Abstract
The second Design Integration Workshop of IFMIF-CDA was held on May 20-27, 1996 at JAERI/Tokai. The primary objectives were, (1) to review and update the Baseline Design Concept, (2) to review the preliminary schedule and cost estimates, and (3) to establish the R and D needs for the next phase of the activity. This report presents a brief summary of the objective and results of the meeting. Detailed information on the agenda, attendees, and presentation material is included in the Appendix. (author)
Maekawa, Hiroshi;
[1]
Konishi, Satoshi
- Japan Atomic Energy Research Inst., Tokai, Ibaraki (Japan). Tokai Research Establishment
Citation Formats
Maekawa, Hiroshi, and Konishi, Satoshi.
Minutes of the second IFMIF-CDA design integration workshop. Proceedings.
Japan: N. p.,
1996.
Web.
Maekawa, Hiroshi, & Konishi, Satoshi.
Minutes of the second IFMIF-CDA design integration workshop. Proceedings.
Japan.
Maekawa, Hiroshi, and Konishi, Satoshi.
1996.
"Minutes of the second IFMIF-CDA design integration workshop. Proceedings."
Japan.
@misc{etde_391637,
title = {Minutes of the second IFMIF-CDA design integration workshop. Proceedings}
author = {Maekawa, Hiroshi, and Konishi, Satoshi}
abstractNote = {The second Design Integration Workshop of IFMIF-CDA was held on May 20-27, 1996 at JAERI/Tokai. The primary objectives were, (1) to review and update the Baseline Design Concept, (2) to review the preliminary schedule and cost estimates, and (3) to establish the R and D needs for the next phase of the activity. This report presents a brief summary of the objective and results of the meeting. Detailed information on the agenda, attendees, and presentation material is included in the Appendix. (author)}
place = {Japan}
year = {1996}
month = {Aug}
}
title = {Minutes of the second IFMIF-CDA design integration workshop. Proceedings}
author = {Maekawa, Hiroshi, and Konishi, Satoshi}
abstractNote = {The second Design Integration Workshop of IFMIF-CDA was held on May 20-27, 1996 at JAERI/Tokai. The primary objectives were, (1) to review and update the Baseline Design Concept, (2) to review the preliminary schedule and cost estimates, and (3) to establish the R and D needs for the next phase of the activity. This report presents a brief summary of the objective and results of the meeting. Detailed information on the agenda, attendees, and presentation material is included in the Appendix. (author)}
place = {Japan}
year = {1996}
month = {Aug}
}