National Library of Energy BETA

Sample records for acquisition costs 1968-2011

  1. Table 5.21 Crude Oil Refiner Acquisition Costs, 1968-2011 (Dollars...

    Energy Information Administration (EIA) (indexed site)

    ... monthly and annual data. * See http:www.eia.govpetroleum for related information. ... 1976Federal Energy Administration (FEA), Form FEA-96, "Monthly Cost Allocation ...

  2. Acquisition Letter on Allowability of Incurred Costs Due to Contractor

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Errors | Department of Energy on Allowability of Incurred Costs Due to Contractor Errors Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors The attached Acquisition Letter has been issued to provide application guidance to contracting officers for determining the allowability of incurred costs due to contractor errors. It applies to all contracts, including management and operating contracts, whose price or cost reimbursement is based on estimated or incurred

  3. Refiner Acquisition Cost of Crude Oil - Composite

    Energy Information Administration (EIA) (indexed site)

    Acquisition Type: Composite Domestic Imported Period: Monthly Annual Download Series History Download Series History Definitions, Sources & Notes Definitions, Sources & Notes Show ...

  4. ACQUISITION GUIDE CHAPTER 31.4: ALLOWABLILITY OF INCURRED COSTS

    Energy.gov [DOE]

    A new chapter (31.4) has been added to the Acquisition Guide. It discusses determining the allowability of incurred costs, emphasizing the five FAR requirements, especially the reasonableness requirement.

  5. Cost-plus-award-fee contracts-Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    With the issuance of Federal Acquisition Circular 2005-37, the FAR now requires, in addition to previous requirements, several new actions in using and administering a cost-plus-award-fee contract. Attached are the pre and post Federal Acquisition Circular 2005-37 requirements for using and administering cost-plus-award-fee contracts. Changes to current Departmental guidance are being considered and will be disseminated in future communications.

  6. Incorporation of learning curve costs in acquisition strategy optimization

    SciTech Connect

    Loerch, A.

    1994-12-31

    Each year, the United States Army procures billions of dollars worth of weapons and equipment so that it can accomplish its worldwide mission of deterrence. The process of deciding what to buy, in what quantities, and when to best respond to the threat posed by potential adversaries, is extremely complex, requiring extensive analysis. Two techniques commonly used in this analysis are mathematical programming and cost estimation. Although they are related through constraints on available procurement funds, the use of nonlinear cost learning curves, which more accurately represent system costs as a function of quantity produced, have not been incorporated into mathematical programming formulations that compute the quantities of items to be procured. As a result, the solutions obtained could be either suboptimal, or even infeasible with respect to budgetary limitations. We present a mixed integer programming formulation that uses a piecewise linear approximation of the learning curve costs for a more accurate portrayal of budgetary constraints. In addition, implementation issues are discussed, and performance results are given.

  7. ,"U.S. Refiner Acquisition Cost of Crude Oil"

    Energy Information Administration (EIA) (indexed site)

    Acquisition Cost of Crude Oil" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Refiner Acquisition Cost of Crude Oil",3,"Monthly","9/2016","1/15/1974" ,"Release Date:","11/1/2016" ,"Next Release Date:","12/1/2016" ,"Excel File

  8. ,"U.S. Total Refiner Acquisition Cost of Crude Oil"

    Energy Information Administration (EIA) (indexed site)

    Refiner Acquisition Cost of Crude Oil" ,"Click worksheet name or tab at bottom for data" ,"Worksheet Name","Description","# Of Series","Frequency","Latest Data for" ,"Data 1","U.S. Total Refiner Acquisition Cost of Crude Oil",3,"Annual",2015,"6/30/1968" ,"Release Date:","11/1/2016" ,"Next Release Date:","12/1/2016" ,"Excel File

  9. Table 3a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual

    Energy Information Administration (EIA) (indexed site)

    a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual" "Projected Price in Constant Dollars" " (constant dollars per barrel in ""dollar year"" specific to each AEO)" ,"AEO $ Year",1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010,2011,2012,2013 "AEO 1994",1992,16.69,16.42999,16.9899,17.66,18.28,19.0599,19.89,20.72,21.65,22.61,23.51,24.29,24.9,25.6,26.3,27,27.64,28.16

  10. Table 3a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual

    Energy Information Administration (EIA) (indexed site)

    a. Imported Refiner Acquisition Cost of Crude Oil, Projected vs. Actual Projected Price in Constant Dollars (constant dollars per barrel in "dollar year" specific to each AEO) AEO $ Year 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 AEO 1994 1992 16.69 16.43 16.99 17.66 18.28 19.06 19.89 20.72 21.65 22.61 23.51 24.29 24.90 25.60 26.30 27.00 27.64 28.16 AEO 1995 1993 14.90 16.41 16.90 17.45 18.00 18.53 19.13 19.65 20.16 20.63

  11. Acquisition Guide Chapters 31.205-33 and 70.31.205-33: Contractor Legal Management Requirements, Approving Settlements, and Determining the Allowability of Settlement Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapters 31.205-33 and 70.31.205-33: Contractor Legal Management Requirements, Approving Settlements, and Determining the Allowability of Settlement Costs

  12. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    _____________________________________________________________ __________________________________________________Chapter 15.4-4 (December 2010) GENERAL GUIDE FOR TECHNICAL ANALYSIS OF COST PROPOSALS FOR ACQUISITION CONTRACTS Acquisition Guide _____________________________________________________________ __________________________________________________Chapter 15.4-4 (November 2010) TABLE OF CONTENT CHAPTER 1 - INTRODUCTION KEY CONCEPTS

  13. Acquisition Regulation

    Energy Saver

    No. 2012-03 Acquisition Letter No. 2012-03 AL_2012-03.pdf (189.71 KB) More Documents & Publications Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors

    2-05 Acquisition Letter No. AL 2012-05 AL 2012-05.pdf (221.89 KB) More Documents & Publications Microsoft Word - AL2005-12.doc OPAM Policy Acquisition Guides Chapter 31 - Contract Cost Principles and Procedures

    3-04 Acquisition Letter No. AL 2013-04 AL 2013-04.pdf (58.37 KB) More

  14. Reissuance of Acquisition Letter on Meal Costs in Management and Operation Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This AL is a reissuance (under the new AL number of 2012-05) of the AL on Meal Costs in Management and Operating Contracts that was originally issued on August 2, 2005 (under AL number 2005-12). It provides additional application guidance on: understanding the standards for reimbursement of contractor meal costs

  15. Customer Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Soft Costs Customer Acquisition Customer Acquisition Photo of a woman, man, and child looking at a silver box on the outside of a home. Customer acquisition costs in the solar ...

  16. Policy Flash 2013-40 Acquisition Guide Chapter 43.3 Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimburstment Contracts

    Energy.gov [DOE]

    Attached is Policy Flash 2013-40 Acquisition Guide Chapter 43.3 Maintaining Alignment of Project Management with Contract Management of Non-Management and Operating (M&O) Cost Reimbursement...

  17. Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  18. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 30 - Cost Accounting Standards Administration Policy Flash 2015-05 - Acquisition Letter 2015-02 Acquisition Letter No. AL 2015-02

  19. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Energy Saver

    Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is Policy Flash 2013-44 Acquisition Guide- Allowability of Incurred Costs Attached is...

  20. ACQUISITION LETTER

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of the Department of Energy Acquisition Regulation (DEAR) subsection 901.301-70. CONTENTS ... ADR is reflected at Federal Acquisition Regulation (FAR) 33.204, which states, "it is ...

  1. Acquisition Regulation

    Energy.gov [DOE] (indexed site)

    .1 * * , No. AL-2015-09 Date August 25, 2015 fJ * - . *--o' 1 '.j t :i ?';; * * '"l'ES'ffito":J ACQUISITION LETTER This Acquisition Letter is issued under the authority ...

  2. ACQUISITION PLANNING

    Energy.gov [DOE] (indexed site)

    Management for the Acquisition of Capital Assets 22. DOE O 436.1 Departmental Sustainability 23. DOE G 413.3-13 Acquisition Strategy Guide for Capital Asset Projects 24. DOE O...

  3. Acquisition Savings Reporting Template Guidance

    Energy.gov [DOE]

    As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting acquisition savings/cost avoidance data effective as of October 1, 2012.

  4. Emergency Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Office of Federal Procurement Policy, (OFPP) updated the Emergency Acquisitions Guide which is an attachment. The Acquisition Guide Chapter 18.0 Emergency Acquisitions is revised to incorporate Federal Acquisition Regulation changes through Federal Acquisition Circular 2005-49 and parts of the OFPP guide. Both the OFPP guide and the Department of Energy guide chapter may assist the contracting community with planning and carrying out procurement requirements during major disaster declarations, other emergencies, contingency operations, or defense or recovery from certain attacks.

  5. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 1 3.2 (November 2009) PURCHASE ORDERS GUIDING PRINCIPLES J Purchase Orders should normally be issued on a fixed-price basis. J Modifications of Purchase Orders may be used for unpriced orders and for administrative matters on priced orders. J Purchase orders cannot exceed the simplified acquisition threshold. This section discusses the Department of Energy's (DOE) use of purchase orders as described in Federal Acquisition Regulation (FAR) 13.302 and the Department of Energy's Acquisition

  6. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 Rev. 1 Date 09/09/2015 Department of Energy No. FAL 2015-04 Rev. 1 Date 09/09/2015 Financial Assistance Regulations ACQUISITION/FINANCIAL ASSISTANCE LETTER This Acquisition/Financial Assistance Letter is issued under the authority of the Senior Procurement Executive of DOE. It is intended for use by procurement professionals of DOE, primarily Contracting Officers, and other officials of DOE that are involved in the acquisition process. Other parties are welcome to its information, but

  7. Interagency Acquisitions

    Energy.gov [DOE]

    Acquisition Letter (AL) 2011-01 has been issued to disseminate the Office of Management and Budget (OMB) guidance on how to structure and format interagency acquisitions. Contracting officers are to ensure that new interagency agreements are supported by a best determination. All interagency agreements for assistance acquisition must contain specific elements as described in the OMB guidance. The Work for Others program is excluded from this AL.

  8. ACQUISITION PLANNING

    Energy.gov [DOE] (indexed site)

    - Multiple Award Preference 10. FAR 17.5 Interagency Acquisitions 11. FAR Subpart 17.6 Management and Operating Contracts 12. FAR Part 19 Small Business Programs Guiding...

  9. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Career Development, Contracting Authority and Responsibilities Acquisition Regulation ... file, except for any documents required by regulation to be maintained in paper copy. ...

  10. ACQUISITION PLANNING

    Energy Saver

    ... The acquisition plan shall include justification for exceeding five years and discuss ... Agency policies and procedures (e.g., Justification for Other Than Full and Open ...

  11. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    Management, April 15, 2002 22. DOE M 413.3-1 Project ... Letter Mission Need Justification and Project Acquisition ... and Execution of the Budget, and more specifically, ...

  12. ACQUISITION PLANNING

    Office of Environmental Management (EM)

    Management, April 15, 2002 23. DOE M 413.3-1 Project ... Letter Mission Need Justification and Project Acquisition ... and Execution of the Budget, and more specifically, ...

  13. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... In addition, DOE Order 413.3B, Program and Project Management for the Acquisition ... proposals Basic research from non-profit organizations Competitive procurement of ...

  14. ACQUISITION PLANNING

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... proposals Basic research from non-profit organizations Competitive procurement of ... PLAN FOR ACTION AND ACQUISITION MANAGEMENT -- ANSWERS WHO, WHAT, WHEN, WHERE, ...

  15. Acquisition Guide

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide ------------------------ Chapter 71.1 (Dec 2014) HEADQUARTERS BUSINESS CLEARANCE PROCESS Guiding Principles  Timely acquisition planning is critical  Effective oversight control systems are essential to ensuring the high quality/integrity of procurement transactions  Collaboration and cooperation are required for timely, effective procurement processes Overview This chapter provides guidance regarding the policies and procedures governing the Field Assistance and

  16. Incorporation of the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    This subject guide chapter provides guidance for Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts.

  17. Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... The guidance contained herein is intended to serve as interim guidance for DOE until such time as the DOE Acquisition Regulation (DEAR) is amended to implement this policy on a ...

  18. Acquisition Letter No. AL 2008-02 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Part 7 Acquisition Planning FAR Part 15 Contracting by Negotiation FAR Part 30 Cost Accounting Standards Administration FAR Part 31 Contract Cost Principles and Procedures FAR...

  19. ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION...

    Office of Environmental Management (EM)

    3: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS The subject ...

  20. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    ------------------------- Chapter 13.3 (March 2014) 1 [Reference: FAR Subpart 13. 3 and FAR Subpart 13.5] Simplified Acquisition Procedures 1. Introduction Simplified Acquisition Procedures (SAP) are contracting methods designed to streamline the acquisition process and facilitate the procurement of goods and services. The results include less paperwork and lower costs for both the contractor and the Government. FAR 13.003(a) states, "Agencies shall use simplified acquisition procedures to

  1. Test Acquisition Guide

    Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1...

  2. Acquisitions___Communications.pdf

    Energy Saver

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate (76.66 KB) More Documents & Publications OPAM Policy Acquisition Guides Chapter 17 - Special Contracting Methods Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

  3. Acquisition Letter No. 2012-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    No. 2012-03 Acquisition Letter No. 2012-03 AL_2012-03.pdf (189.71 KB) More Documents & Publications Acquisition Letter on Allowability of Incurred Costs Due to Contractor Errors

  4. Subject: Cost and Price Analysis | Department of Energy

    Energy.gov [DOE] (indexed site)

    Subject: Cost and Price Analysis More Documents & Publications Acquisition Letter 2009-03 Acquisition Planning-Extending A Management and Operating Contract Without Full and Open...

  5. Microsoft Word - CR-091 Primary Basis of Cost Savings and Cost...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Cost Savings and Cost Savings Amount. The new configurations will only apply to acquisition document types, specifically: BPA Calls, Contracts, Delivery OrderTask Order,...

  6. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

  7. Small Business Issues for Environmental Restoration Acquisitions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Issues for Environmental Restoration Acquisitions The Department of Energy's best practices to reduce and eliminate barriers to small businesses entering into prime contracts for major environmental remediation acquisitions are as follows: Withholding of Payments Billing Cycles Allowability of Insurance Bonding Requirements WITHHOLDING OF PAYMENTS Under a cost reimbursement contract, the Federal Government makes payments conditionally, subject to a final audit. Typically, in a cost reimbursement

  8. ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AND SETTLEMENT COSTS | Department of Energy 3: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS ACQUISITION LETTER 2014-03: ALLOWABILITY OF CONTRACTOR LITIGATION DEFENSE AND SETTLEMENT COSTS The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies to legal costs related to allegations of discrimination where

  9. Refiner Acquisition Cost of Crude Oil - Composite

    Energy Information Administration (EIA) (indexed site)

    2009 2010 2011 2012 2013 2014 View History U.S. 59.29 76.69 101.87 100.93 100.49 92.02 1968-2014 East Coast (PADD 1) 61.63 79.91 111.01 111.50 106.80 96.70 2004-2014 Midwest (PADD...

  10. Acquisition Letter No. AL 2012-05 | Department of Energy

    Energy.gov [DOE] (indexed site)

    and Project Management SUBJECT: Reissuance of Acquisition Letter on Meal Costs in Management and Operation Contracts SUMMARY: This AL is a reissuance (under the new AL...

  11. Attached is Policy Flash 2013-44 Acquisition Guide- Allowability...

    Energy.gov [DOE] (indexed site)

    44 Acquisition Guide- Allowability of Incurred Costs Questions concerning this policy flash should be directed to Michael Righi of the Contract and Financial Assistance Policy...

  12. Acquisition Letter on Contractor Domestic Extended Personnel Assignments

    Energy.gov [DOE]

    The attached Acquisition Letter has been issued to provide guidance on the Department's policy governing reimbursement of costs associated with contractor domestic extended personnel assignments.

  13. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Regulation Federal Acquisition Circular 2005-86 Summary of Rules FAC 2005-86 Item Subject FAR Case I Definition of "Multiple-Award Contract" 2015-019 II Sole Source ...

  14. ACQUISITION PLANNING | Department of Energy

    Energy Saver

    ACQUISITION PLANNING ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications ACQUISITION PLANNING Attachment FY2011-13 Attachment FY2011-40(3)...

  15. Acquisition Letter 2014-01: Management and Operating Contractors' Audit

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Coverage of Cost_Reimbursement Subcontracts | Department of Energy 2014-01: Management and Operating Contractors' Audit Coverage of Cost_Reimbursement Subcontracts Acquisition Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost_Reimbursement Subcontracts The subject Acquisition Letter's purpose is to achieve greater Department-wide emphasis on auditing cost type subcontracts by providing guidance for monitoring management and operating contractors' fulfillment of

  16. Acquisition Letter No. AL 2014-03 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Acquisition Letter No. AL 2014-03 DATE: January 07, 2014 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: ACQUISITION LETTER 2014-03: SUMMARY: The subject Acquisition Letter's purpose is to provide guidance to Contracting Officers on allowability of contractor litigation defense and settlement costs in light of Secretary of the Army v. Tecom. The guidance applies

  17. Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts

    Energy.gov [DOE]

    Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov.

  18. Aerial robotic data acquisition system

    SciTech Connect

    Hofstetter, K.J.; Hayes, D.W.; Pendergast, M.M.; Corban, J.E.

    1993-12-31

    A small, unmanned aerial vehicle (UAV), equipped with sensors for physical and chemical measurements of remote environments, is described. A miniature helicopter airframe is used as a platform for sensor testing and development. The sensor output is integrated with the flight control system for real-time, interactive, data acquisition and analysis. Pre-programmed flight missions will be flown with several sensors to demonstrate the cost-effective surveillance capabilities of this new technology.

  19. Federal Acquisition Regulation Federal Acquisition Circular 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Summary of Rules Item Subject FAR Case I. Updates to Contract Reporting and Central 2010-014 Contractor Registration II. Interagency Acquisitions: Compliance by Nondefense ...

  20. Word Pro - Untitled1

    Energy Information Administration (EIA) (indexed site)

    1 Crude Oil Refiner Acquisition Costs, 1968-2011 Summary Composite Costs Domestic Costs Imported Costs 166 U.S. Energy Information Administration / Annual Energy Review 2011 1 See "Nominal Dollars" in Glossary. 2 In chained (2005) dollars, calculated by using gross domestic product implicit price defla- tors in Table D1. See "Chained Dollars" in Glossary. Source: Table 5.21. 1970 1975 1980 1985 1990 1995 2000 2005 2010 0 20 40 60 80 100 120 Nominal Dollars¹ per Barrel

  1. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions...

    Energy.gov [DOE] (indexed site)

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other ...

  2. Sustainable Acquisition, Federal and Department of Energy Acquisition...

    Energy.gov [DOE] (indexed site)

    PF2011-08 Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments (89.35 KB) More Documents & Publications DOE Acquisition Guide Chapter 23 ...

  3. Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to incorporate (1) Federal Acquisition Circular (FAC) ...

  4. ACQUISITION PLANNING | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning

    ACQUISITION PLANNING (742.74 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2015-13

  5. Acquisition Letter Archive Listing

    Energy Saver

    of Interest | Department of Energy 9.505 - Organizational and Consultant Conflicts of Interest Acquisition Guide Chapter 9.505 - Organizational and Consultant Conflicts of Interest DATE: September 26, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 9.505, Organizational and Consultant Conflicts of Interest SUMMARY: Acquisition Guide

  6. Interagency Acquisitions | Department of Energy

    Office of Environmental Management (EM)

    Acquisition Letter (AL) 2011-03 has been updated to incorporate Federal Acquisition Circular (FAC) 2005-47 which published an interim Federal Acquisition Regulation (FAR) rule ...

  7. Sustainable Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Sustainable Acquisition Sustainable Acquisition Mission The team establishes a national approach to expand purchases of sustainable goods and services, including ...

  8. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2004-04-19

    This Order establishes training and certification requirements and career development programs under the Acquisition Career Development (ACD) Program for DOE and NNSA acquisition workforce. The acquisition workforce includes contracting, purchasing, personal property management, program management, Contracting Officers and Contracting Officer Representatives. The ACD Program implements the Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the objectives of Executive Order (E.O.) 129231, Federal Procurement Reform, dated 10-13-1994. This order cancels DOE O 361.1, Acquisition Career Development Program, dated 11-10-99, AND Acquisition Letter 2003-05, Personal Property Management Career Development, Training, and Certification Program, dated 9-10-03. Cancels DOE O 361.1 Chg 2. Canceled by DOE O 361.1B.

  9. Sustainable Acquisition, Federal and Department of Energy Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulation Amendments | Department of Energy Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments Sustainable Acquisition, Federal and Department of Energy Acquisition Regulation Amendments Executive Order 13514, Federal Leadership in Environmental, Energy and Economic Performance was issued October 5, 2009. Among its purposes were the promotion of sustainable acquisition, including energy, fuel, and water efficiency PF2011-08 Sustainable Acquisition,

  10. Acquisition Resources | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    EM Contractors for Capital Asset Projects Acquisition and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Report ...

  11. Chapter 30 - Cost Accounting Standards Administration | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 0 - Cost Accounting Standards Administration Chapter 30 - Cost Accounting Standards Administration 30.1_DOE's_Oversight_of_Certain_Contractor_Defined_Pension_Plans_and_Its_Effect_on_Contracts_0.pdf (19.91 KB) More Documents & Publications OPAM Policy Acquisition Guides Policy Flash 2015-05 - Acquisition Letter 2015-02 Acquisition Letter No. AL 2015-02

  12. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2001-12-20

    To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Cancels DOE O 361.1. Canceled by DOE O 361.1 Chg 2.

  13. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2003-06-13

    To set forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Development (ACD) Program, which implements Office of Federal Procurement Policy (OFPP) requirements, Federal Acquisition Regulation (FAR) requirements, Federal Acquisition Reform Act (FARA) requirements, and the career development objectives of Executive Order (E.O.) 12931. Change 1 approved 12-20-2001. Change 2 approved 06-13-03. Cancels DOE O 361.1 Chg 1. Canceled by DOE O 361.1A.

