Construction of a 500 kV aerial power line in East Java

Abstract

The authors report on the technical preparations and the construction of a 500 kv, four-bundle power line with a pylon tonnage of approximately 10,000 t of steel and a route length of 251 km in Indonesia. Due to the difficult terrain conditions, the sensitive infrastructure and the extremely short construction period, this project was a special technological challenge. Initially, the authors explain the technical planning of Brown Boveri with emphasis on foundations and assembly. As part of this tailor-made concept new technological solutions were used. They were instrumental in the successful completion of the project in only 19 months by the end of 1986 to the complete satisfaction of the customer. The authors also comment on the pracitcal experiences gained during the construction.
Publication Date:
Oct 12, 1987
Product Type:
Journal Article
Reference Number:
DE-88-000788; EDB-88-037325
Resource Relation:
Journal Name: Elektrizitaetswirtschaft; (Germany, Federal Republic of); Journal Volume: 86:21
Subject:
24 POWER TRANSMISSION AND DISTRIBUTION; OVERHEAD POWER TRANSMISSION; CONSTRUCTION; DEFORMATION; ELECTRICAL INSULATION; FOUNDATIONS; HVDC SYSTEMS; INDONESIA; INSTALLATION; PERFORMANCE TESTING; POWER TRANSMISSION LINES; POWER TRANSMISSION TOWERS; ASIA; DC SYSTEMS; DEVELOPING COUNTRIES; ENERGY SYSTEMS; ISLANDS; MECHANICAL STRUCTURES; POWER SYSTEMS; POWER TRANSMISSION; SUPPORTS; TESTING; TOWERS; 200300* - Electric Power Engineering- Power Transmission & Distribution- (-1989)
OSTI ID:
5627255
Research Organizations:
Brown, Boveri und Cie A.G., Mannheim, Germany, F.R.. Geschaeftsbereich Leitungsbau
Country of Origin:
Germany
Language:
German
Other Identifying Numbers:
Journal ID: CODEN: EKZWA
Submitting Site:
DE
Size:
Pages: 936-942
Announcement Date:
Feb 01, 1988

Citation Formats

Kaeufl, O, Paschen, R, and Kummermehr, R. Construction of a 500 kV aerial power line in East Java. Germany: N. p., 1987. Web.
Kaeufl, O, Paschen, R, & Kummermehr, R. Construction of a 500 kV aerial power line in East Java. Germany.
Kaeufl, O, Paschen, R, and Kummermehr, R. 1987. "Construction of a 500 kV aerial power line in East Java." Germany.
@misc{etde_5627255,
title = {Construction of a 500 kV aerial power line in East Java}
author = {Kaeufl, O, Paschen, R, and Kummermehr, R}
abstractNote = {The authors report on the technical preparations and the construction of a 500 kv, four-bundle power line with a pylon tonnage of approximately 10,000 t of steel and a route length of 251 km in Indonesia. Due to the difficult terrain conditions, the sensitive infrastructure and the extremely short construction period, this project was a special technological challenge. Initially, the authors explain the technical planning of Brown Boveri with emphasis on foundations and assembly. As part of this tailor-made concept new technological solutions were used. They were instrumental in the successful completion of the project in only 19 months by the end of 1986 to the complete satisfaction of the customer. The authors also comment on the pracitcal experiences gained during the construction.}
journal = []
volume = {86:21}
journal type = {AC}
place = {Germany}
year = {1987}
month = {Oct}
}