National Library of Energy BETA

Sample records for alternative test procedure

  1. Alternative Fuels Data Center: Test Your Alternative Fuel IQ

    Alternative Fuels and Advanced Vehicles Data Center

    About Printable Version Share this resource Send a link to Alternative Fuels Data Center: Test Your Alternative Fuel IQ to someone by E-mail Share Alternative Fuels Data Center: Test Your Alternative Fuel IQ on Facebook Tweet about Alternative Fuels Data Center: Test Your Alternative Fuel IQ on Twitter Bookmark Alternative Fuels Data Center: Test Your Alternative Fuel IQ on Google Bookmark Alternative Fuels Data Center: Test Your Alternative Fuel IQ on Delicious Rank Alternative Fuels Data

  2. Cathodic protection acceptance test procedure

    SciTech Connect

    Nordquist, E.M.

    1994-09-02

    This acceptance test procedure is to document testing of added anodes to existing Rectifier No. 11. Anodes were added under Project W-151, Tank 101-AZ Waste Retrieval System.

  3. Standards and Test Procedures | Department of Energy

    Office of Environmental Management (EM)

    Appliance & Equipment Standards Standards and Test Procedures Standards and Test Procedures The Department of Energy (DOE) establishes energy efficiency standards for certain ...

  4. Specifications and Test Procedures | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Specifications and Test Procedures Grid interoperability requires a complex set of interactions defined by specifications and proven through standardized test procedures. Grid...

  5. TMACS Test Procedure TP007: System administration

    SciTech Connect

    Scanlan, P.; Washburn, S.; Seghers, R.

    1994-05-24

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS System Administration functions.

  6. TMACS Test Procedure TP001: Alarm Management

    SciTech Connect

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Alarm management functions.

  7. TMACS Test Procedure TP002: Trending

    SciTech Connect

    Scanlan, P.K.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  8. TMACS Test Procedure TP009: Acromag Driver

    SciTech Connect

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Acromag Software Driver (Bridge Code).

  9. TMACS Test Procedure TP002: Trending

    SciTech Connect

    Scanlan, P.K.

    1994-08-29

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS Trending functions.

  10. Alternative Neutron Detection Testing Summary

    SciTech Connect

    Kouzes, Richard T.; Ely, James H.; Erikson, Luke E.; Kernan, Warnick J.; Lintereur, Azaree T.; Siciliano, Edward R.; Stromswold, David C.; Woodring, Mitchell L.

    2010-04-08

    Radiation portal monitors used for interdiction of illicit materials at borders include highly sensitive neutron detection systems. The main reason for having neutron detection capability is to detect fission neutrons from plutonium. Most currently deployed radiation portal monitors (RPMs) use neutron detectors based upon 3He-filled gas proportional counters, which are the most common large area neutron detector. This type of neutron detector is used in the TSA and other RPMs installed in international locations and in the Ludlum and Science Applications International Corporation RPMs deployed primarily for domestic applications. There is a declining supply of 3He in the world and, thus, methods to reduce the use of this gas in RPMs with minimal changes to the current system designs and sensitivity to cargo-borne neutrons are being investigated. Four technologies have been identified as being currently commercially available, potential alternative neutron detectors to replace the use of 3He in RPMs. These technologies are: 1) Boron trifluoride-filled proportional counters, 2) Boron-lined proportional counters, 3) Lithium-loaded glass fibers, and 4) Coated wavelength-shifting plastic fibers. Reported here is a summary of the testing carried out at Pacific Northwest National Laboratory on these technologies to date, as well as measurements on 3He tubes at various pressures. Details on these measurements are available in the referenced reports. Sponsors of these tests include the Department of Energy (DOE), Department of Homeland Security (DHS), and the Department of Defense (DoD), as well as internal Pacific Northwest National Laboratory funds.

  11. TMACS Test Procedure TP011: Panalarm Interface

    SciTech Connect

    Seghers, R.; Washburn, S.J.

    1994-05-24

    The TMACS Software Test Procedures translate the project`s acceptance criteria into test steps. The TMACS Test Plan (WHC-SD-WM-TP-148) is fulfilled when all Test Cases are approved. This Test Procedure tests the TMACS Panalarm Interface functions.

  12. Current Test Procedure Waivers | Department of Energy

    Office of Environmental Management (EM)

    Current Test Procedure Waivers Current Test Procedure Waivers The U.S. Department of Energy's (DOE) regulations for covered products permit a person to seek a waiver, or an interim ...

  13. TEST PROCEDURE VALIDATION TEST OF A DISCRIMINATING TRITIUM MONITOR...

    Office of Environmental Management (EM)

    Test Results For Physical Separation Of Tritium From Noble Gases And It's Implications For ... AIR SAMPLERS NEW FAMILY OF STACK MONITORS TEST PROCEDURE VALIDATION TEST OF A ...

  14. Test Procedure Waivers | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Appliance & Equipment Standards » Rulemakings & Notices » Test Procedure Waivers Test Procedure Waivers Products covered by standards change as manufacturers add new features to their products and update designs in order to compete for consumers. Innovation and product development occasionally causes products to change in ways that either (1) make the results of a test procedure unrepresentative of actual energy use or efficiency, or (2) make it impossible to test in accordance with

  15. Test report - caustic addition system operability test procedure

    SciTech Connect

    Parazin, R.E.

    1995-10-13

    This Operability Test Report documents the test results of test procedure WHC-SD-WM-OTP-167 ``Caustic Addition System Operability Test Procedure``. The Objective of the test was to verify the operability of the 241-AN-107 Caustic Addition System. The objective of the test was met

  16. Revised evaluation of steam generator testing alternatives

    SciTech Connect

    1981-01-01

    A scoping evaluation was made of various facility alternatives for test of LMFBR prototype steam generators and models. Recommendations are given for modifications to EBR-II and SCTI (Sodium Components Test Installation) for prototype SG testing, and for few-tube model testing. (DLC)

  17. DACS upgrade acceptance test procedure

    SciTech Connect

    Zuehlke, A.C.

    1994-09-28

    The readiness of the Data Acquisition and Control System (DACS) to provide monitoring and control of the mixer pump, directional drive system, and the instrumentation associated with the SY-101 tank and support systems, and the proper functioning of the DACS with new Model 984-785 Programmable Logic Controllers (PLCs), new MODBUS PLUS version 2.01 software for the PLCs, and version 3.72 of the GENESIS software will be systematically evaluated by performance of this procedure. The DACS, which is housed in a trailer located just outside of the north fence at the SY tank farm, receives input signals from a variety of sensors located in and around the SY-101 tanks. These sensors provide information such as: tank vapor space and ventilation system H{sub 2} concentration; tank waste temperature; tank pressure; waste density; operating pump parameters such as speed, flow, rotational position, discharge pressure, and internal temperature; strain (for major equipment); and waste level. The output of these sensors is conditioned and transmitted to the DACS computers where these signals are displayed, recorded, and monitored for out-of-specification conditions. If abnormal conditions are detected, then, in certain situations, the DACS automatically generates alarms and causes the system to abort pump operations.

  18. DOT-7A packaging test procedure

    SciTech Connect

    Kelly, D.L.

    1995-01-23

    This test procedure documents the steps involved with performance testing of Department of Transportation Specification 7A (DOT-7A) Type A packages. It includes description of the performance tests, the personnel involved, appropriate safety considerations, and the procedures to be followed while performing the tests. Westinghouse Hanford Company (WHC) is conducting the evaluation and testing discussed herein for the Department of Energy-Headquarters, Division of Quality Verification and Transportation Safety (EH-321). Please note that this report is not in WHC format. This report is being submitted through the Engineering Documentation System so that it may be used for reference and information purposes.

  19. DOE Launches Public Test Procedure Guidance Website

    Energy.gov [DOE]

    The Department of Energy this week launched a new online database offering guidance on the Department’s test procedures for appliances and commercial equipment.  The new database will provide a...

  20. 2014-05-05 Issuance: Alternative Efficiency Determination Methods and Test

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule | Department of Energy Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule 2014-05-05 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule This document is a pre-publication Federal Register final rule regarding alternative efficiency determination methods and test procedures for walk-in

  1. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures...

    Energy Saver

    Full-Size Electric Vehicle Specifications and Test Procedures AVTA: Full-Size Electric Vehicle Specifications and Test Procedures EV America Test Specifications (97.12 KB) ...

  2. 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking | Department of Energy 07 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal

  3. A Schwarz alternating procedure for singular perturbation problems

    SciTech Connect

    Garbey, M.; Kaper, H.G.

    1994-12-31

    The authors show that the Schwarz alternating procedure offers a good algorithm for the numerical solution of singular perturbation problems, provided the domain decomposition is properly designed to resolve the boundary and transition layers. They give sharp estimates for the optimal position of the domain boundaries and present convergence rates of the algorithm for various second-order singular perturbation problems. The splitting of the operator is domain-dependent, and the iterative solution of each subproblem is based on a modified asymptotic expansion of the operator. They show that this asymptotic-induced method leads to a family of efficient massively parallel algorithms and report on implementation results for a turning-point problem and a combustion problem.

  4. Alternative procedures for J-R curve determination

    SciTech Connect

    Hiser, A.L.; Loss, F.J.

    1983-07-01

    This investigation evaluates alternative displacement techniques with the single-specimen compliance (SSC) procedure which do not require the commonly used load-line displacement measurements in a compact toughness (CT) specimen to determine the J-R curve. The two techniques studied are a double-clip-gage technique involving both crack-mouth displacement and load-line displacement at the edges of the specimen and a technique which requires only crack-mouth displacement. R-curves developed using these techniques are compared to R-curves developed with the normal load-line based deflections. In addition, results of a round-robin program using the SSC procedure are discussed in terms of validating the double-clip-gage technique. R-curves developed from crack-mouth displacements on the J-integral specimen from ASTM E 813 suggest that the standard ASTM E 399 specimen design can be used for both linear-elastic (e.g., K/sub Ic/) and elastic-plastic (e.g., R-curve toughness assessments.

  5. Test Procedure Development and Revision | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure Development and Revision Test Procedure Development and Revision Most energy conservation standards rulemakings are accompanied by a concurrent test procedure rulemaking. Test procedures detail the protocols that manufacturers must follow when testing their products for compliance with Department of Energy (DOE) standards. DOE also uses the test procedures to determine compliance with the applicable standards in any verification or enforcement testing. The procedures specify how

  6. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent...

    Energy Saver

    4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; ...

  7. ENERGY STAR Test Procedures and Verification | Department of...

    Energy.gov [DOE] (indexed site)

    in the development and revision of all test procedures for products in the ENERGY ... To simplify the process for interested parties, more information on the test procedure ...

  8. Test Procedure for UV Weathering Resistance of Backsheet | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure for UV Weathering Resistance of Backsheet Test Procedure for UV Weathering Resistance of Backsheet Presented at the PV Module Reliability Workshop, February 26 - 27 ...

  9. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking GSL TP ...

  10. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration...

    Office of Environmental Management (EM)

    0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document ...

  11. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled...

    Energy.gov [DOE] (indexed site)

    test procedures for refrigerated bottled or canned beverage vending machines, as issued by ... ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled ...

  12. 2014-04-11 Issuance: Test Procedures for Residential Clothes...

    Energy.gov [DOE] (indexed site)

    notice of proposed rulemaking regarding test procedure amendments for residential clothes ... access to this document. 2014-04-11 Test Procedures for Residential Clothes ...

  13. Test Procedures for Integrated Light-Emitting Diode Lamps; Final...

    Energy.gov [DOE] (indexed site)

    Test Procedures for Integrated Light-Emitting Diode Lamps - Final Rule (532.58 KB) More Documents & Publications ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures ...

  14. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration...

    Office of Environmental Management (EM)

    6 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; ...

  15. ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    12-18: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Final Rule ISSUANCE 2015-12-18: Energy Conservation Program: Test Procedures for ...

  16. AVTA: Urban Electric Vehicle Specifications and Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 ...

  17. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ...

  18. 2014-10-16 Issuance: Energy Conservation Program Test Procedures...

    Energy.gov [DOE] (indexed site)

    Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of ... Rulemaking 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External ...

  19. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for ...

  20. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for ...

  1. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final ...

  2. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures...

    Energy Saver

    27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery ...

  3. ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for ...

  4. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central ...

  5. Meeting Concerning Potential Test Procedures and Energy Conservation...

    Office of Environmental Management (EM)

    Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation ...

  6. Energy Conservation Program: Test Procedure for Pumps, Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation ...

  7. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures...

    Energy Saver

    6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This ...

  8. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures...

    Energy Saver

    22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, ...

  9. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    6: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling ...

  10. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light ...

  11. ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    1: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures for ...

  12. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures...

    Energy Saver

    9: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for ...

  13. Energy Conservation Program: Test Procedure for Dedicated-Purpose...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    RIN: 1904-AD66 Energy Conservation Program: Test Procedure for ... to establish and amend energy conservation standards (ECSs) and test procedures ...

  14. DOE Publishes Final Rule for Television Test Procedure | Department...

    Energy.gov [DOE] (indexed site)

    DOE Publishes Final Rule for Plumbing Products Test Procedures DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure...

  15. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation...

    Energy.gov [DOE] (indexed site)

    issued a pre-publication Federal Register final rule regarding test procedures for electric motors. For more information, please visit the rulemaking page. Test Procedure: All...

  16. ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7: Energy Conservation Program: Test Procedures for External Power Supplies, Final Rule ISSUANCE 2015-08-17: Energy Conservation Program: Test Procedures for External Power Supplies, ...

  17. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for ...

  18. Title 18 CFR 4.34(i) Alternative Procedures | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    34(i) Alternative Procedures Jump to: navigation, search OpenEI Reference LibraryAdd to library Legal Document- RegulationRegulation: Title 18 CFR 4.34(i) Alternative...

  19. TMACS Test Procedure TP008: SACS Interface. Revision 5

    SciTech Connect

    Washburn, S.J.

    1994-05-31

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure tests the TMACS SACS Interface functions.

  20. TMACS test procedure TP009: Acromag driver. Revision 5

    SciTech Connect

    Bass, R.B.; Washburn, S.J.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the testing of the functionality of the TMACS Acromag driver software in conjunction with a new bridge for the Panalarm Annunciator system.

  1. Laboratory procedures for waste form testing

    SciTech Connect

    Mast, E.S.

    1994-09-19

    The 100 and 300 areas of the Hanford Site are included on the US Environmental Protection Agencies (EPA) National Priorities List under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Soil washing is a treatment process that is being considered for the remediation of the soil in these areas. Contaminated soil washing fines can be mixed or blended with cementations materials to produce stable waste forms that can be used for beneficial purposes in mixed or low-level waste landfills, burial trenches, environmental restoration sites, and other applications. This process has been termed co-disposal. The Co-Disposal Treatability Study Test Plan is designed to identify a range of cement-based formulations that could be used in disposal efforts in Hanford in co-disposal applications. The purpose of this document is to provide explicit procedural information for the testing of co-disposal formulations. This plan also provides a discussion of laboratory safety and quality assurance necessary to ensure safe, reproducible testing in the laboratory.

  2. TMACS test procedure TP010: Integration summary. Revision 6

    SciTech Connect

    Spurling, D.G.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure verifies that Test Procedures 1, 2, 3, 5 and 9 (WHC-SD-WM-TRP-105, 106, 107, 109 and 113) of TMACS Software Release 4.1 have been successfully completed.

  3. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure...

    Energy Saver

    Final Rule for Residential Furnace Fan Test Procedure DOE Publishes Final Rule for Residential Furnace Fan Test Procedure January 3, 2014 - 12:00am Addthis The Department of Energy ...

  4. CRAD, System Operating Test Procedures - October 23, 2014 (EA...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) CRAD, System Operating Test Procedures - October 23, 2014 (EA CRAD 31-05, Rev. 0) October 23, 2014...

  5. Transportable Emissions Testing Laboratory for Alternative Vehicles Emissions Testing

    SciTech Connect

    Clark, Nigel

    2012-01-31

    The overall objective of this project was to perform research to quantify and improve the energy efficiency and the exhaust emissions reduction from advanced technology vehicles using clean, renewable and alternative fuels. Advanced vehicle and alternative fuel fleets were to be identified, and selected vehicles characterized for emissions and efficiency. Target vehicles were to include transit buses, school buses, vocational trucks, delivery trucks, and tractor-trailers. Gaseous species measured were to include carbon monoxide, carbon dioxide, oxides of nitrogen, hydrocarbons, and particulate matter. An objective was to characterize particulate matter more deeply than by mass. Accurate characterization of efficiency and emissions was to be accomplished using a state-of-the-art portable emissions measurement system and an accompanying chassis dynamometer available at West Virginia University. These two units, combined, are termed the Transportable Laboratory. An objective was to load the vehicles in a real-world fashion, using coast down data to establish rolling resistance and wind drag, and to apply the coast down data to the dynamometer control. Test schedules created from actual vehicle operation were to be employed, and a specific objective of the research was to assess the effect of choosing a test schedule which the subject vehicle either cannot follow or can substantially outperform. In addition the vehicle loading objective was to be met better with an improved flywheel system.

  6. DOE Publishes Final Rule for Residential Furnace Fan Test Procedure

    Energy.gov [DOE]

    The Department of Energy (DOE) has published a final rule regarding test procedures for residential furnace fans.

  7. Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Final Rule; Test Procedures for Ceiling Fans Energy Conservation Program: Final Rule; Test Procedures for Ceiling Fans Ceiling Fans TP Final_Rule (601.19 KB) More Documents & Publications Energy Conservation Program: Energy Conservation Standards for Ceiling Fans ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule 2014-09-19 Issuance: Energy Conservation Program for Consumer Products: Test Procedure

  8. Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rulemaking | Department of Energy Test Procedure for Pumps, Notice of Proposed Rulemaking Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking This document is Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking. commercial_industrial_pumps_tp_nopr.pdf (1.3 MB) More Documents & Publications 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Draft PEI Calculator ISSUANCE 2016-08-26: Energy

  9. TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Rulemaking | Department of Energy TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking TEST PROCEDURES FOR GENERAL SERVICE LAMPS; Supplemental Notice of Proposed Rulemaking GSL TP SNOPR.pdf (309.44 KB) More Documents & Publications ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General

  10. Test Procedure for Compact Fluorescent Lamps: Final Rule | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Procedure for Compact Fluorescent Lamps: Final Rule Test Procedure for Compact Fluorescent Lamps: Final Rule This final rule amends the U.S. Department of Energy's (DOE) test procedures for medium base compact fluorescent lamps (MBCFLs) and adopts test procedures for new metrics for all CFLs including hybrid CFLs and CFLs with bases other than medium screw base. In this final rule, DOE replaces references to ENERGY STAR® testing requirements with references to the latest versions of

  11. Procedure for Performing In-Plane Membrane Conductivity Testing...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In-Plane Membrane Conductivity Testing Procedure for Performing In-Plane Membrane Conductivity Testing Presented at the 2009 High Temperature Membrane Working Group Meeting held ...

  12. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures...

    Energy.gov [DOE] (indexed site)

    notice of public meeting for Energy Conservation Program: Test Procedures for External ... More Documents & Publications 2014-10-16 Issuance: Energy Conservation Program Test ...

  13. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures...

    Energy Saver

    Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking ISSUANCE 2016-02-26: Energy Conservation Program: Test ...

  14. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications ISSUANCE 2016-05-19: Energy Conservation Program: Test ... HSVC ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures for Central ...

  15. ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures...

    Energy Saver

    Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking ISSUANCE 2016-08-04: Energy Conservation Program: Test ...

  16. ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures...

    Office of Environmental Management (EM)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking ISSUANCE 2016-10-28 Energy Conservation Program: Test ...

  17. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule ISSUANCE 2015-06-08: Energy Conservation Program: Test ...

  18. Alternatives Analysis for the Resumption of Transient Testing Program

    SciTech Connect

    Lee Nelson

    2013-11-01

    An alternatives analysis was performed for resumption of transient testing. The analysis considered eleven alternatives including both US international facilities. A screening process was used to identify two viable alternatives from the original eleven. In addition, the alternatives analysis includes a no action alternative as required by the National Environmental Policy Act (NEPA). The alternatives considered in this analysis included: 1. Restart the Transient Reactor Test Facility (TREAT) 2. Modify the Annular Core Research Reactor (ACRR) which includes construction of a new hot cell and installation of a new hodoscope. 3. No Action

  19. Ex Parte Communication on Central Air-Conditioner Test Procedure |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Procedure Ex Parte Communication on Central Air-Conditioner Test Procedure On September 18, 2015, AHRI staff and Manufacturing Representatives met with representatives from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners. AHRI Ex Parte Memo CACTP (39.48 KB) More Documents & Publications Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues Ex Parte Memo on CAC/Dry Charged Units

  20. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Neighborhood Electric Vehicle Specifications and Test Procedures AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (334.01 KB) ETA-NTP004 Electric Vehicle Constant Speed Range Test (138.66 KB) ETA-NTP005 Electric Vehicle Rough Road

  1. TMACS test procedure TP003: Graphics. Revision 6

    SciTech Connect

    Scanlan, P.K.; Washburn, S.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  2. TMACS test procedure TP001: Alarm management. Revision 6

    SciTech Connect

    Scanlan, P.K.

    1994-09-01

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the Alarm Management requirements of the TMACS. The features to be tested are: real-time alarming on high and low level and discrete alarms, equipment alarms, dead-band filtering, alarm display color coding, alarm acknowledgement, and alarm logging.

  3. TMACS test procedure TP004: Reporting. Revision 4

    SciTech Connect

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addressed the report generation capability of the TMACS. The features to be tested are generation of the alarm history report, equipment failure report, single-shell tank report and double-shell tank report.

  4. TMACS test procedure TP003: Graphics. Revision 5

    SciTech Connect

    Scanlan, P.K.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the graphics requirements of the TMACS. The features to be tested are the data display graphics and the graphic elements that provide for operator control and selection of displays.

  5. Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure Consortium for Energy Efficiency (CEE) Notes_ Clothes Dryer Test Procedure CEE and DOE staff discussed the importance of relying on the DOE test method as the sole metric for efficiency and energy use reporting. CEE_Notes_ClothesDryerTestProcedure_25Apr2016 (352.34 KB) More Documents & Publications 2015-03-23 Issuance: Energy Conservation Standards for Residential Clothes Dryers; Request for

  6. Light duty utility arm equipment qualification test procedure

    SciTech Connect

    Kiebel, G.R., Westinghouse Hanford

    1996-07-22

    The Equipment Qualification Test described in this test procedure document is the acceptance test procedure (ATP) for the LDUA Baseline System. It verifies that the equipment is complete and in working order, and demonstrates its readiness for being deployed into an actual underground storage tank.

  7. AVTA: Urban Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Urban Electric Vehicle Specifications and Test Procedures AVTA: Urban Electric Vehicle Specifications and Test Procedures UEVAmerica Specifications (252.08 KB) ETA-UTP001 Implementation of SAE Standard J1263, Feb. 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (50.53 KB) ETA-UTP002 Implementation of SAE Standard J1666, May 1993 - Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (65.68 KB) ETA-UTP003

  8. 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Equipment; Final Rule | Department of Energy 0 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule 2014-04-10 Issuance: Test Procedures for Commercial Refrigeration Equipment; Final Rule This document is a pre-publication Federal Register final rule regarding test procedures for commercial refrigeration equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014. Though it is not intended or expected, should any discrepancy occur

  9. 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Products; Notice of Proposed Rulemaking | Department of Energy 1-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking 2014-11-26 Issuance: Test Procedures for Miscellaneous Refrigeration Products; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for miscellaneous refrigeration products, as issued by the Deputy Assistant Secretary for Energy Efficiency on

  10. 2014-10-14 Issuance: Test Procedures and Energy Conservation...

    Energy.gov [DOE] (indexed site)

    request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy...

  11. DOE Publishes Final Rule for Plumbing Products Test Procedures

    Energy.gov [DOE]

    The Department of Energy has published a final rule regarding test procedures for showerheads, faucets, water closets, urinals, and commercial prerinse spray valves.

  12. Ex Parte Communication on Central Air-Conditioner Test Procedure...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Ex Parte Communication on Central Air-Conditioner Test Procedure Ex Parte Memo on CACDry Charged Units ISSUANCE 2016-05-19: Energy Conservation ...

  13. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure...

    Energy.gov [DOE] (indexed site)

    2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2016-05-06: Energy Conservation Program: Energy ...

  14. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure...

    Energy.gov [DOE] (indexed site)

    the Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned ... meeting ISSUANCE 2015-12-24: Energy Conservation Program: Energy Conservation Standards ...

  15. Energy Conservation Program: Test Procedures for External Power...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EERE-2014-BT-TP-0043 RIN: 1904-AD36 Energy Conservation Program: Test Procedures for External Power Supplies AGENCY: Office of Energy Efficiency and Renewable Energy, Department ...

  16. Energy Conservation Program: Test Procedures for Certain Categories...

    Energy.gov [DOE] (indexed site)

    EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for ... service lamps (GSLs) to support the ongoing energy conservation standards rulemaking. ...

