National Library of Energy BETA

Sample records for draft environmental impact

  1. EIS-0481: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Programmatic Environmental Impact Statement EIS-0481: Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic...

  2. EIS-0451: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supplemental Draft Environmental Impact Statement EIS-0451: Supplemental Draft ... Bonneville Power Administration (BPA) BPA prepared a supplemental draft EIS to evaluate an ...

  3. EIS-0403: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Programmatic Environmental Impact Statement EIS-0403: Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States Abstract: The BLM...

  4. EIS-0386: Draft Programmatic Environmental Impact Statement ...

    Office of Environmental Management (EM)

    Draft Programmatic Environmental Impact Statement EIS-0386: Draft Programmatic Environmental Impact ... would continue under current agency procedures for granting rights-of-way. ...

  5. EIS-0391: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0391: Draft Environmental Impact Statement Tank ... EIS-0391: Draft Environmental Impact Statement, Summary (3.65 MB) EIS-0391: Draft ...

  6. EIS-0288: Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Draft Environmental Impact Statement (EIS) for the Production of Tritium in a Commercial Light Water Reactor

  7. EIS-0525: Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Eastern United States

  8. EIS-0222: Draft Environmental Impact Statement

    Energy.gov [DOE]

    Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan

  9. EIS-0382: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0382: Draft Environmental Impact Statement Mesaba Energy Project, Itasca, MN This Draft Environmental Impact Statement (EIS) provides...

  10. EIS-0447: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0447: Draft Environmental Impact Statement DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to ...

  11. EIS-0336: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0336: Draft Environmental Impact Statement Tucson ... to Santa Ana.FE has prepared this Draft EIS to address the environmental impacts of the ...

  12. Environmental impact report (draft)

    SciTech Connect

    Not Available

    1980-05-01

    The three projects as proposed by Pacific Gas and Electric Company and the environmental analysis of the projects are discussed. Sections on the natural and social environments of the proposed projects and their surrounding areas consist of descriptions of the setting, discussions of the adverse and beneficial consequences of the project, and potential mitigation measures to reduce the effects of adverse impacts. The Environmental Impact Report includes discussions of unavoidable adverse effects, irreversible changes, long-term and cumulative impacts, growth-inducing effects, and feasible alternatives to the project. (MHR)

  13. EIS-0370: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0370: Draft Environmental Impact Statement Windy Gap Firming Project, Colorado Download Document PDF icon EIS-0370: Draft Environmental ...

  14. EIS-0375: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0375: Draft Environmental Impact Statement ... Waste and GTCC-Like Waste (Draft GTCC EIS) to evaluate the potential environmental ...

  15. EIS-0496: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0496: Draft Environmental Impact Statement San ... and state lead agencies, issued a draft EISEnvironmental Impact Report that assesses ...

  16. EIS-0491: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0491: Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory ...

  17. EIS-0325: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0325: Draft Environmental Impact Statement Schultz-Hanford Area Transmission Line Project This summary covers the major points of the Draft...

  18. EIS-0499: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0499: Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota DOE prepared this Draft EIS to evaluate the ...

  19. EIS-0377: Supplemental Draft Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0377: Supplemental Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project In May 2006, Western Area Power...

  20. EIS-0312: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2: Draft Environmental Impact Statement EIS-0312: Draft Environmental Impact Statement Fish and Wildlife Implementation Plan This EIS evaluates the environmental impacts associated...

  1. EIS-0319: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0319: Draft Environmental Impact Statement This EIS evaluates the potential direct, indirect, and cumulative environmental impacts...

  2. EIS-0394: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0394: Draft Environmental Impact Statement FutureGen Project The EIS provides information about the potential environmental impacts of the ...

  3. EIS-0250: Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Draft Environmental Impact Statement for a Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca Mountain (July 1999)

  4. EIS-0377: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0377: Draft Environmental Impact Statement Big Stone II Power Plant and Transmission Project This EIS evaluates the potential environmental...

  5. EIS-0483: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Draft Environmental Impact Statement EIS-0483: Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  6. EIS-0317-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Supplemental Environmental Impact Statement EIS-0317-S1: Draft Supplemental Environmental Impact Statement Kangley-Echo Lake Transmission Line Project Bonneville Power...

  7. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County, Colorado...

  8. EIS-0492: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0492: EPA Notice of Availability of Draft Environmental Impact Statement Oregon LNG Export Project ...

  9. EIS-0501: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0501: EPA Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; ...

  10. EIS-0463: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line ...

  11. EIS-0491: EPA Notice of Availability of Draft Environmental Impact...

    Energy Saver

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0491: EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, ...

  12. EIS-0486: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line ...

  13. EIS-0442: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0442: EPA Notice of Availability of Draft Environmental Impact Statement Reauthorization of Permits, ...

  14. EIS-0431: EPA Notice of Availability of Draft Environmental Impact...

    Energy Saver

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's ...

  15. EIS-0450: EPA Notice of Availability of Draft Environmental Impact...

    Energy Saver

    0: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express Transmission ...

  16. EIS-0487: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EPA Notice of Availability of Draft Environmental Impact Statement EIS-0487: EPA Notice of Availability of Draft Environmental Impact Statement Freeport LNG Liquefaction Project, ...

  17. EIS-0143: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Draft Environmental Impact Statement EIS-0143: Draft Environmental Impact Statement Eugene-Springfield Area Planning Project PDF icon EIS-0143-DEIS.pdf More Documents & ...

  18. EIS-0450: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0450: Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada This EIS, being ...

  19. EIS-0414: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project Energia Sierra Juarez U.S. Transmission, LLC ...

  20. EIS-0323: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0323: Draft Environmental Impact Statement Sacramento Area Voltage Support This Draft EIS evaluates the potential environmental effects of physical...

  1. EIS-0485: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0485: Draft Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska DOE's Western Area Power ...

  2. EIS-0477: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    77: Draft Environmental Impact Statement EIS-0477: Draft Environmental Impact Statement San Juan Basin Energy Connect Project; San Juan County, New Mexico and La Plata County,...

  3. EIS-0070: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0: Draft Environmental Impact Statement EIS-0070: Draft Environmental Impact Statement Mining, Construction and Operation for a Full-size Module at the Anvil Points Oil Shale ...

  4. EIS-0439: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0439: Draft Environmental Impact Statement Rice Solar Energy Project, Riverside County, CA Rice Solar Energy (RSE) has submitted an...

  5. EIS-0343: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0343: Draft Environmental Impact Statement COB Energy Facility COB Energy Facility, a subsidiary of Peoples Energy Resources Corporation...

  6. EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: DRAFT ENVIRONMENTAL IMPACT STATEMENT EIS-0165: Strategic Petroleum Reserve Alabama, Louisiana, Mississippi, and Texas ...

  7. EIS-0453: DOE Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Notice of Availability of Draft Environmental Impact Statement EIS-0453: DOE Notice of ... the Draft Environmental Impact Statement (EIS) for the Recapitalization of Infrastructure ...

  8. EIS-0279: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Draft Environmental Impact Statement EIS-0279: Draft Environmental Impact Statement The ... website due to the potential security sensitivity of some information in these documents. ...

  9. EIS-0395: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0395: Draft Environmental Impact Statement San Luis Rio Colorado Project The proposed transmission line would originate at the San Luis Rio...

  10. EIS-0376: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0376: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  11. EIS-0306: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  12. EIS-0082-S2: Draft Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    82-S2: Draft Environmental Impact Statement EIS-0082-S2: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on ...

  13. EIS-0271: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1: Draft Environmental Impact Statement EIS-0271: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this ...

  14. EIS-0309: Draft Site-Wide Environmental Impact Statement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Site-Wide Environmental Impact Statement EIS-0309: Draft Site-Wide Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA ...

  15. Draft Site-Wide Environmental Impact Statement Nevada Summary...

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room Draft Site-Wide Environmental Impact Statement Nevada Draft Site-Wide Environmental...

  16. EIS-0503: EPA Notice of Availability of Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    EPA announced the availability of the Draft EIS to evaluate the potential environmental ... Download Document EIS-0503: EPA Notice of Availability of Draft Environmental Impact ...

  17. HAWAI'I CLEAN ENERGY DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT...

    Energy.gov [DOE] (indexed site)

    HAWAI'I CLEAN ENERGY DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT SUMMARY (DOEEIS-0459) APRIL 2014 COVER SHEET TITLE: Hawai'i Clean Energy Draft Programmatic Environmental...

  18. EIS-0236-S1: Draft Supplemental Programmatic Environmental Impact Statement

    Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  19. EIS-0499: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0499: EPA Notice of Availability of Draft Environmental Impact Statement Great Northern Transmission Line Project, Minnesota EPA announced the availability of the Draft ...

  20. EIS-0453: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0453: Draft Environmental Impact Statement Recapitalization of Infrastructure Supporting Naval Spent Nuclear Fuel Handling at the Idaho National Laboratory The Draft EIS ...

  1. EIS-0337: Draft Environmental Impact Statement | Department of...

    Energy Saver

    EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management The purpose of the Draft West Valley Demonstration Project Waste Management ...

  2. EIS-0463: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0463: EPA Notice of Availability of Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire EPA announced the availability of the Draft Environmental Impact Statement (Draft EIS) for the Northern Pass Transmission Line Project. The Draft EIS evaluates the potential environmental impacts of a DOE proposal to grant a Presidential permit to Northern Pass

  3. EIS-0469: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0469: Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS evaluates the environmental impacts of...

  4. EIS-0523: Draft Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy : Draft Programmatic Environmental Impact Statement EIS-0523: Draft Programmatic Environmental Impact Statement Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States The First Responder Network Authority (FirstNet) in the U.S. Department of Commerce has prepared a Draft Programmatic Environmental Impact Statement (PEIS) to analyze the potential environmental impacts of a proposal to design, deploy and operate

  5. EIS-0521: EPA Notice of Availability of Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Gunnison Sage-Grouse Rangewide Draft Resource Management Plan Amendment and Draft Environmental Impact Statement

  6. EIS-0521: BLM Notice of Availability of Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Gunnison Sage-Grouse Rangewide Draft Resource Management Plan Amendment and Draft Environmental Impact Statement

  7. Draft Nevada National Security Site Environmental Impact Statement...

    Office of Environmental Management (EM)

    Nevada National Security Site Environmental Impact Statement Released Draft Nevada National Security Site Environmental Impact Statement Released July 25, 2011 - 12:00pm Addthis ...

  8. EIS-0332: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Impact Statement EIS-0332: Draft Environmental Impact Statement McNary-John Day Transmission Line Project Bonneville is proposing to construct, operate, and...

  9. EIS-0399: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Impact Statement EIS-0399: Draft Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-kV Transmission Line MATL proposes to construct and operate a...

  10. EIS-0425: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0425: Draft Environmental Impact Statement Bonneville Power Administration Mid-Columbia Coho Restoration Project, Chelan and Okanogan Counties, WA Draft Environmental Impact Statement for the Mid-Columbia Coho Restoration Program, DOE/EIS-0425 (June 2011) (25.49 MB) More Documents & Publications EIS-0425: Final

  11. EIS-0424: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4: Draft Environmental Impact Statement EIS-0424: Draft Environmental Impact Statement Klickitat Hatchery Complex Program; Klickitat and Yakima Counties, WA BPA issued a draft EIS that evaluates the potential environmental impacts of BPA's proposed funding of the construction, operation, and maintenance of modifications to the Klickitat Hatchery and the Yakama Nation's Hatchery Complex Program. For more information, see: www.energy.gov/node/299947. Download Document EIS-0424: Draft Environmental

  12. EIS-0530: Draft Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Draft Programmatic Environmental Impact Statement EIS-0530: Draft Programmatic Environmental Impact Statement Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Southern United States The First Responder Network Authority (FirstNet) in the U.S. Department of Commerce, with DOE as a cooperating agency, has prepared a Draft Programmatic Environmental Impact Statement (PEIS) to analyze the potential environmental impacts of a proposal to

  13. EIS-0447: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0460: EPA Notice of Availability of Final Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  14. EIS-0491: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana The Environmental Protection Agency issued a...

  15. EIS-0374: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0374: Draft Environmental Impact Statement Klondike IIIBiglow Canyon Project Wind Integration Project BPA has been asked by PPM Energy, Inc. to...

  16. EIS-0397: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0397: Draft Environmental Impact Statement Lyle Falls Fish Passage Project The underlying need for the project is to improve fish passage to...

  17. EIS-0286: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0286: Draft Environmental Impact Statement Hanford Site Solid (Radioactive and Hazardous) Waste Program, Richland, Washington DOE needs to provide...

  18. EIS-0511: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0511: EPA Notice of Availability of Draft Environmental Impact Statement Aguirre Offshore GasPort Project, Puerto Rico EPA announced the availability of the Federal Energy Regulatory Commission's Draft Environmental Impact Statement (DEIS) that analyzes the potential environmental impacts of a proposal to construct and operate: 1) an offshore marine liquid natural gas receiving facility

  19. EIS-0159: Draft Environmental Impact Statement | Department of Energy

    Energy Saver

    0: Draft Environmental Impact Statement EIS-0070: Draft Environmental Impact Statement Mining, Construction and Operation for a Full-size Module at the Anvil Points Oil Shale Facility, Rifle, Garfield County, Colorado EIS-0070-DEIS.pdf (3.45 MB) More Documents & Publications EIS-0068: Final Environmental Impact Statement EIS-0098: Final Environmental Impact Statement EIS-0073

    1: Final Environmental Impact Statement EIS-0071: Final Environmental Impact Statement Memphis Light, Gas and

  20. EIS-0491: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0491: EPA Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana The Environmental Protection Agency issued a notice of availability of a Draft EIS prepared by the Federal Energy Regulatory Commission (with DOE as a cooperating agency) that analyzes the potential environmental impacts of a proposal to construct and

  1. EIS-0333: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    33: Draft Environmental Impact Statement EIS-0333: Draft Environmental Impact Statement Bonneville Power Administration, Benton County, Washington This Draft Environmental Impact Statement (EIS) evaluates the environmental effects of BPA's Proposed Action to execute power purchase and interconnection agreements for the purpose of acquiring up to 50 average megawatts (aMW) (up to about 200 MW) of the project developer's proposed Maiden Wind Farm. DOE/EIS-0333, Bonneville Power Administration,

  2. EIS-0423-S1: Draft Supplemental Environmental Impact Statement | Department

    Office of Environmental Management (EM)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0423-S1: Draft Supplemental Environmental Impact Statement Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury This SEIS supplements the January 2011 Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury. It analyzes the potential environmental impact for a facility at and in the vicinity of the Waste Isolation Pilot Plant near Carlsbad,

  3. Draft Site-Wide Environmental Impact Statement Nevada | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Draft Site-Wide Environmental Impact Statement Nevada Draft site-wide environmental impact statement for the continued operation of the DOE/NNSA Nevada National Security Site and off-site locations in the State of Nevada The U.S. Department of Energy (DOE), National Nuclear Security Administration (NNSA) is pleased to present the "Draft Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear

  4. EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact Statement

    Office of Environmental Management (EM)

    Energy Revised Draft Environmental Impact Statement EIS-0226: Revised Draft Environmental Impact Statement Decommissioning and/or Long-Term Stewardship at the West Valley Demonstration Project and Western New York Nuclear Service Center This EIS has been prepared in accordance with NEPA and SEQR to examine the potential environmental impacts of the range of reasonable alternatives to decommission and/or maintain long-term stewardship at WNYNSC. The alternatives analyzed in this Draft EIS

  5. EIS-0480: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0: Draft Environmental Impact Statement EIS-0480: Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam The Bureau of Reclamation and the National Park Service issued a notice of availability of a Draft EIS that analyzes the potential environmental impacts of adopting a proposed Long-Term Experimental and Management Plan for the operation of Glen Canyon Dam in Page, Arizona. For more information, see: http://energy.gov/node/360931.

  6. EIS-0486: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0486: Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE prepared this Draft EIS to evaluate the potential environmental impacts of the proposed Plains & Eastern Project and alternatives to it. The proposed Project would include an overhead ± 600-kilovolt high-voltage direct current electric transmission system and associated facilities with the capacity to deliver approximately 3,500 megawatts primarily

  7. EIS-0487: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0487: Draft Environmental Impact Statement Freeport LNG Liquefaction Project, Brazoria County, Texas Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand an existing LNG import terminal and associated facilities in Brazoria County, Texas, to

  8. EIS-0493: Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy Availability of the Draft Environmental Impact Statement EIS-0493: Notice of Availability of the Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas; a marine berth

  9. EIS-0501: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0501: Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission prepared a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in Jefferson County, Texas, and associated pipeline facilities in Texas and Louisiana. DOE is a cooperating

  10. EIS-0501: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of Draft Environmental Impact Statement EIS-0501: EPA Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana EPA announced the availability of a Draft EIS, prepared by Federal Energy Regulatory Commission that analyzes the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass

  11. EIS-0501: Notice of Availability of Draft Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Notice of Availability of Draft Environmental Impact Statement EIS-0501: Notice of Availability of Draft Environmental Impact Statement Golden Pass LNG Export Project; Texas and Louisiana The Federal Energy Regulatory Commission announced the availability of a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate natural gas liquefaction and export facilities at the existing Golden Pass liquefied natural gas terminal in

  12. EIS-0503: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0503: Draft Environmental Impact Statement New England Clean Power Link Project, Vermont DOE prepared this Draft EIS to evaluate the potential environmental impacts of a DOE proposal to grant a Presidential permit to Transmission Developers, Inc.-New England, to construct, operate, maintain, and connect a new 1000-megawatt electric transmission system across the U.S.-Canada border near Alburgh, VT. The transmission line would connect to the Vermont

  13. EIS-0283-S2: Draft Supplemental Environmental Impact Statement | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Draft Supplemental Environmental Impact Statement EIS-0283-S2: Draft Supplemental Environmental Impact Statement Surplus Plutonium Disposition This Draft SEIS evaluates the potential environmental impacts of alternatives for disposition of 13.1 metric tons (14.4 tons) of surplus plutonium for which DOE has not made a disposition decision, including 7.1 metric tons (7.8 tons) of plutonium from pits that were declared excess to national defense needs after publication of the 2007

  14. EIS-0453: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 3: DOE Notice of Availability of Draft Environmental Impact Statement EIS-0453: DOE Notice of Availability of Draft Environmental Impact Statement Recapitalization of Infrastructure Supporting Naval Spent Nuclear Fuel Handling at the Idaho National Laboratory The U. S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement (EIS) for the Recapitalization of Infrastructure Supporting Naval Spent Nuclear Fuel Handling

  15. EIS-0474: Notice of Availability of Draft Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Notice of Availability of Draft Environmental Impact Statement EIS-0474: Notice of Availability of Draft Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico The Bureau of Land Management and Western Area Power Administration announce the availability a draft EIS to evaluate the potential environmental impacts of the proposed Southline Transmission Project and address associated potential land use plan amendments. The project would

  16. EIS-0486: DOE Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy Draft Environmental Impact Statement EIS-0486: DOE Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project DOE announces the availability of a draft EIS that evaluates the potential environmental impacts of DOE participating with Clean Line Energy Partners LLC (Clean Line) in the proposed Plains & Eastern Project. The proposed project would include an overhead ± 600 kilovolt (kV) high voltage

  17. EIS-0486: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy Draft Environmental Impact Statement EIS-0486: EPA Notice of Availability of Draft Environmental Impact Statement Plains & Eastern Clean Line Transmission Project EPA announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project. The comment period ends on March 19, 2015, as indicated in the EPA correction notice. For more information visit the project page:

  18. EIS-0488: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG)

  19. EIS-0491: FERC Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 1: FERC Notice of Availability of Draft Environmental Impact Statement EIS-0491: FERC Notice of Availability of Draft Environmental Impact Statement Lake Charles Liquefaction Project, Calcasieu Parish, Louisiana Federal Energy Regulatory Commission issued a notice of availability of a Draft EIS that analyzes the potential environmental impacts of a proposal to construct and operate the Lake Charles Liquefaction Project. For more information on this project,

  20. EIS-0493: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    93: Draft Environmental Impact Statement EIS-0493: Draft Environmental Impact Statement The Federal Energy Regulatory Commission (FERC), with DOE as a cooperating agency, issued a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate a liquefied natural gas export and import terminal on the north shore of Corpus Christi Bay in Nueces and San Patricio Counties, Texas; a marine berth connecting the terminal to the adjacent La Quinta Channel; and an

  1. EIS-0474: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0474: EPA Notice of Availability of Draft Environmental Impact Statement Southline Transmission Line Project; Arizona and New Mexico EPA announces the availability of the ...

