  1. 17.1 - Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    17.1 (June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal

  2. Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Energy.gov [DOE]

    Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to incorporate (1) Federal Acquisition Circular (FAC) changes to Federal Acquisition Regulation (FAR) Part 17.5 – Interagency Acquisitions, Office of Federal Procurement Policy (OFPP) guidance for business case analysis for certain multi-agency and agency-specific contracts, (2) Acquisition Letter 2011-03, and (3) update the current guide chapter 17.1. Acquisition Letter (AL) 2011-03 is hereby rescinded.

  3. Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency Transactions, and Interagency Agreements – Minor Revision

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to add under the paragraph C Exclusions that Power Marketing Administration's activities performed under its power marketing authority, policies, and procedures are excluded from this DOE Acquisition Guide Chapter. The revised chapter is attached with this flash. All other attachments from Policy Flash 2012-32 remain the same.

  4. Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to incorporate (1) Federal Acquisition Circular (FAC) ...

  5. Interagency Acquisitions

    Energy.gov [DOE]

    Acquisition Letter (AL) 2011-01 has been issued to disseminate the Office of Management and Budget (OMB) guidance on how to structure and format interagency acquisitions. Contracting officers are to ensure that new interagency agreements are supported by a best determination. All interagency agreements for assistance acquisition must contain specific elements as described in the OMB guidance. The Work for Others program is excluded from this AL.

  6. Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The revised chapter is attached with this flash. All other attachments from Policy Flash 2012-32 remain the same. PDF icon PF2012-49 AG 17.1- Interagency Acquisitions, Interagency ...

  7. Interagency Acquisitions | Department of Energy

    Office of Environmental Management (EM)

    Acquisition Letter (AL) 2011-03 has been updated to incorporate Federal Acquisition Circular (FAC) 2005-47 which published an interim Federal Acquisition Regulation (FAR) rule ...

  8. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions...

    Energy.gov [DOE] (indexed site)

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other ...

  9. Business Case Analysis Requirements for Certain Interagency and Agency-Specific Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE)

    Office of Federal Procurement Policy’s (OFPP) memorandum, dated September 29, 2011, Development, Review and Approval of Business Cases for Certain Interagency and Agency-Specific Acquisitions, outlines required elements of business case analysis as well as a process for developing, reviewing, and approving business cases to support the establishment and renewal of government-wide acquisition contracts (GWACs), certain multi-agency contracts, certain agency-specific contracts, or agency-specific blanket purchase agreement (BPA). Agency-specific vehicles are either indefinite-delivery, indefinite quantity contracts or blanket purchase agreements intended for the use of your contracting activity, the Department of Energy, or another Federal Agency.

  10. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions: A Guide for

    Energy.gov [DOE]

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other technical and editorial changes. A summary of these changes is provided on page three of the attached Guide. This Guide does not include the additional requirements required for orders funded under the Recovery Act. See the Recovery Act Guide for those requirements at http://management.energy.gov/policy~guidance/1672.htm.

  11. Interagency Coordination

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Interagency Coordination Image showing the cover of the Interagency brochure. Links to interagency pdf. The multi-faceted issues associated with naturally occurring methane hydrates demand a coordinated approach to studying (1) the potential of this resource as a U.S. fossil energy source, and (2) the possible hazards of tapping the resource. The National Methane Hydrates R&D Act of 2000 requires the development of a national methane hydrate R&D program that utilizes the talents of

  12. ACQUISITION PLANNING

    Energy.gov [DOE] (indexed site)

    - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding...

  13. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7...

    Office of Environmental Management (EM)

    business case analysis andor Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. ...

  14. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Summary of Rules Item Subject FAR Case I. Updates to Contract Reporting and Central 2010-014 Contractor Registration II. Interagency Acquisitions: Compliance by Nondefense ...

  15. Interagency Sustainability Working Group

    Energy.gov [DOE]

    The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable buildings in the federal government.

  16. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy DOE Acquisition Guide Chapter 7.1 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Acquisition Guide Chapter 7.1 is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to

  17. Policy Flash 2012-49 | Department of Energy

    Energy Saver

    49 Policy Flash 2012-49 Attached is Policy Flash 2012-49 Acquisition Guide Chapter 17.1- Interagency Acquisitions, Interagency Transactions, and Interagency Agreements- Minor...

  18. Federal Interagency Wind Turbine Radar Interference Mitigation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Interagency Wind Turbine Radar Interference Mitigation Strategy Federal Interagency Wind Turbine Radar Interference Mitigation Strategy Cover of the Federal Interagency ...

  19. Spectrum Interagency Collaboration Meeting

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Department of Energy (DOE) Office of Spectrum Management (OSM) will host the 2016 Interagency Spectrum Collaboration Meeting on July 26-27, 2016 at DOE Headquarters in Washington, DC.

  20. Environmental Justice Interagency Working Group releases "Promising...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Environmental Justice Interagency Working Group releases "Promising Practices for EJ Methodologies in NEPA Reviews" Environmental Justice Interagency Working Group releases ...

  1. Contractor Past Performance Information

    Energy.gov [DOE] (indexed site)

    a. Part A. b. Part B. 2. Interagency agreement format and samples. a. STRIPES IA funds out templates for interagency assisted acquisitions and interagency transactions....

  2. 2005 TEPP Annual Report | Department of Energy

    Office of Environmental Management (EM)

    17.1 (June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal

  3. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Environmental Management (EM)

    Department of Energy is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to references FAR 17.5 and related guide chapter 17.1. Also, two revisions in the chapter are identified by vertical lines in the

  4. Federal Interagency Geothermal Activities 2011

    Energy.gov [DOE]

    This document is the federal interagency geothermal activities document for 2011, which includes incoporation of public comments from the Draft National Geothermal Action Plan.

  5. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide ------------------------ Chapter 71.1 (Dec 2014) HEADQUARTERS BUSINESS CLEARANCE PROCESS Guiding Principles  Timely acquisition planning is critical  Effective oversight control systems are essential to ensuring the high quality/integrity of procurement transactions  Collaboration and cooperation are required for timely, effective procurement processes Overview This chapter provides guidance regarding the policies and procedures governing the Field Assistance and

  6. Intellectual Property (IP) Service Providers for Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Intellectual Property Provides ACQ and Assistance More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions Microsoft ...

  7. Intellectual Property (IP) Service Providers for Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOEIPCounselforDOELaboratories 2015 More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions ...

  8. Interagency Agreements | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Title XVII » Title XVII Environmental Compliance » Environmental Compliance » Interagency Agreements Interagency Agreements The documents included on the Environmental Compliance Division webpages have been posted to comply with applicable environmental requirements as part of LPO's due diligence process for issuing a Department of Energy loan or loan guarantee. With the exception of a Record of Decision, the posting of these documents should not be construed as recommending a decision about

  9. Policy Flash 2012-32 | Department of Energy

    Energy Saver

    2-32 Policy Flash 2012-32 Attached is Policy Flash 2012-32 Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency Transactions and Interagency Agreements Questions...

  10. Acquisition Guide Chapter 71.1 - Headquarters Business Clearance...

    Energy.gov [DOE] (indexed site)

    In accomplishing its mission, the FAOD reviews acquisition plans, solicitations, source selection documents, contracts, and other relevant transactional documentation....

  11. Interagency Sustainability Working Group | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Facilities » Sustainable Buildings & Campuses » Interagency Sustainability Working Group Interagency Sustainability Working Group The Interagency Sustainability Working Group (ISWG) is the coordinating body for sustainable federal buildings. This working group: Serves as a forum for information exchange and promotes agency implementation of goals for sustainable buildings Develops policy and reporting guidance to foster the widespread adoption of sustainable design and operations in the

  12. Interagency Activities and Resources | Department of Energy

    Office of Environmental Management (EM)

    Interagency Activities and Resources WHO and US EPA sign new Memorandum of Understanding ... The videos commemorate two decades of working to advance environmental justice at EPA and ...

  13. Interagency Energy Management Task Force Members

    Energy.gov [DOE]

    The Interagency Energy Management Task Force is led by the Federal Energy Management Program director. Members include energy and sustainability managers from federal agencies.

  14. Federal Interagency Wind Turbine Radar Interference Mitigation...

    Energy.gov [DOE] (indexed site)

    Interagency Wind Turbine Radar Interference Mitigation Strategy January 2016 This report ... from the advice and comments of two wind industry and trade association ...

  15. Environmental Justice Interagency Collaborative Newsletter Volume 1

    Energy.gov [DOE]

    The inaugural edition of the Environmental Justice Interagency Collaborative Newsletter is one of many opportunities the agencies are utilizing to share information and to communicate the various...

  16. Updates on the Interagency Task Force on Natural Gas Storage...

    Energy Saver

    Updates on the Interagency Task Force on Natural Gas Storage Safety - Working with Stakeholders Updates on the Interagency Task Force on Natural Gas Storage Safety - Working with ...

  17. Interagency Wild and Scenic Rivers Coordinating Council's WSRA...

    OpenEI (Open Energy Information) [EERE & EIA]

    to use the flowcharts created by the Interagency Wild and Scenic Rivers Coordinating Council. Author The Interagency Wild and Scenic Rivers Coordinating Council Published The...

  18. Federal Energy Management Program Interagency Partnerships | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Agency Assistance » Federal Energy Management Program Interagency Partnerships Federal Energy Management Program Interagency Partnerships Each interagency partnership is different, and recommendations are crafted based on each organization's purpose, function, goals, requirements, and needs. Each interagency partnership is different, and recommendations are crafted based on each organization's purpose, function, goals, requirements, and needs. The Federal Energy Management Program

  19. Acquisition Letter No. AL 2012-06 | Department of Energy

    Office of Environmental Management (EM)

    AL 2012-06 AL 2012-06.pdf (214.8 KB) More Documents & Publications Acquisition Letter on the Implications of Time-Limited Funds Financial Management Handbook Interagency ...

  20. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Broad agency announcements or unsolicited proposals Basic research from non-profit organizations Competitive procurement of commercial items Interagency agreements ...

  1. Intellectual Property (IP) Service Providers for Acquisition and Assistance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transactions | Department of Energy Intellectual Property Provides ACQ and Assistance (67.65 KB) More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions Microsoft Word - FAL2004-03.doc Guidance Documents

  2. OSTIblog Articles in the interagency cooperation Topic | OSTI, US Dept of

    Office of Scientific and Technical Information (OSTI)

    Energy Office of Scientific and Technical Information interagency

  3. Interagency Field Test Evaluates Co-operation of Turbines and...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interagency Field Test Evaluates Co-operation of Turbines and Radar Interagency Field Test Evaluates Co-operation of Turbines and Radar May 1, 2012 - 2:56pm Addthis The Department ...

  4. Interagency Performance and Risk Assessment Community of Practice...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) Charter Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) Charter Charter ...

  5. Finding and Winning Simplified Acquisitions, Part 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Finding and Winning Simplified Acquisitions, Part 1 Finding and Winning Simplified Acquisitions, Part 1 Presented at the 15th Annual DOE Small Business Forum & Expo by: Guy Timberlake, Chief Visionary Officer and Chief Executive Officer, The American Small Business Coalition Finding and Winning Simplified Acquisitions, Part 1 (4.41 MB) More Documents & Publications Finding and Winning Simplified Acquisitions, Part 2 Chapter 17 - Special Contracting Methods Interagency Acquisition

  6. Interagency mechanical operations group numerical systems group

    SciTech Connect

    1997-09-01

    This report consists of the minutes of the May 20-21, 1971 meeting of the Interagency Mechanical Operations Group (IMOG) Numerical Systems Group. This group looks at issues related to numerical control in the machining industry. Items discussed related to the use of CAD and CAM, EIA standards, data links, and numerical control.

  7. Doubly Distributed Transactions

    Energy Science and Technology Software Center

    2014-08-25

    Doubly Distributed Transactions (D2T) offers a technique for managing operations from a set of parallel clients with a collection of distributed services. It detects and manages faults. Example code with a test harness is also provided

  8. Environmental Justice Interagency Working Group releases "Promising

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Practices for EJ Methodologies in NEPA Reviews" | Department of Energy Environmental Justice Interagency Working Group releases "Promising Practices for EJ Methodologies in NEPA Reviews" Environmental Justice Interagency Working Group releases "Promising Practices for EJ Methodologies in NEPA Reviews" April 6, 2016 - 4:20pm Addthis The Environmental Justice (EJ) Interagency Working Group (IWG) Promising Practices report is a compilation of approaches that the NEPA

  9. INTERAGENCY FIELD TEST & EVALUATION OF WIND TURBINE - RADAR INTERFERENCE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    MITIGATION TECHNOLOGIES | Department of Energy INTERAGENCY FIELD TEST & EVALUATION OF WIND TURBINE - RADAR INTERFERENCE MITIGATION TECHNOLOGIES INTERAGENCY FIELD TEST & EVALUATION OF WIND TURBINE - RADAR INTERFERENCE MITIGATION TECHNOLOGIES The documents below include 1) a report that summarizes the Interagency Field Test & Evaluation (IFT&E) program and publicly available results from the tests and 2) summaries of three field tests designed to measure the impact of wind

  10. Interagency Committees and Working Groups | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Services » Environment » Radiation Protection of the Public and the Environment » Interagency Committees and Working Groups Interagency Committees and Working Groups DOE is actively involved with other Federal agencies that have responsibilities for the radiation protection of the public and the environment. This site provides the different committees and working groups that DOE is involved with. Interagency Steering Committee on Radiation Standards (ISCORS): The ISCORS is comprised of 8

  11. Extension of Comment Period on the Draft Integrated, Interagency...

    Energy Saver

    of Comment Period on the Draft Integrated, Interagency Pre-Application (IIP) Process for Electric Transmission Projects Requiring Federal Authorizations Extension of Comment...

  12. Interagency Task Force Report on Agency Recommendations, Conditions...

    OpenEI (Open Energy Information) [EERE & EIA]

    Agriculture, Environmental Protection Agency, Advisory Council on Historic Preservation (Work Group on the Coordination of Federal Mandates). 2001. Interagency Task Force Report...

  13. Multiple organizations build interagency fire center at LANL

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    effort is now underway to build a new Interagency Fire Center in the heart of Northern New Mexico. The National Nuclear Security Administration (NNSA), Bandelier...

  14. Procedures for Interagency Consultation to Avoid or Mitigate...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    or Mitigate Adverse Effects on Rivers in the Nationwide Inventory (CEQ, 1980) Procedures for Interagency Consultation to Avoid or Mitigate Adverse Effects on Rivers in the ...

  15. Interim Guidance on DOE Personal Property Foreign Transactions

    Energy.gov [DOE]

    The attached Acquisition Letter provides interim direction and procedural guidance to DOE and NNSA on proper protocol for personal property transactions executed with foreign entities, to include property title transfers, loans and abandonments and pertains to personal property in the hand of the Federal government, contractor or a third party. Direction and guidance is specific to accountable personal property, as defined in DOE Order 580.1. Guidance in this Acquisition Letter shall be followed until DOE Order 580.1 is updated to include foreign transactions.

  16. Transactional Network Platform: Applications

    SciTech Connect

    Katipamula, Srinivas; Lutes, Robert G.; Ngo, Hung; Underhill, Ronald M.

    2013-10-31

    In FY13, Pacific Northwest National Laboratory (PNNL) with funding from the Department of Energy’s (DOE’s) Building Technologies Office (BTO) designed, prototyped and tested a transactional network platform to support energy, operational and financial transactions between any networked entities (equipment, organizations, buildings, grid, etc.). Initially, in FY13, the concept demonstrated transactions between packaged rooftop air conditioners and heat pump units (RTUs) and the electric grid using applications or "agents" that reside on the platform, on the equipment, on a local building controller or in the Cloud. The transactional network project is a multi-lab effort with Oakridge National Laboratory (ORNL) and Lawrence Berkeley National Laboratory (LBNL) also contributing to the effort. PNNL coordinated the project and also was responsible for the development of the transactional network (TN) platform and three different applications associated with RTUs. This document describes two applications or "agents" in details, and also summarizes the platform. The TN platform details are described in another companion document.

  17. Second Annual Interagency STEM Volunteer Fair | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Second Annual Interagency STEM Volunteer Fair Second Annual Interagency STEM Volunteer Fair March 4, 2015 11:00AM to 1:00PM EST Department of Energy's Forrestal Building Cafeteria. 1000 Independence Ave SW, entrance on L'Enfant Plaza, west building of DOE. The Department of Energy and the Office of Personnel Management (OPM) are hosting the Second Annual Interagency STEM Volunteer Fair, aiming to match the needs of the STEM and educational community in the Washington, D.C., area with our federal

  18. List of Topics for Interagency Performance & Risk Assessment...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    & Risk Assessment Community of Practice (P&RA CoP) Discussion List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion List of ...

  19. Item Subject I. Preventing Abuse of Interagency Contracts.

    Energy.gov [DOE] (indexed site)

    Abuse of Interagency Contracts. II. Transition to the System for Award Management (SAM). III. Brand-Name Specifications. IV. Time-and-Materials and Labor-Hour Contracts for...

  20. Interagency Energy Management Task Force | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Management Task Force Interagency Energy Management Task Force The Federal Interagency Energy Management Task Force was created by the Federal Energy Management Improvement Act of 1988 to coordinate federal government activities that encourage energy conservation and energy efficiency. Led by the Federal Energy Management Program director and composed of federal energy managers, this task force serves as a forum for: Sharing lessons learned across agencies Providing analysis on technical

  1. Transfer and Transition: Interagency Coordination for Managing Public Lands

    Office of Scientific and Technical Information (OSTI)

    at UMTRCA Title II Sites in Wyoming - 16614 (Conference) | SciTech Connect Conference: Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614 Citation Details In-Document Search Title: Transfer and Transition: Interagency Coordination for Managing Public Lands at UMTRCA Title II Sites in Wyoming - 16614 By the end of fiscal year 2025, the U.S. Department of Energy (DOE) Office of Legacy Management (LM) is anticipating adding 17

  2. Intellectual Property (IP) Service Providers for Acquisition and Assistance

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Transactions | Department of Energy DOE_IP_Counsel_for_DOE_Laboratories 2015 (8.17 KB) More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions WA_05_056_IBM_WATSON_RESEARCH_CENTER_Waiver_of_Domestic_and_.pdf Need to Consider Intentional Destructive Acts in NEPA Documents (DOE, 2006)

  3. International petroleum transactions

    SciTech Connect

    Smith, E.E.; Dzienkowski, J.S.; Anderson, O.L.; Conine, G.B.; Lowe, J.S.

    1993-12-31

    This book is intended primarily as a casebook for students. However, it should not be discarded on these grounds because if compiles important materials that are useful to practitioners as their energy practices become global. The opening chapter is broad in scope and discusses NAFTA, GATT, the EC, and provides comprehensive and current statistical information on world energy resources and the pivotal role of host countries. Legal issues are analyzed in Chapter 2 which provides an excellent discussion of sovereign immunity and the act of state doctrine. Also, this chapter includes model clauses which are helpful even to a seasoned practitioner. Given that security of investment is critical to an international transaction, the book concludes its opening section with a discussion of expropriation issues. Part II is entitled Exploration, development and Production and is divided into four chapters. Using both cases and source materials, a comprehensive survey of ownership of mineral rights and concessions is presented. From a practitioner`s standpoint, Chapters 5 and 6 are important because of the inclusion of model clauses and contracts for production sharing arrangements, licenses, participation agreements, service contracts, and technology transfers. Chapter 8 deals with joint development and operations. The book concludes with three chapters on the history of the markets and international transactions involving oil and natural gas.

  4. Interagency Sustainability Working Group: Update Report; December 2009, Federal Energy Management Program (FEMP) (Brochure)

    SciTech Connect

    Not Available

    2009-12-01

    December 2009 update report offered by the Interagency Sustainability Working Group (ISWG). This report is updated bi-annually.

  5. Residential Transactive Control Demonstration

    SciTech Connect

    Widergren, Steven E.; Fuller, Jason C.; Marinovici, Maria C.; Somani, Abhishek

    2014-02-19

    Arguably the most exciting aspect of the smart grid vision is the full participation of end-use resources with all forms of generation and energy storage in the reliable and efficient operation of an electric power system. Engaging all of these resources in a collaborative manner that respects the objectives of each resource, is sensitive to the system and local constraints of electricity flow, and scales to the large number of devices and systems participating is a grand challenge. Distributed decision-making system approaches have been presented and experimentation is underway. This paper reports on the preliminary findings of a residential demand response demonstration that uses the bidding transactions of supply and end-use air conditioning resources communicating with a real-time, 5 minute market to balance the various needs of the participants on a distribution feeder. The nature of the demonstration, the value streams being explored, and the operational scenarios implemented to characterize the system response are summarized along with preliminary findings.

  6. EERE Interagency Activities related to Siting and Permitting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    | Energy Efficiency and Renewable Energy eere.energy.gov The Parker Ranch installation in Hawaii Office of Energy Efficiency and Renewable Energy Interagency Activities related to Siting and Permitting STEAB Presentation June 27, 2012 Laura Morton Senior Advisor Administration Initiatives to improve permitting and review of renewable energy projects * Rapid Response Teams (Transmission & Renewable Energy Generation) created 2011 * Presidential Memorandum on Speeding Infrastructure

  7. Automated Measurement and Signaling Systems for the Transactional...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Measurement and Signaling Systems for the Transactional Network Automated Measurement and Signaling Systems for the Transactional Network The Transactional Network Project is a ...

