Abstract
This paper presents some characteristics of the Brazilian interconnected system and discusses the load shedding scheme in its different stages considering the beginning of operation of the Itaipu power plant. The present situation of the South and Southeastern load shedding scheme combination is also commented. Finally, the interconnected system evolution and the effects on the load shedding schemes are discussed. 4 refs., 5 figs., 2 tabs.
Vieira Filho, Xisto;
Couri, J J.G.;
Gomes, P;
Almeida, P C
[1]
- ELETROBRAS, Rio de Janeiro, RJ (Brazil)
Citation Formats
Vieira Filho, Xisto, Couri, J J.G., Gomes, P, and Almeida, P C.
Load shedding scheme in the south/southeastern interconnected system.
Brazil: N. p.,
1987.
Web.
Vieira Filho, Xisto, Couri, J J.G., Gomes, P, & Almeida, P C.
Load shedding scheme in the south/southeastern interconnected system.
Brazil.
Vieira Filho, Xisto, Couri, J J.G., Gomes, P, and Almeida, P C.
1987.
"Load shedding scheme in the south/southeastern interconnected system."
Brazil.
@misc{etde_535807,
title = {Load shedding scheme in the south/southeastern interconnected system}
author = {Vieira Filho, Xisto, Couri, J J.G., Gomes, P, and Almeida, P C}
abstractNote = {This paper presents some characteristics of the Brazilian interconnected system and discusses the load shedding scheme in its different stages considering the beginning of operation of the Itaipu power plant. The present situation of the South and Southeastern load shedding scheme combination is also commented. Finally, the interconnected system evolution and the effects on the load shedding schemes are discussed. 4 refs., 5 figs., 2 tabs.}
place = {Brazil}
year = {1987}
month = {Dec}
}
title = {Load shedding scheme in the south/southeastern interconnected system}
author = {Vieira Filho, Xisto, Couri, J J.G., Gomes, P, and Almeida, P C}
abstractNote = {This paper presents some characteristics of the Brazilian interconnected system and discusses the load shedding scheme in its different stages considering the beginning of operation of the Itaipu power plant. The present situation of the South and Southeastern load shedding scheme combination is also commented. Finally, the interconnected system evolution and the effects on the load shedding schemes are discussed. 4 refs., 5 figs., 2 tabs.}
place = {Brazil}
year = {1987}
month = {Dec}
}