  17. TMACS test procedure TP012: Panalarm software bridge

    SciTech Connect

    Washburn, S.J.

    1994-08-25

    This Test Procedure addresses the testing of the functionality of the Tank Monitor and Control System (TMACS) Panalarm bridge software. The features to be tested are: Bridge Initialization Options; Bridge Communication; Bridge Performance; Testing Checksum Errors; and Testing Command Reject Errors. Only the first three could be tested; the last two have been deferred to a later date.

  18. AVTA: Oil Bypass Filter Specifications and Test Procedures | Department of

    Energy Saver

    Energy Oil Bypass Filter Specifications and Test Procedures AVTA: Oil Bypass Filter Specifications and Test Procedures PuraDYN Oil Bypass Filtration System Evaluation Test Plan methodology is used in the testing of all oil bypass filters on the buses at the Idaho National Laboratory. PuraDYN Oil Bypass Filtration System Evaluation Test Plan (732.1 KB) More Documents & Publications Demonstrated Petroleum Reduction Using Oil Bypass Filter Technology on Heavy and Light Vehicles Effects of

  19. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Fleet Test and Evaluation Procedure (231.85 KB) HEVAmerica Technical Specifications (164.3 KB) HEV Baseline Test Sequence (46.65 KB) HEV End of Life Test Sequence (29.89 KB) ETA-HTP01 Implementation of SAE Standard J1263 February 1996 - Road Load Measurement and Dynamometer Simulation Using Coastdown Techniques (118.71 KB) ETA-HTP02 Implementation

  20. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed...

    Energy.gov [DOE] (indexed site)

    the notice of proposed rulemaking for a test procedure for set-top boxes and the ... The Energy Department also retains its authority to test set-top boxes under the ENERGY ...

  1. Acceptance Test Procedure for New Pumping Instrumentation & Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-08-14

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  2. Integrated Performance Testing Workshop - Supplemental Materials (Scripts and Procedures)

    SciTech Connect

    Baum, Gregory A.

    2014-02-01

    A variety of performance tests are described relating to: Material Transfers; Emergency Evacuation; Alarm Response Assessment; and an Enhanced Limited Scope Performance Test (ELSPT). Procedures are given for: nuclear material physical inventory and discrepancy; material transfers; and emergency evacuation.

  3. Rocky Flats ash test procedure (sludge stabilization)

    SciTech Connect

    Winstead, M.L.

    1995-09-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. This test will also gain information on the effects of the glovebox atmosphere (moisture) on the stabilized material. This document provides instructions for testing Rocky Flats Ash in the HC-21C muffle furnace process.

  4. AVTA: Transit Vehicle Specifications and Test Procedures | Department of

    Energy Saver

    Energy Transit Vehicle Specifications and Test Procedures AVTA: Transit Vehicle Specifications and Test Procedures All Advanced Vehicle Testing Activity transit projects follow a rigorous data collection and analysis protocol. Refer to "General Evaluation Plan: Fleet Test and Evaluation Projects" for information about fleet selection, data collection, and products related to new evaluation projects. More Documents & Publications Vehicle Technologies Office: 2010 Vehicle and

  5. Rocky Flats Ash test procedure (sludge stabilization)

    SciTech Connect

    Funston, G.A.

    1995-06-14

    Rocky Flats Ash items have been identified as the next set of materials to be stabilized. This test is being run to determine charge sizes and soak times to completely stabilize the Rocky Flats Ash items. The information gathered will be used to generate the heating rampup cycle for stabilization. The test will provide information to determine charge sizes, soak times and mesh screen sizes (if available at time of test) for stabilization of Rocky Flats Ash items to be processed in the HC-21C Muffle Furnace Process. Once the charge size and soak times have been established, a program for the temperature controller of the HC-21C Muffle Furnace process will be generated for processing Rocky Flats Ash.

  6. Test Procedures for Building Energy Simulation Tools | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Building Energy Simulation Tools Test Procedures for Building Energy Simulation Tools Lead Performer: -- National Renewable Energy Laboratory - Golden, CO -- J. Neymark & Associates - Golden, CO -- Lawrence Berkeley National Laboratory (LBNL) - Berkeley, CA Partners: -- ASHRAE Standing Special Projects Committee 140 -- Residential Energy Services Network (RESNET) -- International Energy Agency (IEA) - Paris, France -- Trane Inc. - Piscataway, NJ -- Carrier Corp. - Alexandria,

  7. Webinar: Test Procedure for Battery Chargers; Notice of Data Availability

    Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of data availability regarding test procedures for battery chargers. 79 FR 27774  (May 15, 2014). For more information, please visit...

  8. LG DOE Television Test Procedures Ex Parte (10-17)

    Office of Environmental Management (EM)

    OF LG ELECTRONICS USA In response to its Request for Information on test procedures for televisions, the Department received a fair amount of both opinion and data from a variety ...

  9. AVTA: Hybrid Electric Vehicle Specifications and Test Procedures...

    Energy.gov [DOE] (indexed site)

    (118.71 KB) ETA-HTP02 Implementation of SAE Standard J1666 May 1993 - Hybrid Electric Vehicle Acceleration, Gradeability, and Deceleration Test Procedure (230.69 KB) ETA-HTP03 ...

  10. Energy Conservation Program: Test Procedures for Certain Categories...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for ... Title III of the Energy Policy and Conservation Act of 1975 (42 U.S.C. 6291, et seq.; ...

  11. Webinar: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Energy.gov [DOE]

    DOE is conducting a public meeting and webinar for the notice of proposed rulemaking regarding test procedures for residential dehumifiers. 79 FR 29271 (May 22, 2014). For more information, please...

  12. DOE Seeks Comment on Application of Clothes Washer Test Procedure

    Energy.gov [DOE]

    Today, the U.S. Department of Energy (DOE) issued a draft interpretative rule clarifying its views on the application of the current residential clothes washer test procedure to machines that offer...

  13. Energy Conservation Program: Test Procedures for Certain Categories...

    Energy.gov [DOE] (indexed site)

    1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 430 Docket No. EERE-2016-BT-TP-0005 RIN 1904-AD64 Energy Conservation Program: Test Procedures for Certain Categories of ...

  14. Meeting Concerning Potential Test Procedures and Energy Conservation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Standards for Set-Top Boxes and Network Equipment | Department of Energy Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment Meeting Concerning Potential Test Procedures and Energy Conservation Standards for Set-Top Boxes and Network Equipment In compliance with the Department of Energy's guidance on ex parte communications (74 Fed. Reg. 52795 (Oct. 14, 2009)), this memorandum provides a summary of a March 7, 2012, meeting with DOE

  15. Flammable gas interlock spoolpiece flow response test plan and procedure

    SciTech Connect

    Schneider, T.C., Fluor Daniel Hanford

    1997-02-13

    The purpose of this test plan and procedure is to test the Whittaker electrochemical cell and the Sierra Monitor Corp. flammable gas monitors in a simulated field flow configuration. The sensors are used on the Rotary Mode Core Sampling (RMCS) Flammable Gas Interlock (FGI), to detect flammable gases, including hydrogen and teminate the core sampling activity at a predetermined concentration level.

  16. Operational test procedure for SY tank farm replacement exhauster unit

    SciTech Connect

    McClees, J.

    1995-09-26

    This operational test procedure will verify that the remaining functions not tested per WHC-SD-WM-ATP-080, or components disturbed during final installation, as well as interfaces with other tank farm equipment and remote monitoring stations are operating correctly.

  17. Review of Test Procedure for Determining HSPFs of Residential Variable-Speed Heat Pumps

    SciTech Connect

    Rice, C. Keith; Munk, Jeffrey D.; Shrestha, Som S.

    2015-08-01

    This report reviews the suitability of the existing Heating Seasonal Performance Factor (HSPF) ratings and testing requirements for the current generation of variable-speed (VS) air-source heat pumps. Recent field test results indicate larger discrepancies between rated HSPF and field-observed HSPF for VS models than for single-speed models in the same houses. These findings suggest that the heating season test and ratings procedure should be revisited for VS heat pumps. The ratings and testing procedures are described in ANSI/AHRI 210/240 (2008) for single-speed, two-capacity, and variable-speed units. Analysis of manufacturer and independent test performance data on VS units reveals why the current VS testing/ratings procedure results in overly optimistic HSPF ratings for some VS units relative to other types of heat pumps. This is due to a combination of extrapolation of low speed test data beyond the originally anticipated ambient temperature operating range and the constraints of unit controls, which prevent low speed operation over the range of ambient temperatures assumed in the procedure for low speed. As a result, the HSPFs of such units are being overpredicted relative to those for single- and two-capacity designs. This overprediction has been found to be significantly reduced by use in the HSPF ratings procedure of an alternative higher-load heating load line, described in a companion report (Rice et al., 2015).

  18. LG DOE Television Test Procedures Ex Parte (10-17)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    United States Department of Energy Washington, D.C. 20585 In the Matter of: Energy Efficiency Program: Test Procedure for Televisions; Request for Information Docket No. EERE-2016-BT- TP-0023; RIN 1904-AD70 EX PARTE REPLY COMMENTS OF LG ELECTRONICS USA In response to its Request for Information on test procedures for televisions, the Department received a fair amount of both opinion and data from a variety of parties. There was, however, less effort to connect that opinion and data with the

  19. PUREX (SAMCONS) uninterruptible power supply (UPS) acceptance test procedure

    SciTech Connect

    Blackaby, W.B.

    1997-09-01

    This Acceptance Test Procedure for the PUREX Surveillance and Monitoring and Control System (SAMCONS) Uninterruptible Power Supply (UPS) provides for testing and verifying the proper operation of the control panel alarms and trouble functions, the 6roper functioning of the AC inverter, ability of the battery supply to maintain the SAMCONS load for a minimum of two hours , and proper interaction with the SAMCONS Video graphic displays for alarm displays.

  20. Refrigerator-freezer energy testing with alternative refrigerants

    SciTech Connect

    Vineyard, E.A.; Sand, J.R.; Miller, W.A.

    1989-01-01

    As a result of the Montreal Protocol that limits the production of ozone-depleting refrigerants, manufacturers are searching for alternatives to replace the R12 that is presently used in residential refrigerator-freezers. Before an alternative can be selected, several issues must be resolved. Among these are energy impacts, system compatibility, cost, and availability. In an effort to determine the energy impacts of some of the alternatives, energy consumption tests were performed in accordance with section 8 of the Association of Home Appliance Manufacturers (AHAM) standard for household refrigerators and household freezers. The results are presented for an 18 cubic foot (0.51 cubic meter), top-mount refrigerator-freezer with a static condenser using the following refrigerants: R12, R500, R12/Dimethyl-ether (DME), R22/R142b, and R134a. Conclusions from the AHAM test are that R500 and R12 /DME have a reduced energy consumption relative to R12 when replaced in the test unit with no modifications to the refrigeration system. Run times were slightly lower than R12 for both refrigerants indicating a higher capacity. While the R134a and R22/R142b results were less promising refrigeration system, such as a different capillary tube or compressor, may improve their performance. 12 refs., 2 figs., 3 tabs.

  1. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Department of Energy Test Procedure for Pumps Final Rule 2015-12-30 Energy Conservation Program: Test Procedure for Pumps Final Rule Test Procedure for Pumps Final Rule Pumps Test Procedure Final Rule.pdf (1.85 MB) More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking

  2. 100 Area soil washing bench-scale test procedures

    SciTech Connect

    Freeman, H.D.; Gerber, M.A.; Mattigod, S.V.; Serne, R.J.

    1993-03-01

    This document describes methodologies and procedures for conducting soil washing treatability tests in accordance with the 100 Area Soil Washing Treatability Test Plan (DOE-RL 1992, Draft A). The objective of this treatability study is to evaluate the use of physical separation systems and chemical extraction methods as a means of separating chemically and radioactively contaminated soil fractions from uncontaminated soil fractions. These data will be primarily used for determining feasibility of the individual unit operations and defining the requirements for a system, or systems, for pilot-scale testing.

  3. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners...

    Office of Environmental Management (EM)

    2 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed ...

  4. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a ...

  5. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge...

    Energy.gov [DOE] (indexed site)

    notice of proposed rulemaking regarding test procedures for high-intesity discharge ... access to this document. 2014-05-05 Test Procedures for High-Intensity Discharge ...

  6. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting ...

  7. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers...

    Energy Saver

    3 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking This ...

  8. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting ...

  9. Test Report for Acceptance Test Procedure for Pumping and Instrumentation Control Skid ''K''

    SciTech Connect

    JOHNS, B.R.

    1999-10-28

    This is a Test Report for Acceptance Test Procedure (ATP) HNF-4276. This test report provides the results of the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''K''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  10. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5055. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''L''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  11. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid N

    SciTech Connect

    KOCH, M.R.

    2000-02-03

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5489. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''N''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  12. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This is a Test Report for Acceptance Test Procedure (ATP) RPP-5073. This test report provides the results of the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''M''. The ATP was successfully completed. A copy of the completed ATP is in the Appendix of this document.

  13. Acceptance Test Procedure: SY101 air pallet system

    SciTech Connect

    Koons, B.M.

    1995-05-30

    The purpose of this test procedure is to verify that the system(s) procured to load the SY-101 Mitigation Test Pump package fulfills its functional requirements. It will also help determine the man dose expected due to handling of the package during the actual event. The scope of this procedure focuses on the ability of the air pallets and container saddles to carry the container package from the new 100 foot concrete pad into 2403-WD where it will be stored awaiting final disposition. This test attempts to simulate the actual event of depositing the SY-101 hydrogen mitigation test pump into the 2403-WD building. However, at the time of testing road modifications required to drive the 100 ton trailer into CWC were not performed. Therefore a flatbed trailer will be use to transport the container to CWC. The time required to off load the container from the 100 ton trailer will be recorded for man dose evaluation on location. The cranes used for this test will also be different than the actual event. This is not considered to be an issue due to minimal effects on man dose.

  14. Refrigerator-freezer energy testing with alternative refrigerants

    SciTech Connect

    Sand, J.R. ); Vineyard, E.A.; Sand, J.R.

    1989-01-01

    As a result of the Montreal Protocol (UNEP 1987) that limits the production of ozone-depleting refrigerants, manufacturers are searching for alternatives to replace the R12 that is presently used in residential refrigerator-freezers. Before an alternative can be selected, several issues must resolved. Among these are energy impacts, system compatibility, cost, and availability, In an effort to determine the energy impacts of some of the alternatives, energy consumption tests were performed in accordance with section 8 of the Association of Home Appliance Manufacturers (AHAM) standard for household refrigerators and household freezers (AHAM 1985). The results are presented for an 18 ft{sup 3} (0.51 m{sup 3}), top mount refrigerators-freezer with a static condenser using the following refrigerants: R 12, R500, R12/dimethylether (DME), R22/R142b, and R134a. Conclusions from the AHAM test are that R500 and R12/DME have a reduced energy consumption relative to R12 when replaced in the test unit with no modifications to the refrigeration system. Run times were slightly lower than R12 for both refrigerants, indicating a higher capacity. While the R134a and R22/R142b results were less promising (6.8% and 8.5% higher energy consumption, respectively), changes to the refrigeration system, such as a different capillary tube or compressor, may improve their performance. It is noted that the test results are only an initial step in determining a replacement for R12.

  15. ALTERNATE REDUCTANT COLD CAP EVALUATION FURNACE PHASE II TESTING

    SciTech Connect

    Johnson, F.; Stone, M.; Miller, D.

    2014-09-03

    Savannah River Remediation (SRR) conducted a Systems Engineering Evaluation (SEE) to determine the optimum alternate reductant flowsheet for the Defense Waste Processing Facility (DWPF). Specifically, two proposed flowsheets (nitric–formic–glycolic and nitric–formic–sugar) were evaluated based upon results from preliminary testing. Comparison of the two flowsheets among evaluation criteria indicated a preference towards the nitric–formic–glycolic flowsheet. Further research and development of this flowsheet eliminated the formic acid, and as a result, the nitric–glycolic flowsheet was recommended for further testing. Based on the development of a roadmap for the nitric–glycolic acid flowsheet, Waste Solidification Engineering (WS-E) issued a Technical Task Request (TTR) to address flammability issues that may impact the implementation of this flowsheet. Melter testing was requested in order to define the DWPF flammability envelope for the nitric-glycolic acid flowsheet. The Savannah River National Laboratory (SRNL) Cold Cap Evaluation Furnace (CEF), a 1/12th scale DWPF melter, was selected by the SRR Alternate Reductant project team as the melter platform for this testing. The overall scope was divided into the following sub-tasks as discussed in the Task Technical and Quality Assurance Plan (TTQAP):  Phase I - A nitric–formic acid flowsheet melter test (unbubbled) to baseline the CEF cold cap and vapor space data to the benchmark melter flammability models;  Phase II - A nitric–glycolic acid flowsheet melter test (unbubbled and bubbled) to: o Define new cold cap reactions and global kinetic parameters in support of the melter flammability model development; o Quantify off-gas surging potential of the feed; o Characterize off-gas condensate for complete organic and inorganic carbon species. After charging the CEF with cullet from Phase I CEF testing, the melter was slurry-fed with glycolic flowsheet based SB6-Frit 418 melter feed at 36

  16. Lightning arrestor connector lead magnesium niobate qualification pellet test procedures.

    SciTech Connect

    Tuohig, W.; Mahoney, Patrick A.; Tuttle, Bruce Andrew; Wheeler, Jill Susanne

    2009-02-01

    Enhanced knowledge preservation for DOE DP technical component activities has recently received much attention. As part of this recent knowledge preservation effort, improved documentation of the sample preparation and electrical testing procedures for lead magnesium niobate--lead titanate (PMN/PT) qualification pellets was completed. The qualification pellets are fabricated from the same parent powders used to produce PMN/PT lightning arrestor connector (LAC) granules at HWF&T. In our report, the procedures for fired pellet surface preparation, electrode deposition, electrical testing and data recording are described. The dielectric measurements described in our report are an information only test. Technical reasons for selecting the electrode material, electrode size and geometry are presented. The electrical testing is based on measuring the dielectric constant and dissipation factor of the pellet during cooling from 280 C to 220 C. The most important data are the temperature for which the peak dielectric constant occurs (Curie Point temperature) and the peak dielectric constant magnitude. We determined that the peak dielectric constant for our procedure would be that measured at 1 kHz at the Curie Point. Both the peak dielectric constant and the Curie point parameters provide semi-quantitative information concerning the chemical and microstructural homogeneity of the parent material used for the production of PMN/PT granules for LACs. Finally, we have proposed flag limits for the dielectric data for the pellets. Specifically, if the temperature of the peak dielectric constant falls outside the range of 250 C {+-} 30 C we propose that a flag limit be imposed that will initiate communication between production agency and design agency personnel. If the peak dielectric constant measured falls outside the range 25,000 {+-} 10,000 we also propose that a flag limit be imposed.

  17. 2015-12-29 Consumer Furnaces and Boilers Test Procedures Final Rule

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Consumer Furnaces and Boilers

  18. Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Furnaces and Boilers, Comment Period Extension

  19. ALTERNATE REDUCTANT COLD CAP EVALUATION FURNACE PHASE I TESTING

    SciTech Connect

    Johnson, F.; Miller, D.; Zamecnik, J.; Lambert, D.

    2014-04-22

    Savannah River Remediation (SRR) conducted a Systems Engineering Evaluation (SEE) to determine the optimum alternate reductant flowsheet for the Defense Waste Processing Facility (DWPF). Specifically, two proposed flowsheets (nitric–formic–glycolic and nitric–formic–sugar) were evaluated based upon results from preliminary testing. Comparison of the two flowsheets among evaluation criteria indicated a preference towards the nitric–formic–glycolic flowsheet. Further evaluation of this flowsheet eliminated the formic acid1, and as a result, the nitric–glycolic flowsheet was recommended for further testing. Based on the development of a roadmap for the nitric–glycolic acid flowsheet, Waste Solidification Engineering (WS-E) issued a Technical Task Request (TTR) to address flammability issues that may impact the implementation of this flowsheet. Melter testing was requested in order to define the DWPF flammability envelope for the nitric glycolic acid flowsheet. The Savannah River National Laboratory (SRNL) Cold Cap Evaluation Furnace (CEF), a 1/12th scale DWPF melter, was selected by the SRR Alternate Reductant project team as the melter platform for this testing. The overall scope was divided into the following sub-tasks as discussed in the Task Technical and Quality Assurance Plan (TTQAP):  Phase I - A nitric–formic acid flowsheet melter test (unbubbled) to baseline the Cold Cap Evaluation Furnace (CEF) cold cap and vapor space data to the benchmark melter flammability models  Phase II - A nitric–glycolic acid flowsheet melter test (unbubbled and bubbled) to: o Define new cold cap reactions and global kinetic parameters for the melter flammability models o Quantify off-gas surging potential of the feed o Characterize off-gas condensate for complete organic and inorganic carbon species Prior to startup, a number of improvements and modifications were made to the CEF, including addition of cameras, vessel support temperature measurement, and a

  20. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for ...

  1. TMACS Test Procedure TP005: Sensor configuration, logging, and data conversion

    SciTech Connect

    Washburn, S.J.

    1994-08-29

    The TMACS Software Project Test Procedures translate the projects acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes.

  2. Testing of Alternative Abrasives for Water-Jet Cutting at C Tank...

    Office of Scientific and Technical Information (OSTI)

    Testing of Alternative Abrasives for Water-Jet Cutting at C Tank Farm Citation Details In-Document Search Title: Testing of Alternative Abrasives for Water-Jet Cutting at C Tank ...

  3. Test plan/procedure for the SPM-1 shipping container system. Revision 0

    SciTech Connect

    Flanagan, B.D.

    1995-07-01

    The 49 CFR 173.465 Type A packaging tests will verify that SPM-1 will provide adequate protection and pass as a Type A package. Test will determine that the handle of the Pig will not penetrate through the plywood spacer and rupture the shipping container. Test plan/procedure provides planning, pre-test, setup, testing, and post-testing guidelines and procedures for conducting the {open_quotes}Free Drop Test{close_quotes} procedure for the SPM-1 package.

  4. Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Procedures A NSSAB outreach display is available for community events The Nevada Site Specific Advisory Board (NSSAB) abides by a variety of federal and self-imposed procedures....

  5. TESTING ALTERNATIVE THEORIES OF GRAVITY USING THE SUN

    SciTech Connect

    Casanellas, Jordi; Pani, Paolo; Lopes, Ilidio; Cardoso, Vitor E-mail: paolo.pani@ist.utl.pt E-mail: vitor.cardoso@ist.utl.pt

    2012-01-20

    We propose a new approach to test possible corrections to Newtonian gravity using solar physics. The high accuracy of current solar models and new precise observations allow us to constrain corrections to standard gravity at unprecedented levels. Our case study is Eddington-inspired gravity, an attractive modified theory of gravity which results in non-singular cosmology and collapse. The theory is equivalent to standard gravity in vacuum, but it sensibly differs from it within matter. For instance, it affects the evolution and the equilibrium structure of the Sun, giving different core temperature profiles, and deviations in the observed acoustic modes and in solar neutrino fluxes. Comparing the predictions from a modified solar model with observations, we constrain the coupling parameter of the theory, |{kappa}{sub g}| {approx}< 3 Multiplication-Sign 10{sup 5} m{sup 5} s{sup -2} kg{sup -1}. Our results show that the Sun can be used to efficiently constrain alternative theories of gravity.

  6. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits...

    Energy Saver

    7 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking ...

  7. DOE Publishes Notice of Proposed Rulemaking for Commercial Refrigeration Equipment Test Procedure

    Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for commercial refrigeration equipment.

  8. ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dehumidifiers, Final Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule ISSUANCE 2015-06-26: Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule This document is the Energy Conservation Program: Test Procedures for Dehumidifiers, Final Rule. dehumid_tp_finalrule.pdf (734.28 KB) More Documents & Publications ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice

  9. ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Clothes Washers, Final Rule | Department of Energy 17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule ISSUANCE 2015-07-17: Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule This document is the Energy Conservation Program: Test Procedures for Clothes Washers, Final Rule. clothes_washers_tp_finalrule.pdf (1.53 MB) More Documents & Publications 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed

  10. ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Battery Chargers, Final Rule | Department of Energy Test Procedure for Battery Chargers, Final Rule ISSUANCE 2016-05-06: Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule This document is the Energy Conservation Program: Test Procedure for Battery Chargers, Final Rule. Battery Chargers TP Final Rule.pdf (449.69 KB) More Documents & Publications 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability ISSUANCE 2015-07-27: Energy

  11. DOE Publishes Notice of Proposed Rulemaking Regarding the Compliance Date for the Dehumidifier Test Procedure

    Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding the compliance date for the dehumidifier test procedure.

  12. AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Department of Energy Plug-in Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures Plug-in Hybrid Electric Vehicle Test Plan DRAFT - Integrated Test Plan and Evaluation Program for Review for Plug-in Hybrid Electric Vehicles (PHEVs) (2.33 MB) More Documents & Publications AVTA: Hybrid Electric Vehicle Specifications and Test Procedures Vehicle Technologies Office: 2010 Vehicle and Systems Simulation and Testing

  13. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters...

