National Library of Energy BETA

Sample records for area reliability coordination

  1. 100 Area electrical distribution fault and coordination report

    SciTech Connect

    Webber, J.J.

    1994-09-23

    This report documents three-phase and line-to-ground fault values and time overcurrent coordination curves for the electrical utility distribution system located in the 100 Areas. Activities that may improve the coordination of the distribution system have also been identified. An evaluation of system coordination was performed. The results of this evaluation are listed in Appendix B. There are protective devices within the 100 Area distribution system that do not coordinate with one another throughout the Areas. There is also a mis-application of reclosing relays at the 100B Area. The impact of the mis-coordination and incorrect application of reclosing relays is that system selectivity is reduced. Equipment will still be protected against damaging currents, however more equipment will be de-energized than necessary during fault conditions. It is the opinion of the author of this report that the cases of mis-coordination listed above, and in Appendix B, do not significantly degrade the system protection system nor the reliability of the 100 Area distribution system. Therefore, immediate response to correct these problems is not recommended. However, a planned methodology, outlined in an Activity Plan, to correct these problems should be developed and implemented in the near future.

  2. Puget Sound area electric reliability plan. Draft environmental impact statement

    SciTech Connect

    Not Available

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  3. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  4. Puget Sound Area Electric Reliability Plan : Final Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, and during certain conditions, there is more demand for power in the Puget Sound area than the transmission system and existing generation can reliably supply. This high demand, called peak demand occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both.

  5. EIS-0160: Puget Sound Area Electric Reliability Plan

    Office of Energy Efficiency and Renewable Energy (EERE)

    The U.S. Department of Energy’s Bonneville Power Administration prepared this statement to assess the environmental and socioeconomic implications of potential solutions to address a power system problem in the Puget Sound area of Washington State.

  6. Area of Interest 1. Interregional Electricity Reliability Issue and Assessment Analysis

    SciTech Connect

    Eto, Joseph H.

    2015-07-01

    In 2010, the U.S. Department of Energy (DOE) tasked Lawrence Berkeley National Laboratory (LBNL) and the Pacific Northwest National Laboratory (PNNL), in separate contracts, to provide coordinated technical support to the electricity industry for two national electricity reliability initiatives. The first initiative focused on improving the frequency response of each of the three North American interconnections. The second initiative focused on improving industry understanding of the causes and consequences of fault-induced delayed voltage recovery, which has been observed in all three interconnections. Both initiatives were conducted in close coordination with the North American Electric Reliability Corporation (NERC) and the Western Electric Coordination Council (WECC) and involved the participation of leading utilities from across the United States. This is the final report on LBNL’s activities. It consists of summaries of each activity, including references to published documents that were prepared through the course of the project. (Activities under taken by PNNL are reported on in a separate report.)

  7. Balancing Area Coordination: Efficiently Integrating Renewable Energy Into the Grid, Greening the Grid

    SciTech Connect

    Katz, Jessica; Denholm, Paul; Cochran, Jaquelin

    2015-06-01

    Greening the Grid provides technical assistance to energy system planners, regulators, and grid operators to overcome challenges associated with integrating variable renewable energy into the grid. Coordinating balancing area operation can promote more cost and resource efficient integration of variable renewable energy, such as wind and solar, into power systems. This efficiency is achieved by sharing or coordinating balancing resources and operating reserves across larger geographic boundaries.

  8. Puget Sound Area Electric Reliability Plan. Appendix B : Local Generation Evaluation : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    The information and data contained in this Appendix was extracted from numerous sources. The principle sources used for technical data were Bonneville Power Administration's 1990 Resource Program along with its technical appendix, and Chapter 8 of the Draft 1991 Northwest Conservation and Electric Power Plan. All cost data is reported 1988 dollars unless otherwise noted. This information was supplemented by other data developed by Puget Sound utilities who participated on the Local Generation Team. Identifying generating resources available to the Puget Sound area involved a five step process: (1) listing all possible resources that might contribute power to the Puget Sound area, (2) characterizing the technology/resource status, cost and operating characteristics of these resources, (3) identifying exclusion criteria based on the needs of the overall Puget Sound Electric Reliability Plan study, (4) applying these criteria to the list of resources, and (5) summarizing of the costs and characteristics of the final list of resources. 15 refs., 20 tabs.

  9. Reliability of emerging bonded interface materials for large-area attachments

    DOE PAGES [OSTI]

    Paret, Paul P.; DeVoto, Douglas J.; Narumanchi, Sreekant

    2015-12-30

    In this study, conventional thermal interface materials (TIMs), such as greases, gels, and phase change materials, pose bottlenecks to heat removal and have long caused reliability issues in automotive power electronics packages. Bonded interface materials (BIMs) with superior thermal performance have the potential to be a replacement to the conventional TIMs. However, due to coefficient of thermal expansion mismatches between different components in a package and resultant thermomechanical stresses, fractures or delamination could occur, causing serious reliability concerns. These defects manifest themselves in increased thermal resistance in the package. In this paper, the results of reliability evaluation of emerging BIMsmore » for large-area attachments in power electronics packaging are reported. Thermoplastic (polyamide) adhesive with embedded near-vertical-aligned carbon fibers, sintered silver, and conventional lead solder (Sn63Pb37) materials were bonded between 50.8 mm x 50.8 mm cross-sectional footprint silicon nitride substrates and copper base plate samples, and were subjected to accelerated thermal cycling until failure or 2500 cycles. Damage in the BIMs was monitored every 100 cycles by scanning acoustic microscopy. Thermoplastic with embedded carbon fibers performed the best with no defects, whereas sintered silver and lead solder failed at 2300 and 1400 thermal cycles, respectively. Besides thermal cycling, additional lead solder samples were subjected to thermal shock and thermal cycling with extended dwell periods. A finite element method (FEM)-based model was developed to simulate the behavior of lead solder under thermomechanical loading. Strain energy density per cycle results were calculated from the FEM simulations. A predictive lifetime model was formulated for lead solder by correlating strain energy density results extracted from modeling with cycles-to-failure obtained from experimental accelerated tests. A power-law-based approach was

  10. Reliability of emerging bonded interface materials for large-area attachments

    SciTech Connect

    Paret, Paul P.; DeVoto, Douglas J.; Narumanchi, Sreekant

    2015-12-30

    In this study, conventional thermal interface materials (TIMs), such as greases, gels, and phase change materials, pose bottlenecks to heat removal and have long caused reliability issues in automotive power electronics packages. Bonded interface materials (BIMs) with superior thermal performance have the potential to be a replacement to the conventional TIMs. However, due to coefficient of thermal expansion mismatches between different components in a package and resultant thermomechanical stresses, fractures or delamination could occur, causing serious reliability concerns. These defects manifest themselves in increased thermal resistance in the package. In this paper, the results of reliability evaluation of emerging BIMs for large-area attachments in power electronics packaging are reported. Thermoplastic (polyamide) adhesive with embedded near-vertical-aligned carbon fibers, sintered silver, and conventional lead solder (Sn63Pb37) materials were bonded between 50.8 mm x 50.8 mm cross-sectional footprint silicon nitride substrates and copper base plate samples, and were subjected to accelerated thermal cycling until failure or 2500 cycles. Damage in the BIMs was monitored every 100 cycles by scanning acoustic microscopy. Thermoplastic with embedded carbon fibers performed the best with no defects, whereas sintered silver and lead solder failed at 2300 and 1400 thermal cycles, respectively. Besides thermal cycling, additional lead solder samples were subjected to thermal shock and thermal cycling with extended dwell periods. A finite element method (FEM)-based model was developed to simulate the behavior of lead solder under thermomechanical loading. Strain energy density per cycle results were calculated from the FEM simulations. A predictive lifetime model was formulated for lead solder by correlating strain energy density results extracted from modeling with cycles-to-failure obtained from experimental accelerated tests. A power

  11. ,"Table 2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area,"

    Energy Information Administration (EIA) (indexed site)

    2. Noncoincident Peak Load, by North American Electric Reliability Corporation Assessment Area," ,"1990-2010 Actual, 2011-2015 Projected" ,"(Megawatts)" ,"Interconnection","NERC Regional Assesment Area","Summer" ,,,"Actual",,,,,,,,,,,,,,,,,,,,,"Projected"

  12. Puget Sound Area Electric Reliability Plan : Appendix E, Transmission Reinforcement Analysis.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    The purpose of this appendix to the draft environmental impact statement (EIS) report is to provide an update of the latest study work done on transmission system options for the Puget Sound Area Electric Reliability Plan. Also included in the attachments to the EIS are 2 reports analyzing the voltage stability of the Puget Sound transmission system and a review by Power Technologies, Inc. of the BPA voltage stability analysis and reactive options. Five transmission line options and several reactive options are presently being considered as possible solutions to the PSAFRP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. Plans were designed to provide at least 500 MVAR reactive margin.

  13. Puget Sound Area Electric Reliability Plan : Scoping Summary Report - Part B Preliminary Technical Analysis Appendix A.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    This report describes in general terms the nature of the voltage instability problem facing the Puget Sound area. The following two chapters cover the technical aspects of the problem. It deals with load growth, the root cause of the problem. Also addressed is the capacity of the current power system and the criteria for future system planning. It also explains the technical results of transmission system modeling which confirm the system's vulnerability to voltage instability, the principal symptom of the problem. The results of the scoping process in each of the four measure categories are presented. Included are lists of all options identified, a discussion of the screening criteria, and descriptions of the measures that survived the screening process and are proposed for further evaluation in Phase 2. We discuss the evaluation methodology which will be used to refine the analyses. The next steps in the planning process are outlined. It also describes the short term operational agreements that will assure continued reliable service until a long term solution is in place. 8 figs., 22 tabs.

  14. Washington DC Reliability Requirements and the Need to Operate Mirant’s Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005)

    Energy.gov [DOE]

    Pursuant to Docket No. EO-05-01: Oak Ridge National Laboratory provided an analysis of the Mirant Potomac River Generation Station in 2005 and discussed the reliability requirements of the local...

  15. Puget Sound Area Electric Reliability Plan. Appendix E: Transmission Reinforcement Analysis : Draft Environmental Impact Statement.

    SciTech Connect

    United States. Bonneville Power Administration.

    1991-09-01

    Five transmission line options and several reactive (voltage support) options are presently being considered as possible solutions to the PSAERP by the Transmission Team. The first two line options would be built on new rights-of way adjacent (as much as possible) to existing corridors. The reactive options would optimize the existing transmission system capability by adding new stations for series capacitors and/or switchgear. The other three line options are rebuilds or upgrades of existing cross mountain transmission lines. These options are listed below and include a preliminary assessment of the additional transmission system reinforcement required to integrate the new facilities into the existing transmission system. These options were derived from earlier study work that was summarized in Puget Sound Reinforcement Transmission Options'' and New Cross Mountain Transmission Line Alternative: The Crosstie'', which are attached. The initial Transmission Options study report recognized the value to system performance of adding an entirely new circuit rather than rebuilding an existing one. However, siting realities require that rebuild options be considered. Typically, the most attractive rebuild options would be the lowest capacity (lowest voltage) circuits. But because of corridor location, length and terminal proximity, the rebuild options listed below appear to be the most promising. Schematic diagrams and QV Curves of each option are also attached. It should be noted that Snoqualmie and Echo Lake refer to the same station east of Puget Sound and Naneum and Kittitas refer to the same station in the Ellensburg area. 100 figs., 20 tabs.

  16. Breckinridge Project, initial effort. Report XI, Volume III. Critical design areas. [Identification of critical design areas; design or materials problems, trade-off areas, items affecting operability and reliability

    SciTech Connect

    1982-01-01

    Several meetings have been held with representatives from Ashland Synthetic Fuels, Inc.; Airco Energy Company, Inc.; Bechtel Group, Inc.; and HRI Engineering, Inc. to identify critical design areas in the Phase Zero work. (Critical design areas are defined as those requiring additional data or further work to finalize design or material selection, to optimize the trade-off between capital investment and operating cost, or to enhance system operability and reliability.) The critical design areas so identified are summarized by plant in this volume of Report XI. Items of a proprietary nature have been omitted from this report, but are included in the limited access version.

  17. ,"Table 3A.1. January Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area,"

    Energy Information Administration (EIA) (indexed site)

    A.1. January Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area," ,"1996-2010 Actual, 2011-2012 Projected" ,"(Megawatts)" ,"January","NERC Regional Assesment Area" ,,,"Actual",,,,,,,,,,,,,,,"Projected" ,,,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,"2011E","2012E" ,"Eastern

  18. Reliable solution processed planar perovskite hybrid solar cells with large-area uniformity by chloroform soaking and spin rinsing induced surface precipitation

    SciTech Connect

    Chern, Yann-Cherng; Wu, Hung-Ruei; Chen, Yen-Chu; Horng, Sheng-Fu; Zan, Hsiao-Wen; Meng, Hsin-Fei

    2015-08-15

    A solvent soaking and rinsing method, in which the solvent was allowed to soak all over the surface followed by a spinning for solvent draining, was found to produce perovskite layers with high uniformity on a centimeter scale and with much improved reliability. Besides the enhanced crystallinity and surface morphology due to the rinsing induced surface precipitation that constrains the grain growth underneath in the precursor films, large-area uniformity with film thickness determined exclusively by the rotational speed of rinsing spinning for solvent draining was observed. With chloroform as rinsing solvent, highly uniform and mirror-like perovskite layers of area as large as 8 cm × 8 cm were produced and highly uniform planar perovskite solar cells with power conversion efficiency of 10.6 ± 0.2% as well as much prolonged lifetime were obtained. The high uniformity and reliability observed with this solvent soaking and rinsing method were ascribed to the low viscosity of chloroform as well as its feasibility of mixing with the solvent used in the precursor solution. Moreover, since the surface precipitation forms before the solvent draining, this solvent soaking and rinsing method may be adapted to spinless process and be compatible with large-area and continuous production. With the large-area uniformity and reliability for the resultant perovskite layers, this chloroform soaking and rinsing approach may thus be promising for the mass production and commercialization of large-area perovskite solar cells.

  19. Reliability Engineering

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    LA-UR 15-27450 This document is approved for public release; further dissemination unlimited Reliability Engineering Reliability Engineering Current practice in reliability is ...

  20. ,"Table 3B.1. FRCC Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area,"

    Energy Information Administration (EIA) (indexed site)

    B.1. FRCC Monthly Peak Hour Demand, by North American Electric Reliability Corporation Assesment Area," ,"1996-2010 Actual, 2011-2012 Projected" ,"(Megawatts)" ,"FRCC","Year","January","February","March","April","May","June","July","August","September","October","November","December"

  1. ,"Table 1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Assessment Area,"

    Energy Information Administration (EIA) (indexed site)

    1. Net Energy For Load, Actual and Projected by North American Electric Reliability Corporation Assessment Area," ,"1990-2010 Actual, 2011-2015 Projected" ,"(Thousands of Megawatthours)" ,"Interconnection","NERC Regional Assesment Area" ,,,1990,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,"2011E","2012E","2013E","2014E","2015E" ,"Eastern

  2. Reliable Power Inc | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Reliable Power Inc Place: Arlington, Virginia Zip: VA 22201 Product: US-based fuel cell manufacturer. Coordinates: 43.337585, -89.379449 Show Map Loading map......

  3. Coordinating the competitors

    SciTech Connect

    Paynter, T. )

    1990-11-01

    Independent power production would provide an opportunity for investors who wished to take risks: they would be free to reap great profits if their IPP were exceptionally low-cost; but they would also risk bankruptcy if their IPP proved uncompetitive. However, independent power producers cannot operate independently. On the contrary, their operations must be continuously coordinated with each other and with utility-owned generators, in order to provide reliable power at least cost. To make IPPs a viable alternative to utility-owned generation, the apparently inconsistent requirements of independent ownership and coordinated operation must be reconciled. 1 tab.

  4. Interagency Coordination

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Interagency Coordination Image showing the cover of the Interagency brochure. Links to interagency pdf. The multi-faceted issues associated with naturally occurring methane hydrates demand a coordinated approach to studying (1) the potential of this resource as a U.S. fossil energy source, and (2) the possible hazards of tapping the resource. The National Methane Hydrates R&D Act of 2000 requires the development of a national methane hydrate R&D program that utilizes the talents of

  5. Hawaii electric system reliability.

    SciTech Connect

    Silva Monroy, Cesar Augusto; Loose, Verne William

    2012-09-01

    This report addresses Hawaii electric system reliability issues; greater emphasis is placed on short-term reliability but resource adequacy is reviewed in reference to electric consumers' views of reliability %E2%80%9Cworth%E2%80%9D and the reserve capacity required to deliver that value. The report begins with a description of the Hawaii electric system to the extent permitted by publicly available data. Electrical engineering literature in the area of electric reliability is researched and briefly reviewed. North American Electric Reliability Corporation standards and measures for generation and transmission are reviewed and identified as to their appropriateness for various portions of the electric grid and for application in Hawaii. Analysis of frequency data supplied by the State of Hawaii Public Utilities Commission is presented together with comparison and contrast of performance of each of the systems for two years, 2010 and 2011. Literature tracing the development of reliability economics is reviewed and referenced. A method is explained for integrating system cost with outage cost to determine the optimal resource adequacy given customers' views of the value contributed by reliable electric supply. The report concludes with findings and recommendations for reliability in the State of Hawaii.

  6. Transmission Reliability Program 2015 Reliability & Markets Peer...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program 2015 Reliability & Markets Peer Review Materials Available Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available September 16, 2015 -...

  7. Case Study - Western Electricity Coordinating Council

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Smart Grid Strategy for Assuring Reliability of the Western Grid The Western Electricity Coordinating Council (WECC) is the Regional Entity responsible for coordinating and promoting bulk electric system reliability in the Western Interconnection. WECC and its members manage the operation and planning of the vast interconnected transmission system connecting generators and loads across almost 1.8 million square miles of territory. The Western Interconnection Synchrophasor Program (WISP), led by

  8. Reliability and Markets Program Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reliability and Markets Program Information Reliability and Markets Program Information Summary of the Tranmission Reliability program's Reliability and Markets activity area. The program helps to increase grid reliability and reduce costs for customers using integrated market and engineering tools. Reliability and Markets Program Factsheet.pdf (2.86 MB) More Documents & Publications 2014 Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review 2012 Reliability &

  9. 2010 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission Reliability Program Peer Review 2010 Transmission Reliability Program Peer Review The Transmission Reliability research area focuses on two key areas: 1) Real-Time Grid Reliability Management and 2) Reliability and Markets. The first area develops monitoring and analysis tools that process synchrophasor data to enable real-time assessment of grid status and stability margins, with the goal of improving power system reliability and visibility through wide-area measurement and

  10. North American Electric Reliability Corporation (NERC): Reliability

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Considerations from the Integration of Smart Grid | Department of Energy (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid North American Electric Reliability Corporation (NERC): Reliability Considerations from the Integration of Smart Grid. NERC develops and enforces Reliability Standards; assesses adequacy annually via a ten-year forcast and winter and

  11. Proposed changes to generating capacity 1980-1989 for the contiguous United States: as projected by the Regional Electric Reliability Councils in their April 1, 1980 long-range coordinated planning reports to the Department of Energy

    SciTech Connect

    1980-12-01

    The changes in generating capacity projected for 1980 to 1989 are summarized. Tabulated data provide summaries to the information on projected generating unit construction, retirements, and changes, in several different categories and groupings. The new generating units to be completed by the end of 1989 total 699, representing 259,490 megawatts. This total includes 10 wind power and one fuel cell installations totaling 48.5 MW to be completed by the end of 1989. There are 321 units totaling 13,222 MW to be retired. There are capacity changes due to upratings and deratings. Summary data are presented for: total requirement for electric energy generation for 1985; hydroelectric energy production for 1985; nuclear energy production for 1985; geothermal and other energy production for 1985; approximate non-fossil generation for 1985; range of fossil energy requirements for 1985; actual fossil energy sources 1974 to 1979; estimated range of fossil fuel requirements for 1985; coal capacity available in 1985; and computation of fuel use in 1985. Power plant capacity factors are presented. Extensive data on proposed generating capacity changes by individual units in the 9 Regional Electric Reliability Councils are presented.

  12. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report The following information represents a partial sequence of events based upon Reliability Coordinator information available to NERC. It is not clear if these events caused the event or were a consequence of other events. NERC is establishing teams to study the event and will coordinate with FERC, DOE, the industry and

  13. Washington DC Reliability Requirements and the Need to Operate...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Washington DC Reliability Requirements and the Need to Operate Mirant's Potomac River Generation Station to Support Local Area Reliability (Oak Ridge National Laboratory 2005) ...

  14. Sandia Energy - Inverter Reliability Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Inverter Reliability Program Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Systems Reliability Inverter Reliability Program Inverter Reliability...

  15. Load Control System Reliability

    SciTech Connect

    Trudnowski, Daniel

    2015-04-03

    This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

  16. Joint Coordinating Committee | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Joint Coordinating Committee

  17. Research Areas

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Areas Our Vision National User Facilities Research Areas In Focus Global Solutions ⇒ Navigate Section Our Vision National User Facilities Research Areas In Focus Global Solutions Biosciences The Biosciences Area forges multidisciplinary teams to solve national challenges in energy, environment and health issues; and to advance the engineering of biological systems for sustainable manufacturing. Biosciences Area research is coordinated through three divisions and is enabled by Berkeley

  18. Career Map: Instrumentation Coordinator

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Wind Program's Career Map provides job description information for Instrumentation Coordinator positions.

  19. Human Reliability Program Overview

    SciTech Connect

    Bodin, Michael

    2012-09-25

    This presentation covers the high points of the Human Reliability Program, including certification/decertification, critical positions, due process, organizational structure, program components, personnel security, an overview of the US DOE reliability program, retirees and academia, and security program integration.

  20. Power electronics reliability analysis.

    SciTech Connect

    Smith, Mark A.; Atcitty, Stanley

    2009-12-01

    This report provides the DOE and industry with a general process for analyzing power electronics reliability. The analysis can help with understanding the main causes of failures, downtime, and cost and how to reduce them. One approach is to collect field maintenance data and use it directly to calculate reliability metrics related to each cause. Another approach is to model the functional structure of the equipment using a fault tree to derive system reliability from component reliability. Analysis of a fictitious device demonstrates the latter process. Optimization can use the resulting baseline model to decide how to improve reliability and/or lower costs. It is recommended that both electric utilities and equipment manufacturers make provisions to collect and share data in order to lay the groundwork for improving reliability into the future. Reliability analysis helps guide reliability improvements in hardware and software technology including condition monitoring and prognostics and health management.

  1. NREL: Performance and Reliability R&D - Photovoltaic Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Photovoltaic Reliability Publications Sign up for NREL PV Reliability and Performance updates today NREL publishes photovoltaic (PV) reliability journal articles, technical ...

  2. Lifetime and Reliability

    SciTech Connect

    2013-08-01

    Solid-state lighting program technology fact sheet that discusses failure, lifetime, and reliability as they relate to LED-based products.

  3. Medical Aspects of Reliability

    SciTech Connect

    Atencio, Julian J.

    2014-05-05

    This presentation covers the medical evaluation as part of a human reliability program, particularly the various medical qualifications and potential disqualifiers.

  4. Reliability Question Comment

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability-Question-Comment Sign In About | Careers | Contact | Investors | bpa.gov Search News & Us Expand News & Us Projects & Initiatives Expand Projects & Initiatives...

  5. Lifetime and Reliability

    Energy.gov [DOE]

    A DOE Solid-State Lighting Program technology fact sheet on lifetime, reliability, and failure as related to LED-based products.

  6. Russian Health Studies Program - Joint Coordinating Committee for Radiation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Effects Research (JCCRER) | Department of Energy Joint Coordinating Committee for Radiation Effects Research (JCCRER) Russian Health Studies Program - Joint Coordinating Committee for Radiation Effects Research (JCCRER) Joint Coordinating Committee for Radiation Effects Research (JCCRER) All About the Joint Coordinating Committee for Radiation Effects Research What is the JCCRER? Why is it important? DOE's Russian Health Studies Program Principal Areas of Cooperation Under the JCCRER

  7. Reliability and Safety

    Energy.gov [DOE]

    DOE solar reliability and safety research and development (R&D) focuses on testing photovoltaic (PV) modules, inverters, and systems for long-term performance, and helping investors, consumers,...

  8. Geographic coordinates | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Property:BoundingCoordinatesSW C Property:Coordinates F Property:FirstWellCoordinates G Property:GBIGCalculatedCenter G cont. Property:GBIGSelectedCenter H Property:HPBD...

  9. Joint transmission system projects to improve system reliability

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    County PUD, 425-783-8444 Joint transmission system projects to improve system reliability First major regional electric grid improvements in decades prepare the area for the...

  10. Washington: Integrated Transportation Programs & Coordinated...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Integrated Transportation Programs & Coordinated Regional Planning Washington: Integrated Transportation Programs & Coordinated Regional Planning November 6, 2013 - 5:42pm Addthis ...

  11. Photovoltaic module reliability workshop

    SciTech Connect

    Mrig, L.

    1990-01-01

    The paper and presentations compiled in this volume form the Proceedings of the fourth in a series of Workshops sponsored by Solar Energy Research Institute (SERI/DOE) under the general theme of photovoltaic module reliability during the period 1986--1990. The reliability Photo Voltaic (PV) modules/systems is exceedingly important along with the initial cost and efficiency of modules if the PV technology has to make a major impact in the power generation market, and for it to compete with the conventional electricity producing technologies. The reliability of photovoltaic modules has progressed significantly in the last few years as evidenced by warranties available on commercial modules of as long as 12 years. However, there is still need for substantial research and testing required to improve module field reliability to levels of 30 years or more. Several small groups of researchers are involved in this research, development, and monitoring activity around the world. In the US, PV manufacturers, DOE laboratories, electric utilities and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in this field were brought together under SERI/DOE sponsorship to exchange the technical knowledge and field experience as related to current information in this important field. The papers presented here reflect this effort.

  12. National Wind Coordinating Collaborative (NWCC) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Coordinating Collaborative (NWCC) Jump to: navigation, search Logo: National Wind Coordinating Collaborative (NWCC) Name: National Wind Coordinating Collaborative (NWCC) Address:...

  13. NREL: Performance and Reliability R&D - PV Module Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PV Module Reliability Workshop NREL hosts an annual Photovoltaic Module Reliability Workshop (PVMRW) so that solar technology experts can share information leading to the ...

  14. Sandia Energy - PV Systems Reliability

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Systems Reliability Home Stationary Power Energy Conversion Efficiency Solar Energy Photovoltaics PV Systems Reliability PV Systems ReliabilityCoryne Tasca2015-05-08T03:40:54+00:00...

  15. Gearbox Reliability Collaborative Update (Presentation)

    SciTech Connect

    Sheng, S.

    2013-10-01

    This presentation was given at the Sandia Reliability Workshop in August 2013 and provides information on current statistics, a status update, next steps, and other reliability research and development activities related to the Gearbox Reliability Collaborative.

  16. wind-turbine fleet reliability

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    wind-turbine fleet reliability - Sandia Energy Energy Search Icon Sandia Home Locations ... SunShot Grand Challenge: Regional Test Centers wind-turbine fleet reliability Home...

  17. Electricity Delivery and Energy Reliability

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Delivery and Energy Reliability The Office of Electricity Delivery and Energy Reliability ... to energy supply disruptions, such as electricity and fuel outages. * Smart Grid (14.4 ...

  18. Environmental Compliance Issue Coordination

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1993-01-07

    To establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance. Cancels DOE O 5400.2. Para. 5a(2) and 5a(7) canceled by DOE O 231.1.

  19. Block coordination copolymers

    DOEpatents

    Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

    2014-11-11

    The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

  20. Block coordination copolymers

    DOEpatents

    Koh, Kyoung Moo; Wong-Foy, Antek G; Matzger, Adam J; Benin, Annabelle I; Willis, Richard R

    2012-11-13

    The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

  1. Block coordination copolymers

    DOEpatents

    Koh, Kyoung Moo; Wong-Foy, Antek G.; Matzger, Adam J.; Benin, Annabelle I.; Willis, Richard R.

    2012-12-04

    The present invention provides compositions of crystalline coordination copolymers wherein multiple organic molecules are assembled to produce porous framework materials with layered or core-shell structures. These materials are synthesized by sequential growth techniques such as the seed growth technique. In addition, the invention provides a simple procedure for controlling functionality.

  2. Canby Geothermal Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Area Overview Geothermal Area Profile Location: California Exploration Region: Transition Zone GEA Development Phase: Coordinates: 41.438, -120.8676 Resource Estimate...

  3. East Brawley Geothermal Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Area Overview Geothermal Area Profile Location: California Exploration Region: Gulf of California Rift Zone GEA Development Phase: Coordinates: 32.99, -115.35 Resource...

  4. Human Reliability Program Workshop

    SciTech Connect

    Landers, John; Rogers, Erin; Gerke, Gretchen

    2014-05-18

    A Human Reliability Program (HRP) is designed to protect national security as well as worker and public safety by continuously evaluating the reliability of those who have access to sensitive materials, facilities, and programs. Some elements of a site HRP include systematic (1) supervisory reviews, (2) medical and psychological assessments, (3) management evaluations, (4) personnel security reviews, and (4) training of HRP staff and critical positions. Over the years of implementing an HRP, the Department of Energy (DOE) has faced various challenges and overcome obstacles. During this 4-day activity, participants will examine programs that mitigate threats to nuclear security and the insider threat to include HRP, Nuclear Security Culture (NSC) Enhancement, and Employee Assistance Programs. The focus will be to develop an understanding of the need for a systematic HRP and to discuss challenges and best practices associated with mitigating the insider threat.

