The Transrapid test facility between system development and system application

Abstract

In the development of a new rail technology, such as the magnetic levitation, there is - in contrast to the further development of the railway technology - not the possibility to use existing routes for the technical verification of the system technology until the application. Instead of this there are two possibilities: Cost-effective preliminary development on test beds and small test facilities up to a development stage which justifies the (relatively serious) risk of realising a service route early and to conclude the system trials and verification there; cost-intensive construction of a large-scale test facility which permits an application-related verification of all important system functions and thus creates the technical pre-requisites for a low-risk system application; The presentation deals with the technical requirements of the system at the test facility the challenges and chances linked to its realisation and adjustment to the rapidly progressing state-of-the-art and which this way opens up for a minimisation of the technical application risk. (orig./HW)
Authors:
Baur, L [1] 
  1. MVP GmbH, Muenchen (Germany)
Publication Date:
Dec 31, 1995
Product Type:
Conference
Report Number:
CONF-951120-
Reference Number:
SCA: 320202; PA: DE-97:0G0349; EDB-97:014108; SN: 97001718053
Resource Relation:
Conference: International conference on magnetically levitated systems, 14. internationale Tagung ueber Magnetschwebesysteme, Bremen (Germany), 26-29 Nov 1995; Other Information: PBD: 1995; Related Information: Is Part Of MAGLEV `95. 14th international conference on magnetically levitated systems. Proceedings; PB: 509 p.
Subject:
32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION; LEVITATED TRAINS; TEST FACILITIES; RAPID TRANSIT SYSTEMS; TESTING; FEDERAL REPUBLIC OF GERMANY
OSTI ID:
412482
Research Organizations:
Verband Deutscher Elektrotechniker e.V. (VDE), Frankfurt am Main (Germany); Energietechnische Gesellschaft im VDE, Frankfurt am Main (Germany)
Country of Origin:
Germany
Language:
English
Other Identifying Numbers:
Other: ISBN 3-8007-2155-4; TRN: DE97G0349
Submitting Site:
DE
Size:
pp. 103-112
Announcement Date:
Jan 20, 2004

Citation Formats

Baur, L. The Transrapid test facility between system development and system application. Germany: N. p., 1995. Web.
Baur, L. The Transrapid test facility between system development and system application. Germany.
Baur, L. 1995. "The Transrapid test facility between system development and system application." Germany.
@misc{etde_412482,
title = {The Transrapid test facility between system development and system application}
author = {Baur, L}
abstractNote = {In the development of a new rail technology, such as the magnetic levitation, there is - in contrast to the further development of the railway technology - not the possibility to use existing routes for the technical verification of the system technology until the application. Instead of this there are two possibilities: Cost-effective preliminary development on test beds and small test facilities up to a development stage which justifies the (relatively serious) risk of realising a service route early and to conclude the system trials and verification there; cost-intensive construction of a large-scale test facility which permits an application-related verification of all important system functions and thus creates the technical pre-requisites for a low-risk system application; The presentation deals with the technical requirements of the system at the test facility the challenges and chances linked to its realisation and adjustment to the rapidly progressing state-of-the-art and which this way opens up for a minimisation of the technical application risk. (orig./HW)}
place = {Germany}
year = {1995}
month = {Dec}
}