  14. Acquisition Career Development Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1999-11-10

    The Order implements the Department's Acquisition Career Development program, mandatory for professionals in the GS-1102 and 1105 occupational procurement series, as well as others with significant procurement responsibilities. The Order also ensures that members of the acquisition workforce are aware of and adhere to the mandatory training and certification requirements. Cancels Acquisition Letter 98-06. Canceled by DOE O 361.1 Chg 1.

  15. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy DOE Acquisition Guide Chapter 7.1 Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Acquisition Guide Chapter 7.1 is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to

  16. Acquisition Career Management Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-01-24

    The order defines requirements and responsibilities for training, certification, and career development programs for the DOE acquisition workforce. Cancels DOE O 361.1A.

  17. Status of Acquisition Letters

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Workers under Service Contracts Jason Taylor Active until rulemaking is complete 6 ... Management and Operating Contracts Jason Taylor Superseded by coverage in the Acquisition ...

  18. Acquisition Career Management Program

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2015-05-14

    The order sets forth requirements and responsibilities for the Department of Energy (DOE) Acquisition Career Management Program. Supersedes DOE O 361.1B.

  19. Acquisition Letter No. AL 2014-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 Acquisition Letter No. AL 2014-01 AL 2014-01.pdf (72.09 KB) More Documents & Publications Acquisition Letter 2014-01: Management and Operating Contractors' Audit Coverage of Cost_Reimbursement Subcontracts Assessment Report: OAI-V-16-03 Assessment Report: OAI-V-16-05

  20. Chapter 31 - Contract Cost Principles and Procedures | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon 31.4 Allowability of Incurred Costs.pdf More Documents & Publications OPAM Policy Acquisition Guides Microsoft Word - AL2005-12.doc OPAM Policy Acquisition Guides...

  1. Chapter 34 - Major Systems Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating...

  2. Startup Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses startup costs for construction and environmental projects, and estimating guidance for startup costs.

  3. ACQUISITION PLANNING | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ACQUISITION PLANNING ACQUISITION PLANNING More Documents & Publications 7pt1AcquisitionPlanning.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Update of Acquisition Guide Chapter 7.1,

  4. Acquisition Letter NO. AL 2016-05 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    NO. AL 2016-05 Acquisition Letter NO. AL 2016-05 DATE: May 3, 2016 TO: Procurement Directors FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: AL 2016-05-Determining if an activity is a FAR 31.205-44 training and education activity (and consequently rendering the overtime costs caused by the activity specifically unallowable); and Managing all overtime costs. SUMMARY: *NOTE* This Policy Flash was previously issued with an

  5. Policy Flash 2014-37 Update to the Department of Energy Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Policy Flash...

  6. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7...

    Office of Environmental Management (EM)

    business case analysis andor Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. ...

  7. Federal Acquisition Regulation Federal Acquisition Circular 59

    Energy.gov [DOE] (indexed site)

    I. Prohibition on Contracting With Inverted Domestic Corporations 2012-013 II. Free Trade Agreement--Colombia 2012-012 III. Revision of Cost Accounting Standards Threshold...

  8. Acquisition & Financial Assistance Rules Status | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates PDF icon ...

  9. Small Business Issues for Environmental Restoration Acquisitions...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions Small Business Issues for Environmental Restoration Acquisitions ...

  10. Enabling Sustainable Acquisition by Improving Procurement Systems...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Enabling Sustainable Acquisition by Improving Procurement Systems Enabling Sustainable Acquisition by Improving Procurement Systems Enabling Sustainable Acquisition by Improving ...

  11. OPAM Policy Acquisition Guides

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 17.3 (February 2004) Acquisition, Use, and Disposal of Real Estate [Reference: DEAR 917.74, 970.5244-1] Overview This section provides internal Departmental information and a DOE point of contact for issues dealing with real estate acquisition, use, and disposal. Background DEAR 917.74 provides the policy and procedures to be followed in the acquisition, use, and disposal of real estate. In accordance with DEAR clause 970.5244-1, Management and Operating contractors also follow the DEAR

  12. Acquisition Program | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Program Acquisition Program Southeastern's acquisition initiatives are met as a result of requirements from our programs and projects that accomplish our agency's mission. In order to follow the Federal Acquisition Regulations regarding announcement of acquisition opportunities, all acquisitions that exceed $25,000 will be published electronically by Southeastern Power Administration. Contact Information For more information, please contact Ann Craft Phone: 706.213.3823

  13. IT Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition IT Acquisition computer-957001_960_720.jpg Acquisition The Chief Information Officer (CIO) guides and manages the Department's effective use of information technology (IT) and IT resources. When acquiring IT solutions, the CIO seeks to integrate project, financial, and acquisition management, and quality oversight methods into a cohesive process to achieve program goals. The Acquisition Management Division uses a variety of IT acquisition solutions, managed in an integrated fashion

  14. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 - Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures OPAM Policy Acquisition Guides...

  15. Sustaninable Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sustaninable Acquisition Sustaninable Acquisition Federal agencies are required to give preference to products that are energy efficient, water efficient, made from biobased or ...

  16. Acquisition and Project Management

    National Nuclear Security Administration (NNSA)

    4%2A en Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise http:nnsa.energy.govblogacquisition-and-project-mana...

  17. Acquisition Strategy RM

    Energy.gov [DOE]

    The Acquisition Strategy (AS) Review Module (RM) is a tool that assists Department of Energy (DOE) federal project review teams in evaluating the adequacy of the AS prior to approval of CD-1. The...

  18. Data acquisition system

    DOEpatents

    Shapiro, Stephen L.; Mani, Sudhindra; Atlas, Eugene L.; Cords, Dieter H. W.; Holbrook, Britt

    1997-01-01

    A data acquisition circuit for a particle detection system that allows for time tagging of particles detected by the system. The particle detection system screens out background noise and discriminate between hits from scattered and unscattered particles. The detection system can also be adapted to detect a wide variety of particle types. The detection system utilizes a particle detection pixel array, each pixel containing a back-biased PIN diode, and a data acquisition pixel array. Each pixel in the particle detection pixel array is in electrical contact with a pixel in the data acquisition pixel array. In response to a particle hit, the affected PIN diodes generate a current, which is detected by the corresponding data acquisition pixels. This current is integrated to produce a voltage across a capacitor, the voltage being related to the amount of energy deposited in the pixel by the particle. The current is also used to trigger a read of the pixel hit by the particle.

  19. Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Acquisition Workers install a process vessel ventilation system in a facility that houses two tanks for processing decontaminated salt solution at the Saltstone Production Facility at EM’s Savannah River Site. Workers install a process vessel ventilation system in a facility that houses two tanks for processing decontaminated salt solution at the Saltstone Production Facility at EM's Savannah River Site. The Office of Environmental Management (EM) is responsible for

  20. A Low-Cost Continuous Emissions Monitoring System for Mobile...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    A Low-Cost Continuous Emissions Monitoring System for Mobile and Stationary Engine SCRDPF ApplicationsData-Logger for Vehicle Data Acquisition This project describes a novel ...

  1. Sustainable Acquisition Developments

    Energy.gov [DOE]

    The Administration continues its emphasis on sustainable acquisition. Attached are 2 letters describing recent developments. The first is dated October 5, 2011, from OFPP Administrator, Daniel Gordon, describing the 95% goal, emphasizing the importance of the program and forecasting changes in the Federal Procurement Data System. Second is a letter from the Defense Procurement and Acquisition Policy Office dated October 4, 2011, furnishing some details regarding changes being made in the Federal Procurement Data System to better enable report of accomplishments. Expect to receive more information from the Information Systems Division of the OCIO as the FPDS changes are made.

  2. LEGS data acquisition facility

    SciTech Connect

    LeVine, M.J.

    1985-01-01

    The data acquisition facility for the LEGS medium energy photonuclear beam line is composed of an auxiliary crate controller (ACC) acting as a front-end processor, loosely coupled to a time-sharing host computer based on a UNIX-like environment. The ACC services all real-time demands in the CAMAC crate: it responds to LAMs generated by data acquisition modules, to keyboard commands, and it refreshes the graphics display at frequent intervals. The host processor is needed only for printing histograms and recording event buffers on magnetic tape. The host also provides the environment for software development. The CAMAC crate is interfaced by a VERSAbus CAMAC branch driver.

  3. Acquisition Letter Archive Listing

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Letter Archive Listing 1 Acquisition Letter Title 1984-1R Rev. 12/92 Acquisition Letters 1987-3R Rev. 12/87 Prescreening Policies and Procedures 1987-5 09/04/87 Patents and Technical Data 1988-1 05/25/88 Rights in Technical Data Facilities 1990-3R Rev. 11/30/92 Internal Audit 1991-05 08/06/91 Guidance on Implementing DOE Fee Policy 1991-08 10/23/91 Special Considerations - Educational Institutions 1991-3 Undated Subcontractor Representations and Certifications - Coverage canceled by 59 FR 24357

  4. POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    23 Acquisition Guide 13.3 Simplified Acquisition Procedures POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures Questions concerning this policy flash...

  5. Acquisition Guide 13.3 Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide is revised to provide a knowledge base that may support the increase of single purchase limits based on the criteria established by the Federal Acquisition Regulations...

  6. Acquisition Letter No. AL-2016-06 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    6 Acquisition Letter No. AL-2016-06 DATE: August 8, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Provisional Reimbursement and Allowability of Costs Associated with Whistleblower Actions SUMMARY: The subject AL provides guidance to Contracting Officers on applying FAR 31.205-47 and DEAR 931.205-47(h) to determine 1) the appropriateness of provisional reimbursement of

  7. Federal Information Technology Acquisition Reform Act (FITARA) Data

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Resources | Department of Energy Information Technology Acquisition Reform Act (FITARA) Data Resources Federal Information Technology Acquisition Reform Act (FITARA) Data Resources FITARA Resources Available for Download: DOE IT Policy Archive: ZIP IT Leadership Directory: HTML | JSON | PDF | XLSX CIO Governance Board Membership List: HTML | JSON | PDF DOE IT Reform Cost Savings: JSON | PDF FITARA Milestones: JSON | PDF DOE IT Policies policyarchive.zip (1.36 MB) bureaudirectory.html (19.15

  8. Acquisition & Financial Assistance Rules Status_May_2016.xlsx

    Energy Saver

    pt31.doc� AcqGuide70pt31.doc� AcqGuide70pt31.doc� (16.63 KB) More Documents & Publications Microsoft Word - AcqGuide70pt31A.doc Acquisition Guide Chapter 70.31A - Costs Associated with Whistleblower Actions Acquisition Letter No. AL-2016-06

    Acquisition Guide Chapter 70.3102-05-6 July 2016 Contractor Compensation - Variable Pay [Reference: FAR 31.205-6, DEAR 970.3102 -05-6, DOE Order 350.1] 1.0 Summary of Latest Changes This update: (1) changes the chapter number from

  9. Performance-Based Services Acquisition

    Energy.gov [DOE] (indexed site)

    Services Acquisition Reference: Public Law 106-398, 821, FAR 37.6 1.0 Summary of ... Federal acquisition law has established a preference for PBSA, which improves procurement ...

  10. Acquisition Letters | Department of Energy

    Energy.gov [DOE] (indexed site)

    August 11, 2006 Acquisition Letter No. AL 2006-10 Class Deviation for Certain DEAR Intellectual Property Clauses October 24, 1993 Acquisition Letter No. AL 1994-19 Basic...

  11. Acquisition Letters Remaining In Effect

    Energy.gov [DOE]

    From Acquisition Letter (Acquisition Letters (AL) that remain in effect are identified below. All other previously issued Als have been superseded by a formal rule-making, incorporated into other guidance, and/or canceled.)

  12. Performance Based Service Acquisition Toolkit

    Energy.gov [DOE]

    Performance-based Service Acquisition (PBA) means an acquisition structured around the results to be achieved as opposed to the manner by which the work is to be performed.

  13. Cost Participation in Research and Development Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5.2 June 2016 ______________________________________________________________________________ 1 Cost Participation in Research and Development Contracting [References: Public Law 109-58, Energy Policy Act of 2005, FAR 35.003(b), DEAR 917.70] 1.0 Summary of Latest Changes This update: (1) combines Acquisition Guide Chapters 17.2, Cost Participation, and 35.2, Cost Sharing in Research and Development Contracting, (2) updates delegations of authority, (3) updates sample cost sharing language for

  14. High Energy Cost Grants | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    High Energy Cost Grants High Energy Cost Grants The High Energy Cost Grant Program provides financial assistance for the improvement of energy generation, transmission, and distribution facilities servicing eligible rural communities with home energy costs that are over 275% of the national average. Grants under this program may be used for the acquisition, construction, installation, repair, replacement, or improvement of energy generation, transmission, or distribution facilities in

  15. Data acquisition instruments: Psychopharmacology

    SciTech Connect

    Hartley, D.S. III

    1998-01-01

    This report contains the results of a Direct Assistance Project performed by Lockheed Martin Energy Systems, Inc., for Dr. K. O. Jobson. The purpose of the project was to perform preliminary analysis of the data acquisition instruments used in the field of psychiatry, with the goal of identifying commonalities of data and strategies for handling and using the data in the most advantageous fashion. Data acquisition instruments from 12 sources were provided by Dr. Jobson. Several commonalities were identified and a potentially useful data strategy is reported here. Analysis of the information collected for utility in performing diagnoses is recommended. In addition, further work is recommended to refine the commonalities into a directly useful computer systems structure.

  16. Acquisition Guide Chapter 1.0 - Acquisition Regulations System | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Acquisition Guide Chapter 1.0 - Acquisition Regulations System Acquisition Guide Chapter 1.0 - Acquisition Regulations System 1.1_Acquisition_Regulation_System_0.pdf (80.8 KB) 1.2_Head_of_Contracting_Activity_(HCA)_Authority,_Functions,_and_Responsibilities_0.pdf (25.78 KB) 1.2_Attachment_Tables_I-IV_0.pdf (29.11 KB) 1.3_Balanced_Scorecard_Assessment_Program_0.pdf (31.8 KB) PF2015-39a - Attachment - Acq Guide Chapter 1.4_Establishing_the_Position_of_Source_Evaluation_Board_(SEB)

  17. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Environmental Management (EM)

    Archive listing Acquisition Letter Archive listing TO RECEIVE A COPY OF AN ARCHIVED ACQUISITION LETTER (AL), PLEASE USE THE PDF FILE BELOW TO SEARCH FOR THE AL NAME/NUMBER AND SEND IT IN TO DOE_OAPMPOLICY@HQ.DOE.GOV. Acquisition Letter Archive listing.pdf (86.37 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

    NO. AL 2016-05 Acquisition Letter NO. AL 2016-05 DATE: May 3, 2016 TO:

  18. new-software-acquisitions

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Software Acquisitions The National Highway Traffic Safety Administration (NHTSA) plans to expand the use of the TRACC cluster. NHTSA's Human Injury Research Division (HIRD) does a lot of work related to real world crash reconstruction. For reconstruction purposes, HIRD uses two different software modules: MADYMO and modeFrontier. Optimization is performed using modeFrontier. Since optimization studies require a lot of simulations, HIRD will use TRACC's cluster with MADYMO and modeFrontier

  19. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    75.04 KB) More Documents & Publications DOE Acquisition Guide Chapter 15.1 Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Templates

  20. Walnut Capital Acquisitions | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Walnut Capital Acquisitions Jump to: navigation, search Name: Walnut Capital Acquisitions Place: Pittsburgh, Pennsylvania Zip: 15232 Product: Walnut Capital Acquisitions is the...

  1. Update to the Department of Energy Acquisition Guide Chapter 16.2,

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts | Department of Energy Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non-Management and Operating Contracts The purpose of this Flash is

  2. Acquisition and Project Management Continuous Improvement Presentation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management ...

  3. Data acquisition system

    DOEpatents

    Phillips, David T.

    1979-01-01

    A data acquisition system capable of resolving transient pulses in the subnanosecond range. A pulse in an information carrying medium such as light is transmitted through means which disperse the pulse, such as a fiber optic light guide which time-stretches optical pulses by chromatic dispersion. This time-stretched pulse is used as a sampling pulse and is modulated by the signal to be recorded. The modulated pulse may be further time-stretched prior to being recorded. The recorded modulated pulse is unfolded to derive the transient signal by utilizing the relationship of the time-stretching that occurred in the original pulse.

  4. Acquisition Strategy RM

    Office of Environmental Management (EM)

    Acquisition Strategy Review Module March 2010 CD-0 O 0 OFFICE OF C CD-1 F ENVIRO Standard R Acquisi Rev Critical Decis CD-2 M ONMENTAL Review Plan ition Stra view Module sion (CD) Ap CD March 2010 L MANAGE n (SRP) ategy e pplicability D-3 EMENT CD-4 Post Ope eration Standard Review Plan, 2 nd Edition, March 2010 i FOREWORD The Standard Review Plan (SRP) 1 provides a consistent, predictable corporate review framework to ensure that issues and risks that could challenge the success of Office of

  5. Standardized Cost Savings Definitions and Reporting Template

    Office of Energy Efficiency and Renewable Energy (EERE)

    As part of the Office of Management and Budget (OMB) Acquisition Savings Initiative and the DOE Strategic Sourcing Program, a key challenge has been to address the requirements of reporting cost savings and cost avoidance data. In order for DOE to fully comply with reporting requirements, we are directing that the attached template be utilized for reporting Fiscal Year (FY) 2012 data.

  6. Operating Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter is focused on capital costs for conventional construction and environmental restoration and waste management projects and examines operating cost estimates to verify that all elements of the project have been considered and properly estimated.

  7. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 |

    Office of Environmental Management (EM)

    Department of Energy is revised to remind the planner when planning for an interagency acquisition to perform a determination of best procurement approach, business case analysis and/or Economy Act determinations and findings, as applicable, in accordance with Federal Acquisition Regulation (FAR) 17.5 Interagency Acquisitions. Revisions to the guide chapter add to references FAR 17.5 and related guide chapter 17.1. Also, two revisions in the chapter are identified by vertical lines in the

  8. U.S. Total Refiner Acquisition Cost of Crude Oil

    Energy Information Administration (EIA) (indexed site)

    2010 2011 2012 2013 2014 2015 View History Composite 76.69 101.87 100.93 100.49 92.02 48.40 1968-2015 Domestic 78.01 100.71 100.72 102.91 94.05 49.95 1968-2015 Imported 75.86 ...

  9. U.S. Refiner Acquisition Cost of Crude Oil

    Energy Information Administration (EIA) (indexed site)

    Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 View History Composite 44.38 44.78 41.43 35.63 30.01 28.47 1974-2016 Domestic 46.68 47.02 43.30 37.76 32.22 30.05 1974-2016 Imported 41.13 ...

  10. ,"U.S. Total Refiner Acquisition Cost of Crude Oil"

    Energy Information Administration (EIA) (indexed site)

    ...12016" ,"Excel File Name:","petprirac2dcunusa.xls" ,"Available from Web Page:","http:www.eia.govdnavpetpetprirac2dcunusa.htm" ,"Source:","Energy Information ...

  11. ,"U.S. Refiner Acquisition Cost of Crude Oil"

    Energy Information Administration (EIA) (indexed site)

    ...12016" ,"Excel File Name:","petprirac2dcunusm.xls" ,"Available from Web Page:","http:www.eia.govdnavpetpetprirac2dcunusm.htm" ,"Source:","Energy Information ...

  12. Key FAR: Federal Acquisition Regulation DEAR: DOE Acquisition...

    Office of Environmental Management (EM)

    1991-AB82 Acquisition Regulation: Patents, Data, and Copyrights- The proposed rule updates, clarifies and streamlines text in certain DOE intellectual property and technology ...

  13. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition News Acquisition News RSS October 17, 2016 DOE Releases Request for Information/Sources Sought for the Savannah River Site Operations Acquisition (Post FY 2018) Cincinnati -- The U.S. Department of Energy (DOE) Environmental Management Consolidated Business Center (EMCBC) today issued a Request for Information (RFI) /Sources Sought in support the upcoming follow-on procurement for the management and operation (M&O) of the Savannah River Site (SRS). October 17, 2016 CH2M President

  14. Acquisition Forecast | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Forecast Acquisition Forecast Acquisition Forecast It is the policy of the U.S. Department of Energy (DOE) to provide timely information to the public regarding DOE's forecast of future prime contracting opportunities and subcontracting opportunities which are available via the Department's major site and facilities management contractors. This forecast has been expanded to also provide timely status information for ongoing prime contracting actions that are valued in excess of the

  15. Acquisition Savings Reporting Process Template

    Energy.gov [DOE] (indexed site)

    steps, then it is an Other Acquisition Savings process. 2 STEP 2 - Select Savings Methodology (In Order of Preference) Regardless if it is Strategic Sourcing or an Other...

  16. Acquisition News | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    all options). October 2, 2015 DOE Announces Acquisition Strategy for Post Fiscal Year 2016 Legacy Cleanup at Los Alamos Cincinnati - The U.S. Department of Energy (DOE)...

  17. Revised Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sourcing Requirements | Department of Energy Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic Sourcing Requirements Revised Department of Energy (DOE) Acquisition Guide Chapter 7.2 Strategic Sourcing Requirements DOE Acquisition Guide Chapter 7.2 has been revised to incorporate recent guidance from the following: Policy Flash 2014-18 dated February 26, 2014, Complex-Wide Strategic Sourcing - Update Policy Flash 2014-16 dated February 12, 2014, Standardized Cost Savings

  18. "Data Acquisition Systems"

    SciTech Connect

    Unterweger, Michael; Costrell, Louis deceased

    2009-07-07

    This project involved support for Lou Costrell and myself in the development of IEEE and IEC standards for nuclear counting and data acquisition systems. Over the years, as a result of this support, Lou and I were able to attend standards meetings of IEEE and IEC, which led directly to the publication of many standards for NIM systems, FastBus and CAMAC. We also chaired several writing committees as well as ANSI N42 (Nuclear instrumentation), IEEE NIM (NIM standard), IEEE NID (NPSS nuclear instruments and detector) and IEC TC45 WG9 (Nuclear instrumentation). Through this support we were able to assure that the interests of the US and DOE were expressed and implemented in the various standards.

  19. Deepwater seismic acquisition technology

    SciTech Connect

    Caldwell, J.

