You need JavaScript to view this

European wind power integration study. Periodic report 1

Abstract

This periodic report no. 1 describes the work done in the Danish part of the European Wind Power Integration Study in the period until 1.4.1991. The R and D project was initiated January 1, 1989 upon prior establishment of registration equipment at 7 wind farms and at the Tjaereborg turbine. ELSAM and the meteorological service centre in Karup (VTC-Karup) have supplied data for the task. Wind Predictability, Potential and Benefits, Wind Farm - Grid Interface, Distribution System Strength, Wind Farm Cost and Operation, and Co-generation Wind Turbines/Other renewables were measured and modelled. The statistical distribution of the wind speed variations (changes in wind speed from one period of time to another) has been established with great certainty in the report. The wind speed variations follow a Weibull distribution, irrespective of the time intervals with which the data are considered. Duration curves and power distributions for the 7 wind farms have been estimated. Registration equipment for one-minute measurements was chosen in order to clarify the short-term variations in the wind power production. The possibility of working out production forecasts, to be applied in the daily load dispatching, were to be assessed for the total amount of wind power production in Jutland  More>>
Publication Date:
Dec 31, 1991
Product Type:
Technical Report
Report Number:
NEI-DK-2560
Reference Number:
SCA: 170602; 170603; PA: DK-97:001176; EDB-97:060535; NTS-97:010190; SN: 97001773058
Resource Relation:
Other Information: PBD: 1991
Subject:
17 WIND ENERGY; WIND LOADS; WIND TURBINE ARRAYS; COGENERATION; DAILY VARIATIONS; FORECASTING; COST ESTIMATION; OPERATION; PROGRESS REPORT; INTERCONNECTED POWER SYSTEMS
OSTI ID:
464495
Research Organizations:
Jysk-Fynske Elsamarbejde (ELSAM), Fredericia (Denmark). Planlaegningsafdelingen
Country of Origin:
Denmark
Language:
English
Other Identifying Numbers:
Other: ON: DE97740017; CNN: Contract JOUR-0041-DK; TRN: DK9701176
Availability:
OSTI as DE97740017
Submitting Site:
DK
Size:
50 p.
Announcement Date:
May 14, 1997

Citation Formats

None. European wind power integration study. Periodic report 1. Denmark: N. p., 1991. Web.
None. European wind power integration study. Periodic report 1. Denmark.
None. 1991. "European wind power integration study. Periodic report 1." Denmark.
@misc{etde_464495,
title = {European wind power integration study. Periodic report 1}
author = {None}
abstractNote = {This periodic report no. 1 describes the work done in the Danish part of the European Wind Power Integration Study in the period until 1.4.1991. The R and D project was initiated January 1, 1989 upon prior establishment of registration equipment at 7 wind farms and at the Tjaereborg turbine. ELSAM and the meteorological service centre in Karup (VTC-Karup) have supplied data for the task. Wind Predictability, Potential and Benefits, Wind Farm - Grid Interface, Distribution System Strength, Wind Farm Cost and Operation, and Co-generation Wind Turbines/Other renewables were measured and modelled. The statistical distribution of the wind speed variations (changes in wind speed from one period of time to another) has been established with great certainty in the report. The wind speed variations follow a Weibull distribution, irrespective of the time intervals with which the data are considered. Duration curves and power distributions for the 7 wind farms have been estimated. Registration equipment for one-minute measurements was chosen in order to clarify the short-term variations in the wind power production. The possibility of working out production forecasts, to be applied in the daily load dispatching, were to be assessed for the total amount of wind power production in Jutland and Funen. The report has examined whether it would be possible to have only one wind measurement and then let it be `guiding` for the total wind farm production. Some simulations are to be carried out in the attempt to set up guidelines for the connection between the strength of distribution systems and the requirements which must be made to the wind farms which are to be places in the system. (EG)}
place = {Denmark}
year = {1991}
month = {Dec}
}