Abstract
Key production targets set for the brown coal and electricity sectors in the GDR for the period up to 1980 include the production of 258 million tons of solid fuels and 47 million tons of briquettes, to be achieved by optimum utilization of existing top production capacities to release open-cast mining equipment as well as by the reconstruction of obsolete briquetting plants and the more-intensive utilization of saliniferous coal. Electric power supplies are to be maintained by extending the network of power stations and high-to-low voltage outdoor grid capacities, including the construction of more power stations by 1980. In gas and coke production, more-intensive use is to be made of existing plants, the capacity of underground storage units is to be increased and more attention is to be paid to the chemical utilization of residual gases. In the sphere of scientific and technical development, coal and pressure gasification figures are to be kept at present levels and further development work is to be undertaken on coal and pressure gasification at the combined Schwarze Pumpe works, where coke production is to reach 1350 kg per annum by 1980. By this time an additional 415,000 newly built flats are to be given
More>>
Citation Formats
Krause, H.
Production targets in the GDR from 1976 to 1980.
Germany: N. p.,
1977.
Web.
Krause, H.
Production targets in the GDR from 1976 to 1980.
Germany.
Krause, H.
1977.
"Production targets in the GDR from 1976 to 1980."
Germany.
@misc{etde_6792482,
title = {Production targets in the GDR from 1976 to 1980}
author = {Krause, H}
abstractNote = {Key production targets set for the brown coal and electricity sectors in the GDR for the period up to 1980 include the production of 258 million tons of solid fuels and 47 million tons of briquettes, to be achieved by optimum utilization of existing top production capacities to release open-cast mining equipment as well as by the reconstruction of obsolete briquetting plants and the more-intensive utilization of saliniferous coal. Electric power supplies are to be maintained by extending the network of power stations and high-to-low voltage outdoor grid capacities, including the construction of more power stations by 1980. In gas and coke production, more-intensive use is to be made of existing plants, the capacity of underground storage units is to be increased and more attention is to be paid to the chemical utilization of residual gases. In the sphere of scientific and technical development, coal and pressure gasification figures are to be kept at present levels and further development work is to be undertaken on coal and pressure gasification at the combined Schwarze Pumpe works, where coke production is to reach 1350 kg per annum by 1980. By this time an additional 415,000 newly built flats are to be given long-distance heating secured on a solid-fuel basis and with the increased utilization of the thermal power link, the application of the module principle to combined heating and power stations of specific constructional type and those of optimum unit size; and the extension of interlinking heating grid systems for cities.}
journal = []
volume = {27:8}
journal type = {AC}
place = {Germany}
year = {1977}
month = {Aug}
}
title = {Production targets in the GDR from 1976 to 1980}
author = {Krause, H}
abstractNote = {Key production targets set for the brown coal and electricity sectors in the GDR for the period up to 1980 include the production of 258 million tons of solid fuels and 47 million tons of briquettes, to be achieved by optimum utilization of existing top production capacities to release open-cast mining equipment as well as by the reconstruction of obsolete briquetting plants and the more-intensive utilization of saliniferous coal. Electric power supplies are to be maintained by extending the network of power stations and high-to-low voltage outdoor grid capacities, including the construction of more power stations by 1980. In gas and coke production, more-intensive use is to be made of existing plants, the capacity of underground storage units is to be increased and more attention is to be paid to the chemical utilization of residual gases. In the sphere of scientific and technical development, coal and pressure gasification figures are to be kept at present levels and further development work is to be undertaken on coal and pressure gasification at the combined Schwarze Pumpe works, where coke production is to reach 1350 kg per annum by 1980. By this time an additional 415,000 newly built flats are to be given long-distance heating secured on a solid-fuel basis and with the increased utilization of the thermal power link, the application of the module principle to combined heating and power stations of specific constructional type and those of optimum unit size; and the extension of interlinking heating grid systems for cities.}
journal = []
volume = {27:8}
journal type = {AC}
place = {Germany}
year = {1977}
month = {Aug}
}