    Energy.gov [DOE] (indexed site)

    Energy Conservation Program for Consumer Products and Certain Industrial Equipment: Test ... Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial ...

  14. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information ISSUANCE 2015-12-04: Energy Conservation Standards and Test ...

  15. Energy Conservation Program: Test Procedures for Commercial Prerinse...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Acceptable alternate forms of Photo-ID include: U.S. Passport or Passport Card; an Enhanced Driver's License or Enhanced ID-Card issued by the States of Minnesota, New York or ...

  16. Text-Alternative Version of Building America Webinar: Field Test...

    Energy Saver

    ... Field test: Start to Finish, as we mentioned, is sort of a big picture overview of things like experimental design, field test considerations, data analysis and reporting are ...

  17. ISSUANCE 2015-04-29: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters Notice of petition to extend test procedure compliance date and request for comment

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters; Notice of petition to extend test procedure compliance date and request for comment.

  18. Comparison of Real World Energy Consumption to Models and Department of Energy Test Procedures

    SciTech Connect

    Goetzler, William; Sutherland, Timothy; Kar, Rahul; Foley, Kevin

    2011-09-01

    This study investigated the real-world energy performance of appliances and equipment as it compared with models and test procedures. The study looked to determine whether the U.S. Department of Energy and industry test procedures actually replicate real world conditions, whether performance degrades over time, and whether installation patterns and procedures differ from the ideal procedures. The study first identified and prioritized appliances to be evaluated. Then, the study determined whether real world energy consumption differed substantially from predictions and also assessed whether performance degrades over time. Finally, the study recommended test procedure modifications and areas for future research.

  19. AVTA: Full-Size Electric Vehicle Specifications and Test Procedures |

    Energy Saver

    Incidents in Plug-in Electric Vehicles (EV) | Department of Energy Battery Testing - Best Practices for Responding to Emergency Incidents in Plug-in Electric Vehicles (EV) AVTA: Battery Testing - Best Practices for Responding to Emergency Incidents in Plug-in Electric Vehicles (EV) The Vehicle Technologies Office's Advanced Vehicle Testing Activity carries out testing on a wide range of advanced vehicles and technologies on dynamometers, closed test tracks, and on-the-road. These results

  20. Test procedure for measurement of performance vs temperature of Whittaker electrochemical cell

    SciTech Connect

    Vargo, G.F.

    1997-01-23

    This document is the test procedure to systematically test the Whittaker cells between the temperatures of -20 degrees F and +120 degrees F. These sensors are used on the Rotary Mode Core Sampling (RMCS) flammable gas interlock (FGI), to detect and quantify hydrogen gas. This procedure supports the testing, that is being performed after cold weather attempts on the Whittaker cell failed.

  1. ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking | Department of Energy 8-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking ISSUANCE 2016-08-26: Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedure for Dedicated-Purpose Pool Pumps, Notice of Proposed Rulemaking. Dedicated Purpose Pool Pumps TP NOPR.pdf

  2. ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certain Categories of General Service Lamps, Final Rule | Department of Energy 09-30: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule ISSUANCE 2016-09-30: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule This document is the Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Final Rule. General Service Lamps TP Final Rule.pdf (353.34 KB)

  3. 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers;

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Notice of Proposed Rulemaking | Department of Energy 1 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking 2014-04-11 Issuance: Test Procedures for Residential Clothes Washers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedure amendments for residential clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 11, 2014. Though it is not

  4. 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps;

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Supplemental Notice of Proposed Rulemaking | Department of Energy Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-05 Issuance: Test Procedures for High-Intensity Discharge Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for high-intesity discharge lamps, as issued by the Deputy Assistant Secretary for Energy

  5. 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Availability | Department of Energy Test Procedures for Battery Chargers; Notice of Data Availability 2014-05-08 Issuance: Test Procedures for Battery Chargers; Notice of Data Availability This document is a pre-publication Federal Register notice of data availability regarding test procedures for battery chargers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 8, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted

  6. 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Lamps; Supplemental Notice of Proposed Rulemaking | Department of Energy 16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking 2014-05-16 Issuance: Test Procedures for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking This document is a pre-publication Federal Register supplemental notice of proposed rulemaking regarding test procedures for integrated light-emitting diode lamps, as issued by the

  7. 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ballasts; Notice of Proposed Rulemaking | Department of Energy 4 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking 2014-10-14 Issuance: Test Procedures Correction for Fluorescent Lamp Ballasts; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14,

  8. 2014-10-16 Issuance: Energy Conservation Program Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Residential Clothes Dryers, Notice of Public Meeting | Department of Energy 6 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting 2014-10-16 Issuance: Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting Energy Conservation Program Test Procedures for Residential Clothes Dryers, Notice of Public Meeting clothes_dryer_nopm.pdf (194.46 KB) More Documents & Publications 2014-01-31

  9. 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Proposed Rulemaking | Department of Energy 2 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking 2015-02-12 Issuance: Test Procedures for Portable Air Conditioners; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 12, 2015. Though it is not intended or

  10. 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Proposed Rulemaking | Department of Energy 3 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking 2015-02-13 Issuance: Test Procedure for Furnaces and Boilers; Notice of Proposed Rulemaking This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for furnaces and boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 13, 2015. Though it is not intended or expected, should any

  11. 2016-10-21 Energy Conservation Program: Test Procedure for Commercial

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Packaged Boilers Final Rule | Department of Energy Program: Test Procedure for Commercial Packaged Boilers Final Rule 2016-10-21 Energy Conservation Program: Test Procedure for Commercial Packaged Boilers Final Rule Commercial Packaged Boilers_Final Rule_10.21.16 (708.07 KB) More Documents & Publications ISSUANCE 2016-02-22: Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers, Notice of Proposed Rulemaking

  12. ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ceiling Fans, Supplemental Notice of Proposed Rule | Department of Energy 6: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule ISSUANCE 2015-05-26: Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fans, Supplemental Notice of Proposed Rule. ceiling_fans_tp_snopr.pdf (526.51 KB) More Documents & Publications

  13. ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Conventional Ovens, Final Rule | Department of Energy 18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule ISSUANCE 2015-06-18: Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule This document is the Energy Conservation Program: Test Procedures for Conventional Ovens, Final Rule. conventional_ovens_tp_finalrule.pdf (448.83 KB) More Documents & Publications ISSUANCE 2015-05-29: Energy Conservation Program: Energy Conservation

  14. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Battery Chargers, Notice of Proposed Rulemaking | Department of Energy 27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Battery Chargers, Notice of Proposed Rulemaking. battery_chargers_tp_nopr.pdf (336.62 KB) More Documents & Publications ISSUANCE

  15. ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Compressors, Notice of Proposed Rulemaking | Department of Energy 22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking ISSUANCE 2016-04-22: Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Compressors, Notice of Proposed Rulemaking. Compressors TP NOPR.pdf (970.54 KB) More Documents & Publications Docket # EERE-2014-BT-STD-0051,

  16. ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Central Air Conditioners and Heat Pumps Final Rule | Department of Energy 5-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule ISSUANCE 2016-05-19: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule This document is the Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps Final Rule. Central Air Conditioners and Heat Pumps TP Final Rule.pdf (2.2 MB) More

  17. ISSUANCE 2016-06-16: Energy Efficiency Program: Test Procedure for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Televisions; Request for Information | Department of Energy 6: Energy Efficiency Program: Test Procedure for Televisions; Request for Information ISSUANCE 2016-06-16: Energy Efficiency Program: Test Procedure for Televisions; Request for Information This document is the Energy Efficiency Program: Test Procedure for Televisions; Request for Information. TV Request for Information.pdf (545.43 KB) More Documents & Publications LG Ex Parte Reply Comments Energy Savings Estimates of Light

  18. ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Manufactured Housing, Notice of Proposed Rulemaking | Department of Energy 10-21: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking ISSUANCE 2016-10-21: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking This document is the Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking. Manufactured Housing TP NOPR (775.7 KB) More Documents &

  19. 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    External Power Supplies, Notice of Public Meeting | Department of Energy 29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting 2014-10-29 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Public Meeting This document is the notice of public meeting for Energy Conservation Program: Test Procedures for External Power Supplies. externalpowersupplies_tp_nopm.pdf (236.66 KB) More Documents &

  20. Compressor Calorimeter Test of R-404A Alternatives ARM-31a, D2Y...

    Office of Scientific and Technical Information (OSTI)

    Test of R-404A Alternatives ARM-31a, D2Y-65, L-40, and R32 + R-134a Mixture using a Scroll Compressor Citation Details In-Document Search Title: Compressor Calorimeter Test of ...

  1. DOE Publishes Notice of Proposed Rulemaking for Direct Heating Equipment and Pool Heater Test Procedures

    Energy.gov [DOE]

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for direct heating equipment and pool heaters.

  2. BESTEST: Test Procedures Building Energy SimulationŽ Tools

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ron.Judkoff@nrel.gov BESTEST: Test Procedures "Building Energy Simulation" Tools 2014 ... and improving building energy simulation tools and associated documentation. -Increase ...

  3. ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Ceiling Fan Light Kits, Final Rule | Department of Energy 15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule ISSUANCE 2015-12-15: Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule This document is the Energy Conservation Program: Test Procedures for Ceiling Fan Light Kits, Final Rule. cflk tp final rule 2015-12-15.pdf (817.76 KB) More Documents & Publications 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light

  4. 2016-10-21 Energy Conservation Program: Test Procedure for Commercial...

    Office of Environmental Management (EM)

    Boilers Final Rule 2016-10-21 Energy Conservation Program: Test Procedure for Commercial ... More Documents & Publications ISSUANCE 2016-02-22: Energy Conservation Program for Certain ...

  5. 2015-12-30 Energy Conservation Program: Test Procedure for Pumps...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Energy Conservation Program: Test Procedure for Pumps, Notice of Proposed Rulemaking Draft PEI Calculator ISSUANCE 2016-08-26: Energy Conservation ...

  6. 2014-06-27 Issuance: Test Procedures for Residential and Commercial...

    Energy.gov [DOE] (indexed site)

    solely as a means to facilitate the public's access to this document. 2014-06-27 Test Procedures for Residential and Commercial Water Heaters; Final Rule More Documents &...

  7. Alternate retrieval technology demonstrations program - test report (ARD Environmental, Inc.)

    SciTech Connect

    Berglin, E.J.

    1997-07-31

    A prototype vehicle, control system, and waste and water scavenging system were designed and fabricated with essentially the full capabilities of the vehicle system proposed by ARD Environmental. A test tank mockup, including riser and decontamination chamber were designed and fabricated, and approximately 830 cubic feet of six varieties of waste simulants poured. The tests were performed by ARD Environmental personnel at its site in Laurel, Maryland, from 4/22/97 through 5/2/97. The capabilities tested were deployment and retrieval, extended mobility and productivity, the ability to operate the system using video viewing only, retrieval after simulated failure, and retrieval and decontamination. Testing commenced with deployment of the vehicle into the tank. Deployment was accomplished using a crane and auxiliary winch to position the vehicle and lower it through the decontamination chamber, into the 36`` diameter x 6` high riser, and touch down on the waste field in the tank. The initial mobility tests were conducted immediately after deployment, prior to sluicing, as the waste field exhibited the greatest amount of variation at this time. This test demonstrated the ability of the vehicle to maneuver over the simulated waste field, and the ability of the operator to work with only video viewing available. In addition, the ability of the vehicle to right itself after being turned on its side was demonstrated. The production rate was evaluated daily through the testing period by measuring the surface and estimating the amount of material removed. The test demonstrated the ability of the vehicle to reduce the waste surface using 400 psi (nominal) water jets, scavenge water and material from the work area, and move to any location, even in the relatively confined space of the 20` diameter test tank. In addition, the ability to sluice to a remote scavenging module was demonstrated. The failure mode test demonstrated the ability to retrieve a stuck vehicle by pulling

  8. Argonne Facilitation of PHEV Standard Testing Procedure (SAE...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications SAE Standards Development HEV, PHEV, EV Test Standard Development and Validation Off-Cycle Benchmarking of PHEVs; Wide Range of Temperatures and ...

  9. Testing LED Color-Tunable Products Text-alternative Version | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Testing LED Color-Tunable Products Text-alternative Version Testing LED Color-Tunable Products Text-alternative Version This is the text-alternative version of Testing LED Color-Tunable Products. One of the points of the CALiPER exploratory work with color-tunable luminaires was to figure out if conventional photometric testing is adequate for getting the information about the performance of the luminaire, and whether the photometric lab knows how to wire up the luminaire and get

  10. TMACS test procedure TP005: Sensor configuration, logging, and data conversion. Revision 4

    SciTech Connect

    Washburn, S.J.

    1994-08-25

    The TMACS Software Project Test Procedures translate the project`s acceptance criteria into test steps. Software releases are certified when the affected Test Procedures are successfully performed and the customers authorize installation of these changes. This Test Procedure addresses the sensor configuration, conversion and logging requirements of the TMACS. The features to be tested are as follows: sensor configuration data; conversion of continuous sensor data to engineering units; conversion of digital data to discrete states; discrete sensor data logging; and continuous sensor data logging.

  11. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control. (PIC) skid designed as ''V''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  12. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-06-20

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designated as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  13. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid W

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''W''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  14. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid R

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''R''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-03-27

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid T

    SciTech Connect

    KOCH, M.R.

    2000-05-18

    This Acceptance Test Procedure (ATP) provides for the inspection and testing Of the new Pumping Instrumentation and Control (PIC) skid designed as ''T''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  17. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-01

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  18. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U

    SciTech Connect

    KOCH, M.R.

    2000-12-05

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.

  19. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid N

    SciTech Connect

    KOCH, M.R.

    1999-12-13

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''N''. The ATP will be performed after the construction of the PIC skid in the shop.

  20. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid L

    SciTech Connect

    KOCH, M.R.

    1999-10-11

    This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping and Instrumentation Control (PIC) skid designed as ''L''. The ATP will be performed after the construction of the PIC skid in the shop.

  1. AMI FW UPGRADEABILITY TEST PROCEDURE AND SECURITY ASSESSMENT

    SciTech Connect

    Snyder, Isabelle B

    2014-01-01

    The National Institute of Standards and Technology (NIST) is producing NISTIR 7823 to define test requirements for Smart Meter upgradability. The term Smart Meter refers specifically to advanced electric meters being deployed to enhance management of electricity distribution for residential and industrial consumers. The underlying functional and security requirements for Smart Meter upgradability are specified in NEMA standard SG-AMI 1-2009. The purpose of NISTIR 7823 is to describe conformance test requirements that may be used voluntarily by testers and/or test laboratories to determine whether Smart Meters and Upgrade Management Systems conform to the requirements of NEMA SG-AMI 1-2009.

  2. Thermal test procedure for a paraboloid concentrator solar cooker

    SciTech Connect

    Mullick, S.C.; Kandpal, T.C.; Kumar, S. )

    1991-01-01

    Suitable thermal tests have been identified for performance evaluation of a concentrating solar cooker. These tests provide parameters that characterize the performance of the solar cooker, and are more or less independent of the climatic variables. The overall heat loss factor is obtained from the cooling curve and the optical efficiency factor is determined from the heating curve - both under full load conditions. The performance characteristic curve for the solar cooker is obtained and discussed. The study indicates that the no load test, which is useful in the case of a box type solar cooker, is not appropriate in the case of concentrator type cookers.

  3. Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Issues | Department of Energy Procedure - ICM Issues Ex Parte Communication on Central Air-Conditioner Test Procedure - ICM Issues On October 8, 2015, AHRI staff and Independent Coil Manufacturer (ICM) Representatives met with a representative from the Department of Energy (DOE) to discuss proposed amended test procedures for central air conditioners and how they would impact ICM manufacturers. 10_8_15AHRI Ex Parte Memo ICM (53.24 KB) More Documents & Publications Ex Parte Communication

  4. AVTA: Neighborhood Electric Vehicle Specifications and Test Procedures...

    Energy.gov [DOE] (indexed site)

    NEVAmerica Technical Specifications (135.99 KB) NEVAmerica Test Sequence (66.19 KB) ETA-NTP002 Implementation of SAE Standard J1666 May 93 - Electric Vehicle Acceleration, ...

  5. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.

    2010-08-01

    The U.S. Department of Energy tasked NREL to develop a process for testing the reliability of models that predict retrofit energy savings, including their associated calibration methods. DOE asked NREL to conduct the work in phases so that a test procedure would be ready should DOE need it to meet legislative requirements related to residential retrofits in FY 2010. This report documents the initial 'Phase 1' test procedure.

  6. ISSUANCE 2016-08-05: Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Cooking Products, Supplemental Notice of Proposed Rulemaking

  7. ISSUANCE 2015-07-15: Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines, Final Rule

  8. ISSUANCE 2015-11-19: Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Portable Air Conditioners; Supplemental Notice of Proposed Rulemaking

  9. ISSUANCE 2015-01-27: Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Dehumidifiers Supplemental Notice of Proposed Rulemaking

  10. 2014-10-02 Issuance: Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for External Power Supplies, Notice of Proposed Rulemaking

  11. ISSUANCE 2016-03-24: Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification of Test Procedures for Fluorescent Lamps Ballasts, Final Rule

  12. ISSUANCE 2015-05-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  13. ISSUANCE 2014-12-29: Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Clarification for Energy Conservation Standards and Test Procedures for Fluorescent Lamp Ballasts

  14. ISSUANCE 2015-06-05: Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Commercial Prerinse Spray Valves, Notice of Proposed Rulemaking

  15. ISSUANCE 2016-08-19: Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Manufactured Housing, Notice of Proposed Rulemaking

  16. Building Energy Simulation Test for Existing Homes (BESTEST-EX): Instructions for Implementing the Test Procedure, Calibration Test Reference Results, and Example Acceptance-Range Criteria

    SciTech Connect

    Judkoff, R.; Polly, B.; Bianchi, M.; Neymark, J.; Kennedy, M.

    2011-08-01

    This publication summarizes building energy simulation test for existing homes (BESTEST-EX): instructions for implementing the test procedure, calibration tests reference results, and example acceptance-range criteria.

  17. Gas characterization system 241-AN-105 field acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AN-105. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  18. Gas characterization system 241-AW-101 field acceptance test procedure

    SciTech Connect

    Schneider, T.C.

    1996-03-01

    This document details the field Acceptance Testing of a gas characterization system being installed on waste tank 241-AW-101. The gas characterization systems will be used to monitor the vapor spaces of waste tanks known to contain measurable concentrations of flammable gases.

  19. Validation of IEEE P1547.1 Interconnection Test Procedures: ASCO 7000 Soft Load Transfer System

    SciTech Connect

    Kroposki, B.; Englebretson, S.; Pink, C.; Daley, J.; Siciliano, R.; Hinton, D.

    2003-09-01

    This report presents the preliminary results of testing the ASCO 7000 Soft Load Transfer System according to IEEE P1547.1 procedures. The ASCO system interconnects synchronous generators with the electric power system and provides monitoring and control for the generator and grid connection through extensive protective functions. The purpose of this testing is to evaluate and give feedback on the contents of IEEE Draft Standard P1547.1 Conformance Tests Procedures for Equipment Interconnecting Distributed Resources With Electric Power Systems.

  20. In-Plane Conductivity Testing Procedures and Results | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    In-Plane Conductivity Testing Procedures and Results In-Plane Conductivity Testing Procedures and Results This presentation on conductivity testing was given at the High Temperature Membrane Working Group Meeting in May 2007. htmwg_bekktech.pdf (354.02 KB) More Documents & Publications Requirements for Samples High Temperature Membrane Working Group Minutes Progress and Status on Through-Plane Resistance and Conductivity Measurement of Fuel Cell Membranes

  1. Test procedures for polyester immobilized salt-containing surrogate mixed wastes

    SciTech Connect

    Biyani, R.K.; Hendrickson, D.W.

    1997-07-18

    These test procedures are written to meet the procedural needs of the Test Plan for immobilization of salt containing surrogate mixed waste using polymer resins, HNF-SD-RE-TP-026 and to ensure adequacy of conduct and collection of samples and data. This testing will demonstrate the use of four different polyester vinyl ester resins in the solidification of surrogate liquid and dry wastes, similar to some mixed wastes generated by DOE operations.

  2. Alternatives Generation and Analysis for Lower Knuckle Ultrasonic Testing Technology

    SciTech Connect

    WOLFF, J.J.

    2001-02-21

    Environmental regulations applicable to the River Protection Project require integrity assessment of the double-shell tank (DST) system. In the early 1990s a strategy and plans were developed to conduct the required tank system examinations and integrity assessments. This included plans to conduct ultrasonic testing of six DSTs. In 1997, an ad hoc committee (Tank Structural Integrity Panel, TSIP) working under the direction of the Office of Environmental Restoration and Waste Management, U.S. Department of Energy, published guidelines for managing risks associated with aging degradation of high level waste storage tanks. This included recommendations on non-destructive examination of specific regions of tanks. For the lower knuckle region, defined as the curved transition from the vertical portion of the tank wall to the flat portion of the tank bottom, the TSIP guidelines contained the following recommendation: ''Examine the lower knuckle region including 5% of the length of the upper weld, at least 2.5% of the area of the predicted maximum stress region of the knuckle base metal and 2.5% of the lower weld if accessible. Emphasis should be on weld/HAZ cracking such as SCC. If the lower weld is not accessible, one-square-foot sections whose length adds up to 5% of the circumference of the knuckle base metal shall be examined.'' Also in 1997, the U.S. Department of Energy and Washington Department of Ecology formalized an agreement on the DST system integrity assessment work scope required to satisfy the applicable regulatory requirements. This cited the TSIP guidelines, and included an agreement to conduct ultrasonic examination on six representative DSTs for determination and extent of cracks, corrosion, and pitting.

  3. Project B610 process control configuration acceptance test procedure

    SciTech Connect

    Silvan, G.R.

    1994-09-20

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator`s console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A.

  4. ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures for

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking | Department of Energy ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking ISSUANCE 2016-10-28 Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps Notice of Proposed Rulemaking Light-Emitting Diode Lamps_TP_NOPR_10-28-16 (206.05 KB) More Documents & Publications 2014-05-16 Issuance: Test Procedures for

  5. Text-Alternative Version: CALiPER Round 11 Test Results | Department of

    Energy Saver

    Energy 11 Test Results Text-Alternative Version: CALiPER Round 11 Test Results Below is the text-alternative version of the "U.S. DOE CALiPER Program Summary of Most Recent Testing" webcast, held February 8, 2011. Terry Shoemaker: Welcome, ladies and gentlemen. I'm Terry Shoemaker with the Pacific Northwest National Laboratory, and I'd like to welcome you to today's webcast, "U.S. DOE CALiPER Program Summary of the Most Recent Testing" (CALiPER Round 11). This is brought

  6. CENRTC Project {number_sign}2F3EOA, OCB A-386, acceptance test procedure

    SciTech Connect

    Akerson, A.W.

    1995-03-06

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC {number_sign}2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00043/M (CENRTC 2F3EOA MWTT OCB A-386 PACKAGE). This procedure separates four tests into separate sections: Energization of A-386 Duplex Panel and Circuits; Local RFL 6750 function tests and start-up; SCADA tests; and A-386 local trip tests.

  7. 2014-02-07 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial packaged boilers, as issued by the Deputy Assistant Secretary for Energy Efficiency on February 7, 2014.

  8. CRAD, System Operating Test Procedures- October 23, 2014 (EA CRAD 31-05, Rev. 0)

    Energy.gov [DOE]

    This Criteria Review and Approach Document (EA CRAD 31-05, Rev. 0) provides objectives, criteria, and approaches for reviewing startup testing procedures for installed structures, systems, or components.

  9. Supervisory Control and Data Acquisition System (SCADA) Substation C3-3 Acceptance Test Procedure

    SciTech Connect

    ZAKRAJSEK, M.F.

    2000-10-17

    The purpose of this acceptance test procedure (ATP) is to demonstrate that the newly installed Supervisory Control and Data Acquisition (SCADA) computer system functions as intended by the design.

  10. 2014-02-21 Issuance: Test Procedure for Commercial Water Heating Equipment; Request for Information

    Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures for commercial water heating equipment, as issued by the Deputy Assistant Secretary for Energy Efficiency (February 21, 2014).

  11. 2014-04-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule regarding test procedures for residential refrigerators and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on April 10, 2014.

  12. DOE Issues Test Procedure Final Rule & Publishes Energy Conservation Standards NOPR for Electric Motors

    Energy.gov [DOE]

    The Department of Energy (DOE) has issued a pre-publication Federal Register final rule regarding test procedures and published a notice of proposed rulemaking (NOPR) regarding energy conservation standards for electric motors.

  13. 2014-01-31 Issuance: Test Procedures for Commercial Clothes Washers; Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 31, 2014.