    1996-09-01

    Although truly new technology is not required for successful acquisition of seismic data in deep Gulf of Mexico waters, it is helpful to review some basic aspects of these seismic surveys. Additionally, such surveys are likely to see early use of some emerging new technology which can improve data quality. Because such items as depth imaging, borehole seismic, 4-D and marine 3-component recording were mentioned in the May 1996 issue of World Oil, they are not discussed again here. However, these technologies will also play some role in the deepwater seismic activities. What is covered in this paper are some new considerations for: (1) longer data records needed in deeper water, (2) some pros and cons of very long steamer use, and (3) two new commercial systems for quantifying data quality.

  20. National Ignition Facility project acquisition plan

    SciTech Connect

    Callaghan, R.W.

    1996-04-01

    The purpose of this National Ignition Facility Acquisition Plan is to describe the overall procurement strategy planned for the National Ignition Facility (NIF) Project. The scope of the plan describes the procurement activities and acquisition strategy for the following phases of the NIF Project, each of which receives either plant and capital equipment (PACE) or other project cost (OPC) funds: Title 1 and 2 design and Title 3 engineering (PACE); Optics manufacturing facilitization and pilot production (OPC); Convention facility construction (PACE); Procurement, installation, and acceptance testing of equipment (PACE); and Start-up (OPC). Activities that are part of the base Inertial Confinement Fusion (ICF) Program are not included in this plan. The University of California (UC), operating Lawrence Livermore National Laboratory (LLNL) and Los Alamos National Laboratory, and Lockheed-Martin, which operates Sandia National Laboratory (SNL) and the University of Rochester Laboratory for Laser Energetics (UR-LLE), will conduct the acquisition of needed products and services in support of their assigned responsibilities within the NIF Project structure in accordance with their prime contracts with the Department of Energy (DOE). LLNL, designated as the lead Laboratory, will have responsibility for all procurements required for construction, installation, activation, and startup of the NIF.

  1. Acquisition Guide Chapter 7.1 - Acquisition Planning | Department of Energy

    Office of Environmental Management (EM)

    7.1 - Acquisition Planning Acquisition Guide Chapter 7.1 - Acquisition Planning PF2009-22.pdf (320.29 KB) PF2009-22a - Attachment-Acquisition Guide Chapter 7.1 - Acquisition Planning (192.2 KB) More Documents & Publications Acquisition Guide Chapter 7.1 - Acquisition Planning Microsoft Word - AcqGuide7pt1.doc Acquisition Guide Chapter 7.1 - Acquisition Planning

  2. BPA's Costs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    links Financial Information Financial Public Processes Asset Management Cost Verification Process Rate Cases BP-18 Rate Case Related Publications Meetings and Workshops Customer...

  3. Acquisition Guide Chapter 7.3:Acquisition Planning in the M&O Environment

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter 2013-03, Acquisition Planning Considerations for M&O Contracts, has been moved to the Acquisition Guide as chapter (7.3).

  4. U.S. Department of Energy Acquisition Strategy Guide for Capital Asset Projects

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2008-07-22

    This guide serves as a tool for federal project directors (FPDs) and the Integrated Project Team (IPT) for developing a project acquisition strategy document. The DOE O 413.3A requires the development and approval of the acquisition strategy for projects with total project cost (TPC) of $20M or greater, as part of the Critical Decision-1 (CD-1), Approve L

  5. Updated NGNP Fuel Acquisition Strategy

    SciTech Connect

    David Petti; Tim Abram; Richard Hobbins; Jim Kendall

    2010-12-01

    A Next Generation Nuclear Plant (NGNP) fuel acquisition strategy was first established in 2007. In that report, a detailed technical assessment of potential fuel vendors for the first core of NGNP was conducted by an independent group of international experts based on input from the three major reactor vendor teams. Part of the assessment included an evaluation of the credibility of each option, along with a cost and schedule to implement each strategy compared with the schedule and throughput needs of the NGNP project. While credible options were identified based on the conditions in place at the time, many changes in the assumptions underlying the strategy and in externalities that have occurred in the interim requiring that the options be re-evaluated. This document presents an update to that strategy based on current capabilities for fuel fabrication as well as fuel performance and qualification testing worldwide. In light of the recent Pebble Bed Modular Reactor (PBMR) project closure, the Advanced Gas Reactor (AGR) fuel development and qualification program needs to support both pebble and prismatic options under the NGNP project. A number of assumptions were established that formed a context for the evaluation. Of these, the most important are: • Based on logistics associated with the on-going engineering design activities, vendor teams would start preliminary design in October 2012 and complete in May 2014. A decision on reactor type will be made following preliminary design, with the decision process assumed to be completed in January 2015. Thus, no fuel decision (pebble or prismatic) will be made in the near term. • Activities necessary for both pebble and prismatic fuel qualification will be conducted in parallel until a fuel form selection is made. As such, process development, fuel fabrication, irradiation, and testing for pebble and prismatic options should not negatively influence each other during the period prior to a decision on reactor type

  6. Acquisitions___Communications.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisitions___Communications.pdf Acquisitions___Communications.pdf (2.09 MB) More Documents & Publications 7pt1AcquisitionPlanning.pdf 37pt.2PerformanceBasedServiceAcquisition.pdf Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning

  7. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Energy.gov [DOE]

    Attached is Policy Flash 2013-30 Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

  8. Acquisition Guide Chapter 7.1 – Acquisition Planning

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Guide Chapter 7.1 is revised to update references, reorganize content, delete M&O coverage (which will be moved to a separate Guide Chapter), and add a new "Alternate Approval Process".

  9. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    & Publications Policy Flash 2016-29 Update to Congressional Notifications - Acquisition Guide Chapter 5.1 and Guide to Financial Assistance Chapter 2, Section 2.6.1 Policy Flash ...

  10. Acquisition Guide Chapter 17.1 - Interagency Acquisitions, Interagency...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The revised chapter is attached with this flash. All other attachments from Policy Flash 2012-32 remain the same. PDF icon PF2012-49 AG 17.1- Interagency Acquisitions, Interagency ...

  11. Policy Flash 2013-30 Acquisition Letter on Acquisition Planning...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  12. Key FAR: Federal Acquisition Regulation DEAR: DOE Acquisition Regulation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    as of 11/4/2016. Highlighted areas denote changes from the last update. Key FAR: Federal Acquisition Regulation DEAR: DOE Acquisition Regulation For the official and most up to date status of a specific rule, please see the Federal Register at https://www.regulations.gov/. Regulation Identifier Number Title/Subject/Purpose Rule Type Status 1901-AB37 Enforcement of Classified Information Security Requirements: The proposed rule amends DOE's statutory prescribed regulation, which sets forth the

  13. Acquisition Guide Chapter 1.0 - Acquisition Regulations System | Department

    Energy Saver

    Procurement Enterprise System (STRIPES) | Department of Energy Financial Assistance Letter No.2010-03 Strategic Integrated Procurement Enterprise System (STRIPES) Acquisition Financial Assistance Letter No.2010-03 Strategic Integrated Procurement Enterprise System (STRIPES) Attached is the subject AL/FAL which prescribes requirements and guidance pertaining to the Department's implementation and use of STRIPES. PF2010-19 Acquisition Financial Assistance Letter No. 2010-03 Strategic

  14. Driver performance data acquisition system for ergonomics research

    SciTech Connect

    Carter, R.J.; Goodman, M.J.

    1994-12-31

    A portable ergonomics data acquisition system consisting of state-of-the-art hardware being designed is described here. It will be employed to record driver, vehicle, and environment parameter data from a wide range of vehicles and trucks. The system will be unobtrusive to the driver and inconspicuous to the outside world. It will have three modes of data gathering and provide for extended periods of data collection. Modularity, flexibility, and cost will be key drivers in the development effort. The ergonomics data acquisition system project is being conducted in two phases--a feasibility study and a development, construction, and validation phase.

  15. Perspective & Acquisition Fellows Program - David Klaus, Deputy...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Perspective & Acquisition Fellows Program - David Klaus, Deputy Under Secretary for Management and Performance Perspective & Acquisition Fellows Program - David Klaus, Deputy Under ...

  16. Acquisition Workforce Information | Department of Energy

    Office of Environmental Management (EM)

    All Acquisition Workforce information has been moved to Powerpedia - Acquisition Workforce. Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real ...

  17. 7.0 - Integrated Acquisition Planning Process

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7.0 (August 2006) 1 INTEGRATING ACQUISITION PLANNING PROCESSES - AN OVERVIEW REFERENCES 1. FAR Part 7 Acquisition Planning 2. FAR Part 34 Major System Acquisition 3. Acquisition Letter 2005-08R, Small Business Programs 4. Acquisition Guide Chapter 7.1, Acquisition Planning 5. Acquisition Guide Chapter 42.5, Contract Management Planning 6. DOE O 580.1 Department of Energy Property Management Program 7. DOE O 413.3 Program and Project Management for the Acquisition of Capital Assets Guiding

  18. Port Asset Acquisition LLC | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Acquisition LLC Jump to: navigation, search Name: Port Asset Acquisition LLC Place: Louisiana Product: PAA was formed to acquire a fuel terminal, tanks and land in Alexandria,...

  19. Federal Acquisition Circular 2005-53

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-53 which makes miscellaneous changes to the Federal Acquisition Regulation.

  20. Federal Acquisition Circular 2005-39

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-39 which makes miscellaneous changes to the Federal Acquisition Regulation.

  1. Searchable Electronic Department of Energy Acquisition Regulation...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Searchable Electronic Department of Energy Acquisition Regulation Searchable Electronic Department of Energy Acquisition Regulation Updated July 2, 2013. The EDEAR is current ...

  2. Department of Energy Acquisition Regulation (DEAR) Technical...

    Energy.gov [DOE] (indexed site)

    of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  3. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    25 KB) More Documents & Publications Chapter 33 - Protests, Disputes and Appeals Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution ACQUISITION LETTER DEAR Part 933

  4. Chapter 39 - Acquisition of Information Technology | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    39 - Acquisition of Information Technology Chapter 39 - Acquisition of Information Technology PDF icon 39.1AcquisitionofInformationResources0.pdf PDF icon ...

  5. Trans India Acquisition Corporation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    India Acquisition Corporation Jump to: navigation, search Name: Trans-India Acquisition Corporation Place: Delaware Sector: Solar Product: Blank check company to be merged with...

  6. Acquisition Letters Remaining In Effect

    Energy.gov [DOE]

    Acquisition Letter (AL) 2010-07 has been issued. It lists ALs currently in effect and the discontinued ALs along with the reason why the AL is no longer in effect.

  7. Acquisition Letters Remaining In Effect

    Energy.gov [DOE]

    Acquisition Letter (AL) 2012-01 has been issued. It lists ALs currently in effect and the discontinued ALs, along with the reason why the AL is no longer in effect.

  8. Sustainable Acquisition | Department of Energy

    Energy.gov [DOE] (indexed site)

    The U.S. Department of Energy's (DOE) Sustainable Acquisition Program serves to ensure the purchase of more sustainable products by working with DOE sites to help them integrate ...

  9. Acquisition Letters | Department of Energy

    Energy.gov [DOE] (indexed site)

    2005 June 22, 2012 Acquisition Letter No. AL 2012-09 Guidance for Fast-Track Cooperative Research And Development Agreement (CRADA) Programs at DOE Facilities. previous 1 2 next...

  10. Performance-Based Services Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7.601 August 2016 ______________________________________________________________________________ 1 Performance-Based Services Acquisition [Reference: Public Law 106-398, § 821, FAR 37.6] 1.0 Summary of Latest Changes This update: (1) changes the chapter number from 37.2 to 37.601 to coincide with the FAR, (2) updates references, and (3) includes administrative changes. 2.0 Discussion This chapter supplements other more primary acquisition regulations and policies contained in the references

  11. Acquisition Templates | Department of Energy

    Office of Environmental Management (EM)

    Templates Acquisition Templates On September 28, 2010, four draft acquisition templates (Competitive Range Exclusion Letter, Competitive Range Inclusion Letter - Written Discussions, Competitive Range Inclusion Letter - Written and Oral Discussions, and Proposal Receipt Checklist) were distributed for Procurement Director (PD) and Head of Contracting Activity (HCA) review and comment. All comments received were considered and changes were made as appropriate. The final versions of the four

  12. acquisition | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    acquisition Small Business Sourcing System NNSA is implementing a system housing small businesses that have participated in our Opportunity Sessions, and have completed the NNSA Capabilities Questionnaire.Information is gathered relevant to the performance of each small business and included in the system. Among the information... Procurement The NNSA's Office of Acquisition & Project Management (APM) offers an 18-36 month procurement forecast that uses information obtained through the NNSA

  13. Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Energy.gov [DOE]

    Acquisition Guide Chapter 17.1 – Interagency Acquisitions, Interagency transactions, and Interagency Agreements is revised to incorporate (1) Federal Acquisition Circular (FAC) changes to Federal Acquisition Regulation (FAR) Part 17.5 – Interagency Acquisitions, Office of Federal Procurement Policy (OFPP) guidance for business case analysis for certain multi-agency and agency-specific contracts, (2) Acquisition Letter 2011-03, and (3) update the current guide chapter 17.1. Acquisition Letter (AL) 2011-03 is hereby rescinded.

  14. Certificate of Current Cost and Pricing Data

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    CERTIFICATE OF CURRENT COST AND PRICING DATA (OCT 1997) This is to certify that, to the best of my knowledge and belief, the cost or pricing data (as defined in section 15.401 of the Federal Acquisition Regulation (FAR) and required under FAR subsection 15.403-4) submitted, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's representative in support of * are accurate, complete, and current as of **. This certification includes the

  15. FAR Acquisition Strategy Team | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FAR Acquisition Strategy Team FAR Acquisition Strategy Team FAR Acquisition Strategy Team (184.09 KB) More Documents & Publications FAR Acquisition Strategy Team Microsoft Word - Section 311 AL FAL Feb 17 2010 Congressional Notification of Pending Contract or Financial Assistance Actions In excess of $1 Million under the Continuing Resolution

  16. Acquisition and Project Management Continuous Improvement Presentation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy and Project Management Continuous Improvement Presentation Acquisition and Project Management Continuous Improvement Presentation Presentation on Acquisition and Project Management Continuous Improvement. Acquisition and Project Management Continuous Improvement presentation (1.43 MB) More Documents & Publications Occupational Safety Performance Voluntary Protection Program Onsite Review, Safeguards and Security - August 2012 Report on Acquisition and Project

  17. Acquisition Forecast Download | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Forecast Download Acquisition Forecast Download Click on the link to download a copy of the DOE HQ Acquisition Forecast. Acquisition-Forecast-2016-11-10.xlsx (70.03 KB) More Documents & Publications National Nuclear Security Administration - Juliana Heynes Small Business Program Manager Directory EA-1900: Notice of Availability of a Draft Environmental Assessment

  18. Acquisition Workforce Information | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Certifications and Professional Development » Acquisition Workforce Information Acquisition Workforce Information All Acquisition Workforce information has been moved to Powerpedia - Acquisition Workforce. Aviation Management Green Leases Executive Secretariat Energy Reduction at HQ Real Estate Approvals Documents and Publications Facilities and Infrastructure Federal Advisory Committee Management Freedom of Information Act Financial Assistance Information Systems Property Procurement and

  19. Department of Energy Acquisition Regulation (DEAR) Technical

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Amendment-Final Rule | Department of Energy Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule PF2009-66.pdf (171.29 KB) PF2009-66a - Attachment-Department of Energy Acquisition Regulation (DEAR) Technical Amendment-Final Rule (172.78 KB) More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C Department of Energy Acquisition

  20. acquisition management | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    management NNSA Office of Acquisition Management improves customer satisfaction (Click to view graph full-size.) Established in 2011, the NNSA Office of Acquisition and Project Management (NA-APM) has a crosscutting role within the NNSA to deliver best value acquisitions and manage projects on budget and schedule. Nearly ninety percent of all NNSA mission work is... Acquisition Management The Office of Acquisition Management supports NNSA's efforts to: Reduce Nuclear Dangers; Manage the nuclear

  1. Proposal to upgrade the MIPP data acquisition system

    SciTech Connect

    Baker, W.; Carey, D.; Johnstone, C.; Kostin, M.; Meyer, H.; Raja, R.; /Fermilab

    2005-03-01

    The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost effective scheme of upgrading the MIPP data acquisition speed to 3000 Hz.

  2. Acquisition Letter on Acquisition Planning Considerations for Management and Operating Contracts

    Office of Energy Efficiency and Renewable Energy (EERE)

    The attached Acquisition Letter is issued to provide updated guidance on the unique acquisition planning procedures associated with management and operating (M%26O) contracts. Acquisition Letter 2009-3 is cancelled.

  3. DOE Acquisition Guide Chapter 23

    Office of Energy Efficiency and Renewable Energy (EERE)

    The purpose of this flash is to provide you an updated copy of the DOE Acquisition Guide Chapter 23. The Chapter has been updated to reflect the more recent requirements of Executive Order 13514, Federal Leadership in Environmental, Energy, and Economic Performance which updates Executive Order 13423.

  4. Acquisition Guide Chapter 37.601 - Performance-Based Services Acquisition |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 7.601 - Performance-Based Services Acquisition Acquisition Guide Chapter 37.601 - Performance-Based Services Acquisition DATE: August 15, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 37.601, Performance-Based Services Acquisition SUMMARY: The subject guide chapter has been revised to change the chapter number from 37.2

  5. A Four Channel Beam Current Monitor Data Acquisition System Using Embedded Processors

    SciTech Connect

    Wheat, Jr., Robert Mitchell; Dalmas, Dale A.; Dale, Gregory E.

    2015-08-11

    Data acquisition from multiple beam current monitors is required for electron accelerator production of Mo-99. A two channel system capable of recording data from two beam current monitors has been developed, is currently in use, and is discussed below. The development of a cost-effective method of extending this system to more than two channels and integrating of these measurements into an accelerator control system is the main focus of this report. Data from these current monitors is digitized, processed, and stored by a digital data acquisition system. Limitations and drawbacks with the currently deployed digital data acquisition system have been identified as have been potential solutions, or at least improvements, to these problems. This report will discuss and document the efforts we've made in improving the flexibility and lowering the cost of the data acquisition system while maintaining the minimum requirements.

  6. Acquisition Guide Chapter 1.1- Acquisition Regulations System- (March 2004)

    Energy.gov [DOE]

    This section discusses the Civilian Agency Acquisition Council, agency acquisition regulations, deviations from the FAR and DEAR, ratification of unauthorized commitments, and Contracting Officers and their representatives.

  7. Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

    Energy.gov [DOE]

    The Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate, is updated to include the involvement of Certified Realty Specialist.

  8. Update of Acquisition Guide Chapter 7.1, Acquisition Planning | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy of Acquisition Guide Chapter 7.1, Acquisition Planning Update of Acquisition Guide Chapter 7.1, Acquisition Planning A new section has been added to the Background segment of Acquisition Guide Chapter 7.1, Acquisition Planning, to emphasize the importance of collaboratively establishing acquisition lead time schedules reflecting firm commitments. A marginal line has been added to note the new material at pages 5 through 7. PF2010-53 Update of Acquisition Guide Chapter 7.1,

  9. Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1

    Energy.gov [DOE]

    Acquisition Guide Chapter 7.1 is revised to update references to DOE orders from 413.3A to 413.3B and 430.2A to 436.1 and DOE manual 413.3-1 to DOE Guide 413.3-13. Revisions to references for the DOE orders and DOE Guide are identified by vertical lines in the left margin.

  10. Estimating Specialty Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Specialty costs are those nonstandard, unusual costs that are not typically estimated. Costs for research and development (R&D) projects involving new technologies, costs associated with future regulations, and specialty equipment costs are examples of specialty costs. This chapter discusses those factors that are significant contributors to project specialty costs and methods of estimating costs for specialty projects.

  11. Mergers and acquisitions: Guidelines for consideration by state public utility commissions

    SciTech Connect

    Graniere, R.J.; Burns, R.E.

    1996-11-01

    This is the first of a series of reports on utility mergers and acquisitions published by NRRI; because it was completed Nov. 1996, it does not cover FERC Order 592 (policy statement on merger policy under Federal Power Act). Since cost-benefit analyses are expensive, state regulators need guidelines that efficiently streamline the review process for mergers and acquisitions. Purpose of this paper is to suggest such guidelines; they are applicable only to mergers and acquisitions of vertically integrated electric utilities or combination electric/gas utilities.

  12. Chapter 13 - Simplified Acquisition Procedures | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 - Simplified Acquisition Procedures Chapter 13 - Simplified Acquisition Procedures 13.1 - Purchase Card Policy and Operating Procedures PDF icon 13.2PurchaseOrders0.pdf PDF...

  13. Chapter 39 - Acquisition of Information Technology | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 - Acquisition of Information Technology Chapter 39 - Acquisition of Information Technology PDF icon 39.1AcquisitionofInformationResources0.pdf PDF icon 39.2GuidanceonElec...

  14. Update to Congressional Notifications - Acquisition Guide Chapter...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Since we previously notified you in Policy Flash 2012-44 for Congressional notifications, ... Acquisition Planning: Revised DOE Acquisition Guide Chapter 7.1 Policy Flash 2016-29 DOE F ...

  15. Chapter 18 - Emergency Acquisitions | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PDF icon 18.0EmergencyAcquisitions0.pdf More Documents & Publications Acqguide18pt0 March 2011 final OPAM Policy Acquisition Guides Microsoft Word - acqguide18pt0 Nov 2010...

  16. Federal Acquisition Circular 2005-58

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-58 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on April 18, 2012 at 77 FR 23363.

  17. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Guide Chapter 1.0 - Acquisition Regulations System Acquisition Guide Chapter 1.2 - Attachment - Non-Delegable HCA Functions and Responsibilities Microsoft Word - AcqGuide71pt1.doc

  18. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    35.9 KB) More Documents & Publications Revision to Acquisition Guide Chapter 33.1, Protests Chapter 33 - Protests, Disputes and Appeals Acquisition Guide Chapter 1.2 - Attachment - Non-Delegable HCA Functions and Responsibilities

  19. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    48.87 KB) More Documents & Publications Chapter 15 - Contracting by Negotiation Revised DOE Acquisition Guide Chapter 15.4-2 Weighted Guidelines (July 201 0) Acquisition Letter No. AL 2009-01

  20. Federal Acquisition Circular 2005-37

    Office of Energy Efficiency and Renewable Energy (EERE)

    Federal Acquisition Circular 2005-37, which makes miscellaneous changes to the Federal Acquisition Regulation, was published in the October 14,2009, issue of the Federal Register. A summary of the changes is attached.

