National Library of Energy BETA

Sample records for approves critical decision

  1. Approval of the Critical Decision 4.

    Office of Legacy Management (LM)

    SUBJECT: ACTION: Approval of the Critical Decision 4 for the Closeout of the General Atomics (GA) Hot Cell Facility (HCF) Decontamination and Decommissioning (D&D) Project, Project Baseline Summary VL-GA-0012, and the Transfer for the GA Project Files to the Office of Legacy Management (LM) ISSUE: None BACKGROUND: Activities associated with the cleanup of the GA HCF and surrounding site were completed on September 28,2003. The GA site has been remediated to negotiated cleanup standards and

  2. Critical Decision 2 (CD-2) Approval Template | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Critical Decision 2 (CD-2) Approval Template Critical Decision 2 (CD-2) Approval Template File ExampleCD-2Template02-14-12.docx More Documents & Publications Example BCP...

  3. Critical Decision 0- Approve Mission Need

    Energy.gov [DOE]

    Approval of CD-0 formally establishes a project and begins the process of conceptual planning and design used to develop alternative concepts and functional requirements. Additionally, Approval...

  4. Quality Assurance for Critical Decision Reviews RM

    Energy.gov [DOE]

    The purpose of this Quality Assurance for Capital Project Critical Decision Review Module (QA RM) is to identify, integrate, and clarify the QA performance objectives, criteria, and guidance needed...

  5. Jefferson Lab News - Jefferson Lab Achieves Critical Milestone...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    approved the project's performance baseline. The approval, known as Critical Decision 2 or CD-2, Approve Performance Baseline, caps years of planning, preparation and review. ...

  6. MicroBooNE Project Critical Decision Documents

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Critical Decisions for MicroBooNE Documents CD-0 Mission Need CD-1 Selection of Alternatives CD-23a Performance Baseline and Long Lead Procurements CD-3b Start of Construction...

  7. Critical Decision 0 (CD-0) ESAAB and PMRC Brief Template | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 0 (CD-0) ESAAB and PMRC Brief Template Critical Decision 0 (CD-0) ESAAB and PMRC Brief Template Template for briefing Critical Decisions to the ESAAB and/or PMRC July 2015 Template (111.92 KB) Key Resources Internal DOE Tools PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Critical Decision 1 (CD-1) ESAAB and PMRC Brief Template Critical Decision 2 (CD-2

  8. Critical Decision 1 (CD-1) ESAAB and PMRC Brief Template | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 1 (CD-1) ESAAB and PMRC Brief Template Critical Decision 1 (CD-1) ESAAB and PMRC Brief Template Template for briefing Critical Decisions to the ESAAB and/or PMRC July 2015 Template (6.63 MB) Key Resources Internal DOE Tools PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Critical Decision 3 (CD-3) ESAAB and PMRC Brief Template DOE Project Management Risk Committee (PMRC) SOP Critical Decision 0 (CD-0

  9. Critical Decision 3 (CD-3) ESAAB and PMRC Brief Template | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 3 (CD-3) ESAAB and PMRC Brief Template Critical Decision 3 (CD-3) ESAAB and PMRC Brief Template Template for briefing Critical Decisions to the ESAAB and/or PMRC July 2015 Template (2.97 MB) Key Resources Internal DOE Tools PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Critical Decision 1 (CD-1) ESAAB and PMRC Brief Template DOE Project Management Risk Committee (PMRC) SOP Critical Decision 0 (CD-0) ESAAB and PMRC Brief

  10. Critical Decision 2 (CD-2) ESAAB and PMRC Brief Template | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 2 (CD-2) ESAAB and PMRC Brief Template Critical Decision 2 (CD-2) ESAAB and PMRC Brief Template Template for briefing Critical Decisions to the ESAAB and/or PMRC July 2015 Template (526.5 KB) Key Resources Internal DOE Tools PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications Baseline Change Proposal (BCP) ESAAB and PMRC Brief Template DOE Project Management Risk Committee (PMRC) SOP Critical Decision 2 (CD-2) ESAAB and PMRC

  11. Facility Software Quality Assurance (SQA) for Captal Project Critical Decisions RM

    Energy.gov [DOE]

    The purpose of this Software Quality Assurance for Capital Project Critical Decision Review Module (SQA RM) is to identify, integrate, and clarify, in one EM document, the SQA performance...

  12. Critical Decision Handbook

    Energy.gov [DOE]

    This Handbook is designed as a practical tool for the Office of Environmental Management (EM) Federal Project Directors (FPDs), Integrated Project Teams (IPTs), Technical Authority Board (TAB), and...

  13. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can make decision bit must notify DOE of intent of restructuring 101-200 employees DOE/NNSA field office is authorized to provide approval 201-500 employees LM is authorized to provide approval and NNSA Administrator is authorized to provide approval for NNSA work force restructurings in consultation with LM 501 and above employees Under Secretary/NNSA Administrator approval required

  14. A criticism of applications with multi-criteria decision analysis that are used for the site selection for the disposal of municipal solid wastes

    SciTech Connect

    Kemal Korucu, M.; Erdagi, Bora

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer The existing structure of the multi-criteria decision analysis for site selection is criticized. Black-Right-Pointing-Pointer Fundamental problematic points based on the critics are defined. Black-Right-Pointing-Pointer Some modifications are suggested in order to provide solutions to these problematical points. Black-Right-Pointing-Pointer A new structure for the decision making mechanism is proposed. Black-Right-Pointing-Pointer The feasibility of the new method is subjected to an evaluation process. - Abstract: The main aim of this study is to criticize the process of selecting the most appropriate site for the disposal of municipal solid wastes which is one of the problematic issues of waste management operations. These kinds of problems are pathological symptoms of existing problematical human-nature relationship which is related to the syndrome called ecological crisis. In this regard, solving the site selection problem, which is just a small part of a larger entity, for the good of ecological rationality and social justice is only possible by founding a new and extensive type of human-nature relationship. In this study, as a problematic point regarding the discussions on ecological problems, the existing structure of the applications using multi-criteria decision analysis in the process of site selection with three main criteria is criticized. Based on this critique, fundamental problematic points (to which applications are insufficient to find solutions) will be defined. Later, some modifications will be suggested in order to provide solutions to these problematical points. Finally, the criticism addressed to the structure of the method with three main criteria and the feasibility of the new method with four main criteria is subjected to an evaluation process. As a result, it is emphasized that the new structure with four main criteria may be effective in solution of the fundamental problematic points.

  15. BLM - Approved Resource Management Plan Amendments/Record of...

    OpenEI (Open Energy Information) [EERE & EIA]

    BLM - Approved Resource Management Plan AmendmentsRecord of Decision for Solar Energy Development in Six Southwestern States Jump to: navigation, search OpenEI Reference...

  16. BLM Approves California Geothermal Development Project

    Energy.gov [DOE]

    The Bureau of Land Management (BLM) and the U.S. Forest Service Inyo National Forest on August 13 signed the Record of Decision approving a new 40-megawatt geothermal project near Mammoth Lakes, California.

  17. Form Approved

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OGE Form 450, 5 CFR Part 2634, Subpart I U.S. Office of Government Ethics (January 2007) (Replaces September 2002 edition) Form Approved OMB NO. 3209-0006 CONFIDENTIAL FINANCIAL DISCLOSURE REPORT Executive Branch Why Must I File? The duties and responsibilities of your position require you to file the Confidential Financial Disclosure Report to avoid involvement in a real or apparent conflict of interest. The purpose of this report is to assist employees and their agencies in avoiding conflicts

  18. Form Approved

    Gasoline and Diesel Fuel Update

    2014 2015 View History Natural Gas Processed (Million Cubic Feet) 2,915 5,526 2014-2015 Total Liquids Extracted (Thousand Barrels) 173 173 2014-2015 NGPL Production, Gaseous Equivalent (Million Cubic Feet) 233 235 2014

    Approved 0MB No. 1905-0092. El A 457B (Expires May 31, 1990.) This survey is voluntary and authorized under the Federal Energy Administration Act of 1974 (Public Law 93-275} as amended. Information about specific households will be kept strictly confidential. The data will be

  19. Navigation Labels and Approval

    Energy.gov [DOE]

    EERE has commonly used and approved navigation labels. To maintain consistency in navigation across EERE, the EERE Template Coordinator reviews and approves requests for new navigation labels and...

  20. Critical Materials Museum Display

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    A APPENDIX A First and foremost, we would like to thank the Critical Materials Institute (CMI) who saw the value of the exhibit and approved its concept. Without CMI's insight, technical and intellectual provision to review exhibit ideas and components, and financial support to pursue museum quality specimens, this exhibit would not exist. CMI readily bequeathed the critical materials exhibit to the CSM Geology Museum, delighted that approximately 40,000 visitors would experience the exhibit

  1. Decision Science | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Decision Science Argonne's decision science programs enhance and strengthen emergency preparedness of government, industry, and the public at large by continuing to develop and apply the critical decision support methods. Decision support tools help our nation plan our response to potential catastrophes. As a leading developer of these software, hardware, and assessment tools, Argonne is strengthening the emergency preparedness of government, industry, and the public at large. Our scientists

  2. Program Evaluation: Informed Decisions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Why, What, & When to Evaluate » Program Evaluation: Informed Decisions Program Evaluation: Informed Decisions Evaluation activities support decision-making that can contribute to efficient and effective management of programs. Evaluative information should be available to inform decisions made during the critical planning, budgeting, analysis, implementation, and benefits reporting/ communications cycles of the program. Program evaluation can provide essential information to inform

  3. Requirements to coordinate agreements, milestones and decision documents

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (AMDD) | Department of Energy to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental agreements, milestones and decision documents (AMDD) which meet certain thresholds are reviewed and approved by Headquarters (HQ) before entering into negotiations and commitments. Requirements to coordinate regulatory negotiations with the EM Office of Regulatory Compliance: new and modified cleanup

  4. 2013 Community Commitment plan approved

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Community Commitment Plan Approved Community Connections: Your link to news and ... All Issues submit 2013 Community Commitment plan approved The plan provides funding ...

  5. Renewable energy projects approved

    Energy.gov [DOE]

    Two renewable energy projects representing a $100 million-plus investment by Las Vegas-based Nevada Power Co.—a cost likely to be covered over time by the utility's customers—were approved Wednesday by state regulators.

  6. Quality Assurance for Critical Decision Reviews RM

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Inquiry National Environmental Policy Act NQA-1 PEP PDS PDSA PSVR Nuclear Quality ... DOE O 414.1C, Quality Assurance, and ASME NQA-1 2004, Part I: Requirements for Quality ...

  7. Reasons for decision in the matter of Sable Offshore Energy Inc., application dated 9 June 1998 for approval of the plan, profile and book of reference respecting the detailed route of a subsea pipeline from the Thebaud platform to a landfall near Goldboro, Nova Scotia, and an onshore pipeline from the landfall point to the inlet of the gas processing plant located east of Goldboro, Nova Scotia: MH-4-98

    SciTech Connect

    1998-12-31

    The National Energy Board approved a natural gas pipeline to be built by the proponents of the Sable Offshore Energy Project within a specified 500-meter-wide corridor. The pipeline will run from an offshore platform near Sable Island to a gas plant on the Nova Scotia mainland. This report summarizes proceedings of hearings held to determine the detailed route of the pipeline within the specified corridor and to consider the most appropriate methods and timing of constructing the pipeline. Specific objections to the detailed route from holders of mineral rights licenses are noted and a Board decision on the detailed route is presented.

  8. Energy Praises the Nuclear Regulatory Commission Approval of the First

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    United States Nuclear Plant Site in Over 30 Years | Department of Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years March 8, 2007 - 10:28am Addthis WASHINGTON, DC - The U.S. Department of Energy (DOE) today commended the Nuclear Regulatory Commission's decision to approve the first-ever Early Site

  9. Waste Stream Approval - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Stream Approval About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a New Hanford Customer Annual Waste Forecast and Funding Arrangements Waste Stream Approval Waste Shipment Approval Waste Receipt Quality Assurance Program Waste Specification Records Tools Points of Contact Waste Stream Approval Email Email Page | Print Print Page | Text Increase Font Size Decrease Font Size After funding approval is in place, the next step is to

  10. Robust Decision Making

    SciTech Connect

    Christopher A. Dieckmann, PE, CSEP-Acq

    2010-07-01

    The Idaho National Laboratory (INL) is funded through the Department of Energy (DOE) Office of Nuclear Energy and other customers who have direct contracts with the Laboratory. The people, equipment, facilities and other infrastructure at the laboratory require continual investment to maintain and improve the laboratory’s capabilities. With ever tightening federal and customer budgets, the ability to direct investments into the people, equipment, facilities and other infrastructure which are most closely aligned with the laboratory’s mission and customers’ goals grows increasingly more important. The ability to justify those investment decisions based on objective criteria that can withstand political, managerial and technical criticism also becomes increasingly more important. The Systems Engineering tools of decision analysis, risk management and roadmapping, when properly applied to such problems, can provide defensible decisions.

  11. Real Estate Approvals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Real Estate Approvals Real Estate Approvals Real Estate Approvals Policy Flash 2011-61, Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate (attachment)

  12. Real Estate Approvals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Real Estate Approvals Real Estate Approvals Real Estate Approvals Policy Flash 2011-61, Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate (attachment)

  13. Approaches to Approved Contractor Lists

    Office of Energy Efficiency and Renewable Energy (EERE)

    Better Buildings Neighborhood Program Workforce / Business Partners Peer Exchange Call: Approaches to Approved Contractor Lists, Call Slides and Summary, April 25, 2013. This workforce/business partners peer exchange call discussed approaches to approved contractor lists.

  14. Waste Shipment Approval - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    About Us Hanford Site Wide Programs Hanford Site Solid Waste Acceptance Program Acceptance Process Waste Shipment Approval About Us Hanford Site Solid Waste Acceptance Program What's New Acceptance Criteria Acceptance Process Becoming a New Hanford Customer Annual Waste Forecast and Funding Arrangements Waste Stream Approval Waste Shipment Approval Waste Receipt Quality Assurance Program Waste Specification Records Tools Points of Contact Waste Shipment Approval Email Email Page | Print Print

  15. DHS Letter - MERRTT Approval | Department of Energy

    Office of Environmental Management (EM)

    DHS Letter - MERRTT Approval DHS Letter - MERRTT Approval Letter approving MERRTT DHS Letter - MERRTT Approval (43.34 KB) More Documents & Publications 2008 MERRTT Revision Letter 2006 TEPP Annual Report 2004 TEPP Annual Report

  16. Example BCP Template | Department of Energy

    Office of Environmental Management (EM)

    Forms and Templates More Documents & Publications Critical Decision 2 (CD-2) Approval Template Critical Decision 4 (CD-4) Approval Template External Independent Review (EIR) Report ...

  17. State of Ohio Approval Policy

    Alternative Fuels and Advanced Vehicles Data Center

    STATE OF OHIO DIVISION OF STATE FIRE MARSHAL E 85 DISPENSER UTILIZATION APPROVAL POLICY When the Division of State Fire Marshal is involved in the approval process for a flammable/combustible liquid dispensing facility that utilizes E-blend, where a listed dispensing device is required by the state fire code and the proposed dispensing device is not specifically listed for the intended application, the following guidelines shall be followed in the approval process: As there are currently no

  18. Criticality Model

    SciTech Connect

    A. Alsaed

    2004-09-14

    The ''Disposal Criticality Analysis Methodology Topical Report'' (YMP 2003) presents the methodology for evaluating potential criticality situations in the monitored geologic repository. As stated in the referenced Topical Report, the detailed methodology for performing the disposal criticality analyses will be documented in model reports. Many of the models developed in support of the Topical Report differ from the definition of models as given in the Office of Civilian Radioactive Waste Management procedure AP-SIII.10Q, ''Models'', in that they are procedural, rather than mathematical. These model reports document the detailed methodology necessary to implement the approach presented in the Disposal Criticality Analysis Methodology Topical Report and provide calculations utilizing the methodology. Thus, the governing procedure for this type of report is AP-3.12Q, ''Design Calculations and Analyses''. The ''Criticality Model'' is of this latter type, providing a process evaluating the criticality potential of in-package and external configurations. The purpose of this analysis is to layout the process for calculating the criticality potential for various in-package and external configurations and to calculate lower-bound tolerance limit (LBTL) values and determine range of applicability (ROA) parameters. The LBTL calculations and the ROA determinations are performed using selected benchmark experiments that are applicable to various waste forms and various in-package and external configurations. The waste forms considered in this calculation are pressurized water reactor (PWR), boiling water reactor (BWR), Fast Flux Test Facility (FFTF), Training Research Isotope General Atomic (TRIGA), Enrico Fermi, Shippingport pressurized water reactor, Shippingport light water breeder reactor (LWBR), N-Reactor, Melt and Dilute, and Fort Saint Vrain Reactor spent nuclear fuel (SNF). The scope of this analysis is to document the criticality computational method. The criticality

  19. DOE Contractor Work Force Restructuring Approval Thresholds

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Work Force Restructuring Approval Thresholds Up to 100 employees Contractor can ... to provide approval for NNSA work force restructurings in consultation with LM 501 ...

  20. Critical Issues in NPH Categorization and Limit State Selection of

    Office of Environmental Management (EM)

    Energy 0 (CD-0) ESAAB and PMRC Brief Template Critical Decision 0 (CD-0) ESAAB and PMRC Brief Template Template for briefing Critical Decisions to the ESAAB and/or PMRC July 2015 Template (111.92 KB) Key Resources Internal DOE Tools PMCDP EVMS PARS IIe FPD Resource Center PM Newsletter Forms and Templates More Documents & Publications DOE Project Management Risk Committee (PMRC) SOP Critical Decision 1 (CD-1) ESAAB and PMRC Brief Template Critical Decision 2 (CD-2 Energy

    1 (CD-1)

  1. Quality Procedure- Approved Suppliers List

    Energy.gov [DOE]

    This procedure establishes the responsibilities, process, and records for developing and maintaining the Approved Suppliers List (ASL) for EM Headquarters Office of Standards and Quality Assurance in accordance with EM-QA-001, Environmental Management Quality Assurance Program.

  2. Product Review Process and Approvals

    Energy.gov [DOE]

    Publications, exhibits, logos, and templates developed by EERE staff, laboratories, and contractors must be reviewed and approved by the Product Governance Team (PGT). The PGT meets every other week.

  3. Critical Materials:

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Critical Materials: 1 Technology Assessment 2 Contents 3 1. Introduction to the Technology/System ............................................................................................... 2 4 2. Technology Assessment and Potential ................................................................................................. 5 5 2.1 Major Trends in Selected Clean Energy Application Areas ........................................................... 5 6 2.1.1 Permanent Magnets for Wind

  4. Approaches to acceptable risk: a critical guide

    SciTech Connect

    Fischhoff, B.; Lichtenstein, S.; Slovic, P.; Keeney, R.; Derby, S.

    1980-12-01

    Acceptable-risk decisions are an essential step in the management of technological hazards. In many situations, they constitute the weak (or missing) link in the management process. The absence of an adequate decision-making methodology often produces indecision, inconsistency, and dissatisfaction. The result is neither good for hazard management nor good for society. This report offers a critical analysis of the viability of various approaches as guides to acceptable-risk decisions. This report seeks to define acceptable-risk decisions and to examine some frequently proposed, but inappropriate, solutions. 255 refs., 22 figs., 25 tabs.

  5. Recently Approved Justification Memoranda - DOE Directives, Delegation...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Recently Approved Justification Memoranda by Website Administrator The following JMs were recently approved. JM DOE O 551.1D, Notice of Intent to Develop a Page Change to DOE O ...

  6. Approval Synopsis - DOE Directives, Delegations, and Requirements

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Synopsis by Website Administrator Microsoft Word Document icon ApprovalSummary (5).doc - Microsoft Word Document, 24 KB (25088

  7. Well Placement Decision Process

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Well Placement Decision Process Well Placement Decision Process Determining where to place a well is a multi-step process. August 1, 2013 Investigation process for determining where to place a sentinel well Investigation process for determining where

  8. REVIEW OF NRC APPROVED DIGITAL CONTROL SYSTEMS ANALYSIS

    SciTech Connect

    D.W. Markman

    1999-09-17

    Preliminary design concepts for the proposed Subsurface Repository at Yucca Mountain indicate extensive reliance on modern, computer-based, digital control technologies. The purpose of this analysis is to investigate the degree to which the U. S. Nuclear Regulatory Commission (NRC) has accepted and approved the use of digital control technology for safety-related applications within the nuclear power industry. This analysis reviews cases of existing digitally-based control systems that have been approved by the NRC. These cases can serve as precedence for using similar types of digitally-based control technologies within the Subsurface Repository. While it is anticipated that the Yucca Mountain Project (YMP) will not contain control systems as complex as those required for a nuclear power plant, the review of these existing NRC approved applications will provide the YMP with valuable insight into the NRCs review process and design expectations for safety-related digital control systems. According to the YMP Compliance Program Guidance, portions of various NUREGS, Regulatory Guidelines, and nuclear IEEE standards the nuclear power plant safety related concept would be applied to some of the designs on a case-by-case basis. This analysis will consider key design methods, capabilities, successes, and important limitations or problems of selected control systems that have been approved for use in the Nuclear Power industry. An additional purpose of this analysis is to provide background information in support of further development of design criteria for the YMP. The scope and primary objectives of this analysis are to: (1) Identify and research the extent and precedence of digital control and remotely operated systems approved by the NRC for the nuclear power industry. Help provide a basis for using and relying on digital technologies for nuclear related safety critical applications. (2) Identify the basic control architecture and methods of key digital control

  9. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Information Center » Decision Summaries Decision Summaries November 4, 2016 Summary of Decisions - October 31, 2016 - November 4, 2016 Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal October 28, 2016 Summary of Decisions - October 24, 2016 - October 28, 2016 Decisions were issued on: - Personnel Security (10 CFR Part 710) October 21, 2016 Summary of Decisions - October 17, 2016 - October 21, 2016 Decisions were issued on: No decisions issued

  10. DOE Project Number Project Name Site Critical Decision Total...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (UVS) Carlsbad CD0 309,000,000 010121 CBC-ETEC-0040.C1 Energy Technology Engineering ... CBC-LBNL-0040.C1 Old Town Demolition Project, Phase 1 Project Lawrence Berkeley National ...

  11. Post Critical Decision-4 Mark Arenaz, Federal Project Director

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The selected remedy will be implemented over approximately 20-years in three overlapping ... allowed quick resolution of issues and ensured their acceptance of the implemented remedy. ...

  12. 2011 Annual Criticality Safety Program Performance Summary

    SciTech Connect

    Andrea Hoffman

    2011-12-01

    plate bundles to 1085 grams U-235, which is the maximum loading of an ATR fuel element. The overloaded fuel plate bundle contained 1097 grams U-235 and was assembled under an 1100 gram U-235 limit in 1982. In 2003, the limit was reduced to 1085 grams citing a new criticality safety evaluation for ATR fuel elements. The fuel plate bundle inventories were not checked for compliance prior to implementing the reduced limit. A subsequent review of the NMIS inventory did not identify further violations. Requirements Management - The INL Criticality Safety program is organized and well documented. The source requirements for the INL Criticality Safety Program are from 10 CFR 830.204, DOE Order 420.1B, Chapter III, 'Nuclear Criticality Safety,' ANSI/ANS 8-series Industry Standards, and DOE Standards. These source requirements are documented in LRD-18001, 'INL Criticality Safety Program Requirements Manual.' The majority of the criticality safety source requirements are contained in DOE Order 420.1B because it invokes all of the ANSI/ANS 8-Series Standards. DOE Order 420.1B also invokes several DOE Standards, including DOE-STD-3007, 'Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Non-Reactor Nuclear Facilities.' DOE Order 420.1B contains requirements for DOE 'Heads of Field Elements' to approve the criticality safety program and specific elements of the program, namely, the qualification of criticality staff and the method for preparing criticality safety evaluations. This was accomplished by the approval of SAR-400, 'INL Standardized Nuclear Safety Basis Manual,' Chapter 6, 'Prevention of Inadvertent Criticality.' Chapter 6 of SAR-400 contains sufficient detail and/or reference to the specific DOE and contractor documents that adequately describe the INL Criticality Safety Program per the elements specified in DOE Order 420.1B. The Safety Evaluation Report for SAR-400 specifically recognizes that the approval of SAR-400 approves the INL

  13. Decision Analysis for EGS

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decision Analysis for EGS Herbert H. Einstein Massachusetts Institute of Technology April 22, 2013 This presentation does not contain any proprietary confidential, or otherwise ...