  14. 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting | Department of Energy 01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting 2014-08-01 Issuance: Test Procedure for Refrigerated Bottled or Canned Beverage Vending Machines; Notice of Proposed Rulemaking and public meeting This document is a pre-publication Federal Register notice of proposed rulemaking and public meeting regarding

  15. Test and evaluation procedures for Sandia's Teraflops Operating System (TOS) on Janus.

    SciTech Connect

    Barnette, Daniel Wayne

    2005-10-01

    This report describes the test and evaluation methods by which the Teraflops Operating System, or TOS, that resides on Sandia's massively-parallel computer Janus is verified for production release. Also discussed are methods used to build TOS before testing and evaluating, miscellaneous utility scripts, a sample test plan, and a proposed post-test method for quickly examining the large number of test results. The purpose of the report is threefold: (1) to provide a guide to T&E procedures, (2) to aid and guide others who will run T&E procedures on the new ASCI Red Storm machine, and (3) to document some of the history of evaluation and testing of TOS. This report is not intended to serve as an exhaustive manual for testers to conduct T&E procedures.

  16. Text-Alternative Version: CALiPER Round 7 Testing Results and SSL Product

    Energy Saver

    Life Issues | Department of Energy 7 Testing Results and SSL Product Life Issues Text-Alternative Version: CALiPER Round 7 Testing Results and SSL Product Life Issues Below is the text-alternative version of the CALiPER Round 7 Testing Results and SSL Product Life Issues webcast. Rosemarie Bartlett: We're very happy to have as our speakers today Bob Lingard, Heidi Steward, and Eric Richman of the Pacific Northwest National Laboratory. Our first speaker is Bob Lingard, an LC who supports the

  17. A free-piston Stirling engine/linear alternator controls and load interaction test facility

    SciTech Connect

    Rauch, J.S.; Kankam, M.D.; Santiago, W.; Madi, F.J.

    1992-08-01

    A test facility at LeRC was assembled for evaluating free-piston Stirling engine/linear alternator control options, and interaction with various electrical loads. This facility is based on a 'SPIKE' engine/alternator. The engine/alternator, a multi-purpose load system, a digital computer based load and facility control, and a data acquisition system with both steady-periodic and transient capability are described. Preliminary steady-periodic results are included for several operating modes of a digital AC parasitic load control. Preliminary results on the transient response to switching a resistive AC user load are discussed.

  18. 2014-02-07 Issuance: Alternative Efficiency Determination Methods...

    Office of Environmental Management (EM)

    Test Procedures for Walk-In Coolers and Walk-In Freezers; Supplemental Notice of Proposed Rulemaking 2014-02-07 Issuance: Alternative Efficiency Determination Methods and Test ...

  19. Text-Alternative Version of Building America Webinar: Field Test Best

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Practices, BEopt, and the National Residential Efficiency Measures Database | Department of Energy Field Test Best Practices, BEopt, and the National Residential Efficiency Measures Database Text-Alternative Version of Building America Webinar: Field Test Best Practices, BEopt, and the National Residential Efficiency Measures Database Building America Research Tools: Field Test Best Practices, BEopt, and the National Residential Efficiency Measures Database March 18, 2015 Lieko Earle, Senior

  20. Accuracy of the European solar water heater test procedure. Part 1: Measurement errors and parameter estimates

    SciTech Connect

    Rabl, A.; Leide, B. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    The Collector and System Testing Group (CSTG) of the European Community has developed a procedure for testing the performance of solar water heaters. This procedure treats a solar water heater as a black box with input-output parameters that are determined by all-day tests. In the present study the authors carry out a systematic analysis of the accuracy of this procedure, in order to answer the question: what tolerances should one impose for the measurements and how many days of testing should one demand under what meteorological conditions, in order to be able to quarantee a specified maximum error for the long term performance The methodology is applicable to other test procedures as well. The present paper (Part 1) examines the measurement tolerances of the current version of the procedure and derives a priori estimates of the errors of the parameters; these errors are then compared with the regression results of the Round Robin test series. The companion paper (Part 2) evaluates the consequences for the accuracy of the long term performance prediction. The authors conclude that the CSTG test procedure makes it possible to predict the long term performance with standard errors around 5% for sunny climates (10% for cloudy climates). The apparent precision of individual test sequences is deceptive because of large systematic discrepancies between different sequences. Better results could be obtained by imposing tighter control on the constancy of the cold water supply temperature and on the environment of the test, the latter by enforcing the recommendation for the ventilation of the collector.

  1. Development of an Outdoor Concentrating Photovoltaic Module Testbed, Module Handling and Testing Procedures, and Initial Energy Production Results

    SciTech Connect

    Muller, M.

    2009-09-01

    This report addresses the various aspects of setting up a CPV testbed and procedures for handling and testing CPV modules.

  2. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid V

    SciTech Connect

    KOCH, M.R.

    2000-07-25

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping Instrumentation and Control (PIC) skid ''V''. The scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Services (SFS) shop upon completion of the construction of the PIC skid.

  3. Acceptance Test Procedure for New Pumping and Instrumentation Control Skid M

    SciTech Connect

    KOCH, M.R.

    1999-11-09

    This Acceptance Test Procedure (ATP) verifies proper construction per the design drawings and tests for proper functioning of the Pumping and Instrumentation Control (PIC) skid ''M''. The Scope section lists the systems and functions to be checked. This ATP will be performed at the Site Fabrication Service's (SFS) shop upon completion of construction of the PIC skid.

  4. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-03-29

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''P''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  5. Test Report for Acceptance Test Procedure for Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-05-11

    This Acceptance Test Report (ATR) provides the test results for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''Q''. The ATR summaries the results and provides a copy of the ATP and inspections in the Appendix.

  6. Detailed design, fabrication and testing of an engineering prototype compensated pulsed alternator. Final report

    SciTech Connect

    Bird, W.L. Jr.; Woodson, H.H.

    1980-03-01

    The design, fabrication, and test results of a prototype compensated pulsed alternator are discussed. The prototype compulsator is a vertical shaft single phase alternator with a rotating armature and salient pole stator. The machine is designed for low rep rate pulsed duty and is sized to drive a modified 10 cm Beta amplifier. The load consists of sixteen 15 mm x 20 mm x 112 cm long xenon flashlamps connected in parallel. The prototype compulsator generates an open circuit voltage of 6 kV, 180 Hz, at a maximum design speed of 5400 rpm. At maximum speed, the inertial energy stored in the compulsator rotor is 3.4 megajoules.

  7. Evaluation of the unloading compliance procedure for J integral testing in the hot cell. Final report

    SciTech Connect

    Clarke, G.A.

    1980-01-01

    A testing program was initiated to develop a procedure for toughness testing of irradiated materials using J integral methods. An evaluation of presently used procedures and improved techniques was completed to increase the reliability of the unloading compliance method for single specimen J/sub Ic/ determination. Three different heats of pressure vessel steels were used to evaluate the reliability and accuracy of the unloading compliance procedure. A new technique for improved sensitivity of displacement measurements was found to be successful on large 4T specimens. This technique consisted of using a small electrical linear actuator to continuously rezero a 0.635 mm (.025 inch) LVDT. The effects of specimen geometry on both J/sub Ic/ and dJ/da were evaluated using various specimen sizes and varying amounts of side grooving.

  8. 2014-05-05 Issuance: Alternative Efficiency Determination Methods...

    Office of Environmental Management (EM)

    Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Final Rule 2014-05-05 Issuance: Alternative Efficiency Determination Methods and Test Procedures for ...

  9. Energy Conservation Program for Consumer Products: Test Procedures for Residential Furnaces Fans; Correction

    Office of Energy Efficiency and Renewable Energy (EERE)

    On January 3, 2014 the U.S. Department of Energy (DOE) published a final rule in the Federal Register that established the test procedure for residential furnace fans. Due to drafting errors, that document inadvertently removed necessary incorporation by reference material in the Code of Federal Regulations (CFR). This final rule rectifies this error by once again adding the removed material.

  10. 241-AN-B pit leak detection ANA-WT-LDSTA-231 acceptance test procedure

    SciTech Connect

    VANDYKE, D.W.

    1999-08-25

    This document describes the method used to test design criteria for Safety Class, Intrinsically Safe leak detector system installed in 241-AN-B Valve Pit located at 200E Tank Farms. The purpose of this Procedure is to demonstrate that the pit leak detection relay cabinet and intrinsically safe probe circuit is fully operable.

  11. CENRTC Project No. 2F3EOA, OCB A-372, acceptance test procedure

    SciTech Connect

    Akerson, A.W.

    1995-01-01

    This test procedure provides the steps necessary to verify correct functional operation of controls, annunciators, alarms, protective relays and related systems impacted by CENRTC No. 2F3EOA, Microwave Transfer Trip Project, modification work performed under work package 6B-93-00038/M (CENRTC 2F3EOA MWTT OCB A-372 PACKAGE).

  12. Test plan/procedure for the shock limiting device of the radioisotope thermoelectric generator package mounting subsystem 145. Revision 1

    SciTech Connect

    Satoh, J.A.

    1995-05-25

    This document defines the procedure to be used in the 18 inch drop test to be used for design verification of the RTG Transportation System Package Mounting.

  13. DOE Publishes Notice of Proposed Rulemaking for Residential Water Heater and Certain Commercial Water Heater Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy has published a notice of proposed rulemaking regarding test procedures for residential water heaters and certain commercial water heaters.

  14. 2014-11-24 Issuance: Test Procedures for Conventional Cooking Products; Supplementary Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplementary Notice of Proposed Rulemaking regarding test procedures for conventional cooking products, as issued by the Deputy Asisstant Secretary for Energy Efficiency. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  15. 2014-05-05 Issuance: Test Procedures for Dehumidifiers; Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for dehumidifiers, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 2, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  16. 2015-01-28 Issuance: Test Procedure for Fluorescent Lamp Ballasts; Final Rule Correction

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for fluorescent lamp ballasts, as issued by the Deputy Assistant Secretary for Energy Efficiency on January 28, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  17. 2014-11-24 Issuance: Test Procedures for Commercial Clothes Washers; Final Rule

    Energy.gov [DOE]

    This document is a pre-publication Federal Register Final Rule regarding test procedures for commercial clothes washers, as issued by the Deputy Assistant Secretary for Energy Efficiency on November 24, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  18. Operability test procedure for rotary mode core sampling system {number_sign}4

    SciTech Connect

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 4. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 4 will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  19. Operability test procedure for rotary mode core sampling system {number_sign}3

    SciTech Connect

    Farris, T.R.; Jarecki, T.D.

    1995-04-26

    This document gives instructions for the Operability Testing of the Rotary Mode Core Sampling (RMCS) System No. 3. This document is based on the Operability Test Procedure for RMCS system No. 2 because the basic design is the same for all three systems. Modifications have been made from the original design only when exact duplication was not feasible or design improvements could be incorporated without affecting the operation of the system. Operability testing of the Rotary Mode Core Sampling System No. 3, will verify that functional and operational requirements have been met. Testing will be completed in two phases. The first phase of testing (section 7) will involve operating the truck equipment to demonstrate its capabilities. The second phase of testing (section 8) will take repeated samples in a simulated operation environment. These tests will be conducted at the ``Rock Slinger`` test site located just south of U-Plant in the 200 West Area. Tests will be done in a simulated tank farm environment. All testing will be non-radioactive and stand-in materials shall be used to simulate waste tank conditions. Systems will be assembled and arranged in a manner similar to that expected in the field.

  20. Recommended procedures for performance testing of radiobioassay laboratories: Volume 1, Quality assurance. [Contains Glossary

    SciTech Connect

    Fenrick, H.W.; MacLellan, J.A.

    1988-11-01

    Draft American National Standards Institute (ANSI) Standard N13.30 (Performance Criteria for Radiobioassay) was developed in response to a concern expressed by the US Department of Energy and US Nuclear Regulatory Commission to help ensure that bioassay laboratories provide accurate and consistent results. The draft standard specifies the criteria for defining the procedures necessary to establish a bioassay performance-testing laboratory and program. The testing laboratory will conduct tests to evaluate the performance of service laboratories. Pacific Northwest Laboratory helped define responsibilities and develop procedures as part of an effort to evaluate the draft ANSI N13.30 performance criteria for quality assurance at bioassay laboratories. This report recommends elements of quality assurance and quality control responsibilities for the bioassay performance-testing laboratory program, including the qualification and performance of personnel and the calibration, certification, and performance of equipment. The data base and recommended records system for documenting radiobioassay performance at the service laboratories are also presented. 15 refs.

  1. ISSUANCE 2016-02-22: Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Commercial and Industrial Equipment: Test Procedures for Commercial Packaged Boilers

  2. ISSUANCE 2016-02-26: Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Certain Categories of General Service Lamps, Notice of Proposed Rulemaking

  3. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel to nickel-copper

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2301-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel, NO2200 or NO2201 (P-41) to nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  4. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of nickel-copper

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-1302-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper NO4400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  5. Performance testing of HEPA filters: Progress towards a European standard procedure

    SciTech Connect

    Dyment, J.

    1997-08-01

    Proposals for a future European testing procedure for {open_quotes}High Efficiency Particulate Air Filters (HEPA and ULPA){close_quotes} are being developed by CEN (Comite Europeen de Normalisation). The new standard will be given the status of national standard in participating countries, conflicting national standards being withdrawn. The standard will comprise 5 parts covering the grouping and classification of HEPA and ULPA filters according to their efficiency, fundamental principles of testing, marking etc (in part 1). Part 2 will cover aerosol production, measurement principles, counting equipment and statistics. Parts 3-5 will cover testing flat sheet media, leak testing of filter elements and the efficiency testing of filter elements respectively. The efficiency test methods allow the use of either homogeneous monodisperse or polydisperse aerosols for the determination of particulate filtration efficiencies as a function of particle size. The particle size at which maximum penetration occurs is first determined in flat sheet media tests; tests on filter elements (constructed using the same filter medium) may be carried out using either a homogeneous monodisperse aerosol of the size at which maximum penetration occurs (MPPS) or a polydisperse aerosol whose median size is close to the MPPS. Tests with monodisperse aerosols may be conducted using condensation nucleus counting equipment; tests using polydisperse test aerosols require the use of optical sizing particle counters. When determining the efficiency of filter elements the downstream aerosol concentrations may be determined from air samples obtained using either an overall method (single point sampling after mixing) or a scan method. The scan method also allows {open_quotes}local{close_quotes} efficiency values to be determined. 1 ref., 1 fig., 1 tab.

  6. Lagoon Seepage Testing Procedures for Central Facilities Area (CFA) Sewage Lagoons at Idaho National Laboratory Butte County, Idaho April 2014

    SciTech Connect

    Alan Giesbrecht

    2014-05-01

    The lagoon seepage testing procedures are documented herein as required by the Wastewater Rules (IDAPA 58.01.16.493). The Wastewater Rules and Wastewater Reuse Permit LA-000141-03 require that the procedure used for performing a seepage test be approved by IDEQ prior to conducting the seepage test. The procedures described herein are based on a seepage testing plan that was developed by J-U-B ENGINEERS, Inc. (J-U-B) and has been accepted by several IDEQ offices for lagoons in Idaho.

  7. 2014-06-27 Issuance: Test Procedures for Residential and Commercial Water Heaters; Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register final rule regarding test procedures for residential and commercial water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  8. 2014-05-05 Issuance: Test Procedure for Portable Air Conditioners; Notice of Data Availability

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of data availabilty regarding test procedures for portable air conditioners, as issued by the Deputy Assistant Secretary for Energy Efficiency on May 5, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  9. 2014-10-27 Issuance: Test Procedure for Ceiling Fan Light Kits; Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for ceiling fan light kits, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 27, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  10. Developing standard performance testing procedures for material control and accounting components at a site

    SciTech Connect

    Scherer, Carolynn P; Bushlya, Anatoly V; Efimenko, Vladimir F; Ilyanstev, Anatoly; Regoushevsky, Victor I

    2010-01-01

    The condition of a nuclear material control and accountability system (MC&A) and its individual components, as with any system combining technical elements and documentation, may be characterized through an aggregate of values for the various parameters that determine the system's ability to perform. The MC&A system's status may be functioning effectively, marginally or not functioning based on a summary of the values of the individual parameters. This work included a review of the following subsystems, MC&A and Detecting Material Losses, and their respective elements for the material control and accountability system: (a) Elements of the MC&A Subsystem - Information subsystem (Accountancy/Inventory), Measurement subsystem, Nuclear Material Access subsystem, including tamper-indicating device (TID) program, and Automated Information-gathering subsystem; (b) Elements for Detecting Nuclear Material Loses Subsystem - Inventory Differences, Shipper/receiver Differences, Confirmatory Measurements and differences with accounting data, and TID or Seal Violations. In order to detect the absence or loss of nuclear material there must be appropriate interactions among the elements and their respective subsystems from the list above. Additionally this work includes a review of regulatory requirements for the MC&A system component characteristics and criteria that support the evaluation of the performance of the listed components. The listed components had performance testing algorithms and procedures developed that took into consideration the regulatory criteria. The developed MC&A performance-testing procedures were the basis for a Guide for MC&A Performance Testing at the material balance areas (MBAs) of State Scientific Center of the Russian Federation - Institute for Physics and Power Engineering (SSC RF-IPPE).

  11. Acceptance test procedure bldg. 271-U remote monitoring of project W-059 B-Plant canyon exhaust system

    SciTech Connect

    MCDANIEL, K.S.

    1999-09-01

    The test procedure provides for verifying indications and alarms The test procedure provides for verifying indications and alarms associated with the B Plant Canyon Ventilation System as they are being displayed on a remote monitoring workstation located in building 271-U. The system application software was installed by PLCS Plus under contract from B&W Hanford Company. The application software was installed on an existing operator workstation in building 271U which is owned and operated by Bechtel Hanford Inc.

  12. Operability test procedure for the TK-900 beta/gamma liquid effluent monitoring system

    SciTech Connect

    Weissenfels, R.D.

    1995-02-24

    This operability test procedure will verify that the 221-B beta/gamma liquid effluent monitoring system, installed near the east end of the six inch chemical sewer header, functions as intended by design. An off-line, skid mounted, beta/gamma radiation monitor and pH monitor was installed near stairwell three in the 221-B electrical gallery by Project W-007H. The skid mounted monitoring system includes two radiation detectors and a pH meter, both with local digital displays. Output signals from each monitor are also received and displayed by the Facility Process Monitor and Control System (FPMCS). Pumps, motors, gauges, valves and transport lines complement the skid monitoring system. The system is part of BAT/AKART for the BCE liquid effluent system.

  13. Grid Interconnection and Performance Testing Procedures for Vehicle-To-Grid (V2G) Power Electronics: Preprint

    SciTech Connect

    Kramer, W.; Chakraborty, S.; Kroposki, B.; Hoke, A.; Martin, G.; Markel, T.

    2012-03-01

    Bidirectional power electronics can add vehicle-to-grid (V2G) capability in a plug-in vehicle, which then allows the vehicle to operate as a distributed resource (DR). The uniqueness of the battery-based V2G power electronics requires a test procedure that will not only maintain IEEE interconnection standards, but can also evaluate the electrical performance of the vehicle working as a DR. The objective of this paper is to discuss a recently published NREL technical report that provides interim test procedures for V2G vehicles for their integration into the electrical distribution systems and for their performance in terms of continuous output power, efficiency, and losses. Additionally, some other test procedures are discussed that are applicable to a V2G vehicle that desires to provide power reserve functions. A few sample test results are provided based on testing of prototype V2G vehicles at NREL.

  14. Comprehensive Compressor Calorimeter Testing of Lower-GWP Alternative Refrigerants for Heat Pump and Medium Temperature Refrigeration Applications

    SciTech Connect

    Shrestha, Som S; Sharma, Vishaldeep; Abdelaziz, Omar

    2014-01-01

    In response to environmental concerns raised by the use of refrigerants with high Global Warming Potential (GWP), the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) has launched an industry-wide cooperative research program, referred to as the Low-GWP Alternative Refrigerants Evaluation Program (AREP), to identify and evaluate promising alternative refrigerants for major product categories. This paper reports one of the Oak Ridge National Laboratory (ORNL) contributions to AREP. It compares performance of alternative refrigerants to that of R-410A and R-404A for heat pump and medium temperature applications, respectively. The alternatives reported in this paper are: R-32, DR-5, and L-41a for R-410A and ARM-31a, D2Y-65, L-40, and a mixture of R-32 and R-134a for R-404A. All performance comparison tests were conducted using scroll compressors of ~1.85 tons (6.5 kW) cooling capacity. Tests were conducted over a range of combinations of saturation suction and saturation discharge temperatures for both compressors. The tests showed that, in general, energy efficiency ratio (EER) and cooling capacity of R-410A alternative refrigerants were slightly lower than that of the baseline refrigerant with a moderate increases in discharge temperature. On the other hand, R-404A alternative refrigerants showed relative performance dependence on saturation suction and saturation discharge temperatures and larger increases in discharge temperature than for the R-410A alternatives. This paper summarizes the relative performance of all alternative refrigerants compared to their respective baseline.

  15. Compressor Calorimeter Test of R-410A Alternative: R-32/134a Mixture Using a Scroll Compressor

    SciTech Connect

    Shrestha, Som S; Sharma, Vishaldeep; Abdelaziz, Omar

    2014-02-01

    As a contribution to the AHRI Low-GWP Alternative Refrigerants Evaluation Program (AREP), this study compares the performance of lower-GWP alternative refrigerant R-32 + R-134a mixture, to that of refrigerant R-410A (baseline) in a scroll compressor designed for air-conditioning and heat pump applications. These comparisons were carried out via compressor calorimeter tests performed on a compressor designed for refrigerant R-410A and having a nominal rated capacity of 21,300 Btu/hr. Tests were conducted over a suction dew point temperature range of 10 F to 55 F in 5 F increments and a discharge dew point temperature range of 70 F to 140 F in 10 F increments. All the tests were performed with 20 F superheat, 40 F superheat, and 65 F suction temperature. A liquid subcooling level of 15 F was maintained for all the test conditions. The tests showed that the discharge temperature of the alternative refrigerant was higher than that of R-410A at all test conditions. Also, the energy efficiency ratio (EER) and cooling capacity of compressor using the alternative refrigerant were slightly lower in comparison to that of R-410A.

  16. ISSUANCE 2015-12-04: Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

    Energy.gov [DOE]

    Energy Conservation Standards and Test Procedure for Miscellaneous Refrigeration Products: Notice of Data Availability; Request for Information

  17. ISSUANCE 2016-08-04: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  18. ISSUANCE 2015-06-08: Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps, Final Rule

  19. ISSUANCE 2015-08-21: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking (version2)

  20. ISSUANCE 2016-08-01: Energy Conservation Program: Corrction; Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  1. ISSUANCE 2015-06-25: Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Integrated Light-Emitting Diode Lamps, Supplemental Notice of Proposed Rulemaking

  2. ISSUANCE 2015-05-12: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters

  3. ISSUANCE 2014-12-23: Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products: Test Procedures for Direct Heating Equipment and Pool Heaters, Final Rule

  4. ISSUANCE 2016-08-01: Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps, Supplemental Notice of Proposed Rulemaking

  5. Proposal for a Vehicle Level Test Procedure to Measure Air Conditioning Fuel Use: Preprint

    SciTech Connect

    Rugh, J.

    2010-02-01

    A procedure is described to measure approximate real-world air conditioning fuel use and assess the impact of thermal load reduction strategies in plug-in hybrid electric vehicles.

  6. DOE Withdraws Proposed Rulemaking (Test Procedure) and Proposed Coverage Determination (Energy Conservation Standard) for Set-Top Boxes

    Energy.gov [DOE]

    The Department of Energy (DOE) has issued pre-publication Federal Register notices withdrawing the notice of proposed rulemaking for a test procedure for set-top boxes and the proposed coverage determination for set-top boxes and network equipment.

  7. Test procedure for use of the shear vane in tanks 103-SY, 103-AN, and 103-AW

    SciTech Connect

    LeClair, M.D.; Waters, E.

    1995-01-01

    This is a record copy of a test procedure for application of the full-scale shear vane to underground waste tanks at Hanford. The introduction of the report provides background information on the development and proof-testing of the shear vane, as well as information about its current location. The document was originally prepared in 1988, and the work as shelved temporarily for lack of funds. Activities to utilize the shear vane will be expedited by use of this information.

  8. Interim Test Procedures for Evaluating Electrical Performance and Grid Integration of Vehicle-to-Grid Applications

    SciTech Connect

    Chakraborty, S.; Kramer, W.; Kroposki, B.; Martin, G.; McNutt, P.; Kuss, M.; Markel, T.; Hoke, A.

    2011-06-01

    The objective of this report is to provide a test plan for V2G testing. The test plan is designed to test and evaluate the vehicle's power electronics capability to provide power to the grid, and to evaluate the vehicle's ability to connect and disconnect from the utility according to a subset of the IEEE Std. 1547 tests.

  9. Building Energy Simulation Test for Existing Homes (BESTEST-EX); Phase 1 Test Procedure: Building Thermal Fabric Cases

    SciTech Connect

    Judkoff, Ron

    2010-08-01

    This report documents the initial Phase 1 test process for testing the reliability of software models that predict retrofit energy savings of existing homes, including their associated calibration methods.

  10. Testing of Alternative Abrasives for Water-Jet Cutting at C Tank Farm

    SciTech Connect

    Krogstad, Eirik J.

