also known as utility-scale projects, are complex and typically require private-sector financing. The Federal Energy Management Program (FEMP) developed a guide to help federal agencies, and the developers and financiers that work with them, to successfully install these projects at federal facilities. FEMP's Large-Scale Renewable Energy Guide,

  1. 2011 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 1 Federal Energy and Water Management Award Winners 2011 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2011 Federal Energy and Water Management Awards include the following. Contracting (Individual) Ronda

  2. 2012 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 2 Federal Energy and Water Management Award Winners 2012 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2012 Federal Energy and Water Management Awards include: Recipients of the 2012 awards were honored at a

  3. 2001 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 1 Federal Energy and Water Management Award Winners 2001 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2001 Federal Energy and Water Management Awards include the following. Water Management Awards to

  4. 2002 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 2 Federal Energy and Water Management Award Winners 2002 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2002 Federal Energy and Water Management Awards include the following. Water Management Awards to

  5. 2003 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 3 Federal Energy and Water Management Award Winners 2003 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2003 Federal Energy and Water Management Awards include the following. Water Conservation Awards to

  6. 2004 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 2004 Federal Energy and Water Management Award Winners 2004 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2004 Federal Energy and Water Management Awards include the following. Water Conservation Award to an

  7. 2005 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 5 Federal Energy and Water Management Award Winners 2005 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2005 Federal Energy and Water Management Awards include the following. Water Conservation Award to an

  8. 2006 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 6 Federal Energy and Water Management Award Winners 2006 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2006 Federal Energy and Water Management Awards include the following. Water Conservation Award to an

  9. 2007 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 7 Federal Energy and Water Management Award Winners 2007 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2007 Federal Energy and Water Management Awards include the following. Highest Achievement Awards Three

  10. 2008 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 8 Federal Energy and Water Management Award Winners 2008 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2008 Federal Energy and Water Management Awards include the following. Water Conservations Awards to

  11. 2010 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 10 Federal Energy and Water Management Award Winners 2010 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2010 Federal Energy and Water Management Awards include the following. Program Manager's Award to a

  12. Water Efficiency in Federal Buildings and Campuses | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities » Water Efficiency » Water Efficiency in Federal Buildings and Campuses Water Efficiency in Federal Buildings and Campuses Water Efficiency in Federal Buildings and Campuses The Federal Energy Management Program (FEMP) provides agencies with guidance and direction on how to increase water efficiency and reduce water use in federal buildings and campuses. Three legal authorities require agencies to reduce water use and implement water efficiency measures: Executive Order (E.O.)

  13. 2013 Federal Energy and Water Management Award Winners | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 3 Federal Energy and Water Management Award Winners 2013 Federal Energy and Water Management Award Winners 2013 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for the outstanding use of energy- and water-efficiency technologies at Federal facilities. View a video honoring the 25 individuals and teams that received awards in 2013. Awards to Individuals: Exceptional Service Image of the poster

  14. SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 SUMMARY OF REGULATIONS IMPLEMENTING FEDERAL POWER ACT SECTION 216 The Energy Policy Act of 2005 added section 216(h) to the Federal Power Act providing for the Department of Energy to act as the lead agency for coordinating all applicable Federal authorizations and related environmental reviews required under Federal law in order to site an electric transmission facility. The Act authorized DOE to issue

  15. Energy Department Announces Agreement to Sell Depleted Uranium to be

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Enriched for Civil Nuclear Power | Department of Energy Announces Agreement to Sell Depleted Uranium to be Enriched for Civil Nuclear Power Energy Department Announces Agreement to Sell Depleted Uranium to be Enriched for Civil Nuclear Power November 10, 2016 - 12:00pm Addthis News Media Contact: (202) 586-4940 GE-Hitachi Global Laser Enrichment Evaluating Construction of $1 Billion Facility for Enrichment Bringing Hundreds of Jobs to Western Kentucky LEXINGTON, Ky.-The Department of Energy

  16. Federal Register Notice: Advisory Council on Historic Preservation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Federal Register Notice: Advisory Council on Historic Preservation Federal Register Notice: Advisory Council on Historic Preservation Extension of the Duration of Programmatic Agreements Based on the Department of Energy Prototype Programmatic Agreement for Its Weatherization Assistance Program, State Energy Program, and Energy Efficiency and Conservation Block Grant; Notice of Program Comment. federal_register_notice-program_comment.pdf (2.3 MB) More Documents &