  2. EIS-0483: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement EIS-0483: EPA Notice of Availability of Draft Environmental Impact Statement Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado...

  3. EIS-0373: Draft Environmental Impact Statement, Summary | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon DOEEIS-0373, Department of Energy, Office of Nuclear Energy Science and Technology, Draft Environmental Impact Statement for the Proposed Consolidation of Nuclear ...

  4. EIS-0427: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0427: Draft Environmental Impact Statement Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona The Grapevine Canyon Wind Project, proposed by...

  5. EIS-0521: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    Western Area Power Administration is participating as a cooperating agency due to the ... EIS-0521: Draft Environmental Impact Statement (32.51 MB) More Documents & Publications ...

  6. EIS-0495: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Draft Environmental Impact Statement More Documents & Publications EIS-0350-S1: Extension of the Public Review and Comment Period and Announcement of an Additional...

  7. EIS-0007: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0007: Draft Environmental Impact Statement Low-BTU Coal Gasification Facility and Industrial Park PDF icon EIS-0007-DEIS.pdf More Documents & Publications EIS-0099: Final ...

  8. EIS-0377: Notice of Availability of the Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    Area Power Administration (Western) announces the availability of the Supplemental Draft Big Stone II Power Plant and Transmission Project Environmental Impact Statement for public...

  9. EIS-0288-S1: Draft Supplemental Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Production of Tritium in a Commercial Light Water Reactor The Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor ...

  10. EIS-0425: EPA Notice of Availability of Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    Notice of Availability of Draft Environmental Impact Statement for the Mid-Columbia Coho Restoration Program, DOEEIS-0425 (June 2011 - 76 FR 37111) More Documents & Publications...

  11. EIS-0431: DOE Notice of Availability of Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    Integrated Gasification Combined Cycle and Carbon Capture and Sequestration Project, Kern County, CA DOE announces the availability of the Draft Environmental Impact Statement for ...

  12. EIS-0433: DOE Comments on the Draft Environmental Impact Statement...

    Energy.gov [DOE] (indexed site)

    XL Project. Comments on the Draft Environmental Impact Statement for the Keystone XL Pipeline Project, DOEEIS-433 (July 2010) More Documents & Publications EIS-0433: Final...

  13. EIS-0349: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    areas; access roads; and wetland mitigation areas.This Draft EIS assesses the existing natural and built environment, evaluates the potential environmental impacts and economic...

  14. EIS-0238: Draft Site-Wide Environmental Impact Statement

    Energy.gov [DOE]

    Draft Site-Wide Environmental Impact Statement on the Continued Operation of the Los Alamos National Laboratory, Los Alamos, New Mexico

  15. EIS-0498: Draft Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    EIS-0498: Draft Environmental Impact Statement Magnolia LNG and Lake Charles Expansion ... and operate the proposed Magnolia LNG Project, an on-land liquefied natural gas ...

  16. EIS-0487: Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    EIS-0487: Notice of Availability of Draft Environmental Impact Statement Freeport LNG ... the Freeport Liquefied Natural Gas (LNG) Liquefaction Project, which would expand ...

  17. EIS-0492: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0492: Draft Environmental Impact Statement Oregon LNG Export Project (Warrenton, OR) ... of the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. ...

  18. EIS-0063: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0063: Draft Environmental Impact Statement Waste Management Operations, Double-Shell Tanks for Defense High-Level Radioactive Waste Storage, Hanford Site, Richland, Washington ...

  19. EIS-0284: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0284: Draft Environmental Impact Statement Low-Emission Boiler System Proof-of-Concept Project The Department of Energy (DOE) limits electronic access to certain NEPA documents ...

  20. EIS-0103: Draft Environmental Impact Statement | Department of...

    Energy Saver

    EIS-0103: Draft Environmental Impact Statement New EnglandHydro-Quebec 450-kV Direct Current Transmission Line Interconnection The Economic Regulatory Administration prepared this ...

  1. EIS-0495: EPA Notice of Availability of Draft Environmental Impact...

    Office of Environmental Management (EM)

    of Availability of Draft Environmental Impact Statement EIS-0495: Walla Walla Basin Spring Chinook Hatchery Program; Umatilla County, Oregon EPA announced the availability of...

  2. EIS-0526: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0526: Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish ... the Lower Yellowstone Intake Diversion Dam Fish Passage Project, a proposal to improve ...

  3. Notice of Availability (NOA) for the Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113 - Jun. 12, 2015 Notice of Availability (NOA) for the Draft Environmental Impact ...

  4. EIS-0431: EPA Notice of Availability of Draft Environmental Impact...

    Energy Saver

    EIS-0431: EPA Notice of Availability of Draft Environmental Impact Statement Hydrogen Energy California's Integrated Gasification Combined Cycle and Carbon Capture and...

  5. EIS-0515: Supplemental Draft Environmental Impact Statement | Department of

    Energy Saver

    Impact Statement | Department of Energy 5: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: Vantage to Pomona Heights 230 kV Transmission Line Project; Yakima, Grant, Benton, and Kittitas Counties, Washington EPA announced the availability of a Supplemental Draft EIS (prepared by the Bureau of Land Management with Bonneville Power Administration as a cooperating

  6. EIS-0488: Notice of Availability Draft Environmental Impact Statement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Availability Draft Environmental Impact Statement EIS-0488: Notice of Availability Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) announced the availability of a Draft EIS for a proposal to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy and export LNG and to expand an existing pipeline by 21 miles. DOE is a cooperating agency in preparing the

  7. EIS-0450: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 0: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0450: EPA Notice of Availability of Draft Environmental Impact Statement TransWest Express Transmission Project; Wyoming, Colorado, Utah, and Nevada EPA announces the availability of the Draft EIS for the TransWest Express Transmission Project in Wyoming, Colorado, Utah, and Nevada. The Bureau of Land Management and DOE's Western Area Power Administration, joint lead agencies for the

  8. EIS-0488: EPA Notice of Availability of Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 8: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0488: EPA Notice of Availability of Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, Cameron Parish, Louisiana. The Federal Energy Regulatory Commission (FERC) proposes to expand an existing liquefied natural gas (LNG) import terminal to enable it to liquefy

  9. EIS-0290: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0290: Draft Environmental Impact Statement U.S. Department of Energy Idaho National Engineering and Environmental Laboratory Advanced Mixed Waste Treatment Project This EIS evaluates the potential environmental impacts associated with four alternatives related to the construction and operation of a proposed waste treatment facility at the INEEL. Four alternatives were analyzed: the No Action Alternative, the Proposed Action, the Non-Thermal Treatment

  10. Energy Transport Corridor Draft Environmental Impact Statement Available

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for Review | Department of Energy Transport Corridor Draft Environmental Impact Statement Available for Review Energy Transport Corridor Draft Environmental Impact Statement Available for Review August 1, 2008 - 3:08pm Addthis The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense are anticipating a summer release of a Final Programmatic Environmental Impact Statement (PEIS) proposing designation of energy

  11. EIS-0105: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5: Draft Environmental Impact Statement EIS-0105: Draft Environmental Impact Statement Conversion to Coal, Baltimore Gas & Electric Company, Brandon Shores Generating Station Units 1 and 2, Anne Arundel County, Maryland The U.S. Department of Energy's Economic Regulatory Administration Office of Fuels Program, Coal and Electricity Division prepared this statement to assess the potential environmental and socioeconomic impacts associated with prohibiting the use of petroleum products as a

  12. EIS-0487: EPA Notice of Availability of Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of a Draft Environmental Impact Statement EIS-0473: DOE Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the availability of the Draft Environmental Impact Statement for the W.A. Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE/EIS-0473D) for public review and comment, as well as the

  13. EIS-0528: DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Western United States

  14. EIS-0527: Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Central United States

  15. EIS-0236-S1: Notice of Availability for the Draft Supplemental Programmatic Environmental Impact Statement

    Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  16. EIS-0236-S1: DOE Notice of Availability of the Draft Environmental Impact Statement

    Energy.gov [DOE]

    National Ignition Facility Draft Environmental Impact Statement to the Stockpile Stewardship and Management

  17. EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement

    Energy.gov [DOE]

    Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

  18. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury

  19. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  20. EIS-0129: Draft Environmental Impact Statement | Department of...

    Energy Saver

    EIS-0129: Draft Environmental Impact Statement New EnglandHydro-Quebec 450 kV Transmission Line Interconnection - Phase II EIS-0129-DEIS.pdf (3.27 MB) More Documents & ...

  1. Draft Environmental Impact Statement for the Disposal of Greater...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Friday, February 18, 2011 Draft Environmental Impact Statement for the Disposal of ... many as 50,000 diagnostic medical procedures every day in the U.S. Today, the ...

  2. EIS-0310: Draft Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 10: Draft Programmatic Environmental Impact Statement EIS-0310: Draft Programmatic Environmental Impact Statement Under the authority of the Atomic Energy Act of 1954, as amended, the DOE is responsible for ensuring the availability of isotopes for medical, industrial and research applications, meeting the nuclear material needs of other Federal agencies, and undertaking research and development activities related to development of nuclear power for civilian use. To meet these

  3. EIS-0396: Draft Programmatic Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 6: Draft Programmatic Environmental Impact Statement EIS-0396: Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The proposed Global Nuclear Energy Partnership (GNEP) Program, which is part of the President's Advanced Energy Initiative, is intended to support a safe, secure, and sustainable expansion of nuclear energy, both domestically and internationally. Domestically, the GNEP Program would promote technologies that support economic, sustained

  4. EIS-0372: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0372: Draft Environmental Impact Statement Bangor Hydro-Electric Company (BHE) Northeast Reliability Interconnect The purpose and need for DOE's action is to respond to BHE's request to amend Presidential Permit PP-89. DOE may issue or amend a Presidential permit if it determines that the action is in the public interest and after obtaining favorable recommendations from the U.S. Departments of State and Defense. In determining whether issuance or

  5. EIS-0459: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications EIS-0459: Final Programmatic Environmental Impact Statement Hawai'i's Evolution: Hawai'i Powered. Technology Driven. EIS-0459: Amended Notice of ...

  6. EIS-0472: Draft Programmatic Environmental Impact Statement ...

    Energy Saver

    Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado This EIS evaluates the environmental impacts of management alternatives for DOE's Uranium Leasing ...

  7. EIS-0408: Draft Programmatic Environmental Impact Statement ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This EIS, being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife Service, will evaluate the environmental impacts ...

  8. EIS-0477: Notice of Availability of Draft Environmental Impact Statement

    Energy.gov [DOE]

    In accordance with the National Environmental Policy Act of 1969, as amended (NEPA), the Bureau of Land Management (BLM) has prepared a Draft Environmental Impact Statement (EIS) for the San Juan Basin Energy Connect Project (Project) and by this notice is announcing the opening of the comment period.

  9. Resource Contingency Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-02-01

    In 1990, the Bonneville Power Administration (BPA) embarked upon the Resource Contingency Program (RCP) to fulfill its statutory responsibilities to supply electrical power to its utility, industrial and other customers in the Pacific Northwest. Instead of buying or building generating plants now, BPA has purchased options to acquire power later if needed. Three option development agreements were signed in September 1993 with three proposed natural gas-fired, combined cycle combustion turbine CT projects near Chehalis and Satsop Washington and near Hermiston, Oregon. This environmental impact statement addresses the environmental consequences of purchasing power from these options. This environmental impact statement addresses the environmental consequences of purchasing power from these options.

  10. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    D - ENVIRONMENTAL JUSTICE METHODOLOGY Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States APPENDIX D - ENVIRONMENTAL JUSTICE METHODOLOGY September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192

  11. EIS-0391: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement Tank Closure and Waste Management for the Hanford Site, Richland, WA EIS-0391-DEA-NOA-2009.pdf (134.82 KB) More Documents & Publications EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0527: EPA Notice of Availability of a Draft Programmatic Environmental Impact

  12. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 - CUMULATIVE IMPACTS Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 11 - CUMULATIVE IMPACTS September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal

  13. EIS-0453: Draft Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE prepared this Draft EIS to evaluate the potential environmental impacts associated with recapitalizing the infrastructure needed to ensure the long-term capability of the Naval Nuclear Propulsion Program (NNPP) and to support naval spent nuclear fuel handling capabilities provided by the Expended Core Facility (ECF). Significant upgrades are necessary to ECF infrastructure and water pools to continue safe and environmentally responsible naval spent nuclear fuel handling until at least 2060.

  14. EIS-0451: EPA Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0451: EPA Notice of Availability of a Draft Environmental Impact Statement Hooper Springs Transmission Project, Caribou County, Idaho EPA announces the availability of the Hooper Springs Project, Caribou County, Idaho Draft Environmental Impact Statement. EIS-0451-DEIS-EPANOA-2013.pdf (194.56 KB) More Documents & Publications EIS-0433-S1: EPA Notice of Availability of a Draft

  15. EIS-0530: EPA Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0530: EPA Notice of Availability of a Draft Environmental Impact Statement Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Southern United States TheEnvironmental Protection Agency announces the availability of the Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Southern United States. For

  16. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    VOLUME 17 - CHAPTERS 19-25 & APPENDICES Colorado Illinois Indiana Iowa Kansas Michigan Minnesota Missouri Montana Nebraska North Dakota Ohio South Dakota Utah Wisconsin Wyoming Page Intentionally Left Blank. August 2016 First Responder Network Authority Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Central United States VOLUME 17 - CHAPTERS 19-25 & APPENDICES Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network

  17. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A - COOPERATING AGENCIES Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States APPENDIX A - COOPERATING AGENCIES September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal

  18. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    B - SCOPING REPORT Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States APPENDIX B - SCOPING REPORT September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal Communications

  19. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    C - APPLICABLE LAWS AND REGULATIONS, EXECUTIVE ORDERS, AND GUIDANCE Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States APPENDIX C - APPLICABLE LAWS AND REGULATIONS, EXECUTIVE ORDERS, AND GUIDANCE September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of

  20. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    E - AIR QUALITY Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States APPENDIX E - AIR QUALITY September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal Communications

  1. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0 - COMPARISON OF ALTERNATIVES Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 10 - COMPARISON OF ALTERNATIVES September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating

  2. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 - OTHER REQUIRED ANALYSES Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 12 - OTHER REQUIRED ANALYSES September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies

  3. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 - LIST OF PREPARERS AND CONTRIBUTORS Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 13 - LIST OF PREPARERS AND CONTRIBUTORS September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192

  4. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 - DISTRIBUTION LIST Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 14 - DISTRIBUTION LIST September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal

  5. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 - GLOSSARY Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 15 - GLOSSARY September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal Communications Commission

  6. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CHAPTER 1 - INTRODUCTION Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 1 - INTRODUCTION September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243 Reston, VA 20192 Cooperating Agencies Federal

  7. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 - BEST MANAGEMENT PRACTICES AND MITIGATION MEASURES Arizona California Idaho Nevada Oregon Washington Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Western United States CHAPTER 9 - BEST MANAGEMENT PRACTICES AND MITIGATION MEASURES September 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr.

  8. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    B Alabama Arkansas Florida Georgia Kentucky Louisiana Mississippi New Mexico North Carolina Oklahoma South Carolina Tennessee Texas Page Intentionally Left Blank. Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Southern United States VOLUME 14 - APPENDIX B October 2016 First Responder Network Authority Amanda Goebel Pereira, AICP NEPA Coordinator First Responder Network Authority U.S. Department of Commerce 12201 Sunrise Valley Dr. M/S 243

  9. EIS-0355: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0355: DOE Notice of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S. Department of Energy's

  10. EIS-0530: DOC Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy DOC Notice of Availability of a Draft Environmental Impact Statement EIS-0530: DOC Notice of Availability of a Draft Environmental Impact Statement Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Southern United States The Department of Commerce announces the availability of the Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Southern United States. For more

  11. EIS-0375: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste Download Document EIS-0375: DOE Notice of Availability of the Draft Environmental Impact Statement (152.08 KB) More Documents & Publications EIS-0375: DOE Notice of Availability of Final Environmental Impact Statement

  12. EIS-0387: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft Environmental Impact Statement Y-12 National Security Complex Project, Oak Ridge, Tennessee EIS-0387-DEIS-EPANOA-2009.pdf (134.82 KB) More Documents & Publications EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0374: EPA Notice of Availability of the Final Environmental Impact Statement EIS-0527:

  13. Draft Uranium Leasing Program Programmatic Environmental Impact...

    Energy Saver

    ... 3-73 5 6 3.4-6 Water Use by Category for Mesa, ... in the DOE 16 Lease Tracts Based on Environmental Monitoring ... samples or the potential hot 5 spot concentrations (168 ...