  8. Federal Interagency Wind Turbine Radar Interference Mitigation Strategy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interagency Wind Turbine Radar Interference Mitigation Strategy January 2016 This report is being disseminated by the U.S. Department of Energy (DOE). As such, this document was prepared in compliance with Section 515 of the Treasury and General Government Appropriations Act for fiscal year 2001 (public law 106-554) and information quality guidelines issued by DOE. Though this report does not constitute "influential" information, as that term is defined in DOE's information quality

  9. First Annual Interagency STEM Volunteer Fair - February 5 2014

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Annual Interagency STEM Volunteer Fair - February 5 2014 Hosted by the Department of Energy's Office of Economic Impact and Diversity AAAS/SSE STEM Volunteer Program The objectives of the AAS/SSE program are to foster the development of STEM literacy and motivate students to pursue STEM careers. STEM volunteers provide assistance to their teachers, with the details developed jointly. They commit to attending their schools an average of one day a week for the school year. Volunteers who are

  10. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    _____________________________________________________________ __________________________________________________Chapter 15.4-4 (December 2010) GENERAL GUIDE FOR TECHNICAL ANALYSIS OF COST PROPOSALS FOR ACQUISITION CONTRACTS Acquisition Guide _____________________________________________________________ __________________________________________________Chapter 15.4-4 (November 2010) TABLE OF CONTENT CHAPTER 1 - INTRODUCTION KEY CONCEPTS

  11. ACQUISITION LETTER

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70. CONTENTS ... ADR is reflected at Federal Acquisition Regulation (FAR) 33.204, which states, "it is ...

  12. Acquisition Regulation

    Energy.gov [DOE] (indexed site)

    .1 * * , No. AL-2015-09 Date August 25, 2015 fJ * - . *--o' 1 '.j t :i ?';; * * '"l'ES'ffito":J ACQUISITION LETTER This Acquisition Letter is issued under the authority ...

  13. ACQUISITION PLANNING

    Energy.gov [DOE] (indexed site)

    Management for the Acquisition of Capital Assets 22. DOE O 436.1 Departmental Sustainability 23. DOE G 413.3-13 Acquisition Strategy Guide for Capital Asset Projects 24. DOE O...

  14. Overview of the federal interagency ecosystem management initiative

    SciTech Connect

    Huke, S.

    1995-12-01

    In early 1994, the White House established a Federal Interagency Ecosystem Management Task Force and Working Group to implement the ecosystem management recommendation in the Vice President`s National Performance Review. The Task Force identified seven ecosystems where mature interagency ecosystem-based activities are mature and ongoing and may provide valuable lessons for broader application. Case studies of each of the seven ecosystems were prepared by interagency teams conducting interviews with representatives of federal, state, and local governments and private interests. The seven ecosystems are: the Southern Appalachian Highlands, Anacostia River Watershed, Prince William Sound, Pacific Northwest Forests, Coastal Louisiana, South Florida, and Great Lakes ecosystems. A final synthesis report, scheduled for completion in the Spring of 1995, will provide an overview of constraints, opportunities, and recommendations in five issue areas: legal, budgetary, science, institutional, policy, and public involvement. A second phase of this initiative will entail the development of ecosystem management strategies for three {open_quotes}new initiatives{close_quotes} laboratories.

  15. Interagency Task Force on Carbon Capture and Storage | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Interagency Task Force on Carbon Capture and Storage Interagency Task Force on Carbon Capture and Storage On February 3, 2010, President Obama sent a memorandum to the heads of fourteen Executive Departments and Federal Agencies establishing an Interagency Task Force on Carbon Capture and Storage. The goal was to develop a comprehensive and coordinated Federal strategy to speed the commercial development and deployment of clean coal technologies. The Task Force, co-chaired by the Department of

  16. Updates on the Interagency Task Force on Natural Gas Storage Safety -

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Working with Stakeholders | Department of Energy Updates on the Interagency Task Force on Natural Gas Storage Safety - Working with Stakeholders Updates on the Interagency Task Force on Natural Gas Storage Safety - Working with Stakeholders June 7, 2016 - 1:11pm Addthis Updates on the Interagency Task Force on Natural Gas Storage Safety – Working with Stakeholders Franklin (Lynn) Orr Franklin (Lynn) Orr Under Secretary for Science and Energy Marie Therese Dominguez Marie Therese

  17. Inter-Agency Agreement Signed between DOE's Wind and Water Power...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Inter-Agency Agreement Signed between DOE's Wind and Water Power Program and Carderock - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & ...

  18. Agenda- Interagency Steering Committee on Performance and Risk Assessment Community of Practice Annual Technical Exchange Meeting

    Energy.gov [DOE]

    Final Agenda for the December, 2014 Interagency Steering Committee on Performance and Risk Assessment Community of Practice Annual Technical Exchange Meeting held in Las Vegas, Nevada.

  19. Agencies that Have Entered into Federal Energy Management Program Interagency Partnerships

    Energy.gov [DOE]

    U.S. Department of Commerce and U.S. Department of the Interior have entered into interagency partnerships with the Federal Energy Management Program.

  20. Acquisition Regulation

    Energy Saver

    No. 2012-03 Acquisition Letter No. 2012-03 AL_2012-03.pdf (189.71 KB) More Documents & Publications Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors

    2-05 Acquisition Letter No. AL 2012-05 AL 2012-05.pdf (221.89 KB) More Documents & Publications Microsoft Word - AL2005-12.doc OPAM Policy Acquisition Guides Chapter 31 - Contract Cost Principles and Procedures

    3-04 Acquisition Letter No. AL 2013-04 AL 2013-04.pdf (58.37 KB) More

  1. Emergency Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Federal Procurement Policy, (OFPP) updated the Emergency Acquisitions Guide which is an attachment. The Acquisition Guide Chapter 18.0 Emergency Acquisitions is revised to incorporate Federal Acquisition Regulation changes through Federal Acquisition Circular 2005-49 and parts of the OFPP guide. Both the OFPP guide and the Department of Energy guide chapter may assist the contracting community with planning and carrying out procurement requirements during major disaster declarations, other emergencies, contingency operations, or defense or recovery from certain attacks.

  2. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 1 3.2 (November 2009) PURCHASE ORDERS GUIDING PRINCIPLES J Purchase Orders should normally be issued on a fixed-price basis. J Modifications of Purchase Orders may be used for unpriced orders and for administrative matters on priced orders. J Purchase orders cannot exceed the simplified acquisition threshold. This section discusses the Department of Energy's (DOE) use of purchase orders as described in Federal Acquisition Regulation (FAR) 13.302 and the Department of Energy's Acquisition

  3. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 Rev. 1 Date 09/09/2015 Department of Energy No. FAL 2015-04 Rev. 1 Date 09/09/2015 Financial Assistance Regulations ACQUISITION/FINANCIAL ASSISTANCE LETTER This Acquisition/Financial Assistance Letter is issued under the authority of the Senior Procurement Executive of DOE. It is intended for use by procurement professionals of DOE, primarily Contracting Officers, and other officials of DOE that are involved in the acquisition process. Other parties are welcome to its information, but

  4. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Career Development, Contracting Authority and Responsibilities Acquisition Regulation ... file, except for any documents required by regulation to be maintained in paper copy. ...

  5. ACQUISITION PLANNING

    Energy Saver

    ... The acquisition plan shall include justification for exceeding five years and discuss ... Agency policies and procedures (e.g., Justification for Other Than Full and Open ...

  6. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    Management, April 15, 2002 22. DOE M 413.3-1 Project ... Letter Mission Need Justification and Project Acquisition ... and Execution of the Budget, and more specifically, ...

  7. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    Management, April 15, 2002 23. DOE M 413.3-1 Project ... Letter Mission Need Justification and Project Acquisition ... and Execution of the Budget, and more specifically, ...

  8. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... In addition, DOE Order 413.3B, Program and Project Management for the Acquisition ... proposals Basic research from non-profit organizations Competitive procurement of ...

  9. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  10. List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion

    Office of Energy Efficiency and Renewable Energy (EERE)

    List of Topics for Interagency Performance & Risk Assessment Community of Practice (P&RA CoP) Discussion

  11. Modeling and low-level waste management: an interagency workshop

    SciTech Connect

    Little, C.A.; Stratton, L.E.

    1980-01-01

    The interagency workshop on Modeling and Low-Level Waste Management was held on December 1-4, 1980 in Denver, Colorado. Twenty papers were presented at this meeting which consisted of three sessions. First, each agency presented its point of view concerning modeling and the need for models in low-level radioactive waste applications. Second, a larger group of more technical papers was presented by persons actively involved in model development or applications. Last of all, four workshops were held to attempt to reach a consensus among participants regarding numerous waste modeling topics. Abstracts are provided for the papers presented at this workshop.

  12. Sensors, Controls, and Transactive Energy Research | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and by utilizing these state of the art solutions, simultaneously enable maximum energy efficiency and enhanced financial transactions leading to a vision of self-aware buildings. ...

  13. Technical Meeting: Software Framework for Transactive Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Technical Meeting: Software Framework for Transactive Energy: VOLTTRON(tm) 2015 On July 23 and 24, 2015, BTO held technical meetings graciously hosted by the Virginia Tech Advanced ...

  14. Transactive energy: enabling a more intelligent, interactive...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    such as customer engagement, business and policy barriers, grid economics, the role of demand response, and cyber and physical security risks. But the transactive concept isn't...

  15. Transactions, Technology & Contractor Human Resources | Department...

    Energy.gov [DOE] (indexed site)

    Panel Technician | Credit: DOE Archives Solar Panel Technician | Credit: DOE Archives Offices of the Deputy General Counsel for Transactions, Technology, & Contractor Human...

  16. Chapter 12 - Inter-Entity Transactions

    Energy.gov [DOE] (indexed site)

    INTER-ENTITY TRANSACTIONS 1. INTRODUCTION. a. Purpose. The chapter establishes the principles and procedures of financing and accounting for costs of work performed by one DOE...

  17. Memorandum, Reporting of Radiological Sealed Sources Transactions...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The requirements for reporting transactions involving radiological sealed sources are identified in Department of Energy (DOE) Notice (N) 234.1, Reporting of Radioactive Sealed ...

  18. Volttron (TM) Transactive Control Node: Case Study

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Toolkit Framework Agent is the sequential point of control for Transactive Control functions. All other agents are event-based, asynchronous Gray boxes represent existing VOLTTRON ...

  19. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The guidance contained herein is intended to serve as interim guidance for DOE until such time as the DOE Acquisition Regulation (DEAR) is amended to implement this policy on a ...

  20. Capturing Energy Upgrades in the Real Estate Transaction | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Capturing Energy Upgrades in the Real Estate Transaction Capturing Energy Upgrades in the Real Estate Transaction Because green building techniques and products may impact the ...

  1. Orange Button - Solar Bankability Data to Advance Transactions...

    Office of Environmental Management (EM)

    Orange Button - Solar Bankability Data to Advance Transactions and Access (SB-DATA) Orange Button - Solar Bankability Data to Advance Transactions and Access (SB-DATA) Orange ...

  2. Interagency Performance and Risk Assessment Community of Practice (P&RA

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    CoP) Charter | Department of Energy Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) Charter Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) Charter Charter for the Interagency Performance and Risk Assessment Community of Practice (P&RA CoP) whose goal is to foster exchange of information regarding preparation of P&RAs across agencies and practitioners; enhance consistency in the preparation of P&RAs across the

  3. Aspects of Exxon Mobil Corporation's Acquisition of XTO Energy Inc

    Reports and Publications

    2009-01-01

    A summary presentation to inform discussion of the recently announced acquisition of XTO Energy Inc. by Exxon Mobil Corporation, a transaction which is reportedly $41 billion in value. "Aspects of Exxon Mobil Corporation's Acquisition of XTO Energy Inc" presents non-proprietary company-level oil and gas production and reserve data and the relevant U.S. aggregate data published by the Energy Information Administration.

  4. Interagency Field Test Evaluates Co-operation of Turbines and Radar

    Energy.gov [DOE]

    The Department of Energy and federal agency partners recently completed the first in a series of three radar technology field tests and demonstrations. The Interagency Field Test and Evaluation of...

  5. NOTICE OF PROPOSED RULEMAKING ON THE INTEGRATED INTERAGENCY PRE-APPLICATION

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PROCESS (IIP) ON ELECTRIC GRID TRANSMISSION | Department of Energy NOTICE OF PROPOSED RULEMAKING ON THE INTEGRATED INTERAGENCY PRE-APPLICATION PROCESS (IIP) ON ELECTRIC GRID TRANSMISSION NOTICE OF PROPOSED RULEMAKING ON THE INTEGRATED INTERAGENCY PRE-APPLICATION PROCESS (IIP) ON ELECTRIC GRID TRANSMISSION The Department of Energy (DOE) proposes to amend its regulations for the timely coordination of Federal Authorizations for proposed interstate electric transmission facilities pursuant to

  6. Final report of the Committee on Interagency Radiation Research and Policy Coordination, 1984-1995

    SciTech Connect

    1995-09-01

    This document is the final report of the Committee on Interagency Radiation Research and Policy Coordination (CIRRPC). The committee was established to address national and international issues involving ionizing and nonionizing radiation. Three sections are included in the report: a summary of CIRRPC`s history structure, and operations; CIRRPC`s most significant activities, findings and recommendations on national radiation issues of sufficient importance and scope to require interagency attention; topics for future consideration by Federal agencies.

  7. Test Acquisition Guide

    Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1...

  8. Interagency Geothermal Coordinating Council fifth annual report. Final draft

    SciTech Connect

    Abel, Fred H.

    1981-07-07

    Geothermal energy is the natural heat of the earth, and can be tapped as a clean, safe, economical alternative source of energy. Much of the geothermal energy resource is recoverable with current or near-current technology and could make a significant contribution both to increasing domestic energy supplies and to reducing the US dependence on imported oil. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural process applications. This report describes the progress for fiscal year 1980 (FY80) of the Federal Geothermal Program. It also summarizes the goals, strategy, and plans which form the basis for the FY81 and FY82 program activities and reflects the recent change in national policy affecting Federal research, development and demonstration programs. The Interagency Geothermal Coordinating Council (IGCC) believes that substantial progress can and will be made in the development of geothermal energy. The IGCC goals are: (1) reduce the institutional barriers so that geothermal projects can be on-line in one-half the current time; (2) make moderate temperature resources an economically competitive source of electricity; (3) remove the backlog of noncompetitive lease applications; (4) competitive lease all KGRA lands; and (5) cut the cost of hydrothermal technology by 25%.

  9. Acquisitions___Communications.pdf

    Energy Saver

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate (76.66 KB) More Documents & Publications OPAM Policy Acquisition Guides Chapter 17 - Special Contracting Methods Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

  10. GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM GC GUIDANCE ON BARTER TRANSACTIONS INVOLVING DOE-OWNED URANIUM The Department of Energy has on a variety of occasions ...

  11. Orange Button - Solar Bankability Data to Advance Transactions and Access

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (SB-DATA) | Department of Energy Orange Button - Solar Bankability Data to Advance Transactions and Access (SB-DATA) Orange Button - Solar Bankability Data to Advance Transactions and Access (SB-DATA) Orange Button – Solar Bankability Data to Advance Transactions and Access (SB-DATA) Creating unified data standards will help the solar industry reduce market inefficiencies and lower costs for consumers. Orange Button℠, originally named Solar Bankability Data to Advance Transactions and

  12. Transactions, Technology and Contractor Human Relations | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Services » Transactions, Technology and Contractor Human Relations Transactions, Technology and Contractor Human Relations Transactions, Technology and Contractor Human Relations Offices of the Deputy General Counsel for Transactions, Technology and Contractor Human Resources Office of the Assistant General Counsel for Procurement and Financial Assistance (GC-61) Office of the Assistant General Counsel for Technology Transfer and Intellectual Property (GC-62) Office of the Assistant

  13. Technical Meeting: Software Framework for Transactive Energy VOLTTRON(tm)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2014 | Department of Energy Energy VOLTTRON(tm) 2014 Technical Meeting: Software Framework for Transactive Energy VOLTTRON(tm) 2014 On July 23 and 24, 2014, BTO held technical meetings graciously hosted by Case Western Reserve University on a Software Framework for Transactive Energy. The purpose of this meeting was to give an overview of the VOLTTRON(tm) platform-a transaction based software platform and an open source software environment-as well as the Transactional Network concept and

  14. Automated Measurement and Signaling Systems for the Transactional Network |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Measurement and Signaling Systems for the Transactional Network Automated Measurement and Signaling Systems for the Transactional Network The Transactional Network Project is a multi-lab activity funded by the U.S. Department of Energy's Building Technologies Office. The project team included staff from Lawrence Berkeley National Laboratory, Pacific Northwest National Laboratory, and Oak Ridge National Laboratory. The team designed, prototyped, and tested a transactional

  15. Transactive Controls Overview- 2014 BTO Peer Review

    Energy.gov [DOE]

    Presenter: Joseph Hagerman, U.S. Department of Energy This presentation at the 2014 Peer Review provided an overview of the Building Technologies Office's Transactive Controls activities. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  16. System and method for secure group transactions

    DOEpatents

    Goldsmith, Steven Y.

    2006-04-25

    A method and a secure system, processing on one or more computers, provides a way to control a group transaction. The invention uses group consensus access control and multiple distributed secure agents in a network environment. Each secure agent can organize with the other secure agents to form a secure distributed agent collective.

  17. Memorandum, Reporting of Radiological Sealed Sources Transactions

    Energy.gov [DOE]

    The requirements for reporting transactions involving radiological sealed sources are identified in Department of Energy (DOE) Notice (N) 234.1, Reporting of Radioactive Sealed Sources. The data reported in accordance with DOE N 234.1 are maintained in the DOE Radiological Source Registry and Tracking (RSRT) database by the Office of Information Management, within the Office of Environment, Health, Safety and Security.

  18. Data report - June`s transactions

    SciTech Connect

    1996-07-01

    This article is the June 1996 data summary. It contains charts and graphs on the following subjects: (1) June`s transactions, (2) Uranium price range data, (3) Uranium historical price data, (4) US/DOE and Euratom average contract prices for natural uranium, (5) SWU historical price data, (6) SWU spot/secondary market data, and (7) US DOE SWU price data.

  19. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Regulation Federal Acquisition Circular 2005-86 Summary of Rules FAC 2005-86 Item Subject FAR Case I Definition of "Multiple-Award Contract" 2015-019 II Sole Source ...

  20. Transaction-Based Building Controls Framework, Volume 1: Reference Guide

    SciTech Connect

    Somasundaram, Sriram; Pratt, Robert G.; Akyol, Bora A.; Fernandez, Nicholas; Foster, Nikolas AF; Katipamula, Srinivas; Mayhorn, Ebony T.; Somani, Abhishek; Steckley, Andrew C.; Taylor, Zachary T.

    2014-12-01

    This document proposes a framework concept to achieve the objectives of raising buildings’ efficiency and energy savings potential benefitting building owners and operators. We call it a transaction-based framework, wherein mutually-beneficial and cost-effective market-based transactions can be enabled between multiple players across different domains. Transaction-based building controls are one part of the transactional energy framework. While these controls realize benefits by enabling automatic, market-based intra-building efficiency optimizations, the transactional energy framework provides similar benefits using the same market -based structure, yet on a larger scale and beyond just buildings, to the society at large.

  1. DOE Seeks Public Input on an Integrated, Interagency Pre-Application Process for Transmission Authorizations

    Energy.gov [DOE]

    A Request for Information (RFI) seeking public input for a draft Integrated, Interagency Pre-application (IIP) Process was published in the Federal Register on August 29, 2013. The Federal Register Notice is available now for downloading. Comments must be received on or before September 29, 2013. As comments are received, they will be posted online.

  2. Committee on Interagency Radiation Research and Policy Coordination (CIRRPC). Seventh annual report

    SciTech Connect

    Young, A.L.

    1991-06-30

    In 1990--91 CIRRPC`s program included efforts to improve interagency coordination on ionizing radiation risk assessments, a review of the reported health risks to humans from exposure to extremely low- frequency electric and magnetic fields (ELF/EMF), and increased coordination with national and international organizations such as NCRP and ICRP.

  3. ACQUISITION PLANNING | Department of Energy

    Energy Saver

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  4. Natural gas industry's response to transaction costs

    SciTech Connect

    Mulherin, J.H.

    1985-07-25

    Legislators and regulators have historically viewed the organizational features in the natural gas industry as noncompetitive. Challenging recent suggestions that the contractual arrangements in the industry are in violation of antitrust statutes, the author states that the methods of organization such as long-term contracts, take-or-pay provisions, and most-favored nation clauses are competitive responses to the costs of transacting in the natural gas industry. These arrangements lower transaction costs by mitigating the opportunistic behavior that can potentially arise in long-term relations involving specialized assets. If policymakers want to enable cost reductions in the industry to reduce the price burden felt by users of gas, an accompaniment of price decontrol by overall deregulation is in order.

  5. Electricity transactions across international borders, 1986

    SciTech Connect

    Not Available

    1987-10-01

    This report summarizes the electricity exchanges between the United States and Mexico and Canada during Calendar Year 1986. The construction, connection, operation and maintenance of any electric transmission facility which crosses an international border of the United States requires a Presidential permit. Presidential permits require that an annual report be filed by the permit holder detailing all transactions with the foreign country. 3 figs., 3 tabs.

  6. SF 6432-IN International Commercial Transactions

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Department Release Date: 11/17/15 Page 1 of 11 Printed copies of this document are uncontrolled. Retrieve latest version electronically. SANDIA CORPORATION SF 6432-IN (11/2015) SECTION II STANDARD TERMS AND CONDITIONS FOR INTERNATIONAL COMMERCIAL TRANSACTIONS THE FOLLOWING CLAUSES APPLY TO THIS CONTRACT AS INDICATED UNLESS SPECIFICALLY DELETED, OR EXCEPT TO THE EXTENT THEY ARE SPECIFICALLY SUPPLEMENTED OR AMENDED IN WRITING IN THE SIGNATURE PAGE OR SECTION I OF THIS CONTRACT. (CTRL+CLICK ON A

  7. Framework for Address Cooperative Extended Transactions

    Energy Science and Technology Software Center

    1997-12-01

    The Framework for Addressing Cooperative Extended Transactions (FACET) is an object-oriented software framework for building models of complex, cooperative behaviors of agents. it can be used to implement simulation models of societal processes such as the complex interplay of participating individuals and organizations engaged in multiple concurrent transactions in pursuit of their various goals. These transactions can be patterned on, for example, clinical guidelines and procedures, business practices, government and corporate policies, etc. FACET canmore » also address other complex behaviors such as biological life cycles or manufacturing processes. FACET includes generic software objects representing the fundamental classes of agent -- Person and Organization - with mechanisms for resource management, including resolution of conflicting requests for participation and/or use of the agent's resources. The FACET infrastructure supports stochastic behavioral elements and coping mechanisms by which specified special conditions and events can cause an active cooperative process to be preempted, diverting the participants onto appropriate alternative behavioral pathways.« less

  8. Committee on Interagency Radiation Research and Policy Coordination second annual report, July 1, 1985--June 30, 1986

    SciTech Connect

    Young, A.L.

