You need JavaScript to view this

DUPIC facility engineering

Abstract

In the early stage of the project, a comprehensive survey was conducted to identify the feasibility of using available facilities and of interface between those facilities. It was found out that the shielded cell M6 interface between those facilities. It was found out that the shielded cell M6 of IMEF could be used for the main process experiments of DUPIC fuel fabrication in regard to space adequacy, material flow, equipment layout, etc. Based on such examination, a suitable adapter system for material transfer around the M6 cell was engineered. Regarding the PIEF facility, where spent PWR fuel assemblies are stored in an annex pool, disassembly devices in the pool are retrofitted and spent fuel rod cutting and shipping system to the IMEF are designed and built. For acquisition of casks for radioactive material transport between the facilities, some adaptive refurbishment was applied to the available cask (Padirac) based on extensive analysis on safety requirements. A mockup test facility was newly acquired for remote test of DUPIC fuel fabrication process equipment prior to installation in the M6 cell of the IMEF facility. (author). 157 refs., 57 tabs., 65 figs.
Publication Date:
Sep 01, 1997
Product Type:
Technical Report
Report Number:
KAERI/RR-1725/96
Reference Number:
SCA: 210200; 210400; PA: AIX-29:000870; EDB-98:048842; SN: 98001898878
Resource Relation:
Other Information: PBD: Sep 1997
Subject:
21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS; CANDU TYPE REACTORS; COST ESTIMATION; FUEL CYCLE; INTERNATIONAL COOPERATION; MOCKUP; NUCLEAR FUELS; PWR TYPE REACTORS; SPENT FUELS; TEST FACILITIES
OSTI ID:
595426
Research Organizations:
Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)
Country of Origin:
Korea, Republic of
Language:
Korean
Other Identifying Numbers:
Other: ON: DE98607835; TRN: KR9700299000870
Availability:
INIS; OSTI as DE98607835
Submitting Site:
KRN
Size:
449 p.
Announcement Date:

Citation Formats

Lee, J S, Choi, J W, Go, W I, Kim, H D, Song, K C, Jeong, I H, Park, H S, Im, C S, Lee, H M, Moon, K H, Hong, K P, Lee, K S, Suh, K S, Kim, E K, Min, D K, Lee, J C, Chun, Y B, Paik, S Y, Lee, E P, Yoo, G S, Kim, Y S, and Park, J C. DUPIC facility engineering. Korea, Republic of: N. p., 1997. Web.
Lee, J S, Choi, J W, Go, W I, Kim, H D, Song, K C, Jeong, I H, Park, H S, Im, C S, Lee, H M, Moon, K H, Hong, K P, Lee, K S, Suh, K S, Kim, E K, Min, D K, Lee, J C, Chun, Y B, Paik, S Y, Lee, E P, Yoo, G S, Kim, Y S, & Park, J C. DUPIC facility engineering. Korea, Republic of.
Lee, J S, Choi, J W, Go, W I, Kim, H D, Song, K C, Jeong, I H, Park, H S, Im, C S, Lee, H M, Moon, K H, Hong, K P, Lee, K S, Suh, K S, Kim, E K, Min, D K, Lee, J C, Chun, Y B, Paik, S Y, Lee, E P, Yoo, G S, Kim, Y S, and Park, J C. 1997. "DUPIC facility engineering." Korea, Republic of.
@misc{etde_595426,
title = {DUPIC facility engineering}
author = {Lee, J S, Choi, J W, Go, W I, Kim, H D, Song, K C, Jeong, I H, Park, H S, Im, C S, Lee, H M, Moon, K H, Hong, K P, Lee, K S, Suh, K S, Kim, E K, Min, D K, Lee, J C, Chun, Y B, Paik, S Y, Lee, E P, Yoo, G S, Kim, Y S, and Park, J C}
abstractNote = {In the early stage of the project, a comprehensive survey was conducted to identify the feasibility of using available facilities and of interface between those facilities. It was found out that the shielded cell M6 interface between those facilities. It was found out that the shielded cell M6 of IMEF could be used for the main process experiments of DUPIC fuel fabrication in regard to space adequacy, material flow, equipment layout, etc. Based on such examination, a suitable adapter system for material transfer around the M6 cell was engineered. Regarding the PIEF facility, where spent PWR fuel assemblies are stored in an annex pool, disassembly devices in the pool are retrofitted and spent fuel rod cutting and shipping system to the IMEF are designed and built. For acquisition of casks for radioactive material transport between the facilities, some adaptive refurbishment was applied to the available cask (Padirac) based on extensive analysis on safety requirements. A mockup test facility was newly acquired for remote test of DUPIC fuel fabrication process equipment prior to installation in the M6 cell of the IMEF facility. (author). 157 refs., 57 tabs., 65 figs.}
place = {Korea, Republic of}
year = {1997}
month = {Sep}
}