    2013-08-01

    Legacy waste from defense-related activities at the Hanford Site has predominantly been stored in underground tanks, some of which have leaked; others may be at risk to do so. The U.S. Department of Energy’s goal is to empty the tanks and transform their contents into more stable waste forms. To do so requires breaking up, and creating a slurry from, solid wastes in the bottoms of the tanks. A technology developed for this purpose is the Mobile Arm Retrieval System. This system is being used at some of the older single shell tanks at C tank farm. As originally planned, access ports for the Mobile Arm Retrieval System were to be cut using a high- pressure water-jet cutter. However, water alone was found to be insufficient to allow effective cutting of the steel-reinforced tank lids, especially when cutting the steel reinforcing bar (“rebar”). The abrasive added in cutting the hole in Tank C-107 was garnet, a complex natural aluminosilicate. The hardness of garnet (Mohs hardness ranging from H 6.5 to 7.5) exceeds that of solids currently in the tanks, and was regarded to be a threat to Hanford Waste Treatment and Immobilization Plant systems. Olivine, an iron-magnesium silicate that is nearly as hard as garnet (H 6.5 to 7), has been proposed as an alternative to garnet. Pacific Northwest National Laboratory proposed to test pyrite (FeS2), whose hardness is slightly less (H 6 to 6.5) for 1) cutting effectiveness, and 2) propensity to dissolve (or disintegrate by chemical reaction) in chemical conditions similar to those of tank waste solutions. Cutting experiments were conducted using an air abrader system and a National Institute of Standards and Technology Standard Reference Material (SRM 1767 Low Alloy Steel), which was used as a surrogate for rebar. The cutting efficacy of pyrite was compared with that of garnet and olivine in identical size fractions. Garnet was found to be most effective in removing steel from the target; olivine and pyrite were less

  11. ISSUANCE 2015-12-11: Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

    Energy.gov [DOE]

    Final Rule Regarding Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment

  12. DOE Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure; Docket No. EERE–2014–BT–TP–0043 / RIN 1904–AD36

    Energy.gov [DOE]

    On 12/19/2014, Apple Inc. met with DOE to discuss the Notice of Proposed Rulemaking to Amend the External Power Supply Test Procedure.

  13. ISSUANCE 2015-06-25: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Residential and Commercial Water Heaters; Correction

  14. Exparte Memo: 4-26-16 Meeting on Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Industrial Equipment: Test Procedures for Water Heaters, EERE-2015-BT-TP-0007-0002, specifically issues surrounding the Conversion...

  15. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid Q

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  16. Acceptance Test Procedure for New Pumping Instrumentation and Control Skid P

    SciTech Connect

    KOCH, M.R.

    2000-02-14

    This Test Plan provides a test method to dedicate the leak detection relays used on the new Pumping Instrumentation and Control (PIC) skids. The new skids are fabricated on-site. The leak detection system is a safety class system per the Authorization Basis.

  17. Accuracy of the European solar water heater test procedure. Part 2: Prediction of long-term performance

    SciTech Connect

    Rabl, A. ); Carvalho, M.J.; Collares-Pereira, M. ); Bourges, B.

    1991-01-01

    This paper continues the evaluation of the European test procedure for solar water heaters, by considering what consequences the errors of the parameters (derived in Part 1, the companion paper) will have for the prediction of the long-term performance. A simple criterion is derived for the required length of the test period, as a function of climatic variables and desired accuracy of the long-term performance prediction. Typically a duration of 10 to 50 days will suffice. Since the actual conditions during a test cannot be foreseen, it will be more efficient to calculate the error of the long-term performance prediction on line at the end of each test day and terminate the series whenever acceptable accuracy is reached.

  18. Swedish tests on rape-seed oil as an alternative to diesel fuel

    SciTech Connect

    Johansson, E.; Nordstroem, O.

    1982-01-01

    The cheapest version of Swedish rape-seed oil was chosen. First the rape-seed oil was mixed in different proportions with regular diesel fuel. A mixture of 1/3 rape-seed oil and 2/3 regular diesel fuel (R 33) was then selected for a long-term test. A Perkins 4.248 diesel engine was used for laboratory tests. Four regular farm tractors, owned and operated by farmers, and two tractors belonging to the Institute have been running on R 33. Each tractor was calibrated on a dynamometer according to Swedish and ISO-standards before they were operated on R 33. Since then the tractors have been regularly recalibrated. The test tractors have been operated on R 33 for more than 3400 h. An additional 1200 h have been covered by the laboratory test engine. None of the test tractors have hitherto required repairs due to the use of R 33, but some fuel filters have been replaced. Some fuel injectors have been cleaned due to deposits on the nozzles. 4 figures, 1 table.

  19. Free-Piston Stirling Engine/linear alternator 1000-hour endurance test

    SciTech Connect

    Rauch, J.; Dochat, G.

    1985-03-01

    The Free-Piston Stirling Engine (FPSE) has the potential to be a long-lived, highly reliable, power conversion device attractive for many product applications such as space, residential or remote-site power. The purpose of endurance testing the FPSE was to demonstrate its potential for long life. The endurance program was directed at obtaining 1000 operational hours under various test conditions: low power, full stroke, duty cycle and stop/start. Critical performance parameters were measured to note any change and/or trend. Inspections were conducted to measure and compare critical seal/bearing clearances. The engine performed well throughout the program, completing more than 1100 hours. Hardware inspection, including the critical clearances, showed no significant change in hardware or clearance dimensions. The performance parameters did not exhibit any increasing or decreasing trends. The test program confirms the potential for long-life FPSE applications.

  20. Results of flow and vibration testing of supercell target elements in support of the N Reactor Alternate Mission Program

    SciTech Connect

    Crowe, R.D.; Samuel, T.J.

    1989-09-01

    The purpose of the Alternate Missions Program Design Tasks is to provide an alternate fuel/target design for producing tritium in the N Reactor. The planning for the program must be consistent with the following production requirements: (1) minimize changes to the reactor for implementation, (2) minimize implementation and production costs, and (3) maximize tritium production within these constraints. To evaluate the structural performance of the fuel/target and supercell target elements to be used in tritium production at the N Reactor, flow and vibration tests on the new supercell target design were conducted as described in WHC-IP-0552, (Crowe and Samuel 1989). Because the new fuel/target and supercell target elements weigh much less than fuel previously used in the N Reactor, testing was necessary to demonstrate that the elements would not vibrate when subjected to prototypical reactor flow conditions. This testing was essential to establish the new fuel and supercell target vibration and hydraulic behavior before actual use in the N Reactor. 5 refs., 10 figs., 11 tabs.

  1. HANFORD MEDIUM-LOW CURIE WASTE PRETREATMENT ALTERNATIVES PROJECT FRACTIONAL CRYSTALLIZATION PILOT SCALE TESTING FINAL REPORT

    SciTech Connect

    HERTING DL

    2008-09-16

    The Fractional Crystallization Pilot Plant was designed and constructed to demonstrate that fractional crystallization is a viable way to separate the high-level and low-activity radioactive waste streams from retrieved Hanford single-shell tank saltcake. The focus of this report is to review the design, construction, and testing details of the fractional crystallization pilot plant not previously disseminated.

  2. TEST REPORT #33: Compressor Calorimeter Test of R-410A Alternative: R-32/R-134a Mixture Using a Scroll Compressor

    SciTech Connect

    Shrestha, Som; Sharma, Vishaldeep; Abdelaziz, Omar

    2014-02-18

    This report investigates the tested performance of lower - GWP candidate refrigerant, 94.07 wt% R - 32 + 5.93 wt % R - 134 a mixture (hereafter referred to as R - 32/134a), as an alternative to baseline refrigerant R - 410 A using a 36,000 Btu/hr compressor calorimeter located at the Heat Exchanger Advanced Testing Facility at Oak Ridge National Laboratory . These tests were conducted during May and August 2013. R - 410A is a near - azeotropic blend of R - 32 and R - 125 with 0.5/0.5 mass fraction and has a GWP 100 of 2100. R - 32 and R - 134a are pure refrigerants and have GWP 100 of 716 and 1370 1, respectively. Based on the GWP 100 values of pure refrigerants and their mass fraction in the blend, GWP 100 of R - 32/134a, which is under development by National Refrigerant, is 755. This report compares various performance parameters, such as cooling capacity, compressor power, refrigerant mass flow rate, EER, isentropic efficiency and discharge temperature of the alternative refrigerant to that of R - 410 A.

  3. A rating procedure for solar domestic hot water systems based on ASHRAE-95 test results

    SciTech Connect

    Minnerly, B.V.; Klein, S.A.; Beckman, W.A. )

    1991-01-01

    A rating method for solar domestic hot water (SDHW) systems is presented that provides site-specific annual performance estimates based on ASHRAE-95 test results. An overall loss and overall gain coefficient are estimated by lumping the entire thermal behavior of the actual system exhibited during the ASHRAE-95 test into the collector parameters of a simplified system model. The performance of the simplified model can then be predicted using either the F-chart or TRNSYS and presented as an estimate of the annual performance of the actual system. Experimental performance measurements taken from relevant literature as well as extensive simulations, indicate that this method is capable of predicting the annual performance of a wide range of SDHW system types to within 5%, independent of location.

  4. Comparison of the mouse Embryonic Stem cell Test, the rat Whole Embryo Culture and the Zebrafish Embryotoxicity Test as alternative methods for developmental toxicity testing of six 1,2,4-triazoles

    SciTech Connect

    Jong, Esther de; Barenys, Marta; Hermsen, Sanne A.B.; Verhoef, Aart; Ossendorp, Bernadette C.; Bessems, Jos G.M.; Piersma, Aldert H.

    2011-06-01

    The relatively high experimental animal use in developmental toxicity testing has stimulated the search for alternatives that are less animal intensive. Three widely studied alternative assays are the mouse Embryonic Stem cell Test (EST), the Zebrafish Embryotoxicity Test (ZET) and the rat postimplantation Whole Embryo Culture (WEC). The goal of this study was to determine their efficacy in assessing the relative developmental toxicity of six 1,2,4-triazole compounds, flusilazole, hexaconazole, cyproconazole, triadimefon, myclobutanil and triticonazole. For this purpose, we analyzed effects and relative potencies of the compounds in and among the alternative assays and compared the findings to their known in vivo developmental toxicity. Triazoles are antifungal agents used in agriculture and medicine, some of which are known to induce craniofacial and limb abnormalities in rodents. The WEC showed a general pattern of teratogenic effects, typical of exposure to triazoles, mainly consisting of reduction and fusion of the first and second branchial arches, which are in accordance with the craniofacial malformations reported after in vivo exposure. In the EST all triazole compounds inhibited cardiomyocyte differentiation concentration-dependently. Overall, the ZET gave the best correlation with the relative in vivo developmental toxicities of the tested compounds, closely followed by the EST. The relative potencies observed in the WEC showed the lowest correlation with the in vivo developmental toxicity data. These differences in the efficacy between the test systems might be due to differences in compound kinetics, in developmental stages represented and in the relative complexity of the alternative assays.

  5. 2014-06-18 Issuance: Test Procedure for Integrated Light-Emitting Diode Lamps; Supplemental Notice of Proposed Rulemaking

    Energy.gov [DOE]

    This document is a pre-publication Federal Register Supplemental Notice of Proposed Rulemaking regarding Test Procedures for Integrated Light-Emitting Diode Lamps, as issued by the Deputy Assistant Secretary for Energy Efficiency on June 18, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  6. 2014-07-10 Issuance: Test Procedures for Refrigerators, Refrigerator-Freezers, and Freezers; Final Rule Correction

    Energy.gov [DOE]

    This document is a pre-publication Federal Register final rule correction regarding test procedures for refrigerators, refrigerator-freezers, and freezers, as issued by the Deputy Assistant Secretary for Energy Efficiency on July 10, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  7. 2014-10-14 Issuance: Test Procedures and Energy Conservation Standards for Residential Solar Water Heaters; Request for Information

    Energy.gov [DOE]

    This document is a pre-publication Federal Register request for information regarding test procedures and energy conservation standards for residential solar water heaters, as issued by the Deputy Assistant Secretary for Energy Efficiency on October 14, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  8. 2014-03-31 Issuance: Test Procedure for Commercial Packaged Boilers; Request for Information, Reopening of the Comment Period

    Energy.gov [DOE]

    This document is a pre-publication Federal Register notice reopening the comment period for the request for information regarding the commercial packaged boiler test procedure rulemaking, as issued by the Deputy Assistant Secretary for Energy Efficiency on March 31, 2014. Though it is not intended or expected, should any discrepancy occur between the document posted here and the document published in the Federal Register, the Federal Register publication controls. This document is being made available through the Internet solely as a means to facilitate the public's access to this document.

  9. Base program interim phase test procedure - Coherent Laser Vision System (CLVS). Final report, September 27, 1994--January 30, 1997

    SciTech Connect

    1997-05-01

    The purpose of the CLVS research project is to develop a prototype fiber-optic based Coherent Laser Vision System suitable for DOE`s EM Robotics program. The system provides three-dimensional (3D) vision for monitoring situations in which it is necessary to update geometrics on the order of once per second. The CLVS project plan required implementation in two phases of the contract, a Base Contract and a continuance option. This is the Test Procedure and test/demonstration results presenting a proof-of-concept for a system providing three-dimensional (3D) vision with the performance capability required to update geometrics on the order of once per second.

  10. Biological alternatives to chemical identification for the ecotoxicological assessment of industrial effluents: The RTG-2 in vitro cytotoxicity test

    SciTech Connect

    Castano, A. . Centro de Sanidad Ambiental); Vega, M.; Blazquez, T.; Tarazona, J.V. )

    1994-10-01

    Ecotoxicology is concerned with the effects of chemicals on biological systems. Identifying components of complex aqueous effluents poses special problems, and can be useless if there is a lack of information on the biological effects of the identified chemicals. Toxicity-based (bioassay-directed) sample fractionation can be very useful, but the small amount of fractioned material is a constraint that can be solved by using in vitro tests. The RTG-2 in vitro cytotoxicity test has been used to assess (a) the efficacy of a treatment plant in the aeronautics industry and (b) the exposure of fish and molluscs cultured in Esteiro Bay to the effluent of a fish-processing factory. Ecotoxicological assessments could be done without identifying the responsible chemicals. The RTG-2 test was used in combination with concentration/fractionation procedures. It proved that the toxicity of the liquid wastes from the aeronautics industry was eliminated by the treatment, and that molluscs and fish reared in Esteiro Bay had accumulated toxic chemicals dumped by the fish-processing factory. A combination of the RTG-2 cytotoxicity test and HPLC proved to give useful information even for chemicals not identified by GC-MS.

  11. Comments on Supplemental Notice of Proposed Rulemaking for Alternative

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Docket No. EERE-2011-BT-TP-0024 | Department of Energy Supplemental Notice of Proposed Rulemaking for Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Docket No. EERE-2011-BT-TP-0024 Comments on Supplemental Notice of Proposed Rulemaking for Alternative Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In

  12. Annual report, spring 2015. Alternative chemical cleaning methods for high level waste tanks-corrosion test results

    SciTech Connect

    Wyrwas, R. B.

    2015-07-06

    The testing presented in this report is in support of the investigation of the Alternative Chemical Cleaning program to aid in developing strategies and technologies to chemically clean radioactive High Level Waste tanks prior to tank closure. The data and conclusions presented here were the examination of the corrosion rates of A285 carbon steel and 304L stainless steel when interacted with the chemical cleaning solution composed of 0.18 M nitric acid and 0.5 wt. % oxalic acid. This solution has been proposed as a dissolution solution that would be used to remove the remaining hard heel portion of the sludge in the waste tanks. This solution was combined with the HM and PUREX simulated sludge with dilution ratios that represent the bulk oxalic cleaning process (20:1 ratio, acid solution to simulant) and the cumulative volume associated with multiple acid strikes (50:1 ratio). The testing was conducted over 28 days at 50°C and deployed two methods to invest the corrosion conditions; passive weight loss coupon and an active electrochemical probe were used to collect data on the corrosion rate and material performance. In addition to investigating the chemical cleaning solutions, electrochemical corrosion testing was performed on acidic and basic solutions containing sodium permanganate at room temperature to explore the corrosion impacts if these solutions were to be implemented to retrieve remaining actinides that are currently in the sludge of the tank.

  13. 2014-03-06 Issuance: Test Procedures for Packaged Terminal Air Conditioners and Packaged Terminal Heat Pumps; Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    This document is a pre-publication Federal Register notice of proposed rulemaking regarding test procedures for packaged terminal air conditioners and packaged terminal heat pumps, as issued by the Deputy Assistant Secretary on March 6, 2014.

  14. A Discussion of Procedures and Equipment for the Comprehensive Test Ban Treaty On-Site Inspection Environmental Sampling and Analysis

    SciTech Connect

    Wogman, Ned A.; Milbrath, Brian D.; Payne, Rosara F.; Seifert, Carolyn E.; Friese, Judah I.; Miley, Harry S.; Bowyer, Ted W.; Hanlen, Richard C.; Onishi, Yasuo; Hayes, James C.; Wigmosta, Mark S.

    2011-02-01

    This paper is intended to serve as a scientific basis to start discussions of the available environmental sampling techniques and equipment that have been used in the past that could be considered for use within the context of the Comprehensive Nuclear-Test-Ban Treaty (CTBT) on-site inspections (OSI). This work contains information on the techniques, equipment, costs, and some operational procedures associated with environmental sampling that have actually been used in the past by the United States for the detection of nuclear explosions. This paper also includes a discussion of issues, recommendations, and questions needing further study within the context of the sampling and analysis of aquatic materials, atmospheric gases, atmospheric particulates, vegetation, sediments and soils, fauna, and drill-back materials.

  15. Achieving dust lead clearance standards after lead hazard control projects: An evaluation of the HUD-recommended cleaning procedure and an abbreviated alternative

    SciTech Connect

    Dixon, S. ); Tohn, E. ); Rupp, R. ); Clark, S. . Dept. of Environmental Health)

    1999-05-01

    The US Department of Housing and Urban Development's (HUD's) Guidelines for the Evaluation and Control of Lead-Based Paint Hazards in Housing strongly recommend that after lead hazard control interventions all walls, ceiling, floors, and other horizontal surfaces be cleaned using a three-step process to reduce lead-contaminated dust and debris. The three steps are: an initial vacuuming using a machine equipped with a high-efficiency particulate air (HEPA) filter (HEPA vacuum), wet wash with a lead cleaner, and a final HEPA vacuum. This study evaluated the effectiveness of two cleaning protocols: (1) the HUD-recommended three-step procedure, and (2) an abbreviated two-step cleaning procedure that omits the final HEPA vacuum. Cleaning procedures were evaluated in 27 dwelling units that had undergone significant lead hazard control interventions likely to produce lead dust. Dust lead samples were collected on floors and in window sills and troughs prior to the lead control hazard intervention, after the wet wash step of the cleaning procedure, and after completion of the second HEPA vacuuming. The results of the study demonstrate that dust lead surface loading on smooth and cleanable surfaces following the three-step and two-step cleaning procedures can achieve 1995 federal guidance dust clearance levels and levels substantially lower. Although the dust lead clearance rates before and after the second HEPA vacuum were the same, the time saved by omitting the second HEPA is small relative to the other elements of the cleaning process.

  16. Welding procedure specification. Supplement 1. Records of procedure qualification tests. Gas tungsten arc welding of chromium-nickel steel to nickel-copper

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2602-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of 300 series Cr-Ni steels (P-8-1) to nickel-copper N04400 (P-42), in thickness range 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  17. Welding procedure specification: gas tungsten arc welding of nickel-copper to nickel-chromium-iron. Supplement 1. Records of procedure qualification tests

    SciTech Connect

    Wodtke, C.H.; Frizzell, D.R.; Plunkett, W.A.

    1986-06-01

    Procedure WPS-2303-ASME-3 is qualified under Section IX of the ASME Boiler and Pressure Vessel Code for gas tungsten arc welding of nickel-copper N04400 (P-42) to nickel-chromium-iron N06600 (P-43), in thickness range of 0.035 to 0.432 inch; filler metal is ERNiCu-7 (F-42); shielding gas is argon.

  18. Compressor Calorimeter Test of R-404A Alternatives ARM-31a, D2Y-65, L-40, and R32 + R-134a Mixture using a Scroll Compressor

    SciTech Connect

    Shrestha, Som S; Sharma, Vishaldeep; Abdelaziz, Omar

    2013-08-01

    As a contribution to the AHRI Low-GWP Alternative Refrigerants Evaluation Program (AREP), this study compares the performance of four lower-GWP alternative refrigerants, ARM-31a, D2Y-65, L-40, and R-32 + R-134a mixture, to that of refrigerant R-404A (baseline) in a scroll compressor designed for medium temperature refrigeration applications. These comparisons were carried out via compressor calorimeter tests performed on a compressor designed for refrigerant R-404A and having a nominal rated capacity of 23,500 Btu/hr. Tests were conducted over a suction dew point temperature range of -10 F to 35 F in 5 F increments and a discharge dew point temperature range of 70 F to 140 F in 10 F increments. All the tests were performed with 20 F superheat, 40 F superheat, and 65 F suction temperature. A liquid subcooling level of 10 F to 15 F was maintained for all the test conditions. However, the cooling capacities reported in this study are normalized for 0 F subcooling. The tests showed that the compressor energy efficiency ratio (EER) and cooling capacity with all four alternative refrigerants tested are higher at higher saturation suction and saturation discharge temperature and lower at lower saturation suction and saturation discharge temperature, compared to that of R-404A. Discharge temperatures of all the alternative refrigerants were higher than that of R-404A at all test conditions.

  19. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards & Labeling Programs for Copy Machines, External Power Supplies, LED Displays, Residential Gas Cooktops and Televisions

    SciTech Connect

    Zheng, Nina; Zhou, Nan; Fridley, David

    2012-03-01

    This report presents a technical review of international minimum energy performance standards (MEPS), voluntary and mandatory energy efficiency labels and test procedures for five products being considered for new or revised MEPS in China: copy machines, external power supply, LED displays, residential gas cooktops and flat-screen televisions. For each product, an overview of the scope of existing international standards and labeling programs, energy values and energy performance metrics and description and detailed summary table of criteria and procedures in major test standards are presented.

  20. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Technician Training The Alternative Fuels Technician Certification Act (Act) regulates the training, testing, and certification of technicians and trainees who install, modify, ...

  1. ISSUANCE 2014-12-23: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Notice of Proposed Rulemaking

  2. ISSUANCE 2015-06-30: Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program for Certain Industrial Equipment: Energy Conservation Standards and Test Procedures for Commercial Heating, Air-Conditioning, and Water-Heating Equipment, Final Rule

  3. ISSUANCE 2015-04-01: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

  4. ISSUANCE 2016-08-15: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Supplemental Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Supplemental Notice of Proposed Rulemaking

  5. ISSUANCE 2015-03-27: Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

    Energy.gov [DOE]

    Energy Conservation Program for Consumer Products and Certain Commercial and Industrial Equipment: Test Procedures for Consumer and Commercial Water Heaters, Notice of Proposed Rulemaking

  6. ISSUANCE 2015-07-27: Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

    Office of Energy Efficiency and Renewable Energy (EERE)

    Energy Conservation Program: Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, Notice of Proposed Rulemaking

  7. The effect of test conditions on the erosion-corrosion of alternate low alloy steel tubing alloys

    SciTech Connect

    Levy, A.V.; Wang, B.Q.

    1988-01-01

    A group of low chromium content tubing steels with additional amounts of silicon were erosion-corrosion tested in air at temperatures to 850{sup 0}C with angular shaped erodent particles and FBC bed material. In previous tests using round shape erodent particles, these modified steels formed highly segmented scales which resulted in considerably lower erosion-corrosion metal wastage rates than occurred in typical silicon content low chromium steels. The same type of behavior occurred when angular shaped particles were used but to a lesser extent. The angular shaped particles resulted in thin scales that directly involved the substrate metal in the metal wastage process.

  8. Testing Low-Energy, High-Power Energy Storage Alternatives in a Full-Hybrid Vehicle (Presentation)

    SciTech Connect

    Cosgrove, J.; Gonger, J.

    2014-01-01

    Automakers have been mass producing hybrid electric vehicles (HEVs) for well over a decade, and the technology has proven to be very effective at reducing per-vehicle gasoline use. However, the battery cost in HEVs contribute to higher incremental cost of HEVs (a few thousand dollars) than the cost of comparable conventional vehicles, which has limited HEV market penetration. Significant cost reductions/performance improvements to the energy storage system (ESS) can improve the vehicle-level cost vs. benefit relationship for HEVs. Such an improvement could lead to larger HEV market penetration and greater aggregate gasoline savings. After significant analysis by the National Renewable Energy Laboratory (NREL), the United States Advanced Battery Consortium (USABC) and Department of Energy (DOE) Energy Storage program suggested a new set of requirements for ESS for power-assist HEVs for cost reduction without impacting performance and fuel economy significantly. With support from DOE, NREL has developed an HEV test platform for in-vehicle performance and fuel economy validation testing of the hybrid system using such LEESS devices. This poster will describe development of the LEESS HEV test platform, and LEESS laboratory as well as in-vehicle evaluation results. The first LEESS technology tested was lithium-ion capacitors (LICs) - i.e., asymmetric electrochemical energy storage devices possessing one electrode with battery-type characteristics (lithiated graphite) and one with ultracapacitor-type characteristics (carbon). We will discuss the performance and fuel saving results with LIC with comparison with original NiMH battery.