  14. Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) has prepared this Draft Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (Draft...

  15. Supplement to the Surplus Plutonium Disposition Draft Environmental Impact Statement

    SciTech Connect

    N /A

    1999-05-14

    On May 22, 1997, DOE published a Notice of Intent in the Federal Register (62 Federal Register 28009) announcing its decision to prepare an environmental impact statement (EIS) that would tier from the analysis and decisions reached in connection with the ''Storage and Disposition of Weapons-Usable Fissile Materials Final Programmatic EIS (Storage and Disposition PEIS)''. ''The Surplus Plutonium Disposition Draft Environmental Impact Statement'' (SPD Draft EIS) (DOWEIS-0283-D) was prepared in accordance with NEPA and issued in July 1998. It identified the potential environmental impacts of reasonable alternatives for the proposed siting, construction, and operation of three facilities for plutonium disposition. These three facilities would accomplish pit disassembly and conversion, immobilization, and MOX fuel fabrication. For the alternatives that included MOX fuel fabrication, the draft also described the potential environmental impacts of using from three to eight commercial nuclear reactors to irradiate MOX fuel. The potential impacts were based on a generic reactor analysis that used actual reactor data and a range of potential site conditions. In May 1998, DCE initiated a procurement process to obtain MOX fuel fabrication and reactor irradiation services. The request for proposals defined limited activities that may be performed prior to issuance of the SPD EIS Record of Decision (ROD) including non-site-specific work associated with the development of the initial design for the MOX fuel fabrication facility, and plans (paper studies) for outreach, long lead-time procurements, regulatory management, facility quality assurance, safeguards, security, fuel qualification, and deactivation. No construction on the proposed MOX facility would begin before an SPD EIS ROD is issued. In March 1999, DOE awarded a contract to Duke Engineering & Services; COGEMA, Inc.; and Stone & Webster (known as DCS) to provide the requested services. The procurement process included

  16. Proposed residential building standards: draft environmental impact report

    SciTech Connect

    Not Available

    1981-03-01

    The Warren-Alquist Act of 1974 requires the California Energy Commission to adopt and periodically update energy-conservation standards for new residential buildings. The Act also requires the CEC to adopt performance standards for new buildings. With increased energy costs, the CEC staff proposed to update the current energy-conservation standards and they are a hybrid of performance and prescriptive requirements. The proposed standards do not cover hotels, motels, or buildings over 3 stories high. The purpose of an environmental impact report (EIR) is to provide public agencies and the public in general with detailed information about the effects a proposed project is likely to have on the environment, to list ways in which the significant effects of such a project might be minimized, and to indicate alternatives to the project. The contents of this Draft EIR includes: a project description; a description of the environmental setting, impacts, and mitigation measures; a discussion of alternatives; and an indication of growth-inducing impacts. The Draft EIR discusses both environmental and socio-economic impacts of the proposed standards compared to both the current standards and the pre-1975 practices. (MCW)

  17. EIS-0336: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement and Public Hearings | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings EIS-0336: DOE Notice of Availability of the Draft Environmental Impact Statement and Public Hearings Proposed Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line The Department of Energy (DOE) announces the availability of the Tucson Electric Power Company (TEP) Sahuarita-Nogales Transmission Line Draft Environmental Impact

  18. EIS-0414: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement and Notice of Public Hearing | Department of Energy 14: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  19. EIS-0464: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0464: DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas DOE announces the availability of the Lake Charles Carbon Capture and Sequestration Project Draft Environmental Impact Statement (DOE/EIS-0464D) for public review and comment, as well as the dates,

  20. Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana - Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement- Addendum June 2016 1 Addendum: Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana Draft Environmental Impact Statement Introduction The Corps of Engineers (Corps) and the Bureau of Reclamation (Reclamation) have prepared this addendum to the Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Environmental Impact Statement (EIS) to provide the public with the

  1. EIS-0423: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement and Notice of Public Hearings | Department of Energy Draft Environmental Impact Statement and Notice of Public Hearings EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings Long-Term Management and Storage of Elemental Mercury Download Document EIS-0423: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearings (38.97 KB) More Documents & Publications EIS-0423: DOE Notice of

  2. Sacramento Area Voltage Support Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2002-11-15

    The Western Area Power Administration's Central Valley Project transmission system forms an integral part of the interconnected Sacramento area transmission grid. Western is contractually responsible to oversee that the system is operated in accordance with strict reliability standards. Growth in the greater Sacramento, California area and power imported from generation outside the region, have increased the demand on the interconnected electric transmission system, leading to transmission system overloads and reducing the reliability and security of the area power system. Western has prepared this Sacramento Area Voltage Support (SVS) Draft Environmental Impact Statement (EIS) in compliance with Federal laws, regulations and guidelines, principally the ''National Environmental Policy Act'' (NEPA). This Draft EIS evaluates the potential environmental effects of physical improvements to the area's power system. Enhancements are needed to improve system reliability and provide voltage support for the Sacramento area. The results of public scoping meetings, workshops, meetings with agencies, and earlier studies by Western and area utilities helped to develop a range of alternatives for analysis. The Proposed Action involves: Constructing a new double-circuit, 230-kV transmission line paralleling the existing double-circuit, 230-kV line from the O'Banion Substation to the Elverta Substation; Realigning a portion of the existing Cottonwood-Roseville single-circuit, 230-kV transmission line north of Elverta Substation; and Reconductoring the existing double-circuit, 230-kV transmission line from the Elverta Substation to the Tracy Substation. Public Hearings on the Draft EIS will be held between December 9-12, 2002. Comments on this Draft EIS are encouraged and should be sent to Ms. Loreen McMahon (above). Comments must be received by December 30, 2002.

  3. DOE/EIS-0333; Draft NEPA/SEPA Environmental Impact Statement...

    Energy Saver

    Maiden Wind Farm We would like to hear from you about Bonneville Power Administration (BPA) and Benton County's Draft Environmental Impact Statement (EIS) for the Maiden Wind Farm. ...

  4. EIS-0407: DOE Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement EIS-0407: DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas E9-22920.pdf (138.89 KB) More Documents & Publications EIS-0407: Notice of Intent to Prepare an Environmental Impact Statement EIS-0407: Amended Notice of Intent to Modify the Scope of the Environmental Impact

  5. EIS-0526: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0526: EPA Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana EPA issued a notice of availability for a Draft EIS, prepared by the U.S. Army Corps of Engineers and the Bureau of Reclamation as joint lead agencies, for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  6. EIS-0426: Draft Site-Wide Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Draft Site-Wide Environmental Impact Statement EIS-0426: Draft Site-Wide Environmental Impact Statement Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada Abstract: This Site-Wide Environmental Impact Statement for the Continued Operation of the Department of Energy/National Nuclear Security Administration Nevada National Security Site and Off-Site Locations in the State of Nevada (NNSS SWEIS) analyzes the potential environmental

  7. EIS-0469: EPA Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy 9: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement Wilton IV Wind Energy Center; Burleigh County, North Dakota This EIS will evaluate the environmental impacts of interconnecting NextEra Energy Resources proposed Wilton IV Wind Energy Center Project, near Bismarck, North Dakota, to one of DOE's Western Area Power Administration's existing substations and to

  8. BP Cherry Point Cogeneration Project, Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2003-09-19

    respective decision-making processes associated with the Applicant's request to interconnect to Bonneville's transmission system and proposed location of the project within wetland areas. Therefore, this Draft EIS serves as the environmental review document for SEPA and for NEPA as required by Bonneville for the interconnection and the Corps for its 404 individual permit. The EIS addresses direct, indirect, and cumulative impacts of the proposed project, and potential mitigation measures proposed by the Applicant, as well as measures recommended by EFSEC. The information and resulting analysis presented in this Draft EIS are based primarily on information provided by the Applicant in the ASC No. 2002-01 (BP 2002). Where additional information was used to evaluate the potential impacts associated with the proposed action, that information has been referenced. EFSEC's environmental consultant, Shapiro and Associates, Inc., did not perform additional studies during the preparation of this Draft EIS.

  9. EIS-0473: DOE Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy DOE Notice of Availability of a Draft Environmental Impact Statement EIS-0473: DOE Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX DOE announces the availability of the Draft Environmental Impact Statement for the W.A. Parish Post-Combustion Carbon Dioxide (CO2) Capture and Sequestration Project (DOE/EIS-0473D) for public review and comment, as well as the

  10. EIS-0473: EPA Notice of Availability of a Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0473: EPA Notice of Availability of a Draft Environmental Impact Statement W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX EPA announces the availability of the W.A. Parish Post-Combusion CO2 W.A. Parish Post-Combustion CO2 Capture and Sequestration Project, Fort Bend County, TX Draft Environmental Impact Statement. EIS-0473-DEIS-EPANOA-2012.pdf

  11. EIS-0418: Draft Environmental Impact Statement | Department of...

    Office of Environmental Management (EM)

    (14.12 MB) More Documents & Publications EIS-0418: Final Environmental Impact Statement EIS-0413: Final Environmental Impact Statement Software Dedication Using NQA-1 - June 2012

  12. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect

    Not Available

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  13. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  14. EIS-0460: EPA Notice of Availability of the Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0460: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project, Morgan County, Illinois The Environmental Protection Agency (EPA) announces the availability of the Draft EIS for the FutureGen 2.0 Project, Morgan County, Illinois EIS-0460-DEIS-EPA-NOA-2013.pdf (197.52 KB) More Documents & Publications EIS-0288-S1: EPA Notice of Availability of

  15. EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact...

    Energy Saver

    EIS-0480: Notice of Intent to Prepare a Draft Environmental Impact Statement Long-Term Experimental and Management Plan for the Operation of Glen Canyon Dam, AZ Two agencies of the ...

  16. EIS-0250-S2 and EIS-0369: Draft Supplemental Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0250-S2 and EIS-0369: Draft Supplemental Environmental Impact Statement Geologic Repository for the Disposal of Spent Nuclear Fuel and High-Level Radioactive Waste at Yucca...

  17. DOE Extends Public Comment Period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) has extended the public comment period for the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (ULP PEIS) to July 1, 2013.

  18. EIS-0387: Draft Site-Wide Environmental Impact Statement | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Draft Site-Wide Environmental Impact Statement EIS-0387: Draft Site-Wide Environmental Impact Statement Y-12 National Security Complex, Oak Ridge, TN The NNSA, a separately organized agency within the DOE, has the responsibility to maintain the safety, reliability, and security of the U.S. nuclear weapons stockpile to meet national security requirements. NNSA manages nuclear weapons programs and facilities, including those at the Y-12 National Security Complex (Y-12) at Oak Ridge,

  19. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement | Department of Energy Revision to EPA Notice Of Availability Draft Environmental Impact Statement EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire This Notice of Availability was first published in the Federal Register on July 31, 2015. The Notice was amended in the October 9, 2015, Federal Register to extend the comment period to December 31, 2015. For more information, including possible

  20. EIS-0337: DOE Notice of Availability of the Draft Environmental Impact

    Office of Environmental Management (EM)

    6: Draft Environmental Impact Statement EIS-0306: Draft Environmental Impact Statement The Department of Energy (DOE) limits electronic access to certain NEPA documents on this website due to the potential security sensitivity of some information in these documents. DOE regrets any inconvenience caused by this decision, which reflects an awareness of the need to protect the public. For information on how to request a copy of a secure DOE NEPA document visit the Secure NEPA Documents page. More

  1. EIS-0511: EPA Notice of Availability of Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    EPA announced the availability of the Federal Energy Regulatory Commission's Draft ... of the DEIS. Download Document EIS-0511: EPA Notice of Availability of Draft ...

  2. EIS-0415: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    South Dakota For more information, see the project page: http:energy.govnode302023. EIS-0415-DEIS-2010.pdf More Documents & Publications EIS-0478: Final Environmental Impact...

  3. EIS-0355: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, ... Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground ...

  4. EIS-0438: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    Albany County, WY This EIS evaluates the potential environmental impacts of interconnecting the proposed 300-megawatt Hermosa West Wind Farm Project, in Albany County, Wyoming, ...

  5. EIS-0359: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF6) conversion facility at the ...

  6. EIS-0506: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    environmental impacts of a proposal to improve fish habitat by restoring stream and floodplain functions, restoring instream fish habitat complexity, and improving water quality ...

  7. EIS-0495: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications EIS-0495: Notice of Intent to Prepare an Environmental Impact Statement EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project...

  8. EIS-0321: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    Condon Wind Project This EIS evaluates the potential environmental impacts of executing one or more power purchase and transmission services agreements to acquire and transmit up...

  9. EIS-0361: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    Record of Decision and Floodplain Statement of Findings EIS-0361: Notice of Intent to Prepare an Environmental Impact Statement and Notice of FloodplainWetlands Involvement...

  10. EIS-0387: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0387: EPA Notice of Availability of the Draft ... More Documents & Publications EIS-0391: EPA Notice of Availability of the Draft ...

  11. EIS-0488: EPA Notice of Availability of Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    EPA announces the availability of the Draft EIS for the Cameron Liquefaction Project, ... EIS-0487: Notice of EIS Adoption EIS-0288-S1: Revision to EPA Notice of Availability Draft ...

  12. Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor

    National Nuclear Security Administration (NNSA)

    FRONT COVER Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor U.S. Department of Energy National Nuclear Security Administration DOE/EIS-0288-S1 August 2014 ACRONYMS AND ABBREVIATIONS CFR Code of Federal Regulations CLWR commercial light water reactor CO2e carbon dioxide equivalent DOE U.S. Department of Energy EIS environmental impact statement EPA U.S. Environmental Protection Agency °F degrees Fahrenheit FR Federal Register

  13. EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact...

    Energy.gov [DOE] (indexed site)

    to the Programmatic Environmental Impact Statement on: (1) wheter to proceed with a Modern Pit Facility (MPF); and (2) if so, where to locate a MPF. EIS-0236-S2-DEIS-Summary-200...

  14. EIS-0236-S2: Draft Supplemental Programmatic Environmental Impact...

    Energy.gov [DOE] (indexed site)

    to the Programmatic Environmental Impact Statement on: (1) whether to proceed with a Modern Pit Facility (MPF); and (2) if so, where to locate a MPF. EIS-0236-S2-DEIS-Summary-200...

  15. EIS-0231: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    This EIS evaluates the environmental impacts of a proposal to by Dine Power Authority, a Navajo Nation enterprise, to construct, operate, and maintain a 500 kilovolt (kV)...

  16. EIS-0378: Draft Environmental Impact Statement | Department of...

    Energy Saver

    PDF icon EIS-0378-DEIS-Summary-2007.pdf PDF icon EIS-0378-DEIS-2007.pdf More Documents & Publications EIS-0378: Final Environmental Impact Statement EIS-0378-SA-01: Supplement ...

  17. EIS-0391: EPA Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    1: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0391: EPA Notice of Availability of the Draft Environmental Impact Statement Tank Closure and Waste ...

  18. EIS-0526: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0526: EPA Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake ...

  19. EIS-0469: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    69: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0469: EPA Notice of Availability of a Draft Environmental Impact Statement Wilton IV Wind Energy ...

  20. EIS-0284: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0284: EPA Notice of Availability of the Draft Environmental Impact Statement Low Emission Boiler System ...

  1. EIS-0457: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    7: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0457: Albany-Eugene ...

  2. EIS-0413: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    13: EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0413: EPA Notice of Availability of a Draft Environmental Impact Statement Searchlight Wind Energy ...

  3. EIS-0451: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of a Draft Environmental Impact Statement EIS-0451: EPA Notice of Availability of a Draft Environmental Impact Statement Hooper Springs Transmission ...

  4. EIS-0404: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement EIS-0404: EPA Notice of Availability of the Draft Environmental Impact Statement Los Vaqueros Reservoir Expansion Project, California...

  5. EIS-0440: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement Quartzsite Solar Energy ...

  6. EIS-0441: EPA Notice of Availability of a Draft Environmental...

    Office of Environmental Management (EM)

    a Draft Environmental Impact Statement Mohave County Wind Farm Project, Mohave County, Arizona EPA announces the availability of BLM's Draft Environmental Impact Statement for the...

  7. Yakima Fisheries Project : Revised Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1995-05-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. The Yakima Fisheries Project (YFP), included in the Northwest Power Planning Council`s fish and wildlife program, would be jointly managed by the State of Washington and the Yakima Indian Nation. Fisheries resources in the Yakima River are severely reduced from historical levels and there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducing coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) the construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. The project has been considerably revised from the original proposal described in the first draft EIS. Examined in addition to No Action (which would leave present anadromous fisheries resources unchanged in the, Basin) are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of re-establishing (via stock imported from another basin) naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 has been identified as the preferred action. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.

  8. EIS-0483: Draft Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    Estes to Flatiron Substation Transmission Lines Rebuild Project, Larimer County, Colorado Western Area Power Administration prepared a draft EIS that analyzes the potential...

  9. EIS-0489: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (Coos County, OR) and Pacific Connector Pipeline Project (Coos, Klamath, Jackson, and Douglas Counties, OR) EPA announced the availability of a Draft EIS prepared by the Federal...

  10. EIS-0474: EPA Notice of Availability of Draft Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Southline Transmission Line Project; Arizona and New Mexico EPA announces the availability of the Southline Transmission Project, (Arizona and New Mexico), draft EIS that was issued by ...

  11. Resource Programs : Draft Environmental Impact Statement, Volume 2, Appendices.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-03-01

    Every two years, Bonneville Power Administration (BPA) prepares a Resource Program which identifies the resource actions BPA will take to meet its obligation to serve the forecasted power requirements of its customers. The Resource Program`s Environmental Impact Statement (RPEIS) is a programmatic environmental document which will support decisions made in several future Resource Programs. Environmental documents tiered to the EIS may be prepared on a site-specific basis. The RPEIS includes a description of the environmental effects and mitigation for the various resource types available in order to evaluate the trade-offs among them. It also assesses the environmental impacts of adding thirteen alternative combinations of resources to the existing power system. This report contains the appendices to the RPEIS.

  12. EA-1952: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1952: Draft Environmental Assessment Lane-Wendson No. 1 ... EA-1952: Final Environmental Assessment EA-1952: Finding of No Significant Impact

  13. EA-1903: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1903: Draft Environmental Assessment Kansas State ... EA-1903: Final Environmental Assessment EA-1903: Finding of No Significant Impact

  14. EIS-0521: EPA Notice of Availability of Draft Environmental Impact...

    Energy.gov [DOE] (indexed site)

    EPA announced the availability of a Bureau of Land Management Draft EIS that analyzes the ... For more information: energy.govnode1195596 Download Document EIS-0521: EPA Notice of ...