    1996-06-30

    This is the second annual report of the Committee on Interagency Radiation Research and Policy Coordination (CIRRPC). CIRRPC was established on April 9, 1984, to replace the Committee on Interagency Radiation Policy and was assigned responsibilities of the former Interagency Radiation Research Committee and former Radiation Policy Council. CIRRPC is chartered under the Federal Coordinating Council for Science, Engineering and Technology (FCCSET) and reports to the Office of Science and Technology Policy (OSTP), Executive Office of the President. Its overall charge is to coordinate radiation matters between agencies, evaluate radiation research, and provide advice on the formulation of radiation policy. During CIRRPC`s second year, the member agencies have called upon this interagency resource to assist in coordinating science and policy issues and to provide a vehicle to accomplish multiagency tasks.

  9. Modeling an Application's Theoretical Minimum and Average Transactional Response Times

    SciTech Connect

    Paiz, Mary Rose

    2015-04-01

    The theoretical minimum transactional response time of an application serves as a ba- sis for the expected response time. The lower threshold for the minimum response time represents the minimum amount of time that the application should take to complete a transaction. Knowing the lower threshold is beneficial in detecting anomalies that are re- sults of unsuccessful transactions. On the converse, when an application's response time falls above an upper threshold, there is likely an anomaly in the application that is causing unusual performance issues in the transaction. This report explains how the non-stationary Generalized Extreme Value distribution is used to estimate the lower threshold of an ap- plication's daily minimum transactional response time. It also explains how the seasonal Autoregressive Integrated Moving Average time series model is used to estimate the upper threshold for an application's average transactional response time.

  10. Nature of Transactions (TI) Code | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    | (NNSA) Nature of Transactions (TI) Code U.S. Department of Energy / U.S. Nuclear Regulatory Commission Nuclear Materials Management & Safeguards System Nature of Transactions (TI) Code* Nature of Transactions (TI) Code* Code: Description: A Initiates lease and financial responsibility of DOE-owned material B Transfer of lease and financial responsiblity of DOE-owned material C Transfer of DOE-owned material with no change in lease or financial responsibility D Return to DOE for credit

  11. Contacts for the Deputy General Counsel for Transactions, Technology, &

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Contractor Human Resources (GC-60) | Department of Energy Transactions, Technology, & Contractor Human Resources (GC-60) Contacts for the Deputy General Counsel for Transactions, Technology, & Contractor Human Resources (GC-60) Gena E. Cadieux, Deputy General Counsel for Transactions, Technology, & Contractor Human Resources 202-586-3426 gena.cadieux@hq.doe.gov Lisa N. Brown, Administrative Staff 202-586-5246 202-586-0325 (fax)

  12. Technical Meeting: Software Framework for Transactive Energy VOLTTRON(tm)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2016 | Department of Energy Software Framework for Transactive Energy VOLTTRON(tm) 2016 Technical Meeting: Software Framework for Transactive Energy VOLTTRON(tm) 2016 On August 4 and 5, 2016, BTO held the third annual Technical Meeting on the Software Framework for Transactive Energy: VOLTTRON(tm). The meeting was hosted by the Smart Buildings Center in Seattle, Washington. The meeting objectives were to continue to build the VOLTTRON user community, share and learn from applications of

  13. Technical Meeting: Reference Guide for a Transaction-Based Building

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Controls Framework | Department of Energy Reference Guide for a Transaction-Based Building Controls Framework Technical Meeting: Reference Guide for a Transaction-Based Building Controls Framework On May 2, 2014, BTO hosted a technical meeting at NREL, in Golden, CO, on the Reference Guide for a Transaction-Based Building Controls Framework: Unlocking energy efficiency and grid service values for building energy consumers. The purpose of this meeting was to review with industry stakeholders

  14. Technical Meeting: Software Framework for Transactive Energy: VOLTTRON(tm)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2015 | Department of Energy Energy: VOLTTRON(tm) 2015 Technical Meeting: Software Framework for Transactive Energy: VOLTTRON(tm) 2015 On July 23 and 24, 2015, BTO held technical meetings graciously hosted by the Virginia Tech Advanced Research Institute on a Software Framework for Transactive Energy: VOLTTRON(tm). The purpose of this meeting was to provide an overview of the VOLTTRON platform, present new developments and uses, discuss advancement of the Transactional Network concept, and

  15. Special operations forces and counterproliferation: The interagency process at work. Study project

    SciTech Connect

    Bakken, H.L.

    1996-04-01

    The threat of use of Weapons of Mass Destruction (WMD) in the United States or against American vital interests overseas is real. Combating the proliferation of WMD has become a high priority for the U.S. Government. Within Department of Defense Counterproliferation Initiative (DOD CPI) of 1993 Special Operations Forces (SOF) have become pivotal players in the creation of a full range of military options to counter this threat. SOF provides the National Command Authority (NCA) with flexible and responsive options. In order to successfully execute any type of CP related special operation, the interagency process must be fully engaged and synchronized. This study assesses the nature of the threat, reviews the evolution of the DOD CPI, and focuses on the use of SOF as an instrument of U.S. policy. Specifically this study explores the connectivity of the interagency process to support a U.S. SOF Counterproliferation mission.

  16. PV Paper Published in IEEE Transactions on Sustainable Energy

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Paper Published in IEEE Transactions on Sustainable Energy - Sandia Energy Energy Search Icon ... Hydrogen Infrastructure Hydrogen Production Market Transformation Fuel Cells ...

  17. Contacts for the Deputy General Counsel for Transactions, Technology...

    Energy.gov [DOE] (indexed site)

    Gena E. Cadieux, Deputy General Counsel for Transactions, Technology, & Contractor Human Resources 202-586-3426 gena.cadieux@hq.doe.gov Lisa N. Brown, Administrative Staff ...

  18. NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results

    SciTech Connect

    Clark, J.S.; Wickenheiser, T.J.; Doherty, M.P.; Marshall, A.; Bhattacharryya, S.K.; Warren, J.

    1992-01-01

    Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.

  19. Chapter 17 - Special Contracting Methods | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 - Special Contracting Methods Chapter 17 - Special Contracting Methods 17.1 - Attachment 1 - OFPP Guidance Interagence Acquisitions June 2008 17.1 - Attachment 2 - OFPP Business Case Guidance 17.1 - Attachment 3A - IA FUNDS OUT Assisted Aquisition Part A 17.1 - Attachment 3A - IA FUNDS OUT Assisted Aquisition Part B 17.1 - Attachment 3B - IA FUNDS OUT Interagency Transaction Part A 17.1 - Attachment 3B - IA FUNDS OUT Interagency Transaction Part B 17.1 - Attachment 3C - IA STRIPES Cover form

  20. Transaction-Based Platform Presentation - VOLTTRON 2016

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Motivation for a Transaction Based Platform GEORGE HERNANDEZ, P.E. August 9, 2016 1 Pacific Northwest National Laboratory VOLTTRON TM 2016 PNNL-SA-120200 How Far We Have Come... August 9, 2016 2 August 9, 2016 3 Linear Verses 'Blobular' Control systems tend to be linear Or maybe even KINDA non-linear But the problem is systems that include physical components tend not to be linear August 9, 2016 4 The Epiphany! STOP trying make systems ever more complicated... Intstead of endless nested loops or

  1. IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL.

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    8 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 33, NO. 2, APRIL 2005 Imaging of a Double Helical Structure in the Reversed Field Pinch F. Bonomo, B. E. Chapman, P. Franz, L. Marrelli, P. Martin, P. Piovesan, I. Predebon, G. Spizzo, and R. B. White Abstract-X-ray tomography and Poincaré reconstructions with the ORBIT code allow imaging of coherent structures emerging in a magnetized fusion plasma when chaos in the magnetic field is reduced. Index Terms-Magnetohydrodynamic (MHD), Monte Carlo

  2. IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL.

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    62 IEEE TRANSACTIONS ON PLASMA SCIENCE, VOL. 33, NO. 2, APRIL 2005 Soft X-Ray Pulses in the Reversed-Field Pinch L. Frassinetti, M. Gobbin, P. Piovesan, L. Marrelli, P. Martin, P. Franz, B. E. Chapman, D. Craig, and J. S. Sarff Abstract-Data obtained in the Madison Symmetric Torus re- versed-field pinch with a soft X-ray diagnostic will be presented. They have been used to study transient transport events in this device. Fast thermal relaxation events are associated to bursts of

  3. Sustainable Acquisition, Federal and Department of Energy Acquisition...

    Energy.gov [DOE] (indexed site)

    PF2011-08 Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments (89.35 KB) More Documents & Publications DOE Acquisition Guide Chapter 23 ...

  4. ACQUISITION PLANNING | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning

    ACQUISITION PLANNING (742.74 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2015-13

  5. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  6. Acquisition Letter Archive Listing

    Energy Saver

    of Interest | Department of Energy 9.505 - Organizational and Consultant Conflicts of Interest Acquisition Guide Chapter 9.505 - Organizational and Consultant Conflicts of Interest DATE: September 26, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 9.505, Organizational and Consultant Conflicts of Interest SUMMARY: Acquisition Guide

  7. Sustainable Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Sustainable Acquisition Sustainable Acquisition Mission The team establishes a national approach to expand purchases of sustainable goods and services, including ...

  8. Systems and methods for performing wireless financial transactions

    DOEpatents

    McCown, Steven Harvey

    2012-07-03

    A secure computing module (SCM) is configured for connection with a host device. The SCM includes a processor for performing secure processing operations, a host interface for coupling the processor to the host device, and a memory connected to the processor wherein the processor logically isolates at least some of the memory from access by the host device. The SCM also includes a proximate-field wireless communicator connected to the processor to communicate with another SCM associated with another host device. The SCM generates a secure digital signature for a financial transaction package and communicates the package and the signature to the other SCM using the proximate-field wireless communicator. Financial transactions are performed from person to person using the secure digital signature of each person's SCM and possibly message encryption. The digital signatures and transaction details are communicated to appropriate financial organizations to authenticate the transaction parties and complete the transaction.

  9. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2004-04-19

    This Order establishes training and certification requirements and career development programs under the Acquisition Career Development (ACD) Program for DOE and NNSA acquisition workforce. The acquisition workforce includes contracting, purchasing, personal property management, program management, Contracting Officers and Contracting Officer Representatives. The ACD Program implements the Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the objectives of Executive Order (E.O.) 129231, Federal Procurement Reform, dated 10-13-1994. This order cancels DOE O 361.1, Acquisition Career Development Program, dated 11-10-99, AND Acquisition Letter 2003-05, Personal Property Management Career Development, Training, and Certification Program, dated 9-10-03. Cancels DOE O 361.1 Chg 2. Canceled by DOE O 361.1B.

  10. Sustainable Acquisition, Federal and Department of Energy Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulation Amendments | Department of Energy Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments Executive Order 13514, Federal Leadership in Environmental, Energy and Economic Performance was issued October 5, 2009. Among its purposes were the promotion of sustainable acquisition, including energy, fuel, and water efficiency PF2011-08 Sustainable Acquisition,

  11. Acquisition Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Contractors for Capital Asset Projects Acquisition and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Report ...

  12. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-12-20

    To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Cancels DOE O 361.1. Canceled by DOE O 361.1 Chg 2.

  13. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-06-13

    To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Change 2 approved 06-13-03. Cancels DOE O 361.1 Chg 1. Canceled by DOE O 361.1A.

  14. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1999-11-10

    The Order implements the Department's Acquisition Career Development program, mandatory for professionals in the GS-1102 and 1105 occupational procurement series, as well as others with significant procurement responsibilities. The Order also ensures that members of the acquisition workforce are aware of and adhere to the mandatory training and certification requirements. Cancels Acquisition Letter 98-06. Canceled by DOE O 361.1 Chg 1.

  15. Acquisition Career Management Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-01-24

    The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels DOE O 361.1A.

  16. Status of Acquisition Letters

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Workers under Service Contracts Jason Taylor Active until rulemaking is complete 6 ... Management and Operating Contracts Jason Taylor Superseded by coverage in the Acquisition ...

  17. Acquisition Career Management Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2015-05-14

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program. Supersedes DOE O 361.1B.

  18. Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program

    SciTech Connect

    1992-04-29

    This report presents the findings of the Interagency Requirements Review of the Department of Energy (DOE) Environmental Restoration and Waste Management (ERWM) Program. The review was requested by Admiral Watkins to help determine the FY 1993 funding levels necessary to meet all legal requirements. The review was undertaken by analysts from the Office of Management and Budget (OMB) and Army Corps of Engineers, reporting to an Interagency Group (IAG) of senior Administration officials concerned with environmental cleanup issues. The purpose of the study was to determine the level of finding needed in FY 1993 for each ERWM Field Office to comply with all Federal, State, and local government legal requirements; all DOE Orders that establish standards for environment, safety and health (ES and H) management; and for prudent investments in other discretionary and management activities such as upgrading administrative buildings, information systems, etc. The study also reviewed the cost estimates supporting the ERWM proposed budget, including direct costs (labor, equipment) and indirect costs (administrative, landlord services, contractor overhead). The study did not analyze whether the Federal/State legal requirements and DOE Orders were necessary or whether the proposed clean-up remedies represent the most cost effective alternatives available.

  19. VOLTTRON Lite: Integration Platform for the Transactional Network

    SciTech Connect

    Haack, Jereme N.; Katipamula, Srinivas; Akyol, Bora A.; Lutes, Robert G.

    2013-10-31

    In FY13, Pacific Northwest National Laboratory (PNNL) with funding from the Department of Energy’s (DOE’s) Building Technologies Office (BTO) designed, prototyped and tested a transactional network platform. The platform is intended to support energy, operational and financial transactions between any networked entities (equipment, organizations, buildings, grid, etc.). Initially, in FY13, the concept demonstrated transactions between packaged rooftop units (RTUs) and the electric grid using applications or “agents” that reside on the platform, on the equipment, on local building controller or in the Cloud. This document describes the core of the transactional network platform, the Volttron Lite™ software and associated services hosted on the platform. Future enhancements are also discussed. The appendix of the document provides examples of how to use the various services hosted on the platform.

  20. Transaction-Based Controls for Building-Grid Integration: VOLTTRON™

    SciTech Connect

    Akyol, Bora A.; Haack, Jereme N.; Hernandez, George; Katipamula, Srinivas; Widergren, Steven E.

    2015-07-01

    The U.S. Department of Energy’s (DOE’s) Building Technologies Office (BTO) is supporting the development of a “transactional network” concept that supports energy, operational, and financial transactions between building systems (e.g., rooftop units -- RTUs), and the electric power grid using applications, or 'agents', that reside either on the equipment, on local building controllers, or in the Cloud. The transactional network vision is delivered using a real-time, scalable reference platform called VOLTTRON that supports the needs of the changing energy system. VOLTTRON is an agent execution and an innovative distributed control and sensing software platform that supports modern control strategies, including agent-based and transaction-based controls. It enables mobile and stationary software agents to perform information gathering, processing, and control actions.

  1. Motivation for the Transaction-Based Reference Platform

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... required by the transaction. - OregonLaws.org 7 Software Agent(s) * In computer science, a software agent is a computer program that acts for a user or other program in a ...

  2. Technical Meeting: Reference Guide for a Transaction-Based Building...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Network (PNNL) (1.03 MB) Presentation: Specification of Transactive Control for a Microgrid (Enernex) (1.37 MB) Presentation: Department of Energy's Multi-Year Plan for the Grid ...

  3. Technical Meeting on the Software Framework for Transactive Energy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    SOFTWARE FRAMEWORK FOR TRANSACTIVE ENERGY: VOLTTRON(tm) 1 Hosted by the Virginia Tech Advanced Research Institute 900 Glebe Rd., Arlington, VA 22203 July 23-24, 2015 Technical ...

  4. Capturing Energy Efficiency Upgrades in the Real Estate Transaction

    Energy.gov [DOE]

    "Capturing Energy Efficiency Upgrades in the Real Estate Transaction," by Residential Energy Efficiency Solutions, July 10, 2012. Describes the concept of a residential MPG number as a simple way of describing a home’s energy consumption.

  5. Capturing Energy Upgrades in the Real Estate Transaction | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Capturing Energy Upgrades in the Real Estate Transaction Capturing Energy Upgrades in the Real Estate Transaction Because green building techniques and products may impact the value of a home, they also affect the appraisal process when it comes to valuing residential properties. With the Cost Approach, the use of green features may increase the energy efficiency of a home but may add to the cost of that home's reproduction or replacement. Appraisers employing the Cost Approach should

  6. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1,

  7. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  8. Small Business Issues for Environmental Restoration Acquisitions...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions ...

  9. Enabling Sustainable Acquisition by Improving Procurement Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Enabling Sustainable Acquisition by Improving Procurement Systems Enabling Sustainable Acquisition by Improving Procurement Systems Enabling Sustainable Acquisition by Improving ...

  10. Customer Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Soft Costs Customer Acquisition Customer Acquisition Photo of a woman, man, and child looking at a silver box on the outside of a home. Customer acquisition costs in the solar ...

  11. OPAM Policy Acquisition Guides

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 17.3 (February 2004) Acquisition, Use, and Disposal of Real Estate [Reference: DEAR 917.74, 970.5244-1] Overview This section provides internal Departmental information and a DOE point of contact for issues dealing with real estate acquisition, use, and disposal. Background DEAR 917.74 provides the policy and procedures to be followed in the acquisition, use, and disposal of real estate. In accordance with DEAR clause 970.5244-1, Management and Operating contractors also follow the DEAR

  12. Acquisition Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Program Acquisition Program Southeastern's acquisition initiatives are met as a result of requirements from our programs and projects that accomplish our agency's mission. In order to follow the Federal Acquisition Regulations regarding announcement of acquisition opportunities, all acquisitions that exceed $25,000 will be published electronically by Southeastern Power Administration. Contact Information For more information, please contact Ann Craft Phone: 706.213.3823

  13. IT Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition IT Acquisition computer-957001_960_720.jpg Acquisition The Chief Information Officer (CIO) guides and manages the Department's effective use of information technology (IT) and IT resources. When acquiring IT solutions, the CIO seeks to integrate project, financial, and acquisition management, and quality oversight methods into a cohesive process to achieve program goals. The Acquisition Management Division uses a variety of IT acquisition solutions, managed in an integrated fashion

  14. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 - Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures OPAM Policy Acquisition Guides...

  15. Sustaninable Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sustaninable Acquisition Sustaninable Acquisition Federal agencies are required to give preference to products that are energy efficient, water efficient, made from biobased or ...

  16. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  17. Acquisition Strategy RM

    Energy.gov [DOE]

    The Acquisition Strategy (AS) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the adequacy of the AS prior to approval of CD-1. The...

  18. Data acquisition system

    DOEpatents

    Shapiro, Stephen L.; Mani, Sudhindra; Atlas, Eugene L.; Cords, Dieter H. W.; Holbrook, Britt

    1997-01-01

    A data acquisition circuit for a particle detection system that allows for time tagging of particles detected by the system. The particle detection system screens out background noise and discriminate between hits from scattered and unscattered particles. The detection system can also be adapted to detect a wide variety of particle types. The detection system utilizes a particle detection pixel array, each pixel containing a back-biased PIN diode, and a data acquisition pixel array. Each pixel in the particle detection pixel array is in electrical contact with a pixel in the data acquisition pixel array. In response to a particle hit, the affected PIN diodes generate a current, which is detected by the corresponding data acquisition pixels. This current is integrated to produce a voltage across a capacitor, the voltage being related to the amount of energy deposited in the pixel by the particle. The current is also used to trigger a read of the pixel hit by the particle.

  19. Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Acquisition Workers install a process vessel ventilation system in a facility that houses two tanks for processing decontaminated salt solution at the Saltstone Production Facility at EM’s Savannah River Site. Workers install a process vessel ventilation system in a facility that houses two tanks for processing decontaminated salt solution at the Saltstone Production Facility at EM's Savannah River Site. The Office of Environmental Management (EM) is responsible for

  20. Proceedings of the IMOG (Interagency Manufacturing Operations Group) Numerical Systems Group. 62nd Meeting

    SciTech Connect

    Maes, G.J.

    1993-10-01

    This document contains the proceedings of the 62nd Interagency Manufacturing Operations Group (IMOG) Numerical Systems Group. Included are the minutes of the 61st meeting and the agenda for the 62nd meeting. Presentations at the meeting are provided in the appendices to this document. Presentations were: 1992 NSG Annual Report to IMOG Steering Committee; Charter for the IMOG Numerical Systems Group; Y-12 Coordinate Measuring Machine Training Project; IBH NC Controller; Automatically Programmed Metrology Update; Certification of Anvil-5000 for Production Use at the Y-12 Plant; Accord Project; Sandia National Laboratories {open_quotes}Accord{close_quotes}; Demo/Anvil Tool Path Generation 5-Axis; Demo/Video Machine/Robot Animation Dynamics; Demo/Certification of Anvil Tool Path Generation; Tour of the M-60 Inspection Machine; Distributed Numerical Control Certification; Spline Usage Method; Y-12 NC Engineering Status; and Y-12 Manufacturing CAD Systems.

  1. Ontological leveling and elicitation for complex industrial transactions

    SciTech Connect

    Phillips, L.R.; Goldsmith, S.Y.; Spires, S.V.

    1998-11-01

    The authors present an agent-oriented mechanism that uses a central ontology as a means to conduct complex distributed transactions. This is done by instantiating a template object motivated solely by the ontology, then automatically and explicitly linking each temple element to an independently constructed interface component. Validation information is attached directly to the links so that the agent need not know a priori the semantics of data validity, merely how to execute a general validation process to satisfy the conditions given in the link. Ontological leveling is critical: all terms presented to informants must be semantically coherent within the central ontology. To illustrate this approach in an industrial setting, they discuss an existing implementation that conducted international commercial transactions on the World-Wide Web. Agents operating within a federated architecture construct, populate by Web-based elicitation, and manipulate a distributed composite transaction object to effect transport of goods over the US/Mexico border.

