You need JavaScript to view this

Continuous operation of a pilot plant for the production of beryllium oxide

Abstract

A method of obtaining beryllium oxide with a purity of 99,2% was developed in a pilot plant with a capacity of 7 tons per month destined to operate continuously. The operation market prospects and control of production with the objective of obtaining internacional technical grade beryllium oxide are discussed.
Authors:
Costa, T C; Amaral, S; Silveira, C M.S.; de Oliveira, A P [1] 
  1. Instituto de Tecnologia, Governador Valadares (Brazil)
Publication Date:
Dec 01, 1975
Product Type:
Conference
Reference Number:
AIX-10-440660; EDB-79-124413
Resource Relation:
Journal Name: Metalurgia (Sao Paulo); (Brazil); Journal Volume: 32:224
Subject:
36 MATERIALS SCIENCE; BERYLLIUM OXIDES; PRODUCTION; PILOT PLANTS; PERFORMANCE; BRAZIL; COST; EFFICIENCY; FORECASTING; MARKET; ALKALINE EARTH METAL COMPOUNDS; BERYLLIUM COMPOUNDS; CHALCOGENIDES; FUNCTIONAL MODELS; LATIN AMERICA; OXIDES; OXYGEN COMPOUNDS; SOUTH AMERICA; 360201* - Ceramics, Cermets, & Refractories- Preparation & Fabrication
OSTI ID:
5954013
Country of Origin:
Brazil
Language:
Portuguese
Other Identifying Numbers:
Journal ID: CODEN: MABMA
Submitting Site:
INIS
Size:
Pages: 473-477
Announcement Date:
May 13, 2001

Citation Formats

Costa, T C, Amaral, S, Silveira, C M.S., and de Oliveira, A P. Continuous operation of a pilot plant for the production of beryllium oxide. Brazil: N. p., 1975. Web.
Costa, T C, Amaral, S, Silveira, C M.S., & de Oliveira, A P. Continuous operation of a pilot plant for the production of beryllium oxide. Brazil.
Costa, T C, Amaral, S, Silveira, C M.S., and de Oliveira, A P. 1975. "Continuous operation of a pilot plant for the production of beryllium oxide." Brazil.
@misc{etde_5954013,
title = {Continuous operation of a pilot plant for the production of beryllium oxide}
author = {Costa, T C, Amaral, S, Silveira, C M.S., and de Oliveira, A P}
abstractNote = {A method of obtaining beryllium oxide with a purity of 99,2% was developed in a pilot plant with a capacity of 7 tons per month destined to operate continuously. The operation market prospects and control of production with the objective of obtaining internacional technical grade beryllium oxide are discussed.}
journal = []
volume = {32:224}
place = {Brazil}
year = {1975}
month = {Dec}
}