Abstract
The energy produced at the Itaipu Power Plant for the Brazilian Interconnected System is transmitted through two different transmission system: -HVDC system, with two bipoles of +- 600 kV, 6300 MW which connect the substation of Foz do Iguacu in the State of Parana, to substation of Ibiuna in the State of Sao Paulo, transmitting the energy generated in 50 Hz units. This system was entirely commissioned on september of 1987. (author) 3 refs., 5 figs.
Citation Formats
Lima, Roberto Campos de, and Oliveira, Mario Cesar Santos de.
On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system.
Brazil: N. p.,
1994.
Web.
Lima, Roberto Campos de, & Oliveira, Mario Cesar Santos de.
On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system.
Brazil.
Lima, Roberto Campos de, and Oliveira, Mario Cesar Santos de.
1994.
"On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system."
Brazil.
@misc{etde_659553,
title = {On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system}
author = {Lima, Roberto Campos de, and Oliveira, Mario Cesar Santos de}
abstractNote = {The energy produced at the Itaipu Power Plant for the Brazilian Interconnected System is transmitted through two different transmission system: -HVDC system, with two bipoles of +- 600 kV, 6300 MW which connect the substation of Foz do Iguacu in the State of Parana, to substation of Ibiuna in the State of Sao Paulo, transmitting the energy generated in 50 Hz units. This system was entirely commissioned on september of 1987. (author) 3 refs., 5 figs.}
place = {Brazil}
year = {1994}
month = {Dec}
}
title = {On the use of programmable logical controllers (PLC) in the emergency control schemes for the 750 kV system}
author = {Lima, Roberto Campos de, and Oliveira, Mario Cesar Santos de}
abstractNote = {The energy produced at the Itaipu Power Plant for the Brazilian Interconnected System is transmitted through two different transmission system: -HVDC system, with two bipoles of +- 600 kV, 6300 MW which connect the substation of Foz do Iguacu in the State of Parana, to substation of Ibiuna in the State of Sao Paulo, transmitting the energy generated in 50 Hz units. This system was entirely commissioned on september of 1987. (author) 3 refs., 5 figs.}
place = {Brazil}
year = {1994}
month = {Dec}
}