  2. New Mexico Non-Taxable Transaction Certificate (NM NTTC) Request

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Mexico Non-Taxable Transaction Certificate (NM NTTC) Request This form is for vendors of Los Alamos National Laboratory. To request a NM Non-Taxable Transaction Certificate (NTTC), please provide the information requested below. Request can be submitted by mail, email or fax to: Los Alamos National Laboratory P.O. Box 1663 Accounts Payable, MS P240 Los Alamos, NM 87545 Fax: (505) 665-8357 processsupport@lanl.gov Company Name (as registered with Tax Authority) NOTE: If registered with the State

  3. Method and apparatus for managing transactions with connected computers

    DOEpatents

    Goldsmith, Steven Y.; Phillips, Laurence R.; Spires, Shannon V.

    2003-01-01

    The present invention provides a method and apparatus that make use of existing computer and communication resources and that reduce the errors and delays common to complex transactions such as international shipping. The present invention comprises an agent-based collaborative work environment that assists geographically distributed commercial and government users in the management of complex transactions such as the transshipment of goods across the U.S.-Mexico border. Software agents can mediate the creation, validation and secure sharing of shipment information and regulatory documentation over the Internet, using the World-Wide Web to interface with human users.

  4. Sustainable Acquisition Developments

    Energy.gov [DOE]

    The Administration continues its emphasis on sustainable acquisition. Attached are 2 letters describing recent developments. The first is dated October 5, 2011, from OFPP Administrator, Daniel Gordon, describing the 95% goal, emphasizing the importance of the program and forecasting changes in the Federal Procurement Data System. Second is a letter from the Defense Procurement and Acquisition Policy Office dated October 4, 2011, furnishing some details regarding changes being made in the Federal Procurement Data System to better enable report of accomplishments. Expect to receive more information from the Information Systems Division of the OCIO as the FPDS changes are made.

  5. LEGS data acquisition facility

    SciTech Connect

    LeVine, M.J.

    1985-01-01

    The data acquisition facility for the LEGS medium energy photonuclear beam line is composed of an auxiliary crate controller (ACC) acting as a front-end processor, loosely coupled to a time-sharing host computer based on a UNIX-like environment. The ACC services all real-time demands in the CAMAC crate: it responds to LAMs generated by data acquisition modules, to keyboard commands, and it refreshes the graphics display at frequent intervals. The host processor is needed only for printing histograms and recording event buffers on magnetic tape. The host also provides the environment for software development. The CAMAC crate is interfaced by a VERSAbus CAMAC branch driver.

  6. Acquisition Letter Archive Listing

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Letter Archive Listing 1 Acquisition Letter Title 1984-1R Rev. 12/92 Acquisition Letters 1987-3R Rev. 12/87 Prescreening Policies and Procedures 1987-5 09/04/87 Patents and Technical Data 1988-1 05/25/88 Rights in Technical Data Facilities 1990-3R Rev. 11/30/92 Internal Audit 1991-05 08/06/91 Guidance on Implementing DOE Fee Policy 1991-08 10/23/91 Special Considerations - Educational Institutions 1991-3 Undated Subcontractor Representations and Certifications - Coverage canceled by 59 FR 24357

  7. Transactive Controls R&D Overview - 2016 BTO Peer Review | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Transactive Controls R&D Overview - 2016 BTO Peer Review Transactive Controls R&D Overview - 2016 BTO Peer Review Presenter: Joseph Hagerman, U.S. Department of Energy This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office's Transactive Controls R&D (Tx-R&D) Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs. 2016 BTO Peer Review Presentation-Transactive

  8. The TSCA interagency testing committee`s approaches to screening and scoring chemicals and chemical groups: 1977-1983

    SciTech Connect

    Walker, J.D.

    1990-12-31

    This paper describes the TSCA interagency testing committee`s (ITC) approaches to screening and scoring chemicals and chemical groups between 1977 and 1983. During this time the ITC conducted five scoring exercises to select chemicals and chemical groups for detailed review and to determine which of these chemicals and chemical groups should be added to the TSCA Section 4(e) Priority Testing List. 29 refs., 1 fig., 2 tabs.

  9. Capturing and using precise semantics for complex transactions

    SciTech Connect

    Phillips, L.R.; Goldsmith, S.Y.; Spires, S.V.

    1998-08-01

    In this paper the authors discuss the leveling process by which a business process ontology is formed in a distributed, multi-lingual, multi-stakeholder environment, with attention to realizing elicitation mechanisms that maintain registration of users` terms with the common ontology. Business processes are recognized from use-case analysis, specified in terms of the common ontology, and realized as operations on the components of a transaction: a temporally extended, complex, distributed object. A primary advantage of this approach is that users see private terminologies while the transaction object is specified in terms of the common ontology, and registration between the two is automatic and continuous. Ready realization of multiple interfaces to stakeholders, independently constructed validation and verification mechanisms, distributed data, and a standard elicitation mechanism and process are other advantages. The language formation process was used successfully during the development of the Border Trade Facilitation System, an agent-oriented mechanism that conducts international border-crossing transactions. In this implementation, agents operating within a federated architecture construct, populate, verify, certify, and manipulate a distributed composite transaction object to effect transport of goods over the US/Mexico border.

  10. Transactive Controls R&D — 2016 BTO Peer Review

    Energy.gov [DOE]

    This presentation at the 2016 Peer Review provided an overview of the Building Technologies Office’s Transactive Controls R&D (Tx-R&D) Program. Through robust feedback, the BTO Program Peer Review enhances existing efforts and improves future designs.

  11. Automated Measurement and Signaling Systems for the Transactional Network

    SciTech Connect

    Piette, Mary Ann; Brown, Richard; Price, Phillip; Page, Janie; Granderson, Jessica; Riess, David; Czarnecki, Stephen; Ghatikar, Girish; Lanzisera, Steven

    2013-12-31

    The Transactional Network Project is a multi-lab activity funded by the US Department of Energy?s Building Technologies Office. The project team included staff from Lawrence Berkeley National Laboratory, Pacific Northwest National Laboratory and Oak Ridge National Laboratory. The team designed, prototyped and tested a transactional network (TN) platform to support energy, operational and financial transactions between any networked entities (equipment, organizations, buildings, grid, etc.). PNNL was responsible for the development of the TN platform, with agents for this platform developed by each of the three labs. LBNL contributed applications to measure the whole-building electric load response to various changes in building operations, particularly energy efficiency improvements and demand response events. We also provide a demand response signaling agent and an agent for cost savings analysis. LBNL and PNNL demonstrated actual transactions between packaged rooftop units and the electric grid using the platform and selected agents. This document describes the agents and applications developed by the LBNL team, and associated tests of the applications.

  12. GridWise Transactive Energy Framework (DRAFT Version)

    SciTech Connect

    Melton, Ronald B.

    2013-11-06

    Over the past decade, the use of demand response and other flexible distributed resources for market efficiency and grid reliability has grown dramatically. Federal and state policy objectives point to an important role for customers loads, generation and storage in the management of an increasingly unpredictable power system. As we consider the need to substantially scale the use of flexible distributed energy resources, there has been growing attention to the need to address not only the economics, but also the control system implications to ensure grid reliability. This has led to a focus on an area of activity called Transactive Energy. Transactive Energy refers to the combination of economic and control techniques to improve grid reliability and efficiency. These techniques may also be used to optimize operations within a customers facility. The Department of Energy has supported the GridWise Architecture Council (the Council) in developing a conceptual framework that can be used in developing architectures, and designing solutions related to transactive energy. The goal of this effort is to encourage and facilitate collaboration among the many stakeholders involved in the transformation of the power system and thereby advance the practical implementation of transactive energy.

  13. POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    23 Acquisition Guide 13.3 Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures Questions concerning this policy flash...

  14. Acquisition Guide 13.3 Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide is revised to provide a knowledge base that may support the increase of single purchase limits based on the criteria established by the Federal Acquisition Regulations...

  15. Conduct and results of the Interagency Nuclear Safety Review Panel's evaluation of the Ulysses space mission

    SciTech Connect

    Sholtis, J.A. Jr. ); Gray, L.B. ); Huff, D.A. ); Klug, N.P. ); Winchester, R.O. )

    1991-01-01

    The recent 6 October 1990 launch and deployment of the nuclear-powered Ulysses spacecraft from the Space Shuttle {ital Discovery} culminated an extensive safety review and evaluation effort by the Interagency Nuclear Safety Review Panel (INSRP). After more than a year of detailed independent review, study, and analysis, the INSRP prepared a Safety Evaluation Report (SER) on the Ulysses mission, in accordance with Presidential Directive-National Security Council memorandum 25. The SER, which included a review of the Ulysses Final Safety Analysis Report (FSAR) and an independent characterization of the mission risks, was used by the National Aeronautics and Space Administration (NASA) in its decision to request launch approval as well as by the Executive Office of the President in arriving at a launch decision based on risk-benefit considerations. This paper provides an overview of the Ulysses mission and the conduct as well as the results of the INSRP evaluation. While the mission risk determined by the INSRP in the SER was higher than that characterized by the Ulysses project in the FSAR, both reports indicated that the radiological risks were relatively small. In the final analysis, the SER proved to be supportive of a positive launch decision. The INSRP evaluation process has demonstrated its effectiveness numerous times since the 1960s. In every case, it has provided the essential ingredients and perspective to permit an informed launch decision at the highest level of our Government.

  16. Interagency Advanced Power Group (IAPG) meeting compendium. October 1991--December 1992

    SciTech Connect

    Not Available

    1993-01-01

    Under the direction of the Interagency Advanced Power Group (IAPG), the Power Information Center (PIC) provides support services for each IAPG information exchange session. IAPG members meet a minimum of once each year to share programmatic and technical information on federally funded research and development (R&D) projects in the area of advanced power. This R&D is directed by one of the five IAPG member agencies-the US Army, US Navy, US Air Force, US Department of Energy, and the National Aeronautics and Space Administration. Affiliated Federal groups and federally funded research and development centers can also participate. To enhance the exchange of information between Government researchers, this 1992 IAPG Meeting Compendium has been assembled. This publication is a re-printing of abstracts of each IAPG presentation offered during 1991-1992. The information is arranged chronologically by IAPG meeting. During the 1992 IAPG meeting year, there were presentations restricted to Government audiences only. These ``Restricted`` minutes have not been included in this compilation.

  17. Performance-Based Services Acquisition

    Energy.gov [DOE] (indexed site)

    Services Acquisition Reference: Public Law 106-398, 821, FAR 37.6 1.0 Summary of ... Federal acquisition law has established a preference for PBSA, which improves procurement ...

  18. Acquisition Letters | Department of Energy

    Energy.gov [DOE] (indexed site)

    August 11, 2006 Acquisition Letter No. AL 2006-10 Class Deviation for Certain DEAR Intellectual Property Clauses October 24, 1993 Acquisition Letter No. AL 1994-19 Basic...

  19. Acquisition Letters Remaining In Effect

    Energy.gov [DOE]

    From Acquisition Letter (Acquisition Letters (AL) that remain in effect are identified below. All other previously issued Als have been superseded by a formal rule-making, incorporated into other guidance, and/or canceled.)

  20. Performance Based Service Acquisition Toolkit

    Energy.gov [DOE]

    Performance-based Service Acquisition (PBA) means an acquisition structured around the results to be achieved as opposed to the manner by which the work is to be performed.

  1. Data acquisition instruments: Psychopharmacology

    SciTech Connect

    Hartley, D.S. III

    1998-01-01

    This report contains the results of a Direct Assistance Project performed by Lockheed Martin Energy Systems, Inc., for Dr. K. O. Jobson. The purpose of the project was to perform preliminary analysis of the data acquisition instruments used in the field of psychiatry, with the goal of identifying commonalities of data and strategies for handling and using the data in the most advantageous fashion. Data acquisition instruments from 12 sources were provided by Dr. Jobson. Several commonalities were identified and a potentially useful data strategy is reported here. Analysis of the information collected for utility in performing diagnoses is recommended. In addition, further work is recommended to refine the commonalities into a directly useful computer systems structure.

  2. Acquisition Guide Chapter 1.0 - Acquisition Regulations System | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Acquisition Guide Chapter 1.0 - Acquisition Regulations System Acquisition Guide Chapter 1.0 - Acquisition Regulations System 1.1_Acquisition_Regulation_System_0.pdf (80.8 KB) 1.2_Head_of_Contracting_Activity_(HCA)_Authority,_Functions,_and_Responsibilities_0.pdf (25.78 KB) 1.2_Attachment_Tables_I-IV_0.pdf (29.11 KB) 1.3_Balanced_Scorecard_Assessment_Program_0.pdf (31.8 KB) PF2015-39a - Attachment - Acq Guide Chapter 1.4_Establishing_the_Position_of_Source_Evaluation_Board_(SEB)

  3. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Environmental Management (EM)

    Archive listing Acquisition Letter Archive listing TO RECEIVE A COPY OF AN ARCHIVED ACQUISITION LETTER (AL), PLEASE USE THE PDF FILE BELOW TO SEARCH FOR THE AL NAME/NUMBER AND SEND IT IN TO DOE_OAPMPOLICY@HQ.DOE.GOV. Acquisition Letter Archive listing.pdf (86.37 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

    NO. AL 2016-05 Acquisition Letter NO. AL 2016-05 DATE: May 3, 2016 TO:

  4. new-software-acquisitions

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Software Acquisitions The National Highway Traffic Safety Administration (NHTSA) plans to expand the use of the TRACC cluster. NHTSA's Human Injury Research Division (HIRD) does a lot of work related to real world crash reconstruction. For reconstruction purposes, HIRD uses two different software modules: MADYMO and modeFrontier. Optimization is performed using modeFrontier. Since optimization studies require a lot of simulations, HIRD will use TRACC's cluster with MADYMO and modeFrontier

  5. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    75.04 KB) More Documents & Publications DOE Acquisition Guide Chapter 15.1 Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Templates

  6. Walnut Capital Acquisitions | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Walnut Capital Acquisitions Jump to: navigation, search Name: Walnut Capital Acquisitions Place: Pittsburgh, Pennsylvania Zip: 15232 Product: Walnut Capital Acquisitions is the...

  7. Acquisition Letter No. AL 2015-03

    Office of Energy Efficiency and Renewable Energy (EERE)

    Statutory Requirements for Congressional Notifications or Quarterly Reporting to the Appropriations Committees for Contract, Financial Assistance, or Other Transaction Agreement Actions. - Revised 08/03/2015

  8. Customer Engagement in AEP gridSMART Residential Transactive System

    SciTech Connect

    Widergren, Steven E.; Marinovici, Maria C.; Fuller, Jason C.; Subbarao, Krishnappa; Chassin, David P.; Somani, Abhishek

    2014-12-31

    — In 2013, AEP Ohio (AEP) operated a 5-minute real-time price (RTP) electricity market system on 4 distribution feeders as part of their gridSMART® demonstration project. The RTP households were billed for their electricity usage according to an RTP tariff approved by the Public Utility Commission of Ohio. They were given the incentive that their annual bill would be no greater than if they were on the flat-rate tariff, but they had financial incentives to shift consumption from high price periods to low price periods. Incentives were also available for response under high prices from local events, such as reaching the distribution feeder capacity or a critical peak pricing event. An analysis of this transactive system experiment was completed in early 2014. This paper describes the incentive provided to the customer, the nature of their interaction with the smart thermostat that provided automated response to the transactive signal, and their level of satisfaction with the program.

  9. Background Fact Sheet Transfer of Depleted Uranium and Subsequent Transactions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Background Fact Sheet Transfer of Depleted Uranium and Subsequent Transactions At the direction of Energy Secretary Steven Chu, over many months, the Energy Department (DOE) has been working closely with Energy Northwest (ENW), the Tennessee Valley Authority (TVA), and USEC Inc. (USEC) to develop a plan to address the challenges at USEC's Paducah Gaseous Diffusion Plant (GDP) that advances America's national security interests, protects taxpayers, and provides benefits for TVA and the Bonneville

  10. Acquisition and Project Management Continuous Improvement Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management ...

  11. Data acquisition system

    DOEpatents

    Phillips, David T.

    1979-01-01

    A data acquisition system capable of resolving transient pulses in the subnanosecond range. A pulse in an information carrying medium such as light is transmitted through means which disperse the pulse, such as a fiber optic light guide which time-stretches optical pulses by chromatic dispersion. This time-stretched pulse is used as a sampling pulse and is modulated by the signal to be recorded. The modulated pulse may be further time-stretched prior to being recorded. The recorded modulated pulse is unfolded to derive the transient signal by utilizing the relationship of the time-stretching that occurred in the original pulse.

  12. Acquisition Strategy RM

    Office of Environmental Management (EM)

    Acquisition Strategy Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Acquisi Rev Critical Decis CD-2 M ONMENTAL Review Plan ition Stra view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) ategy e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of

  13. Key FAR: Federal Acquisition Regulation DEAR: DOE Acquisition...

    Office of Environmental Management (EM)

    1991-AB82 Acquisition Regulation: Patents, Data, and Copyrights- The proposed rule updates, clarifies and streamlines text in certain DOE intellectual property and technology ...

  14. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition News Acquisition News RSS October 17, 2016 DOE Releases Request for Information/Sources Sought for the Savannah River Site Operations Acquisition (Post FY 2018) Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Request for Information (RFI) /Sources Sought in support the upcoming follow-on procurement for the management and operation (M&O) of the Savannah River Site (SRS). October 17, 2016 CH2M President

  15. Acquisition Forecast | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Forecast Acquisition Forecast Acquisition Forecast It is the policy of the U.S. Department of Energy (DOE) to provide timely information to the public regarding DOE's forecast of future prime contracting opportunities and subcontracting opportunities which are available via the Department's major site and facilities management contractors. This forecast has been expanded to also provide timely status information for ongoing prime contracting actions that are valued in excess of the

  16. DOE Issues Guidance for "Other Transactions" | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Guidance for "Other Transactions" DOE Issues Guidance for "Other Transactions" November 15, 2005 - 12:42pm Addthis Provides Opportunity for Increased Industry Research Partnerships WASHINGTON, DC - On November 7, 2005, the Department of Energy (DOE) issued an interim final rule for the establishment of policies and procedures for a new "other transaction" authority. This authority allows DOE to remove barriers to commercial firms' participation in some of DOE's

  17. Acquisition Savings Reporting Process Template

    Energy.gov [DOE] (indexed site)

    steps, then it is an Other Acquisition Savings process. 2 STEP 2 - Select Savings Methodology (In Order of Preference) Regardless if it is Strategic Sourcing or an Other...

  18. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    all options). October 2, 2015 DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos Cincinnati - The U.S. Department of Energy (DOE)...

  19. "Data Acquisition Systems"

    SciTech Connect

    Unterweger, Michael; Costrell, Louis deceased

    2009-07-07

    This project involved support for Lou Costrell and myself in the development of IEEE and IEC standards for nuclear counting and data acquisition systems. Over the years, as a result of this support, Lou and I were able to attend standards meetings of IEEE and IEC, which led directly to the publication of many standards for NIM systems, FastBus and CAMAC. We also chaired several writing committees as well as ANSI N42 (Nuclear instrumentation), IEEE NIM (NIM standard), IEEE NID (NPSS nuclear instruments and detector) and IEC TC45 WG9 (Nuclear instrumentation). Through this support we were able to assure that the interests of the US and DOE were expressed and implemented in the various standards.

  20. Deepwater seismic acquisition technology

    SciTech Connect

    Caldwell, J.

    1996-09-01

    Although truly new technology is not required for successful acquisition of seismic data in deep Gulf of Mexico waters, it is helpful to review some basic aspects of these seismic surveys. Additionally, such surveys are likely to see early use of some emerging new technology which can improve data quality. Because such items as depth imaging, borehole seismic, 4-D and marine 3-component recording were mentioned in the May 1996 issue of World Oil, they are not discussed again here. However, these technologies will also play some role in the deepwater seismic activities. What is covered in this paper are some new considerations for: (1) longer data records needed in deeper water, (2) some pros and cons of very long steamer use, and (3) two new commercial systems for quantifying data quality.

  1. Acquisition Guide Chapter 7.1 - Acquisition Planning | Department of Energy

    Office of Environmental Management (EM)

    7.1 - Acquisition Planning Acquisition Guide Chapter 7.1 - Acquisition Planning PF2009-22.pdf (320.29 KB) PF2009-22a - Attachment-Acquisition Guide Chapter 7.1 - Acquisition Planning (192.2 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Microsoft Word - AcqGuide7pt1.doc Acquisition Guide Chapter 7.1 - Acquisition Planning

  2. Acquisition Guide Chapter 7.3:Acquisition Planning in the M&O Environment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter 2013-03, Acquisition Planning Considerations for M&O Contracts, has been moved to the Acquisition Guide as chapter (7.3).

  3. Quantifying the Level of Cross-State Renewable Energy Transactions

    Energy.gov [DOE]

    This analysis provides first-ever assessment of the extent to which renewable energy is crossing state borders to be used to meet renewable portfolio standard (RPS) requirements. Two primary methods for data collection are Renewable Energy Certificate (REC) tracking and power flow estimates. Data from regional REC tracking systems, state agencies, and utility compliance reports help understand how cross-state transactions have been used to meet RPS compliance. Data on regional renewable energy flow use generator-specific information primarily sourced from EIA, SNL Energy, and FERC Form 1 filings. The renewable energy examined through this method may or may not have actually been used to meet RPS compliance.

  4. Acquisitions___Communications.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisitions___Communications.pdf Acquisitions___Communications.pdf (2.09 MB) More Documents & Publications 7pt1AcquisitionPlanning.pdf 37pt.2PerformanceBasedServiceAcquisition.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning

  5. Creating a Transactive Energy Framework: Improving Reliability and Efficiency

    SciTech Connect

    Melton, Ronald B.

    2013-11-01

    The use of demand response and other flexible distributed resources over the past decade for market efficiency and grid reliability has grown dramatically. Federal and state policy objectives point to an important role for customer loads, generation and storage in the management of an increasingly unpredictable power system. As we consider the need to substantially scale the use of flexible distributed energy resources, there has been growing attention to the need to address not only the economics, but also the control system implications to ensure grid reliability. This has led to a focus on an area of activity called “Transactive Energy.” Transactive Energy refers to the combination of economic and control techniques that improve grid reliability and efficiency. These techniques may also be used to optimize operations within a customer’s facility. The Department of Energy has supported the GridWise® Architecture Council (“the Council”) to develop a framework to provide opportunity for collaboration among the many stakeholders involved in the transformation of the power system.

