Abstract
In 1995 the Technical Committee TC88 of the International Electrotechnical Commission decided to start a new work item, namely to prepare a standard for the certification procedures for wind turbines with respect to safety, performance, interaction with the public grid, environmental requirements and the documentation requested by the certification bodies. The purpose was to provide a common basis for certification of wind turbines, including a basis for accreditation of certification bodies and mutual recognition of certificates. A working group (WG9) was created to prepare a committee draft. WG9 submitted the result late in 1998 to TC88. This paper presents the committee draft Standard, which defines a certification system for Wind Turbine Generator Systems. Key issues in the evaluation of conformity with these standards and identified needs for other technical criteria and procedures are presented. (au) 10 refs.
Hauge Madsen, P
[1]
- Risoe National Lab., Wind Energy and Atmospheric Physics Dept., Roskilde (Denmark)
Citation Formats
Hauge Madsen, P.
Wind turbine certification - the committee draft by IEC-TC88-WG9.
Denmark: N. p.,
1999.
Web.
Hauge Madsen, P.
Wind turbine certification - the committee draft by IEC-TC88-WG9.
Denmark.
Hauge Madsen, P.
1999.
"Wind turbine certification - the committee draft by IEC-TC88-WG9."
Denmark.
@misc{etde_679626,
title = {Wind turbine certification - the committee draft by IEC-TC88-WG9}
author = {Hauge Madsen, P}
abstractNote = {In 1995 the Technical Committee TC88 of the International Electrotechnical Commission decided to start a new work item, namely to prepare a standard for the certification procedures for wind turbines with respect to safety, performance, interaction with the public grid, environmental requirements and the documentation requested by the certification bodies. The purpose was to provide a common basis for certification of wind turbines, including a basis for accreditation of certification bodies and mutual recognition of certificates. A working group (WG9) was created to prepare a committee draft. WG9 submitted the result late in 1998 to TC88. This paper presents the committee draft Standard, which defines a certification system for Wind Turbine Generator Systems. Key issues in the evaluation of conformity with these standards and identified needs for other technical criteria and procedures are presented. (au) 10 refs.}
place = {Denmark}
year = {1999}
month = {Mar}
}
title = {Wind turbine certification - the committee draft by IEC-TC88-WG9}
author = {Hauge Madsen, P}
abstractNote = {In 1995 the Technical Committee TC88 of the International Electrotechnical Commission decided to start a new work item, namely to prepare a standard for the certification procedures for wind turbines with respect to safety, performance, interaction with the public grid, environmental requirements and the documentation requested by the certification bodies. The purpose was to provide a common basis for certification of wind turbines, including a basis for accreditation of certification bodies and mutual recognition of certificates. A working group (WG9) was created to prepare a committee draft. WG9 submitted the result late in 1998 to TC88. This paper presents the committee draft Standard, which defines a certification system for Wind Turbine Generator Systems. Key issues in the evaluation of conformity with these standards and identified needs for other technical criteria and procedures are presented. (au) 10 refs.}
place = {Denmark}
year = {1999}
month = {Mar}
}