  15. EIS-0445: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in Mason County, West Virginia near the town of New Haven. PDF icon EIS-0445-DEIS-Summary-20100.pdf PDF icon Mountaineer Commercial Scale Carbon Capture and Storage Project, Draft...

  16. EIS-0359: EPA Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0360: EPA Notice of Availability of the Draft Environmental ...

  17. EIS-0360: EPA Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications EIS-0343: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0359: EPA Notice of Availability of the Draft Environmental ...

  18. EA-1922: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Availability of a Draft Environmental Assessment EA-1922: Notice of Availability of a ... EA-1922: Draft Environmental Assessment EA-1922: Finding of No Significant Impact

  19. Agencies Publish Draft Environmental Impact Statement on Energy Transport Corridor Designations in 11 Western States

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of the Interior's Bureau of Land Management (BLM), and the U.S. Departments of Energy, Agriculture, Commerce and Defense today released for public review and comment a Draft Programmatic Environmental Impact Statement (Draft PEIS) proposing designation of energy transport corridors on Federal lands in 11 Western States in accordance with Section 368 of the Energy Policy Act of 2005. The proposed energy corridors would facilitate future siting of oil, gas, and hydrogen pipelines and electricity transmission and distribution on Federal lands in the West to help address growing energy demand while protecting the environment.

  20. Environmental impact report. Environmental Impact Statement. Volume 2. Chapter 4.1-4.10. Draft report

    SciTech Connect

    Meredith, M.; Bakle, W.

    1996-07-31

    Impacts Evaluated in Other Sections: A summary of where to find topics associated with the section`s analysis which are addressed elsewhere in the EIR/EIS. Affected Environment (Setting): A description of the existing conditions for each environmental discipline. The setting acts as a baseline to which the analysis compares the effects of the alternatives and components. Evaluation Criteria with Point of Significance: A table presenting the criteria used to determine specific impacts, measurements used to determine whether an impact is `significant,` and the point at which the impact becomes significant. The source and justification for each criterion is also identified in the table. Methodology: A brief description of how the impact analysis was done. Environmental Consequences (Impacts) and Recommended Mitigation: A presentation of the results of the environmental analysis for each discipline, including the identification of impacts, the determination regarding significance, the description of mitigation measures proposed to avoid or lessen impacts, and whether mitigation will reduce the effects to less than significant.

  1. Nez Perce Tribal Hatchery Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration; Nez Perce Tribal Hatchery .

    1996-06-01

    Bonneville Power Administration, the Bureau of Indian Affairs, the Nez Perce Tribe propose a supplementation program to restore chinook salmon to the Clearwater River Subbasin in Idaho. The Clearwater River is a tributary to the Snake River, which empties into the Columbia River. The Nez Perce Tribe would build and operate two central incubation and rearing hatcheries and six satellite facilities. Spring, summer and fall chinook salmon would be reared and acclimated to different areas in the Subbasin and released at the hatchery and satellite sites or in other watercourses throughout the Subbasin. The supplementation program differs from other hatchery programs because the fish would be released at different sizes and would return to reproduce naturally in the areas where they are released. Several environmental issues were identified during scoping: the possibility that the project would fail if mainstem Columbia River juvenile and adult passage problems are not solved; genetic risks to fish listed as endangered or threatened; potential impacts to wild and resident fish stocks because of increase competition for food and space; and water quality. The Proposed Action would affect several important aspects of Nez Perce tribal life, primarily salmon harvest, employment, and fisheries management.

  2. Bonneville Power Administration Wildlife Mitigation Program : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-08-01

    Bonneville Power Administration (BPA) is responsible for mitigating the loss of wildlife habitat caused by the development of the Federal Columbia River Power System. BPA accomplishes this mitigation by funding projects consistent with those recommended by the Northwest Power Planning Council (Council). The projects are submitted to the Council from Indian Tribes, state agencies, property owners, private conservation groups, and other Federal agencies. Future wildlife mitigation actions with potential environmental impacts are expected to include land acquisition and management, water rights acquisition and management, habitat restoration and enhancement, installation of watering devices, riparian fencing, and similar wildlife conservation actions. BPA needs to ensure that individual wildlife mitigation projects are planned and managed with appropriate consistency across projects, jurisdictions, and ecosystems, as well as across time. BPA proposes to standardize the planning and implementation of individual wildlife mitigation projects funded by BPA. Alternative 1 is the No Action alternative. Five standardizing alternatives are identified to represent the range of possible strategies, goals, and procedural requirements reasonably applicable to BPA-funded projects under a standardized approach to project planning and implementation. All action alternatives are based on a single project planning process designed to resolve site-specific issues in an ecosystem context and to adapt to changing conditions and information.

  3. EIS-0373: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    New Mexico; and Idaho National Laboratory (INL), Idaho; (formerly known as Idaho National Engineering and Environmental Laboratory and Argonne National Laboratory-West, Idaho). PDF...

  4. EIS-0383: Draft Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    social and economic resources, waste management, human health and safety, and noise. The EIS also evaluates potential impacts on these resource areas for a scenario...

  5. EIS-0445: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia Notice of Availability of Draft...

  6. Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor, Summary

    National Nuclear Security Administration (NNSA)

    Draft Supplemental Environmental Impact Statement for the Production of Tritium in a Commercial Light Water Reactor Summary U.S. Department of Energy National Nuclear Security Administration DOE/EIS-0288-S1 August 2014 ACRONYMS AND ABBREVIATIONS CFR Code of Federal Regulations CLWR commercial light water reactor DOE U.S. Department of Energy EIS environmental impact statement EPA U.S. Environmental Protection Agency FR Federal Register NEPA National Environmental Policy Act of 1969 NNSA National

  7. Coyote Springs Cogeneration Project, Morrow County, Oregon: Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1994-01-01

    BPA is considering whether to transfer (wheel) electrical power from a proposed privately-owned, combustion-turbine electrical generation plant in Oregon. The plant would be fired by natural gas and would use combined-cycle technology to generate up to 440 average megawatts (aMW) of energy. The plant would be developed, owned, and operated by Portland General Electric Company (PGE). The project would be built in eastern Oregon, just east of the City of Boardman in Morrow County. The proposed plant would be built on a site within the Port of Morrow Industrial Park. The proposed use for the site is consistent with the County land use plan. Building the transmission line needed to interconnect the power plant to BPA`s transmission system would require a variance from Morrow County. BPA would transfer power from the plant to its McNary-Slatt 500-kV transmission line. PGE would pay BPA for wheeling services. Key environmental concerns identified in the scoping process and evaluated in the draft Environmental Impact Statement (DEIS) include these potential impacts: (1) air quality impacts, such as emissions and their contributions to the {open_quotes}greenhouse{close_quotes} effect; (2) health and safety impacts, such as effects of electric and magnetic fields, (3) noise impacts, (4) farmland impacts, (5) water vapor impacts to transportation, (6) economic development and employment impacts, (7) visual impacts, (8) consistency with local comprehensive plans, and (9) water quality and supply impacts, such as the amount of wastewater discharged, and the source and amount of water required to operate the plant. These and other issues are discussed in the DEIS. The proposed project includes features designed to reduce environmental impacts. Based on studies completed for the DEIS, adverse environmental impacts associated with the proposed project were identified, and no evidence emerged to suggest that the proposed action is controversial.

  8. EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy DOE Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: DOE Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement DOE announces the availablity of the Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement for public review and comment. Comment period ends: 3/17/15.

  9. EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement EPA announces the availability of the Engineered High Energy Crop (EHEC) Programs Draft Programmatic Environmental Impact Statement for public review and comment. Comment period ends:

  10. Schultz-Hanford Area Transmission Line Project Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2002-02-08

    This summary covers the major points of the Draft Environmental Impact Statement (EIS) prepared for the BPA Schultz-Hanford Transmission Project proposed by the Bonneville Power Administration (BPA). The project involves constructing a new 500-kilovolt (kV) line in central Washington, north of Hanford. The new line would connect to an existing line at the Schultz Substation near Ellensburg and to a new or existing substation in the Hanford area (see Map 2 in EIS). The project may also involve constructing a new substation to accommodate the new transmission line. As a federal agency, BPA is required by the National Environmental Policy Act (NEPA) to take into account potential environmental consequences of its proposal and take action to protect, restore, and enhance the environment during and after construction. Preparation of this EIS assists in meeting those requirements.

  11. EIS-0460: EPA Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0460: EPA Notice of Availability of the Draft Environmental Impact Statement FutureGen 2.0 Project, ...

  12. EA-1906: Draft Environmental Assessment

    Energy.gov [DOE]

    Draft Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico, April 2012

  13. DOE Issues Draft Request for Proposals for the West Valley Demonstration Project Supplemental Environmental Impact Statement Support Service

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today issued a Draft Request for Proposals (RFP) for the West Valley Demonstration Project Supplemental Environmental Impact Statement (WVDP-SEIS) procurement that will provide support to the U.S. Department of Energy (DOE) West Valley Demonstration Project (WVDP), and the New York State Energy Research and Development Authority (NYSERDA) in developing a Supplemental Environmental Impact Statement for the WVDP and Western New York Nuclear Service Center.

  14. Proposed Columbia Wind Farm No. 1 : Draft Environmental Impact Statement, Joint NEPA/SEPA.

    SciTech Connect

    United States. Bonneville Power Administration; Klickitat County

    1995-03-01

    This Draft Environmental Impact Statement (DEIS) addresses the Columbia Wind Farm {number_sign}1 (Project) proposal for construction and operation of a 25 megawatt (MW) wind power project in the Columbia Hills area southeast of Goldendale in Klickitat County, Washington. The Project would be constructed on private land by Conservation and Renewable Energy System (CARES) (the Applicant). An Environmental Impact Statement is required under both NEPA and SEPA guidelines and is issued under Section 102 (2) (C) of the National Environmental Policy Act (NEPA) at 42 U.S.C. 4321 et seq and under the Washington State Environmental Policy Act (SEPA) as provided by RCW 43.21C.030 (2) (c). Bonneville Power Administration is the NEPA lead agency; Klickitat County is the nominal SEPA lead agency and CARES is the SEPA co-lead agency for this DEIS. The Project site is approximately 395 hectares (975 acres) in size. The Proposed Action would include approximately 91 model AWT-26 wind turbines. Under the No Action Alternative, the Project would not be constructed and existing grazing and agricultural activities on the site would continue.

  15. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 1, 1999 EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan April 1, 1999...

  16. Notice of Availability of Plains & Eastern Clean Line Transmission Project Draft Environmental Impact Statement and Public Hearings: Federal Register Notice, Volume 79, No. 242- Dec. 17, 2014

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the Draft Environmental Impact Statement for the Plains & Eastern Clean Line Transmission Project (DOE/EIS–0486; Draft EIS) for a 90-day public comment period. DOE also announces 15 public hearings to receive comments on the Draft EIS. In addition, DOE invites comments on the National Historic Preservation Act Section 106 process and any potential adverse impacts to historic properties from the proposed Project.

  17. EIS-0355: EPA Notification of Availability of the Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy EPA Notification of Availability of the Draft Environmental Impact Statement EIS-0355: EPA Notification of Availability of the Draft Environmental Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah The purpose of the Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah, Draft Environmental Impact Statement is to provide information on the environmental impacts of the U.S.

  18. EIS-0400: EPA Notice of Availability of a Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of Final Programmatic Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  19. EA-1656: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications EA-1656: Finding of No Significant Impact EA-1656: Final Environmental Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment...

  20. EIS-0382: DOE Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    draft environmental impact statement (EIS) analyzes the potential environmental consequences of DOE's proposed action to provide a total of 36 million in cofunding, through a...

  1. EIS-0375: EPA Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Environmental Protection Agency, Notice of...

  2. EIS-0527: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement

    Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Central United States

  3. EIS-0525: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Eastern United States

  4. EIS-0528: EPA NOTICE OF AVAILABILITY OF A DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Western United States

  5. EIS-0523: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Non-Contiguous United States

  6. EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement

    Energy.gov [DOE]

    Production of Tritium in a Commercial Light Water Reactor (CLWR) Tritium Readiness Supplemental Environmental Impact Statement

  7. EIS-0288-S1: EPA Notice of Availability of Draft Supplemental Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Production of Tritium in a Commercial Light Water Reactor (CLWR) Tritium Readiness Supplemental Environmental Impact Statement

  8. EIS-0527: DOC Notice of Availability of a Draft Programmatic Environmental Impact Statement

    Energy.gov [DOE]

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Central United States

  9. EIS-0525: Department of Commerce Notice of Availability of Draft Programmatic Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE)

    Nationwide Public Safety Broadband Network Programmatic Environmental Impact Statement for the Eastern United States

  10. Tucson Electric Power Company Sahuarita-Nogales Transmission Line Draft Environmental Impact Statement

    SciTech Connect

    N /A

    2003-08-27

    Tucson Electric Power Company (TEP) has applied to the U.S. Department of Energy (DOE) for a Presidential Permit to construct and operate a double-circuit, 345,000-volt (345-kV) electric transmission line across the United States border with Mexico. Under Executive Order (EO) 10485 of September 3, 1953, as amended by EO 12038 of February 3, 1978, a Presidential Permit is required to construct, connect, operate, or maintain facilities at the U.S. international border for the transmission of electric energy between the United States and a foreign country. DOE has determined that the issuance of a Presidential Permit to TEP for the proposed project would constitute a major Federal action that may have a significant impact on the environment within the meaning of the ''National Environmental Policy Act of 1969'' (NEPA) 42 United States Code (U.S.C.) {section}4321 et seq. For this reason, DOE has prepared this Draft Environmental Impact Statement (EIS) to evaluate potential environmental impacts from the proposed Federal action (granting a Presidential Permit for the proposed transmission facilities) and reasonable alternatives, including the No Action Alternative. This EIS was prepared in accordance with Section 102(2)(c) of NEPA, Council of Environmental Quality (CEQ) regulations (40 Code of Federal Regulations [CFR] 1500-1508), and DOE NEPA Implementing Procedures (10 CFR 1021). DOE is the lead Federal Agency, as defined by 40 CFR 1501.5. The U.S. Department of Agriculture Forest Service (USFS), the Bureau of Land Management (BLM) of the U.S. Department of the Interior, and the U.S. Section of the International Boundary and Water Commission, U.S. and Mexico (USIBWC), are cooperating agencies. Each of these organizations will use the EIS for its own NEPA purposes, as described in the Federal Agencies' Purpose and Need and Authorizing Actions section of this summary. The 345-kV double-circuit transmission line would consist of twelve transmission line wires, or

  11. Nevada Site Office Invites Public to Participate in Draft Nevada National Security Site Environmental Impact Statement Hearings

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office is holding a series of public hearings in September 2011 to discuss the Draft Site-Wide Environmental Impact Statement (SWEIS) for the Nevada National Security Site (NNSS) and Off-Site Locations in Nevada. These meetings are part of an official public comment period that spans from July 29 through October 27, 2011.

  12. Summary: Draft Uranium Leasing Program Programmatic Environmental Impact Statement: DOE/EIS 0472-D, March 2013

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Summary: Draft ULP PEIS March 2013 COVER SHEET 1 2 3 Lead Agency: U.S. Department of Energy (DOE) 4 5 Cooperating Agencies: The cooperating agencies are U.S. Department of the Interior (DOI), 6 Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado 7 Department of Transportation (CDOT); Colorado Division of Reclamation, Mining, and Safety 8 (CDRMS); Colorado Parks and Wildlife (CPW); Mesa County Commission; Montrose County 9 Commission; San Juan County Commission;

  13. EIS-0515: EPA Notice of Availability of Supplemental Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy 5: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0515: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement Bay Delta Conservation Plan; Sacramento-San Joaquin Delta, California The Environmental Protection Agency announced the availability of a Supplemental Draft EIS/EIR for the Bay Delta Conservation Plan. For more information on this project, see the project page:

  14. EA-2016: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6: Draft Environmental Assessment EA-2016: Draft Environmental Assessment Willow Creek Wind Farm; Butte County, South Dakota DOE's Western Area Power Administration issued a draft EA that analyzes the potential environmental impacts of the proposed Willow Creek Wind Energy Facility in Butte County, South Dakota. The EA reviews the potential environmental impacts of constructing, operating, and maintaining a 103-megawatt (MW) nameplate capacity wind power generating facility consisting of

  15. EA-2021: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-2021: Draft Environmental Assessment Energy Conservation Standards for Manufactured Housing (RIN 1904-AC11) Section 413 of the Energy Independence and Security Act of 2007 (EISA) directs DOE to establish energy conservation standards for manufactured housing. This Draft Environmental Assessment and Request for Information on Impacts to Indoor Air Quality evaluates the potential environmental impacts of establishing energy conservation standards for manufactured

  16. EIS-0414: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0414: EPA Notice of Availability of the Draft Environmental Impact Statement Energia Sierra Juarez U.S. Transmission Line Project, Construction, Operation, Maintenance,...

  17. EIS-0409: EPA Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    Kemper County Integrated Gasification Combined-Cycle (IGCC) Project, Mississippi Notice of Availability for the Draft Environmental Impact Statement Kemper County Integrated...

  18. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental...

    Energy.gov [DOE] (indexed site)

    Download Document EIS-0463: Revision to EPA Notice Of Availability Draft Environmental Impact Statement (195.62 KB) More Documents & Publications EIS-0515: EPA Notice of ...

  19. EIS-0397: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of the Draft Environmental Impact Statement Lyle Falls Fish Passage Project To Improve Fish Passage to Habitat in the Upper Part of the Watershed,...

  20. EIS-0435: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota Notice of Availability for the Draft Environmental Impact...

  1. EIS-0489: FERC Notice of Availability of Draft Environmental...

    Office of Environmental Management (EM)

    of a Draft EIS to analyze the potential environmental impacts of a proposal to construct and operate the Jordan Cove Liquefaction and Pacific Connector Pipeline Projects. ...

  2. EIS-0492: FERC Notice of Availability of Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0492: FERC Notice of Availability of Draft Environmental Impact Statement Oregon LNG ... the proposed Oregon LNG Terminal and Pipeline Project and Washington Expansion Project. ...

  3. EIS-0444: EPA Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    - Draft Environmental Impact Statement Texan Clean Energy Project, Construction and Operation of a Coal-Based Electric Power Generation and Chemicals Production Plant, Odessa,...