  14. Record of Decision Available

    Energy.gov [DOE]

    DOE has recently published its Record of Decision announcing and explaining DOE’s chosen project alternative and describing any commitments for mitigating potential environmental impacts. The NEPA...

  15. APPROVAL/VARIATION REQUEST (AR/VR)

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    in detail (attach additional documents, if necessary). Reference or list applicable specifications, ... Date Phone number: Fax Number: Email: ReviewApprovalDisposition ...

  16. JOBAID-APPROVE A USERS TRAINING REQUEST

    Energy.gov [DOE]

    The purpose of this job aid is to guide users through the step-by-step process of approving a user training request.

  17. California Streamlines Approvals for Renewable Energy Projects

    Energy.gov [DOE]

    California Governor Arnold Schwarzenegger signed an executive order on November 17 to streamline the state's approval process for renewable energy projects.

  18. ATLAS APPROVED IN-BEAM EXPERIMENTS

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7 785 Baktash Band Termination, Superdeformation and Complex Clusters in 32S 5 TOTAL 82 ATLAS APPROVED SOURCE EXPERIMENTS (Depending on Gammasphere Availability) Exp Spokesperson...

  19. PowerSaver Approved Lenders List

    Energy.gov [DOE]

    This document describes the 2014 approved PowerSaver lender list with contact information for the various states across the United States.

  20. List of Approved Changes - Hanford Site

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Changes Tri-Party Agreement The Agreement Announcements List of Approved Changes TPA Project Manager's Lists Modifications for Public Comment Data Management MP-14 WIDS...

  1. Waste-to-energy: Decision-making and the decisions made

    SciTech Connect

    Schexnayder, S.M. ); Wolfe, A.K. )

    1993-01-01

    During the early 1980's, the number of municipalities considering waste-to-energy (WTE) facilities as a solid waste management option led to projections that WTE would be used to manage as much as half of all municipal solid waste by the turn of the century. However, during the latter part of the 1980's, the cancellation rate for WTE facilities grew to the point that its long-term future is questionable. This research sought to identify and examine the range of factors that influence municipalities' decisions concerning WTE. As part of a larger study, case studies of four communities that recently faced decisions about WTE facilities were undertaken. At two of the sites WTE projects formally were approved, while at the other two sites planned WTE facilities were canceled. The study distinguished between the decision-making process and the decision outcomes while recognizing that all aspects of the process clearly are linked to outcome. Case study findings indicate that like processes need not lead to like outcomes. Further, decisions do not fall neatly into simple acceptance'' or rejection'' categories.

  2. Self-Assessment Standard for DOE Contractor Criticality Safety Programs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    10 March 2010 DOE STANDARD SELF-ASSESSMENT STANDARD FOR DOE CONTRACTOR CRITICALITY SAFETY PROGRAMS DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document is available on the Department of Energy Technical Standards Program Web Page at http://www.hss.energy.gov/nuclearsafety/ns/techstds/ DOE-STD-1158-2010 iii TABLE OF CONTENTS FOREWORD

  3. Air Sparging Decision Tool

    Energy Science and Technology Software Center

    1996-06-10

    The Air Sparging Decision Tool is a computer decision aid to help environmental managers and field practitioners in evaluating the applicability of air sparging to a wide range of sites and for refining the operation of air sparging systems. The program provides tools for the practitioner to develop the conceptual design for an air sparging system suitable for the identified site. The Tool provides a model of the decision making process, not a detailed designmore » of air sparging systems. The Tool will quickly and cost effectively assist the practitioner in screening for applicability of the technology at a proposed site.« less

  4. Sample Approval Memo for Admin Chg - DOE Directives, Delegations, and

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements Sample Approval Memo for Admin Chg by Patricia Greeson Upload File Upload the file here Approval-Memo-AdminChg_6-27-16.docx - 17 KB Short Name approval-memo-adminchg

  5. Patent Waivers Approved Before 2003 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Patent Waivers Approved Before 2003 Patent Waivers Approved Before 2003 This document lists all approved DOE patent waivers by class for 2002 and before. If you wish to obtain a ...

  6. Critical Materials Institute

    ScienceCinema

    Alex King

    2013-06-05

    Ames Laboratory Director Alex King talks about the goals of the Critical Materials Institute in diversifying the supply of critical materials, developing substitute materials, developing tools and techniques for recycling critical materials, and forecasting materials needs to avoid future shortages.

  7. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 16, 2014 Summary of Decisions - December 30, 2013 - January 3, 2014 Decisions were issued on: - Privacy Act Appeal January 10, 2014 Summary of Decisions - MM DD YYYY - MM...

  8. Nuclear criticality safety guide

    SciTech Connect

    Pruvost, N.L.; Paxton, H.C.

    1996-09-01

    This technical reference document cites information related to nuclear criticality safety principles, experience, and practice. The document also provides general guidance for criticality safety personnel and regulators.

  9. DOE's Jefferson Lab Receives Approval To Start Construction of...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE's Jefferson Lab Receives Approval To Start Construction of 310 Million Upgrade DOE's Jefferson Lab Receives Approval To Start Construction of 310 Million Upgrade NEWPORT ...

  10. Global Nuclear Energy Partnership Steering Group Members Approve...

    Office of Environmental Management (EM)

    Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation Global Nuclear Energy Partnership Steering Group Members Approve ...

  11. Energy Praises the Nuclear Regulatory Commission Approval of...

    Office of Environmental Management (EM)

    Praises the Nuclear Regulatory Commission Approval of the First United States Nuclear Plant Site in Over 30 Years Energy Praises the Nuclear Regulatory Commission Approval of the ...

  12. WPN 00-5: Approval of Replacement Refrigerators and Electric...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Provides states with the approval to include refrigerator and electric water heater replacements as an allowable measure. PDF icon WPN 00-5: Approval of Replacement Refrigerators ...

  13. Notification of General User Proposal and Approved Program Results

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Notification of General User Proposal and Approved Program Results Notification of General User Proposal and Approved Program Results Print by Sue Bailey, User Services Group...

  14. SEP Request for Approval Form 4 - Alternative Adjustment Model...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Adjustment Model Application Methodology SEP Request for Approval Form 4 - Alternative Adjustment Model Application Methodology SEP-Request-for-Approval-Form-4Alternati...

  15. Approval/Variation Request Comment Sheet

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    EA15PC3041-3-0 Mar. 25, 2003 Rev. 0 Page 1 of 2 Approval/Variation Request Comment Sheet 1. Page of 2. G APPROVAL REQUEST 3. G VARIATION REQUEST 4. AR/VR No. 5. PO/Subcontract No. 6. Organization 7. Reviewer 8. Comment: 9. Disposition: Working Copy EA15PC3041-3-0 Mar. 25, 2003 Rev. 0 Page 2 of 2 Instructions for Filling Out Approval/Variation Request Comment Sheet Block 1. Technical Reviewer - Enter the total number of pages upon completion of the review. 2. Technical Reviewer - Check the

  16. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 21, 2012 Summary of Decisions - December 17, 2012 - December 21, 2012 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)...

  17. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    January 16, 2015 Summary of Decisions - January 12, 2015 - January 16, 2015 Decisions were issued on: - Freedom of Information Act Appeal - Refund Proceeding January 9, 2015...

  18. Recently Approved Justification Memoranda - DOE Directives, Delegation...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Policy 434.1A, Conduct and Approval of Select Agent and Toxin Work at Department of Energy Sites Notice of Intent to Revise DOE Order 522.1, Pricing of Departmental Materials...

  19. Lazy decision trees

    SciTech Connect

    Friedman, J.H.; Yun, Yeogirl; Kohavi, R.

    1996-12-31

    Lazy learning algorithms, exemplified by nearest-neighbor algorithms, do not induce a concise hypothesis from a given training set; the inductive process is delayed until a test instance is given. Algorithms for constructing decision trees, such as C4.5, ID3, and CART create a single {open_quotes}best{close_quotes} decision tree during the training phase, and this tree is then used to classify test instances. The tests at the nodes of the constructed tree are good on average, but there may be better tests for classifying a specific instance. We propose a lazy decision tree algorithm-LazyDT-that conceptually constructs the {open_quotes}best{close_quote} decision tree for each test instance. In practice, only a path needs to be constructed, and a caching scheme makes the algorithm fast. The algorithm is robust with respect to missing values without resorting to the complicated methods usually seen in induction of decision trees. Experiments on real and artificial problems are presented.

  20. NNSA approves LANL workforce reduction plan

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    NNSA approves LANL workforce reduction plan NNSA approves LANL workforce reduction plan Eligible employees may begin applying for voluntary separation on March 5. March 1, 2012 Aerial view of Los Alamos National Laboratory Aerial view of Los Alamos National Laboratory. Contact Fred deSousa Communications Office (505) 665-3430 Email Program opens March 5, ends April 5 LOS ALAMOS, New Mexico, March 1, 2012-A plan to reduce the Laboratory workforce by between 400 and 800 employees this spring

  1. DOE Approved Technical Standards | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Approved Technical Standards DOE Approved Technical Standards Document ID Filter Document ID sort descending Title Date DOE-HDBK-1028-2009 Human Performance Improvement Handbook Volume 1 of 2 This Human Performance Improvement Handbook is a reference for anyone working in the Department of Energy (DOE) community who wants to learn more about human performance and how it can be improved.The handbook addresses the roles of individuals, leaders, and the organization in improving performance.

  2. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    7:45 am, May 27, 2014 Approved for Public Release; Further Dissemination Unlimited Approved for Public Release; Further Dissemination Unlimited J. C. Fulton President and Chief Executive Officer April 2014 CHPRC-2014-04, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-04, Rev. 0 * Overview CHPRC Monthly Performance Report April 2014 CONTENTS EXECUTIVE SUMMARY

  3. Decision Impact Assessment Model

    Energy Science and Technology Software Center

    1991-08-01

    DIAMOND represents the decision-making environment that utility planners and executives face. Users interact with the model after every year or two of simulation, which provides an opportunity to modify past decisions as well as to make new decisions. For example, construction of a power plant can be started one year, and if circumstances change, the plant can be accelerated, mothballed, cancelled, or continued as originally planned. Similarly, the marketing and financial incentives for demand-side managementmore » programs can be changed from year to year. This frequent user interaction with the model, an operational game, should build greater understanding and insights among utility planners about the risks associated with different types of resources.« less

  4. Tank waste remediation system nuclear criticality safety inspection and assessment plan

    SciTech Connect

    VAIL, T.S.

    1999-04-06

    This plan provides a management approved procedure for inspections and assessments of sufficient depth to validate that the Tank Waste Remediation System (TWRS) facility complies with the requirements of the Project Hanford criticality safety program, NHF-PRO-334, ''Criticality Safety General, Requirements''.

  5. EIS-0236: Record of Decision

    Energy.gov [DOE]

    Record of Decision Programmatic Environmental Impact Statement for Stockpile Stewardship and Management

  6. Critical technologies research: Opportunities for DOE

    SciTech Connect

    Not Available

    1992-12-01

    Recent studies have identified a number of critical technologies that are essential to the nation`s defense, economic competitiveness, energy independence, and betterment of public health. The National Critical Technologies Panel (NCTP) has identified the following critical technology areas: Aeronautics and Surface Transportation; Biotechnology and Life Sciences; Energy and Environment; Information and Communications; Manufacturing; and Materials. Sponsored by the Department of Energy`s Office of Energy Research (OER), the Critical Technologies Research Workshop was held in May 1992. Approximately 100 scientists, engineers, and managers from the national laboratories, industry, academia, and govemment participated. The objective of the Berkeley Workshop was to advance the role of the DOE multiprogram energy laboratories in critical technologies research by describing, defining, and illustrating research areas, opportunities, resources, and key decisions necessary to achieve national research goals. An agenda was developed that looked at DOE`s capabilities and options for research in critical technologies and provided a forum for industry, academia, govemment, and the national laboratories to address: Critical technology research needs; existing research activities and resources; capabilities of the national laboratories; and opportunities for national laboratories, industries, and universities. The Workshop included plenary sessions in which presentations by technology and policy leaders set the context for further inquiry into critical technology issues and research opportunities. Separate sessions then focused on each of the following major areas of technology: Advanced materials; biotechnology and life sciences; energy and environment; information and communication; and manufacturing and transportation.

  7. Critical technologies research: Opportunities for DOE

    SciTech Connect

    Not Available

    1992-12-01

    Recent studies have identified a number of critical technologies that are essential to the nation's defense, economic competitiveness, energy independence, and betterment of public health. The National Critical Technologies Panel (NCTP) has identified the following critical technology areas: Aeronautics and Surface Transportation; Biotechnology and Life Sciences; Energy and Environment; Information and Communications; Manufacturing; and Materials. Sponsored by the Department of Energy's Office of Energy Research (OER), the Critical Technologies Research Workshop was held in May 1992. Approximately 100 scientists, engineers, and managers from the national laboratories, industry, academia, and govemment participated. The objective of the Berkeley Workshop was to advance the role of the DOE multiprogram energy laboratories in critical technologies research by describing, defining, and illustrating research areas, opportunities, resources, and key decisions necessary to achieve national research goals. An agenda was developed that looked at DOE's capabilities and options for research in critical technologies and provided a forum for industry, academia, govemment, and the national laboratories to address: Critical technology research needs; existing research activities and resources; capabilities of the national laboratories; and opportunities for national laboratories, industries, and universities. The Workshop included plenary sessions in which presentations by technology and policy leaders set the context for further inquiry into critical technology issues and research opportunities. Separate sessions then focused on each of the following major areas of technology: Advanced materials; biotechnology and life sciences; energy and environment; information and communication; and manufacturing and transportation.

  8. CD-0, Approve Mission Need

    Energy.gov [DOE]

    The Initiation Phase begins with the identification of a mission-related need. A Program Office will identify a credible performance gap between its current capabilities and capacities and those required to achieve the goals articulated in its strategic plan. The Mission Need Statement (MNS) is the translation of this gap into functional requirements that cannot be met through other than material means. It should describe the general parameters of the solution and why it is critical to the overall accomplishment of the Department’s mission, including the benefits to be realized. The mission need is independent of a particular solution, and should not be defined by equipment, facility, technological solution, or physical end-item. This approach allows the Program Office the flexibility to explore a variety of solutions and not limit potential solutions (refer to DOE G 413.3-17). The requirements needed to attain CD-0 are listed below.

  9. Peircean Decision Aid

    Energy Science and Technology Software Center

    2008-08-14

    The Peircean decision aid (PDA) is a decision support architecture and embedded functionality that supports a decision maker in very complex environments dealing with massive amounts of disparate data, information and knowledge. The solution generated is a hybrid system solution employing a number of technologies that are based on Peircean reasoning, modal logic, and formal concept analysis. The system convolves data/information with knowledge to create a virtual belief state that is passed to a decisionmore » maker for consideration. The system can capture categorized knowledge or it can inductively learn or acquire new knowledge from suites of observations. Captured knowledge is used to abductively generate hypotheses that are potential explanations to observations or collected data. The zero order modal logic architecture is designed to augment knowledge update and belief revision and can be extended to include disjunctive screening of collected data. While intended to be a library for integration into a decision support architecture it possesses a basic stand-alone GUI for use as an analysis support tool.« less

  10. SEP Request for Approval Form 7 - Other Situations for Consumption

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Adjustment | Department of Energy 7 - Other Situations for Consumption Adjustment SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment SEP-Request-for-Approval-Form-7_Other-Situations-for-Consumption-Adjustment.docx (36.48 KB) More Documents & Publications SEP Request for Approval Form 6 - Non-Routine Adjustments SEP Request for Approval Form 5 - Model Does Not Satisfy 3.4.1-3.4.10 Requirements SEP Request for Approval Form 4 - Alternative Adjustment Model

  11. Communications Product Review Process and Approvals | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Product Review Process and Approvals Communications Product Review Process and Approvals The Product Governance Team (PGT) must review and approve all publications, exhibits, logos, and templates for such products developed by Office of Energy Efficiency and Renewable Energy (EERE) staff, laboratories, and contractors. The PGT meets every other week. For the review and approval of EERE website projects, see Web Project Process and Approvals. Before You Start Your Project Before you contact the

  12. The Critical Materials Institute | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    The Critical Materials Institute Director Alex King, Operations Manager Cynthia Feller, Jenni Brockpahler and Melinda Thach. Photo left to right: CMI Director Alex King, Operations Manager Cynthia Feller, Jenni Brockpahler and Melinda Thach. Not pictured: Carol Bergman. CMI staff phone 515-296-4500, e-mail CMIdirector@ameslab.gov 2332 Pammel Drive, 134 Wilhelm Hall, Iowa State University, Ames, IA 50011-1025 The Critical Materials Institute focuses on technologies that make better use of

  13. Critical Materials Workshop

    Energy.gov [DOE]

    AMO hosted a public workshop on Tuesday, April 3, 2012 in Arlington, VA to provide background information on critical materials assessment, the current research within DOE related to critical...

  14. Critical Point Finder

    Energy Science and Technology Software Center

    2007-03-15

    The program robustly finds the critical points in the electric field generated by a specified collection of point charges.

  15. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    June 21, 2013 Summary of Decisions - June 17, 2013 - June 21, 2013 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) June 14,...

  16. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    July 10, 2015 Summary of Decisions - July 6, 2015 - July 10, 2015 Decisions were issued on: - Personnel Security (10 CFR Part 710) - Whistleblower Protection (10 CFR Part 708) July...

  17. Decision Summaries | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    July 25, 2014 Summary of Decisions - July 21, 2014 - July 25, 2014 Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) July 18,...

  18. EIS-0435: Record of Decision

    Energy.gov [DOE]

    Record of Decision for the Modification of the Groton Generation Station Interconnection Agreement, Brown County, South Dakota (December 2011)

  19. Criticality Model Report

    SciTech Connect

    J.M. Scaglione

    2003-03-12

    The purpose of the ''Criticality Model Report'' is to validate the MCNP (CRWMS M&O 1998h) code's ability to accurately predict the effective neutron multiplication factor (k{sub eff}) for a range of conditions spanned by various critical configurations representative of the potential configurations commercial reactor assemblies stored in a waste package may take. Results of this work are an indication of the accuracy of MCNP for calculating eigenvalues, which will be used as input for criticality analyses for spent nuclear fuel (SNF) storage at the proposed Monitored Geologic Repository. The scope of this report is to document the development and validation of the criticality model. The scope of the criticality model is only applicable to commercial pressurized water reactor fuel. Valid ranges are established as part of the validation of the criticality model. This model activity follows the description in BSC (2002a).

  20. Vulnerability of critical infrastructures : identifying critical nodes.

    SciTech Connect

    Cox, Roger Gary; Robinson, David Gerald

    2004-06-01

    The objective of this research was the development of tools and techniques for the identification of critical nodes within critical infrastructures. These are nodes that, if disrupted through natural events or terrorist action, would cause the most widespread, immediate damage. This research focuses on one particular element of the national infrastructure: the bulk power system. Through the identification of critical elements and the quantification of the consequences of their failure, site-specific vulnerability analyses can be focused at those locations where additional security measures could be effectively implemented. In particular, with appropriate sizing and placement within the grid, distributed generation in the form of regional power parks may reduce or even prevent the impact of widespread network power outages. Even without additional security measures, increased awareness of sensitive power grid locations can provide a basis for more effective national, state and local emergency planning. A number of methods for identifying critical nodes were investigated: small-world (or network theory), polyhedral dynamics, and an artificial intelligence-based search method - particle swarm optimization. PSO was found to be the only viable approach and was applied to a variety of industry accepted test networks to validate the ability of the approach to identify sets of critical nodes. The approach was coded in a software package called Buzzard and integrated with a traditional power flow code. A number of industry accepted test networks were employed to validate the approach. The techniques (and software) are not unique to power grid network, but could be applied to a variety of complex, interacting infrastructures.

  1. Critical Materials Museum Display

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    C APPENDIX C This appendix is intended to offer additional information on resources for the critical materials exhibit. Also included are additional vendors and resources for building a well-informed display for the critical materials. Although this list is not exhaustive, it is widely inclusive; hopefully, these resources will assist those who are planning or already building such a display. CM/REE Exhibit How-To Links This Critical Materials Exhibit information:

  2. Reference handbook: Nuclear criticality

    SciTech Connect

    Not Available

    1991-12-06

    The purpose for this handbook is to provide Rocky Flats personnel with the information necessary to understand the basic principles underlying a nuclear criticality.

  3. Resources | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    National Laboratories Links to national laboratories and other facilities with research related to rare earth elements or critical materials. National Energy Technology Laboratory ...

  4. Critical Materials Workshop

    Energy.gov [DOE] (indexed site)

    Critical Materials Workshop U.S. Department of Energy April 3, 2012 eere.energy.gov Dr. Leo Christodoulou Program Manager Advanced Manufacturing Office Energy Efficiency and...

  5. Property:NEPA Decision | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Decision Jump to: navigation, search Property Name NEPA Decision Property Type Page Description Files documenting decisions on NEPA Docs This is a property of type Page. Pages...

  6. Energy Department Approves Gulf Coast Exports of Liquefied Natural...

    Office of Environmental Management (EM)

    Approves Gulf Coast Exports of Liquefied Natural Gas Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas May 20, 2011 - 12:00am Addthis Washington, D.C. - The ...

  7. Energy Department Approves Gulf Coast Exports of Liquefied Natural...

    Office of Environmental Management (EM)

    Approves Gulf Coast Exports of Liquefied Natural Gas Energy Department Approves Gulf Coast Exports of Liquefied Natural Gas May 20, 2011 - 1:00pm Addthis Washington, DC - The U.S. ...

  8. Chapter 71 - Review and Approval of Contract and Financial Assistance...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 71 - Review and Approval of Contract and Financial Assistance Actions Files in PDF format PDF icon 71 1Headquarters approval final Dec 14.pdf PDF icon 71.2 - ...

  9. SEP Request for Approval Form 7 - Other Situations for Consumption...

    Energy Saver

    7 - Other Situations for Consumption Adjustment SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment SEP-Request-for-Approval-Form-7Other-Situations-for-C...

  10. File:08HIATransmissionLineApproval.pdf | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    8HIATransmissionLineApproval.pdf Jump to: navigation, search File File history File usage Metadata File:08HIATransmissionLineApproval.pdf Size of this preview: 463 599 pixels....

  11. SEP Request for Approval Form 3 - Other Complex Regression Model...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 - Other Complex Regression Model Rationale SEP Request for Approval Form 3 - Other Complex Regression Model Rationale SEP-Request-for-Approval-Form-3Other-Complex-Regression-Mod...

  12. SEP Request for Approval Form 4 - Alternative Adjustment Model Application

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Methodology | Department of Energy 4 - Alternative Adjustment Model Application Methodology SEP Request for Approval Form 4 - Alternative Adjustment Model Application Methodology SEP-Request-for-Approval-Form-4_Alternative-Adjustment-Model-Application-Methodology.docx (35.81 KB) More Documents & Publications SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment SEP Request for Approval Form 6 - Non-Routine Adjustments

  13. President Roosevelt Approves Production of Atomic Bomb | National Nuclear

    National Nuclear Security Administration (NNSA)

    Security Administration | (NNSA) Approves Production of Atomic Bomb President Roosevelt Approves Production of Atomic Bomb Washington, DC President Roosevelt approves production of the atomic bomb following receipt of a National Academy of Sciences report determining that a bomb is feasible

  14. Naturalistic Decision Making For Power System Operators

    SciTech Connect

    Greitzer, Frank L.; Podmore, Robin; Robinson, Marck; Ey, Pamela

    2009-06-23

    Abstract: Motivation -- As indicated by the Blackout of 2003, the North American interconnected electric system is vulnerable to cascading outages and widespread blackouts. Investigations of large scale outages often attribute the causes to the three T’s: Trees, Training and Tools. A systematic approach has been developed to document and understand the mental processes that an expert power system operator uses when making critical decisions. The approach has been developed and refined as part of a capability demonstration of a high-fidelity real-time power system simulator under normal and emergency conditions. To examine naturalistic decision making (NDM) processes, transcripts of operator-to-operator conversations are analyzed to reveal and assess NDM-based performance criteria. Findings/Design -- The results of the study indicate that we can map the Situation Awareness Level of the operators at each point in the scenario. We can also identify clearly what mental models and mental simulations are being performed at different points in the scenario. As a result of this research we expect that we can identify improved training methods and improved analytical and visualization tools for power system operators. Originality/Value -- The research applies for the first time, the concepts of Recognition Primed Decision Making, Situation Awareness Levels and Cognitive Task Analysis to training of electric power system operators. Take away message -- The NDM approach provides an ideal framework for systematic training management and mitigation to accelerate learning in team-based training scenarios with high-fidelity power grid simulators.

