National Library of Energy BETA

Sample records for federal correctional institution

  1. Federal Correctional Institution - Phoenix, Arizona | Department...

    Energy Saver

    Photo of a Parabolic-Trough Solar Water-Heating System Installed at the Federal Correctional Institution Facility north of Phoenix, Arizona A parabolic-trough solar water-heating ...

  2. Heating Water with Solar Energy Costs Less at the Phoenix Federal Correctional Institution

    SciTech Connect

    2004-09-01

    A large solar thermal system installed at the Phoenix Federal Correctional Institution (FCI) in 1998 heats water for the prison and costs less than buying electricity to heat that water. This renewable energy system provides 70% of the facility's annual hot water needs. The Federal Bureau of Prisons did not incur the up-front cost of this system because it was financed through an Energy Savings Performance Contract (ESPC). The ESPC payments are 10% less than the energy savings so that the prison saves an average of $6,700 per year, providing an immediate payback. The solar hot water system produces up to 50,000 gallons of hot water daily, enough to meet the needs of 1,250 inmates and staff who use the kitchen, shower, and laundry facilities. This publication details specifications of the parabolic trough solar system and highlights 5 years of measured performance data.

  3. Heating Water with Solar Energy Costs Less at the Phoenix Federal Correctional Institution

    SciTech Connect

    Not Available

    2004-09-01

    A large solar thermal system installed at the Phoenix Federal Correctional Institution (FCI) in 1998 heats water for the prison and costs less than buying electricity to heat that water. This renewable energy system provides 70% of the facility's annual hot water needs. The Federal Bureau of Prisons did not incur the up-front cost of this system because it was financed through an Energy Savings Performance Contract (ESPC). The ESPC payments are 10% less than the energy savings so that the prison saves an average of$6,700 per year, providing an immediate payback. The solar hot water system produces up to 50,000 gallons of hot water daily, enough to meet the needs of 1,250 inmates and staff who use the kitchen, shower, and laundry facilities.

  4. Proposed Rule Correction, Federal Register, 75 FR 66008, October...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Proposed Rule Correction, Federal Register, 75 FR 66008, October 27, 2010 Proposed Rule Correction, Federal Register, 75 FR 66008, October 27, 2010 Document displays a correction ...

  5. Corrections Notice, Federal Register, 71 FR 10097, February 28, 2006 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Corrections Notice, Federal Register, 71 FR 10097, February 28, 2006 Corrections Notice, Federal Register, 71 FR 10097, February 28, 2006 Document displays a correction notice pertaining to Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal Low-Rise Residential Buildings, which was published in the Federal Register on February 28, 2006. Download the corrections notice document. (33.34 KB) More

  6. Corrections Notice, Federal Register, 71 FR 10097, February 28...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Document displays a correction notice pertaining to Energy Conservation Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings and New Federal ...

  7. Mr. Pusch is geologist at the Federal Institute for Geosciences...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Federal Institute for Geosciences and Natural Resources (BGR) in Hannover. He studied geology (2004 - 2009) at the Lehrstuhl fr Ingenieurgeologie & Fachgebiet Tektonik und...

  8. Proposed Rule Correction, Federal Register, 75 FR 66008, October 27, 2010 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Proposed Rule Correction, Federal Register, 75 FR 66008, October 27, 2010 Proposed Rule Correction, Federal Register, 75 FR 66008, October 27, 2010 Document displays a correction to the notice of proposed rulemaking for Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major Renovations of Federal Buildings, which was published in the Federal Register on October 15, 2010. Download the correction to the notice of proposed rulemaking. (89.88

  9. SU-E-T-544: A Radiation Oncology-Specific Multi-Institutional Federated Database: Initial Implementation

    SciTech Connect

    Hendrickson, K; Phillips, M; Fishburn, M; Evans, K; Banerian, S; Mayr, N; Wong, J; McNutt, T; Moore, J; Robertson, S

    2014-06-01

    Purpose: To implement a common database structure and user-friendly web-browser based data collection tools across several medical institutions to better support evidence-based clinical decision making and comparative effectiveness research through shared outcomes data. Methods: A consortium of four academic medical centers agreed to implement a federated database, known as Oncospace. Initial implementation has addressed issues of differences between institutions in workflow and types and breadth of structured information captured. This requires coordination of data collection from departmental oncology information systems (OIS), treatment planning systems, and hospital electronic medical records in order to include as much as possible the multi-disciplinary clinical data associated with a patients care. Results: The original database schema was well-designed and required only minor changes to meet institution-specific data requirements. Mobile browser interfaces for data entry and review for both the OIS and the Oncospace database were tailored for the workflow of individual institutions. Federation of database queries--the ultimate goal of the project--was tested using artificial patient data. The tests serve as proof-of-principle that the system as a whole--from data collection and entry to providing responses to research queries of the federated database--was viable. The resolution of inter-institutional use of patient data for research is still not completed. Conclusions: The migration from unstructured data mainly in the form of notes and documents to searchable, structured data is difficult. Making the transition requires cooperation of many groups within the department and can be greatly facilitated by using the structured data to improve clinical processes and workflow. The original database schema design is critical to providing enough flexibility for multi-institutional use to improve each institution s ability to study outcomes, determine best practices

  10. Institutional origins of the Department of Energy: the Federal Energy Administration

    SciTech Connect

    Anders, R.M.

    1980-11-01

    The Federal Energy Administration was the successor of the Federal Energy Office, a short-term organization created to coordinate the government's response to the Arab oil embargo. In October 1977, it became part of the Department of Energy. A brief history of the period from 1974 to 1977 specifically concerning these agencies is presented. Discussed are: the Arab Oil Embargo, the Federal Energy Office, the Federal Energy Administration, the Autumn Crisis (1974), Zarb Rebuilds the Agency, the Energy Policy and Conservation Act, the Energy Conservation and Production Act, Program Growth, and Energy Reorganization. Records of the Federal Energy Administration are briefly presented.

  11. The Federal Energy Administration (Institutional Origins of the Department of Energy)

    DOE R&D Accomplishments

    Anders, R. M.

    1980-11-01

    The Federal Energy Administration was the successor of the Federal Energy Office, a short-term organization created to coordinate the government's response to the Arab oil embargo. In October 1977, it became part of the Department of Energy. A brief history of the period from 1974 to 1977 specifically concerning these agencies is presented. Discussed are: the Arab Oil Embargo, the Federal Energy Office, the Federal Energy Administration, the Autumn Crisis (1974), Zarb Rebuilds the Agency, the Energy Policy and Conservation Act, the Energy Conservation and Production Act, Program Growth, and Energy Reorganization. Records of the Federal Energy Administration are briefly presented.

  12. Correction: Federal Register Volume 75 Number 199; Friday, October 15, 2010

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    25 Oct 26, 2010 Jkt 223001 PO 00000 Frm 00014 Fmt 4702 Sfmt 4702 E:\FR\FM\27OCP1.SGM 27OCP1 jlentini on DSKJ8SOYB1PROD with PROPOSALS 66008 Federal Register / Vol. 75, No. 207 / Wednesday, October 27, 2010 / Proposed Rules Publicly available documents created or received at the NRC, including petitions for rulemaking PRM-50-93 (ADAMS Accession No. ML093290250) and PRM-50-95 (ADAMS Accession No. ML101610121), are available electronically at the NRC's Electronic Reading Room at http://www.nrc.gov/

  13. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for National Institute of Health

    SciTech Connect

    Schey, Stephen; Francfort, Jim

    2014-11-01

    This report focuses on the National Institute of Health (NIH) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  14. Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans - Implementing Sustainability: The Institutional-Behavioral Dimension

    SciTech Connect

    Malone, Elizabeth L.; Sanquist, Tom; Wolfe, Amy K.; Diamond, Rick; Payne, Christopher; Dion, Jerry

    2013-06-01

    This document is part of a larger, programmatic effort to assist federal agencies in taking action and changing their institutions to achieve and maintain federal sustainability goals, while meeting their mission goals. FEMP is developing guidance for federal agency efforts to enable institutional behavior change for sustainability, and for making sustainability “business as usual.” The driving requirement for this change is Executive Order (EO) 13514, Federal Leadership in Environmental, Energy, and Economic Performance. FEMP emphasizes strategies for increasing energy efficiency and renewable energy utilization as critical components of attaining sustainability, and promotes additional non-energy action pathways contained in EO 13514. This report contributes to the larger goal by laying out the conceptual and evidentiary underpinnings of guidance to federal agencies. Conceptual frameworks focus and organize the development of guidance. We outline a series of progressively refined conceptual frameworks, including a multi-layer approach, key steps in sustainability implementation, a process view of specific approaches to institutional change, the agency Strategic Sustainability Performance Plans (SSPPs), and concepts related to context-specific rules, roles and tools for sustainability. Additionally, we tap pertinent bodies of literature in drawing eight evidence-based principles for behavior change. These principles are important foundations upon which to build in selecting strategies to effect change in organizations. Taken together, this report presents a suite of components that inform the training materials, presentations, web site, and other products that provide guidance to federal agencies.

  15. Communities of Practice: A Tool for Creating Institutional Change in Support of the Mission of the Federal Energy Management Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    Report describes how the Federal Energy Management Program could use communities of practice as tools to stimulate organizational, social, and cultural change to support energy efficiency, renewable energy, and water conservation efforts. Done right, communities of practice have great potential to leverage existing resources. The paper describes the behavior and organizational principles that underlie communities of practices, provides examples of different types of communities of practice, for example, the American Council for an Energy-Efficient Economy Summer Study, EVALTALK, and the Home Energy Pros website. The paper also provides guidance about how to establish a community of practice and a checklist for doing so.

  16. Institutional Change Process for Sustainability

    Energy.gov [DOE]

    For establishing institutional change in a federal agency to achieve sustainability or other energy efficiency goals, follow the five-step institutional change process.

  17. Edison Electric Institute Update

    Energy.gov [DOE]

    Presentation—given at the Fall 2011 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the Edison Electric Institute (EEI) and the current electricity landscape.

  18. Resources on Institutional Change for Sustainability

    Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) offers resources to help agencies achieve institutional change in their organizations.

  19. Resources on Institutional Change for Sustainability | Department...

    Energy.gov [DOE] (indexed site)

    Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans Implementing Sustainability: The Institutional-Behavioral Dimension The FEMP Awards ...

  20. Continuous Change Institutional Change Principle

    Energy.gov [DOE]

    ecause it takes time to establish institutional change, federal agencies need multiyear plans that continuously work to achieve, reinforce, and improve significant and persistent sustainability goals.

  1. Telephone. Federal Communications Commission. Marlene H. Dortch...

    Office of Environmental Management (EM)

    ... (GSA), and National Aeronautics and Space Administration (NASA). ACTION: Correction. ... DoD, GSA, and NASA adopted as final, with changes, an interim rule amending the Federal ...

  2. Idaho National Laboratory (INL) Sitewide Institutional Controls Plan

    SciTech Connect

    W. L. Jolley

    2006-07-27

    On November 9, 2002, the U.S. Environmental Protection Agency (EPA), the U.S. Department of Energy (DOE), and the Idaho Department of Environmental Quality approved the Record of Decision Experimental Breeder Reactor-I/Boiling Water Reactor Experiment Area and Miscellaneous Sites, which requires a Sitewide Institutional Controls Plan for the then Idaho National Engineering and Environmental Laboratory (now known as the Idaho National Laboratory). This document, first issued in June 2004, fulfilled that requirement. The revision is needed to provide an update as remedial actions are completed and new areas of concern are found. This Sitewide Institutional Controls Plan is based on guidance in the May 3, 1999, EPA Region 10 Final Policy on the Use of Institutional Controls at Federal Facilities; the September 29, 2000, EPA guidance Institutional Controls: A Site Manager's Guide to Identifying, Evaluating, and Selecting Institutional Controls at Superfund and RCRA Corrective Action Cleanups; and the April 9, 2003, DOE Policy 454.1, "Use of Institutional Controls." These policies establish measures that ensure short- and long-term effectiveness of institutional controls that protect human health and the environment at federal facility sites undergoing remedial action pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and/or corrective action pursuant to the Resource Conservation and Recovery Act (RCRA). The site-specific institutional controls currently in place at the Idaho National Laboratory are documented in this Sitewide Institutional Controls Plan. This plan is being updated, along with the Idaho National Engineering and Environmental Laboratory Comprehensive Facilities and Land Use Plan, to reflect the progress of remedial activities and changes in CERCLA sites.

  3. Federal Register

    Energy Saver

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  4. Federal Energy and Water Management Awards 2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Greg Leifer U.S. Department of Health and Human Services National Institutes of Health Bethesda, Maryland Greg Leifer is the federal energy program manager for the National ...

  5. Obama Administration Launches Competition for Three New Manufacturing Innovation Institutes

    Energy.gov [DOE]

    The Obama Administration announced that it is launching competitions to create three new manufacturing innovation institutes with a Federal commitment of $200 million across five Federal agencies.

  6. Corrective Action

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of Corrective Action Complete is demonstrated by one of the following: Eliminate Exposure (11 SMAs, 16 Sites) SMA SITE Submittal Date Document 2M-SMA-2.2 03-003(k) September...

  7. Federal Register

    Office of Environmental Management (EM)

    Department of Energy Organization Act (Public Law 95-91), and rules and regulations issued ... SUMMARY: Pursuant to the provisions of the Federal Advisory Committee Act (Public Law ...

  8. Strengthening Federal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Office of the Federal Environ- mental Executive, which shall be maintained in the ... Council on, performance by agencies of functions assigned by sections 2 and 3 of this ...

  9. Federal Sector

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    News & Events Skip navigation links Residential Commercial Industrial Federal Agriculture About five percent of BPA's total electric supply goes to power facilities around...

  10. Corrective Measures Process

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Corrective Measures Process Corrective Measures Process We follow a stringent corrective measures process for legacy cleanup. August 1, 2013 Corrective measures process Corrective measures process

  11. Corrective Measures Process

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Corrective Measures Process Corrective Measures Process We follow a stringent corrective measures process for legacy cleanup. August 1, 2013 Corrective measures process Corrective...

  12. Corrective Action

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Technology and Energy Industry July 12, 2016 Mark Rothleder VP Market Quality and Renewable Integration California ISO Overview * Nonprofit public benefit corporation * Part of Western Electricity Coordinating Council: 14 states, British Columbia, Alberta and parts of Mexico * 71,000 MW of power plant capacity * 50,270 MW record peak demand (July 24, 2006) * 26,014 circuit-miles of transmission lines * ISO is governed by the Federal Energy Regulatory Commission, which has jurisdiction over

  13. Commitment Institutional Change Principle

    Energy.gov [DOE]

    Commitment can be a crucial element that helps federal agencies inject and emphasize sustainability in their organizational culture. Institutions and people change when they have made definite commitments to change, especially when those commitments relate to future conditions. Research shows that explicit commitments improve the rate at which people adopt energy-efficient behaviors.

  14. Federal laboratories for the 21st century

    SciTech Connect

    Gover, J.; Huray, P.G.

    1998-04-01

    Federal laboratories have successfully filled many roles for the public; however, as the 21st Century nears it is time to rethink and reevaluate how Federal laboratories can better support the public and identify new roles for this class of publicly-owned institutions. The productivity of the Federal laboratory system can be increased by making use of public outcome metrics, by benchmarking laboratories, by deploying innovative new governance models, by partnerships of Federal laboratories with universities and companies, and by accelerating the transition of federal laboratories and the agencies that own them into learning organizations. The authors must learn how government-owned laboratories in other countries serve their public. Taiwan`s government laboratory, Industrial Technology Research Institute, has been particularly successful in promoting economic growth. It is time to stop operating Federal laboratories as monopoly institutions; therefore, competition between Federal laboratories must be promoted. Additionally, Federal laboratories capable of addressing emerging 21st century public problems must be identified and given the challenge of serving the public in innovative new ways. Increased investment in case studies of particular programs at Federal laboratories and research on the public utility of a system of Federal laboratories could lead to increased productivity of laboratories. Elimination of risk-averse Federal laboratory and agency bureaucracies would also have dramatic impact on the productivity of the Federal laboratory system. Appropriately used, the US Federal laboratory system offers the US an innovative advantage over other nations.

  15. Determine Institutional Change Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE)

    The first step in the institutional change process is defining your federal agency's sustainability goals. That is, decide what outcomes are desired (or required) over what period of time. Behavioral, organizational, and institutional changes typically are means to achieve desired energy, resource, or greenhouse gas emission outcomes. They are not ends in and of themselves.

  16. Federal Acquisition Circular (FAC) 2005-55

    Energy.gov [DOE]

    Attached for your information is a summary of FAR amendments published in the Federal Register (77 FR 33405, January 3, 2012) and a January 11, 2012 Correction Notice stating the applicability date for Item V is January 17, 2012.

  17. Institutional Change for Sustainability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Institutional Change » Institutional Change for Sustainability Institutional Change for Sustainability Inspire Change with an Awards Program Inspire Change with an Awards Program Report shares 22 stories of FEMP Federal Energy and Water Management Award winners whose projects fostered institutional change in agencies. Read more Continuous Improvement Process Continuous Improvement Process Institutional change is anchored in five steps that are repeated for continuous improvement. Read more The

  18. Engineering Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Institute Engineering Institute Multidisciplinary engineering research that integrates advanced modeling and simulations, novel sensing systems and new developments in information technology. May 14, 2013 Los Alamos Research Park Los Alamos Research Park, the home of Engineering Institute Contact Institute Director Charles Farrar (505) 665-0860 Email UCSD EI Director Michael Todd (858) 534-5951 Executive Administrator Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505)

  19. Seaborg Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Institute Seaborg Institute The institute provides a primary mechanism for fostering cooperation and collaboration in actinide science among the national laboratories, university campuses, and the national and international actinide science community. Contact Director Albert Migliori (505) 663-5627 Email Deputy Director Franz Freibert (505) 667-6879 Email Professional Staff Assistant Susan Ramsay (505) 665-0858 Email actinide The Seaborg Institute at Los Alamos integrates research programs,

  20. Financial Institutions

    Energy.gov [DOE]

    A lending program begins with a financial institution that procures the funds they lend from a number of other sources.

  1. Federal Utility Partnership Working Group Industry Commitment

    Energy.gov [DOE]

    Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of...

  2. Careers | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Careers The Critical Materials Institute at the The Ames Laboratory, a Department of Energy national laboratory affiliated with Iowa State University, offers a variety of career opportunities. These include: Postdoctoral Research Associate Also, The Ames Laboratory participates in federal programs that help develop the research workforce. These include the following programs with the U.S. Department of Energy: Graduate Student Research Program (new in 2014) Science Undergraduate Laboratory

  3. Engineering Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    upon completion of their graduate degrees Over the last seven years, 150 students from 50 academic institutions have participated in the summer school and sixteen such TSM's have...

  4. Engineering Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Education Opportunities » Engineering Institute Engineering Institute Engineering dynamics that include flight, vibration isolation for precision manufacturing, earthquake engineering, blast loading, signal processing, and experimental model analysis. Contact Leader, Los Alamos Charles Farrar Email Leader, UCSD Michael Todd Email Los Alamos Program Administrator Jutta Kayser (505) 663-5649 Email Administrative Assistant Stacy Baker (505) 663-5233 Email Collaboration for conducting

  5. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 528: POLYCHLORINATED BIPHENYLS CONTAMINATION NEVADA TEST SITE, NEVADA

    SciTech Connect

    BECHTEL NEVADA

    2005-06-01

    Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls Contamination is listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO, 1996) and is located in Area 25 of the Nevada Test Site. CAU 528 was created to address polychlorinated biphenyl (PCB) contamination identified during the CAU 262 corrective action investigation. CAU 528 consists of one Corrective Action Site (CAS): CAS 25-27-03, Polychlorinated Biphenyls Surface Contamination.

  6. Federal Utility Partnership Working Group Industry Commitment | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Federal Utility Partnership Working Group Industry Commitment Federal Utility Partnership Working Group Industry Commitment Investor-owned electric utility industry members of the Edison Electric Institute pledge to assist Federal agencies in achieving energy-saving goals. These goals are set in the Energy Policy Act of 1992 and subsequent executive orders. Federal agencies can contact Federal Utility Partnership Working Group utility partners for more information on assistance.

  7. White House Announces Eighth Manufacturing Innovation Institute |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy White House Announces Eighth Manufacturing Innovation Institute White House Announces Eighth Manufacturing Innovation Institute April 6, 2016 - 4:49pm Addthis On Thursday, April 1, the White House announced a new institute which will focus on revolutionary fibers and textile manufacturing. This new institute is the eighth manufacturing hub to be awarded as part of the National Network for Manufacturing Innovation (NNMI). Collectively, the federal government's commitment

  8. Federal Register Volume 71 Number 39; Tuesday, February 28, 2006

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7:09 Feb 27, 2006 Jkt 208001 PO 00000 Frm 00001 Fmt 4734 Sfmt 4734 E:\FR\FM\28FECX.SGM 28FECX wwhite on PROD1PC65 with NOTICES 10097 Federal Register Corrections Vol. 71, No. 39 Tuesday, February 28, 2006 This section of the FEDERAL REGISTER contains editorial corrections of previously published Presidential, Rule, Proposed Rule, and Notice documents. These corrections are prepared by the Office of the Federal Register. Agency prepared corrections are issued as signed documents and appear in the

  9. Federal Technology Transfer and the Federal Laboratory Consortium...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Technology Transfer and the Federal Laboratory Consortium: Federal Technology Transfer and the Federal Laboratory Consortium: Identifying and accessing U.S. federal lab ...

  10. Engineering Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Software Download and Data Sets First name * Last name * Email address * Institution * Software & Data Set Selection (Select one or more) SHMTools Software (0.20.0 Beta) mFUSE ...

  11. Quantum Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Quantum Institute Quantum Institute A new research frontier awaits! Our door is open and we thrive on mutually beneficial partnerships, collaborations that drive innovations and new technologies. Contact Leader Malcolm Boshier (505) 665-8892 Email Two of LANL's most successful quantum technology initiatives: quantum cryptography and the race for quantum computer The area of quantum information, science, and technology is rapidly evolving, with important applications in the areas of quantum

  12. Engineering Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    EI Software Download Request EI Software Download Request Contact Institute Director Charles Farrar (505) 663-5330 Email UCSD EI Director Michael Todd (858) 534-5951 Executive Administrator Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran (505) 665-8899 Email Software Download and Data Sets First name * Last name * Email address * Institution * Software & Data Set Selection (Select one or more) SHMTools Software (0.20.0 Beta) mFUSE Interface (0.2.0 Beta) Datasets

  13. Department of Defense led Institutes for Manufacturing Innovation

    Energy.gov [DOE] (indexed site)

    TX October 8 and 9, 2014 0 Department of Defense led Institutes for Manufacturing ... in Youngstown, OH: National Center for Defense Mfg and Machining * 50M federal ...

  14. Communities of Practice: A Tool for Creating Institutional Change...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Communities of Practice: A Tool for Creating Institutional Change in Support of the Mission of the Federal Energy Management Program Communities of Practice: A Tool for Creating ...

  15. Minority Serving Institutions (MSIs): Bridging the Gap between...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications Bridging the Gap Between Federal Agencies and MSIs Research and Services at the Alabama A&M University Research Institute Office of Energy Efficiency ...

  16. Air Conditioning Heating and Refrigeration Institute Comment

    Energy.gov [DOE]

    These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy’s (DOE) notice in the July 3, 2014 Federal Register...

  17. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada, Rev. No.: 3 with Errata Sheet

    SciTech Connect

    Tim Echelard

    2006-03-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for Corrective Action Unit (CAU) 447, Project Shoal Area (PSA)-Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). Corrective Action Unit 447 is located in the Sand Springs Mountains in Churchill County, Nevada, approximately 48 kilometers (30 miles) southeast of Fallon, Nevada. The CADD/CAP combines the decision document (CADD) with the Corrective Action Plan (CAP) and provides or references the specific information necessary to recommend corrective actions for CAU 447, as provided in the FFACO. Corrective Action Unit 447 consists of two corrective action sites (CASs): CAS 57-49-01, Emplacement Shaft, and CAS 57-57-001, Cavity. The emplacement shaft (CAS-57-49-01) was backfilled and plugged in 1996 and will not be evaluated further. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at PSA. To achieve this, the following tasks were required: (1) Develop corrective action objectives. (2) Identify corrective action alternative screening criteria. (3) Develop corrective action alternatives. (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. (5) Recommend a preferred corrective action alternative for the subsurface at PSA. The original Corrective Action Investigation Plan (CAIP) for the PSA was approved in September 1996 and described a plan to drill and test four characterization wells, followed by flow and transport modeling (DOE/NV, 1996). The resultant drilling is described in a data report (DOE/NV, 1998e) and the data analysis and modeling in an interim modeling report (Pohll et al., 1998). After considering the results of the modeling effort, the U.S. Department

  18. Corrective Actions Process

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Community, Environment » Environmental Stewardship » Environmental Cleanup » Corrective Actions Corrective Actions Process The general process for evaluating and remediating potential release sites is called the corrective action process. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Corrective actions The Laboratory's corrective actions process refers to the way in which the Laboratory investigates, stabilizes,

  19. Institutional Change Process Step 1: Determine Goals

    Office of Energy Efficiency and Renewable Energy (EERE)

    The first step in the institutional change process is defining your federal agency's sustainability goals. That is, decide what outcomes are desired (or required) over what period of time. Behavioral, organizational, and institutional changes typically are means to achieve desired energy, resource, or greenhouse gas emission outcomes. They are not ends in and of themselves.

  20. Step 1: Determine Goals for Institutional Change

    Office of Energy Efficiency and Renewable Energy (EERE)

    The first step in the institutional change process is defining your federal agency's sustainability goals. That is, decide what outcomes are desired (or required) over what period of time. Behavioral, organizational, and institutional changes typically are means to achieve desired energy, resource, or greenhouse gas emission outcomes. They are not ends in and of themselves.

  1. Coordination of Federal Transmission Permitting on Federal Lands...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Planning Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, ...