  4. EIS-0464: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0464: DOE Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, ...

  5. Engineered High Energy Crop Programs Draft Programmatic Environmental...

    Energy.gov [DOE] (indexed site)

    PAGE INTENTIONALLY LEFT BLANK Engineered High Energy Crop Programs Draft Programmatic Environmental Impact Statement DOEEIS-0481 DECEMBER 2014 THIS PAGE INTENTIONALLY LEFT BLANK...

  6. EIS-0403-S1: Supplement to the Draft Programmatic Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0403-S1: Supplement to the Draft Programmatic Environmental Impact Statement Solar Energy Development in Six Southwestern States The full document number is DOE...

  7. EIS-0421: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0421: EPA Notice of Availability of the Draft Environmental Impact Statement Big Eddy-Knight Transmission Project Proposal to Construct, Operate, and Maintain a 27-28...

  8. EIS-0439: DOE Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    and the Loan Guarantee Program (LGP), the California Energy Commission (CEC), and the Bureau of Land Management (BLM), have prepared a Draft Environmental Impact Statement (EIS)...

  9. EIS-0463: Revision to EPA Notice Of Availability Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Impact Statement Northern Pass Transmission Line Project, New Hampshire This Notice of Availability was first published in the Federal Register on...

  10. EIS-0445: Postponement of Public Hearing on the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Hearing on the Draft Environmental Impact Statement Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia Postponement of Public Hearing on...

  11. EIS-0464: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Availability of the Draft Environmental Impact Statement Lake Charles Carbon Capture and Sequestration Project, Lake Charles, Louisiana and Brazoria County, Texas The...

  12. EIS-0445: DOE Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    of the Draft Environmental Impact Statement for the Mountaineer Commercial Scale Carbon Capture and Storage Project, Mason County, West Virginia, DOEEIS-0445 (March 2011 - 76 FR...

  13. EIS-0407: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Notice of Availability of the Draft Environmental Impact Statement Abengoa Biorefinery Project near Hugoton, Stevens County, Kansas PDF icon E9-22920.pdf More Documents &...

  14. EIS-0444: DOE Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    of the Draft Environmental Impact Statement and Public Hearing Notice for the Texas Clean Energy Project, near Odessa, Ector County, Texas, DOEEIS-0444 (March 2011 - 76...

  15. EIS-0414: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez ...

  16. EA-1927: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1927: Draft Environmental Assessment Paducah Gaseous Diffusion Plant Potential Land and ... impacts of the proposed transfer of land and facilities at the Paducah Gaseous ...

  17. EIS-0375: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    of Availability of the Draft Environmental Impact Statement Disposal of Greater-Than-Class C Low-Level Radioactive Waste DOEEIS-0375, Department of Energy, Notice of...

  18. EIS-0413: EPA Notice of Availability of a Draft Environmental Impact

    Office of Environmental Management (EM)

    Statement | Department of Energy Intent to Prepare a Programmatic Environmental Impact Statement EIS-0396: Notice of Intent to Prepare a Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The Department of Energy (DOE) intends to prepare a Programmatic Environmental Impact Statement for the Global Nuclear Energy Partnership initiative (GNEP PEIS) pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended (42 U.S.C. 4321 et seq.), and the Council

  19. EA-1950: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1950: Draft Environmental Assessment Bonneville Power Administration prepared a draft EA to evaluate potential environmental impacts of rebuilding approximately 28 miles of the Grand Coulee-Creston No. 1 115-kilovolt (kV) transmission line between Coulee Dam in Grant County and Creston in Lincoln County, Washington. EA-1950-DEA-2013.pdf (7.21 MB) More Documents & Publications EA-1950: Finding of No Significant Impact and Mitigation Action Plan EA-1950: Final

  20. EIS-0457: EPA Notice of Availability of a Draft Environmental Impact

    Energy Saver

    Statement | Department of Energy Amended Notice of Intent to Prepare an Environmental Impact Statement EIS-0447: Amended Notice of Intent to Prepare an Environmental Impact Statement DOE issued an amended Notice of Intent and is conducting additional public scoping on its Environmental Impact Statement (EIS) (DOE/EIS-0447) for the Champlain Hudson Power Express, Inc., transmission system project (Champlain Hudson Project). An amended application was filed with DOE on February 28, 2012, for a

  1. EIS-0288: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MB) More Documents & Publications EIS-0288: Draft Environmental Impact Statement EIS-0288-S1: Draft Supplemental Environmental Impact Statement EIS-0288-S1: Final Supplemental

  2. EIS-0441: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Statement More Documents & Publications EIS-0403: Final Programmatic Environmental Impact Statement EA-1989: Draft Environmental Assessment EA-1581: Draft Environmental Assessment...

  3. EA-1904: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1904: Draft Environmental Assessment Linac Coherent Light Source-II Draft Environmental Assessment (December 2011) This EA evaluates the ...

  4. EA-2019: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: Draft Environmental Assessment EA-2019: Draft Environmental Assessment Lake Erie Connector Project DOE issued a Draft EA that evaluates the potential environmental impacts of issuing a Presidential permit for a new, 72-mile long, 1,000 megawatt, high-voltage direct current, electric transmission system that would cross the international border with Canada in Lake Erie and connect to the proposed Erie Converter Station in Conneaut Township, Pennsylvania. For more information on this project,

  5. EA-2043: Draft Environmental Assesment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assesment EA-2043: Draft Environmental Assesment EA-2043: Columbia Stock Ranch Section 536 Ecosystem Restoration Project; Columbia County, Oregon The U.S. Army Corps of Engineers issued a draft EA that analyzes the potential environmental impacts of a proposed tidal floodplain ecosystem restoration project at Columbia Stock Ranch, located in Columbia County, Oregon. Bonneville Power Administration, a cooperating agency, proposes to provide funding for the project. For more

  6. EA-1880: Notice of Availability of a Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Availability of a Draft Environmental Assessment EA-1880: Notice of Availability of a Draft Environmental Assessment Big Bend to Witten Transmission Line Project, South Dakota The USDA Rural Utilities Service, initially the lead agency, issued a draft EA that assesses the potential environmental impacts of a proposal by Basic Electric Power Cooperative to construct, own, and operate an approximately 70-mile long 230-kV single-circuit transmission line in South Dakota.

  7. EA-1946: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1946: Draft Environmental Assessment Salem-Albany Transmission Line Rebuild Project; Polk, Benton, Marion, and Linn Counties, Oregon Bonneville Power Administration issued a Draft EA that assesses the potential environmental impacts of the proposed rebuild of the 24-mile Salem-Albany No. 1 and 28-mile Salem-Albany No. 2 transmission lines between Salem and Albany, Oregon. EA-1946-DEA-2014.pdf (9.88 MB) More Documents & Publications EA-1946: Final

  8. EA-1959: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: Draft Environmental Assessment EA-1959: Draft Environmental Assessment Eightmile Ranch Coho Acclimation Site; Okanogan County, Washington Bonneville Power Administration and USDA Forest Service, Okanogan-Wenatchee National Forest, jointly issued a draft EA that assesses the potential environmental impacts of a proposal by the Confederated Tribes and Bands of the Yakama Nation to construct and operate a coho salmon acclimation pond at Eightmile Ranch, which is owned and operated by the Forest

  9. EA-1967: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7: Draft Environmental Assessment EA-1967: Draft Environmental Assessment Hills Creek-Lookout Point Transmission Line Rebuild Project; Lane County, Oregon Summary Bonneville Power Administration issued a draft EA that assesses the potential environmental impacts of the proposed rebuild of its 26-mile 115-kilovolt (kV) Hills Creek-Lookout Point transmission line, which is generally located between Lowell and Oakridge, in Lane County, Oregon. For more information, see:

  10. EA-1977: Notice of Availability of Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 77: Notice of Availability of Draft Environmental Assessment EA-1977: Notice of Availability of Draft Environmental Assessment Acceptance and Disposition of Spent Nuclear Fuel Containing U.S.-Origin Highly Enriched Uranium from the Federal Republic of Germany DOE issued a notice of availability for a draft EA that assesses the potential environmental impacts of receipt, storage, processing and disposition of certain spent nuclear fuel containing U.S.-origin highly

  11. EA-1981: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1: Draft Environmental Assessment EA-1981: Draft Environmental Assessment EA-1981: Bonneville-Hood River Transmission Line Rebuild; Multnomah and Hood River Counties Bonneville Power Administration issued a draft EA that assesses the potential environmental impacts of the proposed rebuild of its 23-mile long, 115-kilovolt Bonneville-Hood River transmission line and an associated tap line running to Cascade Locks. The project would include replacing transmission structures and conductor wires,

  12. EA-1998: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8: Draft Environmental Assessment EA-1998: Draft Environmental Assessment Upper Columbia Spring Chinook and Steelhead Acclimation Project; Chelan County, Washington Bonneville Power Administration issued a draft EA that assesses the potential environmental impacts of a proposal to fund the Yakama Nation to improve, develop, and use acclimation ponds for hatchery-raised steelhead and Chinook salmon in the Methow and Wenatchee watersheds. For more information, see:

  13. EA-2020: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-2020: Draft Environmental Assessment Energy Efficiency Standards for New Federal Low-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD56) Section 305(a) of the Energy Conservation and Production Act (ECPA) requires that DOE establish by rule Federal building and energy efficiency standards for all Federal commercial and multi-family high-rise residential buildings. This draft EA evaluates the potential environmental impacts of updating the

  14. EA-2021: Notice of Availability of the Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Notice of Availability of the Draft Environmental Assessment EA-2021: Notice of Availability of the Draft Environmental Assessment Energy Conservation Standards for Manufactured Housing (RIN 1904-AC11) Section 413 of the Energy Independence and Security Act of 2007 (EISA) directs DOE to establish energy conservation standards for manufactured housing. This Draft Environmental Assessment and Request for Information on Impacts to Indoor Air Quality evaluates the potential

  15. Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report

    SciTech Connect

    Not Available

    1981-08-01

    The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

  16. EIS-0357-S1: Supplement to the Draft Environmental Impact Statement...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    this Supplement to the Draft EIS to correct information regarding carbon dioxide (CO2) emissions from the proposed Gilberton plant, to provide information on the...

  17. EIS-0458: EPA Notice of Availability of Draft Environmental Impact Statement

    Energy.gov [DOE]

    Draft EPA/EIS No. 20110087, Topaz Solar Farm Project, Issuing a Loan Guarantee to Royal Bank of Scotland for Construction and Startup, San Luis Obispo County, CA

  18. Safe interim storage of Hanford tank wastes, draft environmental impact statement, Hanford Site, Richland, Washington

    SciTech Connect

    Not Available

    1994-07-01

    This Draft EIS is prepared pursuant to the National Environmental Policy Act (NEPA) and the Washington State Environmental Policy Act (SEPA). DOE and Ecology have identified the need to resolve near-term tank safety issues associated with Watchlist tanks as identified pursuant to Public Law (P.L.) 101-510, Section 3137, ``Safety Measures for Waste Tanks at Hanford Nuclear Reservation,`` of the National Defense Authorization Act for Fiscal Year 1991, while continuing to provide safe storage for other Hanford wastes. This would be an interim action pending other actions that could be taken to convert waste to a more stable form based on decisions resulting from the Tank Waste Remediation System (TWRS) EIS. The purpose for this action is to resolve safety issues concerning the generation of unacceptable levels of hydrogen in two Watchlist tanks, 101-SY and 103-SY. Retrieving waste in dilute form from Tanks 101-SY and 103-SY, hydrogen-generating Watchlist double shell tanks (DSTs) in the 200 West Area, and storage in new tanks is the preferred alternative for resolution of the hydrogen safety issues.

  19. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    C - SECTION 404(b)(1) Lower Yellowstone Intake Fish Passage EIS Draft Section 404(b)(1) Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft Appendix C Section 404(b)(1) Analysis May 2016 i Contents 1 Introduction ..............................................................................................................................1 1.1 Background .......................................................................................................................1

  20. EA-1966: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1966: Draft Environmental Assessment Sunflower Wind Project, Hebron, North Dakota Western Area Power Administration issued a Draft EA that...

  1. EA-1902: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2: Draft Environmental Assessment EA-1902: Draft Environmental Assessment Northern Wind Project, Roberts County, South Dakota DOE's Western Area Power Administration issued a draft ...

  2. EA-1979: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1979: Draft Environmental Assessment Summit Wind Farm; Summit, South Dakota Western Area Power Administration (Western) issued a draft EA that ...

  3. EA-1891: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1891: Draft Environmental Assessment Alvey-Fairview Transmission Line Rebuild Project, Oregon Bonneville Power Administration issued a draft EA to ...

  4. EA-1984: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1984: Draft Environmental Assessment Disposition of Five Signature Properties at Idaho National Laboratory, Idaho DOE has prepared a draft EA to...

  5. EA-1974: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1974: Draft Environmental Assessment Wallooskee-Youngs Confluence Restoration Project, Clatsop County, Oregon Bonneville Power Administration ...

  6. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix E Monitoring and Adaptive Management i Contents 1.0 Introduction ............................................................................................................................. 1 Project Goal and Objectives ................................................................................................... 1 2.0 Rock

  7. EIS-0460: EPA Notice of Availability of Final Environmental Impact...

    Energy.gov [DOE] (indexed site)

    EIS-0447: EPA Notice of Availability of Draft Environmental Impact Statement EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  8. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lower Yellowstone Intake Diversion Dam Modification Project, Montana DRAFT APPENDIX D Lower Yellowstone Intake Fish Passage EIS Fish Passage Connectivity Index and Cost Effectiveness and Incremental Cost Analysis MAY 2016 Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana APPENDIX D Lower Yellowstone Intake Fish Passage EIS Fish Passage Connectivity Index and Cost Effectiveness and Incremental Cost Analysis Lower Yellowstone Intake Diversion Dam Fish Passage Project Draft

  9. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    September 22, 2006 EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project August 1, 2006 EIS-0383: Draft Environmental Impact Statement...

  10. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 1, 2003 EIS-0337: Draft Environmental Impact Statement West Valley Demonstration Project Waste Management April 1, 2003 EIS-0312: Final Environmental Impact Statement Fish...

  11. Environmental Impact Statement Summary | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Summary Environmental Impact Statement Summary This DOE guidance is intended to help EIS preparers draft the EIS summary. PDF icon Environmental Impact Statement Summary More...

  12. Environmental Impact Statement | netl.doe.gov

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CO2 Capture and Sequestration Project Notice of Intent (November 2011) Draft Environmental Impact Statement (September 2012) Final Environmental Impact Statement (February...

  13. EIS-0515: BOR and FWS Notice of Availability of Draft Environmental Impact

    Energy Saver

    of Energy 9: Great Northern Transmission Line Project, Minnesota EIS-0499: Great Northern Transmission Line Project, Minnesota Summary DOE prepared an EIS that evaluated the potential environmental impacts of a proposal to grant a Presidential permit to Minnesota Power to construct, operate, maintain, and connect a new 500 kilovolt electric transmission system across the U.S.-Canada border. The proposed 220-mile transmission line would cross the border near Roseau, Minnesota, and continue to

  14. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    SciTech Connect

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to support

  15. EA-1948: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE's Western Area Power Administration (Western) issued a draft EA to analyze the potential environmental impacts of a proposal to rebuild and upgrade two parallel 4.8-mile ...

  16. EIS-0399: EPA Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of the Draft Environmental Impact Statement Montana Alberta Tie Ltd. 230-kV Transmission Line Montana Alberta Tie Ltd. 230-kV transmission line...

  17. Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana. Draft Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lower Yellowstone Intake Diversion Dam Fish Passage Project, Montana DRAFT - Appendix F Correspondence Lower Yellowstone Intake Diversion Dam Correspondence Fish Passage Project Appendix F Attachment 1 Correspondence Distributed DEPARTM ENT OF THE ARMY CORPS OF ENGINEERS, OMAHA DISTRICT 1616 CAPITOL AVENUE OMAHA NE 68102-4901 April 5, 2016 District Commander Mr. Lester Randall, Chairman Kickapoo Tribe in Kansas PO Box 271 1107 Goldfinch Road Horton, Kansas 66439 Dear Chairman Randall: The U.S.

  18. EIS-0423: Notice of Intent to Prepare an Environmental Impact...

    Office of Environmental Management (EM)

    EIS-0423: Draft Environmental Impact Statement EIS-0423: Final Environmental Impact Statement EIS-0423-S1: Notice of Intent to Prepare a Supplemental Environmental Impact...

  19. EIS-0089: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: Final Environmental Impact Statement EIS-0089: Final Environmental Impact Statement ... The final environmental impact statement (EIS) consists of the draft EIS and the Addendum ...

  20. EIS-0333: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Final Environmental Impact Statement EIS-0333: Final Environmental Impact Statement Bonneville Power Administration, Maiden Wind Farm This Draft Environmental Impact Statement...

  1. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 1, Summary

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams) are influenced by Western`s power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Western`s firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action altemative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  2. EA-1900: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1900: Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York This EA evaluates the potential environmental impacts of constructing and operating a new Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site. A modernized Radiological Work and Storage Building would streamline radioactive material handling and storage operations, permit

  3. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed Great Northern Transmission Line (GNTL) Project: Federal Register Notice, Volume 80, No. 123- Jun. 26, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy (DOE) announces the availability of the “Great Northern Transmission Line Project Draft Environmental Impact Statement” (DOE/EIS-0499) for public review and comment. DOE is also announcing eight public hearings to receive comments on the Draft EIS.

  4. Notice of Availability (NOA) for the Draft Environmental Impact Statement (EIS) and Announcement of Public Hearings for the Proposed New England Clean Power Link (NECPL) Transmission Line: Federal Register Notice, Volume 80, No. 113- Jun. 12, 2015

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) announces the availability of the “Draft Environmental Impact Statement for the New England Clean Power Link Transmission Line Project” (DOE/EIS-0503) for public review and comment.

  5. Puget Sound Area Electric Reliability Plan. Appendix B : Local Generation Evaluation : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The information and data contained in this Appendix was extracted from numerous sources. The principle sources used for technical data were Bonneville Power Administration's 1990 Resource Program along with its technical appendix, and Chapter 8 of the Draft 1991 Northwest Conservation and Electric Power Plan. All cost data is reported 1988 dollars unless otherwise noted. This information was supplemented by other data developed by Puget Sound utilities who participated on the Local Generation Team. Identifying generating resources available to the Puget Sound area involved a five step process: (1) listing all possible resources that might contribute power to the Puget Sound area, (2) characterizing the technology/resource status, cost and operating characteristics of these resources, (3) identifying exclusion criteria based on the needs of the overall Puget Sound Electric Reliability Plan study, (4) applying these criteria to the list of resources, and (5) summarizing of the costs and characteristics of the final list of resources. 15 refs., 20 tabs.