  17. Unions, Lab sign labor agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Unions, Lab sign labor agreements Unions, Lab sign labor agreements The New Mexico Building and Construction Trades Council and Los Alamos National Security LLC, announced the signing of a series of labor agreements that affect nearly 750 construction and maintenance workers. September 21, 2012 Jay Johnson renews the contracts with the Laboratory's union workers. Jay Johnson (left) associate director for maintenance and infrastructure planning, renews the contracts with the Laboratory's union

  18. Timesharing Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Timesharing Agreements Timesharing Agreements Time Sharing Agreements The Acquisition Management Division (IM-13) administers the Departmental Teleprocessing Services Program (TSP), to ensure: Reduced overhead costs Reduced rates and discounts Diversity of available resources The TSP currently saves the Department over $2.4M a year. For more information, please contact the TSP Coordinator, Diane McDonough diane.mcdonough@hq.doe.gov or Ann Edwards anna.edwards@hq.doe.gov. Congressional Quarterly,

  19. Microsoft Word - Template_SLAC Proprietary Use Agreement_PU 11_14_13

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PU 11/14/2013 1 The Department of Energy has opted to utilize the following agreement for Designated Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisons will require approval by the DOE Contracting

  20. NREL: Technology Transfer - Licensing Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    using, and selling of the licensed technology, methods, or products. 5. Negotiate License Language The company then reviews and comments on the license agreement draft. If needed,...

  1. NREL: Technology Transfer - Nondisclosure Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    established this process to develop mutually beneficial R&D collaborations in a straightforward, flexible, timely, and efficient manner. Process The nondisclosure agreement...

  2. Federal Technology Transfer and the Federal Laboratory Consortium...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Technology Transfer and the Federal Laboratory Consortium: Federal Technology Transfer and the Federal Laboratory Consortium: Identifying and accessing U.S. federal lab ...

  3. Facility Representatives

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-03-01

    This standard, DOE-STD-1063, Facility Representatives, defines the duties, responsibilities and qualifications for Department of Energy (DOE) Facility Representatives, based on facility hazard classification; risks to workers, the public, and the environment; and the operational activity level. This standard provides the guidance necessary to ensure that DOE’s hazardous nuclear and non-nuclear facilities have sufficient staffing of technically qualified facility representatives (FRs) to provide day-to-day oversight of contractor operations.

  4. 200 Area Deactivation Project Facilities Authorization Envelope Document

    SciTech Connect (OSTI)

    DODD, E.N.

    2000-03-28

    Project facilities as required by HNF-PRO-2701, Authorization Envelope and Authorization Agreement. The Authorization Agreements (AA's) do not identify the specific set of environmental safety and health requirements that are applicable to the facility. Therefore, the facility Authorization Envelopes are defined here to identify the applicable requirements. This document identifies the authorization envelopes for the 200 Area Deactivation.

  5. Loan Loss Reserve Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Loan Loss Reserve Agreement Loan Loss Reserve Agreement Loan Loss Reserve Agreement, from the Tool Kit Framework: Small Town University Energy Program (STEP). B2 Loan Loss Reserve Agreement.pdf (59.68 KB) More Documents & Publications Energy Efficiency Loan Program Agreement Template Energy Efficiency Loan Program Agreement-Template Energy Efficiency Loan Program Agreement Template

  6. Effects of Climate Change on Federal Hydropower. Report to Congress

    SciTech Connect (OSTI)

    2013-08-01

    This is a formal Department of Energy report to Congress. It outlines the findings of an assessment directed by Congress in Section 9505 of the SECURE Water Act of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities.

  7. Assessment of the Effects of Climate Change on Federal Hydropower

    SciTech Connect (OSTI)

    Sale, Michael J.; Shih-Chieh, Kao; Ashfaq, Moetasim; Kaiser, Dale P.; Martinez, Rocio; Webb, Cindy; Wei, Yaxing

    2012-10-01

    As directed by Congress in Section 9505 of the SECURE Water Act of 2009 (Public Law 111-11), the US Department of Energy (DOE), in consultation with the federal Power Marketing Administrations (PMAs) and other federal agencies, including federal dam owners, has prepared a comprehensive assessment examining the effects of climate change on water available for hydropower at federal facilities and on the marketing of power from these federal facilities. This Oak Ridge National Laboratory report, referred to as the “9505 Assessment,” describes the technical basis for the report to Congress that was called for in the SECURE Water Act.

