National Library of Energy BETA

Sample records for doe contractor ch2m

  1. DOE Cites CH2M Hill Hanford for Violating Nuclear Safety Rules | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy for Violating Nuclear Safety Rules DOE Cites CH2M Hill Hanford for Violating Nuclear Safety Rules March 10, 2005 - 10:44am Addthis Hanford Tank Farm Contractor Faces Fine of more than $300,000 WASHINGTON, DC - The Department of Energy (DOE) today notified the CH2M Hill Hanford Group, Inc. (CH2M Hill) - that it will fine the company $316,250 for violations of the department's nuclear safety requirements. CH2M Hill is the department's contractor responsible for storage of highly

  2. DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contract at its Hanford Site | Department of Energy CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site June 19, 2008 - 1:29pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced that CH2M Hill Plateau Remediation Company has been selected as the plateau remediation contractor for DOE's Hanford Site in southeastern Washington

  3. DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy M-Washington Group Idaho for Price-Anderson Violations DOE Cites CH2M-Washington Group Idaho for Price-Anderson Violations June 14, 2007 - 1:40pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today notified CH2M-Washington Group Idaho (CWI) that it will fine the company $55,000 for violations of the Department's nuclear safety requirements. CWI is the prime contractor responsible for managing the Idaho Cleanup Project at the Idaho National Laboratory site.

  4. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination...

    Office of Environmental Management (EM)

    DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015 Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September ...

  5. DOE Selects CH2M Hill Plateau Remediation Company for Plateau...

    Office of Environmental Management (EM)

    CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its Hanford Site DOE Selects CH2M Hill Plateau Remediation Company for Plateau Remediation Contract at its ...

  6. The U.S. Department of Energy and contractor CH2M HILL Plateau Remediation

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    6 . The U.S. Department of Energy and contractor CH2M HILL Plateau Remediation Company manage the Waste Encapsulation and Storage Facility at the Hanford Site in southeast Washington state. Waste Encapsulation and Storage Facility Background The Waste Encapsulation and Storage Facility (WESF) provides safe and compliant underwater storage for 1,936 highly radioactive capsules containing the elements cesium and strontium. In the 1970s, radioactive isotopes of the chemical elements cesium and

  7. DOE Cites CH2M Hill Hanford Group for Price-Anderson Violations

    Energy.gov [DOE]

    WASHINGTON, DC - The Department of Energy (DOE) today notified CH2M Hill Hanford Group (CHG) that it will fine the company $82,500 for violations of the Department's nuclear safety requirements. ...

  8. DOE Cites CH2M Hill Hanford Group, Inc. for Price-Anderson Violations

    Energy.gov [DOE]

    WASHINGTON, DC - The Department of Energy (DOE) today issued a Preliminary Notice of Violation (PNOV) to CH2M Hill Hanford Group, Inc. (CHG) for nuclear safety violations.  CHG is the tank...

  9. Joint DOE-CH2M News Release Media Contact: For Immediate Release:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Joint DOE-CH2M News Release Media Contact: For Immediate Release: Destry Henderson, CH2M, (509) 376-8644, April 20, 2015 destry_j_henderson@rl.gov Mark Heeter, DOE, (509)373-1970, mark.heeter@rl.doe.gov WORKERS REMOVE LAST PENCIL TANK FROM KEY AREA OF HANFORD'S PLUTONIUM FINISHING PLANT Removal of contaminated pencil tanks brings facility one step closer toward demolition RICHLAND, Wash. - More than 50 pencil tank assemblies - some two stories tall - contaminated with chemical and radiological

  10. NOPR CH2M | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CH2M NOPR CH2M NOPR CH2M (62.16 KB) More Documents & Publications NOPR NEI NEI Statement DOE Workshop 02 20 FINAL NOPR CIGNL

  11. Letter from DOE to URS | CH2M Oak Ridge LLC on Award Fee Determination for April to September 2015

    Energy.gov [DOE]

    DOE's Oak Ridge Environmental Management Office told URS | CH2M Oak Ridge LLC (UCOR) in a letter that it had completed its evaluation of the company's performance for the award fee period of April to September 2015 and determined that UCOR earned a fee of more than $4.4 million for the period.

  12. Identification of DOE Contractors

    Energy.gov [DOE]

    The attached guidance is issued to Contracting Officers to remind them of the need for DOE's contractor staff to appropriately identify themselves as contractor employees and not federal employees.

  13. Voluntary Protection Program Onsite Review, CH2M HILL Analytical...

    Energy.gov (indexed) [DOE]

    Evaluation to determine whether CH2M HILL Analytical Technical Services is continuing to perform at a level deserving DOE-VPP Star recognition. The Team conducted its review during...

  14. Contractor Employee Assistance at DOE Contractor Sites

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Employee Assistance Program (EAP) for DOE contractor and subcontractor workers complements the DOE medical and psychological evaluations and surveillance program. The EAP provides contractor workers who are experiencing personal problems with an opportunity to receive appropriate treatment and support. The goal of the EAP is to provide a conduit through which the individual can resolve personal and workplace problems. The HSS EAP Manager aids the DOE contracting organizations to maintain a healthy and productive workforce.

  15. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5-16 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  16. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    01-13 1 For use in M&O and non-M&O cost reimbursement solicitations and contracts where work had been previously performed under a DOE M&O contract and the successor Contractor is (a) required to employ all or part of the former Contractor's workforce and sponsors the employee pension and benefit plans; or (b) retains sponsorship of benefit plans that survive performance of the contract work scope. Contracts in this latter category include, but are not limited to, environmental

  17. Voluntary Protection Program Onsite Review, CH2M WG LLC, Idaho Cleanup Project March 2014

    Energy.gov [DOE]

    Evaluation to determine whether CH2M WG LLC, Idaho Cleanup Project is performing at a level deserving DOE-VPP Star recognition.

  18. Voluntary Protection Program Onsite Review, CH2M HILL Analytical Technical Services- January 2008

    Office of Energy Efficiency and Renewable Energy (EERE)

    Evaluation to determine whether CH2M HILL Analytical Technical Services is continuing to perform at a level deserving DOE-VPP Star recognition.

  19. Independent Oversight Review, Hanford Site CH2M Hill Plateau...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CH2M Hill Plateau Remediation Company - November 2012 Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation Company - November 2012 November 2012 Review of the...

  20. Consent Order, CH2M-WG Idaho, LLC - WCO-2011-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CH2M-WG Idaho, LLC - WCO-2011-01 Consent Order, CH2M-WG Idaho, LLC - WCO-2011-01 October 6, 2011 Issued to CH2M-WG Idaho, LLC related to a Hoisting Incident that occurred at the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory On October 6, 2011, the U.S. Department of Energy (DOE) Office of Health Safety and Security's Office of Enforcement and Oversight issued a Consent Order to CH2M-WG Idaho, LLC (CWI) for deficiencies in CWI's oversight of its construction

  1. CH2M HILL Plateau Remediation Company - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contracting CH2M HILL Plateau Remediation Company Contracting ORP Contracts and Procurements RL Contracts and Procurements CH2M HILL Plateau Remediation Company Mission Support Alliance Washington Closure Hanford HPM Corporation (HPMC) Wastren Advantage, Inc. Bechtel National, Inc. Washington River Protection Solutions CH2M HILL Plateau Remediation Company Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size CH2M CH2M HILL Plateau Remediation Company is the prime

  2. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A description of the Contractor Employee Compensation Program should include the following components; a. Philosophy and strategy for all pay delivery programs. b. System for ...

  3. Enforcement Letter, CH2M Hill- October 4, 2004

    Energy.gov [DOE]

    Issued to CH2M Hill related to at a Lapse in Dosimetry Accreditation at the Separations Process Research Unit

  4. Voluntary Protection Program Onsite Review, CH2M HILL Plateau Remediation Co., Inc., Hanford – Jan 2014

    Energy.gov [DOE]

    Evaluation to determine whether CH2M HILL Plateau Remediation Co., Inc., Hanford is performing at a level deserving DOE-VPP Star recognition.

  5. Voluntary Protection Program Onsite Review, CH2M HILL Plateau...

    Energy.gov (indexed) [DOE]

    Programs Participants' Association (VPPPA) Presentation: Conducting your Annual VPP Self Assessment Voluntary Protection Program Onsite Review, CH2M HILL Analytical Technical...

  6. Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractors Contractors The U.S. Department of Energy's Oak Ridge Office of Environmental Management uses three prime contractors to conduct its major cleanup projects at the site. These companies include URS|CH2M Oak Ridge LLC (UCOR), North Wind Solutions LLC, and Isotek Systems LLC. UCOR is the Department of Energy's primary cleanup contractor for the DOE Oak Ridge Reservation, primarily focused on cleanup of East Tennessee Technology Park (the former Oak Ridge K-25 Site). UCOR is also engaged

  7. CH2M HILL Plateau Remediation Company | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CH2M HILL Plateau Remediation Company CH2M HILL Plateau Remediation Company The Office of Hea1th, Safety and Security's Office of Enforcement and Oversight has evaluated the facts and circumstances of a series of radiological work deficiencies at the Plutonium Finishing Plant (PFP) and the 105 K-East Reactor Facility (105KE Reactor) by CH2M HILL Plateau Remediation Company (CHPRC). The radiological work deficiencies at PFP are documented in the April 29, 2011, Department of Energy Richland

  8. CH2M Hill Ltd | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    in consulting, design, engineering, procurement, construction, and operations and maintenance. References: CH2M Hill Ltd1 This article is a stub. You can help OpenEI by...

  9. Political Activity at DOE Facilities by DOE Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Activity at DOE Facilities by DOE Contractors Political Activity at DOE Facilities by DOE Contractors The attached guidance is issued to Contracting Officers to remind them of restrictions on political activity by DOE contractors at the Department's facilities PF2011-02 Political Activity at DOE Facilities or by DOE Contractors, which now includes updated attachments (53.83 KB) PF2011-02a.pdf (17.3 KB) More Documents & Publications Microsoft Word - Political Activity and the

  10. ORAU Wins DOE Facility Management Contractor Small Business Achievemen...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year September ...

  11. DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6...

    Energy Savers

    DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at Ohio and Kentucky Facilities DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at ...

  12. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can make decision bit must notify DOE of intent of restructuring 101-200 employees DOE/NNSA field office is authorized to provide approval 201-500 employees LM is authorized to provide approval and NNSA Administrator is authorized to provide approval for NNSA work force restructurings in consultation with LM 501 and above employees Under Secretary/NNSA Administrator approval required

  13. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement

    Energy.gov [DOE]

    The U.S. Department of Energy (DOE) Richland Operations Office (DOE-RL) and CH2M HILL Plateau Remediation Company (CHPRC) are committed to continuous improvement and will utilize principles of the...

  14. Paducah DOE and Site Contractors

    Energy.gov [DOE]

    Paducah Site Office. DOE manages the day-to-day operations out of the Paducah site office, located at the PGDP.

  15. Preliminary Notice of Violation, CH2M-Washington Group Idaho...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    M-Washington Group Idaho, LLC - EA-2007-03 Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC - EA-2007-03 June 14, 2007 Issued to CH2M-Washington Group Idaho, LLC,...

  16. Enforcement Letter, CH2M Hill Hanford Group, Inc - July 8, 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Inc - July 8, 2005 Enforcement Letter, CH2M Hill Hanford Group, Inc - July 8, 2005 July 8, 2005 Issued to CH2M Hill Hanford Group, Inc., related to Neutron Exposure at the Hanford...

  17. Preliminary Notice of Violation, CH2M Hill Hanford Group, Inc...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Preliminary Notice of Violation, CH2M Hill Hanford Group, Inc. - EA-2006-06 November 16, 2006 Issued to CH2M Hill Hanford Group, Inc., related to Radiological Contamination Events ...

  18. Preliminary Notice of Violation, CH2M Hill Hanford Group, Inc.- EA-2003-06

    Energy.gov [DOE]

    Issued to CH2M Hill Hanford Group, Inc., related to Quality Assurance Issues at the Hanford Site Tank Farms

  19. Independent Activity Report, CH2M Hill Plateau Remediation Company- January 2011

    Energy.gov [DOE]

    Review of the CH2M Hill Plateau Remediation Company Unreviewed Safety Question Procedure [ARPT-RL-2011-003

  20. Enforcement Letter, CH2M Hill Hanford Group, Inc.- April 24, 2001

    Energy.gov [DOE]

    Issued to CH2M Hill Hanford Group, Inc., related to Nuclear Safety Management at the Hanford Site Tank Farms

  1. Preliminary Notice of Violation, CH2M Hill Hanford Group, Inc- EA-2005-01

    Energy.gov [DOE]

    Issued to CH2M Hill Hanford Group, Inc., related to Radiological and Operational Events at the Hanford Tank Farms

  2. Enforcement Letter, CH2M Hill Hanford Group Inc,- September 6, 2007

    Energy.gov [DOE]

    Issued to CH2M Hill Hanford Group, Inc., related to Quality Improvement Deficiencies at the Hanford Tank Farms

  3. DOE / Contractor Resources | The Ames Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    DOE / Contractor Resources As a Department of Energy National Laboratory operated under Contract DE-AC02-07CH11358 by Iowa State University, the Ames Laboratory is required to prepare and submit various Planning and Performance documents for review and approval to the DOE. Included herein are some of those documents that are or may be of interest to our constituents. The Lab Plan is an annual document submitted to the DOE that discusses our mission, core capabilities and infrastructure. The

  4. Voluntary Protection Program Onsite Review, CH2M HILL B&W West Valley LLC, West Valley Demonstration Project – October 2013

    Energy.gov [DOE]

    Evaluation to determine whether CH2M HILL B&W West Valley LLC, West Valley Demonstration Project is performing at a level deserving DOE-VPP Star recognition.

  5. Idaho Cleanup Contractor Surpasses Significant Safety Milestones

    Office of Energy Efficiency and Renewable Energy (EERE)

    IDAHO FALLS, Idaho For the second time in a little over a year, employees with DOE contractor CH2M-WG Idaho (CWI) supporting EM at the Idaho site have achieved 1 million hours without a recordable injury. They also worked more than 1.7 million hours without a lost work-time injury.

  6. Partnership between DOE programs leads to mutual success

    Energy.gov [DOE]

    NNSA and DOE's Oak Ridge Office of EM, along with their major contractors, Consolidated Nuclear Security and URS|CH2M Oak Ridge, recently collaborated to recycle excavated soil resulting in cost savings for two active projects.

  7. DOE Strategic Petroleum Reserve Contractor Receives the Baldrige Award

    Energy.gov [DOE]

    Vice President Cheney Presents DOE contractor with the nation's highest Presidential honor for performance excellence and quality achievement

  8. Enforcement Letter, CH2M Hill Mound, Inc- December 22, 2004

    Energy.gov [DOE]

    Issued to CH2M Hill Mound, Inc. related to a Radioactive Contamination Event during Remediation Activities at the Miamisburg Closure Project

  9. Preliminary Notice of Violation, CH2M HILL Hanford Group, Inc.- NEA-2008-02

    Energy.gov [DOE]

    Issued to CH2M Hill Hanford Group, Inc., related to a Radioactive Waste Spill at the Hanford Site Tank Farms

  10. Consent Order, CH2M Hill Hanford Group, Inc.- EA-2000-09

    Energy.gov [DOE]

    Issued to CH2M Hill Hanford Group, Inc., related to Quality Problems at the Hanford Site Tank Farms, (EA-2000-09)

  11. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can ... to provide approval for NNSA work force restructurings in consultation with LM 501 ...

  12. DOE Selects Two Contractors for Multiple-Award Waste Disposal...

    Office of Environmental Management (EM)

    Selects Two Contractors for Multiple-Award Waste Disposal Contract DOE Selects Two Contractors for Multiple-Award Waste Disposal Contract April 12, 2013 - 12:00pm Addthis Media ...

  13. DOE Announces New Policy for Contractor Benefit Reimbursements | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Policy for Contractor Benefit Reimbursements DOE Announces New Policy for Contractor Benefit Reimbursements April 27, 2006 - 10:32am Addthis WASHINGTON , DC - The Department of Energy (DOE) today announced new policy measures for the reimbursement of contractor pension and medical benefit plan costs that are based on sound business practices and market-based benchmarks for cost management. The Department will continue to reimburse contractors for costs for current and retired

  14. 10 C.F.R. 708: DOE Contractor Employee Protection Program | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    708: DOE Contractor Employee Protection Program 10 C.F.R. 708: DOE Contractor Employee Protection Program Stakeholders: Employee(s) of DOE contractor(s) Scope: 10 C.F.R. 708 ...

  15. ORP Contractors Earn Highest DOE Safety Awards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ORP Contractors Earn Highest DOE Safety Awards ORP Contractors Earn Highest DOE Safety Awards September 30, 2016 - 12:10pm Addthis RICHLAND, Wash. - EM Office of River Protection (ORP) contractors recently earned the highest DOE safety awards during the 32nd annual National Voluntary Protection Programs Participants' Association Safety and Health Conference in Kissimmee, Fla. Bechtel National Inc. (BNI), and Washington River Protection Solutions (WRPS) received the Voluntary Protection Program

  16. Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 2015 | Department of Energy URS | CH2M Oak Ridge LLC - April 2015 Voluntary Protection Program Onsite Review, URS | CH2M Oak Ridge LLC - April 2015 April 2015 UCOR is admitted to the Department of Energy Voluntary Protection Program as a Star Participant. This report summarizes the results from the evaluation of URS | CH2M OAK RIDGE LLC (UCOR) in Oak Ridge, Tennessee during the period of April 14-23 2015, and provides the Associate Under Secretary for AU with the necessary information

  17. DOE Federal and Eligible Contractor Use | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Federal and Eligible Contractor Use 071615.docx (28.88 KB) More Documents & Publications List of Enterprise-Wide Agreements Acquisition Career Management Handbook Change - ...

  18. Political Activity at DOE Facilities and by DOE Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Political Activity at DOE Facilities and by DOE Contractors Political Activity at DOE Facilities and by DOE Contractors The Policy Flash from October 5, 2011, serves to remind Contracting Officers of restrictions on political activity by DOE contractors at the Department facitilites, and it is available here. More Documents & Publications Political Activity Policy Flash Archive Search File Political Activity at DOE Facilities by DOE Contractors

  19. Enforcement Letter, CH2M-Washington Group Idaho LLC , - May 20...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    , - May 20, 2009 May 20, 2009 Issued to CH2M-Washington Group Idaho, LLC, for Electrical Safety Deficiencies at the Idaho National Laboratory On May 20, 2009, the U.S. Department...

  20. Voluntary Protection Program Onsite Review, CH2M HILL B&W West...

    Office of Environmental Management (EM)

    B&W West Valley LLC, West Valley Demonstration Project - October 2013 Voluntary Protection Program Onsite Review, CH2M HILL B&W West Valley LLC, West Valley Demonstration Project - ...

  1. Preliminary Notice of Violation, CH2M-Washington Group Idaho, LLC- EA-2007-03

    Energy.gov [DOE]

    Issued to CH2M-Washington Group Idaho, LLC, related to Radiation Protection Program Deficiencies at the Radioactive Waste Management Complex - Accelerated Retrieval Project at the Idaho National Laboratory

  2. WIPP Security Contractor Receives DOE Voluntary Protection Program Award

    Energy.gov [DOE]

    CARLSBAD, N.M.– Security Walls, LLC, the security contractor for the U.S. Department of Energy’s (DOE) Waste Isolation Pilot Plant (WIPP), recently received the DOE Voluntary Protection Program (VPP) Legacy Star award.

  3. Worker Protection Management for DOE Federal and Contractor Employees

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1998-03-27

    Establishes the framework for an effective worker protection program that will reduce or prevent injuries, illnesses, and accidental losses by providing DOE Federal and contractor workers with a safe and healthful workplace. Cancels DOE O 440.1.

  4. Independent Oversight Review, Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance- April 2012

    Energy.gov [DOE]

    Review of Richland Operations Office and CH2M Hill Plateau Remediation Company and Mission Support Alliance Conduct of Operations

  5. DOE Selects Contractor for Depleted Hexafluoride Conversion Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support March 25, 2013 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564 Bill.Taylor@srs.gov Cincinnati ...

  6. Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    $300 Million | Department of Energy Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE $300 Million December 17, 2015 - 12:35pm Addthis A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. A recent photo of the N Reactor in its cocooned state looks sharply different than it did in 2005. RICHLAND, Wash. - The River Corridor Closure

  7. Self-Assessment Standard for DOE Contractor Criticality Safety Programs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    10 March 2010 DOE STANDARD SELF-ASSESSMENT STANDARD FOR DOE CONTRACTOR CRITICALITY SAFETY PROGRAMS DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document is available on the Department of Energy Technical Standards Program Web Page at http://www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE-STD-1158-2010 iii TABLE OF CONTENTS FOREWORD

  8. MEMORANDUM FOR DOE PAAA COORDINATORS CONTRACTOR PAAA COORDINATORS

    Energy.gov [DOE]

    The DOE Office of Enforcement and Investigation (EH Enforcement) invoked a 120-day suspension of PAAA enforcement actions for issues associated with contractor Internal Dose Evaluation Programs (IDEP). Prior to initiation of the suspension, EH Enforcement had identified deficiencies in DOEcontractor implemented bioassay programs at numerous sites within the DOE complex. The commonality of the IDEP deficiencies at the various sites, as well as the possibility of the existence of similar deficiencies at other DOE sites, led EH Enforcement to the conclusion that a suspension of enforcement actions would be appropriate to provide DOE-contractors an opportunity to review their own IDEPs to determine whether similar or other program deficiencies existed, and, if so, to take appropriate corrective action. Contractors were alerted to review their IDEP during the 120-day suspension period. If program deficiencies were identified, and if they met the Noncompliance Tracking System (NTS) criteria, these issues were to be reported into the NTS, along with proposed corrective actions and the anticipated target completion dates. EH Enforcement did not plan to take enforcement action against the contractor for identified IDEP problems if bioassay program deficiencies were identified and reported and if corrective actions, as identified by the contractor, were implemented. However, failure of the contractor to implement proposed corrective actions would permit EH Enforcement to re-open PAAA enforcement action for any of these issues in the future.

  9. DOE recognizes Nevada National Security Site contractor for safety |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) DOE recognizes Nevada National Security Site contractor for safety Tuesday, September 8, 2015 - 9:09am Steve Lawrence,left, and Ray Juzaitis National Security Technologies (NSTec), the primary contractor at the Nevada National Security Site, has been recognized by the Department of Energy for excellence in occupational safety and health protection. National Nuclear Security Administration Nevada Field Office Manager Steve Lawrence, left,

  10. EM Richland Operations Office Contractor Earns 97 Percent of Available Fee

    Energy.gov [DOE]

    RICHLAND, Wash. – EM’s Richland Operations Office (RL) issued its fiscal year 2015 fee determination for Hanford Site contractor CH2M HILL Plateau Remediation Company (CH2M).