  9. Optimizing surface quality of stainless alloys and using a modified ASTM G 48B procedure for acceptance testing

    SciTech Connect

    Maurer, J.R.

    1999-01-01

    The formation of high-temperature oxide scales and Cr-depleted zones on stainless alloys, such as 6% Mo superaustenitic steels, can significantly reduce their corrosion resistance. Effective methods to remove these layers and restore the surface to an optimized condition are detailed. Also, an acceptance test using a modified ASTM G 48B method at 35 C (95 F) for 72 h with a specimen having a crevice, and special corrosion criteria for failure, are described. Comparison of this test method with one using an uncreviced specimen at lower temperatures and for less time is discussed.

  10. Plans, Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Plans, Procedures Plans, Procedures The following plans and procedures are cited in environmental reports prepared by the Laboratory. Contact Environmental Communication & Public Involvement Email Environmental Plans & Procedures DISCLAIMER: The following is a list of procedures (titles and numbers) cited in reports that have been prepared by the Laboratory's Associate Directorate for Environmental Management (ADEM). To view each procedure, visit the Electronic Public Reading Room (EPRR)

  11. Alternative Evaluation Study: Methods to Mitigate/Accommodate Subsidence for the Radioactive Waste Management Sites at the Nevada Test Site, Nye County Nevada, with Special Focus on Disposal Cell U-3ax/bl

    SciTech Connect

    Barker, L.

    1997-09-01

    An Alternative Evaluation Study is a type of systematic approach to problem identification and solution. An Alternative Evaluation Study was convened August 12-15, 1997, for the purpose of making recommendations concerning closure of Disposal Cell U-3ax/bl and other disposal cells and mitigation/accommodation of waste subsidence at the Radioactive Waste Management Sites at the Nevada Test Site. This report includes results of the Alternative Evaluation Study and specific recommendations.

  12. Alternative Refrigerant Evaluation for High-Ambient Temperature Environments: R-22 and R-410A Alternatives for Mini-Split Air Conditioners

    SciTech Connect

    Abdelaziz, Omar; Munk, Jeffrey D.; Shrestha, Som S.; Linkous, Randall Lee; Goetzler, William; Guernsey, Matt; Kassuga, Theo

    2015-08-01

    The Oak Ridge National Laboratory (ORNL) High-Ambient Temperature Testing Program for Low-GWP Refrigerants aims to develop an understanding of the performance of low-Global Warming Potential (low-GWP) alternatives to Hydrochlorofluorocarbon (HCFC) and Hydrofluorocarbon (HFC) refrigerants in mini-split air conditioners under high ambient temperature conditions. This interim working paper describes the parties involved, the alternative refrigerants selection process, the test procedures, and the preliminary results.

  13. REM Handling Procedures | The Ames Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    REM Handling Procedures Below are recommended handling procedures for the Rare Earth Metals. Keep in mind that these procedures are intended for very high purity metals, and alternative procedures may exist or be better suited to your facilities' capabilities. Please consult with your safety officer(s) before employing any of these procedures. The procedures are grouped by element: La, Ce, Pr & Nd Sc, Y, Gd, Tb, Dy, Ho, Er, Tm and Lu Sm & Yb Eu RECOMMENDED HANDLING PROCEDURES FOR: La,

  14. TEST PLAN AND PROCEDURE FOR THE EXAMINATION OF TANK 241-AY-101 MULTI-PROBE CORROSION MONITORING SYSTEM

    SciTech Connect

    WYRWAS RB; PAGE JS; COOKE GS

    2012-04-19

    This test plan describes the methods to be used in the forensic examination of the Multi-probe Corrosion Monitoring System (MPCMS) installed in the double-shell tank 241-AY-101 (AY-101). The probe was designed by Applied Research and Engineering Sciences (ARES) Corporation. The probe contains four sections, each of which can be removed from the tank independently (H-14-107634, AY-101 MPCMS Removable Probe Assembly) and one fixed center assembly. Each removable section contains three types of passive corrosion coupons: bar coupons, round coupons, and stressed C-rings (H-14-l07635, AY-101 MPCMS Details). Photographs and weights of each coupon were recorded and reported on drawing H-14-107634 and in RPP-RPT-40629, 241-AY-101 MPCMS C-Ring Coupon Photographs. The coupons will be the subject of the forensic analyses. The purpose of this examination will be to document the nature and extent of corrosion of the 29 coupons. This documentation will consist of photographs and photomicrographs of the C-rings and round coupons, as well as the weights of the bar and round coupons during corrosion removal. The total weight loss of the cleaned coupons will be used in conjunction with the surface area of each to calculate corrosion rates in mils per year. The bar coupons were presumably placed to investigate the liquid-air-interface. An analysis of the waste level heights in the waste tank will be investigated as part of this examination.

  15. Test procedures and protocols: Their relevance to the figure of merit for thermal distribution systems. Volume 1: Informal report

    SciTech Connect

    Andrews, J.W.

    1993-09-01

    A conceptual framework is developed that categorizes measurement protocols for forced-air thermal distribution systems in small buildings. This framework is based on the distinction between two generic approaches. The {open_quote}system-comparison{close_quote} approach seeks to determine, via a pair of whole-house energy-use measurements, the difference in energy use between the house with the as-found duct system and the same house with no energy losses attributable to the thermal distribution system. The {open_quote}component loss-factor{close_quote} approach identifies and measures the individual causes of duct losses, and then builds up a value for the net overall duct efficiency, usually with the help of computer simulation. Examples of each approach are analyzed and related to a proposed Figure of Merit for thermal distribution systems. This Figure of Merit would serve as the basis for a Standard Method of Test analogous to those already in place for furnaces, boilers, air conditioners, and heat pumps.

  16. Developing Fatigue Pre-crack Procedure to Evaluate Fracture Toughness of Pipeline Steels Using Spiral Notch Torsion Test

    SciTech Connect

    Wang, Jy-An John; Tan, Ting; Jiang, Hao; Zhang, Wei; Feng, Zhili

    2012-10-01

    The spiral notch torsion test (SNTT) has been utilized to investigate the crack growth behavior of X52 steel base and welded materials used for hydrogen infrastructures. The X52 steel materials are received from a welded pipe using friction stir welding techniques. Finite element models were established to study the crack growth behavior of steel SNTT steel samples, which were assumed to be isotropic material. A series SNTT models were set up to cover various crack penetration cases, of which the ratios between crack depth to diameter (a/D ratio) ranging from 0.10 to 0.45. The evolution of compliance and energy release rates in the SNTT method have been investigated with different cases, including different geometries and materials. Indices of characteristic compliance and energy release rates have been proposed. Good agreement has been achieved between predictions from different cases in the same trend. These work shed lights on a successful protocol for SNTT application in wide range of structural materials. The further effort needed for compliance function development is to extend the current developed compliance function to the deep crack penetration arena, in the range of 0.55 to 0.85 to effectively determine fracture toughness for extremely tough materials.

  17. Microwave power coupler for a superconducting multiple-cell cavity for accelerator application and its testing procedures

    SciTech Connect

    Li, Jianjian

    2008-12-01

    Superconducting cavity resonators offer the advantage of high field intensity for a given input power, making them an attractive contender for particle accelerator applications. Power coupling into a superconducting cavity employed in a particle accelerator requires unique provisions to maintain high vacuum and cryogenic temperature on the cavity side, while operating with ambient conditions on the source side. Components introduced to fulfill mechanical requirements must show negligible obstruction of the propagation of the microwave with absence of critical locations that may give rise to electron multipaction, leading to a multiple section design, instead of an aperture, a probe, or a loop structure as found in conventional cavities. A coaxial power coupler for a superconducting multiple-cell cavity at 3.9 GHz has been developed. The cavity is intended to be employed as an accelerator to provide enhanced electron beam quality in a free-electron laser in Hamburg (FLASH) user facility. The design of the coupler called for two windows to sustain high vacuum in the cavity and two bellows to accommodate mechanical dimensional changes resulting from cryogenics. Suppression of multipacting was accomplished by the choice of conductor dimensions and materials with low second yield coefficients. Prior to integration with the cavity, the coupler was tested for intrinsic properties in a back-to-back configuration and conditioned for high-power operation with increasing power input. Maximum incident power was measured to be 61 kW. When integrated with the superconducting cavity, a loaded quality factor of 9 x 10 5 was measured by transient method. Coupler return loss and insertion loss were estimated to be around -21 dB and -0.2 dB, respectively.

  18. Life-Cycle Cost and Risk Analysis of Alternative Configurations for Shipping Low-Level Radioactive Waste to the Nevada Test Site

    SciTech Connect

    PM Daling; SB Ross; BM Biwer

    1999-12-17

    The Nevada Test Site (NTS) is a major receiver of low-level radioactive waste (LLW) for disposal. Currently, all LLW received at NTS is shipped by truck. The trucks use highway routes to NTS that pass through the Las Vegas Valley and over Hoover Dam, which is a concern of local stakeholder groups in the State of Nevada. Rail service offers the opportunity to reduce transportation risks and costs, according to the Waste Management Programmatic Environmental Impact Statement (WM-PEIS). However, NTS and some DOE LLW generator sites are not served with direct rail service so intermodal transport is under consideration. Intermodal transport involves transport via two modes, in this case truck and rail, from the generator sites to NTS. LLW shipping containers would be transferred between trucks and railcars at intermodal transfer points near the LLW generator sites, NTS, or both. An Environmental Assessment (EA)for Intermodal Transportation of Low-Level Radioactive Waste to the Nevada Test Site (referred to as the NTSIntermodal -M) has been prepared to determine whether there are environmental impacts to alterations to the current truck routing or use of intermodal facilities within the State of Nevada. However, an analysis of the potential impacts outside the State of Nevada are not addressed in the NTS Intermodal EA. This study examines the rest of the transportation network between LLW generator sites and the NTS and evaluates the costs, risks, and feasibility of integrating intermodal shipments into the LLW transportation system. This study evaluates alternative transportation system configurations for NTS approved and potential generators based on complex-wide LLW load information. Technical judgments relative to the availability of DOE LLW generators to ship from their sites by rail were developed. Public and worker risk and life-cycle cost components are quantified. The study identifies and evaluates alternative scenarios that increase the use of rail (intermodal

  19. Comparison of Test Procedures and Energy Efficiency Criteria in Selected International Standards and Labeling Programs for Clothes Washers, Water Dispensers, Vending Machines and CFLs

    SciTech Connect

    Fridley, David; Zheng, Nina; Zhou, Nan

    2010-06-01

    Since the late 1970s, energy labeling programs and mandatory energy performance standards have been used in many different countries to improve the efficiency levels of major residential and commercial equipment. As more countries and regions launch programs covering a greater range of products that are traded worldwide, greater attention has been given to harmonizing the specific efficiency criteria in these programs and the test methods for measurements. For example, an international compact fluorescent light (CFL) harmonization initiative was launched in 2006 to focus on collaboration between Australia, China, Europe and North America. Given the long history of standards and labeling programs, most major energy-consuming residential appliances and commercial equipment are already covered under minimum energy performance standards (MEPS) and/or energy labels. For these products, such as clothes washers and CFLs, harmonization may still be possible when national MEPS or labeling thresholds are revised. Greater opportunity for harmonization exists in newer energy-consuming products that are not commonly regulated but are under consideration for new standards and labeling programs. This may include commercial products such as water dispensers and vending machines, which are only covered by MEPS or energy labels in a few countries or regions. As China continues to expand its appliance standards and labeling programs and revise existing standards and labels, it is important to learn from recent international experiences with efficiency criteria and test procedures for the same products. Specifically, various types of standards and labeling programs already exist in North America, Europe and throughout Asia for products in China's 2010 standards and labeling programs, namely clothes washers, water dispensers, vending machines and CFLs. This report thus examines similarities and critical differences in energy efficiency values, test procedure specifications and other

  20. Alternative Compliance

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Individual Permit » Compliance Individual Permit: Alternative Compliance When permittees believe they have installed measures to minimize pollutants but are unable to certify completion of corrective action, they may seek to place a Site into Alternative Compliance. Contact Environmental Communication & Public Involvement P.O. Box 1663 MS M996 Los Alamos, NM 87545 (505) 667-0216 Email Alternative Compliance Requests to EPA SMA SITE Submittal Date/Letter Document 2M-SMA-1.42 06-001(a)

  1. Emergency Procedures

    Energy.gov [DOE]

    Note: This page is pending deletion, please refer to the Safety and health main page for emergency procedure information:

  2. ISSUANCE 2016-03-10: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Energy.gov [DOE]

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  3. ISSUANCE 2016-04-14: Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Appliance Standards and Rulemaking Federal Advisory Committee: Notice of Open Meetings for the Circulator Pumps Working Group to Negotiate a Notice of Proposed Rulemaking (NOPR) for Energy Conservation Standards and Test Procedures

  4. Product consistency test and toxicity characteristic leaching procedure results of the ceramic waste form from the electrometallurgical treatment process for spent fuel

    SciTech Connect

    Johnson, S. G.; Adamic, M. L.: DiSanto, T.; Warren, A. R.; Cummings, D. G.; Foulkrod, L.; Goff, K. M.

    1999-11-11

    The ceramic waste form produced from the electrometallurgical treatment of sodium bonded spent fuel from the Experimental Breeder Reactor-II was tested using two immersion tests with separate and distinct purposes. The product consistency test is used to assess the consistency of the waste forms produced and thus is an indicator of a well-controlled process. The toxicity characteristic leaching procedure is used to determine whether a substance is to be considered hazardous by the Environmental Protection Agency. The proposed high level waste repository will not be licensed to receive hazardous waste, thus any waste forms destined to be placed there cannot be of a hazardous nature as defined by the Resource Conservation and Recovery Act. Results are presented from the first four fully radioactive ceramic waste forms produced and from seven ceramic waste forms produced from cold surrogate materials. The fully radioactive waste forms are approximately 2 kg in weight and were produced wit h salt used to treat 100 driver subassemblies of spent fuel.

  5. Alternative Refrigerant Evaluation for High-Ambient-Temperature Environments: R-22 and R-410A Alternatives for Mini-Split Air Conditioners

    SciTech Connect

    Abdelaziz, Omar; Shrestha, Som S.; Munk, Jeffrey D.; Linkous, Randall Lee; Goetzler, William; Guernsey, Matt; Kassuga, Theo

    2015-10-01

    The Oak Ridge National Laboratory (ORNL) High-Ambient-Temperature Evaluation Program for low– global warming potential (Low-GWP) Refrigerants aims to develop an understanding of the performance of low-GWP alternative refrigerants to hydrochlorofluorocarbon (HCFC) and hydrofluorocarbon (HFC) refrigerants in mini-split air conditioners under high-ambient-temperature conditions. This final report describes the parties involved, the alternative refrigerant selection process, the test procedures, and the final results.

  6. Alternative Compliance

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Alternative Compliance Request for 19 Site Monitoring AreaSite Combinations Exceeding Target Action Levels for Gross-Alpha Radioactivity CDV-SMA-2 16-021(c) CDV-SMA-2.51 16-010(i) ...

  7. Alternative Financing

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-09-15

    The purpose of the proposed Guide it to provide uniform guidance and describe the methods and procedures recommended for use by DOE in preparing proposals for the use of leased facilities, usually referred to as capital assets.

  8. GRID Alternatives

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    w w w. g r i d a l t e r n a t i v e s . o r g GRID Alternatives Tribal Program Project Development for Long-term Tribal Energy July 27, 2016 Tim Willink, Tribal Program Director 303-968-1633 twillink@gridalternatives.org Vision and Mission Mission: Make renewable energy technology and job training accessible to underserved communities Vision: A successful transition to clean energy that includes everyone People. Planet. Employment. GRID Alternatives History 2001: Founded by Erica Mackie and Tim

  9. Advanced Vehicle Testing and Evaluation

    SciTech Connect

    Garetson, Thomas

    2013-03-31

    The objective of the United States (U.S.) Department of Energy's (DOEs) Advanced Vehicle Testing and Evaluation (AVTE) project was to provide test and evaluation services for advanced technology vehicles, to establish a performance baseline, to determine vehicle reliability, and to evaluate vehicle operating costs in fleet operations.Vehicles tested include light and medium-duty vehicles in conventional, hybrid, and all-electric configurations using conventional and alternative fuels, including hydrogen in internal combustion engines. Vehicles were tested on closed tracks and chassis dynamometers, as well as operated on public roads, in fleet operations, and over prescribed routes. All testing was controlled by procedures developed specifically to support such testing.

  10. Laboratory Analytical Procedures | Bioenergy | NREL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    biofuels and pyrolysis bio-oils research. Biomass Compositional Analysis These lab procedures provide tested and accepted methods for performing analyses commonly used in biofuels ...

  11. Microgrid Testing

    SciTech Connect

    Shirazi, M.; Kroposki, B.

    2012-01-01

    With the publication of IEEE 1574.4 Guide for Design, Operation, and Integration of Distributed Resource Island Systems with Electric Power Systems, there is an increasing amount of attention on not only the design and operations of microgrids, but also on the proper operation and testing of these systems. This standard provides alternative approaches and good practices for the design, operation, and integration of microgrids. This includes the ability to separate from and reconnect to part of the utility grid while providing power to the islanded power system. This presentation addresses the industry need to develop standardized testing and evaluation procedures for microgrids in order to assure quality operation in the grid connected and islanded modes of operation.

  12. Sustainable Alternative Jet Fuels

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Aviation Administration Sustainable Alternative Jet Fuels Update on ASTM Approval Nate Brown U.S. Federal Aviation Administration May 18, 2012 2 Federal Aviation Administration How a Fuel Gets Approved ASTM Balloting Process Specification Properties Engine/APU Testing Fit-For-Purpose Properties Component/Rig Testing ASTM Research Report ASTM Specification Accept ASTM Review & Ballot Re-Eval As Required Reject ASTM Specification Accept ASTM Review & Ballot Re-Eval As Required Reject ASTM

  13. Alternative Fuels Data Center: Underwriters Laboratories Ethanol Dispenser

    Alternative Fuels and Advanced Vehicles Data Center

    Safety Testing Underwriters Laboratories Ethanol Dispenser Safety Testing to someone by E-mail Share Alternative Fuels Data Center: Underwriters Laboratories Ethanol Dispenser Safety Testing on Facebook Tweet about Alternative Fuels Data Center: Underwriters Laboratories Ethanol Dispenser Safety Testing on Twitter Bookmark Alternative Fuels Data Center: Underwriters Laboratories Ethanol Dispenser Safety Testing on Google Bookmark Alternative Fuels Data Center: Underwriters Laboratories

  14. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Biodiesel Quality Testing Procedures Each biodiesel or other renewable diesel producer, distributor, or importer must retain the certificate of analysis for each batch or production lot of B100 sold or delivered in the state for at least one year. The Oregon Department of Agriculture (ODA) or authorized agents may examine these records as necessary. The ODA or authorized agents may also perform on-site testing or obtain samples of biodiesel or other renewable diesel from any producer, bulk

  15. Surface cleanliness measurement procedure

    DOEpatents

    Schroder, Mark Stewart; Woodmansee, Donald Ernest; Beadie, Douglas Frank

    2002-01-01

    A procedure and tools for quantifying surface cleanliness are described. Cleanliness of a target surface is quantified by wiping a prescribed area of the surface with a flexible, bright white cloth swatch, preferably mounted on a special tool. The cloth picks up a substantial amount of any particulate surface contamination. The amount of contamination is determined by measuring the reflectivity loss of the cloth before and after wiping on the contaminated system and comparing that loss to a previous calibration with similar contamination. In the alternative, a visual comparison of the contaminated cloth to a contamination key provides an indication of the surface cleanliness.

  16. Vehicle Technologies Office: Advanced Vehicle Testing Activity (AVTA) Data

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Results | Department of Energy Advanced Vehicle Testing Activity (AVTA) Data and Results Vehicle Technologies Office: Advanced Vehicle Testing Activity (AVTA) Data and Results The Vehicle Technologies Office (VTO) supports work to develop test procedures and carry out testing on a wide range of advanced vehicles and technologies through the Advanced Vehicle Testing Activity (AVTA). This effort collects performance data from a wide range of light-duty alternative fuel and advanced

  17. Testing

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Test photo gallery Test photo gallery Addthis University of Texas Leadership Panel short 1 of 6 University of Texas Leadership Panel short University of Texas Leadership Panel short University of Kentucky Panel short 2 of 6 University of Kentucky Panel short University of Kentucky Panel short University of New Mexico Panel short 3 of 6 University of New Mexico Panel short University of New Mexico Panel short University of Texas Leadership Panel wide 4 of 6 University of Texas Leadership Panel

  18. Methodology for developing and implementing alternative temperature-time curves for testing the fire resistance of barriers for nuclear power plant applications

    SciTech Connect

    Cooper, L.Y.; Steckler, K.D.

    1996-08-01

    Advances in fire science over the past 40 years have offered the potential for developing technically sound alternative temperature-time curves for use in evaluating fire barriers for areas where fire exposures can be expected to be significantly different than the ASTM E-119 standard temperature-time exposure. This report summarizes the development of the ASTM E-119, standard temperature-time curve, and the efforts by the federal government and the petrochemical industry to develop alternative fire endurance curves for specific applications. The report also provides a framework for the development of alternative curves for application at nuclear power plants. The staff has concluded that in view of the effort necessary for the development of nuclear power plant specific temperature-time curves, such curves are not a viable approach for resolving the issues concerning Thermo-Lag fire barriers. However, the approach may be useful to licensees in the development of performance-based fire protection methods in the future.

  19. Policies and Procedures

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    procedures Policies and Procedures Guidelines Safety Computer Security Conduct of Operations JLF Forms Publication Policy

  20. PEAT: an energy alternative

    SciTech Connect

    Schora, F.C.; Punwani, D.V.

    1980-01-01

    Even though peat is a low-heating value and low-bulk density fossil fuel which in its natural state contains over 80 percent moisture, it can be an economical alternative to coal, and fuel oil, as is the case in Iceland and Finland for direct combustion applications. This is because of the relative ease with which peat can be harvested, and the generally low sulfur and ash content of peat. Recent studies show that peat also has very favorable characteristics for conversion to synthetic fuels. Tests show that on the basis of chemistry and kinetics, peat is a better raw material than coal for production of synthetic fuels. Recent estimates also show that conversion of peat to high-Btu gas (>950 Btu/scf) is competitive with other alternatives of synthetic high-Btu gas. Therefore, peat can be an economical energy alternative depending upon location of peat deposits, region of energy need, scale of operation and cost of other energy alternatives.

  1. Acceptance Test Procedure for Project 251W, WBS 3, Substation A-8, Building 251-W, Bus {number_sign}2 switchgear replacement

    SciTech Connect

    VanBaalen, R.A.

    1995-02-01

    This document records the steps taken and results of the acceptance testing of the new 13.8kV switchgear installed at 251W. This gear is under the administrative control of Electrical Utilities.

  2. LANSCE | Materials Test Station

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Training Office Contact Administrative nav background Materials Test Station dotline ... Materials Test Station: the Preferred Alternative When completed, the Materials Test ...

  3. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Incentives Printable Version Share this resource Send a link to Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center on Delicious Rank Alternative Fuels Data Center on Digg Find More places to share Alternative Fuels Data Center on AddThis.com... More in this section... Search Federal State Local Examples

  4. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Summary Tables Printable Version Share this resource Send a link to Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center on Delicious Rank Alternative Fuels Data Center on Digg Find More places to share Alternative Fuels Data Center on AddThis.com... More in this section... Search Federal State Local Examples

  5. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Federal Printable Version Share this resource Send a link to Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center on Delicious Rank Alternative Fuels Data Center on Digg Find More places to share Alternative Fuels Data Center on AddThis.com... More in this section... Search Federal State Local Examples Summary

  6. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Tools Printable Version Share this resource Send a link to Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center on Delicious Rank Alternative Fuels Data Center on Digg Find More places to share Alternative Fuels Data Center on AddThis.com... Truckstop Electrification Truck Stop Electrification Locator Locate

  7. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    AFDC Printable Version Share this resource Send a link to Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center on Delicious Rank Alternative Fuels Data Center on Digg Find More places to share Alternative Fuels Data Center on AddThis.com... Vehicle and Infrastructure Cash-Flow Evaluation Model VICE 2.0: Vehicle

  8. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Incentives » Federal Printable Version Share this resource Send a link to Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center on Delicious Rank Alternative Fuels Data Center on Digg Find More places to share Alternative Fuels Data Center on AddThis.com... More in this section... Search Federal State Local

  9. Impact of ethanol and butanol as oxygenates on SIDI engine efficiency and emissions using steady-state and transient test procedures

    Energy.gov [DOE]

    Alcohols as gasoline blending agent at up to 85 vol-% levels were evaluated in a 2.2L direct injection SI engine for combustion, engine efficiency, and engine-out emissions effects at steady-state and transient test conditions

  10. Determination of alternative fuels combustion products: Phase 1 report

    SciTech Connect

    Whitney, K.A.