  5. Reliability of Electrical Interconnects (Presentation)

    SciTech Connect

    Devoto, D.

    2014-06-01

    This presentation discusses the status of NREL's research on the reliability of electrical interconnects.

  6. Reliability centered maintenance for substation equipment

    SciTech Connect

    1996-08-01

    This paper is a collection of training materials on the principles and implementation of reliability centered maintenance. The main areas discussed in this presentation are organized as follows: RCM principles and concepts; RCM tools, resources and methods; overview of the RCM process; example RCM application; living PM program; RCM implementation experience.

  7. Distributed sensor coordination for advanced energy systems

    SciTech Connect

    Tumer, Kagan

    2015-03-12

    Motivation: The ability to collect key system level information is critical to the safe, efficient and reliable operation of advanced power systems. Recent advances in sensor technology have enabled some level of decision making directly at the sensor level. However, coordinating large numbers of sensors, particularly heterogeneous sensors, to achieve system level objectives such as predicting plant efficiency, reducing downtime or predicting outages requires sophisticated coordination algorithms. Indeed, a critical issue in such systems is how to ensure the interaction of a large number of heterogenous system components do not interfere with one another and lead to undesirable behavior. Objectives and Contributions: The long-term objective of this work is to provide sensor deployment, coordination and networking algorithms for large numbers of sensors to ensure the safe, reliable, and robust operation of advanced energy systems. Our two specific objectives are to: 1. Derive sensor performance metrics for heterogeneous sensor networks. 2. Demonstrate effectiveness, scalability and reconfigurability of heterogeneous sensor network in advanced power systems. The key technical contribution of this work is to push the coordination step to the design of the objective functions of the sensors, allowing networks of heterogeneous sensors to be controlled. By ensuring that the control and coordination is not specific to particular sensor hardware, this approach enables the design and operation of large heterogeneous sensor networks. In addition to the coordination coordination mechanism, this approach allows the system to be reconfigured in response to changing needs (e.g., sudden external events requiring new responses) or changing sensor network characteristics (e.g., sudden changes to plant condition). Impact: The impact of this work extends to a large class of problems relevant to the National Energy Technology Laboratory including sensor placement, heterogeneous sensor

  8. North American Electric Reliability Corporation (NERC): Ensuring...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North American Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk Electric System North American Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk ...

  9. Suspect Counterfeit Coordinators, April 2015

    Energy.gov [DOE] (indexed site)

    Sandia Site OfficeNNSA Nora Armjio SCI Coordinator 505-845-9855 mnarmij@sandia.gov Adlolfo Bachicha SCI Coordinator 505-844-0133 aabachi@sandia.gov SPR Project...

  10. COORDINATION OF DOE TECHNICAL STANDARDS

    Energy.gov [DOE]

    PurposeThis procedure provides guidance on the formal coordination of DOE Technical Standards in the DOE Technical Standards Program (TSP). The purpose of coordination of draft technical standards...

  11. Blade reliability collaborative :

    SciTech Connect

    Ashwill, Thomas D.; Ogilvie, Alistair B.; Paquette, Joshua A.

    2013-04-01

    The Blade Reliability Collaborative (BRC) was started by the Wind Energy Technologies Department of Sandia National Laboratories and DOE in 2010 with the goal of gaining insight into planned and unplanned O&M issues associated with wind turbine blades. A significant part of BRC is the Blade Defect, Damage and Repair Survey task, which will gather data from blade manufacturers, service companies, operators and prior studies to determine details about the largest sources of blade unreliability. This report summarizes the initial findings from this work.

  12. Transmission Reliability Program 2015 Reliability & Markets Peer Review Materials Available

    Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability held a peer review of Reliability & Markets Program on August 4-5 at Cornell University in Ithaca, NY. Materials including the agenda and presentations are now available for download.

  13. Fault Tree Reliability Analysis and Design-for-reliability

    Energy Science and Technology Software Center

    1998-05-05

    WinR provides a fault tree analysis capability for performing systems reliability and design-for-reliability analyses. The package includes capabilities for sensitivity and uncertainity analysis, field failure data analysis, and optimization.

  14. Measurement Practices for Reliability and Power Quality

    SciTech Connect

    Kueck, JD

    2005-05-06

    This report provides a distribution reliability measurement ''toolkit'' that is intended to be an asset to regulators, utilities and power users. The metrics and standards discussed range from simple reliability, to power quality, to the new blend of reliability and power quality analysis that is now developing. This report was sponsored by the Office of Electric Transmission and Distribution, U.S. Department of Energy (DOE). Inconsistencies presently exist in commonly agreed-upon practices for measuring the reliability of the distribution systems. However, efforts are being made by a number of organizations to develop solutions. In addition, there is growing interest in methods or standards for measuring power quality, and in defining power quality levels that are acceptable to various industries or user groups. The problems and solutions vary widely among geographic areas and among large investor-owned utilities, rural cooperatives, and municipal utilities; but there is still a great degree of commonality. Industry organizations such as the National Rural Electric Cooperative Association (NRECA), the Electric Power Research Institute (EPRI), the American Public Power Association (APPA), and the Institute of Electrical and Electronics Engineers (IEEE) have made tremendous strides in preparing self-assessment templates, optimization guides, diagnostic techniques, and better definitions of reliability and power quality measures. In addition, public utility commissions have developed codes and methods for assessing performance that consider local needs. There is considerable overlap among these various organizations, and we see real opportunity and value in sharing these methods, guides, and standards in this report. This report provides a ''toolkit'' containing synopses of noteworthy reliability measurement practices. The toolkit has been developed to address the interests of three groups: electric power users, utilities, and regulators. The report will also serve

  15. Reliability Compliance Specialist

    Energy.gov [DOE]

    (See Frequently Asked Questions for more information). Where would I be working? Western Area Power Administration Desert Southwest Region Maintenance (G5000) 615 S. 43rd Avenue Phoenix, AZ 85009...

  16. Transmission Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission Reliability Transmission Reliability Modernizing America's electricity infrastructure is one of the U.S. Department of Energy's top priorities. The DOE Strategic Plan states that today's electric grid needs to be more efficient, reliable, and secure. A modern, smarter electric grid may save consumers money, help our economy run more efficiently, allow rapid growth in renewable energy sources, and enhance energy reliability. The Department's research into a variety of tools that will

  17. Testing for PV Reliability (Presentation)

    SciTech Connect

    Kurtz, S.; Bansal, S.

    2014-09-01

    The DOE SUNSHOT workshop is seeking input from the community about PV reliability and how the DOE might address gaps in understanding. This presentation describes the types of testing that are needed for PV reliability and introduces a discussion to identify gaps in our understanding of PV reliability testing.

  18. 2015 PV Module Reliability Workshop

    Energy.gov [DOE]

    The National Renewable Energy Laboratory hosts an annual Photovoltaic (PV) Module Reliability Workshop so that solar technology experts can share information leading to the improvement of PV module reliability. Improvements to module reliability reduce the cost of solar electricity and promotes investor confidence in the technology—both critical goals for moving PV technologies deeper into the electricity marketplace.

  19. Montana Watershed Coordination Council | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Coordination Council Jump to: navigation, search Logo: Montana Watershed Coordination Council Name: Montana Watershed Coordination Council Place: Helena, Montana Zip: 59604-6873...

  20. CLEERS Coordination & Joint Development of Benchmark Kinetics...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR CLEERS Coordination & Development of Catalyst Process Kinetic...

  1. Requirements to coordinate agreements, milestones and decision...

    Office of Environmental Management (EM)

    Requirements to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental ...

  2. Coordinating Energy Efficiency with Other Disaster Resiliency...

    Energy Saver

    Coordinating Energy Efficiency with Other Disaster Resiliency Services Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Coordinating Energy ...

  3. Suspect Counterfeit Coordinators, May 2016

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Anyone identifying names that should be changed are encouraged to provide the update information to Michael Stracka (AU-23) at 301-903-8085 michael.stracka@hq.doe.gov May 2016 Site/PSO DOE SCI Coordinators Title Fed/Contr/Sub Telephone E-mail Albuquerque Service Center Paul Romero SCI Coordinator 505-845-4149 Paul.romero@nnsa.doe.gov Ames Site Office/SC Terry Herrman SCI Program Coordinator 515-294-7896 herrman@ameslab.gov Argonne Site Office/SC Steven Gauthier SCI Coordinator 630-252-6165

  4. Gearbox Reliability Collaborative High-Speed Shaft Calibration

    SciTech Connect

    Keller, J.; McNiff, B.

    2014-09-01

    Instrumentation has been added to the high-speed shaft, pinion, and tapered roller bearing pair of the Gearbox Reliability Collaborative gearbox to measure loads and temperatures. The new shaft bending moment and torque instrumentation was calibrated and the purpose of this document is to describe this calibration process and results, such that the raw shaft bending and torque signals can be converted to the proper engineering units and coordinate system reference for comparison to design loads and simulation model predictions.

  5. GRANITE RELIABLE | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon DOE-LPOProject-PostersWINDGranite-Reliable.pdf More Documents & Publications USG OREGON EA-1801: Finding of No Significant Impact DOE-LPOOutreachLPO-OverviewCSP

  6. GRANITE RELIABLE | Department of Energy

    Energy.gov [DOE] (indexed site)

    issued a 169 partial million loan guarantee through the Financial Institutions Partnership Program (FIPP) to finance Granite Reliable, a 99-MW wind power generation project. ...

  7. collecting reliability and performance data

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    collecting reliability and performance data - Sandia Energy Energy Search Icon Sandia Home ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  8. analyzing reliability and performance data

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    analyzing reliability and performance data - Sandia Energy Energy Search Icon Sandia Home ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  9. disseminating reliability and performance data

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    disseminating reliability and performance data - Sandia Energy Energy Search Icon Sandia ... Stationary Power Energy Conversion Efficiency Solar Energy Wind Energy Water Power ...

  10. NREL: Wind Research - Gearbox Reliability Collaborative

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines ... Read about: The Gearbox Reliability Collaborative Gearbox Reliability Collaborative ...

  11. Human Reliability Program Orientation for Employees (Technical...

    Office of Scientific and Technical Information (OSTI)

    Human Reliability Program Orientation for Employees Citation Details In-Document Search ... PERSONNEL; RELIABILITY; US DOE HRP employee orientation, human reliability Word ...

  12. Wide area continuous offender monitoring

    SciTech Connect

    Hoshen, J.; Drake, G.; Spencer, D.

    1996-11-01

    The corrections system in the U.S. is supervising over five million offenders. This number is rising fast and so are the direct and indirect costs to society. To improve supervision and reduce the cost of parole and probation, first generation home arrest systems were introduced in 1987. While these systems proved to be helpful to the corrections system, their scope is rather limited because they only cover an offender at a single location and provide only a partial time coverage. To correct the limitations of first-generation systems, second-generation wide area continuous electronic offender monitoring systems, designed to monitor the offender at all times and locations, are now on the drawing board. These systems use radio frequency location technology to track the position of offenders. The challenge for this technology is the development of reliable personal locator devices that are small, lightweight, with long operational battery life, and indoors/outdoors accuracy of 100 meters or less. At the center of a second-generation system is a database that specifies the offender`s home, workplace, commute, and time the offender should be found in each. The database could also define areas from which the offender is excluded. To test compliance, the system would compare the observed coordinates of the offender with the stored location for a given time interval. Database logfiles will also enable law enforcement to determine if a monitored offender was present at a crime scene and thus include or exclude the offender as a potential suspect.

  13. Hawthorne Geothermal Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: Coordinates: 38.53, -118.65...

  14. Berkshire East Ski Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Energy Development Energy Purchaser Berkshire East Ski Area Location Charlemont MA Coordinates 42.61621237, -72.86660671 Show Map Loading map... "minzoom":false,"mapp...

  15. Photovoltaic performance and reliability workshop

    SciTech Connect

    Mrig, L.

    1993-12-01

    This workshop was the sixth in a series of workshops sponsored by NREL/DOE under the general subject of photovoltaic testing and reliability during the period 1986--1993. PV performance and PV reliability are at least as important as PV cost, if not more. In the US, PV manufacturers, DOE laboratories, electric utilities, and others are engaged in the photovoltaic reliability research and testing. This group of researchers and others interested in the field were brought together to exchange the technical knowledge and field experience as related to current information in this evolving field of PV reliability. The papers presented here reflect this effort since the last workshop held in September, 1992. The topics covered include: cell and module characterization, module and system testing, durability and reliability, system field experience, and standards and codes.

  16. Distributed Generation Operational Reliability, Executive Summary...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Generation Reliability and Availability Database," sponsored by Oak Ridge National ... Distributed Generation Operational Reliability and Availability Database, Final Report, ...

  17. Thermoelectric Mechanical Reliability | Department of Energy

    Energy.gov [DOE] (indexed site)

    Transport Properties, Thermal Response, and Mechanical Reliability of Thermoelectric Materials and Devices for Automotive Waste Heat Recovery Thermoelectric Mechanical Reliability

  18. Widget:GoogleAreaMap | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    specified area shaded. Currently only supports rectangles. Parameters title - The name, word, or phrase you would like to associate with the area. coordsNE - The coordinate pair...

  19. Suspect Counterfeit Coordinators | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coordinators Suspect Counterfeit Coordinators May 2016 Listing of Suspect/Counterfeit Coordinators by Site/Program Secretarial Office (PSO) and title (Federal, Contractor, or Subcontractor). This listing includes email and telephone contacts for each coordinator. Suspect Counterfeit Coordinators - May 2016 (196.36 KB) More Documents & Publications Federal, Contractor, or Subcontractor FTCP Members DOE Hoisting and Rigging Technical Advisory Committee - Membership Roster

  20. Suspect Counterfeit Coordinators, October 2015

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Pacific Northwest Site OfficeSC Carrie Swafford- Bennett SCI Coordinator 509-372-4931 carrie.swafford-bennett@pnso.science.doe.gov Vinh T. Nguyen Contractor 509-372-4737 ...

  1. Web Coordinator Meetings May 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation slides and minutes from the May 16, 2013 Web coordinator meeting. Topics include Trish Cozart's presentation on statistics and site analysis, Alex Clayborne's presentation on monthly stats reports, the EERE feedback widget, and an EERE redesign update.

  2. An Incident Management Preparedness and Coordination Toolkit

    SciTech Connect

    Koch, Daniel B; Payne, Patricia W

    2012-01-01

    Although the use of Geographic Information Systems (GIS) by centrally-located operations staff is well established in the area of emergency response, utilization by first responders in the field is uneven. Cost, complexity, and connectivity are often the deciding factors preventing wider adoption. For the past several years, Oak Ridge National Laboratory (ORNL) has been developing a mobile GIS solution using free and open-source software targeting the needs of front-line personnel. Termed IMPACT, for Incident Management Preparedness and Coordination Toolkit, this ORNL application can complement existing GIS infrastructure and extend its power and capabilities to responders first on the scene of a natural or man-made disaster.

  3. Gearbox Reliability Collaborative | Wind | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Gearbox Reliability Collaborative Premature gearbox failures have a significant impact on the cost of wind farm operations. In 2007, NREL initiated the Gearbox Reliability Collaborative (GRC). The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database in a multi-pronged approach to determine why many wind turbine gearboxes do not achieve their expected design life-the time period that manufacturers

  4. Russian Health Studies Program - Joint Coordinating Committee...

    Energy.gov [DOE] (indexed site)

    Joint Coordinating Committee for Radiation Effects Research (JCCRER) All About the Joint Coordinating Committee for Radiation Effects Research What is the JCCRER? Why is it ...

  5. Executive Order 13583, Establishing a Coordinated Government...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    13583, Establishing a Coordinated Government-Wide Initiative to Promote Diversity and Inclusion in the Federal Workforce Executive Order 13583, Establishing a Coordinated...

  6. Coordination of Federal Authorizations for Electric Transmission...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coordination of Federal Authorizations for Electric Transmission Facilities: Federal Register Notice Volume 73, No. 183 - Sep. 19, 2008 Coordination of Federal Authorizations for...

  7. Coordination of Energy Efficiency and Demand Response

    SciTech Connect

    Goldman, Charles; Reid, Michael; Levy, Roger; Silverstein, Alison

    2010-01-29

    This paper reviews the relationship between energy efficiency and demand response and discusses approaches and barriers to coordinating energy efficiency and demand response. The paper is intended to support the 10 implementation goals of the National Action Plan for Energy Efficiency's Vision to achieve all cost-effective energy efficiency by 2025. Improving energy efficiency in our homes, businesses, schools, governments, and industries - which consume more than 70 percent of the nation's natural gas and electricity - is one of the most constructive, cost-effective ways to address the challenges of high energy prices, energy security and independence, air pollution, and global climate change. While energy efficiency is an increasingly prominent component of efforts to supply affordable, reliable, secure, and clean electric power, demand response is becoming a valuable tool in utility and regional resource plans. The Federal Energy Regulatory Commission (FERC) estimated the contribution from existing U.S. demand response resources at about 41,000 megawatts (MW), about 5.8 percent of 2008 summer peak demand (FERC, 2008). Moreover, FERC recently estimated nationwide achievable demand response potential at 138,000 MW (14 percent of peak demand) by 2019 (FERC, 2009).2 A recent Electric Power Research Institute study estimates that 'the combination of demand response and energy efficiency programs has the potential to reduce non-coincident summer peak demand by 157 GW' by 2030, or 14-20 percent below projected levels (EPRI, 2009a). This paper supports the Action Plan's effort to coordinate energy efficiency and demand response programs to maximize value to customers. For information on the full suite of policy and programmatic options for removing barriers to energy efficiency, see the Vision for 2025 and the various other Action Plan papers and guides available at www.epa.gov/eeactionplan.

  8. NREL Publishes Gearbox Reliability Collaborative Findings Report...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In an effort to help industry increase gearbox reliability, DOE and NREL launched the Wind Turbine Gearbox Reliability Collaborative (GRC) in 2006 to validate the typical gearbox ...

  9. 2013 Transmission Reliability Program Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sauer, U. Illinois Automatic Reliability Reports (ARR) Research & Implementation, Carlos Martinez, ASR, Inc. Reliability Standards Analysis and Assessment, Gil Tam, EPG 2013 TR...

  10. NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NORTH AMERICAN ELECTRIC RELIABILITY COUNCIL: Preliminary Disturbance Report (40.43 KB) More Documents & Publications North American Electric Reliability Council Power Outage Update ...

  11. Reliability and Engineering | Photovoltaic Research | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability and Engineering In the National Center for Photovoltaics (NCPV) at NREL, we focus on photovoltaic (PV) reliability research and development (R&D) to improve PV ...

  12. Continuous Reliability Enhancement for Wind project

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... SunShot Grand Challenge: Regional Test Centers Continuous Reliability Enhancement for Wind project HomeTag:Continuous Reliability Enhancement for Wind project The CREW public ...

  13. RTI International Develops SSL Luminaire Reliability Model |...

    Energy.gov [DOE] (indexed site)

    life testing (ALT) methodologies and a reliability model for predicting the lifetime of ... is not a proxy for luminaire reliability, and that a systems-level approach ...

  14. North American Electric Reliability Corporation Interconnections...

    Energy.gov [DOE] (indexed site)

    Map of the North American Electric Reliability Corporation Interconnection showing the Eastern, Western, and Teaxs Interconnectins. North American Electric Reliability Corporation...

  15. Thermoelectric Mechanical Reliability | Department of Energy

    Energy.gov [DOE] (indexed site)

    0wereszczak.pdf (1.52 MB) More Documents & Publications Thermoelectric Mechanical Reliability Thermoelectric Mechanical Reliability Thermoelectrics Theory and Structure

  16. Comments of North American Electric Reliability Corporation ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    North American Electric Reliability Corporation (NERC) to DOE Smart Grid RFI: Addressing Policy and Logistical Challenges Comments of North American Electric Reliability Corporation ...

  17. Photovoltaic performance and reliability workshop

    SciTech Connect

    Kroposki, B

    1996-10-01

    This proceedings is the compilation of papers presented at the ninth PV Performance and Reliability Workshop held at the Sheraton Denver West Hotel on September 4--6, 1996. This years workshop included presentations from 25 speakers and had over 100 attendees. All of the presentations that were given are included in this proceedings. Topics of the papers included: defining service lifetime and developing models for PV module lifetime; examining and determining failure and degradation mechanisms in PV modules; combining IEEE/IEC/UL testing procedures; AC module performance and reliability testing; inverter reliability/qualification testing; standardization of utility interconnect requirements for PV systems; need activities to separate variables by testing individual components of PV systems (e.g. cells, modules, batteries, inverters,charge controllers) for individual reliability and then test them in actual system configurations; more results reported from field experience on modules, inverters, batteries, and charge controllers from field deployed PV systems; and system certification and standardized testing for stand-alone and grid-tied systems.

  18. Wind turbine reliability database update.

    SciTech Connect

    Peters, Valerie A.; Hill, Roger Ray; Stinebaugh, Jennifer A.; Veers, Paul S.

    2009-03-01

    This report documents the status of the Sandia National Laboratories' Wind Plant Reliability Database. Included in this report are updates on the form and contents of the Database, which stems from a fivestep process of data partnerships, data definition and transfer, data formatting and normalization, analysis, and reporting. Selected observations are also reported.

  19. Web Coordinator Meetings June 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presentation slides and minutes from the June 20, 2013 Web coordinator meeting. Topics include an update about the new EERE home page and landing pages, an overview of the mobile guidelines, and updates on the new Success Stories website and the EERE redesign.

  20. Web Coordinator Meetings March 2013

    Energy.gov [DOE]

    Presentation slides from the March 21, 2013 Web Coordinator Meeting. Topics include updates on OMB's limitation on one-question surveys, the new EERE landing pages, and the leadership of the Transition Team, reminder to update links to Energy Saver, and an introduction to the Product Governance Team.

  1. 2013 Annual DOE-NE Materials Research Coordination Meeting | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Annual DOE-NE Materials Research Coordination Meeting 2013 Annual DOE-NE Materials Research Coordination Meeting The Reactor Materials element of the Nuclear Energy Enabling Technologies (NEET) program conducted its FY 2013 coordination meeting as a series of four web-conferences to act as a forum for the nuclear materials research community. The purpose of this meeting was to report on current and planned nuclear materials research, identify new areas of collaboration and promote

  2. (Coordinated research on fuel cycle cost)

    SciTech Connect

    Cantor, R.A.; Shelton, R.B.; Krupnick, A.J.

    1990-11-05

    The Department of Energy (DOE) and the Commission of the European Communities (CEC) have been exploring the possibility of parallel studies on the externals costs of employing fuel cycles to deliver energy services. These studies are of particular importance following the activities of the US National Energy Strategy (NES), where the potential discrepancies between market prices and the social costs of energy services were raised as significant policy concerns. To respond to these concerns, Oak Ridge National Laboratory (ORNL) and Resources for the Future (RFF) have begun a collaborative effort for the DOE to investigate the external costs, or externalities, generated by cradle to grave fuel cycle activities. Upon initiating this project, the CEC expressed an interest to the DOE that Europe should conduct a parallel study and that the two studies should be highly coordinated for consistency in the results. This series of meetings with members of the CEC was undertaken to resolve some issues implied by pursuing parallel, coordinated studies; issues that were previously defined by the August meetings. In addition, it was an opportunity for some members of the US research team and the DOE sponsor to meet with their European counterparts for the study, as well as persons in charge of research areas that ultimately would play a key role in the European study.

  3. Gearbox Reliability Collaborative Bearing Calibration

    SciTech Connect

    van Dam, J.

    2011-10-01

    NREL has initiated the Gearbox Reliability Collaborative (GRC) to investigate the root cause of the low wind turbine gearbox reliability. The GRC follows a multi-pronged approach based on a collaborative of manufacturers, owners, researchers and consultants. The project combines analysis, field testing, dynamometer testing, condition monitoring, and the development and population of a gearbox failure database. At the core of the project are two 750kW gearboxes that have been redesigned and rebuilt so that they are representative of the multi-megawatt gearbox topology currently used in the industry. These gearboxes are heavily instrumented and are tested in the field and on the dynamometer. This report discusses the bearing calibrations of the gearboxes.

  4. NREL: Transportation Research - Power Electronics Packaging Reliability

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Packaging Reliability A photo of a piece of power electronics testing equipment. NREL power electronics packaging reliability research investigates the performance and reliability of emerging interconnection, interface, and packaging materials. Findings help improve reliability and durability of emerging technologies. Photo by Dennis Schroeder, NREL Power electronics packaging around a semiconductor switching device determines the electrical, thermal, and mechanical properties of a power

  5. CSD Safety and Reliability Data

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CSD Safety & Reliability Data Forecourt CSD Workshop Argonne National Laboratory Kevin Harrison 20-Mar-2013 2 Approach - Composite Data Products CDPs DDPs Results Internal analysis completed quarterly Bundled data (operation & maintenance/safety) delivered to NREL quarterly Composite Data Products (CDPs) * Aggregated data across multiple systems, sites, and teams * Publish analysis results without revealing proprietary data every 6 months 2 Detailed Data Products (DDPs) * Individual data

  6. A thermal battery operational reliability evaluation study

    SciTech Connect

    Herzberg, M.; Jaeger, M.; Shalev, H.

    1994-12-31

    A thermal battery is a one shot device. Its overall reliability is given as the product of its technical and operational reliability. This work evaluates operational reliability. The operational reliability for various performance requirements was estimated by analyzing data received from qualification tests of a certain thermal battery. A lower bound of its operational reliability was evaluated by use of the statistical tolerance method for each specific electrical performance requirement. A conservative overall lower bound for the operational reliability of the thermal battery was calculated as the product of the individual operational reliability estimates corresponding to each performance requirement.

  7. Porphyrin coordination polymer nanospheres and nanorods

    DOEpatents

    Wang, Zhongchun; Shelnutt, John A.; Medforth, Craig J.

    2012-12-04

    A porphyrin coordination polymer nanostructure comprising a network of pyridyl porphyrin molecules and coordinating metal ions coordinatively bound through the pyridyl groups. In some embodiments, the porphyrins are metalloporphyrins. A variety of nanostructures are formed by the network polymer, including nanospheres, polygonal nanostructures, nanorods, and nanofibers, depending on a variety of factors including coordination metal ion, porphyrin type, metal of the metalloporphyrin, and degree of agitation during nanostructure formation. Reduction of coordinating metal ions may be used to form metal nanoparticles on the coordination polymer nanostructure.

  8. Henry Taube and Coordination Chemistry

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Henry Taube and Coordination Chemistry Resources with Additional Information Henry Taube Chuck Painter/Stanford News Service Henry Taube, a Marguerite Blake Wilbur Professor of Chemistry, Emeritus, at Stanford University, received the 1983 Nobel Prize in Chemistry "for his work on the mechanisms of electron transfer reactions, especially in metal complexes" Taube 'received a doctorate from the University of California-Berkeley in 1940 and was an instructor there from 1940-41. "I

  9. Distributed Sensor Coordination for Advanced Energy Systems

    SciTech Connect

    Tumer, Kagan

    2013-07-31

    The ability to collect key system level information is critical to the safe, efficient and reli- able operation of advanced energy systems. With recent advances in sensor development, it is now possible to push some level of decision making directly to computationally sophisticated sensors, rather than wait for data to arrive to a massive centralized location before a decision is made. This type of approach relies on networked sensors (called agents from here on) to actively collect and process data, and provide key control deci- sions to significantly improve both the quality/relevance of the collected data and the as- sociating decision making. The technological bottlenecks for such sensor networks stem from a lack of mathematics and algorithms to manage the systems, rather than difficulties associated with building and deploying them. Indeed, traditional sensor coordination strategies do not provide adequate solutions for this problem. Passive data collection methods (e.g., large sensor webs) can scale to large systems, but are generally not suited to highly dynamic environments, such as ad- vanced energy systems, where crucial decisions may need to be reached quickly and lo- cally. Approaches based on local decisions on the other hand cannot guarantee that each agent performing its task (maximize an agent objective) will lead to good network wide solution (maximize a network objective) without invoking cumbersome coordination rou- tines. There is currently a lack of algorithms that will enable self-organization and blend the efficiency of local decision making with the system level guarantees of global decision making, particularly when the systems operate in dynamic and stochastic environments. In this work we addressed this critical gap and provided a comprehensive solution to the problem of sensor coordination to ensure the safe, reliable, and robust operation of advanced energy systems. The differentiating aspect of the proposed work is in shift- ing the

  10. ESnet Site Coordinators Committee (ESCC) and Site Coordinators

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ESCC About ESnet Our Mission The Network ESnet History Governance & Policies ESnet Policy Board ESCC Acceptable Use Policy Data Privacy Policy Facility Data Policy Career Opportunities ESnet Staff & Org Chart Contact Us Contact Us Technical Assistance: 1 800-33-ESnet (Inside US) 1 800-333-7638 (Inside US) 1 510-486-7600 (Globally) 1 510-486-7607 (Globally) Report Network Problems: trouble@es.net Provide Web Site Feedback: info@es.net ESnet Site Coordinators Committee (ESCC) and Site

  11. Radioisotope thermoelectric generator reliability and safety

    SciTech Connect

    Campbell, R.; Klein, J.