  2. Institutional Change Principles for Fostering Sustainability | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Principles for Fostering Sustainability Institutional Change Principles for Fostering Sustainability The following eight principles serve as the foundational building blocks for developing strategies to achieve institutional change-but they are not the strategies themselves. They are derived from academic literature and inform the framework for achieving institutional change in a federal organization. Each statement is followed by a general strategy for how the principle can be

  3. Social Network and Communications Institutional Change Principle |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Network and Communications Institutional Change Principle Social Network and Communications Institutional Change Principle Federal agencies can use social networks and communications to spark and reinforce behavior change for meeting sustainability goals. This principle is based on research findings showing that people and institutions often are strongly influenced by the behaviors and expectations of others. Methods The social network and communications behavior change

  4. Evidence-Based Background Material Underlying Guidance for Federal Agencies in Implementing Strategic Sustainability Performance Plans

    Energy.gov [DOE]

    Report is part of a larger, programmatic effort to assist Federal agencies in taking action and changing their institutions to achieve and maintain Federal sustainability goals, while meeting their mission goals. This document contributes to this larger goal by laying out the conceptual and evidentiary underpinnings of institutional change in this guidance to Federal agencies.

  5. PRESERVATION OF FEDERAL RECORDS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PRESERVATION OF FEDERAL RECORDS The Federal Records Act requires the Department of Energy (DOE) Records Officer to remind departing Federal and contractor employees that Federal records may not be removed from Government custody nor may they be destroyed except in accordance with a records disposition schedule that has been approved by the Archivist of the United States. The creation of adequate documentation and the preservation of Federal records are required by law and regulation (contained

  6. Report of the Federal Internetworking Requirements Panel

    SciTech Connect

    1994-05-31

    The Federal Internetworking Requirements Panel (FIRP) was established by the National Institute of Standards and Technology (NIST) to reassess Federal requirements for open systems networks and to recommend policy on the Government`s use of networking standards. The Panel was chartered to recommend actions which the Federal Government can take to address the short and long-term issues of interworking and convergence of networking protocols--particularly the Internet Protocol Suite (IPS) and Open Systems Interconnection (OSI) protocol suite and, when appropriate, proprietary protocols. The Panel was created at the request of the Office of Management and Budget in collaboration with the Federal Networking Council and the Federal Information Resources Management Policy Council. The Panel`s membership and charter are contained in an appendix to this report.

  7. Federal Agency NEPA Procedures

    Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  8. Assessing the Security Vulnerabilities of Correctional Facilities

    SciTech Connect

    Morrison, G.S.; Spencer, D.S.

    1998-10-27

    The National Institute of Justice has tasked their Satellite Facility at Sandia National Laboratories and their Southeast Regional Technology Center in Charleston, South Carolina to devise new procedures and tools for helping correctional facilities to assess their security vulnerabilities. Thus, a team is visiting selected correctional facilities and performing vulnerability assessments. A vulnerability assessment helps to identi~ the easiest paths for inmate escape, for introduction of contraband such as drugs or weapons, for unexpected intrusion fi-om outside of the facility, and for the perpetration of violent acts on other inmates and correctional employees, In addition, the vulnerability assessment helps to quantify the security risks for the facility. From these initial assessments will come better procedures for performing vulnerability assessments in general at other correctional facilities, as well as the development of tools to assist with the performance of such vulnerability assessments.

  9. Federal Biomass Activities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    stewardship, environmental management systems stewardship, environmental management ... especially E85 pumps - - DOE GIS database identifying location of Federal fleets ...

  10. Federal Financial Report

    Energy.gov [DOE]

    Federal Financial Report, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website.

  11. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Regulation Federal Acquisition Circular 2005-86 Summary of Rules FAC 2005-86 Item Subject FAR Case I Definition of "Multiple-Award Contract" 2015-019 II Sole Source ...

  12. Federal Employee Training Manual

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-10-11

    This Manual provides detailed requirements to supplement DOE O 360.1B, FEDERAL EMPLOYEE TRAINING. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Cancels DOE M 360.1A-1. Canceled by DOE O 360.1C.

  13. Federal Employee Training Manual

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1999-09-21

    This Manual provides detailed requirements to supplement DOE O 360.1A, Federal Employee Training, dated 9-21-99. The information in this Manual is intended to assist in improving Federal workforce performance under Department of Energy (DOE) managed Federal employee training. Canceled by DOE M 360.1-1B.

  14. Paducah Site Federal Facility Agreement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Facility Agreement Paducah Site Federal Facility Agreement The Federal Facility Agreement (FFA) governs the corrective action/response action process from site investigation through site remediation as agreed to by DOE, the U.S. Environmental Protection Agency, and Kentucky under the Comprehensive Environmental Response, Compensation, and Liability Act; the Resource Conservation and Recovery Act; Kentucky Revised Statute 224; and other laws and regulations identified in the FFA. Paducah

  15. Award Number: Federal Non-Federal Federal Non-Federal Total

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Number: Federal Non-Federal Federal Non-Federal Total (a) (b) (c ) (d) (e) (f) (g) 1. $0 2. $0 3. $0 4. $0 5. Totals $0 $0 $0 $0 $0 (1) (2) (3) (4) $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 7. $0 SF-424A (Rev. 4-92) Prescribed by OMB Circular A-102 Previous Edition Usable Total (5) f. Contractual g. Construction Section B - Budget Categories Catalog of Federal Domestic Assistance Number Grant Program Function or Activity Estimated Unobligated Funds e. Supplies i. Total Direct

  16. Federal and Contractor Employee Roles in the Federal Workplace...

    Energy Saver

    and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition Guide Chapter 37.114 Federal and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition ...

  17. PNNL: IDREAM - Partnering Institutions

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Partnering Institutions Washington State University University of Washington Oak Ridge National Laboratory University of Notre Dame Georgia Institute of Technology

  18. Federal Regulations | U.S. DOE Office of Science (SC)

    Office of Science (SC)

    Federal Regulations Human Subjects Protection Program (HSPP) HSPP Home About Institutional Review Boards (IRBs) Education and Resources Regulations and Requirements Ethical Principles Federal Regulations DOE Special Requirements Health Insurance Portability and Accountability Act (HIPAA) Glossary Abbreviations Contact BER Home Contact Information Human Subjects Protection Program U.S. Department of Energy SC-23/Germantown Building 1000 Independence Ave., SW Washington, DC 20585 Regulations and

  19. FY 2012 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2012 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total Available Fee Total Fee Earned % $41,951,011 $40,706,111 97% Honeywell Federal Manufacturing & Technologies, LLC, the management and operating contractor for the Kansas City Plant, earned an "Excellent" rating in Program, Operations, and Institutional

  20. Workplace Charging Challenge Partner: National Institutes of Health |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Institutes of Health Workplace Charging Challenge Partner: National Institutes of Health Workplace Charging Challenge Partner: National Institutes of Health Joined the Challenge: August 2016 Headquarters: Bethesda, MD Charging Location: Bethesda, MD Domestic Employees: 20,594 The National Institutes of Health (NIH) is dedicated to meeting sustainability goals by providing power for plug-in electric vehicles (PEVs) free of charge, courtesy of the NIH Federal Credit Union

  1. Strategies for Achieving Institutional Change | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Strategies for Achieving Institutional Change Strategies for Achieving Institutional Change Many strategies-including those derived from Institutional Change Principles-may be used to effect institutional change in support of energy and sustainability objectives. Any and all of these strategies can be adapted to meet the strategic sustainability goals of Federal sites of different sizes, missions, and other contexts. As you explore these strategies, keep in mind how each could be used to

  2. Leadership Institutional Change Principle | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Leadership Institutional Change Principle Leadership Institutional Change Principle For changing behavior among employees, leaders in federal agencies should visibly communicate their own commitments to sustainability in the workplace. Such visible leadership will help achieve sustainability goals in the short term and continue to provide motivation for long-term benefits. Methods Leaders should have a deep understanding of the politics of the organization and the ability to inspire and

  3. Minority Serving Institutions Internship Program | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Minority Serving Institutions Internship Program Our Minority Serving Institutions (MSI) Internship Program positions are located in the Washington, D.C. metropolitan area and at our Federal field offices, laboratories, and manufacturing plants. NNSA has facilities in Albuquerque, N.M.; Kansas City, Mo.; Livermore, Calif.; Los Alamos, N.M.; Las Vegas, Nev.; Amarillo, Texas; Aiken, S.C.; and Oak Ridge, Tenn. Selections are made each spring for summer

  4. Housekeeping category corrective action unit work plan

    SciTech Connect

    1996-08-01

    The purpose of this Corrective Action Unit (CAU) Work Plan is to provide a strategy to be used by the US Department of Energy Nevada Operations Office (DOE/NV), the US Department of Defense (DoD) Defense Special Weapons Agency (DSWA) (formerly the Defense Nuclear Agency), and contractor personnel for conducting corrective actions at the Nevada Test Site (NTS) and Nevada off-site locations including the Tonopah Test Range (TTR), the Project Shoal Area, and the Central Nevada Test Area. This Work Plan applies to housekeeping category CAUs already listed in the Federal Facility Agreement and Consent Order (FFACO) Appendices (FFACO, 1996) as well as newly identified Corrective Action Sites (CASs) that will follow the housekeeping process.

  5. Federal Employee Health Services

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2007-10-18

    The order establishes requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Supersedes DOE O 341.1.

  6. Federated Testbed Circuits

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Testbed Circuits Network R&D Overview Experimental Network Testbeds 100G SDN Testbed Dark Fiber Testbed Federated Testbed Circuits Test Circuit Service Performance (perfSONAR)...

  7. Closure Report Central Nevada Test Area Subsurface Corrective Action Unit 443 January 2016

    SciTech Connect

    Findlay, Rick

    2015-11-01

    The U.S. Department of Energy (DOE) Office of Legacy Management (LM) prepared this Closure Report for the subsurface Corrective Action Unit (CAU) 443 at the Central Nevada Test Area (CNTA), Nevada, Site. CNTA was the site of a 0.2- to 1-megaton underground nuclear test in 1968. Responsibility for the site’s environmental restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 443 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended 2011) and all applicable Nevada Division of Environmental Protection (NDEP) policies and regulations. This Closure Report provides justification for closure of CAU 443 and provides a summary of completed closure activities; describes the selected corrective action alternative; provides an implementation plan for long-term monitoring with well network maintenance and approaches/policies for institutional controls (ICs); and presents the contaminant, compliance, and use-restriction boundaries for the site.

  8. Status of Corrective Actions

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Report on February 14 Incident at the Waste Isolation Pilot Project in Carlsbad, New Mexico April 12, 2012 x x Contact Communication Office (505) 667-7000 Corrective Actions...

  9. Corrective Action Program Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2006-03-02

    This Guide was developed to assist the Department of Energy (DOE) organizations and contractors in the development, implementation, and followup of corrective action programs utilizing the feedback and improvement core safety function within DOE's Integrated Safety Management System. This Guide outlines some of the basic principles, concepts, and lessons learned that DOE managers and contractors might consider when implementing corrective action programs based on their specific needs. Canceled by DOE G 414.1-2B. Does not cancel other directives.

  10. Corrective Action Decision Document/Closure Report for Corrective Action Unit 370: T-4 Atmospheric Test Site, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2009-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 370, T-4 Atmospheric Test Site, located in Area 4 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 370 is comprised of Corrective Action Site (CAS) 04-23-01, Atmospheric Test Site T-4. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 370 due to the implementation of the corrective action of closure in place with administrative controls. To achieve this, corrective action investigation (CAI) activities were performed from June 25, 2008, through April 2, 2009, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 370: T-4 Atmospheric Test Site and Record of Technical Change No. 1.

  11. Federal Technical Capability Manual

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2000-06-05

    The Federal Technical Capability Manual provides the process for the recruitment, deployment, development, and retention of Federal personnel with the demonstrated technical capability to safely accomplish the Departments missions and responsibilities at defense nuclear facilities. Canceled by DOE M 426.1-1A. Does not cancel other directives.

  12. Federal Technical Capability

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2009-11-19

    This directive defines requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Cancels DOE M 426.1-1A, Federal Technical Capability Manual.

  13. Federal Acquisition Circulars 2005-56 and 57

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-56 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on March 2, 2012 at 77 FR 12912 and 12913. Also included is a Correction Notice affecting Items I and VI of the FAC. This was published March 9, 2012 at 77 FR 14303. Lastly, a summary of Federal Acquisition Circular 2005-57 is included. This was published March 7, 2012 at 77 FR 13952.

  14. Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Planning » Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land.

  15. Corrective Action Plan for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada

    SciTech Connect

    K. B. Campbell

    2002-04-01

    Corrective Action Unit (CAU) 490, Station 44 Burn Area is located on the Tonopah Test Range (TTR). CAU 490 is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) and includes for Corrective Action Sites (CASs): (1) Fire Training Area (CAS 03-56-001-03BA); (2) Station 44 Burn Area (CAS RG-56-001-RGBA); (3) Sandia Service Yard (CAS 03-58-001-03FN); and (4) Gun Propellant Burn Area (CAS 09-54-001-09L2).

  16. Federal Government Support for Fuel Cell Technologies

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    State and Regional Initiatives June 11, 2009 Federal Government Support for Fuel Cell Technologies Sunita Satyapal Acting Program Manager 2 * Overview & Challenges * Progress & Accomplishments * A New Direction for the Program 3 Technology Barriers Economic & Institutional Barriers Fuel Cell Cost & Durability Targets: Stationary Systems: $750/kW, 40,000-hr durability Vehicles: $30 per kW, 5000-hr durability Safety, Codes & Standards Development Hydrogen Supply & Delivery

  17. Identify Institutional Change Rules for Sustainability

    Energy.gov [DOE]

    It is important to analyze formal and informal workplace rules governing the behavior of individuals and organizations to meet a federal agency's institutional change goals for sustainability. It is also important to determine how these rules actually affect people filling different roles in the organization, and how they mesh with the technologies, systems, and processes that constitute tools.

  18. Social Network and Communications Institutional Change Principle

    Energy.gov [DOE]

    Federal agencies can use social networks and communications to spark and reinforce behavior change for meeting sustainability goals. This principle is based on research findings showing that people and institutions often are strongly influenced by the behaviors and expectations of others.

  19. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    S.A. Gurvitz, The Weizmann Institute of Science, Rehovot, Israel Confinement and Scaling ... S.A. Gurvitz, The Weizmann Institute of Science, Rehovot, Israel Confinement and Scaling ...

  20. Information and Feedback Institutional Change Principle | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Information and Feedback Institutional Change Principle Information and Feedback Institutional Change Principle Information alone, however, is unlikely to lead to action. Federal and commercial programs have demonstrated reductions in energy use from delivery of reports to customers. By providing actionable information and feedback that are tailored to specific workplace situations, federal agencies can help to spur and maintain behaviors that save energy and resources. Methods

  1. Correction coil cable

    DOEpatents

    Wang, S.T.

    1994-11-01

    A wire cable assembly adapted for the winding of electrical coils is taught. A primary intended use is for use in particle tube assemblies for the Superconducting Super Collider. The correction coil cables have wires collected in wire array with a center rib sandwiched therebetween to form a core assembly. The core assembly is surrounded by an assembly housing having an inner spiral wrap and a counter wound outer spiral wrap. An alternate embodiment of the invention is rolled into a keystoned shape to improve radial alignment of the correction coil cable on a particle tube in a particle tube assembly. 7 figs.

  2. Institutional Change Process Step 2: Assess Institutional Rules...

    Office of Environmental Management (EM)

    2: Assess Institutional Rules, Roles, and Tools Institutional Change Process Step 2: Assess Institutional Rules, Roles, and Tools Graphic of the Institutional Change Continuous ...

  3. Federal Employee Health Services

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-12-01

    To establish requirements and responsibilities for occupational medical, employee assistance, and workers' compensation programs for Federal employees. Cancels DOE 3790.1B. Canceled by DOE O 341.1A.

  4. Federal Project Facilitators

    Energy.gov [DOE]

    The following are U.S. Department of Energy (DOE) approved project facilitators who are required under the DOE indefinite-delivery, indefinite-quantity contract to develop federal energy savings performance contracts.

  5. Federal Thought Leaders Roundtable

    Energy.gov [DOE]

    FEMP Director Timothy Unruh will facilitate a round table discussion on cutting-edge topics among senior agency officials. Federal thought leaders will share insights, candid assessments, and challenge the status quo.

  6. The Federal Energy Administration

    Energy.gov [DOE]

    The Federal Energy Administration - written by Roger AndersWashington, D.C.: U.S. Department of Energy, November 1980. 15 pp. 

  7. Federal Water Use Indices

    Energy.gov [DOE]

    FEMP provides water use indices as a guide for Federal agencies. Note that each is a rough estimate of water usage at different types of sites. Your site may vary considerably.

  8. Federal Protective Force

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2009-07-15

    This Manual establishes requirements for the management and operation of the Department of Energy (DOE) Federal protective forces (FPFs). Cancels DOE M 470.4-3, Chg 1. Canceled by DOE O 473.3.

  9. Guide to Federal Funding,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Funding, Financing, and Technical Assistance for Plug-in Electric Vehicles and Charging Stations July 2016 This document was prepared by the U.S. Department of Energy and U.S. Department of Transportation i Funding and Financing Opportunities This guidance document was collaboratively developed by the U.S. Department of Energy and Department Transportation to highlight examples of federal programs that support funding and financing for plug-in electric vehicles (PEVs) and charging

  10. Appendix VI Corrective Action Strategy

    National Nuclear Security Administration (NNSA)

    ......... 15 3.0 Underground Test Area............ 13 3-1 Underground Test Area Corrective Action ...

  11. Correction coil cable

    DOEpatents

    Wang, Sou-Tien

    1994-11-01

    A wire cable assembly (10, 310) adapted for the winding of electrical coils is taught. A primary intended use is for use in particle tube assemblies (532) for the superconducting super collider. The correction coil cables (10, 310) have wires (14, 314) collected in wire arrays (12, 312) with a center rib (16, 316) sandwiched therebetween to form a core assembly (18, 318 ). The core assembly (18, 318) is surrounded by an assembly housing (20, 320) having an inner spiral wrap (22, 322) and a counter wound outer spiral wrap (24, 324). An alternate embodiment (410) of the invention is rolled into a keystoned shape to improve radial alignment of the correction coil cable (410) on a particle tube (733) in a particle tube assembly (732).

  12. Enhanced Collaboration with State and Local Energy Institutions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Enhanced Collaboration with State and Local Energy Institutions State and local energy programs and policies are developed and implemented across a range of agencies and institutions. While EERE is working with some of these institutions on an ad hoc basis, a far greater level of coordination and communication could be achieved which would significantly advance collaborative state and federal efforts and achieve shared goals more rapidly. The breadth of major state and local energy interests

  13. Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Burden RFI | Department of Energy Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Regulatory Burden RFI These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the August 8, 2012 Federal Register requesting information to assist DOE in reviewing existing regulations and in making its

  14. Air-conditioning, Heating, and Refrigeration Institute Comments |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy conditioning, Heating, and Refrigeration Institute Comments Air-conditioning, Heating, and Refrigeration Institute Comments These comments are submitted by the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in response to the U.S. Department of Energy's (DOE) notice in the May 10, 2016 Federal Register requesting information to assist DOE in reviewing existing regulations pursuant to Executive Order 13563 "Improving Regulation and Regulatory

  15. The FEMP Awards Program: Fostering Institutional Change and Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management Excellence | Department of Energy The FEMP Awards Program: Fostering Institutional Change and Energy Management Excellence The FEMP Awards Program: Fostering Institutional Change and Energy Management Excellence Report provides an assessment of the Federal Energy Management Program's (FEMP) Energy and Water Management Awards program to identify the institutional elements of award-winning projects and analyze the relative emphasis placed on them. Download the FEMP Awards Program:

  16. 2010 Federal Employee Viewpoint Survey

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Employee Viewpoint Survey Page 1 of 20 ...Department of Energy 2010 Federal Employee Viewpoint Survey: Trend Report (2006 and 2008 ...

  17. Federal Register | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    of Federal agencies, and provides a forum for public participation in the democratic process. The publications provide access to a wide range of Federal benefits and...

  18. ORISE: EPA recognizes ORISE as Federal Green Challenge award winner

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ORISE recognized by EPA as Federal Green Challenge award winner Improvements in water consumption and electronics recycling noted FOR IMMEDIATE RELEASE June 18, 2014 FY14-48 OAK RIDGE, Tenn.-The Oak Ridge Institute for Science and Education (ORISE), managed by ORAU for the Department of Energy, received a 2014 Federal Green Challenge award from the U.S. Environmental Protection Agency for improving its water consumption levels and its electronic sustainability and recycling efforts in 2013 by

  19. Federal Technical Capability

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2009-11-19

    To define requirements and responsibilities for meeting the Department of Energy (DOE) commitment to recruiting, deploying, developing, and retaining a technically competent workforce that will accomplish DOE missions in a safe and efficient manner through the Federal Technical Capability Program (FTCP). Chg 1 dated 9-20-11 supersedes DOE O 426.1 and cancels DOE P 426.1.

  20. WIPP Documents - Federal Regulations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Federal Regulations 40 CFR Part 191 Environmental radiation protection standards for management and disposal of spent nuclear fuel, high-level and transuranic radioactive wastes. 40 CFR Part 194 Criteria for the certification and re-certification of the Waste Isolation Pilot Plant's compliance with the 40 CFR Part 191 disposal regulations.

  1. Federal Employee Training

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-07-06

    This Order establishes requirements and responsibilities for DOE Federal employee training in accordance with Chapter 41 of Title 5, United States Code (U.S.C.). Supersedes DOE O 360.1B and DOE M 360.1-1B.

  2. Federal Sustainable Print Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2015-11-17

    The Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11, and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade." Does not cancel/supersede other directives.

  3. Federal Sustainable Print Management

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2015-07-07

    This Guide provides acceptable approaches for implementing the IT sustainability requirements and criteria required by DOE Order 436.1, Departmental Sustainability, dated 5-2-11 and related to the sustainability requirements contained in Executive Order 13693, "Planning for Federal Sustainability in the Next Decade.

  4. Federal Employee Training

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1999-09-21

    To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development under the Government Employees Training Act of 1958, as amended. Cancels DOE O 360.1. Canceled by DOE O 360.1B.

  5. Federal Employee Training

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-10-11

    To plan and establish requirements and assign responsibilities for Department of Energy (DOE) Federal employee training, education, and development (hereafter referred to as "training") under the Government Employees Training Act of 1958. Cancels DOE O 360.1A. Canceled by DOE O 360.1C.

  6. FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) | Department...

    Energy Saver

    FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) FEDERAL ASSISTANCE BUDGET INFORMATION (CONSTRUCTION) Form provides information on the federal assistance budget for ...

  7. Electricity Advisory Committee - Federal Register Notices | Department...

    Office of Environmental Management (EM)

    Federal Register Notices Electricity Advisory Committee - Federal Register Notices Electricity Advisory Committee - Federal Register Notices April 8, 2016 Electricity Advisory ...

  8. Corrective Action Decision Document/ Corrective Action Plan for Corrective Action Unit 443: Central Nevada Test Area-Subsurface Central Nevada Test Area, Nevada, Rev. No. 0

    SciTech Connect

    Susan Evans

    2004-11-01

    This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) has been prepared for the subsurface at the Central Nevada Test Area (CNTA) Corrective Action Unit (CAU) 443, CNTA - Subsurface, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996). CAU 443 is located in Hot Creek Valley in Nye County, Nevada, north of U.S. Highway 6, about 48 kilometers north of Warm Springs, Nevada. The CADD/CAP combines the decision document (CADD) with the corrective action plan (CAP) and provides or references the specific information necessary to recommend corrective actions for the UC-1 Cavity (Corrective Action Site 58-57-001) at CAU 443, as provided in the FFACO. The purpose of the CADD portion of the document (Section 1.0 to Section 4.0) is to identify and provide a rationale for the selection of a recommended corrective action alternative for the subsurface at CNTA. To achieve this, the following tasks were required: (1) Develop corrective action objectives; (2) Identify corrective action alternative screening criteria; (3) Develop corrective action alternatives; (4) Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and (5) Recommend a preferred corrective action alternative for the subsurface at CNTA. A Corrective Action Investigation (CAI) was performed in several stages from 1999 to 2003, as set forth in the ''Corrective Action Investigation Plan for the Central Nevada Test Area Subsurface Sites (Corrective Action Unit No. 443)'' (DOE/NV, 1999). Groundwater modeling was the primary activity of the CAI. Three phases of modeling were conducted for the Faultless underground nuclear test. The first involved the gathering and interpretation of geologic and hydrogeologic data into a three-dimensional numerical model of groundwater flow, and use of the output of the flow model for a transport model of radionuclide release

  9. Federal Incentives for Water Power

    SciTech Connect

    2013-04-05

    This factsheet lists the major federal incentives for water power technologies available as of April 2013.

  10. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-04-06

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach for collecting the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 12 on the NTS, CAU 552 consists of two Corrective Action Sites (CASs): 12-06-04, Muckpile; 12-23-05, Ponds. Corrective Action Site 12-06-04 in Area 12 consists of the G-Tunnel muckpile, which is the result of tunneling activities. Corrective Action Site 12-23-05 consists of three dry ponds adjacent to the muckpile. The toe of the muckpile extends into one of the ponds creating an overlap of two CASs. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technic ally viable corrective actions. The results of the field investigation will support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 567: Miscellaneous Soil Sites - Nevada National Security Site, Nevada

    SciTech Connect

    Matthews, Patrick

    2014-12-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 567: Miscellaneous Soil Sites, Nevada National Security Site, Nevada. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 567 based on the implementation of the corrective actions. The corrective actions implemented at CAU 567 were developed based on an evaluation of analytical data from the CAI, the assumed presence of COCs at specific locations, and the detailed and comparative analysis of the CAAs. The CAAs were selected on technical merit focusing on performance, reliability, feasibility, safety, and cost. The implemented corrective actions meet all requirements for the technical components evaluated. The CAAs meet all applicable federal and state regulations for closure of the site. Based on the implementation of these corrective actions, the DOE, National Nuclear Security Administration Nevada Field Office provides the following recommendations: • No further corrective actions are necessary for CAU 567. • The Nevada Division of Environmental Protection issue a Notice of Completion to the DOE, National Nuclear Security Administration Nevada Field Office for closure of CAU 567. • CAU 567 be moved from Appendix III to Appendix IV of the FFACO.