  8. 2001 Federal Energy and Water Management Award Winners

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2001 Federal Energy and Water Management Awards include the following.

  9. 2011 Federal Energy and Water Management Award Winners

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2011 Federal Energy and Water Management Awards include:

  10. 2002 Federal Energy and Water Management Award Winners

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for their outstanding contributions in the areas of energy efficiency, water conservation, and the use of advanced and renewable energy technologies at federal facilities. Winners of the 2002 Federal Energy and Water Management Awards include the following.

  11. Microsoft Word - Political Activity and the Federal Employee.doc |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Political Activity and the Federal Employee.doc Microsoft Word - Political Activity and the Federal Employee.doc Microsoft Word - Political Activity and the Federal Employee.doc (165.92 KB) More Documents & Publications Political Activity at DOE Facilities by DOE Contractors Audit Report: IG-0473 PROCESSING INVITATIONS FOR A PRESIDENTIAL APPOINTEE

  12. Federal Progress Toward Energy/Sustainability Goals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Progress Toward Energy/Sustainability Goals Federal Progress Toward Energy/Sustainability Goals Presentation offers an overview of progress made in federal facility energy management and sustainability based on fiscal year reported findings. Download the Federal Progress Toward Energy/Sustainability Goals presentation. (479.71

  13. Federal Energy Resources Modernization Coordinating Committee

    SciTech Connect (OSTI)

    Parker, G.B.

    1993-04-01

    This report summarizes the broad range of activities that are focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the Federal Energy Resource Modernization (FERM) Coordinating Committee, and as such include activities undertaken from April 1, 1992, through September 30, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for federal energy managers to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems revitalization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities. Lighting systems and air conditioning projects at federal facilities, especially military bases are updated.

  14. Comments on Notice of Proposed Rulemaking for Coordination of Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Authorizations for Electric Transmission Facilities | Department of Energy on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities Comments on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities On behalf of Allegheny Energy, Inc. and its subsidiaries, Monongahela Power Company, The Potomac Edison Company and West Penn Power Company, all doing business as Allegheny Power;

  15. Technology Investment Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technology Investment Agreements Technology Investment Agreements Guidance Policy Flash 2006-31 - Technology Investment Agreements Financial Assistance Letter 2006-03 - Guidance ...

  16. Mobility Agreement for Criminal Investigators | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Mobility Agreement for Criminal Investigators Mobility Agreement for Criminal Investigators PDF icon Mobility Agreement More Documents & Publications Semiannual Report to Congress: ...

  17. Training Partner Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Training Partner Agreement Training Partner Agreement Through this agreement, the registered organization ("Partner") joins in partnership with the Department of Energy (DOE). ...

  18. Contract and Agreement Templates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contract and Agreement Templates Contract and Agreement Templates Here you will find templates for a request for proposals (RFP), loan loss reserve (LLR) fund agreement, and energy ...

  19. DOE and State Sign Natural Resources Damages Settlement Agreement

    Energy.gov [DOE]

    Officials from TDEC and DOE signed a Natural Resources Damages settlement agreement. The signed document designates DOE’s plans to compensate the state for ecological and human use impacts associated with contaminant releases from facilities at the Oak Ridge Reservation.

  20. NREL Bilateral Nondisclosure Agreement - Sample

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    (REV 07/09) Page 1 of 3 BILATERAL NON-DISCLOSURE AGREEMENT No. XX - XXXX ("Agreement") This Agreement is entered into by and between the Alliance for Sustainable Energy, LLC ("Alliance"), the Manager and Operator of the National Renewable Energy Laboratory ("NREL") under Prime Contract No. DE- AC36-08GO28308 for the U.S. Department of Energy (the "DOE"), located at 15013 Denver West Parkway, Golden, CO, 80401 and COMPANY NAME ("Company"), whose

  1. Agreement

    Energy Savers

    Corridor Designations in 11 Western States | Department of Energy Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States November 8, 2007 - 11:31am Addthis WASHINGTON, DC - The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public

  2. AGREEMENT

    National Nuclear Security Administration (NNSA)

    ... Able to operate passenger car, van andor trucks safely while obeying applicable highway ... oil and gas-fired boilers and heaters, electric motors, emergency diesel generators, ...

