The ''Neue Donau'' (''New Danube'') at Vienna was erected for flood protection reasons, but turned out to be a water resort area close to the City Center (bathing, swimming, surfing along 40 km of beaches). At Vienna, a hydropower plant on River Danube (Vienna-Freudenau) is under discussion. This paper discusses various alternatives in order to keep the trophic state of New Danube as is at present, but takes also into account left bank water resources questions as well as the hygienic situation (bathing, swimming, surfing). A comparison of all alternatives indicates that, as eutrophication of New Danube is phosphorus driven, precipitation of P in wastewater treatment in the upstream drainage area is the best solution in respect to the situation of New Danube, the overall drainage basin and the receiving Black Sea. (author).
Authors:
Fleckseder, H [1] 
  1. Inst. fuer Wasserguete und Landschaftswasserbau, Vienna (AT)
Publication Date:
Jan 01, 1990
Product Type:
Conference
Report Number:
CONF-8906375-
Reference Number:
GB-90-002408; EDB-91-001358
Resource Relation:
Journal Name: Water Science and Technology; (UK); Journal Volume: 22:5; Conference: International conference on water pollution control in the Basin of the River Danube, Novi Sad (Yugoslavia), 20-23 Jun 1989
Subject:
13 HYDRO ENERGY; DANUBE RIVER; EUTROPHICATION; HYDROELECTRIC POWER PLANTS; ENVIRONMENTAL IMPACTS; NUTRIENTS; PHOSPHORUS; WATER TREATMENT; ELEMENTS; NONMETALS; POWER PLANTS; RIVERS; STREAMS; SURFACE WATERS; 130600* - Hydro Energy- Environmental Aspects
OSTI ID:
6404622
Country of Origin:
United Kingdom
Language:
English
Other Identifying Numbers:
Journal ID: ISSN 0273-1223; CODEN: WSTED
Submitting Site:
GB
Size:
Pages: 145-154
Announcement Date:
May 13, 2001

Conference:

Citation Formats

Fleckseder, H. Measures to be undertaken in order to preserve the trophic state of the ''New Danube'' at Vienna in the case of the construction of the Vienna-Freudenau hydropower plant. United Kingdom: N. p., 1990. Web.
Fleckseder, H. Measures to be undertaken in order to preserve the trophic state of the ''New Danube'' at Vienna in the case of the construction of the Vienna-Freudenau hydropower plant. United Kingdom.
Fleckseder, H. 1990. "Measures to be undertaken in order to preserve the trophic state of the ''New Danube'' at Vienna in the case of the construction of the Vienna-Freudenau hydropower plant." United Kingdom.
@misc{etde_6404622,
title = {Measures to be undertaken in order to preserve the trophic state of the ''New Danube'' at Vienna in the case of the construction of the Vienna-Freudenau hydropower plant}
author = {Fleckseder, H}
abstractNote = {The ''Neue Donau'' (''New Danube'') at Vienna was erected for flood protection reasons, but turned out to be a water resort area close to the City Center (bathing, swimming, surfing along 40 km of beaches). At Vienna, a hydropower plant on River Danube (Vienna-Freudenau) is under discussion. This paper discusses various alternatives in order to keep the trophic state of New Danube as is at present, but takes also into account left bank water resources questions as well as the hygienic situation (bathing, swimming, surfing). A comparison of all alternatives indicates that, as eutrophication of New Danube is phosphorus driven, precipitation of P in wastewater treatment in the upstream drainage area is the best solution in respect to the situation of New Danube, the overall drainage basin and the receiving Black Sea. (author).}
journal = {Water Science and Technology; (UK)}
volume = {22:5}
place = {United Kingdom}
year = {1990}
month = {Jan}
}