You need JavaScript to view this

Increased capability of Strassy: the decision making aid for the inspection of nuclear materials; Prolongement des capacites de Strassy: systeme d`aide a la decision pour le controle des matieres nucleaires

Abstract

The paper describes the latest developments in STRASSY (Strategy Assistance System), the strategy assistance system for the inspection of nuclear materials. The user can now select the fuel cycle he wishes to investigate from an initial range of 19 facilities. An inspection interface has been developed to enable the details and dates of inspections to be modified. One of the special features of the application of STRASSY in international safeguards is the taking into account of timeliness of detection; certain aspects of the time manager algorithms are presented and analysed, including the guaranteed existence of a solution. The results of a study of diversion paths in a simplified cycle consisting of our facilities are presented. Finally, the modifications necessary to enable STRASSY to be used for a posterior analysis of inspection results are discussed. (authors). 7 refs., 3 figs.
Authors:
Werkoff, F; [1]  Preston, N; [1]  Le Manchec, K; [2]  Dumas, M [3] 
  1. CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Inst. de Protection et de Surete Nucleaire
  2. CRIL-Ingenierie, 92 - Puteaux (France)
  3. CEA Centre d`Etudes de Saclay, 91 - Gif-sur-Yvette (France). Direction des Reacteurs Nucleaires
Publication Date:
Dec 31, 1994
Product Type:
Conference
Report Number:
CEA-CONF-12127; CONF-940307-
Reference Number:
SCA: 055001; 990200; PA: AIX-28:034984; EDB-97:060243; NTS-97:012287; SN: 97001775426
Resource Relation:
Conference: International symposium on nuclear material safeguards, Vienna (Austria), 14-18 Mar 1994; Other Information: PBD: 1994
Subject:
05 NUCLEAR FUELS; 99 MATHEMATICS, COMPUTERS, INFORMATION SCIENCE, MANAGEMENT, LAW, MISCELLANEOUS; NUCLEAR MATERIALS MANAGEMENT; ALGORITHMS; COMPUTERIZED CONTROL SYSTEMS; DETECTION; EQUIPMENT INTERFACES; FUEL CYCLE; INSPECTION; MATERIALS TESTING; NUCLEAR MATERIALS POSSESSION; RADIATION PROTECTION; SAFEGUARDS; SAFETY ENGINEERING
OSTI ID:
463300
Research Organizations:
CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Inst. de Protection et de Surete Nucleaire
Country of Origin:
France
Language:
French
Other Identifying Numbers:
Other: ON: DE97622649; TRN: FR9601335034984
Availability:
INIS; OSTI as DE97622649
Submitting Site:
FRN
Size:
11 p.
Announcement Date:

Citation Formats

Werkoff, F, Preston, N, Le Manchec, K, and Dumas, M. Increased capability of Strassy: the decision making aid for the inspection of nuclear materials; Prolongement des capacites de Strassy: systeme d`aide a la decision pour le controle des matieres nucleaires. France: N. p., 1994. Web.
Werkoff, F, Preston, N, Le Manchec, K, & Dumas, M. Increased capability of Strassy: the decision making aid for the inspection of nuclear materials; Prolongement des capacites de Strassy: systeme d`aide a la decision pour le controle des matieres nucleaires. France.
Werkoff, F, Preston, N, Le Manchec, K, and Dumas, M. 1994. "Increased capability of Strassy: the decision making aid for the inspection of nuclear materials; Prolongement des capacites de Strassy: systeme d`aide a la decision pour le controle des matieres nucleaires." France.
@misc{etde_463300,
title = {Increased capability of Strassy: the decision making aid for the inspection of nuclear materials; Prolongement des capacites de Strassy: systeme d`aide a la decision pour le controle des matieres nucleaires}
author = {Werkoff, F, Preston, N, Le Manchec, K, and Dumas, M}
abstractNote = {The paper describes the latest developments in STRASSY (Strategy Assistance System), the strategy assistance system for the inspection of nuclear materials. The user can now select the fuel cycle he wishes to investigate from an initial range of 19 facilities. An inspection interface has been developed to enable the details and dates of inspections to be modified. One of the special features of the application of STRASSY in international safeguards is the taking into account of timeliness of detection; certain aspects of the time manager algorithms are presented and analysed, including the guaranteed existence of a solution. The results of a study of diversion paths in a simplified cycle consisting of our facilities are presented. Finally, the modifications necessary to enable STRASSY to be used for a posterior analysis of inspection results are discussed. (authors). 7 refs., 3 figs.}
place = {France}
year = {1994}
month = {Dec}
}