Abstract
Analysis of the power frequency temporary overvoltage. Analysis of switching surges - Fault imitation, closing and re closing, fault clearing. Analysis of lightning surges. Insulation design of 765 kV overhead transmission line. Insulation coordination of 765 kV gas insulated substation. Transient recovery voltage and high speed ground switch (author). 38 refs., 55 figs.
Kim, Jeong Boo;
Shim, Eung Bo;
[1]
Lee, Yong Han;
Youn, Jae Yeong;
Hwang, Chi Woo;
Jung, Dong Hak
[2]
- Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center
- Korea Electrotechnology Research Inst., Changwon (Korea, Republic of)
Citation Formats
Kim, Jeong Boo, Shim, Eung Bo, Lee, Yong Han, Youn, Jae Yeong, Hwang, Chi Woo, and Jung, Dong Hak.
A study on the insulation coordination of 765 kV system.
Korea, Republic of: N. p.,
1995.
Web.
Kim, Jeong Boo, Shim, Eung Bo, Lee, Yong Han, Youn, Jae Yeong, Hwang, Chi Woo, & Jung, Dong Hak.
A study on the insulation coordination of 765 kV system.
Korea, Republic of.
Kim, Jeong Boo, Shim, Eung Bo, Lee, Yong Han, Youn, Jae Yeong, Hwang, Chi Woo, and Jung, Dong Hak.
1995.
"A study on the insulation coordination of 765 kV system."
Korea, Republic of.
@misc{etde_267488,
title = {A study on the insulation coordination of 765 kV system}
author = {Kim, Jeong Boo, Shim, Eung Bo, Lee, Yong Han, Youn, Jae Yeong, Hwang, Chi Woo, and Jung, Dong Hak}
abstractNote = {Analysis of the power frequency temporary overvoltage. Analysis of switching surges - Fault imitation, closing and re closing, fault clearing. Analysis of lightning surges. Insulation design of 765 kV overhead transmission line. Insulation coordination of 765 kV gas insulated substation. Transient recovery voltage and high speed ground switch (author). 38 refs., 55 figs.}
place = {Korea, Republic of}
year = {1995}
month = {Dec}
}
title = {A study on the insulation coordination of 765 kV system}
author = {Kim, Jeong Boo, Shim, Eung Bo, Lee, Yong Han, Youn, Jae Yeong, Hwang, Chi Woo, and Jung, Dong Hak}
abstractNote = {Analysis of the power frequency temporary overvoltage. Analysis of switching surges - Fault imitation, closing and re closing, fault clearing. Analysis of lightning surges. Insulation design of 765 kV overhead transmission line. Insulation coordination of 765 kV gas insulated substation. Transient recovery voltage and high speed ground switch (author). 38 refs., 55 figs.}
place = {Korea, Republic of}
year = {1995}
month = {Dec}
}