  1. "Paper" Energy Systems Acquisition Advisory Board Process

    Energy.gov [DOE]

    Memo on "Paper" Energy Systems Acquisition Advisory Board Process from Jeffrey F. Kupper, dated January 14, 2009.

  2. Intellectual Property (IP) Service Providers for Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Intellectual Property Provides ACQ and Assistance More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions Microsoft ...

  3. Intellectual Property (IP) Service Providers for Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOEIPCounselforDOELaboratories 2015 More Documents & Publications Intellectual Property (IP) Service Providers for Acquisition and Assistance Transactions ...

  4. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter: AL2005-08 Microsoft Word - al2004-03.doc Chapter 19 - Small Business Programs...

  5. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    18 - Emergency Acquisitions Acqguide18pt0 March 2011 final Microsoft Word - acqguide18pt0 Nov 2010...

  6. Acquisition Career Management Program Handbook, Partial Revision...

    Energy.gov [DOE] (indexed site)

    Procurement and Assistance Management SUBJECT: Acquisition Career Management Program Handbook, Partial Revision of Chapter 11, Contracting Officer's Representative SUMMARY: The...

  7. Acquisition Letter Archive listing | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Archive listing Acquisition Letter Archive listing TO RECEIVE A COPY OF AN ARCHIVED ACQUISITION LETTER (AL), PLEASE USE THE PDF FILE BELOW TO SEARCH FOR THE AL NAME/NUMBER AND SEND IT IN TO DOE_OAPMPOLICY@HQ.DOE.GOV. Acquisition Letter Archive listing.pdf (86.37 KB) More Documents & Publications Microsoft Word - LibraryofPriorRulemakings.doc Acquisition Letters Remaining in Effect Policy Flash Archive Search File

  8. Federal Acquisition Circular 2005-52

    Energy.gov [DOE]

    Attached for your information is a summary of rules incorporated in the FAR by Federal Acquisition Circular 2005-52.

  9. Acquisition Certifications Handbook 4th edition released

    Office of Energy Efficiency and Renewable Energy (EERE)

    The Acquisition Certifications Program Handbook 4th Edition is released with latest content related to Realty Specialist chapter.

  10. Acquisition and the Environment | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition » Guidance » Acquisition and the Environment Acquisition and the Environment The information provide on these pages are meant to be resource and tool for the DOE acquisition community. Please share suggestions for its further development and improvement. Provide your comments to Richard Langston at (202) 287-1339, or e-mail them to richard.langston@hq.doe.gov GREEN PURCHASING OVERVIEW The White House Task Force on Recycling along with the US Army Center for Health Promotion and

  11. Procurement and Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Procurement and Acquisition Doing Business With the U.S. Department of Energy Welcome to the Department of Energy's Acquisition homepage. The Office of Acquisition Management (OAM) is responsible for all contracting, financial assistance and related activities to fulfill the Department's multitude of missions through its business relationships. As the business organization of the Department, OAM develops and supports the policies, procedures and procurement operational elements. OAM

  12. Acquisition and Project Management | National Nuclear Security...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Human Resources Acquisition Management Technical, Engineering, and Programmatic Support (TEPS) Blanket Purchase Agreements (BPAs) Environmental Program Services Contract ...

  13. Cost Study Manual

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Cost Study Manual Executive Summary This Cost Study Manual documents the procedures for preparing a Cost Study to compare the cost of a contractor's employee benefits to the industry average from a broad-based national benefit cost survey. The annual Employee Benefits Cost Study Comparison (Cost Study) assists with the analysis of contractors' employee benefits costs. The Contracting Officer (CO) may require corrective action when the average benefit per capita cost or the benefit cost as a

  14. Virginia Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Virginia Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions Virginia Dry Natural Gas Proved ...

  15. National Geothermal Data Systems Data Acquisition and Access...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and legacy data from ...

  16. "Paper" Energy Systems Acquisition Advisory Board Process | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    "Paper" Energy Systems Acquisition Advisory Board Process "Paper" Energy Systems Acquisition Advisory Board Process Memo on "Paper" Energy Systems Acquisition Advisory Board ...

  17. Department of Energy Acquisition Letter 2013-04 on Executive...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter 2013-04 on Executive Compensation Department of Energy Acquisition Letter 2013-04 on Executive Compensation Department of Energy Acquisition Letter 2013-04 ...

  18. ACQUISITION LETTER DEAR Part 933 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    sections 601-613. PDF icon ACQUISITION LETTER More Documents & Publications Microsoft Word - ACQUISITION LETTER.doc OPAM Policy Acquisition Guides Chapter 33 - Protests,...

  19. ADR Provisions in Federal Acquisition Regulation (FAR) | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Regulation (FAR) More Documents & Publications Microsoft Word - ADR-Provisions-FederalAcquisitionReg.doc ACQUISITION LETTER DEAR Part 933 Microsoft Word - ACQUISITION LETTER.doc...

  20. 2015 DOE Acquisition and Project Management (APM) Workshop |...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5 DOE Acquisition and Project Management (APM) Workshop 2015 DOE Acquisition and Project Management (APM) Workshop Workshop Details: What: 2015 DOE Acquisition and Project...

  1. Kansas Dry Natural Gas Reserves Acquisitions (Billion Cubic Feet...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Kansas Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions Kansas Dry Natural Gas Proved ...

  2. New Mexico Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Gasoline and Diesel Fuel Update

    Acquisitions (Billion Cubic Feet) New Mexico Dry Natural Gas Reserves Acquisitions ... Referring Pages: Dry Natural Gas Reserves Acquisitions New Mexico Dry Natural Gas Proved ...

  3. New York Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Annual Energy Outlook

    Acquisitions (Billion Cubic Feet) New York Dry Natural Gas Reserves Acquisitions (Billion ... Referring Pages: Dry Natural Gas Reserves Acquisitions New York Dry Natural Gas Proved ...

  4. Federal Acquisition Circular 2005-52 Item Subject FAR...

    Office of Environmental Management (EM)

    Federal Acquisition Circular 2005-52 Item Subject FAR case I Sustainable Acquisition ... VI Technical Amendments NA Item I--Sustainable Acquisition (FAR Case 2010-001) ...

  5. North Dakota Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) North Dakota Dry Natural Gas Reserves Acquisitions ... Referring Pages: Dry Natural Gas Reserves Acquisitions North Dakota Dry Natural Gas Proved ...

  6. Jefferson Lab's Distributed Data Acquisition

    SciTech Connect

    Trent Allison; Thomas Powers

    2006-05-01

    Jefferson Lab's Continuous Electron Beam Accelerator Facility (CEBAF) occasionally experiences fast intermittent beam instabilities that are difficult to isolate and result in downtime. The Distributed Data Acquisition (Dist DAQ) system is being developed to detect and quickly locate such instabilities. It will consist of multiple Ethernet based data acquisition chassis distributed throughout the seven-eights of a mile CEBAF site. Each chassis will monitor various control system signals that are only available locally and/or monitored by systems with small bandwidths that cannot identify fast transients. The chassis will collect data at rates up to 40 Msps in circular buffers that can be frozen and unrolled after an event trigger. These triggers will be derived from signals such as periodic timers or accelerator faults and be distributed via a custom fiber optic event trigger network. This triggering scheme will allow all the data acquisition chassis to be triggered simultaneously and provide a snapshot of relevant CEBAF control signals. The data will then be automatically analyzed for frequency content and transients to determine if and where instabilities exist.

  7. acquisition

    National Nuclear Security Administration (NNSA)

    0%2A en Small Business http:nnsa.energy.govaboutusouroperationsapmsmallbusiness

    Page...

  8. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7 - Special Contracting Methods Subject: Cost and Price Analysis Subject: Cost and Price Analysis...

  9. Active Acquisition Letters | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Procurement and Acquisition » Active Acquisition Letters Active Acquisition Letters Please remember that you can use your browser's EDIT/FIND function to perform a key-word or key-phase search for each browser page. Once you have entered the search value, click the NEXT button. When you advance to the next page, simply click the NEXT button again without re-entering the search value. November 9, 2016 Acquisition Letter No. AL-2017-01 Acquisition Letters (AL) currently in effect and discontinued

  10. Program and Project Management for the Acquisition of Capital Assets

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. Supersedes DOE O 413.3B Chg 1 (AdminChg)

  11. Program and Project Management for the Acquisition of Capital Assets

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2010-11-29

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool.

  12. AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL)...

  13. EGov PMA Scorecard Cost, Schedule & Performance Standard.tif | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif EGov PMA Scorecard Cost, Schedule & Performance Standard.tif (1.8 MB) More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets

  14. Acquisition, Use, and Disposal of Real Estate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate More Documents & Publications Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate OPAM Policy Acquisition Guides Acquisition, Use, and Disposal of Real Estate

  15. Acquisition, Use, and Disposal of Real Estate | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate Acquisition, Use, and Disposal of Real Estate (76.66 KB) More Documents & Publications OPAM Policy Acquisition Guides Chapter 17 - Special Contracting Methods Acquisition Guide Chapter 17.3, Acquisition, Use, and Disposal of Real Estate

  16. Microsoft Word - ACQUISITION LETTER.doc | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ACQUISITION LETTER.doc Microsoft Word - ACQUISITION LETTER.doc Microsoft Word - ACQUISITION LETTER.doc (26.03 KB) More Documents & Publications ACQUISITION LETTER DEAR Part 933 Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution OPAM Policy Acquisition Guides

  17. PAFC Cost Challenges

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    PAFC Cost Challenges Sridhar Kanuri Manager, PAFC Technology *Sridhar.Kanuri@utcpower.com 2 AGENDA Purecell® 400 cost challenge Cost reduction opportunities Summary 3 PURECELL ® FUEL CELL SYSTEM First cost 2010 cost reduction is being accomplished by incremental changes in technology & low cost sourcing Technology advances are required to reduce further cost and attain UTC Power's commercialization targets 2010 First unit 2010 Last unit Commercialization target Powerplant cost 4

  18. Department of Energy (DOE) Acquisition Guide

    Energy.gov [DOE]

    Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition Guide serves this purpose by identifying relevant internal standard operating procedures to be followed by both procurement and program personnel who are involved in various aspects of the acquisition process. The Guide also is intended to be a repository of best practices found throughout the agency that reflect specific illustrations of techniques which ' might be helpful to all readers. Additionally, the Guide includes subject matter that was issued previously through other media, such as Acquisition Letters.

  19. AVLIS Laser Data Acquisition and Control System

    SciTech Connect

    Gill, T.E.

    1986-01-01

    The AVLIS Laser Data Acquisition and Control System provides an integrated hardware and software package which controls up to five diagnostic lasers and automatic and manual data acquisition and reduction subsystems being used to analyze uranium vapor density in the Atomic Vapor Laser Isotope Separation (AVLIS) separation vessel in Oak Ridge, Tennessee. This paper discusses acquisition of critical real-time and post-run vapor density data.

  20. Searchable Electronic Department of Energy Acquisition Regulation |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Searchable Electronic Department of Energy Acquisition Regulation Searchable Electronic Department of Energy Acquisition Regulation Updated July 2, 2013. The EDEAR is current through the Final Rule published May 3, 2013 at 78 FR 25817 If you have any questions concerning this page, please contact Barbara Binney in the Contract and Financial Assistance Policy Division, Office of Acquisition and Project Management. EDEAR July 2 2013 final.pdf (3.36 MB) More Documents &

  1. Acquisition Description/ Category Solicitation Method Contract Type

    Energy Saver

    Energy Career Management Handbook Change 2011-01 Acquisition Career Management Handbook Change 2011-01 A recent review of the Department of Energy (DOE) Acquisition Career Management Program (ACMP), Financial Assistance Program certification identified opportunities for updating the courses required for Level I, Level II, and Level III certification. PF2011-38 Acquisition Career Management Handbook Change 2011-01 (8.44 KB) PF2011-38a.pdf (32.65 KB) More Documents & Publications

  2. Acquisition, Use, and Disposal of Real Estate

    Energy Saver

    8 August 24, 2015 ACQUISITION LETTER This Acquisition Letter is issued under the authority of the Senior Procurement Executives of DOE and NNSA. It is intended for use by procurement professionals of DOE and NNSA, primarily Contracting Officers, and other officials of DOE and NNSA that are involved in the acquisition process. Other parties are welcome to its information, but definitive interpretations of its effect on contracts, and related procedures, if any, may only be made by DOE NNSA

  3. Report: EMAB Acquisition and Project Management Subcommittee...

    Energy.gov [DOE] (indexed site)

    and contract management. On November 2, a very comprehensive report (124 pages) outlining continuous improvement actions in acquisition and project management was approved by Dr....

  4. Alternative Financing - New Acquisition Guide Subchapter | Department...

    Energy.gov [DOE] (indexed site)

    policy flash Alternative Financing - New Acquisition Guide Subchapter More Documents & Publications Policy Flash 2010-83 Policy Flash 2012-30 Flash2011-77 OPAM...

  5. Chapter 7 - Acquisition Planning | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Sourcing Requirements - Update May 2014 PDF icon 7.3 - Acuqisition Planning in the M&O Environment More Documents & Publications Policy Flash 2015-13 ACQUISITION PLANNING ...

  6. Positron emission mammography with tomographic acquisition using...

    Office of Scientific and Technical Information (OSTI)

    The most appropriate acquisition method for specific detection or quantitation tasks requires additionalmore investigation. less Authors: Mark F Smith ; Raymond R Raylman ; ...

  7. Federal Acquisition Circular 2005-47

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-47 was issued December 13, 2010, 75 FR 77721. It concludes 7 separate rulemakings which are described in the attached summary sheet.

  8. Acquisition Letter No. AL 2015-02

    Energy.gov [DOE]

    The purpose of Acquisition Letter is to communicate the revisions to Chapter VII, Risk Management and Insurance Programs of DOE Order 350.1...

  9. Federal Acquisition Circular 2005-48

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-48 was issued December 30, 2010, 75 FR 82565. It concludes 4 separate rulemakings which are described in the attached summary sheet.

  10. Acquisition, Use, and Disposal of Real Estate

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition of Capital Assets, or current version DOE Order 430.1B, Real Property Asset Management, or current version Overview This section provides internal Departmental ...

  11. BCDA - Beamline Controls and Data Acquisition Group

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    * Data Acquisition * ebrick * Hardware * Software * Group Info * Sector Contacts * Knowledge Base * Meetings * Mailing list * APS PV Information * EPICS Naming Convention Print...

  12. Data Acquisition-Manipulation | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    signals and numeric values that can be stored and manipulated in a useful manner by a computer program. Other definitions:Wikipedia Reegle Introduction Data acquisition and...

  13. Federal Information Technology Acquisition Reform Act (FITARA...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Information Technology Acquisition Reform Act (FITARA) Data Resources FITARA Resources Available for Download: DOE IT Policy Archive: ZIP IT Leadership Directory: HTML | ...

  14. Federal Acquisition Circular 2005-63

    Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment published in the December 10, 2012 Federal Register at 77 FR 73516 implements FAR Case 2012–030 Iran Threat Reduction.

  15. ADR Provisions in Federal Acquisition Regulation (FAR)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ADR Provisions in Federal Acquisition Regulation (FAR) d. Alternative means of dispute resolution. Notwithstanding any other provision of this chapter, a contractor and a ...

  16. Cost Model and Cost Estimating Software

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter discusses a formalized methodology is basically a cost model, which forms the basis for estimating software.

  17. C - Phase 1, Acquisition Planning

    Energy.gov [DOE] (indexed site)

    Bahman Habibzadeh, PhD Technology Development Manger Building Technologies Office Emerging Technologies Windows and Building Envelope 2 Emerging Technologies (ET)  Develop cost-effective, high-impact building technologies: Lighting, HVAC, Windows & Envelope, Sensors & Controls, Appliances & Equipment Commercial Buildings Integration (CBI) Residential Buildings Integration (RBI)  Partner with private sector to demonstrate technologies and solutions  Demonstrate market

  18. Career Map: Land Acquisition Specialist | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Land Acquisition Specialist Career Map: Land Acquisition Specialist a male land acquisition specialist takes notes while surveying a piece of land. Land Acquisition Specialist Position Title Land Acquisition Specialist Alternate Title(s) Land Agent, Land Acquisition Associate Education & Training Level Bachelor degree required, prefer graduate degree Education & Training Level Description Land acquisition specialists are expected to have a bachelor's degree or higher in business, real

  19. Acquisition Career Management Handbook Change - Revised Contracting

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Officer's Representative Certification (COR) | Department of Energy Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) A recent review of the January 2009 issue of the Department of Energy (DOE) Acquisition Career Management Program (ACMP) Handbook identified many areas that require an update. Although the ACMP Handbook revisions

  20. Federal Acquisition Circular 2005-56

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-56 which makes miscellaneous changes to the Federal Acquisition Regulation. The Circular was published in the Federal Register on March 2, 2012 at 77 FR 12912 and 12913.

  1. Federal Acquisition Circular 2005-42

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular (FAC) 2005-42 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has eleven rules (seven final and four interim) and one technical amendment. Attached is a short overview of the rules to include its effective date and applicability date.

  2. Federal Acquisition Circular 2005-49

    Energy.gov [DOE]

    Federal Acquisition Circular (FAC) 2005-49 was issued January 24, 2011 in volume 76 FR 4188. It published one interim rule Federal Acquisition Regulation (FAR) case number 2010-016 on Public Access to Federal Awardee Performance and Integrity Information System. This rule is effective January 24, 2011. The summary of the FAC is attached.

  3. Federal Acquisition Circular 2005-40

    Energy.gov [DOE]

    Federal Acquisition Circular 2005-40 implements the Federal Awardee Performance and Integrity Information System (FAPIIS) to the Federal Acquisition Regulation. This FAC was published in the March 23,2010 issue of the Federal Register. A summary of the changes is attached.

  4. NEPA strategy for the Bonneville Power Administration energy resource acquisition

    SciTech Connect

    Pierce, K.S.; Alton, C.C.; Linehan, A.O.

    1995-12-01

    The Bonneville Power Administration (BPA) has a statutory obligation to supply cost-effective electric power to its customers. BPA must also be consistent with the Pacific Northwest Electric Power Planning and Conservation Act, which requires consideration of the Northwest Power Planning Council`s Conservation and Electric Power Plan and Fish and Wildlife Program. The challenge is to operate effectively within an increasingly competitive and dynamic electric utility market while continuing its commitment to the National Environmental Policy Act (NEPA). BPA developed a tiered approach to its environmental analyses associated with energy resource planning and acquisition. The Resource Programs Environmental Impact Statement (RPEIS) is a programmatic document designed to support energy resource decisions for several years. The RPEIS includes a description of the environmental impacts and potential mitigation measures for various energy resources-including conservation, efficiency improvements, renewable resources, cogeneration, combustion turbines, nuclear, and coal. Information was also provided on fuel switching, load management, and emerging technologies. After analyzing the environmental trade-offs among resources, the RPEIS focuses on the cumulative effects of adding these resources to the existing power system. The Record of Decision documents that BPA`s resource acquisitions will include all cost-effective conservation and efficiency improvements, supplemented by a mix of renewables and thermal resources. Subsequent site-specific documents have been prepared on individual resource acquisitions. By focusing environmental reviews on the actual issues ripe for decision and by providing timely environmental information to the public and to the decisionmakers, this tiered approach led to better decisionmaking. BPA was able to operate in a more business-like manner while assuring NEPA compliance.

  5. Activity Based Costing

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Activity Based Costing (ABC) is method for developing cost estimates in which the project is subdivided into discrete, quantifiable activities or a work unit. This chapter outlines the Activity Based Costing method and discusses applicable uses of ABC.

  6. MEMORANDUM FOR CHIEF ACQUISITION OFFICERS | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    FOR CHIEF ACQUISITION OFFICERS MEMORANDUM FOR CHIEF ACQUISITION OFFICERS "Myth-Busting": Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process MEMORANDUM FOR CHIEF ACQUISITION OFFICERS (127.84 KB) More Documents & Publications DOE Vendor Communication Plan Improving Communication with Industry during the Acquisition Process OFPP "Myth-busting" Memo (2/2/11)

  7. 7pt1AcquisitionPlanning.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7pt1AcquisitionPlanning.pdf 7pt1AcquisitionPlanning.pdf (1.68 MB) More Documents & Publications ACQUISITION PLANNING Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisitions___Communications.pdf

  8. Acquisition Letters Remaining in Effect | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in Effect Acquisition Letters Remaining in Effect PF2009-40.pdf (768.41 KB) PF2009-40a - Attachment-Acquisition Letter 2009-06 - Acquisition Letters Remaining in Effect (133.09 KB) More Documents & Publications Acquisition Letters Remaining In Effect AL2007-05.doc� Acquisition Letters Remaining In Effect

  9. Multiple channel data acquisition system

    DOEpatents

    Crawley, H. Bert; Rosenberg, Eli I.; Meyer, W. Thomas; Gorbics, Mark S.; Thomas, William D.; McKay, Roy L.; Homer, Jr., John F.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler.

  10. Multiple channel data acquisition system

    DOEpatents

    Crawley, H.B.; Rosenberg, E.I.; Meyer, W.T.; Gorbics, M.S.; Thomas, W.D.; McKay, R.L.; Homer, J.F. Jr.

    1990-05-22

    A multiple channel data acquisition system for the transfer of large amounts of data from a multiplicity of data channels has a plurality of modules which operate in parallel to convert analog signals to digital data and transfer that data to a communications host via a FASTBUS. Each module has a plurality of submodules which include a front end buffer (FEB) connected to input circuitry having an analog to digital converter with cache memory for each of a plurality of channels. The submodules are interfaced with the FASTBUS via a FASTBUS coupler which controls a module bus and a module memory. The system is triggered to effect rapid parallel data samplings which are stored to the cache memories. The cache memories are uploaded to the FEBs during which zero suppression occurs. The data in the FEBs is reformatted and compressed by a local processor during transfer to the module memory. The FASTBUS coupler is used by the communications host to upload the compressed and formatted data from the module memory. The local processor executes programs which are downloaded to the module memory through the FASTBUS coupler. 25 figs.