  6. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Energy.gov [DOE]

    Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

  7. Report of the Interagency Task Force on Carbon Capture and Storage

    SciTech Connect

    2010-08-01

    Carbon capture and storage (CCS) refers to a set of technologies that can greatly reduce carbon dioxide (CO{sub 2}) emissions from new and existing coal- and gas-fired power plants, industrial processes, and other stationary sources of CO{sub 2}. In its application to electricity generation, CCS could play an important role in achieving national and global greenhouse gas (GHG) reduction goals. However, widespread cost-effective deployment of CCS will occur only if the technology is commercially available and a supportive national policy framework is in place. In keeping with that objective, on February 3, 2010, President Obama established an Interagency Task Force on Carbon Capture and Storage composed of 14 Executive Departments and Federal Agencies. The Task Force, co-chaired by the Department of Energy (DOE) and the Environmental Protection Agency (EPA), was charged with proposing a plan to overcome the barriers to the widespread, cost-effective deployment of CCS within ten years, with a goal of bringing five to ten commercial demonstration projects online by 2016. Composed of more than 100 Federal employees, the Task Force examined challenges facing early CCS projects as well as factors that could inhibit widespread commercial deployment of CCS. In developing the findings and recommendations outlined in this report, the Task Force relied on published literature and individual input from more than 100 experts and stakeholders, as well as public comments submitted to the Task Force. The Task Force also held a large public meeting and several targeted stakeholder briefings. While CCS can be applied to a variety of stationary sources of CO{sub 2}, its application to coal-fired power plant emissions offers the greatest potential for GHG reductions. Coal has served as an important domestic source of reliable, affordable energy for decades, and the coal industry has provided stable and quality high-paying jobs for American workers. At the same time, coal-fired power

  8. Acquisition Guide Chapter 7.1 – Acquisition Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 7.1 is revised to update references, reorganize content, delete M&O coverage (which will be moved to a separate Guide Chapter), and add a new "Alternate Approval Process".

  9. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    & Publications Policy Flash 2016-29 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash ...

  10. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  11. Key FAR: Federal Acquisition Regulation DEAR: DOE Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    as of 11/4/2016. Highlighted areas denote changes from the last update. Key FAR: Federal Acquisition Regulation DEAR: DOE Acquisition Regulation For the official and most up to date status of a specific rule, please see the Federal Register at https://www.regulations.gov/. Regulation Identifier Number Title/Subject/Purpose Rule Type Status 1901-AB37 Enforcement of Classified Information Security Requirements: The proposed rule amends DOE's statutory prescribed regulation, which sets forth the

  12. Acquisition Guide Chapter 1.0 - Acquisition Regulations System | Department

    Energy Saver

    Procurement Enterprise System (STRIPES) | Department of Energy Financial Assistance Letter No.2010-03 Strategic Integrated Procurement Enterprise System (STRIPES) Acquisition Financial Assistance Letter No.2010-03 Strategic Integrated Procurement Enterprise System (STRIPES) Attached is the subject AL/FAL which prescribes requirements and guidance pertaining to the Department's implementation and use of STRIPES. PF2010-19 Acquisition Financial Assistance Letter No. 2010-03 Strategic

  13. Perspective & Acquisition Fellows Program - David Klaus, Deputy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Perspective & Acquisition Fellows Program - David Klaus, Deputy Under Secretary for Management and Performance Perspective & Acquisition Fellows Program - David Klaus, Deputy Under ...

  14. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 30 - Cost Accounting Standards Administration Policy Flash 2015-05 - Acquisition Letter 2015-02 Acquisition Letter No. AL 2015-02

  15. Acquisition Workforce Information | Department of Energy

    Office of Environmental Management (EM)

    All Acquisition Workforce information has been moved to Powerpedia - Acquisition Workforce. Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real ...

  16. 7.0 - Integrated Acquisition Planning Process

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7.0 (August 2006) 1 INTEGRATING ACQUISITION PLANNING PROCESSES - AN OVERVIEW REFERENCES 1. FAR Part 7 Acquisition Planning 2. FAR Part 34 Major System Acquisition 3. Acquisition Letter 2005-08R, Small Business Programs 4. Acquisition Guide Chapter 7.1, Acquisition Planning 5. Acquisition Guide Chapter 42.5, Contract Management Planning 6. DOE O 580.1 Department of Energy Property Management Program 7. DOE O 413.3 Program and Project Management for the Acquisition of Capital Assets Guiding

  17. Port Asset Acquisition LLC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Acquisition LLC Jump to: navigation, search Name: Port Asset Acquisition LLC Place: Louisiana Product: PAA was formed to acquire a fuel terminal, tanks and land in Alexandria,...

  18. Federal Acquisition Circular 2005-53

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-53 which makes miscellaneous changes to the Federal Acquisition Regulation.

  19. Federal Acquisition Circular 2005-39

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-39 which makes miscellaneous changes to the Federal Acquisition Regulation.

  20. Searchable Electronic Department of Energy Acquisition Regulation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Searchable Electronic Department of Energy Acquisition Regulation Searchable Electronic Department of Energy Acquisition Regulation Updated July 2, 2013. The EDEAR is current ...

  1. Department of Energy Acquisition Regulation (DEAR) Technical...

    Energy.gov [DOE] (indexed site)

    of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  2. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    25 KB) More Documents & Publications Chapter 33 - Protests, Disputes and Appeals Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution ACQUISITION LETTER DEAR Part 933

  3. Chapter 39 - Acquisition of Information Technology | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    39 - Acquisition of Information Technology Chapter 39 - Acquisition of Information Technology PDF icon 39.1AcquisitionofInformationResources0.pdf PDF icon ...

  4. Trans India Acquisition Corporation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    India Acquisition Corporation Jump to: navigation, search Name: Trans-India Acquisition Corporation Place: Delaware Sector: Solar Product: Blank check company to be merged with...

  5. Acquisition Letters Remaining In Effect

    Energy.gov [DOE]

    Acquisition Letter (AL) 2010-07 has been issued. It lists ALs currently in effect and the discontinued ALs along with the reason why the AL is no longer in effect.

  6. Acquisition Letters Remaining In Effect

    Energy.gov [DOE]

    Acquisition Letter (AL) 2012-01 has been issued. It lists ALs currently in effect and the discontinued ALs, along with the reason why the AL is no longer in effect.

  7. Sustainable Acquisition | Department of Energy

    Energy.gov [DOE] (indexed site)

    The U.S. Department of Energy's (DOE) Sustainable Acquisition Program serves to ensure the purchase of more sustainable products by working with DOE sites to help them integrate ...

  8. Acquisition Letters | Department of Energy

    Energy.gov [DOE] (indexed site)

    2005 June 22, 2012 Acquisition Letter No. AL 2012-09 Guidance for Fast-Track Cooperative Research And Development Agreement (CRADA) Programs at DOE Facilities. previous 1 2 next...

  9. Performance-Based Services Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7.601 August 2016 ______________________________________________________________________________ 1 Performance-Based Services Acquisition [Reference: Public Law 106-398, § 821, FAR 37.6] 1.0 Summary of Latest Changes This update: (1) changes the chapter number from 37.2 to 37.601 to coincide with the FAR, (2) updates references, and (3) includes administrative changes. 2.0 Discussion This chapter supplements other more primary acquisition regulations and policies contained in the references

  10. Acquisition Templates | Department of Energy

    Office of Environmental Management (EM)

    Templates Acquisition Templates On September 28, 2010, four draft acquisition templates (Competitive Range Exclusion Letter, Competitive Range Inclusion Letter - Written Discussions, Competitive Range Inclusion Letter - Written and Oral Discussions, and Proposal Receipt Checklist) were distributed for Procurement Director (PD) and Head of Contracting Activity (HCA) review and comment. All comments received were considered and changes were made as appropriate. The final versions of the four

  11. Acquisition Savings Reporting Template Guidance

    Energy.gov [DOE]

    As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting acquisition savings/cost avoidance data effective as of October 1, 2012.

  12. acquisition | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    acquisition Small Business Sourcing System NNSA is implementing a system housing small businesses that have participated in our Opportunity Sessions, and have completed the NNSA Capabilities Questionnaire.Information is gathered relevant to the performance of each small business and included in the system. Among the information... Procurement The NNSA's Office of Acquisition & Project Management (APM) offers an 18-36 month procurement forecast that uses information obtained through the NNSA

  13. FAR Acquisition Strategy Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FAR Acquisition Strategy Team FAR Acquisition Strategy Team FAR Acquisition Strategy Team (184.09 KB) More Documents & Publications FAR Acquisition Strategy Team Microsoft Word - Section 311 AL FAL Feb 17 2010 Congressional Notification of Pending Contract or Financial Assistance Actions In excess of $1 Million under the Continuing Resolution

  14. Acquisition and Project Management Continuous Improvement Presentation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management Continuous Improvement. Acquisition and Project Management Continuous Improvement presentation (1.43 MB) More Documents & Publications Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project

  15. Acquisition Forecast Download | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Forecast Download Acquisition Forecast Download Click on the link to download a copy of the DOE HQ Acquisition Forecast. Acquisition-Forecast-2016-11-10.xlsx (70.03 KB) More Documents & Publications National Nuclear Security Administration - Juliana Heynes Small Business Program Manager Directory EA-1900: Notice of Availability of a Draft Environmental Assessment

  16. Acquisition Workforce Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certifications and Professional Development » Acquisition Workforce Information Acquisition Workforce Information All Acquisition Workforce information has been moved to Powerpedia - Acquisition Workforce. Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications Facilities and Infrastructure Federal Advisory Committee Management Freedom of Information Act Financial Assistance Information Systems Property Procurement and

  17. Commercial considerations in conversion and UF{sub 6} transactions

    SciTech Connect

    1994-02-01

    This article addresses various commercial considerations that result from the conversion of U3O8 into UF6 and the associated physical characteristics of natural UF6. Handling, transport, conversion, and enrichment of UF6 are discussed. Avenues of acquisition, including nation of origin, are also noted.

  18. EA-1376: Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory, Los Alamos, NM

    Energy.gov [DOE]

    Proposed Construction and Operation of a New Interagency Emergency Operations Center at Los Alamos National Laboratory, Los Alamos, NMThe Proposed Action is the construction and operation of a new Interagency Emergency Operations Center (Center) at Technical Area 69. The new Center would include a 30,000-square-foot (2,700-square-meter) facility, a garage, a 130-car parking lot, and a 150-foot (45-meter) tall fire suppression water storage tank with antenna attachments on about a 5-acre (2-hectare) site. The new Center would be designed as a state-of-the-art multi-use facility housing about 30 fulltime University of California and Los Alamos County (or their contractor) staff.

  19. Department of Energy Acquisition Regulation (DEAR) Technical

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Amendment-Final Rule | Department of Energy Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule PF2009-66.pdf (171.29 KB) PF2009-66a - Attachment-Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C Department of Energy Acquisition

  20. acquisition management | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    management NNSA Office of Acquisition Management improves customer satisfaction (Click to view graph full-size.) Established in 2011, the NNSA Office of Acquisition and Project Management (NA-APM) has a crosscutting role within the NNSA to deliver best value acquisitions and manage projects on budget and schedule. Nearly ninety percent of all NNSA mission work is... Acquisition Management The Office of Acquisition Management supports NNSA's efforts to: Reduce Nuclear Dangers; Manage the nuclear

  1. Waste status and transaction record summary for the northwest quadrant of the Hanford 200 Area

    SciTech Connect

    Agnew, S.F.; Corbin, R.A.; Duran, T.B.; Jurgensen, K.A.; Ortiz, T.P.; Young, B.L.

    1995-09-01

    This supporting document contains a database of waste transactions and waste status reports for all the waste tanks in the northwest quadrant of the 200 West Area of the Hanford Site.

  2. An ANFIS-based on B2C electronic commerce transaction

    SciTech Connect

    Lin, Juan; Liu, Chenlian; Guo, Yongning

    2014-10-06

    The purpose of this study is to use an adaptive-network-based fuzzy inference system to model a fuzzy logic-based system (FIS) for supporting decision-making process in B2C electronic commerce transaction. Firstly we introduce FIS in B2C electronic commerce transaction and ANFIS. Then we use ANFIS to model FIS with different membership functions(MF). Lastly we give a conclusion.

  3. Pathway to Fuel Cell Deployment--The 3rd Party Transaction: A Vehicle to

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Implementation | Department of Energy to Fuel Cell Deployment--The 3rd Party Transaction: A Vehicle to Implementation Pathway to Fuel Cell Deployment--The 3rd Party Transaction: A Vehicle to Implementation Presented at the Renewable Hydrogen Workshop, Nov. 16, 2009, in Palm Springs, CA renewable_hydrogen_workshop_nov16_damberger.pdf (27.48 MB) More Documents & Publications Biogas Markets and Federal Policy Biomass Program Perspectives on Anaerobic Digestion and Fuel Cell Integration at

  4. Challenges and Opportunities for Transactive Control of Electric Vehicle Supply Equipment. A Reference Guide

    SciTech Connect

    Jin, Xin; Meintz, Andrew

    2015-07-29

    This report seeks to characterize the opportunities and challenges that arise in developing a transactive control strategy for grid-EVSE integration in various use-case scenarios in a way that provides end-user, energy market, grid, and societal benefits. A detailed review provides information about EVSE integration market trends and stakeholder activities. This is followed by an exploration of value proposition for transactive control of EVSE at both the home scale and the building/campus scale. This report will serve as a reference guide for stakeholders in the grid-EVSE integration area, illustrate potential implementations, and identify a high-value research project for overcoming the barriers and unlocking the benefits of transactive controls of EVSE. While it is not intended to specify the technical details of the transactive control solution, the report contains a list of use cases describing potential applications of transactive control of EVSE, barriers to implementing these applications, and research and development (R&D) opportunities to overcome the barriers. The use cases of transactive control of EVSE are listed in Table ES1.

  5. Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached Acquisition Letter is issued to provide updated guidance on the unique acquisition planning procedures associated with management and operating (M%26O) contracts. Acquisition Letter 2009-3 is cancelled.

  6. DOE Acquisition Guide Chapter 23

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this flash is to provide you an updated copy of the DOE Acquisition Guide Chapter 23. The Chapter has been updated to reflect the more recent requirements of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance which updates Executive Order 13423.

  7. Acquisition Guide Chapter 37.601 - Performance-Based Services Acquisition |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 7.601 - Performance-Based Services Acquisition Acquisition Guide Chapter 37.601 - Performance-Based Services Acquisition DATE: August 15, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 37.601, Performance-Based Services Acquisition SUMMARY: The subject guide chapter has been revised to change the chapter number from 37.2

  8. Acquisition Guide Chapter 1.1- Acquisition Regulations System- (March 2004)

    Energy.gov [DOE]

    This section discusses the Civilian Agency Acquisition Council, agency acquisition regulations, deviations from the FAR and DEAR, ratification of unauthorized commitments, and Contracting Officers and their representatives.

  9. Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

    Energy.gov [DOE]

    The Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate, is updated to include the involvement of Certified Realty Specialist.

  10. Update of Acquisition Guide Chapter 7.1, Acquisition Planning | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy of Acquisition Guide Chapter 7.1, Acquisition Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning A new section has been added to the Background segment of Acquisition Guide Chapter 7.1, Acquisition Planning, to emphasize the importance of collaboratively establishing acquisition lead time schedules reflecting firm commitments. A marginal line has been added to note the new material at pages 5 through 7. PF2010-53 Update of Acquisition Guide Chapter 7.1,

  11. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1

    Energy.gov [DOE]

    Acquisition Guide Chapter 7.1 is revised to update references to DOE orders from 413.3A to 413.3B and 430.2A to 436.1 and DOE manual 413.3-1 to DOE Guide 413.3-13. Revisions to references for the DOE orders and DOE Guide are identified by vertical lines in the left margin.

  12. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures PDF icon 13.2PurchaseOrders0.pdf PDF...

  13. Chapter 39 - Acquisition of Information Technology | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 - Acquisition of Information Technology Chapter 39 - Acquisition of Information Technology PDF icon 39.1AcquisitionofInformationResources0.pdf PDF icon 39.2GuidanceonElec...

  14. Update to Congressional Notifications - Acquisition Guide Chapter...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Since we previously notified you in Policy Flash 2012-44 for Congressional notifications, ... Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2016-29 DOE F ...

  15. Chapter 18 - Emergency Acquisitions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon 18.0EmergencyAcquisitions0.pdf More Documents & Publications Acqguide18pt0 March 2011 final OPAM Policy Acquisition Guides Microsoft Word - acqguide18pt0 Nov 2010...

  16. Federal Acquisition Circular 2005-58

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-58 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on April 18, 2012 at 77 FR 23363.

  17. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Guide Chapter 1.0 - Acquisition Regulations System Acquisition Guide Chapter 1.2 - Attachment - Non-Delegable HCA Functions and Responsibilities Microsoft Word - AcqGuide71pt1.doc

  18. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    35.9 KB) More Documents & Publications Revision to Acquisition Guide Chapter 33.1, Protests Chapter 33 - Protests, Disputes and Appeals Acquisition Guide Chapter 1.2 - Attachment - Non-Delegable HCA Functions and Responsibilities

  19. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    48.87 KB) More Documents & Publications Chapter 15 - Contracting by Negotiation Revised DOE Acquisition Guide Chapter 15.4-2 Weighted Guidelines (July 201 0) Acquisition Letter No. AL 2009-01

  20. Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    Federal Acquisition Circular 2005-37, which makes miscellaneous changes to the Federal Acquisition Regulation, was published in the October 14,2009, issue of the Federal Register. A summary of the changes is attached.

  1. Plutonium: The first 50 years. United States plutonium production, acquisition, and utilization from 1944 through 1994

    SciTech Connect

    1996-02-01

    The report contains important newly declassified information regarding the US production, acquisition, and removals of plutonium. This new information, when combined with previously declassified data, has allowed the DOE to issue, for the first time, a truly comprehensive report on the total DOE plutonium inventory. At the December 7, 1993, Openness Press Conference, the DOE declassified the plutonium inventories at eight locations totaling 33.5 metric tons (MT). This report declassifies the remainder of the DOE plutonium inventory. Newly declassified in this report is the quantity of plutonium at the Pantex Site, near Amarillo, Texas, and in the US nuclear weapons stockpile of 66.1 MT, which, when added to the previously released inventory of 33.5 MT, yields a total plutonium inventory of 99.5 MT. This report will document the sources which built up the plutonium inventory as well as the transactions which have removed plutonium from that inventory. This report identifies four sources that add plutonium to the DOE/DoD inventory, and seven types of transactions which remove plutonium from the DOE/DoD inventory. This report also discusses the nuclear material control and accountability system which records all nuclear material transactions, compares records with inventory and calculates material balances, and analyzes differences to verify that nuclear materials are in quantities as reported. The DOE believes that this report will aid in discussions in plutonium storage, safety, and security with stakeholders as well as encourage other nations to declassify and release similar data. These data will also be available for formulating policies with respect to disposition of excess nuclear materials. The information in this report is based on the evaluation of available records. The information contained in this report may be updated or revised in the future should additional or more detailed data become available.

  2. Transactive Control and Coordination of Distributed Assets for Ancillary Services

    SciTech Connect

    Subbarao, Krishnappa; Fuller, Jason C.; Kalsi, Karanjit; Somani, Abhishek; Pratt, Robert G.; Widergren, Steven E.; Chassin, David P.

    2013-09-18

    The need to diversify energy supplies, the need to mitigate energy-related environmental impact, and the entry of electric vehicles in large numbers present challenges and opportunities to power system professionals. Wind and solar power provide many benefits, and to reap the benefits the resulting increased variability—forecasted as well as unforecasted—should be addressed. Demand resources are receiving increasing attention as one means of providing the grid balancing services. Control and coordination of a large number (~millions) of distributed smart grid assets requires innovative approaches. One such is transactive control and coordination (TC2)—a distributed, agent-based incentive and control system. The TC2 paradigm is to create a market system with the following characteristics: • Participation should be entirely voluntary. • The participant decides at what price s/he is willing to participate. • The bids and responses are automated. Such an approach has been developed and demonstrated by Pacific Northwest National Laboratory for energy markets. It is the purpose of this project to develop a similar approach for ancillary services. In this report, the following ancillary services are considered: • spinning reserve • ramping • regulation. These services are to be provided by the following devices: • refrigerators • water heaters • clothes dryers • variable speed drives. The important results are summarized below: The regulation signal can be divided into an energy-neutral high frequency component and a low frequency component. The high frequency component is particularly well suited for demand resources. The low frequency component, which carries energy non-neutrality, can be handled by a combination of generators and demand resources. An explicit method for such a separation is obtained from an exponentially weighted moving average filter. Causal filters (i.e., filters that process only present and past values of a signal

  3. "Paper" Energy Systems Acquisition Advisory Board Process

    Energy.gov [DOE]

    Memo on "Paper" Energy Systems Acquisition Advisory Board Process from Jeffrey F. Kupper, dated January 14, 2009.

  4. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  5. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter: AL2005-08 Microsoft Word - al2004-03.doc Chapter 19 - Small Business Programs...

  6. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    18 - Emergency Acquisitions Acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 Nov 2010...

  7. Acquisition Career Management Program Handbook, Partial Revision...

    Energy.gov [DOE] (indexed site)

    Procurement and Assistance Management SUBJECT: Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative SUMMARY: The...

  8. Acquisition Letter Archive listing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Archive listing Acquisition Letter Archive listing TO RECEIVE A COPY OF AN ARCHIVED ACQUISITION LETTER (AL), PLEASE USE THE PDF FILE BELOW TO SEARCH FOR THE AL NAME/NUMBER AND SEND IT IN TO DOE_OAPMPOLICY@HQ.DOE.GOV. Acquisition Letter Archive listing.pdf (86.37 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

  9. Federal Acquisition Circular 2005-52

    Energy.gov [DOE]

    Attached for your information is a summary of rules incorporated in the FAR by Federal Acquisition Circular 2005-52.