    1989-01-01

    There are numerous occasions when a planetary mission requires energy in remote areas of the solar system. Anytime power is required much beyond Mars or the Asteroid Belts, solar power is not an option. The radioisotope thermoelectric generator (RTG) was developed for such a mission requirement. It is a relatively small and lightweight power source that can produce power under adverse conditions. Just this type of source has become the backbone of the power system for far outer plant exploration. Voyagers I and II are utilizing RTGs, which will soon power the Galileo spacecraft to Jupiter and the Ulysses spacecraft to study the solar poles. The paper discusses RTG operation including thermoelectric design, converter design, general-purpose heat source; RTG reliability including design, testing, experience, and launch approval; and RTG safety issues and methods of ensuring safety.

  12. Coordination of Energy Efficiency and Demand Response

    SciTech Connect

    none,

    2010-01-01

    Summarizes existing research and discusses current practices, opportunities, and barriers to coordinating energy efficiency and demand response programs.

  13. Panel Session III: Innovation and Coordination

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lessons Learned for Hydrogen Panel Session III: Innovation Panel Session III: Innovation and Coordination and Coordination ______________________________ Stefan Unnasch Life Cycle Associates 3 April 2008 2 Hydrogen Vision Life Cycle Associates 3 Hydrogen Infrastructure Today Life Cycle Associates Source: Weinert, J. X., et al.. (2005). CA Hydrogen Highway Network Blueprint Plan, Economics Report 4 Innovation and Coordination Life Cycle Associates Innovation Coordination ☯ Slow Fast Cars Codes

  14. Project Management Coordination Office Organization Chart

    Energy.gov [DOE]

    Project Management Coordination Office Organization Chart, U.S. Department of Energy's Office of Energy Efficiency and Renewable Energy.

  15. Coordinating Permit Office | OpenEI Community

    OpenEI (Open Energy Information) [EERE & EIA]

    Alaska analysis appropriations Categorical Exclusions Coordinating Permit Office Cost Mechanisms Cost Recovery geothermal Hawaii NEPA permitting quarterly meeting White...

  16. Coordinating with Corporate and Institutional Affiliates | Department...

    Energy Saver

    Coordinating with Corporate and Institutional Affiliates Better Buildings Residential ... More Documents & Publications Better Buildings Residential Network Orientation Webinar ...

  17. Coordinating Energy Efficiency With Water Conservation Services...

    Energy Saver

    With Water Conservation Services Coordinating Energy Efficiency With Water Conservation Services Better Buildings Residential Network Program Sustainability Peer Exchange Call ...

  18. Web Coordinator Meetings | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Web Governance, Roles, & Responsibilities » Web Coordinator Meetings Web Coordinator Meetings Once a month, the Office of Energy Efficiency and Renewable Energy (EERE) Web coordinators meet to ask questions, share their experiences, announce new sites, and learn about the latest updates on the EERE website. EERE Web coordinators are the main points of contact between the Communications Team staff and EERE programs and offices. Presentations and minutes from the last two years are posted

  19. Wilson Hot Spring Geothermal Area | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Overview Geothermal Area Profile Location: Nevada Exploration Region: Walker-Lane Transition Zone Geothermal Region GEA Development Phase: Coordinates: 38.7672, -119.1732...

  20. Wade Hampton Census Area, Alaska: Energy Resources | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Wade Hampton Census Area, Alaska: Energy Resources Jump to: navigation, search Equivalent URI DBpedia Coordinates 62.1458336, -162.8919191 Show Map Loading map......

  1. Reliability of steam generator tubing

    SciTech Connect

    Kadokami, E.

    1997-02-01

    The author presents results on studies made of the reliability of steam generator (SG) tubing. The basis for this work is that in Japan the issue of defects in SG tubing is addressed by the approach that any detected defect should be repaired, either by plugging the tube or sleeving it. However, this leaves open the issue that there is a detection limit in practice, and what is the effect of nondetectable cracks on the performance of tubing. These studies were commissioned to look at the safety issues involved in degraded SG tubing. The program has looked at a number of different issues. First was an assessment of the penetration and opening behavior of tube flaws due to internal pressure in the tubing. They have studied: penetration behavior of the tube flaws; primary water leakage from through-wall flaws; opening behavior of through-wall flaws. In addition they have looked at the question of the reliability of tubing with flaws during normal plant operation. Also there have been studies done on the consequences of tube rupture accidents on the integrity of neighboring tubes.

  2. Transmission Reliability Peer Review Materials Now Available

    Energy.gov [DOE]

    The Office of Electricity Delivery and Energy Reliability held a peer review of the Transmission Reliability Program on June 10-11, 2015, in Washington, DC. Materials including the agenda and presentations are now available for download.

  3. Deputy Director, Office of Electric Reliability | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reliability Deputy Director, Office of Electric Reliability Submitted by admin on Sat, 2016-01-16 00:16 Job Summary Organization Name Department Of Energy Agency SubElement...

  4. Reliability Challenges for Solar Energy (Presentation)

    SciTech Connect

    Kurtz, S.

    2009-12-08

    Presentation that reviews reliability issues related to various types of photovoltaic tecnnologies, including crystalline silicon, thin films, and concentrating PV.

  5. North American Electric Reliability Corporation Interconnections...

    Energy Saver

    Map of the North American Electric Reliability Corporation Interconnection showing the ... MB) More Documents & Publications Interconnection Transmission Planning: Awards 2009 ...

  6. PV Reliability Workshop | Photovoltaic Research | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    PV Reliability Workshop NREL hosts an annual Photovoltaic Reliability Workshop (PVRW) so that solar technology experts can share information leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology-both critical goals for moving PV technologies deeper into the electricity marketplace. 2017 Workshop The 2017 Photovoltaic Reliability Workshop (PVRW) will be held Tuesday, February 28, to Thursday,

  7. NREL-Brazil Bilateral Technical Coordination | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Brazil Bilateral Technical Coordination Jump to: navigation, search Logo: NREL-Brazil Bilateral Technical Coordination Name NREL-Brazil Bilateral Technical Coordination Agency...

  8. Web Coordinator Meetings-February 2016 | Department of Energy

    Energy.gov [DOE] (indexed site)

    the February 2016 Web Coordinators Meeting. Presentation (1.56 MB) Minutes (69.78 KB) More Documents & Publications Web Coordinator Meetings-November 2015 Web Coordinator ...

  9. Web Coordinator Meetings-January 2016 | Department of Energy

    Energy.gov [DOE] (indexed site)

    January 2016 Web Coordinators Meeting. Presentation (2.1 MB) Minutes (69.92 KB) More Documents & Publications Web Coordinator Meetings - April 2015 Web Coordinator Meetings - ...

  10. Web Coordinator Meetings - January 2014 | Department of Energy

    Energy.gov [DOE] (indexed site)

    this monthly meeting of the EERE Web coordinators. Presentation (1.77 MB) Minutes (60.54 KB) More Documents & Publications Web Coordinator Meetings - April 2014 Web Coordinator ...

  11. Ms. Maria Galanti Site Coordinator

    Energy.gov [DOE] (indexed site)

    ... of the above-grade pump house and other above-grade ... areas to facilitate movement of heavy equipment. ... Small pieces of demolition debris that accumulated in the ...

  12. Distributed Generation Operational Reliability, Executive Summary Report,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 2004 | Department of Energy Reliability, Executive Summary Report, January 2004 Distributed Generation Operational Reliability, Executive Summary Report, January 2004 This report summarizes the results of the project, "Distributed Generation Market Transformation Tools: Distributed Generation Reliability and Availability Database," sponsored by Oak Ridge National Laboratory (ORNL), Energy Solutions Center (ESC), New York State Energy Research and Development Authority

  13. Granite Reliable Power | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Energy Group Energy Purchaser Green Mountain Power Central Vermont Public Service New England Power Pool Location Milan NH Coordinates 44.74039314, -71.28376007 Show...

  14. Review of Quantitative Software Reliability Methods

    SciTech Connect

    Chu, T.L.; Yue, M.; Martinez-Guridi, M.; Lehner, J.

    2010-09-17

    The current U.S. Nuclear Regulatory Commission (NRC) licensing process for digital systems rests on deterministic engineering criteria. In its 1995 probabilistic risk assessment (PRA) policy statement, the Commission encouraged the use of PRA technology in all regulatory matters to the extent supported by the state-of-the-art in PRA methods and data. Although many activities have been completed in the area of risk-informed regulation, the risk-informed analysis process for digital systems has not yet been satisfactorily developed. Since digital instrumentation and control (I&C) systems are expected to play an increasingly important role in nuclear power plant (NPP) safety, the NRC established a digital system research plan that defines a coherent set of research programs to support its regulatory needs. One of the research programs included in the NRC's digital system research plan addresses risk assessment methods and data for digital systems. Digital I&C systems have some unique characteristics, such as using software, and may have different failure causes and/or modes than analog I&C systems; hence, their incorporation into NPP PRAs entails special challenges. The objective of the NRC's digital system risk research is to identify and develop methods, analytical tools, and regulatory guidance for (1) including models of digital systems into NPP PRAs, and (2) using information on the risks of digital systems to support the NRC's risk-informed licensing and oversight activities. For several years, Brookhaven National Laboratory (BNL) has worked on NRC projects to investigate methods and tools for the probabilistic modeling of digital systems, as documented mainly in NUREG/CR-6962 and NUREG/CR-6997. However, the scope of this research principally focused on hardware failures, with limited reviews of software failure experience and software reliability methods. NRC also sponsored research at the Ohio State University investigating the modeling of digital systems

  15. Reliability Considerations from Integration of Smart Grid

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reliability Considerations from the Integration of Smart Grid 116-390 Village Blvd., Princeton, NJ 08540 609.452.8060 | 609.452.9550 fax www.nerc.com the reliability of the to ensure bulk power system December 2010 (This page intentionally left blank) to ensure the reliability of the bulk power system Reliability Considerations of Integration of Smart Grid i December 2010 N N E E R R C C ' ' s s M M i i s s s s i i o o n n The North American Electric Reliability Corporation (NERC) is an

  16. Program Areas

    Energy.gov [DOE]

    Geothermal energy—a relatively untapped domestic energy resource from the heat of the earth—represents a reliable and nearly inexhaustible energy source, with greatly reduced greenhouse gas...

  17. Coordination of Elusive Metal Ions Revealed | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Coordination of Elusive Metal Ions Revealed Researchers have uncovered the atomic-scale geometry of platinum ions with unprecedented precision within metal organic frameworks (MOFs)-a growing class of porous materials that consist of organic ligands and inorganic components. Due to the immense structural diversity and large surface areas of MOFs, often exceeding the size of a professional football field per gram of material, many uses of MOFs have been discovered in purification, separation,

  18. Photoactive devices including porphyrinoids with coordinating additives

    DOEpatents

    Forrest, Stephen R; Zimmerman, Jeramy; Yu, Eric K; Thompson, Mark E; Trinh, Cong; Whited, Matthew; Diev, Vlacheslav

    2015-05-12

    Coordinating additives are included in porphyrinoid-based materials to promote intermolecular organization and improve one or more photoelectric characteristics of the materials. The coordinating additives are selected from fullerene compounds and organic compounds having free electron pairs. Combinations of different coordinating additives can be used to tailor the characteristic properties of such porphyrinoid-based materials, including porphyrin oligomers. Bidentate ligands are one type of coordinating additive that can form coordination bonds with a central metal ion of two different porphyrinoid compounds to promote porphyrinoid alignment and/or pi-stacking. The coordinating additives can shift the absorption spectrum of a photoactive material toward higher wavelengths, increase the external quantum efficiency of the material, or both.

  19. Fast estimation of reboiler reliability

    SciTech Connect

    Durand, A.A.; Bonilla, M.A.O.

    1995-08-01

    The problems one faces in evaluating the reliability of a reboiler design, or in judging the effect of modifications of process conditions on reboiler operation can be complex. To carry out such evaluations, it is necessary for engineers to perform some calculations to determine: heat transfer coefficients in convection boiling; temperature difference, for the onset of nucleate boiling; heat transfer coefficients in the nucleate boiling region; critical heat flux or critical temperature difference; minimum {Delta}T for film boiling; and heat transfer coefficients for the film boiling region. There are a number of correlations, graphs, and computer programs that can be used to make these calculations. However, besides being laborious, it is still difficult to get a suitable picture of the overall problem from just this data. To simplify the process, and to have a better understanding of the problem, a map of the different boiling regions and their boundaries is presented here. With this map it is possible to locate the design or operating point of a specific kettle reboiler among all the boiling regions, enabling one to make a clearer analysis of its behavior. The parameters used to develop this map are described.

  20. Time-Dependent Reliability Analysis

    Energy Science and Technology Software Center

    1999-10-27

    FRANTIC-3 was developed to evaluate system unreliability using time-dependent techniques. The code provides two major options: to evaluate standby system unavailability or, in addition to the unavailability to calculate the total system failure probability by including both the unavailability of the system on demand as well as the probability that it will operate for an arbitrary time period following the demand. The FRANTIC-3 time dependent reliability models provide a large selection of repair and testingmore » policies applicable to standby or continously operating systems consisting of periodically tested, monitored, and non-repairable (non-testable) components. Time-dependent and test frequency dependent failures, as well as demand stress related failure, test-caused degradation and wear-out, test associated human errors, test deficiencies, test override, unscheduled and scheduled maintenance, component renewal and replacement policies, and test strategies can be prescribed. The conditional system unavailabilities associated with the downtimes of the user specified failed component are also evaluated. Optionally, the code can perform a sensitivity study for system unavailability or total failure probability to the failure characteristics of the standby components.« less

  1. MEMS reliability in shock environments

    SciTech Connect

    TANNER,DANELLE M.; WALRAVEN,JEREMY A.; HELGESEN,KAREN SUE; IRWIN,LLOYD W.; BROWN,FREDERICK A.; SMITH,NORMAN F.; MASTERS,NATHAN

    2000-02-09

    In order to determine the susceptibility of the MEMS (MicroElectroMechanical Systems) devices to shock, tests were performed using haversine shock pulses with widths of 1 to 0.2 ms in the range from 500g to 40,000g. The authors chose a surface-micromachined microengine because it has all the components needed for evaluation: springs that flex, gears that are anchored, and clamps and spring stops to maintain alignment. The microengines, which were unpowered for the tests, performed quite well at most shock levels with a majority functioning after the impact. Debris from the die edges moved at levels greater than 4,000g causing shorts in the actuators and posing reliability concerns. The coupling agent used to prevent stiction in the MEMS release weakened the die-attach bond, which produced failures at 10,000g and above. At 20,000g the authors began to observe structural damage in some of the thin flexures and 2.5-micron diameter pin joints. The authors observed electrical failures caused by the movement of debris. Additionally, they observed a new failure mode where stationary comb fingers contact the ground plane resulting in electrical shorts. These new failure were observed in the control group indicating that they were not shock related.

  2. ANSI Energy Efficiency Standardization Coordination Collaborative (EESCC)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ANSI Energy Efficiency Standardization Coordination Collaborative (EESCC)  The Energy Efficiency Standardization Roadmap is on target for publication in June 2014  Developed by the Energy Efficiency Standardization Coordination Collaborative (EESCC), a cross-sector group of 160 experts chaired by the U.S. Department of Energy and Schneider Electric, and convened by the American National Standards Institute (ANSI)  Establishes a national framework for action and coordination on energy

  3. Spectral Asymmetry Due to Magnetic Coordinates

    SciTech Connect

    Park, Jong-kyu; Boozer, Allen H.; Menard, Jonathan E.

    2008-05-06

    The use of magnetic coordinates is ubiquitous in toroidal plasma physics, but the distortion in Fourier spectra produced by these coordinates is not well known. A spatial symmetry of the field is not always represented by a symmetry in the Fourier spectrum when magnetic coordinates are used because of the distortion of the toroidal angle. The practical importance of spectral distortion is illustrated with a tokamak example.

  4. Project Management Coordination Office | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Project Management Coordination Office Project Management Coordination Office The Project Management Coordination Office (PMCO) provides guidance, leadership, training, and tools in program and project management to Office of Energy Efficiency and Renewable Energy (EERE) headquarters and field employees. PMCO is an internal Business Operations office with a mission to provide EERE executive managers, line managers, and staff offices the unified corporate tools, products, and services that enable

  5. Closure Report for Corrective Action Unit 329: Area 22 Desert Rock Airstrip Fuel Spill with Errata Sheet, Revision 0

    SciTech Connect

    Navarro Nevada Environmental Services

    2010-08-10

    In Appendix 0, Use Restriction (UR) Form, the drawing of the use restricted area shows the incorrect coordinates for the use restricted area, the coordinates on the drawing do not match the approved UR Form. The coordinates have been verified and this Errata Sheet replaces the drawing of the use restricted area with an aerial photo showing the use restricted area and the correct coordinates that match the approved UR Form.

  6. CLEERS Coordination & Joint Development of Benchmark Kinetics...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Catalyst Process Kinetic Data CLEERS Coordination & Joint Development of Benchmark Kinetics for LNT & SCR Functionality of Commercial NOx Storage-Reduction Catalysts...

  7. Western Electricity Coordinating Council Smart Grid Project ...

    OpenEI (Open Energy Information) [EERE & EIA]

    your syntax: * Display map References ARRA Smart Grid Investment Grants1 Western Electricity Award2 Western Electricity Coordinating Council, located in Salt Lake City, Utah,...

  8. Web Coordinator Meetings — June 2015

    Energy.gov [DOE]

    Presentation slides and minutes from the June 18, 2015 Web coordinator meeting. Topics include an overview of government hosting moving to HTTPs and a presentation on visual literacy.

  9. Coordinating Energy Efficiency With Water Conservation Services

    Energy.gov [DOE]

    Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Coordinating Energy Efficiency with Water Conservation Services, call slides and discussion summary, September 11, 2014.

  10. Coordination Chemistry in Magnesium Battery Electrolytes: How...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    March 3, 2014, Research Highlights Coordination Chemistry in Magnesium Battery Electrolytes: How Ligands Affect Their Performance (Top) Schematic illustration of the solution ...

  11. Coordinating with Corporate and Institutional Affiliates

    Energy.gov [DOE]

    Better Buildings Residential Network Peer Exchange Call Series: Coordinating with Corporate and Institutional Affiliates Call Slides and Discussion Summary, February 12, 2015.

  12. Transfer and Transition: Interagency Coordination for Managing...

    Office of Scientific and Technical Information (OSTI)

    Hence, these withdrawals are, permanently, no longer subject to public land, mining, and mineral-leasing lawsmore and regulations. LM is coordinating with DOIBLM in Wyoming to ...

  13. Energy Agency Coordinators for Energy Action Month

    Energy.gov [DOE]

    Agency coordinators serve as primary Federal agency points of contact for Energy Action Month. Contact them if you have questions about implementing an Energy Action Month campaign.

  14. Memorandum of Understanding Regarding Coordination in Federal...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, ...

  15. Sandian Contributes to Western Electricity Coordinating Council...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Contributes to Western Electricity Coordinating Council Photovoltaic Power Plant Model ... Energy Systems LaboratoryBrayton Lab Photovoltaic Systems Evaluation Laboratory PV ...

  16. Secretary Bodman Announces DOE Technology Transfer Coordinator...

    Energy Saver

    to the global marketplace by naming Under Secretary for Science, Dr. Raymond Orbach, as Technology Transfer Coordinator, in accordance with the Energy Policy Act of 2005 (EPAct). ...

  17. Columbia River System Operation Review : Final Environmental Impact Statement, Appendix R: Pacific Northwest Coordination agreement (PNCA).

    SciTech Connect

    Columbia River System Operation Review

    1995-11-01

    Currently, the Federal government coordinates the planning and operation of the Federal Columbia River Power System (FCRPS) with projects owned and operated by the region`s non-Federal hydrogenerating utilities pursuant to the Pacific North-west Coordination Agreement (PNCA). The Bureau of Reclamation (Reclamation), the Corps of Engineers (Corps), and the Bonneville Power Administration (BPA) are parties to the PNCA on behalf of the government of the United States. The PNCA is a complex agreement that provides an opportunity for the region`s power producers to maximize the power system`s reliability and economy while meeting their multiple-use objectives. The PNCA does not dictate the operation of the resources it coordinates. It is essentially an accounting mechanism that exchanges the power produced among the parties in order to improve the reliability of the system and reduce regional power costs. Project owners retain complete autonomy to operate as needed to meet their multiple-use requirements. The PNCA was executed in 1964 as an important component of regional plans to maximize the Northwest`s hydro resource capability. Maximization also included the development of storage projects on the Columbia River in Canada pursuant to the terms of the 1964 Columbia River Treaty. Because of the link between power coordination and Treaty issues, the current parties to the PNCA, currently are contemplating entering into a replacement or renewed power coordination agreement. Because the power coordination agreement is a consensual arrangement, its ultimate provisions must be acceptable to all of its signatories. This Appendix R to the Final Environmental Impact Statement of the Columbia River System is a presentation of the Pacific North-west Coordination Agreement.

  18. Fundamental mechanisms of micromachine reliability

    SciTech Connect

    DE BOER,MAARTEN P.; SNIEGOWSKI,JEFFRY J.; KNAPP,JAMES A.; REDMOND,JAMES M.; MICHALSKE,TERRY A.; MAYER,THOMAS K.

    2000-01-01

    Due to extreme surface to volume ratios, adhesion and friction are critical properties for reliability of Microelectromechanical Systems (MEMS), but are not well understood. In this LDRD the authors established test structures, metrology and numerical modeling to conduct studies on adhesion and friction in MEMS. They then concentrated on measuring the effect of environment on MEMS adhesion. Polycrystalline silicon (polysilicon) is the primary material of interest in MEMS because of its integrated circuit process compatibility, low stress, high strength and conformal deposition nature. A plethora of useful micromachined device concepts have been demonstrated using Sandia National Laboratories' sophisticated in-house capabilities. One drawback to polysilicon is that in air the surface oxidizes, is high energy and is hydrophilic (i.e., it wets easily). This can lead to catastrophic failure because surface forces can cause MEMS parts that are brought into contact to adhere rather than perform their intended function. A fundamental concern is how environmental constituents such as water will affect adhesion energies in MEMS. The authors first demonstrated an accurate method to measure adhesion as reported in Chapter 1. In Chapter 2 through 5, they then studied the effect of water on adhesion depending on the surface condition (hydrophilic or hydrophobic). As described in Chapter 2, they find that adhesion energy of hydrophilic MEMS surfaces is high and increases exponentially with relative humidity (RH). Surface roughness is the controlling mechanism for this relationship. Adhesion can be reduced by several orders of magnitude by silane coupling agents applied via solution processing. They decrease the surface energy and render the surface hydrophobic (i.e. does not wet easily). However, only a molecular monolayer coats the surface. In Chapters 3-5 the authors map out the extent to which the monolayer reduces adhesion versus RH. They find that adhesion is independent of

  19. Atmosphere to Electrons: Update on Strategic Plan for Wind Plant Reliability; NREL (National Renewable Energy Laboratory)

    SciTech Connect

    Keller, J.; Westergaard, C.

    2015-02-01

    An update on the Reliability focus area of the Atmosphere to Electrons (A2e) center is provided, including highlighted projects from each of the four major work packages.

  20. Information Concerning Reliability Impacts under Various System

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Configurations of the Mirant Potomac River Plant | Department of Energy Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO Holdings, Inc. is hereby providing you with additional information concerning reliability impacts under various system conditions

  1. Distributed Generation Operational Reliability and Availability Database,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Final Report, January 2004 | Department of Energy Reliability and Availability Database, Final Report, January 2004 Distributed Generation Operational Reliability and Availability Database, Final Report, January 2004 This final report documents the results of an 18-month project entitled, "Distributed Generation Market Transformation Tools: Distributed Generation Reliability and Availability Database," sponsored by Oak Ridge National Laboratory (ORNL), Energy Solutions Center

  2. Smart Grid Investments Improve Grid Reliability, Resilience,...

    Energy.gov [DOE] (indexed site)

    reliability to reduce customer losses from power disruptions. This report presents findings on smart grid improvements in outage management from OE's Smart Grid Investment ...

  3. Microsoft Word - Pv Reliability Paper.doc

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    RELIABILITY AND AVAILABILITY ANALYSIS OF A FIELDED PHOTOVOLTAIC SYSTEM Elmer Collins, ... to facilitate cost tradeoff studies associated with competing photovoltaic systems. ...

  4. Human Reliability Program Handbook | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    positions affording access to certain materials, nuclear explosive devices, facilities, and programs meet the highest standards of reliability and physical and mental suitability. ...

  5. Salvage Values Determines Reliability of Used Photovoltaics ...

    Energy.gov [DOE] (indexed site)

    Presented at the PV Module Reliability Workshop, February 26 - 27 2013, Golden, Colorado PDF icon pvmrw13ps1energyideasmccabe.pdf More Documents & Publications Revitalizing ...

  6. Wind Turbine Condition Monitoring, Reliability Database, and...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Wind Turbine Gearbox Reliability Database, Condition Monitoring, and O&M Research Update ... (OEMs), gearbox rebuild shops, wind plant owneroperators, and consulting ...

  7. Information Concerning Reliability Impacts under Various System...

    Energy Saver

    Information Concerning Reliability Impacts under Various System Configurations of the Mirant Potomac River Plant Docket No. EO-05-01: PJM Interconnection, L.L.C. and PEPCO ...

  8. Augmenting system reliability analyses with observation priors...

    Office of Scientific and Technical Information (OSTI)

    missing data may be imputed using standard data augmentation (DA). This process is already used in the current implementation of the JMP complex-system reliability modeling codes. ...

  9. Is CO2 Transportation Safe and Reliable?

    SciTech Connect

    Benson, Sally; Ball, David; Herzog, Howard; Hilton, Robert; Finley, Robert J.

    2010-08-16

    Hear experts on Carbon Capture and Storage (CCS) explain why the transportation of carbon dioxide from an emission source to an injection site is safe and reliable.

  10. 2014 DOE Human Reliability Program (HRP) Workshop

    Office of Energy Efficiency and Renewable Energy (EERE)

    2014 DOE Human Reliability Program (HRP) Workshop - September 17-19, at the DOE National Training Center in Albuquerque, New Mexico.

  11. Continuous Reliability Enhancement for Wind (CREW)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Technologies Alistair Ogilvie, CREW Project Lead aogilvi@sandia.gov Continuous Reliability Enhancement for Wind (CREW) 2012 Wind Turbine Blade Workshop June 1, 2012 SAND...

  12. Sandia Energy - North American Electric Reliability Corporation...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    North American Electric Reliability Corporation (NERC) Report Posted Home Energy Assurance Infrastructure Security Grid Integration News News & Events Transmission Grid Integration...

  13. Thermoelectric Mechanical Reliability | Department of Energy

    Energy.gov [DOE] (indexed site)

    Properties for Bulk Thermoelectrics Transport Properties, Thermal Response, and Mechanical Reliability of Thermoelectric Materials and Devices for Automotive Waste Heat Recovery

  14. Computational Actinide Chemistry: Reliable Predictions and New...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Computational Actinide Chemistry: Reliable Predictions and New Concepts PI Name: David ... 100 Million Year: 2014 Research Domain: Chemistry The project will obtain some of the ...

  15. Gearbox Reliability Collaborative Investigation of Gearbox Motion...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Efforts continue to improve wind turbine gearbox reliability across the industry. ... misalignment, provide noise and vibration isolation, and protect from shock loads. ...

  16. Energy Materials Coordinating Committee (EMaCC)

    SciTech Connect

    Not Available

    1991-05-31

    This report summarizes EMaCC activities for fiscal year 1990 and describes the materials research programs of various offices and divisions within the department. The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further the effective use of materials expertise within the department. (JL)

  17. The transportation external coordination working group

    SciTech Connect

    1995-10-01

    In an effort to improve coordinated interactions between the United States Department of Energy (DOE) and external groups interested in transportation activities, DOE established the Transportation External Coordination Working Group (TEC/WG). Membership includes representatives from State, Tribal and local governments, industry, and professional organizations. All DOE programs with significant transportation programs participate.

  18. Thermal Reliability Study of Bypass Diodes in Photovoltaic Modules...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Thermal Reliability Study of Bypass Diodes in Photovoltaic Modules Thermal Reliability Study of Bypass Diodes in Photovoltaic Modules Presented at the PV Module Reliability ...

  19. NREL: Gearbox Reliability Collaborative - Working with the Gearbox...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Wind Gearbox Reliability Collaborative Printable Version Working with the Gearbox Reliability Collaborative Learn more about how you can work with the Gearbox Reliability ...

  20. Topic A and B Awardee: Electric Reliability Council of Texas...

    Office of Environmental Management (EM)

    and B Awardee: Electric Reliability Council of Texas Topic A and B Awardee: Electric Reliability Council of Texas The Electric Reliability Council of Texas (ERCOT) manages the flow ...

  1. Electricity Reliability Council of Texas | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Reliability Council of Texas Jump to: navigation, search Logo: Electricity Reliability Council of Texas Name: Electricity Reliability Council of Texas Abbreviation: ERCOT Address:...

  2. China and India PV Reliability-NREL Cooperation | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    PV Reliability-NREL Cooperation Jump to: navigation, search Logo: China and India PV Reliability under the Asia Pacific Partnership Name China and India PV Reliability under the...