  12. Cyclotron Institute » Brochures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Brochures Overview of the Cyclotron Institute Two-Page Flier for Prospective Graduate Students Folleto en Español

  13. Advanced Studies Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Institute » Advanced Studies Institute Science of Signatures Advanced Studies Institute Developing innovative solution strategies for problems that support the forward deployment theme of the Science of Signatures Pillar, and building skills needed for successful research program development. Contact Institute Director Charles Farrar (505) 665-0860 Email UCSD EI Director Michael Todd (858) 534-5951 Executive Administrator Ellie Vigil (505) 667-2818 Email Administrative Assistant Rebecca Duran

  14. Southern Research Institute Visit

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Southern Reaserch Engineering Capabilities Briefing 2010 Southern Research Institute Pharmaceutical and Biotechnology Research Briefing 2010 CAMD Introduction - Richard Kurtz Mary ...

  15. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    5-March 31, 2006 2005 April 1 Dr. Ralf Rapp, Cyclotron Institute, Texas A&M University, College Station, Texas Thermal Field Theory and Instantons II April 8 Mr. Deqiang Sun, Cyclotron Institute, Texas A&M University, College Station, Texas Bottomonium in QGP and Heavy-Ion Collisions April 22 Dr. Ralf Rapp, Cyclotron Institute, Texas A&M University, College Station, Texas Thermal Field Theory and Instantons III May 6 Dr. Massimo Mannarelli, Massachusetts Institute of Technology,

  16. Better Buildings Federal Award | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    winner of the 2013 Better Buildings Federal Award. The Federal Energy Management Program's (FEMP) Better Buildings Federal Award recognizes the federal government's ...

  17. Better Buildings Federal Award | Department of Energy

    Energy Saver

    U.S. Courthouse was the winner of the 2013 Better Buildings Federal Award. The Federal Energy Management Program's (FEMP) Better Buildings Federal Award recognizes the federal...

  18. The Critical Materials Institute | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The Critical Materials Institute Director Alex King, Operations Manager Cynthia Feller, Jenni Brockpahler and Melinda Thach. Photo left to right: CMI Director Alex King, Operations Manager Cynthia Feller, Jenni Brockpahler and Melinda Thach. Not pictured: Carol Bergman. CMI staff phone 515-296-4500, e-mail CMIdirector@ameslab.gov 2332 Pammel Drive, 134 Wilhelm Hall, Iowa State University, Ames, IA 50011-1025 The Critical Materials Institute focuses on technologies that make better use of

  19. Comments of the Institute for Market Transformation on the Dept. of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy's Energy Efficiency and Sustainable Design Standards for New Federal Buildings: Notice of Proposed Rulemaking | Department of Energy Institute for Market Transformation on the Dept. of Energy's Energy Efficiency and Sustainable Design Standards for New Federal Buildings: Notice of Proposed Rulemaking Comments of the Institute for Market Transformation on the Dept. of Energy's Energy Efficiency and Sustainable Design Standards for New Federal Buildings: Notice of Proposed Rulemaking

  20. Corrective Action Plan for Corrective Action Unit 139: Waste Disposal Sites, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-07-01

    Corrective Action Unit (CAU) 139, Waste Disposal Sites, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 139 consists of seven Corrective Action Sites (CASs) located in Areas 3, 4, 6, and 9 of the Nevada Test Site (NTS), which is located approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1). CAU 139 consists of the following CASs: CAS 03-35-01, Burn Pit; CAS 04-08-02, Waste Disposal Site; CAS 04-99-01, Contaminated Surface Debris; CAS 06-19-02, Waste Disposal Site/Burn Pit; CAS 06-19-03, Waste Disposal Trenches; CAS 09-23-01, Area 9 Gravel Gertie; and CAS 09-34-01, Underground Detection Station. Details of the site history and site characterization results for CAU 139 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007). The purpose of this Corrective Action Plan (CAP) is to present the detailed scope of work required to implement the recommended corrective actions as specified in Section 4.0 of the approved CADD (NNSA/NSO, 2007). The approved closure activities for CAU 139 include removal of soil and debris contaminated with plutonium (Pu)-239, excavation of geophysical anomalies, removal of surface debris, construction of an engineered soil cover, and implementation of use restrictions (URs). Table 1 presents a summary of CAS-specific closure activities and contaminants of concern (COCs). Specific details of the corrective actions to be performed at each CAS are presented in Section 2.0 of this report.

  1. Radiation camera motion correction system

    DOEpatents

    Hoffer, P.B.

    1973-12-18

    The device determines the ratio of the intensity of radiation received by a radiation camera from two separate portions of the object. A correction signal is developed to maintain this ratio at a substantially constant value and this correction signal is combined with the camera signal to correct for object motion. (Official Gazette)

  2. RCRA corrective action and closure

    SciTech Connect

    Not Available

    1995-02-01

    This information brief explains how RCRA corrective action and closure processes affect one another. It examines the similarities and differences between corrective action and closure, regulators` interests in RCRA facilities undergoing closure, and how the need to perform corrective action affects the closure of DOE`s permitted facilities and interim status facilities.

  3. Needle Federated Search Engine

    Energy Science and Technology Software Center

    2009-12-01

    The Idaho National Laboratory (INL) has combined a number of technologies, tools, and resources to accomplish a new means of federating search results. The resulting product is a search engine called Needle, an open-source-based tool that the INL uses internally for researching across a wide variety of information repositories. Needle has a flexible search interface that allows end users to point at any available data source. A user can select multiple sources such as commercialmore » databases (Web of Science, Engineering Index), external resources (WorldCat, Google Scholar), and internal corporate resources (email, document management system, library collections) in a single interface with one search query. In the future, INL hopes to offer this open-source engine to the public. This session will outline the development processes for making Needle™s search interface and simplifying the federation of internal and external data sources.« less

  4. Implementing sustainability: the behavioral-institutional dimension

    SciTech Connect

    Malone, Elizabeth L.; Diamond, Rick C.; Wolfe, Amy K.; Sanquist, Thomas F.; Payne, Christopher T.; Dion, Jerry

    2013-05-10

    Organizations, both public and private sector, are increasingly pursuing strategies to reduce their energy use and increase sustainability. Whether these efforts are based on economic rationale, community spirit, environmental ethics, federal mandates, or other reasons, they predominantly feature strategies that rely on new technologies. If there is any focus on behavior change, it is typically addressed to changing individual behavior. While we recognize the importance—and limitations—of the role of individual behavior in promoting sustainability goals, we are more interested in the role of institutional behavior. We have reviewed the small but growing literature on institutional behavior change, and have identified eight “evidence-based” principles as a guide for federal agencies to take action. This article presents the principles and illustrates them with examples to suggest ways that they can serve as models for others.

  5. Notices Federal Register

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    documents other than rules or proposed rules that are applicable to the public. Notices of hearings and investigations, committee meetings, agency decisions and rulings, delegations of authority, filing of petitions and applications and agency statements of organization and functions are examples of documents appearing in this section. Notices Federal Register 67156 Vol. 79, No. 218 Wednesday, November 12, 2014 DEPARTMENT OF COMMERCE Census Bureau Proposed Information Collection; Comment

  6. BETO Federal Partnerships

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    July 30, 2013 Alicia Lindauer Technology Manager, Strategic Analysis Biomass R&D Board Liaison 2 | Bioenergy Technologies Office Introduction Perception: "..there continues to be a lack of coordination between platforms within DOE and between other federal agencies..." - 2011 Biomass Program Peer Review Report Fact: The Bioenergy Technologies Office works with other agencies and offices to address critical issues related to bioenergy. Existing collaborations allow the Office to: *

  7. Federal Interagency Geothermal Activities

    SciTech Connect

    Anderson, Arlene; Prencipe, Loretta; Todaro, Richard M.; Cuyler, David; Eide, Elizabeth

    2011-06-01

    This collaborative document describes the roles and responsibilities of key Federal agencies in the development of geothermal technologies including the U.S. Department of Energy (DOE); the U.S. Department of Agriculture (USDA), including the U.S. Forest Service; the U.S. Department of Interior (DOI), including the United States Geological Survey (USGS) and Bureau of Land Management (BLM); the Environmental Protection Agency (EPA); and the Department of Defense (DOD).

  8. From Federal Computer Week:

    National Nuclear Security Administration (NNSA)

    Federal Computer Week: Energy agency launches performance-based pay system By Richard W. Walker Published on March 27, 2008 The Energy Department's National Nuclear Security Administration has launched a new performance- based pay system involving about 2,000 of its 2,500 employees. NNSA officials described the effort as a pilot project that will test the feasibility of the new system, which collapses the traditional 15 General Schedule pay bands into broader pay bands. The new structure

  9. Corrective Action Decision Document for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada: Revision 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2004-03-15

    This Corrective Action Decision Document (CADD) identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative appropriate to facilitate the closure of Corrective Action Unit (CAU) 528: Polychlorinated Biphenyls (PCBs) Contamination, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Area 25 of the NTS, CAU 528 consists of one Corrective Action Site (CAS): 25-27-03, Polychlorinated Biphenyls Surface Contamination. Corrective Action Unit 528 was created to address the presence of PCBs around the Test Cell C concrete pad. Corrective action investigation activities were performed from August 24, 2003, through January 8, 2004. The PCBs and total petroleum hydrocarbons-diesel range organics were identified as contaminants of concern in the surface and shallow subsurface soils in 12 areas (Areas 1 through 12) at CAS 25-27-03. Based on the review of existing data, future use, and current operations at the NTS, the following alternatives have been developed for consideration: Alternative 1 - No Further Action; Alternative 2 - Clean Closure; Alternative 3 - Closure in Place with Administrative Controls. The three corrective action alternatives were evaluated on their technical merits, focusing on performance, reliability, feasibility, and safety. Alternative 3 is the preferred corrective action for CAS 25-27-03. The selected alternative was judged to meet all requirements for the technical components evaluated for closure of the sites and additionally to minimize potential future exposure pathways to the contaminated media at CAU 528.

  10. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  11. Corrective Action Decision Document/Closure Report for Corrective Action Unit 410: Waste Disposal Trenches, Tonopah Test Range, Nevada: Revision No. 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-12-22

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 410: Waste Disposal Trenches, Tonopah Test Range, Nevada, in accordance with the Federal Facility Agreement and Consent Order. Corrective Action Unit 410 consists of five Corrective Action Sites (CASs): TA-21-003-TANL; 09-21-001-TA09; TA-19-002-TAB2; TA-21-002-TAAL; and 03-19-001. The CADD and CR have been combined into one report because no further action is recommended for this CAU. The corrective action alternative recommended for CAU 410 is Clean Closure; therefore, no corrective action or corrective action plan is required. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities.

  12. Corrective Action Investigation plan for Corrective Action Unit 263: Area 25 Building 4839 Leachfield, Nevada Test Site, Nevada, March 1999

    SciTech Connect

    ITLV

    1999-03-01

    The Corrective Action Investigation Plan for Corrective Action Unit 263, the Area 25 Building 4839 Leachfield, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the US Department of Energy, Nevada Operations Office; the Nevada Division of Environmental Protection; and the US Department of Defense. Corrective Action Unit 263 is comprised of the Corrective Action Site 25-05-04 sanitary leachfield and associated collection system. This Corrective Action Investigation Plan is used in combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada (DOE/NV, 1998d). The Leachfield Work Plan was developed to streamline investigations at Leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 263. Corrective Action Unit 263 is located southwest of Building 4839, in the Central Propellant Storage Area. Operations in Building 4839 from 1968 to 1996 resulted in effluent releases to the leachfield and associated collection system. In general, effluent released to the leachfield consisted of sanitary wastewater from a toilet, urinal, lavatory, and drinking fountain located within Building 4839. The subsurface soils in the vicinity of the collection system and leachfield may have been impacted by effluent containing contaminants of potential concern generated by support activities associated with the Building 4839 operations.

  13. Federal Technical Capability Panel

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Updated: April 2015 1 U. S. Department of Energy and National Nuclear Security Administration Federal Technical Capability Panel Organization Name Telephone Fax E-Mail FTCP CHAIR Chair (DOE/NTC) Karen L. Boardman (505) 845-6444 (505) 845-6079 kboardman@ntc.doe.gov FTCP Deputy Dave Chaney (505) 845-4300 (505) 845-4879 david.chaney@nnsa.doe.gov FTCP Technical Standards Mgr. Jeanette Yarrington (301) 903-7030 (301) 903-3445 Jeanette.Yarrington@hq.doe.gov FTCP Program Coordinator Jeannie Lozoya

  14. Meeting Federal Energy Security Requirements

    Energy.gov [DOE]

    Presentation—given at at the Fall 2012 Federal Utility Partnership Working Group (FUPWG) meeting—discusses the opportunity to increase the scope of federal-utility partnerships for meeting energy security requirements.

  15. Energy Corridors on Federal Lands

    Office of Energy Efficiency and Renewable Energy (EERE)

    To improve energy delivery and enhance the electric transmission grid for the future, several government agencies currently are working together to establish a coordinated network of Federal energy corridors on Federal lands throughout the United States.

  16. Federal Register | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Register, dated June 30, 2003. Extracted Pages,Department of Energy, Privacy Act, PArecordsJun30.pdf PDF icon Federal Register More Documents & Publications Privacy Act of ...

  17. Corrective Action Plan for Corrective Action Unit 562: Waste Systems, Nevada National Security Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2011-04-30

    This Corrective Action Plan has been prepared for Corrective Action Unit (CAU) 562, Waste Systems, in accordance with the Federal Facility Agreement and Consent Order (1996; as amended March 2010). CAU 562 consists of 13 Corrective Action Sites (CASs) located in Areas 2, 23, and 25 of the Nevada National Security Site. Site characterization activities were performed in 2009 and 2010, and the results are presented in Appendix A of the Corrective Action Decision Document for CAU 562. The scope of work required to implement the recommended closure alternatives is summarized. (1) CAS 02-26-11, Lead Shot, will be clean closed by removing shot. (2) CAS 02-44-02, Paint Spills and French Drain, will be clean closed by removing paint and contaminated soil. As a best management practice (BMP), asbestos tile will be removed. (3) CAS 02-59-01, Septic System, will be clean closed by removing septic tank contents. As a BMP, the septic tank will be removed. (4) CAS 02-60-01, Concrete Drain, contains no contaminants of concern (COCs) above action levels. No further action is required; however, as a BMP, the concrete drain will be removed. (5) CAS 02-60-02, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. As a BMP, the drain grates and drain pipe will be removed. (6) CAS 02-60-03, Steam Cleaning Drain, will be clean closed by removing contaminated soil. As a BMP, the steam cleaning sump grate and outfall pipe will be removed. (7) CAS 02-60-04, French Drain, was clean closed. Corrective actions were completed during corrective action investigation activities. (8) CAS 02-60-05, French Drain, will be clean closed by removing contaminated soil. (9) CAS 02-60-06, French Drain, contains no COCs above action levels. No further action is required. (10) CAS 02-60-07, French Drain, requires no further action. The french drain identified in historical documentation was not located during corrective action investigation

  18. Research - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Overview Viewing gamma ray spectra. The Institute research program focuses on the atomic nucleus, a many-body system of strongly interacting constituents bound together by the...

  19. UNCLASSIFIED Institute for Materials ...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    professor in the Woodruff School of Mechanical Engineering at Georgia Institute of Technology. She was previously a postdoctoral research fellow at the Center for Integrated...

  20. Publications - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    "Progress in Research", Cyclotron Institute Annual Reports View individual articles: 2015 2014 2013 2012 2011 2010 2009 2008 2007 2006 2005 2004 ...

  1. UNCLASSIFIED Institute for Materials ...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Emeritus Institute for Theoretical Condensed Matter Physics (KIT) The Exotic World of Quantum Matter: Novel States Induced by Fluctuations Tuesday, June 30, 2015 2 - 3pm MSL...

  2. Information Science & Technology Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ISTI Information Science & Technology Institute Providing connection to program management for capability needs, as well as IS&T integration and support for mission-critical...

  3. Institute for Advanced Studies

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    working on joint NMC proposals. Participation in the projects must not negatively impact partner institutions. Funding for joint projects should be through partner...

  4. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hass, The Weizmann Institute, Rehovot, Israel A New Precision Measurement of the 7 Be ... Yigal Ronen, Ben Gurion University Beer-Sheva, Israel Space Travel: Science or Fiction? ...

  5. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Jeffrey W. Martin, Kellogg Radiation Laboratory, California Institute of Technology, Pasadena, California Ultracold Neutrons April 20 Professor J. W. Watson, Department of Physics, ...

  6. People - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Overview Dr. Ralf Rapp meets with his research group. At the Institute we focus on conducting basic research, educating students in accelerator-based science and technology, and ...

  7. Facilities - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The Cyclotron Institute has expanded steadily since commissioning the original cyclotron in 1967 and is currently upgrading again. The diagram to the left shows the variety of...

  8. Federal Building Metering Guidance Overview

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Building Metering Guidance Overview  Metering is required for electricity, natural gas, steam, and water consumption per * Energy Policy Act of 2005 * National Energy Conservation Policy Act Section 543, as amended (42 U.S.C. § 8253) * Executive Order 13693, Planning for Federal Sustainability in the Next Decade  Federal Building Metering Guidance issued November 2014 stated the purpose of metering Federal buildings is to collect, analyze, and act on the energy performance data *

  9. Federal Regulations | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Regulations Federal Regulations NOTE: Adobe Acrobat Reader may be necessary to view PDF documents listed below. Accessibility Section 508 of the Rehabilitation Act - Electronic and Information Technology Accessibility Standards Section 504 of the Rehabilitation Act - Nondiscrimination Under Federal Grants and Programs Federal Records Act Freedom of Information Act (as amended) Freedom of Information Act Updates Privacy Act of 1974 (as amended) Privacy Act Overview Cyber Security Atomic

  10. Federal government information handbook: formerly utilized sites remedial action program

    SciTech Connect

    Not Available

    1980-12-31

    This volume is one of a series produced under contract with the DOE, by Politech Corporation to develop a legislative and regulatory data base to assist the FUSRAP management in addressing the institutional and socioeconomic issues involved in carrying out the Formerly Utilized Sites Remedial Action Program. This Information Handbook series contains information about all relevant government agencies at the Federal and state levels, the pertinent programs they administer, each affected state legislature, and current Federal and state legislative and regulatory initiatives. This volume is a compilation of information about the Federal Government. It contains a summary of the organization and responsibilities of agencies within the executive branch of the Federal government which may be relevant to FUSRAP activities; a brief summary of relevant Federal statutes and regulations; a description of the structure of the US Congress, identification of the officers, relevant committees and committee chairmen; a description of the Federal legislative process; a summary of legislation enacted and considered in the recently-adjourned 96th Congress; a description of the Federal budgetary process; a summary of the Carter Administration's comprehensive radioactive waste management program; and excerpts from the text of relevant federal statutes and regulations.

  11. Privatizing federal energy research

    SciTech Connect

    Copulos, M.R.

    1983-01-01

    The government has abandoned an increasing number of research projects, of which the Clinch River Breeder Reactor is the most recent, despite the large sums of public and private dollars already invested. Privatization may be the best way to solve energy problems, save taxpayers a minimum of $2 billion in return, and depoliticize energy research. The Electric Power Research Institute can serve as a model for a system in which industry users would be assessed for a research trust fund that would provide stable funding and allow long-range planning. The EPRI model could also help to overcome information sharing and antitrust constraints. (DCK)

  12. Classification Training Institute Catalog | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Classification Training Institute Catalog Classification Training Institute Catalog Classification Training Institute (CTI) Catalog

  13. Corrective Action Investigation Plan for Corrective Action Unit 219: Septic Systems and Injection Wells, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2005-01-01

    The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.

  14. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No. 0

    SciTech Connect

    Robert F. Boehlecke

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

  15. Corrective Action Investigation Plan for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David A. Strand

    2004-06-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 551, Area 12 muckpiles, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 551 is located in Area 12 of the NTS, which is approximately 110 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Area 12 is approximately 40 miles beyond the main gate to the NTS. Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) shown on Figure 1-1 and listed below: (1) 12-01-09, Aboveground Storage Tank and Stain; (2) 12-06-05, Muckpile; (3) 12-06-07, Muckpile; and (4) 12-06-08, Muckpile. Corrective Action Site 12-01-09 is located in Area 12 and consists of an above ground storage tank (AST) and associated stain. Corrective Action Site 12-06-05 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. Corrective Action Site 12-06-07 is located in Area 12 and consists of a muckpile associated with the U12 C-, D-, and F-Tunnels. Corrective Action Site 12-06-08 is located in Area 12 and consists of a muckpile associated with the U12 B-Tunnel. In keeping with common convention, the U12B-, C-, D-, and F-Tunnels will be referred to as the B-, C-, D-, and F-Tunnels. The corrective action investigation (CAI) will include field inspections, radiological surveys, and sampling of media, where appropriate. Data will also be obtained to support waste management decisions.

  16. Social Empowerment Institutional Change Principle | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Empowerment Institutional Change Principle Social Empowerment Institutional Change Principle By creating a context in which workers feel empowered to take action, federal agencies can promote behaviors and behavior changes that support their sustainability goals. When individuals and organizations believe they can reach desirable social goals, they often do-as is shown in research studies of change. Methods Workers are socially motivated by three desires: Autonomy: They want to have control over

  17. Identify Institutional Change Tools for Sustainability | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Tools for Sustainability Identify Institutional Change Tools for Sustainability After identifying institutional change rules and roles, a federal agency should identify the tools that create the infrastructural context within which it can achieve its sustainability goals. A tool is defined simply as a technology, system, or process used to meet a need. An example would be a time card, which is a system for tracking and verifying work hours. An organization's tools support its standard

  18. University of Delaware Energy Institute Inauguration | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Delaware Energy Institute Inauguration University of Delaware Energy Institute Inauguration September 19, 2008 - 3:43pm Addthis Remarks as Prepared for Secretary Bodman Thank you very much, Dr. Harker. I applaud your contributions to the field of higher education - as well as your commitment to a more secure energy future. Throughout history, our universities have played a key role in finding solutions to our most pressing and complex challenges. The federal government - certainly the Energy

  19. Barometric and Earth Tide Correction

    Energy Science and Technology Software Center

    2005-11-10

    BETCO corrects for barometric and earth tide effects in long-term water level records. A regression deconvolution method is used ot solve a series of linear equations to determine an impulse response function for the well pressure head. Using the response function, a pressure head correction is calculated and applied.

  20. Operations and Maintenance in Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Maintenance in Federal Facilities Operations and Maintenance in Federal Facilities Effective operations and maintenance plans help ensure federal equipment, such as this water ...

  1. Southeastern Federal Power Alliance | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Southeastern Federal Power Alliance Southeastern Federal Power Alliance Southeastern Federal Power Alliance logo Partners Advancing Clean, Reliable Hydropower Sensing a need for a ...

  2. Federal Interagency Wind Turbine Radar Interference Mitigation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Interagency Wind Turbine Radar Interference Mitigation Strategy Federal Interagency Wind Turbine Radar Interference Mitigation Strategy Cover of the Federal Interagency ...

  3. Federated Wind Farm | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Federated Wind Farm Jump to: navigation, search Name Federated Wind Farm Facility Federated Sector Wind energy Facility Type Commercial Scale Wind Facility Status In Service Owner...

  4. Purchasing Renewable Power for Federal Facilities | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Purchasing Renewable Power for Federal Facilities Purchasing Renewable Power for Federal Facilities Federal agencies can purchase renewable power or renewable energy certificates ...

  5. Federal Energy Management Program Report Template | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Management Program Report Template Federal Energy Management Program Report Template Template to create reports for the Federal Energy Management Program (FEMP)...

  6. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  7. Memorandum of Understanding Regarding Coordination in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, ...

  8. Federal Agency NEPA Procedures | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Agency NEPA Procedures Federal Agency NEPA Procedures Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in...

  9. Calendar - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Cyc Reservations for meeting room 308 Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the...

  10. Calendar - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Cy Reservations for meeting room 304 Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the...

  11. Calendar - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    for the Conference Room (Room 300) Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the...

  12. Calendar - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    calendar@comp.tamu.edu Cycl Seminar Rm 228 Your browser does not appear to support JavaScript, but this page needs to use JavaScript to display correctly. You can visit the...

  13. Summary Description Federal Acquisition Circular 2005-58 Federal...

    Energy.gov [DOE] (indexed site)

    Federal preference for purchasing biobased products. Contractors may need to create an inventory management system to track the biobased products purchased for each contract....

  14. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2-March 31, 2003 2002 April 2 Dr. Bency John, Cyclotron Institute, Texas A&M University Isoscalar Giant Resonances in 12 C April 9 Professor J. Rapaport, Ohio University, Athens, Ohio Charge Exchange Reactions and Spin Transfer Measurements April 16 M. Sanchez-Vega and V. E. Jacob, Cyclotron Institute, Texas A&M University Test of the Unitarity of the CKM Matrix via Superallowed β + decay. April 23 Dr. Subrata Pal, Cyclotron Institute, Texas A&M University Strange Particle

  15. Department of Energy Federal Acquisition Regulation Clause Usage Guide

    Energy.gov [DOE]

    Attached for your information is a corrected Department of Energy Federal Acquisition Regulation Clause Usage Guide. This corrected clause matrix is also being posted to the Stripes library. The earlier edition incorrectly designated 52.223-4 Recovered Material Certification and 52.223-9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items, as Not Applicable under management and operating contracts and other facility management contracts. They are actually required clauses as 52.223-17 requires the use of such products in service and construction contracts. They are also being designated as required under the service and construction contract columns.

  16. Cyclotron Institute REU Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    led by Institute faculty. Students will have the opportunity to share their work via an oral presentation and virtual poster session. Gopal Subedi at the TAMU REU poster session....

