Test results with the Transrapid 06. System data from preliminary trials

Journal Article:

Abstract

Following the takeover of the Transrapid maglev facility by MVP, in spite of remaining preparatory work and conversion of the support and guidance system on the basis of a new electronic generation, interesting system data could be obtained experimentally before the planned continuous trials phase. Although the full test track length is not yet available - it is at present only 20.5 km - more than 25,000 km have already been covered in almost 1,200 test runs. Some 200 of these were for the purpose of demonstrating the Transrapid technology to visting German and foreign experts. The system data obtained from the preliminary trails were positive. Any weak points noted were mainly site-specific and not maglev-specific, but in spite of generally satisfactory results there are still many individual aspects calling for improvement and optimation before the technology can be declared ready for service. Proceeding from the positive trend of the system data obtained at up to 355 km/h, it can be said that proof of serviceability of the Transrapid transport system at speeds of up to 400 km/h can be provided in the next two years. (orig.).
Publication Date:
Oct 01, 1987
Product Type:
Journal Article
Reference Number:
DE-89-009063; EDB-89-115350
Resource Relation:
Journal Name: ETR; (Germany, Federal Republic of); Journal Volume: 36:10
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; LEVITATED TRAINS; OPTIMIZATION; PERFORMANCE TESTING; COMMERCIALIZATION; OPERATION; TEST FACILITIES; TESTING; TRAINS; VEHICLES; 320203* - Energy Conservation, Consumption, & Utilization- Transportation- Land & Roadway
OSTI ID:
5950665
Research Organizations:
MVP Versuchs- und Planungsgesellschaft fuer Magnetbahnsysteme m.b.H., Muenchen (Germany, F.R.); Industrieanlagen-Betriebsgesellschaft mbH, Lathen an der Ems (Germany, F.R.). Magnetbahn-Versuchsanlage
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Journal ID: CODEN: ETRUA
Submitting Site:
DE
Size:
Pages: 633-640
Announcement Date:
Feb 01, 1988

Journal Article:

Citation Formats

Heinrich, K, and Mnich, P. Test results with the Transrapid 06. System data from preliminary trials. Germany: N. p., 1987. Web.
Heinrich, K, & Mnich, P. Test results with the Transrapid 06. System data from preliminary trials. Germany.
Heinrich, K, and Mnich, P. 1987. "Test results with the Transrapid 06. System data from preliminary trials." Germany.
@misc{etde_5950665,
title = {Test results with the Transrapid 06. System data from preliminary trials}
author = {Heinrich, K, and Mnich, P}
abstractNote = {Following the takeover of the Transrapid maglev facility by MVP, in spite of remaining preparatory work and conversion of the support and guidance system on the basis of a new electronic generation, interesting system data could be obtained experimentally before the planned continuous trials phase. Although the full test track length is not yet available - it is at present only 20.5 km - more than 25,000 km have already been covered in almost 1,200 test runs. Some 200 of these were for the purpose of demonstrating the Transrapid technology to visting German and foreign experts. The system data obtained from the preliminary trails were positive. Any weak points noted were mainly site-specific and not maglev-specific, but in spite of generally satisfactory results there are still many individual aspects calling for improvement and optimation before the technology can be declared ready for service. Proceeding from the positive trend of the system data obtained at up to 355 km/h, it can be said that proof of serviceability of the Transrapid transport system at speeds of up to 400 km/h can be provided in the next two years. (orig.).}
journal = {ETR; (Germany, Federal Republic of)}
volume = {36:10}
journal type = {AC}
place = {Germany}
year = {1987}
month = {Oct}
}