    1997-09-01

    This report describes the laboratory effort to identify and quantify organic exhaust species generated from alternative-fueled light-duty vehicles operating over the Federal Test Procedure on compressed natural gas, liquefied petroleum gas, methanol, ethanol, and reformulated gasoline. The exhaust species from these vehicles were identified and quantified for fuel/air equivalence ratios of 0.8, 1.0, and 1.2, nominally, and were analyzed with and without a vehicle catalyst in place to determine the influence of a catalytic converter on species formation.

  11. Alternative Fuel Basics | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alternative Fuel Basics Alternative Fuel Basics August 19, 2013 - 5:42pm Addthis Photo of a man in goggles looking at test tubes full of biodiesel. There are a number of fuels available for alternative fuel vehicles. Learn about the following types of fuels: Biodiesel Electricity Ethanol Hydrogen Natural Gas Propane Addthis Related Articles Advanced Technology and Alternative Fuel Vehicle Basics Glossary of Energy-Related Terms Natural Gas Fuel Basics Energy Basics Home Renewable Energy Homes

  12. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Alternative Fuel and Vehicle Tax Alternative fuels used to operate on-road vehicles are taxed at a rate of 0.162 per gasoline gallon equivalent (GGE). Alternative fuels are taxed ...

  13. Alternative Site Technology Deployment-Monitoring System for the U-3ax/bl Disposal Unit at the Nevada Test Site

    SciTech Connect

    Dixon, J.M.; Levitt, D.G.; Rawlinson, S.E.

    2001-02-01

    In December 2000, a performance monitoring facility was constructed adjacent to the U-3ax/bl mixed waste disposal unit at the Nevada Test Site (NTS). Recent studies conducted in the arid southwestern United States suggest that a vegetated monolayer evapotranspiration (ET) closure cover may be more effective at isolating waste than traditional Resource Conservation and Recovery Act (RCRA) multi-layered designs. The monitoring system deployed next to the U-3ax/bl disposal unit consists of eight drainage lysimeters with three surface treatments: two are left bare; two are revegetated with native species; two are being allowed to revegetate with invader species; and two are reserved for future studies. Soil used in each lysimeter is native alluvium taken from the same location as the soil used for the cover material on U-3ax/bl. The lysimeters were constructed so that any drainage to the bottom can be collected and measured. To provide a detailed evaluation of the cover performance, an ar ray of 16 sensors was installed in each lysimeter to measure soil water content, soil water potential, and soil temperature. Revegetation of the U-3ax/bl closure cover establishes a stable plant community that maximizes water loss through transpiration while at the same time, reduces water and wind erosion and ultimately restores the disposal unit to its surrounding Great Basin Desert environment.

  14. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Includes alternative fueladvanced vehicle acquisition requirements and alternative fuel use requirements. Biodiesel Biodiesel is produced from a range of vegetable oils and animal ...

  15. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Beginning January 1, 2017, alternative fuels will be taxed equal to the motor fuel tax on a gallon equivalent basis. Alternative fuels include natural gas, propane, hydrogen, and ...

  16. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    buses and other motor vehicles to use U.S. Environmental Protection Agency compliant alternative fuel systems, purchase alternative fuel equipment, and install fueling stations. ...

  17. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    License Fee Effective July 1, 2015, each alternative fuel supplier, refiner, distributor, terminal operator, importer or exporter of alternative fuel used in motor vehicles must...

  18. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Alternative Fuel Vehicle (AFV) and Hybrid Electric Vehicle (HEV) Funding The Alternative Fuels Incentive Grant (AFIG) Program provides financial assistance for qualified projects; ...

  19. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Last Updated August 2016 State Incentives Alternative Fuel Vehicle (AFV) and Hybrid Electric Vehicle (HEV) Support updated 9132016 Alternative Fuel and Idle Reduction Grants ...

  20. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Development and Deployment Grants The Pennsylvania Energy Development Authority (PEDA) provides grants of up to 1,000,000 for alternative energy projects and ...

  1. Software Verification and Validation Procedure

    SciTech Connect

    Olund, Thomas S.

    2008-09-15

    This Software Verification and Validation procedure provides the action steps for the Tank Waste Information Network System (TWINS) testing process. The primary objective of the testing process is to provide assurance that the software functions as intended, and meets the requirements specified by the client. Verification and validation establish the primary basis for TWINS software product acceptance.

  2. Additional Guidance Regarding Application of Current Procedures...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Additional Guidance Regarding Application of Current Procedures for Testing Energy Consumption of Clothes Washers with Warm Rinse Cycles, Issued: June 30, 2010 Additional Guidance...

  3. Deployment of an Alternative Closure Cover and Monitoring System at the Mixed Waste Disposal Unit U-3ax/bl at the Nevada Test Site

    SciTech Connect

    Levitt, D.G.; Fitzmaurice, T.M.

    2001-02-01

    In October 2000, final closure was initiated of U-3ax/bl, a mixed waste disposal unit at the Nevada Test Site (NTS). The application of approximately 30 cm of topsoil, composed of compacted native alluvium onto an operational cover, seeding of the topsoil, installation of soil water content sensors within the cover, and deployment of a drainage lysimeter facility immediately adjacent to the disposal unit initiated closure. This closure is unique in that it required the involvement of several U.S. Department of Energy (DOE) Environmental Management (EM) groups: Waste Management (WM), Environmental Restoration (ER), and Technology Development (TD). Initial site characterization of the disposal unit was conducted by WM. Regulatory approval for closure of the disposal unit was obtained by ER, closure of the disposal unit was conducted by ER, and deployment of the drainage lysimeter facility was conducted by WM and ER, with funding provided by the Accelerated Site Technology Deployment ( ASTD) program, administered under TD. In addition, this closure is unique in that a monolayer closure cover, also known as an evapotranspiration (ET) cover, consisting of native alluvium, received regulatory approval instead of a traditional Resource Conservation and Recovery Act (RCRA) multi-layered cover. Recent studies indicate that in the arid southwestern United States, monolayer covers may be more effective at isolating waste than layered covers because of the tendency of clay layers to desiccate and crack, and subsequently develop preferential pathways. The lysimeter facility deployed immediately adjacent to the closure cover consists of eight drainage lysimeters with three surface treatments: two were left bare; two were revegetated with native species; two were allowed to revegetate with invader species; and two are reserved for future studies. The lysimeters are constructed such that any drainage through the bottoms of the lysimeters can be measured. Sensors installed in the

  4. Advanced Technology Vehicle Testing

    SciTech Connect

    James Francfort

    2003-11-01

    The light-duty vehicle transportation sector in the United States depends heavily on imported petroleum as a transportation fuel. The Department of Energy’s Advanced Vehicle Testing Activity (AVTA) is testing advanced technology vehicles to help reduce this dependency, which would contribute to the economic stability and homeland security of the United States. These advanced technology test vehicles include internal combustion engine vehicles operating on 100% hydrogen (H2) and H2CNG (compressed natural gas) blended fuels, hybrid electric vehicles, neighborhood electric vehicles, urban electric vehicles, and electric ground support vehicles. The AVTA tests and evaluates these vehicles with closed track and dynamometer testing methods (baseline performance testing) and accelerated reliability testing methods (accumulating lifecycle vehicle miles and operational knowledge within 1 to 1.5 years), and in normal fleet environments. The Arizona Public Service Alternative Fuel Pilot Plant and H2-fueled vehicles are demonstrating the feasibility of using H2 as a transportation fuel. Hybrid, neighborhood, and urban electric test vehicles are demonstrating successful applications of electric drive vehicles in various fleet missions. The AVTA is also developing electric ground support equipment (GSE) test procedures, and GSE testing will start during the fall of 2003. All of these activities are intended to support U.S. energy independence. The Idaho National Engineering and Environmental Laboratory manages these activities for the AVTA.

  5. Procedures - 88-Inch Cyclotron

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Procedures You must be logged in with your Berkeley Lab LDAP to view these documents PUB-3000 Cyclotron Procedures Mechanical Procedures Electrical Procedures Ion Source Procedures Accelerator Safety (SAD & ASE) Cyclotron Policies & Plans Radiological Work Authorizations Memorandums Forms Abbreviations & Acronyms

  6. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuels Technician Certificates The Department of Labor (DOL) will issue a certificate to any person who has successfully passed the appropriate alternative fuels equipment, alternative fuels compression, or electric vehicle technician examination as provided in the Alternative Fuels Technician Certification Act. A certification fee applies. For companies, partnerships, or corporations involved in the business of installing, servicing, repairing, modifying, or renovating equipment used

  7. Alternative Fuels Data Center: Alternative Fuels Save Money in Indy

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuels Save Money in Indy to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Save Money in Indy on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Save Money in Indy on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Save Money in Indy on Google Bookmark Alternative Fuels Data Center: Alternative Fuels Save Money in Indy on Delicious Rank Alternative Fuels Data Center: Alternative Fuels Save Money in Indy on Digg Find

  8. Awardee Share Procedures

    Energy.gov [DOE] (indexed site)

    Share Procedures Procedures for Correctly Reporting Awardee Share on the FAADSFAADS Plus reporting screen in STRIPES To ensure proper reporting by DOE to USASpending.gov, you...

  9. Comments on Supplemental Notice of Proposed Rulemaking for Alternative...

    Energy Saver

    Efficiency Determination Methods and Test Procedures for Walk-In Coolers and Walk-In ... Methods and Test Procedures for Walk-In Coolers and Walk-In Freezers; Docket No. ...

  10. Alternative Refrigerant Evaluation for High-Ambient-Temperature...

    Energy Saver

    test conditions (outdoor temperature 55C and indoor temperature 29C). Image: ORNL. Performance of alternative refrigerants compared with R-22 (mineral oil) at extreme test ...

  11. Innovative and Alternative Technology Assessment Manual

    SciTech Connect

    1980-02-01

    This four chapter, six appendix manual presents the procedures and methodology as well as the baseline costs and energy information necessary for the analysis and evaluation of innovative and alternative technology applications submitted for federal grant assistance under the innovative and alternative technology provisions of the Clean Water Act of 1977. The manual clarifies and interprets the intent of Congress and the Environmental Protection Agency in carrying out the mandates of the innovative and alternative provisions of the Clean Water Act of 1977. [DJE 2005

  12. THERMAL EVALUATION OF ALTERNATE SHIPPING CASK FOR IRRADIATED EXPERIMENTS

    SciTech Connect

    Donna Post Guillen

    2015-06-01

    Results of a thermal evaluation are provided for a new shipping cask under consideration for transporting irradiated experiments between the test reactor and post-irradiation examination (PIE) facilities. Most of the experiments will be irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), then later shipped to the Hot Fuel Examination Facility (HFEF) located at the Materials and Fuels Complex for PIE. To date, the General Electric (GE)-2000 cask has been used to transport experiment payloads between these facilities. However, the availability of the GE-2000 cask to support future experiment shipping is uncertain. In addition, the internal cavity of the GE-2000 cask is too short to accommodate shipping the larger payloads. Therefore, an alternate shipping capability is being pursued. The Battelle Energy Alliance, LLC, Research Reactor (BRR) cask has been determined to be the best alternative to the GE-2000 cask. An evaluation of the thermal performance of the BRR cask is necessary before proceeding with fabrication of the newly designed cask hardware and the development of handling, shipping and transport procedures. This paper presents the results of the thermal evaluation of the BRR cask loaded with a representative set of fueled and non-fueled payloads. When analyzed with identical payloads, experiment temperatures were found to be lower with the BRR cask than with the GE-2000 cask. From a thermal standpoint, the BRR cask was found to be a suitable alternate to the GE-2000 cask for shipping irradiated experiment payloads.

  13. Thermal evaluation of alternative shipping cask for irradiated experiments

    SciTech Connect

    Guillen, Donna Post

    2015-06-01

    Results of a thermal evaluation are provided for a new shipping cask under consideration for transporting irradiated experiments between the test reactor and post-irradiation examination (PIE) facilities. Most of the experiments will be irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), then later shipped to the Hot Fuel Examination Facility (HFEF) located at the Materials and Fuels Complex for PIE. To date, the General Electric (GE)-2000 cask has been used to transport experiment payloads between these facilities. However, the availability of the GE-2000 cask to support future experiment shipping is uncertain. In addition, the internal cavity of the GE-2000 cask is too short to accommodate shipping the larger payloads. Therefore, an alternate shipping capability is being pursued. The Battelle Energy Alliance, LLC, Research Reactor (BRR) cask has been determined to be the best alternative to the GE-2000 cask. An evaluation of the thermal performance of the BRR cask is necessary before proceeding with fabrication of the newly designed cask hardware and the development of handling, shipping and transport procedures. This paper presents the results of the thermal evaluation of the BRR cask loaded with a representative set of fueled and non-fueled payloads. When analyzed with identical payloads, experiment temperatures were found to be lower with the BRR cask than with the GE-2000 cask. Furthermore, from a thermal standpoint, the BRR cask was found to be a suitable alternate to the GE-2000 cask for shipping irradiated experiment payloads.

  14. Procedure for Performing PEM Single Cell Testing

    Office of Energy Efficiency and Renewable Energy (EERE)

    Presented at the 2009 High Temperature Membrane Working Group Meeting held May 18, 2009, in Arlington, Virginia

  15. J1634 SAE BEV Test Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    2010 DOE Vehicle Technologies and Hydrogen Programs Annual Merit Review and Peer Evaluation Meeting, June 7-11, 2010 -- Washington D.C.

  16. CAMAC Crate Controller diagnostic test procedures

    SciTech Connect

    Meadows, J.T.

    1981-07-01

    The basic idea of this diagnostic routine is to check out a parallel type A1 CAMAC Crate Controller using CDL.

  17. Energy Conservation Program: Test Procedure for Refrigerated...

    Energy.gov [DOE] (indexed site)

    is an action issued by the Department of Energy. Though it is not intended or expected, ... to this document. 1 6450-01-P DEPARTMENT OF ENERGY 10 CFR Parts 429 and 431 Docket No. ...

  18. Alternative Financing Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2012-03-12

    This directive provides guidance for identification, planning and approval of alternatively-financed projects. Alternative Financing ("AF") is a process whereby DOE and its operational elements obtain the use of privately-developed capital assets through lease.

  19. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel and Plug-in Hybrid Electric Vehicle Retrofit Regulations Converting a vehicle to operate on an alternative fuel in lieu of the original gasoline or diesel fuel is ...

  20. Alternative Fuels Data Center: About the Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    About Printable Version Share this resource Send a link to Alternative Fuels Data Center: About the Alternative Fuels Data Center to someone by E-mail Share Alternative Fuels Data Center: About the Alternative Fuels Data Center on Facebook Tweet about Alternative Fuels Data Center: About the Alternative Fuels Data Center on Twitter Bookmark Alternative Fuels Data Center: About the Alternative Fuels Data Center on Google Bookmark Alternative Fuels Data Center: About the Alternative Fuels Data

  1. Alternative Fuels Data Center: Dallas Airport Operates With Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels Dallas Airport Operates With Alternative Fuels to someone by E-mail Share Alternative Fuels Data Center: Dallas Airport Operates With Alternative Fuels on Facebook Tweet about Alternative Fuels Data Center: Dallas Airport Operates With Alternative Fuels on Twitter Bookmark Alternative Fuels Data Center: Dallas Airport Operates With Alternative Fuels on Google Bookmark Alternative Fuels Data Center: Dallas Airport Operates With Alternative Fuels on Delicious Rank Alternative Fuels Data

  2. Alternative Fuels Data Center: New Jersey Utility Saves With Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuel Jersey Utility Saves With Alternative Fuel to someone by E-mail Share Alternative Fuels Data Center: New Jersey Utility Saves With Alternative Fuel on Facebook Tweet about Alternative Fuels Data Center: New Jersey Utility Saves With Alternative Fuel on Twitter Bookmark Alternative Fuels Data Center: New Jersey Utility Saves With Alternative Fuel on Google Bookmark Alternative Fuels Data Center: New Jersey Utility Saves With Alternative Fuel on Delicious Rank Alternative Fuels Data

  3. Alternative Fuels Data Center: Technician Training for Alternative Fuels

    Alternative Fuels and Advanced Vehicles Data Center

    Technician Training for Alternative Fuels to someone by E-mail Share Alternative Fuels Data Center: Technician Training for Alternative Fuels on Facebook Tweet about Alternative Fuels Data Center: Technician Training for Alternative Fuels on Twitter Bookmark Alternative Fuels Data Center: Technician Training for Alternative Fuels on Google Bookmark Alternative Fuels Data Center: Technician Training for Alternative Fuels on Delicious Rank Alternative Fuels Data Center: Technician Training for

  4. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fueling Infrastructure Grants The Texas Commission on Environmental Quality (TCEQ) administers the Alternative Fueling Facilities Program (AFFP) as part of the Texas Emissions Reduction Plan. AFFP provides grants for 50% of eligible costs, up to $600,000, to construct, reconstruct, or acquire a facility to store, compress, or dispense alternative fuels in Texas air quality nonattainment areas. Qualified alternative fuels include biodiesel, electricity, natural gas, hydrogen, propane,

  5. Southern Ute Alternative Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Alternative Energy Confidential Draft - For Discussion Only Oxford Solar Project Lessons Learned February, 2016 Rebecca Kauffman, SUAE President Southern Ute Alternative Energy Confidential Draft - For Discussion Only Agenda Background - Southern Ute Indian Tribe - Southern Ute Alternative Energy Solar Project Overview - Why Now? - Why this particular project? Project Development Process - Permitting - Land access - Utility Negotiation Project Next Steps - Remaining Activities 2 Southern Ute

  6. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel and Vehicle Incentives The California Energy Commission (CEC) administers the Alternative and Renewable Fuel and Vehicle Technology Program (ARFVTP) to provide financial incentives for businesses, vehicle and technology manufacturers, workforce training partners, fleet owners, consumers, and academic institutions with the goal of developing and deploying alternative and renewable fuels and advanced transportation technologies. The CEC must prepare and adopt an annual Investment

  7. Alternative Fuels Data Center: E85: An Alternative Fuel

    Alternative Fuels and Advanced Vehicles Data Center

    E85: An Alternative Fuel to someone by E-mail Share Alternative Fuels Data Center: E85: An Alternative Fuel on Facebook Tweet about Alternative Fuels Data Center: E85: An Alternative Fuel on Twitter Bookmark Alternative Fuels Data Center: E85: An Alternative Fuel on Google Bookmark Alternative Fuels Data Center: E85: An Alternative Fuel on Delicious Rank Alternative Fuels Data Center: E85: An Alternative Fuel on Digg Find More places to share Alternative Fuels Data Center: E85: An Alternative

  8. Depleted uranium management alternatives

    SciTech Connect

    Hertzler, T.J.; Nishimoto, D.D.

    1994-08-01

    This report evaluates two management alternatives for Department of Energy depleted uranium: continued storage as uranium hexafluoride, and conversion to uranium metal and fabrication to shielding for spent nuclear fuel containers. The results will be used to compare the costs with other alternatives, such as disposal. Cost estimates for the continued storage alternative are based on a life-cycle of 27 years through the year 2020. Cost estimates for the recycle alternative are based on existing conversion process costs and Capital costs for fabricating the containers. Additionally, the recycle alternative accounts for costs associated with intermediate product resale and secondary waste disposal for materials generated during the conversion process.

  9. Computerized procedures system

    SciTech Connect

    Lipner, Melvin H.; Mundy, Roger A.; Franusich, Michael D.

    2010-10-12

    An online data driven computerized procedures system that guides an operator through a complex process facility's operating procedures. The system monitors plant data, processes the data and then, based upon this processing, presents the status of the current procedure step and/or substep to the operator. The system supports multiple users and a single procedure definition supports several interface formats that can be tailored to the individual user. Layered security controls access privileges and revisions are version controlled. The procedures run on a server that is platform independent of the user workstations that the server interfaces with and the user interface supports diverse procedural views.

  10. Alternative Fuels Data Center: Alternative Fueling Station Counts by State

    Alternative Fuels and Advanced Vehicles Data Center

    Locate Stations Printable Version Share this resource Send a link to Alternative Fuels Data Center: Alternative Fueling Station Counts by State to someone by E-mail Share Alternative Fuels Data Center: Alternative Fueling Station Counts by State on Facebook Tweet about Alternative Fuels Data Center: Alternative Fueling Station Counts by State on Twitter Bookmark Alternative Fuels Data Center: Alternative Fueling Station Counts by State on Google Bookmark Alternative Fuels Data Center:

  11. Alternative Fuels Data Center: About the Alternative Fueling Station Data

    Alternative Fuels and Advanced Vehicles Data Center

    Locate Stations Printable Version Share this resource Send a link to Alternative Fuels Data Center: About the Alternative Fueling Station Data to someone by E-mail Share Alternative Fuels Data Center: About the Alternative Fueling Station Data on Facebook Tweet about Alternative Fuels Data Center: About the Alternative Fueling Station Data on Twitter Bookmark Alternative Fuels Data Center: About the Alternative Fueling Station Data on Google Bookmark Alternative Fuels Data Center: About the

  12. Alternative Fuels Data Center: GE Showcases Innovation in Alternative Fuel

    Alternative Fuels and Advanced Vehicles Data Center

    Vehicles GE Showcases Innovation in Alternative Fuel Vehicles to someone by E-mail Share Alternative Fuels Data Center: GE Showcases Innovation in Alternative Fuel Vehicles on Facebook Tweet about Alternative Fuels Data Center: GE Showcases Innovation in Alternative Fuel Vehicles on Twitter Bookmark Alternative Fuels Data Center: GE Showcases Innovation in Alternative Fuel Vehicles on Google Bookmark Alternative Fuels Data Center: GE Showcases Innovation in Alternative Fuel Vehicles on

  13. Alternative Fuels Data Center: North Carolina City Expands Alternative Fuel

    Alternative Fuels and Advanced Vehicles Data Center

    Fleet North Carolina City Expands Alternative Fuel Fleet to someone by E-mail Share Alternative Fuels Data Center: North Carolina City Expands Alternative Fuel Fleet on Facebook Tweet about Alternative Fuels Data Center: North Carolina City Expands Alternative Fuel Fleet on Twitter Bookmark Alternative Fuels Data Center: North Carolina City Expands Alternative Fuel Fleet on Google Bookmark Alternative Fuels Data Center: North Carolina City Expands Alternative Fuel Fleet on Delicious Rank

  14. Alternative Fuels Data Center: Alternative Fueling Station Locator

    Alternative Fuels and Advanced Vehicles Data Center

    Locate Stations Printable Version Share this resource Send a link to Alternative Fuels Data Center: Alternative Fueling Station Locator to someone by E-mail Share Alternative Fuels ...

  15. Alternative Energy Technology Inc formerly The Alternative Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Technology Inc formerly The Alternative Energy Technology Center Inc Jump to: navigation, search Name: Alternative Energy Technology Inc (formerly The Alternative Energy Technology...

  16. Federal Agency NEPA Procedures

    Energy.gov [DOE]

    Each Federal agency is required to develop NEPA procedures that supplement the CEQ Regulations. Developed in consultation with CEQ, Federal agency NEPA procedures must meet the standards in the CEQ...

  17. Contract Closeout Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    .804 August 2016 ______________________________________________________________________________ 1 Contract Closeout Procedures [References: FAR 4.805; FAR 42.705; FAR 42.708; and FAR 45.] 1.0 Summary of Latest Changes This update: (1) considers Final Rule June 2011 which amended the Federal Acquisition Regulation (FAR) procedures for closing out contract files and revised procedures for clearing final patent reports and quick-closeout procedure (from unsettled indirect rates on the contract as a

  18. THERMAL EVALUATION OF ALTERNATE SHIPPING CASK FOR GTRI EXPERIMENTS

    SciTech Connect

    Donna Post Guillen

    2014-06-01

    The Global Threat Reduction Initiative (GTRI) has many experiments yet to be irradiated in support of the High Performance Research Reactor fuels development program. Most of the experiments will be irradiated in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), then later shipped to the Hot Fuel Examination Facility (HFEF) located at the Materials and Fuels Complex for post irradiation examination. To date, the General Electric (GE)-2000 cask has been used to transport GTRI experiments between these facilities. However, the availability of the GE-2000 cask to support future GTRI experiments is at risk. In addition, the internal cavity of the GE-2000 cask is too short to accommodate shipping the larger GTRI experiments. Therefore, an alternate shipping capability is being pursued. The Battelle Energy Alliance, LLC, Research Reactor (BRR) cask has been determined to be the best alternative to the GE-2000 cask. An evaluation of the thermal performance of the BRR cask is necessary before proceeding with fabrication of the newly designed cask hardware and the development of handling, shipping, and transport procedures. This paper presents the results of the thermal evaluation of the BRR cask loaded with a representative set of fueled and non-fueled experiments. When analyzed with identical payloads, experiment temperatures were found to be lower with the BRR cask than with the GE-2000 cask. From a thermal standpoint, the BRR cask was found to be a suitable alternate to the GE-2000 cask.