  3. POWER GRID RELIABILITY AND SECURITY

    SciTech Connect

    Bose, Anjan; Venkatasubramanian, Vaithianathan; Hauser, Carl; Bakken, David; Anderson, David; Zhao, Chuanlin; Liu, Dong; Yang, Tao; Meng, Ming; Zhang, Lin; Ning, Jiawei; Tashman, Zaid

    2014-09-30

    This project has led to the development of a real-time simulation platform for electric power grids called Grid Simulator or GridSim for simulating the dynamic and information network interactions of large- scale power systems. The platform consists of physical models of power system components including synchronous generators, loads and control, which are simulated using a modified commercial power simulator namely Transient Stability Analysis Tool (TSAT) [1] together with data cleanup components, as well as an emulated substation level and wide-area power analysis components. The platform also includes realistic representations of communication network middleware that can emulate the real-time information flow back and forth between substations and control centers in wide-area power systems. The platform has been validated on a realistic 6000-bus model of the western American power system. The simulator GridSim developed in this project is the first of its kind in its ability to simulate real-time response of large-scale power grids, and serves as a cost effective real-time stability and control simulation platform for power industry.

  4. Topic A and B Awardee: Electric Reliability Council of Texas

    Energy.gov [DOE]

    The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million Texas customers - representing 85 percent of the state's electric load and 75 percent of the Texas land area. As the independent system operator for the region, ERCOT schedules power on an electric grid that connects 40,000 miles of transmission lines and more than 550 generation units. ERCOT also manages financial settlement for the competitive wholesale bulk-power market and administers customer switching for 6.5 million Texans in competitive choice areas.

  5. Model-centric distribution automation: Capacity, reliability, and efficiency

    DOE PAGES [OSTI]

    Onen, Ahmet; Jung, Jaesung; Dilek, Murat; Cheng, Danling; Broadwater, Robert P.; Scirbona, Charlie; Cocks, George; Hamilton, Stephanie; Wang, Xiaoyu

    2016-02-26

    A series of analyses along with field validations that evaluate efficiency, reliability, and capacity improvements of model-centric distribution automation are presented. With model-centric distribution automation, the same model is used from design to real-time control calculations. A 14-feeder system with 7 substations is considered. The analyses involve hourly time-varying loads and annual load growth factors. Phase balancing and capacitor redesign modifications are used to better prepare the system for distribution automation, where the designs are performed considering time-varying loads. Coordinated control of load tap changing transformers, line regulators, and switched capacitor banks is considered. In evaluating distribution automation versus traditionalmore » system design and operation, quasi-steady-state power flow analysis is used. In evaluating distribution automation performance for substation transformer failures, reconfiguration for restoration analysis is performed. In evaluating distribution automation for storm conditions, Monte Carlo simulations coupled with reconfiguration for restoration calculations are used. As a result, the evaluations demonstrate that model-centric distribution automation has positive effects on system efficiency, capacity, and reliability.« less

  6. The implementation of substation automation coordinated with numerical protection relaying

    SciTech Connect

    Welie, G. van; Carolin, T.

    1994-12-31

    During 1987 Eskom embarked on a process of defining user requirements in the area of substation control. This ultimately resulted in a project being established for the procurement and development of a new generation of substation control equipment. At the same time it was decided to establish a new generation of protection schemes for transmission substations, based on numerical protection relays. From the outset, a high degree of coordination was planned between the substation control and protection equipment. Development contracts were placed with suppliers during late 1990 for the protection schemes and during early 1991 for the substation control equipment. These contracts are nearing completion and the first large installations will commence during 1994. The Transmission Group has committed to employing this new technology in all new substations and all substations to be refurbished. This paper discusses the concept of coordinated substation control and protection and gives insight into implementation issues and functional compromises which had to be made to meet project deadlines.

  7. NREL Publishes Gearbox Reliability Collaborative Findings Report

    Energy.gov [DOE]

    DOE's National Renewable Energy Laboratory (NREL) published the first formal report on the efforts of the Gearbox Reliability Collaborative (GRC) to address a major challenge for the wind energy industry—gearbox reliability. Gearbox failures require expensive and time-consuming replacement, significantly increasing the cost of wind plant operation while reducing the plant's power output and revenue.

  8. Agent Concept for Intelligent Distributed Coordination in the Electric Power Grid

    SciTech Connect

    SMATHERS, DOUGLAS C.; GOLDSMITH, STEVEN Y.

    2001-03-01

    Intelligent agents and multi-agent systems promise to take information management for real-time control of the power grid to a new level. This report presents our concept for intelligent agents to mediate and coordinate communications between Control Areas and Security Coordinators for real-time control of the power grid. An appendix describes the organizations and publications that deal with agent technologies.

  9. Case Study - Western Electricity Coordinating Council

    Energy Saver

    and promoting bulk electric system reliability in the Western Interconnection. ... The Western Interconnection Synchrophasor Program (WISP), led by WECC and involving 18 ...

  10. PV Performance and Reliability Validation Capabilities at Sandia...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Performance and Reliability Validation Capabilities at Sandia National Laboratories PV Performance and Reliability Validation Capabilities at Sandia National Laboratories This ...

  11. Competition and Reliability in North American Electricity Markets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop Competition and Reliability in North American ...

  12. Web Coordinator Meetings - January 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 2015 Web Coordinator Meetings - January 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1.2 MB) Minutes (62.26 KB) More Documents & Publications Web Coordinator Meetings - February 2015 Web Coordinator Meetings - March 2015 Web Coordinator Meetings - September

  13. Web Coordinator Meetings-September 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    September 2016 Web Coordinator Meetings-September 2016 The presentation and minutes from the September 2016 Web Coordinators Meeting. Presentation (5.75 MB) Minutes (58.34 KB) More Documents & Publications Web Coordinator Meetings-July 2016 Web Coordinator Meetings-January 2016 Web Coordinator Meetings-June 2016

  14. Web Coordinator Meetings - April 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings - April 2014 Web Coordinator Meetings - April 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1.17 MB) Minutes (60.88 KB) More Documents & Publications Web Coordinator Meetings - June 2014 Web Coordinator Meetings - March 2014 Web Coordinator Meetings - February 2014

  15. Web Coordinator Meetings - June 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    June 2014 Web Coordinator Meetings - June 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentatiom (1.06 MB) Minutes (61.39 KB) More Documents & Publications Web Coordinator Meetings - April 2014 Web Coordinator Meetings - March 2014 Web Coordinator Meetings - February 2014

  16. Web Coordinator Meetings - September 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings - September 2014 Web Coordinator Meetings - September 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (2.1 MB) Minutes (61.01 KB) More Documents & Publications Web Coordinator Meetings - June 2014 Web Coordinator Meetings - January 2014 Web Coordinator Meetings - July 2014

  17. Web Coordinator Meetings-August 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings-August 2016 Web Coordinator Meetings-August 2016 The presentation and minutes from the August 2016 Web Coordinators Meeting. Presentation (2.01 MB) Minutes (57.69 KB) More Documents & Publications Web Coordinator Meetings-July 2016 Web Coordinator Meetings-January 2016 Web Coordinator Meetings-June 2016

  18. Coordination of General Accounting Office Activities

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1992-06-08

    The order provides policies, procedures, and responsibilities for the coordination of General Accounting Office activities and actions required when GAO reports contain recommendations pertaining to the DOE. Supersedes DOE O 2340.1B.

  19. Highly accurate articulated coordinate measuring machine

    DOEpatents

    Bieg, Lothar F.; Jokiel, Jr., Bernhard; Ensz, Mark T.; Watson, Robert D.

    2003-12-30

    Disclosed is a highly accurate articulated coordinate measuring machine, comprising a revolute joint, comprising a circular encoder wheel, having an axis of rotation; a plurality of marks disposed around at least a portion of the circumference of the encoder wheel; bearing means for supporting the encoder wheel, while permitting free rotation of the encoder wheel about the wheel's axis of rotation; and a sensor, rigidly attached to the bearing means, for detecting the motion of at least some of the marks as the encoder wheel rotates; a probe arm, having a proximal end rigidly attached to the encoder wheel, and having a distal end with a probe tip attached thereto; and coordinate processing means, operatively connected to the sensor, for converting the output of the sensor into a set of cylindrical coordinates representing the position of the probe tip relative to a reference cylindrical coordinate system.

  20. Western Electricity Coordinating Council | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Council Jump to: navigation, search Name: Western Electricity Coordinating Council Place: Salt Lake City, UT References: SGIC1 This article is a stub. You can help OpenEI by...

  1. Widget:CoordinatesHelper | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search This widget creates an additional button on the clickable Google map used to assist with the input of coordinates. The additional button allows for the...

  2. Feature Clustering for Accelerating Parallel Coordinate Descent

    SciTech Connect

    Scherrer, Chad; Tewari, Ambuj; Halappanavar, Mahantesh; Haglin, David J.

    2012-12-06

    We demonstrate an approach for accelerating calculation of the regularization path for L1 sparse logistic regression problems. We show the benefit of feature clustering as a preconditioning step for parallel block-greedy coordinate descent algorithms.

  3. WWW media distribution via Hopwise reliable multicast

    SciTech Connect

    Donnelley, J.E.

    1994-12-01

    Repeated access to WWW pages currently makes inefficient use of available network bandwidth. A Distribution Point Model is proposed where large and relatively static sets of pages (e.g. magazines or other such media) are distributed via bulk multicast to LAN distribution points for local access. Some access control issues are discussed. Hopwise Reliable Multicast (HRM) is proposed to simplify reliable multicast of non real time bulk data between LANs. HRM uses TCP for reliability and flow control on a hop by hop basis throughout a multicast distribution tree created by today`s Internet MBone.

  4. MEMS reliability: The challenge and the promise

    SciTech Connect

    Miller, W.M.; Tanner, D.M.; Miller, S.L.; Peterson, K.A.

    1998-05-01

    MicroElectroMechanical Systems (MEMS) that think, sense, act and communicate will open up a broad new array of cost effective solutions only if they prove to be sufficiently reliable. A valid reliability assessment of MEMS has three prerequisites: (1) statistical significance; (2) a technique for accelerating fundamental failure mechanisms, and (3) valid physical models to allow prediction of failures during actual use. These already exist for the microelectronics portion of such integrated systems. The challenge lies in the less well understood micromachine portions and its synergistic effects with microelectronics. This paper presents a methodology addressing these prerequisites and a description of the underlying physics of reliability for micromachines.

  5. Issues in benchmarking human reliability analysis methods : a literature review.

    SciTech Connect

    Lois, Erasmia; Forester, John Alan; Tran, Tuan Q.; Hendrickson, Stacey M. Langfitt; Boring, Ronald L.

    2008-04-01

    There is a diversity of human reliability analysis (HRA) methods available for use in assessing human performance within probabilistic risk assessment (PRA). Due to the significant differences in the methods, including the scope, approach, and underlying models, there is a need for an empirical comparison investigating the validity and reliability of the methods. To accomplish this empirical comparison, a benchmarking study is currently underway that compares HRA methods with each other and against operator performance in simulator studies. In order to account for as many effects as possible in the construction of this benchmarking study, a literature review was conducted, reviewing past benchmarking studies in the areas of psychology and risk assessment. A number of lessons learned through these studies are presented in order to aid in the design of future HRA benchmarking endeavors.

  6. Coordination of Retail Demand Response with Midwest ISO Markets

    SciTech Connect

    Bharvirkar, Ranjit; Bharvirkar, Ranjit; Goldman, Charles; Heffner, Grayson; Sedano, Richard

    2008-05-27

    The Organization of Midwest ISO States (OMS) launched the Midwest Demand Resource Initiative (MWDRI) in 2007 to identify barriers to deploying demand response (DR) resources in the Midwest Independent System Operator (MISO) region and develop policies to overcome them. The MWDRI stakeholders decided that a useful initial activity would be to develop more detailed information on existing retail DR programs and dynamic pricing tariffs, program rules, and utility operating practices. This additional detail could then be used to assess any"seams issues" affecting coordination and integration of retail DR resources with MISO's wholesale markets. Working with state regulatory agencies, we conducted a detailed survey of existing DR programs, dynamic pricing tariffs, and their features in MISO states. Utilities were asked to provide information on advance notice requirements to customers, operational triggers used to call events (e.g. system emergencies, market conditions, local emergencies), use of these DR resources to meet planning reserves requirements, DR resource availability (e.g., seasonal, annual), participant incentive structures, and monitoring and verification (M&V) protocols. This report describes the results of this comprehensive survey and discusses policy implications for integrating legacy retail DR programs and dynamic pricing tariffs into organized wholesale markets. Survey responses from 37 MISO members and 4 non-members provided information on 141 DR programs and dynamic pricing tariffs with a peak load reduction potential of 4,727 MW of retail DR resource. Major findings of this study area:- About 72percent of available DR is from interruptible rate tariffs offered to large commercial and industrial customers, while direct load control (DLC) programs account for ~;;18percent. Almost 90percent of the DR resources included in this survey are provided by investor-owned utilities. - Approximately, 90percent of the DR resources are available with less than

  7. Coordinated Fault Tolerance for High-Performance Computing

    SciTech Connect

    Dongarra, Jack; Bosilca, George; et al.

    2013-04-08

    Our work to meet our goal of end-to-end fault tolerance has focused on two areas: (1) improving fault tolerance in various software currently available and widely used throughout the HEC domain and (2) using fault information exchange and coordination to achieve holistic, systemwide fault tolerance and understanding how to design and implement interfaces for integrating fault tolerance features for multiple layers of the software stack—from the application, math libraries, and programming language runtime to other common system software such as jobs schedulers, resource managers, and monitoring tools.

  8. Web Coordinator Meetings-April 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Web Coordinator Meetings-April 2016 Web Coordinator Meetings-April 2016 The presentation and minutes from the April 2016 Web Coordinators Meeting. Presentation (2.53 MB) Minutes ...

  9. Web Coordinator Meetings-July 2016 | Department of Energy

    Energy.gov [DOE] (indexed site)

    the July 2016 Web Coordinators Meeting. Presentation (1.18 MB) Minutes (57.51 KB) More Documents & Publications Web Coordinator Meetings-June 2016 Web Coordinator Meetings-April ...

  10. Sandia Energy - PV Reliability & Performance Model

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    15-06-01T20:13:00+00:00 This Web Demo model is a simplified "player" version of the Photovoltaic Reliability Performance Model (PV-RPM) currently in development at Sandia National...

  11. MOV reliability evaluation and periodic verification scheduling

    SciTech Connect

    Bunte, B.D.

    1996-12-01

    The purpose of this paper is to establish a periodic verification testing schedule based on the expected long term reliability of gate or globe motor operated valves (MOVs). The methodology in this position paper determines the nominal (best estimate) design margin for any MOV based on the best available information pertaining to the MOVs design requirements, design parameters, existing hardware design, and present setup. The uncertainty in this margin is then determined using statistical means. By comparing the nominal margin to the uncertainty, the reliability of the MOV is estimated. The methodology is appropriate for evaluating the reliability of MOVs in the GL 89-10 program. It may be used following periodic testing to evaluate and trend MOV performance and reliability. It may also be used to evaluate the impact of proposed modifications and maintenance activities such as packing adjustments. In addition, it may be used to assess the impact of new information of a generic nature which impacts safety related MOVs.

  12. Wind Power Reliability Research | Wind | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Wind Power Reliability Research The U.S. wind power industry is well established, with nearly 75 gigawatts of installed capacity across the United States. Given this large base of ...

  13. Photovoltaic Reliability and Engineering (Revised) (Fact Sheet)

    SciTech Connect

    Not Available

    2011-06-01

    Capabilities fact sheet for the National Center for Photovoltaics: Photovoltaic Reliability and Engineering. One-sided sheet that includes Scope, Core Competencies and Capabilities, and Contact/Web information.

  14. NREL: Photovoltaics Research - Performance and Reliability R...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Modules and systems are tested for long-term performance and stressed in the field and with accelerated testing equipment, all to find R&D solutions to improve PV reliability. ...

  15. PV Module Reliability Research (Fact Sheet)

    SciTech Connect

    Not Available

    2013-06-01

    This National Center for Photovoltaics sheet describes the capabilities of its PV module reliability research. The scope and core competencies and capabilities are discussed and recent publications are listed.

  16. Reliability Challenges for Solar Energy (Presentation)

    SciTech Connect

    Kurtz, S.

    2009-04-27

    PV industry can benefit from reliability testing experience of microelectronics industry . Si modules perform well in field; CdTe/CIGS must be sealed to moisture; CPV in product development stage.

  17. Photovoltaic Module Reliability Workshop 2013 | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... C.E. Packard, J.H. Wohlgemuth and S.R. Kurtz of NREL Highly Reliable Photovoltaic Solar Topology, Timothy Johnson of TenKsolar Solar Energy Research Institute for India ...

  18. Reliability of chemical analyses of water samples

    SciTech Connect

    Beardon, R.

    1989-11-01

    Ground-water quality investigations require reliable chemical analyses of water samples. Unfortunately, laboratory analytical results are often unreliable. The Uranium Mill Tailings Remedial Action (UMTRA) Project`s solution to this problem was to establish a two phase quality assurance program for the analysis of water samples. In the first phase, eight laboratories analyzed three solutions of known composition. The analytical accuracy of each laboratory was ranked and three laboratories were awarded contracts. The second phase consists of on-going monitoring of the reliability of the selected laboratories. The following conclusions are based on two years experience with the UMTRA Project`s Quality Assurance Program. The reliability of laboratory analyses should not be taken for granted. Analytical reliability may be independent of the prices charged by laboratories. Quality assurance programs benefit both the customer and the laboratory.

  19. Reliability Issues for Photovoltaic Modules (Presentation)

    SciTech Connect

    Kurtz, S.

    2009-10-01

    Si modules good in field; new designs need reliability testing. CdTe & CIGS modules sensitive to moisture; carefully seal. CPV in product development stage; benefits from expertise in other industries.

  20. Reliability Technology earns prestigious Los Alamos award

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability Technology earns award Reliability Technology earns prestigious Los Alamos award LANL has honored Michael Hamada, Harry Martz and a team of researchers with its first Richard Feynman Prize for Innovation Achievement. August 27, 2013 Terry Wallace, right, Los Alamos National Laboratory Principal Associate Director for Global Security, congratulates Harold Martz, second from right, and Michael Hamada for winning the Laboratory's first-ever Richard Feynman Prize for Innovation

  1. System Reliability for LED-Based Products

    SciTech Connect

    Davis, J Lynn; Mills, Karmann; Lamvik, Michael; Yaga, Robert; Shepherd, Sarah D; Bittle, James; Baldasaro, Nick; Solano, Eric; Bobashev, Georgiy; Johnson, Cortina; Evans, Amy

    2014-04-07

    Results from accelerated life tests (ALT) on mass-produced commercially available 6” downlights are reported along with results from commercial LEDs. The luminaires capture many of the design features found in modern luminaires. In general, a systems perspective is required to understand the reliability of these devices since LED failure is rare. In contrast, components such as drivers, lenses, and reflector are more likely to impact luminaire reliability than LEDs.

  2. Production Facility System Reliability Analysis Report

    SciTech Connect

    Dale, Crystal Buchanan; Klein, Steven Karl

    2015-10-06

    This document describes the reliability, maintainability, and availability (RMA) modeling of the Los Alamos National Laboratory (LANL) design for the Closed Loop Helium Cooling System (CLHCS) planned for the NorthStar accelerator-based 99Mo production facility. The current analysis incorporates a conceptual helium recovery system, beam diagnostics, and prototype control system into the reliability analysis. The results from the 1000 hr blower test are addressed.

  3. Reliability Technology earns prestigious Los Alamos Award

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability Technology earns prestigious Los Alamos Award Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:November 2, 2016 all issues All Issues » submit Reliability Technology earns prestigious Los Alamos Award Technology transferred to Procter & Gamble basis for first-ever Feynman Prize September 1, 2013 Feynman Prize winners Michael Hamada, center, and Harry Martz, second from left, hold their Feynman Prizes during a recent

  4. Reliable Viscosity Calculation from Equilibrium Molecular Dynamics

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Simulations: A Time Decomposition Method - Joint Center for Energy Storage Research July 7, 2015, Research Highlights Reliable Viscosity Calculation from Equilibrium Molecular Dynamics Simulations: A Time Decomposition Method Schematic demonstration of the time decomposition method Scientific Achievement An equilibrium molecular dynamics-based computational method is developed and tested for the reliable calculation of viscosity. Significance and Impact Viscosity is one of the key properties

  5. Gearbox Reliability Collaborative (GRC) Description and Loading

    SciTech Connect

    Oyague, F.

    2011-11-01

    This document describes simulated turbine load cases in accordance to the IEC 61400-1 Ed.3 standard, which is representative of the typical wind turbine design process. The information presented herein is intended to provide a broad understanding of the gearbox reliability collaborative 750kW drivetrain and turbine configuration. In addition, fatigue and ultimate strength drivetrain loads resulting from simulations are presented. This information provides the bases for the analytical work of the gearbox reliability collaborative effort.

  6. Dormant storage reliability assessments-data based

    SciTech Connect

    Merren, G.T.

    1981-01-01

    A relatively large amount of data pertaining to the performance of certain electronic parts after long periods of dormant storage has been collected and analyzed by the Reliability Department of Sandia National Laboratories. The failure models used by Sandia are presented and reliability assessments for selected electronic parts derived from these models and the measured performance data are provided. These data based assessments are compared to similar assessments derived from handbook calculations using the general data and models provided in the handbooks.

  7. Office of Electricity Delivery and Energy Reliability

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Comments of Cisco Systems to Office of Electricity Delivery and Energy Reliability Department of Energy in Response to Request for Information: Addressing Policy and Logistical Challenges to Smart Grid Implementation Issued September 13, 2010 FR Doc. 2010-23251 November 30, 2010 Cisco Systems provides these Comments in response to the Request for Information ("RFI") issued by the Office of Electricity Delivery and Energy Reliability of the Department of Energy ("DOE") on

  8. Grid Performance and Reliability | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Systems Integration » Grid Performance and Reliability Grid Performance and Reliability 2 way power flow orange2.png As the solar industry moves towards achieving the SunShot Initiative goals, the nation's electricity grid must evolve to accommodate increasing amounts of distributed photovoltaic (PV) systems. Effectively interconnecting variable PV generation requires forward thinking and dynamic solutions to ensure compatibility with the existing grid. Projects in the Grid Performance and

  9. Fuel Cell Transit Bus Coordination and Evaluation Plan California...

    Energy Saver

    Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit Evaluation Team Fuel Cell Transit Bus Coordination and Evaluation Plan California Fuel Cell Transit ...

  10. Utah Public Lands Policy Coordination Office | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Lands Policy Coordination Office Jump to: navigation, search Name: Governor's Public Lands Policy Coordination Office Address: 5110 State Office Building Place: Salt Lake City,...

  11. Web Coordinator Meetings - July 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 Web Coordinator Meetings - July 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications Web...

  12. Web Coordinator Meetings - September 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Web Coordinator Meetings - September 2013 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications...

  13. Web Coordinator Meetings - March 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 Web Coordinator Meetings - March 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications Web...

  14. Web Coordinator Meetings - February 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Web Coordinator Meetings - February 2013 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications...

  15. Web Coordinator Meetings - January 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Web Coordinator Meetings - January 2013 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications...

  16. Web Coordinator Meetings - August 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 Web Coordinator Meetings - August 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications Web...

  17. Web Coordinator Meetings - July 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    4 Web Coordinator Meetings - July 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents & Publications Web...

  18. Web Coordinator Meetings - December 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 2014 Web Coordinator Meetings - December 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation Minutes More Documents &...

  19. Kazakhstan Climate Change Coordination Center | Open Energy Informatio...

    OpenEI (Open Energy Information) [EERE & EIA]

    Kazakhstan Climate Change Coordination Center Jump to: navigation, search Name: Kazakhstan Climate Change Coordination Center Address: 48 Abai Street, Room 102 Astana (473000)...

  20. CBEI: Coordinating RTUs in Small and Medium Sized Commercial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coordinating RTUs in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: Coordinating RTUs in Small and Medium Sized Commercial Buildings - 2015 Peer Review ...

  1. Web Coordinator Meetings - November 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    November 2013 Web Coordinator Meetings - November 2013 The presentation and minutes from this monthly meeting of the EERE Web coordinators. File Presentation File Minutes More ...

  2. Web Coordinator Meetings - August 2013 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    August 2013 Web Coordinator Meetings - August 2013 The presentation and minutes from this monthly meeting of the EERE Web coordinators. File Presentation File Minutes More ...

  3. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    OpenEI (Open Energy Information) [EERE & EIA]

    to use the flowcharts created by the Interagency Wild and Scenic Rivers Coordinating Council. Author The Interagency Wild and Scenic Rivers Coordinating Council Published The...

  4. Comments on Notice of Proposed Rulemaking for Coordination of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    on Notice of Proposed Rulemaking for Coordination of Federal Authorizations for Electric Transmission Facilities Comments on Notice of Proposed Rulemaking for Coordination of...

  5. Coordination of Federal Transmission Permitting on Federal Lands...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Planning Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, ...

  6. Web Coordinator Meetings - May 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings - May 2015 Web Coordinator Meetings - May 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1017.46 KB) MInutes ...

  7. Web Coordinator Meetings - April 2015 | Department of Energy

    Office of Environmental Management (EM)

    Meetings - April 2015 Web Coordinator Meetings - April 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1.75 MB) Minutes ...

  8. Web Coordinator Meetings - November 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings - November 2014 Web Coordinator Meetings - November 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1.06 MB) ...

  9. Bay Area

    National Nuclear Security Administration (NNSA)

    8%2A en NNSA to Conduct Aerial Radiological Surveys Over San Francisco, Pacifica, Berkeley, And Oakland, CA Areas http:nnsa.energy.govmediaroompressreleasesamsca

  10. Research Areas

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    in diverse research areas such as cell biology, lithography, infrared microscopy, radiology, and x-ray tomography. Time-Resolved These techniques exploit the pulsed nature of...

  11. Creating a Transactive Energy Framework: Improving Reliability and Efficiency

    SciTech Connect

    Melton, Ronald B.

    2013-11-01

    The use of demand response and other flexible distributed resources over the past decade for market efficiency and grid reliability has grown dramatically. Federal and state policy objectives point to an important role for customer loads, generation and storage in the management of an increasingly unpredictable power system. As we consider the need to substantially scale the use of flexible distributed energy resources, there has been growing attention to the need to address not only the economics, but also the control system implications to ensure grid reliability. This has led to a focus on an area of activity called “Transactive Energy.” Transactive Energy refers to the combination of economic and control techniques that improve grid reliability and efficiency. These techniques may also be used to optimize operations within a customer’s facility. The Department of Energy has supported the GridWise® Architecture Council (“the Council”) to develop a framework to provide opportunity for collaboration among the many stakeholders involved in the transformation of the power system.

  12. A Research Roadmap for Computation-Based Human Reliability Analysis

    SciTech Connect

    Boring, Ronald; Mandelli, Diego; Joe, Jeffrey; Smith, Curtis; Groth, Katrina

    2015-08-01

    The United States (U.S.) Department of Energy (DOE) is sponsoring research through the Light Water Reactor Sustainability (LWRS) program to extend the life of the currently operating fleet of commercial nuclear power plants. The Risk Informed Safety Margin Characterization (RISMC) research pathway within LWRS looks at ways to maintain and improve the safety margins of these plants. The RISMC pathway includes significant developments in the area of thermalhydraulics code modeling and the development of tools to facilitate dynamic probabilistic risk assessment (PRA). PRA is primarily concerned with the risk of hardware systems at the plant; yet, hardware reliability is often secondary in overall risk significance to human errors that can trigger or compound undesirable events at the plant. This report highlights ongoing efforts to develop a computation-based approach to human reliability analysis (HRA). This computation-based approach differs from existing static and dynamic HRA approaches in that it: (i) interfaces with a dynamic computation engine that includes a full scope plant model, and (ii) interfaces with a PRA software toolset. The computation-based HRA approach presented in this report is called the Human Unimodels for Nuclear Technology to Enhance Reliability (HUNTER) and incorporates in a hybrid fashion elements of existing HRA methods to interface with new computational tools developed under the RISMC pathway. The goal of this research effort is to model human performance more accurately than existing approaches, thereby minimizing modeling uncertainty found in current plant risk models.

  13. Combining Balancing Areas' Variability: Impacts on Wind Integration in the Western Interconnection

    SciTech Connect

    Milligan, M.; Kirby, B.; Beuning, S.

    2010-07-01

    This paper investigates the potential impact of balancing area cooperation on a large-scale in the Western Electricity Coordinating Council (WECC).

  14. Continuous Reliability Enhancement for Wind (CREW) database :

    SciTech Connect

    Hines, Valerie Ann-Peters; Ogilvie, Alistair B.; Bond, Cody R.

    2013-09-01

    To benchmark the current U.S. wind turbine fleet reliability performance and identify the major contributors to component-level failures and other downtime events, the Department of Energy funded the development of the Continuous Reliability Enhancement for Wind (CREW) database by Sandia National Laboratories. This report is the third annual Wind Plant Reliability Benchmark, to publically report on CREW findings for the wind industry. The CREW database uses both high resolution Supervisory Control and Data Acquisition (SCADA) data from operating plants and Strategic Power Systems ORAPWindª (Operational Reliability Analysis Program for Wind) data, which consist of downtime and reserve event records and daily summaries of various time categories for each turbine. Together, these data are used as inputs into CREWs reliability modeling. The results presented here include: the primary CREW Benchmark statistics (operational availability, utilization, capacity factor, mean time between events, and mean downtime); time accounting from an availability perspective; time accounting in terms of the combination of wind speed and generation levels; power curve analysis; and top system and component contributors to unavailability.

