Production of electricity from the wind: a preliminary feasibility study for Greece

Journal Article:

Abstract

Wind statistics for Greece show that the conditions prevailing on the Aegean islands--i.e. considerable amounts of wind energy, small electrical loads and high generation costs--are especially favorable for the installation of wind turbine generators (WTGs). This study gives preliminary design parameters for WTGs at six locations and evaluates their performance. The duration of operation varies from 5000 to 7400 hours annually and the specific production is between 2300 and 3600 kwh/kw. The installation of the WTGs would result in diesel fuel savings corresponding to a month's consumption. Finally, the cost of wind generated electricity will be lower than that from diesel engines one to three years after the installation of the WTGs.
Authors:
Publication Date:
Jan 01, 1977
Product Type:
Journal Article
Reference Number:
EDB-79-041788
Resource Relation:
Journal Name: Wind Eng.; (United Kingdom); Journal Volume: 1:4
Subject:
17 WIND ENERGY; GREECE; WIND POWER; WIND TURBINES; AVAILABILITY; ECONOMICS; FEASIBILITY STUDIES; COST; POWER GENERATION; ENERGY SOURCES; EUROPE; POWER; RENEWABLE ENERGY SOURCES; 170400* - Wind Energy- Economic, Industrial, & Business Aspects
OSTI ID:
6496228
Research Organizations:
Universite de Sherbrooke, Quebec
Country of Origin:
United Kingdom
Language:
English
Other Identifying Numbers:
Journal ID: CODEN: WIEND
Submitting Site:
TIC
Size:
Pages: 241-249
Announcement Date:
Mar 01, 1979

Journal Article:

Citation Formats

Galanis, N. Production of electricity from the wind: a preliminary feasibility study for Greece. United Kingdom: N. p., 1977. Web.
Galanis, N. Production of electricity from the wind: a preliminary feasibility study for Greece. United Kingdom.
Galanis, N. 1977. "Production of electricity from the wind: a preliminary feasibility study for Greece." United Kingdom.
@misc{etde_6496228,
title = {Production of electricity from the wind: a preliminary feasibility study for Greece}
author = {Galanis, N}
abstractNote = {Wind statistics for Greece show that the conditions prevailing on the Aegean islands--i.e. considerable amounts of wind energy, small electrical loads and high generation costs--are especially favorable for the installation of wind turbine generators (WTGs). This study gives preliminary design parameters for WTGs at six locations and evaluates their performance. The duration of operation varies from 5000 to 7400 hours annually and the specific production is between 2300 and 3600 kwh/kw. The installation of the WTGs would result in diesel fuel savings corresponding to a month's consumption. Finally, the cost of wind generated electricity will be lower than that from diesel engines one to three years after the installation of the WTGs.}
journal = {Wind Eng.; (United Kingdom)}
volume = {1:4}
journal type = {AC}
place = {United Kingdom}
year = {1977}
month = {Jan}
}