  10. Acquisition Certifications Handbook 4th edition released

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Acquisition Certifications Program Handbook 4th Edition is released with latest content related to Realty Specialist chapter.

  11. Acquisition and the Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition » Guidance » Acquisition and the Environment Acquisition and the Environment The information provide on these pages are meant to be resource and tool for the DOE acquisition community. Please share suggestions for its further development and improvement. Provide your comments to Richard Langston at (202) 287-1339, or e-mail them to richard.langston@hq.doe.gov GREEN PURCHASING OVERVIEW The White House Task Force on Recycling along with the US Army Center for Health Promotion and

  12. Procurement and Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Procurement and Acquisition Doing Business With the U.S. Department of Energy Welcome to the Department of Energy's Acquisition homepage. The Office of Acquisition Management (OAM) is responsible for all contracting, financial assistance and related activities to fulfill the Department's multitude of missions through its business relationships. As the business organization of the Department, OAM develops and supports the policies, procedures and procurement operational elements. OAM

  13. Acquisition and Project Management | National Nuclear Security...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Human Resources Acquisition Management Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs) Environmental Program Services Contract ...

  14. Aerial robotic data acquisition system

    SciTech Connect

    Hofstetter, K.J.; Hayes, D.W.; Pendergast, M.M.; Corban, J.E.

    1993-12-31

    A small, unmanned aerial vehicle (UAV), equipped with sensors for physical and chemical measurements of remote environments, is described. A miniature helicopter airframe is used as a platform for sensor testing and development. The sensor output is integrated with the flight control system for real-time, interactive, data acquisition and analysis. Pre-programmed flight missions will be flown with several sensors to demonstrate the cost-effective surveillance capabilities of this new technology.

  15. Virginia Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions Virginia Dry Natural Gas Proved ...

  16. National Geothermal Data Systems Data Acquisition and Access...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and legacy data from ...

  17. "Paper" Energy Systems Acquisition Advisory Board Process | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    "Paper" Energy Systems Acquisition Advisory Board Process "Paper" Energy Systems Acquisition Advisory Board Process Memo on "Paper" Energy Systems Acquisition Advisory Board ...

  18. Department of Energy Acquisition Letter 2013-04 on Executive...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter 2013-04 on Executive Compensation Department of Energy Acquisition Letter 2013-04 on Executive Compensation Department of Energy Acquisition Letter 2013-04 ...

  19. ACQUISITION LETTER DEAR Part 933 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    sections 601-613. PDF icon ACQUISITION LETTER More Documents & Publications Microsoft Word - ACQUISITION LETTER.doc OPAM Policy Acquisition Guides Chapter 33 - Protests,...

  20. ADR Provisions in Federal Acquisition Regulation (FAR) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulation (FAR) More Documents & Publications Microsoft Word - ADR-Provisions-FederalAcquisitionReg.doc ACQUISITION LETTER DEAR Part 933 Microsoft Word - ACQUISITION LETTER.doc...

  1. 2015 DOE Acquisition and Project Management (APM) Workshop |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 DOE Acquisition and Project Management (APM) Workshop 2015 DOE Acquisition and Project Management (APM) Workshop Workshop Details: What: 2015 DOE Acquisition and Project...

  2. Kansas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions Kansas Dry Natural Gas Proved ...

  3. New Mexico Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Gasoline and Diesel Fuel Update

    Acquisitions (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Acquisitions ... Referring Pages: Dry Natural Gas Reserves Acquisitions New Mexico Dry Natural Gas Proved ...

  4. New York Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Annual Energy Outlook

    Acquisitions (Billion Cubic Feet) New York Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions New York Dry Natural Gas Proved ...

  5. Federal Acquisition Circular 2005-52 Item Subject FAR...

    Office of Environmental Management (EM)

    Federal Acquisition Circular 2005-52 Item Subject FAR case I Sustainable Acquisition ... VI Technical Amendments NA Item I--Sustainable Acquisition (FAR Case 2010-001) ...

  6. North Dakota Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Acquisitions ... Referring Pages: Dry Natural Gas Reserves Acquisitions North Dakota Dry Natural Gas Proved ...

  7. Jefferson Lab's Distributed Data Acquisition

    SciTech Connect

    Trent Allison; Thomas Powers

    2006-05-01

    Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) occasionally experiences fast intermittent beam instabilities that are difficult to isolate and result in downtime. The Distributed Data Acquisition (Dist DAQ) system is being developed to detect and quickly locate such instabilities. It will consist of multiple Ethernet based data acquisition chassis distributed throughout the seven-eights of a mile CEBAF site. Each chassis will monitor various control system signals that are only available locally and/or monitored by systems with small bandwidths that cannot identify fast transients. The chassis will collect data at rates up to 40 Msps in circular buffers that can be frozen and unrolled after an event trigger. These triggers will be derived from signals such as periodic timers or accelerator faults and be distributed via a custom fiber optic event trigger network. This triggering scheme will allow all the data acquisition chassis to be triggered simultaneously and provide a snapshot of relevant CEBAF control signals. The data will then be automatically analyzed for frequency content and transients to determine if and where instabilities exist.

  8. acquisition

    National Nuclear Security Administration (NNSA)

    0%2A en Small Business http:nnsa.energy.govaboutusouroperationsapmsmallbusiness

    Page...

  9. Active Acquisition Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procurement and Acquisition » Active Acquisition Letters Active Acquisition Letters Please remember that you can use your browser's EDIT/FIND function to perform a key-word or key-phase search for each browser page. Once you have entered the search value, click the NEXT button. When you advance to the next page, simply click the NEXT button again without re-entering the search value. November 9, 2016 Acquisition Letter No. AL-2017-01 Acquisition Letters (AL) currently in effect and discontinued

  10. AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL)...

  11. Acquisition, Use, and Disposal of Real Estate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate More Documents & Publications Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate OPAM Policy Acquisition Guides Acquisition, Use, and Disposal of Real Estate

  12. Acquisition, Use, and Disposal of Real Estate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate (76.66 KB) More Documents & Publications OPAM Policy Acquisition Guides Chapter 17 - Special Contracting Methods Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

  13. Microsoft Word - ACQUISITION LETTER.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ACQUISITION LETTER.doc Microsoft Word - ACQUISITION LETTER.doc Microsoft Word - ACQUISITION LETTER.doc (26.03 KB) More Documents & Publications ACQUISITION LETTER DEAR Part 933 Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution OPAM Policy Acquisition Guides

  14. Temporary Waiver of Mandatory Use of the Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions

    Energy.gov [DOE]

    Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. These issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions.

  15. Temporary Waiver of Mandatory Use of Strategic Integrated Procurement Enterprise System (STRIPES) for Certain Purchase Card Transactions

    Energy.gov [DOE]

    Several issues have been identified relating to the use of STRIPES for the processing of transactions at or below the micro-purchase threshold of $3,000 using the Government-wide purchase card. This issues relate strictly to the efficient processing of such transactions and not to the ability of STRIPES to properly and accurately process these actions.

  16. Department of Energy (DOE) Acquisition Guide

    Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition Guide serves this purpose by identifying relevant internal standard operating procedures to be followed by both procurement and program personnel who are involved in various aspects of the acquisition process. The Guide also is intended to be a repository of best practices found throughout the agency that reflect specific illustrations of techniques which ' might be helpful to all readers. Additionally, the Guide includes subject matter that was issued previously through other media, such as Acquisition Letters.

  17. AVLIS Laser Data Acquisition and Control System

    SciTech Connect

    Gill, T.E.

    1986-01-01

    The AVLIS Laser Data Acquisition and Control System provides an integrated hardware and software package which controls up to five diagnostic lasers and automatic and manual data acquisition and reduction subsystems being used to analyze uranium vapor density in the Atomic Vapor Laser Isotope Separation (AVLIS) separation vessel in Oak Ridge, Tennessee. This paper discusses acquisition of critical real-time and post-run vapor density data.

  18. Searchable Electronic Department of Energy Acquisition Regulation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Searchable Electronic Department of Energy Acquisition Regulation Searchable Electronic Department of Energy Acquisition Regulation Updated July 2, 2013. The EDEAR is current through the Final Rule published May 3, 2013 at 78 FR 25817 If you have any questions concerning this page, please contact Barbara Binney in the Contract and Financial Assistance Policy Division, Office of Acquisition and Project Management. EDEAR July 2 2013 final.pdf (3.36 MB) More Documents &

  19. Acquisition Description/ Category Solicitation Method Contract Type

    Energy Saver

    Energy Career Management Handbook Change 2011-01 Acquisition Career Management Handbook Change 2011-01 A recent review of the Department of Energy (DOE) Acquisition Career Management Program (ACMP), Financial Assistance Program certification identified opportunities for updating the courses required for Level I, Level II, and Level III certification. PF2011-38 Acquisition Career Management Handbook Change 2011-01 (8.44 KB) PF2011-38a.pdf (32.65 KB) More Documents & Publications

  20. Acquisition, Use, and Disposal of Real Estate

    Energy Saver

    8 August 24, 2015 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Senior Procurement Executives of DOE and NNSA. It is intended for use by procurement professionals of DOE and NNSA, primarily Contracting Officers, and other officials of DOE and NNSA that are involved in the acquisition process. Other parties are welcome to its information, but definitive interpretations of its effect on contracts, and related procedures, if any, may only be made by DOE NNSA

  1. Report: EMAB Acquisition and Project Management Subcommittee...

    Energy.gov [DOE] (indexed site)

    and contract management. On November 2, a very comprehensive report (124 pages) outlining continuous improvement actions in acquisition and project management was approved by Dr....

  2. Alternative Financing - New Acquisition Guide Subchapter | Department...

    Energy.gov [DOE] (indexed site)

    policy flash Alternative Financing - New Acquisition Guide Subchapter More Documents & Publications Policy Flash 2010-83 Policy Flash 2012-30 Flash2011-77 OPAM...

  3. Chapter 7 - Acquisition Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sourcing Requirements - Update May 2014 PDF icon 7.3 - Acuqisition Planning in the M&O Environment More Documents & Publications Policy Flash 2015-13 ACQUISITION PLANNING ...

  4. Refiner Acquisition Cost of Crude Oil - Composite

    Energy Information Administration (EIA) (indexed site)

    Acquisition Type: Composite Domestic Imported Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show ...

  5. Positron emission mammography with tomographic acquisition using...

    Office of Scientific and Technical Information (OSTI)

    The most appropriate acquisition method for specific detection or quantitation tasks requires additionalmore investigation. less Authors: Mark F Smith ; Raymond R Raylman ; ...

  6. Federal Acquisition Circular 2005-47

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-47 was issued December 13, 2010, 75 FR 77721. It concludes 7 separate rulemakings which are described in the attached summary sheet.

  7. Acquisition Letter No. AL 2015-02

    Energy.gov [DOE]

    The purpose of Acquisition Letter is to communicate the revisions to Chapter VII, Risk Management and Insurance Programs of DOE Order 350.1...

  8. Federal Acquisition Circular 2005-48

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-48 was issued December 30, 2010, 75 FR 82565. It concludes 4 separate rulemakings which are described in the attached summary sheet.

  9. Acquisition, Use, and Disposal of Real Estate

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition of Capital Assets, or current version DOE Order 430.1B, Real Property Asset Management, or current version Overview This section provides internal Departmental ...

  10. BCDA - Beamline Controls and Data Acquisition Group

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    * Data Acquisition * ebrick * Hardware * Software * Group Info * Sector Contacts * Knowledge Base * Meetings * Mailing list * APS PV Information * EPICS Naming Convention Print...

  11. Data Acquisition-Manipulation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    signals and numeric values that can be stored and manipulated in a useful manner by a computer program. Other definitions:Wikipedia Reegle Introduction Data acquisition and...

  12. Federal Information Technology Acquisition Reform Act (FITARA...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Information Technology Acquisition Reform Act (FITARA) Data Resources FITARA Resources Available for Download: DOE IT Policy Archive: ZIP IT Leadership Directory: HTML | ...

  13. Federal Acquisition Circular 2005-63

    Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment published in the December 10, 2012 Federal Register at 77 FR 73516 implements FAR Case 2012–030 Iran Threat Reduction.

  14. ADR Provisions in Federal Acquisition Regulation (FAR)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ADR Provisions in Federal Acquisition Regulation (FAR) d. Alternative means of dispute resolution. Notwithstanding any other provision of this chapter, a contractor and a ...

  15. Transaction-based building controls framework, Volume 2: Platform descriptive model and requirements

    SciTech Connect

    Akyol, Bora A.; Haack, Jereme N.; Carpenter, Brandon J.; Katipamula, Srinivas; Lutes, Robert G.; Hernandez, George

    2015-07-31

    Transaction-based Building Controls (TBC) offer a control systems platform that provides an agent execution environment that meets the growing requirements for security, resource utilization, and reliability. This report outlines the requirements for a platform to meet these needs and describes an illustrative/exemplary implementation.

  16. Proportional Transaction Costs in the Robust Control Approach to Option Pricing: The Uniqueness Theorem

    SciTech Connect

    El Farouq, Naïma; Bernhard, Pierre

    2015-10-15

    We prove the missing uniqueness theorem for the viscosity solution of a quasi-variational inequality related to a minimax impulse control problem modeling the option pricing with proportional transactions costs. This result makes our robust control approach of option pricing in the interval market model essentially complete.

  17. Quantifying the Level of Cross-State Renewable Energy Transactions (Presentation)

    SciTech Connect

    Heeter, J.; Beiter, P.; Flores, F.; Hurlbut, D.; Liu, C.

    2015-02-01

    This presentation and associated spreadsheet examine the level of cross-state renewable energy transactions. Most state renewable portfolio standard (RPS) policies allow for out-of-state renewable energy or renewable energy certificates to count towards compliance. This analysis focuses on compliance for 2012 and provides stakeholders with an understanding of the extent to which RPSs are being met.

  18. Extension of Other Transaction Authority to enter into Technology Investment Agreements (TIAs)

    Energy.gov [DOE]

    Section 3118 of the National Defense Authorization Act (NDAA) of 2011, Public Law 111-383, enacted January 7, 2011, has extended, through September 30, 2015, the "Other Transaction Authority" provision of the Act, which will allow the Department of Energy (DOE) to continue to use other types of agreements, other than grants or contracts, to carry out certain research projects.

  19. Career Map: Land Acquisition Specialist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Land Acquisition Specialist Career Map: Land Acquisition Specialist a male land acquisition specialist takes notes while surveying a piece of land. Land Acquisition Specialist Position Title Land Acquisition Specialist Alternate Title(s) Land Agent, Land Acquisition Associate Education & Training Level Bachelor degree required, prefer graduate degree Education & Training Level Description Land acquisition specialists are expected to have a bachelor's degree or higher in business, real

  20. Acquisition Career Management Handbook Change - Revised Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Officer's Representative Certification (COR) | Department of Energy Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) A recent review of the January 2009 issue of the Department of Energy (DOE) Acquisition Career Management Program (ACMP) Handbook identified many areas that require an update. Although the ACMP Handbook revisions

  1. Federal Acquisition Circular 2005-56

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-56 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on March 2, 2012 at 77 FR 12912 and 12913.

  2. Federal Acquisition Circular 2005-42

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date.

  3. Federal Acquisition Circular 2005-49

    Energy.gov [DOE]

    Federal Acquisition Circular (FAC) 2005-49 was issued January 24, 2011 in volume 76 FR 4188. It published one interim rule Federal Acquisition Regulation (FAR) case number 2010-016 on Public Access to Federal Awardee Performance and Integrity Information System. This rule is effective January 24, 2011. The summary of the FAC is attached.

  4. Federal Acquisition Circular 2005-40

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-40 implements the Federal Awardee Performance and Integrity Information System (FAPIIS) to the Federal Acquisition Regulation. This FAC was published in the March 23,2010 issue of the Federal Register. A summary of the changes is attached.

  5. Federal Interagency Geothermal Activities

    SciTech Connect

    Anderson, Arlene; Prencipe, Loretta; Todaro, Richard M.; Cuyler, David; Eide, Elizabeth

    2011-06-01

    This collaborative document describes the roles and responsibilities of key Federal agencies in the development of geothermal technologies including the U.S. Department of Energy (DOE); the U.S. Department of Agriculture (USDA), including the U.S. Forest Service; the U.S. Department of Interior (DOI), including the United States Geological Survey (USGS) and Bureau of Land Management (BLM); the Environmental Protection Agency (EPA); and the Department of Defense (DOD).

  6. Interagency Spectrum Collaboration Meeting

    Energy.gov [DOE]

    Opening/WelcomeMr. Robbie GreenPrincipal Deputy CIO for Enterprise Information Resources ManagementDepartment of Energy (DOE)

  7. Transacting generation attributes across market boundaries: Compatible information systems and the treatment of imports and exports

    SciTech Connect

    Grace, Robert; Wiser, Ryan

    2002-11-01

    Voluntary markets for ''green'' power, and mandatory policies such as fuel source disclosure requirements and renewables portfolio standards, each rely on the ability to differentiate electricity by the ''attributes'' of the generation. Throughout North America, electricity markets are devising accounting and verification systems for generation ''attributes'': those characteristics of a power plant's production such as fuel source and emissions that differentiate it from undifferentiated (or ''commodity'') electricity. These accounting and verification systems are intended to verify compliance with market mandates, create accurate disclosure labels, substantiate green power claims, and support emissions markets. Simultaneously, interest is growing in transacting (importing or exporting) generation attributes across electricity market borders, with or without associated electricity. Cross-border renewable attribute transactions have advantages and disadvantages. Broad access to markets may encourage more renewable generation at lower cost, but this result may conflict with desires to assure that at least some renewable resources are built locally to achieve either local policy goals or purchaser objectives. This report is intended to serve as a resource document for those interested in and struggling with cross-border renewable attribute transactions. The report assesses the circumstances under which renewable generation attributes from a ''source'' region might be recognized in a ''sink'' region. The report identifies several distinct approaches that might be used to account for and verify attribute import and export transactions, and assesses the suitability of these alternative approaches. Because policymakers have often made systems ''compatibility'' between market areas a pre-requisite to allowing cross-border renewable transactions, this report develops criteria for ''compatible information systems.'' Where fully compatible information systems do not exist

  8. MEMORANDUM FOR CHIEF ACQUISITION OFFICERS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FOR CHIEF ACQUISITION OFFICERS MEMORANDUM FOR CHIEF ACQUISITION OFFICERS "Myth-Busting": Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process MEMORANDUM FOR CHIEF ACQUISITION OFFICERS (127.84 KB) More Documents & Publications DOE Vendor Communication Plan Improving Communication with Industry during the Acquisition Process OFPP "Myth-busting" Memo (2/2/11)

  9. 7pt1AcquisitionPlanning.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7pt1AcquisitionPlanning.pdf 7pt1AcquisitionPlanning.pdf (1.68 MB) More Documents & Publications ACQUISITION PLANNING Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisitions___Communications.pdf

  10. Acquisition Letters Remaining in Effect | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in Effect Acquisition Letters Remaining in Effect PF2009-40.pdf (768.41 KB) PF2009-40a - Attachment-Acquisition Letter 2009-06 - Acquisition Letters Remaining in Effect (133.09 KB) More Documents & Publications Acquisition Letters Remaining In Effect AL2007-05.doc� Acquisition Letters Remaining In Effect

  11. Multiple channel data acquisition system

    DOEpatents

    Crawley, H. Bert; Rosenberg, Eli I.; Meyer, W. Thomas; Gorbics, Mark S.; Thomas, William D.; McKay, Roy L.; Homer, Jr., John F.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler.

  12. Multiple channel data acquisition system

    DOEpatents

    Crawley, H.B.; Rosenberg, E.I.; Meyer, W.T.; Gorbics, M.S.; Thomas, W.D.; McKay, R.L.; Homer, J.F. Jr.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler. 25 figs.

  13. AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL) that remain in effect are identified below. All other...

  14. DOJ Title Standards for Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOJ Title Standards for Acquisition DOJ Title Standards for Acquisition Title Standards 2001 (580.64 KB) More Documents & Publications Acquisition Guide for Federal Agencies REAL ESTATE PROPERTY GUIDE 2014 REAL ESTATE PROPERTY GUIDE 2013

  15. SSC/BCD data acquisition system proposal

    SciTech Connect

    Barsotti, E.; Bowden, M.; Swoboda, C.

    1989-04-01

    The proposed new data acquisition system architecture takes event fragments off a detector over fiber optics and to a parallel event building switch. The parallel event building switch concept, taken from the telephone communications industry, along with expected technology improvements in fiber-optic data transmission speeds over the next few years, should allow data acquisition system rates to increase dramatically and exceed those rates needed for the SSC. This report briefly describes the switch architecture and fiber optics for a SSC data acquisition system.

  16. A data acquisition architecture for the SSC

    SciTech Connect

    Partridge, R.

    1990-01-01

    An SSC data acquisition architecture applicable to high-p{sub T} detectors is described. The architecture is based upon a small set of design principles that were chosen to simplify communication between data acquisition elements while providing the required level of flexibility and performance. The architecture features an integrated system for data collection, event building, and communication with a large processing farm. The interface to the front end electronics system is also discussed. A set of design parameters is given for a data acquisition system that should meet the needs of high-p{sub T} detectors at the SSC.

  17. Multi-user data acquisition environment

    SciTech Connect

    Storch, N.A.

    1983-01-01

    The typical data acquisition environment involves data collection and monitoring by a single user. However, in order to support experiments on the Mars facility at Lawrence Livermore National Laboratory, we have had to create a multi-user data acquisition environment where any user can control the data acquisition and several users can monitor and analyze data being collected in real time. This paper describes how we accomplished this on an HP A600 computer. It focuses on the overall system description and user communication with the tasks within the system. Our current implementation is one phase of a long-term software development project.