  15. Climate Information Needs for Financial Decision Making

    SciTech Connect

    Higgins, Paul

    2013-11-19

    capital assets each year across the public and private sectors (Orszag 2008; United States Census Bureau 2013). Extreme weather events create and exacerbate risks to these financial investments by contributing to: • Direct physical impacts on the investments themselves • Degradation of critical supporting infrastructure • Changes in the availability of key natural resources • Changes to workforce availability or capacity • Changes in the customer base • Supply chain disruptions • Legal liability • Shifts in the regulatory environment • Reductions in credit ratings Even small changes in weather can impact operations in critical economic sectors. As a result, maximizing returns on financial investments depends on accurately understanding and effectively accounting for these risks. Climate variability and change can either exacerbate existing risks or cause new sources of risk to emerge. Managing these risks most effectively will depend on scientific advances and increases in the capacity of financial decision makers to use the scientific knowledge that results. Barriers to using climate information must also be overcome. This study proposes three predefined levels of certainty for communicating about weather and climate risks: 1) possible (i.e., unknown likelihood or less than 50% chance of occurrence), 2) probable (greater than 50% chance of occurrence), and 3) effectively certain (at least 95% chance of occurrence). For example, it is effectively certain that a change in climate will alter weather patterns. It is probable that climate warming will cause increases in the intensity of some extreme events. It is possible that climate change will cause major and widespread disruptions to key planetary life-support services. Key recommendations of this study: 1) Identify climate-related risks and opportunities for financial decision making. 2) Create a framework to translate scientific information in clear and actionable terms for financial decision makers. 3

  16. Requirements to coordinate agreements, milestones and decision...

    Office of Environmental Management (EM)

    Requirements to coordinate agreements, milestones and decision documents (AMDD) Requirements to coordinate agreements, milestones and decision documents (AMDD) Environmental ...

  17. Latent effects decision analysis

    DOEpatents

    Cooper, J. Arlin; Werner, Paul W.

    2004-08-24

    Latent effects on a system are broken down into components ranging from those far removed in time from the system under study (latent) to those which closely effect changes in the system. Each component is provided with weighted inputs either by a user or from outputs of other components. A non-linear mathematical process known as `soft aggregation` is performed on the inputs to each component to provide information relating to the component. This information is combined in decreasing order of latency to the system to provide a quantifiable measure of an attribute of a system (e.g., safety) or to test hypotheses (e.g., for forensic deduction or decisions about various system design options).

  18. Approved for Public Release Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8823 Revision 0 Approved for Public Release Further Dissemination Unlimited Hanford Reach Fall Chinook Redd Monitoring Report for Calendar Year 2014 Prepared for the U.S. Department of Energy Assistant Secretary for Environmental Management Contractor for the U.S. Department of Energy under Contract DE-AC06-09RL14728 P.O. Box 650 Richland, Washington 99352 HNF-58823 Revision 0 TRADEMARK DISCLAIMER Reference herein to any specific commercial product, process, or service by trade name, trademark,

  19. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10:05 am, Jun 25, 2014 Approved for Public Release; Further Dissemination Unlimited J. C. Fulton President and Chief Executive Officer May 2014 CHPRC-2014-05, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-05, Rev. 0 * Overview CHPRC Monthly Performance Report May 2014 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2 TARGET ZERO

  20. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    50 am, Aug 26, 2014 Approved for Public Release; Further Dissemination Unlimited J. C. Fulton President and Chief Executive Officer July 2014 CHPRC-2014-07, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-07, Rev. 0 * Overview CHPRC Monthly Performance Report July 2014 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2 TARGET ZERO

  1. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    25 am, Sep 30, 2014 Approved for Public Release; Further Dissemination Unlimited J. C. Fulton President and Chief Executive Officer August 2014 CHPRC-2014-08, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-08, Rev. 0 * Overview CHPRC Monthly Performance Report August 2014 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2 TARGET

  2. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Shauna E. Adams at 10:45 am, Jul 26, 2012 Approved for Public Release; Further Dissemination Unlimited J. G. Lehew President and Chief Executive Officer June 2012 CHPRC-2012-06, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2012-06, Rev. 0 * Overview CHPRC Monthly Performance Report June 2012 CONTENTS EXECUTIVE SUMMARY

  3. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2:51 pm, Jul 24, 2014 Approved for Public Release; Further Dissemination Unlimited J. C. Fulton President and Chief Executive Officer June 2014 CHPRC-2014-06, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-06, Rev. 0 * Overview CHPRC Monthly Performance Report June 2014 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2 TARGET

  4. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6:46 am, Oct 28, 2014 Approved for Public Release; Further Dissemination Unlimited J. A. Ciucci President and Chief Executive Officer September 2014 CHPRC-2014-09, Rev. 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-09, Rev. 0 * Overview CHPRC Monthly Performance Report September 2014 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  5. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    10:35 am, May 26, 2015 Approved for Public Release; Further Dissemination Unlimited April 2015 CHPRC-2015-04, Revision 0 U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 J. A. Ciucci President and Chief Executive Officer Monthly Performance Report 1 CHPRC-2015-04, Rev. 0 * Overview CHPRC Monthly Performance Report April 2015 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  6. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8:22 am, Feb 24, 2015 Approved for Public Release; Further Dissemination Unlimited J. A. Ciucci President and Chief Executive Officer January 2015 CHPRC-2015-01, Revision 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2015-01, Rev. 0 * Overview CHPRC Monthly Performance Report January 2015 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  7. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    9:09 am, Jan 06, 2015 Approved for Public Release; Further Dissemination Unlimited J. A. Ciucci President and Chief Executive Officer November 2014 CHPRC-2014-11, Revision 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-11, Rev. 0 * Overview CHPRC Monthly Performance Report November 2014 CONTENTS EXECUTIVE SUMMARY

  8. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3:35 pm, Nov 24, 2014 Approved for Public Release; Further Dissemination Unlimited J. A. Ciucci President and Chief Executive Officer October 2014 CHPRC-2014-10, Revision 0 Monthly Performance Report U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 1 CHPRC-2014-10, Rev. 0 * Overview CHPRC Monthly Performance Report October 2014 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  9. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    39 pm, Jan 25, 2016 Approved for Public Release; Further Dissemination Unlimited December 2015 CHPRC-2015-12, Revision 0 U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 J. A. Ciucci President and Chief Executive Officer Monthly Performance Report 1 CHPRC-2015-12, Rev. 0 * Overview CHPRC Monthly Performance Report December 2015 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  10. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2:35 pm, Mar 28, 2016 Approved for Public Release; Further Dissemination Unlimited February 2016 CHPRC-2016-02, Revision 0 U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 J. A. Ciucci President and Chief Executive Officer Monthly Performance Report 1 CHPRC-2016-02, Rev. 0 * Overview CHPRC Monthly Performance Report February 2016 CONTENTS EXECUTIVE SUMMARY

  11. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    05 pm, Feb 22, 2016 Approved for Public Release; Further Dissemination Unlimited January 2016 CHPRC-2016-01, Revision 0 U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 J. A. Ciucci President and Chief Executive Officer Monthly Performance Report 1 CHPRC-2016-01, Rev. 0 * Overview CHPRC Monthly Performance Report January 2016 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  12. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2:23 pm, Nov 19, 2015 Approved for Public Release; Further Dissemination Unlimited October 2015 CHPRC-2015-10, Revision 0 U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 J. A. Ciucci President and Chief Executive Officer Monthly Performance Report 1 CHPRC-2015-10, Rev. 0 * Overview CHPRC Monthly Performance Report October 2015 CONTENTS EXECUTIVE SUMMARY ..............................................................................................................2

  13. Critical Materials Hub

    Office of Energy Efficiency and Renewable Energy (EERE)

    Critical materials, including some rare earth elements that possess unique magnetic, catalytic, and luminescent properties, are key resources needed to manufacture products for the clean energy economy. These materials are so critical to the technologies that enable wind turbines, solar panels, electric vehicles, and energy-efficient lighting that DOE's 2010 and 2011 Critical Materials Strategy reported that supply challenges for five rare earth metals—dysprosium, neodymium, terbium, europium, and yttrium—could affect clean energy technology deployment in the coming years.1, 2

  14. CD-2, Approve Performance Baseline | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2, Approve Performance Baseline CD-2, Approve Performance Baseline CD-2, Approve Performance Baseline << Resource Center | CD-3 >> Description Completion of preliminary design is the first major milestone in the project Execution Phase. The design must be sufficiently mature (refer to DOE O 413.3B, Appendix C, Paragraph 4) at the time of CD-2 approval to provide reasonable assurance that the design will be implementable within the approved PB. The document signed by the CE or PME

  15. Administrator's Final Record of Decision

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    with my recent decision during the Integrated Program Review to convert funding for BPA's Energy Efficiency program from capital to expense, eliminating the growth of long-term...

  16. Critical Materials Workshop Agenda

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Critical Materials Workshop Sheraton Crystal City 1800 Jefferson Davis Highway, Arlington, VA April 3, 2012, 8 am - 5 pm Time (EDT) Activity Speaker 8:00 am - 9:00 am Registration ...

  17. Resources | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Resources The Critical Materials Institute offers connections to resources, including: CMI Annual Report (page includes link pdf of 20-page report) List of resources U.S. Rare Earth Magnet Patents Table Government agency contacts CMI unique facilities CMI recent presentations Photographs via Flick'r: Critical Materials Institute, The Ames Laboratory Videos from The Ames Laboratory Webinars from Colorado School of Mines To offer comments on the CMI website or to ask questions, please contact us

  18. CRITICAL MATERIALS MUSEUM DISPLAY

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CRITICAL MATERIALS MUSEUM DISPLAY STATUS AND "HOW-TO" REPORT NO. 3 09-01-2016 This report is the third and final "How-to" report, which includes an update of progress and a review of lessons learned for the Critical Materials Museum Exhibit at Colorado School of Mines (CSM). The first report explained the beginnings of the exhibit, including the inception, purpose, design foundations, and challenges and advantages of the project (available at

  19. CRITICAL MATERIALS MUSEUM DISPLAY

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    1 04-01-2015 Introduction The Critical Materials display was initiated by the Outreach and Education Coordinator for the Critical Materials Institute (CMI) and the Director of the Colorado School of Mines (CSM) Geology Museum as an opportunity to leverage the relationship between CSM's very successful museum outreach and CMI's desire to reach audiences of all ages across the nation. The display will be designed to provide a visual outreach opportunity with visitors and guests to the Colorado

  20. Waste-to-energy: Decision making and the decisions made

    SciTech Connect

    Schexnayder, S.M. ); Wolfe, A.K. )

    1993-01-01

    During the early 1980s, it was projected that waste-to-energy (WTE) facilities would manage as much as half of all municipal solid waste by the turn of the century. However, during the latter part of the 1980s, the cancellation rate for WTE facilities grew to the point that the portion of the waste stream WTE will handle in the long-term future is less certain. This study, conducted as part of a larger study, identifies factors that influence municipalities, decisions regarding WTE. This study takes a broad perspective about decision-making within communities, emphasizing the context within which decisions were made and the decision-making process. It does not seek to judge the correctness of the decisions.

  1. Waste-to-energy: Decision making and the decisions made

    SciTech Connect

    Schexnayder, S.M.; Wolfe, A.K.

    1993-05-01

    During the early 1980s, it was projected that waste-to-energy (WTE) facilities would manage as much as half of all municipal solid waste by the turn of the century. However, during the latter part of the 1980s, the cancellation rate for WTE facilities grew to the point that the portion of the waste stream WTE will handle in the long-term future is less certain. This study, conducted as part of a larger study, identifies factors that influence municipalities, decisions regarding WTE. This study takes a broad perspective about decision-making within communities, emphasizing the context within which decisions were made and the decision-making process. It does not seek to judge the correctness of the decisions.

  2. Risk Analysis and Decision Making FY 2013 Milestone Report

    SciTech Connect

    Engel, David W.; Dalton, Angela C.; Dale, Crystal; Jones, Edward; Thompson, J.

    2013-06-01

    Risk analysis and decision making is one of the critical objectives of CCSI, which seeks to use information from science-based models with quantified uncertainty to inform decision makers who are making large capital investments. The goal of this task is to develop tools and capabilities to facilitate the development of risk models tailored for carbon capture technologies, quantify the uncertainty of model predictions, and estimate the technical and financial risks associated with the system. This effort aims to reduce costs by identifying smarter demonstrations, which could accelerate development and deployment of the technology by several years.

  3. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 34: Area 3 Contaminated Waste Sites, Nevada Test Site, Nevada

    SciTech Connect

    Lynn Kidman

    2008-10-01

    This document constitutes an addendum to the April 2002, Corrective Action Decision Document/Closure Report for Corrective Action Unit 34: Area 3 Contaminated Waste Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications.

  4. Count Directive No. Title OPI Approval Date

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Due for Review Before 9/30/2016 Count Directive No. Title OPI Approval Date 1 DOE G 414.1-2B Quality Assurance Program Guide AU 8/16/2011 2 DOE G 414.1-4 Safety Software Guide for Use with 10 CFR 830, Subpart A, Quality Assurance Requirements, and DOE O 414.1C, Quality Assurance AU 6/17/2005 3 DOE G 421.1-2A Implementation Guide for Use in Developing Documented Safety Analyses to Meet Subpart B of 10 CFR 830 AU 12/19/2011 4 DOE G 424.1-1B Implementation Guide for Use in Addressing Unreviewed

  5. Approved for Public Release; Further Dissemination Unlimited

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    2015-06 ARJ 7/27/15 Approved for Public Release; Further Dissemination Unlimited 2015-06 ARJ 7/27/15 By Ashley R Jenkins at 1:53 pm, Jul 27, 2015 2015-06 ARJ 7/27/15 June 2015 CHPRC-2015-06, Revision 0 U.S. Department of Energy Contract, DE-AC06-08RL14788 Deliverable C.3.1.3.1 - 1 J. A. Ciucci President and Chief Executive Officer Monthly Performance Report 1 CHPRC-2015-06, Rev. 0 * Overview CHPRC Monthly Performance Report June 2015 CONTENTS EXECUTIVE SUMMARY

  6. Human Resources at Critical Materials Institute | Critical Materials...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Human Resources at Critical Materials Institute Each partner within the Critical Materials Institute manages its own hiring. Use these links to find key contacts for CMI partners ...

  7. Pre-approvals Needed for Alternative Approaches | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Superior Energy Performance » Pre-approvals Needed for Alternative Approaches Pre-approvals Needed for Alternative Approaches Superior Energy Performance logo To accommodate differences in manufacturing operations, some facilities may use alternative approaches as specified in the Superior Energy Performance® (SEP(tm)) Measurement and Verification Protocol for Industry and summarized in the table below. Before submitting your application, we strongly encourage you to request pre-approval from

  8. Global Nuclear Energy Partnership Steering Group Members Approve

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transformation to the International Framework for Nuclear Energy Cooperation | Department of Energy Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation Global Nuclear Energy Partnership Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation June 18, 2010 - 12:00am Addthis The Global Nuclear Energy Partnership Steering Group met in Accra, Ghana on June 16-17, 2010 and approved

  9. LANS Board of Governors approves $3 million for education, economic

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    development, charitable giving in Northern New Mexico LANS approves $3 million for Northern New Mexico LANS Board of Governors approves $3 million for education, economic development, charitable giving in Northern New Mexico Funds approved by the LANS Board of Governors are administered through a Community Commitment Plan. September 23, 2014 Los Alamos National Laboratory sits on top of a once-remote mesa in northern New Mexico with the Jemez mountains as a backdrop to research and

  10. DOE Approves Field Test for Promising Carbon Capture Technology |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Approves Field Test for Promising Carbon Capture Technology DOE Approves Field Test for Promising Carbon Capture Technology November 20, 2012 - 12:00pm Addthis Washington, DC - A promising post combustion membrane technology that can separate and capture 90 percent of the carbon dioxide (CO2) from a pulverized coal plant has been successfully demonstrated and received Department of Energy (DOE) approval to advance to a larger-scale field test. In an $18.75 million

  11. Bodman Statement On Senate Approval of ANWR Provisions | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy On Senate Approval of ANWR Provisions Bodman Statement On Senate Approval of ANWR Provisions March 16, 2005 - 10:50am Addthis Washington, DC - Energy Secretary Samuel W. Bodman released the following statement today regarding Senate approval of ANWR provisions in the budget resolution: "The Senate's vote today to clear the way for environmentally responsible oil and gas exploration in a small portion of ANWR is a victory for American consumers, America's economy and America's

  12. Application & Approval | Y-12 National Security Complex

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Public Use of New Hope Center / Application & Approval Application & Approval Application and Approval - Interested organizations must apply for a permit. An organization must provide its tax ID number, billing address, event description, and contract information. For a permit to be issued, an organization must meet all qualifications and agree to abide by all terms and conditions. Alcoholic beverages are not permitted in New Hope Center. Y-12 may reject a permit request or revoke a

  13. AVLIS Criticality risk assessment

    SciTech Connect

    Brereton, S.J., LLNL

    1998-04-29

    Evaluation of criticality safety has become an important task in preparing for the Atomic Vapor Laser Isotope Separation (AVLIS) uranium enrichment runs that will take place during the Integrated Process Demonstration (IPD) at Lawrence Livermore National Laboratory (LLNL). This integrated operation of AVLIS systems under plant-like conditions will be used to verify the performance of process equipment and to demonstrate the sustained integrated enrichment performance of these systems using operating parameters that are similar to production plant specifications. Because of the potential criticality concerns associated with enriched uranium, substantial effort has been aimed towards understanding the potential system failures of interest from a criticality standpoint, and evaluating them in detail. The AVLIS process is based on selective photoionization of uranium atoms of atomic weight 235 (U-235) in a vapor stream, followed by electrostatic extraction. The process is illustrated in Figure 1. Two major subsystems are involved: the uranium separator and the laser system. In the separator, metallic uranium is fed into a crucible where it is heated and vaporized by an electron beam. The atomic U-235/U-238 vapor stream moves away from the molten uranium and is illuminated by precisely tuned beams of dye laser light. Upon absorption of the tuned dye laser light, the U-235 atoms become excited and eject electrons (become photoionized), giving them a net positive charge. The ions of U-235 are moved preferentially by an electrostatic field to condense on the product collector, forming the enriched uranium product. The remaining vapor, which is depleted in U-235 (tails), passes unaffected through the photoionization/extractor zone and accumulates on collectors in the top of the separator. Tails and product collector surfaces operate at elevated temperatures so that deposited materials flow as segregated liquid streams. The separated uranium condensates (uranium enriched in

  14. Hawaii Clean Energy Initiative - Transmission Line Approval Permit...

    OpenEI (Open Energy Information) [EERE & EIA]

    Reference LibraryAdd to library PermittingRegulatory Guidance - Instructions: Hawaii Clean Energy Initiative - Transmission Line Approval Permit PacketPermittingRegulatory...

  15. Approval memorandum for DOE participation in Voluntary Protection...

    Energy Saver

    Programs Participants' Association (VPPPA) April 13, 1994 The Office of Safety and Quality Assurance (EH-30) is requesting approval for DOE membership in the VPPPA. Attached...

  16. OVERPRESSURE BY SYSTEM DESIGN APPROVAL FORM PS-2 GENERAL Pressure...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    OVERPRESSURE BY SYSTEM DESIGN APPROVAL FORM PS-2 GENERAL Pressure System Number: Pressure System Name: Design Authority: OVERPRESSURE BY SYSTEM DESIGN REPORT CONTAINS: (check if ...

  17. Notice of OMB Action Approving DOE Submission to Extend Information...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of OMB Action Approving DOE Submission to Extend Information Collection Request Title: OE Recovery Act Financial Assistance Grants The Office of Management and Budget (OMB) ...

  18. Reshaping Its Skyline: Y-12 Recieves Approval to Begin Multi...

    National Nuclear Security Administration (NNSA)

    Reshaping Its Skyline: Y-12 Recieves Approval to Begin Multi-Building Biology Complex Demolition Project | National Nuclear Security Administration Facebook Twitter Youtube Flickr...

  19. President Roosevelt Approves Production of Atomic Bomb | National...

    National Nuclear Security Administration (NNSA)

    Approves Production of Atomic Bomb | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the Stockpile Preventing Proliferation...

  20. BLM Approves Salt Wells Geothermal Energy Projects | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Energy Projects Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM Approves Salt Wells Geothermal Energy Projects Abstract Abstract unavailable....

  1. Processing Exemptions to Nuclear Safety Rules and Approval of...

    Office of Environmental Management (EM)

    DOE STANDARD PROCESSING EXEMPTIONS TO NUCLEAR SAFETY RULES AND APPROVAL OF ALTERNATIVE ... Page at http:energy.govehssservicesnuclear-safetydepartment-energy-technical- ...

  2. Approval Memorandum for Guides - DOE Directives, Delegations, and

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Requirements Memorandum for Guides by Website Administrator Microsoft Word Document icon ApprovalMemo-Guide (2).doc - Microsoft Word Document, 36 KB (37376

  3. Approval of Contractor Executive Salaries by Department of Energy...

    Energy.gov [DOE] (indexed site)

    ... was referenced in each of the approval letters signed by the ORO procurement official ... performing decontamination and decommissioning work, performing work in the same ...

  4. Idaho Public Utilities Commission Approves Neal Hot Springs Power...

    OpenEI (Open Energy Information) [EERE & EIA]

    Geothermal Area Regions (0) Retrieved from "http:en.openei.orgwindex.php?titleIdahoPublicUtilitiesCommissionApprovesNealHotSpringsPowerPurchaseAgreement&oldid76143...

  5. Appendix S-51 - Transmission Line Approval - Public Utilities...

    OpenEI (Open Energy Information) [EERE & EIA]

    from "http:en.openei.orgwindex.php?titleAppendixS-51-TransmissionLineApproval-PublicUtilitiesCommission&oldid800735" Feedback Contact needs updating Image needs...

  6. Criticality safety training

    SciTech Connect

    Woodruff, S.K.

    1997-06-01

    Criticality safety training is an important element of the Plutonium Facility safety program at Los Alamos National Laboratory. Training consists of student self-study handbooks and hands-on performance-based training in a mock-up laboratory containing gloveboxes, trolley conveyor system, and self-monitoring instruments. A 10-minute video tape and lecture was presented to describe how training in this area is conducted.

  7. Timelines | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Timelines A listing of timelines about various materials of interest to rare earths and critical materials, organized by those specific to rare earth elements, general chemistry and uses. Timelines of rare earth discovery: Discovery and History of the Rare Earth Elements, Tasman Metals Ltd. REE - Rare Earth Elements and Their Uses, geology.com History of the Rare Earth Elements, Eni Generalic Timelines of chemistry/periodic table: Timeline of Chemical Element Discoveries, Wikipedia The Periodic

  8. Careers | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Careers The Critical Materials Institute at the The Ames Laboratory, a Department of Energy national laboratory affiliated with Iowa State University, offers a variety of career opportunities. These include: Postdoctoral Research Associate Also, The Ames Laboratory participates in federal programs that help develop the research workforce. These include the following programs with the U.S. Department of Energy: Graduate Student Research Program (new in 2014) Science Undergraduate Laboratory

  9. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Projects October 25, 2005 EIS-0374: Record of Decision Klondike III Biglow Canyon Wind Integration Project September 21, 2005 EIS-0355: Record of Decision Remediation...

  10. RETScreen International Clean Energy Decision Support Centre...

    OpenEI (Open Energy Information) [EERE & EIA]

    decision-making tools (i.e. RETScreen Software) that reduce the cost of pre-feasibility studies; disseminating knowledge to help people make better decisions; and by...

  11. Decision Support Tool: Integrated REDD+ accounting frameworks...

    OpenEI (Open Energy Information) [EERE & EIA]

    Decision Support Tool: Integrated REDD+ accounting frameworks: Nested national approaches Jump to: navigation, search Tool Summary LAUNCH TOOL Name: Decision Support Tool:...

