You need JavaScript to view this

Assessment of environmental issues using SUPER-OLADE/BID for comparing alternative electricity system expansion strategies. A case study for Colombia

Abstract

SUPER is a modular package for electricity generation expansion studies. It includes an environmental impacts module (EIM), originally developed by Interconexion Electrica S.A., the operator of the Colombian Power Pool, and adapted for use by utilities with a large hydro component. The paper describes the EIM and illustrates its application to a recent study. (author). 2 figs, 2 tabs.
Authors:
Campo, R; [1]  Angel, E; [2]  Gomez, D; Leon, O L [3] 
  1. Bogota (Colombia)
  2. Interconexion Electrica S.A., Medellin (Colombia)
  3. Empresa de Energia de Bogota, Bogota (Colombia)
Publication Date:
Jun 01, 1996
Product Type:
Conference
Report Number:
CONF-9510224-; STI/PUB-975.
Reference Number:
SCA: 290300; 290200; PA: AIX-28:005077; EDB-97:007364; SN: 97001713504
Resource Relation:
Conference: International symposium on electricity, health and the environment, Vienna (Austria), 16-19 Oct 1995; Other Information: PBD: Jun 1996; Related Information: Is Part Of Electricity, health and the environment: Comparative assessment in support of decision making. Proceedings of a symposium; PB: 857 p.; Proceedings series, Proceedings series.
Subject:
29 ENERGY PLANNING AND POLICY; POWER GENERATION; COST BENEFIT ANALYSIS; ENVIRONMENTAL IMPACTS; COST; ELECTRICITY; ENERGY POLICY; POPULATION RELOCATION; SOCIAL IMPACT; SOCIO-ECONOMIC FACTORS
OSTI ID:
410098
Research Organizations:
European Commission (CEC), Brussels (Belgium); United Nations Economic and Social Commission for Asia and the Pacific, Bangkok (Thailand); International Atomic Energy Agency, Vienna (Austria); International Inst. for Applied Systems Analysis, Laxenburg (Austria); Nuclear Energy Agency, 75 - Paris (France); Organization of the Petroleum Exporting Countries (OPEC), Vienna (Austria); United Nations Environmental Programme; United Nations Industrial Development Organization, Vienna (Austria); International Bank for Reconstruction and Development, Washington, DC (United States); World Meteorological Organization, Geneva (Switzerland)
Country of Origin:
IAEA
Language:
English
Other Identifying Numbers:
Journal ID: ISSN 0074-1884; Other: ISBN 92-0-102496-7; TRN: XA9642661005077
Submitting Site:
INIS
Size:
pp. 467-473
Announcement Date:
Jan 20, 2004

Citation Formats

Campo, R, Angel, E, Gomez, D, and Leon, O L. Assessment of environmental issues using SUPER-OLADE/BID for comparing alternative electricity system expansion strategies. A case study for Colombia. IAEA: N. p., 1996. Web.
Campo, R, Angel, E, Gomez, D, & Leon, O L. Assessment of environmental issues using SUPER-OLADE/BID for comparing alternative electricity system expansion strategies. A case study for Colombia. IAEA.
Campo, R, Angel, E, Gomez, D, and Leon, O L. 1996. "Assessment of environmental issues using SUPER-OLADE/BID for comparing alternative electricity system expansion strategies. A case study for Colombia." IAEA.
@misc{etde_410098,
title = {Assessment of environmental issues using SUPER-OLADE/BID for comparing alternative electricity system expansion strategies. A case study for Colombia}
author = {Campo, R, Angel, E, Gomez, D, and Leon, O L}
abstractNote = {SUPER is a modular package for electricity generation expansion studies. It includes an environmental impacts module (EIM), originally developed by Interconexion Electrica S.A., the operator of the Colombian Power Pool, and adapted for use by utilities with a large hydro component. The paper describes the EIM and illustrates its application to a recent study. (author). 2 figs, 2 tabs.}
place = {IAEA}
year = {1996}
month = {Jun}
}