  15. NREL: Performance and Reliability R&D - Real-Time Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Failure Analysis for Photovoltaic Reliability NREL has equipment and expertise for failure analysis of modules and components. Primary techniques for analyzing modules include ...

  16. Incident Management Preparedness and Coordination Toolkit

    SciTech Connect

    Koch, Daniel B.

    2013-04-01

    As with many professions, safety planners and first responders tend to be specialists in certain areas. To be truly useful, tools should be tailored to meet their specific needs. Thus, general software suites aimed at the professional geographic information system (GIS) community might not be the best solution for a first responder with little training in GIS terminology and techniques. On the other hand, commonly used web-based map viewers may not have the capability to be customized for the planning, response, and recovery (PR&R) mission. Data formats should be open and foster easy information flow among local, state, and federal partners. Tools should be free or low-cost to address real-world budget constraints at the local level. They also need to work both with and without a network connection to be robust. The Incident Management Preparedness and Coordination Toolkit (IMPACT) can satisfy many of these needs while working in harmony with established systems at the local, state, and federal levels. The IMPACT software framework, termed the Geospatial Integrated Problem Solving Environment (GIPSE), organizes tasks, tools, and resources for the end user. It uses the concept of software wizards to both customize and extend its functionality. On the Tasks panel are a number of buttons used to initiate various operations. Similar to macros, these task buttons launch scripts that utilize the full functionality of the underlying foundational components such as the SQL spatial database and ORNL-developed map editor. The user is presented with a series of instruction pages which are implemented with HTML for interactivity. On each page are links which initiate specific actions such as creating a map showing various features. Additional tasks may be quickly programmed and added to the panel. The end user can customize the graphical interface to faciltate its use during an emergency. One of the major components of IMPACT is the ORNL Geospatial Viewer (OGV). It is used to

  17. Incident Management Preparedness and Coordination Toolkit

    Energy Science and Technology Software Center

    2013-04-01

    As with many professions, safety planners and first responders tend to be specialists in certain areas. To be truly useful, tools should be tailored to meet their specific needs. Thus, general software suites aimed at the professional geographic information system (GIS) community might not be the best solution for a first responder with little training in GIS terminology and techniques. On the other hand, commonly used web-based map viewers may not have the capability tomore » be customized for the planning, response, and recovery (PR&R) mission. Data formats should be open and foster easy information flow among local, state, and federal partners. Tools should be free or low-cost to address real-world budget constraints at the local level. They also need to work both with and without a network connection to be robust. The Incident Management Preparedness and Coordination Toolkit (IMPACT) can satisfy many of these needs while working in harmony with established systems at the local, state, and federal levels. The IMPACT software framework, termed the Geospatial Integrated Problem Solving Environment (GIPSE), organizes tasks, tools, and resources for the end user. It uses the concept of software wizards to both customize and extend its functionality. On the Tasks panel are a number of buttons used to initiate various operations. Similar to macros, these task buttons launch scripts that utilize the full functionality of the underlying foundational components such as the SQL spatial database and ORNL-developed map editor. The user is presented with a series of instruction pages which are implemented with HTML for interactivity. On each page are links which initiate specific actions such as creating a map showing various features. Additional tasks may be quickly programmed and added to the panel. The end user can customize the graphical interface to faciltate its use during an emergency. One of the major components of IMPACT is the ORNL Geospatial Viewer (OGV). It is

  18. Reaction coordinates for electron transfer reactions

    SciTech Connect

    Rasaiah, Jayendran C.; Zhu Jianjun

    2008-12-07

    The polarization fluctuation and energy gap formulations of the reaction coordinate for outer sphere electron transfer are linearly related to the constant energy constraint Lagrangian multiplier m in Marcus' theory of electron transfer. The quadratic dependence of the free energies of the reactant and product intermediates on m and m+1, respectively, leads to similar dependence of the free energies on the reaction coordinates and to the same dependence of the activation energy on the reorganization energy and the standard reaction free energy. Within the approximations of a continuum model of the solvent and linear response of the longitudinal polarization to the electric field in Marcus' theory, both formulations of the reaction coordinate are expected to lead to the same results.

  19. Safety and Security Enforcement Coordinator Handbook | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Safety and Security Enforcement Coordinator Handbook Safety and Security Enforcement Coordinator Handbook April 2015 This handbook is a companion document to the Enforcement Process Overview (EPO). The Safety and Security Enforcement Coordinator Handbook is intended to provide Department of Energy (DOE) and DOE contractor enforcement coordinators with information to aid their respective organizations in implementing effective regulatory noncompliance monitoring and reporting programs. In

  20. TT Coordinator Ltr dated May 13 2010 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TT Coordinator Ltr dated May 13 2010 TT Coordinator Ltr dated May 13 2010 TT Coordinator Ltr dated May 13 2010 TT_Coordinator_Ltr_dated_May_13_2010.pdf (13.89 KB) More Documents & Publications Technology Partnership Ombudsman - Roles, Responsibilities, Authorities and Accountabilities Technology Partnership Ombudsman - Roles, Responsibilities, Authorities and Accountabilities OHA 2014 ANNUAL REPORT

  1. Gearbox Reliability Collaborative Update: A Brief (Presentation)

    SciTech Connect

    Sheng, S.; Keller, J.; McDade, M.

    2012-01-01

    This presentation is an update on the Gearbox Reliability Collaborative (GRC) for the AWEA Wind Project Operations, Maintenance & Reliability Seminar. GRC accomplishments are: (1) Failure database software deployed - partners see business value for themselves and customers; (2) Designed, built, instrumented, and tested two gearboxes - (a) Generated unprecedented public domain test data from both field testing and dynamometer testing, (b) Different responses from 'identical' gearboxes, (c) Demonstrated importance of non-torque loading and modeling approach; and (3) Active collaborative, with wide industry support, leveraging DOE funding - Modeling round robin and Condition Monitoring round robin.

  2. MHTGR thermal performance envelopes: Reliability by design

    SciTech Connect

    Etzel, K.T.; Howard, W.W.; Zgliczynski, J.B.

    1992-05-01

    This document discusses thermal performance envelopes which are used to specify steady-state design requirements for the systems of the Modular High Temperature Gas-Cooled Reactor to maximize plant performance reliability with optimized design. The thermal performance envelopes are constructed around the expected operating point accounting for uncertainties in actual plant as-built parameters and plant operation. The components are then designed to perform successfully at all points within the envelope. As a result, plant reliability is maximized by accounting for component thermal performance variation in the design. The design is optimized by providing a means to determine required margins in a disciplined and visible fashion.

  3. Visual inspection reliability for precision manufactured parts

    DOE PAGES [OSTI]

    See, Judi E.

    2015-09-04

    Sandia National Laboratories conducted an experiment for the National Nuclear Security Administration to determine the reliability of visual inspection of precision manufactured parts used in nuclear weapons. In addition visual inspection has been extensively researched since the early 20th century; however, the reliability of visual inspection for nuclear weapons parts has not been addressed. In addition, the efficacy of using inspector confidence ratings to guide multiple inspections in an effort to improve overall performance accuracy is unknown. Further, the workload associated with inspection has not been documented, and newer measures of stress have not been applied.

  4. Technique for Measuring Hybrid Electronic Component Reliability

    SciTech Connect

    Green, C.C.; Hernandez, C.L.; Hosking, F.M.; Robinson, D.; Rutherford, B.; Uribe, F.

    1999-01-01

    Materials compatibility studies of aged, engineered materials and hardware are critical to understanding and predicting component reliability, particularly for systems with extended stockpile life requirements. Nondestructive testing capabilities for component reliability would significantly enhance lifetime predictions. For example, if the detection of crack propagation through a solder joint can be demonstrated, this technique could be used to develop baseline information to statistically determine solder joint lifelengths. This report will investigate high frequency signal response techniques for nondestructively evaluating the electrical behavior of thick film hybrid transmission lines.

  5. Owner/Operator Perspective on Reliability Customer Needs and...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SERVICES AS RELIABLE AS THE SUN OwnerOperator Perspective on Reliability Customer Needs and Field Data Sandia National Laboratories Utility-Scale Grid-Tied PV Inverter Reliability...

  6. 2015 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reliability & Markets Peer Review 2015 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 16 presentations over 2 days on August 4 - 5, 2015 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are available below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure

  7. 2013 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reliability & Markets Peer Review 2013 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 13 presentations over 2 days on August 6 - 7, 2013 at Cornell University in Ithaca, NY. Presentations are available through the links. The agenda and list of presentations are included below. The Reliability and Markets activity of the Transmission Reliability program researches, develops, and implements electricity infrastructure

  8. Arrays of stacked metal coordination compounds

    DOEpatents

    Bulkowski, J.E.

    1986-10-21

    A process is disclosed for preparing novel arrays of metal coordination compounds characterized by arrangement of the metal ions, separated by a linking agent, in stacked order one above the other. The process permits great flexibility in the design of the array. For example, layers of different composition can be added to the array at will. 3 figs.

  9. Linked-View Parallel Coordinate Plot Renderer

    Energy Science and Technology Software Center

    2011-06-28

    This software allows multiple linked views for interactive querying via map-based data selection, bar chart analytic overlays, and high dynamic range (HDR) line renderings. The major component of the visualization package is a parallel coordinate renderer with binning, curved layouts, shader-based rendering, and other techniques to allow interactive visualization of multidimensional data.

  10. Arrays of stacked metal coordination compounds

    DOEpatents

    Bulkowski, John E. (Newark, DE)

    1986-01-01

    A process is disclosed for preparing novel arrays of metal coordination compounds characterized by arrangement of the metal ions, separated by a linking agent, in stacked order one above the other. The process permits great flexibility in the design of the array. For example, layers of different composition can be added to the array at will.

  11. Coordinated Collaboration between Heterogeneous Distributed Energy Resources

    DOE PAGES [OSTI]

    Abdollahy, Shahin; Lavrova, Olga; Mammoli, Andrea

    2014-01-01

    A power distribution feeder, where a heterogeneous set of distributed energy resources is deployed, is examined by simulation. The energy resources include PV, battery storage, natural gas GenSet, fuel cells, and active thermal storage for commercial buildings. The resource scenario considered is one that may exist in a not too distant future. Two cases of interaction between different resources are examined. One interaction involves a GenSet used to partially offset the duty cycle of a smoothing battery connected to a large PV system. The other example involves the coordination of twenty thermal storage devices, each associated with a commercial building.more » Storage devices are intended to provide maximum benefit to the building, but it is shown that this can have a deleterious effect on the overall system, unless the action of the individual storage devices is coordinated. A network based approach is also introduced to calculate some type of effectiveness metric to all available resources which take part in coordinated operation. The main finding is that it is possible to achieve synergy between DERs on a system; however this required a unified strategy to coordinate the action of all devices in a decentralized way.« less

  12. Chromosome Coordinating Meeting 1992 (CCM92)

    SciTech Connect

    Cuticchia, A.J.; Pearson, P.L.; Klinger, H.P.

    1992-12-31

    The Chromosome Coordinating Meeting, CCM 92, was held in Baltimore on November 15--17, 1992. The two major features of the workshop were entry of gene mapping data into databases and construction of consensus data sets (a process called chromosome editing).

  13. Safety and Security Enforcement Coordinator Handbook

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SAFETY AND SECURITY ENFORCEMENT COORDINATOR HANDBOOK APRIL 2015 Office of Enforcement Office of Enterprise Assessments U.S. Department of Energy Table of Contents Ensure use of the current version of this document by checking the Office of Enterprise Assessments website at: http://energy.gov/ea/services/enforcement/enforcement-program-and- process-guidance-and-information Acronyms

  14. Effect of Jatropha based Biodiesel, on Engine Hardware Reliability...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jatropha based Biodiesel, on Engine Hardware Reliability, Emission and Performance Effect of Jatropha based Biodiesel, on Engine Hardware Reliability, Emission and Performance ...

  15. Coming Full Circle in Florida: Improving Electric Grid Reliability...

    Energy Saver

    Coming Full Circle in Florida: Improving Electric Grid Reliability and Resiliency Coming Full Circle in Florida: Improving Electric Grid Reliability and Resiliency May 2, 2013 - ...

  16. Electro-thermal-mechanical Simulation and Reliability for Plug...

    Energy.gov [DOE] (indexed site)

    Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle Converters and Inverters Electro-thermal-mechanical Simulation and Reliability for Plug-in Vehicle ...

  17. ORISE: Inter-rater Reliability brings Standardization to Scientific...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Standardization of Scientific Peer Reviews Inter-Rater Reliability (IRR): new initiative ... a new initiative termed "inter-rater reliability" or IRR. Although IRR may have a ...

  18. NREL: Photovoltaics Research - NREL Hosts PV Module Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability Workshop for Industry March 1, 2016 Nearly 200 researchers from more than 100 companies and representing 16 countries attended the 7th annual PV Module Reliability ...

  19. NREL: Performance and Reliability R&D - Webmaster

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Your email address: Your message: Send Message Printable Version Performance & Reliability Home Capabilities Real-Time Reliability Accelerated Testing Standards Development ...

  20. NREL: Performance and Reliability R&D - Industry Workshop and...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability Each year, NREL researchers, along with solar companies and other national lab researchers, participate in an industry workshop on photovoltaic (PV) reliability, ...

  1. Manufacturing Metrology for c-Si Module Reliability/Durabiltiy...

    Energy.gov [DOE] (indexed site)

    Reliability Workshop, February 26 - 27 2013, Golden, Colorado PDF icon pvmrw13ps1fsecrogers.pdf More Documents & Publications Agenda for the PV Module Reliability Workshop, ...

  2. Thermal Stress and Reliability for Advanced Power Electronics...

    Energy.gov [DOE] (indexed site)

    Thermal Stress and Reliability for Advanced Power Electronics and Electric Machines Power Electronic Thermal System Performance and Integration Thermal Performance and Reliability ...

  3. Microsoft PowerPoint - NERC Reliability Standards and Mandatory...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NERC Reliability NERC Reliability Standards and Standards and Mandatory Compliance Mandatory Compliance Hydro Hydro - - Power Conference Power Conference June 13, 2007 June 13, ...

  4. NREL: Solar Research - NREL Hosts PV Module Reliability Workshop...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliability Workshop for Industry March 1, 2016 Nearly 200 researchers from more than 100 companies and representing 16 countries attended the 7th annual PV Module Reliability ...

  5. Data Center Efficiency and IT Equipment Reliability at Wider...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Center Efficiency and IT Equipment Reliability at Wider Operating Temperature and Humidity Ranges Data Center Efficiency and IT Equipment Reliability at Wider Operating Temperature ...

  6. Thermal Stress and Reliability for Advanced Power Electronics...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Thermal Performance and Reliability of Bonded Interfaces Physics of Failure of Electrical Interconnects Thermal Stress and Reliability for Advanced Power Electronics and Electric ...

  7. CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND REDUCES EMISSIONS - CASE STUDY, 2015 CHP SYSTEM AT FOOD PROCESSING PLANT INCREASES RELIABILITY AND REDUCES EMISSIONS -...

  8. Self-Reliability and Motivation in a Nuclear Security Culture...

    Office of Scientific and Technical Information (OSTI)

    Conference: Self-Reliability and Motivation in a Nuclear Security Culture Enhancement Program Citation Details In-Document Search Title: Self-Reliability and Motivation in a ...

  9. Electricity Reliability Council of Texas (ERCOT) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Electricity Reliability Council of Texas (ERCOT) Jump to: navigation, search The Electric Reliability Council of Texas (ERCOT) manages the flow of electric power to 22 million...

  10. Microsoft PowerPoint - Sandia CREW 2013 Wind Plant Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Nuclear Security Administration under contract DE-AC04-94AL85000. Wind Plant Reliability Benchmark September 2013 Continuous Reliability Enhancement for Wind (CREW)...

  11. Microsoft Word - Sandia CREW 2012 Wind Plant Reliability Benchmark...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2-7328 Unlimited Release September 2012 Continuous Reliability Enhancement for Wind (CREW) Database: Wind Plant Reliability Benchmark Valerie A. Peters, Alistair B. Ogilvie, Cody...

  12. Microsoft Word - Sandia CREW 2013 Wind Plant Reliability Benchmark...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3-7288 Unlimited Release September 2013 Continuous Reliability Enhancement for Wind (CREW) Database: Wind Plant Reliability Benchmark Valerie A. Hines, Alistair B. Ogilvie, Cody R....

  13. The Business Case for Fuel Cells 2013: Reliability, Resiliency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings This report, compiled by Fuel ...

  14. Project Profile: Physics-Based Reliability Models for Supercritical...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Physics-Based Reliability Models for Supercritical-CO2 Turbomachinery Components Project Profile: Physics-Based Reliability Models for Supercritical-CO2 Turbomachinery Components ...

  15. Now Available: Smart Grid Investments Improve Grid Reliability...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Now Available: Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses ...

  16. Characterizing wind power resource reliability in southern Africa...

    Office of Scientific and Technical Information (OSTI)

    DOE PAGES Search Results Published Article: Characterizing wind power resource reliability in southern Africa Title: Characterizing wind power resource reliability in southern...

  17. Office of Electricity Delivery & Energy Reliability FY 2012 Budget...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    & Energy Reliability FY 2012 Budget Request Presentation Presentation by Patricia Hoffman of the Office of Electricity Delivery & Energy Reliability FY 2012 Budget Request....

  18. NREL: Performance and Reliability R&D - Photovoltaic Performance...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Photovoltaic Performance and Reliability Workshops NREL hosts workshops focused on photovoltaic (PV) performance and reliability to encourage collaboration and communication among ...

  19. Competition and Reliability in North American Energy Markets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Markets: Issue Paper Synopses Competition and Reliability in North American Energy ... effect on the reliability of the North American power system and constitute the ...

  20. Science-based MEMS reliability methodology. (Conference) | SciTech...

    Office of Scientific and Technical Information (OSTI)

    Science-based MEMS reliability methodology. Citation Details In-Document Search Title: Science-based MEMS reliability methodology. No abstract prepared. Authors: Walraven, Jeremy ...

  1. Case Study: Fuel Cells Increase Reliability at First National...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fuel Cells Increase Reliability at First National Bank of Omaha Technology Center Fuel cells are a viable primary power choice for data centers-they generate highly reliable ...

  2. The Business Case for Fuel Cells 2013: Reliability, Resiliency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Reliability, Resiliency & Savings The Business Case for Fuel Cells 2013: Reliability, Resiliency & Savings This report, compiled by Fuel Cells 2000 with support from the Fuel ...

  3. Ensuring a Reliable Bulk Electric System | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electric Reliability Corporation (NERC): Ensuring a Reliable Bulk Electric System Cooling Tower Report, October 2008 Transmission Constraints and Congestion in the Western...

  4. 2014 Human Reliability Program Workshop Agenda | Department of...

    Energy.gov [DOE] (indexed site)

    September 17-19, 2014 2014 DOE Human Reliability Program Workshop And Webinar Agenda DOE ... 10 Code of Federal Regulations Part 712, Human Reliability Program INSPECTION REPORT: ...

  5. Value-based reliability transmission planning

    SciTech Connect

    Dalton, J.G. III; Garrison, D.L.; Fallon, C.M.

    1996-08-01

    This paper presents a new value-based reliability planning (VBRP) process proposed for planning Duke Power Company`s (DPC) regional transmission system. All transmission served customers are fed from DPC`s regional transmission system which consists of a 44-kV predominantly radial system and a 100-kV predominantly non-radial system. In the past, any single contingency that could occur during system peak conditions and cause a thermal overload required the overloaded facility to be upgraded, regardless of the costs or the likelihood of the overload occurring. The new VBRP process is based on transmission system reliability evaluation and includes the following important elements: (1) a ten-year historical data base describing the probabilities of forced outages for lines and transformers; (2) a five-year average load duration curve describing the probability of an overload should a contingency occur; (3) a customer outage cost data base; (4) and probabilistic techniques. The new process attempts to balance the costs of improving service reliability with the benefits or value that these improvements bring to these customers. The objective is to provide the customers their required level of reliability while minimizing the Total Cost of their electric service.

  6. Reliability and maintainability seminar: summary of proceedings

    SciTech Connect

    Beek, C. R.

    1981-04-01

    The following are described briefly: Overview of the Federal Reliability and Maintainability Program Plan, Summary of Proceedngs, Overview of Southern Solar Energy Center Programs, and Solar Domestic Hot Water Design Guidelines Handbook. Also included are the Seminar Agenda and the list of Seminar Attendees. (MHR)

  7. The challenge of reliability in MEMS commercialization

    SciTech Connect

    Miller, W.M.; Tanner, D.M.; Miller, S.L.

    1998-09-01

    MicroElectroMechanical Systems (MEMS) that think, sense, act and communicate will open up a broad new array of cost-effective solutions only if MEMS is demonstrated to be sufficiently reliable. This could prove to be a major challenge if it is not addressed concurrently with technology development. There are three requirements for a valid assessment of reliability: statistical significance, identification of fundamental failure mechanisms and development of techniques for accelerating them, and valid physical models to allow prediction of failures during actual use. While these already exist for the microelectronics portion of such integrated systems, the real challenge lies in the less well-understood micromachine portions and its synergistic effects with microelectronics. This requires the elicitation of a methodology focused on MEMS reliability, which the authors discuss. A new testing and analysis infrastructure must also be developed to meet the needs of this methodology. They describe their implementation of this infrastructure and its success in addressing the three requirements for a valid reliability assessment.

  8. The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand

    SciTech Connect

    Watkins, B.E.; Satcher, J.H.

    1995-07-01

    A binuclear, unsymmetric coordinating ligand that is an effective metal chelator has been designed and synthesized. The new ligand has been shown to react readily with iron(II)/(III) forming a variety of coordination complexes. The binuclear complexes are of significant interest since they represent proof-of-principle for the development of coordinatively asymmetric, binuclear metal chelate compounds. Although this structural type of chelator now appears to be common in biological systems, it has not been previously described for inorganic coordination chemistry. The isolation of oxidation products will be helpful in establishing reaction mechanism(s) of these complexes with molecular oxygen. It is expected that this ligand and derivatives of it will play an important role in the development of bioinorganic complexes that aim to mimic enzyme active sites that function by substrate interaction at only one metal site of a multimetal active site.

  9. Securing Wide Area Measurement Systems | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Securing Wide Area Measurement Systems Securing Wide Area Measurement Systems This report documents an assessment of wide area measurement system (WAMS) security conducted by Pacific Northwest National Laboratory (PNNL) as a project funded by the National SCADA Test Bed Program in cooperation with the Department of Energy's Transmission Reliability Program. With emphasis on cyber security, this report also addresses other categories of risk and vulnerability including equipment reliability, data

  10. Electronic logic for enhanced switch reliability

    DOEpatents

    Cooper, J.A.

    1984-01-20

    A logic circuit is used to enhance redundant switch reliability. Two or more switches are monitored for logical high or low output. The output for the logic circuit produces a redundant and fail-safe representation of the switch outputs. When both switch outputs are high, the output is high. Similarly, when both switch outputs are low, the logic circuit's output is low. When the output states of the two switches do not agree, the circuit resolves the conflict by memorizing the last output state which both switches were simultaneously in and produces the logical complement of this output state. Thus, the logic circuit of the present invention allows the redundant switches to be treated as if they were in parallel when the switches are open and as if they were in series when the switches are closed. A failsafe system having maximum reliability is thereby produced.

  11. Fatigue and Reliability of Wind Turbines

    Energy Science and Technology Software Center

    1995-08-17

    FAROW is a computer program that assists in the probalistic analysis of the Fatigue and Reliabiity of Wind turbines. The fatigue lifetime of wind turbine components is calculated using functional forms for important input quantities. Parameters of these functions are defined in an input file as either constants or random variables. The user can select from a library of random variable distribution functions. FAROW uses structural reliability techniques to calculate the mean time to failure,more » probability of failure before a target lifetime, relative importance of each of the random inputs, and the sensitivity of the reliability to all input parameters. Monte Carlo simulation is also available.« less

  12. Bridging Resilience Engineering and Human Reliability Analysis

    SciTech Connect

    Ronald L. Boring

    2010-06-01

    There has been strong interest in the new and emerging field called resilience engineering. This field has been quick to align itself with many existing safety disciplines, but it has also distanced itself from the field of human reliability analysis. To date, the discussion has been somewhat one-sided, with much discussion about the new insights afforded by resilience engineering. This paper presents an attempt to address resilience engineering from the perspective of human reliability analysis (HRA). It is argued that HRA shares much in common with resilience engineering and that, in fact, it can help strengthen nascent ideas in resilience engineering. This paper seeks to clarify and ultimately refute the arguments that have served to divide HRA and resilience engineering.

  13. Reliability Analysis of Brittle, Thin Walled Structures

    SciTech Connect

    Jonathan A Salem and Lynn Powers

    2007-02-09

    One emerging application for ceramics is diesel particulate filters being used order to meet EPA regulations going into effect in 2008. Diesel particulates are known to be carcinogenic and thus need to be minimized. Current systems use filters made from ceramics such as mullite and corderite. The filters are brittle and must operate at very high temperatures during a burn out cycle used to remove the soot buildup. Thus the filters are subjected to thermal shock stresses and life time reliability analysis is required. NASA GRC has developed reliability based design methods and test methods for such applications, such as CARES/Life and American Society for Testing and Materials (ASTM) C1499 “Standard Test Method for Equibiaxial Strength of Ceramics.”

  14. Reliability Estimation for Double Containment Piping

    SciTech Connect

    L. Cadwallader; T. Pinna

    2012-08-01

    Double walled or double containment piping is considered for use in the ITER international project and other next-generation fusion device designs to provide an extra barrier for tritium gas and other radioactive materials. The extra barrier improves confinement of these materials and enhances safety of the facility. This paper describes some of the design challenges in designing double containment piping systems. There is also a brief review of a few operating experiences of double walled piping used with hazardous chemicals in different industries. This paper recommends approaches for the reliability analyst to use to quantify leakage from a double containment piping system in conceptual and more advanced designs. The paper also cites quantitative data that can be used to support such reliability analyses.

  15. Subsea pipeline isolation systems: Reliability and costs

    SciTech Connect

    Masheder, R.R.

    1996-08-01

    Since the Piper Alpha disaster, more than 80 subsea isolation systems (SSIS) have been installed in subsea gas and oil pipelines in the U.K. continental shelf at an estimated cost in the region of {Brit_pounds}500 million. The reliability and costs of these installations have now been assessed between Dec. 1992 and Oct. 1993. This assessment was based upon comprehensive reliability and cost databases which were established so that the studies could be based upon factual information in order to obtain a current status as required by the sponsoring group. The study consultants report findings have now been consolidated into a report by the UKOOA Pipeline Valve Work Group. Probabilities of failure for different types of valves and systems have been assessed and expenditures broken down and compared. The results of the studies and the conclusions drawn by UKOOA Pipeline Valve Group and the HSE Offshore Safety Division are presented in this paper.

  16. Reliability assessment of underground shaft closure

    SciTech Connect

    Fossum, A.F.

    1994-12-31

    The intent of the WIPP, being constructed in the bedded geologic salt deposits of Southeastern New Mexico, is to provide the technological basis for the safe disposal of radioactive Transuranic (TRU) wastes generated by the defense programs of the United States. In determining this technological basis, advanced reliability and structural analysis techniques are used to determine the probability of time-to-closure of a hypothetical underground shaft located in an argillaceous salt formation and filled with compacted crushed salt. Before being filled with crushed salt for sealing, the shaft provides access to an underground facility. Reliable closure of the shaft depends upon the sealing of the shaft through creep closure and recompaction of crushed backfill. Appropriate methods are demonstrated to calculate cumulative distribution functions of the closure based on laboratory determined random variable uncertainty in salt creep properties.

  17. Competition and Reliability in North American Electricity Markets Technical

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Workshop | Department of Energy Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop Competition and Reliability in North American Electricity Markets Technical Workshop (481.75 KB) More Documents & Publications The Relationship between Competitive Power Markets and Grid Reliability. Blackout 2003: Electric System Working Group

  18. Update of technical coordinating committee activities

    SciTech Connect

    Alvarado, R.A.

    1995-12-31

    The Technical Coordinating Committee has its origins in the earliest days of implementing the Low-Level Radioactive Waste Policy Act. Between 1982 and 1985, individuals in several of the states felt that coordination among the states would be beneficial to all by affording states a cost-effective method for sharing ideas, discussing alternatives, and presenting solutions to common problems. At the current time, the committee comprises members from each of the sited states. Various compacts, federal agencies, and industry groups participate in committee activities. The Low-Level Management Program provides support for the committee through the provision of logistical support and limited manpower allocation. Activities of the committee have recently focused on waste treatment and minimization technologies. The committee also has worked diligently to see the review of the 3RSTAT computer code completed. The committee has taken a position on various regulatory proposals the past year. The committee expects to continue its work until new sites are brought online.

  19. (Coordinated research programs in nuclear medicine)

    SciTech Connect

    Knapp, F.F. Jr.