  12. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0, 2003 EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project October 31, 2003 EIS-0312: Record of Decision Fish and Wildlife...

  13. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    19, 2012 EIS-0425: Record of Decision and Mitigation Action Plan Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration...

  14. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    December 15, 1999 EIS-0281: Record of Decision Sandia National LaboratoriesNew Mexico Site-Wide Environmental Impact Statement November 12, 1999 EIS-0222: Record of Decision...

  15. Portsmouth Waste Disposition Record of Decision | Department...

    Office of Environmental Management (EM)

    Waste Disposition Record of Decision Portsmouth Waste Disposition Record of Decision The Ohio Environmental Protection Agency (Ohio EPA) and the U.S. Department of Energy (DOE) ...

  16. Government Performance Result Act (GPRA) / Portfolio Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Government Performance Result Act (GPRA) Portfolio Decision Support (PDS) Government Performance Result Act (GPRA) Portfolio Decision Support (PDS) 2009 DOE Hydrogen Program...

  17. Only critical information was scanned

    Office of Legacy Management (LM)

    Only critical information was scanned. Entire document is available upon request - Click here to email a

  18. Assessing Terrorist Motivations for Attacking Critical Infrastructure

    SciTech Connect

    Ackerman, G; Abhayaratne, P; Bale, J; Bhattacharjee, A; Blair, C; Hansell, L; Jayne, A; Kosal, M; Lucas, S; Moran, K; Seroki, L; Vadlamudi, S

    2006-12-04

    organization will attack critical infrastructure. In other words, this research investigates: (1) why terrorists choose to attack critical infrastructure rather than other targets; (2) how groups make such decisions; (3) what, if any, types of groups are most inclined to attack critical infrastructure targets; and (4) which types of critical infrastructure terrorists prefer to attack and why. In an effort to address the above questions as comprehensively as possible, the project team employed four discrete investigative approaches in its research design. These include: (1) a review of existing terrorism and threat assessment literature to glean expert consensus regarding terrorist target selection, as well as to identify theoretical approaches that might be valuable to analysts and decision-makers who are seeking to understand such terrorist group decision-making processes; (2) the preparation of several concise case studies to help identify internal group factors and contextual influences that have played significant roles in leading some terrorist groups to attack critical infrastructure; (3) the creation of a new database--the Critical Infrastructure Terrorist Incident Catalog (CrITC)--to capture a large sample of empirical CI attack data that might be used to illuminate the nature of such attacks to date; and (4) the development of a new analytical framework--the Determinants Effecting Critical Infrastructure Decisions (DECIDe) Framework--designed to make the factors and dynamics identified by the study more ''usable'' in any future efforts to assess terrorist intentions to target critical infrastructure. Although each is addressed separately in the following chapters, none of the four aspects of this study were developed in isolation. Rather, all the constituent elements of the project informed--and were informed by--the others. For example, the review of the available literature on terrorist target selection made possible the identification of several target selection

  19. Decision tool to optimally select pollution prevention projects within a constrained budget. Master`s thesis

    SciTech Connect

    Hudson, C.

    1995-12-01

    Pollution prevention managers need to select the best environmental projects for an installation within a constrained budget but have no standard way of selecting the optimal mix of projects. This thesis proposes a decision tool to aid decision makers in choosing this optimal mix. The model was built using decision analysis theory which provides a framework to aid the decision maker. Criteria sed in the model for selection was determined using a questionnaire sent to base-level pollution prevention managers. The model ses DPL, a software package designed to build, analyze, and conduct sensitivity analysis of decision problems to perform the quantitative analysis. Built in functions of DPL(TM) allow the decision maker to see the optimal decision policy based on the values entered into the model and to run sensitivity analysis to determine which values are the most critical to the outcome of the model. Decision analysis can be used to create a dominance curve that shows all optimal strategies based on the willingness of the decision maker to make tradeoffs between attributes. This model provides analytical data that can be used to justify decisions made by the pollution prevention manager when selecting the optimal mix of pollution prevention projects for implementation.

  20. Waste Feed Delivery Environmental Permits and Approvals Plan

    SciTech Connect

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  1. Approval Memorandum for Policies, Notices, Orders and Manuals - DOE

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Directives, Delegations, and Requirements Memorandum for Policies, Notices, Orders and Manuals by Patricia Greeson Upload File Upload the file here ApprovalMemo-DeputySecretary6-29-16.docx - 23 KB Short Name approval-memo-dep-sec

  2. CMI Social Media | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Social Media Facebook: Critical Materials Institute Twitter: CMI_hub LinkedIn: Critical Materials Institute Flickr: Critical Materials Institute

  3. Breckinridge Project, initial effort. Report XI, Volume V. Critical review of the design basis. [Critical review

    SciTech Connect

    1982-01-01

    Report XI, Technical Audit, is a compendium of research material used during the Initial Effort in making engineering comparisons and decisions. Volumes 4 and 5 of Report XI present those studies which provide a Critical Review of the Design Basis. The Critical Review Report, prepared by Intercontinental Econergy Associates, Inc., summarizes findings from an extensive review of the data base for the H-Coal process design. Volume 4 presents this review and assessment, and includes supporting material; specifically, Design Data Tabulation (Appendix A), Process Flow Sheets (Appendix B), and References (Appendix C). Volume 5 is a continuation of the references of Appendix C. Studies of a proprietary nature are noted and referenced, but are not included in these volumes. They are included in the Limited Access versions of these reports and may be reviewed by properly cleared personnel in the offices of Ashland Synthetic Fuels, Inc.

  4. CMI Webinar: Energy Materials and Criticality, 2015-2030 | Critical...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CMI Webinar: Energy Materials and Criticality, 2015-2030 The CMI Webinar series includes a CMI-only presentation "CMI Webinar: Energy Materials and Criticality, 2015-2030" by Rod...

  5. Portsmouth Decontamination and Decommissioning Record of Decision

    Office of Energy Efficiency and Renewable Energy (EERE)

    Portsmouth Process Buildings and Complex Facilities Decontamination and Decommissioning Evaluation Project Record of Decision (ROD)

  6. Initial Decision and Risk Analysis

    SciTech Connect

    Engel, David W.

    2012-02-29

    Decision and Risk Analysis capabilities will be developed for industry consideration and possible adoption within Year 1. These tools will provide a methodology for merging qualitative ranking of technology maturity and acknowledged risk contributors with quantitative metrics that drive investment decision processes. Methods and tools will be initially introduced as applications to the A650.1 case study, but modular spreadsheets and analysis routines will be offered to industry collaborators as soon as possible to stimulate user feedback and co-development opportunities.

  7. SEP Request for Approval Form 6 - Non-Routine Adjustments | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Forms SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment SEP Request for Approval Form 4 - Alternative Adjustment Model Application Methodology

  8. SEP Request for Approval Form 5 - Model Does Not Satisfy 3.4...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    KB) More Documents & Publications SEP Request for Approval Form 3 - Other Complex Regression Model Rationale SEP Request for Approval Form 7 - Other Situations for Consumption ...

  9. Critical Infrastructure Modeling System

    Energy Science and Technology Software Center

    2004-10-01

    The Critical Infrastructure Modeling System (CIMS) is a 3D modeling and simulation environment designed to assist users in the analysis of dependencies within individual infrastructure and also interdependencies between multiple infrastructures. Through visual cuing and textual displays, a use can evaluate the effect of system perturbation and identify the emergent patterns that evolve. These patterns include possible outage areas from a loss of power, denial of service or access, and disruption of operations. Method ofmore » Solution: CIMS allows the user to model a system, create an overlay of information, and create 3D representative images to illustrate key infrastructure elements. A geo-referenced scene, satellite, aerial images or technical drawings can be incorporated into the scene. Scenarios of events can be scripted, and the user can also interact during run time to alter system characteristics. CIMS operates as a discrete event simulation engine feeding a 3D visualization.« less

  10. Department of Energy Commends the Nuclear Regulatory Commission's Approval

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of a Second Early Site Permit in Just One Month | Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month Department of Energy Commends the Nuclear Regulatory Commission's Approval of a Second Early Site Permit in Just One Month March 27, 2007 - 12:10pm Addthis The Entergy Corporation's Grand Gulf Site in Mississippi Receives NRC Approval for an ESP WASHINGTON, DC - The U.S. Department of Energy (DOE) today applauded the

  11. Project W-314 phase I environmental permits and approvals plan

    SciTech Connect

    TOLLEFSON, K.S.

    1999-02-24

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided.

  12. Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada

    Office of Legacy Management (LM)

    Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 447: Project Shoal Area, Subsurface, Nevada Controlled Copy No.: Revision No.: 3 March 2006 Approved for public release; further dissemination unlimited. DOE/NV--1025--Rev. 3 Available for public sale, in paper, from: U.S. Department of Commerce National Technical Information Service 5285 Port Royal Road Springfield, VA 22161 Phone: 800.553.6847 Fax: 703.605.6900 Email: orders@ntis.gov Online ordering:

  13. DOI Announces Two Solar Projects Approved in California, Nevada

    Energy.gov [DOE]

    The U.S. Department of the Interior (DOI) announced the approval of two solar energy projects located near the Nevada-California border that are expected to supply 550 megawatts of renewable energy.

  14. BLM Approves Salt Wells Geothermal Plant in Churchill County...

    OpenEI (Open Energy Information) [EERE & EIA]

    Plant in Churchill County Jump to: navigation, search OpenEI Reference LibraryAdd to library Web Site: BLM Approves Salt Wells Geothermal Plant in Churchill County Abstract...

  15. Virginia Senate Approves Budget Deal to Include Money for FEL...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Virginia Senate Approves Budget Deal to Include Money for FEL (Daily Press) External Link: http:articles.dailypress.com2012-04-18newsdp-nws-general-assembly-budget-da... By ...

  16. Secretary Jewell Announces Approval of Second Utility-Scale Solar...

    Energy.gov [DOE] (indexed site)

    (DOI) Sally Jewell announced on May 7, 2014, the approval of the 200-megawatt Moapa Solar Energy Center Project on tribal trust land in Nevada and that nine federally recognized ...

  17. Review and Approval of Nuclear Facility Safety Basis and Safety...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    104-2014, Review and Approval of Nuclear Facility Safety Basis and Safety Design Basis Documents by Website Administrator This Standard describes a framework and the criteria to be...

  18. Headquarters Security Operations Facility Clearance and Approval Program

    Energy.gov [DOE]

    The Headquarters Facility Clearance and Approval Program (FCAP) is established by DOE Order to administratively determine that a facility is or is not eligible to access, receive, produce, use, and...

  19. DOI Approves Three Renewable Energy Projects in Arizona and Nevada

    Energy.gov [DOE]

    The U.S. Department of the Interior (DOI) on June 3 announced the approval of three major renewable energy projects in Arizona and Nevada that are expected to deliver up to 520 megawatts to the electricity grid.

  20. Approval Memo for Administrative Changes - DOE Directives, Delegations,

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    and Requirements Memo for Administrative Changes by Website Administrator Microsoft Word Document icon Approval-Memo-for-Administrative-Changes (1).doc - Microsoft Word Document, 14 KB (15104

  1. Y-12 Final Site-Wide Environmental Impact Statement Approved...

    National Nuclear Security Administration (NNSA)

    Blog Home Field Offices Welcome to the NNSA Production Office NPO News Releases Y-12 Final Site-Wide Environmental Impact Statement Approved Y-12 Final Site-Wide...

  2. Secretary of Energy Announces Approval and Funding for Facilities Upgrade

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs | Department of Energy Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs Secretary of Energy Announces Approval and Funding for Facilities Upgrade at the Thomas Jefferson National Lab and Highlights Lab's Successful Education Programs February 22, 2006 - 12:09pm Addthis NEWPORT NEWS , VA - Secretary of Energy Samuel W.

  3. APPROVAL REQUIRED WHEN EMPLOYEES ENGAGE IN OUTSIDE EMPLOYMENT

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    APPROVAL REQUIRED WHEN EMPLOYEES ENGAGE IN OUTSIDE EMPLOYMENT Pursuant to 5 C.F.R. §§ 2635.803 and 3301.103 (a), all Department of Energy employees, other than special Government employees, must obtain prior written approval from their immediate supervisor and an ethics counselor before engaging in outside employment regardless of whether the employee is compensated for the activity. A special Government employee is an employee serving not more than 130 days in any consecutive 365 day period.

  4. $3 million approved for 2015 LANS Community Commitment Plan

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    $3 million approved for 2015 LANS Community Commitment Plan Community Connections: Your link to news and opportunities from Los Alamos National Laboratory Latest Issue:November 2, 2016 all issues All Issues » submit $3 million approved for 2015 LANS Community Commitment Plan Education, economic development and community giving to receive $1 million each October 1, 2014 Elizabeth and Roger Inman of Purple Adobe Lavender Farm in Abiquiu. The company was one of the 2014 LANS Community Commitment

  5. Attorney General's signed concurrence letter approved October 9, 2009 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Attorney General's signed concurrence letter approved October 9, 2009 Attorney General's signed concurrence letter approved October 9, 2009 Attorney General Consulation on binding Arbitration Guidance AG Concurrence for BPA (149.57 KB) More Documents & Publications Letter from DOJ regarding Boneeville Power Administration's Guidance on the Use of Binding Arbitration for BPA Contracts Oct 2009 final concurrence letter for BPA BPA FINAL Binding Arbitration policy

  6. Global Nuclear Energy Partnership Steering Group Members Approve

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transformation to the International Framework for Nuclear Energy Cooperation | Department of Energy Global Nuclear Energy Partnership Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation Global Nuclear Energy Partnership Steering Group Members Approve Transformation to the International Framework for Nuclear Energy Cooperation June 21, 2010 - 11:59am Addthis The Global Nuclear Energy Partnership Steering Group met in Accra, Ghana on June

  7. April 15: Memorandum of Decision

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ASSISTANT SECRETARY OF ENERGY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY MEMORANDUM OF DECISION SUBJECT: Determination of inapplicability (limited waiver in the public interest) of section 1605 of the Recovery Act of 2009 (the Buy American provision) for the GE Jenbacher JMC 320 gas reciprocating engine being used in the Golden Triangle Regional Solid Waste Management Authority (GTR) landfill gas to energy project, funded in part under a sub-award (AR060-GT11-0111-0001) from the Mississippi

  8. Critical Materials Museum Exhibit Evaluation | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Critical Materials Museum Exhibit Evaluation Thank you for visiting the Critical Materials Exhibit at the Colorado School of Mines Geology Museum. Completing the ratings section is required to submit this webform. For rating, please indicate the number with which you agree the most, with 0 being not at all, 1 being the least, and 5 being the most. Rating * -0 1 2 3 4 5+ This exhibit helped me learn about Critical Materials. This exhibit helped me learn about Critical Materials. - -0 This exhibit

  9. Record of Decision for Mars 2020 Mission

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ... Record of Decision for Mars 2020 Mission Mars 2020 Rover instrument selection. Mars 2020 Rover instrument selection. NASA issued a record of decision (ROD) to use a nuclear battery ...

  10. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the Shepherds Flat Wind Energy Project June 10, 2008 EIS-0378: Record of Decision Port Angeles-Juan de Fuca Transmssion Proj June 4, 2008 EIS-0183: Record of Decision Electrical...

  11. Record of Decision (ROD) | Department of Energy

    Energy Saver

    August 5, 2016 EIS-0491: Record of Decision (Lake Charles LNG Export Company, LLC) Lake ... DOE announced its decision in Lake Charles Exports, LLC (LCE), DOEFE Docket No. 11-59-LNG...

  12. DOE-TSPP-6-2013, Approving and Issuing DOE Technical Standards

    Energy.gov [DOE]

    This procedure provides guidance for approving and issuing the Department of Energy (DOE) Technical Standards.

  13. Memorandum Approval of a Permanenet Variance Regarding Static Magnetic Fields at Brookhaven National Laboratory (Variance 1021)

    Energy.gov [DOE]

    Approval of a Permanenet Variance Regarding Static Magnetic Fields at Brookhaven National Laboratory (Variance 1021)

  14. Decision support models for solid waste management: Review and game-theoretic approaches

    SciTech Connect

    Karmperis, Athanasios C.; Aravossis, Konstantinos; Tatsiopoulos, Ilias P.; Sotirchos, Anastasios

    2013-05-15

    Highlights: ? The mainly used decision support frameworks for solid waste management are reviewed. ? The LCA, CBA and MCDM models are presented and their strengths, weaknesses, similarities and possible combinations are analyzed. ? The game-theoretic approach in a solid waste management context is presented. ? The waste management bargaining game is introduced as a specific decision support framework. ? Cooperative and non-cooperative game-theoretic approaches to decision support for solid waste management are discussed. - Abstract: This paper surveys decision support models that are commonly used in the solid waste management area. Most models are mainly developed within three decision support frameworks, which are the life-cycle assessment, the costbenefit analysis and the multi-criteria decision-making. These frameworks are reviewed and their strengths and weaknesses as well as their critical issues are analyzed, while their possible combinations and extensions are also discussed. Furthermore, the paper presents how cooperative and non-cooperative game-theoretic approaches can be used for the purpose of modeling and analyzing decision-making in situations with multiple stakeholders. Specifically, since a waste management model is sustainable when considering not only environmental and economic but also social aspects, the waste management bargaining game is introduced as a specific decision support framework in which future models can be developed.

  15. Bid Decision Gate Reviews | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bid Decision Gate Reviews Bid Decision Gate Reviews Presented at the 15th Annual DOE Small Business Forum & Expo by: Tan Wilson, PMP, President of Entellect, LLC Bid Decision Gate Reviews (5.88 MB) More Documents & Publications Proposal Preparedness Revised OMB Circular A-76 (Revised November 14, 2002) Marketing to Win: How to Identify the Real Decision-maker and Tailor Your Message

  16. EIS-0218: Revised Record of Decision

    Office of Energy Efficiency and Renewable Energy (EERE)

    Revision of the Record of Decision for a Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel

  17. Summary of Decisions- July 9- 13, 2012

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) - Application for Exception

  18. CMI Factsheet | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CMI Factsheet 3D printer uses laser and metals to build new combinations of materials What is the Energy Innovation Hub for Critical Materials? Created by the U.S. Department of Energy, the Energy Innovation Hub is operated under the name the Critical Materials Institute. CMI is led by the DOE's Ames Laboratory, and managed by DOE's Advanced Manufacturing Office. It brings together the expertise of DOE national laboratories, universities, and industry partners to eliminate materials criticality

  19. Guidelines for Preparing Criticality Safety Evaluations at Department of Energy Nonreactor Nuclear Facilities

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    STD-3007-2007 February 2007 DOE STANDARD GUIDELINES FOR PREPARING CRITICALITY SAFETY EVALUATIONS AT DEPARTMENT OF ENERGY NONREACTOR NUCLEAR FACILITIES U.S. Department of Energy AREA SAFT Washington, D.C. 20585 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. NOT MEASUREMENT SENSITIVE This document has been reproduced from the best available copy. Available to DOE and DOE contractors from the Office of Scientific and Technical Information, P.O. Box 62, Oak Ridge,

  20. LWA-0001- Affirming Decision and Order- In the Matter of Ronald Sorri

    Energy.gov [DOE]

    The Complainant, Sandia National Laboratories, and L&M Technologies Inc. have agreed, through their counsels, to the dismissal of L&M Technologies Inc. as a party to this proceeding. As the Secretary's designee for the purpose of reviewing an Initial Agency Decision, pursuant to section 708.11, title 10, Code of Federal Regulations, I have approved the dismissal of L&M Technologies Inc. as a party to this proceeding, and hereby affirm the elements of relief ordered by the Office of Hearings and Appeals.

  1. Developing shape analysis tools to assist complex spatial decision making

    SciTech Connect

    Mackey, H.E.; Ehler, G.B.; Cowen, D.

    1996-05-31

    The objective of this research was to develop and implement a shape identification measure within a geographic information system, specifically one that incorporates analytical modeling for site location planning. The application that was developed incorporated a location model within a raster-based GIS, which helped address critical performance issues for the decision support system. Binary matrices, which approximate the object`s geometrical form, are passed over the grided data structure and allow identification of irregular and regularly shaped objects. Lastly, the issue of shape rotation is addressed and is resolved by constructing unique matrices corresponding to the object`s orientation

  2. News Archive | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    while improving energy efficiency of engines, June 3, 2016 New America: Things of the Internet: Critical Minerals in the Information Age Green Chemistry: The Nexus Blog: The ...

  3. My Account | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    My Account Primary tabs Log in(active tab) Request new password Username * Enter your Critical Materials Institute username. Password * Enter the password that accompanies your ...

  4. Criticality Safety | Department of Energy

    Office of Environmental Management (EM)

    Contact Garrett Smith 301-903-7440 DOE Employee Concerns Program Environment Worker Health & Safety Facility Safety Nuclear Safety Criticality Safety Quality Assurance Risk ...

  5. CMI Webinar: Critical Elements in Phosphate | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Critical Elements in Phosphate The CMI Webinar series began with a presentation on Critical Elements in Phosphate by Patrick Zhang, Florida Industrial and Phosphate Research Institute (FIPR), on March 24, 2015. The recording of the webinar runs nearly 38 minutes (37:54

  6. Record of Decision for Ground Water | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision for Ground Water Record of Decision for Ground Water Record of Decision for Ground Water (April 1997) Record of Decision for Ground Water (625.12 KB) More Documents & Publications EIS-0198: Record of Decision EIS-0170: Record of Decision (April 1997) EIS-0251: Second Record of Decision (May 1997)

  7. CMI Industry Survey | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Yes No Rare earth elements Rare earth elements - Yes Rare earth elements - No Other critical materials Other critical materials - Yes Other critical materials - No Converting rare ...

  8. EIS-0383: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0383: Record of Decision Orlando Gasification Project, Orlando, Orange County, FL Record of Decision for the environmental impact statement (EIS) (DOE...

  9. EIS-0183: Revised Record of Decision | Department of Energy

    Energy Saver

    Revised Record of Decision EIS-0183: Revised Record of Decision Electrical Interconnection ... Revised Record of Decision for the Electrical Interconnection of the SummitWestward ...

  10. EIS-0378: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Record of Decision EIS-0378: Record of Decision Port Angeles-Juan de Fuca Transmssion Project The Department of Energy announces its decision to implement its proposed actions...

  11. EIS-0323: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Decision EIS-0323: Record of Decision Record of Decision for the Sacramento Area Voltage Support Environmental Impact Statement (DOEEIS-0323) (011204) PDF icon Record of...

  12. EIS-0297: Record of Decision | Department of Energy

    Energy Saver

    Record of Decision EIS-0297: Record of Decision Interconnection of the Griffith Power ... Record of Decision for the Interconnection of the Griffith Power Plant With the ...

  13. EIS-0410: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0: Record of Decision EIS-0410: Record of Decision Keystone Oil Pipeline Project Record of Decision for the Western Area Power Administration to modify three existing substation...

  14. EIS-0395: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decision EIS-0395: Record of Decision San Luis Rio Colorado Project PDF icon Record of Decision for the Western Area Power Administration San Luis Rio Colorado Project, DOE...

  15. EIS-0289: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9: Record of Decision EIS-0289: Record of Decision JEA Circulating Fluidized Bed Combustor Project, Jacksonville, Duval County, FL Record of Decision; JEA Circulating Fluidized Bed...

  16. EIS-0229: Amended Record of Decision (April 2002) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decision (April 2002) EIS-0229: Amended Record of Decision (April 2002) Surplus Plutonium Disposition Program Amended Record of Decision: The U.S. Department of Energy's National...

  17. EIS-0247: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0247: Record of Decision Construction and Operation of the Spallation Neutron Source The Department of Energy (DOE) is issuing this Record of Decision (ROD)...

  18. EIS-0474: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0474: Record of Decision Southline Transmission Line Project; Arizona and New Mexico DOE's Western Area Power Administration issued a Record of Decision for ...

  19. Simulation of human decision making

    DOEpatents

    Forsythe, J. Chris; Speed, Ann E.; Jordan, Sabina E.; Xavier, Patrick G.

