You need JavaScript to view this

Fiscal 1997 for the upgrading of the Asia/Pacific coal development. Survey of the optimization of the coal transportation system in Indonesia; 1997 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia ni okeru sekitan yuso system saitekika chosa

Abstract

The paper summarized the results of Phase 1 and Phase 2 surveys conducted based on `Agreement on the comprehensive survey of a coal transportation system in South Sumatra` concluded between NEDO and the Ministry of Mine and Energy in Indonesia. In addition to the data collection and site surveys made in Phase 1, conducted in Phase 2 were determination of sites for harbors, determination of a scenario on coal transportation from coal mines to harbors, optimization of the coal transportation system, social/economic assessment, and proposal on the optimum transportation system. The results of the simulation were as follows: It is the most advantageous to transport coal from coal deposit area to harbor by rail and from harbor to Paiton by barge weighed over 10,000 tons. Tanjung Api Api is the most advantageous as harbor. The production scale which is profitable became more than 15 million tons. The present coal price of PTBA is $25/t arriving Suralaya. The coal in this case is said to be 5500kcal/kg in quality, and the coal of the same quality to this is only profitable. 8 refs., 68 figs., 104 tabs.
Publication Date:
Mar 01, 1998
Product Type:
Technical Report
Report Number:
ETDE/JP-99714264
Reference Number:
SCA: 013000; 015000; PA: JP-98:0B0248; EDB-99:004542; SN: 98002036099
Resource Relation:
Other Information: PBD: Mar 1998
Subject:
01 COAL, LIGNITE, AND PEAT; INDONESIA; COAL MINING; TRANSPORTATION SYSTEMS; COAL; OPTIMIZATION; DATA COMPILATION; TRAINS; SIMULATION; BARGES; HARBORS; SITE SELECTION
OSTI ID:
289524
Research Organizations:
New Energy and Industrial Technology Development Organization, Tokyo (Japan)
Country of Origin:
Japan
Language:
Japanese
Other Identifying Numbers:
Other: ON: DE99714264; TRN: JN98B0248
Availability:
Available from Office of Scientific and Technical Information, P.O.Box 1000, Oak Ridge Tennessee 37831, USA; OSTI as DE99714264
Submitting Site:
NEDO
Size:
292 p.
Announcement Date:
Jan 11, 1999

Citation Formats

None. Fiscal 1997 for the upgrading of the Asia/Pacific coal development. Survey of the optimization of the coal transportation system in Indonesia; 1997 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia ni okeru sekitan yuso system saitekika chosa. Japan: N. p., 1998. Web.
None. Fiscal 1997 for the upgrading of the Asia/Pacific coal development. Survey of the optimization of the coal transportation system in Indonesia; 1997 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia ni okeru sekitan yuso system saitekika chosa. Japan.
None. 1998. "Fiscal 1997 for the upgrading of the Asia/Pacific coal development. Survey of the optimization of the coal transportation system in Indonesia; 1997 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia ni okeru sekitan yuso system saitekika chosa." Japan.
@misc{etde_289524,
title = {Fiscal 1997 for the upgrading of the Asia/Pacific coal development. Survey of the optimization of the coal transportation system in Indonesia; 1997 nendo Asia Taiheiyo sekitan kaihatsu kodoka chosa. Indonesia ni okeru sekitan yuso system saitekika chosa}
author = {None}
abstractNote = {The paper summarized the results of Phase 1 and Phase 2 surveys conducted based on `Agreement on the comprehensive survey of a coal transportation system in South Sumatra` concluded between NEDO and the Ministry of Mine and Energy in Indonesia. In addition to the data collection and site surveys made in Phase 1, conducted in Phase 2 were determination of sites for harbors, determination of a scenario on coal transportation from coal mines to harbors, optimization of the coal transportation system, social/economic assessment, and proposal on the optimum transportation system. The results of the simulation were as follows: It is the most advantageous to transport coal from coal deposit area to harbor by rail and from harbor to Paiton by barge weighed over 10,000 tons. Tanjung Api Api is the most advantageous as harbor. The production scale which is profitable became more than 15 million tons. The present coal price of PTBA is $25/t arriving Suralaya. The coal in this case is said to be 5500kcal/kg in quality, and the coal of the same quality to this is only profitable. 8 refs., 68 figs., 104 tabs.}
place = {Japan}
year = {1998}
month = {Mar}
}