  17. Financial Institution Lending Programs

    Energy.gov [DOE]

    Financial institution loans for clean energy projects are originated and serviced through an entity other than the government, typically banks. In this case, a state or local government is not the...

  18. Contact - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Contact Website Manager Bruce Hyman Email: hyman@comp.tamu.edu Mailing Address Cyclotron Institute Texas A&M University 3366 TAMU College Station, TX, 77843-3366 Campus Location...

  19. Critical Materials Institute

    ScienceCinema

    Alex King

    2013-06-05

    Ames Laboratory Director Alex King talks about the goals of the Critical Materials Institute in diversifying the supply of critical materials, developing substitute materials, developing tools and techniques for recycling critical materials, and forecasting materials needs to avoid future shortages.

  20. New England Fuel Institute

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and CEO of the New England Fuel Institute Before the U.S. Department of Energy and the Quadrennial Energy Review Task Force Public Hearing on "New England Regional ...

  1. UNCLASSIFIED Institute for Materials ...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PSI: the X-ray free electron laser SwissFEL and its future experimental capabilities. Biography: Prof. Dr. Jol Mesot is, since 2008, director of the Paul Scherrer Institute...

  2. Federal Energy Management Program (FEMP)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SMALL BUSINESS PROGRAM The Federal Energy Management Program (FEMP) is a U.S. Department of Energy (DOE) program focused on reducing the federal government's energy consumption by providing federal agencies with information, tools, and assistance toward tracking and meeting energy- related requirements and goals. FEMP seeks contracts with small businesses to aid in this effort. This fact sheet outlines essential resources and tips to get you started in small business contracting with FEMP.

  3. Resources | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Resources The Critical Materials Institute offers connections to resources, including: CMI Annual Report (page includes link pdf of 20-page report) List of resources U.S. Rare Earth Magnet Patents Table Government agency contacts CMI unique facilities CMI recent presentations Photographs via Flick'r: Critical Materials Institute, The Ames Laboratory Videos from The Ames Laboratory Webinars from Colorado School of Mines To offer comments on the CMI website or to ask questions, please contact us

  4. Great Lakes Energy Institute

    SciTech Connect

    Alexander, J. Iwan

    2012-11-18

    The vision of the Great Lakes Energy Institute is to enable the transition to advanced, sustainable energy generation, storage, distribution and utilization through coordinated research, development, and education. The Institute will place emphasis on translating leading edge research into next generation energy technology. The Institute’s research thrusts focus on coordinated research in decentralized power generation devices (e.g. fuel cells, wind turbines, solar photovoltaic devices), management of electrical power transmission and distribution, energy storage, and energy efficiency.

  5. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    INSTITUTE COLLOQUIA AND SEMINARS April 1, 2010-March 31, 2011 2010 May 11 Dr. J. J. Ressler, Lawrence Livermore National Laboratory, Livermore, California Surrogate Reactions for Nuclear Energy Application May 12 Professor Lie-Wen Chen, Institute of Nuclear, Particle Astronomy and Cosmology (INPAC) and Department of Physics, Shanghai Jiao Tong University, Shanghai, China Probing the Nuclear Symmetry Energy with Heavy-Ion Reactions and Neutron Skin Thickness of Heavy Nuclei May 13 Professor A. R.

  6. Corrective Action Investigation Plan for Corrective Action Unit 137: Waste Disposal Sites, Nevada Test Site, Nevada, Rev. No.:0

    SciTech Connect

    Wickline, Alfred

    2005-12-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 137: Waste Disposal Sites. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 137 contains sites that are located in Areas 1, 3, 7, 9, and 12 of the Nevada Test Site (NTS), which is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 137 is comprised of the eight corrective action sites (CASs) shown on Figure 1-1 and listed below: (1) CAS 01-08-01, Waste Disposal Site; (2) CAS 03-23-01, Waste Disposal Site; (3) CAS 03-23-07, Radioactive Waste Disposal Site; (4) CAS 03-99-15, Waste Disposal Site; (5) CAS 07-23-02, Radioactive Waste Disposal Site; (6) CAS 09-23-07, Radioactive Waste Disposal Site; (7) CAS 12-08-01, Waste Disposal Site; and (8) CAS 12-23-07, Waste Disposal Site. The Corrective Action Investigation (CAI) will include field inspections, radiological surveys, geophysical surveys, sampling of environmental media, analysis of samples, and assessment of investigation results, where appropriate. Data will be obtained to support corrective action alternative evaluations and waste management decisions. The CASs in CAU 137 are being investigated because hazardous and/or radioactive constituents may be present in concentrations that could potentially pose a threat to human health and the environment. Existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives for the CASs. Additional information will be generated by conducting a CAI before evaluating and selecting corrective action

  7. Federal Buildings Supplemental Survey 1993

    Energy Information Administration (EIA) (indexed site)

    6. Electricity Consumption and Expenditure Intensities in FBSS Buildings in Federal Region 3, 1993 Electricity Consumption Electricity Expenditures Distribution of Building-Level...

  8. Federal Buildings Supplemental Survey 1993

    Energy Information Administration (EIA) (indexed site)

    4. Energy Conservation Features in FBSS Building in Federal Region 3, Number of Buildings and Floorspace, 1993 Total Floorspace Number of Buildings (thousand square feet) Any Any...

  9. Federal Interagency Geothermal Activities 2011

    Energy.gov [DOE]

    This document is the federal interagency geothermal activities document for 2011, which includes incoporation of public comments from the Draft National Geothermal Action Plan.

  10. Federal Buildings Supplemental Survey -- Overview

    Energy Information Administration (EIA) (indexed site)

    Buildings The Federal Buildings Supplemental Survey 1993 provides building-level energy-related characteristics for a special sample of commercial buildings owned by the...

  11. Federal Buildings Supplemental Survey 1993

    Energy Information Administration (EIA) (indexed site)

    grants to Federal agencies to implement energy efficiency and water conservation projects. (See Energy Conservation Program Assistance and Retrofit or Purchase of Any...

  12. Federal Buildings Supplemental Survey 1993

    SciTech Connect

    1995-11-01

    The Energy Information Administration (EIA) of the US Department of Energy (DOE) is mandated by Congress to be the agency that collects, analyzes, and disseminates impartial, comprehensive data about energy including the volume consumed, its customers, and the purposes for which it is used. The Federal Buildings Supplemental Survey (FBSS) was conducted by EIA in conjunction with DOE`s Office of Federal Energy Management Programs (OFEMP) to gain a better understanding of how Federal buildings use energy. This report presents the data from 881 completed telephone interviews with Federal buildings in three Federal regions. These buildings were systematically selected using OFEMP`s specifications; therefore, these data do not statistically represent all Federal buildings in the country. The purpose of the FBSS was threefold: (1) to understand the characteristics of Federal buildings and their energy use; (2) to provide a baseline in these three Federal regions to measure future energy use in Federal buildings as required in EPACT; and (3) to compare building characteristics and energy use with the data collected in the CBECS.

  13. Federal Requirements for the Web

    Energy.gov [DOE]

    Federal laws and requirements govern the Office of Energy Efficiency and Renewable Energy (EERE) with regards to its websites and other digital media.

  14. EIS-0375: Corrected Notice of Intent to Prepare an Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy Corrected Notice of Intent to Prepare an Environmental Impact Statement EIS-0375: Corrected Notice of Intent to Prepare an Environmental Impact Statement Disposal of Greater-than-Class-C Low-Level Radioactive Waste and Department of Energy GTCC-like Waste DOE issued a correction to the Greater-Than-Class C (GTCC) Notice of Intent which was published in the Federal Register on July 23, 2007. The "Correction," issued on July 31, 2007, revised data in

  15. State and federal regulation of OTEC plants in Hawaii

    SciTech Connect

    Keith, K.M.

    1980-09-01

    The advantages of ocean thermal energy conversion (OTEC) for Hawaii, its institutional support, projected contributions of OTEC in the future, and environmental concerns are discussed. Three experimental OTEC facilities in Hawaii are described, and the many regulations that must be observed and permits needed are described. Applicability of existing federal laws in regulating commercial-scale OTEC plants is examined, and applicable Coast Guard regulations and maritime laws are discussed briefly. Questions of state-federal relations, particularly regarding Hawaii's archipelagic claims and coastal zone, are addressed. (LEW)

  16. Federal interagency ecosystem management initiative: Great Lakes ecosystem case study

    SciTech Connect

    Cordle, S.

    1995-12-01

    In August 1994 a team of representatives from six Federal agencies conducted a case study of ecosystem management practices in the Great Lakes. Its report was based on interviews carried out in Chicago, Illinois, and Ann Arbor, Michigan; on phone interviews; and on written materials provided by Federal and State officials as well as representatives of Tribal organizations, non-governmental organizations, academia, industry, and the International Joint Commission. The report describes mainly what the participants told or provided to the survey team, with a few explicit conclusions and recommendations from the team. The issues covered by the survey included Legal, Institutional, Science and Information, Budget, and Public Participation.

  17. RCRA corrective action: Work plans

    SciTech Connect

    Not Available

    1995-02-01

    This Information Brief describes the work plans that owners/operators may have to prepare in conjunction with the performance of corrective action for compliance with RCRA guidelines. In general, the more complicated the performance of corrective action appears from the remedial investigation and other analyses, the more likely it is that the regulator will impose work plan requirements. In any case, most owner/operators will prepare work plans in conjunction with the performance of corrective action processes as a matter of best engineering management practices.

  18. Corrective Action Investigation Plan for Corrective Action Unit 135: Area 25 Underground Storage Tanks Nevada Test Site, Nevada

    SciTech Connect

    U.S. Department of Energy, Nevada Operations Office

    1999-05-05

    This Corrective Action Investigation Plan (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the US Department of Energy, Nevada Operations Office (DOE/NV); the State of Nevada Division of Environmental Protection (NDEP); and the US Department of Defense (FFACO, 1996). The CAIP is a document that provides or references all of the specific information for investigation activities associated with Corrective Action Units (CAUs) or Corrective Action Sites (CASs). According to the FFACO, CASs are sites potentially requiring corrective action(s) and may include solid waste management units or individual disposal or release sites (FFACO, 1996). Corrective Action Units consist of one or more CASs grouped together based on geography, technical similarity, or agency responsibility for the purpose of determining corrective actions. This CAIP contains the environmental sample collection objectives and the criteria for conducting site investigation activities at CAU 135, Area 25 Underground Storage Tanks (USTs), which is located on the Nevada Test Site (NTS). The NTS is approximately 105 kilometers (km) (65 miles [mi]) northwest of Las Vegas, Nevada.

  19. Corrective Action Investigation Plan for Corrective Action Unit 528: Polychlorinated Biphenyls Contamination, Nevada Test Site, Nevada, Rev. 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-05-08

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 528, Polychlorinated Biphenyls Contamination (PCBs), Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in the southwestern portion of Area 25 on the NTS in Jackass Flats (adjacent to Test Cell C [TCC]), CAU 528 consists of Corrective Action Site 25-27-03, Polychlorinated Biphenyls Surface Contamination. Test Cell C was built to support the Nuclear Rocket Development Station (operational between 1959 and 1973) activities including conducting ground tests and static firings of nuclear engine reactors. Although CAU 528 was not considered as a direct potential source of PCBs and petroleum contamination, two potential sources of contamination have nevertheless been identified from an unknown source in concentrations that could potentially pose an unacceptable risk to human health and/or the environment. This CAU's close proximity to TCC prompted Shaw to collect surface soil samples, which have indicated the presence of PCBs extending throughout the area to the north, east, south, and even to the edge of the western boundary. Based on this information, more extensive field investigation activities are being planned, the results of which are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document.

  20. Corrective Action Plan for Corrective Action Unit 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada

    SciTech Connect

    D. L. Gustafason

    2001-02-01

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 143: Area 25 Contaminated Waste Dumps, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order of 1996. This CAP provides the methodology for implementing the approved corrective action alternative as listed in the Corrective Action Decision Document (U.S. Department of Energy, Nevada Operations Office, 2000). The CAU includes two Corrective Action Sites (CASs): 25-23-09, Contaminated Waste Dump Number 1; and 25-23-03, Contaminated Waste Dump Number 2. Investigation of CAU 143 was conducted in 1999. Analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine constituents of concern for CAU 143. Radionuclide concentrations in disposal pit soil samples associated with the Reactor Maintenance, Assembly, and Disassembly Facility West Trenches, the Reactor Maintenance, Assembly, and Disassembly Facility East Trestle Pit, and the Engine Maintenance, Assembly, and Disassembly Facility Trench are greater than normal background concentrations. These constituents are identified as constituents of concern for their respective CASs. Closure-in-place with administrative controls involves use restrictions to minimize access and prevent unauthorized intrusive activities, earthwork to fill depressions to original grade, placing additional clean cover material over the previously filled portion of some of the trenches, and placing secondary or diversion berm around pertinent areas to divert storm water run-on potential.

  1. Federal Building Metering Implementation Plan Template | Department...

    Office of Environmental Management (EM)

    Implementation Plan Template Federal Building Metering Implementation Plan Template Document provides a template for a federal building metering implementation plan....

  2. Executive Order 13423: Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management Executive Order 13423: Strengthening Federal Environmental, Energy, and ...

  3. Sustainability in Existing Federal Buildings | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities Sustainable Buildings & Campuses Sustainability in Existing Federal Buildings Sustainability in Existing Federal Buildings The General Services Administration ...

  4. Federal Aviation Administration | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Aviation Administration Jump to: navigation, search Logo: Federal Aviation Administration Name: Federal Aviation Administration Address: 800 Independence Ave., SW Place:...

  5. Federal Spectrum Management at the National Telecommunications...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Spectrum Management at the National Telecommunications and Information Administration Federal Spectrum Management at the National Telecommunications and Information ...

  6. Assisting Federal Facilities with Energy Conservation Technologies...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Financing Assisting Federal Facilities with Energy Conservation Technologies (AFFECT) Funding Opportunity Assisting Federal Facilities with Energy Conservation ...

  7. PROCEEDINGS OF THE WORKSHOP ON LHC INTERACTION REGION CORRECTION SYSTEMS

    SciTech Connect

    FISCHER,W.; WEI,J.

    1999-09-02

    The Workshop on LHC Interaction Region Correction Systems was held at Brookhaven National Laboratory, Upton, New York, on 6 and 7 May 1999. It was attended by 25 participants from 5 institutions. The performance of the Large Hadron Collider (LHC) at collision energy is limited by the field quality of the interaction region quadrupoles and dipoles. In three sessions the workshop addressed the field quality of the these magnets, reviewed the principles and efficiency of global and local correction schemes and finalized a corrector layout. The session on Field Quality Issues, chaired by J. Strait (FNAL), discussed the progress made by KEK and FNAL in achieving the best possible field quality in the interaction region quadrupoles. Results of simulation studies were presented that assess the effects of magnetic field errors with simulation studies. Attention was given to the uncertainties in predicting and measuring field errors. The session on Global Correction, chaired by J.-P. Koutchouk (CERN), considered methods of reducing the nonlinear detuning or resonance driving terms in the accelerator one-turn map by either sorting or correcting. The session also discussed the crossing angle dependence of the dynamic aperture and operational experience from LEP. The session on Local Correction, chaired by T. Taylor (CERN), discussed the location, strength and effectiveness of multipole correctors in the interaction regions for both proton and heavy ion operation. Discussions were based on technical feasibility considerations and dynamic aperture requirements. The work on linear corrections in the interaction regions was reviewed.

  8. Entropic corrections to Einstein equations

    SciTech Connect

    Hendi, S. H. [Physics Department, College of Sciences, Yasouj University, Yasouj 75914 (Iran, Islamic Republic of); Research Institute for Astronomy and Astrophysics of Maragha (RIAAM), Maragha (Iran, Islamic Republic of); Sheykhi, A. [Research Institute for Astronomy and Astrophysics of Maragha (RIAAM), Maragha (Iran, Islamic Republic of); Department of Physics, Shahid Bahonar University, P.O. Box 76175-132, Kerman (Iran, Islamic Republic of)

    2011-04-15

    Considering the general quantum corrections to the area law of black hole entropy and adopting the viewpoint that gravity interprets as an entropic force, we derive the modified forms of Modified Newtonian dynamics (MOND) theory of gravitation and Einstein field equations. As two special cases we study the logarithmic and power-law corrections to entropy and find the explicit form of the obtained modified equations.

  9. Federal Real Property Council Guidance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Real Property Council Guidance for Improved Asset Management December 22, 2004 Federal Real Property Council Guidance for Improved Asset Management Table of Contents I. Overview............................................................................. 1 II. Guiding Principles .................................................................... 3 III. Asset Management Plan - Required Components............................... 4 IV. Asset Management Plan - "Shelf

  10. Federal Thought Leaders Roundtable Video

    Energy.gov [DOE]

    Federal Energy Managment Program (FEMP) Director Timothy Unruh will facilitate a roundtable discussion among senior agency officials on cutting-edge topics related to federal sustainability goals, policy, and initiatives. Panelists will review innovative project case studies and share insights and strategies for replicating them. This FEMP First Thursday Seminar is scheduled for June 2, 2016.

  11. Format for Federal Register Notice

    Energy.gov [DOE] (indexed site)

    ... Describe measures to be instituted to prevent unauthorized people from retrieving the records. Example: "Access is limited by protecting the database with a password known only to ...

  12. Ecologic Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Institute Name: Ecologic Institute Address: Pfalzburger Strasse 4344 Place: Berlin, Germany Year Founded: 1995 Phone Number: +49 (30) 86880-0 Website: ecologic.eu...

  13. Strategies for Achieving Institutional Change

    Office of Energy Efficiency and Renewable Energy (EERE)

    Many strategies—including those derived from Institutional Change Principles–may be used to effect institutional change in support of energy and sustainability objectives.

  14. Rahus Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    article is a stub. You can help OpenEI by expanding it. Rahus Institute is a policy organization located in Martinez, California. References About Rahus Institute Retrieved...

  15. Corrective action decision document, Second Gas Station, Tonopah test range, Nevada (Corrective Action Unit No. 403)

    SciTech Connect

    1997-11-01

    This Corrective Action Decision Document (CADD) for Second Gas Station (Corrective Action Unit [CAU] No. 403) has been developed for the U.S. Department of Energy`s (DOE) Nevada Environmental Restoration Project to meet the requirements of the Federal Facility Agreement and Consent Order (FFACO) of 1996 as stated in Appendix VI, {open_quotes}Corrective Action Strategy{close_quotes} (FFACO, 1996). The Second Gas Station Corrective Action Site (CAS) No. 03-02-004-0360 is the only CAS in CAU No. 403. The Second Gas Station CAS is located within Area 3 of the Tonopah Test Range (TTR), west of the Main Road at the location of former Underground Storage Tanks (USTs) and their associated fuel dispensary stations. The TTR is approximately 225 kilometers (km) (140 miles [mi]) northwest of Las Vegas, Nevada, by air and approximately 56 km (35 mi) southeast of Tonopah, Nevada, by road. The TTR is bordered on the south, east, and west by the Nellis Air Force Range and on the north by sparsely populated public land administered by the Bureau of Land Management and the U.S. Forest Service. The Second Gas Station CAS was formerly known as the Underground Diesel Tank Site, Sandia Environmental Restoration Site Number 118. The gas station was in use from approximately 1965 to 1980. The USTs were originally thought to be located 11 meters (m) (36 feet [ft]) east of the Old Light Duty Shop, Building 0360, and consisted of one gasoline UST (southern tank) and one diesel UST (northern tank) (DOE/NV, 1996a). The two associated fuel dispensary stations were located northeast (diesel) and southeast (gasoline) of Building 0360 (CAU 423). Presently the site is used as a parking lot, Building 0360 is used for mechanical repairs of vehicles.

  16. 2016 SOUTHWESTERN FEDERAL HYDROPOWER MEETING Bolling Federal Building

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 SOUTHWESTERN FEDERAL HYDROPOWER MEETING Bolling Federal Building 601 E 12 th Street Kansas City, Missouri 64106 June 23, 2016 12:00 p.m. LUNCH 1:15 p.m. Future Major Rehabilitations in Panel Discussion Southwestern's Region 1:45 p.m. Projects Impacting Federal Power Tulsa District  Interior Least Tern Operations and Habitat Creation  Arkansas River Corridor  Lake Eufaula Advisory Committee  Tenkiller Downstream Fishery Issues - DO / Minimum Flows  Broken Bow Seasonal Pool Update

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada, Revision 0

    SciTech Connect

    Matthews, Patrick

    2013-11-01

    This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 570: Area 9 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The purpose of the CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed.

  18. Corrective Action Decision Document for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Grant Evenson

    2008-02-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.

  19. Infrastructure Institutional Change Principle

    Energy.gov [DOE]

    Research shows that changes in infrastructure prompt changes in behavior (for better or worse). Federal agencies can modify their infrastructure to promote sustainability-oriented behavior change, ideally in ways that make new behaviors easier and more desirable to follow than existing patterns of behavior.

  20. Leadership Institutional Change Principle

    Energy.gov [DOE]

    For changing behavior among employees, leaders in Federal agencies should visibly communicate their own commitments to sustainability in the workplace. Such visible leadership will help achieve sustainability goals in the short term and continue to provide motivation for long-term benefits.

  1. Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2009-06-01

    Corrective Action Unit (CAU) 372 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 372 is comprised of the four corrective action sites (CASs) listed below: • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on February 10, 2009, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; Desert Research Institute, and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 372.

  2. National Federal Fleet Loaner Program, Interim Status Report

    SciTech Connect

    Francfort, James Edward

    2000-10-01

    The goal of the U.S. Department of Energy's (DOE) Loaner Program is to increase the awareness, deployment, and use of electric vehicles (EVs) in Federal fleets. The Loaner Program accomplishes this by providing free EVs to Federal fleets on a loaner basis, generally for 1 or 2 months. The Program partners DOE with six electric utilities, with DOE providing financial support and some leads on Federal fleets interested in obtaining EVs. The utilities obtain the vehicles, identify candidate loaner fleets, loan the vehicles, provide temporary charging infrastructure, provide overall support to participating Federal fleets, and support fleets with their leasing decisions. While the utilities have not had the success initially envisioned by themselves, DOE, the Edison Electric Institute, and the Electric Vehicle Association of the Americas, the utilities can not be faulted for their efforts, as they are not the entity that makes the ultimate lease or no-lease decision. Some external groups have suggested to DOE that they direct other federal agencies to change their processes to make loaning vehicles easier; this is simply not within the power of DOE. By law, a certain percentage of all new vehicle acquisitions are supposed to be alternative fuel vehicles (AFV); however, with no enforcement, the federal agencies are not compelled to lease AFVs such as electric vehicles.

  3. SOUTHEASTERN FEDERAL POWER ALLIANCE Martin Luther King, Jr. Federal...

    Energy.gov [DOE] (indexed site)

    Martin Luther King, Jr. Federal Building 77 Forsyth Street SW, Atlanta, GA 30303 November 6, 2014 November 5, 2014: Meet at the Glenn Hotel lobby at 6:00 p.m. to walk to...

  4. Ethiopian Development Research Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Ethiopian Development Research Institute Jump to: navigation, search Logo: Ethiopian Development Research Institute Name: Ethiopian Development Research Institute Address: Ethiopia...

  5. Utilization Technology Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Utilization Technology Institute Jump to: navigation, search Name: Utilization Technology Institute Place: Des Plaines, IL References: Utilization Technology Institute1...

  6. MASSACHUSETTS INSTITUTE OF TECHNOLOGY | Princeton Plasma Physics...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    MASSACHUSETTS INSTITUTE OF TECHNOLOGY American Fusion News Category: Massachusetts Institute of Technology (MIT) Link: MASSACHUSETTS INSTITUTE OF TECHNOLOGY...

  7. CMI Social Media | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Social Media Facebook: Critical Materials Institute Twitter: CMI_hub LinkedIn: Critical Materials Institute Flickr: Critical Materials Institute

  8. Corrective Action Decision Document for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Mark Krause

    2010-08-01

    This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drain • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective

  9. Institutional Change Process Step 2: Assess Institutional Rules, Roles, and

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Tools | Department of Energy 2: Assess Institutional Rules, Roles, and Tools Institutional Change Process Step 2: Assess Institutional Rules, Roles, and Tools Graphic of the Institutional Change Continuous Improvement Process gear. The steps begin with Determine Goals and move to Assess Institutional Rules, Roles and Tools then to Develop Action Plan then to Implement Plan then finally to Measure and Evaluate. The process begins again with Determine Goals. Determine Goals Develop Action Plan

  10. Federal Advisory Committee Management | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Advisory Committee Management Federal Advisory Committee Management The Federal Advisory Committee Management Program assures the Department of Energy's overall compliance with the Federal Advisory Committee Act (FACA). The program is located in the Office of the Executive Secretariat. Federal Advisory Committee Act The Federal Advisory Committee Act of 1972 (Public Law 92-463) establishes the policies and minimum requirements for Federal agencies to manage and administer advisory

  11. Use of Institutional Controls

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-04-09

    The Policy ensures that the Department of Energy will use institutional controls in the management of resources, facilities and properties under its control, and in implementing its programmatic responsibilities. Certified 1-28-11. Supersedes DOE P 454.1, dated 4-9-03.

  12. Use of Institutional Controls

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-04-09

    The Policy ensures that the Department of Energy will use institutional controls in the management of resources, facilities and properties under its control, and in implementing its programmatic responsibilities. Certified 1-28-11. Superseded by Chg 1 (Admin Chg), dated 12-7-15.

  13. Corrective Action Decision Document/Closure Report for Corrective Action Unit 557: Spills and Tank Sites, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2009-05-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 557, Spills and Tank Sites, in Areas 1, 3, 6, and 25 of the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order. Corrective Action Unit 557 comprises the following corrective action sites (CASs): • 01-25-02, Fuel Spill • 03-02-02, Area 3 Subdock UST • 06-99-10, Tar Spills • 25-25-18, Train Maintenance Bldg 3901 Spill Site The purpose of this Corrective Action Decision Document/Closure Report is to identify and provide the justification and documentation that supports the recommendation for closure of the CAU 557 CASs with no further corrective action. To achieve this, a corrective action investigation (CAI) was conducted from May 5 through November 24, 2008. The CAI activities were performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 557: Spills and Tank Sites, Nevada Test Site, Nevada.