    2008-05-06

    A method for computer emulation of human decision making defines a plurality of concepts related to a domain and a plurality of situations related to the domain, where each situation is a combination of at least two of the concepts. Each concept and situation is represented in the computer as an oscillator output, and each situation and concept oscillator output is distinguishable from all other oscillator outputs. Information is input to the computer representative of detected concepts, and the computer compares the detected concepts with the stored situations to determine if a situation has occurred.

  20. cognitive-based-decision-making

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    November 29, 2011 From Cognitive-Based Decision Making To Car-Following Modeling: Beyond an Accident-Free Environment Dr. Samer Hamdar Assistant professor, George Washington University Tuesday, November 29, 2011 - 10am Argonne TRACC Building 222, Room D-233 In the year 2005, the monetary cost of injuries related to traffic accidents reached 625 billion USD (U. S. Dollars) in the U.S.A. only. Based on the National Highway Traffic Safety Agency (NHSTA) studies, 5 accident types of interest can be

  1. North Dome decision expected soon

    SciTech Connect

    Not Available

    1981-08-01

    Decisions soon will be made which will set in motion the development of Qatar's huge North Dome gas field. The government and state company, Qatar General Petroleum Corp. (QGPC) is studying the results of 2 feasibility studies on the economics of LNG export, although initially North Dome exploitation will be aimed at the domestic market. Decisions on the nature and timing of the North Dome development are the most important that have had to be faced in the short 10-yr history of the small Gulf state. The country's oil production is currently running at approximately 500,000 bpd, with 270,000 bpd originating from 3 offshore fields. Output is expected to decline through 1990, and it generally is accepted that there is little likelihood of further major crude discoveries. Therefore, Qatar has to begin an adjustment from an economy based on oil to one based on gas, while adhering to the underlying tenets of long-term conservation and industrial diversification.

  2. Microsoft Word - Critical Infrastructure Security and Resilience...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Presidential Proclamation -- Critical Infrastructure Security and Resilience Month, 2013 CRITICAL INFRASTRUCTURE SECURITY AND RESILIENCE MONTH, 2013 - - - - - - - BY THE ...

  3. pocforms06a0399.doc | Department of Energy

    Energy.gov [DOE] (indexed site)

    More Documents & Publications fleetappforms04f1298.doc&0; OPC Security Whitepaper 3Hardening Guidelines for OPC Hosts Critical Decision 2 (CD-2) Approval Template...

  4. Chemical Management (Volume 3 of 3), Approval Memorandum

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    De part m e n t of En erg y memorandum DATE: REPLY T O ATTN OF: SUBJECT: TO: April 5, 2005 EH-52:Dan Marsick:3-3954 APPROVAL OF DEPARTMENT OF ENERGY (DOE) CHEMICAL MANAGEMENT HANDBOOK VOLUME 3 Dennis Kubicki, EH-24 This memorandum forwards the subject DOE technical standard, DOE-HDBK-1139/3-2004 which has been approved for publication and distribution. This standard was reviewed by the Cognizant Secretarial Officer organizations and Operations Offices through a formal coordination process and

  5. Assessing Terrorist Motivations for Attacking Critical "Chemical" Infrastructure

    SciTech Connect

    Ackerman, G; Bale, J; Moran, K

    2004-12-14

    Certain types of infrastructure--critical infrastructure (CI)--play vital roles in underpinning our economy, security, and way of life. One particular type of CI--that relating to chemicals--constitutes both an important element of our nation's infrastructure and a particularly attractive set of potential targets. This is primarily because of the large quantities of toxic industrial chemicals (TICs) it employs in various operations and because of the essential economic functions it serves. This study attempts to minimize some of the ambiguities that presently impede chemical infrastructure threat assessments by providing new insight into the key motivational factors that affect terrorist organizations propensity to attack chemical facilities. Prepared as a companion piece to the Center for Nonproliferation Studies August 2004 study--''Assessing Terrorist Motivations for Attacking Critical Infrastructure''--it investigates three overarching research questions: (1) why do terrorists choose to attack chemical-related infrastructure over other targets; (2) what specific factors influence their target selection decisions concerning chemical facilities; and (3) which, if any, types of groups are most inclined to attack chemical infrastructure targets? The study involved a multi-pronged research design, which made use of four discrete investigative techniques to answer the above questions as comprehensively as possible. These include: (1) a review of terrorism and threat assessment literature to glean expert consensus regarding terrorist interest in targeting chemical facilities; (2) the preparation of case studies to help identify internal group factors and contextual influences that have played a significant role in leading some terrorist groups to attack chemical facilities; (3) an examination of data from the Critical Infrastructure Terrorist Incident Catalog (CrITIC) to further illuminate the nature of terrorist attacks against chemical facilities to date; and (4

  6. FEATURES, EVENTS, AND PROCESSES: SYSTEM-LEVEL AND CRITICALITY

    SciTech Connect

    D.L. McGregor

    2000-12-20

    The primary purpose of this Analysis/Model Report (AMR) is to identify and document the screening analyses for the features, events, and processes (FEPs) that do not easily fit into the existing Process Model Report (PMR) structure. These FEPs include the 3 1 FEPs designated as System-Level Primary FEPs and the 22 FEPs designated as Criticality Primary FEPs. A list of these FEPs is provided in Section 1.1. This AMR (AN-WIS-MD-000019) documents the Screening Decision and Regulatory Basis, Screening Argument, and Total System Performance Assessment (TSPA) Disposition for each of the subject Primary FEPs. This AMR provides screening information and decisions for the TSPA-SR report and provides the same information for incorporation into a project-specific FEPs database. This AMR may also assist reviewers during the licensing-review process.

  7. Facts about the Plutonium Record of Decision | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Facts about the Plutonium Record of Decision Facts about the Plutonium Record of Decision

  8. CRAD, NNSA- Criticality Safety (CS)

    Energy.gov [DOE]

    CRAD for Criticality Safety (CS). Criteria Review and Approach Documents (CRADs) that can be used to conduct a well-organized and thorough assessment of elements of safety and health programs.

  9. Autoclave nuclear criticality safety analysis

    SciTech Connect

    D`Aquila, D.M.; Tayloe, R.W. Jr.

    1991-12-31

    Steam-heated autoclaves are used in gaseous diffusion uranium enrichment plants to heat large cylinders of UF{sub 6}. Nuclear criticality safety for these autoclaves is evaluated. To enhance criticality safety, systems are incorporated into the design of autoclaves to limit the amount of water present. These safety systems also increase the likelihood that any UF{sub 6} inadvertently released from a cylinder into an autoclave is not released to the environment. Up to 140 pounds of water can be held up in large autoclaves. This mass of water is sufficient to support a nuclear criticality when optimally combined with 125 pounds of UF{sub 6} enriched to 5 percent U{sup 235}. However, water in autoclaves is widely dispersed as condensed droplets and vapor, and is extremely unlikely to form a critical configuration with released UF{sub 6}.

  10. Crosswalk of DOE-STD-1104 Bases of Approval | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Crosswalk of DOE-STD-1104 Bases of Approval Crosswalk of DOE-STD-1104 Bases of Approval February 4, 2015 DOE-STD-1104-2009 to DOE-STD-1104-2014 Bases of Approval Crosswalk for Safety Basis Documents. This document provides a crosswalk of Bases of Approval of DOE-STD-1104-2009 by Document / Section and Page # to the Bases of Approval for DOE-STD-1104-2014. Crosswalk of DOE-STD-1104 Bases of Approval (297.29 KB) More Documents & Publications Requirements Crosswalk of DOE-STD-1104-2014

  11. Lecture notes for criticality safety

    SciTech Connect

    Fullwood, R.

    1992-03-01

    These lecture notes for criticality safety are prepared for the training of Department of Energy supervisory, project management, and administrative staff. Technical training and basic mathematics are assumed. The notes are designed for a two-day course, taught by two lecturers. Video tapes may be used at the options of the instructors. The notes provide all the materials that are necessary but outside reading will assist in the fullest understanding. The course begins with a nuclear physics overview. The reader is led from the macroscopic world into the microscopic world of atoms and the elementary particles that constitute atoms. The particles, their masses and sizes and properties associated with radioactive decay and fission are introduced along with Einstein's mass-energy equivalence. Radioactive decay, nuclear reactions, radiation penetration, shielding and health-effects are discussed to understand protection in case of a criticality accident. Fission, the fission products, particles and energy released are presented to appreciate the dangers of criticality. Nuclear cross sections are introduced to understand the effectiveness of slow neutrons to produce fission. Chain reactors are presented as an economy; effective use of the neutrons from fission leads to more fission resulting in a power reactor or a criticality excursion. The six-factor formula is presented for managing the neutron budget. This leads to concepts of material and geometric buckling which are used in simple calculations to assure safety from criticality. Experimental measurements and computer code calculations of criticality are discussed. To emphasize the reality, historical criticality accidents are presented in a table with major ones discussed to provide lessons-learned. Finally, standards, NRC guides and regulations, and DOE orders relating to criticality protection are presented.

  12. invention disclosures | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    invention disclosures CMI Invention Disclosures Success for the Critical Materials Institute will be defined by how well it meets its mission to assure supply chains of materials critical to clean energy technologies. To enable innovation in U.S. manufacturing and to enhance U.S. energy security, CMI must develop, demonstrate, and deploy clean energy technology. To direct research in a way to minimize the time to discovery and the time between discovery and deployment, the CMI team includes both

  13. Facility Approvals, Security Surveys, and Nuclear Materials Surveys

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1992-09-15

    To establish Department of Energy (DOE) requirements for granting facility approvals prior to permitting safeguards and security interests on the premises and the conduct of insite security and/or nuclear material surveys of facilities with safeguards and security interests. Cancels DOE 5634.1A. Canceled by DOE O 470.1 dated 9-28-95.

  14. Facility Approvals, Security Surveys, and Nuclear Materials Surveys

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1988-02-03

    To establish the Department of Energy (DOE) requirements for granting facility approvals prior to permitting safeguards and security interests on the premises and the conduct of on-site security and/or nuclear material surveys of facilities with safeguards and security interests. Cancels DOE O 5630.7 and DOE O 5634.1. Canceled by DOE 5634.1B.

  15. Decision Analysis for EGS | Department of Energy

    Energy.gov [DOE] (indexed site)

    Decision Analysis for EGS presentation at the April 2013 peer review meeting held in Denver, Colorado. decisionegseinsteinpeer2013.pdf (911.67 KB) More Documents & Publications ...

  16. Decision Analysis for EGS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    with development of EGS; Uncertainties associated with operation of EGS. analysiseinsteindecisionanalysis.pdf (2.35 MB) More Documents & Publications Decision Analysis for ...

  17. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Amendment to Record of Decision Spent Nuclear Fuel Management and Idaho National Engineering Laboratory Environmental Restoration and Waste Management Programs March 7,...

  18. Simulation, Modeling & Decision Science | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Research Laboratory focuses on integration of information technologies and cognition into the engineering process to support decision making for and the realization of...

  19. Creating ensembles of decision trees through sampling

    DOEpatents

    Kamath, Chandrika; Cantu-Paz, Erick

    2005-08-30

    A system for decision tree ensembles that includes a module to read the data, a module to sort the data, a module to evaluate a potential split of the data according to some criterion using a random sample of the data, a module to split the data, and a module to combine multiple decision trees in ensembles. The decision tree method is based on statistical sampling techniques and includes the steps of reading the data; sorting the data; evaluating a potential split according to some criterion using a random sample of the data, splitting the data, and combining multiple decision trees in ensembles.

  20. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EIS-0218: Revision to the Record of Decision Proposed Nuclear Weapons Nonproliferation Policy Concerning Foreign Research Reactor Spent Nuclear Fuel July 1, 2000 EIS-0285:...

  1. FDA Approves Drug for Type 2 Diabetes Invented with Aid of Protein...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    FDA Approves Drug for Type 2 Diabetes Invented with Aid of Protein Structure Data Taken at ALS FDA Approves Drug for Type 2 Diabetes Invented with Aid of Protein Structure Data...

  2. SEP Request for Approval Form 1 - Modeling of Data at Finer Intervals...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SEP Request for Approval Form 1 - Modeling of Data at Finer Intervals than Weekly File SEP-Request-for-Approval-Form-1Modeling-of-Data-at-Finer-Intervals-than-Weekly.docx More ...

  3. SEP Request for Approval Form 1 - Modeling of Data at Finer Intervals than

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Weekly | Department of Energy 1 - Modeling of Data at Finer Intervals than Weekly SEP Request for Approval Form 1 - Modeling of Data at Finer Intervals than Weekly SEP-Request-for-Approval-Form-1_Modeling-of-Data-at-Finer-Intervals-than-Weekly.docx (36.88 KB) More Documents & Publications SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment Superior Energy Performance Enrollment and Application Forms SEP Request for Approval Form 5 - Model Does Not Satisfy

  4. SEP Request for Approval Form 2 - Other Derived Energy Sources | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy 2 - Other Derived Energy Sources SEP Request for Approval Form 2 - Other Derived Energy Sources SEP-Request-for-Approval-Form-2_Other-Derived-Energy-Sources.docx (38.18 KB) More Documents & Publications SEP Request for Approval Form 3 - Other Complex Regression Model Rationale Superior Energy Performance Enrollment and Application Forms SEP Request for Approval Form 7 - Other Situations for Consumption Adjustment

  5. SEP Request for Approval Form 3 - Other Complex Regression Model Rationale

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy 3 - Other Complex Regression Model Rationale SEP Request for Approval Form 3 - Other Complex Regression Model Rationale SEP-Request-for-Approval-Form-3_Other-Complex-Regression-Model-Rationale.docx (36.53 KB) More Documents & Publications Superior Energy Performance Enrollment and Application Forms SEP Request for Approval Form 5 - Model Does Not Satisfy 3.4.1-3.4.10 Requirements SEP Request for Approval Form 1 - Modeling of Data at Finer Intervals than Week

  6. WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    as Allowable Weatherization Measures | Department of Energy 0-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures WPN 00-5: Approval of Replacement Refrigerators and Electric Water Heaters as Allowable Weatherization Measures Effective: Oct. 6, 2000 Provides states with the approval to include refrigerator and electric water heater replacements as an allowable measure. WPN 00-5: Approval of Replacement Refrigerators and Electric Water

  7. PRECLOSURE CRITICALITY ANALYSIS PROCESS REPORT

    SciTech Connect

    A.E. Danise

    2004-10-25

    This report describes a process for performing preclosure criticality analyses for a repository at Yucca Mountain, Nevada. These analyses will be performed from the time of receipt of fissile material until permanent closure of the repository (preclosure period). The process describes how criticality safety analyses will be performed for various configurations of waste in or out of waste packages that could occur during preclosure as a result of normal operations or event sequences. The criticality safety analysis considers those event sequences resulting in unanticipated moderation, loss of neutron absorber, geometric changes, or administrative errors in waste form placement (loading) of the waste package. The report proposes a criticality analyses process for preclosure to allow a consistent transition from preclosure to postclosure, thereby possibly reducing potential cost increases and delays in licensing of Yucca Mountain. The proposed approach provides the advantage of using a parallel regulatory framework for evaluation of preclosure and postclosure performance and is consistent with the U.S. Nuclear Regulatory Commission's approach of supporting risk-informed, performance-based regulation for fuel cycle facilities, ''Yucca Mountain Review Plan, Final Report'', and 10 CFR Part 63. The criticality-related criteria for ensuring subcriticality are also described as well as which guidance documents will be utilized. Preclosure operations and facilities have significant similarities to existing facilities and operations currently regulated by the U.S. Nuclear Regulatory Commission; therefore, the design approach for preclosure criticality safety will be dictated by existing regulatory requirements while using a risk-informed approach with burnup credit for in-package operations.

  8. The effects of emotional states and traits on risky decision-making.

    SciTech Connect

    Bernard, Michael Lewis; Smith, Bruce W., 1959-

    2006-12-01

    Understanding the role of emotional states is critical for predicting the kind of decisions people will make in risky situations. Currently, there is little understanding as to how emotion influences decision-making in situations such as terrorist attacks, natural disasters, pandemics, and combat. To help address this, we used behavioral and neuroimaging methods to examine how emotion states and traits influence decisions. Specifically, this study used a wheel of fortune behavioral task and functional magnetic resonance imaging (fMRI) to examine the effects of emotional states and traits on decision-making pertaining to the degree of risk people are willing to make in specific situations. The behavioral results are reported here. The neural data requires additional time to analyze and will be reported at a future date. Biases caused by emotion states and traits were found regarding the likelihood of making risky decisions. The behavioral results will help provide a solid empirical foundation for modeling the effects of emotion on decision in risky situations.

  9. News About CMI | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    About CMI 2016 New CMI Team Members: via Rio Rinto: Rio Tinto partners with Department of Energy's Critical Materials Institute for recovery of critical minerals and metals, October 11, 2016 via Business Wire: Rio Tinto partners with Department of Energy's Critical Materials Institute for recovery of critical minerals and metals, October 11, 2016 via Ames Laboratory: Critical Materials Institute announces multi-faceted research partnership with Rio Tinto to explore recovery of critical minerals

  10. Criticality assessment of LLRWDF closure

    SciTech Connect

    Sarrack, A.G.; Weber, J.H.; Woody, N.D.

    1992-10-06

    During the operation of the Low Level Radioactive Waste Disposal Facility (LLRWDF), large amounts (greater than 100 kg) of enriched uranium (EU) were buried. This EU came primarily from the closing and decontamination of the Naval Fuels Facility in the time period from 1987--1989. Waste Management Operations (WMO) procedures were used to keep the EU boxes separated to prevent possible criticality during normal operation. Closure of the LLRWDF is currently being planned, and waste stabilization by Dynamic Compaction (DC) is proposed. Dynamic compaction will crush the containers in the LLRWDF and result in changes in their geometry. Research of the LLRWDF operations and record keeping practices have shown that the EU contents of trenches are known, but details of the arrangement of the contents cannot be proven. Reviews of the trench contents, combined with analysis of potential critical configurations, revealed that some portions of the LLRWDF can be expected to be free of criticality concerns while other sections have credible probabilities for the assembly of a critical mass, even in the uncompacted configuration. This will have an impact on the closure options and which trenches can be compacted.

  11. Critical Amounts of Uranium Compounds

    DOE R&D Accomplishments

    Konopinski, E.; Metropolis, N.; Teller, E.; Woods, L.

    1943-03-19

    The method of calculation of critical masses of oxides and fluorides of U is given. The geometry assumed is a sphere and the calculations hold only in the absence of hydrogenous materials. Calculations are carried out which are applicable to materials containing form 20 to 100% U{sup 235}. (T.R.H.)

  12. First Responders and Criticality Accidents

    SciTech Connect

    Valerie L. Putman; Douglas M. Minnema

    2005-11-01

    Nuclear criticality accident descriptions typically include, but do not focus on, information useful to first responders. We studied these accidents, noting characteristics to help (1) first responders prepare for such an event and (2) emergency drill planners develop appropriate simulations for training. We also provide recommendations to help people prepare for such events in the future.

  13. Managing Critical Management Improvement Initiatives

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-10-01

    Provides requirements and responsibilities for planning, executing and assessing critical management improvement initiatives within DOE. DOE N 251.59, dated 9/27/2004, extends this Notice until 10/01/2005. Archived 11-8-10. Does not cancel other directives.

  14. High critical current superconducting tapes

    DOEpatents

    Holesinger, Terry G. (Los Alamos, NM); Jia, Quanxi (Los Alamos, NM); Foltyn, Stephen R. (Los Alamos, NM)

    2003-09-23

    Improvements in critical current capacity for superconducting film structures are disclosed and include the use of a superconducting RE-BCO layer including a mixture of rare earth metals, e.g., yttrium and europium, where the ratio of yttrium to europium in the RE-BCO layer ranges from about 3 to 1 to from about 1.5 to 1.

  15. Decontamination of Anthrax spores in critical infrastructure and critical assets.

    SciTech Connect

    Boucher, Raymond M.; Crown, Kevin K.; Tucker, Mark David; Hankins, Matthew Granholm

    2010-05-01

    Decontamination of anthrax spores in critical infrastructure (e.g., subway systems, major airports) and critical assets (e.g., the interior of aircraft) can be challenging because effective decontaminants can damage materials. Current decontamination methods require the use of highly toxic and/or highly corrosive chemical solutions because bacterial spores are very difficult to kill. Bacterial spores such as Bacillus anthracis, the infectious agent of anthrax, are one of the most resistant forms of life and are several orders of magnitude more difficult to kill than their associated vegetative cells. Remediation of facilities and other spaces (e.g., subways, airports, and the interior of aircraft) contaminated with anthrax spores currently requires highly toxic and corrosive chemicals such as chlorine dioxide gas, vapor- phase hydrogen peroxide, or high-strength bleach, typically requiring complex deployment methods. We have developed a non-toxic, non-corrosive decontamination method to kill highly resistant bacterial spores in critical infrastructure and critical assets. A chemical solution that triggers the germination process in bacterial spores and causes those spores to rapidly and completely change to much less-resistant vegetative cells that can be easily killed. Vegetative cells are then exposed to mild chemicals (e.g., low concentrations of hydrogen peroxide, quaternary ammonium compounds, alcohols, aldehydes, etc.) or natural elements (e.g., heat, humidity, ultraviolet light, etc.) for complete and rapid kill. Our process employs a novel germination solution consisting of low-cost, non-toxic and non-corrosive chemicals. We are testing both direct surface application and aerosol delivery of the solutions. A key Homeland Security need is to develop the capability to rapidly recover from an attack utilizing biological warfare agents. This project will provide the capability to rapidly and safely decontaminate critical facilities and assets to return them to

  16. DOE and Critical Materials Video (Text Version)

    Energy.gov [DOE]

    This is a text version of the "DOE and Critical Materials" video presented at the Critical Materials Workshop, held on April 3, 2012 in Arlington, Virginia.

  17. Energy Department Releases New Critical Materials Strategy |...

    Office of Environmental Management (EM)

    Critical Materials Strategy Energy Department Releases New Critical Materials Strategy ... wind turbines, electric vehicles, solar cells and energy-efficient lighting. ...

  18. Nuclear criticality safety: 2-day training course

    SciTech Connect

    Schlesser, J.A.

    1997-02-01

    This compilation of notes is presented as a source reference for the criticality safety course. At the completion of this training course, the attendee will: be able to define terms commonly used in nuclear criticality safety; be able to appreciate the fundamentals of nuclear criticality safety; be able to identify factors which affect nuclear criticality safety; be able to identify examples of criticality controls as used as Los Alamos; be able to identify examples of circumstances present during criticality accidents; have participated in conducting two critical experiments; be asked to complete a critique of the nuclear criticality safety training course.

  19. Critical Materials Workshop Plenary Session Videos | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Critical Materials Workshop Plenary Session Videos Critical Materials Workshop Plenary Session Videos Welcome and Overview of Workshop and Energy Innovation Hubs Speakers * Dr. Leo ...

  20. NQA-1 Commercial Grade Dedication Critical Characteristics |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NQA-1 Commercial Grade Dedication Critical Characteristics NQA-1 Commercial Grade Dedication Critical Characteristics May 5, 2015 Presenter: Randy P. Lanham, PE, CSP, Fire ...

  1. Waste feed delivery environmental permits and approvals plan

    SciTech Connect

    Papp, I.G.

    1998-07-06

    This document describes the range of environmental actions, including required permits and other agency approvals, that may affect waste feed delivery (WFD) activities in the Hanford Site`s Tank Waste Remediation System (TWRS). This plan expands on the summary level information in the Tank Waste Remediation System Environmental Program Plan (HNF 1773) to address requirements that are most pertinent to WFD. This plan outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for WFD to proceed. Appendices at the end of this plan provide preliminary cost and schedule estimates for implementing the selected strategies. The rest of this section summarizes the scope of WFD activities, including important TWRS operating information, and describes in more detail the objectives, structure, and content of this plan.

  2. Rotary mode core sampling approved checklist: 241-TX-113

    SciTech Connect

    Fowler, K.D.

    1998-08-03

    The safety assessment for rotary mode core sampling was developed using certain bounding assumptions, however, those assumptions were not verified for each of the existing or potential flammable gas tanks. Therefore, a Flammable Gas/Rotary Mode Core Sampling Approved Checklist has been completed for tank 241-TX-113 prior to sampling operations. This transmittal documents the dispositions of the checklist items from the safety assessment.

  3. Rotary mode core sampling approved checklist: 241-TX-116

    SciTech Connect

    FOWLER, K.D.