  18. ACQUISITION LETTER DEAR Part 933 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ACQUISITION LETTER DEAR Part 933 ACQUISITION LETTER DEAR Part 933 This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in connection with disputes that arise under the Contract Disputes Act (CDA) of 1978, 41 U.S.C. sections 601-613. ACQUISITION LETTER (26.03 KB) More Documents & Publications Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution Microsoft Word - ACQUISITION LETTER.doc OPAM Policy Acquisition Guides

  19. EM Works to Involve Local Communities More in Acquisition Processes |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Works to Involve Local Communities More in Acquisition Processes EM Works to Involve Local Communities More in Acquisition Processes September 30, 2016 - 12:55pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Ralph Holland provides EM's acquisition outlook during the National Cleanup Workshop. EM Acquisition and Project Management Deputy Assistant Secretary Ralph Holland provides EM's acquisition outlook during the National Cleanup Workshop.

  20. Department of Energy (DOE) Acquisition Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (DOE) Acquisition Guide Department of Energy (DOE) Acquisition Guide Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition

  1. The Department of Energy has opted to utilize the following agreement for Designated Non-Proprietary User Facilities transactions

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    agreement for Designated Proprietary User Facilities transactions. Because these transactions are widespread across Departmental facilities, uniformity in agreement terms is desirable. Except for the *** provisions, minor modifications to the terms of this agreement may be made by CONTRACTOR, but any changes to the *** provisions or substantive changes to the non *** provisons will require approval by the DOE Contracting Officer, WHICH WILL LIKEY DELAY YOUR ACCESS TO THE USER FACILITY. In

  2. Acquisition Planning: Revised Acquisition Letter 2009-03 and Revised DOE Acquisition Guide Chapter 7.1

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter (AL) 2009-03 and Acquisition Guide Chapter 7.1 have been revised to move the guidance regarding who approves an Acquisition Plan for a contract exceeding $1 00 million from the AL to the Acquisition Guide. To reflect the changes, AL-2009-03 Revision 1 has replaced AL-2009-03 and the affected parts of Acquisition Guide Chapter 7.1 have been modified. Additional minor revisions to the Guide chapter were made: references to obsolete AL 96-09 and obsolete AL 2006-1 1 were deleted; the requirement to begin acquisition planning for an M&O contract at least 18 months prior to contract expiration was changed to 24 months; minor editorial changes were made to the Property Management section; and attachment 2's milestone schedule was conformed to the SEB Monthly Status Report format (that status report was established in March 201 0; see http://management.enernv.gov/docurnents/SEBMonthly Status Remrtinn Requirement.pdf).

  3. Coupling through tortuous path narrow slot apertures into complex cavities - Antennas and Propagation, IEEE Transactions on

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    6 IEEE TRANSACTIONS ON ANTENNAS AND PROPOGATION, VOL. 48, NO. 3, MARCH 2000 Coupling Through Tortuous Path Narrow Slot Apertures into Complex Cavities Russell P. Jedlicka, Senior Member, IEEE, Steven P. Castillo, Senior Member, IEEE, and Larry K. Warne Abstract-A hybrid finite-element method/method of moments (FEM/MOM) model has been implemented to compute the coupling of fields into a cavity through narrow slot apertures having depth. The model utilizes the slot model of Warne and Chen

  4. Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

  5. Multi-Channel Data Acquisition System for Nuclear Pulse Processing...

    Office of Scientific and Technical Information (OSTI)

    Conference: Multi-Channel Data Acquisition System for Nuclear Pulse Processing Citation Details In-Document Search Title: Multi-Channel Data Acquisition System for Nuclear Pulse ...

  6. Acquisition Letter No. AL 2013-11 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H...

  7. One Acquisition Solution for Integrated Services (OASIS) - Brad...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Solution for Integrated Services (OASIS) - Brad DeMers, General Services Administration (GSA) One Acquisition Solution for Integrated Services (OASIS) - Brad DeMers,...

  8. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program & Project Management For The Acquisition Of Capital Assets (310.65 KB) More Documents & Publications "Paper" Energy Systems Acquisition Advisory Board Process ESAAB ...

  9. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets 2014 DOE Project Management Workshop ...

  10. ,"Florida Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Data for" ,"Data 1","Florida Dry Natural Gas Reserves Acquisitions ... 10:36:51 AM" "Back to Contents","Data 1: Florida Dry Natural Gas Reserves Acquisitions ...

  11. Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005...

    Energy.gov [DOE] (indexed site)

    37 Federal Acquisition Circular (FAC) 2005-66 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management...

  12. Acquisition Letter No. AL 2014-02 | Department of Energy

    Energy Saver

    SUBJECT: ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE SUMMARY: The subject Acquisition Letter's purpose is to provide guidance on provisional payment of fee for non ...

  13. Data acquisition system of Moeller polarimeter Hall A Jefferson...

    Office of Scientific and Technical Information (OSTI)

    Data acquisition system of Moeller polarimeter Hall A Jefferson Lab (in Russian) Citation Details In-Document Search Title: Data acquisition system of Moeller polarimeter Hall A ...

  14. "Supervisory Control and Data Acquisition (SCADA) Systems." The...

    Energy Saver

    "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 ...

  15. Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) The purpose of...

  16. Microsoft Word - ADR-Provisions-FederalAcquisitionReg.doc | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications ADR Provisions in Federal Acquisition Regulation (FAR) Microsoft Word - ACQUISITION LETTER.doc Microsoft Word - ADR Revised Policy82508Reformatted.doc...

  17. Green Lease Policies and Procedures for Lease Acquisition | Department...

    Energy Saver

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition PDF icon RSL-2007-12 More Documents & Publications Attachment 1:...

  18. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Energy Saver

    Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is...

  19. 2015 DOE Acquisition and Project Management Workshop Agenda ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Acquisition and Project Management Workshop Agenda 2015 DOE Acquisition and Project Management Workshop Agenda This year's theme is "Federal Stewardship-- Providing the Value...

  20. Carbon Compliance Acquisition 5 Limited | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Compliance Acquisition 5 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 5 Limited Place: Greater London, United Kingdom Zip: EC2M 2TD Sector: Carbon...

  1. Program & Project Management For The Acquisition Of Capital Assets...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II...

  2. Program and Project Management for the Acquisition of Capital...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3.3B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement,...

  3. Acquisition Letter No. 2012-06 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter on the Implications of Time-Limited Funds SUMMARY:...

  4. Acquisition Letter No. AL 2014-07 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions SUMMARY: The purpose of Acquisition Letter (AL) 2014-07 is to establish the...

  5. Carbon Compliance Acquisition 16 Limited | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Compliance Acquisition 16 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 16 Limited Place: United Kingdom Zip: LS12DS Product: Security broking and fund...

  6. Class Deviation from the Federal Acquisition Regulation (FAR...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, ...

  7. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Energy.gov [DOE] (indexed site)

    Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, ... More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  8. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Energy.gov [DOE] (indexed site)

    Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C ... Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, ...

  9. Federal Acquisition Circular (FAC) 2005-67 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Acquisition Circular (FAC) 2005-67 Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 21, 2013 Federal ...

  10. Federal Acquisition Circular 2005-38 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal ...

  11. Meeting the Challenge: Integrating Acquisition and Project Management...

    Energy Saver

    Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, ...

  12. U.S. Coalbed Methane Proved Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Acquisitions ... Release Date: 11192015 Next Release Date: 12312016 Referring Pages: Coalbed Methane ...

  13. 17.3 - Acquisition, Use and Disposal of Real Property

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management for the Acquisition of Capital Assets, or current version DOE Order ... Management for the Acquisition of Capital Assets may apply. For DOE actions, ...

  14. Acquisition Letter: AL2005-08 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in its entirety. Microsoft Word - AL2005-08.doc (230.7 KB) More Documents & Publications OPAM Policy Acquisition Guides Acquisition Guide Chapter 19 Update Microsoft Word - ...

  15. Green Lease Policies and Procedures for Lease Acquisition | Department...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition RSL-2007-12 (40.58 KB) More Documents & Publications Attachment ...

  16. Grant Acquisition and Other Funding Opportunities Webinar

    Energy.gov [DOE]

    Kerretv Online is hosting a free webinar on grant acquisition and other funding opportunities. The training will cover developing relationships with funders, finding the right funder, writing the proposal, and understanding how to report back to the funder.

  17. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    22.02 KB) More Documents & Publications Acquisition, Use, and Disposal of Real Estate Chapter 17 - Special Contracting Methods SIGNED Class Deviation Findings and Determination 970.5244-1

  18. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Microsoft Word - AcqGuide16pt1 Nov 2010 Chapter 16 - Types of Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance...

  19. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

  20. Energy Systems Acquisitions Advisory Board Procedures

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-10-28

    The Notice streamlines the Energy Systems Acquisition Advisory Board (ESAAB) process to ensure informed, objective, and documented Strategic and Major System Critical Decision, Baseline Change Proposal, and site selection final decisions. Does not cancel other directives.

  1. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    Idaho Calcine Disposition Project A&E https:www.emcbc.doe. govSEBCDP EMCBC Full and ... on the DOE Acquisition Forecast (http:hqlnc.doe.govForecast) and other public sources. ...

  2. MDS-Plus data acquisition engine

    SciTech Connect

    Flor, G. ); Cazzaro, F.; Fregonese, G.; Stangherlin, S. )

    1990-10-01

    MDS-Plus, a model driven data acquisition system being jointly developed at Istituto Gas Ionizzati, MIT Plasma Fusion Center, and Los Alamos National Laboratory, is based on the concept of an experiment model. The model contains descriptions of experiment data, devices, and actions to be performed. The data acquisition engine, i.e., the part of the system which actually executes the acquisition process, is driven by the contents of the model itself and implemented as a set of independent processes. A scheduler keeps the data acquisition engine in step with a state machine reflecting the operation of the actual experiment; a dispatcher takes care of the appropriate sequencing of the operations associated with each state of the experiment; various servers actually execute actions on behalf of the dispatcher.

  3. Acquisition Career Management Handbook Change - Revised Contracting...

    Energy.gov [DOE] (indexed site)

    (43.19 KB) PF2012-16a.pdf (1.08 MB) More Documents & Publications OPAM Policy Acquisition Guides Personal Property Management Certification Brochure Accessing Online COR Training

  4. Federal Acquisition Circular (FAC) 2005-65

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the January 29, 2013 Federal Register at 78 FR 6184. This FAC issued 4 final rules and a technical amendment.

  5. Federal Acquisition Circular (FAC) 2005-71

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the November 25, 2013 Federal Register at 78 FR 70476. This FAC issued 2 final rules and 1...

  6. Federal Acquisition Circular (FAC) 2005-66

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the February 28, 2013 Federal Register at 78 FR 13764. This FAC issued 3 final rules, 1 interim rule, and a technical amendment.

  7. Federal Acquisition Circular 2005-64

    Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment, published in the December 21, 2012 Federal Register at 77 FR 75766, implements FAR Case 2011–028 Nondisplacement of Qualified Workers Under Service Contracts.

  8. Federal Acquisition Circular (FAC) 2005-69

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the August 1, 2013 Federal Register at 78 FR 46779. This FAC issued 6 final rules and a technical amendment.

  9. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    528.37 KB) More Documents & Publications Microsoft Word - AL2006-07.doc Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Personal Property Management Certification Brochure

  10. Federal Acquisition Circular (FAC) 2005-70

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2013 Federal Register at 78 FR 60168. This FAC issued 2 interim rules.

  11. Small Business Issues for Environmental Restoration Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement

  12. Acquisition Management | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Acquisition Management The Office of Acquisition Management supports NNSA's efforts to: Reduce Nuclear Dangers; Manage the nuclear weapons stockpile; Recapitalize the nuclear infrastructure and deterrent capability; Strengthen the science, technology, and engineering base; and, Continue NNSA management reforms. Our Values: Providing solutions: We will use our expertise and knowledge to be solutions people assisting our business partners to achieve mission goals while ensuring compliance with

  13. DOE Federal Acquisition Regulation Clause Usage Guide

    Energy.gov [DOE]

    The subject matrix contained an error related to the solicitation provision at FAR 52.209-5. That provision was identified as Not Applicable for most contract types but it should have identified the provisions as Required for most contract types but Not Applicable for simplified acquisitions and acquisitions of commercial items. A corrected matrix is attached and the matrix in the Stripes Library is being replaced.

  14. acquisition and project management | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration and project management Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise Contracting professionals from the NNSA Acquisition & Project Management (APM) Field Program Section (FPS) recently served as role players for Office of Secure Transportation (OST) training exercises in Arkansas and Oklahoma. OST Federal Agents transport U.S. nuclear weapons, components and... SNL Starting Points Sandia Field Office Home

  15. Updated NGNP Fuel Acquisition Strategy

    SciTech Connect

    David Petti; Tim Abram; Richard Hobbins; Jim Kendall

    2010-12-01

    A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type

  16. Part B - Requirements & Funding Information PART B - Requirements and Funding Information

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    b. Part B 1 Part B - Requirements & Funding Information PART B - Requirements and Funding Information Gray highlights are instructions. Remove the instructions from the interagency agreement. Attachment 3.b. Part B 2 PART B - Requirements & Funding Information B.1. Purpose This is an interagency transaction. An interagency transaction is an intra-governmental transaction when the servicing agency uses internal resources to support the requesting agency requirement and is a reimbursable

  17. Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition...

    Energy.gov [DOE] (indexed site)

    Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and...

  18. NA APM - Associate Administrator for Acquisition & Project Management |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) APM - Associate Administrator for Acquisition & Project Management

  19. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations

    Energy.gov [DOE]

    This page contains the presentations presented at the 2015 DOE Acquisition and Project Management (APM) Workshop.

  20. Acquisition Guide Chapter 15 1 - Source Selection Guide | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 5 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - (Final - Changes Accepted)(April 2013).pdf (917.82 KB) More Documents & Publications DOE Source Evaluation Board (SEB) Document Templates DOE Acquisition Guide Chapter 15.1 Source Selection Guide OPAM Policy Acquisition Guides

  1. Acquisition Guide, Chapter 6.1, Competition Requirements | Department of

    Office of Environmental Management (EM)

    Energy .1 - Acquisition Planning Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Guide Chapter 7.1 is revised to update references, reorganize content, delete M&O coverage (which will be moved to a separate Guide Chapter), and add a new "Alternate Approval Process". PF2013-09 Acquisition Guide Chapter 7.1 - Acquisition Planning (19.24 KB) PF2013-09a.pdf (483.88 KB) More Documents & Publications Policy Flash 2015-13 Acquisition Planning: Revised DOE

  2. Finding and Winning Simplified Acquisitions, Part 2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Finding and Winning Simplified Acquisitions, Part 2 Finding and Winning Simplified Acquisitions, Part 2 Presented at the 15th Annual DOE Small Business Forum & Expo by: Guy Timberlake, Chief Visionary Officer and Chief Executive Officer, The American Small Business Coalition Finding and Winning Simplified Acquisitions, Part 2 (6.47 MB) More Documents & Publications Finding and Winning Simplified Acquisitions, Part 1 December 12, 2013 Business Opportunity Session Presentations Acquisition

  3. Update on Procurement Opportunities and Acquisition Process | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Update on Procurement Opportunities and Acquisition Process Update on Procurement Opportunities and Acquisition Process Presentation from the 2015 DOE National Cleanup Workshop by J. E. Surash, P.E., Deputy Assistant Secretary, Acquisition and Project Management. Update on Procurement Opportunities and Acquisition Process (2.49 MB) More Documents & Publications EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental

  4. Updated Acquisition Guide Chapter 23 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide Chapter 23 Updated Acquisition Guide Chapter 23 Acquisition Guide Chapter 23 concerning environmental considerations for DOE contracts has been updated. The update recognizes the new Sustainable Acquisition Program clauses which became effective October 20, 2010 as a result of the rule published September 22, 2010, at 75 FR 57690. These clauses should be incorporated in new awards or added to existing applicable contracts. PF2011-25 Updated Acquisition Guide Chapter 23 (8.53

  5. Trigger Data Acquisition | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Trigger Data Acquisition Trigger Data Acquisition Argonne and MSU have taken responsibility for the Level 2 Supervisor and Region-of-Interest Builder components of the Level 2 trigger. These custom electronics boards route a subset of the information from the detector system to the ATLAS High Level Trigger. The trigger system as a whole reduces the input event rate from 100kHz to a few kHz on the basis of the information from the RoIB and eventually, following further processing, to ~200 Hz for

  6. Federal Acquisition Circular (FAC) 2005-68

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 26, 2013 Federal Register at 78 FR 38535. This FAC issued 1 interim rule. To view this rule go to Federal Register site then search by date and go to General Services Administration to find the rule https://www.federalregister.gov/articles/current.

  7. Data acquisition for FNAL E665

    SciTech Connect

    Geesaman, D.F.; Green, M.C.; Kaufman, S.; Tentindo-Repond, S.; Bartlett, J.F.; Melanson, H.L.; Petravick, D.; Michael, D.G.; McLeod, D.; Vidal, M.

    1989-01-01

    The data acquisition system for FNAL E665, an experiment to study deep inelastic muon scattering from nucleons and nuclei, is described. The system is built with the FNAL VAXONLINE and RSX DA building blocks. The structure, capabilities and limitations for data flow, control and monitoring are discussed. 20 refs., 1 fig.

  8. Data acquisition for a large neutrino detector

    SciTech Connect

    Ahrens, L.A.; Aronson, S.A.; Connolly, P.L.

    1983-01-01

    A hierarchical, distributed intelligence data acquisition system which has been used for the past two years in neutrino experiments at Brookhaven National Laboratory is described. Performance characteristics and the nature of problems encountered in bringing the system to maturity are discussed and some generalizations of the experience are suggested.

  9. Controls and data acquisition on Atlas

    SciTech Connect

    Scudder, D.W.; Hosack, K.W.; Parsons, W.M.; Reass, W.A.; Thompson, M.C.; Wysocki, F.J.; Creager, J.

    1997-09-01

    The control and data acquisition systems for Atlas will use a large degree of decentralization. By distributing control points close to the systems being controlled, the authors expect to simplify the task of isolating electronic systems from the large expected EMI pulses, allow connection of the various parts of the system by high-level fiber-optic networks, allow a simple configuration of the control and data acquisition screen rooms, and simplify the software efforts through the resulting modularization. The Atlas control system must control capacitor charging, machine and diagnostic timing and triggering, marx module diagnostics, vacuum systems, gas handling for railgaps, safety interlocks, and oil handling. Many of these tasks will be performed by industrial-style programmable logic controllers (PLCs). Each of 38 Marx bank maintenance units will have a control and diagnostic package which will monitor both charging and discharging current and railgap trigger timing. An unusual feature of digitizers to record each Marx module`s output waveform, plus nanosecond resolution time interval meters to record the firing time of each railgap. The machine data acquisition system for Atlas will be built around an SQL database, use National Instruments LabVIEW software to control data acquisition instruments and provide links for a variety of experimentalists` data analysis packages. World Wide Web access will provide an interface through which users can monitor experimental data and machine status.

  10. Federal Acquisition Circular (FAC) 2005-76

    Energy.gov [DOE]

    Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the July 25, 2014 Federal Register at 79 FR 43574. FAC 2005-76 issued 2 final rules, 1 interim rule and 1 technical amendment.

  11. Dumand-array data-acquisition system

    SciTech Connect

    Brenner, A.E.; Theriot, D.; Dau, W.D.; Geelhood, B.D.; Harris, F.; Learned, J.G.; Stenger, V.; March, R.; Roos, C.; Shumard, E.

    1982-04-01

    An overall data acquisition approach for DUMAND is described. The scheme assumes one array to shore optical fiber transmission line for each string of the array. The basic event sampling period is approx. 13 ..mu..sec. All potentially interesting data is transmitted to shore where the major processing is performed.

  12. 741 Transaction

    National Nuclear Security Administration (NNSA)

    Data Input for DOE Contractors D-23 NMMSS welcomes comments and suggestions on the quality and usefulness of this publication. Your input is an important part of the...

  13. 741 Transaction

    National Nuclear Security Administration (NNSA)

    required to report government owned material to NMMSS should refer to the D-23, Personal Computer Data Input for Department of Energy Contractors for guidance in the electronic...

  14. Transactional Network

    Office of Energy Efficiency and Renewable Energy (EERE)

    Lead Performer: Pacific Northwest National Laboratory - Richland, WA Project Partners: -- Lawrence Berkeley National Laboratory - Berkeley, CA -- Oak Ridge National Laboratory - Oak Ridge, TN -- Transformative Wave - Kent, WA -- Emerson - St. Louis, MO -- NorthWrite - Minneapolis, MN -- EnerNOC - Baltimore, MD

  15. 741 Transaction

    National Nuclear Security Administration (NNSA)

    ... 1.1. Reporting Guidelines Refer to the DOE M 474.1-2, Manual for Nuclear Materials Management and Safeguards System Reporting and Data Submission for specific Department ...

  16. 741 Transaction

    National Nuclear Security Administration (NNSA)

    ... that data submissions must be made in acceptable electronic forms to the Nuclear Materials Management Safeguards System (NMMSS) and provide the information necessary for ...

  17. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial Acquisition Letter 2014-02

    Office of Energy Efficiency and Renewable Energy (EERE)

    SUMMARY: AL 2014-05/FAL 2014-02 (AL/FAL) implements statutory requirements for Congressional notifications or quarterly reporting to the Appropriations Committees for contract, financial assistance, or other transaction agreement actions in accordance with Energy and Water Development and Related Agencies Appropriations Act, 2014, Division D, Title III, Section 3011 to include related notices for prior fiscal years Appropriations Acts. A summary of the 2 statutory pre-award/pre-selection notices and the 1 post award quarterly report follows. See the AL/FAL for details to include a decision chart to assist in determining which notice template to use.

  18. POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov

  19. Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  20. Publication of Federal Acquisition Circular 2005-51

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-51 which makes two changes to the Federal Acquisition Regulation involving the small business program and a modification of Standard Form 26.

  1. Acquisition Guide Chapter 15.2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5.2 Acquisition Guide Chapter 15.2 Unsolicited Proposals - Revised August 2015. PDF icon Acquisition Guide Chapter 15.2 More Documents & Publications POLICY FLASH 2015-34 OPAM...

  2. Chapter 41 - Acquisition of Utility Services | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 - Acquisition of Utility Services Chapter 41 - Acquisition of Utility Services PDF icon 41.1Utilities0.pdf More Documents & Publications AcqGuide41pt1.doc&0; Chapter 9 -...

  3. Acquisition Letter No. AL 2014-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter No. AL 2014-02 Acquisition Letter No. AL 2014-02 DATE: October 31, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial...

