Abstract
The purpose of the program of operation for an industrial injection of gas is briefly reviewed. It is emphasized that the works constitute the final stage of exploration. The decisive economic and extractive aspects are given. Final remarks deal with the methods of floor consolidation and tightness control. In the interest of the perspective exploration of the reservoir it is concluded and must be realized as an operating principle that the main problem, after determining the probable reservoir structure, consists in determining step-by-step (by combined theoretical, technical and economic parameters) the surface equipment needed from the geological and rock property factors, which were determined by suitable methods (hydro-exploration, gas injection). The technique and time-table of the geological exploration, and the design and construction of the installations will depend on the solution of the main problem. At the beginning, partial capacities will be sufficient for the surface installation. (12 refs.)
Citation Formats
Lange, W.
Geological rock property and production problems of the underground gas storage reservoir of Ketzin.
Germany: N. p.,
1966.
Web.
Lange, W.
Geological rock property and production problems of the underground gas storage reservoir of Ketzin.
Germany.
Lange, W.
1966.
"Geological rock property and production problems of the underground gas storage reservoir of Ketzin."
Germany.
@misc{etde_6623481,
title = {Geological rock property and production problems of the underground gas storage reservoir of Ketzin}
author = {Lange, W}
abstractNote = {The purpose of the program of operation for an industrial injection of gas is briefly reviewed. It is emphasized that the works constitute the final stage of exploration. The decisive economic and extractive aspects are given. Final remarks deal with the methods of floor consolidation and tightness control. In the interest of the perspective exploration of the reservoir it is concluded and must be realized as an operating principle that the main problem, after determining the probable reservoir structure, consists in determining step-by-step (by combined theoretical, technical and economic parameters) the surface equipment needed from the geological and rock property factors, which were determined by suitable methods (hydro-exploration, gas injection). The technique and time-table of the geological exploration, and the design and construction of the installations will depend on the solution of the main problem. At the beginning, partial capacities will be sufficient for the surface installation. (12 refs.)}
journal = []
volume = {12:1}
journal type = {AC}
place = {Germany}
year = {1966}
month = {Jan}
}
title = {Geological rock property and production problems of the underground gas storage reservoir of Ketzin}
author = {Lange, W}
abstractNote = {The purpose of the program of operation for an industrial injection of gas is briefly reviewed. It is emphasized that the works constitute the final stage of exploration. The decisive economic and extractive aspects are given. Final remarks deal with the methods of floor consolidation and tightness control. In the interest of the perspective exploration of the reservoir it is concluded and must be realized as an operating principle that the main problem, after determining the probable reservoir structure, consists in determining step-by-step (by combined theoretical, technical and economic parameters) the surface equipment needed from the geological and rock property factors, which were determined by suitable methods (hydro-exploration, gas injection). The technique and time-table of the geological exploration, and the design and construction of the installations will depend on the solution of the main problem. At the beginning, partial capacities will be sufficient for the surface installation. (12 refs.)}
journal = []
volume = {12:1}
journal type = {AC}
place = {Germany}
year = {1966}
month = {Jan}
}