  3. Agreement

    National Nuclear Security Administration (NNSA)

    ... 34 Article 20 - Holidays And Energy Conservation Day ......13.2.3. Pay on Holidays and Energy Conservation Day is addressed in ARTICLE 20 ...

  4. Agreement

    National Nuclear Security Administration (NNSA)

    ... 66 Article 31 - Energy Conservation Day ......80 hours) plus Energy Conservation Day (eight 8 hours) is eighty-eight (88) hours. ...

  5. ORISE: Facilities

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ORISE Facilities Unique laboratories and training centers among the assets managed on behalf of the U.S. Department of Energy The Oak Ridge Institute for Science and Education (ORISE) is home to a number of on- and off-site facilities that support the U.S. Department of Energy's (DOE) science education and research mission. From on-site medical laboratories to radiation emergency medicine training facilities, ORISE facilities are helping to address national needs in the following areas:

  6. Facility Safety

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-10-24

    Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

  7. Facility Safety

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-11-16

    Establishes facility safety requirements related to: nuclear safety design, criticality safety, fire protection and natural phenomena hazards mitigation.

  8. South Valley Compliance Agreement Summary

    Office of Environmental Management (EM)

    Agreement with the U.S. Air Force for payment of costs associated with the remediation ... to pay the full USG's share (91%), no payment will be made and USAF will notify DOE and ...

  9. Master Safeguards and Security Agreements

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1988-02-03

    To establish the Department of Energy policy, requirements, responsibilities, and authorities for the development and implementation of Master Safeguards and Security Agreements (MSSA's). Does not cancel another directive. Canceled by DOE O 5630.13A

  10. Nuclear Rocket Test Facility Decommissioning Including Controlled Explosive Demolition of a Neutron-Activated Shield Wall

    SciTech Connect (OSTI)

    Michael Kruzic

    2007-09-01

    Located in Area 25 of the Nevada Test Site, the Test Cell A Facility was used in the 1960s for the testing of nuclear rocket engines, as part of the Nuclear Rocket Development Program. The facility was decontaminated and decommissioned (D&D) in 2005 using the Streamlined Approach For Environmental Restoration (SAFER) process, under the Federal Facilities Agreement and Consent Order (FFACO). Utilities and process piping were verified void of contents, hazardous materials were removed, concrete with removable contamination decontaminated, large sections mechanically demolished, and the remaining five-foot, five-inch thick radiologically-activated reinforced concrete shield wall demolished using open-air controlled explosive demolition (CED). CED of the shield wall was closely monitored and resulted in no radiological exposure or atmospheric release.

  11. Interagency Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title XVII » Title XVII Environmental Compliance » Environmental Compliance » Interagency Agreements Interagency Agreements The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPO's due diligence process for issuing a Department of Energy loan or loan guarantee. With the exception of a Record of Decision, the posting of these documents should not be construed as recommending a decision about

  12. NETL Partnership and Licensing Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Partnerships and Licensing Options Cooperative Research and Development Agreement (CRADA) A CRADA allows for joint research projects between NETL and either public or private entities. Small businesses are given preferential consideration for the agreements. Intellectual property ownership is defined and cost sharing is essential. Intellectual Property (IP) License An Intellectual Property License transfers NETL-owned IP from government sector to private sector ownership both exclusively and

  13. Sample Retention Incentive Service Agreement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Phased Retirement Service Agreement Introduction This is an employment agreement between ____(employee's name)_____ (hereinafter referred to as "you" or "your") and the ______(Departmental element)________ (hereinafter referred to as "the employer" or Departmental element) for the purpose of the employer committing to retaining you in a phased retirement status to fulfill a critical need and, in return, your committing to a period of service to the employer. This

  14. Requirements to coordinate agreements, milestones and decision...

    Office of Environmental Management (EM)

    Requirements to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental ...

