Abstract
This Draft Implementation Document (ID) for Rinsewater Transfer has been prepared as a requirement for conducting and completing the Interim Response Action (IRA) at the Hydrazine Blending and Storage Facility (HBSF) located at Rocky Mountain Arsenal (RMA) in Commerce City, Colorado. This document has been prepared in accordance with requirements set forth in the October 1988 Final Decision Document for the HBSF IRA (Peer, 1988) and the Amendment to the Final Decision Document (HLA, 1991). The HBSF IRA task was separated into two phases that comprise complete decommissioning of the HBSF as cited in the Federal Facility Agreement. The design portion of Phase I of the HBSF IRA included analytical methods development and laboratory certification for analysis of hydrazine fuel compounds (hydrazine, monomethyl hydrazine) (MMH), and unsymmetrical dimethyl hydrazine (UDMH) and n-nitrosodimethylamine (NDMA) in HBSF rinsewater, chemical characterization of hydrazine rinsewater, bench- and pilot-scale testing of ultraviolet (UV) light/chemical oxidation treatment systems for treatment of hydrazine rinsewater, full-scale startup testing of a UV light/chemical oxidation treatment system, and air monitoring during startup testing as described in the Draft Final Treatment Report (HLA, 1991).
Citation Formats
None.
Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2.
Canada: N. p.,
1991.
Web.
None.
Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2.
Canada.
None.
1991.
"Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2."
Canada.
@misc{etde_5415177,
title = {Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2}
author = {None}
abstractNote = {This Draft Implementation Document (ID) for Rinsewater Transfer has been prepared as a requirement for conducting and completing the Interim Response Action (IRA) at the Hydrazine Blending and Storage Facility (HBSF) located at Rocky Mountain Arsenal (RMA) in Commerce City, Colorado. This document has been prepared in accordance with requirements set forth in the October 1988 Final Decision Document for the HBSF IRA (Peer, 1988) and the Amendment to the Final Decision Document (HLA, 1991). The HBSF IRA task was separated into two phases that comprise complete decommissioning of the HBSF as cited in the Federal Facility Agreement. The design portion of Phase I of the HBSF IRA included analytical methods development and laboratory certification for analysis of hydrazine fuel compounds (hydrazine, monomethyl hydrazine) (MMH), and unsymmetrical dimethyl hydrazine (UDMH) and n-nitrosodimethylamine (NDMA) in HBSF rinsewater, chemical characterization of hydrazine rinsewater, bench- and pilot-scale testing of ultraviolet (UV) light/chemical oxidation treatment systems for treatment of hydrazine rinsewater, full-scale startup testing of a UV light/chemical oxidation treatment system, and air monitoring during startup testing as described in the Draft Final Treatment Report (HLA, 1991).}
place = {Canada}
year = {1991}
month = {Aug}
}
title = {Hydrazine blending and storage facility, interim response action, draft implementation document for rinsewater transfer, phase 2}
author = {None}
abstractNote = {This Draft Implementation Document (ID) for Rinsewater Transfer has been prepared as a requirement for conducting and completing the Interim Response Action (IRA) at the Hydrazine Blending and Storage Facility (HBSF) located at Rocky Mountain Arsenal (RMA) in Commerce City, Colorado. This document has been prepared in accordance with requirements set forth in the October 1988 Final Decision Document for the HBSF IRA (Peer, 1988) and the Amendment to the Final Decision Document (HLA, 1991). The HBSF IRA task was separated into two phases that comprise complete decommissioning of the HBSF as cited in the Federal Facility Agreement. The design portion of Phase I of the HBSF IRA included analytical methods development and laboratory certification for analysis of hydrazine fuel compounds (hydrazine, monomethyl hydrazine) (MMH), and unsymmetrical dimethyl hydrazine (UDMH) and n-nitrosodimethylamine (NDMA) in HBSF rinsewater, chemical characterization of hydrazine rinsewater, bench- and pilot-scale testing of ultraviolet (UV) light/chemical oxidation treatment systems for treatment of hydrazine rinsewater, full-scale startup testing of a UV light/chemical oxidation treatment system, and air monitoring during startup testing as described in the Draft Final Treatment Report (HLA, 1991).}