Prior to the present programme of work, the effects which a tidal power barrage would have on the region, during both construction and operation, had not been studied in detail. This volume of the Detailed Report therefore represents a significant extension of work into these aspects of the Severn Barrage Project. In the Regional Study, a number of benefits have been identified, some of which may represent net benefits nationally. The economic assessment of both regional and national benefits and costs is presented. The second part of this volume reports on the work done on the Legal Background for the Project. (author).
Publication Date:
Jan 01, 1989
Product Type:
Technical Report
Report Number:
ETSU-TID-4060-P5
Reference Number:
GB-90-000502; EDB-90-092292; ERA-15-034292
Subject:
16 TIDAL AND WAVE POWER; TIDAL POWER PLANTS; LEGAL ASPECTS; REGIONAL ANALYSIS; SEVERN RIVER; AGRICULTURE; CONSTRUCTION; ECONOMIC ANALYSIS; ENVIRONMENTAL IMPACTS; HARBORS; OPERATION; PLANNING; RECREATIONAL AREAS; ROAD TRANSPORT; SHIPS; SOCIO-ECONOMIC FACTORS; TOURISM; ECONOMICS; INDUSTRY; INSTITUTIONAL FACTORS; LAND TRANSPORT; POWER PLANTS; RIVERS; STREAMS; SURFACE WATERS; TRANSPORT; 160400* - Tidal & Wave Power- Economic, Industrial & Business Aspects; 160500 - Tidal & Wave Power- Environmental Aspects
OSTI ID:
6909890
Research Organizations:
UKAEA Harwell Lab. (UK). Energy Technology Div.; Severn Tidal Power Group, Sidcup (UK)
Country of Origin:
United Kingdom
Language:
English
Availability:
Available from The British Library Document Supply Centre, Boston Spa, Wetherby, West Yorks. LS23 7BQ.
Submitting Site:
GB
Size:
Pages: (vp.)
Announcement Date:
May 13, 2001

Citation Formats

None. Severn Barrage project. Detailed report - V. 5. United Kingdom: N. p., 1989. Web.
None. Severn Barrage project. Detailed report - V. 5. United Kingdom.
None. 1989. "Severn Barrage project. Detailed report - V. 5." United Kingdom.
@misc{etde_6909890,
title = {Severn Barrage project. Detailed report - V. 5}
author = {None}
abstractNote = {Prior to the present programme of work, the effects which a tidal power barrage would have on the region, during both construction and operation, had not been studied in detail. This volume of the Detailed Report therefore represents a significant extension of work into these aspects of the Severn Barrage Project. In the Regional Study, a number of benefits have been identified, some of which may represent net benefits nationally. The economic assessment of both regional and national benefits and costs is presented. The second part of this volume reports on the work done on the Legal Background for the Project. (author).}
place = {United Kingdom}
year = {1989}
month = {Jan}
}