  15. NREL: Technology Transfer - Technology Partnership Agreements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Ombuds. Printable Version Technology Transfer Home About Technology Transfer Technology Partnership Agreements Agreements for Commercializing Technology CRADAs Work for...

  16. Illinois State Historic Preservation Programmatic Agreement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications New Hampshire State Historic Preservation Programmatic Agreement Prototype Programmatic Agreement Between DOE, State Energy Offices, and State ...

  17. Wisconsin State Historic Preservation Programmatic Agreement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Offices, and State Historic Preservation Offices Illinois State Historic Preservation Programmatic Agreement New Hampshire State Historic Preservation Programmatic Agreement

  18. Iowa State Historic Preservation Programmatic Agreement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications Illinois State Historic Preservation Programmatic Agreement New Hampshire State Historic Preservation Programmatic Agreement North Carolina State ...

  19. Facility Clearance Program | National Nuclear Security Administration |

    National Nuclear Security Administration (NNSA)

    (NNSA) Facility Clearance Program The Facility Clearance (FCL) Program regulates DOE approval of a Federal or contractor facility's eligibility to access, receive, generate, reproduce, store, transmit, or destroy classified information or matter, special nuclear material (SNM), other hazardous material presenting a potential radiological, chemical, or biological sabotage threat, and/or DOE property of significant monetary value, exclusive of facilities and land values (hereinafter referred

  20. California State Historic Preservation Programmatic Agreement | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy California State Historic Preservation Programmatic Agreement California State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office. state_historic_preservation_programmatic_agreement_ca.pdf (1.33 MB) More Documents & Publications Arizona State Historic Preservation Programmatic Agreement Delaware State Historic Preservation Programmatic Agreement Florida State Historic

  1. New Hampshire State Historic Preservation Programmatic Agreement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy New Hampshire State Historic Preservation Programmatic Agreement New Hampshire State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office. state_historic_preservation_programmatic_agreement_nh.pdf (624.25 KB) More Documents & Publications Illinois State Historic Preservation Programmatic Agreement Prototype Programmatic Agreement Between DOE, State Energy Offices,

  2. North Carolina State Historic Preservation Programmatic Agreement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy North Carolina State Historic Preservation Programmatic Agreement North Carolina State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office. state_historic_preservation_programmatic_agreement_nc.pdf (541.87 KB) More Documents & Publications Indiana State Historic Preservation Programmatic Agreement South Dakota State Historic Preservation Programmatic Agreement

  3. Washington State Historic Preservation Programmatic Agreement | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Washington State Historic Preservation Programmatic Agreement Washington State Historic Preservation Programmatic Agreement Fully executed programmatic agreement between DOE, State Energy Office and State Historic Preservation Office. state_historic_preservation_programmatic_agreement_wa.pdf (627.44 KB) More Documents & Publications Kansas State Historic Preservation Programmatic Agreement South Dakota State Historic Preservation Programmatic Agreement Utah State Historic

  4. The Role of the Federal Project Director: Lessons from the National

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ignition Facility | Department of Energy The Role of the Federal Project Director: Lessons from the National Ignition Facility The Role of the Federal Project Director: Lessons from the National Ignition Facility The National Ignition Facility (NIF) Facility is home of the world's largest laser. With 192 laser beams that can deliver more than 60 times the energy of any previous laser system, NIF represents a significant step in enabling the study of high-energy density science, and should

  5. Environmental enforcement of federal agencies: A struggle for power under the New Federalism. Master's thesis

    SciTech Connect (OSTI)

    Surver, R.E.

    1990-01-01

    The challenge to Federalism presented by the new wave of environmental statutes is, while not unique in our history, a significant strain on state and federal relations. Behind this tension is the question of who should enforce these laws, especially when the violator is a Federal agency. Traditionally Federal agencies have been free to perform their diverse missions without restraint either from other Federal agencies or the states. This freedom has led to abuse in the arena of environmental compliance. Recent congressional hearings concerning amendments to the Resource Conservation and Recovery Act saw a congressional feeding frenzy over what was termed the abominable mess of federal facility environmental compliance. The obvious anger and frustration directed toward federal agencies, including the Environmental Protection Agency (EPA), by representatives of the states is a clear indicator of the extent of the problem and also a catalyst for an ill-conceived and dangerous legislative fix.