  6. Tank Closure and Waste Management Environmental Impact Statement...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 APPENDIX V RECHARGE SENSITIVITY ANALYSIS In the Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford Site, Richland, Washington (Draft TC & WM...

  7. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (FERC Project No. 460) September 17, 2010 EIS-0414: Draft Environmental Impact Statement Energia Sierra Juarez Transmission Project August 27, 2010 EIS-0455: Final Environmental...

  8. EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: DOE Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado DOE announces the availability of a Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DOE-NOA-DEIS-2013.pdf (202.73 KB) More Documents & Publications Uranium

  9. EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0472: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Uranium Leasing Program, Mesa, Montrose, and San Miguel Counties, Colorado EPA announces the availability of the Draft Programmatic Environmental Impact Statement for the Uranium Leasing Program. EIS-0472-DEIS-EPA-NOA-2013.pdf (193.5 KB) More Documents & Publications EIS-0441:

  10. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement Remediation of the Moab Uranium Mill Tailings, Grand and San Juan Counties, Utah September 3, 2004 EIS-0346: Draft Environmental Impact Statement Salmon...

  11. EA-1855: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5: Draft Environmental Assessment EA-1855: Draft Environmental Assessment The Bonneville Power Administration (BPA) proposes to rebuild the Creston-Bell 115-kilovolt transmission...

  12. EA-1932: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1932: Draft Environmental Assessment Bass Lake Native Fish Restoration, Eureka, Lincoln County, Montana This EA will evaluate the potential...

  13. EA-1917: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7: Draft Environmental Assessment EA-1917: Draft Environmental Assessment Wave Energy Test Facility Project, Newport, OR This EA evaluates Northwest National Marine Renewable ...

  14. EA-1995: Draft Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    Draft Environmental Assessment EA-1995: Draft Environmental Assessment Trestle Bay Ecosystem Restoration Project, Clatsop County, Oregon The U.S. Army Corps of Engineers issued a ...

  15. EA-1862: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1862: Draft Environmental Assessment Oneida Seven Generations Corporation: Energy Recovery Project, Ashwaubenon, Wisconsin Comment Period Ends: 9...

  16. EA-1809: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1809: Draft Environmental Assessment White Earth Nation Wind Energy Project II Becker and Mahnomen Counties, MN This EA evaluates the potential...

  17. EA-1923: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Draft Environmental Assessment EA-1923: Draft Environmental Assessment Green Energy School Wind Turbine Project on Saipan, Commonwealth of the Northern Mariana Islands This EA ...

  18. EA-1870: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    70: Draft Environmental Assessment EA-1870: Draft Environmental Assessment Utah Coal and Biomass Fueled Pilot Plant Kanab, Utah The U.S. Department of Energy (DOE) prepared this...

  19. EA-1790: DOE Notice of Availability of the Draft Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Notice of Availability of the Draft Environmental Assessment Heterogeneous Feed Biorefinery Pontotoc, MS The U.S. Department of Energy (DOE) has prepared a draft Environmental...

  20. EA-1955: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1955: Draft Environmental Assessment Campbell County Wind Farm, Campbell County, South Dakota DOE's Western Area Power Administration (Western) ...

  1. EA-1860: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0: Draft Environmental Assessment EA-1860: Draft Environmental Assessment Richland Center Renewable Energy Waste- to- Energy Project, Richland, Wisconsin Comment Period Ended: 92...

  2. EA-1728: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1728: Draft Environmental Assessment Integrated Vegetation Management on the Hanford Site, Richland, Washington For more information, contact: Mr....

  3. EA-1960: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1960: Draft Environmental Assessment Townsite Solar Project Transmission Line, Clark County, Nevada The Bureau of Land Management, with Western...

  4. EA-1889: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1889: Draft Environmental Assessment Disposal of Decommissioned, Defueled Naval Reactor Plants from USS Enterprise (CVN 65) The Department of the...

  5. EA-1829: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1829: Draft Environmental Assessment Phycal Algae Pilot Project, Wahiawa and Kalaeloa, HI For more information, contact: Mr. Jesse Garcia NEPA...

  6. EA-1993: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Draft Environmental Assessment EA-1993: Draft Environmental Assessment Proposed High Explosive Science & Engineering Project, Pantex Plant, Amarillo, Texas The proposed action ...

  7. EA-1972: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1972: Draft Environmental Assessment Electric District 2 to Saguaro No. 2 Transmission Line Rebuild, Pinal County, Arizona Western Area Power ...

  8. EA-1934: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1934: Draft Environmental Assessment Expansion of Active Borrow Areas, Hanford Site, Richland, Washington This EA will evaluate the potential ...

  9. EA-1901: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1901: Draft Environmental Assessment Kootenai River White Sturgeon and Burbot Hatcheries Project, Bonners Ferry, Boundary County, Idaho This EA ...

  10. EA-1973: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Draft Environmental Assessment EA-1973: Draft Environmental Assessment Kootenai River Restoration at Bonners Ferry, Boundary County, Idaho Bonneville Power Administration issued ...

  11. EA-1931: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1931: Draft Environmental Assessment Keeler to Tillamook Transmission Line Rebuild, Washington and Tillamook Counties, Oregon Bonneville Power ...

  12. DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal...

    Office of Environmental Management (EM)

    Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOEEIS-0375-D) February 2011 SUMMARY ENERGY U.S. DEPARTMENT OF ...

  13. DOE/EIS-0375D: Draft Environmental Impact Statement for the Disposal...

    Office of Environmental Management (EM)

    Impact Statement for the Volume 1: Chapters 1 through 8 February 2011 Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste (DOEEIS-0375-D) T H E ...

  14. Supplemental report on population estimates for Hanford Defense waste draft environmental impact statement

    SciTech Connect

    Yandon, K.E.; Burlison, J.S.; Rau, R.G.

    1980-10-01

    The research reported here supplies population data for ongoing environmental evaluations of the Hanford Site's waste management programs. The population figures in this report will be used to calculate dose to population from waste management operations for up to 10,000 years after 1990.

  15. EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy 6: USACE and BOR Notice of Availability of the Draft Environmental Impact Statement EIS-0526: USACE and BOR Notice of Availability of the Draft Environmental Impact Statement Lower Yellowstone Intake Diversion Dam Fish Passage Project; near Glendive, Montana The U.S. Army Corps of Engineers and the Bureau of Reclamation jointly issued a notice of availability for a Draft EIS for the Lower Yellowstone Intake Diversion Dam Fish Passage Project. DOE's

  16. EA-1917: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assessment EA-1917: Notice of Availability of a Draft Environmental Assessment Wave Energy Test Facility, Newport, OR DOE announces the availability of the Draft EA for the...

  17. Federal Register Notice for Draft Addendum to Environmental Review...

    Energy Saver

    Notice for Draft Addendum to Environmental Review Documents Concerning Exports of Natural Gas from the United States Federal Register Notice for Draft Addendum to...

  18. EA-1989: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1989: Draft Environmental Assessment Cliffrose Solar Energy Interconnection Project, Mohave County, Arizona Western Area Power Administration issued a draft EA that assesses the ...

  19. EA-2018: Draft Environmental Assessment | Department of Energy

    Office of Environmental Management (EM)

    EA-2018: Draft Environmental Assessment Front Range-Midway Solar Interconnection Project; El Paso County, Colorado Western Area Power Administration issued a draft EA that analyzes ...

  20. EA-1945: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1945: Draft Environmental Assessment Northern Mid-Columbia Joint Project, Douglas and Chelan Counties, Washington Bonneville Power Administration (BPA) issued a Draft...

  1. EIS-0523: Nationwide Public Safety Broadband Network Draft Programmatic Environmental Impact Statement for the Non-Contiguous United States

    Energy.gov [DOE]

    The First Responder Network Authority (FirstNet) in the U.S. Department of Commerce is preparing, with DOE as a cooperating agency, a Programmatic Environmental Impact Statement (PEIS) that will analyze the potential environmental impacts of a proposal to design, deploy and operate the Nationwide Public Safety Broadband Network. This PEIS covers the non-contiguous United States.

  2. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 15, 2015 EIS-0485: Final Environmental Impact Statement Interconnection of the Grande Prairie Wind Farm, Holt County, Nebraska January 8, 2015 EIS-0481: Draft Programmatic...

  3. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Partnership September 1, 2008 EIS-0399: Final Environmental Impact Statement Montana Alberta Tie Ltd. (MATL) 230-KV Transmission Line August 29, 2008 EIS-0370: Draft...

  4. Environmental Impact Statements (EIS) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Wind Project March 1, 2001 EIS-0281: Draft Environmental Impact Statement Summary (Spanish) Laboratorios Nacionales de SandiaNuevo Mexico Declaracion de Impacto Ambiental de...

  5. Lake Erie Connector Project Environmental Assessment Draft

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Volume 1 - Main Document U.S. Department of Energy Office of Electricity Delivery and Energy Reliability Washington DC June 2016 Cover Photo Credits http://www.itclakeerieconnector.com/ DRAFT LAKE ERIE CONNECTOR PROJECT ENVIRONMENTAL ASSESSMENT Volume 1-Main Document DOE/EA-2019 U.S. DEPARTMENT OF ENERGY OFFICE OF ELECTRICITY DELIVERY AND ENERGY RELIABILITY COOPERATING AGENCY U.S. ARMY CORPS OF ENGINEERS This Page Intentionally Left Blank Lake Erie Connector Project Draft Environmental

  6. EIS-0481: EPA Notice of Availability of Final Environmental Impact...

    Energy.gov [DOE] (indexed site)

    of Final Environmental Impact Statement More Documents & Publications EIS-0463-S1: EPA Notice of Availability of Supplement to the Draft Environmental Impact Statement...

  7. EIS-0340: Notice of Intent to Prepare an Environmental Impact...

    Energy.gov [DOE] (indexed site)

    EIS-0340-NOI-2001.pdf More Documents & Publications EIS-0340: Draft Environmental Impact Statement EIS-0340: Record of Decision EIS-0340: Final Environmental Impact Statement...

  8. EIS-0354: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4: Final Environmental Impact Statement EIS-0354: Final Environmental Impact Statement ... near-term and future power needs.The Draft EIS (published in November 2002) evaluated ...

  9. EA-1947: Draft Revised Finding of No Significant Impact | Department...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1947: Draft Revised Finding of No Significant Impact EA-1947: Draft Revised Finding of No Significant Impact Transfer of the Kansas City Plant, Kansas City, Missouri The National ...

  10. Draft Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement

    SciTech Connect

    N /A

    2004-02-27

    This ''Site-wide Environmental Impact Statement for Continued Operation of Lawrence Livermore National Laboratory and Supplemental Stockpile Stewardship and Management Programmatic Environmental Impact Statement'' (LLNL SW/SPEIS) describes the purpose and need for agency action for the continued operation of LLNL and analyzes the environmental impacts of these operations. The primary purpose of continuing operation of LLNL is to provide support for the National Nuclear Security Administration's (NNSA's) nuclear weapons stockpile stewardship missions. LLNL, located about 40 miles east of San Francisco, California, is also needed to support other U.S. Department of Energy (DOE) programs and Federal agencies such as the U.S. Department of Defense, Nuclear Regulatory Commission, U.S. Environmental Protection Agency (EPA), and the newly established U.S. Department of Homeland Security. This LLNL SW/SPEIS analyzes the environmental impacts of reasonable alternatives for ongoing and foreseeable future operations, facilities, and activities at LLNL. The reasonable alternatives include the No Action Alternative, Proposed Action, and the Reduced Operation Alternative. The major decision to be made by DOE/NNSA is to select one of the alternatives for the continued operation of the LLNL. As part of the Proposed Action, DOE/NNSA is considering: using additional materials including plutonium on the National Ignition Facility (NIF); increasing the administrative limit for plutonium in the Superblock, which includes the Plutonium Facility, the Tritium Facility, and the Hardened Engineering Test Building; conducting the Integrated Technology Project, using laser isotope separation to provide material for Stockpile Stewardship experiments, in the Plutonium Facility; increasing the material-at-risk limit for the Plutonium Facility; and increasing the Tritium Facility material-at-risk. A discussion of these issues is presented in Section S.5.2, Proposed Action. The ''National

  11. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Office of Environmental Management (EM)

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  12. EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...

    Energy Saver

    Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Draft...

  13. Draft Tank Closure & Waste Management EIS - Summary

    Office of Environmental Management (EM)

    Draft Tank Closure and Waste Management Environmental Impact Statement for the Hanford ... (Ecology) Title: Draft Tank Closure and Waste Management Environmental Impact Statement ...

  14. Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433 Document details a the draft environmental assessment for proposed rule 10 CFR Part 433, Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings Download the draft environmental assessment for proposed rule

  15. EIS-0374: Final Environmental Impact Statement | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0374: Final Environmental Impact Statement Klondike IIIBiglow Canyon Wind Integration Project This summary covers the major points of the draft...

  16. EIS-0495: Notice of Intent to Prepare an Environmental Impact...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement More Documents & Publications EIS-0495: Draft Environmental Impact Statement EIS-0241-SA-02: Supplement Analysis for the Hood River Fisheries Project...

  17. EA-2006: Draft Environmental Assessment

    Energy.gov [DOE]

    Columbia Estuary Ecosystem Restoration Program Bonneville Power Administration, with the U.S. Army Corps of Engineers as a cooperating agency, issued a draft programmatic EA for actions recommended by the Northwest Power and Conservation Council to help restore ecological structure, function, and biodiversity within the Columbia River estuary. Activities under this program could include full reconnection of tidal influence through breaching dikes and levees; partial reconnection of tidal influence through culverts, bridges, and tidegates; enhancement of the quantity and quality of tidal channels; removal of invasive species; and restoration of riparian habitat conditions, such as planting native vegetation.

  18. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 1, Summary

    SciTech Connect

    Not Available

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public.

  19. Draft environmental impact statement siting, construction, and operation of New Production Reactor capacity. Volume 4, Appendices D-R

    SciTech Connect

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains 15 appendices.

  20. EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement | Department of Energy EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0408: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement Upper Great Plains Wind Energy Programmatic EIS EPA announces the availabilty of the Upper Great Plains Programmatic Wind Project Programmatic EIS, that is being prepared jointly by DOE's Western Area Power Administration and the Department of the Interior's Fish and Wildlife

  1. EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement and Notice of Public Hearings | Department of Energy 6: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings EIS-0426: DOE Notice of Availability of the Draft Site-Wide Environmental Impact Statement and Notice of Public Hearings Continued Operation of the Nevada National Security Site and Off-Site Locations in the State of Nevada The National Nuclear Security Administration (NNSA), a separately organized

  2. EIS-0185: Final Environmental Impact Statement | Department of Energy

    Energy Saver

    9: Draft Environmental Impact Statement EIS-0129: Draft Environmental Impact Statement New England/Hydro-Quebec 450 kV Transmission Line Interconnection - Phase II EIS-0129-DEIS.pdf (3.27 MB) More Documents & Publications EIS-0129: Final Environmental Impact Statement EIS-0116: Final Environmental Impact Statement EIS-0125 Energy

    61: Final Programmatic Environmental Impact Statement EIS-0161: Final Programmatic Environmental Impact Statement The Department of Energy (DOE) limits

  3. Draft Waste Management Programmatic Environmental Impact Statement for managing treatment, storage, and disposal of radioactive and hazardous waste. Volume 3, Appendix A: Public response to revised NOI, Appendix B: Environmental restoration, Appendix C, Environmental impact analysis methods, Appendix D, Risk

    SciTech Connect

    1995-08-01

    Volume three contains appendices for the following: Public comments do DOE`s proposed revisions to the scope of the waste management programmatic environmental impact statement; Environmental restoration sensitivity analysis; Environmental impacts analysis methods; and Waste management facility human health risk estimates.

  4. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Portsmouth, Ohio, Site

    SciTech Connect

    N /A

    2003-11-28

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Portsmouth site in Ohio (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Portsmouth to a more stable chemical form suitable for use or disposal. The facility would also convert the DUF{sub 6} from the East Tennessee Technology Park (ETTP) site near Oak Ridge, Tennessee. In a Notice of Intent (NOI) published in the Federal Register on September 18, 2001 (Federal Register, Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (United States Code, Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (Code of Federal Regulations, Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a Federal Register Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Portsmouth site; from the transportation of all ETTP cylinders (DUF{sub 6}, low-enriched UF6

  5. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    SciTech Connect

    N /A

    2003-11-28

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF{sub 6}) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF{sub 6} stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF{sub 6} conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF{sub 6} conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (D&D) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride

  6. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 3, Appendix A

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  7. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  8. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    SciTech Connect

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced by Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.

  9. EIS-0481: EPA Notice of Availability of Draft Programmatic Environment...

    Energy Saver

    EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0481: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement Engineered ...

  10. EIS-0505: EPA Notice of Availability of Supplemental Draft Environment...

    Energy Saver

    5: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0505: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement ...

  11. EIS-0523: EPA Notice of Availability of Draft Programmatic Environment...

    Office of Environmental Management (EM)

    : EPA Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0523: EPA Notice of Availability of Draft Programmatic Environmental Impact Statement ...

  12. EIS-0515: EPA Notice of Availability of Supplemental Draft Environment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EPA Notice of Availability of Supplemental Draft Environmental Impact Statement EIS-0515: EPA Notice of Availability of Supplemental Draft Environmental Impact Statement Bay Delta ...

  13. EIS-0527: EPA Notice of Availability of a Draft Programmatic...

    Office of Environmental Management (EM)

    EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement EIS-0527: EPA Notice of Availability of a Draft Programmatic Environmental Impact Statement ...

  14. EIS-0528: EPA NOTICE OF AVAILABILITY OF A DRAFT PROGRAMMATIC...

    Office of Environmental Management (EM)

    EPA NOTICE OF AVAILABILITY OF A DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT EIS-0528: EPA NOTICE OF AVAILABILITY OF A DRAFT PROGRAMMATIC ENVIRONMENTAL IMPACT STATEMENT ...