  11. Improved Three-Dimensional Resistivity Data Acquisition Capabilities at the Hanford Site

    SciTech Connect

    Glaser, Danney R.; Eberlein, Susan J.; McNeill, M.; Hildebrand, R. Doug; Levitt, M.; Crook, N.

    2013-11-07

    The recent 3D electrical resistivity characterization at 241-U Tank Farm represents the first full-farm true 3D environmental resistivity deployment in the world. Technological and manufacturing developments by the vendor resulted in a data acquisition system that far surpasses the ability of the previous off-the-shelf systems. The new data acquisition system allows for 180 channels, which enables the full-farm 3D acquisition without the inaccuracies associated with combining multiple datasets. This ultimately leads to a more accurate model of the subsurface and a better understanding of moisture and contaminant distribution within the vadose zone. Additionally, advancements in electrical noise filters and increased output power resulted in better quality data than previously acquired at the site, reducing the amount of poor quality data by more than half. Ultimately, the new, improved system increased the speed of data acquisition and quality of the final results. The system allowed a reduction in field labor and field work duration to half the field budget estimates, resulting in a 25% reduction in overall project costs. The new resistivity data acquisition system represents technological advancements resulting in a greater quantity of data with decreased project costs.

  12. A Review of Cost Estimation in New Technologies - Implications for Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Process Plants | Department of Energy A Review of Cost Estimation in New Technologies - Implications for Energy Process Plants A Review of Cost Estimation in New Technologies - Implications for Energy Process Plants This report reviews literature on cost estimation in several areas involving major capital expenditure programs: energy process plants, major weapons systems acquisition, public works and larger construction projects, and cost estimating techniques and problems for chemical

  13. AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT AL 2014-06 ACQUISITION LETTERS REMAINING IN EFFECT Acquisition Letters (AL) that remain in effect are identified below. All other...

  14. DOJ Title Standards for Acquisition | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOJ Title Standards for Acquisition DOJ Title Standards for Acquisition Title Standards 2001 (580.64 KB) More Documents & Publications Acquisition Guide for Federal Agencies REAL ESTATE PROPERTY GUIDE 2014 REAL ESTATE PROPERTY GUIDE 2013

  15. SSC/BCD data acquisition system proposal

    SciTech Connect

    Barsotti, E.; Bowden, M.; Swoboda, C.

    1989-04-01

    The proposed new data acquisition system architecture takes event fragments off a detector over fiber optics and to a parallel event building switch. The parallel event building switch concept, taken from the telephone communications industry, along with expected technology improvements in fiber-optic data transmission speeds over the next few years, should allow data acquisition system rates to increase dramatically and exceed those rates needed for the SSC. This report briefly describes the switch architecture and fiber optics for a SSC data acquisition system.

  16. A data acquisition architecture for the SSC

    SciTech Connect

    Partridge, R.

    1990-01-01

    An SSC data acquisition architecture applicable to high-p{sub T} detectors is described. The architecture is based upon a small set of design principles that were chosen to simplify communication between data acquisition elements while providing the required level of flexibility and performance. The architecture features an integrated system for data collection, event building, and communication with a large processing farm. The interface to the front end electronics system is also discussed. A set of design parameters is given for a data acquisition system that should meet the needs of high-p{sub T} detectors at the SSC.

  17. Multi-user data acquisition environment

    SciTech Connect

    Storch, N.A.

    1983-01-01

    The typical data acquisition environment involves data collection and monitoring by a single user. However, in order to support experiments on the Mars facility at Lawrence Livermore National Laboratory, we have had to create a multi-user data acquisition environment where any user can control the data acquisition and several users can monitor and analyze data being collected in real time. This paper describes how we accomplished this on an HP A600 computer. It focuses on the overall system description and user communication with the tasks within the system. Our current implementation is one phase of a long-term software development project.

  18. Contracts Awarded for Acquisition of Crude Oil for the Strategic Petroleum

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Reserve | Department of Energy Contracts Awarded for Acquisition of Crude Oil for the Strategic Petroleum Reserve Contracts Awarded for Acquisition of Crude Oil for the Strategic Petroleum Reserve January 16, 2009 - 9:36am Addthis Royalty-In-Kind and Direct Purchases Will Add 16.8 Million Barrels to SPR by January 2010 WASHINGTON, DC - The U.S. Department of Energy (DOE) has awarded contracts to purchase10,683,000 barrels of crude oil at a cost of $553 million for the Department's Strategic

  19. Life Cycle Cost Estimate

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    Life-cycle costs (LCCs) are all the anticipated costs associated with a project or program alternative throughout its life. This includes costs from pre-operations through operations or to the end of the alternative.This chapter discusses life cycle costs and the role they play in planning.

  20. Cost Estimation Package

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter focuses on the components (or elements) of the cost estimation package and their documentation.

  1. A chronicle of costs

    SciTech Connect

    Elioff, T.

    1994-04-01

    This report contains the history of all estimated costs associated with the superconducting super collider.

  2. ACQUISITION LETTER DEAR Part 933 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ACQUISITION LETTER DEAR Part 933 ACQUISITION LETTER DEAR Part 933 This AL establishes policy and provides guidance for the use of alternative dispute resolution techniques in connection with disputes that arise under the Contract Disputes Act (CDA) of 1978, 41 U.S.C. sections 601-613. ACQUISITION LETTER (26.03 KB) More Documents & Publications Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution Microsoft Word - ACQUISITION LETTER.doc OPAM Policy Acquisition Guides

  3. EM Works to Involve Local Communities More in Acquisition Processes |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Works to Involve Local Communities More in Acquisition Processes EM Works to Involve Local Communities More in Acquisition Processes September 30, 2016 - 12:55pm Addthis EM Acquisition and Project Management Deputy Assistant Secretary Ralph Holland provides EM's acquisition outlook during the National Cleanup Workshop. EM Acquisition and Project Management Deputy Assistant Secretary Ralph Holland provides EM's acquisition outlook during the National Cleanup Workshop.

  4. Department of Energy (DOE) Acquisition Guide | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (DOE) Acquisition Guide Department of Energy (DOE) Acquisition Guide Regulatory requirements for the acquisition process are set forth in the Federal Acquisition Regulation (FAR) and are supplemented in the Department of Energy Acquisition Regulation (DEAR). FAR 1.301 provides for the issuance of additional internal agency guidance, including designations and delegations of authority, assignments of responsibilities, work-flow procedures, and internal reporting requirements. The DOE Acquisition

  5. Acquisition Planning: Revised Acquisition Letter 2009-03 and Revised DOE Acquisition Guide Chapter 7.1

    Office of Energy Efficiency and Renewable Energy (EERE)

    Acquisition Letter (AL) 2009-03 and Acquisition Guide Chapter 7.1 have been revised to move the guidance regarding who approves an Acquisition Plan for a contract exceeding $1 00 million from the AL to the Acquisition Guide. To reflect the changes, AL-2009-03 Revision 1 has replaced AL-2009-03 and the affected parts of Acquisition Guide Chapter 7.1 have been modified. Additional minor revisions to the Guide chapter were made: references to obsolete AL 96-09 and obsolete AL 2006-1 1 were deleted; the requirement to begin acquisition planning for an M&O contract at least 18 months prior to contract expiration was changed to 24 months; minor editorial changes were made to the Property Management section; and attachment 2's milestone schedule was conformed to the SEB Monthly Status Report format (that status report was established in March 201 0; see http://management.enernv.gov/docurnents/SEBMonthly Status Remrtinn Requirement.pdf).

  6. Hydrogen Threshold Cost Calculation

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program Record (Offices of Fuel Cell Technologies) Record #: 11007 Date: March 25, 2011 Title: Hydrogen Threshold Cost Calculation Originator: Mark Ruth & Fred Joseck Approved by: Sunita Satyapal Date: March 24, 2011 Description: The hydrogen threshold cost is defined as the hydrogen cost in the range of $2.00-$4.00/gge (2007$) which represents the cost at which hydrogen fuel cell electric vehicles (FCEVs) are projected to become competitive on a cost per mile basis with the competing

  7. OOTW COST TOOLS

    SciTech Connect

    HARTLEY, D.S.III; PACKARD, S.L.

    1998-09-01

    This document reports the results of a study of cost tools to support the analysis of Operations Other Than War (OOTW). It recommends the continued development of the Department of Defense (DoD) Contingency Operational Support Tool (COST) as the basic cost analysis tool for 00TWS. It also recommends modifications to be included in future versions of COST and the development of an 00TW mission planning tool to supply valid input for costing.

  8. Hydrogen Pathway Cost Distributions

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Pathway Cost Distributions Jim Uihlein Fuel Pathways Integration Tech Team January 25, 2006 2 Outline * Pathway-Independent Cost Goal * Cost Distribution Objective * Overview * H2A Influence * Approach * Implementation * Results * Discussion Process * Summary 3 Hydrogen R&D Cost Goal * Goal is pathway independent * Developed through a well defined, transparent process * Consumer fueling costs are equivalent or less on a cents per mile basis * Evolved gasoline ICE and gasoline-electric

  9. Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition Strategy Lessons Learned Report, NNSA, Feb 2010 Idaho Spent Fuel Facility (ISFF) Project, Appropriate Acquisition...

  10. Multi-Channel Data Acquisition System for Nuclear Pulse Processing...

    Office of Scientific and Technical Information (OSTI)

    Conference: Multi-Channel Data Acquisition System for Nuclear Pulse Processing Citation Details In-Document Search Title: Multi-Channel Data Acquisition System for Nuclear Pulse ...

  11. Acquisition Letter No. AL 2013-11 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter 11- Non-Management and Operating (Non-M&O) Contractor Business Systems Clauses for Section H...

  12. One Acquisition Solution for Integrated Services (OASIS) - Brad...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Solution for Integrated Services (OASIS) - Brad DeMers, General Services Administration (GSA) One Acquisition Solution for Integrated Services (OASIS) - Brad DeMers,...

  13. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program & Project Management For The Acquisition Of Capital Assets (310.65 KB) More Documents & Publications "Paper" Energy Systems Acquisition Advisory Board Process ESAAB ...

  14. Program & Project Management For The Acquisition Of Capital Assets...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets 2014 DOE Project Management Workshop ...

  15. ,"Florida Dry Natural Gas Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Data for" ,"Data 1","Florida Dry Natural Gas Reserves Acquisitions ... 10:36:51 AM" "Back to Contents","Data 1: Florida Dry Natural Gas Reserves Acquisitions ...

  16. Policy Flash 2013-37 Federal Acquisition Circular (FAC) 2005...

    Energy.gov [DOE] (indexed site)

    37 Federal Acquisition Circular (FAC) 2005-66 Questions concerning this policy flash should be directed to Barbara Binney, of the Office of Acquisition and Project Management...

  17. Acquisition Letter No. AL 2014-02 | Department of Energy

    Energy Saver

    SUBJECT: ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE SUMMARY: The subject Acquisition Letter's purpose is to provide guidance on provisional payment of fee for non ...

  18. Data acquisition system of Moeller polarimeter Hall A Jefferson...

    Office of Scientific and Technical Information (OSTI)

    Data acquisition system of Moeller polarimeter Hall A Jefferson Lab (in Russian) Citation Details In-Document Search Title: Data acquisition system of Moeller polarimeter Hall A ...

  19. "Supervisory Control and Data Acquisition (SCADA) Systems." The...

    Energy Saver

    "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 "Supervisory Control and Data Acquisition (SCADA) Systems." The CIP Report. Vol 7 No 8 ...

  20. Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) Acquisition Guide Chapter 50.1- Extraordinary Contractual Actions (January 2009) The purpose of...

  1. Microsoft Word - ADR-Provisions-FederalAcquisitionReg.doc | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    More Documents & Publications ADR Provisions in Federal Acquisition Regulation (FAR) Microsoft Word - ACQUISITION LETTER.doc Microsoft Word - ADR Revised Policy82508Reformatted.doc...

  2. Green Lease Policies and Procedures for Lease Acquisition | Department...

    Energy Saver

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition PDF icon RSL-2007-12 More Documents & Publications Attachment 1:...

  3. 2015 DOE Acquisition and Project Management Workshop Agenda ...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    DOE Acquisition and Project Management Workshop Agenda 2015 DOE Acquisition and Project Management Workshop Agenda This year's theme is "Federal Stewardship-- Providing the Value...

  4. Carbon Compliance Acquisition 5 Limited | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Compliance Acquisition 5 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 5 Limited Place: Greater London, United Kingdom Zip: EC2M 2TD Sector: Carbon...

  5. Program & Project Management For The Acquisition Of Capital Assets...

    Energy.gov [DOE] (indexed site)

    More Documents & Publications Program & Project Management For The Acquisition Of Capital Assets Program & Project Management For The Acquisition Of Capital Assets PARS II...

  6. Program and Project Management for the Acquisition of Capital...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    3.3B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement,...

  7. Acquisition Letter No. 2012-06 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Acquisition Letter on the Implications of Time-Limited Funds SUMMARY:...

  8. Acquisition Letter No. AL 2014-07 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter 07 - Benchmark Compensation Amount for Individual Executive Salary Actions SUMMARY: The purpose of Acquisition Letter (AL) 2014-07 is to establish the...

  9. Carbon Compliance Acquisition 16 Limited | Open Energy Information

    OpenEI (Open Energy Information) [EERE & EIA]

    Compliance Acquisition 16 Limited Jump to: navigation, search Name: Carbon Compliance Acquisition 16 Limited Place: United Kingdom Zip: LS12DS Product: Security broking and fund...

  10. Class Deviation from the Federal Acquisition Regulation (FAR...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, Test Program for Certain Commercial Items Class Deviation from the Federal Acquisition Regulation (FAR) 13.5, ...

  11. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Energy.gov [DOE] (indexed site)

    Department of Energy Acquisition Regulation (DEAR) Final Rule for changes to Parts 908, ... More Documents & Publications Department of Energy Acquisition Regulation (DEAR) Technical ...

  12. Department of Energy Acquisition Regulation (DEAR) Final Rule...

    Energy.gov [DOE] (indexed site)

    Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, and C ... Department of Energy Acquisition Regulation (DEAR) Final Rule for Subchapters A, B, ...

  13. Federal Acquisition Circular (FAC) 2005-67 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Federal Acquisition Circular (FAC) 2005-67 Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 21, 2013 Federal ...

  14. Federal Acquisition Circular 2005-38 | Department of Energy

    Energy.gov [DOE] (indexed site)

    Federal Acquisition Circular 2005-3 8, which makes miscellaneous changes to the Federal Acquisition Regulation (FAR), was published in the December 10, 2009 issue of the Federal ...

  15. Meeting the Challenge: Integrating Acquisition and Project Management...

    Energy Saver

    Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, P.E. Meeting the Challenge: Integrating Acquisition and Project Management - J. E. Surash, ...

  16. U.S. Coalbed Methane Proved Reserves Acquisitions (Billion Cubic...

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) U.S. Coalbed Methane Proved Reserves Acquisitions ... Release Date: 11192015 Next Release Date: 12312016 Referring Pages: Coalbed Methane ...

  17. 17.3 - Acquisition, Use and Disposal of Real Property

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Management for the Acquisition of Capital Assets, or current version DOE Order ... Management for the Acquisition of Capital Assets may apply. For DOE actions, ...

  18. Acquisition Letter: AL2005-08 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    in its entirety. Microsoft Word - AL2005-08.doc (230.7 KB) More Documents & Publications OPAM Policy Acquisition Guides Acquisition Guide Chapter 19 Update Microsoft Word - ...

  19. Green Lease Policies and Procedures for Lease Acquisition | Department...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition RSL-2007-12 (40.58 KB) More Documents & Publications Attachment ...

  20. Grant Acquisition and Other Funding Opportunities Webinar

    Energy.gov [DOE]

    Kerretv Online is hosting a free webinar on grant acquisition and other funding opportunities. The training will cover developing relationships with funders, finding the right funder, writing the proposal, and understanding how to report back to the funder.

  1. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    22.02 KB) More Documents & Publications Acquisition, Use, and Disposal of Real Estate Chapter 17 - Special Contracting Methods SIGNED Class Deviation Findings and Determination 970.5244-1

  2. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Microsoft Word - AcqGuide16pt1 Nov 2010 Chapter 16 - Types of Contracts Policy Flash 2014-37 Update to the Department of Energy Acquisition Guide Chapter 16.2, Performance...

  3. Energy Systems Acquisitions Advisory Board Procedures

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-10-28

    The Notice streamlines the Energy Systems Acquisition Advisory Board (ESAAB) process to ensure informed, objective, and documented Strategic and Major System Critical Decision, Baseline Change Proposal, and site selection final decisions. Does not cancel other directives.

  4. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    Idaho Calcine Disposition Project A&E https:www.emcbc.doe. govSEBCDP EMCBC Full and ... on the DOE Acquisition Forecast (http:hqlnc.doe.govForecast) and other public sources. ...

  5. MDS-Plus data acquisition engine

    SciTech Connect

    Flor, G. ); Cazzaro, F.; Fregonese, G.; Stangherlin, S. )

    1990-10-01

    MDS-Plus, a model driven data acquisition system being jointly developed at Istituto Gas Ionizzati, MIT Plasma Fusion Center, and Los Alamos National Laboratory, is based on the concept of an experiment model. The model contains descriptions of experiment data, devices, and actions to be performed. The data acquisition engine, i.e., the part of the system which actually executes the acquisition process, is driven by the contents of the model itself and implemented as a set of independent processes. A scheduler keeps the data acquisition engine in step with a state machine reflecting the operation of the actual experiment; a dispatcher takes care of the appropriate sequencing of the operations associated with each state of the experiment; various servers actually execute actions on behalf of the dispatcher.

  6. Acquisition Career Management Handbook Change - Revised Contracting...

    Energy.gov [DOE] (indexed site)

    (43.19 KB) PF2012-16a.pdf (1.08 MB) More Documents & Publications OPAM Policy Acquisition Guides Personal Property Management Certification Brochure Accessing Online COR Training

  7. Federal Acquisition Circular (FAC) 2005-65

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the January 29, 2013 Federal Register at 78 FR 6184. This FAC issued 4 final rules and a technical amendment.

  8. Federal Acquisition Circular (FAC) 2005-71

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the November 25, 2013 Federal Register at 78 FR 70476. This FAC issued 2 final rules and 1...

  9. Federal Acquisition Circular (FAC) 2005-66

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the February 28, 2013 Federal Register at 78 FR 13764. This FAC issued 3 final rules, 1 interim rule, and a technical amendment.

  10. Federal Acquisition Circular 2005-64

    Energy.gov [DOE]

    The Federal Acquisition Regulation (FAR) amendment, published in the December 21, 2012 Federal Register at 77 FR 75766, implements FAR Case 2011–028 Nondisplacement of Qualified Workers Under Service Contracts.

  11. Federal Acquisition Circular (FAC) 2005-69

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the August 1, 2013 Federal Register at 78 FR 46779. This FAC issued 6 final rules and a technical amendment.

  12. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    528.37 KB) More Documents & Publications Microsoft Word - AL2006-07.doc Acquisition Career Management Handbook Change - Revised Contracting Officer's Representative Certification (COR) Personal Property Management Certification Brochure

  13. Federal Acquisition Circular (FAC) 2005-70

    Energy.gov [DOE]

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2013 Federal Register at 78 FR 60168. This FAC issued 2 interim rules.

  14. Acquisition Management | National Nuclear Security Administration | (NNSA)

    National Nuclear Security Administration (NNSA)

    Acquisition Management The Office of Acquisition Management supports NNSA's efforts to: Reduce Nuclear Dangers; Manage the nuclear weapons stockpile; Recapitalize the nuclear infrastructure and deterrent capability; Strengthen the science, technology, and engineering base; and, Continue NNSA management reforms. Our Values: Providing solutions: We will use our expertise and knowledge to be solutions people assisting our business partners to achieve mission goals while ensuring compliance with

  15. DOE Federal Acquisition Regulation Clause Usage Guide

    Energy.gov [DOE]

    The subject matrix contained an error related to the solicitation provision at FAR 52.209-5. That provision was identified as Not Applicable for most contract types but it should have identified the provisions as Required for most contract types but Not Applicable for simplified acquisitions and acquisitions of commercial items. A corrected matrix is attached and the matrix in the Stripes Library is being replaced.

  16. acquisition and project management | National Nuclear Security

    National Nuclear Security Administration (NNSA)

    Administration and project management Acquisition and Project Management Office volunteers get up-close look at Office of Secure Transportation exercise Contracting professionals from the NNSA Acquisition & Project Management (APM) Field Program Section (FPS) recently served as role players for Office of Secure Transportation (OST) training exercises in Arkansas and Oklahoma. OST Federal Agents transport U.S. nuclear weapons, components and... SNL Starting Points Sandia Field Office Home

  17. Acquisition Guide, Chapter 38.1, Strategic Acquisition Transactions: A Guide for

    Energy.gov [DOE]

    The Strategic Acquisition Transactions Guide has been updated to reflect changes in the Federal Acquisition Regulation through Federal Acquisition Circular 2005-38 and other technical and editorial changes. A summary of these changes is provided on page three of the attached Guide. This Guide does not include the additional requirements required for orders funded under the Recovery Act. See the Recovery Act Guide for those requirements at http://management.energy.gov/policy~guidance/1672.htm.

  18. ASPEN costing manual

    SciTech Connect

    Schwint, K.J.

    1986-07-25

    The ASPEN program contains within it a Cost Estimation System (CES) which estimates the purchase cost and utility consumption rates for major pieces of equipment in a process flowsheet as well as installed equipment costs. These estimates are ''preliminary-study grade'' with an accuracy of plus or minus 30%. The ASPEN program also contains within it an Economic Evaluation System (EES) which estimates overall capital investment costs, annual operating expenses and profitability indices for a chemical plant. This ASPEN costing manual has been written as a guide for those inexperienced in the use of ASPEN and unfamiliar with standard cost estimating techniques who want to use the ASPEN CES and EES. The ASPEN Costing Manual is comprised of the following sections: (1) Introduction, (2) ASPEN Input Language, (3) ASPEN Cost Estimation System (CES), (4) ASPEN Cost Blocks; and (5) ASPEN Economic Evaluation System (EES).