  11. NEW - DOE O 350.3, Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    To ensure that contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships; that contractor relations/human resources specialists achieve consultations with management and operating contractors; and that appropriate labor standards are included in DOE/NNSA contracts and subcontracts. Cancels Chapters I-III of DOE O 350.1 Chg 4. Does not cancel other directives.

  12. Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project | Department of Energy Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project Idaho Governor Praises DOE, Contractor Effort for Resuming Critical Cleanup Project July 30, 2013 - 12:00pm Addthis Idaho Governor C.L. “Butch” Otter discusses the importance of completing the cleanup mission at the Idaho site. Idaho Governor C.L. "Butch" Otter discusses the importance of completing the cleanup mission at the Idaho site. An exterior view of the

  13. DOE Human Genome Program contractor-grantee workshop

    SciTech Connect (OSTI)

    1996-01-01

    This volume contains the proceedings for the DOE Human Genome Program`s Contractor-Grantee Workshop V held in Sante Fe, New Mexico January 28, February 1, 1996. Presentations were divided into sessions entitled Sequencing; Mapping; Informatics; Ethical, Legal, and Social Issues; and Infrastructure. Reports of individual projects described herein are separately indexed and abstracted for the database.

  14. Criteria and Procedures for DOE Contractor Employee Protection Program

    Energy.gov [DOE]

    This regulation provides procedures for processing complaints by employees of DOE contractors alleging retaliation by their employers for disclosure of information concerning danger to public or worker health or safety, substantial violations of law, or gross mismanagement; for participation in Congressional proceedings; or for refusal to participate in dangerous activities.

  15. Worker Protection Management for DOE Federal and Contractor Employees

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Establishes the framework for an effective worker protection program that will reduce or prevent accidental losses, injuries, and illnesses by providing DOE Federal and contractor workers with a safe and healthful workplace. Chg 1, 10-26-95; Chg 2, 10-26-96.

  16. Radiation exposure for DOE and DOE contractor employees, 1979. Twelfth annual report

    SciTech Connect (OSTI)

    Not Available

    1982-02-01

    This report is a summary of the data submitted by DOE and DOE contractors for 1979 for 104,986 employees, representing 81% of all DOE and DOE contractor employees. Of all employees monitored, 47.6% received a dose equivalent that was less than measurable, 50.8% a measurable exposure less than 1 rem, and 1.6% an exposure greater than 1 rem. Only three DOE contractor employees at three separate facilities received whole-body dose equivalents greater than 5 rem during 1979. The two reported cases of internal depositions were both less than the annual dose-equivalent standard and resulted from accidental exposures. (PSB)

  17. ASSESSMENT REPORT Audit Coverage of Cost Allowability for URS | CH2M Oak Ridge LLC During

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    for URS | CH2M Oak Ridge LLC During Fiscal Years 2011, 2012, and 2013 Under Department of Energy Contract No. DE-SC0004645 OAI-V-16-09 June 2016 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 June 10, 2016 MEMORANDUM FOR THE MANAGER, OAK RIDGE OFFICE OF ENVIRONMENTAL MANAGEMENT FROM: Debra K. Solmonson Deputy Assistant Inspector General for Audits and Inspections Office of Inspector General SUBJECT: INFORMATION:

  18. DOE contractor's meeting on chemical toxicity

    SciTech Connect (OSTI)

    Not Available

    1987-01-01

    The Office of Health and Environmental Research (OHER) is required to determine the potential health and environmental effects associated with energy production and use. To ensure appropriate communication among investigators and scientific disciplines that these research studies represent, OHER has sponsored workshops. This document provides a compilation of activities at the Third Annual DOE/OHER Workshop. This year's workshop was broadened to include all OHER activities identified as within the chemical effects area. The workshop consisted of eight sessions entitled Isolation and Detection of Toxic chemicals; Adduct Formation and Repair; Chemical Toxicity (Posters); Metabolism and Genotoxicity; Inhalation Toxicology; Gene Regulation; Metals Toxicity; and Biological Mechanisms. This document contains abstracts of the information presented by session.

  19. Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1999-04-15

    To clarify and modify policies and procedures for management of Department of Energy (DOE) facility contractor employees located in the Washington, D.C., area. A facility contractor employee is any employee of either a contractor responsible for managing a Department-owned facility, such as a National Laboratory, or a subcontractor of such a contractor. Facility contractor means any contractor performing under a Management and Operating (M&O), Management and Integration (M&I), or Environmental Restoration Management Contractor (ERMC) contract awarded by a DOE contracting officer. Canceled by DOE O 350.2.

  20. UCOR Assumes Role as Primary Cleanup Contractor for ETTP | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy UCOR Assumes Role as Primary Cleanup Contractor for ETTP UCOR Assumes Role as Primary Cleanup Contractor for ETTP August 1, 2011 - 12:00pm Addthis OAK RIDGE, Tenn. - Following the successful completion of transition, URS | CH2M Oak Ridge LLC (UCOR) has assumed its role as the primary contractor for remediation and cleanup of the Department of Energy's (DOE) East Tennessee Technology Park (ETTP). "We are extremely pleased to have UCOR on board," said John Eschenberg, the DOE

  1. Joint DOE-CH2M HILL News Release Media Contact: For Immediate Release:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Energy Join the Call: One Million Hours of STEM Volunteer Service Join the Call: One Million Hours of STEM Volunteer Service June 30, 2015 - 10:19am Addthis Join the Call: One Million Hours of STEM Volunteer Service America's ability to meet the demands of its energy future depends on having a trained, dedicated science, technology, engineering, and mathematics (STEM) workforce. To answer this call, the Energy Department has an obligation to do all that is possible to attract, engage,

  2. Joint DOE-CH2M News Release Media Contact: For Immediate...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    PLANT Removal of contaminated pencil tanks brings facility one step closer toward ... The tanks, called "pencil tanks" due to their long and narrow shape, reclaimed plutonium ...

  3. Radiation Exposures for DOE and DOE Contractor Employees - 1989. Twenty-second annual report

    SciTech Connect (OSTI)

    Smith, M. H.; Eschbach, P. A.; Harty, R.; Millet, W. H.; Scholes, V. A.

    1992-12-01

    This report is one of a series of annual reports provided by the U.S. Department of Energy (DOE) summarizing occupational radiation exposures received by DOE and DOE contractor employees. These reports provide an overview of radiation exposures received each year and identify trends in exposures being experienced over the years.

  4. DOE Seeks Input On Addressing Contractor Pension and Medical...

    Office of Environmental Management (EM)

    the increasing costs and liabilities of contractor employee pension and medical benefits. ... contractor employee pension and medical benefits to current employees and retirees. ...

  5. Recovery Act Funds Expand Groundwater Treatment at Hanford Site: Contractor CH2M HILL drills record number of wells

    Energy.gov [DOE]

    RICHLAND, Wash. – Workers at the Hanford Site have surpassed goals for drilling wells to detect and remove contamination from groundwater.

  6. Radiation exposures for DOE and DOE contractor employees - 1991. Twenty-fourth annual report

    SciTech Connect (OSTI)

    Smith, M.H.; Hui, T.E.; Millet, W.H.; Scholes, V.A.

    1994-11-01

    This is the 24th annual radiation exposure report published by US DOE and its predecessor agencies. This report summarizes the radiation exposures received by both employees and visitors at DOE and COE contractor facilities during 1991. Trends in radiations exposures are evaluated. The significance of the doses is addressed by comparing them to the DOE limits and by correlating the doses to health risks based on risk estimates from expert groups.

  7. Directory of DOE and contractor personnel involved in non-government standards activities

    SciTech Connect (OSTI)

    1995-08-01

    This document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies.

  8. DOE Selects Seven Contractors for Waste Treatment Basic Ordering...

    Office of Environmental Management (EM)

    Contractor Business Size Eligible Services Babcock Services, Inc Small Alternative Disposition Strategies (Restricted and Unrestricted RecyclingReuse); Ancillary Services ...

  9. DOE 2010 Continuity of Operations (COOP) Awareness Briefing Available to Contractors

    Energy.gov [DOE]

    For each contract requiring or involving responsibility for work or operations at sites or facilities that support or perform essential directly support National Essential Functions Mission Essential Functions (MEF), Primary Mission Essential Functions (PMEF), or Essential Supporting Activities (ESA) the Contractor Requirements Document (CRD) DOE Order 150.1, Continuity Programs, sets forth the contractor responsibility for a Continuity of Operations (COOP) Program. This requires the contractor and its applicable subcontractors to conduct annual COOP awareness briefing for all its contractor workforce.

  10. Radiation exposures for DOE and DOE contractor employees, 1979. Twelfth annual report

    SciTech Connect (OSTI)

    Not Available

    1980-12-01

    This report includes: standards for radiation protection; whole body radiation exposures by general trends, dose equivalent distributions, and average dose equivalent ratios; internal exposures; worker terminations; whole body dose equivalents greater than 5 Rem; and Appendices of distribution of annual whole body exposures by facility type, by contractor; and by DOE field organization.

  11. Memorandum, CH2M HG Idaho, LLC, Request for Variance to Title 10 Code of Federal Regulations part 851, "Worker Safety and Health"

    Energy.gov [DOE]

    CH2M HG Idaho, LLC, Request for Variance to Title 10 Code of Federal Regulations part 851, "Worker Safety and Health"

  12. Memorandum CH2M WG Idaho, LLC, Request for Variance to Title 10, Code of Federal Regulations Part 851, "Worker Safety and Health Program"

    Energy.gov [DOE]

    Memorandum CH2M WG Idaho, LLC, Request for Variance to Title 10, Code of Federal Regulations Part 851, "Worker Safety and Health Program"

  13. Proposed 708 Criteria and Procedures for DOE Contractor Employee Protection Program

    Energy.gov [DOE]

    The Department of Energy (DOE) proposes amendments for its contractor employee protection program which provides recourse to DOE contractor employees who believe they have been retaliated against for activities such as a disclosure of information regarding management of environmental, safety, health, and other matters, for participating in Congressional proceedings, or for refusing to engage in illegal or dangerous activities.

  14. DOE 2011 Continuity of Operations (COOP) Awareness Briefing Available to Contractors

    Energy.gov [DOE]

    For each contract requiring or involving responsibility for work or operations at DOE/NNSA sites or facilities that support or perform essential functions/activities that directly support National Essential Functions (NEF), Mission Essential Functions (MEF), Primary Mission Essential Functions (PMEF), or Essential Supporting Activities (ESA) the Contractor Requirements Document (CRD) DOE Order 150.1, Continuity Programs, sets forth the contractor responsibility for a Continuity of Operations (COOP) Program. This CRD requires the contractor and its applicable subcontractors to conduct annual COOP awareness briefing for all its contractor workforce.

  15. Enforcement Letter, CH2M-WG Idaho - September 28, 2011 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of the Sodium Bearing Waste Treatment Project at the Idaho National Laboratory ... of the Sodium Bearing Waste Treatment Project at DOE's Idaho National Laboratory. ...

  16. Special Report Order, CH2M Hill Hanford Group, Inc. - October...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    nuclear safety operations associated with corrective action management, worker training and qualification, and adherence to authorization basis documentation at DOE's Hanford site. ...

  17. Voluntary Protection Program Onsite Review, CH2M HILL B&W West...

    Energy.gov (indexed) [DOE]

    Away, Restricted or Transferred D&D Decontamination and Decommissioning DOE Department of Energy DSA Documented Safety Analysis EM Office of Environmental Management FD Facility...

  18. DOE Seeks Deactivation Contractor for Paducah Gaseous Diffusion...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    interests by including firm-fixed-price line items, and requiring the contractor ... The Paducah GDP is a Government-owned uranium enrichment plant that was constructed in the ...

  19. PART 708 -- DOE CONTRACTOR EMPLOYEE PROTECTION PROGRAM | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... If you are an employee of a contractor, you may not file a complaint against your employer under this part if: (a) The complaint is based on race, color, religion, sex, age, ...

  20. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    its Princeton Plasma Physics Laboratory | Department of Energy Princeton Plasma Physics Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Princeton Plasma Physics Laboratory July 3, 2008 - 2:15pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a contractor to manage and operate Princeton Plasma Physics Laboratory (PPPL), a DOE Office of Science research facility

  1. Letter to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007

    Energy.gov [DOE]

    Memorandum to Mr. Podonsky from DOE and Contractor Attorneys' Association concerning 10 CFR 851 implementation issues, May 21, 2007

  2. EM Contractor's Success in Addressing Challenging Waste Leads...

    Office of Environmental Management (EM)

    Idaho Site cleanup contractor CH2M-WG Idaho's (CWI) success last year in treating and packaging 6,000 drums of radioactive and hazardous waste left over from the Cold War weapons...

  3. EM's Oak Ridge Office Contractor Scores High in Latest Award...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 27, 2016 - 12:50pm Addthis OAK RIDGE, Tenn. - EM gave URS | CH2M Oak Ridge LLC ... Each year, EM releases information relating to contractor fee payments - earned by ...

  4. DOE Employees, Contractors Donate More than 15,500 Pounds of Food |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Employees, Contractors Donate More than 15,500 Pounds of Food DOE Employees, Contractors Donate More than 15,500 Pounds of Food September 15, 2014 - 9:08am Addthis U.S. Department of Energy and contractor staff prepare shipments of food to local pantries as part of the Portsmouth Site’s 2014 Feds Feed Families effort. U.S. Department of Energy and contractor staff prepare shipments of food to local pantries as part of the Portsmouth Site's 2014 Feds Feed Families

  5. DOE Seeks Input On Addressing Contractor Pension and Medical Benefits Liabilities

    Energy.gov [DOE]

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced in the Federal Register that it is seeking public comment on how to address the increasing costs and liabilities of contractor...

  6. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate its Ames Laboratory

    Office of Energy Efficiency and Renewable Energy (EERE)

    WASHINGTON, DC - The U.S. Department of Energy (DOE) today issued its Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor to operate Ames...

  7. CH2M HILL Plateau Remediation Company, NEL-2014-01

    Energy Savers

    Energy CEIC Participating in the 2016 Berkeley Energy Summit CEIC Participating in the 2016 Berkeley Energy Summit February 18, 2016 - 3:29pm Addthis CEIC Participating in the 2016 Berkeley Energy Summit Sanjiv Malhotra Sanjiv Malhotra Director, Clean Energy Investment Center On February 19, I am excited to join an impressive group of industry and community leaders at the 2016 Berkeley Energy and Resources Collaborative (BERC) Energy Conference. This is a part of our ongoing mission at DOE's

  8. Worker Protection Management for DOE Federal and Contractor Employees

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1995-09-30

    Cancels DOE 3790.1B, Except VIII; attach. 2, para. 2C, 2D(2)-(3), 2E(1)-(8), attach. 3, para. 2C, 2D(2)-(3), 2E(1)-(7), of DOE 5480.4; DOE 5480.7A; DOE 5480.8A; DOE 5480.9A; DOE 5480.10; DOE 5480.16A; DOE 5483.1A

  9. Contractor Workplace Substance Abuse Program at DOE Sites (10 CFR 707)

    Office of Energy Efficiency and Renewable Energy (EERE)

    This rule establishes policies, criteria, and procedures for developing and implementing programs to maintain a workplace free from the use of illegal drugs. It applies to DOE contractors performing work at sites owned or controlled by DOE and to individuals with unescorted access to the control areas of certain DOE reactors.

  10. Use of Facility Contractor Employees for Services to DOE in the Washington, D.C., Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2001-07-12

    To clarify and modify policies and procedures for management of Department of Energy (DOE), including National Nuclear Security Administration (NNSA), facility contractor employees located in the Washington, D.C., area. Cancels DOE N 350.5. Certified 12-28-06. Canceled by DOE O 350.2A.

  11. Microsoft Word - Attachment J-1 Covered Site Contractors and Sub-Contractors.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    J-1-1 ATTACHMENT J.1 COVERED SITE CONTRACTORS/SUB-CONTRACTORS Covered Prime Contractors And Their Covered Sub-Contractors: HPM Corporation (HPMC) (10/1/2012 - present) HPMC Covered Subs: Computer Science Corp (CSC) Advanced Technologies and Laboratories International, Inc. (ATL) (5/16/2005- present) No subcontractors Battelle Memorial Institute/Pacific Northwest National Laboratory (PNNL) No subcontractors CH2M Hill Plateau Remediation Company (CHPRC) (10/01/2008 - present) No subcontractors

  12. OSTIblog Articles in the doe contractor Topic | OSTI, US Dept of Energy

    Office of Scientific and Technical Information (OSTI)

    Office of Scientific and Technical Information contractor Topic Customized Services for the Department of Energy Research Community by Debbie Nuchols 16 Jul, 2009 in Products and Content While the majority of the Office of Scientific and Technical Information's (OSTI) activities are focused on making the Department of Energy's (DOE) scientific and technical information widely accessible, OSTI also provides special services to the Department and its contractor community. For example, in

  13. Pollution prevention opportunity assessment approach, training, and technical assistance for DOE contractors. FY 1995 report

    SciTech Connect (OSTI)

    Pemberton, S.

    1996-02-01

    The Department of Energy and its contractors are faced with environmental concerns and large waste management costs. Federal legislation and DOE Orders require sites to develop waste minimization/pollution prevention programs. In response to these requirements, the Kansas City Plant developed a pollution prevention tool called a pollution prevention opportunity assessment (PPOA). Pilot assessments resulted in the development of a graded approach to reduce the amount of effort required for activities that utilized nonhazardous and/or low-volume waste streams. The project`s objectives in FY95 were to validate DOE`s PPOA Graded Approach methodology, provide PPOA training and technical assistance to interested DOE personnel and DOE contractors, enhance the methodology with energy analysis and tools for environmental restoration activities, implement a DOE-wide PPOA database, and provide support to DOE EM-334 in the completion of a report which estimates the future potential for pollution prevention and waste minimization in the DOE complex.

  14. Specification for HEPA Filters Used By DOE Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The Application Guide in subpart 4.5 of ASME NQA-1-2004 describes how ASME NQA-1-2000 addresses the DOE quality assurance requirements. 2.1 Department of Energy (DOE) Rules, Orders ...

  15. DOE, Contractors Gather Food for Less Fortunate | Department...

    Energy Savers

    KY) with an American flag constructed of donated food. Media Contact Buz Smith (270) 441-6821 Robert.Smith@lex.doe.gov PADUCAH, Ky. - The U.S. Department of Energy (DOE) and its ...

  16. DOE Issues Draft Request for Proposals Seeking Contractor to Manage, Operate Waste Isolation Pilot Plant

    Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) issued a Draft Request for Proposal (RFP) seeking a management and operations contractor to maintain the Waste Isolation Pilot Plan (WIPP) and manage the DOE National Transuranic Waste (TRU) Program in Carlsbad, New Mexico.

  17. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Argonne National Laboratory | Department of Energy Argonne National Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Argonne National Laboratory April 19, 2006 - 10:23am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximated $2.54 billion, five-year management and operating contract for Argonne National Laboratory (ANL), a DOE Office

  18. DOE Selects Contractor for California Energy Technology Engineering...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Engineering Center Cleanup June 26, 2014 - 12:00pm Addthis Media Contact Bill Taylor, 803-952-8564, bill.taylor@srs.gov Cincinnati - The Department of Energy (DOE) today...

  19. DOE Recertifies EM Contractors in Star Program Recognizing Excellence...

    Office of Environmental Management (EM)

    February 26, 2015 - 12:00pm Addthis Savannah River Operations Office Manager Dr. Dave Moody ... return of the Paducah Gaseous Diffusion Plant leased facilities to DOE," said Woodard. ...

  20. DOE Selects Contractor for California Energy Technology Engineering Center Cleanup

    Energy.gov [DOE]

    Cincinnati - The Department of Energy (DOE) today awarded a competitive $25.7 million task order for cleanup activities at the Energy Technology Engineering Center (ETEC) to North Wind of Idaho Falls, Idaho.

  1. Specification for HEPA Filters Used by DOE Contractors

    Energy.gov (indexed) [DOE]

    ... on Nuclear Air and Gas Treatment ASME NQA -1, Quality Assurance Requirements for ... evidence of compliance with the requirements of DOE O 414.1D and ASME NQA-1 as applicable. ...

  2. DOE and Contractor Officials Discuss Safety Culture at National Cleanup

    Energy Savers

    Ellenton, FL, Affordable | Department of Energy Manatee County Habitat for Humanity, Ellenton, FL, Affordable DOE Zero Energy Ready Home Case Study: Manatee County Habitat for Humanity, Ellenton, FL, Affordable Case study of a DOE Zero Energy Ready Home in Ellenton, FL, that scored HERS 53 without PV, HERS 23 with PV. This 1,143-square-foot affordable home has R-23 ICF walls, a spray-foamed sealed attic, solar hot water, and a ducted mini-split heat pump.

  3. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    SciTech Connect (OSTI)

    1996-08-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document and to DOE Order 1300.2A. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this TSL are those recorded as of July 1, 1996.

  4. DOE Selects Seven Contractors for Waste Treatment Basic Ordering Agreements

    Office of Energy Efficiency and Renewable Energy (EERE)

    Cincinnati – The U.S. Department of Energy (DOE) issued seven Basic Ordering Agreements (BOAs) for the treatment of Low-Level Waste (LLW) and Mixed Low-Level Waste (MLLW). The LLW MLLW treatment services also include the treatment of liquid and solid Toxic Substances Control Act (TSCA) regulated waste, such as polychlorinated biphenyls (PCBs) and asbestos.

  5. DOE Selects Contractor for Depleted Hexafluoride Conversion Project Support

    Energy.gov [DOE]

    Cincinnati – The U.S. Department of Energy (DOE) today awarded a competitive small business task order to Navarro Research and Engineering Inc. of Oak Ridge, Tennessee. The award is a $22 million, time and materials task order with a three-year performance period and two one-year extension options.

  6. Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2004-02-19

    The Notice establishes DOE policy requirements and responsibilities for remote connections to DOE and contractor information technology systems. The Notice will also ensure compliance with the requirements of DOE O 205.1, Department of Energy Cyber Security Management Program, dated 3-21-03, to protect DOE information and information technology systems commensurate with the risk and magnitude of harm that could result from their unauthorized access, use, disclosure, modification or destruction. DOE N 205.15, dated 3/18/05, extends this directive until 3/18/06. No cancellations.