    1999-02-24

    The safety assessment for rotary mode core sampling was developed using certain bounding assumptions, however, those assumptions were not verified for each of the existing or potential flammable gas tanks. Therefore, a Flammable Gas/Rotary Mode Core Sampling Approved Checklist has been completed for tank 241-TX-116 prior to sampling operations. This transmittal documents the dispositions of the checklist items from the safety assessment.

  4. Microsoft Word - Short Form CRADA Agreement Boilerplate Approved June 2014

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    agreement, which is uniform across the Departmental facilities, for small value transactions. Except for minor modifications to the terms of this agreement made by CONTRACTOR, most changes will require approval by the DOE Contracting Officer, WHICH WILL LIKELY DELAY THE START DATE OF THE PROJECT. If substantive changes are required, the DOE Model CRADA may be more appropriate due to the increased flexibility such agreements afford. STEVENSON-WYDLER (15 U.S.C. 3710a) SHORT FORM COOPERATIVE

  5. Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer

    Alternative Fuels and Advanced Vehicles Data Center

    Vehicles E15 Approved for Use in 2001 and Newer Vehicles to someone by E-mail Share Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Facebook Tweet about Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Twitter Bookmark Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Google Bookmark Alternative Fuels Data Center: E15 Approved for Use in 2001 and Newer Vehicles on Delicious Rank Alternative

  6. Attachment I: Approval of Agreement-in-Principal with the State of Alaska |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy I: Approval of Agreement-in-Principal with the State of Alaska Attachment I: Approval of Agreement-in-Principal with the State of Alaska US Department of Energy Memorandum DATE: January 31, 1995 REPLY TO ATTN OF: EM-22 (C. Smoot, 202/586-2352) SUBJECT: Approval of Agreement-in-Principle with the State of Alaska TO: Manager, Nevada Operations Office Thank you for providing the draft Agreement-in-Principle with the State of Alaska for review and approval. I approve the

  7. Summary of Decisions - October 17, 2016 - October 21, 2016 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy 17, 2016 - October 21, 2016 Summary of Decisions - October 17, 2016 - October 21, 2016 October 21, 2016 - 2:25pm Addthis No decisions issued during this week. Addthis Related Articles Summary of Decisions - December 24, 2012 - December 28, 2012 Summary of Decisions - March 2, 2015 - March 6, 2015 Summary of Decisions - March 16, 2015 - March 20, 2015

  8. Summary of Decisions - December 24, 2012 - December 28, 2012 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy December 24, 2012 - December 28, 2012 Summary of Decisions - December 24, 2012 - December 28, 2012 December 28, 2012 - 1:22pm Addthis No decisions were issued during this week. Addthis Related Articles Summary of Decisions - December 31, 2012 - January 4, 2013 Summary of Decisions - March 2, 2015 - March 6, 2015 Summary of Decisions - March 16, 2015 - March 20

  9. Summary of Decisions - December 31, 2012 - January 4, 2013 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy 31, 2012 - January 4, 2013 Summary of Decisions - December 31, 2012 - January 4, 2013 January 4, 2013 - 8:38am Addthis No decisions were issued during this week Addthis Related Articles Summary of Decisions - December 24, 2012 - December 28, 2012 Summary of Decisions - January 5, 2015 - January 9, 2015 Summary of Decisions - March 2, 2015 - March 6

  10. Summary of Decisions - November 2, 2015 - November 6, 2015 | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy November 2, 2015 - November 6, 2015 Summary of Decisions - November 2, 2015 - November 6, 2015 November 6, 2015 - 2:13pm Addthis No decisions were issued during this week. Addthis Related Articles Summary of Decisions - March 2, 2015 - March 6, 2015 Summary of Decisions - March 16, 2015 - March 20, 2015 Summary of Decisions - December 24, 2012 - December 28, 2012

  11. Tank farms pump critical characteristic and specification guide

    SciTech Connect

    Titzler, P.A.

    1997-01-17

    The Design Authority group for Tank Farms, in conjunction with the Construction Projects organization, have recognized that there is a need to provide consistency in the procurement and testing of pumps and to assure that known critical attributes and features are included with each pump order as well as to reduce potential confusion by pump suppliers. As a result, a panel of pump experts representing Lockheed Martin Hanford Company (LMHC), Fluor Daniel Northwest (FDNW), Numatec Hanford Corporation (NHC), SGN Eurisys Services Corporation (SESC), and ARES Corporation has been assembled to prepare a guide for pump specifications. This document contains the consensus listing of critical characteristics and procurement recommendations of the panel. It is intended to be used as a guide for future pump procurement activities. If followed, it will help reduce cleanup costs at the Hanford Site and promote prompt approval of pumping system designs and procurement specifications. Alternate criteria may be specified on a case by case basis if deviation from the requirements contained herein is merited due to special circumstances.

  12. P:\DECISION\0071.tee.wpd

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OHA Exception Decisions issued since July 5, 1995, are available on the OHA website located at http://www.oha.doe.gov. The text of a cited decision may be accessed by entering the case number of the decision in the search engine located at http://www.oha.doe.gov/search.htm. June 11, 2010 DEPARTMENT OF ENERGY OFFICE OF HEARINGS AND APPEALS Application for Exception Name of Case: Monroe Oil Company Date of Filing: May 26, 2010 Case Number: TEE-0071 On May 26, 2010, Monroe Oil Company (Monroe)

  13. Spatio-temporal Visualization for Environmental Decision Support

    SciTech Connect

    Bhaduri, Budhendra L.; Shankar, Mallikarjun; Sorokine, Alexandre; Ganguly, Auroop R.

    2009-01-01

    Traditional visualization of earth surface features has been addressed through visual exploration, analysis, synthesis, and presentation of observable geospatial data. However, characterizing the changes in their observable and unobservable properties of geospatial features is critical for planning and policy formulation. Recent approaches are addressing modeling and visualization of the temporal dynamics that describe observed and/or predicted physical and socioeconomic processes using vast volumes of earth observation (imagery and other geophysical) data from remote sensor networks. This paper provides an overview of selected geospatial modeling and simulation, exploratory analysis of earth observation data, and high performance visualization research at Oak Ridge National Laboratory for developing novel data driven approaches for geospatial knowledge discovery and visualization relevant to environmental decision support.

  14. AGING FACILITY CRITICALITY SAFETY CALCULATIONS

    SciTech Connect

    C.E. Sanders

    2004-09-10

    The purpose of this design calculation is to revise and update the previous criticality calculation for the Aging Facility (documented in BSC 2004a). This design calculation will also demonstrate and ensure that the storage and aging operations to be performed in the Aging Facility meet the criticality safety design criteria in the ''Project Design Criteria Document'' (Doraswamy 2004, Section 4.9.2.2), and the functional nuclear criticality safety requirement described in the ''SNF Aging System Description Document'' (BSC [Bechtel SAIC Company] 2004f, p. 3-12). The scope of this design calculation covers the systems and processes for aging commercial spent nuclear fuel (SNF) and staging Department of Energy (DOE) SNF/High-Level Waste (HLW) prior to its placement in the final waste package (WP) (BSC 2004f, p. 1-1). Aging commercial SNF is a thermal management strategy, while staging DOE SNF/HLW will make loading of WPs more efficient (note that aging DOE SNF/HLW is not needed since these wastes are not expected to exceed the thermal limits form emplacement) (BSC 2004f, p. 1-2). The description of the changes in this revised document is as follows: (1) Include DOE SNF/HLW in addition to commercial SNF per the current ''SNF Aging System Description Document'' (BSC 2004f). (2) Update the evaluation of Category 1 and 2 event sequences for the Aging Facility as identified in the ''Categorization of Event Sequences for License Application'' (BSC 2004c, Section 7). (3) Further evaluate the design and criticality controls required for a storage/aging cask, referred to as MGR Site-specific Cask (MSC), to accommodate commercial fuel outside the content specification in the Certificate of Compliance for the existing NRC-certified storage casks. In addition, evaluate the design required for the MSC that will accommodate DOE SNF/HLW. This design calculation will achieve the objective of providing the criticality safety results to support the preliminary design of the Aging

  15. ISA Approves Standard for Wireless Automation in Process Control...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards DOEOE National SCADA Test Bed Fiscal Year 2009 Work Plan Control Systems ...

  16. Latest News | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    News News releases CMI in the news News archive CMI social media Latest News News about CMI: The Economist: Magnetic moments: 3D printers promise better, cheaper and more powerful magnets, Nov. 19, 2016 Big Area Additive Manufacturing: original from ORNL, via EurekAlert!, phys.org, UPI, Science Daily, 3d printing; Nextbigfuture; tctmagazine; engineering.com, Plastics Today New CMI Team Members: via Rio Rinto: Rio Tinto partners with Department of Energy's Critical Materials Institute for

  17. Los Alamos Critical Assemblies Facility

    SciTech Connect

    Malenfant, R.E.

    1981-06-01

    The Critical Assemblies Facility of the Los Alamos National Laboratory has been in existence for thirty-five years. In that period, many thousands of measurements have been made on assemblies of /sup 235/U, /sup 233/U, and /sup 239/Pu in various configurations, including the nitrate, sulfate, fluoride, carbide, and oxide chemical compositions and the solid, liquid, and gaseous states. The present complex of eleven operating machines is described, and typical applications are presented.

  18. News Releases | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Releases CMI taps the power of supercomputing to find rare-earth refining alternatives, June 20, 2016 Mr. Rare Earth, Karl Gschneidner passes away on April 27, April 29, 2016 Ames Laboratory scientist inducted into National Academy of Inventors, April 15, 2016 Critical Materials Institute gains ten industrial and research affiliates, April 11, 2016 How true is conventional wisdom about price volatility of tech metals?, Feb. 11, 2016 Ames Laboratory scientist named to National Academy of

  19. Decisions that led to Y-12

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Decisions that led to Y-12 Last week we saw the political and organizational changes that led up to the Manhattan Project being created on August 13, 1942. The S-1 Executive ...

  20. Final decisions that led to Y-12

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    decisions that led to Y-12 As we have seen earlier in this series, Ernest O. Lawrence and ... By late 1942, progress on the reactor technology being led by Enrico Fermi at the ...

  1. 5(b)/9(c) Record of Decision

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    of the limit. See NRP080005, at 2-3. Evaluation and Decision: BPA acknowledges that a literal reading of the calculation method referenced in Seattle et al.'s comment is...

  2. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    April 8, 1988 EIS-0113: Record of Decision Disposal of Hanford Defense High-Level, Transuranic, and Tank Wastes, Hanford Site, Richland, Washington May 14, 1981 EIS-0046: Record of...

  3. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Revised by State September 25, 2009 EIS-0399: Record of Decision (WAPA) Montana Alberta Tie Ltd. 230-kV Transmission Line Project September 15, 2009 EIS-0312: Record of...

  4. Record of Decision (ROD) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management December 13, 1996 EIS-0243: Record of Decision (December 1996) Environmental Impact Statement for the Nevada Test Site and Off-Site Locations in the State of Nevada...

  5. Critical Materials Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Critical Materials Workshop Critical Materials Workshop critical_materials_workshop_presentations.pdf (6.76 MB) More Documents & Publications Critical Materials Workshop EV Everywhere Workshop: Traction Drive Systems Breakout Group Report Advanced Power Electronics and Electric Motors (APEEM) R&D Program Overview

  6. EIS-0377: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0377: Record of Decision Big Stone II Power Plant and Transmission Project Department of Energy announces its record of decision for the Big Stone II Power...

  7. EIS-0217: Supplemental Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management EIS-0217-ROD-1997.pdf (19.24 KB) More Documents & Publications EIS-0217: Supplemental Record of Decision EIS-0217: Record of Decision EIS-0217: Amended Record of Decision

  8. EIS-0275: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5: Record of Decision EIS-0275: Record of Decision Disposal of the S1C Prototype Reactor Plant This Record of Decision has been prepared on the proposed disposal of the defueled...

  9. Property:NEPA Decision Url | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Decision Url Jump to: navigation, search Property Name NEPA Decision Url Property Type URL Description URLs to decisions on NEPA Docs This is a property of type URL. Retrieved from...

  10. Geospatial Decision Making System - Energy Innovation Portal

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Biomass and Biofuels Biomass and Biofuels Find More Like This Return to Search Geospatial Decision Making System Idaho National Laboratory Contact INL About This Technology Technology Marketing Summary The INL has developed a geospatial decision making process to assist agricultural producers in optimizing operating conditions of combine harvesters which detects the presence of grain and distinguishes between that and residual plant material. Upon detecting grain in the process, the system sends

  11. Climate modeling with decision makers in mind

    DOE PAGES [OSTI]

    Jones, Andrew; Calvin, Katherine; Lamarque, Jean -Francois

    2016-04-27

    The need for regional- and local-scale climate information is increasing rapidly as decision makers seek to anticipate and manage a variety of context-specific climate risks over the next several decades. Furthermore, global climate models are not developed with these user needs in mind, and they typically operate at resolutions that are too coarse to provide information that could be used to support regional and local decisions.

  12. Parallel object-oriented decision tree system

    DOEpatents

    Kamath; Chandrika , Cantu-Paz; Erick

    2006-02-28

    A data mining decision tree system that uncovers patterns, associations, anomalies, and other statistically significant structures in data by reading and displaying data files, extracting relevant features for each of the objects, and using a method of recognizing patterns among the objects based upon object features through a decision tree that reads the data, sorts the data if necessary, determines the best manner to split the data into subsets according to some criterion, and splits the data.

  13. Data Decision Analysis: Project Shoal

    SciTech Connect

    Forsgren, Frank; Pohll, Greg; Tracy, John

    1999-01-01

    The purpose of this study was to determine the most appropriate field activities in terms of reducing the uncertainty in the groundwater flow and transport model at the Project Shoal area. The data decision analysis relied on well-known tools of statistics and uncertainty analysis. This procedure identified nine parameters that were deemed uncertain. These included effective porosity, hydraulic head, surface recharge, hydraulic conductivity, fracture correlation scale, fracture orientation, dip angle, dissolution rate of radionuclides from the puddle glass, and the retardation coefficient, which describes the sorption characteristics. The parameter uncertainty was described by assigning prior distributions for each of these parameters. Next, the various field activities were identified that would provide additional information on these parameters. Each of the field activities was evaluated by an expert panel to estimate posterior distribution of the parameters assuming a field activity was performed. The posterior distributions describe the ability of the field activity to estimate the true value of the nine parameters. Monte Carlo techniques were used to determine the current uncertainty, the reduction of uncertainty if a single parameter was known with certainty, and the reduction of uncertainty expected from each field activity on the model predictions. The mean breakthrough time to the downgradient land withdrawal boundary and the peak concentration at the control boundary were used to evaluate the uncertainty reduction. The radionuclide 137Cs was used as the reference solute, as its migration is dependent on all of the parameters. The results indicate that the current uncertainty of the model yields a 95 percent confidence interval between 42 and 1,412 years for the mean breakthrough time and an 18 order-of-magnitude range in peak concentration. The uncertainty in effective porosity and recharge dominates the uncertainty in the model predictions, while the

  14. Critical Materials Hub | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities » Critical Materials Hub Critical Materials Hub Green light reflection from a low-oxygen environment 3D printer laser deposition of metal powder alloys. Photo courtesy of The Critical Materials Institute, Ames Laboratory Green light reflection from a low-oxygen environment 3D printer laser deposition of metal powder alloys. Photo courtesy of The Critical Materials Institute, Ames Laboratory Critical materials, including some rare earth elements that possess unique magnetic,

  15. Critical Materials Workshop | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Workshops » Critical Materials Workshop Critical Materials Workshop April 3, 2012 AMO hosted a public workshop on Tuesday, April 3, 2012 in Arlington, VA to provide background information on critical materials assessment, the current research within DOE related to critical materials, and the foundational aspects of Energy Innovation Hubs. Additionally, the workshop solicited input from the critical materials community on R&D gaps that could be addressed by DOE. Questions or suggestions may

  16. Directory of certificiates of compliance for radioactive materials packages: Report of NRC approved packages. Revision 19, Volume 1

    SciTech Connect

    1996-10-01

    This directory provides information on packagings approved by the U.S. Nuclear Regulatory Commission.

  17. Memorandum, Approval of a Permanent Variance Regarding Static Magnetic Fields at Brookhaven National Laboratory (Variance 102 1)

    Energy.gov [DOE]

    Approval of a Permanenet Variance Regarding Static Magnetic Fields at Brookhaven National Laboratory (Variance 1021)

  18. DOE Defends Decision to Revoke Energy Star Designation for Certain...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decision to Revoke Energy Star Designation for Certain LG Refrigerators DOE Defends Decision to Revoke Energy Star Designation for Certain LG Refrigerators December 23, 2009 -...

  19. EIS-0374: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0374: Record of Decision Klondike III Biglow Canyon Wind Integration Project The Bonneville Power Administration (BPA) has decided to implement the Proposed...

  20. EIS-0427: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7: Record of Decision EIS-0427: Record of Decision Interconnection of the Grapevine Canyon Wind Project, Coconino County, Arizona Western Area Power Administration (Western)...

  1. Proposed Procedures for Liquefied Natural Gas Export Decisions...

    Office of Environmental Management (EM)

    Proposed Procedures for Liquefied Natural Gas Export Decisions Proposed Procedures for Liquefied Natural Gas Export Decisions On August 15, 2014, the Department of Energy's (DOE) ...

  2. Decision Support for Operations and Maintenance (DSOM) - Energy...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Decision Support for Operations and Maintenance (DSOM) Pacific Northwest National ... The Decision Support for Operations and Maintenance (DSOM) system is an expert ...

  3. EIS-0312: Record of Decision (2012) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Bonneville Power Administration Administrator's Record of Decision: Columbia Basin Fish Accords Memorandum of Agreement (MOA) with the Kalispel Tribe This Record of Decision...

  4. EIS-0397: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0397: Record of Decision Lyle Falls Fish Passage Project The Bonneville Power Administration (BPA) has decided to fund modifications to the existing Lyle...

  5. Materials Down Select Decisions Made Within DOE's Chemical Hydrogen...

    Energy Saver

    Materials Down Select Decisions Made Within DOE's Chemical Hydrogen Storage Center of Excellence Materials Down Select Decisions Made Within DOE's Chemical Hydrogen Storage Center ...

  6. Summary of Decisions - January 5, 2015 - January 9, 2015 | Department...

    Energy.gov [DOE] (indexed site)

    the noted period. Addthis Related Articles Summary of Decisions - January 13, 2014 - January 17, 2014 Summary of Decisions - May 12, 2014 - May 16, 2014...

  7. EIS-0454: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0454: Record of Decision Tonopah Solar Energy, LLC, Crescent Dunes Solar Energy Project (September 2011) For more information, contact: Ms. Angela Colamaria,...

  8. Record of Decision for the Uranium Leasing Program Programmatic...

    Office of Environmental Management (EM)

    Record of Decision for the Uranium Leasing Program Programmatic Environmental Impact Statement Record of Decision for the Uranium Leasing Program Programmatic Environmental Impact ...

  9. EIS-0421: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decision EIS-0421: Record of Decision Big Eddy-Knight Transmission Project Wasco County, Oregon and Klickitat County, Washington For more information contact: Ms. Stacy Mason,...

  10. EIS-0325: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0325: Record of Decision Schultz-Hanford Area Transmission Line Project Bonneville Power Administration has decided to implement the Agency Preferred...

  11. EIS-0255: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Decision EIS-0255: Record of Decision Execution of Agreements to Install Additional Wind Turbines at the Wyoming Windpower Plant BPA has decided to execute one or more...

  12. EIS-0413: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3: Record of Decision EIS-0413: Record of Decision Searchlight Wind Energy Project, Searchlight, NV After considering potential environmental impacts, Western Area Power ...

  13. EIS-0345: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0345: Record of Decision Electrical Interconnection of the Plymouth Generating Facility The Bonneville Power Administration (BPA) has decided to implement...

  14. DOE Secretarial Memorandum on Improved Decision Making through...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Memorandum on Improved Decision Making through the Integration of Program and Project ... DOE Secretarial Memorandum on Improved Decision Making through the Integration of Program ...

  15. EIS-0319: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0319: Record of Decision Relocation of Technical Area 18 Capabilities and Materials at the Los Alamos National Laboratory The Department of Energy's (DOE's)...

  16. EIS-0197: Record of Decision (November 1996) | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision (November 1996) EIS-0197: Record of Decision (November 1996) Delivery of the Canadian Entitlement The United States Entity (the Administrator of the Bonneville...

  17. EIS-0372: Record of Decision and Floodplain Statement of Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision and Floodplain Statement of Findings EIS-0372: Record of Decision and Floodplain Statement of Findings Bangor Hydro-Electric Company Northeast Reliability...

  18. EIS-0119: Amended Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Amended Record of Decision EIS-0119: Amended Record of Decision Decommissioning of Eight Surplus Production Reactors at the Hanford Site, Richland, Washington DOE has decided to...

  19. EIS-0246: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Record of Decision EIS-0246: Record of Decision Wildlife Mitigation Program BPA has decided to adopt the set of prescriptions (goals, strategies, and procedural requirements)...

  20. EIS-0456: Record of Decision and Floodplain Statement of Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision and Floodplain Statement of Findings EIS-0456: Record of Decision and Floodplain Statement of Findings Cushman Hydroelectric Project, Mason County, Washington...

  1. EIS-0230: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    30: Record of Decision EIS-0230: Record of Decision Electrical Interconnection of the Chehalis Generation Facility Bonneville Power Administration (BPA) has decided to offer...

  2. EIS-0343: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0343: Record of Decision Electrical Interconnection of the COB Energy Facility The Bonneville Power Administration (BPA) has decided to offer contract terms...

  3. EIS-0198: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8: Record of Decision EIS-0198: Record of Decision Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project (April 1997) The Department of Energy (DOE) is issuing this...

  4. EIS-0330: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0330: Record of Decision Wallula-McNary Transmission Line Project and Wallula Power Project The Bonneville Power Administration (BPA) has decided to...

  5. EIS-0349: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    49: Record of Decision EIS-0349: Record of Decision Electrical Interconnection of the BP Cherry Point Cogeneration Project The Bonneville Power Administration (Bonneville) has...

  6. EIS-0240: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Record of Decision EIS-0240: Record of Decision Disposition of Surplus Highly Envirched Uranium The Department of Energy (DOE) has decided to implement a program to make surplus...

  7. EIS-0183: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in the wholesale power market. PDF icon DOEEIS-0183, Administrator's Record of Decision, Bonneville Power Administration, GNA Cliffs Energy Project, Record of Decision...

  8. EIS-0197: Supplement to Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supplement to Record of Decision EIS-0197: Supplement to Record of Decision Delivery of the Canadian Entitlement The United States Entity has decided to supplement an earlier...

  9. EIS-0225: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Record of Decision EIS-0225: Record of Decision Continued Operation of the Pantex Plant and Associated Storage of Nuclear Weapon Components The Department of Energy is issuing...

  10. EIS-0440: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0: Record of Decision EIS-0440: Record of Decision Quartzsite Solar Energy Project, La Paz County, AZ After considering potential environmental impacts, Western Area Power ...

  11. EIS-0161: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Decision Tritium Supply and Recycling The Department of Energy (DOE) is issuing this Record of Decision regarding DOE's proposal for Tritium Supply and Recycling Facilities. ...

  12. Plutonium Record of Decision Statement from NNSA Adminstrator Frank Klotz |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Plutonium Record of Decision Statement from NNSA Adminstrator Frank Klotz Plutonium Record of Decision Statement from NNSA Administrator Frank G. Klotz

  13. EIS-0266: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6: Record of Decision EIS-0266: Record of Decision Fourmile Hill Geothermal Development Project Power Purchase and Transmission Service Agreements The Bonneville Power...

  14. EIS-0332: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0332: Record of Decision McNary-John Day Transmission Line Project Bonneville Power Administration has decided to implement the proposed action identified in...

  15. Reduction of Transient Particulate Matter Spikes with Decision...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reduction of Transient Particulate Matter Spikes with Decision Tree Based Control Using a non-parametric decision tree to measure transient PM could correctly identify 94% of high ...

  16. Spectrum Sciences Decision and Data Handling Issues | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Spectrum Sciences Decision and Data Handling Issues Spectrum Sciences Decision and Data Handling Issues PDF icon spectrum sciences softwarebreaches.pdf PDF icon Park ...

