Ranking transmission projects in large scale systems using an AC power flow model; Priorizacao de obras em sistemas de grande porte usando um modelo AC da rede

Abstract

Initially, this paper summarizes the approach developed by the Brazilian Planning Criteria Working Group (GTCP/ELETROBRAS) for identifying which subset of transmission investments should be postponed to meet a pre-stablished budget constraint with the least possible impact on system performance. Next, this paper presents the main features of the computational model PRIO, which allows the application of the ranking process to large scale power systems (2,000 buses and 3,000 circuits), with as many as 100 projects to be ranked. In this model, the adequacy analysis of each system state is carried out through an AC power flow coupled to a successive linear programming based remedial actions model. Case studies with the IEEE-RTS system and a configuration of the Brazilian Southeastern are presented and discussed. (author) 7 refs., 6 figs., 5 tabs.
Authors:
Melo, A C.G.; [1]  Fontoura Filho, R N; [2]  Peres, L A.P. Pecorelli; [3]  Morozowski Filho, M [4] 
  1. Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil)
  2. ELETROBRAS, Rio de Janeiro, RJ (Brazil)
  3. FURNAS, Rio de Janeiro, RJ (Brazil)
  4. Santa Catarina Univ., Florianopolis, SC (Brazil)
Publication Date:
Dec 31, 1994
Product Type:
Conference
Report Number:
ETDE-BR-0029; CONF-9405393-
Reference Number:
SCA: 240100; PA: BR-98:0R0034; EDB-98:082332; SN: 98001979851
Resource Relation:
Conference: 4. SEPOPE: symposium of specialists in electric operational and expansion planning, 4. SEPOPE: simposio de especialistas em planejamento da operacao e expansao eletrica, Belo Horizonte (Brazil), 23-27 May 1994; Other Information: PBD: 1994; Related Information: Is Part Of Technical papers presented at the 4. symposium of specialists in electric operational and expansion planning. v. 2; PB: 351 p.; Artigos tecnicos apresentados no 4. simposio de especialistas em planejamento da operacao e expansao eletrica. v. 2
Subject:
24 POWER TRANSMISSION AND DISTRIBUTION; RELIABILITY; PLANNING; OPERATION; COST BENEFIT ANALYSIS; P CODES; POWER SYSTEMS; PERFORMANCE; EVALUATION; POWER TRANSMISSION LINES
OSTI ID:
659518
Research Organizations:
Itaipu Binacional, Foz do Iguacu, Puerto Rico (Brazil); ELETROBRAS, Rio de Janeiro, RJ (Brazil)
Country of Origin:
Brazil
Language:
Portuguese
Other Identifying Numbers:
Other: ON: DE98765511; TRN: BR98R0034
Availability:
OSTI as DE98765511
Submitting Site:
BR
Size:
pp. 213-218
Announcement Date:
Aug 26, 1998

Citation Formats

Melo, A C.G., Fontoura Filho, R N, Peres, L A.P. Pecorelli, and Morozowski Filho, M. Ranking transmission projects in large scale systems using an AC power flow model; Priorizacao de obras em sistemas de grande porte usando um modelo AC da rede. Brazil: N. p., 1994. Web.
Melo, A C.G., Fontoura Filho, R N, Peres, L A.P. Pecorelli, & Morozowski Filho, M. Ranking transmission projects in large scale systems using an AC power flow model; Priorizacao de obras em sistemas de grande porte usando um modelo AC da rede. Brazil.
Melo, A C.G., Fontoura Filho, R N, Peres, L A.P. Pecorelli, and Morozowski Filho, M. 1994. "Ranking transmission projects in large scale systems using an AC power flow model; Priorizacao de obras em sistemas de grande porte usando um modelo AC da rede." Brazil.
@misc{etde_659518,
title = {Ranking transmission projects in large scale systems using an AC power flow model; Priorizacao de obras em sistemas de grande porte usando um modelo AC da rede}
author = {Melo, A C.G., Fontoura Filho, R N, Peres, L A.P. Pecorelli, and Morozowski Filho, M}
abstractNote = {Initially, this paper summarizes the approach developed by the Brazilian Planning Criteria Working Group (GTCP/ELETROBRAS) for identifying which subset of transmission investments should be postponed to meet a pre-stablished budget constraint with the least possible impact on system performance. Next, this paper presents the main features of the computational model PRIO, which allows the application of the ranking process to large scale power systems (2,000 buses and 3,000 circuits), with as many as 100 projects to be ranked. In this model, the adequacy analysis of each system state is carried out through an AC power flow coupled to a successive linear programming based remedial actions model. Case studies with the IEEE-RTS system and a configuration of the Brazilian Southeastern are presented and discussed. (author) 7 refs., 6 figs., 5 tabs.}
place = {Brazil}
year = {1994}
month = {Dec}
}