  4. A simulation of data acquisition system for SSC experiments

    SciTech Connect

    Watase, Y.; Ikeda, H.

    1989-04-01

    A simulation on some parts of the data acquisition system was performed using a general purpose simulation language GPSS. Several results of the simulation are discussed for the data acquisition system for the SSC experiment.

  5. Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...

    Office of Environmental Management (EM)

    11 Federal Acquisition Circular (FAC) 2005-71 Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71 Questions concerning this policy flash should be directed to Barbara...

  6. ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE | Department...

    Energy.gov [DOE] (indexed site)

    on provisional payment of fee for non management and operating contracts. PF2014-08 Acquisition Letter 2014-02 Provisional Payment of FeeAcquisition Letter 2014-02 Provisional ...

  7. Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Federal Acquisition Circular (FAC) 2005-67 Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005-67 Questions concerning this policy flash should be directed to Barbara...

  8. Executive Order 12969-Federal Acquisition and Community RightTo...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2969-Federal Acquisition and Community RightTo-Know Executive Order 12969-Federal Acquisition and Community RightTo-Know The efficiency of the Federal Government is served when it ...

  9. ESPC ENABLE Acquisition Plan Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The acquisition plan is the first formal step in the ESPC ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process. ...

  10. Program and Project Management for the Acquisition of Capital...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    13.B, Chg 1 (PgChg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health...

  11. Program and Project Management for the Acquisition of Capital...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ARCHIVED DOE O 413.3A Chg 1, Program and Project Management for the Acquisition of Capital Assets by John Makepeace Functional areas: Acquisition, Defense Nuclear Facility Safety...

  12. Acquisition Letter No. 2012-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    No. 2012-03 Acquisition Letter No. 2012-03 AL_2012-03.pdf (189.71 KB) More Documents & Publications Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors

  13. Federal Acquisition Circular 2005-43 | Department of Energy

    Energy Saver

    Attached for your information is a summary of Federal Acquisition Circular PAC) 2005-43 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has five rules ...

  14. Acquisition Letter No. AL 2013-10 | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2016-11 Acquisition Letter No. AL 2016-01

  15. Review of Supervisory Control and Data Acquisition (SCADA) Systems...

    Office of Scientific and Technical Information (OSTI)

    United States Language: English Subject: 24 - POWER TRANSMISSION AND DISTRIBUTION, 99 - GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; DATA ACQUISITION...

  16. Acquisition Letters No. AL 2013-05 | Department of Energy

    Energy Saver

    7 Acquisition Letter No. AL 2015-07 DATE: July 07, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letter No. AL 2015-07, Performance of Inherently Governmental and Critical Functions SUMMARY: Attached is revised Acquisition Letter (AL) No. AL 2015-07, Performance of Inherently Governmental and Critical Functions, dated July 07, 2015. This AL provides

  17. Improving Communication with Industry during the Acquisition Process |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Improving Communication with Industry during the Acquisition Process Improving Communication with Industry during the Acquisition Process The Office of Federal Procurement Policy, (OFPP) issued the attached memorandum entitled "Myth-Busting: Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process" on February 2, 2011. PF2011-44 Improving Communication with Industry during the Acquisition Process (41.59 KB) PF2011-44a.pdf

  18. Acquisition & Financial Assistance Rules Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates Department of Energy, Office of Acquisition Management Proposed Rules Current as of 11/4/16 Regulation Identifier Number Title / Subject / Purpose Rule Type Status 1901-AB37 Enforcement of Classified Information Security Requirements: The proposed rule amends DOE's statutory prescribed regulation, which sets forth the

  19. Assessment of Acquisition and Financial Assistance Operations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Acquisition and Financial Assistance Operations Assessment of Acquisition and Financial Assistance Operations The Department of Energy's Office of Energy Efficiency and Renewable Energy's Assessment of Acquisition and Financial Assistance Operations, in coordination with the National Academy of Public Administration. Assessment of Acquisition and Financial Assistance Operations (754.94 KB) More Documents & Publications Reorganization of the Office of Energy Efficiency and

  20. Attachment 1: Green Lease Policies and Procedures for Lease Acquisition |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition (45.31 KB) More Documents & Publications Green Lease Policies and Procedures for Lease Acquisition Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Energy Efficiency in Separate Tenant Spaces - A Feasibility Study

  1. Federal Acquisition Circular (FAC) 2005-91 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    91 Federal Acquisition Circular (FAC) 2005-91 DATE: October 24, 2016 TO: Procurement Directors Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Federal Acquisition Circular (FAC) 2005-91 SUMMARY: Attached for your information is a brief summary of the Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2016 Federal Register at 81 FR 67726. FAC 2005-91 issued 9 final rules, 1

  2. Federal Acquisition Circular 2005-34 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2005-34 Federal Acquisition Circular 2005-34 PF2009-54.pdf (879.43 KB) PF2009-54a - Attachment-Summary of the Contents of Federal Acquisition Circular 2005-34 Published in the July 1, 2009 Issue of the Federal Register at Page 31556 (11.54 KB) More Documents & Publications Federal Acquisition Circular 2005-40 Federal Acquisition Circular 2005-47 Policy Flash Archive Search File

  3. POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Positions (Expired) | Department of Energy 9A Direct Hire Authority for Acquisition Positions (Expired) POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition Positions (Expired) THIS GUIDANCE HAS EXPIRED This Policy on Direct Hire Authority for Acquisition Positions has been replaced by POLICY GUIDANCE MEMORANDUM #34B Direct Hire Authority for Contract Specialist Positions POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition Positions (Expired) (49.21 KB)

  4. Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007)...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007) Exploration Activity Details...

  5. Data Acquisition-Manipulation At Cascades Region (Ingebritsen...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Cascades Region (Ingebritsen & Mariner, 2010) Exploration...

  6. Data Acquisition-Manipulation (Beck & Cermak, 1989) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Beck & Cermak, 1989) Exploration Activity Details Location...

  7. Data Acquisition-Manipulation At Truckhaven Area (Layman Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Truckhaven Area (Layman Energy Associates, 2007)...

  8. Data Acquisition-Manipulation (Verma & Santoyo, 1997) | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Verma & Santoyo, 1997) Exploration Activity Details Location...

  9. Office of Acquisition and Financial Assessment PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office (245.98 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  10. Acquisition Guide Chapter 1.3 - Balanced Scorecard Performance Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program | Department of Energy .3 - Balanced Scorecard Performance Assessment Program Acquisition Guide Chapter 1.3 - Balanced Scorecard Performance Assessment Program DATE: May 17, 2016 TO: Heads of Contracting Activities and Procurement Directors FROM: Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 1.3--Balanced Scorecard Performance Assessment Program SUMMARY: Acquisition Guide Chapter 1.3-Balanced Scorecard Performance Assessment Program, is updated to reflect the

  11. Acquisition Letter No. AL 2014-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Acquisition Letter No. AL 2014-03 DATE: January 07, 2014 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies

  12. Acquisition Letter No. AL 2016-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Acquisition Letter No. AL 2016-02 DATE: February 17, 2016 TO: Procurement Directors/Contracting Officers FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letter 2016-02/Financial Acquisition Letter 2016-02 Congressional Notifications and Quarterly Reporting to the Appropriations Committees in Accordance with the Energy and Water Development and Related Agencies Appropriations Act, 2016, Division D, Title

  13. Acquisition Guide Chapter 71.1- Headquarters Business Clearance Process

    Energy.gov [DOE]

    Revised Acquisition Guide Chapter 71.1, "Headquarters Business Clearance Process" Issued as Policy Flash 2008-66

  14. Acquisition Career Management Handbook Change 2011-01 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Career Management Handbook Change 2011-01 Acquisition Career Management Handbook Change ... Career Management Program (ACMP), Financial Assistance Program certification ...

  15. NA APM - Associate Administrator for Acquisition & Project Management...

    National Nuclear Security Administration (NNSA)

    APM - Associate Administrator for Acquisition & Project Management | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the ...

  16. National Geothermal Data Systems Data Acquisition and Access | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and legacy data from DOE-funded demonstration projects, the US Geological Survey, and other sources. analysis_snyder_ngds_data_acquisition.pdf (1.77 MB) More Documents & Publications National Geothermal Data System Architecture Design, Testing and Maintenance State Geological Survey Contributions to the National Geothermal Data

  17. Acquisition & Project Management | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Acquisition & Project Management NNSA continues improvements in best practices for acquisition and project management In July, NNSA's Office of Acquisition and Project Management hosted the third annual Federal Project Director and Project Integrator Training Session in Albuquerque, N.M. This training is one of several initiatives undertaken by NNSA to continually improve contracting and project management... NNSA Office of Acquisition Management improves customer satisfaction (Click to view

  18. The CDMS II data acquisition system

    SciTech Connect

    Bauer, D.A.; Burke, S.; Cooley, J.; Crisler, M.; Cushman, P.; DeJongh, F.; Duong, L.; Ferril, R.; Golwala, S.R.; Hall, J.; Holmgren, D.; ,

    2011-01-01

    The Data Acquisition System for the CDMS II dark matter experiment was designed and built when the experiment moved to its new underground installation at the Soudan Lab. The combination of remote operation and increased data load necessitated a completely new design. Elements of the original LabView system remained as stand-alone diagnostic programs, but the main data processing moved to a VME-based system with custom electronics for signal conditioning, trigger formation and buffering. The data rate was increased 100-fold and the automated cryogenic system was linked to the data acquisition. A modular server framework with associated user interfaces was implemented in Java to allow control and monitoring of the entire experiment remotely.

  19. In situ acquisition of cathodic protection parameters

    SciTech Connect

    Baptista, W.; Costa, J.C.M. da

    1997-01-01

    Present, offshore cathodic protection (CP) design in Brazil uses parameters found in the literature and in international norms, such as: initial and average current density, coating efficiency, leaked current at the buried part of the wet Xmas tree, etc. Five data acquisition systems (DAS) were launched at the Campos Basin water in depths of 102, 290, and 975 m. The DASs were recovered after 8, 11, and 14 months, respectively. Adequate methods of data processing guaranteed the acquisition of reliable parameters for use in CP projects in seawater: initial and average current densities, anode current capacity, and polarization curves at several time intervals. The potential of {minus}800 mV{sub Ag/AgCl} is generally accepted as norm for carbon steel protection in seawater. The cathodic current density necessary to obtain this potential is extremely dependent upon environmental conditions, and the geometry and superficial condition of the submerged steel structure.

  20. Acquisition systems for heat transfer measurement

    SciTech Connect

    De Witt, R.J.

    1983-01-01

    Practical heat transfer data acquisition systems are normally characterized by the need for high-resolution, low-drift, low-speed recording devices. Analog devices such as strip chart or circular recorders and FM analog magnetic tape have excellent resolution and work well when data will be presented in temperature versus time format only and need not be processed further. Digital systems are more complex and require an understanding of the following components: digitizing devices, interface bus types, processor requirements, and software design. This paper discusses all the above components of analog and digital data acquisition, as they are used in current practice. Additional information on thermocouple system analysis will aid the user in developing accurate heat transfer measuring systems.

  1. The acquisition of dangerous biological materials :

    SciTech Connect

    Aceto, Donato Gonzalo; Astuto-Gribble, Lisa M.; Gaudioso, Jennifer M.

    2007-11-01

    Numerous terrorist organizations have openly expressed interest in producing and deploying biological weapons. However, a limiting factor for many terrorists has been the acquisition of dangerous biological agents, as evidenced by the very few successful instances of biological weapons use compared to the number of documented hoaxes. Biological agents vary greatly in their ability to cause loss of life and economic damage. Some agents, if released properly, can kill many people and cause an extensive number of secondary infections; other agents will sicken only a small number of people for a short period of time. Consequently, several biological agents can potentially be used to perpetrate a bioterrorism attack but few are likely capable of causing a high consequence event. It is crucial, from a US national security perspective, to more deeply understand the likelihood that terrorist organizations can acquire the range of these agents. Few studies have attempted to comprehensively compile the technical information directly relevant to the acquisition of dangerous bacteria, viruses and toxins. In this report, technical fact sheets were assembled for 46 potentially dangerous biological agents. Much of the information was taken from various research sources which could ultimately and significantly expedite and improve bioterrorism threat assessments. By systematically examining a number of specific agent characteristics included in these fact sheets, it may be possible to detect, target, and implement measures to thwart future terrorist acquisition attempts. In addition, the information in these fact sheets may be used as a tool to help laboratories gain a rudimentary understanding of how attractive a method laboratory theft is relative to other potential acquisition modes.

  2. Acquisition Guide Chapter Updates for Threshold Changes

    Energy.gov [DOE]

    The Federal Acquisition Regulation is regularly updated to revise dollar thresholds associated for various activities. Policy Flash 2011-15 provides a quick reference guide to the threshold changes that were effective October 1, 2010. This Flash is to inform you that the following Guide Chapters have been updated to reflect the threshold changes: Chapter 3.1 Chapter 6.1 Chapter 15.4-4 Chapter 16.1 Chapter 18.0 Chapter 37.1 Chapter 38.1

  3. Department of Energy Acquisition Regulation (DEAR)

    Office of Energy Efficiency and Renewable Energy (EERE)

    To ensure that you are using the most recent version of the Department of Energy Acquisition Regulation (DEAR), use one of the electronic versions at one of the following websites: DOE Procurement - http://management.energy.gov/DEAR.htm; Electronic Code of Federal Regulations - http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Tit... or Hill Air Force Base - http://farsite.hill.af.mil/vfdoea.htm.

  4. Publication of Federal Acquisition Circular 2005-50

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38.

  5. Calorimeter Data Acquisition and Reporting Software

    SciTech Connect

    Plummer, Jean R.; Levi, Gerald

    1998-08-27

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard''s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From the retrieved voltage data, the reporting program can calculate a standard''s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.

  6. CALDAR. Calorimeter Data Acquisition and Reporting Software

    SciTech Connect

    Plummer, J.R.; Levi, G.

    1998-07-20

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard`s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From the retrieved voltage data, the reporting program can calculate a standard`s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.

  7. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  8. DAQMAN - A flexible configurable data acquisition system

    Energy Science and Technology Software Center

    2012-08-01

    DAQMAN is a flexible configurable interface that allows the user to build and operate a VME-based data acquisition system on a Linux workstation. It consists of two parts: a Java-based Graphical User Interface to configure the system, and a C-based utility that reads out the data and creates the output ASCII data file, with two levels of diagnostic tools. The data acquisition system requires a CAEN CONET-VME Bridge to communicate between the hardware in themore » VME crate and the Linux workstation. Data acquisition modules, such as ADCs, TDC, Scalers, can be loaded into the system, or removed easily. The GUI allows users to activate modules, and channels within modules by clicking on icons. Running configurations are stored; data are collected and can be viewed either as raw numbers, or by charts and histograms that update as the data are accumulated. Data files are written to disk in ASCII format, with a date and time stamp.« less

  9. Calorimeter Data Acquisition and Reporting Software

    Energy Science and Technology Software Center

    1998-08-27

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard''s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From themore » retrieved voltage data, the reporting program can calculate a standard''s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.« less

  10. Aspects of Hess' Acquisition of American Oil & Gas

    Reports and Publications

    2010-01-01

    On July 27, 2010, Hess Corporation announced that it had agreed to acquire American Oil & Gas, Inc. in a stock-only transaction worth as much as $488 million (based on Hess' closing price of $53.30/share, anticipated number of newly issued shares, and $30 million credit facility extended to American Oil & Gas prior to closing).

  11. Genomics:GTL Contractor-Grantee Workshop IV and Metabolic Engineering Working Group Inter-Agency Conference on Metabolic Engineering 2006

    SciTech Connect

    Mansfield, Betty Kay; Martin, Sheryl A

    2006-02-01

    Welcome to the 2006 joint meeting of the fourth Genomics:GTL Contractor-Grantee Workshop and the six Metabolic Engineering Working Group Inter-Agency Conference. The vision and scope of the Genomics:GTL program continue to expand and encompass research and technology issues from diverse scientific disciplines, attracting broad interest and support from researchers at universities, DOE national laboratories, and industry. Metabolic engineering's vision is the targeted and purposeful alteration of metabolic pathways to improve the understanding and use of cellular pathways for chemical transformation, energy transduction, and supramolecular assembly. These two programs have much complementarity in both vision and technological approaches, as reflected in this joint workshop. GLT's challenge to the scientific community remains the further development and use of a broad array of innovative technologies and computational tools to systematically leverage the knowledge and capabilities brought to us by DNA sequencing projects. The goal is to seek a broad and predictive understanding of the functioning and control of complex systems--individual microbes, microbial communities, and plants. GTL's prominent position at the interface of the physical, computational, and biological sciences is both a strength and challenge. Microbes remain GTL's principal biological focus. In the complex 'simplicity' of microbes, they find capabilities needed by DOE and the nation for clean and secure energy, cleanup of environmental contamination, and sequestration of atmospheric carbon dioxide that contributes to global warming. An ongoing challenge for the entire GTL community is to demonstrate that the fundamental science conducted in each of your research projects brings us a step closer to biology-based solutions for these important national energy and environmental needs.

  12. Interim report of the interagency coal export task force: draft for public comment. [Trade by country 1960-1979; general forecasting to 1985, 1990 and 2000

    SciTech Connect

    1981-01-01

    The Interagency Coal Export Task Force was formed in the Spring of 1980 at the direction of the President, in support of the international efforts of the United States, encouraging the use of coal. Its purpose was to report on possible courses of action to increase United States steam coal exports in a manner consistent with other national policies, including our commitment to environmental protection. The Task Force assembled existing data, developed significant new information regarding the international coal market and undertook analyses of apparent problems underlying coal exports. The Task Force contributed to a public awareness of the fact that increased coal exports will serve both the domestic and international interests of the United States. Based upon extensive, independent field studies in Europe and the Far East, the Task Force concludes that there will be significant growth in world demand for steam coal. Such growth has already begun, has contributed to the almost seven-fold increase in United States overseas steam coal exports for 1990 over 1979, and is expected to continue beyond the end of this century. The growth in world steam coal trade projected in the report does not guarantee United States coal exporters a large or expanding share of the market. The United States' role depends on the buying strategies of the consuming countries, the policies and prices of competing exporters, and the actions taken by the United States to maintain reasonable prices, prompt delivery and dependable quality. Projections of United States steam coal exports, therefore, rest upon a number of highly uncertain factors which are discussed in some detail.

  13. Funding Opportunity Announcement: Solar Bankability Data to Advance Transactions and Access (SB-DATA)

    Energy.gov [DOE]

    The Solar Bankability Data to Advance Transactions and Access (SB-DATA) funding program targets soft cost reduction by increasing data accessibility and quality. It will facilitate the growth and expansion of the solar industry by creating a standardized data landscape for distributed solar. As the solar market continues to rapidly grow, it’s critical that the collection, management, and exchange of solar datasets across the value chain – especially those that affect the bankability of solar assets – are coordinated and streamlined to protect consumers, increase efficient pricing, and support new and existing businesses entering the solar marketplace. The goal of SB-DATA is to support the creation and adoption of industry-led open data standards for rapid and seamless data exchange across the value chain from origination to decommissioning.

  14. Federal Acquisition Circular (FAC) 2005-75 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    75 Federal Acquisition Circular (FAC) 2005-75 Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the June 24, 2014 Federal Register at 79 FR 35858. FAC 2005-75 issued 1 final rule and 2 interim rules. PF2014-36 Federal Acquisition Circular (FAC) 2005-75 (15.76 KB) PF-2014-36a.pdf (13.72 KB) More Documents & Publications Federal Acquisition Circular (FAC) 2005-91 Federal Acquisition Circular (FAC) 2005-67 Publication of Federal

  15. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 Policy Flash 2014-20 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 DATE: March 10, 2014 ...

  16. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial...

    Energy Saver

    0 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 Policy Flash 2014-20 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 DATE: March 10, 2014...

  17. Federal Acquisition Circular (FAC) 2005-72

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the December 31, 2014 Federal Register at 78 FR 80368. This FAC issued 4 final rules. Please note that the final rule on Service Contracts Reporting Requirements is applicable to solicitations issued and contracts awarded on or after January 30, 2014. Contracting officers will modify existing indefinite-delivery contracts, on a bilateral basis in accordance with FAR 1.108(d)(3), within six months of the effective date of the final rule, if the remaining period of performance extends beyond October 1, 2013, and $2.5 million or more remains to be obligated.

  18. Secure Video Surveillance System Acquisition Software

    Energy Science and Technology Software Center

    2009-12-04

    The SVSS Acquisition Software collects and displays video images from two cameras through a VPN, and store the images onto a collection controller. The software is configured to allow a user to enter a time window to display up to 2 1/2, hours of video review. The software collects images from the cameras at a rate of 1 image per second and automatically deletes images older than 3 hours. The software code operates in amore » linux environment and can be run in a virtual machine on Windows XP. The Sandia software integrates the different COTS software together to build the video review system.« less

  19. MPS (Multiparticle Spectrometer) data acquisition software system

    SciTech Connect

    Saulys, A.C.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Lindenbaum, S.J.; Chan, C.S.

    1989-04-04

    A description of the software for a FASTBUS based data acquisition system in use at the Brookhaven National Laboratory Multiparticle Spectrometer is presented. Data reading and formatting is done by the SLAC Scanner Processors (SSP's) resident in the FASTBUS system. A multiprocess software system on VAX computers is used to communicate with the SSP's, record the data, and monitor on-line the progress of high energy and heavy ion experiments. The structure and the performance of this system are discussed. 4 refs., 1 fig.

  20. Acquisition Description/ Category Solicitation Method Contract Type

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    10/3/2016 Acquisition Description/ Category Solicitation Method Contract Type Period of Performance Contract Value Carlsbad Field Office Carlsbad Technical Assistance Portage, Inc. Full and Open Competition Time and Materials 7/1/10-6/30/15 $31.7M Carlsbad Technical Assistance Portage, Inc. DE-EM0004007 Full and Open Competition Firm-Fixed Price (Hybrid) 1/2/16-1/1/19 $42.4M Specialized Transportation Services Cast Specialty Transportation, Inc. DE-EM0001819 Small Business Set Aside Fixed price