  14. Energy Conservation Program: Establishment of Procedures for Requests for Correction of Errors in Rules

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    establishment of procedures for requests for correction of errors in rules is an action issued by the Department of Energy. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document. 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 430 and

  15. Federal Buildings Supplemental Survey 1993

    Energy Information Administration (EIA) (indexed site)

    3. Consumption and Expenditures for Sum of Major Fuels, Electricity, and Natural Gas in FBSS Buildings in Federal Region 3, 1993 Sum of Sum of Major Major Electricity Natural...

  16. Federal Substance Abuse Testing Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2014-01-30

    The Order establishes the requirements and responsibilities for the DOE Federal Substance Abuse Testing Program which covers drug and alcohol testing. Supersedes DOE O 3792.3 Chg 1.

  17. Federal Government Project Performance Benchmarks

    Energy.gov [DOE]

    Reports five major performance metrics that can be used to benchmark proposed energy service company projects within the federal government, disaggregated and reported by major retrofit strategy. Author: U.S. Department of Energy

  18. Federal Laboratory Consortium National Meeting

    Energy.gov [DOE]

    Each year, the Federal Laboratory Consortium for Technology Transfer (FLC) holds a national meeting where technology transfer (T2) professionals can hear from some of the most forward-thinking...

  19. * Milepost Federal Energy Regulatory Commission

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... L.P. CEQ Council on Environmental Quality CFR Code of Federal Regulations CGT Columbia Gulf ... the late 1970s at the Naval Weapons Center in China Lake, California. ...

  20. Sustainability in Existing Federal Buildings

    Energy.gov [DOE]

    For meeting federal sustainability requirements, agencies can use evaluation methods, such as benchmarking and energy audits, and planning to make existing buildings energy efficient. Agencies can follow these steps to comply with energy reduction requirements.

  1. Award Categories Federal Small Business

    Energy.gov [DOE] (indexed site)

    ... As a result of BEST's relationship with Y-12, the company has obtained an NQA-1 based QA Program that can now be recognized all across the DOE Federal complex. BEST developed and ...

  2. Corrective Action Decision Document/Closure Report for Corrective Action Unit 383: Area E-Tunnel Sites, Nevada Test Site

    SciTech Connect

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile • CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.

  3. Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    Wickline, Alfred

    2006-12-01

    , to determine the potential for a release; (7) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes; and (8) Collect quality control samples. This Corrective Action Investigation Document (CAIP) has been developed in accordance with the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, U.S. Department of Energy, and U.S. Department of Defense. Under the FFACO, this CAIP will be submitted to the Nevada Division of Environmental Protection for approval. Field work will be conducted following approval.

  4. Litchfield Correctional Center District Heating Low Temperature...

    OpenEI (Open Energy Information) [EERE & EIA]

    Litchfield Correctional Center District Heating Low Temperature Geothermal Facility Jump to: navigation, search Name Litchfield Correctional Center District Heating Low Temperature...

  5. Re: Corrected Memorandum Summarizing Ex Parte Communication

    Office of Environmental Management (EM)

    via email) Re: Corrected Memorandum Summarizing Ex Parte Communication This memorandum is submitted to revise and correct our earlier memorandum submitted on September 23 rd . ...

  6. Federal Renewable Energy Screening Assistant

    SciTech Connect

    Shelpuk, B; Walker, A

    1994-10-01

    The Federal Renewable Energy Screening Assistant is a software tool to be used by energy auditors to prioritize future studies of potentially cost-effective renewable energy applications at federal facilities. This paper describes the structure and function of the tool, gives an inventory of renewable energy technologies represented in the tool, and briefly describes the algorithms used to rank opportunities by the savings-to-investment ratio.

  7. Federal Authorities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Authorities Federal Authorities DOE is the Sector Specific Agency (SSA) for Energy and within the Department ISER oversees all activities associated with the National Infrastructure Protection Plan (NIPP) and the Energy Sector Specific Plan (SSP). In doing so, ISER maintains a close partnership with the two Energy Sector Coordinating Councils (SCCs), the Electricity SCC and the Oil and Natural Gas SCC, and governmental partners through the Critical Infrastructure Protection Advisory

  8. Federal technology policy in transition

    SciTech Connect

    Carnes, K.H.

    1995-12-31

    This paper discusses federal energy and environmental policies and their impact on the U.S. economy. A brief history of the federal government`s role in developing scientific and technological infrastructure is given. Current trends in technology are summarized, with an emphasis on global aspects, and their impact on the economy is discussed. The need for a national technology policy, including continued research and development funding, is discussed and key elements of such a policy are outlined.

  9. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ballasts; Notice of Proposed Rulemaking | Department of Energy 4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14,

  10. Closure Report for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2009-06-30

    Corrective Action Unit (CAU) 134 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Aboveground Storage Tanks” and consists of the following four Corrective Action Sites (CASs), located in Areas 3, 15, and 29 of the Nevada Test Site: · CAS 03-01-03, Aboveground Storage Tank · CAS 03-01-04, Tank · CAS 15-01-05, Aboveground Storage Tank · CAS 29-01-01, Hydrocarbon Stain

  11. Corrective Action Decision Document for Corrective Action Unit 145: Wells and Storage Holes, Nevada Test Site, Nevada, Rev. No.: 0, with ROTC No. 1 and Addendum

    SciTech Connect

    David Strand

    2006-04-01

    This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 145, Wells and Storage Holes in Area 3 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 145 is comprised of the following corrective action sites (CASs): (1) 03-20-01, Core Storage Holes; (2) 03-20-02, Decon Pad and Sump; (3) 03-20-04, Injection Wells; (4) 03-20-08, Injection Well; (5) 03-25-01, Oil Spills; and (6) 03-99-13, Drain and Injection Well. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the six CASs within CAU 145. Corrective action investigation activities were performed from August 1, 2005, through November 8, 2005, as set forth in the CAU 145 Corrective Action Investigation Plan and Record of Technical Change No. 1. Analytes detected during the Corrective Action Investigation (CAI) were evaluated against appropriate final action levels to identify the contaminants of concern for each CAS. The results of the CAI identified contaminants of concern at one of the six CASs in CAU 145 and required the evaluation of corrective action alternatives. Assessment of the data generated from investigation activities conducted at CAU 145 revealed the following: CASs 03-20-01, 03-20-02, 03-20-04, 03-20-08, and 03-99-13 do not contain contamination; and CAS 03-25-01 has pentachlorophenol and arsenic contamination in the subsurface soils. Based on the evaluation of analytical data from the CAI, review of future and current operations at the six CASs, and the detailed and comparative analysis of the potential corrective action alternatives, the following corrective actions are recommended for CAU 145. No further action is the preferred corrective action for CASs 03-20-01, 03-20-02, 03-20-04, 03-20-08, and 03-99-13. Close in place is the preferred corrective action for CAS 03-25-01. The

  12. 1998 federal energy and water management award winners

    SciTech Connect

    1998-10-28

    Energy is a luxury that no one can afford to waste, and many Federal Government agencies are becoming increasingly aware of the importance of using energy wisely. Thoughtful use of energy resources is important, not only to meet agency goals, but because energy efficiency helps improve air quality. Sound facility management offers huge savings that affect the agency`s bottom line, the environment, and workplace quality. In these fiscally-modest times, pursuing sound energy management programs can present additional challenges for energy and facility managers. The correct path to take is not always the easiest. Hard work, innovation, and vision are characteristic of those who pursue energy efficiency. That is why the Department of energy, Federal Energy Management Program (FEMP) is proud to salute the winners of the 1998 Federal Energy and Water Management Award. The 1998 winners represent the kind of 21st century thinking that will help achieve widespread Federal energy efficiency. In one year, the winners, through a combination of public and private partnerships, saved more than $222 million and 10.5 trillion Btu by actively identifying and implementing energy efficiency, water conservation, and renewable energy projects. Through their dedication, hard work, ingenuity, and success, the award winners have also inspired others to increase their own efforts to save energy and water and to more aggressively pursue the use of renewable energy sources. The Federal Energy and Water Management Awards recognize the winners` contributions and ability to inspire others to take action.

  13. Cyclotron Institute » Education

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Education The Cyclotron Institute provides education and training in nuclear science at the undergraduate, graduate, and postdoctoral levels. Faculty teach a variety of courses in nuclear chemistry and nuclear physics. Research is emphasized at the graduate and postdoctoral levels, although we also have a Research Experience for Undergraduates Program each summer. Finally, we also participate in the Saturday Morning Physics program for high school students each spring.

  14. Cyclotron Institute » Research

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Student Analyzing Data The Institute research program focuses on the atomic nucleus, a many-body system of strongly interacting constituents bound together by the strongest forces known in nature. The properties investigated often can be described in terms of the motions of single nucleons (neutrons and protons), the correlated motions of several nucleons, and the collective motions of many nucleons. On a finer scale, they can be understood in terms of the degrees of freedom of quarks

  15. Research | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Four Research Thrusts organizational chart of four research thrusts (A click on the org chart image will lead to a pdf version that includes hotlinks for the e-mail addresses for leaders.) CMI has more than 30 projects focused in four areas. Project titles are available in a table, which can be sorted by project leader, location of project leader, project title or project number. CMI research is conducted at partner institutions, including national laboratories, universities and

  16. ORGANIZATIONAL CHART - CYCLOTRON INSTITUTE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    INSTITUTE April 1, 2000 - March 31, 2001 Health Physics Rodriguez DIRECTOR Natowitz SEE Line Proj. Manager Clark Horvat Hyman Utley Senior ME Derrig Graduate Students Research Associates Research Scientists Research Group Leaders Administration Harris Wellmann Batson Valerian Deason Computer Syst. Hagel Burch Student Wkrs Senior Acc. Phys. May Acc. Phys. Kim Clark Operations Chief Abegglen Target Maker Utley Building Maintenance Mynar Gallegos Kingsbury Shumbera Electrical Shop Cowden Haisler

  17. Nuclear Energy Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    (NEI) Summit Presentation University-Industry- Laboratory Partnerships: Gauging Effectiveness Douglas Kothe, CASL Director Oak Ridge National Laboratory February 26, 2014 CASL-U-2014-0355-000 CASL-U-2014-0355-000 University-Industry-Laboratory Partnerships Gauging Effectiveness CASL: The Consortium for Advanced Simulation of Light Water Reactors A DOE Energy Innovation Hub Douglas B. Kothe Oak Ridge National Laboratory Director, CASL 9 th Nuclear Energy R&D Summit Nuclear Energy Institute

  18. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1-March 31, 2002 2001 April 10 Dr. Massimo Di Toro, LNS/INFN and the University of Catania, Italy Isospin Effects on Nuclear Dynamics April 12 Dr. C. Lewis, U.S. Environmental Protection Agency, Research Triangle, North Carolina Air Pollution Research Using Radiocarbon Measurements April 17 Professor Olga Kocharovskaya, Department of Physics, Texas A&M University, College Station, Texas Laser Control of Mossbauer Nuclear Transitions May 1 Dr. Bency John, Cyclotron Institute, Texas A&M

  19. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6-March 31, 2007 2006 April 6 Dr. Jamal Jalilian-Marian, Institute for Nuclear Theory, University of Washington, Seattle, Washington An Introduction to Particle Production in High Energy Nuclear Collisions April 7 Professor Taka Kajino, National Astronomical Observatory, University of Tokyo, Tokyo, Japan A Frontier of Nuclear Astrophysics: Big-Bang Cosmology and Supernova Nucleosynthesis April 19 Dr. Anna Stasto, Brookhaven National Laboratory, Upton, New York High Energy Limit and Parton

  20. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7-March 31, 2008 2007 April 5 Dr. Nigel Orr, Laboratoire de Physique Corpusculaire, Universite de Caen Basse-Normandie, France Probing Nuclear Structure Far from Stability: from Breakup to Knockout April 10 Dr. Lie-wen Chen, Institute of Theoretical Physics, Shanghai Jiao Tong University, Shanghai, China Probing the Nuclear Symmetry Energy with Heavy-Ion Reactions Induced by Neutron- Rich Nuclei April 11 Dr. Nigel Orr, Laboratoire de Physique Corpusculaire, Universite de Caen Basse-Normandie,

  1. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    09-March 31, 2010 2009 April 17 Professor Jian-Wei Qiu, Department of Physics and Astronomy, Iowa State University, Ames, Iowa and Brookhaven National Laboratory, Upton, New York QCD and High Energy Nuclear Collisions April 21 Dr. Peter Levai, KFKI Research Institute for Particle and Nuclear Physics, Budapest, Hungary Can We Find Quark-Gluon Plasma in pp Collision at LHC? April 28 Professor Wolfgang Mittig, NSCL, Michigan State University, East Lansing, Michigan Nuclear Power and Global Energy

  2. Corrective Action Investigation Plan for Corrective Action Unit 562: Waste Systems Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2009-04-01

    Conduct radiological surveys. • Perform field screening. • Collect and submit environmental samples for laboratory analysis to determine the nature and extent of any contamination released by each CAS. • Collect samples of source material to determine the potential for a release. • Collect samples of potential remediation wastes. • Collect quality control samples. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; DOE, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996; as amended February 2008). Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  3. Federal Utility Program Overview (Fact Sheet)

    SciTech Connect

    Not Available

    2009-07-01

    Fact sheet overview of the U.S. Department of Energy (DOE) Federal Energy Management Program's (FEMP) Federal Utility Program, including common contracts and services available to Federal agencies through local serving utilities.

  4. Biomass Resources for the Federal Sector

    SciTech Connect

    Not Available

    2005-08-01

    Biomass Resources for the Federal Sector is a fact sheet that explains how biomass resources can be incorporated into the federal sector, and also how they can provide opportunities to meet federal renewable energy goals.

  5. Federal Acquisition Circular 2005-58

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-58 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on April 18, 2012 at 77 FR 23363.

  6. Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    Federal Acquisition Circular 2005-37, which makes miscellaneous changes to the Federal Acquisition Regulation, was published in the October 14,2009, issue of the Federal Register. A summary of the changes is attached.

  7. SOUTHEASTERN FEDERAL POWER ALLIANCE Sam Nunn Federal Building

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sam Nunn Federal Building 61 Forsyth Street SW, Atlanta, GA 30303 April 12, 2016 April 11, 2016: Meet on the Glenn Hotel roof at 5:30 p.m. to partake of the manager's welcome wine tasting reception. At 6:15 we will walk to Dutch-treat dinner at Der Biergarten, 300 Marietta St NW, Atlanta, GA 30313. April 12, 2016: The meeting will begin at 8:30 a.m. in the Sam Nunn Federal Building, Social Security Administration's conference room on the 20 th floor, Room 20T110. Breaks will be announced based

  8. Anti-double dipping rules for federal tax incentives

    SciTech Connect

    Ing, E.T.C.

    1997-12-31

    Political as well as technological changes are now reshaping the electric utility industry. While accommodating these changes, state legislative and regulatory agencies have the opportunity to promote public policies. In this regard, various state entities are evaluating appropriate incentives for renewable energy development so as to introduce greater competition in electric generation. For example, the California legislature is considering a supplemental production payment and the State of Iowa has instituted a low-interest loan program for wind and other alternative energy generation. By complementing the existing federal tax incentives, state incentives can spur the wind industry`s growth. If structured in the wrong way, however, state assistance programs will undercut the value of the federal tax incentives. The federal anti-double dipping rules apply to certain state programs. If a developer utilizes the wrong type of state assistance for a wind project, the anti-double dipping rules will reduce the federal tax incentives and this in turn will decrease the project`s profitability. Rather than suffer these results, very few if any developer will use the state program. Despite the time and effort a state may expend to enact a program for alternative energy development, the state assistance will be ineffectual. This paper reviews the counterproductive results which state assistance can have on a wind project because of the federal anti-double dipping rules.

  9. Guidance for Federal Agencies on E.O. 13514 Section 12, Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management Guidance for Federal Agencies on E.O. 13514 Section 12, Federal Fleet Management Document provides guidance on ...

  10. Federal Metering Requirements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Metering Requirements Federal Metering Requirements Presentation-given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting-covers the 42 USC 8253 Energy Management Requirement; Executive Order 13514(g) High-Performance Sustainable Federal Buildings; federal metering needs, history, and status; and utility/agency opportunities. Download the Federal Metering Requirements presentation given by Brad Gustafson. (351.32 KB) More Documents & Publications Federal Utility

  11. Federal Workplace Charging Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Workplace Charging Workshop Federal Workplace Charging Workshop Over 50 different federal organizations convened at the October 2016 Federal Workplace Charging Workshop, co-organized by the White House Council on Environmental Quality and the Workplace Charging Challenge. Attendees learned about federal workplace charging authority and federal employee charging guidance from the White House. They also heard from agencies that already offer charging to their employees and shared best

  12. FEDERAL FINANCING PROGRAMS for CLEAN ENERGY

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FEDERAL FINANCING PROGRAMS for CLEAN ENERGY FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY * 2016 | INSIDE COVER THIS PAGE INTENTIONALLY LEFT BLANK FOR PRINTING CONTENTS Foreword 3 Acknowledgements 5 Indexes of Federal Financing Programs for Clean Energy 6 * Federal Financing Programs for Clean Energy by Administering Agency * Federal Financing Programs for Clean Energy by Program Type Profiles of Federal Financing Programs 11 for Clean Energy by Agency * United States Department of Energy (DOE) *

  13. Mr. Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection

    Office of Legacy Management (LM)

    Tim Murphy, Chief Bureau of Federal Facilities Division of Environmental Protection 2030 E. Flamingo Road, Suite 230 Las Vegas, NV 89119-0818 October 11, 2011 PATH FORWARD: 2011 SHORT-TERM DATA ACQUISITION PLAN PROJECT SHOAL AREA, SUB SURF ACE CORRECTIVE ACTION UNIT 447, NEVADA Dear Mr. Murphy: The U.S. Department of Energy (DOE) Office of Legacy Management (LM) is providing this Short-Term Data Acquisition Plan for the Project Shoal Area (Shoal), Subsurface Corrective Action Unit 447, near

  14. Federal Energy Efficiency through Utility Partnerships

    SciTech Connect

    Not Available

    2007-08-01

    Two-page fact sheet on FEMP's Federal Utility Program that works with federal agencies and their utilities to reduce energy use.

  15. Federal Energy and Water Management Awards 2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jeff Hernbloom U.S. Department of Transportation Federal Aviation Administration Kansas ... the program throughout the Federal Aviation Administration, with savings of nearly ...

  16. NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION ACT OF 2002 Public Law NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION ACT OF 2002 (95.77 ...

  17. Federally Led Accident Investigation Reports | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federally Led Accident Investigation Reports Federally Led Accident Investigation Reports Includes Pre-March 2011 Type A Reports June 1, 1999 Type A Accident Investigation Board...

  18. Certified Federal Project Directors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certified Federal Project Directors Certified Federal Project Directors Updated on September 12, 2016. CertifiedFPDs9-12-2016.pdf (143.56

  19. Federal Progress Toward Energy/Sustainability Goals

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Progress Toward Energy Sustainability Goals June 10, 2014 Chris Tremper Program Analyst, Federal Energy Management Program U.S. Department of Energy 2 Overall Federal Energy...

  20. Federal Loan Program | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    less. In recent years, the federal government has offered loans for renewables and energy efficiency projects. 1 Federal Loan Program Incentives CSV (rows 1 - 13) Incentive...

  1. Memorandum: Regarding Delegation of Designated Federal Officials...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Memorandum: Regarding Delegation of Designated Federal Officials for Site Specific Advisory Boards Memorandum: Regarding Delegation of Designated Federal Officials for Site ...

  2. Federal NEPA Contacts | Department of Energy

    Energy Saver

    Federal NEPA Contacts CEQ and most Federal agencies identify primary points of contact for NEPA compliance. Normally a senior environmental professional, environmental law...

  3. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Register Notice, Volume 80, No. 42 - March 4, 2015 Application from Sempra to export electric energy to Mexico. Federal Register Notice. February 17, 2015 Electricity...

  4. Federal Thought Leaders Roundtable Video Transcript

    Energy.gov [DOE]

    First Thursday Seminar. Federal Thought Leaders Roundtable. Federal energy and environmental leaders share insights and discuss sustainability goals, policies, and initiatives. Energy champions...

  5. Idaho National Engineering Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Federal Facility Agreement and Consent Order State Idaho Agreement Type Federal Facility Agreement Legal Driver(s) CERCLA Scope Summary Ensure that the environmental impacts...

  6. Lawrence Livermore National Laboratory Federal Facility Agreement...

    Office of Environmental Management (EM)

    Site 300) Agreement Name Lawrence Livermore National Laboratory Federal Facility Agreement Under CERCLA Section 120, June 29, 1992 State California Agreement Type Federal Facility ...

  7. German Renewable Energy Federation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Federation Jump to: navigation, search Name: German Renewable Energy Federation Place: Paderborn, Germany Zip: 33100 Sector: Renewable Energy Product: Paderborn-based pressure...

  8. Federal Energy Subsidies | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Federal Energy Subsidies Jump to: navigation, search Does wind energy receive federal subsidies, and if so how much? Do other forms of energy receive subsidies? Do fossil fuels...

  9. Competing Federal Utility Energy Service Contracts | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Competing Federal Utility Energy Service Contracts Competing Federal Utility Energy Service Contracts Opening utility energy service contracts to competing franchised utility ...

  10. Federal Utility Partnership Working Group Utility Partners

    Energy.gov [DOE]

    Federal Utility Partnership Working Group (FUPWG) utility partners are eager to work closely with Federal agencies to help achieve energy management goals.

  11. Federal Renewable Energy Projects and Technologies | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Federal Energy Management Program (FEMP) provides resources and tools that help ... of electricity consumed by the federal government is to come from renewable energy ...

  12. Funding Mechanisms for Federal Geothermal Permitting (Presentation)

    SciTech Connect

    Witherbee, K.

    2014-03-01

    This presentation is about the GRC paper, which discusses federal agency revenues received for geothermal projects and potential federal agency budget sources for processing geothermal applications.

  13. Federal Acquisition Circular 2005-53

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-53 which makes miscellaneous changes to the Federal Acquisition Regulation.

  14. Federal Acquisition Circular 2005-39

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-39 which makes miscellaneous changes to the Federal Acquisition Regulation.

  15. FY 2008 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2008 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2008 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  16. FY 2010 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2010 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2010 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  17. FY 2009 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2009 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2009 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  18. FY 2006 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2006 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2006 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  19. FY 2007 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2007 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2007 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  20. FY 2011 Honeywell Federal Manufacturing & Technologies, LLC,...

    National Nuclear Security Administration (NNSA)

    FY 2011 Honeywell Federal Manufacturing & Technologies, LLC, PER Summary SUMMARY OF FY 2011 HONEYWELL FEDERAL MANUFACTURING & TECHNOLOGIES, LLC, AWARD FEE DETERMINATION Total ...

  1. Federal Business Opportunities website | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Opportunities website Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: Federal Business Opportunities website Abstract This website lists federal...

  2. Federal Buildings Supplemental Survey - Index Page

    Energy Information Administration (EIA) (indexed site)

    Buildings 1993 Federal Buildings Supplemental Survey Overview Full Report Tables Energy usage and energy costs, by building characteristics, for federally-owned buildings in...

  3. Federal Highway Administration | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Administration Jump to: navigation, search Logo: Federal Highway Administration Name: Federal Highway Administration Abbreviation: FHWA Address: 1200 New Jersey Ave, SE Place:...

  4. 2006 National Electric Transmission Congestion Study Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 National Electric Transmission Congestion Study Federal Register Notice & Comments 2006 National Electric Transmission Congestion Study Federal Register Notice & Comments The...

  5. Designation Memo: Federal Technical Capability Panel Chairperson...

    Energy Saver

    Federal Technical Capability Panel Chairperson Designation Memo: Federal Technical Capability Panel Chairperson May 4, 2007, the Deputy Secretary memorandum designating Karen ...

  6. Federal Acquisition Circular 2005-63

    Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment published in the December 10, 2012 Federal Register at 77 FR 73516 implements FAR Case 2012–030 Iran Threat Reduction.

  7. SOUTHEASTERN FEDERAL POWER ALLIANCE- November 6, 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Southeastern Federal Power Alliance meeting was held on November 6,2014 in the Martin Luther King, Jr. Federal Building in Atlanta, Georgia.

  8. Federal Utility Partnership Working Group Seminar: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Seminar: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Presentation covers the Federal Utility Partnership Working Group Seminar: Chairman's ...

  9. Federal Utility Partnership Working Group Meeting: Chairman's...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Utility Partnership Working Group Meeting: Chairman's Corner Presentation-given at the April 2012 Federal Utility Partnership Working Group (FUPWG) meeting-lists key ...

  10. Federal Utility Partnership Working Group Meeting: Washington...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Utility Partnership Working Group Meeting: Washington Update PDF icon fupwgspring12unruh.pdf More Documents & Publications Federal Utility Partnership Working Group ...

  11. FEDERAL FINANCING PROGRAMS for CLEAN ENERGY

    Energy.gov [DOE] (indexed site)

    FEDERAL FINANCING PROGRAMS for CLEAN ENERGY FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY * 2016 | INSIDE COVER THIS PAGE INTENTIONALLY LEFT BLANK FOR PRINTING CONTENTS Foreword 3 ...