  19. Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition...

    Energy.gov [DOE] (indexed site)

    Questions concerning this policy flash should be directed to Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and...

  20. 2017 Levelized Costs AEO 2012 Early Release

    Gasoline and Diesel Fuel Update

    1 July 2012 Short-Term Energy Outlook Highlights * EIA projects the West Texas Intermediate (WTI) crude oil spot price to average about $88 per barrel over the second half of 2012 and the U.S. refiner acquisition cost (RAC) of crude oil to average $93 per barrel, both about $7 per barrel lower than last month's Outlook. EIA expects WTI and RAC crude oil prices to remain roughly at these second half levels in 2013. Beginning in this month's Outlook, EIA is also providing a forecast of Brent crude

  1. Direct/Indirect Costs

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    This chapter provides recommended categories for direct and indirect elements developed by the Committee for Cost Methods Development (CCMD) and describes various estimating techniques for direct and indirect costs.

  2. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center

    Annual Fuel Cost gal Annual GHG Emissions (lbs of CO2) Vehicle Cost Calculator See Assumptions and Methodology Back Next U.S. Department of Energy Energy Efficiency and ...

  3. Low Cost, Durable Seal

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Cost, Durable Seal George M. Roberts UTC Power Corporation February 14, 2007 This presentation does not contain any proprietary or confidential information 1 LOW COST, DURABLE SEAL Outline * Project Objective * Technical Approach * Timeline * Team Roles * Budget * Q&A 2 LOW COST, DURABLE SEAL Project Objective Develop advanced, low cost, durable seal materials and sealing techniques amenable to high volume manufacture of PEM cell stacks. DOE Targets/Goals/Objectives Project Goal Durability

  4. NA APM - Associate Administrator for Acquisition & Project Management |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) APM - Associate Administrator for Acquisition & Project Management

  5. 2015 DOE Acquisition and Project Management (APM) Workshop Presentations

    Energy.gov [DOE]

    This page contains the presentations presented at the 2015 DOE Acquisition and Project Management (APM) Workshop.

  6. Acquisition Guide Chapter 15 1 - Source Selection Guide | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 5 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - Source Selection Guide Acquisition Guide Chapter 15 1 - (Final - Changes Accepted)(April 2013).pdf (917.82 KB) More Documents & Publications DOE Source Evaluation Board (SEB) Document Templates DOE Acquisition Guide Chapter 15.1 Source Selection Guide OPAM Policy Acquisition Guides

  7. Power Plant Cycling Costs

    SciTech Connect

    Kumar, N.; Besuner, P.; Lefton, S.; Agan, D.; Hilleman, D.

    2012-07-01

    This report provides a detailed review of the most up to date data available on power plant cycling costs. The primary objective of this report is to increase awareness of power plant cycling cost, the use of these costs in renewable integration studies and to stimulate debate between policymakers, system dispatchers, plant personnel and power utilities.

  8. Acquisition Guide, Chapter 6.1, Competition Requirements | Department of

    Office of Environmental Management (EM)

    Energy .1 - Acquisition Planning Acquisition Guide Chapter 7.1 - Acquisition Planning Acquisition Guide Chapter 7.1 is revised to update references, reorganize content, delete M&O coverage (which will be moved to a separate Guide Chapter), and add a new "Alternate Approval Process". PF2013-09 Acquisition Guide Chapter 7.1 - Acquisition Planning (19.24 KB) PF2013-09a.pdf (483.88 KB) More Documents & Publications Policy Flash 2015-13 Acquisition Planning: Revised DOE

  9. Finding and Winning Simplified Acquisitions, Part 1 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Finding and Winning Simplified Acquisitions, Part 1 Finding and Winning Simplified Acquisitions, Part 1 Presented at the 15th Annual DOE Small Business Forum & Expo by: Guy Timberlake, Chief Visionary Officer and Chief Executive Officer, The American Small Business Coalition Finding and Winning Simplified Acquisitions, Part 1 (4.41 MB) More Documents & Publications Finding and Winning Simplified Acquisitions, Part 2 Chapter 17 - Special Contracting Methods Interagency Acquisition

  10. Finding and Winning Simplified Acquisitions, Part 2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Finding and Winning Simplified Acquisitions, Part 2 Finding and Winning Simplified Acquisitions, Part 2 Presented at the 15th Annual DOE Small Business Forum & Expo by: Guy Timberlake, Chief Visionary Officer and Chief Executive Officer, The American Small Business Coalition Finding and Winning Simplified Acquisitions, Part 2 (6.47 MB) More Documents & Publications Finding and Winning Simplified Acquisitions, Part 1 December 12, 2013 Business Opportunity Session Presentations Acquisition

  11. 17.1 - Interagency Acquisitions, Interagency Transactions, and Interagency Agreements

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    17.1 (June 2012) 1 Interagency Acquisitions, Interagency Transactions, and Interagency Agreements CONTENTS Guiding Principles  This chapter provides guidance on interagency acquisitions, interagency transactions and interagency agreements  In addition to interagency acquisitions authorized by the Economy Act, Federal Acquisition Regulation (FAR) 17.5 is revised to broaden the scope of coverage to address all Interagency Acquisitions to include orders over $500,000 issued against Federal

  12. Update on Procurement Opportunities and Acquisition Process | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy Update on Procurement Opportunities and Acquisition Process Update on Procurement Opportunities and Acquisition Process Presentation from the 2015 DOE National Cleanup Workshop by J. E. Surash, P.E., Deputy Assistant Secretary, Acquisition and Project Management. Update on Procurement Opportunities and Acquisition Process (2.49 MB) More Documents & Publications EM Projects Perspective - Jack Surash, Deputy Assistant Secretary for Acquisition and Project Management, Environmental

  13. Updated Acquisition Guide Chapter 23 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Guide Chapter 23 Updated Acquisition Guide Chapter 23 Acquisition Guide Chapter 23 concerning environmental considerations for DOE contracts has been updated. The update recognizes the new Sustainable Acquisition Program clauses which became effective October 20, 2010 as a result of the rule published September 22, 2010, at 75 FR 57690. These clauses should be incorporated in new awards or added to existing applicable contracts. PF2011-25 Updated Acquisition Guide Chapter 23 (8.53

  14. Audit of Acquisition of Scientific Research at Ames Laboratory, ER-B-95-05

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    S. DEPARTMENT OF ENERGY OFFICE OF INSPECTOR GENERAL REPORT ON AUDIT OF ACQUISITION OF SCIENTIFIC RESEARCH AT AMES LABORATORY The Office of Inspector General wants to make the distribution of its reports as customer friendly and cost effective as possible. Therefore, this report will be available electronically through the Internet five to seven days after publication at the following alternative addresses: Department of Energy Headquarters Gopher gopher.hr.doe.gov Department of Energy

  15. Trigger Data Acquisition | Argonne National Laboratory

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Trigger Data Acquisition Trigger Data Acquisition Argonne and MSU have taken responsibility for the Level 2 Supervisor and Region-of-Interest Builder components of the Level 2 trigger. These custom electronics boards route a subset of the information from the detector system to the ATLAS High Level Trigger. The trigger system as a whole reduces the input event rate from 100kHz to a few kHz on the basis of the information from the RoIB and eventually, following further processing, to ~200 Hz for

  16. DOE Acquisition Guide Chapter 16.2R1 (June 2014)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Chapter 16.2R1 (June 2014) Performance Evaluation and Measurement Plans for Cost-Reimbursement, Non- Management and Operating Contracts [Reference: FAR 6, FAR 16, FAR 22, FAR 32, FAR 46, DEAR 915.404-4-72, DEAR 916.405-2, DEAR 970.1504-1, and Acquisition Guide Chapter 16.1] Overview The policy of the DOE is to maximize contractor performance and to align costs with performance through the use of performance-based management as a strategic contract management tool to plan for, manage, and

  17. Policy Flash 2014-29 Acquisition Letter 2014-07- Benchmark Compensation Amount for Individual Executive Salary Actions

    Energy.gov [DOE]

    The purpose of Acquisition Letter (AL) 2014-07 is to establish the form, "Compensation Subject to the Executive CAP (OFPP Limitation)" as the minimum required documentation to support DOE/NNSA Contracting Officers (CO) and Contractor Human Resources Specialists conclusion, that approved allowable costs do not exceed the Office of Federal Procurement Policy (OFPP) limitation pursuant to FAR 31.205-6(p).

  18. Acquisition Guide, Chapter 42.16, Reporting Other Contractor Information into the Federal Awardee Performance and Integrity Information System

    Energy.gov [DOE]

    The subject Acquisition Guide Chapter has the internal procedures for data entry to report other contractor information into the Federal Awardee Performance and Integrity Information System (FAPIIS). Other contractor information includes terminations for cause or default, defective cost or pricing data, determinations of non-responsibility, and administrative agreements for debarment or suspension.

  19. Benchmarking Soft Costs for PV Systems in the United States (Presentation)

    SciTech Connect

    Ardani, K.

    2012-06-01

    This paper presents results from the first U.S. based data collection effort to quantify non-hardware, business process costs for PV systems at the residential and commercial scales, using a bottom-up approach. Annual expenditure and labor hour productivity data are analyzed to benchmark business process costs in the specific areas of: (1) customer acquisition; (2) permitting, inspection, and interconnection; (3) labor costs of third party financing; and (4) installation labor.

  20. A model of the Capital Cost of a natural gas-fired fuel cell based Central Utilities Plant

    SciTech Connect

    Not Available

    1993-06-30

    This model defines the methods used to estimate the cost associated with acquisition and installation of capital equipment of the fuel cell systems defined by the central utility plant model. The capital cost model estimates the cost of acquiring and installing the fuel cell unit, and all auxiliary equipment such as a boiler, air conditioning, hot water storage, and pumps. The model provides a means to adjust initial cost estimates to consider learning associated with the projected level of production and installation of fuel cell systems. The capital cost estimate is an input to the cost of ownership analysis where it is combined with operating cost and revenue model estimates.

  1. Cost analysis guidelines

    SciTech Connect

    Strait, R.S.

    1996-01-10

    The first phase of the Depleted Uranium Hexafluoride Management Program (Program)--management strategy selection--consists of several program elements: Technology Assessment, Engineering Analysis, Cost Analysis, and preparation of an Environmental Impact Statement (EIS). Cost Analysis will estimate the life-cycle costs associated with each of the long-term management strategy alternatives for depleted uranium hexafluoride (UF6). The scope of Cost Analysis will include all major expenditures, from the planning and design stages through decontamination and decommissioning. The costs will be estimated at a scoping or preconceptual design level and are intended to assist decision makers in comparing alternatives for further consideration. They will not be absolute costs or bid-document costs. The purpose of the Cost Analysis Guidelines is to establish a consistent approach to analyzing of cost alternatives for managing Department of Energy`s (DOE`s) stocks of depleted uranium hexafluoride (DUF6). The component modules that make up the DUF6 management program differ substantially in operational maintenance, process-options, requirements for R and D, equipment, facilities, regulatory compliance, (O and M), and operations risk. To facilitate a consistent and equitable comparison of costs, the guidelines offer common definitions, assumptions or basis, and limitations integrated with a standard approach to the analysis. Further, the goal is to evaluate total net life-cycle costs and display them in a way that gives DOE the capability to evaluate a variety of overall DUF6 management strategies, including commercial potential. The cost estimates reflect the preconceptual level of the designs. They will be appropriate for distinguishing among management strategies.

  2. Federal Acquisition Circular (FAC) 2005-68

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the June 26, 2013 Federal Register at 78 FR 38535. This FAC issued 1 interim rule. To view this rule go to Federal Register site then search by date and go to General Services Administration to find the rule https://www.federalregister.gov/articles/current.

  3. Data acquisition for FNAL E665

    SciTech Connect

    Geesaman, D.F.; Green, M.C.; Kaufman, S.; Tentindo-Repond, S.; Bartlett, J.F.; Melanson, H.L.; Petravick, D.; Michael, D.G.; McLeod, D.; Vidal, M.

    1989-01-01

    The data acquisition system for FNAL E665, an experiment to study deep inelastic muon scattering from nucleons and nuclei, is described. The system is built with the FNAL VAXONLINE and RSX DA building blocks. The structure, capabilities and limitations for data flow, control and monitoring are discussed. 20 refs., 1 fig.

  4. Data acquisition for a large neutrino detector

    SciTech Connect

    Ahrens, L.A.; Aronson, S.A.; Connolly, P.L.

    1983-01-01

    A hierarchical, distributed intelligence data acquisition system which has been used for the past two years in neutrino experiments at Brookhaven National Laboratory is described. Performance characteristics and the nature of problems encountered in bringing the system to maturity are discussed and some generalizations of the experience are suggested.

  5. Controls and data acquisition on Atlas

    SciTech Connect

    Scudder, D.W.; Hosack, K.W.; Parsons, W.M.; Reass, W.A.; Thompson, M.C.; Wysocki, F.J.; Creager, J.

    1997-09-01

    The control and data acquisition systems for Atlas will use a large degree of decentralization. By distributing control points close to the systems being controlled, the authors expect to simplify the task of isolating electronic systems from the large expected EMI pulses, allow connection of the various parts of the system by high-level fiber-optic networks, allow a simple configuration of the control and data acquisition screen rooms, and simplify the software efforts through the resulting modularization. The Atlas control system must control capacitor charging, machine and diagnostic timing and triggering, marx module diagnostics, vacuum systems, gas handling for railgaps, safety interlocks, and oil handling. Many of these tasks will be performed by industrial-style programmable logic controllers (PLCs). Each of 38 Marx bank maintenance units will have a control and diagnostic package which will monitor both charging and discharging current and railgap trigger timing. An unusual feature of digitizers to record each Marx module`s output waveform, plus nanosecond resolution time interval meters to record the firing time of each railgap. The machine data acquisition system for Atlas will be built around an SQL database, use National Instruments LabVIEW software to control data acquisition instruments and provide links for a variety of experimentalists` data analysis packages. World Wide Web access will provide an interface through which users can monitor experimental data and machine status.

  6. Federal Acquisition Circular (FAC) 2005-76

    Energy.gov [DOE]

    Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the July 25, 2014 Federal Register at 79 FR 43574. FAC 2005-76 issued 2 final rules, 1 interim rule and 1 technical amendment.

  7. Dumand-array data-acquisition system

    SciTech Connect

    Brenner, A.E.; Theriot, D.; Dau, W.D.; Geelhood, B.D.; Harris, F.; Learned, J.G.; Stenger, V.; March, R.; Roos, C.; Shumard, E.

    1982-04-01

    An overall data acquisition approach for DUMAND is described. The scheme assumes one array to shore optical fiber transmission line for each string of the array. The basic event sampling period is approx. 13 ..mu..sec. All potentially interesting data is transmitted to shore where the major processing is performed.

  8. substantially reduced production costs

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    production costs - Sandia Energy Energy Search Icon Sandia Home Locations Contact Us Employee Locator Energy & Climate Secure & Sustainable Energy Future Stationary Power Energy ...

  9. SOFT COST GRAND CHALLENGE

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    energycenter.org California Center for Sustainable Energy Soft Cost Grand Challenge May 22, 2014 Accelerating the transition to a sustainable world powered by clean energy 2...

  10. Workplace Charging Installation Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Installation costs and services vary considerably, so employers are encouraged to obtain a number of quotes before moving forward with any installation. An initial site investigation should include:

  11. POLICY FLASH 2014-23 Acquisition Guide 13.3 Simplified Acquisition Procedures

    Office of Energy Efficiency and Renewable Energy (EERE)

    Questions concerning this policy flash should be directed to Carol Jenkins, of the Office of Acquisition and Project Management Policy at 202-287-1827 or at Carol.Jenkins@hq.doe.gov

  12. Policy Flash 2013-78 Acquisition Guide Chapter 7.3 Acquisition...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Jason Taylor of the Contract and Financial Assistance Policy Division, Office of Policy, Office of Acquisition and Project Management at (202) 287-1560 or at jason.taylor@hq.doe....

  13. Transmission line capital costs

    SciTech Connect

    Hughes, K.R.; Brown, D.R.

    1995-05-01

    The displacement or deferral of conventional AC transmission line installation is a key benefit associated with several technologies being developed with the support of the U.S. Department of Energy`s Office of Energy Management (OEM). Previous benefits assessments conducted within OEM have been based on significantly different assumptions for the average cost per mile of AC transmission line. In response to this uncertainty, an investigation of transmission line capital cost data was initiated. The objective of this study was to develop a database for preparing preliminary estimates of transmission line costs. An extensive search of potential data sources identified databases maintained by the Bonneville Power Administration (BPA) and the Western Area Power Administration (WAPA) as superior sources of transmission line cost data. The BPA and WAPA data were adjusted to a common basis and combined together. The composite database covers voltage levels from 13.8 to 765 W, with cost estimates for a given voltage level varying depending on conductor size, tower material type, tower frame type, and number of circuits. Reported transmission line costs vary significantly, even for a given voltage level. This can usually be explained by variation in the design factors noted above and variation in environmental and land (right-of-way) costs, which are extremely site-specific. Cost estimates prepared from the composite database were compared to cost data collected by the Federal Energy Regulatory Commission (FERC) for investor-owned utilities from across the United States. The comparison was hampered because the only design specifications included with the FERC data were voltage level and line length. Working within this limitation, the FERC data were not found to differ significantly from the composite database. Therefore, the composite database was judged to be a reasonable proxy for estimating national average costs.

  14. Decommissioning Unit Cost Data

    SciTech Connect

    Sanford, P. C.; Stevens, J. L.; Brandt, R.

    2002-02-26

    The Rocky Flats Closure Site (Site) is in the process of stabilizing residual nuclear materials, decommissioning nuclear facilities, and remediating environmental media. A number of contaminated facilities have been decommissioned, including one building, Building 779, that contained gloveboxes used for plutonium process development but did little actual plutonium processing. The actual costs incurred to decommission this facility formed much of the basis or standards used to estimate the decommissioning of the remaining plutonium-processing buildings. Recent decommissioning activities in the first actual production facility, Building 771, implemented a number of process and procedural improvements. These include methods for handling plutonium contaminated equipment, including size reduction, decontamination, and waste packaging, as well as management improvements to streamline planning and work control. These improvements resulted in a safer working environment and reduced project cost, as demonstrated in the overall project efficiency. The topic of this paper is the analysis of how this improved efficiency is reflected in recent unit costs for activities specific to the decommissioning of plutonium facilities. This analysis will allow the Site to quantify the impacts on future Rocky Flats decommissioning activities, and to develop data for planning and cost estimating the decommissioning of future facilities. The paper discusses the methods used to collect and arrange the project data from the individual work areas within Building 771. Regression and data correlation techniques were used to quantify values for different types of decommissioning activities. The discussion includes the approach to identify and allocate overall project support, waste management, and Site support costs based on the overall Site and project costs to provide a ''burdened'' unit cost. The paper ultimately provides a unit cost basis that can be used to support cost estimates for

  15. Table 3b. Imported Refiner Acquisition Cost of Crude Oil, Projected...

    Energy Information Administration (EIA) (indexed site)

    ...4066225,22.12084421,23.75932947,25.52264901,27.51055464,29.66626656,31.85916391,34.0019784...8849436,22.96524155,24.33309179,25.79246377,27.27412238,28.81951691,30.38043478,32.1382286...

  16. Table 3b. Imported Refiner Acquisition Cost of Crude Oil, Projected...

    Energy Information Administration (EIA) (indexed site)

    AEO 1994 17.06 17.21 18.24 19.43 20.64 22.12 23.76 25.52 27.51 29.67 31.86 34.00 36.05 38.36 40.78 43.29 45.88 48.37 AEO 1995 15.24 17.27 18.23 19.26 20.39 21.59 22.97 24.33 25.79 ...

  17. Acquisition Guide Chapters on Allowable Food and Beverage Costs at DOE and Contractor Sponsored Conferences

    Energy.gov [DOE]

    Section 1606 of the Recovery Act requires that all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 3 1 of title 40, United States Code.

  18. Acquisition Guide Chapter 70.31A- Costs Associated with Whistleblower Actions

    Energy.gov [DOE]

    The subject guide chapter is revised to incorporate the requirements of Section 627 of the Energy Policy Act of 2005.

  19. Policy Flash 2014-26 Acquisition Guide Chapter 70.31A - Costs...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Questions concerning this policy flash should be directed to Jason Taylor, of the Contract and Financial Assistance Policy Division at (202) 287-1560 or at Jason.Taylor@hq.doe.gov PDF ...

  20. Publication of Federal Acquisition Circular 2005-51

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-51 which makes two changes to the Federal Acquisition Regulation involving the small business program and a modification of Standard Form 26.

  1. Acquisition Guide Chapter 15.2 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    5.2 Acquisition Guide Chapter 15.2 Unsolicited Proposals - Revised August 2015. PDF icon Acquisition Guide Chapter 15.2 More Documents & Publications POLICY FLASH 2015-34 OPAM...

  2. Chapter 41 - Acquisition of Utility Services | Department of...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    1 - Acquisition of Utility Services Chapter 41 - Acquisition of Utility Services PDF icon 41.1Utilities0.pdf More Documents & Publications AcqGuide41pt1.doc&0; Chapter 9 -...

  3. Acquisition Letter No. AL 2014-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition Letter No. AL 2014-02 Acquisition Letter No. AL 2014-02 DATE: October 31, 2013 TO: Procurement DirectorsContracting Officers FROM: Director Contract and Financial...

  4. A simulation of data acquisition system for SSC experiments

    SciTech Connect

    Watase, Y.; Ikeda, H.

    1989-04-01

    A simulation on some parts of the data acquisition system was performed using a general purpose simulation language GPSS. Several results of the simulation are discussed for the data acquisition system for the SSC experiment.

  5. Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005...

    Office of Environmental Management (EM)

    11 Federal Acquisition Circular (FAC) 2005-71 Policy Flash 2014-11 Federal Acquisition Circular (FAC) 2005-71 Questions concerning this policy flash should be directed to Barbara...

  6. ACQUISITION LETTER 2014-02: PROVISIONAL PAYMENT OF FEE | Department...

    Energy.gov [DOE] (indexed site)

    on provisional payment of fee for non management and operating contracts. PF2014-08 Acquisition Letter 2014-02 Provisional Payment of FeeAcquisition Letter 2014-02 Provisional ...