  7. NEW - DOE O 350.1 Chg 5, Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  8. DOE Seeks Contractor for Depleted Uranium Hexafluoride (DUF6) Operations at Ohio and Kentucky Facilities

    Energy.gov [DOE]

    Cincinnati -- The U.S. Department of Energy (DOE) today issued a Draft Request for Proposal (RFP) seeking a contractor to perform Depleted Uranium Hexafluoride (DUF6) Operations at the two DUF6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky.

  9. Notice of Intent to Develop DOE P XXX.X, Contractor Assurance Systems Policy

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-06-09

    The Commission to Review the Effectiveness of the National Energy Laboratories (CRENEL) found that the implementation of contractor assurance system (CAS) is inconsistent and recommended that DOE ensure greater uniformity across the complex. CRENEL also recommended that site offices more extensively use data from CAS.

  10. DOE technical standards list: Directory of DOE and contractor personnel involved in non-government standards activities

    SciTech Connect (OSTI)

    1999-05-01

    The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document. Additional names were added from rosters supplied by non-Government standards bodies. The committees or governing bodies in which the person participates is listed after each name. An asterisk preceding the committee notation indicates that the person has identified himself or herself as the DOE representative on that committee. Appendices to this document are also provided to sort the information by the parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees. DOE employees and contractors listed in this technical standards list are those recorded as of May 1, 1999.

  11. DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fermi National Accelerator Laboratory | Department of Energy Fermi National Accelerator Laboratory DOE Issues Request for Proposals Seeking a Contractor to Manage and Operate Fermi National Accelerator Laboratory July 10, 2006 - 2:57pm Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today announced the issuance of a final Request for Proposals (RFP) for the competitive selection of an approximately $1.58 billion, five-year management and operating contract for Fermi National

  12. Microsoft Word - Attachment J-6 List of Applicable DOE Directives and COntractor Requirements Documents.doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    J-6-1 ATTACHMENT J.6 LIST OF APPLICABLE DOE DIRECTIVES AND CONTRACTOR REQUIREMENTS DOCUMENTS (LIST B) The following is a list of applicable DOE Directives and Orders appended to this Contract as prescribed in Section I, Clause I.3. This list is not all inclusive. Document Number Title CRD O 150.1 Continuity Programs CRD O 205.1b, Chg.3 DOE Cyber Program CRD O 206.1 DOE Privacy Program CRD O 243.1B, Admin. Chg 1. Records Management Program CRD O 414.1D, Admin Chg 1. Quality Assurance CRD O

  13. Characterization of emergency preparedness at DOE contractor facilities

    SciTech Connect (OSTI)

    Gillings, J.C.; Murphy, B.L.; Corbit, C.D.; MacLellan, J.A.; Essig, T.H.; Higby, D.P.; Hooker, C.D.; Laughlin, G.J.; Stoetzel, G.A.; Swinth, K.L.

    1984-07-01

    A study of emergency preparedness capabilities at DOE facilities was initiated following the incident at the Three Mile Island (TMI) Nuclear Power Station. It was designed to parallel but expand on a study on emergency preparedness instrumentation that was conducted in 1970 by Pacific Northwest Laboratory. The 1970 survey findings led to the publication of four reports on performance criteria for radiological emergency instrumentation. Three of these reports - BNWL-1635 (Selby et al. 1972), BNWL-1742 (Anderson et al. 1974) and BNWL-1857 (Andersen et al. 1976) - addressed the criteria for emergency instrumentation at reactors, mixed oxide fuel fabrication plants, and fuel reprocessing plants, respectively. The fourth report, BNWL-1991 (Bramson et al. 1976), addressed evaluation testing and calibration methodology for these instruments. This report is presented in three parts. Part One is a review of the BNWL documents to determine whether they are applicable to state-of-the-art instrument capabilities. The Appendix to Part One provides a comparison between the instrument performance criteria established in BNWL-1991 to applicable American National Standards Institute (ANSI) standards for portable survey and contamination meters, installed radiation and area monitors, effluent monitors, calibration techniques, criticality detection systems, alarm systems, and direct reading dosimeters. Part Two compares the 1970 survey results with the 1980 survey results to identify trends in emergency preparedness. Part Three is a discussion of the results of the 1980 emergency preparedness survey and the supporting data for each of the 15 modules. 8 references. (ACR)

  14. Department of Justice: CH2M Hill Hanford Group Inc. Admits Criminal Conduct, Parent Company Agrees to Cooperate in Ongoing Investigation and Pay $18.5 Million to Resolve Civil and Criminal Allegations

    Energy.gov [DOE]

    The Justice Department, in conjunction with the U.S. Attorney’s Office for the Eastern District of Washington, announced today that Colorado-based CH2M Hill Hanford Group Inc. (CHG) and its parent company, CH2M Hill Companies Ltd. (CH2M Hill) have agreed that CHG committed federal criminal violations, defrauding the public by engaging in years of widespread time card fraud.

  15. Solar Contractor Licensing

    Energy.gov [DOE]

    The Arizona Registrar of Contractors does have a specific plumbing license which includes solar water heaters. R-37 is required for contractors installing or performing maintenance on residential...

  16. Federal and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition Guide Chapter 37.114

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 37.114 has been added to the DOE Acquisition Guide to aid in establishing effective management controls for: identification of contractor employees and their work product

  17. Process waste assessment approach, training and technical assistance for DOE contractors; FY93 report, ADS {number_sign}35303C

    SciTech Connect (OSTI)

    Pemberton, S

    1994-03-01

    The Department of Energy (DOE) and its contractors are faced with a large waste management problem as are other industries. One of the tools used in a successful waste minimization pollution prevention (WMin/P2) program is a process waste assessment (PWA). The purpose of this project was to share the Kansas City Plant`s (KCP`s) PWA expertise with other DOE personnel and DOE contractors. This consisted of two major activities: (1) The KCP`s PWA graded approach methodology was modified with the assistance of DOE/Defense Program`s laboratories, and (2) PWA training and technical assistance were provided to interested DOE personnel and DOE contractors. This report documents the FY93 efforts, lesson learned, and future plans for both PWA-related activities.

  18. Worker Safety and Health Program for DOE (Including the National Nuclear Security Administration) Federal and Contractor Employees

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-20

    This document was developed to assist the Department of Energy (DOE or the Department) Federal and contractor employees in effectively developing, managing, and implementing a worker safety and health program. Supersedes DOE G 440.1-1A and DOE G 440.1-8.

  19. Memorandum requesting a clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility

    Energy.gov [DOE]

    Memorandum requesting a clarification of the circumstances under which a DOE Government Owned Contractor Operated (GOCO) facility may be considered a laser manufacturer and subject to FDA laser manufacturer requirements and other points of interpretation of the FDA Exemption Letter, 78EL-01DOE (DOE exemption or exemption) by the LSSG for GOCG facilities.

  20. Worker Safety and Health Program for DOE (Including the National Nuclear Security Administration) Federal and Contractor Employees

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-10-20

    This document was developed to assist the Department of Energy (DOE or the Department) Federal and contractor employees in effectively developing, managing, and implementing a worker safety and health program. Cancels DOE G 440.1-1A and DOE G 440.1-8. Adm Chg 1, dated 3-22-13.

  1. DOE Technical Standards List. Directory of DOE and contractor personnel involved in non-government standards activities

    SciTech Connect (OSTI)

    1997-06-01

    This is a periodic report on the level of agency participation in non-Government standards activities. This technical standards list is intended to assist US Department of Energy (DOE) management and other personnel involved in the DOE technical Standards Program by identifying those participating individuals. The body of this document contains a listing of DOE employees and DOE contractors who have submitted a Record of Non-Government Standards Activity. Additional names were added from rosters supplied by non-Government standards bodies. Appendices to this document are provided to list the information by parent employment organization, by non-Government standards activity, and by the proper names of the non-Government standards organizations and committees.

  2. Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-05-18

    The Order establishes policies and procedures for managing DOE and NNSA management and operating (M&O) contractors and other facility management contractor employees assigned to the Washington, D.C., area.

  3. Occupational Safety and Health Program for DOE Contractor Employees at Government-Owned Contractor-Operated Facilities

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1983-06-22

    Cancels DOE O 5483.1. Canceled by DOE O 440.1 of 9-30-1995 and by DOE N 251.4 & para. 2a, 2b, 2c of Chapter III canceled by DOE O 231.1.

  4. Technical Baseline Summary Description for the Tank Farm Contractor

    SciTech Connect (OSTI)

    TEDESCHI, A.R.

    2000-04-21

    This document is a revision of the document titled above, summarizing the technical baseline of the Tank Farm Contractor. It is one of several documents prepared by CH2M HILL Hanford Group, Inc. to support the U.S. Department of Energy Office of River Protection Tank Waste Retrieval and Disposal Mission at Hanford.

  5. Defense Secretary Awards EM Idaho Contractor Freedom Award at Pentagon

    Energy.gov [DOE]

    IDAHO FALLS, Idaho – CH2M-WG Idaho (CWI), the main cleanup contractor for the EM program at the Idaho Operations Office, received the Secretary of Defense Employer Support Freedom Award at the Pentagon for its support of National Guard and Reserve employees.

  6. Anthony Cugini Named Director of DOE's National Energy Technology

    Energy Savers

    is

    1 2011 Annual Report to the Oak Ridge Community Annual Report to the Oak Ridge Community DOE/ORO/2399 Progress Cleanup P Progress Cleanup P 2 This report was produced by URS | CH2M Oak Ridge LLC, DOE's Environmental Management contractor for the Oak Ridge Reservation. About the Cover After recontouring and revegetation, the P1 Pond at East Tennessee Technology Park is flourishing. The contaminated pond was drained, recontoured, and restocked with fish that would not disturb the pond

  7. DRAFT - DOE O 350.2C, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    The Order establishes policies and procedures for managing DOE and NNSA management and operating (M&O) contractors and other facility management contractor employees assigned to the Washington, D.C., area.

  8. A DOE contractor`s perspective of environmental monitoring requirements at a low-level waste facility

    SciTech Connect (OSTI)

    Ferns, T.W.

    1989-11-01

    Environmental monitoring at a low-level waste disposal facility (LLWDF) should, (1) demonstrate compliance with environmental laws; (2) detect any spatial or temporal environmental changes; and (3) provide information on the potential or actual exposure of humans and/or the environment to disposed waste and/or waste by-products. Under the DOE Order system the LLWDF site manager has more freedom of implementation for a monitoring program than either the semi-prescriptive NRC, or the prescriptive EPA hazardous waste programs. This paper will attempt to compare and contrast environmental monitoring under the different systems (DOE, NRC, and EPA), and determine if the DOE might benefit from a more prescriptive system.

  9. Contractor Assurance Systems | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contractor Assurance Systems Deputy Director for Field Operations Deputy Director Home Mission & Functions Deputy Director Biography Organization Oversight Contractor Assurance Systems Who We Are Operations Improvement Committee Contact Information Deputy Director for Field Operations U.S. Department of Energy SC-3/Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 P: (202) 586-5434 F: (202) 586-4120 E: Email Us Oversight Contractor Assurance Systems Print Text Size: A A A

  10. Contractor Human Resources | U.S. DOE Office of Science (SC)

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contractor Human Resources Integrated Support Center (ISC) ISC Home About Services Freedom of Information Act (FOIA) Privacy Act NEPA Documents Contact Information Integrated Support Center Roxanne Purucker U.S. Department of Energy 9800 S. Cass Avenue Argonne, IL 60439 P: (630) 252-2110 Kenneth Tarcza U.S. Department of Energy 200 Administration Road Oak Ridge, TN 37830 P: (865) 576-4444 Services Contractor Human Resources Print Text Size: A A A FeedbackShare Page Contractor Human Resources

  11. DOE Recertifies EM Contractors in Star Program Recognizing Excellence in Safety

    Energy.gov [DOE]

    EM congratulated two of its contractors at the Savannah River Operations and Portsmouth/Paducah Project offices for their recent Voluntary Protection Program (VPP) Star recertifications.

  12. DOE 0 350.1 Change 2--Contractor Human Resource Management Program

    Energy.gov [DOE]

    The Department of Energy issued the above listed Directive, which includes a Contractor Requirements Documents (CRD), on October 13,2009.

  13. HANFORD SITE WELDING PROGRAM SUCCESSFULLY PROVIDING A SINGLE SITE FUNCTION FOR USE BY MULTIPLE CONTRACTORS

    SciTech Connect (OSTI)

    CANNELL GR

    2009-11-19

    The Department of Energy, Richland Operations (DOE-RL) recently restructured its Hanford work scope, awarding two new contracts over the past several months for a total of three contracts to manage the sites cleanup efforts. DOE-RL met with key contractor personnel prior to and during contract transition to ensure site welding activities had appropriate oversight and maintained code compliance. The transition also provided an opportunity to establish a single site-wide function that would provide welding and materials engineering services to the Hanford site contractors: CH2M HILL Plateau Remediation Company (CHPRC); Mission Support Alliance (MSA); Washington River Protection Solutions (WRPS); and Washington Closure Hanford (WCH). Over the years, multiple and separate welding programs (amongst the several contractors) existed at the Hanford site leading to inefficiencies resulting from duplication of administrative efforts, maintenance of welding procedures, welder performance certifications, etc. The new, single program eliminates these inefficiencies. The new program, co-managed by two of the sites' new contractors, the CHPRC ('owner' of the program and responsible for construction welding services) and the MSA (provides maintenance welding services), provides more than just the traditional construction and maintenance welding services. Also provided, are welding engineering, specialty welding development/qualification for the closure of radioactive materials containers and materials evaluation/failure analysis. The following describes the new Hanford site welding program.

  14. Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2003-10-29

    To establish policies and procedures for management of DOE, including NNSA, Management and Operating (M&O) and other facility management contractor employees assigned to the Washington, D.C., area. Cancels DOE O 350.2.

  15. DOE General Counsel Issues Arbitration Guidance for Management and Operations Contractors

    Energy.gov [DOE]

    Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include...

  16. ORAU Wins DOE Facility Management Contractor Small Business Achievement of the Year

    Energy.gov [DOE]

    The Oak Ridge Associated Universities (ORAU) won the Facility Management Contractor Small Business Achievement of the Year Award for FY 2013 at the Small Business Forum & Expo, June 12, 2014, Tampa, FL.

  17. DOE Scorecard Rates Savannah River Site’s Security Contractor as ‘Excellent’

    Energy.gov [DOE]

    AIKEN, S.C. – Centerra-SRS, the security contractor at the Savannah River Site (SRS), earned an overall “excellent” performance rating for the most recent evaluation period of Oct. 1, 2015, to March 31, 2016

  18. Contractor Work Planning and Control Lessons Learned from DOE and International Projects

    Energy.gov [DOE]

    Slide Presentation by Bob McQuinn; URS Global Management and Operations Services; Frank McCoy and Rick Runnels; URS - Professional Solutions. Contractor Work Planning and Control-URS Lessons Learned.

  19. DOE, New Idaho Cleanup Contractor Reflect on Successful Transition, Look to Future

    Energy.gov [DOE]

    IDAHO FALLS, Idaho – It’s now been a little more than a month since Fluor Idaho, LLC, officially took over as the new contractor for the Idaho Cleanup Project (ICP) at DOE’s Idaho Site.

  20. DOE SEEKS CONTRACTOR TO DISPOSITION WASTE AT THE ADVANCED MIXED WASTE

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    TREATMENT PROJECT (AMWTP) SEEKS CONTRACTOR TO DISPOSITION WASTE AT THE ADVANCED MIXED WASTE TREATMENT PROJECT (AMWTP) Inside the AMWTP facility The AMWTP facility Idaho Falls - The U.S. Department of Energy, Idaho Operations Office, in coordination with the Office of Environmental Management today released a Final �Request for Proposal� to obtain a contractor to perform waste processing at the Advanced Mixed Waste Treatment Project at the Department�s Idaho Site near Idaho Falls,

  1. DOE Office of Inspector General Audit Report "The Department of Energy's Management of Contractor Fines, Penalties and Legal Costs"

    Office of Energy Efficiency and Renewable Energy (EERE)

    Please review the attached DOE Office of Inspector General Audit Report "The Department of Energy's Management of Contractor Fines, Penalties and Legal Costs," especially Recommendation 2.a. That Recommendation requires the Senior Procurement Executive, in conjunction with the field site Counsels, to review high-value (which you should define as above $500K) outside law firm invoices for the period identified in the report to ensure no unallowable costs were reimbursed.

  2. Pages - Contractor Assurance Home

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    safety Management (ISM). Metrics and targets to assess performance, including benchmarking of key functional areas with other DOE contractors, industry and research...

  3. Memo of Readiness to Proceed with Phase 1 Privatization for the Tank Farm Contractor

    SciTech Connect (OSTI)

    HONEYMAN, J.O.

    2000-04-24

    This Readiness to Proceed Memorandum provides the CH2M HILL Hanford Group, Inc. formal certification of readiness to proceed with provision of the waste feed and infrastructure to handle the products from the privatization contractor's waste processing plant. Summary information is included from the integrated scope-cost-schedule baseline, the analyses of the baseline, management systems, and systems reviews.

  4. Federal-Contractor Partnership Allows Continued Waste Processing in Oak Ridge

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM’s Oak Ridge Office of Environmental Management and two of its contractors — URS I CH2M Oak Ridge, LLC (UCOR) and Wastren Advantage, Inc. (WAI) — have developed a plan that allows the site to continue processing transuranic waste and maintain its cleanup schedule.

  5. West Valley Demonstration Project Contractor Reaches 2 Million Safe Work Hours

    Office of Energy Efficiency and Renewable Energy (EERE)

    WEST VALLEY, N.Y. – EM’s West Valley Demonstration Project (WVDP) contractor CH2M HILL BWXT West Valley (CHBWV) and its subcontractors achieved this month 2 million safe work hours without a lost-time accident over the past 30 months

  6. DOE Human Genome Program: Contractor-Grantee Workshop IV, November 13--17, 1994, Santa Fe, New Mexico

    SciTech Connect (OSTI)

    Not Available

    1994-10-01

    This volume contains the proceedings of the fourth Contractor-Grantee Workshop for the Department of Energy (DOE) Human Genome Program. Of the 204 abstracts in this book, some 200 describe the genome research of DOE-funded grantees and contractors located at the multidisciplinary centers at Lawrence Berkeley Laboratory, Lawrence Livermore National Laboratory, and Los Alamos National Laboratory; other DOE-supported laboratories; and more than 54 universities, research organizations, and companies in the United States and abroad. Included are 16 abstracts from ongoing projects in the Ethical, Legal, and Social Issues (ELSI) component, an area that continues to attract considerable attention from a wide variety of interested parties. Three abstracts summarize work in the new Microbial Genome Initiative launched this year by the Office of Health and Environmental Research (OHER) to provide genome sequence and mapping data on industrially important microorganisms and those that live under extreme conditions. Many of the projects will be discussed at plenary sessions held throughout the workshop, and all are represented in the poster sessions.

  7. Acquisition Guide Chapters on Allowable Food and Beverage Costs at DOE and Contractor Sponsored Conferences

    Energy.gov [DOE]

    Section 1606 of the Recovery Act requires that all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 3 1 of title 40, United States Code.

  8. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    This correspondence course provides an overview of the roles and responsibilities of the DOE or DOE-contractor FSO. The course emphasizes facility clearance requirements, personnel ...

  9. Worker Protection Management for DOE Federal and Contractor Employees Guide for use with DOE O 440.1

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1997-07-10

    This implementation guide provides general information and methodologies that DOE finds acceptable in meeting the Department's requirements defined in DOE O 440.1.

  10. DOE-ORP Prime Contracts - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Office of River Protection About ORP ORP Projects & Facilities Newsroom Contracts & Procurements ORP Contracts & Procurements Home DOE-ORP Contract Management Plans DOE-ORP Prime Contracts BNI Contract BNI Contract Modifications ATL Contract ATL Contract Modifications WRPS Contract WRPS Contract Modifications CH2M Contract CH2M Contract Modifications WAI Contract WAI Contract Mods DOE-ORP Contracting Officers DOE ORP Contracting Officer Representatives DOE ORP Purchase Card Buyers

  11. Supplemental Requirements for the Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-10-19

    The Notice supplements review and approval requirements of DOE O 350.2A, Use of Management and Operating (M&O) or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area, dated 10-29-03.

  12. Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C. Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2011-05-31

    To establish policies and procedures for management of Department of Energy (DOE), including National Nuclear Security Administration (NNSA), management and operating (M&O) and other facility management contractor employees assigned to the Washington, D.C. area. Supersedes DOE O 350.2A

  13. U.S. Department of Energy, Oak Ridge Office and URS/CH2M Oak Ridge, LLC (UCOR) East Tennessee Technology Park (ETTP) Contract Partnering Agreement

    Office of Environmental Management (EM)

    of Health, Safety and Security Office of Analysis, HS-24 December 19, 2013 Responses to Frequently Asked Questions on DOE O 232.2, Occurrence Reporting and Processing of Operations Information Page 1 of 30 Responses to Frequently Asked Questions on DOE O 232.2, Occurrence Reporting and Processing of Operations Information Office of Analysis, HS-24 December 19, 2013 The intent of these responses to frequently asked questions (FAQ) is to provide additional insights for Department of Energy (DOE)

  14. Suspension of DOE N 351.1, Contractor Employee Pension and Medical Benefits Policy

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-19

    The subject directive has been suspended as of June 19, 2006, for 1 year while the Department consults with stakeholders, including Congress, and continues to solicit their views of the issue. Cancels: DOE N 351.1

  15. Successful River Corridor Contractor Completes Extra Work Scope...

    Office of Environmental Management (EM)

    Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE 300 Million Successful River Corridor Contractor Completes Extra Work Scope, Saving DOE 300 Million ...

  16. Federal and Contractor Employee Roles in the Federal Workplace...

    Energy Savers

    and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition Guide Chapter 37.114 Federal and Contractor Employee Roles in the Federal Workplace: New DOE Acquisition ...

  17. DOE Chooses Contractor to Disposition Waste at the Advanced Mixed Waste

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    NOTIFICATION AND FEDERAL EMPLOYEE ANTIDISCRIMINATION AND RETALIATION ACT (No FEAR Act) On March 3, 2011, Secretary Steven Chu issued a memorandum for all DOE employees, entitled "Equal Employment Opportunity and Diversity Policy Statement". In his policy statement, Secretary Chu expressed his commitment to equal employment opportunity and diversity, and his support of the rights of employees to participate in the EEO process without fear of reprisal. The Secretary's statement accords

  18. DOE Rates EM's Savannah River Site Contractor as 'Very Good' in Fee

    Energy Savers

    2020 | Department of Energy Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by 2020 DOE Pursues SunShot Initiative to Achieve Cost Competitive Solar Energy by 2020 February 4, 2011 - 12:05pm Addthis U.S. Energy Secretary Steven Chu today announced additional details of the Department of Energy's "SunShot" initiative to reduce the total costs of photovoltaic solar energy systems by about 75% so that they are cost competitive at large scale with other forms of

  19. DOE O 350.2B Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, DC Area

    Office of Energy Efficiency and Renewable Energy (EERE)

    On May 31, 2011, the Department issued a Contractor Requirements Document (CRD) to the above listed Directive.

