You need JavaScript to view this

Continuous high-temperature recycling of waste by the Thermoselect process; Unterbrechungsloses Hochtemperaturrecycling - Abfallveredelung durch Thermoselect

Abstract

Based on the experience with the Thermoselect plant at Fondotoce, Italy (100 Mg/d), which was commissioned in 1992, a 225,000 Mg/a plant with three units (720 Mg/d) is being constructed at Karlsruhe, Germany. The plant is scheduled for commissioning in 1998. The contribution presents the product balance, the approved emission levels, and the energy uses envisaged for the Karlsruhe project. Final product quality data and energy yields illustrate the differences from conventional thermal processes. An ecobalance comparing the Thermoselect process with grate furnaces shows that water, soil and air pollution is much reduced by the new Termoselect process. Apart from high product quality, the plant also has the advantage of reduced dumping cost and no long-term ecological hazards. (orig./SR) [Deutsch] Auf Basis der grosstechnischen Erfahrung mit einer seit 1992 in Fondotoce (Italien) betriebenen THERMOSELECT-Anlage (Kapazitaet 100 Mg/d), Restmuell umweltgerecht zu behandeln, wird 1998 der Aufbau einer 225.000 Mg/a-Anlage mit 3 Linien (720 Mg/d) in Karlsruhe (Deutschland) abgeschlossen. Die Produktebilanz und die genehmigten Emissionswerte sind in dem Artikel belegt. Gezeigt wird die fuer das Projekt Karlsruhe vorgesehene Energienutzung. Die Endprodduktqualitaeten und die Energieausbeute verdeutlichen die Unterschiede zu bisherigen konventionellen thermischen Verfahren. Eine erarbeitete Oekobilanz mit einem Vergleich von THERMOSELECT und Rostfeuerung  More>>
Authors:
Stahlberg, R [1] 
  1. Thermoselect Engineering S.r.l., Verbania (Italy)
Publication Date:
Sep 01, 1998
Product Type:
Conference
Report Number:
DGMK-9802; CONF-980466-
Reference Number:
SCA: 200103; 090900; PA: DE-98:0GD460; EDB-98:098940; SN: 98002001686
Resource Relation:
Conference: 3. DGMK faculty meeting: utilization of energy and matter of wastes, renewable raw materials and coal, 3. DGMK-Fachbereichstagung: Energetische und stoffliche Nutzung von Abfaellen, nachwachsenden Rohstoffen und Kohlen (Velen III), Velen (Germany), 20-22 Apr 1998; Other Information: PBD: 1998; Related Information: Is Part Of DGMK faculty meeting: Utilisation of energy and matter of wastes and renewable materials, Velen, 20-22 April 1998. Authors` manuscripts; PB: 420 p.; Beitraege zur DGMK-Fachbereichstagung `Energetische und stoffliche Nutzung von Abfaellen und nachwachsenden Rohstoffen` 20.-22. April 1998 in Velen/Westf.. Autorenmanuskripte
Subject:
20 FOSSIL-FUELED POWER PLANTS; 09 BIOMASS FUELS; WASTE PROCESSING; PYROLYSIS; GASIFICATION; PERFORMANCE; POLLUTION ABATEMENT; POLLUTION REGULATIONS; ENERGY RECOVERY
OSTI ID:
650674
Research Organizations:
Deutsche Wissenschaftliche Gesellschaft fuer Erdoel, Erdgas und Kohle e.V., Hamburg (Germany)
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Journal ID: ISSN 1433-9013; Other: ON: DE98776234; TRN: DE98GD460
Availability:
OSTI as DE98776234
Submitting Site:
DE
Size:
pp. 151-167
Announcement Date:
Oct 13, 1998

Citation Formats

Stahlberg, R. Continuous high-temperature recycling of waste by the Thermoselect process; Unterbrechungsloses Hochtemperaturrecycling - Abfallveredelung durch Thermoselect. Germany: N. p., 1998. Web.
Stahlberg, R. Continuous high-temperature recycling of waste by the Thermoselect process; Unterbrechungsloses Hochtemperaturrecycling - Abfallveredelung durch Thermoselect. Germany.
Stahlberg, R. 1998. "Continuous high-temperature recycling of waste by the Thermoselect process; Unterbrechungsloses Hochtemperaturrecycling - Abfallveredelung durch Thermoselect." Germany.
@misc{etde_650674,
title = {Continuous high-temperature recycling of waste by the Thermoselect process; Unterbrechungsloses Hochtemperaturrecycling - Abfallveredelung durch Thermoselect}
author = {Stahlberg, R}
abstractNote = {Based on the experience with the Thermoselect plant at Fondotoce, Italy (100 Mg/d), which was commissioned in 1992, a 225,000 Mg/a plant with three units (720 Mg/d) is being constructed at Karlsruhe, Germany. The plant is scheduled for commissioning in 1998. The contribution presents the product balance, the approved emission levels, and the energy uses envisaged for the Karlsruhe project. Final product quality data and energy yields illustrate the differences from conventional thermal processes. An ecobalance comparing the Thermoselect process with grate furnaces shows that water, soil and air pollution is much reduced by the new Termoselect process. Apart from high product quality, the plant also has the advantage of reduced dumping cost and no long-term ecological hazards. (orig./SR) [Deutsch] Auf Basis der grosstechnischen Erfahrung mit einer seit 1992 in Fondotoce (Italien) betriebenen THERMOSELECT-Anlage (Kapazitaet 100 Mg/d), Restmuell umweltgerecht zu behandeln, wird 1998 der Aufbau einer 225.000 Mg/a-Anlage mit 3 Linien (720 Mg/d) in Karlsruhe (Deutschland) abgeschlossen. Die Produktebilanz und die genehmigten Emissionswerte sind in dem Artikel belegt. Gezeigt wird die fuer das Projekt Karlsruhe vorgesehene Energienutzung. Die Endprodduktqualitaeten und die Energieausbeute verdeutlichen die Unterschiede zu bisherigen konventionellen thermischen Verfahren. Eine erarbeitete Oekobilanz mit einem Vergleich von THERMOSELECT und Rostfeuerung zeigt die deutlich geringe Belastung der Umweltkompartimente Wasser, Boden und Luft durch das neue THERMOSELECT-Verfahren. Neben hohen Produktqualitaeten wird - verglichen mit traditionellen Techniken - ein deutlich verringerter Entsorgungspreis erreicht, wobei gleichzeitig oekologische Belastungen auszuschliessen sind. (orig./SR)}
place = {Germany}
year = {1998}
month = {Sep}
}