    1990-10-03

    The traveler visited the Clinic for Nuclear Medicine at the University of Bonn, West Germany, to review, organize, and plan collaborative studies. He also met with the editorial board of the journal NucCompact -- European/American Communications in Nuclear Medicine, on which he serves as US editor. He also visited colleagues at the Cyclotron Research Center (CRC) at the University of Liege, Belgium, to coordinate clinical applications of the ultrashort-lived iridium-191m radionuclide obtained from the osmium-190/iridium-191m generator system. The traveler planned and coordinated continuing collaboration with colleagues at the CRC for further applications of this generator system. He also visited the University of Metz, Metz, France, to organize a three-center project for the synthesis and evaluation of various receptor-specific cerebral imaging agents, involving the Oak Ridge National Laboratory (ORNL), CRC, and the University of Metz.

  20. DOE Designates Southwest Area and Mid-Atlantic Area National Interest

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electric Transmission Corridors | Department of Energy Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 - 11:12am Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National Interest

  1. DOE Designates Southwest Area and Mid-Atlantic Area National Interest

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Electric Transmission Corridors | Department of Energy Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors DOE Designates Southwest Area and Mid-Atlantic Area National Interest Electric Transmission Corridors October 2, 2007 - 2:50pm Addthis WASHINGTON, DC - U.S. Department of Energy (DOE) Assistant Secretary for Electricity Delivery and Energy Reliability Kevin M. Kolevar today announced the Department's designation of two National Interest

  2. Reliable Video Analysis Helps Security Company Grow

    SciTech Connect

    Meurer, Dave; Furgal, Dave; Hobson, Rick

    2014-10-24

    Armed Response Team (ART) has grown to become the largest locally owned security company in New Mexico. With technical assistance from Sandia National Laboratories through the New Mexico Small Business Assistance (NMSBA) Program, ART got help so they could quickly bring workable video security solutions to market. By offering a reliable video analytic camera system, they’ve been able to reduce theft, add hundreds of clients, and increase their number of employees.

  3. Coordination and Outreach | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Outreach Coordination and Outreach As the Energy Sector-Specific Agency (SSA), ISER has established close relationships with private and public industry owners and operators of the energy infrastructure, as well as State and local governments. This puts ISER in a unique position to understand their perspectives on prevention, protection, mitigation, response and recovery options and to quickly deploy the best available technology in a tailored, systems approach. ISER's partnerships with the

  4. Reliability of natural gas cogeneration systems

    SciTech Connect

    1995-12-01

    Cogeneration systems fueled by natural gas exceed the reliability of most central station power generating units, according to a study conducted by RINC Corporation for Gas Research Institute (GRI). In the study, researchers obtained operating data from 122 natural gas cogeneration units nationwide representing 2,200 megawatts (MW) of capacity and nearly 2 million hours of operating time at 37 facilities. Units were grouped into categories reflecting size (from 60 kilowatts to 100 MW), type of system (gas engine or gas turbine technology), use of emission controls, and type of thermal application. Various types and sizes of gas systems reported average availability factors ranging from 90.0 to 95.8 versus a weighted average of 85.9 percent for fossil-fuel steam, nuclear, and gas-turbine-based central station power generating units. Comparisons are based on study data and data reported by the North American Electric Reliability Council for utility power plants. Gas cogeneration can improve utility operations because as a group the relatively small, dispersed cogeneration units are more reliable than one or more large central station units of similar capacity.

  5. Human Reliability Analysis for Design: Using Reliability Methods for Human Factors Issues

    SciTech Connect

    Ronald Laurids Boring

    2010-11-01

    This paper reviews the application of human reliability analysis methods to human factors design issues. An application framework is sketched in which aspects of modeling typically found in human reliability analysis are used in a complementary fashion to the existing human factors phases of design and testing. The paper provides best achievable practices for design, testing, and modeling. Such best achievable practices may be used to evaluate and human system interface in the context of design safety certifications.

  6. About the Office of Electricity Delivery and Energy Reliability |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy the Office of Electricity Delivery and Energy Reliability About the Office of Electricity Delivery and Energy Reliability About the Office of Electricity Delivery and Energy Reliability The Office of Electricity Delivery and Energy Reliability (OE) provides national leadership to ensure that the Nation's energy delivery system is secure, resilient and reliable. OE works to develop new technologies to improve the infrastructure that brings electricity into our homes,

  7. Closure Report for Corrective Action Unit 399: Area 18 Disposal Site

    SciTech Connect

    Navarro Nevada Environmental Services

    2010-08-10

    The closure report for CAU 399 is just a one page summary listing the coordinates of the disposal site which were given at the time (1995) in Nevada State Plan Coordinates - North American Datum of 1983. The drawing of the use restricted site also listed the coordinates in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner, which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the disposal site with the coordinates listed showing the use restricted area.

  8. Web Coordinator Meetings - February 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    February 2015 Web Coordinator Meetings - February 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (17.81 MB) Minutes (61.06 ...

  9. Web Coordinator Meetings-October 2015 | Department of Energy

    Office of Environmental Management (EM)

    October 2015 Web Coordinator Meetings-October 2015 The presentation and minutes from the October 2015 Web Coordinators Meeting. Presentation (3.23 MB) Minutes (68.07 KB) More ...

  10. Web Coordinator Meetings - March 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    March 2015 Web Coordinator Meetings - March 2015 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (2.55 MB) Minutes (62.29 KB) More ...

  11. Web Coordinator Meetings-September 2015 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings-September 2015 Web Coordinator Meetings-September 2015 The presentation and minutes from the September 2015 Web Coordinators Meeting. Presentation (6.21 MB) Minutes (67.42 ...

  12. Web Coordinator Meetings - October 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    October 2014 Web Coordinator Meetings - October 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1.43 MB) Minutes (61.18 KB) ...

  13. Web Coordinator Meetings - August 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    August 2014 Web Coordinator Meetings - August 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (6.15 MB) Minutes (60.81 KB) ...

  14. Web Coordinator Meetings-May 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings-May 2016 Web Coordinator Meetings-May 2016 The presentation and minutes from the May 2016 Web Coordinators Meeting. Presentation (2.48 MB) Minutes (68.29 KB) More ...

  15. Web Coordinator Meetings - February 2014 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    February 2014 Web Coordinator Meetings - February 2014 The presentation and minutes from this monthly meeting of the EERE Web coordinators. Presentation (1.77 MB) Minutes (61.62 ...

  16. Web Coordinator Meetings-June 2016 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Meetings-June 2016 Web Coordinator Meetings-June 2016 The presentation and minutes from the June 2016 Web Coordinators Meeting. Presentation (2.4 MB) Minutes (68.42 KB) More ...

  17. Coordinating Pediatric Medical Care during an Influenza Pandemic - Hospital Workbook

    SciTech Connect

    HCTT CHE

    2010-01-01

    This workbook is intended to assist hospitals with coordinating medical care for pediatric influenza-like illness across their community.

  18. Historical Information on the Transportation External Coordination Working

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Group (TEC) | Department of Energy Historical Information on the Transportation External Coordination Working Group (TEC) Historical Information on the Transportation External Coordination Working Group (TEC) Historical Information on the Transportation External Coordination Working Group (TEC) TEC was formed in 1992 to improve coordination between the U.S. Department of Energy (DOE) and external groups interested in the Department's transportation activities. TEC was co-chaired by DOE's

  19. Federal Agency Energy Coordinators for Award Nominations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Awards » Federal Agency Energy Coordinators for Award Nominations Federal Agency Energy Coordinators for Award Nominations Contact your agency coordinator in advance to discuss your Federal Energy and Water Management Award nomination. Agency coordinators are responsible for vetting nomination information and submitting approved nominations to the Federal Energy Management Program on behalf of the agencies. Each agency listed below is limited to 15 Federal Energy and Water Management

  20. Current Human Reliability Analysis Methods Applied to Computerized Procedures

    SciTech Connect

    Ronald L. Boring

    2012-06-01

    Computerized procedures (CPs) are an emerging technology within nuclear power plant control rooms. While CPs have been implemented internationally in advanced control rooms, to date no US nuclear power plant has implemented CPs in its main control room (Fink et al., 2009). Yet, CPs are a reality of new plant builds and are an area of considerable interest to existing plants, which see advantages in terms of enhanced ease of use and easier records management by omitting the need for updating hardcopy procedures. The overall intent of this paper is to provide a characterization of human reliability analysis (HRA) issues for computerized procedures. It is beyond the scope of this document to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper serves as a review of current HRA as it may be used for the analysis and review of computerized procedures.

  1. 2010 Transmission Reliability Program Peer Review | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the system. The second area focuses on developing a comprehensive set of integrated market and engineering design principles, tools, and technologies to support efficient,...

  2. Requirements to coordinate agreements, milestones and decision documents

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (AMDD) | Department of Energy to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental agreements, milestones and decision documents (AMDD) which meet certain thresholds are reviewed and approved by Headquarters (HQ) before entering into negotiations and commitments. Requirements to coordinate regulatory negotiations with the EM Office of Regulatory Compliance: new and modified cleanup

  3. Predicting the reliability of electronic circuits.

    SciTech Connect

    Loescher, Douglas H.

    2004-06-01

    Procedures to predict the reliability of electrical circuits are discussed. Three cases are introduced and discussed. In Case 1, an analyst predicts the probability of any failure in the intended relations between circuit inputs and circuit outputs. In Case 2, an analyst predicts the probability that specified unintended outputs would occur. In Case 3, an analyst considers coupling between circuits. Logic models are given for the three cases, and sources of failure probabilities of components are mentioned. Methods of analysis are given, software tools are mentioned, and recommendations for presentation and review of results are discussed.

  4. Final report on reliability and lifetime prediction.

    SciTech Connect

    Gillen, Kenneth Todd; Wise, Jonathan; Jones, Gary D.; Causa, Al G.; Terrill, Edward R.; Borowczak, Marc

    2012-12-01

    This document highlights the important results obtained from the subtask of the Goodyear CRADA devoted to better understanding reliability of tires and to developing better lifetime prediction methods. The overall objective was to establish the chemical and physical basis for the degradation of tires using standard as well as unique models and experimental techniques. Of particular interest was the potential application of our unique modulus profiling apparatus for assessing tire properties and for following tire degradation. During the course of this complex investigation, extensive relevant information was generated, including experimental results, data analyses and development of models and instruments. Detailed descriptions of the findings are included in this report.

  5. Coordinate time dependence in quantum gravity

    SciTech Connect

    Bojowald, Martin; Singh, Parampreet; Skirzewski, Aureliano

    2004-12-15

    The intuitive classical space-time picture breaks down in quantum gravity, which makes a comparison and the development of semiclassical techniques quite complicated. Using ingredients of the group averaging method to solve constraints one can nevertheless introduce a classical coordinate time into the quantum theory, and use it to investigate the way a semiclassical continuous description emerges from discrete quantum evolution. Applying this technique to test effective classical equations of loop cosmology and their implications for inflation and bounces, we show that the effective semiclassical theory is in good agreement with the quantum description even at short scales.

  6. Using wind plant data to increase reliability.

    SciTech Connect

    Peters, Valerie A.; Ogilvie, Alistair B.; McKenney, Bridget L.

    2011-01-01

    Operators interested in improving reliability should begin with a focus on the performance of the wind plant as a whole. To then understand the factors which drive individual turbine performance, which together comprise the plant performance, it is necessary to track a number of key indicators. Analysis of these key indicators can reveal the type, frequency, and cause of failures and will also identify their contributions to overall plant performance. The ideal approach to using data to drive good decisions includes first determining which critical decisions can be based on data. When those required decisions are understood, then the analysis required to inform those decisions can be identified, and finally the data to be collected in support of those analyses can be determined. Once equipped with high-quality data and analysis capabilities, the key steps to data-based decision making for reliability improvements are to isolate possible improvements, select the improvements with largest return on investment (ROI), implement the selected improvements, and finally to track their impact.

  7. Real Time Grid Reliability Management 2005

    SciTech Connect

    Eto, Joe; Eto, Joe; Lesieutre, Bernard; Lewis, Nancy Jo; Parashar, Manu

    2008-07-07

    The increased need to manage California?s electricity grid in real time is a result of the ongoing transition from a system operated by vertically-integrated utilities serving native loads to one operated by an independent system operator supporting competitive energy markets. During this transition period, the traditional approach to reliability management -- construction of new transmission lines -- has not been pursued due to unresolved issues related to the financing and recovery of transmission project costs. In the absence of investments in new transmission infrastructure, the best strategy for managing reliability is to equip system operators with better real-time information about actual operating margins so that they can better understand and manage the risk of operating closer to the edge. A companion strategy is to address known deficiencies in offline modeling tools that are needed to ground the use of improved real-time tools. This project: (1) developed and conducted first-ever demonstrations of two prototype real-time software tools for voltage security assessment and phasor monitoring; and (2) prepared a scoping study on improving load and generator response models. Additional funding through two separate subsequent work authorizations has already been provided to build upon the work initiated in this project.

  8. Ensuring the Availability and Reliability of Urea Dosing For...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ensuring the Availability and Reliability of Urea Dosing For On-Road and Non-Road Ensuring the Availability and Reliability of Urea Dosing For On-Road and Non-Road 2003 DEER ...

  9. Reliable fuel source | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Reliable fuel source Reliable fuel source Posted: February 7, 2013 - 7:00pm | Y-12 Report | Volume 9, Issue 2 | 2013 Y-12 provides the U.S. Navy with feedstock from retired weapons ...

  10. 2016 Reliability & Markets Peer Review- Day 1 Presentations

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on June 9 - 10, 2016. Presentations from Day 1 (Sessions I through IV) are available here.

  11. Case Study: Fuel Cells Increase Reliability at First National...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Increase Reliability at First National Bank of Omaha Case Study: Fuel Cells Increase Reliability at First National Bank of Omaha First National Bank of Omaha installed a fuel cell ...

  12. DOE Lab Releases Wind Turbine Reliability Benchmark Report |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lab Releases Wind Turbine Reliability Benchmark Report DOE Lab Releases Wind Turbine Reliability Benchmark Report October 1, 2012 - 1:17pm Addthis This is an excerpt from the Third ...

  13. NREL and Sandia host PV Module Reliability Workshop, Feb. 23...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and Sandia host PV Module Reliability Workshop, Feb. 23-25, 2016 - Sandia Energy Energy ... Twitter Google + Vimeo GovDelivery SlideShare NREL and Sandia host PV Module Reliability ...

  14. A customizable model for chronic disease coordination: Lessons learned from the coordinated chronic disease program

    DOE PAGES [OSTI]

    Voetsch, Karen; Sequeira, Sonia; Chavez, Amy Holmes

    2016-03-31

    In 2012, the Centers for Disease Control and Prevention provided funding and technical assistance to all states and territories to implement the Coordinated Chronic Disease Program, marking the first time that all state health departments had federal resources to coordinate chronic disease prevention and control programs. This article describes lessons learned from this initiative and identifies key elements of a coordinated approach. We analyzed 80 programmatic documents from 21 states and conducted semistructured interviews with 7 chronic disease directors. Six overarching themes emerged: 1) focused agenda, 2) identification of functions, 3) comprehensive planning, 4) collaborative leadership and expertise, 5) managedmore » resources, and 6) relationship building. Furthermore, these elements supported 4 essential activities: 1) evidence-based interventions, 2) strategic use of staff, 3) consistent communication, and 4) strong program infrastructure. On the basis of these elements and activities, we propose a conceptual model that frames overarching concepts, skills, and strategies needed to coordinate state chronic disease prevention and control programs.« less

  15. The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand

    SciTech Connect

    Watkins, B.E.

    1993-11-01

    Structure/activity relations of the bacterial enzyme methane monooxygenase, which catalyzes oxidation of methane to methanol, are being investigated. Then inorganic coordination complexes are synthesized that mimic the function of the native enzyme but are more robust and have higher catalytic site density. These catalysts can be useful in process catalytic reactors in converting methane in natural gas to liquid methanol.

  16. OMB 1910-5122, Human Reliability Program - Description of Collections |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy OMB 1910-5122, Human Reliability Program - Description of Collections OMB 1910-5122, Human Reliability Program - Description of Collections Human Reliability Program Certification (DOE F 470.3). Under the Department of Energy Human Reliability Program (HRP), individuals who are applicants for or incumbents in designated positions must be evaluated to ensure that they meet the requirements for certification in the program. This form documents that each part of the

  17. 2012 Annual Planning Summary for Electricity Delivery and Energy Reliability

    Energy.gov [DOE]

    The ongoing and projected Environmental Assessments and Environmental Impact Statements for 2012 and 2013 within Electricity Delivery and Energy Reliability.

  18. 2012 Reliability & Markets Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reliability & Markets Peer Review 2012 Reliability & Markets Peer Review The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentations and summaries are available through the links and the agenda is included below. Summaries | Full Presentations Day 1: August 7 Transmission Investment Assessment Under Uncertainty About Fuel Prices, Technology, Renewables Penetration

  19. HUMAN RELIABILITY ANALYSIS FOR COMPUTERIZED PROCEDURES

    SciTech Connect

    Ronald L. Boring; David I. Gertman; Katya Le Blanc

    2011-09-01

    This paper provides a characterization of human reliability analysis (HRA) issues for computerized procedures in nuclear power plant control rooms. It is beyond the scope of this paper to propose a new HRA approach or to recommend specific methods or refinements to those methods. Rather, this paper provides a review of HRA as applied to traditional paper-based procedures, followed by a discussion of what specific factors should additionally be considered in HRAs for computerized procedures. Performance shaping factors and failure modes unique to computerized procedures are highlighted. Since there is no definitive guide to HRA for paper-based procedures, this paper also serves to clarify the existing guidance on paper-based procedures before delving into the unique aspects of computerized procedures.

  20. Pump system characterization and reliability enhancement

    SciTech Connect

    Staunton, R.H.

    1997-09-01

    Pump characterization studies were performed at the Oak Ridge National Laboratory (ORNL) to review and analyze six years (1990 to 1995) of data from pump systems at domestic nuclear plants. The studies considered not only pumps and pump motors but also pump related circuit breakers and turbine drives (i.e., the pump system). One significant finding was that the number of significant failures of the pump circuit breaker exceeds the number of significant failures of the pump itself. The study also shows how regulatory code testing was designed for the pump only and therefore did not lead to the discovery of other significant pump system failures. Potential diagnostic technologies both experimental and mature, suitable for on-line and off-line pump testing were identified. The study does not select or recommend technologies but proposes diagnostic technologies and monitoring techniques that should be further evaluated/developed for making meaningful and critically needed improvements in the reliability of the pump system.

  1. Advancing Usability Evaluation through Human Reliability Analysis

    SciTech Connect

    Ronald L. Boring; David I. Gertman

    2005-07-01

    This paper introduces a novel augmentation to the current heuristic usability evaluation methodology. The SPAR-H human reliability analysis method was developed for categorizing human performance in nuclear power plants. Despite the specialized use of SPAR-H for safety critical scenarios, the method also holds promise for use in commercial off-the-shelf software usability evaluations. The SPAR-H method shares task analysis underpinnings with human-computer interaction, and it can be easily adapted to incorporate usability heuristics as performance shaping factors. By assigning probabilistic modifiers to heuristics, it is possible to arrive at the usability error probability (UEP). This UEP is not a literal probability of error but nonetheless provides a quantitative basis to heuristic evaluation. When combined with a consequence matrix for usability errors, this method affords ready prioritization of usability issues.

  2. Wind Power Reliability: Breaking Down a Barrier

    Energy.gov [DOE]

    The steady increase of wind power on the grid presents new challenges for power system operators charged with making sure the grid stays up and running. "We need to ensure that we are going down a path that will lead to better reliability [with wind power]," said Bob Zavadil, an executive vice president at EnerNex Corporation in Knoxville, Tenn., a firm specializing in renewable energy grid interconnection and integration. "If this piece isn't done, there will be problems." EnerNex has spent the last decade perfecting wind turbine and plant models that test a wind plant's influence on the grid and its ability to provide grid support. In its latest effort, the company is using American Recovery and Reinvestment Act funds worth $750,000 to develop documentation and validations of computer wind turbine models.

  3. Development of Centrifugal Contactor with High Reliability

    SciTech Connect

    Okamura, Nobuo; Takeuchi, Masayuki; Ogino, Hideki; Kase, Takeshi; Koizumi, Tsutomu

    2007-07-01

    In Japan Atomic Energy Agency (JAEA), an innovative centrifugal contactor system has been developed for a future reprocessing plant. It was confirmed that it had a higher extraction capacity through the uranium test already. But it was necessary that it had the higher mechanical reliability to be applied in a reprocessing plant. In this study, two types of driving units that use a ball bearing or a magnetic bearing have been developed for it. It was confirmed that they had enough abilities trough endurance tests. The driving unit with ball bearing could be operated continuously for 5000 hours that was equal to a term of an annual operation. It was found that it could be operated for a year without maintenance. JAEA will continue to improve them and select more advantageous one on the basis of economy and lifetime in near future. (authors)

  4. Probabilistic fatigue methodology and wind turbine reliability

    SciTech Connect

    Lange, C.H.

    1996-05-01

    Wind turbines subjected to highly irregular loadings due to wind, gravity, and gyroscopic effects are especially vulnerable to fatigue damage. The objective of this study is to develop and illustrate methods for the probabilistic analysis and design of fatigue-sensitive wind turbine components. A computer program (CYCLES) that estimates fatigue reliability of structural and mechanical components has been developed. A FORM/SORM analysis is used to compute failure probabilities and importance factors of the random variables. The limit state equation includes uncertainty in environmental loading, gross structural response, and local fatigue properties. Several techniques are shown to better study fatigue loads data. Common one-parameter models, such as the Rayleigh and exponential models are shown to produce dramatically different estimates of load distributions and fatigue damage. Improved fits may be achieved with the two-parameter Weibull model. High b values require better modeling of relatively large stress ranges; this is effectively done by matching at least two moments (Weibull) and better by matching still higher moments. For this purpose, a new, four-moment {open_quotes}generalized Weibull{close_quotes} model is introduced. Load and resistance factor design (LRFD) methodology for design against fatigue is proposed and demonstrated using data from two horizontal-axis wind turbines. To estimate fatigue damage, wind turbine blade loads have been represented by their first three statistical moments across a range of wind conditions. Based on the moments {mu}{sub 1}{hor_ellipsis}{mu}{sub 3}, new {open_quotes}quadratic Weibull{close_quotes} load distribution models are introduced. The fatigue reliability is found to be notably affected by the choice of load distribution model.

  5. Human Reliability Analysis for Small Modular Reactors

    SciTech Connect

    Ronald L. Boring; David I. Gertman

    2012-06-01

    Because no human reliability analysis (HRA) method was specifically developed for small modular reactors (SMRs), the application of any current HRA method to SMRs represents tradeoffs. A first- generation HRA method like THERP provides clearly defined activity types, but these activity types do not map to the human-system interface or concept of operations confronting SMR operators. A second- generation HRA method like ATHEANA is flexible enough to be used for SMR applications, but there is currently insufficient guidance for the analyst, requiring considerably more first-of-a-kind analyses and extensive SMR expertise in order to complete a quality HRA. Although no current HRA method is optimized to SMRs, it is possible to use existing HRA methods to identify errors, incorporate them as human failure events in the probabilistic risk assessment (PRA), and quantify them. In this paper, we provided preliminary guidance to assist the human reliability analyst and reviewer in understanding how to apply current HRA methods to the domain of SMRs. While it is possible to perform a satisfactory HRA using existing HRA methods, ultimately it is desirable to formally incorporate SMR considerations into the methods. This may require the development of new HRA methods. More practicably, existing methods need to be adapted to incorporate SMRs. Such adaptations may take the form of guidance on the complex mapping between conventional light water reactors and small modular reactors. While many behaviors and activities are shared between current plants and SMRs, the methods must adapt if they are to perform a valid and accurate analysis of plant personnel performance in SMRs.

  6. Puget Sound Area Electric Reliability Plan : Supplemental Environmental Analysis, Schultz Substation.

    SciTech Connect

    United States. Bonneville Power Administration.

    1992-04-01

    This document describes the purpose, function, and the environmental consequences of the proposed Schultz substation near Ellensburg, Washington. The affected environment is described in detail, including aerial survey photographs. The impacts on vegetation, fish and wildlife, soils, and water resources are described. (GHH)

  7. Photovoltaic Module Reliability Workshop 2014: February 25-26, 2014

    SciTech Connect

    Kurtz, S.

    2014-02-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  8. Photovoltaic Module Reliability Workshop 2013: February 26-27, 2013

    SciTech Connect

    Kurtz, S.

    2013-10-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  9. Photovoltaic Module Reliability Workshop 2011: February 16-17, 2011

    SciTech Connect

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  10. Photovoltaic Module Reliability Workshop 2010: February 18-19, 2010

    SciTech Connect

    Kurtz, J.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  11. Photovoltaic Module Reliability Workshop 2012: February 28 - March 1, 2012

    SciTech Connect

    Kurtz, S.

    2013-11-01

    NREL's Photovoltaic (PV) Module Reliability Workshop (PVMRW) brings together PV reliability experts to share information, leading to the improvement of PV module reliability. Such improvement reduces the cost of solar electricity and promotes investor confidence in the technology--both critical goals for moving PV technologies deeper into the electricity marketplace.

  12. PECO energy adopts reliability centered maintenance to improve preventive maintanance of power delivery equipment

    SciTech Connect

    Maurer, R.; Linn, P.; Termine, G.; Schwan, C.

    1996-08-01

    One of the biggest challenges facing PECO Energy, in the area of power delivery, is holding the line on maintenance costs while preserving high levels of worker safety, enhancing equipment reliability, and improving customer satisfaction. PECO has taken an early lead in tackling this apparent industry-wide problem by adopting a proven preventive maintenance (PM) optimization method known as Reliability Centered Maintenance (RCM). The purpose of this paper is to explain: (1) how RCM was successfully introduced at PECO using data, lessons learned and consulting support associated with EPRI`s RCM for Substations research project; (2) how the RCM methodology will be implemented over the long term for the Power Delivery System; and (3) how the RCM activities will help lead to the development of a living PM program that will foster a continuous improvement in equipment reliability through cost-effective preventive maintenance.

  13. Instrument reliability for high-level nuclear-waste-repository applications

    SciTech Connect

    Rogue, F.; Binnall, E.P.; Armantrout, G.A.

    1983-01-31

    Reliable instrumentation will be needed to evaluate the characteristics of proposed high-level nuclear-wasted-repository sites and to monitor the performance of selected sites during the operational period and into repository closure. A study has been done to assess the reliability of instruments used in Department of Energy (DOE) waste repository related experiments and in other similar geological applications. The study included experiences with geotechnical, hydrological, geochemical, environmental, and radiological instrumentation and associated data acquisition equipment. Though this paper includes some findings on the reliability of instruments in each of these categories, the emphasis is on experiences with geotechnical instrumentation in hostile repository-type environments. We review the failure modes, rates, and mechanisms, along with manufacturers modifications and design changes to enhance and improve instrument performance; and include recommendations on areas where further improvements are needed.

  14. Accurate, reliable control of process gases by mass flow controllers

    SciTech Connect

    Hardy, J.; McKnight, T.

    1997-02-01

    The thermal mass flow controller, or MFC, has become an instrument of choice for the monitoring and controlling of process gas flow throughout the materials processing industry. These MFCs are used on CVD processes, etching tools, and furnaces and, within the semiconductor industry, are used on 70% of the processing tools. Reliability and accuracy are major concerns for the users of the MFCs. Calibration and characterization technologies for the development and implementation of mass flow devices are described. A test facility is available to industry and universities to test and develop gas floe sensors and controllers and evaluate their performance related to environmental effects, reliability, reproducibility, and accuracy. Additional work has been conducted in the area of accuracy. A gravimetric calibrator was invented that allows flow sensors to be calibrated in corrosive, reactive gases to an accuracy of 0.3% of reading, at least an order of magnitude better than previously possible. Although MFCs are typically specified with accuracies of 1% of full scale, MFCs may often be implemented with unwarranted confidence due to the conventional use of surrogate gas factors. Surrogate gas factors are corrections applied to process flow indications when an MFC has been calibrated on a laboratory-safe surrogate gas, but is actually used on a toxic, or corrosive process gas. Previous studies have indicated that the use of these factors may cause process flow errors of typically 10%, but possibly as great as 40% of full scale. This paper will present possible sources of error in MFC process gas flow monitoring and control, and will present an overview of corrective measures which may be implemented with MFC use to significantly reduce these sources of error.