  20. U.S. Department of Energy, Richland Operations Office And CH2M HILL Plateau Remediation Company Partnering Charter For Partnering Performance Agreement

    Office of Environmental Management (EM)

    Reporting Period: Fiscal Years (FY) 2012 - 2016 FY2013 Annual Report Management Excellence Goals Driving Top Priorities Target FY2012 FY2013 FY2014 FY2015 FY2016 1. Achieve EMS/Sustainability Goals (normalized to the number of legacy sites). Be a leader among DOE offices in sustainability.* Annual   2. Publish Post Competition Accountability Report on the LM internet. Quarterly   3. Conduct independent evaluations of key programs, projects, or technical issues by goal using external

  1. Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-03-20

    The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

  2. Notice of Intent to Revise DOE O 350.2B, Use of Management and Operating or Other Facility Management Contractor Employees for Services to DOE in the Washington, D.C., Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    The objective of this revision is to incorporate a more performance based risk management approach into the oversight and management of these assignments. The revision will result in a reduction of DOE requirements, increased delegation of management responsibilities to sponsoring program organizations, elimination of reporting requirements and institutionalizing DOE-wide cost constraints for contractor domestic assignments. Approved 3-20-15.

  3. DOE awards contract for sludge buildout project

    Energy.gov [DOE]

    DOE's Oak Ridge Office of Environmental Management has awarded a contract to CH2M Hill Constructors, Inc. for the Sludge Processing Facility Buildouts Project at the Transuranic Waste Processing Center.

  4. EM Contractor's Role in Energy-Conservation Challenge Pays Off for Idaho

    Office of Environmental Management (EM)

    Site | Department of Energy Contractor's Role in Energy-Conservation Challenge Pays Off for Idaho Site EM Contractor's Role in Energy-Conservation Challenge Pays Off for Idaho Site October 29, 2015 - 12:20pm Addthis IDAHO FALLS, Idaho - A challenge issued three years ago by a facility director to his staff at the Idaho Site has resulted in the implementation of several energy-conservation projects and huge cost savings to taxpayers. CH2M-WG Idaho (CWI), EM's main cleanup contractor at the

  5. Contractor Protective Force

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2008-11-05

    This Manual establishes requirements for the management and operation of the U.S. Department of Energy contractor protective forces. Cancels: DOE M 470.4-3 Chg 1, CRD (Attachment 2) only, except for Section C. Canceled by DOE O 473.3.

  6. DOE CONTRACTOR PENSION PLANS

    Energy.gov (indexed) [DOE]

    retains sponsorship of benefit plans that survive performance of the contract work scope. ... plan shall be submitted to a limited-scope audit annually that satisfies the ...

  7. DOE CONTRACTOR PENSION PLANS

    Office of Environmental Management (EM)

    ... If not already authorized under Appendix A of the contract, a justification shall be provided with proposed costs and impacts to budget, if any. (iii) In the absence of ...

  8. DOE CONTRACTOR PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... 3 years or after a significant event) including rational for maintaining current asset allocation strategy. (dd) Comparison of budget projections submitted to the Department to ...

  9. Transactions, Technology & Contractor Human Resources | Department...

    Energy.gov (indexed) [DOE]

    Panel Technician | Credit: DOE Archives Solar Panel Technician | Credit: DOE Archives Offices of the Deputy General Counsel for Transactions, Technology, & Contractor Human...

  10. DOE's Oak Ridge Office and UCOR Sign Partnering Agreement | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (DOE) Oak Ridge Office and URS | CH2M Oak Ridge, LLC (UCOR) met to sign a partnering agreement that defines the working arrangement and expectations between the two entities. ...

  11. DOE Awards Contract for D&D Project for ETTP

    Energy.gov [DOE]

    DOE awards contract for the remaining environmental cleanup at ETTP to URS | CH2M Oak Ridge, LLC. The $2.2 billion contract will complete cleanup and provide support functions at ETTP.

  12. Solar Installation Contractor

    Energy.gov [DOE]

    Alternate Title(s):General Contractor, Electrical or Plumbing Contractor, Construction Manager, Project Superintendant

  13. Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09.

  14. Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09

  15. EM Contractor List.xls

    Office of Environmental Management (EM)

    Oak Ridge CD1 TBD 001012 OR-0040.C5 K-31 Facility Demolition Oak Ridge CD3 URS CH2M Hill Oak Ridge, LLC 001021 14-D-403 Outfall 200 Mercury Treatment Facility Oak Ridge CD1 URS...

  16. Contractor Past Performance Information

    Energy.gov (indexed) [DOE]

    management controls and the compliance assessments of contractor performance information. Section IV has best practices to address contractor performance information....

  17. Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    The purpose of this directive is to establish Department of Energy (DOE) responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. This order cancels DOE O 3220.1A, DOE O 3220.4A, DOE O 3220.6A, and DOE O 3309.1A.

  18. Federal, Contractor, or Subcontractor | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal, Contractor, or Subcontractor Federal, Contractor, or Subcontractor 8/14/2014 Listing of Suspect/Counterfeit Coordinators by Site/Program Secretarial Office (PSO) and title (Federal, Contractor, or Subcontractor). This listing includes email and telephone contacts for each coordinator. Suspect Counterfeit Coordinators August 2014 (42.8 KB) More Documents & Publications Suspect Counterfeit Coordinators DOE Employee Concerns Program Contact List DOE Hoisting and Rigging Technical

  19. Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-09-29

    To ensure that contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships; that contractor relations/human resources specialists achieve consultations with management and operating contractors; and that appropriate labor standards are included in DOE/NNSA contracts and subcontracts. Cancels Chapters I-III of DOE O 350.1 Chg 4. Does not cancel other directives.

  20. EM's Oak Ridge Office Contractor Scores High in Latest Award Fee Evaluation

    Energy.gov [DOE]

    OAK RIDGE, Tenn. – EM gave URS | CH2M Oak Ridge LLC (UCOR) a score of nearly 96 percent, allowing the contractor to earn over $4.4 million of the available fee of more than $4.6 million for the period from April to September 2015. UCOR is responsible for cleaning up the East Tennessee Technology Park (ETTP), formerly the Oak Ridge Gaseous Diffusion Plant, as well as other select sites on DOE’s Oak Ridge Reservation under a contract valued at $2.4 billion.

  1. Facility Management Contractors and other Contractors Directory |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Facility Management Contractors and other Contractors Directory Facility Management Contractors and other Contractors Directory FMCs achieve the mission of the field site they manage and operate, they have independent buying authority and use best commercial practices to subcontract for supplies and services. Moreover, the Department flows-down small business buying preferences in order to help the FMCs meet their small business subcontracting plan goals. Historically,

  2. Hydrogen Contractors Meeting

    SciTech Connect (OSTI)

    Fitzsimmons, Tim

    2006-05-16

    This volume highlights the scientific content of the 2006 Hydrogen Contractors Meeting sponsored by the Division of Materials Sciences and Engineering (DMS&E) on behalf of the Office of Basic Energy Sciences (BES) of the U. S. Department of Energy (DOE). Hydrogen Contractors Meeting held from May 16-19, 2006 at the Crystal Gateway Marriott Hotel Arlington, Virginia. This meeting is the second in a series of research theme-based Contractors Meetings sponsored by DMS&E held in conjunction with our counterparts in the Office of Energy Efficiency and Renewable Energy (EERE) and the first with the Hydrogen, Fuel Cells and Infrastructure Technologies Program. The focus of this year’s meeting is BES funded fundamental research underpinning advancement of hydrogen storage. The major goals of these research efforts are the development of a fundamental scientific base in terms of new concepts, theories and computational tools; new characterization capabilities; and new materials that could be used or mimicked in advancing capabilities for hydrogen storage.

  3. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    officers as they evaluate the integrity and performance of prospective contractors. ... 52.209-8) Contractor Sampling, random inspection of the FAPIIS and other relevant sources. ...

  4. Solar Contractor Licensing

    Energy.gov [DOE]

    Utah's Division of Occupational and Professional Licensing requires installers of solar energy systems to be licensed contractors. General electrical contractors carrying an S200 or an S201...

  5. Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-29

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, cancels Chapters I-III of DOE O 350.1 Chg 4

  6. Site: Contract Name: Contractor: Contract Number: Contract Type:

    Office of Environmental Management (EM)

    Maximum Fee Performance Period Fee Available Fee Earned FY2011 $0 $0 FY2012 $3,463,912 $200,000 FY2013 $3,463,912 $350,000 FY2014 $4,535,359 $175,000 FY2015 $8,141,680 $410,000 FY2016 $4,112,058 $610,000 FY2017 $4,112,058 FY2018 $4,112,058 FY2019 $1,860,997 Cumulative Fee $33,802,034 $1,745,000 $494,981,490 CH2M Hill BWXT, LLC DE-EM0001529 $33,802,034 Fee Information August 29, 2011 - March 9, 2020 $0 N/A EM Contractor Fee West Valley Demonstration Project - West Valley, NY West Valley

  7. STEP Preferred Contractors

    Energy.gov [DOE]

    STEP Preferred Contractors, from the Tool Kit Framework: Small Town University Energy Program (STEP).

  8. Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    This directive establishes DOE responsibilities and requirements for the management and oversight of contractor Human Resource Management (HR) programs. Chg 1, 5-8-98; Chg 2, 11-22-09; Chg 3, 2-23-10; Chg 4, 4-29-13. DOE O 350.1 Chg 5, dated 9-30-2014, supersedes DOE O 350.1 Chg 4. The Order is revised to reflect the cancellation of Chapters 1-3 due to the incorporation of these chapters into DOE Order 350.3; reflect organizational changes; delete reference to the DOE Retrospective Rating Insurance Plan, which is no longer available; remove the CRD from Chapter VII.

  9. STOP WORK POLICY for Hanford Site Contractors

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    STOP WORK POLICY for Hanford Site Contractors DOE RL and ORP strongly believe in a workplace where hazards have been identified and controlled through a rigorous process, thereby ensuring the safety of the worker, the public and the environment. The Hanford Site Stop Work Procedure is approved by all site contractors with support and concurrence from the Labor Council Presidents. It's a contractually-binding document issued by DOE RL/ORP that implements 10 CFR 851, Worker Safety and Health

  10. Renewable Energy Contractor Licensing

    Office of Energy Efficiency and Renewable Energy (EERE)

    Companies with an electrical contractor license may engage in the business of making electrical installations. Similarly a plumbing contractor license allows a company to engage in the business of...

  11. Working Capital for Contractors

    Energy.gov [DOE]

    Better Buildings Neighborhood Program Financing Peer Exchange Call: Working Capital for Contractors, Call Slides and Discussion Summary, August 30, 2012.

  12. Contractor Past Performance Information

    Energy.gov (indexed) [DOE]

    2013) 3 the use of contractor performance information, outlines associated management responsibilities that agency Chief Acquisition Officers (CAOs) and Senior...

  13. Arbitration Guidance for Management & Operating Contractors | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Arbitration Guidance for Management & Operating Contractors Arbitration Guidance for Management & Operating Contractors The Office of the General Counsel, in conjunction with the Office of the General Counsel of the NNSA, has reviewed the question of whether M&O contractors can include binding arbitration in their contracts with third-parties. (41.19 KB) More Documents & Publications Microsoft Word - Arbitration Guidance for M&O Contractors.docx DOE General

  14. Independent Oversight Review, Department of Energy Contractor - August 2000

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Department of Energy Contractor - August 2000 Independent Oversight Review, Department of Energy Contractor - August 2000 August 2000 Review of Department of Energy Contractor Occupational Medicine Programs from December 1998 to June 1999 This report provides the results of a series of reviews of contractor occupational medicine programs that were conducted at eight Department of Energy (DOE) sites from September 1998 to December 1999. The reviews were conducted by the

  15. WIPP contractor receives VPP Legacy of Stars Award 2013

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste ...

  16. Independent Oversight Review of Department of Energy Contractor...

    Energy.gov (indexed) [DOE]

    The Department of Energy (DOE) Office of Oversight performed a two-phased review of eight Departmental contractor occupational medicine programs. The first phase of the review was ...

  17. Communication to All Department of Energy Contractors

    Office of Energy Efficiency and Renewable Energy (EERE)

    Information is provided herein that is to be disseminated to all Department of Energy (DOE) prime Contractors. Please direct all of your Contracting Officers to electronically dispatch the information to all their prime contractors immediately. If an electronic message of non-deliverability is received, Contracting Officers should attempt delivery by an alternate means of delivery. Procurement Directors are directed to provide confirmation to Berta Schreiber and Richard Langston by 9 a.m. EDT July 31, 2012, that they have provided notification to their prime contractors.

  18. Homeowner and Contractor Surveys

    Energy.gov [DOE]

    Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Homeowner and Contractor Surveys, Call Slides and Discussion Summary, January 19, 2012.

  19. Solar Contractor Licensing

    Energy.gov [DOE]

    In June 2005, Assembly Bill 3 amended the Nevada Revised Statutes, Chapter 618, to create a mandatory licensing program for contractors installing and maintaining photovoltaic systems, beginning...

  20. Solar Contractor Licensing

    Energy.gov [DOE]

    Hawaii offers several specialty licenses for solar contractors through Hawaii’s Department of Commerce and Consumer Affairs. The following specialty licenses are available: Solar Power Systems...

  1. Contractor Past Performance Information

    Energy Savers

    (FAPIIS) References Federal Acquisition Regulation (FAR) Subparts 8.4 Federal Supply ... of Federal Acquisition Regulation (FAR) Part 42.15 - Contractor Performance Information. ...

  2. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    February 2010 February 26, 2010 Contractor Recovery Act Update Newsletter DOE Contractor CH2M HILL Plateau Remediation Company produces a weekly newsletter with information on projects funded by the Recovery Act. February 24, 2010 Letter from DOE to Contractor about ISMS and Waste Retrieval This link takes you to the letter DOE sent to CH2M HILL Plateau Remediation Company that was mentioned in today's Tri-City Herald article on the Waste Retrieval Project and the Integrated Safety Management

  3. Contractor Employee Pension and Medical Benefits Policy

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2006-06-19

    To ensure that reimbursement of costs incurred by Department of Energy (DOE) contractors' pension and medical benefits are reasonable in accordance with applicable laws, regulations and contract requirements and reflect prudent business practices. This directive has been suspended as of June 19, 2006, for 1 year. For more information, see DOE N 251.66.

  4. URS | CH2M OAK RIDGE LLC APRIL 2015

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... AU Office of Environment, Health, Safety and Security AU-12 Office of Worker Safety and Health Assistance BBS Behavior-Based Safety BLS Bureau of Labor Statistics CBT ...

  5. Solar and Wind Contractor Licensing

    Energy.gov [DOE]

    In June of 2014, SB 447 mandated that the Louisiana State Licencsing Board for Contractors develop new rules for solar contractors no later than January 1, 2015. Licensed contractors must be in c...

  6. Improving Contractor Past Performance

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Federal Procurement Policy, (OFPP) performed an assessment of how well some agencies, including the Department of Energy, are managing these efforts. The attached OFPP memorandum of January 21, 2011, entitled "Improving the Use of Contractor Performance Information Assessments: Summary of the Office of Federal Procurement Policy's review, and Strategies for Improvement" provides the details of this assessment which includes the Department of Energy. Also, the memo provides some very good guidance on preparing contractor performance evaluation reports. The Acquisition Guide Chapter 42.15 Contractor Performance Information incorporates the guidance that is not otherwise part of the Chapter. Revisions are made to Section II – Parts C and I.

  7. Contractor Past Performance Information

    Energy.gov (indexed) [DOE]

    to the Government and the contractor. A list of the e-mail notifications is as follows: Command POC Member assigned Focal Point assigned Alternate Focal Point assigned FAPIIS...

  8. Solar Contractor Licensing

    Energy.gov [DOE]

    Until 1994, Florida offered limited specialty licenses for residential solar hot water and pool heating, as well a general solar contractor's license. These specialty licenses have not been issued...

  9. Microsoft Word - Arbitration Guidance for M&O Contractors.docx | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Arbitration Guidance for M&O Contractors.docx Microsoft Word - Arbitration Guidance for M&O Contractors.docx Microsoft Word - Arbitration Guidance for M&O Contractors.docx (15.21 KB) More Documents & Publications DOE General Counsel Issues Arbitration Guidance for M&O Contractors Arbitration Guidance for Management & Operating Contractors Model Arbitration Provision

  10. Meeting between Department of Energy Contractor and the Nuclear Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Institute Regarding Proposed Revision of 10 CFR 810 | Department of Energy between Department of Energy Contractor and the Nuclear Energy Institute Regarding Proposed Revision of 10 CFR 810 Meeting between Department of Energy Contractor and the Nuclear Energy Institute Regarding Proposed Revision of 10 CFR 810 Pursuant to DOE's Guidance on Ex Parte Communications (74 Fed. Reg. 52,795; Oct. 14, 2009), this memorandum is to memorialize the meeting between a Department of Energy contractor

  11. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to tailor the chapter for Department of Energy (DOE) use of the Contractor Performance Assessment Reporting System (CPARS). The updated Guide Chapter includes internal procedures for evaluating and reporting contractor performance information pursuant to the recently amended FAR subpart 42.15 and the OFPP memorandum of July 29,2009, entitled "Improving the Use of Contractor Performance Information" include evaluation factors, rating scales, and appropriate management controls.

  12. Contacts for the Assistant General Counsel for Contractor Human Resources |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Contractor Human Resources Contacts for the Assistant General Counsel for Contractor Human Resources Jean S. Stucky, Assistant General Counsel for Contractor Human Resources 202-586-7532 jean.stucky@hq.doe.gov Eva M. Auman, Attorney-Adviser 202-287-5630 Grant Programs Legacy/Closure Sites Hanford Moab National Energy Testing Laboratory National Renewable Energy Laboratory Pacific Northwest National Laboratory Waste Isolation Pilot Project (Carlsbad Field Office) Thomas

  13. SECRETARIAL POLICY STATEMENT ON CONTRACTOR DEFINED BENEFIT PENSION PLANS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SECRETARIAL POLICY STATEMENT ON CONTRACTOR DEFINED BENEFIT PENSION PLANS The Department of Energy (DOE) has a longstanding interest in the retention and well- being of the workforce employed by its management and operating (M&O) and other significant contractors, which today include nuclear, laboratory, and environmental clean-up contractors. Much of the work performed by employees under M&O and other significant contracts initially required and continues to require highly specialized

  14. Rev.1 U.S. D EPARTMENT OF ENERGY Contractor Records Custodian Authorization

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 (9-2014) Rev.1 U.S. D EPARTMENT OF ENERGY Contractor Records Custodian Authorization SECTION I. Authorization Pursuant to DOE Order 243.1B, Records Management Program, Attachment 1, Contractor Requirements Document, (Name) , employee of (Contractor Organization) , is hereby authorized to function as a Contractor Records Custodian for (DOE Element) . The incumbent responsibilities include complying with the requirements of the noted Contract Requirements Document (CRD), including flowing down

  15. Hanford Site Treating Record Amount of Contaminated Groundwater

    Energy.gov [DOE]

    RICHLAND, Wash. - U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M HILL) has exceeded this year’s goal for treating 1.4 billion gallons of contaminated groundwater at the Hanford Site in Washington state.

  16. One of the Largest Pieces of Processing Equipment Removed from Plutonium Finishing Plant- Worker involvement led to safe completion of high-hazard work

    Energy.gov [DOE]

    RICHLAND, WASH. – U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CH2M HILL) announced today the successful removal of one of the largest, most complex pieces of equipment from the Plutonium Finishing Plant (PFP) at the Hanford Site in southeast Washington State.

  17. Contractor Legal Management Requirements

    Energy.gov [DOE]

    The purpose of this flash is to inform you of the issuance of two new Acquisition Guide Chapters, Chapters 70-31 C and 31.3, both titled "Contractor Legal Management Requirements." (Chapter 31.3 simply refers you to Chapter 70-31 C.)

  18. Contractor Performance Assessment Reporting System (CPARS) Web Based Training Classes

    Office of Energy Efficiency and Renewable Energy (EERE)

    The DOE Acquisition Career Manager (ACM) has approved Continuous Learning Points (CLPs) for Contractor Performance Assessment Reporting System (CPARS) web based training classes. See the attachment for list of classes.

  19. American Recovery & Reinvestment Act Newsletter July 2010

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    16 | EM Recovery Act Newsletter ARGONNE | BROOKHAVEN | ETEC | HANFORD | IDAHO | LANL | MOAB | MOUND | NTS DOE contractor CH2M HILL Plateau Remediation Company is using 250,000 in ...

  20. Energy Department Selects Deactivation Contractor for Paducah Gaseous

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Diffusion Plant | Department of Energy Selects Deactivation Contractor for Paducah Gaseous Diffusion Plant Energy Department Selects Deactivation Contractor for Paducah Gaseous Diffusion Plant July 22, 2014 - 5:48pm Addthis News Media Contact Brad Mitzelfelt, (859) 219-4035, brad.mitzelfelt@lex.doe.gov LEXINGTON, Ky. - The U.S. Department of Energy (DOE) today awarded a Task Order under the Nationwide Environmental Management ID/IQ Unrestricted Contract to Fluor Federal Services, Inc. for

  1. Approaches to Approved Contractor Lists

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Neighborhood Program Workforce / Business Partners Peer Exchange Call: Approaches to Approved Contractor Lists, Call Slides and Summary, April 25, 2013. This workforce/business partners peer exchange call discussed approaches to approved contractor lists.

  2. Homeowner and Contractor Surveys | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Homeowner and Contractor Surveys Homeowner and Contractor Surveys Better Buildings Neighborhood Program Data and Evaluation Peer Exchange Call: Homeowner and Contractor Surveys, ...

  3. Contractor Human Resources | National Nuclear Security Administration...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contractor Human Resources The Contractor Human Resources mission is to provide expert advice and assistance to our customers in order to ensure quality Contractor Human Resource ...

  4. Site: Contract Name: Contractor: Contract Number: Contract Type...

    Office of Environmental Management (EM)

    Richland, WA Plateau Remediation Contract September 2015 0 CH2M Hill Plateau Remediation Company DE-AC06-08RL14788 Cost Plus Award Fee 5,468,188,902 228,491,376 Fee Information...