  17. EIS-0217: Amended Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Amended Record of Decision EIS-0217: Amended Record of Decision Savannah River Site Waste Management, Savannah River Operations Office, Aiken, South Carolina This Record of ...

  18. Record of Decision; Defense Waste Processing Facility at the...

    Office of Environmental Management (EM)

    Record of Decision; Defense Waste Processing Facility at the Savannah River Site, Aiken, SC AGENCY: Department of Energy, DOE. ACTION: Record of Decision, Defense Waste Processing ...

  19. Decision insight into stakeholder conflict for ERN.

    SciTech Connect

    Siirola, John; Tidwell, Vincent Carroll; Benz, Zachary O.; Stansbury, Melanie; Richards, Elizabeth H.; Turnley, Jessica Glicken; Warrender, Christina E.; Morrow, James Dan

    2012-02-01

    Participatory modeling has become an important tool in facilitating resource decision making and dispute resolution. Approaches to modeling that are commonly used in this context often do not adequately account for important human factors. Current techniques provide insights into how certain human activities and variables affect resource outcomes; however, they do not directly simulate the complex variables that shape how, why, and under what conditions different human agents behave in ways that affect resources and human interactions related to them. Current approaches also do not adequately reveal how the effects of individual decisions scale up to have systemic level effects in complex resource systems. This lack of integration prevents the development of more robust models to support decision making and dispute resolution processes. Development of integrated tools is further hampered by the fact that collection of primary data for decision-making modeling is costly and time consuming. This project seeks to develop a new approach to resource modeling that incorporates both technical and behavioral modeling techniques into a single decision-making architecture. The modeling platform is enhanced by use of traditional and advanced processes and tools for expedited data capture. Specific objectives of the project are: (1) Develop a proof of concept for a new technical approach to resource modeling that combines the computational techniques of system dynamics and agent based modeling, (2) Develop an iterative, participatory modeling process supported with traditional and advance data capture techniques that may be utilized to facilitate decision making, dispute resolution, and collaborative learning processes, and (3) Examine potential applications of this technology and process. The development of this decision support architecture included both the engineering of the technology and the development of a participatory method to build and apply the technology

  20. Plutonium-238 Transuranic Waste Decision Analysis

    SciTech Connect

    Brown, Mike; Lechel, David J.; Leigh, C.D.

    1999-06-29

    Five transuranic (TRU) waste sites in the Department of Energy (DOE) complex, collectively, have more than 2,100 cubic meters of Plutonium-238 (Pu-238) TRU waste that exceed the wattage restrictions of the Transuranic Package Transporter-II (TRUPACT-11). The Waste Isolation Pilot Plant (WIPP) is being developed by the DOE as a repository for TRU waste. With the Waste Isolation Pilot Plant (WIPP) opening in 1999, these sites are faced with a need to develop waste management practices that will enable the transportation of Pu-238 TRU waste to WIPP for disposal. This paper describes a decision analysis that provided a logical framework for addressing the Pu-238 TRU waste issue. The insights that can be gained by performing a formalized decision analysis are multifold. First and foremost, the very process. of formulating a decision tree forces the decision maker into structured, logical thinking where alternatives can be evaluated one against the other using a uniform set of criteria. In the process of developing the decision tree for transportation of Pu-238 TRU waste, several alternatives were eliminated and the logical order for decision making was discovered. Moreover, the key areas of uncertainty for proposed alternatives were identified and quantified. The decision analysis showed that the DOE can employ a combination approach where they will (1) use headspace gas analyses to show that a fraction of the Pu-238 TRU waste drums are no longer generating hydrogen gas and can be shipped to WIPP ''as-is'', (2) use drums and bags with advanced filter systems to repackage Pu-238 TRU waste drums that are still generating hydrogen, and (3) add hydrogen getter materials to the inner containment vessel of the TRUPACT-11to relieve the build-up of hydrogen gas during transportation of the Pu-238 TRU waste drums.

  1. Critical Materials Institute Affiliates Program

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    4 Critical Materials Institute Affiliates Program MEMBER AGREEMENT ("Agreement") WHEREAS, The Ames Laboratory ("AMES"), a U.S. Department of Energy ("DOE") National Laboratory operated by Iowa State University of Science and Technology ("ISU") under the authority of its Contract DE-AC02-07CH11358, with administrative offices at 311 TASF, 2408 Pammel Dr,. Ames, IA 50011-1015, is the recipient of funding from the U.S. Department of Energy's Office of Energy

  2. OMB Approval No. 0348-0041 BUDGET INFORMATION - Construction Programs

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OMB Approval No. 0348-0041 BUDGET INFORMATION - Construction Programs NOTE: Certain Federal assistance programs require additional computations to arrive at the Federal share of project costs eligible for participation. If such is the case, you will be notified. COST CLASSIFICATION a. Total Cost b. Costs Not Allowable for Participation c. Total Allowable Costs (Columns a-b) 1 Administrative and legal expenses $0.00 $0.00 $0.00 2 Land, structures, rights-of-way, appraisals, etc. $0.00 $0.00

  3. Critical_Materials_Summary.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CriticalMaterialsSummary.pdf CriticalMaterialsSummary.pdf PDF icon CriticalMaterialsSummary.pdf More Documents & Publications RFI U.S. Department of Energy - Critical...

  4. Applying a life cycle decision methodology to Fernald waste management alternatives

    SciTech Connect

    Yuracko, K.L.; Gresalfi, M.; Yerace, P.

    1996-07-01

    During the past five years, a number of U.S. Department of Energy (DOE) funded efforts have demonstrated the technical efficacy of converting various forms of radioactive scrap metal (RSM) into useable products. From the development of large accelerator shielding blocks, to the construction of low-level waste containers, technology has been applied to this fabrication process in a safe and stakeholder supported manner. The potential health and safety risks to both workers and the public have been addressed. The question remains: can products be fabricated from RSM in a cost efficient and market competitive manner? This paper presents a methodology for use within DOE to evaluate the costs and benefits of recycling and reusing some RSM, rather than disposing of this RSM in an approved burial site. This life cycle decision methodology, developed by both the Oak Ridge National Laboratory (ORNL) and DOE Fernald, is the focus of the following analysis.

  5. A Multiple Objective Decision Support Tool (MODS)

    Energy Science and Technology Software Center

    2003-12-14

    The Multiple Objective Decision Support (MODS) tool is an automated tool used to assist decision makers and policy analysts with multiple-objective decision problems. The classes of problems that this decision support tool addresses have both multiple objectives and multiple stakeholders. Decision problems, which have multiple objectives that in general cannot be maximized simultaneously, and multiple stakeholders, who have different perspectives about the relative importance of the objectives, require analytic approaches and tools that can providemore » flexible support to decision makers. This tool provides capabilities for the management, analysis, and graphical display for these types of decision problems drawn from diverse problem domains. The MODS tool is a unique integration of analysis algorithms, an information database, and a graphical user interface. This collection of algorithms, the combination of an information database with the analysis into a single tool, and the graphical user interface provides a technically advanced tool to decision makers and policy analysts. There are two main issues when addressing problems of this type: what set of attributes should be used to characterize the tokens in the domain of interest, and how should the values of these attributes and their weights be determined and combined to provide a relative ordering to the tokens. This tool addresses both of these issues. This decision support tool provides a flexible way to derive and use a chosen set of attributes. For example, the tool could be used to first perform a paired comparison of a large set of attributes and from this evaluation select those attributes that have the highest weights. The flexibility of the tool allows experimentation with various attribute sets and this capability, along with domain expertise, addresses the first issue. To address the second issue, several algorithms have been implemented. For example, two algorithms that have been implemented are

  6. Accelerator driven sub-critical core

    SciTech Connect

    McIntyre, Peter M; Sattarov, Akhdiyor

    2015-03-17

    Systems and methods for operating an accelerator driven sub-critical core. In one embodiment, a fission power generator includes a sub-critical core and a plurality of proton beam generators. Each of the proton beam generators is configured to concurrently provide a proton beam into a different area of the sub-critical core. Each proton beam scatters neutrons within the sub-critical core. The plurality of proton beam generators provides aggregate power to the sub-critical core, via the proton beams, to scatter neutrons sufficient to initiate fission in the sub-critical core.

  7. IMO group approves enhanced design rules for tankers

    SciTech Connect

    Not Available

    1992-04-06

    This paper reports on a committee of the International Maritime Organization (IMO) which has approved ship design rules aimed at reducing the risk of oil spills from tankers. The approval by IMO's maritime environment protection committee (MEPC) assures that the next generation of tankers will have double hulls or, despite reservations by the U.S., middeck or other designs that offer protection against pollution equal to that provided by double hulls. The requirement for double hull or middeck design will apply to tankers larger than 5,000 dwt. Small tankers, of 600-5,000 dwt, must be fitted with a double bottom. There are no requirements for tankers of less than 600 dwt. The enhanced design criteria will take effect July 6, 1993, for new and existing vessels from 70 nations that have signed the International Convention for the Prevention of Pollution from Ships (Marpol 73/78). Owners in those countries control 90% of the world tanker fleet. MEPC also tackled the problem of existing single hulled vessels. They will be able to trade until they are 25-30 years old before they will be required to meet the enhanced design criteria.

  8. CD-3, Approve Start of Construction/Execution | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3, Approve Start of Construction/Execution CD-3, Approve Start of Construction/Execution CD-3, Approve Start of Construction/Execution << Resource Center | CD-4 >> DescriptionCD-3 is a continuation of the execution phase. The project is ready to complete all construction, implementation, procurement, fabrication, acceptance and turnover activities. Table 2.3 lists the requirements needed to attain CD-3. Subject Requirements Prior to CD-3 References Templates Examples Updated CD-2

  9. DOE's Jefferson Lab Receives Approval To Start Construction of $310 Million

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Upgrade | Jefferson Lab DOE's Jefferson Lab Receives Approval To Start Construction of $310 Million Upgrade DOE's Jefferson Lab Receives Approval To Start Construction of $310 Million Upgrade NEWPORT NEWS, Va., Sept. 15, 2008 - The U.S. Department of Energy's Thomas Jefferson National Accelerator Facility (Jefferson Lab) today received approval from DOE to begin construction on a $310 million project that will provide physicists worldwide with an unprecedented ability to study the basic

  10. Summary of Decisions- April 7, 2014 – April 11, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  11. Summary of Decisions- December 23, 2013 – December 27, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  12. Summary of Decisions- December 16, 2013 – December 20, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  13. Summary of Decisions- October 27, 2014 – October 31, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  14. Summary of Decisions- July 29, 2013- August 2, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Whistleblower Appeal (10 CFR Part 708)

  15. Summary of Decisions- July 18, 2016 – July 22, 2016

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  16. Summary of Decisions- February 23, 2015 – February 27, 2015

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  17. Summary of Decisions- September 30, 2013 – October 4, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Whistleblower Appeal (10 CFR Part 708)

  18. Summary of Decisions- December 9, 2013 – December 13, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  19. Summary of Decisions- December 2, 2013 – December 6, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  20. Summary of Decisions- October 8, 2012 – October 12, 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  1. Summary of Decisions- October 21, 2013 – October 25, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  2. Summary of Decisions- February 9, 2015 – February 13, 2015

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  3. Summary of Decisions- January 20, 2014 – January 24, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  4. Summary of Decisions- February 25, 2013 – March 1, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  5. Summary of Decisions- May 20, 2013 – May 24, 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  6. Summary of Decisions- August 5, 2013- August 9, 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Whistleblower Appeal (10 CFR Part 708)

  7. Summary of Decisions- March 14, 2016 – March 18, 2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  8. Summary of Decisions- February 29, 2016 – March 4, 2016

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  9. Summary of Decisions- August 12, 2013- August 16, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  10. Summary of Decisions- June 10, 2013- June 14, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  11. Summary of Decisions- September 9, 2013 – September 13, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  12. Summary of Decisions- July 15, 2013- July 19, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  13. Summary of Decisions- July 30 – August 3, 2012

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  14. Summary of Decisions- March 10, 2014 – March 14, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  15. Summary of Decisions- July 14, 2014 – July 18, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  16. Summary of Decisions- July 21, 2014 – July 25, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  17. Summary of Decisions- April 1, 2013 – April 5, 2013

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  18. Summary of Decisions- January 21, 2013 – January 25, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  19. Summary of Decisions- June 8, 2015 – June 12, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  20. Summary of Decisions- December 21, 2015 – December 25, 2015

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  1. Summary of Decisions- November 16, 2015 – November 20, 2015

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  2. Summary of Decisions- August 17, 2015 – August 21, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  3. Summary of Decisions- November 30, 2015 – December 4, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  4. Summary of Decisions- November 9, 2015 – November 13, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  5. Summary of Decisions- August 3, 2015 – August 7, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  6. Summary of Decisions- March 23, 2015 – March 27, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  7. Summary of Decisions- August 26, 2013- August 30, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  8. Summary of Decisions- September 21, 2015 – September 25, 2015

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  9. Summary of Decisions- November 18, 2013 – November 22, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Whistleblower Appeal (10 CFR Part 708)

  10. Summary of Decisions- September 24, 2012 – September 28, 2012

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  11. Summary of Decisions- December 10, 2012 – December 14, 2012

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  12. Summary of Decisions- March 3, 2014 – March 7, 2014

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  13. Summary of Decisions- November 24, 2014 – November 28, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  14. Summary of Decisions- August 13 – August 17, 2012

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  15. Summary of Decisions- June 23, 2014 – June 27, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Whistleblower Appeal (10 CFR Part 708)

  16. Summary of Decisions- September 14, 2015 – September 18, 2015

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  17. Summary of Decisions- June 16, 2014 – June 20, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  18. Summary of Decisions- April 14, 2014 – April 18, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  19. Summary of Decisions- September 16, 2013 – September 20, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Whistleblower Appeal (10 CFR Part 708)

  20. Summary of Decisions- August 19, 2013- August 23, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  1. Summary of Decisions- April 29, 2013 – May 3, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  2. Summary of Decisions- November 17, 2014 – November 21, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal

  3. Summary of Decisions- September 3- September 7, 2012

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710)

  4. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for an Extension of the ICR for OE Recovery Act Financial ...

  5. Notice of Office of Management and Budget Action to Approve with...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Office of Management and Budget Action to Approve with Change the Information Collection Request (ICR) for a New Collection for OE Recovery Act Financial Assistance ...

  6. National Policy Memorandum NPM-TRUS-29: Guidance for the Approval...

    OpenEI (Open Energy Information) [EERE & EIA]

    for the Approval of Tribal Leasing Regulations under the HEARTH ActLegal Author Bureau of Indian Affairs Organizations Bureau of Land Management and Bureau of Indian Affairs...

  7. WPN 04-3: DOE-Approved Energy Audits for the Weatherization Assistance Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    To inform the network which states have had their energy audit procedures and priority lists re-approved by DOE as required every five years.

  8. WPN 03-4: DOE-Approved Energy Audits for the Weatherization Assistance Program

    Office of Energy Efficiency and Renewable Energy (EERE)

    To inform the network which states have had their energy audit procedures and priority lists re-approved by DOE as required every five years.

  9. NNSA Approves Restart of Buidling 9206 at Y-12 | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration | (NNSA) Approves Restart of Buidling 9206 at Y-12 April 10, 2002 PDF icon 4-9-20

  10. Y-12 Final Site-Wide Environmental Impact Statement Approved | National

    National Nuclear Security Administration (NNSA)

    Nuclear Security Administration | (NNSA) Final Site-Wide Environmental Impact Statement Approved March 02, 2011 Microsoft Office document icon NR-03-2

  11. WPN 97-6: Approval of Wet-Spray Cellulose Insulation as an Allowable Weatherization Material

    Energy.gov [DOE]

    To provide states with information about the approved use of wet-spray cellulose for use in the low-income Weatherization Assistance Program.

  12. Critical Materials Institute UPDATE | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Critical Materials Institute UPDATE An error occurred. Try watching this video on www.youtube.com, or enable JavaScript if it is disabled in your browser. The Critical Materials...

  13. Decision Support for Operations and Maintenance IV

    Energy Science and Technology Software Center

    2011-12-22

    DSOM (Decision Support for Operations and Maintenance) is an expert operations and maintenance system that integrates plant operations, fuel management, and maintenance processes. The DSOM package provides operators with the information they need for cost-effective operating decisions creating savings in fuel, personnel, maintenance, and plant life extension. DSOM provides operators real-time system performance information to allow them to determine if the plant is malfunctioning or running below expectations. By catching potential problems, DSOM enables plantsmore » to operate safely at peak efficiency, while providing a higher level of reliability and safety.« less

  14. Energy crisis: resources or decisions. [Pamphlet

    SciTech Connect

    Yasinsky, J.B.

    1981-01-01

    The no-growth philosophy has contributed to a decade of debate and indecision over which domestic energy programs the US should pursue. This attitude has eroded faith in the ability of technology to bring future energy security and has crippled our decision-making process. The US has abundant energy resources of coal and nuclear power, and is developing efficient new energy technologies that can help us shift away from foreign oil dependency. A decision to use these resources to substitute for imported oil, coupled with strong domestic economic growth and conservation, can move us closer to energy independence.

  15. Canister Transfer Facility Criticality Calculations

    SciTech Connect

    J.E. Monroe-Rammsy

    2000-10-13

    The objective of this calculation is to evaluate the criticality risk in the surface facility for design basis events (DBE) involving Department of Energy (DOE) Spent Nuclear Fuel (SNF) standardized canisters (Civilian Radioactive Waste Management System [CRWMS] Management and Operating Contractor [M&O] 2000a). Since some of the canisters will be stored in the surface facility before they are loaded in the waste package (WP), this calculation supports the demonstration of concept viability related to the Surface Facility environment. The scope of this calculation is limited to the consideration of three DOE SNF fuels, specifically Enrico Fermi SNF, Training Research Isotope General Atomic (TRIGA) SNF, and Mixed Oxide (MOX) Fast Flux Test Facility (FFTF) SNF.

  16. Critical heat flux test apparatus

    DOEpatents

    Welsh, Robert E.; Doman, Marvin J.; Wilson, Edward C.

    1992-01-01

    An apparatus for testing, in situ, highly irradiated specimens at high temperature transients is provided. A specimen, which has a thermocouple device attached thereto, is manipulated into test position in a sealed quartz heating tube by a robot. An induction coil around a heating portion of the tube is powered by a radio frequency generator to heat the specimen. Sensors are connected to monitor the temperatures of the specimen and the induction coil. A quench chamber is located below the heating portion to permit rapid cooling of the specimen which is moved into this quench chamber once it is heated to a critical temperature. A vacuum pump is connected to the apparatus to collect any released fission gases which are analyzed at a remote location.

  17. Critical Materials Workshop Final Participant List

    Office of Energy Efficiency and Renewable Energy (EERE)

    List of participants who attended the Critical Materials Workshop held on April 3, 2012 in Arlington, VA

  18. Alternative Energy Generation Opportunities in Critical Infrastructure...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Alternative Energy Generation Opportunities in Critical Infrastructure New Jersey E. ... Agency by the National Renewable Energy Laboratory (NREL) under Interagency ...

  19. Spent Fuel Criticality Benchmark Experiments

    SciTech Connect

    J.M. Scaglione

    2001-07-23

    Characteristics between commercial spent fuel waste packages (WP), Laboratory Critical Experiments (LCEs), and commercial reactor critical (CRC) evaluations are compared in this work. Emphasis is placed upon comparisons of CRC benchmark results and the relative neutron flux spectra in each system. Benchmark evaluations were performed for four different pressurized water reactors using four different sets of isotopes. As expected, as the number of fission products used to represent the burned fuel inventory approached reality, the closer to unity k{sub eff} became. Examination of material and geometry characteristics indicate several fundamental similarities between the WP and CRC systems. In addition, spectral evaluations were performed on a representative pressurized water reactor CRC, a 21-assembly area of the core modeled in a potential WP configuration, and three LCEs considered applicable benchmarks for storage packages. Fission and absorption reaction spectra as well as relative neutron flux spectra are generated and compared for each system. The energy dependent reaction rates are the product of the neutron flux spectrum and the energy dependent total macroscopic cross section. With constant source distribution functions, and the total macroscopic cross sections for the fuel region in the CRCs and WP being composed of nearly the same isotopics, the resulting relative flux spectra in the CRCs and WP are very nearly the same. Differences in the relative neutron flux spectra between WPs and CRCs are evident in the thermal energy range as expected. However, the relative energy distribution of the absorption, fission, and scattering reaction rates in both the CRCs and the WP are essentially the same.

  20. Wireless System Considerations When Implementing NERC Critical

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Infrastructure Protection Standards | Department of Energy Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Wireless System Considerations When Implementing NERC Critical Infrastructure Protection Standards Energy asset owners are facing a monumental challenge as they address compliance with the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) Standards (CIP-002 through CIP-009). The increased

  1. Anomalies of Nuclear Criticality, Revision 6

    SciTech Connect

    Clayton, E. D.; Prichard, Andrew W.; Durst, Bonita E.; Erickson, David; Puigh, Raymond J.

    2010-02-19

    This report is revision 6 of the Anomalies of Nuclear Criticality. This report is required reading for the training of criticality professionals in many organizations both nationally and internationally. This report describes many different classes of nuclear criticality anomalies that are different than expected.

  2. EIS-0251: Record of Decision | Department of Energy

    Office of Environmental Management (EM)

    Record of Decision EIS-0251: Record of Decision Dry Storage Container System for the Management of Navel Spent Nuclear Fuel (January 1997) (62 FR 91095) Record of Decision for a Dry Storage Container System for the Management of Navel Spent Nuclear Fuel (January 1997) (62 FR 91095) (30.36 KB) More Documents & Publications EIS-0203: Record of Decision EIS-0251: Record of Decision EIS-0251: Final Environmental Impact Statement

  3. Addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada, Revision 1

    SciTech Connect

    Krauss, Mark J

    2013-10-01

    This document constitutes an addendum to the Corrective Action Decision Document/Closure Report for Corrective Action Unit 529: Area 25 Contaminated Materials, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction (UR) Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-23-17, Contaminated Wash (Parcel H). This UR was established as part of FFACO corrective actions and was based on the presence of total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level at the time of the initial investigation.

  4. Court decision dropping toxic substance rules stands

    SciTech Connect

    Bryant, C.R.

    1993-06-01

    In a somewhat surprising move, the U.S. Department of Labor has decided not to appeal a court decision essentially dropping regulations established by the Occupational Safety and Health Administration (OSHA) for about 400 hazardous substances. The decision leaves unregulated or subject to reduced standards substances that range from carbon monoxide to perchloroethylene. The Labor Department had until March 22, 1993, to appeal the court decision. On July 8, 1992, the U.S. Court of Appeals for the 11th Circuit overturned OSHA's final Air Contaminants Standard, which was promulgated in 1989. The standard established permissible exposure limits (PELs) for 428 toxic substances. In AFL-CIO vs. OSHA, the Court ruled that OSHA failed to make a separate scientific case for evaluating health risks of each chemical. Because of the decision not to appeal, PELs for more than half of the substances regulated by OSHA now are removed from the books or revert to the voluntary industry standards adopted by OSHA in 1970 and in force prior to the 1989 final rule.

  5. CRITICALITY SAFETY TRAINING AT FLUOR HANFORD (FH)

    SciTech Connect

    TOFFER, H.

    2005-05-02

    The Fluor Hanford Criticality Safety engineers are extensively trained. The objectives and requirements for training are derived from Department of Energy (DOE) and American National Standards Institute/American Nuclear Society Standards (ANSI/ANS), and are captured in the Hanford Criticality Safety Program manual, HNF-7098. Qualification cards have been established for the general Criticality Safety Engineer (CSE) analyst, CSEs who support specific facilities, and for the facility Criticality Safety Representatives (CSRs). Refresher training and continuous education in the discipline are emphasized. Weekly Brown Bag Sessions keep the criticality safety engineers informed of the latest developments and historic perspectives.

  6. Criticality safety basics, a study guide

    SciTech Connect

    V. L. Putman

    1999-09-01

    This document is a self-study and classroom guide, for criticality safety of activities with fissile materials outside nuclear reactors. This guide provides a basic overview of criticality safety and criticality accident prevention methods divided into three parts: theory, application, and history. Except for topic emphasis, theory and history information is general, while application information is specific to the Idaho National Engineering and Environmental Laboratory (INEEL). Information presented here should be useful to personnel who must know criticality safety basics to perform their assignments safely or to design critically safe equipment or operations. However, the guide's primary target audience is fissile material handler candidates.