  19. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Vehicle Acquisition and Fuel Use Requirements for State and Alternative Fuel Provider Fleets Under the Energy Policy Act (EPAct) of 1992, as amended, certain state government and alternative fuel provider fleets are required to acquire alternative fuel vehicles (AFVs) as a portion of their annual light-duty vehicle acquisitions. Compliance is required by fleets that operate, lease, or control 50 or more light-duty vehicles within the United States. Of those 50 vehicles, at least 20 must be used

  20. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuels Road Tax Alternative fuels including, but not limited to, natural gas or propane sold by a licensed alternative fuel dealer and used in on-road vehicles is subject to a $0.222 per gallon equivalent road tax. The New Hampshire Department of Safety will define rules for the applicable conversion rates for natural gas and propane based on nationally recognized standards for weights and measures. Certain exemptions apply, including sales to government entities, between duly

  1. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fueling Infrastructure Tax Credit An income tax credit is available for 25% of the cost to purchase, construct, and install qualified alternative fueling infrastructure. Qualified property includes equipment used to distribute, dispense, or store alternative fuel. Eligible fuels include natural gas and propane. The entire credit must be taken in three equal annual installments beginning with the taxable year in which the facility is placed into service. Unused credits may be carried

  2. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Committee of Alternative Fuels Technician Examiners The Committee of Alternative Fuels Technician Examiners (Committee) was established to assist the Commissioner of Labor on matters relating to the formulation of rules and standards to comply with the Alternative Fuels Technician Certification Act. The Committee consists of eight members, including experts in the natural gas and electric vehicle industries. (Reference House Bill 2622, 2016, and Oklahoma Statutes 40-142.6

  3. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Weight Limit Exemption Gross vehicle weight rating limits for AFVs are 1,000 pounds greater than those for comparable conventional vehicles, as long as the AFVs operate using an alternative fuel or both alternative and conventional fuel, when operating on a highway that is not part of the interstate system. For the purpose of this exemption, alternative fuel is defined as compressed natural gas, propane, ethanol, or any mixture containing 85% or more ethanol (E85) with gasoline or other fuels,

  4. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fueling Infrastructure Tax Credit For tax years beginning on or after January 1, 2015, an income tax credit is available for the cost of constructing a qualified alternative fueling station. The credit is 20% of the costs directly associated with the purchase and installation of any alternative fuel storage and dispensing equipment or electric vehicle supply equipment (EVSE), up to $1,500 for individuals or $20,000 for businesses. Tax credits may be carried forward for two years and

  5. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Use and Fuel-Efficient Vehicle Requirements State-owned vehicle fleets must implement petroleum displacement plans to increase the use of alternative fuels and fuel-efficient vehicles. Reductions may be met by petroleum displaced through the use of biodiesel, ethanol, other alternative fuels, the use of hybrid electric vehicles, other fuel-efficient or low emission vehicles, or additional methods the North Carolina Division of Energy, Mineral and Land Resources approves.

  6. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fueling Infrastructure Tax Credit for Residents Through the Residential Energy Tax Credit program, qualified residents may receive a tax credit for 25% of alternative fuel infrastructure project costs, up to $750. Qualified residents may receive a tax credit for 50% of project costs, up to $750. Qualified alternative fuels include electricity, natural gas, gasoline blended with at least 85% ethanol (E85), propane, and other fuels that the Oregon Department of Energy approves. A

  7. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel and Alternative Fuel Vehicle (AFV) Fund The North Carolina State Energy Office administers the Energy Policy Act (EPAct) Credit Banking and Selling Program, which enables the state to generate funds from the sale of EPAct 1992 credits. The funds that EPAct credit sales generate are deposited into the Alternative Fuel Revolving Fund (Fund) for state agencies to offset the incremental costs of purchasing biodiesel blends of at least 20% (B20) or ethanol blends of at least 85%

  8. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    and Infrastructure Tax Credit for Businesses Business owners and others may be eligible for a tax credit of 35% of eligible costs for qualified alternative fuel infrastructure projects, or the incremental or conversion cost of two or more AFVs. Qualified infrastructure includes facilities for mixing, storing, compressing, or dispensing fuels for vehicles operating on alternative fuels. Qualified alternative fuels include electricity, natural gas, gasoline blended with at least 85% ethanol (E85),

  9. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    funding for public and private alternative fueling stations, including DC fast electric vehicle supply equipment (EVSE), natural gas, propane, and hydrogen fueling infrastructure. ...

  10. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Vehicle (AFV) and Fueling Infrastructure Tax Credit The state offers an income tax credit of 36% of the cost of converting a vehicle to operate on an alternative fuel, the incremental cost of purchasing an original equipment manufacturer AFV, and the cost of alternative fueling equipment. Alternatively, a taxpayer may take a tax credit of 7.2% of the cost of the motor vehicle, up to $1,500. To qualify for the tax credit, vehicles must be dedicated AFVs and registered in

  11. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Transportation Fuel Study The Rhode Island Office of Energy Resources (OER) will prepare a study on strategies to reduce greenhouse gas emissions and promote alternative ...

  12. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    take actions to promote the growth of domestic alternative fuel sources, such as natural gas, and reduce dependence on foreign oil. (Reference House Concurrent Resolution 132, 2013

  13. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative fuel production facilities, including biodiesel, biomass, biogas, and ethanol ... In addition, temporary property tax rate abatements are available for qualified biodiesel, ...

  14. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Biodiesel, ethanol, and renewable diesel are not considered alternative fuels by the IRS. ... derived from biomass" includes ethanol, biodiesel, and renewable diesel, the IRS ...

  15. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    The Wisconsin Department of Agriculture, Trade and Consumer Protection must pursue the establishment and maintenance of sufficient alternative fueling infrastructure at public ...

  16. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    The Agricultural Growth, Research, and Innovation Program may offer grants, loans, or other financial incentives to alternative fuel retailers for the installation of ethanol ...

  17. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    fuel use. For these purposes, alternative fuels are natural gas, hydrogen, propane, or electricity used to operate a motor vehicle. (Reference Connecticut General Statutes 4a-59

  18. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Loans The Oregon Department of Energy administers the State Energy Loan Program (SELP) which offers low-interest loans for qualified projects. Eligible alternative fuel projects...

  19. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    alternative fuels are defined as methanol, ethanol, natural gas, liquefied petroleum gas (propane), coal-derived liquid fuels, hydrogen, electricity, biodiesel, renewable diesel,...

  20. Alternative fuel information: Glossary

    SciTech Connect

    Not Available

    1994-06-01

    This short document contains definitions of acronyms and definitions of terms used in papers on the use of alternative fuels in automobiles.

  1. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    two competitive grant programs to fund projects that reduce greenhouse gas (GHG) emissions in the transportation sector. The Delaware Alternative Fueling Infrastructure Grant...

  2. Solar Alternative Energy Credits

    Energy.gov [DOE]

    Pennsylvania's Alternative Energy Portfolio Standard (AEPS), created by S.B. 1030 on November 30, 2004, requires each electric distribution company (EDC) and electric generation supplier (EGS) to...

  3. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Vehicle (AFV) and Hybrid Electric Vehicle (HEV) Insurance Discount Farmers Insurance provides a discount of up to 10% on all major insurance coverage for HEV and ...

  4. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Vehicle (AFV) Parking Space Regulation Natural Gas and Propane Vehicle License Fee State Agency Electric Vehicle Supply Equipment (EVSE) Installation Planned ...

  5. Alternative Energy Portfolio Standard

    Energy.gov [DOE]

    NOTE: On February 2016, the PA Public Service Commission (PUC) issued a final rulemaking order amending and clarifying several provisions of PA Alternative Energy Portfolio Standard (AEPS), net...

  6. Alternative Energy Portfolio Standard

    Office of Energy Efficiency and Renewable Energy (EERE)

    The “alternative energy generating sources” include combined heat and power (CHP) projects, flywheel energy storage, energy efficient steam technology. and renewable technologies that generate us...

  7. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    For the purpose of the credit, alternative fuels vehicles include dedicated or bi-fuel natural gas, propane, and hydrogen vehicles. Through December 31, 2016, purchased or leased ...

  8. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Use Requirement West Virginia higher education governing boards must use alternative fuels to the maximum extent feasible. (Reference West Virginia Code 18B-5-9)...

  9. Alternative Fueling Station Locator

    Alternative Fuels and Advanced Vehicles Data Center

    19,710 alternative fuel stations in the United States Excluding private stations Location details are subject to change. We recommend calling the stations to verify location, hours...

  10. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Loans The Oregon Department of Energy administers the State Energy Loan Program (SELP) which offers low-interest loans for qualified projects. Eligible alternative fuel projects ...

  11. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    State Energy Plan The Missouri Department of Economic Development's Division of Energy developed a comprehensive state energy plan to include information related to alternative ...

  12. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Infrastructure Grants The Maryland Energy Administration administers the Maryland Alternative Fuel Infrastructure Program (AFIP), which provides grants to develop public access ...

  13. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Feasibility Study Grants The Wyoming State Energy Office (SEO) offers ... (verified March 2016). For more information, see the SEO Energy Assistance website.

  14. Alternative Refrigerant Evaluation for High-Ambient-Temperature

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environments | Department of Energy Alternative Refrigerant Evaluation for High-Ambient-Temperature Environments Alternative Refrigerant Evaluation for High-Ambient-Temperature Environments Performance of alternative refrigerants compared with R-22 (mineral oil) at extreme test conditions (outdoor temperature 55°C and indoor temperature 29°C). Image: ORNL. Performance of alternative refrigerants compared with R-22 (mineral oil) at extreme test conditions (outdoor temperature 55°C and

  15. Alternative Fuels Data Center: Alaska Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Alaska Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Alaska Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Alaska Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Alaska Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Alaska

  16. Alternative Fuels Data Center: Colorado Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Colorado Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Colorado Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Colorado Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Colorado Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  17. Alternative Fuels Data Center: Delaware Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Delaware Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Delaware Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Delaware Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Delaware Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  18. Alternative Fuels Data Center: Florida Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Florida Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Florida Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Florida Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Florida Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Florida

  19. Alternative Fuels Data Center: Georgia Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Georgia Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Georgia Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Georgia Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Georgia Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Georgia

  20. Alternative Fuels Data Center: Hawaii Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Hawaii Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Hawaii Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Hawaii Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Hawaii Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Hawaii

  1. Alternative Fuels Data Center: Idaho Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Idaho Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Idaho Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Idaho Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Idaho Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Idaho

  2. Alternative Fuels Data Center: Illinois Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Illinois Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Illinois Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Illinois Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Illinois Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  3. Alternative Fuels Data Center: Indiana Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Indiana Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Indiana Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Indiana Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Indiana Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Indiana

  4. Alternative Fuels Data Center: Iowa Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Iowa Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Iowa Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Iowa Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Iowa Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Iowa Transportation

  5. Alternative Fuels Data Center: Kansas Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Kansas Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Kansas Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Kansas Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Kansas Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Kansas

  6. Alternative Fuels Data Center: Kentucky Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Kentucky Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Kentucky Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Kentucky Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Kentucky Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  7. Alternative Fuels Data Center: Maryland Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Maryland Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Maryland Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Maryland Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Maryland Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  8. Alternative Fuels Data Center: Michigan Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Michigan Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Michigan Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Michigan Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Michigan Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  9. Alternative Fuels Data Center: Nebraska Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Nebraska Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Nebraska Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Nebraska Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Nebraska Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  10. Alternative Fuels Data Center: New York Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles New York Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: New York Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: New York Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: New York Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: New

  11. Alternative Fuels Data Center: Ohio Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Ohio Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Ohio Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Ohio Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Ohio Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Ohio Transportation

  12. Alternative Fuels Data Center: Oklahoma Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Oklahoma Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Oklahoma Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Oklahoma Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Oklahoma Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  13. Alternative Fuels Data Center: Oregon Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Oregon Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Oregon Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Oregon Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Oregon Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Oregon

  14. Alternative Fuels Data Center: Utah Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Utah Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Utah Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Utah Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Utah Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Utah Transportation

  15. Alternative Fuels Data Center: Vermont Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Vermont Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Vermont Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Vermont Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Vermont Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Vermont

  16. Alternative Fuels Data Center: Virginia Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Virginia Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Virginia Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Virginia Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Virginia Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center:

  17. Alternative Fuels Data Center: Wyoming Transportation Data for Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels and Vehicles Wyoming Transportation Data for Alternative Fuels and Vehicles to someone by E-mail Share Alternative Fuels Data Center: Wyoming Transportation Data for Alternative Fuels and Vehicles on Facebook Tweet about Alternative Fuels Data Center: Wyoming Transportation Data for Alternative Fuels and Vehicles on Twitter Bookmark Alternative Fuels Data Center: Wyoming Transportation Data for Alternative Fuels and Vehicles on Google Bookmark Alternative Fuels Data Center: Wyoming

  18. Alternative Fuels Data Center: Blue Ridge Parkway Incorporates Alternative

    Alternative Fuels and Advanced Vehicles Data Center

    Fuels in Its Fleet Blue Ridge Parkway Incorporates Alternative Fuels in Its Fleet to someone by E-mail Share Alternative Fuels Data Center: Blue Ridge Parkway Incorporates Alternative Fuels in Its Fleet on Facebook Tweet about Alternative Fuels Data Center: Blue Ridge Parkway Incorporates Alternative Fuels in Its Fleet on Twitter Bookmark Alternative Fuels Data Center: Blue Ridge Parkway Incorporates Alternative Fuels in Its Fleet on Google Bookmark Alternative Fuels Data Center: Blue Ridge

  19. Federal Test Procedure Emissions Test Results from Ethanol Variable...

    Alternative Fuels and Advanced Vehicles Data Center

    ... Alcohol sam- ples were collected by drawing dilute air and exhaust gas sam- ples through primary and secondary impingers filled with pure water and chilled in an ice-bath to ...

  20. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Aftermarket Alternative Fuel Vehicle (AFV) Conversion Requirements Conventional original equipment manufacturer vehicles altered to operate on propane, natural gas, methane, ethanol, or electricity are classified as aftermarket AFV conversions. All vehicle conversions must meet current applicable U.S. Environmental Protection Agency or California Air Resources Board standards for aftermarket conversions. (Reference Pennsylvania Department of Environmental Protection Policy on Clean Alternative

  1. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Vehicle (AFV) Infrastructure Incentives Study The Georgia Joint Alternative Fuels Infrastructure Study Committee will evaluate how providing market incentives for AFV fueling infrastructure may lead to AFV market deployment. The Committee will provide a report of its recommendations and proposed legislation by December 1, 2016. (Reference Senate Resolution 1038

  2. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Vehicle Retrofit Emissions Inspection Process The California Department of Health and Safety may adopt a process by which state designated referees inspect vehicles that present prohibitive inspection circumstances, such as vehicles equipped with alternative fuel retrofit systems. (Reference California Health and Safety Code 44014

  3. Alternative Fuels Data Center

    SciTech Connect

    2013-06-01

    Fact sheet describes the Alternative Fuels Data Center, which provides information, data, and tools to help fleets and other transportation decision makers find ways to reduce petroleum consumption through the use of alternative and renewable fuels, advanced vehicles, and other fuel-saving measures.

  4. Alternative fuel transit buses

    SciTech Connect

    Motta, R.; Norton, P.; Kelly, K.

    1996-10-01

    The National Renewable Energy Laboratory (NREL) is a U.S. Department of Energy (DOE) national laboratory; this project was funded by DOE. One of NREL`s missions is to objectively evaluate the performance, emissions, and operating costs of alternative fuel vehicles so fleet managers can make informed decisions when purchasing them. Alternative fuels have made greater inroads into the transit bus market than into any other. Each year, the American Public Transit Association (APTA) surveys its members on their inventory and buying plans. The latest APTA data show that about 4% of the 50,000 transit buses in its survey run on an alternative fuel. Furthermore, 1 in 5 of the new transit buses that members have on order are alternative fuel buses. This program was designed to comprehensively and objectively evaluate the alternative fuels in use in the industry.

  5. Yttrium-90 Resin Microsphere Radioembolization Using an Antireflux Catheter: An Alternative to Traditional Coil Embolization for Nontarget Protection

    SciTech Connect

    Morshedi, Maud M. Bauman, Michael Rose, Steven C. Kikolski, Steven G.

    2015-04-15

    PurposeSerious complications can result from nontarget embolization during yttrium-90 (Y-90) transarterial radioembolization. Hepatoenteric artery coil embolization has been traditionally performed to prevent nontarget radioembolization. The U.S. Food and Drug Administration–approved Surefire Infusion System (SIS) catheter, designed to prevent reflux, is an alternative to coils. The hypothesis that quantifiable SIS procedural parameters are comparable to coil embolization was tested.MethodsFourteen patients aged 36–79 years with colorectal, neuroendocrine, hepatocellular, and other predominantly bilobar hepatic tumors who underwent resin microsphere Y-90 radioembolization using only the SIS catheter (n = 7) versus only detachable coils (n = 7) for nontarget protection were reviewed retrospectively. Procedure time, fluoroscopy time, contrast dose, radiation dose, and cost were evaluated.ResultsMultivariate analysis identified significant cohort differences in the procedural parameters evaluated (F(10, 3) = 10.39, p = 0.04). Between-group comparisons of the pretreatment planning procedure in the SIS catheter group compared to the coil embolization group demonstrated a significant reduction in procedure time (102.6 vs. 192.1 min, respectively, p = 0.0004), fluoroscopy time (14.3 vs. 49.7 min, respectively, p = 0.0016), and contrast material dose (mean dose of 174.3 vs. 265.0 mL, respectively, p = 0.0098). Procedural parameters were not significantly different between the two groups during subsequent dose delivery procedures. Overall cost of combined first-time radioembolization procedures was significantly less in the SIS group ($4252) compared to retrievable coil embolization ($11,123; p = 0.001).ConclusionThe SIS catheter results in a reduction in procedure time, fluoroscopy time, and contrast material dose and may be an attractive cost-effective alternative to detachable coil embolization for prevention of nontarget radioembolization.

  6. Hydrogen recombiner catalyst test supporting data

    SciTech Connect

    Britton, M.D.

    1995-01-19

    This is a data package supporting the Hydrogen Recombiner Catalyst Performance and Carbon Monoxide Sorption Capacity Test Report, WHC-SD-WM-TRP-211, Rev 0. This report contains 10 appendices which consist of the following: Mass spectrometer analysis reports: HRC samples 93-001 through 93-157; Gas spectrometry analysis reports: HRC samples 93-141 through 93-658; Mass spectrometer procedure PNL-MA-299 ALO-284; Alternate analytical method for ammonia and water vapor; Sample log sheets; Job Safety analysis; Certificate of mixture analysis for feed gases; Flow controller calibration check; Westinghouse Standards Laboratory report on Bois flow calibrator; and Sorption capacity test data, tables, and graphs.

  7. HEV, PHEV, BEV Test Standard Validation | Department of Energy

    Energy.gov [DOE] (indexed site)

    More Documents & Publications HEV, PHEV, EV Test Standard Development and Validation J1634 SAE BEV Test Procedures Argonne Facilitation of PHEV Standard Testing Procedure (SAE ...

  8. AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test...

    Energy Saver

    Plug-in Hybrid Electric Vehicle Specifications and Test Procedures AVTA: Plug-in Hybrid Electric Vehicle Specifications and Test Procedures Plug-in Hybrid Electric Vehicle Test ...

  9. In-service Inspection Ultrasonic Testing of Reactor Pressure Vessel Welds for Assessing Flaw Density and Size Distribution per 10 CFR 50.61a, Alternate Fracture Toughness Requirements

    SciTech Connect

    Sullivan, Edmund J.; Anderson, Michael T.; Norris, Wallace

    2012-09-17

    Pressurized thermal shock (PTS) events are system transients in a pressurized water reactor (PWR) in which there is a rapid operating temperature cool-down that results in cold vessel temperatures with or without repressurization of the vessel. The rapid cooling of the inside surface of the reactor pressure vessel (RPV) causes thermal stresses that can combine with stresses caused by high pressure. The aggregate effect of these stresses is an increase in the potential for fracture if a pre-existing flaw is present in a material susceptible to brittle failure. The ferritic, low alloy steel of the reactor vessel beltline adjacent to the core, where neutron radiation gradually embrittles the material over the lifetime of the plant, can be susceptible to brittle fracture. The PTS rule, described in the Code of Federal Regulations, Title 10, Section 50.61 (§50.61), “Fracture Toughness Requirements for Protection against Pressurized Thermal Shock Events,” adopted on July 23, 1985, establishes screening criteria to ensure that the potential for a reactor vessel to fail due to a PTS event is deemed to be acceptably low. The U.S. Nuclear Regulatory Commission (NRC) completed a research program that concluded that the risk of through-wall cracking due to a PTS event is much lower than previously estimated. The NRC subsequently developed a rule, §50.61a, published on January 4, 2010, entitled “Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events” (75 FR 13). Use of the new rule by licensees is optional. The §50.61a rule differs from §50.61 in that it requires licensees who choose to follow this alternate method to analyze the results from periodic volumetric examinations required by the ASME Code, Section XI, Rules for Inservice Inspection (ISI) of Nuclear Power Plants. These analyses are intended to determine if the actual flaw density and size distribution in the licensee’s reactor vessel beltline welds are bounded

  10. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  11. Participant Registration Procedure

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    operations / participant registration procedure Participant Registration Procedure Under The "Safety" banner in the JLF Website "Policies and Procedures" Section: Complete Laser Eye Examination. Complete in LTRAIN HS5200-W Laser Safety. Complete in LTRAIN HS4258-W Beryllium (Be) Awareness. Complete in LTRAIN HS4261-W Lead (Pb) Awareness. Complete in LTRAIN HS5229-W Electrical Safety Awareness. Complete in LTRAIN HS-6001-W General Employee Radiological Training. Complete in

  12. Quality Procedure- Stop Work

    Energy.gov [DOE]

    This Quality Procedure establishes the Office of Standards and Quality Assurance authority, responsibilities, and instructions to direct that unsafe work be stopped, during the execution and operations of its activities, specifically in oversight activities. this procedure is utilized and accomplished upon coordination with management of the Environmental Management (EM) Headquarters and Field Office. This procedure also provides provisions for the restart of work that has been stopped under provisions of this document.

  13. Alternative Fuels Data Center: Alternative Fuel Vehicles Beat the Heat,

    Alternative Fuels and Advanced Vehicles Data Center

    Fight the Freeze, and Conquer the Mountains Alternative Fuel Vehicles Beat the Heat, Fight the Freeze, and Conquer the Mountains to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel Vehicles Beat the Heat, Fight the Freeze, and Conquer the Mountains on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel Vehicles Beat the Heat, Fight the Freeze, and Conquer the Mountains on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel Vehicles Beat

  14. Alternative Fuels Data Center: Alternative Fuels Help Ensure America's

    Alternative Fuels and Advanced Vehicles Data Center

    National Parks Stay Green for Another Century Alternative Fuels Help Ensure America's National Parks Stay Green for Another Century to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuels Help Ensure America's National Parks Stay Green for Another Century on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuels Help Ensure America's National Parks Stay Green for Another Century on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuels Help

  15. Alternative Fuels Data Center: Alternative Fuel and Advanced Technology

    Alternative Fuels and Advanced Vehicles Data Center

    Vehicles Aid in Emergency Recovery Efforts Alternative Fuel and Advanced Technology Vehicles Aid in Emergency Recovery Efforts to someone by E-mail Share Alternative Fuels Data Center: Alternative Fuel and Advanced Technology Vehicles Aid in Emergency Recovery Efforts on Facebook Tweet about Alternative Fuels Data Center: Alternative Fuel and Advanced Technology Vehicles Aid in Emergency Recovery Efforts on Twitter Bookmark Alternative Fuels Data Center: Alternative Fuel and Advanced

  16. Text Delegation Procedures

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    Procedures for Line Managers' Delegations of Authority when proposing new delegations, redelegating existing delegation, proposing an amendment, rescinding a delegation, and when a delegation is not needed.

  17. NNMCAB Processes and Procedures

    Energy.gov [DOE]

    At the January 8, 2014 Committee meeting NNMCAB Staff, Covered the Procedures and Processes that are used in Running the Board.

  18. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Alternative Fuel Tax Rate A license tax of $0.24 per gasoline gallon equivalent (GGE) or diesel gallon equivalent (DGE) is collected on all alternative fuel used, sold, or distributed for sale or use in Wyoming. Alternative fuels include compressed natural gas (CNG), liquefied natural gas (LNG), liquefied petroleum gas (propane), electricity, and renewable diesel. For taxation purposes, one GGE of CNG is equal to 5.66 pounds (lbs.), one DGE of LNG is equal to 6.06 lbs., one GGE of propane is

  19. Alternative Fuels Data Center

    Alternative Fuels and Advanced Vehicles Data Center

    Dealer and Commercial User License Beginning January 1, 2017, alternative fuel dealers and alternative fuel commercial users must apply for a license from the Michigan Department of Treasury. Commercial users are defined as those operating vehicles with three or more axles, or two axles and a gross vehicle weight rating exceeding 26,000 pounds, that operate in more than one state. Alternative fuel dealers must pay a license fee of $500 and commercial users must pay a license fee of $50. For the

  20. Alternative Fuels Data Center

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Vehicle (AFV) Low-Interest Loans Oklahoma has a private loan program with a 3% interest rate for the cost of converting private fleets to operate on alternative fuels and for the ...