  5. 2015-09-25 EM Contractor List.xls

    Office of Environmental Management (EM)

    Project INL Idaho National Laboratory CD0 TBD TBD EM 001021 OR-0041.C2 Outfall 200 Mercury Treatment Facility Oak Ridge Oak Ridge CD0 UCOR URS CH2M Hill Oak Ridge, LLC EM...

  6. Labor Standards Compliance, Contractor Labor Relations, and Contractor Workforce Restructuring Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2014-04-07

    The Order ensures that DOE and NNSA management and operating and other facility management contractors pursue collective bargaining practices that promote efficiency and economy in contract operations, judicious expenditure of public funds, equitable resolution of disputes, and effective collective bargaining relationships.

  7. Annual DOE Occupational Radiation Exposure | 1984 Report

    Energy.gov [DOE]

    The Seventeenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1984.

  8. Annual DOE Occupational Radiation Exposure | 1990 Report

    Energy.gov [DOE]

    The Twenty-third Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1990.

  9. Annual DOE Occupational Radiation Exposure | 1989 Report

    Energy.gov [DOE]

    The Twenty-second Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1989.

  10. Annual DOE Occupational Radiation Exposure | 1987 Report

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Twentieth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1987.

  11. Annual DOE Occupational Radiation Exposure | 1986 Report

    Energy.gov [DOE]

    The Nineteenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1986.

  12. Annual DOE Occupational Radiation Exposure | 1991 Report

    Energy.gov [DOE]

    The Twenty-fourth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1991.

  13. Annual DOE Occupational Radiation Exposure | 1978 Report

    Energy.gov [DOE]

    The Eleventh Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1978.

  14. Annual DOE Occupational Radiation Exposure | 1976 Report

    Energy.gov [DOE]

    The Ninth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1976.

  15. Annual DOE Occupational Radiation Exposure | 1988 Report

    Energy.gov [DOE]

    The Twenty-first Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1988.

  16. Annual DOE Occupational Radiation Exposure | 1977 Report

    Energy.gov [DOE]

    The Tenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1977.

  17. Annual DOE Occupational Radiation Exposure | 1985 Report

    Energy.gov [DOE]

    The Eighteenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1985.

  18. Annual DOE Occupational Radiation Exposure | 1981 Report

    Energy.gov [DOE]

    The Fourteenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1981.

  19. Annual DOE Occupational Radiation Exposure | 1983 Report

    Energy.gov [DOE]

    The Sixteenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1983.

  20. Annual DOE Occupational Radiation Exposure | 1979 Report

    Energy.gov [DOE]

    The Twelfth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1979.

  1. Annual DOE Occupational Radiation Exposure | 1980 Report

    Energy.gov [DOE]

    The Thirteenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1980.

  2. Annual DOE Occupational Radiation Exposure | 1982 Report

    Energy.gov [DOE]

    The Fifteenth Annual Report of Radiation Exposures for DOE & DOE Contractor Employees analyzes occupational radiation exposures at the U.S. Department of Energy (DOE) and its contractor employees during 1982.

  3. Targeting Contractors That Target Moderate Income Homeowners

    Energy.gov [DOE]

    Provides an overview of the services provided by EGIA including business development webinars, a contractor exchange, and contractor recognition.

  4. EM Contractors for Capital Asset Projects

    Energy.gov [DOE]

    Read the EM Contractors for Capital Asset Projects list, which includes the project name, number, site, and contractor.

  5. Management and Operating Contractors' Subcontract Audit Coverage...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management and Operating Contractors' Subcontract Audit Coverage DOEIG-0885 April 2013 ... INFORMATION: Special Report on "Management and Operating Contractors' Subcontract ...

  6. Team Hanford: Records management in a multi-contractor environment

    SciTech Connect (OSTI)

    Anderson, E.N.; Anderson, T.V.; Munch, J.W.; Potter, C.N.

    1993-08-01

    Expanding technology, increased emphasis on cost containment, and an ever growing list of requirements and regulations present challenges to records managers. The multi-contractor environment of the Department of Energy`s (DOE) Hanford Site further complicates the picture. In an effort to strengthen the site`s records management program, representatives of DOE`s Richland Operations Office and its four Hanford contractors joined forces. This synergistic Team Hanford approach continues to spawn success and is looked on as a model for similar DOE sites.

  7. EM Contractor Fee

    Office of Environmental Management (EM)

    Portsmouth/Paducah Project Office Contract Name: Portsmouth D&D Contract Contractor: Fluor-BWXT Portsmouth LLC Contract Number: DE-AC30-10CC40017 Contract Type: Cost-Plus-Award-Fee Total Estimated Contract Cost: $2,505,496,484 Contract Base Period: March 29, 2011 - March 28, 2016 Contract Option Period: Option 1: 3/29/16 -9/30/18 Option 1a: 10/1/18 - 3/28/21 Fee Information Minimum Fee $0 Maximum Fee $184,024,974 Performance Period Fee Available Fee Earned FY2011 $6,190,992 $5,779,687 FY2012

  8. EM Contractor Fee

    Office of Environmental Management (EM)

    2016 Site: Portsmouth Paducah Project Office Contract Name: Paducah Deactivation Task Order Contractor: Fluor Federal Services Contract Number: DE-EM0001131-DE-DT0007774 Contract Type: Cost Plus Award Fee and FFP Total Estimated Contract Cost: $422,000,000 Contract Base Period: July 22, 2014 - July 21, 2017 Contract Option Period: N/A Fee Information Minimum Fee $0 Maximum Fee $17,278,589 Performance Period Fee Available Fee Earned FY2015 $6,170,759 $4,257,824 FY2016 $5,553,915 $0 FY2017

  9. EM Contractor Fee

    Office of Environmental Management (EM)

    Portsmouth Environmental Technical Services II Contractor: Restoration Services Inc Contract Number: DE-EM0002639 Contract Type: Cost Plus Award Fee Total Estimated Contract Cost: $51,615,957 Contract Base Period: October 1, 2013 - September 30, 2016 Contract Option Period: Option 1: 10/1/16 - 9/30/18 Fee Information Minimum Fee $0 Maximum Fee $1,179,075 Performance Period Fee Available Fee Earned FY2014 $389,929 $358,735 FY2015 $392,092 $360,725 FY2016 $397,054 FY2017 (Option) $0 FY2018

  10. Request to Cancel Department of Energy (DOE) Order 350.2B, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2015-11-23

    DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions.

  11. Request to Cancel Department of Energy (DOE) Order, Use of Management and Operating or other Facility Management Contractor Employees for Services to DOE in the Washington D.C. Area, dated May 31, 2011

    Directives, Delegations, and Requirements [Office of Management (MA)]

    DOE is canceling this directive and its associated DOE-wide mandated requirements in recognition of Departmental management and oversight improvements of Headquarters sponsored assignments to the Washington D.C. area and opting to implement as program specific risk based management approach to these actions.

  12. DOE - Office of Legacy Management -- Mound_Benefits

    Office of Legacy Management (LM)

    Ohio > Mound_Benefits Mound, Ohio, Site Former Workers' Employment Verification and Benefits Administration Contractor Employment Verification Mercer, Mound Benefits Center (866) 296-5036 Medical and Life Insurance for Former EG&G, BWXTO, and CH2M HILL Employees For questions about health insurance coverage and/or dependent information, life insurance and/or beneficiaries, etc.: Mound Benefits Center P.O. Box 10361 Des Moines, IA 50306-0361 Benefit Center Website (866) 296-5036 9:00 a.m.

  13. New Idaho Cleanup Project Contractor Unveils Management Team | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Idaho Cleanup Project Contractor Unveils Management Team New Idaho Cleanup Project Contractor Unveils Management Team April 27, 2016 - 12:35pm Addthis IDAHO FALLS, Idaho - EM's new contractor for the Idaho Cleanup Project (ICP), Fluor Idaho, LLC, has unveiled its senior management team. "The 90-day transition process is now halfway complete and Fluor Idaho, LLC, is on track to take over operations on June 1," DOE-Idaho Deputy Manager Jack Zimmerman said. Heading Fluor

  14. 48 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 8 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees 48 C.F.R. 970.0309: Whistleblower Protection of Contractor Employees Stakeholders: DOE contractors Scope: 48 C.F.R. 970.0309 directs contracting officers to review 48 CFR subpart 903.9 when seeking to determine the applicability of the DOE Employee Protection Program to management and operating contracts. Summary: CFR subpart 903.9 implements the DOE Contractor Employee Protection Program as outlined in

  15. Contractor Rating and Feedback Systems

    Energy.gov [DOE]

    Better Buildings Residential Workforce/ Business Partners Peer Exchange Call Series: Contractor Rating and Feedback Systems, Call Slides and Discussion Summary, April 24, 2014.

  16. Worldwide pipelines and contractors directory

    SciTech Connect (OSTI)

    1999-11-01

    This directory contains information on the following: pipeline contractors; US natural gas pipelines; US crude oil pipelines; US product pipelines; Canadian pipelines and foreign pipelines.

  17. Trends in Contractor Conversion Rates

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Residential Network Workforce / Business Partners Peer Exchange Call Series: Trends in Contractor Conversion Rates, Call Slides and Discussion Summary, December 5, 2013.

  18. contractor | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    - The National Nuclear Security Administration (NNSA) today announced the recipients of the 2014 Bradley A. Peterson Federal and Contractor Security Professional of the Year Awards...

  19. DOE?s Idaho Operations Office Issues 2011-Beyond Strategic...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    support DOE's missions in energy, science and national security, through excellence in management. The DOE-ID Strategic Plan sets out objectives for ID and its contractors that...

  20. Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: Centerra-Savannah River Site Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2014 - September 30, 2015 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate and maintain an armed and uniformed protective force for the physical protection of United States Department of Energy (DOE) security interests and other such related duties at the Savannah River Site (SRS). The

  1. WIPP contractor receives VPP Legacy of Stars Award 2013

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Management and Operating Contractor Recognized for Continuous Safety Performance CARLSBAD, N.M., September 20, 2013 - The U.S. Department of Energy (DOE) recognized Nuclear Waste Partnership LLC (NWP), the Waste Isolation Pilot Plant (WIPP) management and operating (M&O) contractor, with the Voluntary Protection Program (VPP) Legacy of Stars Award in latter August 2013. "Safety is central to everything we do, and achieving this elite designation validates our work and the safety-focused

  2. National Nuclear Security Administration Contractor Governance, IG-0881

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    National Nuclear Security Administration Contractor Governance DOE/IG-0881 February 2013 U.S. Department of Energy Office of Inspector General Office of Audits & Inspections Department of Energy Washington, DC 20585 February 19, 2013 MEMORANDUM FOR THE ACTING ADMINISTRATOR, NATIONAL NUCLEAR SECURITY ADMINISTRATION FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "National Nuclear Security Administration Contractor Governance" INTRODUCTION Since July

  3. Non-Facility Contractor Prior Performance, IG-0857

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Non-Facility Contractor Prior Performance DOE/IG-0857 October 2011 Department of Energy Washington, DC 20585 October 28, 2011 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Non-Facility Contractor Prior Performance" INTRODUCTION AND OBJECTIVE The Department of Energy obligated approximately $89 billion during Fiscal Years 2009 and 2010, through various contracts and financial assistance awards, including contracts funded

  4. DOE Employee Concerns Program | Department of Energy

    Energy Savers

    Concerns Program DOE Employee Concerns Program The DOE ECP which encourages the free and open expression of employee concerns and provides DOE federal, contractor, and...

  5. Annual DOE Occupational Radiation Exposure Reports | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    employees during 1985. May 19, 2006 Annual DOE Occupational Radiation Exposure | 1984 Report The Seventeenth Annual Report of Radiation Exposures for DOE & DOE Contractor...

  6. DOE Honors Safety Star: Department's Program Honors Portsmouth...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Contractor Employee for Promoting Safety Excellence DOE Honors Safety Star: Department's Program Honors Portsmouth Site Contractor Employee for Promoting Safety ...

  7. DOE Facility Management Contracts Facility Owner Contractor

    Energy.gov (indexed) [DOE]

    three month option periods until protest resolved 9302011 M&O 1999 Bechtel National, Inc. (67%) and Babcock and Wilcox Company (33%) Portsmouth Remediation EM LATAParallax 110...

  8. Portsmouth DOE & Site Contractors | Department of Energy

    Energy.gov (indexed) [DOE]

    These activities will eliminate groundwater contamination sources, improve worker safety, reduce surveillance and maintenance costs, and prepare the rest of the plant for D&D. FBP ...

  9. DOE Facility Management Contracts Facility Owner Contractor

    Office of Environmental Management (EM)

    2000 9302012 9302012 M&O 2001 http:www.wipp.energy.govlibraryfoiaM&OContractWTS%20Index.pdf David Garcia 575-234-7315 Art Welton 575-234-7461 SLAC National Accelerator...

  10. DOE Facility Management Contracts Facility Owner Contractor

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    transition) 6151999 6302011 2 three month option periods 9302011 M&O 1999 http:www.id.energy.govPSDAMWTPHomepage.html Mike Adams 208-526-5277 Wendy Bauer 208-526-2808 ...

  11. DOE Facility Management Contracts Facility Owner Contractor

    Office of Environmental Management (EM)

    TRU Solutions 12142000 9302012 9302012 M&O 2001 http:www.wipp.energy.govlibraryfoiaM&OContractWTS%20Index.pdf David Garcia 575-234-7315 Art Welton 575-234-7461...

  12. DOE Facility Management Contracts Facility Owner Contractor

    Energy Savers

    2006 http:www.anl.govcontract Patricia ... Ames National Laboratory SC Iowa State University 124... 2008 http:www.eere.energy.govgoldenNRELPrime.aspx Jamie Harris ...

  13. Contractor Protective Force - DOE Directives, Delegations, and...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Functional areas: Safeguards, Security, and Emergency Management, Security, This Manual establishes requirements for the management and operation of the U.S. Department of...

  14. Contractor Past Performance Information

    Office of Environmental Management (EM)

    vehicles offer tiered pricing or other appropriate strategies, to reduce prices as cumulative volume increases. Ensuring that Department of Energy (DOE) cost savings and ...

  15. Contractor Past Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... satisfactory performance record or lack of satisfactory record of integrity and business ethics; and o The Small Business Administration does not issue a Certificate of Competency. ...

  16. DOE News Release Media Contact: For Immediate Release:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Cameron Hardy, DOE May 10, 2010 (509) 376-5365, Cameron_M_Hardy@rl.gov Dee Millikin, CH2M HILL Plateau Remediation Company (509) 376-1297, Dee_Millikin@rl.gov Three Fuel Storage Facilities Removed from Hanford's Landscape Completion of Recovery Act Project Reduces Cleanup Footprint RICHLAND, WASH. - Gone from the Hanford landscape are three large buildings, which once stored radioactive fuel rods. In their place is a patch of ground that has been remediated, backfilled, and contoured, leaving

  17. For Immediate Release:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    October 24, 2016 Media Contacts: Tania Reyes Mills, CH2M, (509) 373-6828 Tania_Reyes@rl.gov Mark Heeter, DOE, (509) 373-1970, mark.heeter@rl.doe.gov DOE Meets FY2016 Groundwater Cleanup Goals at Hanford RICHLAND, Wash. - Workers at the U.S. Department of Energy's (DOE) Hanford Site are marking another year of significant achievements in protecting the Columbia River from contaminated groundwater. During the past 12 months, contractor CH2M HILL Plateau Remediation Company (CH2M) met its goal to

  18. Management and operating contractor plan for transition to the project Hanford Management Contractor

    SciTech Connect (OSTI)

    Waite, J.L., Westinghouse Hanford

    1996-06-27

    This is Revision 1 to the M{ampersand}O Contractor Plan for Transition to the Project Hanford Management Contractor.

  19. DOE Guide to Working with Tribal Nations

    Energy.gov [DOE]

    U.S. Department of Energy (DOE) employees and contractors frequently work with Indian tribes or nations as part of their jobs. The purpose of this guide is to help DOE employees and contractors...

  20. Hanford Workers Achieve Success in Difficult Glove Box Project...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    prevent exposure. RICHLAND, Wash. - EM's Richland Operations Office and contractor CH2M HILL Plateau Remediation Company (CH2M HILL) recently finished safely separating three glove...

  1. Working Effectively with Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Working Effectively with Contractors Working Effectively with Contractors On March 2, 2011, the Department issued the attached memorandum for heads of departmental elements that addressed the respective roles of Departmental officials and contractors. PF2011-50 Working Effectively with Contractors (7.84 KB) PF2011-50a.pdf (42.71 KB) More Documents & Publications Policy Memo: Working Effectively with Contractors Inspection Report: INS-L-12-05 Federal and Contractor Employee Roles in the

  2. Contractor Human Resource Management Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1996-09-30

    Cancels DOE 3220.1A, DOE 3220.4A, DOE 3220.6A, DOE 3309.1A, DOE 3830.1, DOE 3890.1A, and DOE N 3131.1.

  3. Contractor Past Performance Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon Contractor Past Performance Information More Documents & Publications Contractor Past Performance Information Policy Flash 2015-11 Microsoft Word - AcqGuide42pt Nov 2010...

  4. Hanford Contractor Assumes Responsibility of Three Wastewater...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Assumes Responsibility of Three Wastewater Facilities Hanford Contractor Assumes Responsibility of Three Wastewater Facilities April 29, 2015 - 12:00pm Addthis The ...

  5. Salt Waste Contractor Reaches Contract Milestone | Department...

    Office of Environmental Management (EM)

    Salt Waste Contractor Reaches Contract Milestone Salt Waste Contractor Reaches Contract Milestone April 29, 2013 - 12:00pm Addthis Robert Brown, SRR tank farm operator, performs ...

  6. Leighton Contractors Pty Ltd | Open Energy Information

    Open Energy Information (Open El) [EERE & EIA]

    Leighton Contractors Pty Ltd Jump to: navigation, search Name: Leighton Contractors Pty Ltd Place: Chatswood, New South Wales, Australia Zip: 2067 Sector: Renewable Energy,...

  7. DOE F 3220.3 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE F 3220.3 Form summarizes contractor hours and earnings by facility. PDF icon REPORT OF CONTRACTOR HOURS AND EARNINGS More Documents & Publications DOE F 3230.6A DOE F 3220.4A ...

  8. Technical Assistance Contractor management plan. Revision 1

    SciTech Connect (OSTI)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  9. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    EXPORT/IMPORT CONTROL Contractors and subcontractors who engage in exporting and importing need to have an export/import control program. It is the responsibility of each contractor to: Interpret and comply with U.S. Export and Import Control Laws and Regulations. Make accurate Export Control determinations for information, technologies, and commodities they generate. Obtain required export and import licenses, permit, or other authorizations. Protect the information, technologies or commodities

  10. Alternate HVAC systems and exceptions for QA-Credentialed HVAC Contractor |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Alternate HVAC systems and exceptions for QA-Credentialed HVAC Contractor Alternate HVAC systems and exceptions for QA-Credentialed HVAC Contractor The document outlines alternate HVAC systems and exceptions for QA-Credentialed HVAC Contractor. HVAC Credentialing Alternate HVAC Systems Bulletin 07012015.pdf (409.41 KB) More Documents & Publications ENERGY STAR Certified Homes, Version 3 (Rev. 07) Inspection Checklists for National Program Requirements DOE Zero Energy

  11. AUDIT REPORT Follow-Up Audit of Contractor Intergovernmental Personnel Act

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Contractor Intergovernmental Personnel Act Assignments DOE/IG-0928 November 2014 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 November 12, 2014 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "Follow-Up Audit of Contractor Intergovernmental Personnel Act Assignments" BACKGROUND The Department of Energy maintains 16 contractor-operated

  12. A Guide for DOE Employees Working with Indian Tribal Nations (DOE, 2000)

    Energy.gov [DOE]

    The purpose of this guide is to help DOE employees and contractors initiate contact with tribes and build effective relationships.

  13. DOE-TSL-4-99

    Office of Energy Efficiency and Renewable Energy (EERE)

    Directory of DOE and Contractor Personnel Involved in Non-Government Standards Activities; Directory of DOE and Contractor Personnel Involved in Non-Government Standards Activities Superseding DOE-TSL-4-98 May 1998 The body of this document contains a listing of DOE employees and DOE contractors who have submitted form DOE F 1300.2, Record of Non-Government Standards Activity, which is attached to the end of this document.

  14. Policy for Federal Oversight and Contractor Assurance Systems

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2016-08-09

    This Policy establishes the Department of Energy’s (DOE) expectations for the implementation of a comprehensive and robust oversight process that enables the Department’s mission to be accomplished effectively, efficiently, safely, and securely by utilizing and leveraging the outcomes and information from effective Contractor Assurance Systems (CAS) to inform the Government’s oversight wherever appropriate.

  15. EM Sees Growth Across Complex in Partnering Agreements with Contractors

    Energy.gov [DOE]

    AIKEN, S.C. – DOE Savannah River Operations Office Manager Dave Moody views the partnering relationship between his office and liquid waste contractor Savannah River Remediation (SRR) as an opportunity to view cleanup work from each other’s point of view.

  16. 17.6 - Origin, Characteristics, and Significance of the DOE's...

    Energy Savers

    ... in M&O contractor management controls. 4. DOE's ... by use of Special Financial Institution Accounts, ... follow DOE's Accounting Handbook. 8. DOE's relying on the ...

  17. DOE Laboratory Accreditation Program

    Energy.gov [DOE]

    Administered by the Office of Worker Safety and Health Policy, the DOE Laboratory Accreditation Program (DOELAP) is responsible for implementing performance standards for DOE contractor external dosimetry and radiobioassay programs through periodic performance testing and on-site program assessments.

  18. DOE F

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    242.1 (12-2014) U.S. DEPARTMENT OF ENERGY Forms Manager Designation SECTION I. Designation Information Pursuant to DOE Guide 242.1-1, Forms Management Guide, (Name) _______________________________________________ is hereby designated a Forms Manager for (DOE Organization/Contractor Activity) ____________________________________________________________________. The incumbent's responsibilities include providing guidance and assisting within their respective organizations, supporting applicable

  19. DOE Technical Standards List: Directory of DOE and Contractor...

    Office of Environmental Management (EM)

    ... NGS Activity APPENDIX C 99 AIAA-ASG Aerospace Sciences Group AIAA-ASG-CFD Computational Fluid Dynamics Subcommittee AIAA-STC Standards Technical Council AICHE American Institute of ...

  20. Proceedings of the fuels technology contractors review meeting

    SciTech Connect (OSTI)

    Malone, R.D.