  7. Decision making in a non-profit engineering environment

    SciTech Connect

    Christensen, D.C.

    1997-06-01

    A conceptual management framework is developed and applied in a science and engineering organization located within a non-profit, public institution. The goal of this research is to select a set of projects whose combined contributions to the organization`s strategic interests satisfy sponsor desires and can be completed within existing time and resource constraints. The development of the rationale for project selection and implementation within the plutonium facility at Los Alamos National Laboratory is studied. This includes the integration of prioritization decision tools, optimization techniques, and advanced planning and scheduling tools. The Nuclear Materials Technology Division is the custodian of the plutonium facility, whose mission is to develop, demonstrate, and deploy technologies necessary to address the nation`s and world`s plutonium problems. This includes management of nuclear weapon stockpile components, stabilization of plutonium residues, clean-up of contaminated soils and facilities, support to non-proliferation and arms control initiatives, and the eventual disposition of surplus plutonium. In this study, projects are evaluated against selection criteria deemed to be of critical program importance. The Analytic Hierarchy Process is used to evaluate and rank the importance of the suite of candidate projects. Because individual projects may be of interest to a number of business sectors and sponsors, the approach must be capable of using funding sources in an integrated manner in order to meet overall facility and program strategies. Finally, project planning and scheduling tools are integrated into the decision network in order to ensure that appropriate resource leveling occurs and that the actual project selection takes into account the temporal relationships among available resources.

  8. Learning environment simulator: a tool for local decision makers and first responders

    SciTech Connect

    Leclaire, Rene J; Hirsch, Gary B

    2009-01-01

    The National Infrastructure Simulation and Analysis Center (NISAC) has developed a prototype learning environment simulator (LES) based on the Critical Infrastructure Protection Decision Support System (CIPDSS) infrastructure and scenario models. The LES is designed to engage decision makers at the grass-roots level (local/city/state) to deepen their understanding of an evolving crisis, enhance their intuition and allow them to test their own strategies for events before they occur. An initial version is being developed, centered on a pandemic influenza outbreak and has been successfully tested with a group of hospital administrators and first responders. LES is not a predictive tool but rather a simulated environment allowing the user to experience the complexities of a crisis before it happens. Users can contrast various approaches to the crisis, competing with alternative strategies of their own or other participants. LES is designed to assist decision makers in making informed choices by functionally representing relevant scenarios before they occur, including impacts to critical infrastructures with their interdependencies, and estimating human health & safety and economic impacts. In this paper a brief overview of the underlying models are given followed by a description of the LES, its interface and usage and an overview of the experience testing LES with a group of hospital administrators and first responders. The paper concludes with a brief discussion of the work remaining to make LES operational.

  9. Request for approval, vented container annual release fraction

    SciTech Connect

    HILL, J.S.

    1999-10-12

    In accordance with the approval conditions for Modification to the Central Waste Complex (CWC) Radioactive Air Emissions Notice of Construction (NOC). dated August 24,1998, a new release fraction has been developed for submittal to the Washington State Department of Health (WDOH). The proposed annual release fraction of 2.50 E-14 is proposed for use in future NOCs involving the storage and handling operations associated with vented containers on the Hanford Site. The proposed annual release fraction was the largest release fraction calculated from alpha measurements of the NucFil filters from 10 vented containers consisting of nine 55-gallon drums and one burial box with dimensions of 9.3 x 5.7 x 6.4 feet. An annual release fraction of 2.0 E-09 was used in the modification to the CWC radioactive air emissions NOC. This study confirmed that the release fraction used in the CWC radioactive air emissions NOC was conservative.

  10. 1994 Characterization report for the state approved land disposal site

    SciTech Connect

    Swanson, L.C.

    1994-09-19

    This report summarizes the results of characterization activities at the proposed state-approved land disposal site (SALDS); it updates the original characterization report with studies completed since the first characterization report. The initial characterization report discusses studies from two characterization boreholes, 699-48-77A and 699-48-77B. This revision includes data from implementation of the Groundwater Monitoring Plan and the Aquifer Test Plan. The primary sources of data are two down-gradient groundwater monitoring wells, 699-48-77C and 699-48-77D, and aquifer testing of three zones in well 699-48-77C. The SALDS is located on the Hanford Site, approximately 183 m north of the 200 West Area on the north side of the 200 Areas Plateau. The SALDS is an infiltration basin proposed for disposal of treated effluents from the 200 Areas of Hanford.

  11. Public Discourse in Energy Policy Decision-Making: Final Report

    SciTech Connect

    Idaho Citizen; Eileen DeShazo; John Freemuth; Tina Giannini; Troy Hall; Ann Hunter; Jeffrey C. Joe; Michael Louis; Carole Nemnich; Jennie Newman; Steven J. Piet; Stephen Sorensen; Paulina Starkey; Kendelle Vogt; Patrick Wilson

    2010-08-01

    The ground is littered with projects that failed because of strong public opposition, including natural gas and coal power plants proposed in Idaho over the past several years. This joint project , of the Idaho National Laboratory, Boise State University, Idaho State University and University of Idaho has aimed to add to the tool box to reduce project risk through encouraging the public to engage in more critical thought and be more actively involved in public or social issues. Early in a project, project managers and decision-makers can talk with no one, pro and con stakeholder groups, or members of the public. Experience has shown that talking with no one outside of the project incurs high risk because opposition stakeholders have many means to stop most (if not all) energy projects. Talking with organized stakeholder groups provides some risk reduction from mutual learning, but organized groups tend not to change positions except under conditions of a negotiated settlement. Achieving a negotiated settlement may be impossible. Furthermore, opposition often arises outside pre-existing groups. Standard public polling provides some information but does not reveal underlying motivations, intensity of attitudes, etc. Improved methods are needed that probe deeper into stakeholder (organized groups and members of the public) values and beliefs/heuristics to increase the potential for change of opinions and/or out-of-box solutions. The term “heuristics” refers to the mental short-cuts, underlying beliefs, and paradigms that everyone uses to filter and interpret information, to interpret what is around us, and to guide our actions and decisions. This document is the final report of a 3-year effort to test different public discourse methods in the subject area of energy policy decision-making. We analyzed 504 mail-in surveys and 80 participants in groups on the Boise State University campus for their preference, financial support, and evaluations of eight attributes

  12. OVERPRESSURE BY SYSTEM DESIGN APPROVAL FORM PS-2 GENERAL Pressure System Number:

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    OVERPRESSURE BY SYSTEM DESIGN APPROVAL FORM PS-2 GENERAL Pressure System Number: Pressure System Name: Design Authority: OVERPRESSURE BY SYSTEM DESIGN REPORT CONTAINS: (check if complete) Reason for using overprotection by design Detailed failure analysis by multidisciplinary team Detailed analysis to determine maximum credible pressure Requirements for periodic inspections and testing of controls, procedures and instrumentation APPROVAL: Comments: Pressure Systems Committee Chair signature:

  13. Project W-521 waste feed delivery systems environmental permits and approvals plan

    SciTech Connect

    TOLLEFSON, K.S.

    1999-09-21

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities.

  14. An economic decision framework using modeling for improving aquifer remediation design

    SciTech Connect

    James, B.R.; Gwo, J.P.; Toran, L.E.

    1995-11-01

    Reducing cost is a critical challenge facing environmental remediation today. One of the most effective ways of reducing costs is to improve decision-making. This can range from choosing more cost- effective remediation alternatives (for example, determining whether a groundwater contamination plume should be remediated or not) to improving data collection (for example, determining when data collection should stoop). Uncertainty in site conditions presents a major challenge for effective decision-making. We present a framework for increasing the effectiveness of remedial design decision-making at groundwater contamination sites where there is uncertainty in many parameters that affect remediation design. The objective is to provide an easy-to-use economic framework for making remediation decisions. The presented framework is used to 1) select the best remedial design from a suite of possible ones, 2) estimate if additional data collection is cost-effective, and 3) determine the most important parameters to be sampled. The framework is developed by combining elements from Latin-Hypercube simulation of contaminant transport, economic risk-cost-benefit analysis, and Regional Sensitivity Analysis (RSA).

  15. SILENE Benchmark Critical Experiments for Criticality Accident Alarm Systems

    SciTech Connect

    Miller, Thomas Martin; Reynolds, Kevin H.

    2011-01-01

    In October 2010 a series of benchmark experiments was conducted at the Commissariat a Energie Atomique et aux Energies Alternatives (CEA) Valduc SILENE [1] facility. These experiments were a joint effort between the US Department of Energy (DOE) and the French CEA. The purpose of these experiments was to create three benchmarks for the verification and validation of radiation transport codes and evaluated nuclear data used in the analysis of criticality accident alarm systems (CAASs). This presentation will discuss the geometric configuration of these experiments and the quantities that were measured and will present some preliminary comparisons between the measured data and calculations. This series consisted of three single-pulsed experiments with the SILENE reactor. During the first experiment the reactor was bare (unshielded), but during the second and third experiments it was shielded by lead and polyethylene, respectively. During each experiment several neutron activation foils and thermoluminescent dosimeters (TLDs) were placed around the reactor, and some of these detectors were themselves shielded from the reactor by high-density magnetite and barite concrete, standard concrete, and/or BoroBond. All the concrete was provided by CEA Saclay, and the BoroBond was provided by Y-12 National Security Complex. Figure 1 is a picture of the SILENE reactor cell configured for pulse 1. Also included in these experiments were measurements of the neutron and photon spectra with two BICRON BC-501A liquid scintillators. These two detectors were provided and operated by CEA Valduc. They were set up just outside the SILENE reactor cell with additional lead shielding to prevent the detectors from being saturated. The final detectors involved in the experiments were two different types of CAAS detectors. The Babcock International Group provided three CIDAS CAAS detectors, which measured photon dose and dose rate with a Geiger-Mueller tube. CIDAS detectors are currently in

  16. Working with CMI: Affiliates | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Affiliates CMI Affiliates are companies and organizations interested in being informed about CMI research outcomes and providing input to CMI on a continuing basis. Each Affiliate pays an annual membership fee, based on the organization size and type, and signs a Membership Agreement. Link to a list of current CMI Affiliates. Foreign entitites must be approved for membership by the U.S. Department of Energy. For more details, contact CMIaffiliates@ameslab.gov. Affiliates Fees The annual

  17. Working with CMI: Associates | Critical Materials Institute

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Associates CMI Associates work with CMI researchers to define a scope of work, budget and timeline for the work. Once internally approved, the entity must execute either a CRADA or SPP with Ames or another Team national laboratory before work may begin. For more information: CMIaffiliates@ameslab.gov CMI Affiliates Membership, The Ames Laboratory, 306 TASF, 2408 Pammel Drive, Ames, IA, 50011-1015

  18. Decision Support Tool for the Management of Debris from Radiological Dispersal Devices and Other Incidents of National Significance

    SciTech Connect

    Lemieux, P.; Thorneloe, S.; Hayes, C.; Rodgers, M.; Christman, R.

    2008-07-01

    Unique challenges exist for the handling, transport, and disposal of debris resulting from homeland security incidents, disasters or other national emergencies. Access to guidance to facilitate decision making to ensure the safe and timely disposal of debris is critical to helping restore a community or region and prevent further contamination or spread of disease. For a radiological dispersal device (RDD), proper characterization of the quantity, properties, and level of contamination of debris can have a significant impact on cleanup costs and timelines. A suite of decision support tools (DSTs) is being developed by the U.S. EPA's Office of Research and Development to assist individuals responsible for making decisions associated with handling, transport, and disposal of such debris. The DSTs are location-specific to help identify specific facilities and contacts for making final disposal decisions. The DSTs provide quick reference to technical information, regulations, and other information to provide decision makers with assistance in guiding disposal decisions that are important for the protection of public health, first responders, and the environment. These tools are being developed in partnership with other U.S. government agencies, EPA program offices, industry, and state and local emergency response programs. (authors)

  19. THE CRITICAL FEW 2015 FEDERAL PROCUREMENT OFFICE PERFORMANCE...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... certification requires advance approval by the DOE ACM. Any questions about the FAITAS reporting must be directed to the DOE ACM. Contract Closeout metrics are self reported, and ...

  20. Range of Neutronic Parameters for Repository Criticality Analyses

    SciTech Connect

    W.J. Anderson

    1999-09-28

    The ''Range of Neutronic Parameters for Repository Criticality Analyses'' technical report contains a summary of the benchmark criticality analyses (including the laboratory critical experiment [LCEs] and the commercial reactor criticals [CRCs]) used to support the validation of the criticality evaluation methods. This report also documents the development of the Critical Limits (CLs) for the repository criticality analyses.

  1. Tank Farm Area Cleanup Decision-Making

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Area Cleanup Decision-Making Groundwater Vadose Zone Single Shell Tank System Closure (tanks, structures and pipelines) * Washington State Hazardous Waste Management Act (Resource Conservation & Recovery Act Closure Plan for dangerous waste constituents) + * DOE Order 435.1 (435.1 closure plan for radioactive residual constituents in tanks and components of tanks) Single Shell Tank System Releases to Soil (Environmental Media) - Options: Hazardous/Dangerous waste constituents and

  2. Memorandum of Decision: March 31, 2011

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ASSISTANT SECRETARY OF ENERGY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY MEMORANDUM OF DECISION SUBJECT: Determination of inapplicability (waiver) of section 1605 of the American Reinvestment and Recovery Act of 2009 (Recovery Act Buy American provisions) to EERE-funded projects for (1) 400 to 750 watt micro hydro-turbines meeting the specifications detailed below; (2) Oil fired direct vent space heaters for use in buildings that do not have ducts or piping for boiler heating systems; (3)

  3. Memorandum of Decision: Solar Public Interest Waiver

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ASSISTANT SECRETARY OF ENERGY FOR ENERGY EFFICIENCY AND RENEWABLE ENERGY MEMORANDUM OF DECISION SUBJECT: Determination of inapplicability (nationwide limited waiver in the public interest) of section 1605 of the Recovery Act of 2009 (the Buy American provision) to EERE-funded projects for incidental and/or ancillary solar Photovoltaic (PV) equipment, when this equipment is utilized in solar installations containing domestically manufactured PV cells or modules (panels). Under the authority of

  4. Money Related Decommissioning and Funding Decision Making

    SciTech Connect

    Goodman, Lynne S.

    2008-01-15

    'Money makes the world go round', as the song says. It definitely influences decommissioning decision-making and financial assurance for future decommissioning. This paper will address two money-related decommissioning topics. The first is the evaluation of whether to continue or to halt decommissioning activities at Fermi 1. The second is maintaining adequacy of financial assurance for future decommissioning of operating plants. Decommissioning costs considerable money and costs are often higher than originally estimated. If costs increase significantly and decommissioning is not well funded, decommissioning activities may be deferred. Several decommissioning projects have been deferred when decision-makers determined future spending is preferable than current spending, or when costs have risen significantly. Decommissioning activity timing is being reevaluated for the Fermi 1 project. Assumptions for waste cost-escalation significantly impact the decision being made this year on the Fermi 1 decommissioning project. They also have a major impact on the estimated costs for decommissioning currently operating plants. Adequately funding full decommissioning during plant operation will ensure that the users who receive the benefit pay the full price of the nuclear-generated electricity. Funding throughout operation also will better ensure that money is available following shutdown to allow decommissioning to be conducted without need for additional funds.

  5. CRITICAL INFRASTRUCTURE PROTECTION Multiple Efforts to Secure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Multiple Efforts to Secure Control Systems Are Under Way, but Challenges Remain CRITICAL INFRASTRUCTURE PROTECTION Multiple Efforts to Secure Control Systems Are Under Way, but ...

  6. Additive Manufacturing Meets the Critical Materials Shortage...

    Energy.gov [DOE] (indexed site)

    clean energy products, such as solar cells, wind turbines, electric vehicles and energy-efficient lighting. Critical materials are also valuable for making the magnets ...

  7. Computing Criticality of Lines in Power Systems

    SciTech Connect

    Pinar, Ali; Reichert, Adam; Lesieutre, Bernard

    2006-10-13

    We propose a computationally efficient method based onnonlinear optimization to identify critical lines, failure of which cancause severe blackouts. Our method computes criticality measure for alllines at a time, as opposed to detecting a single vulnerability,providing a global view of the system. This information on criticality oflines can be used to identify multiple contingencies by selectivelyexploring multiple combinations of broken lines. The effectiveness of ourmethod is demonstrated on the IEEE 30 and 118 bus systems, where we canvery quickly detect the most critical lines in the system and identifysevere multiple contingencies.

  8. The baryonic susceptibility near critical temperature (Journal...

    Office of Scientific and Technical Information (OSTI)

    Country of Publication: United States Language: English Subject: 72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS; BARYONS; CHIRALITY; CRITICAL TEMPERATURE; ENERGY-LEVEL DENSITY; ...

  9. FAQS Reference Guide – Criticality Safety (NNSA)

    Energy.gov [DOE]

    This reference guide has been developed to address the competency statements in DOE-STD-1173-2009, Criticality Safety Functional Area Qualification Standard.

  10. Critical function and success path summary display

    DOEpatents

    Scarola, Kenneth; Jamison, David S.; Manazir, Richard M.; Rescorl, Robert L.; Harmon, Daryl L.

    1995-01-01

    The content of and hierarchical access to three levels of display pages containing information on critical function monitoring and success path monitoring.

  11. National Critical Infrastructure Security and Resilience Month...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Assistant Secretary, Office of Electricity Delivery & Energy Reliability November is National Critical Infrastructure Security and Resilience Month, a time during which we ...

  12. FAQS Reference Guide – Criticality Safety

    Office of Energy Efficiency and Renewable Energy (EERE)

    This reference guide addresses the competency statements in the April 2009 edition of DOE-STD-1173-2009, Criticality Safety Functional Area Qualification Standard.

  13. How the Koontz Decision May Affect Climate Change Policy

    Energy.gov [DOE]

    Please join us for a Sept. 10 webinar to discuss the Supreme Court's controversial decision in Koontz v. St. Johns River Water Management District and explore how the decision may affect the...

  14. Summary of Decisions - November 11, 2013 - November 15, 2013...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decisions - November 11, 2013 - November 15, 2013 November 15, 2013 - 9:49am Addthis Freedom of Information Act Appeals On November 14, 2013, OHA issued a decision denying in...

  15. Summary of Decisions - May 6, 2013 - May 10, 2013 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2013 Summary of Decisions - May 6, 2013 - May 10, 2013 May 10, 2013 - 10:49am Addthis Freedom of Information Act (FOIA) Appeal On May 6, 2013, OHA issued a decision remanding an...

  16. Property:NEPA DecisionDocumentDate | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    DecisionDocumentDate Jump to: navigation, search Property Name NEPA DecisionDocumentDate Property Type Date This is a property of type Date. Subproperties This property has the...

  17. EIS-0082-S1: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    -S1: Record of Decision EIS-0082-S1: Record of Decision Defense Waste Processing Facility, Savannah River Site, Aiken, South Carolina For more information, see the project page: ...

  18. Summary of Decisions - October 19, 2015 - October 23, 2015 |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Summary of Decisions - October 19, 2015 - October 23, 2015 October 23, 2015 - 2:20pm Addthis Freedom of Information Act (FOIA) Appeal On October 23, 2015, OHA issued a decision ...

  19. Summary of Decisions - October 15, 2012 - October 19, 2012 |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Summary of Decisions - October 15, 2012 - October 19, 2012 October 19, 2012 - 1:20pm Addthis Freedom of Information Act On October 19, 2012, OHA issued a decision denying a FOIA ...

  20. EIS-0305: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0305: Record of Decision Treating Transuranic (TRU)Alpha Low-Level Waste at the Oak Ridge National Laboratory The U.S. Department of Energy (DOE) is issuing...

  1. EIS-0158-S2: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    -S2: Record of Decision EIS-0158-S2: Record of Decision Sale of Naval Petroleum Reserve No. 1 (Elk Hills), Kern County, California The Department of Energy (DOE) is issuing this...

  2. EIS-0241: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Record of Decision EIS-0241: Record of Decision Hood River Fisheries Project Based on the analysis in the EIS, Alternative 1 was chosen because it best meets the need and...

  3. EIS-0365: Record of Decision and Floodplain Statement of Findings...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision and Floodplain Statement of Findings EIS-0365: Record of Decision and Floodplain Statement of Findings Imperial-Mexicali 230-kV Transmission Lines DOE announces...

  4. EIS-0281: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0281: Record of Decision Sandia National LaboratoriesNew Mexico Site-Wide Environmental Impact Statement The U.S. Department of Energy (DOE) is issuing this...

  5. EIS-0306: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Record of Decision EIS-0306: Record of Decision Treatment and Management of Sodium-Bonded ... Spent Nuclear Fuel (final EIS) 65 FR 47987, August 4, 2000) (DOEEIS-0306, July 2000). ...

  6. EIS-0399: Record of Decision (OE) | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    OE) EIS-0399: Record of Decision (OE) Montana Alberta Tie Ltd. 230-kV Transmission Line Project Department of Energy announces its decision to issue a Presidential permit to...

  7. EIS-0243: Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Decision EIS-0243: Record of Decision Department of Energy's Waste Management Program: Treatment and Disposal of Low-Level Waste and Mixed Low-Level Waste For the management of ...

  8. T-537: Oracle Critical Patch Update Advisory - January 2011 ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    T-537: Oracle Critical Patch Update Advisory - January 2011 January 19, 2011 - 7:11am ... Oracle Critical Update Addthis Related Articles T-537: Oracle Critical Patch Update ...

  9. UNEP-Bioenergy Decision Support Tool | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Free Equivalent URI: cleanenergysolutions.orgcontentbioenergy-decision-support-tool Language: English DeploymentPrograms: Public-Private Partnerships Regulations: Mandates...

  10. Summary of Decisions- February 4, 2013- February 8, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) - Application for Exception

  11. EIS-0425: Record of Decision and Mitigation Action Plan

    Energy.gov [DOE]

    Bonneville Power Administration Record of Decision and Mitigation Action Plan for the Mid-Columbia Restoration Project

  12. Summary of Decisions- November 4, 2013 – November 8, 2013

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) - Application for Exception

  13. Memorandum of Decision: Withdrawal of LED Lighting Waiver | Department...

    Office of Environmental Management (EM)

    LED Lighting Waiver Memorandum of Decision: Withdrawal of LED Lighting Waiver novemberdecisionwithdraw More Documents & Publications Nationwide Nonavailability Waiver: November...

  14. EIS-0220: Amended Record of Decision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    : Amended Record of Decision EIS-0220: Amended Record of Decision Interim Management of Nuclear Materials On December 12, 1995, the U.S. Department of Energy (DOE) issued a Record of Decision (ROD) and Notice of Preferred Alternatives, 60 FR 65300 (December 19, 1995), for the final environmental impact statement, Interim Management of Nuclear Materials (IMNM EIS) (DOE/EIS-0220, October 20, 1995), at the Savannah River Site (SRS), Aiken, South Carolina. As part of its decision, DOE decided to

  15. Summary of Decisions- February 24, 2014 – February 28, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) - Application for Exception

  16. Summary of Decisions- June 1, 2015 – June 5, 2015

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal - Hydroelectric Production Incentives Program

  17. Design and Decision Support Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Commercial Buildings » Design and Decision Support Guides Design and Decision Support Guides CBI works with industry partners and the Building Energy Codes Program to develop design and decision support tools and resources that demonstrate scalable and replicable approaches to achieve high-performance energy efficient new commercial buildings and major retrofits for a variety of building types. These tools and resources serve to inform and guide decision-makers to increase investment in energy

  18. Summary of Decisions- July 16- July 20, 2012

    Office of Energy Efficiency and Renewable Energy (EERE)

    Decisions were issued on: - Freedom of Information Act Appeal - Personnel Security (10 CFR Part 710) - Application for Exception

  19. Summary of Decisions- December 15, 2014 – December 19, 2014

    Energy.gov [DOE]

    Decisions were issued on: - Personnel Security (10 CFR Part 710) - Freedom of Information Act Appeal - Application for Exception

  20. Manhattan Project: Potsdam and the Final Decision to Use the...

    Office of Scientific and Technical Information (OSTI)

    A directive (right), written by Leslie Groves, approved by President Truman, and issued by Secretary of War Henry Stimson and General of the Army George Marshall, ordered the Army ...