  15. EIS-0418: Final Environmental Impact Statement | Department of Energy

    Office of Environmental Management (EM)

    Statement and Notice of Public Hearing | Department of Energy DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing EIS-0414: DOE Notice of Availability of the Draft Environmental Impact Statement and Notice of Public Hearing Energia Sierra Juarez Transmission Project The Department of Energy (DOE) announces the availability of the ''Draft Environmental Impact Statement for the Energia Sierra Juarez U.S. Transmission Line Project'' for public

  16. EIS-0499: EPA Notice of Availability of Final Environmental Impact

    Energy Saver

    Draft Environmental Impact Statement EIS-0488: Draft Environmental Impact Statement Cameron Liquefaction Project, Cameron Parish, Louisiana Federal Energy Regulatory Commission (FERC) has prepared a Draft EIS, with DOE as a cooperating agency, that analyzes the potential environmental impacts of a proposal to expand the existing Cameron Pipeline by 21 miles (from Calcasieu to Beauregard Parishes, Louisiana, with modifications in Cameron Parish), and expand an existing liquefied natural gas (LNG)

  17. EA-1778: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    78: Draft Environmental Assessment EA-1778: Draft Environmental Assessment Draft Environmental Assessment for Proposed Rule, 10 CFR Part 433, "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings" and 10 CFR Part 435 "Energy Conservation and Fossil Fuel-Generated Energy Consumption Reduction Standards for the Design and Construction of New

  18. EA-1900: Notice of Availability of a Draft Environmental Assessment |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 900: Notice of Availability of a Draft Environmental Assessment EA-1900: Notice of Availability of a Draft Environmental Assessment Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York DOE announces the availability of the Draft Environmental Assessment for the Radiological Work and Storage Building at the Knolls Atomic Power Laboratory Kesselring Site, West Milton, New York. EA-1900-NOA-DEA-2012 (11.34 KB)

  19. EIS-0422: EPA Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    DOEEIS-0422 (July 2010 - 75 FR 38517) More Documents & Publications EIS-0403-S1: EPA Notice of Availability of the Supplement to the Draft Programmatic Environmental...

  20. EA-1812: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1812: Draft Environmental Assessment Haxtun Wind Energy Project, Logan and Phillips ... Renewable Energy Deployment Program to Phillips County for design, permitting, and ...

  1. EA-1976D: Draft Environmental Assessment | Department of Energy

    Energy.gov [DOE] (indexed site)

    draft EA in accordance with the National Environmental Policy Act (NEPA). Emera is proposing to construct and operate facilities to receive, dehydrate, and compress natural gas ...

  2. EA-1976D: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Availability of Draft Environmental Assessment Emera CNG, LLC Compressed Natural Gas Project, Florida DOE's National Energy Technology Laboratory (NETL) announces the...

  3. EA-1951: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CX-005846: Categorical Exclusion Determination EA-1912: Draft Environmental Assessment EA-1912: Midway-Benton No. 1 Rebuild Project, near town of Desert Aire, Benton County, WA...

  4. Paducah Gaseous Diffusion Plant Draft Paducah Environmental Assessment...

    Energy.gov [DOE] (indexed site)

    Draft Environmental Assessment (EA) for Potential Land and Facilities Transfers at the Paducah Gaseous Diffusion Plant in McCracken County, Kentucky. DOE is inviting comments on...

  5. DOE/EA-1903 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    03 DRAFT ENVIRONMENTAL ASSESSMENT KANSAS STATE UNIVERSITY'S ZOND WIND ENERGY PROJECT MANHATTAN, KANSAS U.S. Department of Energy Office of Energy Efficiency and Renewable Energy ...

  6. EA-1994: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1994: Draft Environmental Assessment Malheur Resource Area Jonesboro Diversion Dam ... for replacement of an existing diversion dam and installation of a fish passage ...

  7. EA-1849-S-1: Draft Supplemental Environmental Assessment | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assessment EA-1849-S-1: Draft Supplemental Environmental Assessment Tuscarora Phase II Generating Facility, Elko County, Nevada This SEA provides additional information...

  8. EA-1809: Notice of Availability of a Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1809: Notice of Availability of a Draft Environmental Assessment White Earth Nation Wind Energy Project II, Becker and Mahnomen Counties, MN DOE announces the...

  9. EA-1773: DOE Notice of Availability of the Draft Environmental...

    Energy.gov [DOE] (indexed site)

    Commerical Scale Integrated Demonstration BioEnergy Center, Vero Beach, Florida The U.S. Department of Energy (DOE) has prepared a draft Environmental Assessment (EA) to analyze...

  10. EA-1903: Notice of Availability of Draft Environmental Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1903: Notice of Availability of Draft Environmental Assessment Kansas State University Zond Wind Energy Project, Manhattan, Kansas DOE's Golden Field Office announces the ...

  11. EA-2020: Notice of Availability of Draft Environmental Assessment...

    Office of Environmental Management (EM)

    EA-2020: Notice of Availability of Draft Environmental Assessment Energy Efficiency Standards for New Federal Low-Rise Residential Buildings' Baseline Standards Update (RIN ...

  12. EIS-0404: Final Environmental Impact Statement | Department of...

    Energy Saver

    PDF icon EIS-0404-FEIS-Apps-2010.pdf More Documents & Publications EIS-0496: Final Environmental Impact Statement EIS-0157-SA-01: Supplement Analysis EIS-0496: Draft

  13. EIS-0226: Notice of Intent to Prepare an Environmental Impact...

    Energy.gov [DOE] (indexed site)

    April 2010) More Documents & Publications EIS-0226: DOE Notice of Availability of the Revised Draft Environmental Impact Statement EIS-0226: Notice of Changes to Public Hearings...

  14. EIS-0372: Final Environmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    (BHE) Northeast Reliability Interconnect This Comment-Response Addendum presents the comments (and associated responses) received on the Draft Environmental Impact Statement for...

  15. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part B

    SciTech Connect

    Not Available

    1994-06-01

    Two types of projects in the spent nuclear fuel and environmental restoration and waste management activities at the Idaho National Engineering Laboratory (INEL) are described. These are: foreseeable proposed projects where some funding for preliminary planning and/or conceptual design may already be authorized, but detailed design or planning will not begin until the Department of Energy (DOE) has determined that the requirements of the National Environmental Policy Act process for the project have been completed; planned or ongoing projects not yet completed but whose National Environmental Policy Act documentation is already completed or is expected to be completed before the Record of Decision for this Envirorunental Impact Statement (EIS) is issued. The section on project summaries describe the projects (both foreseeable proposed and ongoing).They provide specific information necessary to analyze the environmental impacts of these projects. Chapter 3 describes which alternative(s) each project supports. Summaries are included for (a) spent nuclear fuel projects, (b) environmental remediation projects, (c) the decontamination and decommissioning of surplus INEL facilities, (d) the construction, upgrade, or replacement of existing waste management facilities, (e) infrastructure projects supporting waste management activities, and (f) research and development projects supporting waste management activities.

  16. EIS-0018: Final Environmental Impact Statement | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8: Final Environmental Impact Statement EIS-0018: Final Environmental Impact Statement Continued Operation of Los Alamos Scientific Laboratory Site, Los Alamos, New Mexico EIS-0018: Final Environmental Impact Statement (11.84 MB) More Documents & Publications EIS-0085-S: Final Environmental Impact Statement EIS-0098: Draft Environmental Impact Statement EIS-0098: Final

  17. EIS-0226: Notice of Intent to Prepare an Environmental Impact Statement |

    Office of Environmental Management (EM)

    Draft Environmental Impact Statement EIS-0222: Draft Environmental Impact Statement Revised Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land-Use Plan This EIS evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years. EIS-0222-DEISExecutiveSummary-1999.pdf (305.59 KB) More Documents & Publications EIS-0222: Final Environmental Impact Statement EIS-0222: Record

  18. Environmental Regulatory Compliance Plan for site: Draft characterization of the Yucca Mountain site:Draft

    SciTech Connect

    1988-01-01

    The objective of the EMMP is to document compliance with the NWPA. To do so, a summary description of site characterization activites is provided, based on the consultation draft of the SCP. Subsequent chpaters identify those technical areas having the potential to be impacted by site characterization activities and the monitoring plans proposed to identify whether those impacts acutally occur. Should monitoring confirm the potential for significant adverse impact, mitigative measures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicle, any significant adverse environmental impacts. Although site characterization activies involve both surface and subsurface activities, it is the surface-based aspect of site characterization that is addressed in detailed by the EMMP. The schedule and duration of these activities is given in the consultation draft of the SCP. A breif summary of all proposed activities is given in the EMMP. 10 refs., 8 figs.

  19. EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental...

    Office of Environmental Management (EM)

    Revision to EPA Notice of Availability Draft Supplemental Environmental Impact Statement EIS-0288-S1: Revision to EPA Notice of Availability Draft Supplemental Environmental Impact ...

  20. EA-1792-S1: Draft Supplemental Environmental Assessment | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Draft Supplemental Environmental Assessment EA-1792-S1: Draft Supplemental Environmental Assessment DOE's Golden Field Office has prepared the supplemental EA in accordance with the National Environmental Policy Act (NEPA). The University of Maine is proposing to use Congressionally directed federal funding, from DOE, to deploy, test and retrieve one 1/8-scale floating wind turbine (20kw) prototype in Castine Harbor, offshore of Castine Maine. This test would be conducted prior to

  1. EA-1949: FERC Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1949: FERC Draft Environmental Assessment Admiralty Inlet Pilot Tidal Project, Puget Sound, WA This EA analyzes the potential environmental effects of a proposal by the Public Utility District No. 1 of Snowhomish County, Washington to construct and operate the Admiralty Inlet Tidal Project. The proposed 680-kilowatt project would be located on the east side of Admiralty Inlet in Puget Sound, Washington, about 1 kilometer west of Whidbey Island, entirely within

  2. EA-2004: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-2004: Draft Environmental Assessment The Seneca Nation Wind Turbine Project, Cattaraugus Territory, Erie County, New York The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of federal funding to the Seneca Nation of Indians, to design, permit, and construct up to a 2.0-megawatt wind turbine on Tribal common lands in the Cattaraugus Territory, New York. The turbine would be located near Lucky Lane and Gil Lay Arena. An Environmental

  3. Draft Environmental Assessment on the Remote-handled Waste Disposition...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Draft Environmental Assessment on the Remote-handled Waste Disposition Project available for public review and comment The U.S. Department of Energy invites the public to review...

  4. EA-1925: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1925: Draft Environmental Assessment Midnight Point and Mahogany Geothermal Exploration Projects, Glass Buttes, Oregon (DOI-BLM-OR-P040-2011-0021-EA; DOEEA-1925) Ormat Nevada, ...

  5. EA-1778: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EA-1778: Draft Environmental Assessment Proposed Rule, 10 CFR Part 433 and 10 CFR Part 435, "Fossil Fuel-Generated Energy Consumption Reduction for New Federal Buildings and Major ...

  6. NEPA and CEQA: Integrating State and Federal Environmental Reviews (Draft)

    Energy.gov [DOE]

    The Council on Environmental Quality (CEQ), in collaboration with the California Governor’s Office of Planning and Research, issued on March 5, 2013, a draft handbook on integrating NEPA and...

  7. EA-1915: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Land at the Hanford Site, Richland, Washington The draft EA assesses the potential environmental effects of conveying approximately 1,641 acres of Hanford Site land to the ...

  8. Draft

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Closing the Circle: The Department of Energy and Environmental Management 1942-1994 F.G. Gosling and Terrence R. Fehner History Division Executive Secretariat Department of Energy March 1994 Draft Our mission at the Department of Energy is no less significant than trying to close the circle on the splitting of the atom begun a half-century ago by [the Manhattan Project]. -Tom Grumbly Draft * 3 EM Overview Closing the Circle: The Department of Energy and Environmental Management 1942-1994 Table

  9. EA-1861: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1861: Draft Environmental Assessment Frito-Lay Biomass Boiler Project, Beloit, Wisconsin The U.S. Department of Energy (DOE) is proposing to authorize the expenditure of Federal grant funding to design, permit, and construct a biomass boiler house at the Frito-Lay North America (Frito-Lay) plant in Beloit, Wisconsin. Frito-Lay would construct and operate a new boilerhouse for a wood chip boiler and purchase wood fuel from regional suppliers (proposed project).

  10. EA-1916: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1916: Draft Environmental Assessment Hydropower Project Pilot License, Cobscook Bay Tidal Energy Project-FERC Project No. 12711-005 On September 1, 2011, Ocean Renewable Power Company Maine, LLC (ORPC Maine) filed an application for an 8-year pilot license to construct and operate its proposed Cobscook Bay Tidal Energy Project (Cobscook Bay Project or project). The 300-kilowatt (kW) hydrokinetic project would be located in Cobscook Bay in Washington County,

  11. EA-1970: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-1970: Draft Environmental Assessment Fishermen's Atlantic City Windfarm, LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey DOE is proposing to provide funding to Fishermen's Atlantic City Windfarm, LLC to construct and operate up to six wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of Atlantic City, NJ. The proposed action includes a cable crossing from the turbines

  12. EA-1970: Notice of Availability of Draft Environmental Assessement |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Notice of Availability of Draft Environmental Assessement EA-1970: Notice of Availability of Draft Environmental Assessement Fishermen's Atlantic City Windfarm, LLC Offshore Wind Demonstration Project, offshore Atlantic City, New Jersey DOE is proposing to provide funding to Fishermen's Atlantic City Windfarm, LLC to construct and operate up to six wind turbine generators, for an offshore wind demonstration project, approximately 2.8 nautical miles off the coast of

  13. EA-2001: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Draft Environmental Assessment EA-2001: Draft Environmental Assessment Energy Efficiency Standards for New Federal Commercial and Multi-Family High-Rise Residential Buildings' Baseline Standards Update (RIN 1904-AD39) The U.S. Department of Energy (DOE) is publishing this final rule to implement provisions in the Energy Conservation and Production Act (ECPA) that require DOE to update the baseline Federal energy efficiency performance standards for the construction of new Federal commercial and

  14. Idaho National Laboratory Stand-Off Experiment Range draft environmental

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    assessment available for public review and comment News Media Contact: Tim Jackson (208) 526-8484 For Immediate Release December 22, 2010 Idaho National Laboratory Stand-Off Experiment Range draft environmental assessment available for public review and comment Idaho Falls, ID � The U.S. Department of Energy today published a draft environmental assessment for a proposed Stand-Off Experiment Range at Idaho National Laboratory. �This range would represent an expansion of capability and

  15. DEISCODES. For Environmental Impact Statements

    SciTech Connect

    Widmayer, D.A. [U.S. NRC, Office of Material Safety and Safegaurds, Washington, D.C., (United States)

    1983-01-01

    DEISCODES, the Draft Environmental Impact Statement CODES are five separate FORTRAN codes used to perform the analysis in the Draft Environmental Impact Statement written to support 10 CFR 61, Licensing Requirements for Land Disposal of Radioactive Waste. The five codes are named OPTIONS, GRWATER, INTRUDE, INVERSW, and INVERSI. These codes calculate impact measures associated with the management of Low-Level radioactive Waste (LLW). Three phases of waste management are considered: waste processing, transportation, and disposal, utilizing (1) information on waste characteristics, (2) data and assumptions on disposal technologies and (3) impact calculational methodologies presented in NUREG/CR-1759 and NUREG-0782. The INTRUDE code determines the radiological impacts resulting from potential inadvertent human intrusion into a selected disposal facility containing processed waste as a function of time after disposal. GRWATER calculates the individual exposures resulting from use of contaminated water drawn from various human access locations such as a well that may become contaminated as a result of potential groundwater migration or radionuclides. The OPTIONS code calculates the waste volume-averaged inadvertent intruder impacts, impacts resulting from exposed waste scenarios, as well as those resulting from operational accidents, and those associated with short term consideration such as waste processing and transportation impacts, disposal costs, energy use, land use, etc. INVERSI, calculates the limiting concentrations in waste to meet a specific dose criterion for a disposal facility. INVERSW, calculates disposal facility radionuclide concentrations and inventories to meet specific allowable dose criteria for groundwater migration for the facility design and regionally representative environmental characteristics.

  16. EIS-0471: Notice of Adoption of an Environmental Impact Statement...

    Energy Saver

    EIS-0440: EPA Notice of Availability of a Final Environmental Impact Statement EIS-0250-S1 and EIS-0250-S2: EPA Notice of Availability of the Draft Supplemental Environmental...

  17. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 2, Part A

    SciTech Connect

    Not Available

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  18. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1

    SciTech Connect

    Not Available

    1994-06-01

    This document analyzes at a pregrammatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For pregrammatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  19. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Summary

    SciTech Connect

    Not Available

    1994-06-01

    This document analyzes at a programmatic level the potential environmental consequences over the next 40 years of alternatives related to the transportation, receipt, processing, and storage of spent nuclear fuel under the responsibility of the US Department of Energy. It also analyzes the site-specific consequences of the Idaho National Engineering Laboratory sitewide actions anticipated over the next 10 years for waste and spent nuclear fuel management and environmental restoration. For programmatic spent nuclear fuel management, this document analyzes alternatives of no action, decentralization, regionalization, centralization and the use of the plans that existed in 1992/1993 for the management of these materials. For the Idaho National Engineering Laboratory, this document analyzes alternatives of no action, ten-year plan, minimum and maximum treatment, storage, and disposal of US Department of Energy wastes.

  20. Draft environmental impact statement for construction and operation of the proposed Bangor Hydro-Electric Company`s second 345-kV transmission tie line to New Brunswick

    SciTech Connect

    1993-10-01

    This Draft Environmental Impact Statement (DEIS) was prepared by the US Department of Energy (US DOE). The proposed action is the issuance of Presidential Permit PP-89 by DOE to Bangor Hydro-Electric Company to construct and operate a new international transmission line interconnection to New Brunswick, Canada that would consist of an 83.8 mile (US portion), 345-kilovolt (kV) alternating current transmission line from the US-Canadian border at Baileyville, Maine to an existing substation at Orrington, Maine. The principal environmental impacts of the construction and operation of the transmission line would be incremental in nature and would include the conversion of forested uplands (mostly commercial timberlands) and wetlands to right-of-way (small trees, shrubs, and herbaceous vegetation). The proposed line would also result in localized minor to moderate visual impacts and would contribute a minor incremental increase in the exposure of some individuals to electromagnetic fields. This DEIS documents the purpose and need for the proposed action, describes the proposed action and alternatives considered and provides a comparison of the proposed and alternatives routes, and provides detailed information on analyses of the environmental consequences of the proposed action and alternatives, as well as mitigative measures to minimize impacts.