  7. Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    3 Federal Acquisition Circular (FAC) 2005-67 Policy Flash 2013-63 Federal Acquisition Circular (FAC) 2005-67 Questions concerning this policy flash should be directed to Barbara...

  8. Executive Order 12969-Federal Acquisition and Community RightTo...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2969-Federal Acquisition and Community RightTo-Know Executive Order 12969-Federal Acquisition and Community RightTo-Know The efficiency of the Federal Government is served when it ...

  9. ESPC ENABLE Acquisition Plan Template | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    The acquisition plan is the first formal step in the ESPC ENABLE procurement process. The completed acquisition plan will serve as a guide throughout the rest of the process. ...

  10. Program and Project Management for the Acquisition of Capital...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    13.B, Chg 1 (PgChg), Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health...

  11. Program and Project Management for the Acquisition of Capital...

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    ARCHIVED DOE O 413.3A Chg 1, Program and Project Management for the Acquisition of Capital Assets by John Makepeace Functional areas: Acquisition, Defense Nuclear Facility Safety...

  12. Federal Acquisition Circular 2005-43 | Department of Energy

    Energy Saver

    Attached for your information is a summary of Federal Acquisition Circular PAC) 2005-43 which makes changes to the Federal Acquisition Regulation (FAR). The FAC has five rules ...

  13. Acquisition Letter No. AL 2013-10 | Department of Energy

    Office of Environmental Management (EM)

    More Documents & Publications Acquisition Letter 09 - Revision of Department of Energy (DOE) Order 350.1 and Special H Clause Policy Flash 2016-11 Acquisition Letter No. AL 2016-01

  14. OPAM Policy Acquisition Guides | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    31 - Contract Cost Principles and Procedures Microsoft Word - AcqGuide70pt31B.doc Microsoft Word - AL2005-12.doc...

  15. Review of Supervisory Control and Data Acquisition (SCADA) Systems...

    Office of Scientific and Technical Information (OSTI)

    United States Language: English Subject: 24 - POWER TRANSMISSION AND DISTRIBUTION, 99 - GENERAL AND MISCELLANEOUSMATHEMATICS, COMPUTING, AND INFORMATION SCIENCE; DATA ACQUISITION...

  16. Acquisition Letters No. AL 2013-05 | Department of Energy

    Energy Saver

    7 Acquisition Letter No. AL 2015-07 DATE: July 07, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letter No. AL 2015-07, Performance of Inherently Governmental and Critical Functions SUMMARY: Attached is revised Acquisition Letter (AL) No. AL 2015-07, Performance of Inherently Governmental and Critical Functions, dated July 07, 2015. This AL provides

  17. Improving Communication with Industry during the Acquisition Process |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Improving Communication with Industry during the Acquisition Process Improving Communication with Industry during the Acquisition Process The Office of Federal Procurement Policy, (OFPP) issued the attached memorandum entitled "Myth-Busting: Addressing Misconceptions to Improve Communication with Industry during the Acquisition Process" on February 2, 2011. PF2011-44 Improving Communication with Industry during the Acquisition Process (41.59 KB) PF2011-44a.pdf

  18. Acquisition & Financial Assistance Rules Status | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Acquisition & Financial Assistance Rules Status Acquisition & Financial Assistance Rules Status Subscribe to Acquisition & Financial Assistance Rules Status Updates Department of Energy, Office of Acquisition Management Proposed Rules Current as of 11/4/16 Regulation Identifier Number Title / Subject / Purpose Rule Type Status 1901-AB37 Enforcement of Classified Information Security Requirements: The proposed rule amends DOE's statutory prescribed regulation, which sets forth the

  19. Assessment of Acquisition and Financial Assistance Operations | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Acquisition and Financial Assistance Operations Assessment of Acquisition and Financial Assistance Operations The Department of Energy's Office of Energy Efficiency and Renewable Energy's Assessment of Acquisition and Financial Assistance Operations, in coordination with the National Academy of Public Administration. Assessment of Acquisition and Financial Assistance Operations (754.94 KB) More Documents & Publications Reorganization of the Office of Energy Efficiency and

  20. Attachment 1: Green Lease Policies and Procedures for Lease Acquisition |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 1: Green Lease Policies and Procedures for Lease Acquisition Attachment 1: Green Lease Policies and Procedures for Lease Acquisition Green Lease Policies and Procedures for Lease Acquisition (45.31 KB) More Documents & Publications Green Lease Policies and Procedures for Lease Acquisition Attachment 2: Solicitation for Offers with New and Revised Green Lease Text Energy Efficiency in Separate Tenant Spaces - A Feasibility Study

  1. Federal Acquisition Circular (FAC) 2005-91 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    91 Federal Acquisition Circular (FAC) 2005-91 DATE: October 24, 2016 TO: Procurement Directors Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Federal Acquisition Circular (FAC) 2005-91 SUMMARY: Attached for your information is a brief summary of the Federal Acquisition Regulation (FAR) amendments, published in the September 30, 2016 Federal Register at 81 FR 67726. FAC 2005-91 issued 9 final rules, 1

  2. Federal Acquisition Circular 2005-34 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2005-34 Federal Acquisition Circular 2005-34 PF2009-54.pdf (879.43 KB) PF2009-54a - Attachment-Summary of the Contents of Federal Acquisition Circular 2005-34 Published in the July 1, 2009 Issue of the Federal Register at Page 31556 (11.54 KB) More Documents & Publications Federal Acquisition Circular 2005-40 Federal Acquisition Circular 2005-47 Policy Flash Archive Search File

  3. POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Positions (Expired) | Department of Energy 9A Direct Hire Authority for Acquisition Positions (Expired) POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition Positions (Expired) THIS GUIDANCE HAS EXPIRED This Policy on Direct Hire Authority for Acquisition Positions has been replaced by POLICY GUIDANCE MEMORANDUM #34B Direct Hire Authority for Contract Specialist Positions POLICY GUIDANCE MEMORANDUM #09A Direct Hire Authority for Acquisition Positions (Expired) (49.21 KB)

  4. Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007)...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Monaster And Coolbaugh, 2007) Exploration Activity Details...

  5. Data Acquisition-Manipulation At Cascades Region (Ingebritsen...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Cascades Region (Ingebritsen & Mariner, 2010) Exploration...

  6. Data Acquisition-Manipulation (Beck & Cermak, 1989) | Open Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Beck & Cermak, 1989) Exploration Activity Details Location...

  7. Data Acquisition-Manipulation At Truckhaven Area (Layman Energy...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation At Truckhaven Area (Layman Energy Associates, 2007)...

  8. Data Acquisition-Manipulation (Verma & Santoyo, 1997) | Open...

    OpenEI (Open Energy Information) [EERE & EIA]

    Jump to: navigation, search GEOTHERMAL ENERGYGeothermal Home Exploration Activity: Data Acquisition-Manipulation (Verma & Santoyo, 1997) Exploration Activity Details Location...

  9. Office of Acquisition and Financial Assessment PIA, Golden Field Office |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office Office of Acquisition and Financial Assessment PIA, Golden Field Office (245.98 KB) More Documents & Publications Integrated Safety Management Workshop Registration, PIA, Idaho National Laboratory Occupational Medicine - Assistant PIA, Idaho National Laboratory

  10. Acquisition Guide Chapter 1.3 - Balanced Scorecard Performance Assessment

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Program | Department of Energy .3 - Balanced Scorecard Performance Assessment Program Acquisition Guide Chapter 1.3 - Balanced Scorecard Performance Assessment Program DATE: May 17, 2016 TO: Heads of Contracting Activities and Procurement Directors FROM: Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 1.3--Balanced Scorecard Performance Assessment Program SUMMARY: Acquisition Guide Chapter 1.3-Balanced Scorecard Performance Assessment Program, is updated to reflect the

  11. Acquisition Letter No. AL 2016-02 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    2 Acquisition Letter No. AL 2016-02 DATE: February 17, 2016 TO: Procurement Directors/Contracting Officers FROM: Acting Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letter 2016-02/Financial Acquisition Letter 2016-02 Congressional Notifications and Quarterly Reporting to the Appropriations Committees in Accordance with the Energy and Water Development and Related Agencies Appropriations Act, 2016, Division D, Title

  12. Acquisition Guide Chapter 71.1- Headquarters Business Clearance Process

    Energy.gov [DOE]

    Revised Acquisition Guide Chapter 71.1, "Headquarters Business Clearance Process" Issued as Policy Flash 2008-66

  13. Acquisition Guide Chapter 71.1 - Headquarters Business Clearance...

    Energy.gov [DOE] (indexed site)

    In accomplishing its mission, the FAOD reviews acquisition plans, solicitations, source selection documents, contracts, and other relevant transactional documentation....

  14. Acquisition Career Management Handbook Change 2011-01 | Department...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Career Management Handbook Change 2011-01 Acquisition Career Management Handbook Change ... Career Management Program (ACMP), Financial Assistance Program certification ...

  15. NA APM - Associate Administrator for Acquisition & Project Management...

    National Nuclear Security Administration (NNSA)

    APM - Associate Administrator for Acquisition & Project Management | National Nuclear Security Administration Facebook Twitter Youtube Flickr RSS People Mission Managing the ...

  16. National Geothermal Data Systems Data Acquisition and Access | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy Systems Data Acquisition and Access National Geothermal Data Systems Data Acquisition and Access Project objective: To support the acquisition of new and legacy data from DOE-funded demonstration projects, the US Geological Survey, and other sources. analysis_snyder_ngds_data_acquisition.pdf (1.77 MB) More Documents & Publications National Geothermal Data System Architecture Design, Testing and Maintenance State Geological Survey Contributions to the National Geothermal Data

  17. Acquisition & Project Management | National Nuclear Security Administration

    National Nuclear Security Administration (NNSA)

    Acquisition & Project Management NNSA continues improvements in best practices for acquisition and project management In July, NNSA's Office of Acquisition and Project Management hosted the third annual Federal Project Director and Project Integrator Training Session in Albuquerque, N.M. This training is one of several initiatives undertaken by NNSA to continually improve contracting and project management... NNSA Office of Acquisition Management improves customer satisfaction (Click to view

  18. The CDMS II data acquisition system

    SciTech Connect

    Bauer, D.A.; Burke, S.; Cooley, J.; Crisler, M.; Cushman, P.; DeJongh, F.; Duong, L.; Ferril, R.; Golwala, S.R.; Hall, J.; Holmgren, D.; ,

    2011-01-01

    The Data Acquisition System for the CDMS II dark matter experiment was designed and built when the experiment moved to its new underground installation at the Soudan Lab. The combination of remote operation and increased data load necessitated a completely new design. Elements of the original LabView system remained as stand-alone diagnostic programs, but the main data processing moved to a VME-based system with custom electronics for signal conditioning, trigger formation and buffering. The data rate was increased 100-fold and the automated cryogenic system was linked to the data acquisition. A modular server framework with associated user interfaces was implemented in Java to allow control and monitoring of the entire experiment remotely.

  19. In situ acquisition of cathodic protection parameters

    SciTech Connect

    Baptista, W.; Costa, J.C.M. da

    1997-01-01

    Present, offshore cathodic protection (CP) design in Brazil uses parameters found in the literature and in international norms, such as: initial and average current density, coating efficiency, leaked current at the buried part of the wet Xmas tree, etc. Five data acquisition systems (DAS) were launched at the Campos Basin water in depths of 102, 290, and 975 m. The DASs were recovered after 8, 11, and 14 months, respectively. Adequate methods of data processing guaranteed the acquisition of reliable parameters for use in CP projects in seawater: initial and average current densities, anode current capacity, and polarization curves at several time intervals. The potential of {minus}800 mV{sub Ag/AgCl} is generally accepted as norm for carbon steel protection in seawater. The cathodic current density necessary to obtain this potential is extremely dependent upon environmental conditions, and the geometry and superficial condition of the submerged steel structure.

  20. Acquisition systems for heat transfer measurement

    SciTech Connect

    De Witt, R.J.

    1983-01-01

    Practical heat transfer data acquisition systems are normally characterized by the need for high-resolution, low-drift, low-speed recording devices. Analog devices such as strip chart or circular recorders and FM analog magnetic tape have excellent resolution and work well when data will be presented in temperature versus time format only and need not be processed further. Digital systems are more complex and require an understanding of the following components: digitizing devices, interface bus types, processor requirements, and software design. This paper discusses all the above components of analog and digital data acquisition, as they are used in current practice. Additional information on thermocouple system analysis will aid the user in developing accurate heat transfer measuring systems.

  1. The acquisition of dangerous biological materials :

    SciTech Connect

    Aceto, Donato Gonzalo; Astuto-Gribble, Lisa M.; Gaudioso, Jennifer M.

    2007-11-01

    Numerous terrorist organizations have openly expressed interest in producing and deploying biological weapons. However, a limiting factor for many terrorists has been the acquisition of dangerous biological agents, as evidenced by the very few successful instances of biological weapons use compared to the number of documented hoaxes. Biological agents vary greatly in their ability to cause loss of life and economic damage. Some agents, if released properly, can kill many people and cause an extensive number of secondary infections; other agents will sicken only a small number of people for a short period of time. Consequently, several biological agents can potentially be used to perpetrate a bioterrorism attack but few are likely capable of causing a high consequence event. It is crucial, from a US national security perspective, to more deeply understand the likelihood that terrorist organizations can acquire the range of these agents. Few studies have attempted to comprehensively compile the technical information directly relevant to the acquisition of dangerous bacteria, viruses and toxins. In this report, technical fact sheets were assembled for 46 potentially dangerous biological agents. Much of the information was taken from various research sources which could ultimately and significantly expedite and improve bioterrorism threat assessments. By systematically examining a number of specific agent characteristics included in these fact sheets, it may be possible to detect, target, and implement measures to thwart future terrorist acquisition attempts. In addition, the information in these fact sheets may be used as a tool to help laboratories gain a rudimentary understanding of how attractive a method laboratory theft is relative to other potential acquisition modes.

  2. Acquisition Guide Chapter Updates for Threshold Changes

    Energy.gov [DOE]

    The Federal Acquisition Regulation is regularly updated to revise dollar thresholds associated for various activities. Policy Flash 2011-15 provides a quick reference guide to the threshold changes that were effective October 1, 2010. This Flash is to inform you that the following Guide Chapters have been updated to reflect the threshold changes: Chapter 3.1 Chapter 6.1 Chapter 15.4-4 Chapter 16.1 Chapter 18.0 Chapter 37.1 Chapter 38.1

  3. Department of Energy Acquisition Regulation (DEAR)

    Office of Energy Efficiency and Renewable Energy (EERE)

    To ensure that you are using the most recent version of the Department of Energy Acquisition Regulation (DEAR), use one of the electronic versions at one of the following websites: DOE Procurement - http://management.energy.gov/DEAR.htm; Electronic Code of Federal Regulations - http://ecfr.gpoaccess.gov/cgi/t/text/text-idx?c=ecfr&tpl=/ecfrbrowse/Tit... or Hill Air Force Base - http://farsite.hill.af.mil/vfdoea.htm.

  4. From Thule to Huli`s: Use of Magnetotellurics in difficult acquisition areas

    SciTech Connect

    Christopherson, K.R.

    1996-12-31

    Recent applications of Magnetotellurics have produced results superior to those of earlier years by many improvements in the technology, the application and, the interpretation of the method. MT continues to be useful in those areas where seismic acquisition is either difficult or expensive, where the surface inhibits effective seismic penetration, or where the use of MT is cost-effective as a predecessor to seismic. Improvements made to MT within the last few years include: multi-site acquisition with varied station spacings and omni-directional, low frequency antennae; smaller, higher storage field computers, sensor-box modifications for filtering unwanted signal (such as lightning); post-acquisition re-processing of the data via robust schemes; and faster, larger 2-D and 3-D modeling capabilities. Within the last two years, MT has been used world-wide for a variety of exploration targets. These include the continued use of MT for mapping subcarbonate plays in Papua New Guinea with on-going drilling. Here, use of seismic is precluded due to thick, high-velocity surface limestone. MT has been used as a precursor to seismic in overthrust regimes in Nevada and Colorado where MT is used to highgrade areas as prospects before seismic programs are acquired. In Greenland, MT has been used for reconnaissance mapping in large basin environments sub-basalt. On-going system modifications are being made to provide larger channel systems and future marine acquisition of MT.

  5. From Thule to Huli's: Use of Magnetotellurics in difficult acquisition areas

    SciTech Connect

    Christopherson, K.R. )

    1996-01-01

    Recent applications of Magnetotellurics have produced results superior to those of earlier years by many improvements in the technology, the application and, the interpretation of the method. MT continues to be useful in those areas where seismic acquisition is either difficult or expensive, where the surface inhibits effective seismic penetration, or where the use of MT is cost-effective as a predecessor to seismic. Improvements made to MT within the last few years include: multi-site acquisition with varied station spacings and omni-directional, low frequency antennae; smaller, higher storage field computers, sensor-box modifications for filtering unwanted signal (such as lightning); post-acquisition re-processing of the data via robust schemes; and faster, larger 2-D and 3-D modeling capabilities. Within the last two years, MT has been used world-wide for a variety of exploration targets. These include the continued use of MT for mapping subcarbonate plays in Papua New Guinea with on-going drilling. Here, use of seismic is precluded due to thick, high-velocity surface limestone. MT has been used as a precursor to seismic in overthrust regimes in Nevada and Colorado where MT is used to highgrade areas as prospects before seismic programs are acquired. In Greenland, MT has been used for reconnaissance mapping in large basin environments sub-basalt. On-going system modifications are being made to provide larger channel systems and future marine acquisition of MT.

  6. Publication of Federal Acquisition Circular 2005-50

    Energy.gov [DOE]

    Attached for your information is a summary of Federal Acquisition Circular 2005-50 which makes miscellaneous changes to the Federal Acquisition Regulation. We are reviewing Item II for possible changes we may need to make in DOE Acquisition Guide Chapter 38.

  7. Calorimeter Data Acquisition and Reporting Software

    SciTech Connect

    Plummer, Jean R.; Levi, Gerald

    1998-08-27

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard''s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From the retrieved voltage data, the reporting program can calculate a standard''s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.

  8. CALDAR. Calorimeter Data Acquisition and Reporting Software

    SciTech Connect

    Plummer, J.R.; Levi, G.

    1998-07-20

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard`s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From the retrieved voltage data, the reporting program can calculate a standard`s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.

  9. DAQMAN - A flexible configurable data acquisition system

    Energy Science and Technology Software Center

    2012-08-01

    DAQMAN is a flexible configurable interface that allows the user to build and operate a VME-based data acquisition system on a Linux workstation. It consists of two parts: a Java-based Graphical User Interface to configure the system, and a C-based utility that reads out the data and creates the output ASCII data file, with two levels of diagnostic tools. The data acquisition system requires a CAEN CONET-VME Bridge to communicate between the hardware in themore » VME crate and the Linux workstation. Data acquisition modules, such as ADCs, TDC, Scalers, can be loaded into the system, or removed easily. The GUI allows users to activate modules, and channels within modules by clicking on icons. Running configurations are stored; data are collected and can be viewed either as raw numbers, or by charts and histograms that update as the data are accumulated. Data files are written to disk in ASCII format, with a date and time stamp.« less

  10. Calorimeter Data Acquisition and Reporting Software

    Energy Science and Technology Software Center

    1998-08-27

    The calorimeter Data Acquisition and Reporting Program performs the calculations necessary to calculate the calorimetric sample results in grams and provide a printable report for up to twelve Mound Calorimeters. To determine a standard''s wattage or sample gram fill, the reporting program retrieves the output voltage from the power supply at the calorimeter and a temperature resistant resistor via a voltmeter and digital input card in a Hewlett Packard Data Acquisition Unit (DAQ). From themore » retrieved voltage data, the reporting program can calculate a standard''s wattage output and sample gram fill. The reporting program also determines equilibrium (stability) by performing a stability algorithm bassed on user defined slope an/or sigma values for the previous forty values. Once the stability is determined, the reporting program will notify the user that the calorimeter has reached equilibrium. The Calorimeter Data Acquisition and Reporting Program operates continuously as described to monitor for calorimeter equilibrium and to generate a printable report with sample results.« less

  11. Estimating Renewable Energy Costs

    Office of Energy Efficiency and Renewable Energy (EERE)

    Some renewable energy measures, such as daylighting, passive solar heating, and cooling load avoidance, do not add much to the cost of a building. However, renewable energy technologies typically...

  12. Vehicle Cost Calculator

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    Select FuelTechnology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Next Vehicle Cost Calculator Update Your Widget Code This ...

  13. Vehicle Cost Calculator

    Alternative Fuels and Advanced Vehicles Data Center

    Select FuelTechnology Electric Hybrid Electric Plug-in Hybrid Electric Natural Gas (CNG) Flex Fuel (E85) Biodiesel (B20) Propane (LPG) Next Vehicle Cost Calculator Vehicle 0 City ...

  14. Cost Estimating Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates. No cancellations.

  15. Cost Estimating Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2011-05-09

    This Guide provides uniform guidance and best practices that describe the methods and procedures that could be used in all programs and projects at DOE for preparing cost estimates.

  16. Cost Estimating Guide

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    1997-03-28

    The objective of this Guide is to improve the quality of cost estimates and further strengthen the DOE program/project management system. The original 25 separate chapters and three appendices have been combined to create a single document.

  17. INDEPENDENT COST REVIEW (ICR)

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Report SOP Standard Operating Procedure TEC Total Estimated Cost TIPR Technical ... FY13 FY14 FY15 FY16 Total PED Construction TEC OPC TPC Note: above values include MR...