  12. The Preface on pages xvii-xix has been altered to correct a

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Preface on pages xvii-xix has been altered to correct a typesetting error in the printed book. All of the text is unchanged, but sections of the text have been rearranged to place paragraphs in the proper order. Rickover and the Nuclear Navy Rickover and the Nuclear Navy THE DISCIPLINE OF TECHNOLOGY by Francis Duncan Naval Institute Press Annapolis, Maryland Published 1989 by the United States Naval Institute Annapolis, Maryland Copyright © 1989 on the foreword All rights reserved. Prepared

  13. Cyclotron Institute REU Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NOW TAKING APPLICATIONS FOR SUMMER 2017 REU! "Texas A&M Science - Labors of Lab." REU student Kassie Marble featured in TAMU College of Science Video The Texas A&M Cyclotron Institute, with support from the National Science Foundation, serves as a Research Experiences for Undergraduates site during the summer of each year. Alysssa Dibidad in the K150 control room. This REU site focuses on research in nuclear and particle science. Students will have the opportunity to work

  14. Cyclotron Institute » Publications

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Publications Cyclotron Institute Upgrade White Paper Annual Reports 2015-2016 (full report) 2014-2015 (full report) 2013-2014 (full report) 2012-2013 (full report) 2011-2012 (full report) 2010-2011 (full report) 2009-2010 (full report) 2008-2009 (full report) 2007-2008 (full report) 2006-2007 (full report) 2005-2006 (full report) 2004-2005 (full report) 2003-2004 (full report) 2002-2003 (full report) 2001-2002 2000-2001 1999-2000 1998-1999

  15. Cyclotron Institute » Tours

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Tours We do offer tours of our facility to educational groups on a limited basis. Visitors will learn how a cyclotron works and get to see the ion source, control room, and one of the experimental halls. Unfortunately, access to the cyclotron itself is dictated by operational constraints which cannot be predicted in advance. If you would like to schedule a tour of the Cyclotron Institute, please contact Julie Anderson at unulldnulle TOD umat nullTnullOD pmnulloc TA nosrednullnnullAJnull or

  16. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    INSPECTION REPORT: INS-O-15-02 INSPECTION REPORT: INS-O-15-02 April 2, 2015 Allegation Regarding Human Reliability Program Unsuitable Reportable Behaviors at the Office of Secure Transportation Publically available version of the OUO report issued in November 2014. FREQUENTLY REQUESTED FOIA: Inspection Report: INS-O-15-02 (1008.14 KB) More Documents & Publications Inspection Report: INS-O-15-02 FIA-15-0058 - In the Matter of Bradley P. Jones Inspection Report: DOE/IG-0921

    INSTITUTE

  17. INSTITUTE COLLOQUIA AND SEMINARS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4-March 31, 2005 2004 April 8 Dr. Jeffrey W. Martin, Kellogg Radiation Laboratory, California Institute of Technology, Pasadena, California Ultracold Neutrons April 20 Professor J. W. Watson, Department of Physics, Kent State University, Kent, Ohio Short-range Correlations in Nuclei from (p,2p+n) and (e,e'p+N) Measurements May 10 Mr. Sean Liddick, NSCL- Michigan State University, East Lansing, Michigan The Evolution of Shell Structure in the A~60 Mass Region May 25 Dr. Juha Ärje, Department of

  18. Corrective Action Decision Document/Closure Report for Corrective Action Unit 504: 16a-Tunnel Muckpile, Nevada Test Site

    SciTech Connect

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 504, 16a-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 504 is comprised of four Corrective Action Sites (CASs): • 16-06-01, Muckpile • 16-23-01, Contaminated Burial Pit • 16-23-02, Contaminated Area • 16-99-01, Concrete Construction Waste Corrective Action Site 16-23-01 is not a burial pit; it is part of CAS 16-06-01. Therefore, there is not a separate data analysis and assessment for CAS 16-23-01; it is included as part of the assessment for CAS 16-06-01. In addition to these CASs, the channel between CAS 16-23-02 (Contaminated Area) and Mid Valley Road was investigated with walk-over radiological surveys and soil sampling using hand tools. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 504. A CADD was originally submitted for CAU 504 and approved by the Nevada Division of Environmental Protection (NDEP). However, following an agreement between NDEP, DTRA, and the DOE, National Nuclear Security Administration Nevada Site Office to change to a risk-based approach for assessing the corrective action investigation (CAI) data, NDEP agreed that the CAU could be re-evaluated using the risk-based approach and a CADD/CR prepared to close the site.

  19. Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2009-02-01

    dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.

  20. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2009-03-31

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12

  1. Corrective Action Plan for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-04-01

    Corrective Action Unit (CAU) 543: Liquid Disposal Units is listed in Appendix III of the ''Federal Facility Agreement and Consent Order'' (FFACO) which was agreed to by the state of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). CAU 543 sites are located in Areas 6 and 15 of the Nevada Test Site (NTS), which is approximately 65 miles northwest of Las Vegas, Nevada. CAU 543 consists of the following seven Corrective Action Sites (CASs) (Figure 1): CAS 06-07-01, Decon Pad; CAS 15-01-03, Aboveground Storage Tank; CAS 15-04-01, Septic Tank; CAS 15-05-01, Leachfield; CAS 15-08-01, Liquid Manure Tank; CAS 15-23-01, Underground Radioactive Material Area; and CAS 15-23-03, Contaminated Sump, Piping. All Area 15 CASs are located at the former U.S. Environmental Protection Agency (EPA) Farm, which operated from 1963 to 1981 and was used to support animal experiments involving the uptake of radionuclides. Each of the Area 15 CASs, except CAS 15-23-01, is associated with the disposal of waste effluent from Building 15-06, which was the primary location of the various tests and experiments conducted onsite. Waste effluent disposal from Building 15-06 involved piping, sumps, outfalls, a septic tank with leachfield, underground storage tanks, and an aboveground storage tank (AST). CAS 15-23-01 was associated with decontamination activities of farm equipment potentially contaminated with radiological constituents, pesticides, and herbicides. While the building structures were removed before the investigation took place, all the original tanks, sumps, piping, and concrete building pads remain in place. The Area 6 CAS is located at the Decontamination Facility in Area 6, a facility which operated from 1971 to 2001 and was used to decontaminate vehicles, equipment, clothing, and other materials that had become contaminated during nuclear testing activities. The CAS includes the effluent collection and distribution systems for Buildings

  2. Corrective Action Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2007-10-01

    Corrective Action Unit (CAU) 166, Storage Yards and Contaminated Materials, is listed in the Federal Facility Agreement and Consent Order (FFACO) of 1996 (FFACO, 1996). CAU 166 consists of seven Corrective Action Sites (CASs) located in Areas 2, 3, 5, and 18 of the Nevada Test Site (NTS), which is located approximately 65 miles northwest of Las Vegas, Nevada (Figure 1). CAU 166 consists of the following CASs: (1) CAS 02-42-01, Cond. Release Storage Yd - North; (2) CAS 02-42-02, Cond. Release Storage Yd - South; (3) CAS 02-99-10, D-38 Storage Area; (4) CAS 03-42-01, Conditional Release Storage Yard; (5) CAS 05-19-02, Contaminated Soil and Drum; (6) CAS 18-01-01, Aboveground Storage Tank; and (7) CAS 18-99-03, Wax Piles/Oil Stain. Details of the site history and site characterization results for CAU 166 are provided in the approved Corrective Action Investigation Plan (CAIP) (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2006) and in the approved Corrective Action Decision Document (CADD) (NNSA/NSO, 2007).

  3. Corrective Action Decision Document/Closure Report for Corrective Action Unit 559: T Tunnel Compressor/Blower Pad, Nevada Test Site

    SciTech Connect

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 559.

  4. Corrective Action Decision Document/Closure Report for Corrective Action Unit 477: Area 12 N-Tunnel Muckpile, Nevada Test Site

    SciTech Connect

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAU 477.

  5. Corrective Action Decision Document/Closure Report for Corrective Action Unit 476: Area 12 T-Tunnel Muckpile, Nevada Test Site

    SciTech Connect

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 476, Area 12 T-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 476 is comprised of one Corrective Action Site (CAS): • 12-06-02, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 476.

  6. Corrective Action Decision Document/Closure Report for Corrective Action Unit 478: Area 12 T-Tunnel Ponds, Nevada Test Site

    SciTech Connect

    NSTec Environmental Restoration

    2010-03-15

    This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictions for CAU 478.

  7. Corrective Action Investigation Plan for Corrective Action Unit 409: Other Waste Sites, Tonopah Test Range, Nevada (Rev. 0)

    SciTech Connect

    DOE /NV

    2000-10-05

    This Corrective Action Investigation Plan contains the U.S. Department of Energy, Nevada Operations Office's approach to collect the data necessary to evaluate corrective action alternatives appropriate for the closure of Corrective Action Unit (CAU) 409 under the Federal Facility Agreement and Consent Order. Corrective Action Unit 409 consists of three Corrective Action Sites (CASs): TA-53-001-TAB2, Septic Sludge Disposal Pit No.1; TA-53-002-TAB2, Septic Sludge Disposal Pit No.2; and RG-24-001-RGCR, Battery Dump Site. The Septic Sludge Disposal Pits are located near Bunker Two, close to Area 3, on the Tonopah Test Range. The Battery Dump Site is located at the abandoned Cactus Repeater Station on Cactus Peak. The Cactus Repeater Station was a remote, battery-powered, signal repeater station. The two Septic Sludge Disposal Pits were suspected to be used through the late 1980s as disposal sites for sludge from septic tanks located in Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern are the same for the disposal pits and include: volatile organic compounds (VOCs), semivolatile organic compounds, total petroleum hydrocarbons (TPHs) as gasoline- and diesel-range organics, polychlorinated biphenyls, Resource Conservation and Recovery Act metals, and radionuclides (including plutonium and depleted uranium). The Battery Dump Site consists of discarded lead-acid batteries and associated construction debris, placing the site in a Housekeeping Category and, consequently, no contaminants are expected to be encountered during the cleanup process. The corrective action the at this CAU will include collection of discarded batteries and construction debris at the Battery Dump Site for proper disposal and recycling, along with photographic documentation as the process progresses. The corrective action for the remaining CASs involves the collection of background radiological data through borings drilled at

  8. Radiosondes Corrected for Inaccuracy in RH Measurements

    DOE Data Explorer

    Miloshevich, Larry

    2008-01-15

    Corrections for inaccuracy in Vaisala radiosonde RH measurements have been applied to ARM SGP radiosonde soundings. The magnitude of the corrections can vary considerably between soundings. The radiosonde measurement accuracy, and therefore the correction magnitude, is a function of atmospheric conditions, mainly T, RH, and dRH/dt (humidity gradient). The corrections are also very sensitive to the RH sensor type, and there are 3 Vaisala sensor types represented in this dataset (RS80-H, RS90, and RS92). Depending on the sensor type and the radiosonde production date, one or more of the following three corrections were applied to the RH data: Temperature-Dependence correction (TD), Contamination-Dry Bias correction (C), Time Lag correction (TL). The estimated absolute accuracy of NIGHTTIME corrected and uncorrected Vaisala RH measurements, as determined by comparison to simultaneous reference-quality measurements from Holger Voemel's (CU/CIRES) cryogenic frostpoint hygrometer (CFH), is given by Miloshevich et al. (2006).

  9. Federal Reporting Recipient Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    July, 19, 2011 Federal_Reporting_Recipient_Information.xls (1.04 MB

  10. Federal Energy Savings Performance Contracting Steering Committee |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Contracting Steering Committee Federal Energy Savings Performance Contracting Steering Committee The Federal Energy Savings Performance Contracting (ESPC) Steering Committee shares experiences and lessons learned and coordinates process and procedural improvements among federal agency implementers to promote improved ESPCs throughout the federal government. This includes: Discussing practical application of the ESPC authority to identify problems, barriers to the

  11. Federal Acquisition Circular 2005-40

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-40 implements the Federal Awardee Performance and Integrity Information System (FAPIIS) to the Federal Acquisition Regulation. This FAC was published in the March 23,2010 issue of the Federal Register. A summary of the changes is attached.

  12. Comprehensive Baseline Environmental Audit of the Inhalation Toxicology Research Institute, Albuquerque, New Mexico

    SciTech Connect

    Not Available

    1993-06-01

    This report documents the results of the Comprehensive Baseline Environmental Audit conducted at the Inhalation Toxicology Research Institute (ITRI) in Albuquerque, New Mexico. The scope of the audit at the ITRI was comprehensive, addressing environmental activities in the technical areas of air; soils, sediments, and biota; surface water/drinking water; groundwater; waste management; toxic and chemical materials; quality assurance; radiation; inactive waste sites; environmental management; and environmental monitoring programs. Specifically assessed was the compliance of ITRI operations and activities with Federal, state, and local regulations; DOE Orders; internal operating standards; and best management practices. Onsite activities included inspection of ITRI facilities and operations; review of site documents; interviews with DOE and contractor personnel, as well as representatives from state regulatory agencies; and reviews of previous appraisals. Using these sources of information, the environmental audit team developed findings, which fell into two general categories: compliance findings and best management practice findings. Each finding also identifies apparent causal factor(s) that contributed to the finding and will assist line management in developing ``root causes`` for implementing corrective actions.

  13. Closure Report for Corrective Action Unit 177: Mud Pits and Cellars Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2007-02-01

    This Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 177: Mud Pits and Cellars, Nevada Test Site, Nevada. This Closure Report complies with the requirements of the Federal Facility Agreement and Consent Order (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The Corrective Action Sites (CASs) within CAU 177 are located within Areas 8, 9, 19, and 20 of the Nevada Test Site. The purpose of this Closure Report is to provide documentation supporting the completed corrective actions and data that confirm the corrective actions implemented for CAU 177 CASs.

  14. DOE Federal Aviation Professional Awards | Department of Energy

    Energy Saver

    DOE Federal Aviation Professional Awards DOE Federal Aviation Professional Awards PDF icon DOE Federal Aviation Professional Awards More Documents & Publications DOE Federal...

  15. 2016 Southwestern Federal Hydropower Council Bolling Federal Building

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Southwestern Federal Hydropower Council Bolling Federal Building 601 E 12 th Street Kansas City, Missouri 64106 June 22, 2016 Wednesday, June 22 8:00 a.m. Welcome NWK 8:05 a.m. Introductions All 8:15 a.m. Corps' Risk Matrix Overview 8:30 a.m. FY 16/FY17 COE Budget Southwestern/COE 9:00 a.m. Direct Funding Initiative Update 9:15 a.m. Station Service at Corps Hydropower Projects 10:00 a.m. BREAK 10:15 a.m. Presentation of Proposed FY 17 COE Districts & Preliminary FY 18 Work Packages 12:00

  16. Federal Utility Partnership Working Group Seminar

    Energy.gov [DOE] (indexed site)

    Department of Energy 2 Federal Utility Partnership Working Group (FUPWG) meeting-lists key utility program projects and upcoming utility energy service contract (UESC) training. Download the Federal Utility Partnership Working Group Meeting Chairman's Corner presentation. (134.21 KB) More Documents & Publications Federal Utility Partnership Working Group Meeting: Chairman's Corner Federal Utility Partnership Working Group Seminar: Chairman's Corner Federal Utility Partnership Working

  17. Federal Energy Management Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Energy Management Tools Federal Energy Management Tools logo_femp.png The Federal Energy Management Program (FEMP) offers links to tools that can help agencies reduce energy use and meet federal laws and requirements. Tools include software, calculators, data sets, and databases created by the U.S. Department of Energy and other federal organizations. To find a tool, browse by title, description, type, or category. Click a column heading to sort the table. Title Description Type Category

  18. Federal Register Notices | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Register Notices Federal Register Notices September 30, 2016 Application to Export Electric Energy OE Docket No. EA-429 CWP Energy: Federal Register Notice, Volume 81, No. 190 - Sept. 30, 2016 Application from CWP Energy to export electric energy to Mexico. Federal Register Notice. September 27, 2016 Application to Export Electric Energy OE Docket No. EA-184-C Morgan Stanley Capital Group Inc.: Federal Register Notice, Volume 81, No. 187 - Sept. 27, 2016 Application from MSCG to export

  19. Cyclotron Institute Upgrade Project

    SciTech Connect

    Clark, Henry; Yennello, Sherry; Tribble, Robert

    2014-08-26

    The Cyclotron Institute at Texas A&M University has upgraded its accelerator facilities to extend research capabilities with both stable and radioactive beams. The upgrade is divided into three major tasks: (1) re-commission the K-150 (88”) cyclotron, couple it to existing beam lines to provide intense stable beams into the K-500 experimental areas and use it as a driver to produce radioactive beams; (2) develop light ion and heavy ion guides for stopping radioactive ions created with the K-150 beams; and (3) transport 1+ ions from the ion guides into a charge-breeding electron-cyclotron-resonance ion source (CB-ECR) to produce highly-charged radioactive ions for acceleration in the K-500 cyclotron. When completed, the upgraded facility will provide high-quality re-accelerated secondary beams in a unique energy range in the world.

  20. CORRECTIVE ACTION PLAN FOR CORRECTIVE ACTION UNIT 543: LIQUID DISPOSAL UNITS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-09-01

    The purpose of this Corrective Action Plan is to provide the detailed scope of work required to implement the recommended corrective actions as specified in the approved Corrective Action Decision Document.

  1. Corrective Action Investigation Plan for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada, Rev. No.: 0

    SciTech Connect

    David Strand

    2006-06-01

    contaminants of concern are present. (5) If contaminants of concern are present, collect additional step-out samples to define the extent of the contamination. (6) Collect samples of investigation-derived waste, as needed, for waste management and minimization purposes. This Corrective Action Investigation Plan has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Under the ''Federal Facility Agreement and Consent Order'', this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection, and field work will commence following approval.

  2. Corrective Action Decision Document for Corrective Action Unit 5: Landfills, Nevada Test Site, Nevada: Revision No. 0 (with Record of Technical Change No. 1)

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-10-24

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative (CAA) appropriate to facilitate the closure of Corrective Action (CAU) 5: Landfills, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Areas 5, 6, 12, 20, and 23 of the NTS, CAU 5 is comprised of eight corrective action sites (CASs). The corrective action investigation (CAI) of CAU 5 was conducted from October 7, 2002 through January 30, 2003, with geophysical surveys completed from March 6 through May 8, 2002, and topographic surveys conducted from March 11 through April 29, 2003. Contaminants of concern (COCs) were identified only at CAS 12-15-01. Those COCs included total petroleum hydrocarbons and volatile organic compounds. Based on the evaluation of analytical data from the CAI, review of future and current operations in Areas 5, 6, 12, 20, and 23 of the Nevada Test Site, and the detailed and comparative analysis of the potential CAAs, the following single alternative was developed for consideration. Close in Place with Administrative Controls is the recommended alternative for all of the CASs in CAU 5. This alternative was judged to meet all requirements for the technical components evaluated. Additionally, the alternative meets all applicable state and federal regulations for closure of the sites and will eliminate inadvertent intrusion into landfills at CAU 5.

  3. THE INSTITUTIONAL ORIGINS OF THE...

    Office of Environmental Management (EM)

    (1947 -1975) Federal Energy Administration (1974) -1977) Energy Research and DevelopmentAdministration3 (1975 - 1977) INCLUDES 1sPECIALEnergy Office ( t7J) tklr ... ...

  4. Security Notice | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    User login Username * Password * Request new password Log in Forgot Your Password? Security Notice This computer system is operated on a U.S. Federal Government network ...

  5. Form:Research Institution | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Research Institution Jump to: navigation, search Add a Research or Development Institution Input your research or development institution name below to add to the registry. If your...

  6. Industrial Technology Research Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Technology Research Institute Jump to: navigation, search Logo: Industrial Technology Research Institute Name: Industrial Technology Research Institute Address: Rm. 112, Bldg. 24,...

  7. Cornell Fuel Cell Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Cornell Fuel Cell Institute Jump to: navigation, search Name: Cornell Fuel Cell Institute Place: Ithaca, New York Zip: 14850 Product: The Cornell Fuel Cell Institute (CFCI)...

  8. Hitachi Research Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Institute Jump to: navigation, search Name: Hitachi Research Institute Place: Tokyo, Japan Zip: 101-8010 Product: Hitachi Research Institute is the think tank of the Hitachi...

  9. GHG Management Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    GHG Management Institute Jump to: navigation, search Name: GHG Management Institute Address: Greenhouse Gas Management Institute 9215 View Avenue NW Seattle, WA USA 98117 Place:...

  10. Honda Research Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    search Name: Honda Research Institute Place: Mountain View, California Sector: Biofuels, Solar Product: California-based research institute of Honda. The institute conducts...

  11. Rocky Mountain Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Rocky Mountain Institute Jump to: navigation, search Logo: Rocky Mountain Institute Name: Rocky Mountain Institute Address: 1820 Folsom Street Place: Boulder, Colorado Zip: 80302...

  12. Sustainable Europe Research Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Europe Research Institute Jump to: navigation, search Logo: Sustainable Europe Research Institute Name: Sustainable Europe Research Institute Address: Garnisongasse 721 A -1090...

  13. Low Carbon Research Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Research Institute Jump to: navigation, search Logo: Low Carbon Research Institute Name: Low Carbon Research Institute Address: King Edward VII Avenue CF10 3NB Place: Cardiff,...

  14. UC Berkeley- Energy Institute | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Berkeley- Energy Institute Jump to: navigation, search Logo: UC Berkeley- Energy Institute Name: UC Berkeley- Energy Institute Address: 2547 Channing Way Place: Berkeley,...

  15. Corrective Action Decision Document for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada with Errata Sheet

    SciTech Connect

    Grant Evenson

    2007-03-01

    This Corrective Action Decision Document (CADD) has been prepared for Corrective Action Unit (CAU) 166, Storage Yards and Contaminated Materials, in accordance with the Federal Facility Agreement and Consent Order (1996). The corrective action sites (CASs) are located in Areas 2, 3, 5, and 18 of the Nevada Test Site, Nevada. Corrective Action Unit 166 is comprised of the following CASs: • 02-42-01, Cond. Release Storage Yd - North • 02-42-02, Cond. Release Storage Yd - South • 02-99-10, D-38 Storage Area • 03-42-01, Conditional Release Storage Yard • 05-19-02, Contaminated Soil and Drum • 18-01-01, Aboveground Storage Tank • 18-99-03, Wax Piles/Oil Stain The purpose of this CADD is to identify and provide the rationale for the recommendation of a corrective action alternative (CAA) for the seven CASs within CAU 166. Corrective action investigation (CAI) activities were performed from July 31, 2006, through February 28, 2007, as set forth in the CAU 166 Corrective Action Investigation Plan (NNSA/NSO, 2006).

  16. Corrective Action Decision Document/Closure Report for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Alfred Wickline

    2008-03-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 190, Contaminated Waste Sites, Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy, Environmental Management; U.S. Department of Defense; and DOE, Legacy Management (1996, as amended January 2007). Corrective Action Unit 190 is comprised of the following four corrective action sites (CASs): • 11-02-01, Underground Centrifuge • 11-02-02, Drain Lines and Outfall • 11-59-01, Tweezer Facility Septic System • 14-23-01, LTU-6 Test Area The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation for closure of CAU 190 with no further corrective action. To achieve this, corrective action investigation (CAI) activities were performed from March 21 through June 26, 2007. All CAI activities were conducted as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 190: Contaminated Waste Sites, Nevada Test Site, Nevada (NNSA/NSO, 2006). The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective process: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. The CAU 190 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the data quality objective data needs.

  17. Corrective Action Decision Document/Closure Report for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 0 with Errata Sheet

    SciTech Connect

    Alfred Wickline

    2005-12-01

    This Corrective Action Decision Document/Closure Report (CADD/CR) has been prepared for Corrective Action Unit (CAU) 309, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. The corrective actions proposed in this document are according to the ''Federal Facility Agreement and Consent Order'' (FFACO) that was agreed to by the State of Nevada, U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 309 is comprised of the three Corrective Action Sites (CASs) (Figure 1-1) listed below: (1) CAS 12-06-09, Muckpile; (2) CAS 12-08-02, Contaminated Waste Dump (CWD); and (3) CAS 12-28-01, I-, J-, and K-Tunnel Debris. Corrective Action Sites 12-06-09 and 12-08-02 will be collectively referred to as muckpiles in this document. Corrective Action Site 12-28-01 will be referred to as the fallout plume because of the extensive lateral area of debris and fallout contamination resulting from the containment failures of the J- and K-Tunnels. A detailed discussion of the history of this CAU is presented in the ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 309: Area 12 Muckpiles, Nevada Test Site (NTS), Nevada.'' (NNSA/NSO, 2004). This CADD/CR provides justification for the closure of CAU 309 without further corrective action. This justification is based on process knowledge and the results of the investigative activities conducted according to the CAIP (NNSA/NSO, 2004), which provides information relating to the history, planning, and scope of the investigation. Therefore, this information will not be repeated in this CADD/CR.

  18. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 34: Area 3 Contaminated Waste Sites, Nevada Test Site, Nevada

    SciTech Connect

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the April 2002, Corrective Action Decision Document/Closure Report for Corrective Action Unit 34: Area 3 Contaminated Waste Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.

  19. Program Course Corrections Based on Evaluation Results

    Energy.gov [DOE]

    Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Program Course Corrections Based on Evaluation Results, Call Slides and Discussion Summary, April 12, 2012, This call discussed using evaluation results as the basis for course corrections.

  20. COLLEGE OF SCIENCE CYCLOTRON INSTITUTE Cyclotron Institute, Texas...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Candidates must have experience with modern nuclear instrumentation and data analysis ... The position will be based at the Institute in College Station, Texas, USA. The Cyclotron ...

  1. Federal Budgeting Process in DOE

    Energy.gov [DOE]

    This course is designed to provide DOE and NNSA program and project managers a working knowledge of Federal financial and managerial systems to accomplish their Department’s budgeting and accounting processes, including budget submissions, managing authorized funding and establishing success criteria. Participants apply the foundational skills required to successfully manage a project through its financial life cycle. These skills include: integrating projects, programs, and missions; resourcing and funding programs; validating and funding projects; effectively participating in the budget process; managing the flow of funds to programs and projects and effectively using financial accounting and reporting systems to attain program and project success. You will earn 32 continuous learning points for this course. This is an elective course for the Level II PMCDP certification for Federal Project Directors and is available to all DOE employees.

  2. Clothes Washer Test Cloth Correction Factor Information

    Energy.gov [DOE]

    This page contains the information used to determine the test cloth correction factors for each test cloth lot.

