Expressway construction in landslide areas. ; Construction work between Fujioka interchange and Saku interchange of Joshin'etsu expressway. Ugoku yama wo tsuranuku. ; Joshin'etsu Jidoshado Fujioka IC/Saku IC kan kensetsu koji

Abstract

The Joshin'etsu motorway is a 204km expressway. Various technological studies have been made for the remediation work for the 69.5km section which is opened to traffic this spring, because not only a series of tunnels, bridges, long cut and fill soil particular to mountain roads are included but also the section has many landslide areas. The length of the Higureyama tunnel is 2,314m. Although strong andesite is prevailing as the nature of the soil, the central area of the tunnel is consisted of brittle mudstone and self-crushing andesite with faults because the tunnel runs through the lower portion of a landslide zone. The mudstone is a squeezing ground, and buckling of H supporting, breakage of lock bolts, and damage of sprayed concrete occurred in many places. 2 years and 10 months are required for the construction of the tunnel. The average monthly drilling is only 10m/month which is an unprecedented case in tunnel excavation. Even limited to large-scale landslides, 13 occurrences are experienced. 10 figs., 1 tab.
Authors:
Togo, Y [1] 
  1. Japan Highway Public Corp., Tokyo (Japan)
Publication Date:
Mar 15, 1993
Product Type:
Journal Article
Reference Number:
NEDO-93-911286; EDB-93-105512
Resource Relation:
Journal Name: Doboku Gakkai-Shi (Journal of the Japan Society of Civil Engineers); (Japan); Journal Volume: 78:3
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; AUTOMOBILES; ROADS; MOUNTAINS; LANDSLIDES; CONSTRUCTION; BRITTLENESS; ROCKS; TERTIARY PERIOD; WATER SPRINGS; CENOZOIC ERA; GEOLOGIC AGES; MECHANICAL PROPERTIES; VEHICLES; 320203* - Energy Conservation, Consumption, & Utilization- Transportation- Land & Roadway
OSTI ID:
7368848
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
Journal ID: ISSN 0021-468X; CODEN: DOGAAR
Submitting Site:
NEDO
Size:
Pages: 2-5
Announcement Date:
Aug 19, 1993

Citation Formats

Togo, Y. Expressway construction in landslide areas. ; Construction work between Fujioka interchange and Saku interchange of Joshin'etsu expressway. Ugoku yama wo tsuranuku. ; Joshin'etsu Jidoshado Fujioka IC/Saku IC kan kensetsu koji. Japan: N. p., 1993. Web.
Togo, Y. Expressway construction in landslide areas. ; Construction work between Fujioka interchange and Saku interchange of Joshin'etsu expressway. Ugoku yama wo tsuranuku. ; Joshin'etsu Jidoshado Fujioka IC/Saku IC kan kensetsu koji. Japan.
Togo, Y. 1993. "Expressway construction in landslide areas. ; Construction work between Fujioka interchange and Saku interchange of Joshin'etsu expressway. Ugoku yama wo tsuranuku. ; Joshin'etsu Jidoshado Fujioka IC/Saku IC kan kensetsu koji." Japan.
@misc{etde_7368848,
title = {Expressway construction in landslide areas. ; Construction work between Fujioka interchange and Saku interchange of Joshin'etsu expressway. Ugoku yama wo tsuranuku. ; Joshin'etsu Jidoshado Fujioka IC/Saku IC kan kensetsu koji}
author = {Togo, Y}
abstractNote = {The Joshin'etsu motorway is a 204km expressway. Various technological studies have been made for the remediation work for the 69.5km section which is opened to traffic this spring, because not only a series of tunnels, bridges, long cut and fill soil particular to mountain roads are included but also the section has many landslide areas. The length of the Higureyama tunnel is 2,314m. Although strong andesite is prevailing as the nature of the soil, the central area of the tunnel is consisted of brittle mudstone and self-crushing andesite with faults because the tunnel runs through the lower portion of a landslide zone. The mudstone is a squeezing ground, and buckling of H supporting, breakage of lock bolts, and damage of sprayed concrete occurred in many places. 2 years and 10 months are required for the construction of the tunnel. The average monthly drilling is only 10m/month which is an unprecedented case in tunnel excavation. Even limited to large-scale landslides, 13 occurrences are experienced. 10 figs., 1 tab.}
journal = []
volume = {78:3}
journal type = {AC}
place = {Japan}
year = {1993}
month = {Mar}
}