  18. System Cost Model

    Energy Science and Technology Software Center

    1996-03-27

    SCM is used for estimation of the life-cycle impacts (costs, health and safety risks) of waste management facilities for mixed low-level, low-level, and transuranic waste. SCM uses parametric cost functions to estimate life-cycle costs for various treatment, storage, and disposal modules which reflect planned and existing waste management facilities at Department of Energy (DOE) installations. SCM also provides transportation costs for intersite transfer of DOE wastes. SCM covers the entire DOE waste management complex tomore » allow system sensitivity analysis including: treatment, storage, and disposal configuration options; treatment technology selection; scheduling options; transportation options; waste stream and volume changes; and site specific conditions.« less

  19. Soft Costs Fact Sheet

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy SunShot Initiative is a collaborative national effort to make solar energy technologies cost-competitive with conventional forms of energy by the end of the decade. Reducing the total installed cost for utility-scale solar electricity to roughly 6 cents per kilowatt hour without subsidies will result in rapid, large-scale adoption of solar electricity across the United States. Reaching this goal will re-establish American technological leadership, improve the nation's energy security,

  20. Independent Cost Estimate (ICE)

    Energy.gov [DOE]

    Independent Cost Estimate (ICE). On August 8-12, the Office of Project Management Oversight and Assessments (PM) will conduct an ICE on the NNSA Albuquerque Complex Project (NACP) at Albuquerque, NM. This estimate will support the Critical Decision (CD) for establishing the performance baseline and approval to start construction (CD-2/3). This project is at CD-1, with a total project cost range of $183M to $251M.

  1. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Soft Costs » Soft Costs Soft Costs The U.S. Department of Energy (DOE) SunShot Initiative's soft costs program works to lower the non-hardware costs of solar and accelerate the adoption of solar energy technologies throughout the United States. In support of the SunShot Initiative goals, the soft costs program works in the following strategic areas: networking and technical assistance, data analysis, business innovation, and training. Soft Costs Activity Areas, Business Innovation, Networking

  2. Federal Acquisition Circular (FAC) 2005-75 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    75 Federal Acquisition Circular (FAC) 2005-75 Attached for your information is a brief summary of Federal Acquisition Regulation (FAR) amendments, published in the June 24, 2014 Federal Register at 79 FR 35858. FAC 2005-75 issued 1 final rule and 2 interim rules. PF2014-36 Federal Acquisition Circular (FAC) 2005-75 (15.76 KB) PF-2014-36a.pdf (13.72 KB) More Documents & Publications Federal Acquisition Circular (FAC) 2005-91 Federal Acquisition Circular (FAC) 2005-67 Publication of Federal

  3. Program and Project Management for the Acquisition of Capital Assets (Informational Purposes Only)

    Directives, Delegations, and Other Requirements [Office of Management (MA)]

    2016-01-11

    The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of delivering projects within the original performance baseline (PB), cost and schedule, and fully capable of meeting mission performance, safeguards and security, and environmental, safety, and health requirements unless impacted by a directed change; and b) implement Office of Management and Budget (OMB) Circulars to include: A-11, Part 7, Capital Programming Guide, which prescribes new requirements and leading practices for project and acquisition management; A-123, Management's Responsibility for Internal Control, which defines management's responsibility for internal control in Federal agencies; and A-131, Value Engineering, which requires that all Federal agencies use Value Engineering (VE) as a management tool. The Page Change is a limited update to incorporate recent Secretarial policies and issues raised by external stakeholders.

  4. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    0 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 Policy Flash 2014-20 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 DATE: March 10, 2014 ...

  5. Policy Flash 2014-20 / Acquisition Letter 2014-05 / Financial...

    Energy Saver

    0 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 Policy Flash 2014-20 Acquisition Letter 2014-05 Financial Acquisition Letter 2014-02 DATE: March 10, 2014...

  6. Factory Cost Model

    Energy Science and Technology Software Center

    1996-12-17

    The Factory Cost Model (FCM) is an economic analysis tool intended to provide flat panel display (FPD) and other similar discrete component manufacturers with the ability to make first-order estimates of the cost of unit production. This software has several intended uses. Primary among these is the ability to provide first-order economic analysis for future factories. Consequently, the model requires a minimal level of input detail, and accomodates situations where actual production data are notmore » available. This software is designed to be activity based such that most of the calculated direct costs are associated with the steps of a manufacturibg process. The FCM architecture has the ability to accomodate the analysis of existing manufacturing facilities. The FCM can provide assistance with strategic economic decisions surrounding production related matters. For instance, the program can project the effect on costs and resources of a new product''s introduction, or it can assess the potential cost reduction produced by step yield improvements in the manufacturing process.« less

  7. Comparative analysis of monetary estimates of external environmental costs associated with combustion of fossil fuels

    SciTech Connect

    Koomey, J.

    1990-07-01

    Public utility commissions in a number of states have begun to explicitly treat costs of environmental externalities in the resource planning and acquisition process (Cohen et al. 1990). This paper compares ten different estimates and regulatory determinations of external environmental costs associated with fossil fuel combustion, using consistent assumptions about combustion efficiency, emissions factors, and resource costs. This consistent comparison is useful because it makes explicit the effects of various assumptions. This paper uses the results of the comparison to illustrate pitfalls in calculation of external environmental costs, and to derive lessons for design of policies to incorporate these externalities into resource planning. 38 refs., 2 figs., 10 tabs.

  8. Federal Acquisition Circular (FAC) 2005-72

    Office of Energy Efficiency and Renewable Energy (EERE)

    Attached for your information is a list of Federal Acquisition Regulation (FAR) amendments, published in the December 31, 2014 Federal Register at 78 FR 80368. This FAC issued 4 final rules. Please note that the final rule on Service Contracts Reporting Requirements is applicable to solicitations issued and contracts awarded on or after January 30, 2014. Contracting officers will modify existing indefinite-delivery contracts, on a bilateral basis in accordance with FAR 1.108(d)(3), within six months of the effective date of the final rule, if the remaining period of performance extends beyond October 1, 2013, and $2.5 million or more remains to be obligated.

  9. Secure Video Surveillance System Acquisition Software

    Energy Science and Technology Software Center

    2009-12-04

    The SVSS Acquisition Software collects and displays video images from two cameras through a VPN, and store the images onto a collection controller. The software is configured to allow a user to enter a time window to display up to 2 1/2, hours of video review. The software collects images from the cameras at a rate of 1 image per second and automatically deletes images older than 3 hours. The software code operates in amore » linux environment and can be run in a virtual machine on Windows XP. The Sandia software integrates the different COTS software together to build the video review system.« less

  10. MPS (Multiparticle Spectrometer) data acquisition software system

    SciTech Connect

    Saulys, A.C.; Etkin, A.; Foley, K.J.; Hackenburg, R.W.; Longacre, R.S.; Love, W.A.; Morris, T.W.; Platner, E.D.; Lindenbaum, S.J.; Chan, C.S.

    1989-04-04

    A description of the software for a FASTBUS based data acquisition system in use at the Brookhaven National Laboratory Multiparticle Spectrometer is presented. Data reading and formatting is done by the SLAC Scanner Processors (SSP's) resident in the FASTBUS system. A multiprocess software system on VAX computers is used to communicate with the SSP's, record the data, and monitor on-line the progress of high energy and heavy ion experiments. The structure and the performance of this system are discussed. 4 refs., 1 fig.

  11. Acquisition Description/ Category Solicitation Method Contract Type

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    10/3/2016 Acquisition Description/ Category Solicitation Method Contract Type Period of Performance Contract Value Carlsbad Field Office Carlsbad Technical Assistance Portage, Inc. Full and Open Competition Time and Materials 7/1/10-6/30/15 $31.7M Carlsbad Technical Assistance Portage, Inc. DE-EM0004007 Full and Open Competition Firm-Fixed Price (Hybrid) 1/2/16-1/1/19 $42.4M Specialized Transportation Services Cast Specialty Transportation, Inc. DE-EM0001819 Small Business Set Aside Fixed price

  12. Acquisition Description/ Category Solicitation Method Contract...

    Energy Saver

    ... Plus Award Fee 82911-82817 121.1M Moab Remedial Action Contract (Uranium Mill ... Cost Plus Award Fee wFixed Unit Price Component 110411-093016 121M Moab Technical ...

  13. Site Acquisition Description/ Category Contracting Office Solicitation

    Office of Environmental Management (EM)

    Portsmouth Infrastructure https:www.emcbc.doe. govSEBPortsmouthISS EMCBC Small Business Fixed Price with Cost Plus Award 120-160M 7152014 722014 662014 1292014 3...

  14. Acquisition Description/ Category Solicitation Method Contract...

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    ... Moab Remedial Action Contract (Uranium Mill Tailings Cleanup) Portage, Inc. Competitive Small Business IDIQ Task Order Cost Plus Award Fee wFixed Unit Price Component 110411-09...

  15. Federal Supply Schedules References Federal Acquisition Regulation...

    Office of Environmental Management (EM)

    ... Contractual terms and conditions are contained in GSA ... open market costs as the search for sources; the need to ... and Awards and enter the RFQ title or number in ...

  16. 7pt1AcquisitionPlanning.pdf

    Energy Saver

    7AC Technologies, Inc. America's Next Top Energy Innovator Challenge 498 likes 7AC Technologies, Inc. National Renewable Energy Laboratory Air conditioning is a very large contributor to U.S. and world energy consumption. Heating and cooling costs for commercial and industrial buildings exceed 25 percent of U.S. primary energy consumption (cooling alone accounts for 4.5 Quads out of 40 Quads) and typically accounts for almost half of a building's operating costs. Air conditioning is also a

  17. Soft Costs | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    costs program works to lower the non-hardware costs of ... data analysis, business innovation, and training. ... for as much as 64% of the total cost of a new solar system. ...

  18. QGESS: Capital Cost Scaling Methodology

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    the tonnes of CO2 utilized. The costs of the process are to include infrastructure, raw materials, processing, byproduct disposal, and utilities costs, as well as any other costs....

  19. Factors Impacting Decommissioning Costs - 13576

    SciTech Connect

    Kim, Karen; McGrath, Richard

    2013-07-01

    The Electric Power Research Institute (EPRI) studied United States experience with decommissioning cost estimates and the factors that impact the actual cost of decommissioning projects. This study gathered available estimated and actual decommissioning costs from eight nuclear power plants in the United States to understand the major components of decommissioning costs. Major costs categories for decommissioning a nuclear power plant are removal costs, radioactive waste costs, staffing costs, and other costs. The technical factors that impact the costs were analyzed based on the plants' decommissioning experiences. Detailed cost breakdowns by major projects and other cost categories from actual power plant decommissioning experiences will be presented. Such information will be useful in planning future decommissioning and designing new plants. (authors)

  20. Low Cost, Durable Seal

    SciTech Connect

    Roberts, George; Parsons, Jason; Friedman, Jake

    2010-12-17

    Seal durability is critical to achieving the 2010 DOE operational life goals for both stationary and transportation PEM fuel cell stacks. The seal material must be chemically and mechanically stable in an environment consisting of aggressive operating temperatures, humidified gases, and acidic membranes. The seal must also be producible at low cost. Currentlyused seal materials do not meet all these requirements. This project developed and demonstrated a high consistency hydrocarbon rubber seal material that was able to meet the DOE technical and cost targets. Significant emphasis was placed on characterization of the material and full scale molding demonstrations.

  1. 37pt.2PerformanceBasedServiceAcquisition.pdf | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7pt.2PerformanceBasedServiceAcquisition.pdf 37pt.2PerformanceBasedServiceAcquisition.pdf (1022.17 KB) More Documents & Publications Acquisitions___Communications.pdf Acquisition Guide Chapter 7.1 - Acquisition Planning One Acquisition Solution for Integrated Services (OASIS) - Brad DeMers, General Services Administration (GSA)

  2. Transient data acquisition techniques under EDS

    SciTech Connect

    Telford, S.

    1985-06-01

    This paper is the first of a series which describes the Enrichment Diagnostic System (EDS) developed for the MARS project at Lawrence Livermore National Laboratory. Although EDS was developed for use on AVLIS, the functional requirements, overall design, and specific techniques are applicable to any experimental data acquisition system involving large quantities of transient data. In particular this paper will discuss the techniques and equipment used to do the data acquisition. Included are what types of hardware are used and how that hardware (CAMAC, digital oscilloscopes) is interfaced to the HP computers. In this discussion the author will address the problems encountered and the solutions used, as well as the performance of the instrument/computer interfaces. The second topic the author will discuss is how the acquired data is associated to graphics and analysis portions of EDS through efficient real time data bases. This discussion will include how the acquired data is folded into the overall structure of EDS providing the user immediate access to raw and analyzed data. By example you will see how easily a new diagnostic can be added to the EDS structure without modifying the other parts of the system. 8 figs.

  3. Bagless Transfer System Welder Data Acquisition Software

    Energy Science and Technology Software Center

    2003-09-30

    The Bagless Transfer System Welder Data Acquisition Software (BTS DAS) was developed by SRTC to replace a strip chart recorder that has been in place since the design of the BTS. During the welding process, critical weld parameters such as weld current and voltage, can give valuable information about the weld. In the past, weld data from the TID welding process, has been monitored using strip chart recorders. The data from the weld process, recordedmore » on the strip chart recorder traces, are reviewed to analyze the weld. The BTS DAS improves this technology by digitizing the weld data which allows for automation of the analysis process. Also, the data files are now stored digitally as well as a hard copy printout, so they can be reanalyzed if needed. The BTS DAS performs the necessary functions to perform the data acquisition functions during the BTS Welding Process. It is important to monitor the critical weld parameters, current and voltage, during a weld as they can be used to set acceptance criteria for weld acceptance. The software monitors and records the weld current, voltage, and RPM data. The welder DAS is a passive device and does not control the welder. The BTS control system interfaces directly with the welder and the BTS DAS. Digital handshaking is used between the BTS DAS and the BTS control system to ensure that the DAS is ready to weld prior to allowing the operator to initiate the welding process.« less

  4. Turbine Cost Systems Engineering Model

    Energy Science and Technology Software Center

    2012-09-30

    turb_costSE is a set of models that link wind turbine component masses (and a few other key variables) to component costs.

  5. Heliostat cost reduction study.

    SciTech Connect

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David; Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  6. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to make revisions to the Contractor Performance Assessment Reporting System (CPARS) guidance and includes incorporating Federal Acquisition Regulation (FAR) changes through Federal Acquisition Circular (FAC) 2005-66. Since the CPARS guide and related user manuals include civilian agency guidance, this chapter has been revised to reference the CPARS website and guidance, as well as removing outdated and duplicative guidance.

  7. Michigan Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Michigan Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 16 2010's 333 409 0 11 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  8. Montana Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Montana Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 0 41 3 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  9. Alaska Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Million Barrels) Alaska Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 79 0 2 187 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Reserves Acquisitions

  10. Arkansas Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Arkansas Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 22 2010's 0 0 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Acquisitions

  11. Arkansas Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Arkansas Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 774 6,220 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  12. California (with State off) Shale Proved Reserves Acquisitions (Billion

    Energy Information Administration (EIA) (indexed site)

    Cubic Feet) Acquisitions (Billion Cubic Feet) California (with State off) Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 0 21 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  13. Colorado Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Colorado Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 1,021 0 0 60 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Acquisitions

  14. Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy 3.214 - Alternative Dispute Resolution Acquisition Guide Chapter 33.214 - Alternative Dispute Resolution DATE: August 25, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 33.214, Alternative Dispute Resolution SUMMARY: The subject guide chapter has been revised to add a paragraph pertaining to clause DOE-H-2033 Alternative

  15. Acquisition Guide Chapter 4.804 - Contract Closeout Procedures | Department

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    of Energy .804 - Contract Closeout Procedures Acquisition Guide Chapter 4.804 - Contract Closeout Procedures DATE: September 7, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 4.804, Contract Closeout Procedures SUMMARY: The subject guide chapter has been revised to align with the FAR, update references, and make administrative changes.

  16. Acquisition Guide Chapter 42.1202 - Novation Agreements | Department of

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Energy 2.1202 - Novation Agreements Acquisition Guide Chapter 42.1202 - Novation Agreements DATE: August 25, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Guide Chapter 42.1202, Novation Agreements SUMMARY: The subject guide chapter has been revised to change the chapter number from 42.3 to 42.1202 to align with the FAR, update references, and make

  17. Acquisition Letter No. AL 2015-09 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    9 Acquisition Letter No. AL 2015-09 DATE: August 25, 2015 TO: Procurement Directors/Contracting Officers FROM: Director Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition and Project Management SUBJECT: Deputy Secretary Memorandum entitled "Updated Guidance on Conference-Related Activities and Spending. SUMMARY: Acquisition Letter (AL) 2015-09 has been issued to transmit the subject memorandum of the Deputy Secretary. The memorandum contains a model H

  18. Acquisition Letter No. AL-2016-08 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    8 Acquisition Letter No. AL-2016-08 DATE: August 11, 2016 TO: Procurement Directors/Contracting Officers FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: DOE Policy on Contractor Defined Benefit Pension Plans Participation SUMMARY: The purpose of Acquisition Letter (AL) 2016-08 is to provide guidance regarding a) the continued participation of DOE contractor incumbent employees in an existing defined benefit pension plan

  19. Acquisition Letter No. AL-2017-01 | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    7-01 Acquisition Letter No. AL-2017-01 DATE: November 8, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letters (AL) Remaining in Effect SUMMARY: The attached AL identifies ALs currently in effect and discontinued ALs, along with the reason why an AL is discontinued. Questions concerning this policy flash should be directed to Mike Dombrowski at

  20. Acquisition Planning--Extending A Management and Operating Contract Without

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Full and Open Competition; and Site and Utilization Management Planning | Department of Energy Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning Acquisition Planning--Extending A Management and Operating Contract Without Full and Open Competition; and Site and Utilization Management Planning PF2009-13.pdf (337.25 KB) PF2009-13a - Acquisition Letter 2009-03 - Acquisition Planning (130.37 KB) More Documents

  1. Program and Project Management for the Acquisition of Capital Assets -

    U.S. Department of Energy (DOE) - all webpages (Extended Search)

    DOE Directives, Delegations, and Requirements B, Program and Project Management for the Acquisition of Capital Assets by Jay Glascock Functional areas: Acquisition, Defense Nuclear Facility Safety and Health Requirement, Program Management The purpose of this Order is to a) provide the Department of Energy (DOE) Elements, including the National Nuclear Security Administration (NNSA), with program and project management direction for the acquisition of capital assets with the goal of

  2. Acquisition Guide, Chapter 42.15, Contractor Performance Information

    Office of Energy Efficiency and Renewable Energy (EERE)

    The subject Acquisition Guide Chapter has been updated to make revisions to the Contractor Performance Assessment Reporting System guidance and includes incorporating Federal Acquisition Regulation (FAR) changes through Federal Acquisition Circular (FAC) 2005-46. Most significant revisions are the change in the reporting thresholds for awards issued on or after October 1, 2010, and additional information on registering a contract or order either manually or auto register.

  3. Wyoming Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Wyoming Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 59 123 36 0 3 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Acquisitions

  4. North Dakota Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) North Dakota Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 1 2010's 87 161 142 273 304 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  5. Ohio Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Million Barrels) Ohio Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 3 2010's 22 0 3 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Reserves Acquisitions

  6. Ohio Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Ohio Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 42 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  7. Oklahoma Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Oklahoma Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 11 1 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Acquisitions

  8. Acquisition Letters (AL) Remaining in Effect | Department of Energy

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    (AL) Remaining in Effect Acquisition Letters (AL) Remaining in Effect DATE: November 8, 2016 TO: Procurement Directors Heads of Contracting Activities FROM: Chief Contract and Financial Assistance Policy Division Office of Policy Office of Acquisition Management SUBJECT: Acquisition Letters (AL) Remaining in Effect SUMMARY: The attached AL identifies ALs currently in effect and discontinued ALs, along with the reason why an AL is discontinued. Questions concerning this policy flash should be

  9. Utah Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Utah Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 125 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Acquisitions

  10. Utah Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Million Barrels) Utah Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 26 2010's 3 10 26 42 18 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Reserves Acquisitions

  11. Virginia Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Virginia Coalbed Methane Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 0 0 534 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Coalbed Methane Reserves Acquisitions

  12. Virginia Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Virginia Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2010's 0 0 18 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  13. West Virginia Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) West Virginia Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 324 507 0 0 2,305 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  14. Department of Energy Acquisition System - A Guide for Executives |

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Department of Energy Acquisition System - A Guide for Executives Department of Energy Acquisition System - A Guide for Executives The principal purposes of the Department's acquisition system are to: Deliver on a timely basis the best value product or service to the customer by, for example, Maximizing the use of commercial products and services. Using contractors who have a track record of successful past performance or who demonstrate a current superior ability to perform. Promoting

  15. Colorado Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Colorado Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 0 0 0 6 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  16. Kansas Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Million Barrels) Kansas Crude Oil + Lease Condensate Reserves Acquisitions (Million Barrels) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 2 2010's 8 19 8 2 37 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Crude Oil plus Lease Condensate Reserves Acquisitions

  17. Kentucky Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Kentucky Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 0 45 0 0 0 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  18. Wyoming Shale Proved Reserves Acquisitions (Billion Cubic Feet)

    Energy Information Administration (EIA) (indexed site)

    Acquisitions (Billion Cubic Feet) Wyoming Shale Proved Reserves Acquisitions (Billion Cubic Feet) Decade Year-0 Year-1 Year-2 Year-3 Year-4 Year-5 Year-6 Year-7 Year-8 Year-9 2000's 0 2010's 4 0 0 2 47 - = No Data Reported; -- = Not Applicable; NA = Not Available; W = Withheld to avoid disclosure of individual company data. Release Date: 11/19/2015 Next Release Date: 12/31/2016 Referring Pages: Shale Natural Gas Reserves Acquisitions

  19. NNSA Office of Acquisition Management improves customer satisfaction |

    National Nuclear Security Administration (NNSA)

    National Nuclear Security Administration | (NNSA) Office of Acquisition Management improves customer satisfaction Monday, September 19, 2016 - 2:07pm (Click to view graph full-size.) Established in 2011, the NNSA Office of Acquisition and Project Management (NA-APM) has a crosscutting role within the NNSA to deliver best value acquisitions and manage projects on budget and schedule. Nearly ninety percent of all NNSA mission work is performed via contracts. Within NA-APM, it is the mission of

  20. Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard

    Office of Energy Efficiency and Renewable Energy (EERE) (indexed site)

    Operating Procedures, Revision 2 | Department of Energy Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard Operating Procedures, Revision 2 Independent Cost Review (ICR) and Independent Cost Estimate (ICE) Standard Operating Procedures, Revision 2 This Standard Operating Procedures (SOP) provides guidance for Department of Energy (DOE) Project Management Oversight and Assessment (PM) staff and contractors performing either an Independent Cost Estimate (ICE) or an