  3. Environmental Management Headquarters Corrective Action Plan...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    II Environmental Management Headquarters Corrective Action Plan - Radiological Release ... actions for addressing Office of Environmental Management (EM) Headquarters (HQ) ...

  4. Request for Correction | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Request for Correction Request for Correction In the Department of Energy's correction request process, the burden of proof rests with the requester. An affected person who believes that information the Department disseminates does not adhere to the information quality guidelines of OMB or the Department, or who would like to request correction of specific information, needs to provide the following information within 60 calendar days of the initial information dissemination: Requester

  5. Biogas Markets and Federal Policy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    americanbiogascouncil.org Promoting the Anaerobic Digestion and Biogas Industries 1 americanbiogascouncil.org Biogas Markets and Federal Policy Patrick Serfass, Executive Director www.americanbiogascouncil.org Promoting the Anaerobic Digestion and Biogas Industries www.americanbiogascouncil.org Promoting the Anaerobic Digestion and Biogas Industries American Biogas Council: The Voice of the US Biogas Industry  The only U.S. organization representing the biogas and anaerobic digestion industry

  6. Federal Government Project Performance Benchmarks

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Government Project Performance Benchmarks (All ASHRAE Zones) We define an ESCO as a company that provides energy efficiency-related and other value-added services and that employs performance contracting as a core part of its energy efficiency services business. 1 For projects with electricity savings, we assume site energy conversion (1 kWh = 3,412 Btu). We did not estimate avoided Btus from gallons of water conserved. In general, we followed the analytical approach documented in Hopper

  7. Federal Register Volume 71 Number 30; Tuesday, February 14, 2006

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    46 Feb 13, 2006 Jkt 208001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\14FEN1.SGM 14FEN1 rmajette on PROD1PC67 with NOTICES 7749 Federal Register / Vol. 71, No. 30 / Tuesday, February 14, 2006 / Notices Abstract: IPEDS is a system of surveys designed to collect basic data from approximately 6,600 Title IV postsecondary institutions in the United States. The IPEDS provides information on numbers of students enrolled, degrees completed, other awards earned, dollars expended, staff employed at

  8. Resource Conservation and Recovery Act corrective measures study: Area 6 decontamination pond facility, corrective action unit no. 92

    SciTech Connect

    1997-10-01

    Corrective Action Unit (CAU) No. 92, the Area 6 Decontamination Pond Facility (DPF), is an historic disposal unit located at the Nevada Test Site (NTS) in Nye County, Nevada (Figures 1 - 1, 1-2, and 1-3). The NTS is operated by the U.S. Department of Energy, Nevada Operations Office (DOE/NV), which has been required by the Nevada Division of Environmental Protection (NDEP) to characterize the DPF under the requirements of the Resource Conservation and Recovery Act (RCRA) Part A Permit (NDEP, 1995) for the NTS and Title 40 Code of Federal Regulations (CFR) Part 265 (1996c). The DPF is prioritized in the Federal Facility Agreement and Consent Order (FFACO, 1996) but is governed by the permit. The DPF was characterized through sampling events in 1994, 1996, and 1997. The results of these sampling events are contained in the Final Resource Conservation and Recovery Act Industrial Site Environmental Restoration Site Characterization Report, Area 6 Decontamination Pond Facility, Revision I (DOE/NV, 1997). This Corrective Measures Study (CMS) for the Area 6 DPF has been prepared for the DOE/NV`s Environmental Restoration Project. The CMS has been developed to support the preparation of a Closure Plan for the DPF. Because of the complexities of the contamination and regulatory issues associated with the DPF, DOE/NV determined a CMS would be beneficial to the evaluation and selection of a closure alternative.

  9. Cyclotron Institute » Graduate Studies

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Graduate Studies Students wishing to carry out their dissertation research at the Cyclotron Institute must be formally enrolled in the graduate program in the departments of Physics, Chemistry, or Nuclear Engineering, but may elect to work with any Institute faculty research advisor, irrespective of that advisor's departmental affiliation. Research programs at the Cyclotron Institute are generally funded by the U.S. Department of Energy, the National Science Foundation, and the Robert A. Welch

  10. Los Alamos National Laboratory Institutes

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Los Alamos National Laboratory Institutes The National Security Education Center has formed several institutes, each with a partner university or consortia of universities. The formation of these institutes serves the need for LANL to recruit new staff and provide educational opportunities that will enhance retention at the Laboratory. This is accomplished by:  Developing long-term collaborative relationships with universities whose research interests are important to the Laboratory. 

  11. Integrative Bioengineering Institute

    SciTech Connect

    Eddington, David; Magin,L,Richard; Hetling, John; Cho, Michael

    2009-01-09

    Microfabrication enables many exciting experimental possibilities for medicine and biology that are not attainable through traditional methods. However, in order for microfabricated devices to have an impact they must not only provide a robust solution to a current unmet need, but also be simple enough to seamlessly integrate into standard protocols. Broad dissemination of bioMEMS has been stymied by the common aim of replacing established and well accepted protocols with equally or more complex devices, methods, or materials. The marriage of a complex, difficult to fabricate bioMEMS device with a highly variable biological system is rarely successful. Instead, the design philosophy of my lab aims to leverage a beneficial microscale phenomena (e.g. fast diffusion at the microscale) within a bioMEMS device and adapt to established methods (e.g. multiwell plate cell culture) and demonstrate a new paradigm for the field (adapt instead of replace). In order for the field of bioMEMS to mature beyond novel proof-of-concept demonstrations, researchers must focus on developing systems leveraging these phenomena and integrating into standard labs, which have largely been ignored. Towards this aim, the Integrative Bioengineering Institute has been established.

  12. Atlanta Community Leaders’ Institute Conference

    Energy.gov [DOE]

    The Atlanta Community Leaders Institute (CLI) held a conference on February 8 and 9 at Morehouse School of Medicine, in Atlanta, Georgia.

  13. Bolton Community Leaders’ Institute Conference

    Energy.gov [DOE]

    The Bolton Community Leaders Institute (CLI) held a conference on February 22 and 23 at the Southeastern Community College in Whiteville, North Carolina.

  14. Institutional Change Basics for Sustainability

    Energy.gov [DOE]

    Institutional change integrates technology, policy, and behavior to make new sustainability practices and perspectives become a typical part of how an agency operates.

  15. Nuclear Structure - Research - Cyclotron Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Nuclear Structure depiction of giant resonance modes (ref. Xinfeng Chen, "Giant Resonance Study By 6Li Scattering" Nuclear structure studies at the Institute explore a wide range ...

  16. CASL - Massachusetts Institute of Technology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Massachusetts Institute of Technology Cambridge, MA The Department of Nuclear Science and Engineering at MIT has been a leader in the development of the nuclear engineering...

  17. Research and Institutional Integrity Office

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    about any of these ethics policies and related procedures, please contact Meredith Montgomery, Director of Institutional Assurance and Integrity, at 510-486-4453 or...

  18. Izabela Stroe: Worcester Polytechnic Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Izabela Stroe: Worcester Polytechnic Institute Alumni Link: Opportunities, News and Resources for Former Employees Latest Issue:September 2015 all issues All Issues submit...

  19. My Account | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    My Account Primary tabs Log in(active tab) Request new password Username * Enter your Critical Materials Institute username. Password * Enter the password that accompanies your ...

  20. Corrective Action Decision Document/Closure Report for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe Nevada Test Site, Nevada, Revision 0

    SciTech Connect

    Patrick Matthews

    2010-07-01

    This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): 11-23-05, Pin Stripe Contamination Area 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that

  1. Lessons learned on utilizing the SEI/CMM in the federal government work for others environment

    SciTech Connect

    Stewart, A.

    1997-11-01

    This report contains viewgraphs on lessons learned on utilizing the Software Engineering Institute Capability Maturity Model in the federal government work for others environment. These viewgraphs outline: data systems research and development; what is the SEI/CMM; Data Systems Research and Development process improvement approach; accomplishments; and lessons learned.

  2. Gas Technology Institute (Partnership for Advanced Residential...

    OpenEI (Open Energy Information) [EERE & EIA]

    Technology Institute (Partnership for Advanced Residential Retrofit) Jump to: navigation, search Name: Gas Technology Institute Place: Des Plaines, IL Website:...

  3. Denver University - International Institute for Environment and...

    OpenEI (Open Energy Information) [EERE & EIA]

    - International Institute for Environment and Enterprise Name: Denver University - International Institute for Environment and Enterprise Address: 2199 S. University Blvd....

  4. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........32 Comprehensive Legacy Management and Institutional Controls ...

  5. Institute for Advanced Composites Manufacturing Innovation Holds...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Institute for Advanced Composites Manufacturing Innovation Holds Second Membership Meeting Institute for Advanced Composites Manufacturing Innovation Holds Second Membership Meeting ...

  6. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........49 Comprehensive Legacy Management and Institutional Controls ...

  7. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........33 Comprehensive Legacy Management and Institutional Controls ...

  8. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........34 Comprehensive Legacy Management and Institutional Controls ...

  9. Comprehensive Legacy Management and Institutional Controls Plan

    Office of Legacy Management (LM)

    Department of Energy Comprehensive Legacy Management and Institutional Controls Plan Doc. .........52 Comprehensive Legacy Management and Institutional Controls ...

  10. Clean Energy Manufacturing Innovation Institute for Composites...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clean Energy Manufacturing Innovation Institute for Composites Materials and Structures Clean Energy Manufacturing Innovation Institute for Composites Materials and Structures ...

  11. Notices and Rules Related to Federal Energy Management

    Energy.gov [DOE]

    The Federal Energy Management Program (FEMP) issues notices and rules related to federal energy management.

  12. Closure Report for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    SciTech Connect

    NSTec Environmental Restoration

    2010-02-28

    Corrective Action Unit (CAU) 563 is identified in the Federal Facility Agreement and Consent Order (FFACO) as “Septic Systems” and consists of the following four Corrective Action Sites (CASs), located in Areas 3 and 12 of the Nevada Test Site: · CAS 03-04-02, Area 3 Subdock Septic Tank · CAS 03-59-05, Area 3 Subdock Cesspool · CAS 12-59-01, Drilling/Welding Shop Septic Tanks · CAS 12-60-01, Drilling/Welding Shop Outfalls Closure activities were conducted from September to November 2009 in accordance with the FFACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 563. The corrective action alternatives included No Further Action and Clean Closure.

  13. Corrective Action Plan for Corrective Action Unit 262: Area 25 Septic Systems and Underground Discharge Point, Nevada Test Site, Nevada

    SciTech Connect

    K. B. Campbell

    2002-06-01

    This Corrective Action Plan (CAP) provides selected corrective action alternatives and proposes the closure methodology for Corrective Action Unit (CAU) 262, Area 25 Septic Systems and Underground Discharge Point. CAU 262 is identified in the Federal Facility Agreement and Consent Order (FFACO) of 1996. Remediation of CAU 262 is required under the FFACO. CAU 262 is located in Area 25 of the Nevada Test Site (NTS), approximately 100 kilometers (km) (62 miles [mi]) northwest of Las Vegas, Nevada. The nine Corrective Action Sites (CASs) within CAU 262 are located in the Nuclear Rocket Development Station complex. Individual CASs are located in the vicinity of the Reactor Maintenance, Assembly, and Disassembly (R-MAD); Engine Maintenance, Assembly, and Disassembly (E-MAD); and Test Cell C compounds. CAU 262 includes the following CASs as provided in the FFACO (1996); CAS 25-02-06, Underground Storage Tank; CAS 25-04-06, Septic Systems A and B; CAS 25-04-07, Septic System; CAS 25-05-03, Leachfield; CAS 25-05-05, Leachfield; CAS 25-05-06, Leachfield; CAS 25-05-08, Radioactive Leachfield; CAS 25-05-12, Leachfield; and CAS 25-51-01, Dry Well. Figures 2, 3, and 4 show the locations of the R-MAD, the E-MAD, and the Test Cell C CASs, respectively. The facilities within CAU 262 supported nuclear rocket reactor engine testing. Activities associated with the program were performed between 1958 and 1973. However, several other projects used the facilities after 1973. A significant quantity of radioactive and sanitary waste was produced during routine operations. Most of the radioactive waste was managed by disposal in the posted leachfields. Sanitary wastes were disposed in sanitary leachfields. Septic tanks, present at sanitary leachfields (i.e., CAS 25-02-06,2504-06 [Septic Systems A and B], 25-04-07, 25-05-05,25-05-12) allowed solids to settle out of suspension prior to entering the leachfield. Posted leachfields do not contain septic tanks. All CASs located in CAU 262 are

  14. Federal Facility Agreement progress report

    SciTech Connect

    Not Available

    1993-10-01

    The (SRS) Federal Facility Agreement (FFA) was made effective by the US. Environmental Protection Agency Region IV (EPA) on August 16, 1993. To meet the reporting requirements in Section XXV of the Agreement, the FFA Progress Report was developed. The FFA Progress Report is the first of a series of quarterly progress reports to be prepared by the SRS. As such this report describes the information and action taken to September 30, 1993 on the SRS units identified for investigation and remediation in the Agreement. This includes; rubble pits, runoff basins, retention basin, seepage basin, burning pits, H-Area Tank 16, and spill areas.

  15. Federal Flood Risk Management Standard (2015)

    Energy.gov [DOE]

    The Federal Flood Risk Management Standard (FFRMS (2015)) expands upon E.O. 11988, Floodplain Management, (1977) by directing that federal agencies use a higher vertical flood elevation and...

  16. Funding Federal Energy and Water Projects

    Energy.gov [DOE] (indexed site)

    The U.S. Department of Energy (DOE) Federal Energy Management Program (FEMP) helps Federal ... ee.doe.gov for additional information, or visit www.femp. energy.govfinancingespcs.html. ...

  17. Federal Digital Strategy | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Federal Digital Strategy Home Graham7781's picture Submitted by Graham7781(2017) Super contributor 19 September, 2012 - 14:32 OpenEI part of the Federal Digital Strategy data...

  18. First Annual Federal STEM Volunteer Fair

    Energy.gov [DOE]

    First Annual Federal STEM Volunteer Fair aims to match the needs of the STEM and educational community in the Washington, D.C., area with our federal workers who are seeking volunteer opportunities.

  19. Exploring Ways to Standardize Federal Energy Contracts

    Energy.gov [DOE]

    Presentation—given at the Spring 2013 Federal Utility Partnership Working Group (FUPWG) meeting—covers ways to standardize federal energy contracts and initial findings, including savings calculations, assurances and guarantees, equipment performance standards, pricing, and more.

  20. Green Power Purchasing Goal for Federal Government

    Office of Energy Efficiency and Renewable Energy (EERE)

    The federal Energy Policy Act of 2005 (EPAct 2005) extended and expanded several previous goals and standards to reduce energy use in existing and new federal buildings. Section 203 of EPAct 2005...

  1. Alaska Rural Energy Conference- Federal Energy Track

    Energy.gov [DOE]

    On the first day of the Alaska Rural Energy Conference, the U.S. Department of Energy (DOE) Office of Indian Energy is hosting a federal energy track to cover federal programs and opportunities for Alaska Native villages.

  2. Federal Energy Administration Act | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Federal Energy Administration Act Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- StatuteStatute: Federal Energy Administration ActLegal Abstract...

  3. Federal Railroad Administration | Department of Energy

    Office of Environmental Management (EM)

    Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment A Guide for State, Local & Tribal Leaders and their Partners August 28, 2013 2 Contents 1 Foreword ................................................................................................................................... 5 2 Acknowledgements ................................................................................................................... 6 3 Federal Finance Facilities

  4. Federal Acquisition Circular (FAC) 2005-65

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the January 29, 2013 Federal Register at 78 FR 6184. This FAC issued 4 final rules and a technical amendment.

  5. Federal Acquisition Circular (FAC) 2005-71

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the November 25, 2013 Federal Register at 78 FR 70476. This FAC issued 2 final rules and 1...

  6. Federal Acquisition Circular (FAC) 2005-66

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the February 28, 2013 Federal Register at 78 FR 13764. This FAC issued 3 final rules, 1 interim rule, and a technical amendment.

  7. Federal Acquisition Circular 2005-64

    Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment, published in the December 21, 2012 Federal Register at 77 FR 75766, implements FAR Case 2011–028 Nondisplacement of Qualified Workers Under Service Contracts.

  8. Federal Acquisition Circular (FAC) 2005-69

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the August 1, 2013 Federal Register at 78 FR 46779. This FAC issued 6 final rules and a technical amendment.

  9. Federal Acquisition Circular (FAC) 2005-70

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2013 Federal Register at 78 FR 60168. This FAC issued 2 interim rules.

  10. Federal Buildings Personnel Training Act of 2010

    Energy.gov [DOE]

    On December 14, 2010, President Obama signed the Federal Buildings Personnel Training Act of 2010 into law. This legislation will have an important impact on Federal agency training programs geared...

  11. Guide on Federal Employee Assistance Programs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-12-01

    This Guide supplements the requirements and responsibilities specified in DOE O 341.1, Federal Employee Health Services, dated 12-1-03, and applies only to Federal employees. Canceled by DOE G 341.1-2A.

  12. Cyclotron Institute » Facilities Overview

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Facilities Overview Facility Layout The Cyclotron Institute has expanded steadily since commissioning the original cyclotron in 1967 and is currently upgrading again. The diagram to the left shows the variety of sophisticated detectors and spectrometers that enhance the Institute's capacity for nuclear research. Follow the links in the menu for more detailed information about our facilities

  13. The Brazilian Audit Tribunal's role in improving the federal environmental licensing process

    SciTech Connect

    Lima, Luiz Henrique; Magrini, Alessandra

    2010-02-15

    This article describes the role played by the Brazilian Audit Tribunal (Tribunal de Contas da Uniao - TCU) in the external auditing of environmental management in Brazil, highlighting the findings of an operational audit conducted in 2007 of the federal environmental licensing process. Initially, it records the constitutional and legal framework of Brazilian environmental licensing, describing the powers and duties granted to federal, state and municipal institutions. In addition, it presents the responsibilities of the TCU in the environmental area, comparing these with those of other Supreme Audit Institutions (SAI) that are members of the International Organization of Supreme Audit Institutions (INTOSAI). It also describes the work carried out in the operational audit of the Brazilian environmental licensing process and its main conclusions and recommendations. Finally, it draws a parallel between the findings and recommendations made in Brazil with those of academic studies and audits conducted in other countries.

  14. Pulse compressor with aberration correction

    SciTech Connect

    Mankos, Marian

    2015-11-30

    In this SBIR project, Electron Optica, Inc. (EOI) is developing an electron mirror-based pulse compressor attachment to new and retrofitted dynamic transmission electron microscopes (DTEMs) and ultrafast electron diffraction (UED) cameras for improving the temporal resolution of these instruments from the characteristic range of a few picoseconds to a few nanoseconds and beyond, into the sub-100 femtosecond range. The improvement will enable electron microscopes and diffraction cameras to better resolve the dynamics of reactions in the areas of solid state physics, chemistry, and biology. EOI’s pulse compressor technology utilizes the combination of electron mirror optics and a magnetic beam separator to compress the electron pulse. The design exploits the symmetry inherent in reversing the electron trajectory in the mirror in order to compress the temporally broadened beam. This system also simultaneously corrects the chromatic and spherical aberration of the objective lens for improved spatial resolution. This correction will be found valuable as the source size is reduced with laser-triggered point source emitters. With such emitters, it might be possible to significantly reduce the illuminated area and carry out ultrafast diffraction experiments from small regions of the sample, e.g. from individual grains or nanoparticles. During phase I, EOI drafted a set of candidate pulse compressor architectures and evaluated the trade-offs between temporal resolution and electron bunch size to achieve the optimum design for two particular applications with market potential: increasing the temporal and spatial resolution of UEDs, and increasing the temporal and spatial resolution of DTEMs. Specialized software packages that have been developed by MEBS, Ltd. were used to calculate the electron optical properties of the key pulse compressor components: namely, the magnetic prism, the electron mirror, and the electron lenses. In the final step, these results were folded

  15. Federal Advisory Committee Management | Department of Energy

    Energy Saver

    ... Current DOE Federal Advisory Committees: Active Committees Advanced Scientific Computing ... Ultra-Deepwater Advisory Committee (UDAC) Unconventional Resources Technology Advisory ...

  16. DOE Releases Federal Building Metering Guidance

    Office of Energy Efficiency and Renewable Energy (EERE)

    The guidance requires federal agencies to review, revise, and submit to FEMP its metering implementation plan within one year.

  17. FEMP Federal Fleet Files - May 2009 Issue

    SciTech Connect

    2009-06-04

    May 2009 issue of the monthly FEMP newsletter highlighting the latest news and developments impacting Federal fleets.

  18. Planning for Solar Projects on Federal Sites

    Energy.gov [DOE]

    Planning for the federal site solar project can begin after the solar solar pre-screening is complete.

  19. Environmentally and Economically Beneficial Practices on Federal...

    Office of Environmental Management (EM)

    Environmentally and Economically Beneficial Practices on Federal Landscaped Grounds This Environmental Protection Agency report contains recommendations for a series of...

  20. Metering in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities » Operations & Maintenance » Metering in Federal Buildings Metering in Federal Buildings The U.S. Department of Energy is required by the Energy Policy Act of 2005 and Executive Order 13693 to establish guidelines for agencies to meter their federal buildings for energy (electricity, natural gas, and steam) and water use. To help agencies meet these metering requirements, the Federal Energy Management Program (FEMP) provides guidance materials, an implementation plan template,

  1. Executive Order 13423- Strengthening Federal Environmental, Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental, Energy, and Transportation Management Executive Order 13423- Strengthening Federal Environmental, Energy, and Transportation Management It is the policy of ...

  2. Federal Incentives for Water Power (Fact Sheet)

    SciTech Connect

    Not Available

    2013-05-01

    This fact sheet describes the federal incentives available as of April 2013 for the development of water power technologies.

  3. Federal Acquisition Circular 2005-52

    Energy.gov [DOE]

    Attached for your information is a summary of rules incorporated in the FAR by Federal Acquisition Circular 2005-52.

  4. Federal Energy and Water Management Awards

    Energy.gov [DOE]

    Fact sheet for the Federal Energy and Water Management Awards, including history, legislative drivers, goals and objectives, and event details.

  5. Competing Federal Utility Energy Service Contracts

    Energy.gov [DOE]

    Opening utility energy service contracts to competing franchised utility companies ensures federal agencies get the best value for their projects.

  6. Federal Employee Viewpoint Survey | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Policy and Guidance » Human Capital Management » Federal Employee Viewpoint Survey Federal Employee Viewpoint Survey The Federal Employee Viewpoint Survey (FedView survey) is a tool that measures employees' perceptions of whether, and to what extent, conditions characterizing successful organizations are present in their agencies. Survey results provide valuable insight into the challenges agency leaders face in ensuring the Federal Government has an effective civilian workforce and how well

  7. Commissioning for Federal Facilities | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Federal Facilities Commissioning for Federal Facilities Guide describes building commissioning, recommissioning, retrocommissioning, and continuous commissioning for federal facilities. Download the Commissioning for Federal Facilities guide. (2.77 MB) More Documents & Publications Chapter 9: Commissioning the Building Guide to Operating and Maintaining EnergySmart Schools Example Retro-Commissioning Scope of Work to Include Services as Part of an ESPC Investment-Grade Audit

  8. Commissioning in Federal Buildings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in Federal Buildings Commissioning in Federal Buildings Commissioning in Federal Buildings Commissioning is a quality-assurance process used to verify that a building performs according to the original design and intent, and meets the needs of the owners and occupants. The commissioning process also prepares building staff to operate and maintain the building. Federal agencies are required to make sure building systems and equipment are commissioned in new construction and existing buildings.

  9. Federal Digital Strategy | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Digital Strategy Federal Digital Strategy New expectations require the Federal Government to be ready to deliver and receive digital information and services anytime, anywhere and on any device. It must do so safely, securely, and with fewer resources. To build for the future, the Federal Government has developed a Digital Strategy that embraces the opportunity to innovate more with less, and enables entrepreneurs to better leverage government data to improve the quality of services to

  10. Presidential Memorandum Boosts Federal Energy Management

    Energy.gov [DOE]

    President Obama signed a memorandum directing the federal government to consume 20% of its electricity from renewable sources by 2020.

  11. BETO Federal Partnerships | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Partnerships BETO Federal Partnerships EERE Federal Partnerships 2013 program_management_review2013_collaborations_lindauer.pdf (1.82 MB) More Documents & Publications 2015 Program Management Review Presentations 2015 Peer Review Presentations-Plenaries Bioenergy Technologies Office Overview

  12. Leveraging Federal Funds | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Funds Leveraging Federal Funds Provides information on leveraging federal funds renewable_funding_webinar_011510.pdf (107.66 KB) More Documents & Publications Introduction to Property-Assessed Clean Energy (PACE) Financing Programs Structuring Credit Enhancements for Clean Energy Finance Programs (Text Version) Commercial PACE: Updates from the Field & New Resources for Design and Implementation

  13. Federal Acquisition Circular (FAC) 2005-68

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 26, 2013 Federal Register at 78 FR 38535. This FAC issued 1 interim rule. To view this rule go to Federal Register site then search by date and go to General Services Administration to find the rule https://www.federalregister.gov/articles/current.

  14. Federal Acquisition Circular 2005-56

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-56 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on March 2, 2012 at 77 FR 12912 and 12913.

  15. Federal Acquisition Circular 2005-49

    Energy.gov [DOE]

    Federal Acquisition Circular (FAC) 2005-49 was issued January 24, 2011 in volume 76 FR 4188. It published one interim rule Federal Acquisition Regulation (FAR) case number 2010-016 on Public Access to Federal Awardee Performance and Integrity Information System. This rule is effective January 24, 2011. The summary of the FAC is attached.

  16. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada

    Office of Legacy Management (LM)

    Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada Controlled Copy No.: Revision No.: 3 March 2006 Approved for public release; further dissemination unlimited. DOE/NV--1025--Rev. 3 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering:

  17. Phase and birefringence aberration correction

    DOEpatents

    Bowers, M.; Hankla, A.

