You need JavaScript to view this

Rapid construction of deep mines in the Donbass

Abstract

Highly effective models of mines with new technological and construction solutions designed to shorten building schedules were developed by design institutes of the Donbass under the leadership of the Ministries of the Coal Industry of the USSR and Ukrainian SSR. One arrangement described combining industrial facilities, an administrative and support buildings with buildings over the shaft in one complex reduces labor expenditure, transport between facilities and the total area from which earth must be removed. The introduction of simple technological flow charts for excavating a sector, the use of permanent structures and equipment guaranteeing effective ventilation are all measures which accelerate the time in which the mine can eventually be put into operation by 20 months and result in an overall saving of 33.81 million rubles. (In Russian)
Authors:
Publication Date:
Aug 01, 1979
Product Type:
Journal Article
Reference Number:
EDB-80-093682
Resource Relation:
Journal Name: Ugol; (USSR); Journal Volume: 8
Subject:
01 COAL, LIGNITE, AND PEAT; COAL MINES; DESIGN; COAL MINING; CONSTRUCTION; DEPTH; FLOWSHEETS; PLANNING; UKRAINIAN SSR; UNDERGROUND MINING; USSR; VENTILATION; ASIA; DIAGRAMS; DIMENSIONS; EASTERN EUROPE; EUROPE; MINES; MINING; 012000* - Coal, Lignite, & Peat- Mining
OSTI ID:
5231316
Country of Origin:
USSR
Language:
Russian
Other Identifying Numbers:
Journal ID: CODEN: UGOLA
Submitting Site:
CLA
Size:
Pages: 31-35
Announcement Date:
Jun 01, 1980

Citation Formats

Pshenichnyi, A A. Rapid construction of deep mines in the Donbass. USSR: N. p., 1979. Web.
Pshenichnyi, A A. Rapid construction of deep mines in the Donbass. USSR.
Pshenichnyi, A A. 1979. "Rapid construction of deep mines in the Donbass." USSR.
@misc{etde_5231316,
title = {Rapid construction of deep mines in the Donbass}
author = {Pshenichnyi, A A}
abstractNote = {Highly effective models of mines with new technological and construction solutions designed to shorten building schedules were developed by design institutes of the Donbass under the leadership of the Ministries of the Coal Industry of the USSR and Ukrainian SSR. One arrangement described combining industrial facilities, an administrative and support buildings with buildings over the shaft in one complex reduces labor expenditure, transport between facilities and the total area from which earth must be removed. The introduction of simple technological flow charts for excavating a sector, the use of permanent structures and equipment guaranteeing effective ventilation are all measures which accelerate the time in which the mine can eventually be put into operation by 20 months and result in an overall saving of 33.81 million rubles. (In Russian)}
journal = []
volume = {8}
journal type = {AC}
place = {USSR}
year = {1979}
month = {Aug}
}