Abstract
The concept-development status of solar power satellite (SPS) systems is considered, with attention to Heavy-Lift Launch Vehicles (HLLVs), the construction methods to be used in either geostationary or low earth orbit, and the configuration of the solar array. By comparison with the 30-ton payload of the Space Shuttle, HLLV designs under consideration have payloads of 114 to 425 tons. The unit cost for 5-GW satellites, in 1977 dollars, is estimated at five billion dollars. Consideration is given to the possible deleterious environmental effects of both the 400 or more launches required for each SPS and such results of radio frequency energy transfer beam operation as the suppression of blood platelet production in human beings and ionospheric heating. The uncertainty that still surrounds the relative advantages of competing designs and the need for long-range, billion-dollar funding appear to be insuperable obstacles to the construction of SPSs.
Citation Formats
Bulloch, C.
Solar power satellite - A geostationary channel tunnel.
Switzerland: N. p.,
1981.
Web.
Bulloch, C.
Solar power satellite - A geostationary channel tunnel.
Switzerland.
Bulloch, C.
1981.
"Solar power satellite - A geostationary channel tunnel."
Switzerland.
@misc{etde_5464427,
title = {Solar power satellite - A geostationary channel tunnel}
author = {Bulloch, C}
abstractNote = {The concept-development status of solar power satellite (SPS) systems is considered, with attention to Heavy-Lift Launch Vehicles (HLLVs), the construction methods to be used in either geostationary or low earth orbit, and the configuration of the solar array. By comparison with the 30-ton payload of the Space Shuttle, HLLV designs under consideration have payloads of 114 to 425 tons. The unit cost for 5-GW satellites, in 1977 dollars, is estimated at five billion dollars. Consideration is given to the possible deleterious environmental effects of both the 400 or more launches required for each SPS and such results of radio frequency energy transfer beam operation as the suppression of blood platelet production in human beings and ionospheric heating. The uncertainty that still surrounds the relative advantages of competing designs and the need for long-range, billion-dollar funding appear to be insuperable obstacles to the construction of SPSs.}
journal = []
volume = {36}
journal type = {AC}
place = {Switzerland}
year = {1981}
month = {Dec}
}
title = {Solar power satellite - A geostationary channel tunnel}
author = {Bulloch, C}
abstractNote = {The concept-development status of solar power satellite (SPS) systems is considered, with attention to Heavy-Lift Launch Vehicles (HLLVs), the construction methods to be used in either geostationary or low earth orbit, and the configuration of the solar array. By comparison with the 30-ton payload of the Space Shuttle, HLLV designs under consideration have payloads of 114 to 425 tons. The unit cost for 5-GW satellites, in 1977 dollars, is estimated at five billion dollars. Consideration is given to the possible deleterious environmental effects of both the 400 or more launches required for each SPS and such results of radio frequency energy transfer beam operation as the suppression of blood platelet production in human beings and ionospheric heating. The uncertainty that still surrounds the relative advantages of competing designs and the need for long-range, billion-dollar funding appear to be insuperable obstacles to the construction of SPSs.}
journal = []
volume = {36}
journal type = {AC}
place = {Switzerland}
year = {1981}
month = {Dec}
}