A mass impregnation and continuous sheath extrusion plant that will eliminate the long period of vacuum treatment usually required for high voltage oil-filled cables is among the latest techniques included in the new factory at Pirelli General's Eastleigh works. The new factory is said to be the first in Europe designed solely for the manufacture of the full range of oil-filled cables. Possible future increases of system voltages to about 750-kV ac or 1000-kV dc have been taken into account in the design of the works, so that only a small amount of modification and new plant will be involved.
Citation Formats
None.
Mass impregnation plant speeds high voltage cable production.
United Kingdom: N. p.,
1965.
Web.
None.
Mass impregnation plant speeds high voltage cable production.
United Kingdom.
None.
1965.
"Mass impregnation plant speeds high voltage cable production."
United Kingdom.
@misc{etde_5845698,
title = {Mass impregnation plant speeds high voltage cable production}
author = {None}
abstractNote = {A mass impregnation and continuous sheath extrusion plant that will eliminate the long period of vacuum treatment usually required for high voltage oil-filled cables is among the latest techniques included in the new factory at Pirelli General's Eastleigh works. The new factory is said to be the first in Europe designed solely for the manufacture of the full range of oil-filled cables. Possible future increases of system voltages to about 750-kV ac or 1000-kV dc have been taken into account in the design of the works, so that only a small amount of modification and new plant will be involved.}
journal = []
volume = {176}
journal type = {AC}
place = {United Kingdom}
year = {1965}
month = {May}
}
title = {Mass impregnation plant speeds high voltage cable production}
author = {None}
abstractNote = {A mass impregnation and continuous sheath extrusion plant that will eliminate the long period of vacuum treatment usually required for high voltage oil-filled cables is among the latest techniques included in the new factory at Pirelli General's Eastleigh works. The new factory is said to be the first in Europe designed solely for the manufacture of the full range of oil-filled cables. Possible future increases of system voltages to about 750-kV ac or 1000-kV dc have been taken into account in the design of the works, so that only a small amount of modification and new plant will be involved.}