  1. EA-1959: Final Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: Final Environmental Assessment EA-1959: Final Environmental Assessment Eightmile Ranch ... EA-1959: Draft Environmental Assessment EIS-0425: Draft Environmental Impact Statement ...

  2. Proposed residential building standards: final environmental impact report

    SciTech Connect

    Not Available

    1981-06-03

    The Environmental Impact Report (EIR) incorporates by reference the Draft (EIR) on the original Staff Proposed Standards. Presented are: a summary of the potential impacts identified in each technical area of the Draft EIR; a comparative analysis, by technical area, of potential impacts resulting from the original Staff Proposed Standards, the Committee Proposed Standards, and the new Staff Proposed Standards; and response to comments received at the Draft EIR Public Hearing. Potential impacts compared are: air quality, public health, consumer impacts, construction industry impacts, employment, state and local government finance, and cultural resources. (MCW)

  3. EIS-0525: Department of Commerce Notice of Availability of Draft...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0525: Department of Commerce Notice of Availability of Draft Programmatic Environmental Impact Statement EIS-0525: Department of Commerce Notice of Availability of Draft ...

  4. EIS-0396: DOE Notice of Availability of the Draft Programmatic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Impact Statement | Department of Energy DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement EIS-0396: DOE Notice of Availability of the Draft Programmatic Environmental Impact Statement Global Nuclear Energy Partnership The Department of Energy (DOE) announces the availability of the Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement (Draft GNEP PEIS, DOE/EIS-0396). Notice of Availability of Draft Global Nuclear

  5. EIS-0423-S1: DOE Notice of Availability of a Draft Supplemental...

    Energy Saver

    Impact Statement Draft Supplemental Environmental Impact Statement for the Long-Term Management and Storage of Elemental Mercury DOE announces the availability of the Draft...

  6. DRAFT

    National Nuclear Security Administration (NNSA)

    Environmental Assessment for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Molybdenum-99 (DOE/EA-1929) Prepared for U.S. Department of Energy National Nuclear Security Administration Defense Nuclear Nonproliferation/ Global Threat Reduction Initiative July 2012 EA for NorthStar Medical Technologies LLC Commercial Domestic Production of the Medical Isotope Mo-99 DRAFT ii This Page Intentionally Left Blank EA for NorthStar Medical Technologies LLC

  7. Environmental Assessment Fact Sheet - Potential Impacts

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE has prepared a draft Environmental Assessment for Conducting Astrophysics and Other Basic Science Experiments at the WIPP Site. It examines the potential environmental consequences from conducting particular types of scientific experiments in an area of the WIPP underground called the experiment gallery. The environmental assessment also looks at the potential cumulative impacts of conducting experiments and operating the WIPP as a transuranic waste repository. This fact sheet presents

  8. Environmental Impact Statements and Environmental Assessments...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Impact Statements and Environmental Assessments Status Chart Environmental Impact Statements and Environmental Assessments Status Chart The Status Chart provides the ...

  9. EIS-0337: DOE Notice of Availability of the Draft Environmental...

    Office of Environmental Management (EM)

    Impact Statement West Valley Demonstration Project Waste Management DOE's ... Impact Statement, West Valley Demonstration Project Waste Management Environmental ...

  10. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 2, Sections 1-6

    SciTech Connect

    Not Available

    1991-04-01

    This (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains the analysis of programmatic alternatives, project alternatives, affected environment of alternative sites, environmental consequences, and environmental regulations and permit requirements.

  11. Draft environmental impact statement for the siting, construction, and operation of New Production Reactor capacity. Volume 3, Sections 7-12, Appendices A-C

    SciTech Connect

    Not Available

    1991-04-01

    This Environmental Impact Statement (EIS) assesses the potential environmental impacts, both on a broad programmatic level and on a project-specific level, concerning a proposed action to provide new tritium production capacity to meet the nation`s nuclear defense requirements well into the 21st century. A capacity equivalent to that of about a 3,000-megawatt (thermal) heavy-water reactor was assumed as a reference basis for analysis in this EIS; this is the approximate capacity of the existing production reactors at DOE`s Savannah River Site near Aiken, South Carolina. The EIS programmatic alternatives address Departmental decisions to be made on whether to build new production facilities, whether to build one or more complexes, what size production capacity to provide, and when to provide this capacity. Project-specific impacts for siting, constructing, and operating new production reactor capacity are assessed for three alternative sites: the Hanford Site near Richland, Washington; the Idaho National Engineering Laboratory near Idaho Falls, Idaho; and the Savannah River Site. For each site, the impacts of three reactor technologies (and supporting facilities) are assessed: a heavy-water reactor, a light-water reactor, and a modular high-temperature gas-cooled reactor. Impacts of the no-action alternative also are assessed. The EIS evaluates impacts related to air quality; noise levels; surface water, groundwater, and wetlands; land use; recreation; visual environment; biotic resources; historical, archaeological, and cultural resources; socioeconomics; transportation; waste management; and human health and safety. The EIS describes in detail the potential radioactive releases from new production reactors and support facilities and assesses the potential doses to workers and the general public. This volume contains references; a list of preparers and recipients; acronyms, abbreviations, and units of measure; a glossary; an index and three appendices.

  12. EIS-0370: EPA Notice of Availability of the Final Environmental...

    Energy Saver

    EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental Impact Statement...

  13. EIS-0370: EPA Notice of Availability of the Final Environmental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Impact Statement EIS-0440: EPA Notice of Availability of the Draft Environmental Impact Statement EIS-0350-S1: EPA Notice of Availability of the Draft Supplemental Environmental...

  14. Draft Environmental Assessment: Sand Point Wind Installation...

    Energy Saver

    1 1.1 NATIONAL ENVIRONMENTAL POLICY ACT ... 1 and 2. Figure 2-4. TDX electrical integration schematic ... Environmental Quality CFR Code of Federal Regulations CO 2 ...

  15. Environmental Impact Statement Explained

    Energy.gov [DOE]

    The National Environmental Policy Act (NEPA) requires Federal agencies to prepare an Environmental Impact Statement (EIS) for all major Federal actions that may significantly affect the quality of...

  16. Environmental Management FY 2006 Budget Request DRAFT

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Justice Environmental Justice The Department of Energy (DOE) is committed to promoting environmental justice in all its activities in keeping with Executive Order (EO) 12898: Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations. This EO directs each Federal agency to "make achieving environmental justice part of its mission by identifying and addressing, as appropriate, disproportionately high and adverse human health or environmental effects

  17. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs, Draft Environmental Impact Statement. Volume 1, Appendix D: Part A, Naval Spent Nuclear Fuel Management

    SciTech Connect

    Not Available

    1994-06-01

    Volume 1 to the Department of Energy`s Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Management Programs Environmental Impact Statement evaluates a range of alternatives for managing naval spent nuclear fuel expected to be removed from US Navy nuclear-powered vessels and prototype reactors through the year 2035. The Environmental Impact Statement (EIS) considers a range of alternatives for examining and storing naval spent nuclear fuel, including alternatives that terminate examination and involve storage close to the refueling or defueling site. The EIS covers the potential environmental impacts of each alternative, as well as cost impacts and impacts to the Naval Nuclear Propulsion Program mission. This Appendix covers aspects of the alternatives that involve managing naval spent nuclear fuel at four naval shipyards and the Naval Nuclear Propulsion Program Kesselring Site in West Milton, New York. This Appendix also covers the impacts of alternatives that involve examining naval spent nuclear fuel at the Expended Core Facility in Idaho and the potential impacts of constructing and operating an inspection facility at any of the Department of Energy (DOE) facilities considered in the EIS. This Appendix also considers the impacts of the alternative involving limited spent nuclear fuel examinations at Puget Sound Naval Shipyard. This Appendix does not address the impacts associated with storing naval spent nuclear fuel after it has been inspected and transferred to DOE facilities. These impacts are addressed in separate appendices for each DOE site.

  18. Technical support document: Energy efficiency standards for consumer products: Refrigerators, refrigerator-freezers, and freezers including draft environmental assessment, regulatory impact analysis

    SciTech Connect

    1995-07-01

    The Energy Policy and Conservation Act (P.L. 94-163), as amended by the National Appliance Energy Conservation Act of 1987 (P.L. 100-12) and by the National Appliance Energy Conservation Amendments of 1988 (P.L. 100-357), and by the Energy Policy Act of 1992 (P.L. 102-486), provides energy conservation standards for 12 of the 13 types of consumer products` covered by the Act, and authorizes the Secretary of Energy to prescribe amended or new energy standards for each type (or class) of covered product. The assessment of the proposed standards for refrigerators, refrigerator-freezers, and freezers presented in this document is designed to evaluate their economic impacts according to the criteria in the Act. It includes an engineering analysis of the cost and performance of design options to improve the efficiency of the products; forecasts of the number and average efficiency of products sold, the amount of energy the products will consume, and their prices and operating expenses; a determination of change in investment, revenues, and costs to manufacturers of the products; a calculation of the costs and benefits to consumers, electric utilities, and the nation as a whole; and an assessment of the environmental impacts of the proposed standards.

  19. EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental...

    Energy.gov [DOE] (indexed site)

    EPA announces the availability of the Draft Supplemental Environmental Impact Statement ... Download Document EIS-0423-S1: EPA Notice of Availability of a Draft Supplemental ...

  20. EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental...

    Energy Saver

    Draft Supplemental Environmental Impact Statement EIS-0283-S2: EPA Notice of Availability ... Download Document EIS-0283-S2: EPA Notice of Availability of the Draft Supplemental ...

  1. DOE/EIS-0396\tDraft Global Nuclear Energy Partnership Programmatic...

    Energy Saver

    2008 U.S. Department of Energy, Office of Nuclear Energy DOEEIS-0396 Summary Draft Global Nuclear Energy Partnership Programmatic Environmental Impact Statement Draft Global ...

  2. Environmental Management FY 2006 Budget Request DRAFT

    Office of Environmental Management (EM)

    Environmental Contractor Mentors Young Students Environmental Contractor Mentors Young Students November 26, 2014 - 12:00pm Addthis Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Jeff Boulton of LATA Kentucky works with middle school students to demonstrate and test the acidity and basicity levels of groundwater. Middle school students use water bottles and powdered drink mix to learn how contamination

  3. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    SciTech Connect

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  4. Final Environmental Impact Statement

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS - 0097-F c f ` f= �c J m s= Final Environmental Impact Statement BONNEVILLE POWER ADMINISTRATION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of Energy August 1983 Appendices albLbfp= J MMVTJc= Responsible Official: tfiif^j= ^K= s^rde^k= Assistant Secretary for Environmental Protection. Safety, and Emergency Prepafedness Final Environmental Impact Statement BONNEVILLE POWER ADM IN ISTRA TION TRANSMISSION FACILITIES VEGETATION MANAGEMENT PROGRAM U.S. Department of

  5. EA-1919: Notice of Availability of a Draft Programmatic Environmental...

    Energy Saver

    the potential environmental impacts associated with resuming the clearance of scrap metal, originating from DOE radiological areas, for recycling pursuant to improved...

  6. EA-1884: Draft Environmental Assessment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This EA evaluates the environmental impacts of interconnecting the proposed Wray Wind Energy Project, for approximately 90 megawatts of wind generation, to Western's...

  7. EIS-0441: EPA Notice of Availability of a Draft Environmental...

    Energy.gov [DOE] (indexed site)

    Environmental Impact Statement for the Mohave County Wind Farm Project, Mohave County, Arizona. DOE's Western Area Power Administration is a cooperating agency....

  8. EA-1611-S1: Draft Supplemental Environmental Assessment | Department...

    Energy.gov [DOE] (indexed site)

    supplemental EA that assesses the potential environmental impacts of the proposed expansion of Colorado Highlands Wind Project, which interconnects to Western's transmission...

  9. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs Draft Environmental Impact Statement. Volume 1, Appendix D, Part B: Naval spent nuclear fuel management

    SciTech Connect

    Not Available

    1994-06-01

    This volume contains the following attachments: transportation of Naval spent nuclear fuel; description of Naval spent nuclear receipt and handling at the Expended Core Facility at the Idaho National Engineering Laboratory; comparison of storage in new water pools versus dry container storage; description of storage of Naval spent nuclear fuel at servicing locations; description of receipt, handling, and examination of Naval spent nuclear fuel at alternate DOE facilities; analysis of normal operations and accident conditions; and comparison of the Naval spent nuclear fuel storage environmental assessment and this environmental impact statement.

  10. Draft Environmental Assessment for the High Explosive Science and Engineering Facility Pantex Plant

    National Nuclear Security Administration (NNSA)

    DRAFT DOE/EA-1993 U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL ASSESSMENT FOR THE HIGH EXPLOSIVE SCIENCE AND ENGINEERING FACILITY PANTEX PLANT * AMARILLO, TEXAS * 2015 Draft Environmental Assessment for the High Explosive Science and Engineering Facility Pantex Plant August 2015 TABLE OF CONTENTS 1.0 INTRODUCTION .................................................................................................................... 1 2.0 BACKGROUND

  11. EIS-0344: Draft Envrionmental Impact Statement | Department of...

    Energy.gov [DOE] (indexed site)

    Coulee - Bell 500-kV Transmission Line Project This Environmental Impact Statement (EIS) discloses the potential impacts associated with construction and operation of the proposed...

  12. EA-1919: Notice of Availability of a Draft Programmatic Environmental...

    Energy.gov [DOE] (indexed site)

    comments on the Draft PEA was printed correctly in the Draft PEA but contained an error in the Notice of Availability (NOA) published in the Federal Register on December 12,...

  13. Department of Energy Programmatic Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs draft environmental impact statement. Volume 1, Appendix B: Idaho National Engineering Laboratory Spent Nuclear Fuel Management Program

    SciTech Connect

    Not Available

    1994-06-01

    The US Department of Energy (DOE) has prepared this report to assist its management in making two decisions. The first decision, which is programmatic, is to determine the management program for DOE spent nuclear fuel. The second decision is on the future direction of environmental restoration, waste management, and spent nuclear fuel management activities at the Idaho National Engineering Laboratory. Volume 1 of the EIS, which supports the programmatic decision, considers the effects of spent nuclear fuel management on the quality of the human and natural environment for planning years 1995 through 2035. DOE has derived the information and analysis results in Volume 1 from several site-specific appendixes. Volume 2 of the EIS, which supports the INEL-specific decision, describes environmental impacts for various environmental restoration, waste management, and spent nuclear fuel management alternatives for planning years 1995 through 2005. This Appendix B to Volume 1 considers the impacts on the INEL environment of the implementation of various DOE-wide spent nuclear fuel management alternatives. The Naval Nuclear Propulsion Program, which is a joint Navy/DOE program, is responsible for spent naval nuclear fuel examination at the INEL. For this appendix, naval fuel that has been examined at the Naval Reactors Facility and turned over to DOE for storage is termed naval-type fuel. This appendix evaluates the management of DOE spent nuclear fuel including naval-type fuel.

  14. Draft SPD Supplemental EIS Master Reference List | National Nuclear...

    National Nuclear Security Administration (NNSA)

    Office of General Counsel National Environmental Policy Act (NEPA) NEPA Reading Room Surplus Plutonium Disposition Supplemental Environmental Impact Statement Draft SPD...

  15. EIS-0463: Notice of Intent to Prepare a Supplement to the Draft

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Impact Statement and Announcing the Extension of the Public Comment Period and Postponement of Public Hearings To Receive Comments on the Draft Environmental Impact Statement | Department of Energy a Supplement to the Draft Environmental Impact Statement and Announcing the Extension of the Public Comment Period and Postponement of Public Hearings To Receive Comments on the Draft Environmental Impact Statement EIS-0463: Notice of Intent to Prepare a Supplement to the Draft

  16. EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Impact Statement | Department of Energy 3-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement EIS-0433-S1: EPA Notice of Availability of a Draft Supplemental Environmental Impact Statement Keystone XL Project EPA announces the availability fo the Keystone XL Project Draft Supplemental Environmental Impact Statement. EIS-0433-S1-DSEIS-EPANOA-2013.pdf (194.56 KB) More Documents & Publications EIS-0451: EPA Notice of Availability of a Draft

  17. EIS-0236-S4: DOE Notice of Availability of the Draft Supplemental...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supplemental Programmatic Environmental Impact Statement and Notice of Public Hearings Complex Transformation The Draft Complex Transformation SPEIS analyzes the potential...

  18. Draft environmental assessment: Ocean Thermal Energy Conversion (OTEC) Pilot Plants

    SciTech Connect

    Sullivan, S.M.; Sands, M.D.; Donat, J.R.; Jepsen, P.; Smookler, M.; Villa, J.F.

    1981-02-01

    This Environmental Assessment (EA) has been prepared, in accordance with the National Environmental Policy Act of 1969, for the deployment and operation of a commercial 40-Megawatt (MW) Ocean Thermal Energy Conversion (OTEC) Pilot Plant (hereafter called the Pilot Plant). A description of the proposed action is presented, and a generic environment typical of the candidate Pilot Plant siting regions is described. An assessment of the potential environmental impacts associated with the proposed action is given, and the risk of credible accidents and mitigating measures to reduce these risks are considered. The Federal and State plans and policies the proposed action will encompass are described. Alternatives to the proposed action are presented. Appendix A presents the navigation and environmental information contained in the US Coast Pilot for each of the candidate sites; Appendix B provides a brief description of the methods and calculations used in the EA. It is concluded that environmental disturbances associated with Pilot Plant activities could potentially cause significant environmental impacts; however, the magnitude of these potential impacts cannot presently be assessed, due to insufficient engineering and environmental information. A site- and design-specific OTEC Pilot Plant Environmental Impact Statement (EIS) is required to resolve the potentially significant environmental effects associated with Pilot Plant deployment and operation. (WHK)

  19. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Brookhaven Site Office (BHSO) BHSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Resources Contact Information Brookhaven Site Office U.S. Department of Energy PO Box 5000 Upton, NY 11973 P: (631) 344-3425 E: Email Us National Environmental Policy Act (NEPA) Documents Environmental

  20. Environmental Assessments (EA) / Environmental Impact Statements (EIS) |

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    U.S. DOE Office of Science (SC) Environmental Assessments (EA) / Environmental Impact Statements (EIS) Princeton Site Office (PSO) PSO Home About Projects Contract Management NEPA Documents Categorical Exclusion Determinations Environmental Assessments and Environmental Impact Statements Contact Information Princeton Site Office U.S. Department of Energy P.O. Box 102 Princeton, NJ 08543 P: (609) 243-3700 F: (609) 243-2032 National Environmental Policy Act (NEPA) Documents Environmental