You need JavaScript to view this

A new approach to the nuclear power plant site licensing

Abstract

The Israel Electric Corporation Ltd.(IEC) conducted a survey to determine the geotechnical suitability of the Shivta Site for the purpose of erecting a Nuclear Power Station and presented the results in a Preliminary Safety Analysis Report (PSAR) to the Licensing Division of the Israel Atomic Energy Commission (LD). The studies for selecting a site in the NW Negev were conducted by multi-disciplinary teams of Israeli and US professionals, beginning in 1982, over a twelve-year period. The investigations involved comprehensive geological, geophysical, geotechnical, hydrological, as well as geomorphic and pedologic evaluations of the region and the then- proposed site locale. The prior studies were completed using highly advanced and modern tools and approaches and provided a significant amount of information related to the tectonic and seismic characteristics of the NW Negev region. (author).
Authors:
Kidron, A A [1] 
  1. Israel Electric Corp. Ltd., Haifa (Israel)
Publication Date:
Dec 01, 1996
Product Type:
Conference
Report Number:
INIS-mf-15507; CONF-961252-
Reference Number:
SCA: 210700; PA: AIX-28:024056; EDB-97:072386; SN: 97001789052
Resource Relation:
Conference: 19. conference of the Israel Nuclear Societies, Herzliya (Israel), 9-10 Dec 1996; Other Information: PBD: Dec 1996; Related Information: Is Part Of Program and book of abstracts; PB: 149 p.
Subject:
21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS; REACTOR LICENSING; ISRAEL ATOMIC ENERGY COMMISSION; REACTOR SAFETY
OSTI ID:
475990
Research Organizations:
Israel Nuclear Society, Yavne (Israel)
Country of Origin:
Israel
Language:
English
Other Identifying Numbers:
Other: ON: DE97616259; TRN: IL9606184024056
Availability:
INIS; OSTI as DE97616259
Submitting Site:
INIS
Size:
pp. 1-4
Announcement Date:

Citation Formats

Kidron, A A. A new approach to the nuclear power plant site licensing. Israel: N. p., 1996. Web.
Kidron, A A. A new approach to the nuclear power plant site licensing. Israel.
Kidron, A A. 1996. "A new approach to the nuclear power plant site licensing." Israel.
@misc{etde_475990,
title = {A new approach to the nuclear power plant site licensing}
author = {Kidron, A A}
abstractNote = {The Israel Electric Corporation Ltd.(IEC) conducted a survey to determine the geotechnical suitability of the Shivta Site for the purpose of erecting a Nuclear Power Station and presented the results in a Preliminary Safety Analysis Report (PSAR) to the Licensing Division of the Israel Atomic Energy Commission (LD). The studies for selecting a site in the NW Negev were conducted by multi-disciplinary teams of Israeli and US professionals, beginning in 1982, over a twelve-year period. The investigations involved comprehensive geological, geophysical, geotechnical, hydrological, as well as geomorphic and pedologic evaluations of the region and the then- proposed site locale. The prior studies were completed using highly advanced and modern tools and approaches and provided a significant amount of information related to the tectonic and seismic characteristics of the NW Negev region. (author).}
place = {Israel}
year = {1996}
month = {Dec}
}