    1996-07-09

    A Brillouin enhanced four wave mixing phase conjugate mirror corrects phase aberrations of a coherent electromagnetic beam and birefringence induced upon that beam. The stimulated Brillouin scattering (SBS) phase conjugation technique is augmented to include Brillouin enhanced four wave mixing (BEFWM). A seed beam is generated by a main oscillator which arrives at the phase conjugate cell before the signal beams in order to initiate the Brillouin effect. The signal beam which is being amplified through the amplifier chain is split into two perpendicularly polarized beams. One of the two beams is chosen to be the same polarization as some component of the seed beam, the other orthogonal to the first. The polarization of the orthogonal beam is then rotated 90{degree} such that it is parallel to the other signal beam. The three beams are then focused into cell containing a medium capable of Brillouin excitation. The two signal beams are focused such that they cross the seed beam path before their respective beam waists in order to achieve BEFWM or the two signal beams are focused to a point or points contained within the focused cone angle of the seed beam to achieve seeded SBS, and thus negate the effects of all birefringent and material aberrations in the system. 5 figs.

  18. Phase and birefringence aberration correction

    DOEpatents

    Bowers, Mark; Hankla, Allen

    1996-01-01

    A Brillouin enhanced four wave mixing phase conjugate mirror corrects phase aberrations of a coherent electromagnetic beam and birefringence induced upon that beam. The stimulated Brillouin scattering (SBS) phase conjugation technique is augmented to include Brillouin enhanced four wave mixing (BEFWM). A seed beam is generated by a main oscillator which arrives at the phase conjugate cell before the signal beams in order to initiate the Brillouin effect. The signal beam which is being amplified through the amplifier chain is split into two perpendicularly polarized beams. One of the two beams is chosen to be the same polarization as some component of the seed beam, the other orthogonal to the first. The polarization of the orthogonal beam is then rotated 90.degree. such that it is parallel to the other signal beam. The three beams are then focused into cell containing a medium capable of Brillouin excitation. The two signal beams are focused such that they cross the seed beam path before their respective beam waists in order to achieve BEFWM or the two signal beams are focused to a point or points contained within the focused cone angle of the seed beam to achieve seeded SBS, and thus negate the effects of all birefringent and material aberrations in the system.

  19. Rulison Site corrective action report

    SciTech Connect

    1996-09-01

    Project Rulison was a joint US Atomic Energy Commission (AEC) and Austral Oil Company (Austral) experiment, conducted under the AEC`s Plowshare Program, to evaluate the feasibility of using a nuclear device to stimulate natural gas production in low-permeability gas-producing geologic formations. The experiment was conducted on September 10, 1969, and consisted of detonating a 40-kiloton nuclear device at a depth of 2,568 m below ground surface (BGS). This Corrective Action Report describes the cleanup of petroleum hydrocarbon- and heavy-metal-contaminated sediments from an old drilling effluent pond and characterization of the mud pits used during drilling of the R-EX well at the Rulison Site. The Rulison Site is located approximately 65 kilometers (40 miles) northeast of Grand Junction, Colorado. The effluent pond was used for the storage of drilling mud during drilling of the emplacement hole for the 1969 gas stimulation test conducted by the AEC. This report also describes the activities performed to determine whether contamination is present in mud pits used during the drilling of well R-EX, the gas production well drilled at the site to evaluate the effectiveness of the detonation in stimulating gas production. The investigation activities described in this report were conducted during the autumn of 1995, concurrent with the cleanup of the drilling effluent pond. This report describes the activities performed during the soil investigation and provides the analytical results for the samples collected during that investigation.

  20. Corrective Action Decision Document for Corrective Action Unit 490: Station 44 Burn Area, Tonopah Test Range, Nevada (Rev. No.: 0, February 2001)

    SciTech Connect

    DOE /NV

    2001-02-23

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, Nevada Operations Office's selection of a recommended Corrective Action Alternative (CAA) appropriate to facilitate the closure of Corrective Action Unit (CAU) 490, Station 44 Burn Area, Tonopah Test Range (TTR), Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 490 is located on the Nellis Air Force Range and the Tonopah Test Range and is approximately 140 miles northwest of Las Vegas, Nevada. This CAU is comprised of four Corrective Action Sites (CASs): 03-56-001-03BA, Fire Training Area (located southwest of Area 3); RG-56-001-RGBA, Station 44 Burn Area (located west of Main Lake); 03-58-001-03FN, Sandia Service Yard (located north of the northwest corner of Area 3); and 09-54-001-09L2, Gun Propellant Burn Area (located south of the Area 9 Compound on the TTR). A Corrective Action Investigation was performed in July and August 2000, and analytes detected during the corrective action investigation were evaluated against preliminary action levels to determine contaminants of concern (COCs). There were no COCs identified in soil at the Gun Propellant Burn Area or the Station 44 Burn Area; therefore, there is no need for corrective actions at these two sites. Five soil samples at the Fire Training Area and seven at the Sandia Service Yard exceeded PALs for total petroleum hydrocarbons-diesel. Upon the identification of COCs specific to CAU 490, Corrective Action Objectives were developed based on a review of existing data, future use, and current operations at the TTR, with the following three CAAs under consideration: Alternative 1 - No Further Action, Alternative 2 - Closure In Place - No Further Action With Administrative Controls, and Alternative 3 - Clean Closure by Excavation and Disposal. These alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on

  1. Corrective Action Decision Document for Corrective Action Unit 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site, Nevada: Revision No. 0

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office

    2003-10-17

    This Corrective Action Decision Document identifies and rationalizes the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's selection of a recommended corrective action alternative appropriate to facilitate the closure of Corrective Action Unit (CAU) 140: Waste Dumps, Burn Pits, and Storage Area, Nevada Test Site (NTS), Nevada, under the Federal Facility Agreement and Consent Order. Located in Areas 5, 22, and 23 of the NTS, CAU 140 consists of nine corrective action sites (CASs). Investigation activities were performed from November 13 through December 11, 2002, with additional sampling to delineate the extent of contaminants of concern (COCs) conducted on February 4 and March 18 and 19, 2003. Results obtained from the investigation activities and sampling indicated that only 3 of the 9 CASs at CAU 140 had COCs identified. Following a review of existing data, future land use, and current operations at the NTS, the following preferred alternatives were developed for consideration: (1) No Further Action - six CASs (05-08-02, 05-17-01, 05-19-01, 05-35-01, 05-99-04, and 22-99-04); (2) Clean Closure - one CAS (05-08-01), and (3) Closure-in-Place - two CASs (05-23-01 and 23-17-01). These alternatives were judged to meet all requirements for the technical components evaluated. Additionally, the alternatives meet all applicable state and federal regulations for closure of the site and will eliminate potential future exposure pathways to the contaminated media at CAU 140.

  2. Identifying new technologies that save energy and reduce costs to the Federal sector: The New Technology Program

    SciTech Connect

    Hunt, W.D.M.; Conover, D.R.; Stockmeyer, M.K.

    1995-11-01

    In 1990 the New Technology Demonstration Program (formerly the Test Bed Demonstration Program) was initiated by the US Department of Energy`s Office (DOE`s) of Federal Energy Management Programs with the purpose of accelerating the introduction of new technologies into the Federal sector. The program has since expanded into a multi-laboratory collaborative effort that evaluates new technologies and shares the results with the Federal design and procurement communities. These evaluations are performed on a collaborative basis which typically includes technology manufacturers, Federal facilities, utilities, trade associations, research institutes, and other in partnership with DOE. The end result is a range of effective technology transfer tools that provide operations and performance data on new technologies to Federal designers, building managers, and procurement officials. These tools assist in accelerating a technology`s Federal application and realizing reductions in energy consumption and costs.

  3. Los Alamos National Laboratory Accident Investigation Board Corrective...

    Office of Environmental Management (EM)

    Accident Investigation Board Corrective Action Plan Update Los Alamos National Laboratory Accident Investigation Board Corrective Action Plan Update Topic: Status of the Corrective ...

  4. Performance Assessment Institute-NV

    SciTech Connect

    Lombardo, Joesph

    2012-12-31

    The National Supercomputing Center for Energy and the Environment’s intention is to purchase a multi-purpose computer cluster in support of the Performance Assessment Institute (PA Institute). The PA Institute will serve as a research consortium located in Las Vegas Nevada with membership that includes: national laboratories, universities, industry partners, and domestic and international governments. This center will provide a one-of-a-kind centralized facility for the accumulation of information for use by Institutions of Higher Learning, the U.S. Government, and Regulatory Agencies and approved users. This initiative will enhance and extend High Performance Computing (HPC) resources in Nevada to support critical national and international needs in "scientific confirmation". The PA Institute will be promoted as the leading Modeling, Learning and Research Center worldwide. The program proposes to utilize the existing supercomputing capabilities and alliances of the University of Nevada Las Vegas as a base, and to extend these resource and capabilities through a collaborative relationship with its membership. The PA Institute will provide an academic setting for interactive sharing, learning, mentoring and monitoring of multi-disciplinary performance assessment and performance confirmation information. The role of the PA Institute is to facilitate research, knowledge-increase, and knowledge-sharing among users.

  5. Monthly Progress Report for Corrective Actions 2016

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Progress Reports for Corrective Actions 2016 Monthly Progress Report for Corrective Actions Prescribed in Attachment A of the Settlement Agreement and Stipulated Final Order, Dated January 22, 2016, NO. HWB-14-21 (CO) Waste Isolation Pilot Plant EPA I.D. Number: NM4890139088-TSDF dated October 31, 2016 Monthly Progress Report for Corrective Actions Prescribed in Attachment A of the Settlement Agreement and Stipulated Final Order, Dated January 22, 2016, NO. HWB-14-21 (CO) Waste Isolation Pilot

  6. Weather-Corrected Performance Ratio

    SciTech Connect

    Dierauf, T.; Growitz, A.; Kurtz, S.; Cruz, J. L. B.; Riley, E.; Hansen, C.

    2013-04-01

    Photovoltaic (PV) system performance depends on both the quality of the system and the weather. One simple way to communicate the system performance is to use the performance ratio (PR): the ratio of the electricity generated to the electricity that would have been generated if the plant consistently converted sunlight to electricity at the level expected from the DC nameplate rating. The annual system yield for flat-plate PV systems is estimated by the product of the annual insolation in the plane of the array, the nameplate rating of the system, and the PR, which provides an attractive way to estimate expected annual system yield. Unfortunately, the PR is, again, a function of both the PV system efficiency and the weather. If the PR is measured during the winter or during the summer, substantially different values may be obtained, making this metric insufficient to use as the basis for a performance guarantee when precise confidence intervals are required. This technical report defines a way to modify the PR calculation to neutralize biases that may be introduced by variations in the weather, while still reporting a PR that reflects the annual PR at that site given the project design and the project weather file. This resulting weather-corrected PR gives more consistent results throughout the year, enabling its use as a metric for performance guarantees while still retaining the familiarity this metric brings to the industry and the value of its use in predicting actual annual system yield. A testing protocol is also presented to illustrate the use of this new metric with the intent of providing a reference starting point for contractual content.

  7. Closure Report for Housekeeping Category Corrective Action Unit 345 Nevada Test Site, Nevada

    SciTech Connect

    A. T. Urbon

    2000-11-01

    This Closure Report for Corrective Action Unit (CAU) 345 summarizes the disposition of ten Corrective Action Sites (CAS) located in Areas 2 and 9 of the Nevada Test Site, Nevada. The table listed in the report provides a description of each CAS and the status of its associated waste as listed in the ''Federal Facilities Agreement and Consent Order'' (FFACO, 1996). Copies of the Sectored Housekeeping Site Closure Verification Form for each CAS are included as Attachment A. The battery at CAS 09-24-04 required sampling for waste disposal purposes. The waste was found to be not hazardous. Results of the sampling are included in Attachment B.

  8. CLOSURE REPORT FOR CORRECTIVE ACTION UNIT 204: STORAGE BUNKERS, NEVADA TEST SITE, NEVADA

    SciTech Connect

    2006-04-01

    Corrective Action Unit (CAU) 330 consists of four Corrective Action Sites (CASs) located in Areas 6, 22, and 23 of the Nevada Test Site (NTS). The unit is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as CAU 330: Areas 6, 22, and 23 Tanks and Spill Sites. CAU 330 consists of the following CASs: CAS 06-02-04, Underground Storage Tank (UST) and Piping CAS 22-99-06, Fuel Spill CAS 23-01-02, Large Aboveground Storage Tank (AST) Farm CAS 23-25-05, Asphalt Oil Spill/Tar Release

  9. ARM - Evaluation Product - Corrected Precipitation Radar Moments...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ProductsCorrected Precipitation Radar Moments in Antenna Coordinates Documentation Use the Data File Inventory tool to view data availability at the file level. Comments? We would...

  10. Linux Kernel Error Detection and Correction

    Energy Science and Technology Software Center

    2007-04-11

    EDAC-utils consists fo a library and set of utilities for retrieving statistics from the Linux Kernel Error Detection and Correction (EDAC) drivers.

  11. Correcting radar range measurements for atmospheric propagation...

    Office of Scientific and Technical Information (OSTI)

    Title: Correcting radar range measurements for atmospheric propagation effects. Abstract not provided. Authors: Doerry, Armin Walter Publication Date: 2013-12-01 OSTI Identifier: ...

  12. Environmental Assessment and Corrective Measures Study Report...

    Office of Environmental Management (EM)

    ... Goal RBCA Risk-Based Corrective Action ... RWQCB Regional Water Quality Control Board SVE Soil Vapor Extraction SWMU Solid Waste ... heating; hot air or steam injection. ...

  13. Dispersion corrections to parity violating electron scattering

    SciTech Connect

    Gorchtein, M.; Horowitz, C. J. [Nuclear Theory Center, Indiana University, Bloomington, IN 47408 (United States); Ramsey-Musolf, M. J. [University of Wisconsin-Madison, Madison, WI 53706 (United States)

    2010-08-04

    We consider the dispersion correction to elastic parity violating electron-proton scattering due to {gamma}Z exchange. In a recent publication, this correction was reported to be substantially larger than the previous estimates. In this paper, we study the dispersion correction in greater detail. We confirm the size of the disperion correction to be {approx}6% for the QWEAK experiment designed to measure the proton weak charge. We enumerate parameters that have to be constrained to better than relative 30% in order to keep the theoretical uncertainty for QWEAK under control.

  14. Model Requests for Access or Correction

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Model-Requests-for-Access-or-Correction Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects &...

  15. Executive Order 13514: Federal Leadership in Environmental, Energy, and Economic Performance; Comprehensive Federal Fleet Management Handbook

    SciTech Connect

    2010-06-17

    Comprehensive Federal fleet management guide offered as a companion to Executive Order 13514 Section 12 guidance.

  16. Institutional computing (IC) information session

    SciTech Connect

    Koch, Kenneth R; Lally, Bryan R

    2011-01-19

    The LANL Institutional Computing Program (IC) will host an information session about the current state of unclassified Institutional Computing at Los Alamos, exciting plans for the future, and the current call for proposals for science and engineering projects requiring computing. Program representatives will give short presentations and field questions about the call for proposals and future planned machines, and discuss technical support available to existing and future projects. Los Alamos has started making a serious institutional investment in open computing available to our science projects, and that investment is expected to increase even more.

  17. EPA and the Federal Technology Transfer Act: Opportunity knocks

    SciTech Connect

    Gatchett, A.M.; Fradkin, L.; Moore, M.; Gorman, T.; Ehrlich, A.

    1990-12-31

    In 1986, the Federal Technology Transfer Act (FTTA) was established to promote a closer, collaborative relationship between federal government agencies and the private sector. With the increasing need for new cost-effective technologies to prevent and control pollution, both the US Environmental Protection Agency (EPA) and private industry are encouraged to facilitate the transfer of knowledge and technology under this Act. The FTTA removed several of the legal and institutional barriers to cooperative research that existed before the Act`s passage. Through the FTTA, the government strives to promote the movement of its products, processes, skills, and knowledge into the private sector for further development and commercialization by encouraging the exchange of technical personnel and the sharing of facilities and other resources. Collaborative efforts between industry, federal agencies, and academia are made possible through cooperative research and development agreements (CRADAs). Forty-two CRADAs and five licensing agreements have been initiated with EPA under this program. This paper provides an overview of this new and innovative program within the EPA. 1 fig., 2 tabs.

  18. Corrective Action Investigation Plan for Corrective Action Unit 552: Area 12 Muckpile and Ponds, Nevada Test Site, Nevada, Rev. No.: 1 with ROTC 1 and 2

    SciTech Connect

    David A. Strand

    2005-01-01

    This Corrective Action Investigation Plan (CAIP) contains project-specific information including facility descriptions, environmental sample collection objectives, and criteria for conducting site investigation activities at Corrective Action Unit (CAU) 552: Area 12 Muckpile and Ponds, Nevada Test Site (NTS), Nevada. This CAIP has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (FFACO) (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 552 is comprised of the one Corrective Action Site which is 12-23-05, Ponds. One additional CAS, 12-06-04, Muckpile (G-Tunnel Muckpile), was removed from this CAU when it was determined that the muckpile is an active site. A modification to the FFACO to remove CAS 12-06-04 was approved by the Nevada Division of Environmental Protection (NDEP) on December 16, 2004. The G-Tunnel ponds were first identified in the 1991 Reynolds Electrical & Engineering Co., Inc. document entitled, ''Nevada Test Site Inventory of Inactive and Abandoned Facilities and Waste Sites'' (REECo, 1991). Corrective Action Unit 552 is being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Therefore, additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating and selecting the corrective action alternatives for the site. The CAI will include field inspections, radiological surveys, and sampling of appropriate media. Data will also be obtained to support investigation-derived waste (IDW) disposal and potential future waste management decisions.

  19. Corrective Action Decision Document/Closure Report for Corrective Action Unit 551: Area 12 Muckpiles, Nevada Test Site, Nevada, Rev. No.: 1

    SciTech Connect

    Wickline, Alfred

    2006-11-01

    This Corrective Action Decision Document (CADD)/Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 551, Area 12 Muckpiles, Nevada Test Site (NTS), Nevada. The corrective actions proposed in this document are in accordance with the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada, U.S. Department of Energy (DOE), and the U.S. Department of Defense (FFACO, 1996). The NTS is approximately 65 miles (mi) northwest of Las Vegas, Nevada (Figure 1-1). Corrective Action Unit 551 is comprised of the four Corrective Action Sites (CASs) that are shown on Figure 1-2 and listed below: CAS 12-01-09, Aboveground Storage Tank and Stain; CAS 12-06-05, U-12b Muckpile; CAS 12-06-07, Muckpile; and CAS 12-06-08, Muckpile. A detailed discussion of the history of this CAU is presented in the ''Corrective Action Investigation Plan (CAIP) for Corrective Action Unit 551: Area 12 Muckpiles'' (NNSA/NSO, 2004). This CADD/CR provides justification for the closure of CAU 551 in place with administrative controls. This justification is based upon process knowledge and the results of the investigative activities conducted in accordance with the CAIP (NNSA/NSO, 2004). The CAIP provides information relating to the history, planning, and scope of the investigation; therefore, this information will not be repeated in the CADD/CR. Corrective Action Unit 551, Area 12 Muckpiles, consists of four inactive sites located in the southwestern portion of Area 12. The four CAU 551 sites consist of three muckpiles, and an aboveground storage tank (AST) and stain. The CAU 551 sites were all used during underground nuclear testing at the B-, C-, D- and F-Tunnels in the late 1950s and early 1960s and have mostly remained inactive since that period.

  20. 30-Day Federal Register Notice - Extension | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    30-Day Federal Register Notice - Extension 30-Day Federal Register Notice - Extension Record Extension-30 Day Federal Register Notice 30-Day Federal Register Notice - Extension (57.73 KB) More Documents & Publications 30 Day Federal Register Notice Extension - FINAL 30-Day Federal Register Notice - Proposed 30 Day Federal Register Notice Proposed - FINAL

  1. FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY Federal Financing Programs for Clean Energy.pdf (2.55 MB) More Documents & Publications FEDERAL FINANCING PROGRAMS FOR CLEAN ENERGY Federal Financing Programs for Clean Energy Guide to Federal Financing for Energy Efficiency and Clean Energy Deployment Federal Finance Facilities Available for Energy Efficiency Upgrades and Clean Energy Deployment

  2. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  3. Groundwater Monitoring Report Project Shoal Area, Corrective Action Unit 447

    SciTech Connect

    2008-01-01

    This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.

  4. Multiple Motivations Institutional Change Principle

    Energy.gov [DOE]

    The multiple motivations principle suggests that a portfolio approach—rather than a single strategy—may be required to achieve change. Research demonstrates that people and institutions adopt new...

  5. Facility Upgrade - Cyclotron Institute - TAMU

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the Cyclotron Institute Facility Upgrade White Paper Follow the links below to open the files, or right click and select "Save Target As..." to save the file to your computer. File...

  6. Cyclotron Institute » External Collaborations

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    External Collaborations High Energy Physics Instrumentation A number of research projects involving Institute scientists are carried out at other large national and international accelerator facilities in collaboration with groups from other universities and laboratories worldwide. Many of these are directly complementary to the local experimental program but others, as described below, explore other frontiers. Cyclotron Institute scientists carry out research within the BRAHMS and STAR

  7. Cyclotron Institute » Journal Links

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Journal Links Acta Physica Polonica A Acta Physica Polonica B LANL e-Print Archive Nuclear Experiment Nuclear Theory Accelerator Physics Atomic Physics American Physical Society Physical Review A Physical Review C Physical Review D Physical Review Letters Reviews of Modern Physics Institute of Physics Journal of Physics B: Atomic, Molecular and Optical Physics Journal of Physics G: Nuclear and Particle Physics American Institute of Physics Applied Physics Letters Physics Today Nuclear Physics A

  8. Hydraulic Institute Mission and Vision:

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Institute Mission and Vision: Vision: To be a global authority on pumps and pumping systems. Mission: To be a value-adding resource to member companies and pump users worldwide by: * Developing and delivering comprehensive industry standards. * Expanding knowledge by providing education and tools for the effective application, testing, installation, operation and maintenance of pumps and pumping systems. * Serving as a forum for the exchange of industry information. The Hydraulic Institute is a

  9. Southface Energy Institute: Advanced Commercial Buildings Initiative |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Southface Energy Institute: Advanced Commercial Buildings Initiative Southface Energy Institute: Advanced Commercial Buildings Initiative Southface Energy Institute: Advanced Commercial Buildings Initiative Lead Performer: Southface Energy Institute - Atlanta, GA Partners: - City of Atlanta - Atlanta, GA - Georgia Institute of Technology - Atlanta, GA - Kendeda Fund - Atlanta, GA - Oak Ridge National Laboratory - Oak Ridge, TN - Acuity Brands Lighting - Atlanta, GA -

  10. Closure Report for Corrective Action Unit 396: Area 20 Spill Sites, Nevada Test Site, Nevada

    SciTech Connect

    U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Bechtel Nevada

    2004-06-01

    Corrective Action Unit (CAU) 396, Area 20 Spill Sites, is located on the Nevada Test Site approximately 105 kilometers (65 miles) northwest of Las Vegas, Nevada. CAU 396 is listed in Appendix II of the Federal Facility Agreement and Consent Order of 1996 and consists of the following four Corrective Action Sites (CASs) located in Area 20 of the Nevada Test Site: CAS 20-25-01, Oil Spills (2); CAS 20-25-02, Oil Spills; CAS 20-25-03, Oil Spill; CAS 20-99-08, Spill. Closure activities for CAU 396 were conducted in accordance with the Federal Facility Agreement and Consent Order and the Nevada Division of Environmental Protection-approved Streamlined Approach for Environmental Restoration Plan for CAU 396.

  11. Community-Based Federal Environmental Justice Resource Guide...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Community-Based Federal Environmental Justice Resource Guide (EJ IWG, 2015) Community-Based Federal Environmental Justice Resource Guide (EJ IWG, 2015) The Federal Interagency ...

  12. Notices and Rules Related to Federal Energy Management | Department...

    Energy.gov [DOE] (indexed site)

    DOE's Federal Energy Management Program (FEMP) issues notices and rules related to federal ... The following notices and rules were announced by DOE, FEMP, and BTO through the Federal ...

  13. 2009 Federal Energy and Water Management Award Winners | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 Federal Energy and Water Management Award Winners 2009 Federal Energy and Water Management Award Winners The Federal Energy and Water Management Awards recognize individuals, ...

  14. PP-13 Federal Power Commission | Department of Energy

    Office of Environmental Management (EM)

    3 Federal Power Commission PP-13 Federal Power Commission Presidential permit authorizing Federal Power Commission to construct, operate, and maintain electric transmission ...

  15. Federal Land Policy and Management Act of 1976 (FLPMA) | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Legal Document- Federal RegulationFederal Regulation: Federal Land Policy and Management Act of 1976 (FLPMA)Legal Abstract FLPMA, also called the BLM Organic Act,...

  16. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program) Jump to: navigation, search Logo: Federal Energy Management Program (FEMP) Name...

  17. US DOE Federal Energy Management Program (FEMP) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    US DOE Federal Energy Management Program (FEMP) (Redirected from Federal Energy Management Program (FEMP)) Jump to: navigation, search Logo: Federal Energy Management Program...

  18. Sample Documents for Federal On-Site Renewable Power Purchase...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sample Documents for Federal On-Site Renewable Power Purchase Agreements Sample Documents for Federal On-Site Renewable Power Purchase Agreements To help streamline the federal ...

  19. Denver Federal Center Solar Park | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Federal Center Solar Park Jump to: navigation, search Name Denver Federal Center Solar Park Facility Denver Federal Center Sector Solar Facility Type Photovoltaic Owner SunEdison...

  20. Federal Memorandum of Understanding for Hydropower | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Federal Memorandum of Understanding for Hydropower Jump to: navigation, search Federal Memorandum of Understanding for Hydropower Hydroelectric-collage2.jpg Home Federal Inland...