    1993-11-01

    The Fuels Technology Contractors Review Meeting was held November 16-18, 1993, at the Morgantown Energy Technology Center (METC) in Morgantown, West Virginia. This meeting was sponsored and hosted by METC, the Office of Fossil Energy, U.S. Department of Energy (DOE). METC periodically provides an opportunity to bring together all of the R&D participants in a DOE-sponsored contractors review meeting to present key results of their research and to provide technology transfer to the active research community and to the interested public. This meeting was previously called the Natural Gas Technology Contractors Review Meeting. This year it was expanded to include DOE-sponsored research on oil shale and tar sands and so was retitled the Fuels Technology Contractors Review Meeting. Current research activities include efforts in both natural gas and liquid fuels. The natural gas portion of the meeting included discussions of results summarizing work being conducted in fracture systems, both natural and induced; drilling, completion, and stimulation research; resource characterization; delivery and storage; gas to liquids research; and environmental issues. The meeting also included project and technology summaries on research in oil shale, tar sands, and mild coal gasification, and summaries of work in natural-gas fuel cells and natural-gas turbines. The format included oral and poster session presentations. Individual papers have been processed separately for inclusion in the Energy Science and Technology database.

  1. DOE F 1340-3

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Technical Review Policy and Evaluation Office of General Counsel 8. Type of Publication ... contractor, approved DOE F 1340.3A, "Public Communications Procurement Proposal" ...

  2. DOE MENTOR-PROTÉGÉ

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    business relationships between DOE prime contractors, small businesses and minority institutions of higher learning. ... Federal Procurement Data System -Next Generation (FPDS-NG) ...

  3. DOE MENTOR-PROTÉGÉ

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    business relationships between DOE prime contractors, small businesses and minority institutions of higher learning. ... Federal Procurement Data System-Next Generation (FPDS-NG) is ...

  4. DOE’s Worker-Focused Safety Program Honors Contractors Across EM Complex

    Energy.gov [DOE]

    Several contractors across the EM complex received honors in recent months in an important DOE safety program that turns to workers to assess, prevent, and control potential health and safety hazards.

  5. Department of Energy Issues Draft Request for Proposals for Argonne National Laboratory Contractor

    Energy.gov [DOE]

    WASHINGTON, DC -- The Department of Energy (DOE) is seeking comments on a draft Request for Proposals (RFP) for the competitive selection of a management and operating (M&O) contractor for...

  6. DOE-STD-3020-97; DOE Standard Specification for HEPA Filters...

    Energy.gov (indexed) [DOE]

    It provides guidance to DOE contractor sites for procurement and testing of High Efficiency Particulate Air (HEPA) filters used in DOE nuclear facilities. This standard was ...

  7. DOE-STD-3024-98; DOE Standard Content of System Design Descriptions

    Energy Savers

    documents in other industries is generally not suitable to meet the needs of DOE nuclear facilities. Across the DOE complex, different contractors have guidance documents, but ...

  8. Better Buildings - Concierge Programs for Contractors - They...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Contractor Meeting * Bi-monthly meetings have encouraged a sharing of techniques and products by all the contractors. * This was an impromptu demonstration of a new foam gun that ...

  9. PIA - Savannah River Site Management and Operating Contractor...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor ...

  10. PARS II 104 Contractor Monthly Upload | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    104 Contractor Monthly Upload PARS II 104 Contractor Monthly Upload PDF icon PARS II 104 Contractor Monthly Upload More Documents & Publications PARS II TRAINING PARS II Training ...

  11. contractors | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    contractors Supply Chain Management Center event highlights how small businesses can help NNSA carry out its missions The Supply Chain Management Center (SCMC) has been an important tool for NNSA to save taxpayer dollars. At the event on Feb. 18, NNSA leadership and the New Mexico congressional delegation were well represented. From left, Scott Bissen, SCMC Director; Rep. Steve Pearce (R-NM); NNSA Administrator

  12. contractor

    National Nuclear Security Administration (NNSA)

    demonstrated highly effective leadership in 2014 while directing the NMSSUP Phase II Transition to OperationsReadiness Verification team. Randy's efforts assured the performance...

  13. CONTRACTOR:

    Office of Legacy Management (LM)

    conduct research and perform devel- opment work on a process for the preparation of ductile, high-purity, zirconium (preferably in coherent form) by fused salt electrolysis. b. ...

  14. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    This will allow DOE to make any necessary determinations that may affect clearance eligibility. For example, simply including "terminated" or "for cause" does not provide enough ...

  15. DOE

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    O 580 .1 A Admin Chg 1 3 10-23 2012 U.S. Department of Energyadmin change DOE O XXX.XWashington, D.C. DOE O XXX.X Chg X: XX-XX-XXXX SUBJECT: ADMINISTRATIVE CHANGE TO DOE O XXX.X, TITLE (IN ITALICS) EXPLANATION OF CHANGES. [This information can be copied from the Approval Memo] LOCATIONS OF CHANGES: Page Paragraph Changed To [Original text that was changed] [Revised text]

  16. DOE enforcement program roles and responsibilities: DOE handbook

    SciTech Connect (OSTI)

    1995-08-01

    The Price-Anderson Act provides indemnification to DOE contractors who manage and conduct nuclear activities in the DOE complex. The government acts as an insurer for these contractors against any findings of liability from the nuclear activities of the contractor within the scope of its contract. 10 CFR Part 820 establishes the legal framework for implementing DOE`s Nuclear Safety Enforcement Program. Integration with other DOE organizations and programs would assure that the enforcement process properly considers the actual or potential safety significance of a violation when determining an appropriate enforcement sanction. Achieving a proactive contractor compliance assurance rather than a heavy enforcement hand, will require a foundation of cooperation and teamwork across DOE organizations. This handbook identifies the areas of interface for the DOE Enforcement Program and provides guidance on roles and responsibilities for the key DOE organizational areas. It complements DOE-HDBK-1087-95 and 1089-95.

  17. Contracts Technical Specifications Template

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contractors Contractors The U.S. Department of Energy's Oak Ridge Office of Environmental Management uses three prime contractors to conduct its major cleanup projects at the site. These companies include URS|CH2M Oak Ridge LLC (UCOR), North Wind Solutions LLC, and Isotek Systems LLC. UCOR is the Department of Energy's primary cleanup contractor for the DOE Oak Ridge Reservation, primarily focused on cleanup of East Tennessee Technology Park (the former Oak Ridge K-25 Site). UCOR is also engaged

  18. NREL Selects Contractor for New Research Support Facility - News Releases |

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    NREL Selects Contractor for New Research Support Facility Building to showcase renewable energy and energy efficiency technologies August 2, 2006 The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) has selected J.E. Dunn Rocky Mountain Construction to design and construct the first phase of the Laboratory's new Research Support Facilities (RSF). The value of the contract is $9.4 million, appropriated by the Energy and Water Development Subcommittee of the U.S.

  19. NREL Selects Contractor for New Science & Technology Facility - News

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Releases | NREL Selects Contractor for New Science & Technology Facility September 24, 2004 Golden, Colo. - The U.S. Department of Energy's (DOE) National Renewable Energy Laboratory (NREL) has signed a subcontract with the M. A. Mortenson Company to build the Laboratory's first major new facility in a decade, the Science & Technology Facility. The value of the construction subcontract is nearly $18 million. The total value of the project, including equipment and furnishings is

  20. DOE Special Session Presentations of the 59th Health Physics...

    Office of Environmental Management (EM)

    Staff or related DOE contractors involved in radiation protection within the DOE complex. ... Occupational Radiation Exposures at the Department of Energy Nimi Rao*, U.S. Department of ...

  1. DOE-HDBK-1016/1-93 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE-HDBK-10161-93 June 21, 2006 DOE Fundamentals Handbook, Engineering Symbology, Prints, and ... Handbook was developed to assist nuclear facility operating contractors in ...

  2. DOE Awards Workforce Opportunities in Regional Careers Grant...

    Energy.gov (indexed) [DOE]

    Tennessee Technical Park K-732 Switchyard DOE Awards Workforce Opportunities in Regional Careers Grant DOE Selects Seven Contractors for Waste Treatment Basic Ordering Agreements

  3. DOE-STD-1091-96 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    program so as to achieve the policy objectives and fulfill the requirements delineated in DOE O 440.1, "Worker Protection Management for DOE Federal and Contractor Employees." ...

  4. DOE-STD-6005-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to support components of the Worker Protection Program required by Department of Energy (DOE) Order 440.1A, Worker Protection Management for DOE Federal and Contractor Employees. ...

  5. DOE Labor Relations Training and Information Session, November...

    Office of Environmental Management (EM)

    PDF icon Training and Information Session Agenda PDF icon DOE Secretarial Policy on Contractor Pension Plan Participation (101515) PDF icon DOE Order 350.1, Chapter 5 Benefits ...

  6. C:\\Forms\\DOE F 3220.5.cdr

    Energy.gov (indexed) [DOE]

    Effective date 25a. Contractor: 26. DOE APPROVED SALARY 27. DOE APPROVED EFFECTIVE DATE 25c. Contracting officer (or designee) 25b. Headquarters Signature: Signature: Program...

  7. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    This order cancels DOE M 470.4-1, Chg 2, dated 102010, Safeguards and Security Program Planning and Management Physical Security DOE NAP 70.2, Chg 1, dated 72011, Physical ...

  8. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    References: PERSEC F 5633.33, NNSA Personnel Security Clearance Action Request DOE F ... All SNL Members of the Worksforce granted a DOE Security Clearance are required to obtain ...

  9. Audit of Department of Energy`s contractor liability insurance costs

    SciTech Connect (OSTI)

    1996-09-13

    Fifty-four of DOE`s major contractors reported expending $44.3 million in liability insurance costs for the last 3 years of operation. Purpose of this audit was to evaluate how DOE implemented its policy to assume the risk of losses for its contractors rather than to insure them commercially. Contractors are required to use self-insurance if combined annual premiums for commercial insurance exceed $10,000. Review of 18 major contractors showed that DOE was not consistently following its policy and that contractors using commercial insurance incurred higher costs. Required approvals were not always obtained prior to purchasing certain other types of liability insurance. It is recommended that DOE`s policies requiring self-insurance be fully implemented; that requests for approval for commercial insurance when annual premiums exceeded $10,000 be fully justified; and that the commercial insurance policies specifically define the liability coverage prior to approval and payment. It is also recommended that the contracts include clauses limiting reimbursements for insurance expenditures to actual losses and administrative costs.

  10. Notice of Intent to Revise Department of Energy Order 350.1, Contractor Human Resources Management Program

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2012-10-19

    DOE O 350.1 establishes responsibilities, requirements, and cost allow-ability criteria for the management an oversight of contractor human resource management programs, is being revised to remove contractor requirements from Chapter IV, Compensation, Chapter V, Benefits, and Chapter VI Pensions

  11. EM Contractor List-Sep.xls

    Office of Environmental Management (EM)

    Wave | Department of Energy Contractor Instrumental in Providing Observatory's Continuous Power Wave EM Contractor Instrumental in Providing Observatory's Continuous Power Wave October 17, 2016 - 12:00pm Addthis MSA and Benton Public Utilities District linemen set up the cables to be pulled into the vaults. MSA and Benton Public Utilities District linemen set up the cables to be pulled into the vaults. RICHLAND, Wash. - EM Richland Operations Office (RL) contractor Mission Support Alliance

  12. Programs: Operating as a Prime Contractor

    Energy.gov [DOE]

    Better Buildings Residential Network Program Sustainability Peer Exchange Call: Operating as a Prime Contractor, Call Slides and Discussion Summary, May 9, 2013.

  13. Solar Contractor Licensing | Department of Energy

    Energy.gov (indexed) [DOE]

    < Back Eligibility InstallersContractors Savings Category Solar - Passive Solar Water Heat Solar Space Heat Solar Thermal Electric Solar Thermal Process Heat Solar Photovoltaics...

  14. Contractor Sales Training | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications Homeowner and Contractor Surveys Focus Series: Philadelphia Energyworks: In the City of Brotherly Love, Sharing Know-How Leads to Sustainability ...

  15. Engaging and Growing Small Contractor Businesses

    Energy.gov [DOE]

    Better Buildings Neighborhood Program Workforce Peer Exchange Call: Engaging and Growing Small Contractor Businesses, call slides and discussion summary, November 8, 2012.

  16. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Attached is Acquisition Letter 2013-07, which provides suggested modification language. (The Final Rule's revisions are administrative in nature. Regarding costs contractors have ...

  17. Five Steps to a Profitable Contractor Base

    Energy.gov [DOE]

    Presents an introduction to Session 2: Five Steps to a Profitable Contractor Base. From Residential Energy Efficiency Solutions: From Innovation to Market Transformation, July 10, 2012

  18. Contractor-Funded Incentives | Department of Energy

    Energy Savers

    Contractor-Funded Incentives Better Buildings Residential Network Workforce Business ... More Documents & Publications Energy Advising Services in the Post-ARRA World Strategies ...

  19. Hanford Contractor Receives Awards for Safety

    Energy.gov [DOE]

    RICHLAND, Wash. – A Hanford site contractor supporting EM’s cleanup program has again received a prestigious safety award from DOE’s Voluntary Protection Program (VPP).

  20. DOE News Release Media Contact: For Immediate Release:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Dee Millikin, CH2M HILL Plateau Remediation Company September 30, 2009 (509) 376-1297, Dee_Millikin@rl.gov Geoff Tyree, DOE (509) 376-4171, Geoff_Tyree@rl.gov Hanford Workers Resume Cleanup of 200 North Area of the Hanford Site RICHLAND, WASH. -Workers are tackling a $12.5 million American Recovery and Reinvestment Act (Recovery Act) project at the Hanford Site in Washington State that should reduce the government site's cleanup footprint by some four square miles. U.S. Department of Energy

  1. Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Award Fee Determination Scorecard Contractor: G4S Government Solutions, Inc. - Wackenhut Services Incorporated (WSI) Contract: Protective Force Security Services Contract Number: DE-AC30-10CC60025 Award Period: October 1, 2013 - September 30, 2014 Basis of Evaluation: Award Fee Plan The contractor is required to provide, operate, and maintain an armed and uniformed protective force for the physical protection of U.S. Department of Energy (DOE) security interests and other such related duties at

  2. National Nuclear Security Administration Contractors' Disability Compensation and Return-to-Work Programs, IG-0867

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Audit Report The National Nuclear Security Administration Contractors' Disability Compensation and Return-to-Work Programs DOE/IG-0867 June 2012 U.S. Department of Energy Office of Inspector General Office of Audits and Inspections Department of Energy Washington, DC 20585 June 18, 2012 MEMORANDUM FOR THE SECRETARY FROM: Gregory H. Friedman Inspector General SUBJECT: INFORMATION: Audit Report on "NNSA Contractors' Disability Compensation and Return-to-Work Programs" INTRODUCTION AND

  3. Building America Expert Meeting: Transitioning Traditional HVAC Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to Whole House Performance Contractors | Department of Energy Transitioning Traditional HVAC Contractors to Whole House Performance Contractors Building America Expert Meeting: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the

  4. Environmental Requirements Management

    SciTech Connect (OSTI)

    Cusack, Laura J.; Bramson, Jeffrey E.; Archuleta, Jose A.; Frey, Jeffrey A.

    2015-01-08

    CH2M HILL Plateau Remediation Company (CH2M HILL) is the U.S. Department of Energy (DOE) prime contractor responsible for the environmental cleanup of the Hanford Site Central Plateau. As part of this responsibility, the CH2M HILL is faced with the task of complying with thousands of environmental requirements which originate from over 200 federal, state, and local laws and regulations, DOE Orders, waste management and effluent discharge permits, Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) response and Resource Conservation and Recovery Act (RCRA) corrective action documents, and official regulatory agency correspondence. The challenge is to manage this vast number of requirements to ensure they are appropriately and effectively integrated into CH2M HILL operations. Ensuring compliance with a large number of environmental requirements relies on an organization’s ability to identify, evaluate, communicate, and verify those requirements. To ensure that compliance is maintained, all changes need to be tracked. The CH2M HILL identified that the existing system used to manage environmental requirements was difficult to maintain and that improvements should be made to increase functionality. CH2M HILL established an environmental requirements management procedure and tools to assure that all environmental requirements are effectively and efficiently managed. Having a complete and accurate set of environmental requirements applicable to CH2M HILL operations will promote a more efficient approach to: • Communicating requirements • Planning work • Maintaining work controls • Maintaining compliance

  5. Microsoft Word - Attachment J-1 Covered Site Contractors and Sub-Contractors (Mod 003).doc

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    3 Section J Workers' Compensation Claims Services Penser North America, Inc. J-1-1 ATTACHMENT J.1 COVERED SITE CONTRACTORS/SUB-CONTRACTORS Current Covered Prime Contractors and their Covered Sub-Contractors: HPM Corporation (HPMC) (10/1/2012 - present) HPMC Covered Subs: Computer Science Corp (CSC) Advanced Technologies & Laboratories International, Inc. (ATL) (5/16/2005- present) No subcontractors Battelle Memorial Institute/Pacific Northwest National Laboratory (PNNL) No subcontractors

  6. Award Fee Evaluation Period 5 Determination Scorecard Contractor: Fluor-BWXT Portsmouth LLC

    Office of Environmental Management (EM)

    The Advanced Mixed Waste Treatment Facility Contract at the Idaho National Engineering and Environmental Laboratory DOE/IG-0622 September 2003

    Modernization of Tritium Requirements Systems DOE/IG-0632 December 2003

    Operations The Los Alamos Neutron Science Center DOE/IG-0666 November 2004

    Use and Management of Mobile Communications Services DOE/IG-0669 December 2004

    Report on Management Controls Over Contractor Tuition Reimbursements for Courses Leading to Degrees at

  7. DOE-STD-1158-2002

    Energy.gov [DOE]

    Self-Assessment Standard for DOE Contractor Criticality Safety Programs Replaced by DOE-STD-1158-2010 This document encompasses all elements of the Contractor criticality safety program at DOE facilities. The effectiveness of the criticality safety program is dependent upon management implementing its roles and responsibilities to integrate criticality safety into work practices. This doc is an assessment tool.

  8. Safeguards and Security Program - DOE Directives, Delegations...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    classified matter, sensitive information, government property, and the safety and security of employees, contractors, and the general public. Supersedes DOE P 470.1....

  9. DOE G 442.1-1

    Energy.gov (indexed) [DOE]

    can address issues such as health, safety, the environment, management practices, fraud, waste, or reprisal for raising a concern. Employer. DOE, a contractor, or a...

  10. Quality Assurance Functional Area Qualification Standard - DOE...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    establishes common functional area competency requirements for DOE personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical QA...

  11. Quality Assurance Functional Area Qualification Standard - DOE...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    common functional area competency requirements for all DOE QA personnel who provide assistance, direction, guidance, oversight, or evaluation of contractor technical...

  12. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    and Canada. The term "official" international travel is defined by DOE as: "Official" International Travel - Approved travel (whether wholly or partly on official business)...

  13. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    U.S. DOE SECURITY CLEARANCES Clearnce Home Initial Clearance Clearance Reinstate Clearance Upgrade Clearance Downgrade Clearance Extension Clearance Reciprocity Clearance ...

  14. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Note: In circumstances where the potential danger associated with an item is questionable, consult the physical security contact for additional information. Illegal drugs (does not ...

  15. Enforcement Letter, CH2M Oak Ridge, LLC - SEL-2012-01 | Department...

    Office of Environmental Management (EM)

    Enforcement Letter, Isotek Systems, LLC - January 20, 2010 Enforcement Letter, NEL-2012-01 - February 28, 2012 Enforcement Letter, Babcock & Wilcox Technical Services Y-12, LLC - ...

  16. Independent Oversight Review, Hanford Site CH2M Hill Plateau Remediation

    Office of Environmental Management (EM)

    Management Program - March 2014 | Department of Energy Review, Bonneville Power Administration Safety Management Program - March 2014 Independent Oversight Review, Bonneville Power Administration Safety Management Program - March 2014 March 2014 Oversight Review of the Bonneville Power Administration Safety Management Program Bonneville Power Administration management requested that the U.S. Department of Energy Office of Enforcement and Oversight (Independent Oversight), within the Office

  17. Independent Oversight Review, URS CH2M Oak Ridge - June 2013...

    Energy.gov (indexed) [DOE]

    Oak Ridge Environmental Management Radiological Controls Activity Level Implementation The purpose of this set of facility specific Independent Oversight targeted reviews is to...

  18. Office of Enforcement Special Report Order, Office of River Protection, CH2M Hill Hanford Group

    Energy Savers

    Weatherization Funding and Energy Efficiency Grants for Pennsylvania | Department of Energy 352.4 Million in Weatherization Funding and Energy Efficiency Grants for Pennsylvania Obama-Biden Administration Announces More Than $352.4 Million in Weatherization Funding and Energy Efficiency Grants for Pennsylvania March 12, 2009 - 12:00am Addthis Washington, DC -- Vice President Joe Biden and Energy Secretary Chu today announced Pennsylvania will receive $352,477,062 in weatherization and energy

  19. Emergency preparedness for the small oilfield contractor

    SciTech Connect (OSTI)

    Reavis, H.C.

    1995-12-01

    Changes in the oil and gas industry have been dramatic in recent years. Operators have consolidated field office facilities and downsized staffing at many of their remaining facilities. As a result, operators are turning to independent Contractors as a method of controlling both peak personnel demands and selected production functions. With these changes in the business environment, the role of the specialized contractor has been greatly expanded. Tasks Diane performed by operator employees are now ongoing services provided by the contractor. Their performance can Taken be exemplary until a major emergency occurs. Emergency response can no longer be considered a secondary issue. Every contractor, small or large, must be equally prepared for an emergency. Their ability to address emergency incidents will have a direct effect in their success. This paper is a presentation of the actual learning experiences of one oilfield contractor confronted with the ask of emergency preparedness, more specifically a small contractor. Oilfield service contractors commonly employ field personnel who work for extended periods of time without direct supervision. These employees may singularly or collectively float between sites or anchor one site. Operating sites might be localized or spread over a vast geographical area. Because of the uniqueness of their situation, direct supervision is minimal and the employees will shoulder greater responsibilities and authority. The contractor must evaluate operating conditions and develop an approach which will achieve the optimum results.

  20. C:\\Forms\\DOE F 2050.11.cdr

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 OMB Control No. (2-87) 1910-0800 (Previous GC-792) Contractor Interim Certification Final Certification DOE Prime andor Subcontract Nos. Contractor hereby certifies that: 1. All ...

  1. A Guide for DOE Employees Working with Indian Tribal Nations (2000)

    Energy.gov [DOE]

    The purpose of this guide is to help DOE employees and contractors initiate contact with tribes and build effective relationships.