  15. Novel Low Cost, High Reliability Wind Turbine Drivetrain

    SciTech Connect

    Chobot, Anthony; Das, Debarshi; Mayer, Tyler; Markey, Zach; Martinson, Tim; Reeve, Hayden; Attridge, Paul; El-Wardany, Tahany

    2012-09-13

    Clipper Windpower, in collaboration with United Technologies Research Center, the National Renewable Energy Laboratory, and Hamilton Sundstrand Corporation, developed a low-cost, deflection-compliant, reliable, and serviceable chain drive speed increaser. This chain and sprocket drivetrain design offers significant breakthroughs in the areas of cost and serviceability and addresses the key challenges of current geared and direct-drive systems. The use of gearboxes has proven to be challenging; the large torques and bending loads associated with use in large multi-MW wind applications have generally limited demonstrated lifetime to 8-10 years [1]. The large cost of gearbox replacement and the required use of large, expensive cranes can result in gearbox replacement costs on the order of $1M, representing a significant impact to overall cost of energy (COE). Direct-drive machines eliminate the gearbox, thereby targeting increased reliability and reduced life-cycle cost. However, the slow rotational speeds require very large and costly generators, which also typically have an undesirable dependence on expensive rare-earth magnet materials and large structural penalties for precise air gap control. The cost of rare-earth materials has increased 20X in the last 8 years representing a key risk to ever realizing the promised cost of energy reductions from direct-drive generators. A common challenge to both geared and direct drive architectures is a limited ability to manage input shaft deflections. The proposed Clipper drivetrain is deflection-compliant, insulating later drivetrain stages and generators from off-axis loads. The system is modular, allowing for all key parts to be removed and replaced without the use of a high capacity crane. Finally, the technology modularity allows for scalability and many possible drivetrain topologies. These benefits enable reductions in drivetrain capital cost by 10.0%, levelized replacement and O&M costs by 26.7%, and overall cost of

  16. ULTRA SECURE HIGH RELIABILITY WIRELESS RADIATION MONITOR

    SciTech Connect

    Cordaro, J.; Shull, D.; Farrar, M.; Reeves, G.

    2011-08-03

    Radiation monitoring in nuclear facilities is essential to safe operation of the equipment as well as protecting personnel. In specific, typical air monitoring of radioactive gases or particulate involves complex systems of valves, pumps, piping and electronics. The challenge is to measure a representative sample in areas that are radioactively contaminated. Running cables and piping to these locations is very expensive due to the containment requirements. Penetration into and out of an airborne or containment area is complex and costly. The process rooms are built with thick rebar-enforced concrete walls with glove box containment chambers inside. Figure 1 shows high temperature radiation resistance cabling entering the top of a typical glove box. In some case, the entire processing area must be contained in a 'hot cell' where the only access into the chamber is via manipulators. An example is shown in Figure 2. A short range wireless network provides an ideal communication link for transmitting the data from the radiation sensor to a 'clean area', or area absent of any radiation fields or radioactive contamination. Radiation monitoring systems that protect personnel and equipment must meet stringent codes and standards due to the consequences of failure. At first glance a wired system would seem more desirable. Concerns with wireless communication include latency, jamming, spoofing, man in the middle attacks, and hacking. The Department of Energy's Savannah River National Laboratory (SRNL) has developed a prototype wireless radiation air monitoring system that address many of the concerns with wireless and allows quick deployment in radiation and contamination areas. It is stand alone and only requires a standard 120 VAC, 60 Hz power source. It is designed to be mounted or portable. The wireless link uses a National Security Agency (NSA) Suite B compliant wireless network from Fortress Technologies that is considered robust enough to be used for classified data

  17. Flathead River Focus Watershed Coordinator, 2003-2004 Annual Report.

    SciTech Connect

    DuCharme, Lynn

    2004-06-01

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost

  18. Flathead River Focus Watershed Coordinator, 2005-2006 Annual Report.

    SciTech Connect

    DuCharme, Lynn

    2006-05-01

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost

  19. Flathead River Focus Watershed Coordinator, 2004-2005 Annual Report.

    SciTech Connect

    DuCharme, Lynn

    2006-06-26

    The Bonneville Power Administration (BPA) has long been involved with funding of the Cooperative Habitat Protection and Improvement with Private Landowners program in accordance with the Northwest Power Planning Council's (NPPC) Fish & Wildlife Program (Section 7.7). Section 7.7B.1 requires the establishment of ''at least one model watershed coordinator selected by each representative state''. This project was initiated in 1997 with the purpose of fulfilling the NWPCC's watershed program within the Flathead River basin in western Montana. Currently, the Flathead watershed has been radically altered by hydropower and other land uses. With the construction of Hungry Horse, Bigfork and Kerr dams, the Flathead River system has been divided into isolated populations. Bull trout have been listed as threatened by the US Fish and Wildlife Service and westslope cutthroat trout have been petitioned for listing. Many streams in the drainage have been destabilized during recent decades. Past legal and illegal species introductions are also causing problems. This project fosters in-kind, out-of-place mitigation to offset the impacts of hydroelectric power to 72 miles of the South Fork of the Flathead River and its tributaries upstream of Hungry Horse Dam. Key subbasins within the Flathead drainage, which are critical to native species restoration, are experiencing rapid changes in land ownership and management direction. Subdivision and residential development of agricultural and timber lands adjacent to waterways in the drainage pose one of the greatest threats to weak but recoverable stocks of trout species. Plum Creek Timber Company, a major landholder in the Flathead drainage is currently divesting itself of large tracks of its lakeshore and streamside holdings. Growth of small tract development throughout the area and its tributaries is occurring at a record rate. Immediate to short-term action is required to protect stream corridors through many of these areas if cost

  20. Innovation and Coordination at the Callifornia Fuel Cell Partnership |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Innovation and Coordination at the Callifornia Fuel Cell Partnership Innovation and Coordination at the Callifornia Fuel Cell Partnership Presented at Refueling Infrastructure for Alternative Fuel Vehicles: Lessons Learned for Hydrogen Conference, April 2-3, 2008, Sacramento, California dunwoody_innovation_coordination_cafcp.pdf (606.38 KB) More Documents & Publications Vision for Rollout of Fuel Cell Vehicles and Hydrogen Fuel Stations Moving toward a commercial

  1. DOE-TSPP-5-2013, Coordination of Technical Standards

    Energy.gov [DOE]

    This procedure provides guidance on the formal coordination of the Department of Energy (DOE) Technical Standards in the DOE Technical Standards Program (TSP). The purpose of coordination of draft DOE Technical Standards is to solicit and receive comments from interested persons and organizations in order to improve and correct DOE Technical Standards. DOE Technical Standards are coordinated through the electronic TSP RevCom process.

  2. Coordination of Federal Transmission Permitting on Federal Lands (216(h)) |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Planning » Coordination of Federal Transmission Permitting on Federal Lands (216(h)) Coordination of Federal Transmission Permitting on Federal Lands (216(h)) On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve coordination among project applicants, federal agencies, states and tribes involved in the siting and permitting process for electric transmission facilities on Federal land.

  3. Federal, State, and Local Coordination | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal, State, and Local Coordination Federal, State, and Local Coordination ISER's success in supporting the national security mission relies heavily upon the ability to partner and coordinate with numerous Federal, State, local and tribal government agencies and organizations, domestic and international private and public energy sectors, other DOE offices, and DOE National Laboratories. Some of these partners include: Federal Partners: White House National Security Staff (NSS), Federal

  4. CBEI: Coordinating RTUs in Small and Medium Sized Commercial Buildings -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2015 Peer Review | Department of Energy Coordinating RTUs in Small and Medium Sized Commercial Buildings - 2015 Peer Review CBEI: Coordinating RTUs in Small and Medium Sized Commercial Buildings - 2015 Peer Review Presenter: James Braun, Purdue University View the Presentation CBEI: Coordinating RTUs in Small and Medium Sized Commercial Buildings - 2015 Peer Review (1.8 MB) More Documents & Publications Control and Diagnostics for Rooftop Units - 2014 BTO Peer Review CBEI: Lessons

  5. Coordinated Airborne Studies in the Tropics (CAST) Field Campaign Report

    Office of Scientific and Technical Information (OSTI)

    (Technical Report) | SciTech Connect Coordinated Airborne Studies in the Tropics (CAST) Field Campaign Report Citation Details In-Document Search Title: Coordinated Airborne Studies in the Tropics (CAST) Field Campaign Report The last field campaign held at the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility site on Manus Island, Papua New Guinea (PNG), was conducted in February 2014 as part of the Co-ordinated Airborne Studies in the Tropics

  6. Coordinator Resources | U.S. DOE Office of Science (SC)

    Office of Science (SC)

    Regional Science Bowl Coordinators » Coordinator Resources National Science Bowl® (NSB) NSB Home About Regional Science Bowl Coordinators Alumni Historical Information - National Finals National Science Bowl Logos Regional Competitions National Finals Volunteers Key Dates Frequently Asked Questions News Media Contact Us WDTS Home Contact Information National Science Bowl® U.S. Department of Energy SC-27/ Forrestal Building 1000 Independence Ave., SW Washington, DC 20585 E: Email Us Regional

  7. High reliability plastic packaging for microelectronics

    SciTech Connect

    Sweet, J.N.; Peterson, D.W.; Hsia, A.H.; Tuck, M.

    1997-07-01

    Goal was Assembly Test Chips (ATCs) which could be used for evaluating plastic encapsulation technologies. Circuits were demonstrated for measuring Au-Al wirebond and Al metal corrosion failure rates during accelerated temperature and humidity testing. The test circuits on the ATC02.5 chip were very sensitive to extrinsic or processing induced failure rates. Accelerated aging experiments were conducted with unpassivated triple track Al structures on the ATC02.6 chip; the unpassivated tracks were found to be very sensitive to particulate contamination. Some modifications to existing circuitry were suggested. The piezoresistive stress sensing circuitry designed for the ATC04 test chip was found suitable for determining the change in the state of mechanical stress at the die when both initial and final measurements were made near room temperature (RT). Attempt to measure thermal stress between RT and a typical polymer glass transition temperature failed because of excessive die resistor- substrate leakage currents at the high temperature end; suitable circuitry changes were developed to overcome this problem. One temperature and humidity experiment was conducted with Sandia developed static radom access memory parts to examine non-corrosion CMOS failures; this objective was not achieved, but corrosion failure at the metal to Si contacts on the die surface could be detected. This 2-year effort resulted in new designs for test circuits which could be used on an advanced ATC for reliability assessment in Defense Programs electronics development projects.

  8. Human Reliability Considerations for Small Modular Reactors

    SciTech Connect

    OHara J. M.; Higgins, H.; DAgostino, A.; Erasmia, L.

    2012-01-27

    Small modular reactors (SMRs) are a promising approach to meeting future energy needs. Although the electrical output of an individual SMR is relatively small compared to that of typical commercial nuclear plants, they can be grouped to produce as much energy as a utility demands. Furthermore, SMRs can be used for other purposes, such as producing hydrogen and generating process heat. The design characteristics of many SMRs differ from those of current conventional plants and may require a distinct concept of operations. The U.S. Nuclear Regulatory Commission (NRC) conducted research to examine the human factors engineering and the operational aspects of SMRs. The research identified thirty potential human-performance issues that should be considered in the NRC's reviews of SMR designs and in future research activities. The purpose of this report is to illustrate how the issues can support SMR probabilistic risk analyses and their review by identifying potential human failure events for a subset of the issues. As part of addressing the human contribution to plant risk, human reliability analysis practitioners identify and quantify the human failure events that can negatively impact normal or emergency plant operations. The results illustrated here can be generalized to identify additional human failure events for the issues discussed and can be applied to those issues not discussed in this report.

  9. Task Decomposition in Human Reliability Analysis

    SciTech Connect

    Boring, Ronald Laurids; Joe, Jeffrey Clark

    2014-06-01

    In the probabilistic safety assessments (PSAs) used in the nuclear industry, human failure events (HFEs) are determined as a subset of hardware failures, namely those hardware failures that could be triggered by human action or inaction. This approach is top-down, starting with hardware faults and deducing human contributions to those faults. Elsewhere, more traditionally human factors driven approaches would tend to look at opportunities for human errors first in a task analysis and then identify which of those errors is risk significant. The intersection of top-down and bottom-up approaches to defining HFEs has not been carefully studied. Ideally, both approaches should arrive at the same set of HFEs. This question remains central as human reliability analysis (HRA) methods are generalized to new domains like oil and gas. The HFEs used in nuclear PSAs tend to be top-down— defined as a subset of the PSA—whereas the HFEs used in petroleum quantitative risk assessments (QRAs) are more likely to be bottom-up—derived from a task analysis conducted by human factors experts. The marriage of these approaches is necessary in order to ensure that HRA methods developed for top-down HFEs are also sufficient for bottom-up applications.

  10. Individual Differences in Human Reliability Analysis

    SciTech Connect

    Jeffrey C. Joe; Ronald L. Boring

    2014-06-01

    While human reliability analysis (HRA) methods include uncertainty in quantification, the nominal model of human error in HRA typically assumes that operator performance does not vary significantly when they are given the same initiating event, indicators, procedures, and training, and that any differences in operator performance are simply aleatory (i.e., random). While this assumption generally holds true when performing routine actions, variability in operator response has been observed in multiple studies, especially in complex situations that go beyond training and procedures. As such, complexity can lead to differences in operator performance (e.g., operator understanding and decision-making). Furthermore, psychological research has shown that there are a number of known antecedents (i.e., attributable causes) that consistently contribute to observable and systematically measurable (i.e., not random) differences in behavior. This paper reviews examples of individual differences taken from operational experience and the psychological literature. The impact of these differences in human behavior and their implications for HRA are then discussed. We propose that individual differences should not be treated as aleatory, but rather as epistemic. Ultimately, by understanding the sources of individual differences, it is possible to remove some epistemic uncertainty from analyses.

  11. The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand

    SciTech Connect

    Watkins, B.E.; Satcher, J.H.

    1995-03-01

    We are investigating the structure/activity relationships of the bacterial enzyme methane monooxygenase, which catalyzes the specific oxidation of methane to methanol. We then utilize this information to design and synthesize inorganic coordination complexes that mimic the function of the native enzyme but are more robust and have higher catalytic site density. We envision these catalysts to be useful in process catalytic reactors in the conversion of methane in natural gas to liquid ethanol.

  12. The synthesis and characterization of new iron coordination complexes utilizing an asymmetric coordinating chelate ligand

    SciTech Connect

    Baldwin, D.; Watkins, B.E.; Satcher, J.H.

    1993-12-31

    The authors are investigating the structure/activity relationships of the bacterial enzyme, methane monooxygenase, which catalyzes the specific oxidation of methane to methanol. They then utilize this information to design and synthesize inorganic coordination complexes that mimic the function of the native enzyme but are more robust and have higher catalytic site density. They envision these catalysts to be useful in process catalytic reactors in the conversion of methane in natural gas to liquid methanol.

  13. Title 16 USC 824a Interconnection and Coordination of Facilities...

    OpenEI (Open Energy Information) [EERE & EIA]

    a Interconnection and Coordination of Facilities, Emergencies, Transmission to Foreign Countries Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  14. Title 10 CFR 900 Coordination of Federal Authorizations for Electric...

    OpenEI (Open Energy Information) [EERE & EIA]

    900 Coordination of Federal Authorizations for Electric Transmission Facilities Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document-...

  15. Mr. Carl Spreng RFLMA Project Coordinator HMWMD-B2

    Office of Legacy Management (LM)

    Spreng RFLMA Project Coordinator HMWMD-B2 Department of Energy Washington , DC 20585 September 9, 2013 Colorado Department of Public Health and Environment 4300 Cherry Creek Drive ...

  16. Preparation of Core-Shell Coordination Molecular Assemblies via...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Preparation of Core-Shell Coordination Molecular Assemblies via the Enrichment of Structure-Directing "Codes" of Bridging Ligands and Metathesis of Metal Units Previous Next List ...

  17. Coordination of Energy Efficiency and Demand Response: A Resource...

    OpenEI (Open Energy Information) [EERE & EIA]

    Coordination of Energy Efficiency and Demand Response: A Resource of the National Action Plan for Energy Efficiency Jump to: navigation, search Tool Summary LAUNCH TOOL Name:...

  18. Technical Report of the Wild and Scenic Rivers Coordinating Council...

    OpenEI (Open Energy Information) [EERE & EIA]

    search OpenEI Reference LibraryAdd to library PermittingRegulatory Guidance - GuideHandbook: Technical Report of the Wild and Scenic Rivers Coordinating...

  19. Coordinating Energy Efficiency with Other Disaster Resiliency Services

    Energy.gov [DOE]

    Better Buildings Residential Network Program Sustainability Peer Exchange Call Series: Coordinating Energy Efficiency with Disaster Resiliency and Response, Call Slides and Discussion Summary, January 9, 2014.

  20. Gateway:Coordinated Low Emissions Assistance Network (CLEAN)...

    OpenEI (Open Energy Information) [EERE & EIA]

    improve efficiency and enhance coordination of LEDS activities. CLEAN falls under the umbrella of the LEDS Global Partnership as a network of practitioners from around the world...

  1. DOE Releases EPRI Report on Benefits of Regional Coordination in Wind Energy Transfers

    Energy.gov [DOE]

    The Department of Energy (DOE) recently released a report finding that inter-regional cooperation can help lower the cost of transporting wind energy from windy areas in the Midwest and South-Central United States to areas with less wind generation capability in the Southeastern United States, improving the ability to meet our nation's electricity demand using clean resources. DOE awarded the Electric Power Research Institute (EPRI) and LCG Consulting an American Recovery and Reinvestment Act (ARRA) grant to evaluate the benefits of coordinating inter-regional transfers of wind energy.

  2. Closure Report (CR) for Corrective Action Unit (CAU) 41: Area 27 Landfills with Errata Sheet, Revision 0

    SciTech Connect

    Navarro Nevada Environmental Services

    2010-08-10

    The closure report for CAU 41 is just a one page summary listing the coordinates of the landfill which were given at the time (1996) in Nevada State Plan Coordinates - North American Datum of 1983. The drawing of the use restricted site also listed the coordinates in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner, which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the landfill with the coordinates listed showing the use restricted area.

  3. Coordinating Tectons: Bipyridyl Terminated Allenylidene Complexes

    SciTech Connect

    Cifuentes, Marie P.; Humphrey, Mark G.; Koutsantonis, George A.; Lengkeek, Nigel A.; Petrie, Simon; Sanford, Vanessa; Schauer, Phil A.; Skelton, Brian W.; Stranger, Robert; White, Allan H.

    2009-01-15

    A series of complexes with {pi}-conjugated carbon chains terminated by bipyridyl moieties has been prepared. These allenylidene complexes were derived from 9-hydroxy-9-ethynyl-4,5-diazafluorene, the preparation of which is reported; the new allenylidene complexes are highly colored with the cumulated carbon chain terminating in a bipyridyl unit providing a site for further coordination. The synthesis, characterization, and X-ray structure determination of trans-[MCl(P{intersection}P){sub 2}{sub {double_bond}}C{sub {double_bond}}C{sub {double_bond}}(4,5-diazafluoren-9-yl)]PF{sub 6} (M = Ru, P{intersection}P = bis(diphenylphosphino)methane (dppm), 1,2-bis(diphenylphosphino)ethane (dppe), 1,2-bis(dimethylphosphino)ethane (dmpe); M = Os, P{intersection}P = dppm) are described. The effect of the variation in metal and ligand on electronic and electrochemical characteristics of these complexes has been investigated by using UV-vis, solution electrochemistry, and a combination of these techniques in spectroelectrochemical experiments. DFT calculations have been performed on trans-[RuCl(P{intersection}P){sub 2}{sub {double_bond}}C{sub {double_bond}}C{sub {double_bond}}(4,5-diazafluoren-9-yl)]{sup q} (P{intersection}P = dppm, bis(dimethylphosphino)methane (dmpm); q = -1, 0, +1, +2) and subsequently solvent-corrected calculations with use of COSMO were also undertaken to examine the nature of electronic transitions in various oxidation states.

  4. Federal Energy Resources Modernization Coordinating Committee

    SciTech Connect

    Parker, G.B.

    1993-04-01

    This report summarizes the broad range of activities that are focused on meeting the President's Executive Order on Federal Energy Management promulgated to meet energy savings goals and encourage more efficient management of all federal energy resources. These activities are reported semiannually under the auspices of the Federal Energy Resource Modernization (FERM) Coordinating Committee, and as such include activities undertaken from April 1, 1992, through September 30, 1992. The activities reported are classified into four major categories: (1) technology-base support, which includes development of processes, software, metering and monitoring equipment and strategies, and other tools for federal energy managers to better understand and characterize their energy resources; (2) federal energy systems testing and monitoring; (3) federal energy systems revitalization projects at federal installations in cooperation with the utilities serving the sites; and (4) energy supply, distribution and end-use conservation assessment for federal agencies and/or facilities. Lighting systems and air conditioning projects at federal facilities, especially military bases are updated.

  5. NREL Hosts PV Module Reliability Workshop for Industry | PV | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hosts PV Module Reliability Workshop for Industry March 1, 2016 Nearly 200 researchers from more than 100 companies and representing 16 countries attended the 7th annual PV Module Reliability Workshop, held Feb. 23-25, 2016, in Golden, Colo. The program was designed by the National Renewable Energy Laboratory (NREL) in collaboration with Sandia National Laboratories and the photovoltaic (PV) industry. "NREL's PV Module Reliability Workshop is unique in its requirement for all organizations

  6. NREL Hosts PV Module Reliability Workshop for Industry | Solar | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Hosts PV Module Reliability Workshop for Industry March 1, 2016 Nearly 200 researchers from more than 100 companies and representing 16 countries attended the 7th annual PV Module Reliability Workshop, held Feb. 23-25, 2016, in Golden, Colo. The program was designed by the National Renewable Energy Laboratory (NREL) in collaboration with Sandia National Laboratories and the photovoltaic (PV) industry. "NREL's PV Module Reliability Workshop is unique in its requirement for all organizations

  7. EOI: High Reliability Wireless Communications System | Y-12 National

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Security Complex EOI: High Reliability ... EOI: High Reliability Wireless Communications System Consolidated Nuclear Security, LLC (hereafter known as "CNS", for additional company information, see website (www.y12.doe.gov)), acting under its Prime Contract No. DE-NA0001942 with the United States Department of Energy (DOE), is soliciting an Expression of Interest (EOI)/Request for Information (RFI) for a market survey of available High Reliability Wireless Communications System.

  8. Smart Grid Investments Improve Grid Reliability, Resilience, and Storm

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Responses (November 2014) | Department of Energy Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart Grid Investments Improve Grid Reliability, Resilience, and Storm Responses (November 2014) Smart grid technologies are helping utilities to speed outage restoration following major storm events, reduce the total number of affected customers, and improve overall service reliability to reduce customer losses from power disruptions. This report presents

  9. 2012 Reliability & Markets Peer Review - Full Presentations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Full Presentations 2012 Reliability & Markets Peer Review - Full Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. The full presentations are available below. Presentation summaries are also available. 2012 R&M Peer Review - Transmission Investment Assessment Under Uncertainty - Ben Hobbs (410.84 KB) 2012 R&M Peer Review - Renewable

  10. 2012 Reliability & Markets Peer Review - Presentation Summaries |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Presentation Summaries 2012 Reliability & Markets Peer Review - Presentation Summaries The Transmission Reliability R&D Reliability & Markets Peer Review included 11 presentations over 2 days on August 7 - 8, 2012 at Cornell University in Ithaca, NY. Presentation summaries are available below. The full presentations are also available. 2012 R&M Peer Review - Summary: Transmission Investment Under Uncertainty - Ben Hobbs (109.91 KB) 2012 R&M Peer

  11. 2013 Reliability & Markets Peer Review - Day 1 Presentations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy 1 Presentations 2013 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 6 - 7, 2013. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Ben Hobbs (Johns Hopkins), Kameshwar Poolla (UC Berkeley) Session II: Ray Zimmerman (Cornell), Hsiao-Dong Chiang (Cornell) Session III: Shmuel Oren (UC Berkeley), Dan Tylavsky (U Arizona), Tom

  12. 2015 Reliability & Markets Peer Review - Day 1 Presentations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy 1 Presentations 2015 Reliability & Markets Peer Review - Day 1 Presentations The Transmission Reliability R&D Reliability & Markets Peer Review included 6 sessions over 2 days on August 4 - 5, 2015. Presentations from Day 1 (Sessions I through IV) are available below. Session I: Shmuel Oren, Eilyan Bitar, Anna Scaglione Session II: Pravin Varaiya, Alejandro Dominguez-Garcia Session III: Kory Hedman, Bill Schulze, Ben Hobbs Session IV: Lang Tong, Tom Overbye, Zhifang

  13. The Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy The Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs The Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs The Role of Advancements in Photovoltaic Efficiency, Reliability, and Costs Although tremendous progress has been made in reducing the cost of PV systems, additional LCOE reductions of 40%-50% between 2015 and 2020 will be required to reach the SunShot Initiative's targets (see Woodhouse et al. 2016). Understanding the

  14. 2013 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission Reliability Program Peer Review 2013 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included six sessions over 2 days on June 27 - 28, 2013. Presentations are available through the individual session links. The agenda and introduction by Joe Eto, LBNL, are available below. Day 1: June 27 Session I Baselining Studies and Analysis, Bharat Bhargava, EPG Baselining Studies and Analysis, Brett Amidan, PNNL Synchrophasor Standards Support and

  15. 2014 Transmission Reliability Program Peer Review | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transmission Reliability Program Peer Review 2014 Transmission Reliability Program Peer Review The Transmission Reliability Program Peer Review included 20 presentations over 2 days on June 3 - 4, 2014 in Washington, DC. Presentations are available through the links. The agenda is included below. Day 1: June 3 Session I Synchrophasor Standards Support and Development, Allen Goldstein, NIST Advanced Synchrophasor Metrology, Paul Ewing, ORNL Technology Assessment for Next Generation PMU, Mark

  16. Office of Electricity Delivery And Energy Reliability To Hold Technical

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conference On The Design Of Future Electric Transmission | Department of Energy Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission February 5, 2009 - 10:57am Addthis On March 4, 2009, the Department of Energy's Office of Electricity Delivery and Energy Reliability (OE) will conduct a

  17. Competition and Reliability in North American Energy Markets: Issue Paper

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Synopses | Department of Energy Energy Markets: Issue Paper Synopses Competition and Reliability in North American Energy Markets: Issue Paper Synopses Jack Casazza, Frank Delea, and George Loehr argue that "deregulation and restructuring have had a devastating effect on the reliability of the North American power system and constitute the ultimate root cause of the August 14, 2003" Competition and Reliability in North American Energy Markets: Issue Paper Synopses (114.12

  18. The Relationship between Competitive Power Markets and Grid Reliability. |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy The Relationship between Competitive Power Markets and Grid Reliability. The Relationship between Competitive Power Markets and Grid Reliability. The U.S. Department of Energy and Natural Resources Canada should commission an independent study of the relationships among industry restructuring, competition in power markets, and grid reliability, and how those relationships should be managed to best serve the public interest. The Relationship between Competitive Power

  19. Vehicle Technologies Office Merit Review 2014: Performance and Reliability

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Bonded Interfaces for High-Temperature Packaging | Department of Energy and Reliability of Bonded Interfaces for High-Temperature Packaging Vehicle Technologies Office Merit Review 2014: Performance and Reliability of Bonded Interfaces for High-Temperature Packaging Presentation given by National Renewable Energy Laboratory at 2014 DOE Hydrogen and Fuel Cells Program and Vehicle Technologies Office Annual Merit Review and Peer Evaluation Meeting about performance and reliability of bonded

  20. Reliability study of an emerging fire suppression system

    SciTech Connect

    Miller, David A.; Rossati, Lyric M.; Fritz, Nathan K.; Cournoyer, Michael E.; Granzow, Howard N.

    2015-02-07

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Plutonium gloveboxes are known to present harsh environmental conditions for polymer materials, these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. The primary component of interest in self-contained fire extinguishers is the nylon 6-6 machined tube that comprises the main body of the system.Thermo-mechanical modeling and characterization of nylon 6-6 for use in plutonium glovebox applications has been carried out. Data has been generated regarding property degradation leading to poor, or reduced, engineering performance of nylon 6-6 components. In this study, nylon 6-6 tensile specimens conforming to the casing of self-contained fire extinguisher systems have been exposed to hydrochloric, nitric, and sulfuric acids. This information was used to predict the performance of a load bearing engineering component comprised of nylon 6-6 and designed to operate in a consistent manner over a specified time period. The study provides a fundamental understanding of the engineering performance of the fire suppression system and the effects of environmental degradation due to acid exposure on engineering performance. Data generated help identify the limitations of self-contained fire extinguishers. No critical areas of concern for plutonium glovebox applications of nylon 6-6 have been identified when considering exposure to mineral acid.

  1. Reliability study of an emerging fire suppression system

    DOE PAGES [OSTI]

    Miller, David A.; Rossati, Lyric M.; Fritz, Nathan K.; Cournoyer, Michael E.; Granzow, Howard N.

    2015-02-07

    Self-contained fire extinguishers are a robust, reliable and minimally invasive means of fire suppression for gloveboxes. Plutonium gloveboxes are known to present harsh environmental conditions for polymer materials, these include radiation damage and chemical exposure, both of which tend to degrade the lifetime of engineered polymer components. The primary component of interest in self-contained fire extinguishers is the nylon 6-6 machined tube that comprises the main body of the system.Thermo-mechanical modeling and characterization of nylon 6-6 for use in plutonium glovebox applications has been carried out. Data has been generated regarding property degradation leading to poor, or reduced, engineering performancemore » of nylon 6-6 components. In this study, nylon 6-6 tensile specimens conforming to the casing of self-contained fire extinguisher systems have been exposed to hydrochloric, nitric, and sulfuric acids. This information was used to predict the performance of a load bearing engineering component comprised of nylon 6-6 and designed to operate in a consistent manner over a specified time period. The study provides a fundamental understanding of the engineering performance of the fire suppression system and the effects of environmental degradation due to acid exposure on engineering performance. Data generated help identify the limitations of self-contained fire extinguishers. No critical areas of concern for plutonium glovebox applications of nylon 6-6 have been identified when considering exposure to mineral acid.« less

  2. Electricity Policy Coordination and Implementation | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Implementation Electricity Policy Coordination and Implementation OE is laying the framework for a modern electricity system by contributing to the development and implementation of electricity policy at the Federal and State level. Also read information on what happened in the August 2003 Blackout. Transmission Planning National Electric Transmission Congestion Study Recovery Act: Interconnection Transmission Planning Coordination of Federal Transmission Permitting on Federal Lands, Section

  3. Design and reliability of a MEMS thermal rotary actuator. (Conference...

    Office of Scientific and Technical Information (OSTI)

    Citation Details In-Document Search Title: Design and reliability of a MEMS thermal rotary ... Resource Relation: Conference: Proposed for presentation at the TEXMEMS IX held September ...

