You need JavaScript to view this

Systems principles of planning the net cost of oil and gas extraction

Abstract

The automated system of calculation of ASPC ''oil extraction'' is developed in order to improve the existing system of planning of the oil extracting sector. The most complete expression of the systems construction of the plan is found in the section ''net cost and profit.'' Unity of the production process advances definite requirements for construction of the plan for net cost of oil and gas extraction as the model of this unified process. According to these requirements, the plan for net cost must be developed on the basis of interrelationship of the indicators of the plan for net cost within the section and with indicators of other sections of the plan, methodological unity and continuity of the methods of planning net cost by elements of outlays, articles of calculation and technical-economic factors, methodological continuity of regimes and stages of planning, as well as based on methodological continuity of the control levels. The listed requirements are principles for systems planning of the net cost of oil and gas extraction. These principles guarantee improvement in planning of net cost of oil and gas extraction according to the requirements made for the national economic planning.
Authors:
Publication Date:
Jan 01, 1979
Product Type:
Journal Article
Reference Number:
EDB-83-183534
Resource Relation:
Journal Name: Tr. Vses. Nauchno-Issled. Inst. Organ., Upr. Ekon. Neftegazov. Prom-sti.; (USSR); Journal Volume: 39
Subject:
02 PETROLEUM; 03 NATURAL GAS; NATURAL GAS DEPOSITS; EXPLOITATION; PETROLEUM DEPOSITS; COST; ECONOMIC ANALYSIS; PLANNING; SYSTEMS ANALYSIS; ECONOMICS; GEOLOGIC DEPOSITS; MINERAL RESOURCES; RESOURCES; 020300* - Petroleum- Drilling & Production; 030300 - Natural Gas- Drilling, Production, & Processing; 020700 - Petroleum- Economics, Industrial, & Business Aspects; 030600 - Natural Gas- Economic, Industrial, & Business Aspects
OSTI ID:
5681727
Country of Origin:
USSR
Language:
Russian
Other Identifying Numbers:
Journal ID: CODEN: XYZO1
Submitting Site:
HEDB
Size:
Pages: 72-79
Announcement Date:
May 01, 1983

Citation Formats

Ryazanova, N I. Systems principles of planning the net cost of oil and gas extraction. USSR: N. p., 1979. Web.
Ryazanova, N I. Systems principles of planning the net cost of oil and gas extraction. USSR.
Ryazanova, N I. 1979. "Systems principles of planning the net cost of oil and gas extraction." USSR.
@misc{etde_5681727,
title = {Systems principles of planning the net cost of oil and gas extraction}
author = {Ryazanova, N I}
abstractNote = {The automated system of calculation of ASPC ''oil extraction'' is developed in order to improve the existing system of planning of the oil extracting sector. The most complete expression of the systems construction of the plan is found in the section ''net cost and profit.'' Unity of the production process advances definite requirements for construction of the plan for net cost of oil and gas extraction as the model of this unified process. According to these requirements, the plan for net cost must be developed on the basis of interrelationship of the indicators of the plan for net cost within the section and with indicators of other sections of the plan, methodological unity and continuity of the methods of planning net cost by elements of outlays, articles of calculation and technical-economic factors, methodological continuity of regimes and stages of planning, as well as based on methodological continuity of the control levels. The listed requirements are principles for systems planning of the net cost of oil and gas extraction. These principles guarantee improvement in planning of net cost of oil and gas extraction according to the requirements made for the national economic planning.}
journal = []
volume = {39}
journal type = {AC}
place = {USSR}
year = {1979}
month = {Jan}
}