  2. Facility Security Officer Contractor Toolcart

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    ... DOE has notified Sandia that all Members of the Workforce with a security clearance, ... All clearance requests can now be submitted as usual. The suspension of e-QIP was ...

  3. Spotlight on Austin, Texas: Let Your Contractor Be Your Guide...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Let Your Contractor Be Your Guide for Big Rewards Spotlight on Austin, Texas: Let Your Contractor Be Your Guide for Big Rewards Spotlight on Austin, Texas: Let Your Contractor Be ...

  4. Emergency preparedness for the small oilfield contractor

    SciTech Connect (OSTI)

    Reavis, H.C.

    1995-12-31

    The changes in the oil and gas industry have been dramatic in recent years. Operators have consolidated field office facilities and downsized staffing at many of their remaining facilities. As a result of these changes, operators are turning to independent contractors as a method of controlling both peak personnel demands and selected production functions. With these changes in the business environment, the role of the specialized contractor has been greatly expanded. Tasks once performed by operator employees are now ongoing services provided by the contractor. Their performance can often be exemplary until a major emergency occurs. Emergency response can no longer be considered a secondary issue. Every contractor, small or large, must be equally prepared for an emergency. Their ability to address emergency incidents will have a direct effect in their success. This paper is a presentation of the actual learning experiences of one oilfield contractor confronted with the task of emergency preparedness, more specifically a small contractor. For the purposes of this discussion, a small contractor is one that employs one, a handful, or more individuals. These employees might singularly or collectively float between sites or anchor one site. Operating sites might be localized or spread over a vast geographical area. Because of the uniqueness of their situation, direct supervision may be minimal, shouldering greater responsibilities and authority on the employees.

  5. Enforcement Guidance Supplement 05-01: Contractor Investigation, Causal Analysis, and Corrective Actions

    Energy.gov [DOE]

    Section 1.3 of the Operational Procedures for Enforcement, published in June 1998, provides the opportunity for the Office of Price-Anderson Enforcement (OE) to periodically issue clarifying guidance regarding the processes used in its enforcement activities. Such guidance is typically issued in the form of an Enforcement Guidance Supplement (EGS). As part of the investigation of potential nuclear safety noncompliances, OE routinely reviews the contractor's investigation of the noncompliance, the associated causal analysis, and the corrective actions developed by the contractor to resolve the noncompliance and prevent recurrence. A high percentage of enforcement actions undertaken by OE feature recurrent events or deficiencies, indicating weaknesses associated with contractor processes to develop and implement effective corrective actions. In response, OE has developed this EGS to disseminate information regarding observed deficiencies as a potential lessons -learned for the DOE contractor community. Attachment A provides enforcement case examples highlighting performance deficiencies specific to this subject area.

  6. DOE

    Gasoline and Diesel Fuel Update

    DOE /E/A- 0202( 83//Q J Sh or t-T er m En er gy O ut lo ok a to m Quar terly Proje ction s Febru ary 1983 Ene rgy Info rma tion Adm inist ratio n Was hing ton, D.C. t rt jrt .or t lor t lor t .lor t- ior t- ior t <.o rt ort . m .er m -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -Te rm -T erm -T erm -T erm Nrm ue rgy En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En erg y En

  7. DOE Employment - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Services » DOE Employee Concerns Program DOE Employee Concerns Program The DOE ECP which encourages the free and open expression of employee concerns and provides DOE federal, contractor, and subcontractor employees with an independent avenue to raise any concern related, but not limited, to the environment, safety, health, and management. The DOE ECP is designed to: Encourage open communication; Inform employees of the proper forum for consideration of their concerns; Ensure employees can

  8. DOE Policy 141.1: Management of Cultural Resources (DOE, 2001...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    to raise the level of awareness and accountability among DOE contractors concerning the importance of the Department's cultural resource-related legal and trust responsibilities. ...

  9. DOE-HDBK-3012-2003; DOE Handbook Guide to Good Practices for...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... with managementsupervisor names. - Functional description for ES&H organizations (NQA-1). 27 DOE-HDBK-3012-2003 - General site map. - Contractor ORR andor Management Self ...

  10. Department of Energy Honors Hanford Site Contractor for Employee...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Site Contractor for Employee Involvement and Management Leadership in Safety and Health Department of Energy Honors Hanford Site Contractor for Employee Involvement and...

  11. POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS...

    Energy Savers

    POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING THE FINAL RULE TO EXISTING CONTRACTS POLICY FLASH 2013-56 CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: APPLYING...

  12. Programs and Contractors -Top Tips for Successful Relationships...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Programs and Contractors -Top Tips for Successful Relationships (101) Programs and Contractors -Top Tips for Successful Relationships (101) Better Buildings Residential Network ...

  13. Driving Demand: Working With and Learning from Contractors

    Energy.gov [DOE]

    This webinar covered how to work with and learn from contractors as well as NYSERDA's lessons learned in their contractor experiences.

  14. Better Buildings: Workforce, Spotlight on Maine: Contractor Sales...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy Upgrade Conversions Better Buildings: Workforce, Spotlight on Maine: Contractor Sales Training Boosts Energy...

  15. Trends in Contractor Conversion Rates | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Better Buildings -- Concierge Programs for Contractors -- They're Not Just for Consumers anymore Programs and Contractors -Top Tips for Successful Relationships (101) Spotlight on ...

  16. Interview: LaborWorks@NeighborWorks Provides Vermont Contractors...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They Need It Interview: LaborWorks@NeighborWorks Provides Vermont Contractors With Help When They ...

  17. Employee of Savannah River Site Contractor Recognized as Exemplary...

    Office of Environmental Management (EM)

    Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health Employee of Savannah River Site Contractor Recognized as Exemplary in Safety and Health ...

  18. Policy Flash: 2013-52 Contractor Legal Management Requirements...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Policy Flash: 2013-52 Contractor Legal Management Requirements: Final Rule Questions concerning this policy...

  19. Policy Flash 2013-77 Contractor Performance Information | Department...

    Energy Savers

    Policy Flash 2013-77 Contractor Performance Information Policy Flash 2013-77 Contractor Performance Information Questions concerning this policy flash should be directed to Barbara...

  20. Diverse Array of Career Resources Help EM Contractor Employees...

    Office of Environmental Management (EM)

    with EM, Professional Services of America, Inc. (PSA) oper- ates the Contractor Transition Service Program. Its services are available to contractor employees across the EM...

  1. Update to M&O Contractor Model Subcontract entitled "Standard...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    M&O Contractor Model Subcontract entitled "Standard Research Subcontract (Educational Institution or Nonprofit Organization)" Update to M&O Contractor Model Subcontract entitled ...

  2. Nevada National Security Site contractor receives safety recertificati...

    National Nuclear Security Administration (NNSA)

    Nevada National Security Site contractor receives safety recertification for 5th straight ... and operating contractor for the Nevada National Security Site, continues to ...

  3. ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION...

    Office of Environmental Management (EM)

    3: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS The subject ...

  4. Programs: Operating as a Prime Contractor | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Programs: Operating as a Prime Contractor Better Buildings Residential Network Program Sustainability Peer Exchange Call: Operating as a Prime Contractor, Call Slides and ...

  5. Award Fee Determination Scorecard Contractor: Centerra-Savannah...

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    The contractor will provide timely, accurate, reliable and actionable project and contractor cost, schedule, performance, risk, and forecast data, reports and information. This ...

  6. Employee-Focused Structure Helps Produce Upgrades for Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Employee-Focused Structure Helps Produce Upgrades for Contractor Employee-Focused Structure Helps Produce Upgrades for Contractor Photo of a young man sitting on a couch, looking ...

  7. Contractor Rating and Feedback Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rating and Feedback Systems Contractor Rating and Feedback Systems Better Buildings Residential Workforce Business Partners Peer Exchange Call Series: Contractor Rating and ...

  8. Public Utility Awards EM's Idaho Site Contractor for Energy Conservati...

    Office of Environmental Management (EM)

    Public Utility Awards EM's Idaho Site Contractor for Energy Conservation Public Utility Awards EM's Idaho Site Contractor for Energy Conservation January 27, 2016 - 12:00pm Addthis ...

  9. Technical assistance contractor management plan: Surface and ground water

    SciTech Connect (OSTI)

    Not Available

    1994-09-01

    This report presents the general management structure of the Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project. This team is a partnership of four major private subcontractors, which teamed together, are striving to be the leader in environmental restoration of uranium mining and milling operations. It will provide a pool of experts in various aspects of the technologies necessary to accomplish this goal, available to DOE to deal with mission concerns. The report expands on goals from TAC`s mission statement, which include management concerns, environment, safety, and health, quality, technical support, communications, and personnel.

  10. Acquisition Guide Chapter 9.4, Contractor Responsibility Determinations

    Energy.gov [DOE]

    Attached is new Acquisition Guide Chapter 9.4, Contractor Responsibility Determinations. This Chapter is being issued to address recommendations from a recent Inspector General (IG) report that found DOE Contracting Officers (CO) were not always conducting responsibility determinations properly. In particular, the IG found that for sole source awards, including 8(a) awards, the CO was not documenting reviews of past performance. The IG recommended that COs consistently follow existing FAR requirements for completing responsibility determinations. This Chapter reiterates and summarizes current FAR requirements for doing so.

  11. Hiring Qualified Contractors | Department of Energy

    Office of Environmental Management (EM)

    Be absolutely sure the contractor you consider hiring is qualified, honest, and registered with the State-before you sign a contract or make a down payment. Federal, State, and ...

  12. Magazine Bestows Safety Award on EM Contractor

    Energy.gov [DOE]

    RICHLAND, Wash. – A woman-owned small business prime contractor to EM’s Office of River Protection has been named one of America’s safest companies for 2013 by EHS Today magazine.

  13. CRAD, NNSA- Evaluating Contractor Assurance Systems

    Energy.gov [DOE]

    CRAD for Evaluating Contractor Assurance Systems. Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  14. List of Contractors to Support Anthrax Remediation

    SciTech Connect (OSTI)

    Judd, Kathleen S.; Lesperance, Ann M.

    2010-05-14

    This document responds to a need identified by private sector businesses for information on contractors that may be qualified to support building remediation efforts following a wide-area anthrax release.

  15. Lab contractor awards LANL Foundation $3 million

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Contractor awards LANL Foundation $3 million Lab contractor awards LANL Foundation $3 million To provide educational enrichment and educational outreach funding for a wide variety of education programs in the seven Northern New Mexico counties. October 29, 2008 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and innovation covering multi-disciplines from bioscience, sustainable energy sources, to plasma

  16. Contractor SOW Template - ICE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ICE Contractor SOW Template - ICE The template presented below is a Statement of Work (SOW) for services of an ICE Support Contractor for assisting OECM in conducting an ICE. Project and review specific information should be incorporated. Explanatory text appears in italics, while information that should be selected appears in <<brackets>>. The format and contents of this SOW is not compulsory, and the use is at the discretion of the OECM Analysts, tailored as appropriate for the

  17. Contractor SOW Template - ICR | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ICR Contractor SOW Template - ICR The template presented below is a Statement of Work (SOW) for services of an OECM ICR Support Contractor for assisting OCEM in performing an ICR. Project and review specific information should be incorporated. Explanatory text appears in italics, while information that should be selected appears in <<brackets>>. The format and contents of this SOW is not compulsory, and the use is at the discretion of the OECM Analysts, tailored as needed for the

  18. Staff and Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Staff and Contractors Staff and Contractors Watch the video above to hear a message from Secretary Moniz, highlighting the FY 2016 budget request for the Department of Energy and his appreciation for the vital mission and dedicated employees of the Department. As referenced in the video, employees are encouraged to visit the Department's website to view the full FY 2016 budget presentation, which proposes approximately $30 billion to support nuclear security, clean energy, environmental cleanup,

  19. DOE-HDBK-1139-2006

    Energy.gov [DOE]

    Chemical Management This non-mandatory Handbook is designed to assist Department of Energy (DOE) and contractor managers in assessing chemical hazard management and is approved for use by all DOE Components and their contractors. Examples of best practices needed to institute high-quality chemical management within the context of a site's Integrated Safety Management System (ISMS) are provided.

  20. DOE-STD-1158-2010

    Energy.gov [DOE]

    Self-Assessment Standard for DOE Contractor Criticality Safety Programs This document encompasses all elements of the Contractor Criticality Safety Program at DOE facilities. The effectiveness of the criticality safety program is dependent upon management implementing its roles and responsibilities to integrate criticality safety into work practices. This doc is an assessment tool.

  1. DOE-STD-1134-99

    Energy.gov [DOE]

    Review Guide For Criticality Safety Evaluations The purpose of this document is to provide a set of guidelines, not checklists, for use by DOE criticality safety personnel when reviewing criticality safety evaluations produced by the contractor. This review guide is intended to provide a consistent framework for assuring that acceptable evaluations are produced by DOE contractors.

  2. DOE Handbook: Implementing Activity-level Work Planning & Control at

    Office of Environmental Management (EM)

    Department of Energy DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors DOE General Counsel Issues Arbitration Guidance for M&O Contractors (February 3, 2010) Washington, DC - The Office of the General Counsel, in conjunction with the Office of General Counsel of the NNSA, has reviewed the question of whether Department of Energy contractors can include binding arbitration in their contracts with

  3. Policy Memo: Working Effectively with Contractors | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Policy Memo: Working Effectively with Contractors Policy Memo: Working Effectively with Contractors Guidance on working effectively with contractors. (42.71 KB) More Documents & Publications Working Effectively with Contractors OPAM Policy Acquisition Guides Aligning Contract Incentives & Contract Mgt Trends - David Leotta, Director, Office of Contract Management, OAPM

  4. DOE-STD-1134-99 Review Guide for Criticality Safety Evaluations

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    when reviewing Criticality Safety Evaluations that were developed by DOE Contractors to demonstrate the safety of fissile material handling at DOE Non-Reactor Nuclear Facilities. ...

  5. DOE-STD-1112-2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    Laboratory Accreditation Program for Radiobioassay This technical standard describes the U.S. Department of Energy Laboratory Accreditation Program (DOELAP) for Radiobioassay, for use by the U.S. Department of Energy (DOE) and DOE Contractor radiobioassay programs.

  6. CONTRACTOR LEGAL MANAGEMENT REQUIREMENTS: FINAL RULE

    Energy.gov [DOE]

    The Department has issued a Final Rule revising the existing contractor regulations covering contractor legal management requirements at 10 C.F.R. 719 (Federal Register May 3, 2013; http://www.gpo.gov/fdsys/pkg/FR-2013-05-03/pdf/2013-10485.pdf). One unusual aspect of the Final Rule is that it requires Contracting Officers to attempt to execute bilateral modifications to existing affected contracts to apply the Final Rule's revisions to those contracts. We will issue an Acquisition Letter shortly with suggested contract modification language. (The Final Rule's revisions "… are designed to clarify and streamline existing requirements, improve efficiency of contractor legal management, and facilitate oversight over the expenditure of taxpayer dollars." The contract modifications will state the revisions will only apply to costs incurred from date the bilateral modifications are executed forward. The revisions are administrative in nature. Regarding costs contractors have not yet incurred, the revisions could have been communicated to contractors without using a Final Rule to incorporate them into current contracts. Consequently, the modifications do not require equitable adjustments.)

  7. DOE extends the Idaho Cleanup Project Contract for Three Years | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy extends the Idaho Cleanup Project Contract for Three Years DOE extends the Idaho Cleanup Project Contract for Three Years September 25, 2012 - 12:00pm Addthis Media Contacts Brad Bugger 208-526-0833 Danielle Miller 208-526-5709 Idaho Falls, ID - The U.S. Department of Energy has extended by three years its contract with the company currently operating the Idaho Cleanup Project at the department's Idaho Site. CH2M-WG Idaho, LLC's (CWI) period of performance on the current contract

  8. Audit Report: DOE-OIG-16-09 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 Audit Report: DOE-OIG-16-09 March 30, 2016 Management of the Startup of the Sodium-Bearing Waste Treatment Facility Under its contract for the Idaho Cleanup Project, CH2M-WG Idaho LLC was to design, construct, and operate the Sodium-Bearing Waste Treatment Facility (SBWTF) to treat 900,000 gallons of radioactive liquid waste that is currently stored in underground waste tanks at the Idaho National Laboratory. In April 2012, the Department declared construction complete, beginning the project's

  9. Explosive Demolitions To Change Hanford’s Skyline

    Office of Energy Efficiency and Renewable Energy (EERE)

    RICHLAND, WASH. – U.S. Department of Energy (DOE) contractor CH2M HILL Plateau Remediation Company (CHPRC) will use explosives to demolish several structures near the center of the Hanford Site on two separate days – February 18 and March 4

  10. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    April 2010 April 28, 2010 Contractor Recovery Act Update: April 23, 2010 DOE Contractor CH2M HILL Plateau Remediation Company produces a weekly newsletter with information on environmental cleanup projects funded by the Recovery Act. April 26, 2010 Completion of 300 Area Waste Sites Meets TPA Milestone DOE met a Tri-Party Agreement milestone by completing cleanup work on 11 different waste sites at Hanford's 300 Area just north of Richland, Wash. April 23, 2010 Hanford Site to Activate Emergency

  11. Hanford Blog Archive - Hanford Site

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    March 2012 March 29, 2012 DOE Contractor Completes Massive Excavation Washington Closure disposes 650,000 tons of contaminated soil from the C-7 waste site March 09, 2012 DOE Lowers Age Limit for B Reactor Tours Families, schools invited to visit National Historic Landmark March 09, 2012 FACT SHEET: Removing Pencil Tanks Contractor CH2M HILL Plateau Remediation Company is removing plutonium processing equipment from the highest-hazard facility at Hanford. March 08, 2012 PRESS RELEASE: Fifth

  12. DOE-STD-3020-2005 | Department of Energy

    Energy.gov (indexed) [DOE]

    Specification for HEPA Filters used by DOE Contractors Replaced by DOE-STD-3020-2015 | Supersedes DOE-STD-3020-97 (January 1997) This standard establishes specifications and ...

  13. DOE Directives | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Directives DOE Directives Directives are the Department of Energy's primary means to communicate and institutionalize directives and policies and to establish requirements, responsibilities, and procedures for Departmental elements and contractors. DOE O 413.3A - Program and Project Management for the Acquisition of Capital Assets DOE G 413.3-1 - Managing Design and Construction Using Systems Engineering for Use with DOE O 413.3A DOE G 413.3-2 - Quality Assurance Guide for Project Management

  14. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Intense Pulse Neutron Source, Argonne Tandem-Linac Accelerator System, Center for Nanoscale Materials; Electron Microscope Center; Atmospheric Radiation Measurement Climate ...

  15. Contractor Workplace Substance Abuse Program at DOE Sites (10...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    September 14, 2007 Policy Flash - Recent State Initiatives on "Recreational" Marijuana use AU-1 Memorandum - Clarification on the Drug Testing Custody and Control Form for ...

  16. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Environmental Management (EM)

    of science, with great expertise in biology, chemistry, physics and related ... materials research, with additional strengths in the areas of chemistry and plant biology. ...

  17. DOE Scorecard Rates Savannah River Site's Security Contractor...

    Energy.gov (indexed) [DOE]

    This support included explosive detection searches at local schools and venues used by presidential candidates for speaking engagements. In addition, Centerra was commended for ...

  18. DOE Rates EM's Savannah River Site Contractor as 'Very Good'...

    Office of Environmental Management (EM)

    ... The production process at MOX, which is now under construction, will eventually create fuel pellets for U.S. commercial reactor fuel assemblies. Savannah River Site's H Canyon ...

  19. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... has been a leader in fusion energy research, specializing in magnetic confinement experiments using a tokomak, or donut-shaped, reactor design. Magnetic fusion research at ...

  20. DOE's Worker-Focused Safety Program Honors Contractors Across...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... and control, and safety and health training. Each participating company is ... job in taking ownership for their safety, ... Outlines Safe Startup and Commissioning ...

  1. Idaho Governor Praises DOE, Contractor Effort for Resuming Critical...

    Energy Savers

    ... EM's Idaho Site Crews Complete Buried Waste Cleanup Accomplishment Subscribe to EM News Email Updates Gov Delivery logo To receive the latest news and updates about the Office of ...

  2. Worker Protection Management for DOE Federal and Contractor Employees...

    Energy Savers

    Waste Management Nuclear Materials & Waste Tank Waste and Waste Processing Waste Disposition Packaging and Transportation Site & Facility Restoration Deactivation & Decommissioning ...

  3. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the Host Laboratory for U.S. participation in the Large Hadron Collider (LHC) Compact Muon Solenoid detector, construction of certain LHC accelerator components, and the U.S. LHC...

  4. DOE Issues Request for Proposals Seeking a Contractor to Manage...

    Office of Environmental Management (EM)

    "Fermilab is a world leader in high energy physics, which helps the U.S. maintain global competitiveness," said Under Secretary for Science, Dr. Raymond L. Orbach. "Through this ...

  5. DOE human genome program contractor-grantee workshop VI

    SciTech Connect (OSTI)

    1997-10-01

    Research is presented from the workshop on the Human Genome Project. Topics include sequencing, genetic mapping, informatics, ethical and legal issues, and infrastructure.

  6. Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Sales Training Call Slides and Discussion Summary, January 19, 2012

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9, 2012 Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Sales Training Call Slides and Discussion Summary Agenda * Call Logistics and Attendance  Does your project provide any sales training assistance to contractors? (Or, are you thinking about doing so?) * Program Experience and Lessons:  Nancy Hohns, EnergyWorks, Philadelphia  Mary Templeton, Better Buildings for Michigan  Andy Meyer, Efficiency Maine * Discussion:  Has sales training impacted the

  7. DOE F 350.1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    50.1 DOE F 350.1 This form documents expenditures related to contractor salary and wage increases. Contractor Salary-Wage Increase Expenditure Report (11.08 KB) More Documents & Publications AcqGuide70pt5.doc&#0; DOE F 3220.4A DOE F 3230.6A

  8. DOE-STD-1107-97 | Department of Energy

    Energy Savers

    Key Radiation Protection Positions at DOE Facilities Change Notice No. 1 (November 2007) This document provides detailed qualification criteria for contractor key radiation ...

  9. DOE-STD-1107-97 | Department of Energy

    Energy Savers

    Knowledge, Skills, and Abilities for Key Radiation Protection Positions at DOE Facilities ... This document provides detailed qualification criteria for contractor key radiation ...

  10. DOE Portsmouth Site Puts Environmental Database Online | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    including DOE and its contractors, regulatory agencies, and members of the public. ... "We hope users of the application find it and the user guides easy and enlightening to ...