  6. Code of Federal Regulations NUCLEAR SAFETY MANAGEMENT | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy NUCLEAR SAFETY MANAGEMENT Code of Federal Regulations NUCLEAR SAFETY MANAGEMENT This part governs the conduct of DOE contractors, DOE personnel, and other persons conducting activities (including providing items and services) that affect, or may affect, the safety of DOE nuclear facilities. Code of Federal Regulations NUCLEAR SAFETY MANAGEMENT (167.52 KB) More Documents & Publications Code of Federal Regulations TRESPASSING ON DEPARTMENT OF ENERGY PROPERTY Code of Federal

  7. Energy Savings Performance Contracts for Federal Agencies | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Contracts for Federal Agencies Energy Savings Performance Contracts for Federal Agencies Energy Savings Performance Contracts for Federal Agencies Energy savings performance contracts (ESPCs) allow federal agencies to procure energy savings and facility improvements with no up-front capital costs or special appropriations from Congress. An ESPC is a partnership between an agency and an energy service company (ESCO). Agencies have used the ESPC contracting vehicle since 1998 to

  8. Federal Technical Capability Program (FTCP) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Technical Capability Program (FTCP) Federal Technical Capability Program (FTCP) Vision For DOE to be a technically proficient enterprise, with federal technical personnel overseeing Defense Nuclear Facilities in a manner that enables and enhances the DOE mission in a technically defensible fashion, while being recognized as preeminent in federal technical leadership and competency. Missions and Functions The Department of Energy is committed to developing and maintaining a technically

  9. Video: 2013 Federal Energy and Water Management Award Winners | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Video: 2013 Federal Energy and Water Management Award Winners Video: 2013 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, groups, and agencies for the outstanding use of energy- and water-efficiency technologies at Federal facilities. This video honors the 25 individuals and teams that received awards in 2013. Their exceptional efforts contributed to saving 1.9 trillion British thermal units of energy, almost

  10. Wheelabrator Millbury Facility Biomass Facility | Open Energy...

    Open Energy Information (Open El) [EERE & EIA]

    Facility Facility Wheelabrator Millbury Facility Sector Biomass Facility Type Municipal Solid Waste Location Worcester County, Massachusetts Coordinates 42.4096528, -71.8571331...

  11. Facility Decontamination and Decommissioning Program Surveillance and Maintenance Plan, Revision 2

    SciTech Connect (OSTI)

    Poderis, Reed J.; King, Rebecca A.

    2013-09-30

    This Surveillance and Maintenance (S&M) Plan describes the activities performed between deactivation and final decommissioning of the following facilities located on the Nevada National Security Site, as documented in the Federal Facility Agreement and Consent Order under the Industrial Sites program as decontamination and decommissioning sites: ? Engine Maintenance, Assembly, and Disassembly (EMAD) Facility: o EMAD Building (Building 25-3900) o Locomotive Storage Shed (Building 25-3901) ? Test Cell C (TCC) Facility: o Equipment Building (Building 25-3220) o Motor Drive Building (Building 25-3230) o Pump Shop (Building 25-3231) o Cryogenic Lab (Building 25-3232) o Ancillary Structures (e.g., dewars, water tower, piping, tanks) These facilities have been declared excess and are in various stages of deactivation (low-risk, long-term stewardship disposition state). This S&M Plan establishes and implements a solid, cost-effective, and balanced S&M program consistent with federal, state, and regulatory requirements. A graded approach is used to plan and conduct S&M activities. The goal is to maintain the facilities in a safe condition in a cost-effective manner until their final end state is achieved. This plan accomplishes the following: ? Establishes S&M objectives and framework ? Identifies programmatic guidance for S&M activities to be conducted by National Security Technologies, LLC, for the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) ? Provides present facility condition information and identifies hazards ? Identifies facility-specific S&M activities to be performed and their frequency ? Identifies regulatory drivers, NNSA/NFO policies and procedures, and best management practices that necessitate implementation of S&M activities ? Provides criteria and frequencies for revisions and updates ? Establishes the process for identifying and dispositioning a condition that has not been previously identified or

  12. Coordination of Federal Transmission Permitting on Federal Lands...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Planning Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, ...