  4. Sandia Energy - Sandia Report Offers Reliable Way to Evaluate...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    SunShot News & Events Photovoltaic Research & Capabilities Solar Energy Assurance Microgrid Solar Newsletter Sandia Report Offers Reliable Way to Evaluate Unintentional...

  5. PROJECT PROFILE: From Modules to Atoms: Increasing Reliability...

    Energy.gov [DOE] (indexed site)

    The project will study reliability-related defects in major photovoltaic (PV) technologies that include silicon (Si), cadmium telluride (CdTe), and copper indium gallium selenide ...

  6. NNSA Awards Contract for Reliable Fuel Supply Program | National...

    National Nuclear Security Administration (NNSA)

    ... enable countries with good nonproliferation credentials to pursue nuclear power generation. ... NNSA maintains and enhances the safety, security, reliability and performance of the ...

  7. NREL: News - UPS Fleet Study Quantifies the Reliability, Low...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    UPS Fleet Study Quantifies the Reliability, Low Emissions of CNG Trucks Tuesday October ... Service (UPS), which has the nation's largest private compressed natural gas (CNG) fleet. ...

  8. North American Electric Reliability Council Power Outage Update...

    Office of Environmental Management (EM)

    will continue to experience rotating outages due to generating capacity availability. North American Electric Reliability Council Power Outage Update (48.2 KB) More Documents & ...

  9. Innovation Impact, Wind: NREL Collaborative Improves the Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Collaborative Improves the Reliability of Wind Turbine Gearboxes Gearbox failures have a significant impact on the cost of wind farm operations. To help minimize gearbox failures, ...

  10. RTI International Develops Ssl Luminaire System Reliability Model

    Office of Energy Efficiency and Renewable Energy (EERE)

    With the help of DOE funding, RTI International is developing and validating accelerated life testing (ALT) methodologies and reliability models for predicting the lifetime of integrated solid...

  11. Summary of the Optics, IR, Injection, Operations, Reliability...

    Office of Scientific and Technical Information (OSTI)

    Technical Report: Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group Citation Details In-Document Search Title: Summary of the Optics, ...

  12. Microsoft PowerPoint - Sandia CREW 2011 Wind Turbine Reliability...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Wind Turbine Reliability Benchmark U.S. Fleet; Public Report October 2011 Continuous ... Results & Discussion SCADA and data transfer challenges lead to "Unknown Time" * ...

  13. Microsoft Word - Sandia CREW 2013 Wind Plant Reliability Benchmark...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Abstract To benchmark the current U.S. wind turbine fleet reliability performance and ... ideas and perspectives that can help us address the nation's most daunting challenges. ...

  14. Handbook of human-reliability analysis with emphasis on nuclear...

    Office of Scientific and Technical Information (OSTI)

    nuclear power plant applications. Final report Citation Details In-Document Search Title: Handbook of human-reliability analysis with emphasis on nuclear power plant applications. ...

  15. Power Electronics Reliability Kick Off Meeting … Silicon Power...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Will (initially) focus on equipment that contains high-powered semiconductor switches 3 Project Accomplishments * Adapted Sandia's reliability analysis tools and processes to power ...

  16. NWTC Collaborative Increases Gearbox Reliability and Helps Reduce...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and equipment suppliers. Ultimately, the findings are made public for use throughout the wind industry. This knowledge results in increased gearbox reliability and an ...

  17. Fast, Sensitive and Reliable Hydrogen Sensor | Argonne National...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Fast, Sensitive and Reliable Hydrogen Sensor Technology available for licensing Warm-up not required, and responds in less than 75 milliseconds in a 2% hydrogen atmosphere...

  18. Office of Electricity Delivery And Energy Reliability To Hold...

    Office of Environmental Management (EM)

    Office of Electricity Delivery And Energy Reliability To Hold Technical Conference On The Design Of Future Electric Transmission Office of Electricity Delivery And Energy ...

  19. Office of Electricity Delivery and Energy Reliability Cyber Security...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Office of Electricity Delivery and Energy Reliability Cyber Security Project Selections On September 23, 2010, speaking at the inaugural GridWise Global Forum, U.S. Energy ...

  20. DOE Office of Electricity Delivery & Energy Reliability (OE)...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Delivery & Energy Reliability (OE) Energy Storage Safety Workshop - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & ...

  1. "Increasing Solar Panel Efficiency And Reliability By Evaporative...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Lewis Meixler, Charles Gentile, Patricia Hillyer, Dylan Carpe, Jason Wang, Caroline Brooks The efficiency and reliability of photovoltaic solar panels decreases with increasing ...

  2. Office of Electricity Delivery & Energy Reliability FY 2012 Budget...

    Energy Saver

    recovery enable sources Office of Electricity Delivery and Energy Reliability recovery, the transition to renewable energy sources, and achieve the President's clean energy goals. ...

  3. Proposed EPA Rules Will Cut Carbon Pollution While Maintaining Reliability

    Energy.gov [DOE]

    The Energy Department is committed to supporting successful implementation of EPA’s Clean Power Plan while maintaining electric grid reliability.

  4. Handbook of human-reliability analysis with emphasis on nuclear...

    Office of Scientific and Technical Information (OSTI)

    emphasis on nuclear power plant applications. Final report Citation Details In-Document Search Title: Handbook of human-reliability analysis with emphasis on nuclear power plant ...

  5. Summary of the Optics, IR, Injection, Operations, Reliability...

    Office of Scientific and Technical Information (OSTI)

    Summary of the Optics, IR, Injection, Operations, Reliability and Instrumentation Working Group Citation Details In-Document Search Title: Summary of the Optics, IR, Injection, ...

  6. NREL: Performance and Reliability R&D - Accelerated Testing of...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Accelerated Testing of Modules and Components for Photovoltaic Reliability To conduct accelerated testing of modules and components, NREL subjects photovoltaic (PV) components and ...

  7. NREL: Performance and Reliability R&D - Development for Comprehensive...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Standards Development for Photovoltaic Reliability NREL is supporting the development of ... NREL researchers work through the International Photovoltaic (PV) Quality Assurance (QA) ...

  8. NREL Gearbox Reliability Collaborative Analysis Round Robin: Preprint

    SciTech Connect

    Oyague, F.; Butterfield, C. P.; Sheng, S.

    2009-05-01

    The Gearbox Reliability Collaborative is working to determine the causes and loading conditions that result in the premature failure of wind turbine gearboxes.

  9. Addressing Security and Reliability Concerns of Large Power Transforme...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    With the nation's security and economy dependent on the reliable delivery of electricity, ... a Joint Electromagnetic Pulse (EMP) Resilience Strategy for the grid and are now ...

  10. 2016 Transmission Reliability Program Peer Review- Day 1 Presentations

    Office of Energy Efficiency and Renewable Energy (EERE)

    The 2016 Transmission Reliability Program Peer Review included 8 sessions over 2 days on June 7 - 8, 2016, in Washington, DC.

  11. Letter from Pepco Holdings Regarding the Reliability of Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of electricity service for the Nation's Capital in light of the recent shutdown of the ... concerns, is critical to ensuring reliable electric service to the Nation's Capital. ...

  12. Self-Reliability and Motivation in a Nuclear Security Culture...

    Office of Scientific and Technical Information (OSTI)

    and Motivation in a Nuclear Security Culture Enhancement Program Citation Details In-Document Search Title: Self-Reliability and Motivation in a Nuclear Security Culture ...

  13. The Business Case for Fuel Cells 2013: Reliability, Resiliency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Fuel Cells 2013 Reliability, Resiliency & Savings i Authors and Acknowledgements This report was written and compiled by Sandra Curtin and Jennifer Gangi of Fuel Cells 2000, an ...

  14. Competition and Reliability in North American Energy Markets...

    Energy Saver

    ... are mutually beneficial to the extent that a reliable grid is necessary to ... He reviews three industry trends that are causes for concern: 1) Increased organizational ...

  15. Reliable Energy Level Alignment at Physisorbed Molecule-Metal...

    Office of Scientific and Technical Information (OSTI)

    at Physisorbed Molecule-Metal Interfaces from Density Functional Theory Title: Reliable Energy Level Alignment at Physisorbed Molecule-Metal Interfaces from Density Functional ...

  16. Reliability of Oak Ridge Facilities Grows (Journal Article) ...

    Office of Scientific and Technical Information (OSTI)

    Resource Relation: Journal Name: Neutron News; Journal Volume: 22; Journal Issue: 2 Research Org: ... Subject: 11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; RELIABILITY; OAK RIDGE; ...

  17. Model Predictive Control-based Optimal Coordination of Distributed Energy Resources

    SciTech Connect

    Mayhorn, Ebony T.; Kalsi, Karanjit; Lian, Jianming; Elizondo, Marcelo A.

    2013-01-07

    Distributed energy resources, such as renewable energy resources (wind, solar), energy storage and demand response, can be used to complement conventional generators. The uncertainty and variability due to high penetration of wind makes reliable system operations and controls challenging, especially in isolated systems. In this paper, an optimal control strategy is proposed to coordinate energy storage and diesel generators to maximize wind penetration while maintaining system economics and normal operation performance. The goals of the optimization problem are to minimize fuel costs and maximize the utilization of wind while considering equipment life of generators and energy storage. Model predictive control (MPC) is used to solve a look-ahead dispatch optimization problem and the performance is compared to an open loop look-ahead dispatch problem. Simulation studies are performed to demonstrate the efficacy of the closed loop MPC in compensating for uncertainties and variability caused in the system.

  18. Model Predictive Control-based Optimal Coordination of Distributed Energy Resources

    SciTech Connect

    Mayhorn, Ebony T.; Kalsi, Karanjit; Lian, Jianming; Elizondo, Marcelo A.

    2013-04-03

    Distributed energy resources, such as renewable energy resources (wind, solar), energy storage and demand response, can be used to complement conventional generators. The uncertainty and variability due to high penetration of wind makes reliable system operations and controls challenging, especially in isolated systems. In this paper, an optimal control strategy is proposed to coordinate energy storage and diesel generators to maximize wind penetration while maintaining system economics and normal operation performance. The goals of the optimization problem are to minimize fuel costs and maximize the utilization of wind while considering equipment life of generators and energy storage. Model predictive control (MPC) is used to solve a look-ahead dispatch optimization problem and the performance is compared to an open loop look-ahead dispatch problem. Simulation studies are performed to demonstrate the efficacy of the closed loop MPC in compensating for uncertainties and variability caused in the system.

  19. Optimal Control and Coordination of Connected and Automated Vehicles at Urban Traffic Intersections

    SciTech Connect

    Zhang, Yue J.; Malikopoulos, Andreas; Cassandras, Christos G.

    2016-01-01

    We address the problem of coordinating online a continuous flow of connected and automated vehicles (CAVs) crossing two adjacent intersections in an urban area. We present a decentralized optimal control framework whose solution yields for each vehicle the optimal acceleration/deceleration at any time in the sense of minimizing fuel consumption. The solu- tion, when it exists, allows the vehicles to cross the intersections without the use of traffic lights, without creating congestion on the connecting road, and under the hard safety constraint of collision avoidance. The effectiveness of the proposed solution is validated through simulation considering two intersections located in downtown Boston, and it is shown that coordination of CAVs can reduce significantly both fuel consumption and travel time.

  20. Energy materials coordinating committee (EMaCC). Annual technical report, fiscal year 2003

    SciTech Connect

    none,

    2004-10-18

    The DOE Energy Materials Coordinating Committee (EMaCC) serves primarily to enhance coordination among the Department's materials programs and to further effective use of materials expertise within the Department. These functions are accomplished through the exchange of budgetary and planning information among program managers and through technical meetings/workshops on selected topics involving both DOE and major contractors. In addition, EMaCC assists in obtaining materials-related inputs for both intra- and interagency compilations. Topical subcommittees of the EMaCC are responsible for conducting seminars and otherwise facilitating information flow between DOE organizational units in materials areas of particular importance to the Department. The EMaCC Terms of Reference were recently modified and developed into a Charter that was approved on June 5, 2003. As a result of this reorganization, the existing subcommittees were disbanded and new subcommittees are being formed.

  1. McKenzie River Focus Watershed Coordination: Year-End Report 2000.

    SciTech Connect

    Thrailkil, Jim

    2000-01-01

    This report summarizes accomplishments of the McKenzie River Focus Watershed Council (MWC) in the areas of coordination and administration during Fiscal Year 2000. Coordination and administration consist of prioritization and planning for projects; project management and implementation; procurement of funding for long-term support of the Council; and watershed education/outreach program for residents and local schools. Key accomplishments in the area of project planning include coordinating: monthly Council and executive committee meetings; staffing the Upper Willamette Spring Chinook Working Group; staffing the water quality technical committee; and guiding education and stewardship projects. Key accomplishments in the area of project management include the completion of the McKenzie-Willamette Confluence Assessment; securing funds for project planning in the confluence area; near completion of the BPA funded McKenzie sub-basin assessment; development of a framework for a McKenzie Watershed Conservation Strategy; an evaluation of Council's monitoring programs - ambient water quality, storm-event water quality, Tier III water quality, and macroinvertebrate monitoring. The Council, in cooperation with the McKenzie River Cooperative, completed habitat enhancements in the Gate Creek and Deer Creek sub-watersheds. This partnership recently submitted Bring Back the Natives grant for initiation of projects in other McKenzie tributaries. The Council will also be working with a local business to develop a river-side riparian enhancement and native landscaping project on the lodge grounds. This will serve as a demonstration project for blending fish and wildlife habitat concerns with maintaining grounds for business opportunities. Accomplishments in the area of procurement of funding included developing the FY2000 Scope of Work and budget for approval by the Council and BPA; providing quarterly budget and work program progress reports to the Council; and securing additional

  2. Application of the BISON Fuel Performance Code to the FUMEX-III Coordinated Research Project

    SciTech Connect

    R. L. Williamson; S. R. Novascone

    2012-04-01

    INL recently participated in FUMEX-III, an International Atomic Energy Agency sponsored fuel modeling Coordinated Research Project. A main purpose of FUMEX-III is to compare code predictions to reliable experimental data. During the same time period, the INL initiated development of a new multidimensional (2D and 3D) multiphysics nuclear fuel performance code called BISON. Interactions with international fuel modeling researchers via FUMEX-III played a significant and important role in the BISON evolution, particularly influencing the selection of material and behavioral models which are now included in the code. BISON's ability to model integral fuel rod behavior did not mature until 2011, thus the only FUMEX-III case considered was the Riso3-GE7 experiment, which includes measurements of rod outer diameter following pellet clad mechanical interaction (PCMI) resulting from a power ramp late in fuel life. BISON comparisons to the Riso3-GE7 final rod diameter measurements are quite reasonable. The INL is very interested in participation in the next Fuel Modeling Coordinated Research Project and would like to see the project initiated as soon as possible.

  3. Gearbox Reliability Collaborative High Speed Shaft Tapered Roller Bearing Calibration

    SciTech Connect

    Keller, J.; Guo, Y.; McNiff, B.

    2013-10-01

    The National Renewable Energy Laboratory (NREL) Gearbox Reliability Collaborative (GRC) is a project investigating gearbox reliability primarily through testing and modeling. Previous dynamometer testing focused upon acquiring measurements in the planetary section of the test gearbox. Prior to these tests, the strain gages installed on the planetary bearings were calibrated in a load frame.

  4. Improving the environment in urban areas

    SciTech Connect

    Adamkus, V.V.

    1994-12-31

    The author discusses the need for improvements to the environment in urban areas, and efforts being made under the direction of the Environmental Protection Agency (EPA) to address these problems. The impact the new Clean Air Act can have on emissions from gasoline powered autos, diesel burning trucks, fixed emission sources ranging from utilities to chemical plants, and consumer products like hair sprays and charcoal starters, will all work together to improve air quality in urban areas. The author also discusses Brownfields Economic Redevelopment Plan efforts being supported by the EPA in a coordinated plan to get municipalities involved in cleaning up areas with pollution, to remove the blight on the urban areas, provide new land for development, and promote additional jobs.

  5. Automatic ball bar for a coordinate measuring machine

    DOEpatents

    Jostlein, H.

    1997-07-15

    An automatic ball bar for a coordinate measuring machine determines the accuracy of a coordinate measuring machine having at least one servo drive. The apparatus comprises a first and second gauge ball connected by a telescoping rigid member. The rigid member includes a switch such that inward radial movement of the second gauge ball relative to the first gauge ball causes activation of the switch. The first gauge ball is secured in a first magnetic socket assembly in order to maintain the first gauge ball at a fixed location with respect to the coordinate measuring machine. A second magnetic socket assembly secures the second gauge ball to the arm or probe holder of the coordinate measuring machine. The second gauge ball is then directed by the coordinate measuring machine to move radially inward from a point just beyond the length of the ball bar until the switch is activated. Upon switch activation, the position of the coordinate measuring machine is determined and compared to known ball bar length such that the accuracy of the coordinate measuring machine can be determined. 5 figs.

  6. Automatic ball bar for a coordinate measuring machine

    DOEpatents

    Jostlein, Hans

    1997-01-01

    An automatic ball bar for a coordinate measuring machine determines the accuracy of a coordinate measuring machine having at least one servo drive. The apparatus comprises a first and second gauge ball connected by a telescoping rigid member. The rigid member includes a switch such that inward radial movement of the second gauge ball relative to the first gauge ball causes activation of the switch. The first gauge ball is secured in a first magnetic socket assembly in order to maintain the first gauge ball at a fixed location with respect to the coordinate measuring machine. A second magnetic socket assembly secures the second gauge ball to the arm or probe holder of the coordinate measuring machine. The second gauge ball is then directed by the coordinate measuring machine to move radially inward from a point just beyond the length of the ball bar until the switch is activated. Upon switch activation, the position of the coordinate measuring machine is determined and compared to known ball bar length such that the accuracy of the coordinate measuring machine can be determined.

  7. Maritime shipping as a high reliability industry: A qualitative analysis

    SciTech Connect

    Mannarelli, T.; Roberts, K.; Bea, R.

    1994-10-01

    The maritime oil shipping industry has great public demands for safe and reliable organizational performance. Researchers have identified a set of organizations and industries that operate at extremely high levels of reliability, and have labelled them High Reliability Organizations (HRO). Following the Exxon Valdez oil spill disaster of 1989, public demands for HRO-level operations were placed on the oil industry. It will be demonstrated that, despite enormous improvements in safety and reliability, maritime shipping is not operating as an HRO industry. An analysis of the organizational, environmental, and cultural history of the oil industry will help to provide justification and explanation. The oil industry will be contrasted with other HRO industries and the differences will inform the shortfalls maritime shipping experiences with regard to maximizing reliability. Finally, possible solutions for the achievement of HRO status will be offered.

  8. Wind turbine reliability : a database and analysis approach.

    SciTech Connect

    Linsday, James; Briand, Daniel; Hill, Roger Ray; Stinebaugh, Jennifer A.; Benjamin, Allan S.

    2008-02-01

    The US wind Industry has experienced remarkable growth since the turn of the century. At the same time, the physical size and electrical generation capabilities of wind turbines has also experienced remarkable growth. As the market continues to expand, and as wind generation continues to gain a significant share of the generation portfolio, the reliability of wind turbine technology becomes increasingly important. This report addresses how operations and maintenance costs are related to unreliability - that is the failures experienced by systems and components. Reliability tools are demonstrated, data needed to understand and catalog failure events is described, and practical wind turbine reliability models are illustrated, including preliminary results. This report also presents a continuing process of how to proceed with controlling industry requirements, needs, and expectations related to Reliability, Availability, Maintainability, and Safety. A simply stated goal of this process is to better understand and to improve the operable reliability of wind turbine installations.

  9. CERTS: Consortium for Electric Reliability Technology Solutions - Research Highlights

    SciTech Connect

    Eto, Joseph

    2003-07-30

    Historically, the U.S. electric power industry was vertically integrated, and utilities were responsible for system planning, operations, and reliability management. As the nation moves to a competitive market structure, these functions have been disaggregated, and no single entity is responsible for reliability management. As a result, new tools, technologies, systems, and management processes are needed to manage the reliability of the electricity grid. However, a number of simultaneous trends prevent electricity market participants from pursuing development of these reliability tools: utilities are preoccupied with restructuring their businesses, research funding has declined, and the formation of Independent System Operators (ISOs) and Regional Transmission Organizations (RTOs) to operate the grid means that control of transmission assets is separate from ownership of these assets; at the same time, business uncertainty, and changing regulatory policies have created a climate in which needed investment for transmission infrastructure and tools for reliability management has dried up. To address the resulting emerging gaps in reliability R&D, CERTS has undertaken much-needed public interest research on reliability technologies for the electricity grid. CERTS' vision is to: (1) Transform the electricity grid into an intelligent network that can sense and respond automatically to changing flows of power and emerging problems; (2) Enhance reliability management through market mechanisms, including transparency of real-time information on the status of the grid; (3) Empower customers to manage their energy use and reliability needs in response to real-time market price signals; and (4) Seamlessly integrate distributed technologies--including those for generation, storage, controls, and communications--to support the reliability needs of both the grid and individual customers.

  10. Final report for CCS cross-layer reliability visioning study

    SciTech Connect

    Quinn, Heather M; Dehon, Andre; Carter, Nicj

    2010-12-20

    The geometric rate of improvement of transistor size and integrated circuit performance known as Moore's Law has been an engine of growth for our economy, enabling new products and services, creating new value and wealth, increasing safety, and removing menial tasks from our daily lives. Affordable, highly integrated components have enabled both life-saving technologies and rich entertainment applications. Anti-lock brakes, insulin monitors, and GPS-enabled emergency response systems save lives. Cell phones, internet appliances, virtual worlds, realistic video games, and mp3 players enrich our lives and connect us together. Over the past 40 years of silicon scaling, the increasing capabilities of inexpensive computation have transformed our society through automation and ubiquitous communications. Looking forward, increasing unpredictability threatens our ability to continue scaling integrated circuits at Moore's Law rates. As the transistors and wires that make up integrated circuits become smaller, they display both greater differences in behavior among devices designed to be identical and greater vulnerability to transient and permanent faults. Conventional design techniques expend energy to tolerate this unpredictability by adding safety margins to a circuit's operating voltage, clock frequency or charge stored per bit. However, the rising energy costs needed to compensate for increasing unpredictability are rapidly becoming unacceptable in today's environment where power consumption is often the limiting factor on integrated circuit performance and energy efficiency is a national concern. Reliability and energy consumption are both reaching key inflection points that, together, threaten to reduce or end the benefits of feature size reduction. To continue beneficial scaling, we must use a cross-layer, Jull-system-design approach to reliability. Unlike current systems, which charge every device a substantial energy tax in order to guarantee correct operation in

  11. Gearbox Reliability Collaborative Project Report: Findings from Phase 1 and Phase 2 Testing

    SciTech Connect

    Link, H.; LaCava, W.; van Dam, J.; McNiff, B.; Sheng, S.; Wallen, R.; McDade, M.; Lambert, S.; Butterfield, S.; Oyague, F.

    2011-06-01

    This report describes the Gearbox Reliability Collaborative's work at NREL to increase the reliability of wind turbine gearboxes.

  12. Closure Report (CR) for Corrective Action Unit (CAU) 91: Area 3 U-3fi Injection Well with Errata Sheet and Certification, Revision 0

    SciTech Connect

    Navarro Nevada Environmental Services

    2010-08-10

    The closure report for CAU 91 has no Use Restriction Form or drawing/map included in the document to describe the use restricted area, however, Section 3.3.3 states that the site will be fenced and signage placed indicating the area as a Resource Conservation and Recovery Act (RCRA) Unit. The drawing that was placed in the FFACO indicating the use restricted area lists the coordinates for the RCRA Unit in Nevada State Plan Coordinates - North American Datum of 1983. In the ensuing years the reporting of coordinates has been standardized so that all coordinates are reported in the same manner, which is: NAD 27 UTM Zone 11 N, meters. This Errata Sheet updates the coordinate reporting to the currently accepted method and includes an aerial photo showing the RCRA Unit with the coordinates listed showing the use restricted area.

  13. Development of a reliable, miniaturized hydrogen safety sensor prototype

    SciTech Connect

    Sekhar, Praveen K; Brosha, Eric L; Rangachary, Mukundan; Garzon, Fernando H; Williamson, Todd L

    2010-01-01

    In this article, the development and long-term testing of a hydrogen safety sensor for vehicle and infrastructure applications is presented. The working device is demonstrated through application of commercial and reproducible manufacturing methods and rigorous life testing results guided by materials selection, and sensor design. Fabricated using Indium Tin Oxide (ITO) as the sensing electrode, Yttria-Stabilized Zirconia (YSZ) as an oxygen ion conducting solid electrolyte and Platinum (Pt) as a pseudo-counter electrode, the device was subjected to interference studies, temperature cycling, and long-testing routine. The sensor responded in real time to varying concentrations of H{sub 2} (1000 to 20,000 ppm) monitored under a humidified condition. Among the interference gases tested such as nitric oxide (NO), nitrogen dioxide (NO{sub 2}), ammonia (NH{sub 3}), carbon monoxide (CO), and propylene (C{sub 3}H{sub 6}), the sensor showed cross-sensitivity to C{sub 3}H{sub 6}. Analyzing the overall device performance over 4000 hrs of testing for 5000 ppm of H{sub 2}, (a) the sensitivity varied {+-}21% compared to response recorded at 0 hrs, and (c) the response rise time fluctuated between 3 to 46 s. The salient features of the H{sub 2} sensor prototype designed and co-developed by Los Alamos National Laboratory (LANL) are (a) stable three phase interface (electrode/electrolyte/gas) leading to reliable sensor operation, (b) low power consumption, (b) compactness to fit into critical areas of application, (c) simple operation, (d) fast response, (e) a direct voltage read-out circumventing the need for any additional conditioning circuitry, and (f) conducive to commercialization.

  14. Robust Design of Reliability Test Plans Using Degradation Measures.

    SciTech Connect

    Lane, Jonathan Wesley; Lane, Jonathan Wesley; Crowder, Stephen V.; Crowder, Stephen V.

    2014-10-01

    With short production development times, there is an increased need to demonstrate product reliability relatively quickly with minimal testing. In such cases there may be few if any observed failures. Thus, it may be difficult to assess reliability using the traditional reliability test plans that measure only time (or cycles) to failure. For many components, degradation measures will contain important information about performance and reliability. These measures can be used to design a minimal test plan, in terms of number of units placed on test and duration of the test, necessary to demonstrate a reliability goal. Generally, the assumption is made that the error associated with a degradation measure follows a known distribution, usually normal, although in practice cases may arise where that assumption is not valid. In this paper, we examine such degradation measures, both simulated and real, and present non-parametric methods to demonstrate reliability and to develop reliability test plans for the future production of components with this form of degradation.

  15. Widget:BoundingCoordinatesHelper | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    This widget creates an interactive Google map to assist with the input of bounding box coordinates. The map will output the NE and SW corners of a rectangular extent to two...

  16. UTM Well Coordinates for the Boise Hydrogeophysical Research Site (BHRS)

    SciTech Connect

    David Lim

    2014-12-19

    A series of oscillatory pumping tests were performed at the BHRS. The data collected from these wells will be used to tomographically image the shallow subsurface. This excel file only contains well coordinates for all wells at the Boise site.

  17. UTM Well Coordinates for the Boise Hydrogeophysical Research Site (BHRS)

    DOE Data Explorer

    David Lim

    A series of oscillatory pumping tests were performed at the BHRS. The data collected from these wells will be used to tomographically image the shallow subsurface. This excel file only contains well coordinates for all wells at the Boise site.

  18. ARM - Field Campaign - ISDAC - NASA ARCTAS Coordination with...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    - NASA ARCTAS Coordination with ARM ARM Data Discovery Browse Data Related Campaigns ... Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : ISDAC - NASA ARCTAS ...

  19. ARM - Field Campaign - NASA Coordinated Airborne CO2 Lidar Flight...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Send us a note below or call us at 1-888-ARM-DATA. Send Campaign : NASA Coordinated ... Spectrometer (LAS) measurements using the NASA LangleyITT 1.57-micron Continuous-Wave ...

  20. Memorandum of Understanding Regarding Coordination in Federal Agency Review

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Electric Transmission Facilities on Federal Land, October 23, 2009 | Department of Energy Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 Memorandum of Understanding Regarding Coordination in Federal Agency Review of Electric Transmission Facilities on Federal Land, October 23, 2009 On October 23, 2009, the Department of Energy and eight other Federal agencies entered into a Memorandum of Understanding (MOU) to improve