The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production

Abstract

In this paper the construction, technological parameters and operation of Gabcikovo (primary hydro energy power) and Cierny Vah (secondary hydro energy power) are described. Construction of the hydroelectric power plant (HPP) Gabcikovo started in 1978 as a part of a system of hydro power projects Gabcikovo-Nagymaros. Basic technical data are: installed capacity 8 x 90 MW, production in an average aqueous year 2.650 GWh, number of hydroelectric generating sets (HGS) 8, turbine flow 8 x 413-636 m{sup 3}/s, head 12.9-24 m.The Gabcikovo plant produced 9.163 GWh of electricity from the beginning of its operation till the end of 1966. The construction of the pumped storage plant (PSP) Cierny Vah started in 1976 and it was put into operation at the end of 1980. The main goal of the PSP Cierny Vah is to meet the control functions of an electrification system of the Slovak Republic, a substitute function in the cases of unexpected power outages and a planned electricity production from re-pumping. Technological parts are: six re-pumping vertical HGS in a three machine arrangement - a motor-generator, a turbine, a pump - are located in three double-blocks. Basic technical data: installed capacity 6 x 122.4 MW + 0.768 MW, yearly  More>>
Authors:
Zacharovsky, M [1] 
  1. Slovenske elektrarne, a.s., Vodne elektrarne Trencin (Slovakia)
Publication Date:
Dec 01, 1997
Product Type:
Conference
Report Number:
INIS-SK-97-003; CONF-9705209-
Reference Number:
SCA: 130500; 130600; PA: AIX-28:077494; EDB-98:066044; SN: 97001881195
Resource Relation:
Conference: Role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection., Bratislava (Slovakia), 13-15 May 1997; Other Information: PBD: 1997; Related Information: Is Part Of Workshop on the role of enhancement of utilization of primary and secondary hydro potential in the context of environmental protection. Part II; PB: 160 p.
Subject:
13 HYDRO ENERGY; ECONOMIC IMPACT; HYDROELECTRIC POWER PLANTS; PUMPED STORAGE POWER PLANTS; ENVIRONMENTAL IMPACTS; HYDROELECTRIC POWER; NATURE RESERVES; POTENTIAL ENERGY; RIVERS; SURFACE WATERS; WATER RESOURCES
OSTI ID:
614913
Research Organizations:
Ministry of Economy of the Slovak Republic, Bratislava (Slovakia); Slovak Power Co., plc, Bratislava (Slovakia); Slovak Comittee of World Energy Council, Bratislava (Slovakia)
Country of Origin:
Slovakia
Language:
English
Other Identifying Numbers:
Other: ON: DE98605096; TRN: SK97K0334077494
Availability:
INIS; OSTI as DE98605096
Submitting Site:
INIS
Size:
pp. 6 p., Pt.II
Announcement Date:
Jun 26, 1998

Citation Formats

Zacharovsky, M. The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production. Slovakia: N. p., 1997. Web.
Zacharovsky, M. The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production. Slovakia.
Zacharovsky, M. 1997. "The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production." Slovakia.
@misc{etde_614913,
title = {The most important structures utilizing primary and secondary hydroenergetic potential for electric energy production}
author = {Zacharovsky, M}
abstractNote = {In this paper the construction, technological parameters and operation of Gabcikovo (primary hydro energy power) and Cierny Vah (secondary hydro energy power) are described. Construction of the hydroelectric power plant (HPP) Gabcikovo started in 1978 as a part of a system of hydro power projects Gabcikovo-Nagymaros. Basic technical data are: installed capacity 8 x 90 MW, production in an average aqueous year 2.650 GWh, number of hydroelectric generating sets (HGS) 8, turbine flow 8 x 413-636 m{sup 3}/s, head 12.9-24 m.The Gabcikovo plant produced 9.163 GWh of electricity from the beginning of its operation till the end of 1966. The construction of the pumped storage plant (PSP) Cierny Vah started in 1976 and it was put into operation at the end of 1980. The main goal of the PSP Cierny Vah is to meet the control functions of an electrification system of the Slovak Republic, a substitute function in the cases of unexpected power outages and a planned electricity production from re-pumping. Technological parts are: six re-pumping vertical HGS in a three machine arrangement - a motor-generator, a turbine, a pump - are located in three double-blocks. Basic technical data: installed capacity 6 x 122.4 MW + 0.768 MW, yearly production 1,281 GWh, number of HGS 6, number of domestic hydroelectric generating sets 1, turbine flow 3 x 30 m{sup /}s, pump flow 6 x 22 m{sup 3}/s, upper reservoir volume 3.7 mil. m{sup 3}, max. head 434 m, peak time 5.71 hour, pumping time 7.78 hour, re-pumping cycle efficiency 74.36%. From putting the PSP into operation till the end of 1996, the HGS in operation 145,269 hours in total, including 53,332 hours in a turbine mode of operation, 70,293 hours in a pumping mode operation and 21,644 hours in a compensation mode operation. Whereas they supplied 5,346 GWh in the mains and the consumed 6,933 GWh of electricity for pumping. Hydroenergetic potential is a primary source of energy which is recyclable, i.e. unexhaustible and also ecologically the most tolerable. (Abstract Truncated)}
place = {Slovakia}
year = {1997}
month = {Dec}
}