  11. DOE EIR FM.doc | Department of Energy

    Office of Environmental Management (EM)

    EIR FM.doc PDF icon DOE EIR FM.doc More Documents & Publications Contractor Statement of Work (SOW) Template (for EIR) External Independent Review (EIR) Standard Operating...

  12. DOE F 3220.5 | Department of Energy

    Energy Savers

    5 DOE F 3220.5 Form documents proposed salary actions, education, salary history, approvals and concurrences in regard to contractor compensation approval. PDF icon APPLICATION FOR...

  13. DOE-STD-3006-95 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    This standard also provides guidance for requesting exemptions. The requirements for ORRs and RAs apply both to responsible contractors and to DOE. This standard addresses the ...

  14. Report on Audit of Department of Energy Management and Operating Contractor Available Fees, IG-0390

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AUDIT OF DEPARTMENT OF ENERGY MANAGEMENT AND OPERATING CONTRACTOR AVAILABLE FEES The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative address: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy Headquarters Anonymous FTP vm1.hqadmin.doe.gov

  15. UMTRA project technical assistance contractor quality assurance implementation plan

    SciTech Connect (OSTI)

    Not Available

    1994-03-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance contractor (TAC) Quality Assurance Implementation Plan (QAIP) outlines the primary requirements for integrating quality functions for TAC technical activities applied to the surface and ground water phases of the UMTRA Project. The QAIP is subordinate to the latest issue of the UMTRA Project TAC Quality Assurance Program Plan (QAPP) (DOE, 1993a), which was developed using US Department of Energy (DOE) Order 5700.6C quality assurance (QA) criteria. The QAIP addresses technical aspects of the TAC UMTRA Project surface and ground water programs. All QA issues in the QAIP shall comply with requirements contained in the TAC QAPP (DOE, 1933a). Because industry standards for data acquisition and data control are not addressed in DOE Order 5700.6C, the QAIP has been formatted to the 14 US Environmental Protection Agency (EPA) Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) QA requirements. DOE Order 5700.6C criteria that are not contained in the CERCLA requirements are added to the QAIP as additional requirements in Sections 15.0 through 18.0. Project documents that contain CERCLA requirements and 5700.6 criteria shall be referenced in this document to avoid duplication. Referenced documents are not included in this QAIP but are available through the UMTRA Project Document Control Center.

  16. DOE-STD-0100T-93

    Office of Energy Efficiency and Renewable Energy (EERE)

    Licensed Reactor Nuclear Safety Criteria Applicable to DOE Reactors Canceled | Superseding DOE/NE-0100T (April 1991) This document identifies nuclear safety criteria applied to licensed reactors. The degree of application of these criteria to a DOE-owned reactor, consistent with their application to comparable licensed reactors, must be determined by the DOE and DOE contractor.

  17. Local Contractors Face an Enviable Challenge

    Energy.gov [DOE]

    Clean Energy Works in Portland, Oregon, has become so good at enticing homeowners to complete energy efficiency evaluations and upgrades that some contractors are politely asking for the projects to slow down a bit. Clean Energy Works hit the ground running by launching its program with significant rebate offers to residents.

  18. Idaho Site Contractor Achieves Treatment Project Milestone

    Energy.gov [DOE]

    IDAHO FALLS, Idaho – The Idaho site’s main cleanup contractor recently achieved a major performance milestone by successfully passing an operational readiness review for a first-of-a-kind facility that will treat the remaining 900,000 gallons of liquid radioactive waste generated by the site’s legacy cleanup mission.

  19. Media Contacts: For Immediate Release:

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Cameron Hardy, DOE July 20, 2010 (509) 376-5365, Cameron.Hardy@rl.doe.gov Dee Millikin, CH2M HILL Plateau Remediation Company (509) 376-1297, Dee_Millikin@rl.gov **Photo Release** Helicopter Removes Aging Truck From Steep Rattlesnake Ravine RICHLAND, WASH. - A Sikorsky S-64 helicopter removed an old truck from a steep ravine on Rattlesnake Mountain today as part of the cleanup of the Arid Lands Ecology Reserve (ALE). The Department of Energy's contractor, CH2M HILL Plateau Remediation Company,

  20. Management of Contractor Personnel Policies and Programs

    Directives, Delegations, and Requirements [Office of Management (MA)]

    1992-11-30

    Cancels DOE 3309.1. Canceled by DOE O 350.1, 9-30-1996, DOE N 251.26, 1-9-1998 & DOE N 251.28 1-20-1998.

  1. Justification Memoranda - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Justification Memoranda by Diane Johnson Notice of Intent to Revise Department of Energy Order 350.1, Contractor Human Resources Management Program - by Robert Myers - last modified Jun 19, 2014 11:17 AM DOE O 350.1 establishes responsibilities, requirements, and cost allow-ability criteria for the management an oversight of contractor human resource management programs, is being revised to remove contractor requirements from Chapter IV, Compensation, Chapter V, Benefits, and Chapter VI Pensions

  2. Environmental Program Description for the Tank Farm Contractor

    SciTech Connect (OSTI)

    POWELL, P.A.

    2000-04-20

    This Environmental Program Description has been developed in support of the Integrated Environmental, Safety, and Health Management System and consistent with the goals of DOE/RL-96-50, Hanford Strategic Plan. This Environmental Program Plan was developed in support of the Integrated Environment, Safety, and Health Management System Description for the Tank Farm Contractor (ISMS) (RPP-MP-003), which establishes a single, defined environmental, safety, and health management system that integrates requirements into the work planning and execution processes to protect workers, the public, and the environment. The ISMS also provides mechanisms for increasing worker involvement in work planning, including hazard and environmental impact identification, analysis, and control; work execution; and feedback/improvement processes. The ISMS plan consists of five core functions. Each section of this plan describes the activities (formerly known as the Tank Waste Remediation System) of the Tank Farm Contractor (TFC) environmental organization according to the following core functions: Establish Environmental Policy and Define Work Scope; Identify Hazards, Environmental Impacts, and Requirements; Analyze Hazards and Environmental Impacts and Implement Controls; Provide Feedback and Continuous Improvement; and Perform Work within Controls.

  3. Audit Report: DOE-OIG-16-06 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 Audit Report: DOE-OIG-16-06 February 5, 2016 Followup Audit of the Department of Energy's Management of Contractor Fines, Penalties, and Legal Costs Our September 2009 report on The Department of Energy's Management of Contractor Fines, Penalties, and Legal Costs (DOE/IG-0825) revealed the Department had reimbursed contractors for legal costs that were questionable because of their association with an underlying fine or penalty, permitted contractors to incur costs for outside counsel that

  4. Building America Expert Meeting Report. Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, Arlan

    2011-10-01

    This expert meeting was hosted by the IBACOS Building America research team to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting.

  5. Extension of DOE Directives

    Directives, Delegations, and Requirements [Office of Management (MA)]

    2005-03-18

    The following directives are extended until 3-18-06: DOE N 205.8, Cyber Security Requirements for Wireless Devices and Information Systems, dated 2-11-04; DOE N 205.9, Certification and Accreditation Process for Information Systems Including National Security Systems, dated 02-19-04; DOE N 205.10, Cyber Security Requirements for Risk Management, dated 02-19-04; DOE N 205.11, Security Requirements for Remote Access to DOE and Applicable Contractor Information Technology Systems, dated 2-19-04. DOE N 205.12, Clearing, Sanitizing, and Destroying Information System Storage Media, Memory Devices, and Other Related Hardware, dated 2-19-04.

  6. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transitioning Traditional HVAC Contractors to Whole House Performance Contractors Arlan Burdick IBACOS, Inc. October 2011 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or

  7. Term Assignments of Contractors to the Washington D.C. Area.

    Office of Energy Efficiency and Renewable Energy (EERE)

    On July 2, 2013 the DOE Office of the Inspector General issued Audit Report Number 0890 entitled, "Follow-up Audit on Term Assignments of Contractor Employees." The audit was conducted as a follow-up of the FY 2005 audit of "Management of Facility Contractors Assigned to the Washington D.C. area DOE/IG 0710." The earlier report found instances where assignment justifications were insufficient, costs appeared excessive and allowances inconsistent. The follow-up audit recognized improved management of assignments but noted assignment justifications and cost management could be improved. The report recommended DOE determine prior year actual costs to assist in calculating the estimated costs for the upcoming year of multi-year assignments and ensure assignment records in the Departmental Management and Tracking System (DMATS) are accurate.

  8. Office of River Protection Women-Owned Small Business Contractor...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of River Protection Women-Owned Small Business Contractor Receives One-Year Extension Office of River Protection Women-Owned Small Business Contractor Receives One-Year ...

  9. Two EM Contractors Are Among Fiscal Year 2015 Small Business...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Two EM Contractors Are Among Fiscal Year 2015 Small Business Award Winners Two EM Contractors Are Among Fiscal Year 2015 Small Business Award Winners June 15, 2016 - 12:05pm ...

  10. West Valley Demonstration Project Contractor Reaches 2 Million...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Demonstration Project Contractor Reaches 2 Million Safe Work Hours West Valley Demonstration Project Contractor Reaches 2 Million Safe Work Hours May 31, 2016 - 12:20pm Addthis A ...

  11. Programs and Contractors - Top Tips for Successful Relationships...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Programs and Contractors - Top Tips for Successful Relationships (101) Programs and Contractors - Top Tips for Successful Relationships (101) October 22, 2015 1:00PM to 2:30PM...

  12. Waste Isolation Pilot Plant Contractor Receives 86 Percent of...

    Office of Environmental Management (EM)

    Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee Waste Isolation Pilot Plant Contractor Receives 86 Percent of Available Fee April 27, 2016 - 12:20pm ...

  13. Home Performance Contractor Pro Forma | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Home Performance Contractor Pro Forma, with program HR, assumptions, marketing actuals and costs, and more, as posted on the U.S. Department of Energy's Better Buildings Neighborhood Program website. Home Performance Contractor Pro Forma (1.18 MB

  14. Local Contractors Face an Enviable Challenge | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Local Contractors Face an Enviable Challenge Local Contractors Face an Enviable Challenge A photo of a man and a woman looking at plans for a home. Clean Energy Works in Portland, ...

  15. DOE MENTOR-PROTÉGÉ

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    goal , 52% small business subcontracting goal, and statutory socio-economic goals 2 HISTORY OF DOE MENTOR-PROTÉGÉ PROGRAM June 9, 1995 The DOE Mentor Protégé Program Initiative was launched. The purpose of the initiative is to encourage DOE prime contractors to assist energy- related small disadvantaged, 8(a), and women-owned small businesses to enhance their businesses and technical capabilities to ensure full participation in the mission of DOE. December 1999 A permanent DOE Mentor

  16. PIA - Savannah River Site Management and Operating Contractor (HRMS) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) PIA - Savannah River Site Management and Operating Contractor (HRMS) (292.43 KB) More Documents & Publications PIA - Savannah River Nuclear Solutions (SRNS) Human Resource Management System (HRMS) Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory PIA -

  17. Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Pricing

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Neighborhood Program Workforce Peer Exchange Call: Contractor Pricing, call slides and discussion summary, September 27, 2012.

  18. Transactions, Technology and Contractor Human Relations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Services » Transactions, Technology and Contractor Human Relations Transactions, Technology and Contractor Human Relations Transactions, Technology and Contractor Human Relations Offices of the Deputy General Counsel for Transactions, Technology and Contractor Human Resources Office of the Assistant General Counsel for Procurement and Financial Assistance (GC-61) Office of the Assistant General Counsel for Technology Transfer and Intellectual Property (GC-62) Office of the Assistant

  19. Contractor Fee Payments - Idaho Operations Office | Department of Energy

    Office of Environmental Management (EM)

    Idaho Operations Office Contractor Fee Payments - Idaho Operations Office See the amount of fees earned on EM's major contracts for each evaluated fee period and the total contract to date at the Idaho Operations Office on these charts. Advanced Mixed Waste Treatment Project (34.47 KB) Idaho Cleanup Project (33.59 KB) More Documents & Publications Contractor Fee Payments - Richland Operations Office Contractor Fee Payments - Oak Ridge Operations Contractor Fee Payments - Savannah River

  20. DOE Selects Savannah River Remediation, LLC for Liquid Waste...

    Energy Savers

    Savannah River Remediation, LLC is a limited liability company consisting of URS Washington Division; Babcock & Wilcox Technical Services Group, Inc.; Bechtel National, Inc.; CH2M ...

  1. CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY CINCINNATI PARTNERS WITH CONTRACTORS FOR SUSTAINABILITY Approaching energy efficiency as a step to local economic transformation, the Greater Cincinnati Energy Alliance (GCEA) has worked to reduce energy consumption in the Greater Cincinnati, Ohio, and northern Kentucky regions by encouraging homeowners, commercial property owners, and nonprofit organizations to undertake

  2. Authorize_Changes_Contractor_Work_Force_Restructuring_Policy.pdf |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Authorize_Changes_Contractor_Work_Force_Restructuring_Policy.pdf Authorize_Changes_Contractor_Work_Force_Restructuring_Policy.pdf Authorize_Changes_Contractor_Work_Force_Restructuring_Policy.pdf (137.48 KB) More Documents & Publications Workforce Restructuring Policy Draft Policy and Planning Guidance for Community Transition Activities General Workforce Restructuring Plan Template

  3. Construction Contractor Checklist | Argonne National Laboratory

    U.S. Department of Energy (DOE) all webpages (Extended Search)

    Construction Contractor Checklist For small businesses seeking contracting opportunities with Argonne in the construction/demolition field, please be sure you have taken the following steps in advance of receiving a contract solicitation to ensure you are in a position to make a successful bid: Determine whether your company is a small business. Check the North American Industrial Classification System (NAICS) codes for your industry and the related size standard and gross revenue standards.

  4. DOE Form

    National Nuclear Security Administration (NNSA)

    /1991) PROJECT: U.S. Department of Energy Requirements Change Notice Baseline List of Required Compliance Documents CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO.: DE-AC05-000R22800, I.85 , Laws, Regulations, and DOE Directives (December 2000), DEAR 970.5204-2 No.: NNSA-50 Page 1 of 36 Pages LOCATION: Oak Ridge, Tennessee DATE OF CONTRACT: August 31 , 2000 This Requirements Change Notice (RCN) No. NNSA-50 incorporates, into Section J, Attachment E, Contract No.

  5. DOE Form

    National Nuclear Security Administration (NNSA)

    11991) PROJECT: U.S. Department of Energy Requirements Change Notice Baseline List of Required Compliance Documents CONTRACTOR: Babcock & Wilcox Technical Services Y-12, LLC CONTRACT NO. : DE-AC05-000R22800, 1.85, Laws, Regulations, and DOE Directives (December 2 000), DEAR 970.5204-2 COR-NP0-60 ESH-6.6.2013-515290 No.: NNSA-51 Page 1 of 34 Pages LOCATION : Oak Ridge, Tennessee DATE OF CONTRACT: August 31, 2000 This Requirements Change Notice (RCN) No. NNSA-51 incorporates, into Section J,

  6. Acquisition Guide, Chapters 42.15, Contractor Performance Information and 42.16 Reporting Other Contractor Information into Federal Awardee Performance and Integrity Information System (FAPIIS)

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapters have been updated to incorporate guidance from the Office of Federal Procurement Policy's (OFPP) March 6, 2013 memorandum Improving the Collection and Use of Information about Contractor Performance and Integrity. A summary of some the revisions for both chapters includes DOE's annual reporting performance targets, MAX site quarterly reporting by the DOE Agency Coordinator, the requirement for 100% reporting compliance at all levels from the local office through the Headquarters, describing monitoring methods integrity information for FAPIIS, and updating list of the available past performance and FAPIIS training opportunities.

  7. Building America Expert Meeting Report: Transitioning Traditional HVAC Contractors to Whole House Performance Contractors

    SciTech Connect (OSTI)

    Burdick, A.

    2011-10-01

    This report outlines findings resulting from a U.S. Department of Energy Building America expert meeting to determine how HVAC companies can transition from a traditional contractor status to a service provider for whole house energy upgrade contracting. IBACOS has embarked upon a research effort under the Building America Program to understand business impacts and change management strategies for HVAC companies. HVAC companies can implement these strategies in order to quickly transition from a 'traditional' heating and cooling contractor to a service provider for whole house energy upgrade contracting. Due to HVAC service contracts, which allow repeat interaction with homeowners, HVAC companies are ideally positioned in the marketplace to resolve homeowner comfort issues through whole house energy upgrades. There are essentially two primary ways to define the routes of transition for an HVAC contractor taking on whole house performance contracting: (1) Sub-contracting out the shell repair/upgrade work; and (2) Integrating the shell repair/upgrade work into their existing business. IBACOS held an Expert Meeting on the topic of Transitioning Traditional HVAC Contractors to Whole House Performance Contractors on March 29, 2011 in San Francisco, CA. The major objectives of the meeting were to: Review and validate the general business models for traditional HVAC companies and whole house energy upgrade companies Review preliminary findings on the differences between the structure of traditional HVAC Companies and whole house energy upgrade companies Seek industry input on how to structure information so it is relevant and useful for traditional HVAC contractors who are transitioning to becoming whole house energy upgrade contractors Seven industry experts identified by IBACOS participated in the session along with one representative from the National Renewable Energy Laboratory (NREL). The objective of the meeting was to validate the general operational profile of an

  8. Recent DOE Directives Changes

    Energy.gov [DOE]

    On September 1, 2009, the Department of Energy (DOE) manuals were revised and issued to correspond with the following recent Contractor Requirements Documents (CRDs) changes to the following Directives: DOE M 205.1-8 Administrative Change 1—Cyber Security Incident Management Manual; DOE M 205.1-7 Administrative Change 1—Security Controls for Unclassified Information Systems Manual; DOE M 205.1-6 Administrative Change 1—Media Sanitization Manual; DOE M 205.1-5 Administrative Change 1—Cyber Security Process Requirements Manual

  9. DOE-STD-3006-2010

    Energy.gov [DOE]

    Planning and Conducting Readiness Reviews Superseding DOE-STD-3006-2000 (June 2000) This Standard provides standardized methods and approaches for planning and conducting RRs. This Standard also provides guidance for preparation of exemption requests in accordance with DOE O 251.1C. DOE O 425.1D requirements for RRs apply both to responsible contractors and to DOE

  10. DOE O 442.2 Differing Professional Opinions for Technical Issues Involving Environment, Safety and Health DOE O 470.4B Safeguards and Security Program DOE O 472.2 Personnel Security

    Energy.gov [DOE]

    The Department issued Contractor Requirements Documents (CRDs) for the subject Directives as follows: DOE O 442.2 (July 29, 2011), DOE O 470.4B (July 21, 2011) and DOE O 472.2 (July 27, 2011).

  11. Better Buildings Neighborhood Program Business Models Guide: HVAC Contractor Business Model Conclusion

    Energy.gov [DOE]

    Better Buildings Neighborhood Program Business Models Guide: HVAC Contractor Business Model Conclusion, Summary of HVAC Contractor Insights.

  12. Better Buildings Neighborhood Program Business Models Guide: Contractor/Retailer Business Models

    Energy.gov [DOE]

    Business models information focused on remodelers, HVAC (heating, ventilation, and air conditioning) contractors, home performance contractors, or retailers.

  13. Court denies review of contractor/utility feud: contractors fear denial sets precedent

    SciTech Connect (OSTI)

    Poplett, J.

    1986-02-03

    On Jan. 27, the US Supreme Court refused to review a recent federal circuit court decision allowing a California public utility to enter into energy-related contractor activities; this may set a precedent for future related cases, according to an attorney for the contractor plaintiffs. The Supreme Court's refusal lets stand the 9th Federal Circuit Court of Appeals decision on Grason Electric Co. et al. vs. the Sacramento Municipal Utility District (SMUD). That decision allows SMUD - a public utility - to engage in energy-related businesses such as the installation of energy management systems and lighting retrofits, according to the attorney. The plaintiffs in the case, 13 electrical contractors in the Sacramento area, originally brought the case against SMUD on antitrust grounds because, they alleged, the utility was encroaching upon their businesses.

  14. Proceedings of the advanced research and technology development direct utilization, instrumentation and diagnostics contractors' review meeting

    SciTech Connect (OSTI)

    Geiling, D.W. ); Goldberg, P.M. )

    1990-01-01

    The 1990 Advanced Research and Technology Development (AR TD) Direct Utilization, and Instrumentation and Diagnostics Contractors Review Meeting was held September 16--18, 1990, at the Hyatt at Chatham Center in Pittsburgh, PA. The meeting was sponsored by the US Department of Energy (DOE), Office of Fossil Energy, and the Pittsburgh and Morgantown Energy Technology Centers. Each year the meeting provides a forum for the exchange of information among the DOE AR TD contractors and interested parties. This year's meeting was hosted by the Pittsburgh Energy Technology Center and was attended by 120 individuals from industry, academia, national laboratories, and other governmental agencies. Papers were presented on research addressing coal surface, science, devolatilization and combustion, ash behavior, emission controls for gases particulates, fluid bed combustion and utilization in diesels and turbines. Individual reports are processed separately for the data bases.

  15. DOE-STD-3020-97 | Department of Energy

    Energy.gov (indexed) [DOE]

    Supersedes DOE NE F3-45 (January 1987) | Replaced by DOE-STD-3020-2005 This standard ... The standard specifies minimum requirements to be included in contractor specifications. ...

  16. Post-Closure Benefits: DOE Complex vs Closure Sites | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Post-Closure Benefits Post-Closure Benefits: DOE Complex vs Closure Sites Post-Closure Benefits: DOE Complex vs Closure Sites Status of Contractor Pension and PRB Benefit ...

  17. NEW - DOE G 580.1-1A, Personal Property

    Directives, Delegations, and Requirements [Office of Management (MA)]

    This Guide provides non-regulatory guidance and information to assist DOE organizations and contractors in implementing the DOE-wide and site-specific personal property management programs.

  18. DOE/EH-0433 Part I: Program Elements (Revised 2012)

    Energy.gov (indexed) [DOE]

    and its contractors have enjoyed these same benefits. DOE-VPP participants enter into a new relationship of trust with DOE, in which health and safety problems can be approached...

  19. http://www.hss.doe.gov/CSA/analysis/do/

    National Nuclear Security Administration (NNSA)

    Any DOE or DOE contractor employee who already has acce and Processing System (ORPS) will automatically be able to access the Daily ORPS Reports and password, both via this web ...

  20. DOE F 3230.6A | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE F 3230.6A Form is used to track individual compensation for contractors. REPORT OF COMPENSATION PART I - INDIVIDUAL COMPENSATION (6.42 KB) More Documents & Publications DOE F ...