You need JavaScript to view this

Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995

Abstract

The fourth refueling of the Unit 1 of Laguna Verde Nuclear Central was executed in the period of April 17 to May 31 of 1995 with the participation of a task group of 358 persons, included technicians and radiation protection officials and auxiliaries.The radiation monitoring and radiological surveillance to the workers was present length ways the refueling process and always attached to the ALARA criteria. The check points for radiation levels were set at: primary container or dry well, reloading floor, decontamination room (level 10.5), turbine building and radioactive waste building. To take advantage of the refueling process, rooms 203 and 213 of the turbine buildings were subject to inspection and maintenance work in valves, heaters and drains of heaters. Management aspects as personnel selection and training, costs, and countable are also presented in this report. Owing to the high cost of man-hour of the members of the ININ staff, its participation in the refueling process was in smaller number than years before. (Author).
Publication Date:
Dec 31, 1995
Product Type:
Miscellaneous
Report Number:
INIS-mf-14689
Reference Number:
SCA: 210100; PA: AIX-28:001865; EDB-97:006499; NTS-97:004614; SN: 97001712000
Resource Relation:
Other Information: PBD: 1995
Subject:
21 NUCLEAR POWER REACTORS AND ASSOCIATED PLANTS; LAGUNA VERDE-1 REACTOR; REACTOR FUELING; RADIATION PROTECTION; PERSONNEL MONITORING; ALARA; BATCH LOADING; CONTAINMENT BUILDINGS; FUEL RODS; MEXICO; PROGRESS REPORT; RADIATION MONITORING; REACTOR CHARGING MACHINES; REACTOR CORES; SPENT FUEL ELEMENTS
OSTI ID:
406888
Research Organizations:
Instituto Nacional de Investigaciones Nucleares, Mexico City (Mexico)
Country of Origin:
Mexico
Language:
Spanish
Other Identifying Numbers:
Other: ON: DE97606646; TRN: MX9500079001865
Availability:
INIS; OSTI as DE97606646
Submitting Site:
INIS
Size:
186 p.
Announcement Date:
Jan 07, 1997

Citation Formats

Mendoza L, A, Flores C, E, and Lopez G, C P.F. Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995. Mexico: N. p., 1995. Web.
Mendoza L, A, Flores C, E, & Lopez G, C P.F. Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995. Mexico.
Mendoza L, A, Flores C, E, and Lopez G, C P.F. 1995. "Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995." Mexico.
@misc{etde_406888,
title = {Report on the Fourth Reactor Refueling. Laguna Verde Nuclear Central. Unit 1. April-May 1995; Informe de la Cuarta Recarga de Combustible. Central Laguna Verde. Unidad 1. Abril-Mayo 1995}
author = {Mendoza L, A, Flores C, E, and Lopez G, C P.F.}
abstractNote = {The fourth refueling of the Unit 1 of Laguna Verde Nuclear Central was executed in the period of April 17 to May 31 of 1995 with the participation of a task group of 358 persons, included technicians and radiation protection officials and auxiliaries.The radiation monitoring and radiological surveillance to the workers was present length ways the refueling process and always attached to the ALARA criteria. The check points for radiation levels were set at: primary container or dry well, reloading floor, decontamination room (level 10.5), turbine building and radioactive waste building. To take advantage of the refueling process, rooms 203 and 213 of the turbine buildings were subject to inspection and maintenance work in valves, heaters and drains of heaters. Management aspects as personnel selection and training, costs, and countable are also presented in this report. Owing to the high cost of man-hour of the members of the ININ staff, its participation in the refueling process was in smaller number than years before. (Author).}
place = {Mexico}
year = {1995}
month = {Dec}
}