  13. Headquarters Facilities Master Security Plan - Chapter 4, FOCI...

    Energy Savers

    These actions include obtaining a favorable FOCI determination, obtaining a facility clearance, and registering their classified contracts into Federal databases. This chapter ...

  14. Site maps and facilities listings

    SciTech Connect (OSTI)

    Not Available

    1993-11-01

    In September 1989, a Memorandum of Agreement among DOE offices regarding the environmental management of DOE facilities was signed by appropriate Assistant Secretaries and Directors. This Memorandum of Agreement established the criteria for EM line responsibility. It stated that EM would be responsible for all DOE facilities, operations, or sites (1) that have been assigned to DOE for environmental restoration and serve or will serve no future production need; (2) that are used for the storage, treatment, or disposal of hazardous, radioactive, and mixed hazardous waste materials that have been properly characterized, packaged, and labelled, but are not used for production; (3) that have been formally transferred to EM by another DOE office for the purpose of environmental restoration and the eventual return to service as a DOE production facility; or (4) that are used exclusively for long-term storage of DOE waste material and are not actively used for production, with the exception of facilities, operations, or sites under the direction of the DOE Office of Civilian Radioactive Waste Management. As part of the implementation of the Memorandum of Agreement, Field Offices within DOE submitted their listings of facilities, systems, operation, and sites for which EM would have line responsibility. It is intended that EM facility listings will be revised on a yearly basis so that managers at all levels will have a valid reference for the planning, programming, budgeting and execution of EM activities.

  15. Federal Acquisition Regulation Federal Acquisition Circular 59

    Energy.gov (indexed) [DOE]

    I. Prohibition on Contracting With Inverted Domestic Corporations 2012-013 II. Free Trade Agreement--Colombia 2012-012 III. Revision of Cost Accounting Standards Threshold...

  16. Nevada Test Site FFCA Consent Order, May 10, 1996 Summary

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order (FFACO) State Nevada Agreement Type Federal Facility Agreement and Consent Order Legal Driver(s) FFCAct Scope Summary Identify sites of ...

  17. Uncle Sam goes to market: Federal agency disposal of emission reduction credits under the Federal property management regulations. Master's thesis

    SciTech Connect (OSTI)

    Rafferty, V.J.

    1994-01-30

    With the realignment and closure of Federal facilities, especially Department of Defense installations, Federal agencies have been presented with a unique opportunity: the chance to create and dispose of air emission reduction credits (ERCs). This situation and current commitments by the Congress and EPA to expand the use of market based pollution control programs have generated interest in certain circles as to whether and how Federal agencies can dispose of ERCs and similar pollution rights and allowances. This paper will discuss ERCs, why the disposal of ERCs by Federal agencies is a pressing issue, and how Federal agencies can dispose of ERCs under existing Federal property laws and regulations.

  18. Federal Progress Toward Energy/Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy eere.energy.gov Federal Progress Toward Energy/ Sustainability Goals August 4, 2016 Chris Tremper Program Analyst Federal Energy Management Program U.S. Department of Energy 2 Fiscal Year 2015 Federal Energy Consumption and GHG Emissions: 0.95 Quadrillion Btu, $21 Billion, 83 Million MTCO2e 46% 13% 20% 44% 51% 12% 33% 57% 38% 62% 44% 46% 2% 2% 2% 3% 5% 5% 5% 1% 5% Gasoline Diesel Other Jet Fuel Coal and Purchased Steam Electricity Natural Gas Fuel Oil Facilities Mobility Excluded

  19. Promoting greater Federal energy productivity [Final report

    SciTech Connect (OSTI)

    Hopkins, Mark; Dudich, Luther

    2003-03-05

    This document is a close-out report describing the work done under this DOE grant to improve Federal Energy Productivity. Over the four years covered in this document, the Alliance To Save Energy conducted liaison with the private sector through our Federal Energy Productivity Task Force. In this time, the Alliance held several successful workshops on the uses of metering in Federal facilities and other meetings. We also conducted significant research on energy efficiency, financing, facilitated studies of potential energy savings in energy intensive agencies, and undertook other tasks outlined in this report.

  20. Facility Representatives

    Energy Savers

    Program Manager Office of the Departmental Representative to the Defense Nuclear Facilities Safety Board (DOE DR-1) DOE Headquarters, Forrestal Building 1000 Independence ...