Abstract
This work looks into the feasibility of implementing a scheme for the islanding of the Santa Cruz Thermic Plant ( Rio de janeiro State) with LIGHT`s (Electric power public utility) loads fed by the Santa Cruz-Jacarepagua trunk connection, considering presently-existing system problems relative to a significant frequency drop when a loss occurs of a large generation block and which causes the blockade scheme of the mentioned Plant to work, thus aggravating the frequency control still further. An analysis is made of such scheme implementation implications on the scheme for islanding a Santa Cruz 84 MW machine to provide supply to the auxiliary services of The Angra dos Reis nuclear plant presently existing in the system. 2 refs., 9 figs.
Nascimento, A R;
[1]
Gomes, Paulo;
Almeida, Paulo C. de;
[2]
Sereno, Marcos G
[3]
- Light Servicos de Eletricidade SA, Rio de Janeiro, RJ (Brazil)
- ELETROBRAS, Rio de Janeiro, RJ (Brazil)
- FURNAS, Rio de Janeiro, RJ (Brazil)
Citation Formats
Nascimento, A R, Gomes, Paulo, Almeida, Paulo C. de, and Sereno, Marcos G.
Santa Cruz thermic plant islanding with local loads.
Brazil: N. p.,
1987.
Web.
Nascimento, A R, Gomes, Paulo, Almeida, Paulo C. de, & Sereno, Marcos G.
Santa Cruz thermic plant islanding with local loads.
Brazil.
Nascimento, A R, Gomes, Paulo, Almeida, Paulo C. de, and Sereno, Marcos G.
1987.
"Santa Cruz thermic plant islanding with local loads."
Brazil.
@misc{etde_535824,
title = {Santa Cruz thermic plant islanding with local loads}
author = {Nascimento, A R, Gomes, Paulo, Almeida, Paulo C. de, and Sereno, Marcos G}
abstractNote = {This work looks into the feasibility of implementing a scheme for the islanding of the Santa Cruz Thermic Plant ( Rio de janeiro State) with LIGHT`s (Electric power public utility) loads fed by the Santa Cruz-Jacarepagua trunk connection, considering presently-existing system problems relative to a significant frequency drop when a loss occurs of a large generation block and which causes the blockade scheme of the mentioned Plant to work, thus aggravating the frequency control still further. An analysis is made of such scheme implementation implications on the scheme for islanding a Santa Cruz 84 MW machine to provide supply to the auxiliary services of The Angra dos Reis nuclear plant presently existing in the system. 2 refs., 9 figs.}
place = {Brazil}
year = {1987}
month = {Dec}
}
title = {Santa Cruz thermic plant islanding with local loads}
author = {Nascimento, A R, Gomes, Paulo, Almeida, Paulo C. de, and Sereno, Marcos G}
abstractNote = {This work looks into the feasibility of implementing a scheme for the islanding of the Santa Cruz Thermic Plant ( Rio de janeiro State) with LIGHT`s (Electric power public utility) loads fed by the Santa Cruz-Jacarepagua trunk connection, considering presently-existing system problems relative to a significant frequency drop when a loss occurs of a large generation block and which causes the blockade scheme of the mentioned Plant to work, thus aggravating the frequency control still further. An analysis is made of such scheme implementation implications on the scheme for islanding a Santa Cruz 84 MW machine to provide supply to the auxiliary services of The Angra dos Reis nuclear plant presently existing in the system. 2 refs., 9 figs.}
place = {Brazil}
year = {1987}
month = {Dec}
}